Permit Application Status

PRCOM20191614


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20191614
Building Permit - Commercial
Certificate of Occupancy
METCALF BANK
NEW COMMERCIAL
SENIOR LIVING APARTMENTS WITH INDEPENDENT LIVING, ASSISTED LIVING, AND MEMORY CARE - INCLUDES POOL AND AMENITIES Foundation permit: PRCOM20193058
06/21/2019
09/28/2020
02/02/2020
03/07/2023
Locations
Contacts
O'REILLY BUILD LLC, Address:5051 S NATIONAL AVE STE 4-110, Phone:(417) 862-9500  
ALDEN PLUMBING & MECHANICAL LLC, Address:5600 W 95TH ST STE307, Phone:(816) 666-8662  
CLAYCO ELECTRIC COMPANY, Address:319 E 11TH AVE, Phone:(816) 221-0593  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
SWD ARCHITECTS - PAUL STARK, Address:315 NICHOLS RD, SUITE 228, Phone:(816) 531-1698  
OLSSON ASSOCIATES, Address:1301 BURLINGTON, SUITE 100, Phone:(816) 361-1171  
METCALF BANK, Address:609 NE 291 HWY  
Drew@oreillybuild.com, Address:Drew@oreillybuild.com  
LEES SUMMIT SENIOR COMMUNITY LLC, Address:5051 S NATIONAL AVE STE 4-100  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 06/08/2021 06/08/2021
Michael Weissenbach
Misc
Corrective Action Required
06/08/2021

(Informational Purposes) Added sprinklers to Porte Cochere.
Health Department Review Approved 09/30/2020
Joe Frogge
kitchen approved - 10/8/19 pool approved - 9/30/20
Building Plan Review Approved with Conditions 08/21/2019 09/28/2020
Joe Frogge
Final Development Plan
Resolved
11/04/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 8/6/19 - Acknowledged in letter.
License Tax Application
Resolved
09/28/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 8/6/19 - Acknowledged in letter.
Elevator Equipment Permit
Corrective Action Required
08/14/2019

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 8/6/19 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
08/14/2019

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes. 8/6/19 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
08/14/2019

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 8/6/19 - Acknowledged in letter.
Engineered truss package
Corrective Action Required
08/14/2019

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide floor and roof truss packages or request deferral. 8/6/19 - Deferred per request.
Bldg - Accessibility - Toilet and bathing facilities 1109.2
Resolved
08/19/2019

2018 IBC 1109.2 – Toilet and bathing facilities. Each toilet room and bathing room shall be accessible. Where a floor level is not required to be connected by an accessible route, the only toilet rooms or bathing rooms provided within the facility shall not be located on the inaccessible floor. Except as provided for in Sections 1109.2.2 and 1109.2.3, at least one of each type of fixture, element, control or dispenser in each accessible toilet room and bathing room shall be accessible. (See code section for possible exceptions.) Action required: All public and/or employee restrooms to be fully accessible. 67" turning radius, 60" behind water closet, grab bars, etc. (multiple locations of restrooms accessed from common corridors) 8/6/19 - 60" clearance at wall behind water closets not addressed.
Health Dept Review
Resolved
10/08/2019

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 8/6/19 - Acknowledged in letter.
Health Dept Inspection
Corrective Action Required
08/14/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 8/6/19 - Acknowledged in letter.
Miscellaneous Correction
Resolved
08/19/2019

2018 IBC 1107.5 Group I-1. Accessible units and Type B units shall be provided in Group I-1 occupancies in accordance with Sections 1107-5.1.1 and 1107.5.1.2. Address the following for MCAL Accessible units: - - 60" clearance behind water closets per 1102.11.2 & 604.3.1. 8/6/19 - Not addressed. - - -
Accessibility - Fixed sidewall grab bars 604.5.1
Resolved
08/19/2019

ICC A117.1-2017 Section 1104.11.1 Grab Bar and Shower Seat Reinforcement. Reinforcement shall be provided for the future installation of grab bars and shower seats at water closets, bathtubs, and shower compartments. Where walls are located to permit the installation of grab bars and seats complying with Section 604.5 at water closets; grab bars complying with Section 607.4 at bathtubs; and for grab bars and shower seats complying with Sections, 608.3, 608.2.1.3, 608.2.2.3 and 608.2.3.2 at shower compartments; reinforcement shall be provided for the future installation of grab bars and seats complying with those requirements. (see code for exceptions) Action required: Provide vertical side grab bar (or reinforcement) at all Type B units. MCAL & IL 8/6/19 - Not addressed.
Miscellaneous Correction
Corrective Action Required
08/14/2019

2018 IBC 3002.3 Emergency signs. An approved pictorial sign of a standardized design shall be posted adjacent to each elevator call station on all floors instructing occupants to use the exit stairways and not to use the elevators in case of fire. The sign shall read: IN CASE OF FIRE, ELEVATORS ARE OUT OF SERVICE. USE EXIT STAIRS. (see code for exceptions) Action required: Comment is for informational purposes. To be field verified at inspections. 8/6/19 - Acknowledged in letter.
Miscellaneous Correction
Resolved
09/30/2020

Pool design not included in submittal. Action required: Provide complete pool design or request deferral. 8/6/19 - Deferred per request.
Miscellaneous Correction
Resolved
08/19/2019

2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: Unable to locate MSB switchgear (or other panels 800 amps and above) on drawings to verify. Please clarify. IL E5.1 conflicts with 01/IL E2.1 room numbers. 8/6/19 - Door out of room 165 required to have panic hardware. (referenced letter from Hoss & Brown not found in submittal)
Misc
Resolved
08/19/2019

2017 NEC 230.72 Grouping of disconnects. (A) General. The two to six disconnects as permitted in 230.71 shall be grouped. Each disconnect shall be marked to indicate the load served. (see code for exception) 230.2 limits number of services per building or structure to one. Action required: Provide information on drawings to demonstrate compliance. 8/6/19 - Not addressed (referenced letter from Hoss & Brown not found in submittal)
Sprinkler Plan Review Released for Construction 05/04/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
05/04/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a Hydrostatic Test and Alarm/Water flow Test.
Miscellaneous Correction
Corrective Action Required
05/04/2020

(Action Required) Signage above FDC to state "Apartment FDC pump at 175" Signage above FDC for Memory/Assisted Care to state "Memory/Assisted" One sprinkler head in Unit 2018 needs to cover the opposite room.
Alarm Plan Review Released for Construction 02/20/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
02/20/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule alarm testing.
Misc
Corrective Action Required
02/20/2020

(Informational Purposes) Update records showing 2018 I-Series and NFPA 2016
Licensed Contractors Approved 08/21/2019 12/31/2019
Joe Frogge
LC - General Contractor
Resolved
12/31/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 8/6/19 - Acknowledged in letter.
LC - MEP Subs
Resolved
12/31/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 8/6/19 - Acknowledged in letter.
Final Development Plan Review Approved 11/04/2019
Joe Frogge
Fire Plan Review Approved with Conditions 08/21/2019 08/16/2019
Michael Weissenbach
Posting of occupant load
Corrective Action Required
08/14/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Add occupant load signs to pool, dining, fitness center and theatre
Construction documents for fire alarm systems
Corrective Action Required
08/14/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of engineered stamped plans for fire alarm system.
Hazardous material identification
Corrective Action Required
08/14/2019

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. (Verified At Inspection) Label generator/fuel cell Provide information regarding the use and storage of oxygen in assisted living and memory care
Address numbers required
Corrective Action Required
08/14/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
08/14/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Action Required) Order three Knox Boxes. Two for the exterior of the building, the other for the elevator. Place your order through Knoxbox.com Note: Two boxes required for the exterior due to two separate sprinkler rooms.
Construction documents - Fire protection systems
Corrective Action Required
08/14/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of engineered stamped plans for fire sprinkler system. Note: 4 inch storz connection for FDC. Class one standpipes in stairwells
Installation acceptance testing
Corrective Action Required
08/14/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a test.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
08/14/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection)
Stairway identification signs
Corrective Action Required
08/14/2019

2018 IFC (B) 1023.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open an dclosed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level. (Verified At Inspection)
Duct smoke detectors
Corrective Action Required
08/14/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Verified At Inspection) 2,000 CFM or greater will need to have duct detection.
Illumination required
Corrective Action Required
08/14/2019

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Verified At Inspection) Provide emergency exterior illumination at all exits.
Building Plan Review Rejected 08/06/2019 08/06/2019
Joe Frogge
Final Development Plan
Corrective Action Required
08/05/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 8/6/19 - Acknowledged in letter.
License Tax Application
Corrective Action Required
08/05/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 8/6/19 - Acknowledged in letter.
Miscellaneous Correction
Resolved
08/06/2019

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Elevator Equipment Permit
Corrective Action Required
08/05/2019

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 8/6/19 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
08/05/2019

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes. 8/6/19 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
08/05/2019

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 8/6/19 - Acknowledged in letter.
Engineered truss package
Corrective Action Required
08/05/2019

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide floor and roof truss packages or request deferral. 8/6/19 - Deferred per request.
Miscellaneous Correction
Resolved
08/06/2019

Inadequate information to complete review. Provide the following: - Complete construction details for shaft wall 'E' U905. - Complete construction details and UL designations for rated horizontal assemblies. - Complete construction details for exterior wall U357.
Miscellaneous Correction
Resolved
08/06/2019

2018 706.6 Vertical continuity. Fire walls shall extend from the foundation to a termination point not less than 30 inches above both adjacent roofs. Exceptions: (see code for complete list) 4. In buildings of Types III, IV and V construction, walls shall be permitted to terminate at the underside of combustible roof sheathing or decks provide that all of the following are met: (see code for complete list) 4.1. Roof openings are not less than 4 feet from the fire wall. Action required: Relocate openings through roofs within 4' of all fire walls.
Bldg - Accessibility - Toilet and bathing facilities 1109.2
Corrective Action Required
08/05/2019

2018 IBC 1109.2 – Toilet and bathing facilities. Each toilet room and bathing room shall be accessible. Where a floor level is not required to be connected by an accessible route, the only toilet rooms or bathing rooms provided within the facility shall not be located on the inaccessible floor. Except as provided for in Sections 1109.2.2 and 1109.2.3, at least one of each type of fixture, element, control or dispenser in each accessible toilet room and bathing room shall be accessible. (See code section for possible exceptions.) Action required: All public and/or employee restrooms to be fully accessible. 67" turning radius, 60" behind water closet, grab bars, etc. (multiple locations of restrooms accessed from common corridors) 8/6/19 - 60" clearance at wall behind water closets not addressed.
Health Dept Review
Corrective Action Required
08/05/2019

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 8/6/19 - Acknowledged in letter.
Health Dept Inspection
Corrective Action Required
08/05/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 8/6/19 - Acknowledged in letter.
Miscellaneous Correction
Corrective Action Required
08/05/2019

2018 IBC 1107.5 Group I-1. Accessible units and Type B units shall be provided in Group I-1 occupancies in accordance with Sections 1107-5.1.1 and 1107.5.1.2. Address the following for MCAL Accessible units: - - 60" clearance behind water closets per 1102.11.2 & 604.3.1. 8/6/19 - Not addressed. - - -
Bldg - Toilet room wall finish 1210.2.2
Resolved
08/06/2019

1209.2.2 Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finishes for MCAL Restroom #47.
Miscellaneous Correction
Resolved
08/06/2019

2018 IBC 420.8 Group I-1 cooking facilities. In Group I-1 occupancies, rooms or spaces that contain cooking facilities with domestic cooking appliances shall be in accordance with all of the following criteria: (see code for 9 specific requirements) Action required: Modify designs to demonstrate compliance. (re: MC Kitchen #25 & AL Demo Kitchen #175)
Accessibility - Fixed sidewall grab bars 604.5.1
Corrective Action Required
08/05/2019

ICC A117.1-2017 Section 1104.11.1 Grab Bar and Shower Seat Reinforcement. Reinforcement shall be provided for the future installation of grab bars and shower seats at water closets, bathtubs, and shower compartments. Where walls are located to permit the installation of grab bars and seats complying with Section 604.5 at water closets; grab bars complying with Section 607.4 at bathtubs; and for grab bars and shower seats complying with Sections, 608.3, 608.2.1.3, 608.2.2.3 and 608.2.3.2 at shower compartments; reinforcement shall be provided for the future installation of grab bars and seats complying with those requirements. (see code for exceptions) Action required: Provide vertical side grab bar (or reinforcement) at all Type B units. MCAL & IL 8/6/19 - Not addressed.
Miscellaneous Correction
Resolved
08/06/2019

ICC A117.1-2017 Section 1104.1.1. Clear floor space. For Type B units, clear floor spaces shall be 48 inches minimum in length and 30 inches minimum in width. Action required: Provide minimum clear floor space at Studio Type D lavatories.
Miscellaneous Correction
Resolved
08/06/2019

2018 IBC 716.2.3 Fire doors. Fire doors installed within a fire door assembly shall meet the fire rating indicated in Table 716.1(2). Actions required: - Doors in MCAL 2 hour Fire Walls to be 90 minute rated. - Doors at Interior Exit Stairways to be 60 minute rated.
Plan Submittal 2012 Codes
Resolved
08/06/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Update code references on Sheet S0.1. (refers to 2012 IBC in 2 places)
Miscellaneous Correction
Resolved
08/06/2019

2018 IBC 1023.2 Construction. Enclosures for interior exit stairways and ramps shall be constructed as fire barriers in accordance with Section 707 or horizontal assemblies constructed in accordance with Section 711, or both. Interior exit stairway and ramp enclosures shall have a fire-resistance rating of not less than 2 hours where connecting four stories or more and not less than 1 hour where connecting less than four stories. The number of stories connected by the interior exit stairways or ramps shall include any basements, but not any mezzanines. Interior exit stairways and ramps shall have a fire-resistance rating not less than the floor assembly penetrated, but need not exceed 2 hours. (see code for exceptions) Action required: Updated design to show Interior Exit Stairway walls to be constructed as Fire Barriers.
Miscellaneous Correction
Corrective Action Required
08/05/2019

2018 IBC 3002.3 Emergency signs. An approved pictorial sign of a standardized design shall be posted adjacent to each elevator call station on all floors instructing occupants to use the exit stairways and not to use the elevators in case of fire. The sign shall read: IN CASE OF FIRE, ELEVATORS ARE OUT OF SERVICE. USE EXIT STAIRS. (see code for exceptions) Action required: Comment is for informational purposes. To be field verified at inspections. 8/6/19 - Acknowledged in letter.
Miscellaneous Correction
Resolved
08/06/2019

2018 IBC 3002.1 Hoistway enclosure protection. Elevator, dumbwaiter and other hoistway enclosures shall be shaft enclosures complying with Sections 712 and 713. Action required: Updated design to show elevator shaft walls to be constructed as Fire Barriers.
Miscellaneous Correction
Resolved
08/06/2019

2018 IBC 404.6 Enclosures of atriums. Atrium spaces shall be separated from adjacent spaces by a 1-hour fire barrier constructed in accordance with Section 707 or a horizontal assembly constructed in accordance with Section 711, or both. (see code for exceptions) Action required: Updated design to show atrium walls to be constructed as Fire Barriers.
Miscellaneous Correction
Resolved
08/06/2019

City of Lee's Summit Code of Ordinances - Article II, Division 2, Sections 28-61 thru 28-65. Massage Therapists and Massage Facilities. Provide information and/or design changes to demonstrate compliance with adopted ordinance at Massage Room #2043; specifically as applies to: - mold resistant paint - lockable doors - dressing rooms - lockers - door swings
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Resolved
08/06/2019

ICC A117.1-2017 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Provide minimum 18" clearance at latch side of door at Laundry Room #3038A.
Bldg - Construction classification 602.1
Resolved
08/06/2019

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: All columns to be fire rated per IBC Table 601.
Miscellaneous Correction
Resolved
08/06/2019

2018 IBC 1107.6.2 Group R-2. Accessible units, Type A units and Type B units shall be provided in Group R-2 occupancies in accordance with Sections 1107.6.2.1 thru 1107.6.2.3. Address the following for IL Type A units: - 67" turning space per 1103.3.2. (see units G, H, J & K restrooms and closets) - Vertical side grab bar per 1103.11.1 - 60" clearance behind water closets per 1103.2.4.2 - Minimum clear space at showers per 1103.11.2.5.2.
Miscellaneous Correction
Resolved
08/06/2019

2018 IBC 1107.6.2 Group R-2. Accessible units, Type A units and Type B units shall be provided in Group R-2 occupancies in accordance with Sections 1107.6.2.1 thru 1107.6.2.3. Address the following for IL Type B units: - Reach ranges per 308 at stackable washer/dryers - Vertical side grab bars or reinforcement at water closets per 1104.11.1
Mech - Dryer exhaust - Specified length 504.6.4.1
Resolved
08/06/2019

2018 IMC 504.8.4 Duct Length. The maximum allowable exhaust duct length shall be determined by one of the methods specified in Section 504.8.4.1 through 504.8.4.3. Action required: Shorten clothes dryer exhaust ducts or comply with one approved alternates.
Miscellaneous Correction
Corrective Action Required
08/05/2019

Pool design not included in submittal. Action required: Provide complete pool design or request deferral. 8/6/19 - Deferred per request.
Miscellaneous Correction
Resolved
08/06/2019

2018 IPC 1101.3 Prohibited drainage. (as amended by LSCO 7-413) Sanitary sewer systems shall be designed, built and maintained in such a manner to prevent all storm or ground water from draining, discharging or entering into the sanitary sewer system. Connection of sump pumps, foundation drains, yard drains, gutter downspouts and any other storm water drainage receptacle(s) or system(s) are specifically prohibited from being connected to the sanitary sewer system. Action required: Elevator sump pump must discharge to storm or daylight, not to sanitary sewer/drain.
Bldg - Emergency power for illumination 1006.3
Resolved
08/06/2019

2018 IBC 1008.3 – Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency lighting on exterior side of all exits.
Miscellaneous Correction
Resolved
08/06/2019

2018 IBC Exit Signs 1013.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Relocate exit sign/light in Corridor #1036 to light up with exit door.
Miscellaneous Correction
Resolved
08/06/2019

2017 NEC Article 210.52 (A) General Provisions. In every kitchen, family room, dining room, living room, parlor, library, den, sunroom, bedroom, recreation room, or similar room or area of dwelling units, receptacle outlets shall be installed in accordance with the general provisions specified in 210.52(A)(1) through (A)(4). (1) Spacing. Receptacles shall be installed such that no point measured horizontally along the floor line of any wall space is more than 6 feet from a receptacle outlet. (2) Wall Space. As used by this section, a wall space shall include the following: 1. Any space 2 feet or more in width (including space measured around corners) and unbroken along the floor line by doorways and similar openings, fireplaces, and fixed cabinets that do not have countertops or similar work surfaces. 2. The space occupied by fixed panels in walls, excluding sliding panels. 3. The space afforded by fixed room dividers, such as freestanding bar-type counters or railings. (3) Floor Receptacles. Receptacle outlets in or on floors shall not be counted as part of the required number of receptacle outlets unless located within 18 inches of the wall. (4) Countertop and Similar Work Surface Receptacle Outlets. Receptacles installed for countertop and similar work surfaces as specified in 210.52(C) shall not be considered as the receptacle outlets required by 210.52(A). Action required: Provide additional receptacles in living units where wall space is 2' or more. (see 03/E4.2 - possibly more - verify)
Miscellaneous Correction
Corrective Action Required
08/05/2019

2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: Unable to locate MSB switchgear (or other panels 800 amps and above) on drawings to verify. Please clarify. IL E5.1 conflicts with 01/IL E2.1 room numbers. 8/6/19 - Door out of room 165 required to have panic hardware. (referenced letter from Hoss & Brown not found in submittal)
Misc
Corrective Action Required
08/05/2019

2017 NEC 230.72 Grouping of disconnects. (A) General. The two to six disconnects as permitted in 230.71 shall be grouped. Each disconnect shall be marked to indicate the load served. (see code for exception) 230.2 limits number of services per building or structure to one. Action required: Provide information on drawings to demonstrate compliance. 8/6/19 - Not addressed (referenced letter from Hoss & Brown not found in submittal)
Licensed Contractors Rejected 08/06/2019 08/06/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
08/05/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 8/6/19 - Acknowledged in letter.
LC - MEP Subs
Corrective Action Required
08/05/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 8/6/19 - Acknowledged in letter.
Special Inspections Review Approved 08/06/2019
Joe Frogge
Fire Plan Review Approved with Conditions 08/12/2019 08/05/2019
Joe Frogge
Posting of occupant load
Corrective Action Required
08/05/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Add occupant load signs to pool, dining, fitness center and theatre
Construction documents for fire alarm systems
Corrective Action Required
08/05/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of engineered stamped plans for fire alarm system.
Hazardous material identification
Corrective Action Required
08/05/2019

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. (Verified At Inspection) Label generator/fuel cell Provide information regarding the use and storage of oxygen in assisted living and memory care
Address numbers required
Corrective Action Required
08/05/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
08/05/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Action Required) Order three Knox Boxes. Two for the exterior of the building, the other for the elevator. Place your order through Knoxbox.com Note: Two boxes required for the exterior due to two separate sprinkler rooms.
Construction documents - Fire protection systems
Corrective Action Required
08/05/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of engineered stamped plans for fire sprinkler system. Note: 4 inch storz connection for FDC. Class one standpipes in stairwells
Installation acceptance testing
Corrective Action Required
08/05/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a test.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
08/05/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection)
Stairway identification signs
Corrective Action Required
08/05/2019

2018 IFC (B) 1023.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open an dclosed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level. (Verified At Inspection)
Duct smoke detectors
Corrective Action Required
08/05/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Verified At Inspection) 2,000 CFM or greater will need to have duct detection.
Illumination required
Corrective Action Required
08/05/2019

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Verified At Inspection) Provide emergency exterior illumination at all exits.
Fire Plan Review Approved with Conditions 08/05/2019
Michael Weissenbach
Posting of occupant load
Corrective Action Required
08/05/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Add occupant load signs to pool, dining, fitness center and theatre
Construction documents for fire alarm systems
Corrective Action Required
08/05/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of engineered stamped plans for fire alarm system.
Hazardous material identification
Corrective Action Required
08/05/2019

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. (Verified At Inspection) Label generator/fuel cell Provide information regarding the use and storage of oxygen in assisted living and memory care
Address numbers required
Corrective Action Required
08/05/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
08/05/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Action Required) Order three Knox Boxes. Two for the exterior of the building, the other for the elevator. Place your order through Knoxbox.com Note: Two boxes required for the exterior due to two separate sprinkler rooms.
Construction documents - Fire protection systems
Corrective Action Required
08/05/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of engineered stamped plans for fire sprinkler system. Note: 4 inch storz connection for FDC. Class one standpipes in stairwells
Installation acceptance testing
Corrective Action Required
08/05/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a test.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
08/05/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection)
Misc
Resolved
08/05/2019

(Action Required) 1. Minimum height for canopy will need to be 13 feet 6 inches. 2. Required fire flow shall be provided. 3. Hydrants will need to be in working order before going vertical. 4. All water improvements will need to be in place. 5. All weather surface must be in place for fire dept. access.
Stairway identification signs
Corrective Action Required
08/05/2019

2018 IFC (B) 1023.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open an dclosed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level. (Verified At Inspection)
Duct smoke detectors
Corrective Action Required
08/05/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Verified At Inspection) 2,000 CFM or greater will need to have duct detection.
Illumination required
Corrective Action Required
08/05/2019

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Verified At Inspection) Provide emergency exterior illumination at all exits.
Building Plan Review Rejected 07/08/2019 07/02/2019
Joe Frogge
Final Development Plan
Corrective Action Required
07/02/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
License Tax Application
Corrective Action Required
07/02/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
07/02/2019

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Elevator Equipment Permit
Corrective Action Required
07/02/2019

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
07/02/2019

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
07/02/2019

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Engineered truss package
Corrective Action Required
07/02/2019

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide floor and roof truss packages or request deferral.
Miscellaneous Correction
Corrective Action Required
07/02/2019

Inadequate information to complete review. Provide the following: - Complete construction details for shaft wall 'E' U905. - Complete construction details and UL designations for rated horizontal assemblies. - Complete construction details for exterior wall U357.
Miscellaneous Correction
Corrective Action Required
07/02/2019

2018 706.6 Vertical continuity. Fire walls shall extend from the foundation to a termination point not less than 30 inches above both adjacent roofs. Exceptions: (see code for complete list) 4. In buildings of Types III, IV and V construction, walls shall be permitted to terminate at the underside of combustible roof sheathing or decks provide that all of the following are met: (see code for complete list) 4.1. Roof openings are not less than 4 feet from the fire wall. Action required: Relocate openings through roofs within 4' of all fire walls.
Bldg - Accessibility - Toilet and bathing facilities 1109.2
Corrective Action Required
07/02/2019

2018 IBC 1109.2 – Toilet and bathing facilities. Each toilet room and bathing room shall be accessible. Where a floor level is not required to be connected by an accessible route, the only toilet rooms or bathing rooms provided within the facility shall not be located on the inaccessible floor. Except as provided for in Sections 1109.2.2 and 1109.2.3, at least one of each type of fixture, element, control or dispenser in each accessible toilet room and bathing room shall be accessible. (See code section for possible exceptions.) Action required: All public and/or employee restrooms to be fully accessible. 67" turning radius, 60" behind water closet, grab bars, etc. (multiple locations of restrooms accessed from common corridors)
Health Dept Review
Corrective Action Required
07/02/2019

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
07/02/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
07/02/2019

2018 IBC 1107.5 Group I-1. Accessible units and Type B units shall be provided in Group I-1 occupancies in accordance with Sections 1107-5.1.1 and 1107.5.1.2. Address the following for MCAL Accessible units: - 67" turning spaces in all rooms per 1102.3.2. - 60" clearance behind water closets per 1102.11.2 & 604.3.1. - Vertical side grab bar at water closets per 1102.11.2 & 604.5.1.2. - Shower seats per 1102.11.2, 608..2 & 610.3. - Shower Transfer clearances per 1102.11.2 & 68.2.1.2.1.
Bldg - Toilet room wall finish 1210.2.2
Corrective Action Required
07/02/2019

1209.2.2 Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finishes for MCAL Restroom #47.
Miscellaneous Correction
Corrective Action Required
07/02/2019

2018 IBC 420.8 Group I-1 cooking facilities. In Group I-1 occupancies, rooms or spaces that contain cooking facilities with domestic cooking appliances shall be in accordance with all of the following criteria: (see code for 9 specific requirements) Action required: Modify designs to demonstrate compliance. (re: MC Kitchen #25 & AL Demo Kitchen #175)
Accessibility - Fixed sidewall grab bars 604.5.1
Corrective Action Required
07/02/2019

ICC A117.1-2017 Section 1104.11.1 Grab Bar and Shower Seat Reinforcement. Reinforcement shall be provided for the future installation of grab bars and shower seats at water closets, bathtubs, and shower compartments. Where walls are located to permit the installation of grab bars and seats complying with Section 604.5 at water closets; grab bars complying with Section 607.4 at bathtubs; and for grab bars and shower seats complying with Sections, 608.3, 608.2.1.3, 608.2.2.3 and 608.2.3.2 at shower compartments; reinforcement shall be provided for the future installation of grab bars and seats complying with those requirements. (see code for exceptions) Action required: Provide vertical side grab bar (or reinforcement) at all Type B units. MCAL & IL
Miscellaneous Correction
Corrective Action Required
07/03/2019

ICC A117.1-2017 Section 1104.1.1. Clear floor space. For Type B units, clear floor spaces shall be 48 inches minimum in length and 30 inches minimum in width. Action required: Provide minimum clear floor space at Studio Type D lavatories.
Miscellaneous Correction
Corrective Action Required
07/03/2019

2018 IBC 716.2.3 Fire doors. Fire doors installed within a fire door assembly shall meet the fire rating indicated in Table 716.1(2). Actions required: - Doors in MCAL 2 hour Fire Walls to be 90 minute rated. - Doors at Interior Exit Stairways to be 60 minute rated.
Plan Submittal 2012 Codes
Corrective Action Required
07/03/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Update code references on Sheet S0.1. (refers to 2012 IBC in 2 places)
Miscellaneous Correction
Corrective Action Required
07/03/2019

2018 IBC 1023.2 Construction. Enclosures for interior exit stairways and ramps shall be constructed as fire barriers in accordance with Section 707 or horizontal assemblies constructed in accordance with Section 711, or both. Interior exit stairway and ramp enclosures shall have a fire-resistance rating of not less than 2 hours where connecting four stories or more and not less than 1 hour where connecting less than four stories. The number of stories connected by the interior exit stairways or ramps shall include any basements, but not any mezzanines. Interior exit stairways and ramps shall have a fire-resistance rating not less than the floor assembly penetrated, but need not exceed 2 hours. (see code for exceptions) Action required: Updated design to show Interior Exit Stairway walls to be constructed as Fire Barriers.
Miscellaneous Correction
Corrective Action Required
07/03/2019

2018 IBC 3002.3 Emergency signs. An approved pictorial sign of a standardized design shall be posted adjacent to each elevator call station on all floors instructing occupants to use the exit stairways and not to use the elevators in case of fire. The sign shall read: IN CASE OF FIRE, ELEVATORS ARE OUT OF SERVICE. USE EXIT STAIRS. (see code for exceptions) Action required: Comment is for informational purposes. To be field verified at inspections.
Miscellaneous Correction
Corrective Action Required
07/03/2019

2018 IBC 3002.1 Hoistway enclosure protection. Elevator, dumbwaiter and other hoistway enclosures shall be shaft enclosures complying with Sections 712 and 713. Action required: Updated design to show elevator shaft walls to be constructed as Fire Barriers.
Miscellaneous Correction
Corrective Action Required
07/03/2019

2018 IBC 404.6 Enclosures of atriums. Atrium spaces shall be separated from adjacent spaces by a 1-hour fire barrier constructed in accordance with Section 707 or a horizontal assembly constructed in accordance with Section 711, or both. (see code for exceptions) Action required: Updated design to show atrium walls to be constructed as Fire Barriers.
Miscellaneous Correction
Corrective Action Required
07/03/2019

City of Lee's Summit Code of Ordinances - Article II, Division 2, Sections 28-61 thru 28-65. Massage Therapists and Massage Facilities. Provide information and/or design changes to demonstrate compliance with adopted ordinance at Massage Room #2043; specifically as applies to: - mold resistant paint - lockable doors - dressing rooms - lockers - door swings
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Corrective Action Required
07/03/2019

ICC A117.1-2017 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Provide minimum 18" clearance at latch side of door at Laundry Room #3038A.
Bldg - Construction classification 602.1
Corrective Action Required
07/03/2019

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: All columns to be fire rated per IBC Table 601.
Miscellaneous Correction
Corrective Action Required
07/03/2019

2018 IBC 1107.6.2 Group R-2. Accessible units, Type A units and Type B units shall be provided in Group R-2 occupancies in accordance with Sections 1107.6.2.1 thru 1107.6.2.3. Address the following for IL Type A units: - 67" turning space per 1103.3.2. (see units G, H, J & K restrooms and closets) - Vertical side grab bar per 1103.11.1 - 60" clearance behind water closets per 1103.2.4.2 - Minimum clear space at showers per 1103.11.2.5.2.
Miscellaneous Correction
Corrective Action Required
07/03/2019

2018 IBC 1107.6.2 Group R-2. Accessible units, Type A units and Type B units shall be provided in Group R-2 occupancies in accordance with Sections 1107.6.2.1 thru 1107.6.2.3. Address the following for IL Type B units: - Reach ranges per 308 at stackable washer/dryers - Vertical side grab bars or reinforcement at water closets per 1104.11.1
Mech - Dryer exhaust - Specified length 504.6.4.1
Corrective Action Required
07/03/2019

2018 IMC 504.8.4 Duct Length. The maximum allowable exhaust duct length shall be determined by one of the methods specified in Section 504.8.4.1 through 504.8.4.3. Action required: Shorten clothes dryer exhaust ducts or comply with one approved alternates.
Miscellaneous Correction
Corrective Action Required
07/03/2019

Pool design not included in submittal. Action required: Provide complete pool design or request deferral.
Miscellaneous Correction
Corrective Action Required
07/03/2019

2018 IPC 1101.3 Prohibited drainage. (as amended by LSCO 7-413) Sanitary sewer systems shall be designed, built and maintained in such a manner to prevent all storm or ground water from draining, discharging or entering into the sanitary sewer system. Connection of sump pumps, foundation drains, yard drains, gutter downspouts and any other storm water drainage receptacle(s) or system(s) are specifically prohibited from being connected to the sanitary sewer system. Action required: Elevator sump pump must discharge to storm or daylight, not to sanitary sewer/drain.
Bldg - Emergency power for illumination 1006.3
Corrective Action Required
07/03/2019

2018 IBC 1008.3 – Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency lighting on exterior side of all exits.
Miscellaneous Correction
Corrective Action Required
07/03/2019

2018 IBC Exit Signs 1013.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Relocate exit sign/light in Corridor #1036 to light up with exit door.
Miscellaneous Correction
Corrective Action Required
07/03/2019

2017 NEC Article 210.52 (A) General Provisions. In every kitchen, family room, dining room, living room, parlor, library, den, sunroom, bedroom, recreation room, or similar room or area of dwelling units, receptacle outlets shall be installed in accordance with the general provisions specified in 210.52(A)(1) through (A)(4). (1) Spacing. Receptacles shall be installed such that no point measured horizontally along the floor line of any wall space is more than 6 feet from a receptacle outlet. (2) Wall Space. As used by this section, a wall space shall include the following: 1. Any space 2 feet or more in width (including space measured around corners) and unbroken along the floor line by doorways and similar openings, fireplaces, and fixed cabinets that do not have countertops or similar work surfaces. 2. The space occupied by fixed panels in walls, excluding sliding panels. 3. The space afforded by fixed room dividers, such as freestanding bar-type counters or railings. (3) Floor Receptacles. Receptacle outlets in or on floors shall not be counted as part of the required number of receptacle outlets unless located within 18 inches of the wall. (4) Countertop and Similar Work Surface Receptacle Outlets. Receptacles installed for countertop and similar work surfaces as specified in 210.52(C) shall not be considered as the receptacle outlets required by 210.52(A). Action required: Provide additional receptacles in living units where wall space is 2' or more. (see 03/E4.2 - possibly more - verify)
Miscellaneous Correction
Corrective Action Required
07/03/2019

2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: Unable to locate MSB switchgear (or other panels 800 amps and above) on drawings to verify. Please clarify. IL E5.1 conflicts with 01/IL E2.1 room numbers.
Misc
Corrective Action Required
07/03/2019

2017 NEC 230.72 Grouping of disconnects. (A) General. The two to six disconnects as permitted in 230.71 shall be grouped. Each disconnect shall be marked to indicate the load served. (see code for exception) 230.2 limits number of services per building or structure to one. Action required: Provide information on drawings to demonstrate compliance.
Licensed Contractors Rejected 07/08/2019 07/02/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
07/02/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
07/02/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 07/08/2019 06/24/2019
Michael Weissenbach
Posting of occupant load
Corrective Action Required
06/24/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Action Required) Add occupant load signs to pool, dining, fitness center and theatre
Construction documents for fire alarm systems
Corrective Action Required
06/24/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of engineered stamped plans for fire alarm system.
Hazardous material identification
Corrective Action Required
06/24/2019

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. (Action Required) Label generator/fuel cell Provide information regarding the use and storage of oxygen in assisted living and memory care
Address numbers required
Corrective Action Required
06/24/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
06/24/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Action Required) Order two Knox Boxes. One for the exterior of the building, the other for the elevator. Place your order through Knoxbox.com
Construction documents - Fire protection systems
Corrective Action Required
06/24/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of engineered stamped plans for fire sprinkler system. Note: 4 inch storz connection for FDC. Class one standpipes in stairwells
Installation acceptance testing
Corrective Action Required
06/24/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a test.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
06/24/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection)
Misc
Corrective Action Required
06/24/2019

(Action Required) 1. Minimum height for canopy will need to be 13 feet 6 inches. 2. Required fire flow shall be provided. 3. Hydrants will need to be in working order before going vertical. 4. All water improvements will need to be in place. 5. All weather surface must be in place for fire dept. access.
Stairway identification signs
Corrective Action Required
06/24/2019

2018 IFC (B) 1023.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open an dclosed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level. (Verified At Inspection)
Duct smoke detectors
Corrective Action Required
06/24/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) 2,000 CFM or greater will need to have duct detection.
Illumination required
Corrective Action Required
06/24/2019

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Action Required) Provide emergency exterior illumination at all exits.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $86,458.00 $86,458.00 Paid 10/17/2019
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 10/17/2019
7232302-Residential License Tax Fee $37,884.16 $37,884.16 Paid 10/17/2019
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 03/09/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 03/09/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 02/07/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Framing Inspection - Commercial Passed 3/22/2021 12/22/2021 12/22/2020
Miscellaneous Correction
Corrective Action Required
12/22/2020
-Building A 1st floor exterior sheathing nail pattern ok
Rough Framing Inspection - Commercial Partial 12/22/2020 12/22/2020 12/22/2020
Miscellaneous Correction
Corrective Action Required
12/22/2020
-Building A 1st floor exterior sheathing nail pattern ok
All Rough Inspection - Commercial Partial 2/3/2021 2/3/2021 02/03/2021
Corrective Action Required
12/22/2020
THIRD FLOOR
Corrective Action Required
02/03/2021
***BUILDING C*** —AREAS APPROVED— PRE ROCK: 3031-MECHANICAL ROOM WALLS, EAST SHOWER WALL 4’ 3030-MECHANICAL ROOM WALLS, EAST SHOWER WALL 3029-MECHANICAL ROOM WALLS 3027-MECHANICAL ROOM WALLS, SHOWER BUILD OUT WALLS 3026-SHOWER BUILD OUT WALLS 3025-MECHANICAL CLOSET WALLS 3024-MECHANICAL CLOSET WALLS 3023-MECHANICAL CLOSET WALLS 3022-MECHANICAL CLOSET WALLS, SHOWER BUILD OUT WALLS 3021-MECHANICAL CLOSET WALLS 3020-MECHANICAL CLOSET WALLS, SHOWER BUILD OUT WALLS
All Rough Inspection - Commercial Partial 3/2/2021 3/2/2021 03/02/2021
Corrective Action Required
12/22/2020
THIRD FLOOR
Corrective Action Required
02/03/2021
***BUILDING C*** —AREAS APPROVED— PRE ROCK: 3031-MECHANICAL ROOM WALLS, EAST SHOWER WALL 4’ 3030-MECHANICAL ROOM WALLS, EAST SHOWER WALL 3029-MECHANICAL ROOM WALLS 3027-MECHANICAL ROOM WALLS, SHOWER BUILD OUT WALLS 3026-SHOWER BUILD OUT WALLS 3025-MECHANICAL CLOSET WALLS 3024-MECHANICAL CLOSET WALLS 3023-MECHANICAL CLOSET WALLS 3022-MECHANICAL CLOSET WALLS, SHOWER BUILD OUT WALLS 3021-MECHANICAL CLOSET WALLS 3020-MECHANICAL CLOSET WALLS, SHOWER BUILD OUT WALLS 3019 MECHANICAL CLOSET OK TO ROCK CORRIDOR WALL AND CEILING FOR SOFFITS ONLY
SECOND FLOOR
Corrective Action Required
03/02/2021
***BUILDING C*** —AREAS APPROVED— OK TO ROCK CORRIDOR WALL FROM CEILING SUBFLOOR TO 16" BELOW FLOOR TRUSS BOTTOM FOR SOFFIT. PROTECT PENETRATIONS AND CALL FOR ANOTHER INSPECTION FOR CEILING SOFFIT ROCK OK TO ROCK WALL AND CEILING OF MECHANICAL CLOSETS: 2020-21; 2023-26; 2028-31 CORRECTIONS REQUIRED: 2019-PROTECT PENETRATION OF FIREWALL 2022-REPAIR DRYER DUCT 2027-FIRECAULK DRYER DUCT PENETRATIONS
All Rough Inspection - Commercial Partial 3/9/2021 03/09/2021
THIRD FLOOR
Informational
03/09/2021
***BUILDING C*** —AREAS APPROVED— PRE ROCK: 3031-MECHANICAL ROOM WALLS, EAST SHOWER WALL 4’ 3030-MECHANICAL ROOM WALLS, EAST SHOWER WALL 3029-MECHANICAL ROOM WALLS 3027-MECHANICAL ROOM WALLS, SHOWER BUILD OUT WALLS 3026-SHOWER BUILD OUT WALLS 3025-MECHANICAL CLOSET WALLS 3024-MECHANICAL CLOSET WALLS 3023-MECHANICAL CLOSET WALLS 3022-MECHANICAL CLOSET WALLS, SHOWER BUILD OUT WALLS 3021-MECHANICAL CLOSET WALLS 3020-MECHANICAL CLOSET WALLS, SHOWER BUILD OUT WALLS 3019 MECHANICAL CLOSET OK TO ROCK CORRIDOR WALL FOR SOFFITS ONLY
SECOND FLOOR
Informational
03/09/2021
***BUILDING C*** -AREAS APPROVED- PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT
FIRST FLOOR
Informational
03/09/2021
Miscellaneous Correction
Corrective Action Required
03/09/2021
-2019-PROTECT PENETARATION AT 2HR FIRE WALL -SEAL CORRIDOOR PENETRATIONS AND DRAFT STOP FOR SOFFIT PRE ROCK -INSTALL RC CHANNEL AT MECHANICAL ROOM CEILINGS AND CORRIDOOR SOFFITS FOR INSPECTION
All Rough Inspection - Commercial Partial 03/09/2021
THIRD FLOOR
Informational
03/09/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3031-MECHANICAL ROOM WALLS, EAST SHOWER WALL 4’ 3030-MECHANICAL ROOM WALLS, EAST SHOWER WALL 3029-MECHANICAL ROOM WALLS 3027-MECHANICAL ROOM WALLS, SHOWER BUILD OUT WALLS 3026-SHOWER BUILD OUT WALLS 3025-MECHANICAL CLOSET WALLS 3024-MECHANICAL CLOSET WALLS 3023-MECHANICAL CLOSET WALLS 3022-MECHANICAL CLOSET WALLS, SHOWER BUILD OUT WALLS 3021-MECHANICAL CLOSET WALLS 3020-MECHANICAL CLOSET WALLS, SHOWER BUILD OUT WALLS 3019 MECHANICAL CLOSET OK TO ROCK CORRIDOR WALL FOR SOFFITS ONLY
SECOND FLOOR
Informational
03/09/2021
—AREAS APPROVED— ***BUILDING C*** PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT
FIRST FLOOR
Informational
03/09/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
03/09/2021
-2019-PROTECT PENETARATION AT 2HR FIRE WALL -SEAL CORRIDOOR PENETRATIONS AND DRAFT STOP FOR SOFFIT PRE ROCK -INSTALL RC CHANNEL AT MECHANICAL ROOM CEILINGS AND CORRIDOOR SOFFITS FOR INSPECTION
Rated Assembly Inspection Partial 3/10/2021 3/10/2021 03/10/2021
THIRD FLOOR
Informational
03/10/2021
-AREAS APPROVED- BUILDING C SHEAR WALLS IL-A 1ST LAYER: ROOMS 3019,3022-325,3027, 3029-3031
SECOND FLOOR
Informational
03/10/2021
FIRST FLOOR
Informational
03/10/2021
Miscellaneous Correction
Corrective Action Required
03/10/2021
-PATCH HOLE AT DWV IN 3028 -3026 COMPLETE NAILING PATTERN NORTH AND SOUTH WALLS -3020-3021 COMPLETE NAILING PATTERN IN MECHANICAL CLOSETS
All Rough Inspection - Commercial Partial 3/10/2021 03/10/2021
THIRD FLOOR
Informational
03/09/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS (EXCEPT SHEAR WALLS AS DESCRIBED IN CORRECTIONS) OK TO ROCK CORRIDOR WALL FOR SOFFITS ONLY AND INSTALL RC ON CEILING
SECOND FLOOR
Informational
03/09/2021
—AREAS APPROVED— ***BUILDING C*** PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING
FIRST FLOOR
Informational
03/09/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
03/09/2021
-2019-PROTECT PENETARATION AT 2HR FIRE WALL -SEAL CORRIDOOR PENETRATIONS AND DRAFT STOP FOR SOFFIT PRE ROCK -INSTALL RC CHANNEL AT MECHANICAL ROOM CEILINGS AND CORRIDOOR SOFFITS FOR INSPECTION -CORRECT NAILING PATTERN AT MECHANICAL ROOM SHEAR WALLS 3021 & 3020
All Rough Inspection - Commercial Partial 3/22/2021 3/22/2021 03/22/2021
THIRD FLOOR
Informational
03/10/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS (EXCEPT SHEAR WALLS AS DESCRIBED IN CORRECTIONS) OK TO ROCK CORRIDOR WALL FOR SOFFITS ONLY AND INSTALL RC ON CEILING ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS 3003-3005, 3009, 3013, 3015 BEHIND SHOWERS
SECOND FLOOR
Informational
03/10/2021
—AREAS APPROVED— ***BUILDING C*** PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING
FIRST FLOOR
Informational
03/10/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
03/10/2021
-2019-PROTECT PENETARATION AT 2HR FIRE WALL -SEAL CORRIDOOR PENETRATIONS AND DRAFT STOP FOR SOFFIT PRE ROCK -INSTALL RC CHANNEL AT MECHANICAL ROOM CEILINGS AND CORRIDOOR SOFFITS FOR INSPECTION -CORRECT NAILING PATTERN AT MECHANICAL ROOM SHEAR WALLS 3021 & 3020 3-22-21 PRE ROCK AT SHOWERS- 3012 BOCCA PLATE, 3011 ADD STUD, SEAL PENETRATION AT DWV, AND STRAP TOP PLATE, 3008, BOCCA PLATE, 3007 BOCCA PLATE, STRAP TOP PLATE, 3006 STRAP TOP PLATE,
All Rough Inspection - Commercial Partial 3/25/2021 3/25/2021 03/25/2021
THIRD FLOOR
Informational
03/22/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS (EXCEPT SHEAR WALLS AS DESCRIBED IN CORRECTIONS) OK TO ROCK CORRIDOR WALL FOR SOFFITS ONLY AND INSTALL RC ON CEILING ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS 3003-3005, 3009, 3013, 3015 BEHIND SHOWERS
SECOND FLOOR
Informational
03/22/2021
—AREAS APPROVED— ***BUILDING C*** PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING
FIRST FLOOR
Informational
03/22/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
03/22/2021
-SEAL CORRIDOOR PENETRATIONS AND DRAFT STOP FOR SOFFIT PRE ROCK -INSTALL RC CHANNEL AT MECHANICAL ROOM CEILINGS AND CORRIDOOR SOFFITS FOR INSPECTION *****3-22-21 PRE ROCK AT SHOWERS***** 3012 BOCCA PLATE, 3011 ADD STUD, SEAL PENETRATION AT DWV, AND STRAP TOP PLATE, 3008, BOCCA PLATE, 3007 BOCCA PLATE, STRAP TOP PLATE, 3006 STRAP TOP PLATE, *****3-25-21 ALL ROUGH***** -IDENTIFY WHITE INSULATED CONDUCTORS USED AS CURRENT CARRYING CONDUCTORS AT BOTH POINTS OF TERMINATION THROUGHOUT -COMPLETE FASTENING OF TRUSS TO TOP PLATE PER DETAIL 7 ON S3.1 THROUGHOUT -ADDRESS STUDS BEARING STUDS BORED OVER 40% -ADDRESS SHEAR WALL TO EXTERIOR WALL CONNECTIONS AND OFFSETS AT SHEAR WALL/ EXTERIOR WALLS -MIN. 3 STUDS REQUIRED AT EXTERIOR WALL CORNERS PER 2308.5.2 -PROVIDE PUTTY PACKS AT BOXES WITH SHARED SPACES AT PARTY WALLS -SEAL LINE SET PENETRATIONS IN DRAFT STOP THROUGHOUT -3020- MISSING ROOF BOOT AT VENT, REPAIR FIRE RATED PLYWOOD AT ROOF, BOCCA PLATE AT DWV IN BATH -3022- ADD STUD AT SHEATHING SEAM UNDER WINDOW -3024- MISSING H2.5s IN CLOSET, MISSING NAILS IN H2.5 OUTSIDE OF CLOSET, ADD STUD UNDER GAP IN TOP PLATE AT PARTY WALL -3026- SEAL DRAFT STOP IN BATH, CONNECT DRYER VENT AT ROOF, ADD STUD AT SHEATHING SEAM UNDER WINDOW,
Rated Assembly Inspection Partial 03/30/2021
THIRD FLOOR
Informational
03/10/2021
-AREAS APPROVED- BUILDING C SHEAR WALLS IL-A 1ST LAYER: ROOMS 3019,3022-325,3027, 3029-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031
SECOND FLOOR
Informational
03/10/2021
FIRST FLOOR
Informational
03/10/2021
Miscellaneous Correction
Corrective Action Required
03/10/2021
-PATCH HOLE AT DWV IN 3028 -3026 COMPLETE NAILING PATTERN NORTH AND SOUTH WALLS
Rated Assembly Inspection Partial 3/31/2021 3/31/2021 03/31/2021
THIRD FLOOR
Informational
03/30/2021
-AREAS APPROVED- BUILDING C SHEAR WALLS IL-A 1ST LAYER: ROOMS 3019,3022-325,3027, 3029-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031,3003-3016 SHOWER BUILD OUT CEILINGS 3027,3026,3023,3022, 3020, 3006, 3007,3008, 3011, 3012
SECOND FLOOR
Informational
03/30/2021
FIRST FLOOR
Informational
03/30/2021
Miscellaneous Correction
Corrective Action Required
03/30/2021
-PATCH HOLE AT DWV IN 3028 -3026 COMPLETE NAILING PATTERN NORTH AND SOUTH WALLS
All Rough Inspection - Commercial Partial 4/2/2021 4/2/2021 04/02/2021
THIRD FLOOR
Informational
03/25/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS: 3030, 3028, 3026, 3024, 3022, 3020 ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS 3003-3005, 3009, 3013, 3015 BEHIND SHOWERS
SECOND FLOOR
Informational
03/25/2021
—AREAS APPROVED— ***BUILDING C*** PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING
FIRST FLOOR
Informational
03/25/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
03/25/2021
-SEAL CORRIDOOR PENETRATIONS AND DRAFT STOP FOR SOFFIT PRE ROCK -INSTALL RC CHANNEL AT MECHANICAL ROOM CEILINGS AND CORRIDOOR SOFFITS FOR INSPECTION *****3-22-21 PRE ROCK AT SHOWERS***** 3012 BOCCA PLATE, 3011 ADD STUD, SEAL PENETRATION AT DWV, AND STRAP TOP PLATE, 3008, BOCCA PLATE, 3007 BOCCA PLATE, STRAP TOP PLATE, 3006 STRAP TOP PLATE, -SEAL LINE SET PENETRATIONS IN DRAFT STOP THROUGHOUT-CHECK LINE SET PENETRATIONS AFTER INSTALLATION -3020- MISSING ROOF BOOT AT VENT-CHECK WITH RC INSPECTION
All Rough Inspection - Commercial Partial 4/5/2021 4/5/2021 04/05/2021
THIRD FLOOR
Informational
04/02/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3031, 3030, 3029, 3028, 3027, 3026, 3025, 3024, 3022, 3019, 3020 -STAIRWELL WALLS AND CEILING ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS 3003-3016 BEHIND SHOWERS
SECOND FLOOR
Informational
04/02/2021
—AREAS APPROVED— ***BUILDING C*** PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING
FIRST FLOOR
Informational
04/02/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
04/02/2021
3021-COMPLETE RIDGE VENT OR ROOFING -SEAL LINE SET PENETRATIONS IN DRAFT STOP THROUGHOUT-CHECK LINE SET PENETRATIONS AFTER INSTALLATION -3020, 3027- MISSING ROOF BOOT AT VENT-CHECK WITH RC INSPECTION
Rated Assembly Inspection Partial 04/05/2021
THIRD FLOOR
Informational
03/31/2021
-AREAS APPROVED- BUILDING C SHEAR WALLS IL-A 1ST LAYER: ROOMS 3019,3022-325,3027, 3029-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING AND 24" AT WALL SHOWER BUILD OUT CEILINGS 3027,3026,3023,3022, 3020, 3006, 3007,3008, 3011, 3012 ROCK BEHIND SHOWERS 3019-3031 BUILDING A RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016
SECOND FLOOR
Informational
03/31/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031
FIRST FLOOR
Informational
03/31/2021
Miscellaneous Correction
Corrective Action Required
03/31/2021
-PATCH HOLE AT DWV IN 3028 -3026 COMPLETE NAILING PATTERN NORTH AND SOUTH WALLS
All Rough Inspection - Commercial Partial 04/07/2021
THIRD FLOOR
Informational
04/05/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3031, 3030, 3029, 3028, 3027, 3026, 3025, 3024, 3022, 3019, 3020 -STAIRWELL WALLS AND CEILING ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS ROOMS: 3004, 3006, 3008, 3010, 3012, 3014, 3016
SECOND FLOOR
Informational
04/05/2021
—AREAS APPROVED— ***BUILDING C*** PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING
FIRST FLOOR
Informational
04/05/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
04/05/2021
3021-COMPLETE RIDGE VENT OR ROOFING -SEAL LINE SET PENETRATIONS IN DRAFT STOP THROUGHOUT-CHECK LINE SET PENETRATIONS AFTER INSTALLATION -3020- MISSING ROOF BOOT AT VENT-CHECK WITH RC INSPECTION
Rated Assembly Inspection Partial 04/07/2021
THIRD FLOOR
Informational
04/05/2021
-AREAS APPROVED- BUILDING C RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING AND 24" AT WALL SHOWER BUILD OUT CEILINGS 3027,3026,3023,3022, 3020, 3006, 3007,3008, 3011, 3012 ROCK BEHIND SHOWERS 3019-3031 RC CHANNEL ROOMS 3019-3020, 3022-3031 BUILDING A RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016
SECOND FLOOR
Informational
04/05/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031
FIRST FLOOR
Informational
04/05/2021
Miscellaneous Correction
Corrective Action Required
04/05/2021
3021- COMPLETE RIDGE VENT/ ROOF
All Rough Inspection - Commercial Partial 04/08/2021
THIRD FLOOR
Informational
04/07/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING
SECOND FLOOR
Informational
04/07/2021
—AREAS APPROVED— ***BUILDING C*** PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING
FIRST FLOOR
Informational
04/07/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
04/07/2021
3021-COMPLETE RIDGE VENT OR ROOFING -SEAL LINE SET PENETRATIONS IN DRAFT STOP THROUGHOUT-CHECK LINE SET PENETRATIONS AFTER INSTALLATION -3020- MISSING ROOF BOOT AT VENT-CHECK WITH RC INSPECTION
Rated Assembly Inspection Partial 4/12/2021 4/12/2021 04/12/2021
THIRD FLOOR
Informational
04/07/2021
-AREAS APPROVED- BUILDING C RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING AND 24" AT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 RC CHANNEL ROOMS 3019-3020, 3022-3031, 3003-3016, : below require corrections : - 3020 add screws 8" OC - - 3021 add screws 8" OC - - 3022 add screws 8" OC - BUILDING A RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016
SECOND FLOOR
Informational
04/07/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031
FIRST FLOOR
Informational
04/07/2021
Miscellaneous Correction
Corrective Action Required
04/07/2021
3021- COMPLETE RIDGE VENT/ ROOF
Rated Assembly Inspection Partial 4/14/2021 4/14/2021 04/14/2021
THIRD FLOOR
Informational
04/12/2021
-AREAS APPROVED- BUILDING C RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING AND 24" AT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS 3019-3031 IN BATHROOMS AND LAUNDRY ROOMS BUILDING A RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016
SECOND FLOOR
Informational
04/12/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031
FIRST FLOOR
Informational
04/12/2021
Miscellaneous Correction
Corrective Action Required
04/12/2021
3021- COMPLETE RIDGE VENT/ ROOF
All Rough Inspection - Commercial Partial 4/14/2021 4/14/2021 04/14/2021
THIRD FLOOR
Informational
04/08/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING B**** ROOMS: 3001, 3018, 3037, 3038, 3039, 3042, 3043, 3044 CORIDOOR 3034 OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
04/08/2021
—AREAS APPROVED— ***BUILDING C*** PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING
FIRST FLOOR
Informational
04/08/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
04/08/2021
3021-COMPLETE RIDGE VENT OR ROOFING -SEAL LINE SET PENETRATIONS IN DRAFT STOP THROUGHOUT-CHECK LINE SET PENETRATIONS AFTER INSTALLATION -3020- MISSING ROOF BOOT AT VENT-CHECK WITH RC INSPECTION *4-14 ALL ROUGH BUILDING B -3047 SEAL DRAFT STOP -3045 COMPLETE ENGINEERING CORRECTIONS AT TRUSS SUPPORT/ CMU WALL -3041 COMPLETE CMU WALL/ FRAMING-NOT READY -3040 FIREBLOCK DEAD SPACE, COMPLETE SPRINKLERS -3002 COMPLETE ELECTRICAL- NOT READY -3001 CONNECT ROOF VENT
Rated Assembly Inspection Partial 4/15/2021 4/15/2021 04/15/2021
THIRD FLOOR
Informational
04/14/2021
-AREAS APPROVED- BUILDING C RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS 3019-3031 IN BATHROOMS AND LAUNDRY ROOMS OK TO INSTALL RC AT CORRIDOOR WALLS BUILDING B OK TO INSTALL RC CHANNEL CORRIDOOR WALLS BUILDING A RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 OK TO INSTALL RC CORRIDOOR WALLS AND CEILINGS FIRST 16" EACH SIDE
SECOND FLOOR
Informational
04/14/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031
FIRST FLOOR
Informational
04/14/2021
Miscellaneous Correction
Corrective Action Required
04/14/2021
3021- COMPLETE RIDGE VENT/ ROOF
Rated Assembly Inspection Partial 4/16/2021 4/16/2021 04/16/2021
THIRD FLOOR
Informational
04/15/2021
-AREAS APPROVED- BUILDING C RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS 3019-3031 IN BATHROOMS AND LAUNDRY ROOMS CEILINGS OK TO INSTALL RC AT CORRIDOOR WALLS BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 OK TO INSTALL RC CHANNEL CORRIDOOR WALLS FIRST LAYER ROOMS 3003-3016 BATHROOM CEILINGS BUILDING A OK TO INSTALL RC CORRIDOOR WALLS AND CEILINGS FIRST 16" EACH SIDE
SECOND FLOOR
Informational
04/15/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031
FIRST FLOOR
Informational
04/15/2021
Miscellaneous Correction
Corrective Action Required
04/15/2021
3021- COMPLETE RIDGE VENT/ ROOF
Rated Assembly Inspection Partial 4/19/2021 4/19/2021 04/19/2021
THIRD FLOOR
Informational
04/16/2021
-AREAS APPROVED- BUILDING C RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS 3019-3031 IN BATHROOMS AND LAUNDRY ROOMS CEILINGS OK TO INSTALL RC AT CORRIDOOR WALLS BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 OK TO INSTALL RC CHANNEL CORRIDOOR WALLS FIRST LAYER ROOMS 3003-3016 BATHROOM CEILINGS BUILDING A OK TO INSTALL RC CORRIDOOR WALLS AND CEILINGS FIRST 16" EACH SIDE
SECOND FLOOR
Informational
04/16/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031
FIRST FLOOR
Informational
04/16/2021
-AREAS APPROVED- MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL
Miscellaneous Correction
Corrective Action Required
04/16/2021
3021- COMPLETE RIDGE VENT/ ROOF
All Rough Inspection - Commercial Partial 4/21/2021 4/21/2021 04/21/2021
THIRD FLOOR
Informational
04/14/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING B**** ROOMS: 3001, 3018, 3037, 3038, 3039, 3042, 3043, 3044 CORIDOOR 3034 OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
04/14/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019,2021,2023,2025,2027,2029,2031 PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING
FIRST FLOOR
Informational
04/14/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
04/14/2021
3021-COMPLETE RIDGE VENT OR ROOFING 3004-MISSING ROOF BOOTS AT VENTS -SEAL LINE SET PENETRATIONS IN DRAFT STOP THROUGHOUT-CHECK LINE SET PENETRATIONS AFTER INSTALLATION *4-14 ALL ROUGH BUILDING B -3047 SEAL DRAFT STOP -3045 COMPLETE ENGINEERING CORRECTIONS AT TRUSS SUPPORT/ CMU WALL -3041 COMPLETE CMU WALL/ FRAMING-NOT READY -3040 FIREBLOCK DEAD SPACE, COMPLETE SPRINKLERS -3002 COMPLETE ELECTRICAL- NOT READY -3001 CONNECT ROOF VENT
All Rough Inspection - Commercial Partial 4/22/2021 4/22/2021 04/22/2021
THIRD FLOOR
Informational
04/21/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING B**** ROOMS: 3001, 3018, 3037, 3038, 3039, 3042, 3043, 3044 CORIDOOR 3034 OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
04/21/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2027, 2030-2031 PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING
FIRST FLOOR
Informational
04/21/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
04/21/2021
3021-COMPLETE RIDGE VENT OR ROOFING 3004-MISSING ROOF BOOTS AT VENTS -SEAL LINE SET PENETRATIONS IN DRAFT STOP THROUGHOUT-CHECK LINE SET PENETRATIONS AFTER INSTALLATION *4-14 ALL ROUGH BUILDING B -3047 SEAL DRAFT STOP -3045 COMPLETE ENGINEERING CORRECTIONS AT TRUSS SUPPORT/ CMU WALL -3041 COMPLETE CMU WALL/ FRAMING-NOT READY -3040 FIREBLOCK DEAD SPACE, COMPLETE SPRINKLERS -3002 COMPLETE ELECTRICAL- NOT READY -3001 CONNECT ROOF VENT *4-21 ALL ROUGH BUILDING C 2ND FLOOR -2028 COMPLETE ELECTRICAL AT SERVICE PANEL
Rated Assembly Inspection Partial 4/23/2021 4/23/2021 04/23/2021
THIRD FLOOR
Informational
04/19/2021
-AREAS APPROVED- BUILDING C RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS 3019-3031 IN BATHROOMS AND LAUNDRY ROOMS CEILINGS OK TO INSTALL RC AT CORRIDOOR WALLS BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 OK TO INSTALL RC CHANNEL CORRIDOOR WALLS FIRST LAYER ROOMS 3003-3016 BATHROOM CEILINGS BUILDING A OK TO INSTALL RC CORRIDOOR WALLS AND CEILINGS FIRST 16" EACH SIDE
SECOND FLOOR
Informational
04/19/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015
FIRST FLOOR
Informational
04/19/2021
-AREAS APPROVED- MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL
Miscellaneous Correction
Corrective Action Required
04/19/2021
3021- COMPLETE RIDGE VENT/ ROOF
All Rough Inspection - Commercial Partial 4/23/2021 4/23/2021 04/23/2021
THIRD FLOOR
Informational
04/22/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING B**** ROOMS: 3001, 3018, 3037, 3038, 3039, 3042, 3043, 3044 CORIDOOR 3034 OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
04/22/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING
FIRST FLOOR
Informational
04/22/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
04/22/2021
3021-COMPLETE RIDGE VENT OR ROOFING 3004-MISSING ROOF BOOTS AT VENTS -SEAL LINE SET PENETRATIONS IN DRAFT STOP BUILDING C-CHECK LINE SET PENETRATIONS AFTER INSTALLATION -EXPOSE AND SEAL DUCT PENETRATIONS IN CORRIDORS AT SHAFT WALL *4-14 ALL ROUGH BUILDING B -3047 SEAL DRAFT STOP -3045 COMPLETE ENGINEERING CORRECTIONS AT TRUSS SUPPORT/ CMU WALL -3041 COMPLETE CMU WALL/ FRAMING-NOT READY -3040 FIREBLOCK DEAD SPACE, COMPLETE SPRINKLERS -3002 COMPLETE ELECTRICAL- NOT READY -3001 CONNECT ROOF VENT
All Rough Inspection - Commercial Partial 4/27/2021 4/27/2021 04/27/2021
THIRD FLOOR
Informational
04/23/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING B**** ROOMS: 3001, 3018, 3037, 3038, 3039, 3042, 3043, 3044 CORIDOOR 3034 OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
04/23/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING
FIRST FLOOR
Informational
04/23/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
04/23/2021
3004-MISSING ROOF BOOTS AT VENTS -SEAL LINE SET PENETRATIONS IN DRAFT STOP BUILDING C-CHECK LINE SET PENETRATIONS AFTER INSTALLATION -EXPOSE AND SEAL DUCT PENETRATIONS IN CORRIDORS AT SHAFT WALL *4-14 ALL ROUGH BUILDING B -3047 SEAL DRAFT STOP -3045 COMPLETE ENGINEERING CORRECTIONS AT TRUSS SUPPORT/ CMU WALL -3041 COMPLETE CMU WALL/ FRAMING-NOT READY -3040 FIREBLOCK DEAD SPACE, COMPLETE SPRINKLERS -3002 COMPLETE ELECTRICAL- NOT READY -3001 CONNECT ROOF VENT
Rated Assembly Inspection Partial 4/27/2021 4/27/2021 04/27/2021
THIRD FLOOR
Informational
04/23/2021
-AREAS APPROVED- BUILDING C RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS 3019-3031 IN BATHROOMS AND LAUNDRY ROOMS CEILINGS OK TO INSTALL RC AT CORRIDOOR WALLS BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 OK TO INSTALL RC CHANNEL CORRIDOOR WALLS FIRST LAYER ROOMS 3003-3016 BATHROOM CEILINGS BUILDING A OK TO INSTALL RC CORRIDOOR WALLS AND CEILINGS FIRST 16" EACH SIDE
SECOND FLOOR
Informational
04/23/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015
FIRST FLOOR
Informational
04/23/2021
-AREAS APPROVED- MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL
Miscellaneous Correction
Corrective Action Required
04/23/2021
All Rough Inspection - Commercial Partial 4/28/2021 4/28/2021 04/28/2021
THIRD FLOOR
Informational
04/27/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING B**** ROOMS: 3001, 3018, 3037, 3038, 3039, 3042, 3043, 3044 CORIDOOR 3034 OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
04/27/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING ***BUILDING B*** ROOMS: 2003, 2005, 2007, 2009, 2011, 2013
FIRST FLOOR
Informational
04/27/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
04/27/2021
3004-MISSING ROOF BOOTS AT VENTS -SEAL LINE SET PENETRATIONS IN DRAFT STOP BUILDING C-CHECK LINE SET PENETRATIONS AFTER INSTALLATION -EXPOSE AND SEAL DUCT PENETRATIONS IN CORRIDORS AT SHAFT WALL *4-14 ALL ROUGH BUILDING B -3047 SEAL DRAFT STOP -3045 COMPLETE ENGINEERING CORRECTIONS AT TRUSS SUPPORT/ CMU WALL -3041 COMPLETE CMU WALL/ FRAMING-NOT READY -3040 FIREBLOCK DEAD SPACE, COMPLETE SPRINKLERS -3002 COMPLETE ELECTRICAL- NOT READY -3001 CONNECT ROOF VENT
All Rough Inspection - Commercial Partial 4/29/2021 4/29/2021 04/29/2021
THIRD FLOOR
Informational
04/28/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING B**** ROOMS: 3001, 3018, 3037, 3038, 3039, 3042, 3043, 3044 CORIDOOR 3034 OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
04/28/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING ***BUILDING B*** ROOMS: 2003, 2005, 2007, 2009, 2011, 2013, 2015
FIRST FLOOR
Informational
04/28/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
04/28/2021
3004-MISSING ROOF BOOTS AT VENTS -SEAL LINE SET PENETRATIONS IN DRAFT STOP BUILDING C-CHECK LINE SET PENETRATIONS AFTER INSTALLATION -EXPOSE AND SEAL DUCT PENETRATIONS IN CORRIDORS AT SHAFT WALL *4-14 ALL ROUGH BUILDING B -3047 SEAL DRAFT STOP -3045 COMPLETE ENGINEERING CORRECTIONS AT TRUSS SUPPORT/ CMU WALL -3041 COMPLETE CMU WALL/ FRAMING-NOT READY -3040 FIREBLOCK DEAD SPACE, COMPLETE SPRINKLERS -3002 COMPLETE ELECTRICAL- NOT READY -3001 CONNECT ROOF VENT **4-29** -Provide strap at top plate where bored more than 50% in load bearing walls throughout (all units) -Secure SEC per code throught (all units) 2006- Bocca plate at shower top plate, correct/ complete mechanical at bath 2010-Seal penetration at mechanical closet, seal penetrations, bocca plates, structural strap at storm drain back wall 2014- Midpoint strap at dwv, bocca plate at sprinkler line, putty packs at party wall
All Rough Inspection - Commercial Partial 04/29/2021
THIRD FLOOR
Informational
04/29/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING B**** ROOMS: 3001, 3018, 3037, 3038, 3039, 3042, 3043, 3044 CORIDOOR 3034 OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
04/29/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING ***BUILDING B*** ROOMS: 2003, 2005, 2007, 2009, 2011, 2013, 2015
FIRST FLOOR
Informational
04/29/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
04/29/2021
3004-MISSING ROOF BOOTS AT VENTS -SEAL LINE SET PENETRATIONS IN DRAFT STOP BUILDING C-CHECK LINE SET PENETRATIONS AFTER INSTALLATION -EXPOSE AND SEAL DUCT PENETRATIONS IN CORRIDORS AT SHAFT WALL *4-14 ALL ROUGH BUILDING B -3047 SEAL DRAFT STOP -3045 COMPLETE ENGINEERING CORRECTIONS AT TRUSS SUPPORT/ CMU WALL -3041 COMPLETE CMU WALL/ FRAMING-NOT READY -3040 FIREBLOCK DEAD SPACE, COMPLETE SPRINKLERS -3002 COMPLETE ELECTRICAL- NOT READY -3001 CONNECT ROOF VENT **4-29** -Provide strap at top plate where bored more than 50% in load bearing walls throughout (all units) -Secure SEC per code throught (all units) 2004-label white current carrying conductors, complete DWV 2006- Bocca plate at shower top plate, correct/ complete mechanical at bath 2010-Seal penetration at mechanical closet, seal penetrations, bocca plates, structural strap at storm drain back wall 2014- Midpoint strap at dwv, bocca plate at sprinkler line, putty packs at party wall
All Rough Inspection - Commercial Partial 4/30/2021 4/30/2021 04/30/2021
THIRD FLOOR
Informational
04/29/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING B**** ROOMS: 3001, 3018, 3037, 3038, 3039, 3042, 3043, 3044 CORIDOOR 3034 OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
04/29/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING ***BUILDING B*** ROOMS: 2003-2016
FIRST FLOOR
Informational
04/29/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
04/29/2021
3004-MISSING ROOF BOOTS AT VENTS -SEAL LINE SET PENETRATIONS IN DRAFT STOP BUILDING C-CHECK LINE SET PENETRATIONS AFTER INSTALLATION -EXPOSE AND SEAL DUCT PENETRATIONS IN CORRIDORS AT SHAFT WALL *4-14 ALL ROUGH BUILDING B -3047 SEAL DRAFT STOP -3045 COMPLETE ENGINEERING CORRECTIONS AT TRUSS SUPPORT/ CMU WALL -3041 COMPLETE CMU WALL/ FRAMING-NOT READY -3040 FIREBLOCK DEAD SPACE, COMPLETE SPRINKLERS -3002 COMPLETE ELECTRICAL- NOT READY -3001 CONNECT ROOF VENT **4-29** -Provide strap at top plate where bored more than 50% in load bearing walls throughout (all units) -Secure SEC per code throught (all units) 2004-label white current carrying conductors, complete DWV 2006- Bocca plate at shower top plate, correct/ complete mechanical at bath 2010-Seal penetration at mechanical closet, seal penetrations, bocca plates, structural strap at storm drain back wall 2014- Midpoint strap at dwv, bocca plate at sprinkler line, putty packs at party wall
All Rough Inspection - Commercial Partial 04/30/2021
THIRD FLOOR
Informational
04/30/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING B**** ROOMS: 3001, 3018, 3037, 3038, 3039, 3042, 3043, 3044 CORIDOOR 3034 OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
04/30/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING ***BUILDING B*** ROOMS: 2003-2016
FIRST FLOOR
Informational
04/30/2021
—AREAS APPROVED— **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
04/30/2021
3004-MISSING ROOF BOOTS AT VENTS -SEAL LINE SET PENETRATIONS IN DRAFT STOP BUILDING C-CHECK LINE SET PENETRATIONS AFTER INSTALLATION -EXPOSE AND SEAL DUCT PENETRATIONS IN CORRIDORS AT SHAFT WALL *4-14 ALL ROUGH BUILDING B -3047 SEAL DRAFT STOP -3045 COMPLETE ENGINEERING CORRECTIONS AT TRUSS SUPPORT/ CMU WALL -3041 COMPLETE CMU WALL/ FRAMING-NOT READY -3040 FIREBLOCK DEAD SPACE, COMPLETE SPRINKLERS -3002 COMPLETE ELECTRICAL- NOT READY -3001 CONNECT ROOF VENT
Rated Assembly Inspection Partial 5/3/2021 5/3/2021 05/03/2021
THIRD FLOOR
Informational
04/27/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS 3019-3031 IN BATHROOMS AND LAUNDRY ROOMS CEILINGS OK TO INSTALL RC AT CORRIDOOR WALLS BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 OK TO INSTALL RC CHANNEL CORRIDOOR WALLS FIRST LAYER ROOMS 3003-3016 BATHROOM CEILINGS BUILDING A RC CHANNEL ROOMS 3003-3016 OK TO INSTALL RC CORRIDOOR WALLS AND CEILINGS FIRST 16" EACH SIDE
SECOND FLOOR
Informational
04/27/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015
FIRST FLOOR
Informational
04/27/2021
-AREAS APPROVED- MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL
Miscellaneous Correction
Corrective Action Required
04/27/2021
All Rough Inspection - Commercial Partial 5/3/2021 5/3/2021 05/03/2021
THIRD FLOOR
Informational
04/30/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING B**** ROOMS: 3001, 3018, 3037, 3038, 3039, 3042, 3043, 3044 CORIDOOR 3034 OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
04/30/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING ***BUILDING B*** ROOMS: 2003-2016
FIRST FLOOR
Informational
04/30/2021
—AREAS APPROVED— ***BUILDING C*** OK TO INSTALL RC CHANNEL FOR MECHANICAL SOFFITS **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
04/30/2021
3004-MISSING ROOF BOOTS AT VENTS -SEAL LINE SET PENETRATIONS IN DRAFT STOP BUILDING C-CHECK LINE SET PENETRATIONS AFTER INSTALLATION -EXPOSE AND SEAL DUCT PENETRATIONS IN CORRIDORS AT SHAFT WALL *4-14 ALL ROUGH BUILDING B -3047 SEAL DRAFT STOP -3045 COMPLETE ENGINEERING CORRECTIONS AT TRUSS SUPPORT/ CMU WALL -3041 COMPLETE CMU WALL/ FRAMING-NOT READY -3040 FIREBLOCK DEAD SPACE, COMPLETE SPRINKLERS -3002 COMPLETE ELECTRICAL- NOT READY -3001 CONNECT ROOF VENT
Rated Assembly Inspection Partial 5/6/2021 5/6/2021 05/06/2021
THIRD FLOOR
Informational
05/03/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS 3019-3031 IN BATHROOMS AND LAUNDRY ROOMS CEILINGS ROOMS OK FOR RC: 3041, 3040, 3045, 3002, BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 OK TO INSTALL RC CHANNEL CORRIDOOR WALLS FIRST LAYER ROOMS 3003-3016 BATHROOM CEILINGS BUILDING A RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS OK TO INSTALL RC CEILINGS FIRST 16" EACH SIDE
SECOND FLOOR
Informational
05/03/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015
FIRST FLOOR
Informational
05/03/2021
-AREAS APPROVED- MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL
Miscellaneous Correction
Corrective Action Required
05/03/2021
All Rough Inspection - Commercial Partial 5/6/2021 5/6/2021 05/06/2021
THIRD FLOOR
Informational
05/03/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING ***BUILDING A*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING B**** ROOMS: 3001, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045 CORIDOOR 3034 OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
05/03/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING ***BUILDING B*** ROOMS: 2003-2016 ***BUILDING A*** ROOMS: 2040-2042, 2044
FIRST FLOOR
Informational
05/03/2021
—AREAS APPROVED— ***BUILDING C*** OK TO INSTALL RC CHANNEL FOR MECHANICAL SOFFITS **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
05/03/2021
3004-MISSING ROOF BOOTS AT VENTS -SEAL LINE SET PENETRATIONS IN DRAFT STOP BUILDING C-CHECK LINE SET PENETRATIONS AFTER INSTALLATION -EXPOSE AND SEAL DUCT PENETRATIONS IN CORRIDORS AT SHAFT WALL *4-14 ALL ROUGH BUILDING B -3047 SEAL DRAFT STOP -3045 COMPLETE ENGINEERING CORRECTIONS AT TRUSS SUPPORT/ CMU WALL -3040 FIREBLOCK DEAD SPACE, COMPLETE SPRINKLERS -3002 COMPLETE ELECTRICAL -3001 CONNECT ROOF VENT **5-6 ALL ROUGH BUILDING A -2001 SEAL VENT IN MECHANICAL -2002 SEAL PENETRATIONS, SECURE SEC -2035A FLASH OPENINGS -2037 SEAL DEAD SPACE, BOCA PLATE -2038 SEAL DEAD SPACES -2039 FINISH FRAMING REST NOT READY FOR INSPECTION
All Rough Inspection - Commercial Partial 5/7/2021 5/7/2021 05/07/2021
THIRD FLOOR
Informational
05/06/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING ***BUILDING B*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR 3034 OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
05/06/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING ***BUILDING B*** ROOMS: 2003-2016 ***BUILDING A*** ROOMS: 2001,2002,2018,2040-2045
FIRST FLOOR
Informational
05/06/2021
—AREAS APPROVED— ***BUILDING C*** OK TO INSTALL RC CHANNEL FOR MECHANICAL SOFFITS **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
05/06/2021
3004-MISSING ROOF BOOTS AT VENTS -SEAL LINE SET PENETRATIONS IN DRAFT STOP BUILDING C-CHECK LINE SET PENETRATIONS AFTER INSTALLATION -EXPOSE AND SEAL DUCT PENETRATIONS IN CORRIDORS AT SHAFT WALL *5-7 3040- COMPLETE SPRIKLER INSTALLATION 300 -CONNECT VENT, ROOF BOOT AT VENT 3004- MISSING ROOF BOOT 2035A- FLASH OPENINGS 2017-SEAL DEAD SPACES, FINISH DRAIN 2047-NOT INSPECTED
Rated Assembly Inspection Partial 5/7/2021 5/7/2021 05/07/2021
THIRD FLOOR
Informational
05/06/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS 3019-3031 IN BATHROOMS AND LAUNDRY ROOMS CEILINGS ROOMS OK FOR RC: 3041, 3040, 3045, 3002, BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 OK TO INSTALL RC CHANNEL CORRIDOOR WALLS FIRST LAYER ROOMS 3003-3016 BATHROOM CEILINGS RC CORRIDOR WALLS BUILDING A RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS OK TO INSTALL RC CEILINGS FIRST 16" EACH SIDE
SECOND FLOOR
Informational
05/06/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2016
FIRST FLOOR
Informational
05/06/2021
-AREAS APPROVED- OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL
Miscellaneous Correction
Corrective Action Required
05/06/2021
Rated Assembly Inspection Partial 5/11/2021 5/11/2021 05/11/2021
THIRD FLOOR
Informational
05/07/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS 3019-3031 IN BATHROOMS AND LAUNDRY ROOMS CEILINGS ROOMS OK FOR RC: 3041, 3040, 3045, 3002, BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 OK TO INSTALL RC CHANNEL CORRIDOOR WALLS FIRST LAYER ROOMS 3003-3016 BATHROOM CEILINGS RC CORRIDOR WALLS BUILDING A RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS OK TO INSTALL RC CEILINGS FIRST 16" EACH SIDE
SECOND FLOOR
Informational
05/07/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2016
FIRST FLOOR
Informational
05/07/2021
-AREAS APPROVED- OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL
Miscellaneous Correction
Corrective Action Required
05/07/2021
All Rough Inspection - Commercial Partial 5/11/2021 05/11/2021
THIRD FLOOR
Informational
05/07/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING ***BUILDING B*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR 3034 OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
05/07/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING ***BUILDING B*** ROOMS: 2003-2016 ***BUILDING A*** ROOMS: 2001,2002,2018,2040-2045
FIRST FLOOR
Informational
05/07/2021
—AREAS APPROVED— ***BUILDING C*** OK TO INSTALL RC CHANNEL FOR MECHANICAL SOFFITS **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
05/07/2021
3004-MISSING ROOF BOOTS AT VENTS -SEAL LINE SET PENETRATIONS IN DRAFT STOP BUILDING C-CHECK LINE SET PENETRATIONS AFTER INSTALLATION -EXPOSE AND SEAL DUCT PENETRATIONS IN CORRIDORS AT SHAFT WALL *5-7 3040- COMPLETE SPRIKLER INSTALLATION 3002- CONNECT VENT, ROOF BOOT AT VENT 3004- MISSING ROOF BOOT 2035A- FLASH OPENINGS 2017-SEAL DEAD SPACES, FINISH DRAIN 2047-NOT INSPECTED
Rated Assembly Inspection Partial 5/13/2021 5/13/2021 05/13/2021
THIRD FLOOR
Informational
05/11/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3021, 3025, 3027-3031 MECHANICAL ROOM CEILINGS: -3022-3024, 3026, 3027, 3029-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 OK TO INSTALL RC CHANNEL CORRIDOOR WALLS RC CORRIDOR WALLS FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3007, 3009-3011, 3013-3016 MECHANICAL ROOMS: -3006, 3009, 3011, 3015, 3016 BUILDING A RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS OK TO INSTALL RC CEILINGS FIRST 16" EACH SIDE
SECOND FLOOR
Informational
05/11/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2016
FIRST FLOOR
Informational
05/11/2021
-AREAS APPROVED- OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL
Miscellaneous Correction
Corrective Action Required
05/11/2021
5-13-21 -SEAL PENETRATIONS AT BATHROOMS:3008, 3012, 3022, 3023, 3024, 3026 AND MECHANICAL CLOSETS AT: 3001-3004, 3005, 3007, 3008, 3010, 3012, 3013, 3014, 3020, 3021, 3025, 3028
All Rough Inspection - Commercial Partial 5/14/2021 5/14/2021 05/14/2021
THIRD FLOOR
Informational
05/11/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING ***BUILDING B*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR 3034 OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
05/11/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 PRE ROCK: OK TO ROCK WALLS OF MECHANICAL ROOMS 2020-2031 OK TO ROCK CORRIDOOR WALLS FOR SOFFIT AND INSTALL RC AT CEILING ***BUILDING B*** ROOMS: 2003-2016 ***BUILDING A*** ROOMS: 2001,2002,2018,2040-2045
FIRST FLOOR
Informational
05/11/2021
—AREAS APPROVED— ***BUILDING C*** OK TO INSTALL RC CHANNEL FOR MECHANICAL SOFFITS **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
05/11/2021
-EXPOSE AND SEAL PENETRATIONS AT SHAFT WALL PER UL LISTING *5-14 3040- COMPLETE SPRIKLER INSTALLATION 3002- CONNECT VENT, ROOF BOOT AT VENT 3004- MISSING ROOF BOOT 2035A- FLASH OPENINGS 2017- COMPLETE MECHANICAL 2047-NOT INSPECTED
Rated Assembly Inspection Partial 5/14/2021 5/14/2021 05/14/2021
THIRD FLOOR
Informational
05/13/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 OK TO INSTALL RC CHANNEL CORRIDOOR WALLS RC CORRIDOR WALLS FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3007, 3009-3013, 3015-3016 BUILDING A RC CHANNEL CORRIDOR WALLS OK TO INSTALL RC CEILINGS FIRST 16" EACH SIDE RC
SECOND FLOOR
Informational
05/13/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2016 BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044
FIRST FLOOR
Informational
05/13/2021
-AREAS APPROVED- OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL
Miscellaneous Correction
Corrective Action Required
05/13/2021
5-14-21 -SEAL PENETRATIONS AT MECHANICAL CLOSETS: 3008, 3014 -COMPLETE DRYWALL AND RC AT SHAFT WALL IN END UNITS 2018,2020,2001,2002
All Rough Inspection - Commercial Partial 5/17/2021 5/17/2021 05/17/2021
THIRD FLOOR
Informational
05/14/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING CORRIDOR TO SHAFT WALL ***BUILDING B*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS CORRIDOR TO SHAFT WALL ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
05/14/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 CORRIDOR WALLS AND CEILING TO SHAFT WALL ***BUILDING B*** ROOMS: 2003-2017 CORRIDOR WALLS AND CEILINGS TO SHAFT WALL ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2040-2045
FIRST FLOOR
Informational
05/14/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ***BUILDING B*** CORRIDOR CEILNGS TO SHAFT WALL ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
05/14/2021
-EXPOSE AND SEAL PENETRATIONS AT SHAFT WALL PER UL LISTING *5-17 INSTALL JOIST HANGERS AT ATTIC ACCESS IN CORRIDORS 3040- COMPLETE SPRIKLER INSTALLATION 2035A- FLASH OPENINGS 2047-NOT INSPECTED
Rated Assembly Inspection Partial 5/17/2021 5/17/2021 05/17/2021
THIRD FLOOR
Informational
05/14/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL
SECOND FLOOR
Informational
05/14/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2016 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL CORRIDOR WALLS AND CEILNIG TO SHAFT WALL
FIRST FLOOR
Informational
05/14/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL
Miscellaneous Correction
Corrective Action Required
05/14/2021
5-17-21 -COMPLETE DRYWALL AND RC AT SHAFT WALL IN END UNITS 2018,2020,2001,2002
All Rough Inspection - Commercial Partial 5/18/2021 5/18/2021 05/18/2021
THIRD FLOOR
Informational
05/17/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING CORRIDOR TO SHAFT WALL ***BUILDING B*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS CORRIDOR TO SHAFT WALL ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
05/17/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 CORRIDOR WALLS AND CEILING TO SHAFT WALL ***BUILDING B*** ROOMS: 2003-2017 CORRIDOR WALLS AND CEILINGS TO SHAFT WALL ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2040-2045
FIRST FLOOR
Informational
05/17/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ***BUILDING B*** CORRIDOR CEILNGS TO SHAFT WALL ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL
Miscellaneous Correction
Corrective Action Required
05/17/2021
-EXPOSE AND SEAL PENETRATIONS AT SHAFT WALL PER UL LISTING *5-17 INSTALL JOIST HANGERS AT ATTIC ACCESS IN CORRIDORS 3040- COMPLETE SPRIKLER INSTALLATION 2035A- FLASH OPENINGS 2047-NOT INSPECTED
Rated Assembly Inspection Partial 5/18/2021 5/18/2021 05/18/2021
THIRD FLOOR
Informational
05/17/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL
SECOND FLOOR
Informational
05/17/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2016 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL CORRIDOR WALLS AND CEILNIG TO SHAFT WALL
FIRST FLOOR
Informational
05/17/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1015-117, 1020-1023, 1025-1030, ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL
Miscellaneous Correction
Corrective Action Required
05/17/2021
5-17-21 -COMPLETE DRYWALL AND RC AT SHAFT WALL IN END UNITS 2018,2020,2001,2002
Rated Assembly Inspection Partial 5/20/2021 5/20/2021 05/20/2021
THIRD FLOOR
Informational
05/18/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, SCREW PATTERN ROOMS 3019-3031 BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL
SECOND FLOOR
Informational
05/18/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2016 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002 RC CHANNEL CORRIDOR WALLS AND CEILNIG TO SHAFT WALL
FIRST FLOOR
Informational
05/18/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1015-117, 1020-1023, 1025-1030, ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL
Miscellaneous Correction
Corrective Action Required
05/18/2021
5-17-21 -COMPLETE DRYWALL AND RC AT SHAFT WALL IN END UNITS 2018,2020
All Rough Inspection - Commercial Partial 5/20/2021 5/20/2021 05/20/2021
THIRD FLOOR
Informational
05/18/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING CORRIDOR TO SHAFT WALL SOFFIT FRAMING IN CORRIDOR ***BUILDING B*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS CORRIDOR TO SHAFT WALL ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
05/18/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 CORRIDOR WALLS AND CEILING TO SHAFT WALL ***BUILDING B*** ROOMS: 2003-2017 CORRIDOR WALLS AND CEILINGS TO SHAFT WALL ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2040-2045
FIRST FLOOR
Informational
05/18/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015, 1017, 1021, 1027 ***BUILDING B*** CORRIDOR CEILNGS TO SHAFT WALL ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS
Miscellaneous Correction
Corrective Action Required
05/18/2021
-EXPOSE AND SEAL PENETRATIONS AT SHAFT WALL PER UL LISTING *5-20 3040- COMPLETE SPRIKLER INSTALLATION 2035A- FLASH OPENINGS 2047-NOT INSPECTED 1023-REPAIR SHEAR WALL SHEATHING, ADD STUDS AT OVER NOTCHED STUDS IN SHEAR WALL 1025-REPAIR SHEAR WALL SHEATHING BOTH WALLS
Rated Assembly Inspection Partial 5/21/2021 5/21/2021 05/21/2021
THIRD FLOOR
Informational
05/20/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, SCREW PATTERN ROOMS 3019-3031 BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 SCREW PATTERN ROOMS 3003-3016 BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL
SECOND FLOOR
Informational
05/20/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2020 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018 RC CHANNEL CORRIDOR WALLS AND CEILNIG TO SHAFT WALL
FIRST FLOOR
Informational
05/20/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1015-117, 1020-1023, 1025-1030, ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL
Miscellaneous Correction
Corrective Action Required
05/20/2021
All Rough Inspection - Commercial Partial 5/21/2021 5/21/2021 05/21/2021
THIRD FLOOR
Informational
05/20/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING CORRIDOR TO SHAFT WALL SOFFIT FRAMING IN CORRIDOR ***BUILDING B*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS CORRIDOR TO SHAFT WALL ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING SOFFIT FRAMING IN CORRIDOR ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
05/20/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 CORRIDOR WALLS AND CEILING TO SHAFT WALL ***BUILDING B*** ROOMS: 2003-2017 CORRIDOR WALLS AND CEILINGS TO SHAFT WALL ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2040-2045
FIRST FLOOR
Informational
05/20/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015, 1017, 1021, 1027, 1026, 1028, 1030 ***BUILDING B*** CORRIDOR CEILNGS TO SHAFT WALL ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS
Miscellaneous Correction
Corrective Action Required
05/20/2021
-EXPOSE AND SEAL PENETRATIONS AT SHAFT WALL PER UL LISTING *5-20 3040- COMPLETE SPRIKLER INSTALLATION 2035A- FLASH OPENINGS 2047-NOT INSPECTED 1023-REPAIR SHEAR WALL SHEATHING, ADD STUDS AT OVER NOTCHED STUDS IN SHEAR WALL 1025-REPAIR SHEAR WALL SHEATHING BOTH WALLS
Rated Assembly Inspection Partial 5/25/2021 5/25/2021 05/25/2021
THIRD FLOOR
Informational
05/21/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, SCREW PATTERN ROOMS 3019-3031 BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 SCREW PATTERN ROOMS 3003-3016 BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL
SECOND FLOOR
Informational
05/21/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2020 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018 RC CHANNEL CORRIDOR WALLS AND CEILNIG TO SHAFT WALL
FIRST FLOOR
Informational
05/21/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1026, 1029-1031 ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL
Miscellaneous Correction
Corrective Action Required
05/21/2021
All Rough Inspection - Commercial Partial 5/25/2021 5/25/2021 05/25/2021
THIRD FLOOR
Informational
05/21/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING CORRIDOR TO SHAFT WALL SOFFIT FRAMING IN CORRIDOR ***BUILDING B*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS CORRIDOR TO SHAFT WALL ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING SOFFIT FRAMING IN CORRIDOR ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
05/21/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 CORRIDOR WALLS AND CEILING TO SHAFT WALL ***BUILDING B*** ROOMS: 2003-2017 CORRIDOR WALLS AND CEILINGS TO SHAFT WALL ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2040-2045
FIRST FLOOR
Informational
05/21/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015, 1017, 1021. 1022, 1024, 1026, 1028, 1030 ***BUILDING B*** CORRIDOR CEILNGS TO SHAFT WALL ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS
Miscellaneous Correction
Corrective Action Required
05/21/2021
-EXPOSE AND SEAL PENETRATIONS AT SHAFT WALL PER UL LISTING *5-25 2035A- FLASH OPENINGS 2047-NOT INSPECTED 1023-REPAIR SHEAR WALL SHEATHING, ADD STUDS AT OVER NOTCHED STUDS IN SHEAR WALL 1025-REPAIR SHEAR WALL SHEATHING BOTH WALLS 1027-REPAIR SHEAR WALL, DWV AND ELECTRICAL
All Rough Inspection - Commercial Partial 5/26/2021 5/26/2021 05/26/2021
THIRD FLOOR
Informational
05/25/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING CORRIDOR TO SHAFT WALL SOFFIT FRAMING IN CORRIDOR ***BUILDING B*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS CORRIDOR TO SHAFT WALL ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING SOFFIT FRAMING IN CORRIDOR ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
05/25/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 CORRIDOR WALLS AND CEILING TO SHAFT WALL ***BUILDING B*** ROOMS: 2003-2017 CORRIDOR WALLS AND CEILINGS TO SHAFT WALL ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2040-2045
FIRST FLOOR
Informational
05/25/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015, 1017, 1021. 1022, 1024, 1026, 1028, 1030 ***BUILDING B*** CORRIDOR CEILNGS TO SHAFT WALL ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS
Miscellaneous Correction
Corrective Action Required
05/25/2021
-EXPOSE AND SEAL PENETRATIONS AT SHAFT WALL PER UL LISTING *5-25 2035A- FLASH OPENINGS 2047-NOT INSPECTED 1023-REPAIR SHEAR WALL SHEATHING, ADD STUDS AT OVER NOTCHED STUDS IN SHEAR WALL 1025-REPAIR SHEAR WALL SHEATHING BOTH WALLS 1027-REPAIR SHEAR WALL, DWV AND ELECTRICAL
Rated Assembly Inspection Partial 5/26/2021 5/26/2021 05/26/2021
THIRD FLOOR
Informational
05/25/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, SCREW PATTERN ROOMS 3019-3031 BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 SCREW PATTERN ROOMS 3003-3016 BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL
SECOND FLOOR
Informational
05/25/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2020 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018 RC CHANNEL CORRIDOR WALLS AND CEILNIG TO SHAFT WALL
FIRST FLOOR
Informational
05/25/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL
Miscellaneous Correction
Corrective Action Required
05/25/2021
Electrical Service Inspection Failed 5/27/2021 5/27/2021 05/27/2021
Misc
Corrective Action Required
05/27/2021
-Provide Ground rods and #3/0 GEC per plans-ensure that min. 8' of rod is in contact with the soil per code
All Rough Inspection - Commercial Partial 5/27/2021 5/27/2021 05/27/2021
THIRD FLOOR
Informational
05/26/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING CORRIDOR TO SHAFT WALL SOFFIT FRAMING IN CORRIDOR ***BUILDING B*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS CORRIDOR TO SHAFT WALL ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING SOFFIT FRAMING IN CORRIDOR ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
05/26/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 CORRIDOR WALLS AND CEILING TO SHAFT WALL ***BUILDING B*** ROOMS: 2003-2017 CORRIDOR WALLS AND CEILINGS TO SHAFT WALL ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2040-2045
FIRST FLOOR
Informational
05/26/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 ***BUILDING B*** CORRIDOR CEILNGS TO SHAFT WALL ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS
Miscellaneous Correction
Corrective Action Required
05/26/2021
-EXPOSE AND SEAL PENETRATIONS AT SHAFT WALL PER UL LISTING ***5-27*** 2035A- FLASH OPENINGS 2047-NOT INSPECTED 3047- COMPLETE STORM DRAIN BUILDING B: -REMOVE ALL SHEET ROCK FROM MECHANICAL CLOSETS AND AT SHAFT WALL PENETRATIONS -SEAL PLATE PENETRATIONS AT ALL DWV, MECHANICAL AND ELECTRICAL -BOCCAL PLATE PROTECTION AT SPRINKLER AND DWV LESS THAN 1.25" FROM FACE OF STUDS
Rated Assembly Inspection Partial 5/27/2021 5/27/2021 05/27/2021
THIRD FLOOR
Informational
05/26/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, SCREW PATTERN ROOMS 3019-3031 BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 SCREW PATTERN ROOMS 3003-3016 BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL
SECOND FLOOR
Informational
05/26/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2020 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018 RC CHANNEL CORRIDOR WALLS AND CEILNIG TO SHAFT WALL
FIRST FLOOR
Informational
05/26/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR
Miscellaneous Correction
Corrective Action Required
05/26/2021
All Rough Inspection - Commercial Partial 5/28/2021 5/28/2021 05/28/2021
THIRD FLOOR
Informational
05/27/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING CORRIDOR TO SHAFT WALL SOFFIT FRAMING IN CORRIDOR ***BUILDING B*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS CORRIDOR TO SHAFT WALL ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING SOFFIT FRAMING IN CORRIDOR ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
05/27/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 CORRIDOR WALLS AND CEILING TO SHAFT WALL ***BUILDING B*** ROOMS: 2003-2017 CORRIDOR WALLS AND CEILINGS TO SHAFT WALL ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2040-2045
FIRST FLOOR
Informational
05/27/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS WITHOUT MECHANICAL CLOSETS:1001,1003,1005,1007,1009,1011,1013 ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS
Miscellaneous Correction
Corrective Action Required
05/27/2021
-EXPOSE AND SEAL PENETRATIONS AT SHAFT WALL PER UL LISTING ***5-28*** 2035A- FLASH OPENINGS 2047-NOT INSPECTED 3047- COMPLETE STORM DRAIN BUILDING B: -REMOVE ALL SHEET ROCK FROM MECHANICAL CLOSETS AND AT SHAFT WALL PENETRATIONS -SEAL PLATE PENETRATIONS AT ALL DWV, MECHANICAL AND ELECTRICAL -BOCCAL PLATE PROTECTION AT SPRINKLER AND DWV LESS THAN 1.25" FROM FACE OF STUDS -PATCH HOLES IN ALL DRAFT STOPS AND TOP PLATE BORES
Rated Assembly Inspection Partial 5/28/2021 5/28/2021 05/28/2021
THIRD FLOOR
Informational
05/27/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, SCREW PATTERN ROOMS 3019-3031 SCREW PATTERN AT CORRIDOR WALLS AND CEILING UP TO SHAFT WALL COMPLETE BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 SCREW PATTERN ROOMS 3003-3016 BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3002
SECOND FLOOR
Informational
05/27/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2020 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL FIRST LAYER AT BATHROOM CEILINGS ROOMS:2003-2010, 2013,2014 BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018 RC CHANNEL CORRIDOR WALLS AND CEILNIG TO SHAFT WALL
FIRST FLOOR
Informational
05/27/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR
Miscellaneous Correction
Corrective Action Required
05/27/2021
5-28 SEAL PENETRATIONS IN FIRST LAYER AT CEILINGS 2011,2012,2015,2016
Electrical Service Inspection Passed 5/28/2021 5/28/2021 05/28/2021
Misc
Resolved
05/28/2021
-Provide Ground rods and #3/0 GEC per plans-ensure that min. 8' of rod is in contact with the soil per code
Rated Assembly Inspection Partial 6/1/2021 6/1/2021 06/01/2021
THIRD FLOOR
Informational
05/28/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, SCREW PATTERN ROOMS 3019-3031 SCREW PATTERN AT CORRIDOR WALLS AND CEILING UP TO SHAFT WALL COMPLETE BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 SCREW PATTERN ROOMS 3003-3016 BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3002
SECOND FLOOR
Informational
05/28/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2020 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL FIRST LAYER AT BATHROOM CEILINGS ROOMS:2003-2016 BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018 RC CHANNEL CORRIDOR WALLS AND CEILNIG TO SHAFT WALL
FIRST FLOOR
Informational
05/28/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR
Miscellaneous Correction
Corrective Action Required
05/28/2021
Rated Assembly Inspection Partial 6/2/2021 6/2/2021 06/02/2021
THIRD FLOOR
Informational
06/01/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, SCREW PATTERN ROOMS 3019-3031 SCREW PATTERN AT CORRIDOR WALLS AND CEILING UP TO SHAFT WALL COMPLETE BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 SCREW PATTERN ROOMS 3003-3016 BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3002
SECOND FLOOR
Informational
06/01/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2020 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL FIRST LAYER AT BATHROOM CEILINGS ROOMS:2003-2016 BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018 RC CHANNEL CORRIDOR WALLS AND CEILNIG TO SHAFT WALL
FIRST FLOOR
Informational
06/01/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR
Miscellaneous Correction
Corrective Action Required
06/01/2021
All Rough Inspection - Commercial Partial 6/1/2021 06/02/2021
THIRD FLOOR
Informational
05/28/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING CORRIDOR TO SHAFT WALL SOFFIT FRAMING IN CORRIDOR ***BUILDING B*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS CORRIDOR TO SHAFT WALL ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING SOFFIT FRAMING IN CORRIDOR ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
05/28/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 CORRIDOR WALLS AND CEILING TO SHAFT WALL ***BUILDING B*** ROOMS: 2003-2017 CORRIDOR WALLS AND CEILINGS TO SHAFT WALL ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2040-2045
FIRST FLOOR
Informational
05/28/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1001,1002,1003,1005,1007,1009,1011,1013 MECHANICAL CLOSETS:1003, 1009, 1013, 1014 ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS
Miscellaneous Correction
Corrective Action Required
05/28/2021
-EXPOSE AND SEAL PENETRATIONS AT SHAFT WALL PER UL LISTING ***5-28*** 2035A- FLASH OPENINGS 2047-NOT INSPECTED 3047- COMPLETE STORM DRAIN ***6-2*** BUILDING B: -COMPLETE SHAFT WALL PENETRATIONS PER UL LISTING -SEAL PLATE PENETRATIONS AT ALL DWV, MECHANICAL AND ELECTRICAL -BOCCAL PLATE PROTECTION AT SPRINKLER AND DWV LESS THAN 1.25" FROM FACE OF STUDS -PATCH HOLES IN ALL DRAFT STOPS AND TOP PLATE BORES
All Rough Inspection - Commercial Partial 6/3/2021 6/3/2021 06/03/2021
THIRD FLOOR
Informational
06/02/2021
—AREAS APPROVED— ***BUIDING C*** PRE ROCK: 3019-3031 MECHANICAL ROOM WALLS AND BEHIND SHOWERS ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING CORRIDOR TO SHAFT WALL SOFFIT FRAMING IN CORRIDOR ***BUILDING B*** PRE ROCK: 3003-3016 MECHANICAL ROOM WALLS, BEHIND SHOWERS CORRIDOR TO SHAFT WALL ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING SOFFIT FRAMING IN CORRIDOR ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL OK TO INSULATE EXTERIOR WALLS
SECOND FLOOR
Informational
06/02/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 CORRIDOR WALLS AND CEILING TO SHAFT WALL ***BUILDING B*** ROOMS: 2003-2017 CORRIDOR WALLS AND CEILINGS TO SHAFT WALL ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2040-2045
FIRST FLOOR
Informational
06/02/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1001,1002,1003,1005,1007,1009,1011,1013 MECHANICAL CLOSETS:1003, 1009, 1013, 1014 ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS
Miscellaneous Correction
Corrective Action Required
06/02/2021
-EXPOSE AND SEAL PENETRATIONS AT SHAFT WALL PER UL LISTING ***5-28*** 2035A- FLASH OPENINGS 2047-NOT INSPECTED 3047- COMPLETE STORM DRAIN ***6-2*** BUILDING B: -COMPLETE SHAFT WALL PENETRATIONS PER UL LISTING -SEAL PLATE PENETRATIONS AT ALL DWV, MECHANICAL AND ELECTRICAL -BOCCAL PLATE PROTECTION AT SPRINKLER AND DWV LESS THAN 1.25" FROM FACE OF STUDS -PATCH HOLES IN ALL DRAFT STOPS AND TOP PLATE BORES
Rated Assembly Inspection Partial 6/3/2021 6/3/2021 06/03/2021
THIRD FLOOR
Informational
06/02/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, SCREW PATTERN ROOMS 3019-3031 SCREW PATTERN AT CORRIDOR WALLS AND CEILING UP TO SHAFT WALL COMPLETE BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 SCREW PATTERN ROOMS 3003-3016 BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044
SECOND FLOOR
Informational
06/02/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2020 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL FIRST LAYER AT BATHROOM CEILINGS ROOMS:2003-2016 BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018 RC CHANNEL CORRIDOR WALLS AND CEILNIG TO SHAFT WALL
FIRST FLOOR
Informational
06/02/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR
Miscellaneous Correction
Corrective Action Required
06/02/2021
All Rough Inspection - Commercial Partial 6/4/2021 6/4/2021 06/04/2021
THIRD FLOOR
Informational
06/03/2021
—AREAS APPROVED— ***BUIDING C*** ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING CORRIDOR TO SHAFT WALL SOFFIT FRAMING IN CORRIDOR ***BUILDING B*** CORRIDOR TO SHAFT WALL ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING SOFFIT FRAMING IN CORRIDOR STAIRWELL WALLS AND CEILING ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL
SECOND FLOOR
Informational
06/03/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 CORRIDOR WALLS AND CEILING STAIRWELL WALLS AND CEILING ***BUILDING B*** ROOMS: 2003-2017 CORRIDOR WALLS AND CEILINGS \ STAIRWELL WALLS AND CEILING ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2040-2045 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
06/03/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING
Miscellaneous Correction
Corrective Action Required
06/03/2021
-EXPOSE AND SEAL PENETRATIONS AT SHAFT WALL PER UL LISTING ***5-28*** 2035A- FLASH OPENINGS 2047-NOT INSPECTED 3047- COMPLETE STORM DRAIN ***6-4** -H2.5 AT STAIRWELL 3A, PROTECT NM STAIRWELL 1B -SHAFT PENETRATION PER UL AT 1002 MECHANICAL CLOSET
Rated Assembly Inspection Partial 6/4/2021 6/4/2021 06/04/2021
THIRD FLOOR
Informational
06/03/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, SCREW PATTERN ROOMS 3019-3031 SCREW PATTERN AT CORRIDOR WALLS AND CEILING UP TO SHAFT WALL COMPLETE FIRST LAYER AT SHAFT WALL IN CORRIDOR BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 SCREW PATTERN ROOMS 3003-3016 BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044
SECOND FLOOR
Informational
06/03/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL FIRST LAYER AT SHAFTWALL IN CORRIDOR BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2020 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL FIRST LAYER AT BATHROOM CEILINGS ROOMS:2003-2016 FIRST LAYER AT SHAFT WALL IN CORRIDOR BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018 RC CHANNEL CORRIDOR WALLS AND CEILNIG TO SHAFT WALL
FIRST FLOOR
Informational
06/03/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR
Miscellaneous Correction
Corrective Action Required
06/03/2021
-CORRECT SHAFT PENETRATION AT CORRIDOR 3B
All Rough Inspection - Commercial Partial 6/8/2021 6/8/2021 06/08/2021
THIRD FLOOR
Informational
06/04/2021
—AREAS APPROVED— ***BUIDING C*** ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING CORRIDOR TO SHAFT WALL SOFFIT FRAMING IN CORRIDOR ***BUILDING B*** CORRIDOR TO SHAFT WALL ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING SOFFIT FRAMING IN CORRIDOR STAIRWELL WALLS AND CEILING ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL STAIRWELL WALLS AND CEILING
SECOND FLOOR
Informational
06/04/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 CORRIDOR WALLS AND CEILING STAIRWELL WALLS AND CEILING ***BUILDING B*** ROOMS: 2003-2017 CORRIDOR WALLS AND CEILINGS \ STAIRWELL WALLS AND CEILING ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2040-2045 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
06/04/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING
Miscellaneous Correction
Corrective Action Required
06/04/2021
-EXPOSE AND SEAL PENETRATIONS AT SHAFT WALL PER UL LISTING ***5-28*** 2035A- FLASH OPENINGS 2047-NOT INSPECTED 3047- COMPLETE MECHANICAL VENT/ DRAIN ***6-4** -SHAFT PENETRATION PER UL AT 1002 MECHANICAL CLOSET
Rated Assembly Inspection Partial 6/8/2021 6/8/2021 06/08/2021
THIRD FLOOR
Informational
06/04/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, SCREW PATTERN ROOMS 3019-3031 SCREW PATTERN AT CORRIDOR WALLS AND CEILING UP TO SHAFT WALL COMPLETE FIRST LAYER AT SHAFT WALL IN CORRIDOR BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 SCREW PATTERN ROOMS 3003-3016 FIRST LAYER AT SHAFT WALL IN CORRIDOR BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044
SECOND FLOOR
Informational
06/04/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL FIRST LAYER AT SHAFTWALL IN CORRIDOR BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2020 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL FIRST LAYER AT BATHROOM CEILINGS ROOMS:2003-2016 BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018 RC CHANNEL CORRIDOR WALLS AND CEILNIG TO SHAFT WALL FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018
FIRST FLOOR
Informational
06/04/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR
Miscellaneous Correction
Corrective Action Required
06/04/2021
-REPAIR SHAFT LAYER AT CORRIDOR 2C
Rated Assembly Inspection Partial 6/10/2021 6/10/2021 06/10/2021
THIRD FLOOR
Informational
06/08/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, SCREW PATTERN ROOMS 3019-3031 SCREW PATTERN AT CORRIDOR WALLS AND CEILING UP TO SHAFT WALL COMPLETE FIRST LAYER AT SHAFT WALL IN CORRIDOR BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 SCREW PATTERN ROOMS 3003-3016 FIRST LAYER AT SHAFT WALL IN CORRIDOR BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044
SECOND FLOOR
Informational
06/08/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL FIRST LAYER AT SHAFTWALL IN CORRIDOR SCREW PATTERN UNITS AND CORRIDOR BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2020 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL FIRST LAYER AT BATHROOM CEILINGS ROOMS:2003-2016 BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018 RC CHANNEL CORRIDOR WALLS AND CEILNIG TO SHAFT WALL FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018
FIRST FLOOR
Informational
06/08/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR
Miscellaneous Correction
Corrective Action Required
06/08/2021
-REPAIR SHAFT LAYER AT CORRIDOR 2C
Rated Assembly Inspection Partial 6/14/2021 6/14/2021 06/14/2021
THIRD FLOOR
Informational
06/10/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, SCREW PATTERN ROOMS 3019-3031 SCREW PATTERN AT CORRIDOR WALLS AND CEILING UP TO SHAFT WALL COMPLETE FIRST LAYER AT SHAFT WALL IN CORRIDOR BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 SCREW PATTERN ROOMS 3003-3016 FIRST LAYER AT SHAFT WALL IN CORRIDOR BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044
SECOND FLOOR
Informational
06/10/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL FIRST LAYER AT SHAFTWALL IN CORRIDOR SCREW PATTERN UNITS AND CORRIDOR BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2020 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL FIRST LAYER AT BATHROOM CEILINGS ROOMS:2003-2016 BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018 RC CHANNEL CORRIDOR WALLS AND CEILNIG TO SHAFT WALL FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018
FIRST FLOOR
Informational
06/10/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 RC ROOMS 1001-1016 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR
Miscellaneous Correction
Corrective Action Required
06/10/2021
-REPAIR SHAFT LAYER AT CORRIDOR 2C
All Rough Inspection - Commercial Partial 6/14/2021 6/14/2021 06/14/2021
THIRD FLOOR
Informational
06/08/2021
—AREAS APPROVED— ***BUIDING C*** ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING CORRIDOR TO SHAFT WALL SOFFIT FRAMING IN CORRIDOR ***BUILDING B*** CORRIDOR TO SHAFT WALL ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING SOFFIT FRAMING IN CORRIDOR STAIRWELL WALLS AND CEILING ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL STAIRWELL WALLS AND CEILING
SECOND FLOOR
Informational
06/08/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 CORRIDOR WALLS AND CEILING STAIRWELL WALLS AND CEILING ***BUILDING B*** ROOMS: 2003-2017 CORRIDOR WALLS AND CEILINGS \ STAIRWELL WALLS AND CEILING ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2040-2045 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
06/08/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061
Miscellaneous Correction
Corrective Action Required
06/08/2021
-EXPOSE AND SEAL PENETRATIONS AT SHAFT WALL PER UL LISTING ***5-28*** 2035A- FLASH OPENINGS 2047-NOT INSPECTED 3047- COMPLETE MECHANICAL VENT/ DRAIN ***6-4** -SHAFT PENETRATION PER UL AT 1002 MECHANICAL CLOSET
Rated Assembly Inspection Partial 6/15/2021 6/15/2021 06/15/2021
THIRD FLOOR
Informational
06/14/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, SCREW PATTERN ROOMS 3019-3031 SCREW PATTERN AT CORRIDOR WALLS AND CEILING UP TO SHAFT WALL COMPLETE FIRST LAYER AT SHAFT WALL IN CORRIDOR BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 SCREW PATTERN ROOMS 3003-3016 FIRST LAYER AT SHAFT WALL IN CORRIDOR BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044
SECOND FLOOR
Informational
06/14/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL FIRST LAYER AT SHAFTWALL IN CORRIDOR SCREW PATTERN UNITS AND CORRIDOR BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2020 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL FIRST LAYER AT BATHROOM CEILINGS ROOMS:2003-2016 BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018 RC CHANNEL CORRIDOR WALLS AND CEILNIG TO SHAFT WALL FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018
FIRST FLOOR
Informational
06/14/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AT CORRIDOR ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 RC ROOMS 1001-1016 SHAFT LAYER AT CORRIDOR ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR
Miscellaneous Correction
Corrective Action Required
06/14/2021
-REPAIR SHAFT LAYER AT CORRIDOR 2C
All Rough Inspection - Commercial Partial 6/15/2021 6/15/2021 06/15/2021
THIRD FLOOR
Informational
06/14/2021
—AREAS APPROVED— ***BUIDING C*** ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING CORRIDOR TO SHAFT WALL SOFFIT FRAMING IN CORRIDOR ***BUILDING B*** CORRIDOR TO SHAFT WALL ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING SOFFIT FRAMING IN CORRIDOR STAIRWELL WALLS AND CEILING ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL STAIRWELL WALLS AND CEILING
SECOND FLOOR
Informational
06/14/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 CORRIDOR WALLS AND CEILING STAIRWELL WALLS AND CEILING ***BUILDING B*** ROOMS: 2003-2017 CORRIDOR WALLS AND CEILINGS \ STAIRWELL WALLS AND CEILING ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2040-2045 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
06/14/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061
Miscellaneous Correction
Corrective Action Required
06/14/2021
-EXPOSE AND SEAL PENETRATIONS AT SHAFT WALL PER UL LISTING ***5-28*** 2035A- FLASH OPENINGS 2047-NOT INSPECTED 3047- COMPLETE MECHANICAL VENT/ DRAIN ***6-4** -SHAFT PENETRATION PER UL AT 1002 MECHANICAL CLOSET
All Rough Inspection - Commercial Partial 6/18/2021 6/18/2021 06/18/2021
THIRD FLOOR
Informational
06/15/2021
—AREAS APPROVED— ***BUIDING C*** ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING CORRIDOR TO SHAFT WALL SOFFIT FRAMING IN CORRIDOR ***BUILDING B*** CORRIDOR TO SHAFT WALL ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING SOFFIT FRAMING IN CORRIDOR STAIRWELL WALLS AND CEILING ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL STAIRWELL WALLS AND CEILING
SECOND FLOOR
Informational
06/15/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 CORRIDOR WALLS AND CEILING STAIRWELL WALLS AND CEILING ***BUILDING B*** ROOMS: 2003-2017 CORRIDOR WALLS AND CEILINGS \ STAIRWELL WALLS AND CEILING ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,,235,2040-2045 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
06/15/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061
Miscellaneous Correction
Corrective Action Required
06/15/2021
-EXPOSE AND SEAL PENETRATIONS AT SHAFT WALL PER UL LISTING ***5-28*** 2047-NOT INSPECTED 3047- COMPLETE MECHANICAL VENT/ DRAIN ***6-4** -SHAFT PENETRATION PER UL AT 1002 MECHANICAL CLOSET
Rated Assembly Inspection Partial 6/18/2021 6/18/2021 06/18/2021
THIRD FLOOR
Informational
06/15/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, SCREW PATTERN ROOMS 3019-3031 SCREW PATTERN AT CORRIDOR WALLS AND CEILING UP TO SHAFT WALL COMPLETE FIRST LAYER AT SHAFT WALL IN CORRIDOR BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 SCREW PATTERN ROOMS 3003-3016 FIRST LAYER AT SHAFT WALL IN CORRIDOR BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044
SECOND FLOOR
Informational
06/15/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL FIRST LAYER AT SHAFTWALL IN CORRIDOR SCREW PATTERN UNITS AND CORRIDOR BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2020 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL FIRST LAYER AT BATHROOM CEILINGS ROOMS:2003-2016 BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018 SHAFT LAYER AT CORRIDORS
FIRST FLOOR
Informational
06/15/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AT CORRIDOR ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 RC ROOMS 1001-1016 SHAFT LAYER AT CORRIDOR ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR
Miscellaneous Correction
Corrective Action Required
06/15/2021
-REPAIR SHAFT LAYER AT CORRIDOR 2C
Rated Assembly Inspection Partial 6/22/2021 6/22/2021 06/22/2021
THIRD FLOOR
Informational
06/18/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, SCREW PATTERN ROOMS 3019-3031 SCREW PATTERN AT CORRIDOR WALLS AND CEILING UP TO SHAFT WALL COMPLETE FIRST LAYER AT SHAFT WALL IN CORRIDOR BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 SCREW PATTERN ROOMS 3003-3016 FIRST LAYER AT SHAFT WALL IN CORRIDOR BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044
SECOND FLOOR
Informational
06/18/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL FIRST LAYER AT SHAFTWALL IN CORRIDOR SCREW PATTERN UNITS AND CORRIDOR BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2020 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL FIRST LAYER AT BATHROOM CEILINGS ROOMS:2003-2016 BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018 SHAFT LAYER AT CORRIDORS
FIRST FLOOR
Informational
06/18/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AT CORRIDOR ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 RC ROOMS 1001-1016 SHAFT LAYER AT CORRIDOR ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR ****MCAL BUILDING*** OK FOR RC IN CORRIDORS FIRST 16" FOR SOFFITS
Miscellaneous Correction
Corrective Action Required
06/18/2021
-REPAIR SHAFT LAYER AT CORRIDOR 2C
All Rough Inspection - Commercial Partial 6/22/2021 6/22/2021 06/22/2021
THIRD FLOOR
Informational
06/18/2021
—AREAS APPROVED— ***BUIDING C*** ROOMS:3019-3031 -STAIRWELL WALLS AND CEILING CORRIDOR TO SHAFT WALL SOFFIT FRAMING IN CORRIDOR ***BUILDING B*** CORRIDOR TO SHAFT WALL ROOMS: 3003-3016 STAIRWELL WALLS AND CEILING SOFFIT FRAMING IN CORRIDOR STAIRWELL WALLS AND CEILING ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3037, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL STAIRWELL WALLS AND CEILING
SECOND FLOOR
Informational
06/18/2021
—AREAS APPROVED— ***BUILDING C*** ROOMS: 2019-2031 CORRIDOR WALLS AND CEILING STAIRWELL WALLS AND CEILING ***BUILDING B*** ROOMS: 2003-2017 CORRIDOR WALLS AND CEILINGS \ STAIRWELL WALLS AND CEILING ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,,235,2040-2045 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
06/18/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048
Miscellaneous Correction
Corrective Action Required
06/18/2021
-EXPOSE AND SEAL PENETRATIONS AT SHAFT WALL PER UL LISTING ***5-28*** 2047-NOT INSPECTED 3047- COMPLETE MECHANICAL VENT/ DRAIN ***6-4** -SHAFT PENETRATION PER UL AT 1002 MECHANICAL CLOSET
Rated Assembly Inspection Partial 6/23/2021 6/23/2021 06/23/2021
THIRD FLOOR
Informational
06/22/2021
-AREAS APPROVED- BUILDING C RC CHANNEL ROOMS 3019-3031 RC CHANNEL MECHANICAL ROOM CEILINGS 3019-3031, CORRIDOOR CEILING RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SHOWER BUILD OUT CEILINGS 3031,3030,3029,3028,3027,3026,3025,3024,3023, 3022, 3020, 3006, 3007,3008, 3011, 3012,3018, ROCK BEHIND SHOWERS 3019-3031 FIRST LAYER ROOMS IN BATHROOMS AND LAUNDRY ROOMS CEILINGS: -3018-3031 MECHANICAL ROOM CEILINGS: -3018-3031 ROOMS OK FOR RC: 3041, 3040, 3045, 3002, SCREW PATTERN ROOMS 3019-3031 SCREW PATTERN AT CORRIDOR WALLS AND CEILING UP TO SHAFT WALL COMPLETE FIRST LAYER AT SHAFT WALL IN CORRIDOR BUILDING B RC CHANNEL MECHANICAL ROOM CEILINGS 3003-3016 RC CHANNEL ROOMS 3003-3016 RC CHANNEL CORRIDOR WALLS AND CEILINGS TO SHAFT WALL FIRST LAYER ROOMS BATHROOM AND LAUNDRY ROOM CEILINGS: -3001-3016 MECHANICAL ROOMS: -3001-3016 SCREW PATTERN ROOMS 3003-3016 FIRST LAYER AT SHAFT WALL IN CORRIDOR BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044
SECOND FLOOR
Informational
06/22/2021
-AREAS APPROVED- BUILDING C: MECHANICAL ROOM CEILINGS 2019, 2020, 2022, 2024-2031 ROCK BEHIND SHOWERS AT SHEAR WALLS 2019-2031 RC CHANNEL ROOMS 2019-2031 RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL FIRST LAYER AT SHAFTWALL IN CORRIDOR SCREW PATTERN UNITS AND CORRIDOR BUILDING B: ROCK BEHIND SHOWERS AT SHEAR WALLS 2005,2007,2008,2011-2015 RC ROOMS 2003-2020 RC CHANNEL CORRIDOR WALLS AND CEILNG TO SHAFT WALL FIRST LAYER AT BATHROOM CEILINGS ROOMS:2003-2016 BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018 SHAFT LAYER AT CORRIDORS
FIRST FLOOR
Informational
06/22/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AT CORRIDOR ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 RC ROOMS 1001-1016 SHAFT LAYER AT CORRIDOR ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1055,1056,1061,1062,1016,1018,1046 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR ****MCAL BUILDING*** OK FOR RC IN CORRIDORS FIRST 16" FOR SOFFITS
Miscellaneous Correction
Corrective Action Required
06/22/2021
-REPAIR SHAFT LAYER AT CORRIDORS
Rated Assembly Inspection Partial 6/29/2021 6/29/2021 06/29/2021
THIRD FLOOR
Informational
06/23/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFT
SECOND FLOOR
Informational
06/23/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS
FIRST FLOOR
Informational
06/23/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AT CORRIDOR ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 RC ROOMS 1001-1016 SHAFT LAYER AT CORRIDOR ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1055,1056,1061,1062,1016,1018,1046,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR ****MCAL BUILDING*** RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A
Miscellaneous Correction
Corrective Action Required
06/23/2021
All Rough Inspection - Commercial Partial 6/29/2021 6/29/2021 06/29/2021
THIRD FLOOR
Informational
06/22/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL STAIRWELL WALLS AND CEILING
SECOND FLOOR
Informational
06/22/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043,2046 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
06/22/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048
Miscellaneous Correction
Corrective Action Required
06/22/2021
2047-NOT INSPECTED 2044-INCOMPLETE 2045-INCOMPLETE 3047- COMPLETE MECHANICAL VENT/ DRAIN
Rated Assembly Inspection Partial 6/30/2021 6/30/2021 06/30/2021
THIRD FLOOR
Informational
06/29/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFT
SECOND FLOOR
Informational
06/29/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS
FIRST FLOOR
Informational
06/29/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AT CORRIDOR ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 RC ROOMS 1001-1016 SHAFT LAYER AT CORRIDOR ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1055,1056,1061,1062,1016,1018,1046,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR ****MCAL BUILDING*** RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A
Miscellaneous Correction
Corrective Action Required
06/29/2021
-1037 COMPLETE SECOND LAYER ABOVE CEILING BEFORE RC CHANNEL AT SHAFT WALLS
All Rough Inspection - Commercial Partial 6/30/2021 6/30/2021 06/30/2021
THIRD FLOOR
Informational
06/29/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL STAIRWELL WALLS AND CEILING
SECOND FLOOR
Informational
06/29/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043,2046 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
06/29/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048
Miscellaneous Correction
Corrective Action Required
06/29/2021
2047-NOT INSPECTED 2044-INCOMPLETE 2045-INCOMPLETE 3047- COMPLETE MECHANICAL VENT/ DRAIN
Rated Assembly Inspection Partial 7/2/2021 7/2/2021 07/02/2021
THIRD FLOOR
Informational
06/30/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFT
SECOND FLOOR
Informational
06/30/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS
FIRST FLOOR
Informational
06/30/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 RC ROOMS 1001-1016 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1001-1003,1005-1008,1011-1014 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR ****MCAL BUILDING*** RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A
Miscellaneous Correction
Corrective Action Required
06/30/2021
-1037 COMPLETE SECOND LAYER ABOVE CEILING BEFORE RC CHANNEL AT SHAFT WALLS -REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS -REMOVE ROCK AT 2047 CEILING -1004,1009,1010 SEAL PENETRATIONS
All Rough Inspection - Commercial Partial 7/2/2021 7/2/2021 07/02/2021
THIRD FLOOR
Informational
06/30/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL STAIRWELL WALLS AND CEILING
SECOND FLOOR
Informational
06/30/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
06/30/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT
Miscellaneous Correction
Corrective Action Required
06/30/2021
2044-INCOMPLETE 2045-INCOMPLETE 3047- COMPLETE MECHANICAL VENT/ DRAIN
Rated Assembly Inspection Partial 7/6/2021 7/6/2021 07/06/2021
THIRD FLOOR
Informational
07/02/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFT
SECOND FLOOR
Informational
07/02/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS
FIRST FLOOR
Informational
07/02/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 RC ROOMS 1001-1016 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1001-1009,1011-1014 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR ****MCAL BUILDING*** RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A
Miscellaneous Correction
Corrective Action Required
07/02/2021
-1037 COMPLETE SECOND LAYER ABOVE CEILING BEFO -1010 SEAL PENETRATIONSRE RC CHANNEL AT SHAFT WALLS -REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS
All Rough Inspection - Commercial Partial 7/6/2021 7/6/2021 07/06/2021
THIRD FLOOR
Informational
07/02/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL STAIRWELL WALLS AND CEILING
SECOND FLOOR
Informational
07/02/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
07/02/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, 1037,1038 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT
Miscellaneous Correction
Corrective Action Required
07/02/2021
2044-INCOMPLETE 2045-INCOMPLETE 3047- COMPLETE MECHANICAL VENT/ DRAIN
Rated Assembly Inspection Partial 7/7/2021 7/7/2021 07/07/2021
THIRD FLOOR
Informational
07/06/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFT
SECOND FLOOR
Informational
07/06/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS
FIRST FLOOR
Informational
07/06/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 RC ROOMS 1001-1016 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1001-1009,1011-1014 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR ****MCAL BUILDING*** RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A
Miscellaneous Correction
Corrective Action Required
07/06/2021
-1037 COMPLETE SECOND LAYER ABOVE CEILING BEFO -1010 SEAL PENETRATIONSRE RC CHANNEL AT SHAFT WALLS -REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS
All Rough Inspection - Commercial Partial 7/7/2021 7/7/2021 07/07/2021
THIRD FLOOR
Informational
07/06/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL STAIRWELL WALLS AND CEILING
SECOND FLOOR
Informational
07/06/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
07/06/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, 1037,1038 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT
Miscellaneous Correction
Corrective Action Required
07/06/2021
2044-INCOMPLETE 2045-INCOMPLETE 3047- COMPLETE MECHANICAL VENT/ DRAIN
Rated Assembly Inspection Partial 7/9/2021 7/9/2021 07/09/2021
THIRD FLOOR
Informational
07/07/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFT
SECOND FLOOR
Informational
07/07/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038,246,245,247 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS -SOFFITS IN CORRIDORS OK TO COVER
FIRST FLOOR
Informational
07/07/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1019,1021-1031 ***BUILDING B*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1001-1004, 1007, 1009, 1010, 1013, 1014 RC ROOMS 1001-1016 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 100-1014 ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR ****MCAL BUILDING*** RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A
Miscellaneous Correction
Corrective Action Required
07/07/2021
-1037 COMPLETE SECOND LAYER ABOVE CEILING BEFO -1010 SEAL PENETRATIONSRE RC CHANNEL AT SHAFT WALLS -REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS
All Rough Inspection - Commercial Partial 7/9/2021 7/9/2021 07/09/2021
THIRD FLOOR
Informational
07/07/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL STAIRWELL WALLS AND CEILING
SECOND FLOOR
Informational
07/07/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
07/07/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, 1037,1038 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT
Miscellaneous Correction
Corrective Action Required
07/07/2021
2044-INCOMPLETE 2045-INCOMPLETE 3047- COMPLETE MECHANICAL VENT/ DRAIN
Pool Steel/Bonding - Commercial Failed 7/12/2021 7/12/2021 07/12/2021
Miscellaneous Correction
Corrective Action Required
07/12/2021
Complete bonding per NEC 680
Rated Assembly Inspection Partial 7/12/2021 7/12/2021 07/12/2021
THIRD FLOOR
Informational
07/09/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFT
SECOND FLOOR
Informational
07/09/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038,246,245,247 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS -SOFFITS IN CORRIDORS OK TO COVER
FIRST FLOOR
Informational
07/09/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1019,1021-1031 ***BUILDING B*** Rated layer at bathrooms Corridor soffit framing ok RC complete ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR ****MCAL BUILDING*** RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A
Miscellaneous Correction
Corrective Action Required
07/09/2021
-1037 COMPLETE SECOND LAYER ABOVE CEILING BEFO -1010 SEAL PENETRATIONSRE RC CHANNEL AT SHAFT WALLS -REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS
All Rough Inspection - Commercial Partial 7/12/2021 7/12/2021 07/12/2021
THIRD FLOOR
Informational
07/09/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL STAIRWELL WALLS AND CEILING
SECOND FLOOR
Informational
07/09/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
07/09/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, 1037,1038,1049,1052 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT
Miscellaneous Correction
Corrective Action Required
07/09/2021
2044-INCOMPLETE 2045-INCOMPLETE 3047- COMPLETE MECHANICAL VENT/ DRAIN
Pool Steel/Bonding - Commercial Failed 7/13/2021 7/13/2021 07/13/2021
Miscellaneous Correction
Informational
07/13/2021
Water bonding to be in line at pump
Miscellaneous Correction
Corrective Action Required
07/13/2021
-Complete (4) points to perimeter surface bonding per code and ensure all steel reinforcement is connected and in contact with perimeter surface bonding
Rated Assembly Inspection Partial 7/13/2021 7/13/2021 07/13/2021
THIRD FLOOR
Informational
07/12/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFT
SECOND FLOOR
Informational
07/12/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038,246,245,247 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS -SOFFITS IN CORRIDORS OK TO COVER
FIRST FLOOR
Informational
07/12/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1019,1021-1031 ***BUILDING B*** Rated layer at bathrooms Corridor soffit framing ok RC complete ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR ****MCAL BUILDING*** RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A
Miscellaneous Correction
Corrective Action Required
07/12/2021
-1037 COMPLETE SECOND LAYER ABOVE CEILING -REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding
Pool Steel/Bonding - Commercial Passed 8/10/2021 07/14/2021
Miscellaneous Correction
Informational
07/14/2021
Componenets bonded: Shell bonding, (4) points, perimeter surface, sleeves for accessible device, ladder, bond to equipment location Water bonding to be in line at pump
Pool Steel/Bonding - Commercial Partial 7/14/2021 7/14/2021 07/14/2021
Miscellaneous Correction
Informational
07/13/2021
Componenets bonded: Shell bonding, (4) points, perimeter surface, sleeves for accessible device, ladder, bond to equipment location Water bonding to be in line at pump
Miscellaneous Correction
Resolved
07/14/2021
-Complete (4) points to perimeter surface bonding per code and ensure all steel reinforcement is connected and in contact with perimeter surface bonding
Rated Assembly Inspection Partial 7/14/2021 7/14/2021 07/14/2021
THIRD FLOOR
Informational
07/13/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFT
SECOND FLOOR
Informational
07/13/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038,246,245,247 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS -SOFFITS IN CORRIDORS OK TO COVER
FIRST FLOOR
Informational
07/13/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1019,1021-1031 ***BUILDING B*** Rated layer at bathrooms Corridor soffit framing ok RC complete ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR ****MCAL BUILDING*** RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A
Miscellaneous Correction
Corrective Action Required
07/13/2021
-1037 COMPLETE SECOND LAYER ABOVE CEILING -REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding
Rated Assembly Inspection Partial 7/14/2021 7/14/2021 07/14/2021
THIRD FLOOR
Informational
07/14/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFT
SECOND FLOOR
Informational
07/14/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038,246,245,247 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS -SOFFITS IN CORRIDORS OK TO COVER
FIRST FLOOR
Informational
07/14/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1019,1021-1031 ***BUILDING B*** SCREW PATTERN AT UNITS Corridor soffit framing ok RC complete ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR ****MCAL BUILDING*** RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169-
Miscellaneous Correction
Corrective Action Required
07/14/2021
-1037 COMPLETE SECOND LAYER ABOVE CEILING -REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding
All Rough Inspection - Commercial Failed 7/16/2021 7/16/2021 07/16/2021
THIRD FLOOR
Informational
07/12/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL STAIRWELL WALLS AND CEILING
SECOND FLOOR
Informational
07/12/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
07/12/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, 1037,1038,1049,1052 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT
Miscellaneous Correction
Corrective Action Required
07/12/2021
2044-INCOMPLETE 2045-INCOMPLETE 3047- COMPLETE MECHANICAL VENT/ DRAIN
Rated Assembly Inspection Partial 7/16/2021 7/16/2021 07/16/2021
THIRD FLOOR
Informational
07/14/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFT
SECOND FLOOR
Informational
07/14/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038,246,245,247 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS -SOFFITS IN CORRIDORS OK TO COVER
FIRST FLOOR
Informational
07/14/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1019,1021-1031 -SCREW PATTERN AT MECHANICAL CLOSETS ***BUILDING B*** SCREW PATTERN AT UNITS Corridor soffit framing ok RC complete ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR ****MCAL BUILDING*** RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169-
Miscellaneous Correction
Corrective Action Required
07/14/2021
-1037 COMPLETE SECOND LAYER ABOVE CEILING -REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding
Rated Assembly Inspection Partial 7/20/2021 7/20/2021 07/20/2021
THIRD FLOOR
Informational
07/16/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFT
SECOND FLOOR
Informational
07/16/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038,246,245,247 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS -SOFFITS IN CORRIDORS OK TO COVER
FIRST FLOOR
Informational
07/16/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1019,1021-1031 -SCREW PATTERN AT MECHANICAL CLOSETS ***BUILDING B*** SCREW PATTERN AT UNITS Corridor soffit framing ok RC complete ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR ****MCAL BUILDING*** RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169-
Miscellaneous Correction
Corrective Action Required
07/16/2021
-1037 COMPLETE SECOND LAYER ABOVE CEILING -REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding
All Rough Inspection - Commercial Failed 7/20/2021 7/20/2021 07/20/2021
THIRD FLOOR
Informational
07/16/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** ROOMS: 3001, 3002, 3017, 3018, 3038, 3039, 3041, 3042, 3043, 3044, 3045, 3047 CORIDOOR TO SHAFT WALL STAIRWELL WALLS AND CEILING
SECOND FLOOR
Informational
07/16/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
07/16/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, 1037,1038,1049,1052 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT
Miscellaneous Correction
Corrective Action Required
07/16/2021
2044-INCOMPLETE 2045-INCOMPLETE 3047- COMPLETE MECHANICAL VENT/ DRAIN -MCAL- MIDPOINT STRAP AT ALL 2" AND SMALLER DWV
Rated Assembly Inspection Partial 7/21/2021 7/21/2021 07/21/2021
THIRD FLOOR
Informational
07/20/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFTS -SCREW PATTERN STAIRWELLS S2,3
SECOND FLOOR
Informational
07/20/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038,246,245,247 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS -SOFFITS IN CORRIDORS OK TO COVER -SCREW PATTERN STAIRWELLS S2,3
FIRST FLOOR
Informational
07/20/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1019,1021-1031 -SCREW PATTERN AT MECHANICAL CLOSETS ***BUILDING B*** SCREW PATTERN AT UNITS Corridor soffit framing ok RC complete ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S2,3 MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR ****MCAL BUILDING*** RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169-
Miscellaneous Correction
Corrective Action Required
07/20/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding
All Rough Inspection - Commercial Partial 7/21/2021 7/21/2021 07/21/2021
THIRD FLOOR
Informational
07/20/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
07/20/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
07/20/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, 1037,1038,1049,1052 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT ROOM 1041 OK FOR SOFFIT FRAMING ROOMS OK FOR BATHROOM PRE ROCK AND EXTERIOR WALL INSULATION:101,103,104,105,108,109,111,113-119,121
Miscellaneous Correction
Corrective Action Required
07/20/2021
2044-INCOMPLETE 2045-INCOMPLETE 1057-INSTALL DAMPERS, COMPLETE PLUMBING 1057A-REPAIR TRUSSES 024-REPAIR TRUSS
All Rough Inspection - Commercial Partial 7/22/2021 7/22/2021 07/22/2021
THIRD FLOOR
Informational
07/21/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
07/21/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
07/21/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, 1037,1038,1049,1052 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT ROOM 1041 OK FOR SOFFIT FRAMING ROOMS OK FOR BATHROOM PRE ROCK AND EXTERIOR WALL INSULATION:101,103,104,105,106,108,109,111-119,121
Miscellaneous Correction
Corrective Action Required
07/21/2021
2044-INCOMPLETE 2045-INCOMPLETE 1057-INSTALL DAMPERS, COMPLETE PLUMBING 1057A-REPAIR TRUSSES 024-REPAIR TRUSS
Rated Assembly Inspection Partial 7/22/2021 7/22/2021 07/22/2021
THIRD FLOOR
Informational
07/21/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFTS -SCREW PATTERN STAIRWELLS S2,3
SECOND FLOOR
Informational
07/21/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038,246,245,247 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS -SOFFITS IN CORRIDORS OK TO COVER -SCREW PATTERN STAIRWELLS S2,3
FIRST FLOOR
Informational
07/21/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1019,1021-1031 -SCREW PATTERN AT MECHANICAL CLOSETS -SCREW PATTERN ROOMS AND CORRIDOR ***BUILDING B*** SCREW PATTERN AT UNITS Corridor soffit framing ok RC complete ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER ****MCAL BUILDING*** RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101,103,104,105,106,108,109,111-119,121
Miscellaneous Correction
Corrective Action Required
07/21/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding
Piers/Caissons Inspection - Commercial Partial 7/22/2021 (10:00) 7/22/2021 07/22/2021
Misc
Informational
07/22/2021
Piers and ground rods for light pole bases: (11) piers South, West sides of building drive, Northeast corner at building
All Rough Inspection - Commercial Partial 7/23/2021 7/23/2021 07/23/2021
THIRD FLOOR
Informational
07/22/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
07/22/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
07/22/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, 1037,1038,1049,1052 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT ROOM 1041 OK FOR SOFFIT FRAMING ROOMS OK FOR BATHROOM PRE ROCK AND EXTERIOR WALL INSULATION:101-106,108,109-123,128,130,131,133,136,137,141-144
Miscellaneous Correction
Corrective Action Required
07/22/2021
2044-INCOMPLETE 2045-INCOMPLETE 1057-INSTALL DAMPERS, COMPLETE PLUMBING 1057A-REPAIR TRUSSES 024-REPAIR TRUSS MCAL- -PARTY WALLS-PROVIDE STUD SHOES AT ALL STUDS OVERBORED BY SPRINKLER LINE -SEAL ALL GAPS AND PENETRATIONS IN SMOKE WALLS
Rated Assembly Inspection Partial 7/23/2021 7/23/2021 07/23/2021
THIRD FLOOR
Informational
07/22/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFTS -SCREW PATTERN STAIRWELLS S2,3
SECOND FLOOR
Informational
07/22/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038,246,245,247 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS -SOFFITS IN CORRIDORS OK TO COVER -SCREW PATTERN STAIRWELLS S2,3
FIRST FLOOR
Informational
07/22/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1019,1021-1031 -SCREW PATTERN AT MECHANICAL CLOSETS -SCREW PATTERN ROOMS AND CORRIDOR ***BUILDING B*** SCREW PATTERN AT UNITS Corridor soffit framing ok RC complete ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER ****MCAL BUILDING*** RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-123,128,130,131,133,136,137,141-144
Miscellaneous Correction
Corrective Action Required
07/22/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
Piers/Caissons Inspection - Commercial Partial 7/23/2021 (11:30) 7/23/2021 07/23/2021
Misc
Informational
07/22/2021
Piers and ground rods for (21) light pole bases around drive
Rated Assembly Inspection Failed 7/26/2021 7/26/2021 07/26/2021
THIRD FLOOR
Informational
07/23/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFTS -SCREW PATTERN STAIRWELLS S2,3
SECOND FLOOR
Informational
07/23/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038,246,245,247 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS -SOFFITS IN CORRIDORS OK TO COVER -SCREW PATTERN STAIRWELLS S2,3
FIRST FLOOR
Informational
07/23/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1019,1021-1031 -SCREW PATTERN AT MECHANICAL CLOSETS -SCREW PATTERN ROOMS AND CORRIDOR ***BUILDING B*** SCREW PATTERN AT UNITS Corridor soffit framing ok RC complete ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 MCAL BUILDING: RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER ****MCAL BUILDING*** RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-123,128,130,131,133,136,137,141-144
Miscellaneous Correction
Corrective Action Required
07/23/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS -LOWER CEILING BOXES TO FACE OF ROCK AND SEAL PENETRATIONS AT SEPARATION WALLS AND CORRIDORS -COMPLETE SCREW PATTERN IN BUILDING 2A
All Rough Inspection - Commercial Failed 7/26/2021 7/26/2021 07/26/2021
THIRD FLOOR
Informational
07/23/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
07/23/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
07/23/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, 1037,1038,1049,1052 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT ROOM 1041 OK FOR SOFFIT FRAMING ROOMS OK FOR BATHROOM PRE ROCK AND EXTERIOR WALL INSULATION:101-106,108,109-123,128,130,131,133,136,137,141-144
Miscellaneous Correction
Corrective Action Required
07/23/2021
2044-INCOMPLETE 2045-INCOMPLETE 1057-INSTALL DAMPERS, COMPLETE PLUMBING 1057A-REPAIR TRUSSES 024-REPAIR TRUSS MCAL- -PARTY WALLS-PROVIDE STUD SHOES AT ALL STUDS OVERBORED BY SPRINKLER LINE -SEAL ALL GAPS AND PENETRATIONS AT SMOKE WALLS
Rated Assembly Inspection Partial 7/28/2021 7/28/2021 07/28/2021
THIRD FLOOR
Informational
07/26/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFTS -SCREW PATTERN STAIRWELLS S2,3
SECOND FLOOR
Informational
07/26/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038,246,245,247 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS -SOFFITS IN CORRIDORS OK TO COVER -SCREW PATTERN STAIRWELLS S2,3, 2037 -
FIRST FLOOR
Informational
07/26/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1019,1021-1031 -SCREW PATTERN AT MECHANICAL CLOSETS -SCREW PATTERN ROOMS AND CORRIDOR ***BUILDING B*** SCREW PATTERN AT UNITS Corridor soffit framing ok RC complete ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-123,126,128,130,131,133,135-137,139,141-146
Miscellaneous Correction
Corrective Action Required
07/26/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS -LOWER CEILING BOXES TO FACE OF ROCK AND SEAL PENETRATIONS AT SEPARATION WALLS AND CORRIDORS -COMPLETE SCREW PATTERN IN BUILDING 2A
All Rough Inspection - Commercial Partial 7/28/2021 7/28/2021 07/28/2021
THIRD FLOOR
Informational
07/26/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
07/26/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
07/26/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, 1037,1038,1049,1052 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 1057 OK TO ROCK FOR ELECTRICAL GEAR EAST AND SOUTH WALLS STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT ROOM 1041 OK FOR SOFFIT FRAMING ROOMS OK FOR BATHROOM PRE ROCK AND EXTERIOR WALL INSULATION::101-106,108,109-123,126,128,130,131,133,135-137,139,141-146
Miscellaneous Correction
Corrective Action Required
07/26/2021
2044-INCOMPLETE 2045-INCOMPLETE 1057-INSTALL DAMPERS, COMPLETE PLUMBING 1057A-REPAIR TRUSSES 024-REPAIR TRUSS MCAL- -PARTY WALLS-PROVIDE STUD SHOES AT ALL STUDS OVERBORED BY SPRINKLER LINE -SEAL ALL GAPS AND PENETRATIONS AT SMOKE WALLS
Rated Assembly Inspection Partial 7/29/2021 7/29/2021 07/29/2021
THIRD FLOOR
Informational
07/28/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFTS -SCREW PATTERN STAIRWELLS S2,3
SECOND FLOOR
Informational
07/28/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038,246,245,247 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS -SOFFITS IN CORRIDORS OK TO COVER -SCREW PATTERN STAIRWELLS S2,3, 2037 -SCREW PATTERN ROOMS AND CORRIDORS EXCEPT 2001
FIRST FLOOR
Informational
07/28/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1019,1021-1031 -SCREW PATTERN AT MECHANICAL CLOSETS -SCREW PATTERN ROOMS AND CORRIDOR ***BUILDING B*** SCREW PATTERN AT UNITS Corridor soffit framing ok RC complete ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128,,130,131,133,135-137,139,140-146
Miscellaneous Correction
Corrective Action Required
07/28/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS -LOWER CEILING BOXES TO FACE OF ROCK AND SEAL PENETRATIONS AT SEPARATION WALLS AND CORRIDORS -COMPLETE SCREW PATTERN IN BUILDING 2A-ROOM 2001
All Rough Inspection - Commercial Partial 7/29/2021 7/29/2021 07/29/2021
THIRD FLOOR
Informational
07/28/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
07/28/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
07/28/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, 1037,1038,1049,1052 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048,1057,1057A ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT ROOM 1041 OK FOR SOFFIT FRAMING ROOMS OK FOR BATHROOM PRE ROCK AND EXTERIOR WALL INSULATION::101-106,108,109-128,,130,131,133,135-137,139,140-146
Miscellaneous Correction
Corrective Action Required
07/28/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL- -PARTY WALLS-PROVIDE STUD SHOES AT ALL STUDS OVERBORED BY SPRINKLER LINE
Rated Assembly Inspection Partial 8/2/2021 8/2/2021 08/02/2021
THIRD FLOOR
Informational
07/29/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL CORRIDOR WALLS AND CEILING TO SHAFT WALL SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFTS, SHAFT LAYER -SCREW PATTERN STAIRWELLS S2,3
SECOND FLOOR
Informational
07/29/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038,246,245,247 RC CHANNEL CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS -SOFFITS IN CORRIDORS OK TO COVER -SCREW PATTERN STAIRWELLS S2,3, 2037-FIRST LAYER FOR SHAFT -SCREW PATTERN ROOMS AND CORRIDORS EXCEPT 2001
FIRST FLOOR
Informational
07/29/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1019,1021-1031 -SCREW PATTERN AT MECHANICAL CLOSETS -SCREW PATTERN ROOMS AND CORRIDOR ***BUILDING B*** SCREW PATTERN AT UNITS Corridor soffit framing ok RC complete ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128,,130,131,133,135-137,139,140-146
Miscellaneous Correction
Corrective Action Required
07/29/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS -LOWER CEILING BOXES TO FACE OF ROCK AND SEAL PENETRATIONS AT SEPARATION WALLS AND CORRIDORS -COMPLETE SCREW PATTERN IN BUILDING 2A-ROOM 2001
All Rough Inspection - Commercial Failed 8/2/2021 8/2/2021 08/02/2021
THIRD FLOOR
Informational
07/29/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
07/29/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
07/29/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, 1037,1038,1049,1052 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048,1057,1057A ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT ROOM 1041 OK FOR SOFFIT FRAMING ROOMS OK FOR BATHROOM PRE ROCK AND EXTERIOR WALL INSULATION::101-106,108,109-128,,130,131,133,135-137,139,140-146
Miscellaneous Correction
Corrective Action Required
07/29/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL- -PARTY WALLS-PROVIDE STUD SHOES AT ALL STUDS OVERBORED BY SPRINKLER LINE -CORRIDOR 167- SUPPORT AC, SEAL SMOKE WALL, COMPLETE MECHANICAL
Rated Assembly Inspection Partial 8/3/2021 8/3/2021 08/03/2021
THIRD FLOOR
Informational
08/02/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A RC CHANNEL AND RATED LAYER CORRIDOR WALLS AND CEILING SCREW PATTERN AT ROOMS: 3001,3002,3017,3018,3039-3041,3043,3044 3038 -FIRST LAYER AT HVAC SHAFTS, SHAFT LAYER -STAIRWELLS S2,3
SECOND FLOOR
Informational
08/02/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038,246,245,247 RC CHANNEL AND RATED LAYER CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS -SOFFITS IN CORRIDORS OK TO COVER -SCREW PATTERN STAIRWELLS S2,3, 2037-FIRST LAYER FOR SHAFT -SCREW PATTERN ROOMS AND CORRIDORS EXCEPT 2001
FIRST FLOOR
Informational
08/02/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1019,1021-1031 -SCREW PATTERN AT MECHANICAL CLOSETS -SCREW PATTERN ROOMS AND CORRIDOR ***BUILDING B*** SCREW PATTERN AT UNITS Corridor soffit framing ok RC complete ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128,,130,131,133,135-137,139,140-146
Miscellaneous Correction
Corrective Action Required
08/02/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS -LOWER CEILING BOXES TO FACE OF ROCK AND SEAL PENETRATIONS AT SEPARATION WALLS AND CORRIDORS -COMPLETE SCREW PATTERN IN BUILDING 2A-ROOM 2001
All Rough Inspection - Commercial Partial 8/3/2021 8/3/2021 08/03/2021
THIRD FLOOR
Informational
08/02/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
08/02/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
08/02/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1046, 1053, 1056, 1059, 1061, 1062, 1037,1038,1049,1052 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048,1057,1057A ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT ROOM 1041 OK FOR SOFFIT FRAMING ROOMS OK FOR BATHROOM PRE ROCK AND EXTERIOR WALL INSULATION::101-106,108,109-128,,130,131,133,135-137,139,140-146
Miscellaneous Correction
Corrective Action Required
08/02/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL- -PARTY WALLS-PROVIDE STUD SHOES AT ALL STUDS OVERBORED BY SPRINKLER LINE -CORRIDOR 167- SUPPORT AC, SEAL SMOKE WALL, COMPLETE MECHANICAL
All Rough Inspection - Commercial Partial 8/6/2021 8/6/2021 08/06/2021
THIRD FLOOR
Informational
08/03/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
08/03/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
08/03/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1041,1042,1046, 1053, 1056, 1059, 1061, 1062, 1037,1038,1049,1052 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL STAIRWELL WALLS AND CEILING ROOMS 1018, 1061, 1045,1047,1048,1057,1057A ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT ROOM 1041 OK FOR SOFFIT FRAMING ROOMS OK FOR BATHROOM PRE ROCK, AND EXTERIOR WALL INSULATION::101-106,108,109-128,,130,131,133,135-137,139,140-146 ROOMS OK FOR MECHANICAL ROOM PRE ROCK:101-107,109-113,115-123
Miscellaneous Correction
Corrective Action Required
08/03/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL- -PARTY WALLS-PROVIDE STUD SHOES AT ALL STUDS OVERBORED BY SPRINKLER LINE -CORRIDOR 167- SUPPORT AC, SEAL SMOKE WALL, COMPLETE MECHANICAL
Rated Assembly Inspection Partial 8/6/2021 8/6/2021 08/06/2021
THIRD FLOOR
Informational
08/03/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
08/03/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: RC CHANNEL ROOMS: 2039-2042, 2044 RC CHANNEL ROOMS 2001, 2002, 2018,2037,2038,246,245,247 RC CHANNEL AND RATED LAYER CORRIDOR WALLS AND CEILNIG FIRST LAYER AT BATHROOM CEILINGS 2001,2002,2017,2018,2042 SHAFT LAYER AT CORRIDORS, SECOND LAYER AT CORRIDORS -SOFFITS IN CORRIDORS OK TO COVER -SCREW PATTERN STAIRWELLS S2,3, 2037-SHAFT LAYER COMPLETE -SCREW PATTERN ROOMS AND CORRIDORS EXCEPT 2001
FIRST FLOOR
Informational
08/03/2021
-AREAS APPROVED- ***BUILDING C*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL FIRST LAYER BATHROOM CEILINGS: -1019-1031 RC CHANNEL AT ROOMS 1019-1031 RC CHANNEL AT CORRIDOR WALLS AND CEILING TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS 1019-1031 SHAFT LAYER AND SECOND LAYER AT CORRIDOR RATED LAYER AT CEILINGS IN BATHROOMS: 1019,1021-1031 -SCREW PATTERN AT MECHANICAL CLOSETS -SCREW PATTERN ROOMS AND CORRIDOR ***BUILDING B*** SCREW PATTERN AT UNITS Corridor soffit framing ok RC complete ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128,,130,131,133,135-137,139,140-146 -RATED CEILING LAYER AT BATHROOMS 1046,1047
Miscellaneous Correction
Corrective Action Required
08/03/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS -LOWER CEILING BOXES TO FACE OF ROCK AND SEAL PENETRATIONS AT SEPARATION WALLS AND CORRIDORS -COMPLETE SCREW PATTERN IN BUILDING 2A-ROOM 2001
Gas Service Inspection - Commercial Passed 8/10/2021 8/10/2021 08/10/2021
All Rough Inspection - Commercial Partial 8/10/2021 8/10/2021 08/10/2021
THIRD FLOOR
Informational
08/06/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
08/06/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
08/06/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1046, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL STAIRWELL WALLS AND CEILING ROOMS 1061, 1045,1047,1048,1057,1057A ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT ROOM 1041 OK FOR SOFFIT FRAMING ROOMS OK FOR BATHROOM PRE ROCK, AND EXTERIOR WALL INSULATION::101-106,108,109-128,,130,131,133,135-137,139,140-146, Kitchen 164 OK FOR INSULATION AT EXTERIOR WALL ROOMS OK FOR MECHANICAL ROOM PRE ROCK:101-107,109-113,115-123 CORRIDOR 167 TO 10' FROM SHAFT WALL
Miscellaneous Correction
Corrective Action Required
08/06/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL- -PARTY WALLS-PROVIDE STUD SHOES AT ALL STUDS OVERBORED BY SPRINKLER LINE
Rated Assembly Inspection Partial 8/10/2021 8/10/2021 08/10/2021
THIRD FLOOR
Informational
08/06/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
08/06/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2045
FIRST FLOOR
Informational
08/06/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128,,130,131,133,135-137,139,140-146 -RATED CEILING LAYER AT BATHROOMS 1046,1047
Miscellaneous Correction
Corrective Action Required
08/06/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
Rated Assembly Inspection Partial 8/11/2021 8/11/2021 08/11/2021
THIRD FLOOR
Informational
08/10/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
08/10/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2045
FIRST FLOOR
Informational
08/10/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128,,130,131,133,135-137,139,140-146 -RATED CEILING LAYER AT BATHROOMS 1046,1047
Miscellaneous Correction
Corrective Action Required
08/10/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Partial 8/11/2021 8/11/2021 08/11/2021
THIRD FLOOR
Informational
08/10/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
08/10/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
08/10/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1046, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL STAIRWELL WALLS AND CEILING ROOMS 1061, 1045,1047,1048,1057,1057A,1058 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT ROOM 1041 OK FOR SOFFIT FRAMING ROOMS OK FOR BATHROOM PRE ROCK, AND EXTERIOR WALL INSULATION::101-106,108,109-128,,130,131,133,135-137,139,140-146, Kitchen 164 OK FOR INSULATION AT EXTERIOR WALL ROOMS OK FOR MECHANICAL ROOM PRE ROCK:101-107,109-113,115-123 CORRIDOR 167 TO 10' FROM SHAFT WALL ROOMS: 113,115,116,119
Miscellaneous Correction
Corrective Action Required
08/10/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL- -PARTY WALLS-PROVIDE STUD SHOES AT ALL STUDS OVERBORED BY SPRINKLER LINE
Rated Assembly Inspection Partial 8/13/2021 8/13/2021 08/13/2021
THIRD FLOOR
Informational
08/11/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
08/11/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2045
FIRST FLOOR
Informational
08/11/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1032,1034,1037,1039,1055,1061,1062 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128,,130,131,133,135-137,139,140-146 -RATED CEILING LAYER AT BATHROOMS 1046,1047
Miscellaneous Correction
Corrective Action Required
08/11/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Partial 8/13/2021 8/13/2021 08/13/2021
THIRD FLOOR
Informational
08/11/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
08/11/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
08/11/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1046, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL STAIRWELL WALLS AND CEILING ROOMS OK FOR BATHROOM PRE ROCK MC: 3,7,8,10,11,13,14,15,16,18 ROOMS 1061, 1045,1047,1048,1057,1057A,1058 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT ROOM 1041 OK FOR SOFFIT FRAMING ROOMS OK FOR BATHROOM PRE ROCK, AND EXTERIOR WALL INSULATION::101- 106,108,109-128,,130,131,133,135-137,139,140-146, Kitchen 164 OK FOR INSULATION AT EXTERIOR WALL ROOMS OK FOR MECHANICAL ROOM PRE ROCK:101-107,109-113,115-123 CORRIDOR 167 TO 10' FROM SHAFT WALL ROOMS:102,110-113,115,116,118-123
Miscellaneous Correction
Corrective Action Required
08/11/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL- -117 PLATE PENETRATION -115 ANCHOR BOLTS -114 COMPLETE PLUMBING, ANCHOR BOLTS -101 FIX SHEAR WALL AND NAIL BOTH -106 COMPLETE SPRINKLER, PUTTY PACKS -105 PUTTY PACKS -108 SEAL PENETRATIONS, PROTECT NM -103-109 PROVIDE ANCHOR BOLTS 32" OC AND WITHIN 12" OF PLATE BREAK
Rated Assembly Inspection Partial 8/17/2021 8/17/2021 08/17/2021
THIRD FLOOR
Informational
08/13/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
08/13/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2045
FIRST FLOOR
Informational
08/13/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1054,10561055,1061,1062 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128,,130,131,133,135-137,139,140-146 RC CHANNEL ROOMS: 102-113,115-123 -RATED CEILING LAYER AT BATHROOMS 1046,1047
Miscellaneous Correction
Corrective Action Required
08/13/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Partial 8/17/2021 8/17/2021 08/17/2021
THIRD FLOOR
Informational
08/13/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
08/13/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
08/13/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1046, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL STAIRWELL WALLS AND CEILING ROOMS OK FOR BATHROOM PRE ROCK MC: 3,7,8,10,11,13,14,15,16,18 ROOMS 1061, 1045,1047,1048,1057,1057A,1058 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT ROOM 1041 OK FOR SOFFIT FRAMING ROOMS OK FOR BATHROOM PRE ROCK, AND EXTERIOR WALL INSULATION::101- 106,108,109-128,,130,131,133,135-137,139,140-146, Kitchen 164 OK FOR INSULATION AT EXTERIOR WALL ROOMS OK FOR MECHANICAL ROOM PRE ROCK:101-107,109-113,115-123 CORRIDOR 167 TO 10' FROM SHAFT WALL ROOMS:102-113,115-123
Miscellaneous Correction
Corrective Action Required
08/13/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL- -114 COMPLETE PLUMBING, ANCHOR BOLTS -101 FIX SHEAR WALL AND NAIL BOTH -105 PUTTY PACKS
All Rough Inspection - Commercial Failed 8/18/2021 8/18/2021 08/18/2021
THIRD FLOOR
Informational
08/17/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
08/17/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
08/17/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1046, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052 **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL STAIRWELL WALLS AND CEILING ROOMS OK FOR BATHROOM PRE ROCK MC: 3,7,8,10,11,13,14,15,16,18 ROOMS 1061, 1045,1047,1048,1057,1057A,1058 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT ROOM 1041 OK FOR SOFFIT FRAMING ROOMS OK FOR BATHROOM PRE ROCK, AND EXTERIOR WALL INSULATION::101- 106,108,109-128,,130,131,133,135-137,139,140-146, Kitchen 164 OK FOR INSULATION AT EXTERIOR WALL ROOMS OK FOR MECHANICAL ROOM PRE ROCK:101-107,109-113,115-123 CORRIDOR 167 TO 10' FROM SHAFT WALL ROOMS:102-113,115-123
Miscellaneous Correction
Corrective Action Required
08/17/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL- -114 COMPLETE PLUMBING, ANCHOR BOLTS -101 FIX SHEAR WALL AND NAIL BOTH -105 PUTTY PACKS
Piers/Caissons Inspection - Commercial Failed 8/18/2021 08/18/2021
Misc
Informational
07/23/2021
Piers and ground rods for (21) light pole bases around drive
Rated Assembly Inspection Partial 8/18/2021 8/18/2021 08/18/2021
THIRD FLOOR
Informational
08/17/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
08/17/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2045
FIRST FLOOR
Informational
08/17/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1054,10561055,1061,1062 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128,,130,131,133,135-137,139,140-146 RC CHANNEL ROOMS: 102-113,115-123 -RATED CEILING LAYER AT BATHROOMS 1046,1047 -RC FOR PREROCK AT MC UNITS 1-18
Miscellaneous Correction
Corrective Action Required
08/17/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
Rated Assembly Inspection Partial 8/19/2021 8/19/2021 08/19/2021
THIRD FLOOR
Informational
08/18/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
08/18/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2045
FIRST FLOOR
Informational
08/18/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1054,1056,1057A,1055,1061,1062 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128,,130,131,133,135-137,139,140-146 RC CHANNEL ROOMS: 102-113,115-123 -RATED CEILING LAYER AT BATHROOMS 1046,1047 -RC FOR PREROCK AT MC UNITS 1-18
Miscellaneous Correction
Corrective Action Required
08/18/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Partial 8/19/2021 8/19/2021 08/19/2021
THIRD FLOOR
Informational
08/18/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
08/18/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
08/18/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1046, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOMS OK FOR BATHROOM PRE ROCK WITH RC: 1-18 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT Kitchen 164 OK FOR INSULATION AT EXTERIOR WALL ROOMS OK FOR MECHANICAL ROOM PRE ROCK:101-107,109-113,115-123 CORRIDOR 167 TO 10' FROM SHAFT WALL ROOMS:102-113,115-123
Miscellaneous Correction
Corrective Action Required
08/18/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL- -114 COMPLETE PLUMBING, ANCHOR BOLTS -101 FIX SHEAR WALL AND NAIL BOTH -105 PUTTY PACKS
Piers/Caissons Inspection - Commercial Partial 8/19/2021 8/19/2021 08/19/2021
Misc
Informational
08/18/2021
Piers and ground rods for (21) light pole bases around drive Piers and ground rods for (5) light pole bases in MCAL courtyards
Rated Assembly Inspection Partial 8/20/2021 8/20/2021 08/20/2021
THIRD FLOOR
Informational
08/19/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
08/19/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2045
FIRST FLOOR
Informational
08/19/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1054,1056,1057A,1055,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128-130,131,133,135-137,139,140-147 RC CHANNEL ROOMS: 102-113,115-123 -RC FOR PREROCK AT MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-104,106-108,110,112
Miscellaneous Correction
Corrective Action Required
08/19/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Partial 8/20/2021 8/20/2021 08/20/2021
THIRD FLOOR
Informational
08/19/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
08/19/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
08/19/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1046, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOMS OK FOR BATHROOM PRE ROCK WITH RC: 1-18, ROOMS FOR BATHROOM PRE ROCK: 101-106,108,109-133,135-137,139,140-147 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT Kitchen 164 OK FOR INSULATION AT EXTERIOR WALL ROOMS OK FOR MECHANICAL ROOM PRE ROCK:101-107,109-113,115-123 CORRIDOR 167 TO 10' FROM SHAFT WALL ROOMS:102-113,115-123
Miscellaneous Correction
Corrective Action Required
08/19/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL- -114 COMPLETE PLUMBING, ANCHOR BOLTS -101 FIX SHEAR WALL AND NAIL BOTH -105 PUTTY PACKS
Rated Assembly Inspection Failed 8/23/2021 8/23/2021 08/23/2021
THIRD FLOOR
Informational
08/20/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
08/20/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2045
FIRST FLOOR
Informational
08/20/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1054,1056,1057A,1055,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128-130,131,133,135-137,139,140-147 RC CHANNEL ROOMS: 102-113,115-123 -RC FOR PREROCK AT MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-104,106-108,110,112
Miscellaneous Correction
Corrective Action Required
08/20/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Failed 8/23/2021 8/23/2021 08/23/2021
THIRD FLOOR
Informational
08/20/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
08/20/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
08/20/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1046, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOMS OK FOR BATHROOM PRE ROCK WITH RC: 1-18, ROOMS FOR BATHROOM PRE ROCK: 101-106,108,109-133,135-137,139,140-147 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT Kitchen 164 OK FOR INSULATION AT EXTERIOR WALL ROOMS OK FOR MECHANICAL ROOM PRE ROCK:101-107,109-113,115-123 CORRIDOR 167 TO 10' FROM SHAFT WALL ROOMS:102-113,115-123
Miscellaneous Correction
Corrective Action Required
08/20/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL- -114 COMPLETE PLUMBING, ANCHOR BOLTS -101 FIX SHEAR WALL AND NAIL BOTH -105 PUTTY PACKS
All Rough Inspection - Commercial Partial 8/24/2021 8/24/2021 08/24/2021
THIRD FLOOR
Informational
08/23/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
08/23/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
08/23/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1046, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOMS OK FOR BATHROOM PRE ROCK WITH RC: 1-18, ROOMS FOR BATHROOM PRE ROCK: 101-106,108,109-133,135-137,139,140-147 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT Kitchen 164 OK FOR INSULATION AT EXTERIOR WALL ROOMS OK FOR MECHANICAL ROOM PRE ROCK:101-107,109-113,115-123 CORRIDOR 167 TO 10' FROM SHAFT WALL ROOMS:102-113,115-123
Miscellaneous Correction
Corrective Action Required
08/23/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL- -114 COMPLETE PLUMBING, ANCHOR BOLTS -101 FIX SHEAR WALL AND NAIL BOTH -105 PUTTY PACKS
Rated Assembly Inspection Partial 8/24/2021 8/24/2021 08/24/2021
THIRD FLOOR
Informational
08/23/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
08/23/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2045
FIRST FLOOR
Informational
08/23/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1054,1056,1057A,1055,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128-130,131,133,135-137,139,140-147 RC CHANNEL ROOMS: 102-113,115-123 -RC FOR PREROCK AT MC UNITS 1-18 -SCREW PATTERN AT BATHROOMS -MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-104,106-108,110,112
Miscellaneous Correction
Corrective Action Required
08/23/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Failed 8/25/2021 8/25/2021 08/25/2021
THIRD FLOOR
Informational
08/24/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
08/24/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
08/24/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1046, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOMS OK FOR BATHROOM PRE ROCK WITH RC: 1-18, ROOMS FOR BATHROOM PRE ROCK: 101-106,108,109-133,135-137,139,140-147 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT Kitchen 164 OK FOR INSULATION AT EXTERIOR WALL ROOMS OK FOR MECHANICAL ROOM PRE ROCK:101-107,109-113,115-123 CORRIDOR 167 TO 10' FROM SHAFT WALL ROOMS:102-113,115-123
Miscellaneous Correction
Corrective Action Required
08/24/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL- -114 COMPLETE PLUMBING, ANCHOR BOLTS -101 FIX SHEAR WALL AND NAIL BOTH -105 PUTTY PACKS
Rated Assembly Inspection Partial 8/25/2021 8/25/2021 08/25/2021
THIRD FLOOR
Informational
08/24/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
08/24/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2045
FIRST FLOOR
Informational
08/24/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1054,1056,1057A,1055,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128-130,131,133,135-137,139,140-147 RC CHANNEL ROOMS: 102-113,115-123 -RC FOR PREROCK AT MC UNITS 1-18 -SCREW PATTERN AT BATHROOMS -MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-104,106-109,110,112,114,116,117,118,120,121,123
Miscellaneous Correction
Corrective Action Required
08/24/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
Rated Assembly Inspection Partial 8/26/2021 8/26/2021 08/26/2021
THIRD FLOOR
Informational
08/25/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
08/25/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2045
FIRST FLOOR
Informational
08/25/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1054,1056,1057,1057A,1055,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128-130,131,133,135-137,139,140-147 RC CHANNEL ROOMS: 102-147 -RC FOR PREROCK AT MC UNITS 1-18 -SCREW PATTERN AT BATHROOMS -MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-123
Miscellaneous Correction
Corrective Action Required
08/25/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Partial 8/26/2021 8/26/2021 08/26/2021
THIRD FLOOR
Informational
08/25/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
08/25/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
08/25/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1046, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOMS OK FOR BATHROOM PRE ROCK WITH RC: 1-18, ROOMS FOR BATHROOM PRE ROCK: 101-106,108,109-133,135-137,139,140-147 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT Kitchen 164 OK FOR INSULATION AT EXTERIOR WALL ROOMS OK FOR MECHANICAL ROOM PRE ROCK:101-107,109-113,115-123 CORRIDOR 167 TO 10' FROM SHAFT WALL ROOMS:102-147
Miscellaneous Correction
Corrective Action Required
08/25/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL-
All Rough Inspection - Commercial Partial 8/27/2021 8/27/2021 08/27/2021
THIRD FLOOR
Informational
08/26/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
08/26/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
08/26/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1046, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOMS OK FOR BATHROOM PRE ROCK WITH RC: 1-18, ROOMS FOR BATHROOM PRE ROCK: 101-106,108,109-133,135-137,139,140-147 ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT Kitchen 164 OK FOR INSULATION AT EXTERIOR WALL ROOMS OK FOR MECHANICAL ROOM PRE ROCK:101-107,109-113,115-123 CORRIDOR 167 TO 10' FROM SHAFT WALL ROOMS:102-147
Miscellaneous Correction
Corrective Action Required
08/26/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL-
Rated Assembly Inspection Partial 8/27/2021 8/27/2021 08/27/2021
THIRD FLOOR
Informational
08/26/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
08/26/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2045
FIRST FLOOR
Informational
08/26/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 OK TO INSTALL RC FOR SOFFITS IN CORRIDOR THROUGHOUT -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1054,1056,1057,1057A,1055,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128-130,131,133,135-137,139,140-147 RC CHANNEL ROOMS: 102-147 -RC FOR PREROCK AT MC UNITS 1-18 -SCREW PATTERN AT BATHROOMS -MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-123
Miscellaneous Correction
Corrective Action Required
08/26/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
Rated Assembly Inspection Partial 8/27/2021 8/27/2021 08/27/2021
THIRD FLOOR
Informational
08/27/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
08/27/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2045
FIRST FLOOR
Informational
08/27/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128-130,131,133,135-137,139,140-147 RC CHANNEL ROOMS: 102-147 -RC FOR PREROCK AT MC UNITS 1-18 -SCREW PATTERN AT BATHROOMS -MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-123
Miscellaneous Correction
Corrective Action Required
08/27/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
Rated Assembly Inspection Partial 8/30/2021 8/30/2021 08/30/2021
THIRD FLOOR
Informational
08/27/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
08/27/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2045
FIRST FLOOR
Informational
08/27/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128-130,131,133,135-137,139,140-147 RC CHANNEL ROOMS: 102-147 -RC FOR PREROCK AT MC UNITS 1-18 -SCREW PATTERN AT BATHROOMS -MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-123
Miscellaneous Correction
Corrective Action Required
08/27/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Partial 8/30/2021 8/30/2021 08/30/2021
THIRD FLOOR
Informational
08/27/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
08/27/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
08/27/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1046, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 OK FOR ROCK BEHIND ELECTRICAL EQUIPMENT Kitchen 164 OK CORRIDOR 167 TO 10' FROM SHAFT WALL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
08/27/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL-
Rated Assembly Inspection Partial 8/31/2021 8/31/2021 08/31/2021
THIRD FLOOR
Informational
08/30/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
08/30/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2045
FIRST FLOOR
Informational
08/30/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128-130,131,133,135-137,139,140-147 RC CHANNEL ROOMS: 102-147 -RC FOR PREROCK AT MC UNITS 1-18 -SCREW PATTERN AT BATHROOMS -MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-145, 147
Miscellaneous Correction
Corrective Action Required
08/30/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS -146 SUPPORT PEX AT BATHROOM CEILING RATED LAYER
All Rough Inspection - Commercial Partial 9/1/2021 9/1/2021 09/01/2021
THIRD FLOOR
Informational
08/30/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
08/30/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
08/30/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK CORRIDOR 167 TO 10' FROM SHAFT WALL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
08/30/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL-
Rated Assembly Inspection Partial 9/1/2021 9/1/2021 09/01/2021
THIRD FLOOR
Informational
08/31/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
08/31/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2045
FIRST FLOOR
Informational
08/31/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128-130,131,133,135-137,139,140-147 RC CHANNEL ROOMS: 102-147 -RC FOR PREROCK AT MC UNITS 1-18 -SCREW PATTERN AT BATHROOMS -MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-115
Miscellaneous Correction
Corrective Action Required
08/31/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS -146 SUPPORT PEX AT BATHROOM CEILING RATED LAYER
All Rough Inspection - Commercial Partial 9/2/2021 9/2/2021 09/02/2021
THIRD FLOOR
Informational
09/01/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
09/01/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
09/01/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING **MCAL BUILDING** PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169 TO RM 123 CORRIDOR 172 TO RM 110 CORRIDOR 173 TO RM 102 UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
09/01/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL-
Rated Assembly Inspection Partial 9/2/2021 9/2/2021 09/02/2021
THIRD FLOOR
Informational
09/01/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
09/01/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2044
FIRST FLOOR
Informational
09/01/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128-130,131,133,135-137,139,140-147 RC CHANNEL ROOMS: 102-147 -RC FOR PREROCK AT MC UNITS 1-18 -SCREW PATTERN AT BATHROOMS -MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-123
Miscellaneous Correction
Corrective Action Required
09/01/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS -146 SUPPORT PEX AT BATHROOM CEILING RATED LAYER
All Rough Inspection - Commercial Partial 9/3/2021 9/3/2021 09/03/2021
THIRD FLOOR
Informational
09/02/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
09/02/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
09/02/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169 TO RM 123 CORRIDOR 172 TO RM 110 CORRIDOR 173 TO RM 102 SHARED SPACES OK FOR RC 150-174 UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
09/02/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL-
Rated Assembly Inspection Partial 9/3/2021 9/3/2021 09/03/2021
THIRD FLOOR
Informational
09/02/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
09/02/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2044
FIRST FLOOR
Informational
09/02/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128-130,131,133,135-137,139,140-147, 181,182 RC CHANNEL ROOMS: 102-147 -RC FOR PREROCK AT MC UNITS 1-18, -SCREW PATTERN AT BATHROOMS -MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-123
Miscellaneous Correction
Corrective Action Required
09/02/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Failed 9/8/2021 9/8/2021 09/08/2021
THIRD FLOOR
Informational
09/03/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
09/03/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
09/03/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169 TO RM 123 CORRIDOR 172 TO RM 110 CORRIDOR 173 TO RM 102 SHARED SPACES OK FOR RC 150-174 UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
09/03/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL-
Rated Assembly Inspection Partial 9/8/2021 9/8/2021 09/08/2021
THIRD FLOOR
Informational
09/03/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
09/03/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2044
FIRST FLOOR
Informational
09/03/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128-130,131,133,135-137,139,140-147, 181,182 RC CHANNEL ROOMS: 102-147 RC CORRIDORS 169,172,173 WALLS ONLY -RC FOR PREROCK AT MC UNITS 1-18, -SCREW PATTERN AT BATHROOMS -MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-123
Miscellaneous Correction
Corrective Action Required
09/03/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Partial 9/10/2021 9/10/2021 09/10/2021
THIRD FLOOR
Informational
09/08/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
09/08/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
09/08/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169 SHARED SPACES OK FOR RC 150-174 UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
09/08/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MCAL-
Rated Assembly Inspection Partial 9/10/2021 9/10/2021 09/10/2021
THIRD FLOOR
Informational
09/08/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
09/08/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2044
FIRST FLOOR
Informational
09/08/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128-130,131,133,135-137,139,140-147, 181,182 RC CHANNEL ROOMS: 102-147 RC CORRIDORS 169,172,173 WALLS ONLY -RC FOR PREROCK AT MC UNITS 1-18, -SCREW PATTERN AT BATHROOMS -MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-129, 131-137, 139-147
Miscellaneous Correction
Corrective Action Required
09/08/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
Rated Assembly Inspection Partial 9/13/2021 9/13/2021 09/13/2021
THIRD FLOOR
Informational
09/10/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
09/10/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2044
FIRST FLOOR
Informational
09/10/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A SCREW PATTERN AT CORRIDOR SOFFITS-OK FOR FRAMING: 172,173,169- RC AT PRE ROCK FOR BATHROOM CEILINGS:101-106,108,109-128-130,131,133,135-137,139,140-147, 181,182 RC CHANNEL ROOMS: 102-147 RC CORRIDORS 169,172,173 WALLS ONLY -RC FOR PREROCK AT MC UNITS 1-18, -SCREW PATTERN AT BATHROOMS -MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-147
Miscellaneous Correction
Corrective Action Required
09/10/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Partial 9/13/2021 9/13/2021 09/13/2021
THIRD FLOOR
Informational
09/10/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
09/10/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS: 2001,2002, 2017,2018,2043, 2045,2046, 2047 STAIRWELL WALLS AND CEILING
FIRST FLOOR
Informational
09/10/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169 SHARED SPACES OK FOR RC 150-174 UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
09/10/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MC- Units 1-18- support mc, install putty packs, nail corners, finish plumbing in 11, install all anchor bolts
Rated Assembly Inspection Partial 9/14/2021 9/14/2021 09/14/2021
THIRD FLOOR
Informational
09/13/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
09/13/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2044 -ROOM 2044- SHAFT WALL LAYER
FIRST FLOOR
Informational
09/13/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-147 RC CORRIDORS 169,172,173 -SCREW PATTERN AT BATHROOMS -MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-147 -RC AT MC UNITS 1-18 -RATED LAYER AT BATHROOMS 1-18
Miscellaneous Correction
Corrective Action Required
09/13/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Partial 9/14/2021 9/14/2021 09/14/2021
THIRD FLOOR
Informational
09/13/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
09/13/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL COMPLETE EXCEPT 2044
FIRST FLOOR
Informational
09/13/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,173 MC EXTERIOR WALLS OK FOR FOAM MC SHARED SPACES OK FOR RC 150-174 MC UNITS 1-18 AL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
09/13/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS MC- INSTALL PUTTY PACKS AT CORRIDOR SIDE UNITS 2,10, 16,18, DAMPERS AT MECH. CLOSETS 1-18 COMPLETE DRY SYSTEM IN ATTIC
All Rough Inspection - Commercial Partial 9/15/2021 9/15/2021 09/15/2021
THIRD FLOOR
Informational
09/14/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
09/14/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL COMPLETE EXCEPT 2044
FIRST FLOOR
Informational
09/14/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,173, 34,39,42 MC EXTERIOR WALLS OK FOR FOAM MC SHARED SPACES OK FOR RC 150-174 MC UNITS 1-18, 21, 36,37 SHARED SPACES: 150,152,153,154,157, 174,174A, AL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
09/14/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS COMPLETE DRY SYSTEM IN ATTIC
Rated Assembly Inspection Partial 9/15/2021 9/15/2021 09/15/2021
THIRD FLOOR
Informational
09/14/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
09/14/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2044 -ROOM 2044- SHAFT WALL LAYER
FIRST FLOOR
Informational
09/14/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-147 RC CORRIDORS 169,172,173 -SCREW PATTERN AT BATHROOMS -MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-147 -RC AT MC UNITS 1-18, 36 -RC SHARED SPACES 150-157 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS
Miscellaneous Correction
Corrective Action Required
09/14/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Partial 9/16/2021 9/16/2021 09/16/2021
THIRD FLOOR
Informational
09/15/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
09/15/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL COMPLETE EXCEPT 2044
FIRST FLOOR
Informational
09/15/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,173, 34,39,42 MC EXTERIOR WALLS OK FOR FOAM MC SHARED SPACES OK FOR RC 149-160, 162,162A, 174, 174A,175 MC UNITS 1-18, 21, 36,37 SHARED SPACES: 149,150,152,153,154,157,159,162, 174,174A, 175 AL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
09/15/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS COMPLETE DRY SYSTEM IN ATTIC
Rated Assembly Inspection Partial 9/16/2021 9/16/2021 09/16/2021
THIRD FLOOR
Informational
09/15/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
09/15/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2044 -ROOM 2044- SHAFT WALL LAYER
FIRST FLOOR
Informational
09/15/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-147 RC CORRIDORS 169,172,173 -SCREW PATTERN AT BATHROOMS -MC UNITS 1-18 -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-147 -RC AT MC UNITS 1-18, 36 -RC SHARED SPACES 150-157 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS
Miscellaneous Correction
Corrective Action Required
09/15/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
Rated Assembly Inspection Partial 9/21/2021 9/21/2021 09/21/2021
THIRD FLOOR
Informational
09/16/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
09/16/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2044 -ROOM 2044- SHAFT WALL LAYER
FIRST FLOOR
Informational
09/16/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1041,1042,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 -RATED LAYER AT CORRIDORS 1036 TO ELEVATOR, 1060 TO 1036 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-147 RC CORRIDORS 169,172,173 -SCREW PATTERN MC UNITS 1-9, 18 -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-147 -RC AT MC UNITS 1-18, 36 -RC SHARED SPACES 150-157 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS
Miscellaneous Correction
Corrective Action Required
09/16/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Partial 9/21/2021 9/21/2021 09/21/2021
THIRD FLOOR
Informational
09/16/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
09/16/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL COMPLETE EXCEPT 2044
FIRST FLOOR
Informational
09/16/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING SOFFIT FRAMING 1049,1052, CORRIDOR1060,1036 **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,173, 34,39,42 MC EXTERIOR WALLS OK FOR FOAM MC SHARED SPACES OK FOR RC 149-160, 162,162A, 174, 174A,175 MC UNITS 1-18, 21, 36,37 SHARED SPACES: 149,150,152,153,154,157,159,162, 174,174A, 175 AL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
09/16/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS COMPLETE DRY SYSTEM IN ATTIC
All Rough Inspection - Commercial Partial 9/22/2021 9/22/2021 09/22/2021
THIRD FLOOR
Informational
09/21/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
09/21/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL COMPLETE EXCEPT 2044
FIRST FLOOR
Informational
09/21/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING SOFFIT FRAMING 1049,1052, CORRIDOR1060,1036 **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,173, 34,39,42 MC EXTERIOR WALLS OK FOR FOAM MC SHARED SPACES OK FOR RC 149-160, 162,162A, 174, 174A,175 MC UNITS 1-18, 21, 36,37 SHARED SPACES: 149,150,152,153,154,157,159,162, 174,174A, 175 AL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
09/21/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS COMPLETE DRY SYSTEM IN ATTIC
Rated Assembly Inspection Partial 9/22/2021 9/22/2021 09/22/2021
THIRD FLOOR
Informational
09/21/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
09/21/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2044 -ROOM 2044- SHAFT WALL LAYER
FIRST FLOOR
Informational
09/21/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1032-1035,1037,10391055,1056,1061,1062,1016,1018,1041,1042,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 -RATED LAYER AT CORRIDORS 1036 TO ELEVATOR, 1060 TO 1036 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161 RC CORRIDORS 169,172,173 -SCREW PATTERN MC UNITS 1-9, 18 -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-147 -RC AT MC UNITS 1-18, 36 -RC SHARED SPACES 150-157 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS
Miscellaneous Correction
Corrective Action Required
09/21/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Partial 9/27/2021 9/27/2021 09/27/2021
THIRD FLOOR
Informational
09/22/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
09/22/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL COMPLETE EXCEPT 2044
FIRST FLOOR
Informational
09/22/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING SOFFIT FRAMING 1049,1052, CORRIDOR1060,1036 **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,176,177a,177 to rm 135, 173, 34,39,42 MC EXTERIOR WALLS OK FOR FOAM MC SHARED SPACES OK FOR RC 149-160, 162,162A,163 to truss repair, 174, 174A,175,179A MC UNITS 1-18, 21,24,28-33, 36,37 SHARED SPACES: 149,150,152,153,154,157,159,162, 174,174A, 175 AL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
09/22/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS COMPLETE DRY SYSTEM IN ATTIC
Rated Assembly Inspection Partial 9/27/2021 9/27/2021 09/27/2021
THIRD FLOOR
Informational
09/22/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
09/22/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2044 -ROOM 2044- SHAFT WALL LAYER
FIRST FLOOR
Informational
09/22/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1031-1035,1036,1037,10391055,1056,1060,1061,1062,1016,1018,1041,1042,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 -RATED LAYER AT CORRIDORS 1036 TO ELEVATOR, 1060 TO 1036 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177 -SCREW PATTERN MC UNITS 1-18 -SCREW PATTERN CORRIDORS -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-147 -RC AT MC UNITS 1-18,21,24,28-33, 36 -RC SHARED SPACES 150-158, 162, 163 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS
Miscellaneous Correction
Corrective Action Required
09/22/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
Rated Assembly Inspection Partial 9/29/2021 9/29/2021 09/29/2021
THIRD FLOOR
Informational
09/27/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE
SECOND FLOOR
Informational
09/27/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ROOM 2044 -ROOM 2044- SHAFT WALL LAYER
FIRST FLOOR
Informational
09/27/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1031-1035,1036,1037,10391055,1056,1060,1061,1062,1016,1018,1041,1042,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 -RATED LAYER AT CORRIDORS 1036 TO ELEVATOR, 1060 TO 1036 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177 -SCREW PATTERN MC UNITS 1-18 -SCREW PATTERN CORRIDORS -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-147 -RC AT MC UNITS 1-18,21,24,25,28-33, 36,45 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS
Miscellaneous Correction
Corrective Action Required
09/27/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Partial 9/29/2021 9/29/2021 09/29/2021
THIRD FLOOR
Informational
09/27/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE
SECOND FLOOR
Informational
09/27/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR CEILINGS TO SHAFT WALL COMPLETE EXCEPT 2044
FIRST FLOOR
Informational
09/27/2021
—AREAS APPROVED— ***BUILDING C*** CORRIDOR CEILINGS TO SHAFT WALL ROOMS:1015,1017,1020-1030 STAIRWELL WALLS AND CEILING ***BUILDING B*** CORRRIDOR CEILNGS TO SHAFT WALL ROOMS: 1002-1015 STAIRWELL WALLS AND CEILING ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING SOFFIT FRAMING 1049,1052, CORRIDOR1060,1036 **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,176,177a,177 to rm 135, 173, 34,39,42 MC EXTERIOR WALLS OK FOR FOAM MC SHARED SPACES OK FOR RC 149-160, 162,162A,163 to truss repair, 174, 174A,175,179A MC UNITS 1-18, 21,24,25,28-33, 36,37,45 SHARED SPACES: 149,150,152,153,154,157,159,161,162, 162A,174,174A,175 AL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
09/27/2021
2044-INCOMPLETE 2045-INCOMPLETE 024-REPAIR TRUSS COMPLETE DRY SYSTEM IN ATTIC
All Rough Inspection - Commercial Partial 9/30/2021 9/30/2021 09/30/2021
THIRD FLOOR
Informational
09/29/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
09/29/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE EXCEPT ELEVATOR
FIRST FLOOR
Informational
09/29/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING SOFFIT FRAMING 1049,1052, CORRIDOR1060,1036 **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,176,177a,177 to rm 135, 173, 34,39,42 MC EXTERIOR WALLS OK FOR FOAM MC SHARED SPACES OK FOR RC 149-160, 162,162A,163 to truss repair, 174, 174A,175,179A MC UNITS 1-18, 21,24,25,27-33, 36,37,45 SHARED SPACES: 149,150,152,153,154,157,159,161,162, 162A,174,174A,175 AL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
09/29/2021
024-REPAIR TRUSS COMPLETE DRY SYSTEM IN ATTIC
Rated Assembly Inspection Partial 9/30/2021 9/30/2021 09/30/2021
THIRD FLOOR
Informational
09/29/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
09/29/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
09/29/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1031-1035,1036,1037,10391055,1056,1060,1061,1062,1016,1018,1041,1042,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 -RATED LAYER AT CORRIDORS 1036 TO ELEVATOR, 1060 TO 1036 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177 -SCREW PATTERN MC UNITS 1-18 -SCREW PATTERN CORRIDORS -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-147 -RC AT MC UNITS 1-18,21,24,25,27-33, 36,45 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS
Miscellaneous Correction
Corrective Action Required
09/29/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Partial 10/6/2021 10/6/2021 10/06/2021
THIRD FLOOR
Informational
09/30/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
09/30/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE EXCEPT ELEVATOR
FIRST FLOOR
Informational
09/30/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING SOFFIT FRAMING 1049,1052, CORRIDOR1060,1036 **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,176,177a,177 to rm 135, 173, 34,39,42,48 MC EXTERIOR WALLS OK FOR FOAM MC SHARED SPACES OK FOR RC 149-160, 162,162A,163 to truss repair, 174, 174A,175,179A MC UNITS 1-18, 21,24,25,27-33, 36,37,45 SHARED SPACES: 149,150,152,153,154,157,159,161,162, 162A,174,174A,175 AL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
09/30/2021
024-REPAIR TRUSS COMPLETE DRY SYSTEM IN ATTIC
Rated Assembly Inspection Partial 10/6/2021 10/6/2021 10/06/2021
THIRD FLOOR
Informational
09/30/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
09/30/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
09/30/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1031-1035,1036,1037,10391055,1056,1060,1061,1062,1016,1018,1041,1042,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1046-1052 -RATED LAYER AT CORRIDORS 1036 TO ELEVATOR, 1060 TO 1036 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48 -SCREW PATTERN MC UNITS 1-18 -SCREW PATTERN CORRIDORS -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-147 -RC AT MC UNITS 1-18,21,24,25,27-33, 36,45 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS
Miscellaneous Correction
Corrective Action Required
09/30/2021
-REMOVE ROCK AT SHAFT WALLS AND 4' PIECES IN CORRODORS MCAL bulding -SEAL ALL GAPS/PENETRATIONS IN SMOKE WALLS
All Rough Inspection - Commercial Partial 10/8/2021 10/8/2021 10/08/2021
THIRD FLOOR
Informational
10/06/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
10/06/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE EXCEPT ELEVATOR
FIRST FLOOR
Informational
10/06/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING SOFFIT FRAMING 1049,1052, CORRIDOR1060,1036 **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,176,177a,177, 173, 34,39,42,48 MC EXTERIOR WALLS OK FOR FOAM MC SHARED SPACES OK FOR RC 149-160, 162,162A,163,174, 174A,175,179A,179 MC UNITS 1-18, 21,24-33, 36,37,45 SHARED SPACES: 149,150,152,153,154,157,159,161,162, 162A,174,174A,175 AL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
10/06/2021
024-REPAIR TRUSS COMPLETE DRY SYSTEM IN ATTIC
Rated Assembly Inspection Partial 10/8/2021 10/8/2021 10/08/2021
THIRD FLOOR
Informational
10/06/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
10/06/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
10/06/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1031-1035,1036,1037,10391055,1056,1060,1061,1062,1016,1018,1041,1042,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1040,1046-1052 -RATED LAYER AT CORRIDORS 1036 TO ELEVATOR, 1060 TO 1036 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48 -SCREW PATTERN MC UNITS 1-18 -SCREW PATTERN CORRIDORS -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-147 -RC AT MC UNITS 1-18,21,24-33, 36,45 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS
Miscellaneous Correction
Corrective Action Required
10/06/2021
All Rough Inspection - Commercial Partial 10/12/2021 10/12/2021 10/12/2021
THIRD FLOOR
Informational
10/08/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
10/08/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE EXCEPT ELEVATOR
FIRST FLOOR
Informational
10/08/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING SOFFIT FRAMING 1049,1052, CORRIDOR1060,1036 **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,176,177a,177, 173, 34,39,42,48 MC EXTERIOR WALLS OK FOR FOAM MC SHARED SPACES OK FOR RC 149-160, 162,162A,163,174, 174A,175,179A,179 MC UNITS 1-18, 21,24-33, 36,37,45 SHARED SPACES: 149,150,152,153,154,157,159,161,162, 162A,174,174A,175 AL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
10/08/2021
024-REPAIR TRUSS COMPLETE DRY SYSTEM IN ATTIC
Rated Assembly Inspection Partial 10/12/2021 10/12/2021 10/12/2021
THIRD FLOOR
Informational
10/08/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
10/08/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
10/08/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1031-1035,1036,1037,10391055,1056,1060,1061,1062,1016,1018,1041,1042,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1040,1046-1052 -RATED LAYER AT CORRIDORS 1036 TO ELEVATOR, 1060 TO 1036 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN MC UNITS 1-18 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS
Miscellaneous Correction
Corrective Action Required
10/08/2021
-ADDRESS COLUMN RATING AT 162/163
Rated Assembly Inspection Partial 10/13/2021 10/13/2021 10/13/2021
THIRD FLOOR
Informational
10/12/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
10/12/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
10/12/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1031-1035,1036,1037,10391055,1056,1060,1061,1062,1016,1018,1041,1042,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1040,1041,1046-1052 -RATED LAYER AT CORRIDORS 1036 TO ELEVATOR, 1060 TO 1036 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN MC UNITS 1-18 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45,46 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS
Miscellaneous Correction
Corrective Action Required
10/12/2021
-ADDRESS COLUMN RATING AT 162/163
All Rough Inspection - Commercial Partial 10/13/2021 10/13/2021 10/13/2021
THIRD FLOOR
Informational
10/12/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
10/12/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE EXCEPT ELEVATOR
FIRST FLOOR
Informational
10/12/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING SOFFIT FRAMING 1049,1052, CORRIDOR1060,1036 **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,176,177a,177, 173, 34,39,42,48 MC EXTERIOR WALLS OK FOR FOAM MC SHARED SPACES OK FOR RC 149-160, 162,162A,163,174, 174A,175,179A,179 MC UNITS 1-18, 21,24-33, 36,37,45,46 SHARED SPACES: 149,150,152,153,154,157,159,161,162, 162A,174,174A,175 AL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
10/12/2021
024-REPAIR TRUSS COMPLETE DRY SYSTEM IN ATTIC
Sprinkler - Hydrostatic Test Partial 10/14/2021 10/14/2021
All Rough Inspection - Commercial Partial 10/15/2021 10/15/2021 10/15/2021
THIRD FLOOR
Informational
10/13/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
10/13/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE EXCEPT ELEVATOR
FIRST FLOOR
Informational
10/13/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING SOFFIT FRAMING 1049,1052, CORRIDOR1060,1036 **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,176,177a,177, 173, 34,39,42,48 MC EXTERIOR WALLS OK FOR FOAM MC SHARED SPACES OK FOR RC 149-160, 162,162A,163,174, 174A,175,179A,179 MC UNITS 1-18, 21,24-33, 36,37,45,46 SHARED SPACES: 149,150,152,153,154,157,159,161,162, 162A,174,174A,175 AL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
10/13/2021
024-REPAIR TRUSS COMPLETE DRY SYSTEM IN ATTIC
Rated Assembly Inspection Partial 10/15/2021 10/15/2021 10/15/2021
THIRD FLOOR
Informational
10/13/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
10/13/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
10/13/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1031-1035,1036,1037,10391055,1056,1060,1061,1062,1016,1018,1041,1042,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1042, 1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1040,1041,1046-1052 -RATED LAYER AT CORRIDORS 1036 TO ELEVATOR, 1060 TO 1036 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN MC UNITS 1-18 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45,46 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS
Miscellaneous Correction
Corrective Action Required
10/13/2021
-ADDRESS COLUMN RATING AT 162/163
Piers/Caissons Inspection - Commercial Partial 10/15/2021 (1:00) 10/15/2021 10/15/2021
Misc
Informational
08/19/2021
Piers and ground rods for (21) light pole bases around drive Piers and ground rods for (5) light pole bases in MCAL courtyards
All Rough Inspection - Commercial Partial 10/18/2021 10/18/2021 10/18/2021
THIRD FLOOR
Informational
10/15/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
10/15/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE EXCEPT ELEVATOR
FIRST FLOOR
Informational
10/15/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUIDING A*** CORRIDOR CEILNG TO SHAFT WALL EXTERIOR WALL 1032 OK TO INSULATE STAIRWELL WALLS AND CEILING ROOMS: 1016,1018,1041,1042,1043,1044,1046,1050, 1053, 1053A, 1056, 1059, 1061, 1062, 1037,1038,1049,1052,1061, 1045,1047,1048,1057,1057A,1058 ROOM 1041 OK FOR SOFFIT FRAMING STAIRWELL WALLS AND CEILING SOFFIT FRAMING 1049,1052, CORRIDOR1060,1036 **MCAL BUILDING** --- PRE ROCK: MECHANICAL ROOM 165 NORTH WALL ROOM 156 Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,176,177a,177, 173, 34,39,42,48 MC EXTERIOR WALLS OK FOR FOAM MC SHARED SPACES OK FOR RC 149-160, 162,162A,163,174, 174A,175,179A,179 MC UNITS 1-18, 21,24-33, 36,37,45,46 SHARED SPACES: 149,150,152,153,154,157,159,161,162, 162A,174,174A,175 AL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
10/15/2021
024-REPAIR TRUSS COMPLETE DRY SYSTEM IN ATTIC
Rated Assembly Inspection Partial 10/18/2021 10/18/2021 10/18/2021
THIRD FLOOR
Informational
10/15/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
10/15/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
10/15/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1031-1035,1036,1037,10391055,1056,1060,1061,1062,1016,1018,1041,1042,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1042, 1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1040,1041,1046-1052 -RATED LAYER AT CORRIDORS 1036 TO ELEVATOR, 1060 TO 1036 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN UNITS 1-18, 1041-1044 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45,46 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS
Miscellaneous Correction
Corrective Action Required
10/15/2021
-ADDRESS COLUMN RATING AT 162/163
Piers/Caissons Inspection - Commercial Partial 10/18/2021 10/18/2021 10/18/2021
Misc
Informational
10/15/2021
-Piers and ground rods for (21) light pole bases around drive -Piers and ground rods for (5) light pole bases in MCAL courtyards -Piers and ground rods for (12) sight lighting pole bases at west and south
Piers/Caissons Inspection - Commercial Partial 10/19/2021 10/19/2021 10/19/2021
Misc
Informational
10/18/2021
-Piers and ground rods for (21) light pole bases around drive -Piers and ground rods for (5) light pole bases in MCAL courtyards -Piers and ground rods for (23) sight lighting pole bases at East, west and south
Rated Assembly Inspection Partial 10/19/2021 10/19/2021 10/19/2021
THIRD FLOOR
Informational
10/18/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
10/18/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
10/18/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1031-1035,1036,1037,10391055,1056,1060,1061,1062,1016,1018,1041,1042,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1042, 1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1040,1041,1046-1052 -RATED LAYER AT CORRIDORS 1036 TO ELEVATOR, 1060 TO 1036 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN UNITS 1-18, 1041-1044 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45,46 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS --(2) of 3 columns complete-COMPLETE WRAP OF BEAM IN 162/163 -RATED LAYER AT 149,154,171, 162 TO UNFINISHED COLUMN
Miscellaneous Correction
Corrective Action Required
10/18/2021
-ADDRESS COLUMN RATING AT 162/163
All Rough Inspection - Commercial Partial 10/21/2021 10/21/2021 10/21/2021
THIRD FLOOR
Informational
10/18/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
10/18/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE EXCEPT ELEVATOR
FIRST FLOOR
Informational
10/18/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUIDING A*** COMPLETE **MCAL BUILDING** Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,176,177a,177, 173, 34,39,42,48 MC UNITS 1-18, 21,24-33, 36,37,44,45,46 SHARED SPACES: 149,150,152,153,154,156,157,159,161,162, 162A,174,174A,175 AL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
10/18/2021
All Rough Inspection - Commercial Failed 11/2/2021 11/2/2021 11/02/2021
THIRD FLOOR
Informational
10/21/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
10/21/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE EXCEPT ELEVATOR
FIRST FLOOR
Informational
10/21/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUIDING A*** COMPLETE **MCAL BUILDING** Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,176,177a,177, 173, 34,39,42,48 MC UNITS 1-18, 21,24-33, 36,37,44,45,46 SHARED SPACES: 149,150,152,153,154,156,157,159,161,162, 162A,174,174A,175 AL UNITS: 102-147
Miscellaneous Correction
Corrective Action Required
10/21/2021
Kitchen area: -Strap DWV, Seal penetrations, Complete plumbing and sprinkler above ceiling
Rated Assembly Inspection Partial 10/22/2021 11/2/2021 11/02/2021
THIRD FLOOR
Informational
10/19/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
10/19/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
10/19/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1031-1035,1036,1037,10391055,1056,1060,1061,1062,1016,1018,1041,1042,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1042, 1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1040,1041,1046-1052 -RATED LAYER AT CORRIDORS 1036 TO ELEVATOR, 1060 TO 1036 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN UNITS 1-18, 1041-1044 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45,46 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS --(2) of 3 columns complete-COMPLETE WRAP OF BEAM IN 162/163 -RATED LAYER AT 149,154,171, 162 TO UNFINISHED COLUMN -MCAL 2hr wall OK
Miscellaneous Correction
Corrective Action Required
10/19/2021
-ADDRESS COLUMN RATING AT 162/163
All Rough Inspection - Commercial Partial 11/3/2021 11/3/2021 11/03/2021
THIRD FLOOR
Informational
11/02/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/02/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE EXCEPT ELEVATOR
FIRST FLOOR
Informational
11/02/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUIDING A*** COMPLETE **MCAL BUILDING** Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,176,177a,177, 173, 34,39,42,48 MC UNITS 1-18, 21,24-33, 36,37,44,45,46 SHARED SPACES: 149,150,152,153,154,156,157,159,161,162, 162A,174,174A,175 AL UNITS: 102-147 164 walls ok except at column
Miscellaneous Correction
Corrective Action Required
11/02/2021
KITCHEN AREA, Complete plumbing and sprinkler above ceiling
Rated Assembly Inspection Partial 11/4/2021 11/4/2021 11/04/2021
THIRD FLOOR
Informational
11/02/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/02/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
11/02/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1031-1035,1036,1037,10391055,1056,1060,1061,1062,1016,1018,1041,1042,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1042, 1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1040,1041,1046-1052 -RATED LAYER AT CORRIDORS 1036 TO ELEVATOR, 1060 TO 1036 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN UNITS 1-18, 1041-1044 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45,46 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS --(2) of 3 columns complete-COMPLETE WRAP OF BEAM IN 162/163 -RATED LAYER AT 149,154,171, 162 TO UNFINISHED COLUMN -MCAL 2hr wall OK -SOFFITS IN CORRIDORS 177A,176, 34,39,42
Miscellaneous Correction
Corrective Action Required
11/02/2021
-ADDRESS COLUMN RATING AT 162/163
Rated Assembly Inspection Partial 11/5/2021 11/5/2021 11/05/2021
THIRD FLOOR
Informational
11/04/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/04/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
11/04/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** CORRIDOR WALLS AND CELINGS OK FOR SOFFITS TO SHAFT WALL PRE ROCK BEHIND SHOWERS ROOMS: -1016 RC AT LOBBY 1032 RC AT CEILINGS IN ROOMS1031-1035,1036,1037,10391055,1056,1060,1061,1062,1016,1018,1041,1042,1046,1047,1049,1050,1052 RC AT CORRIDOR WALLS AND CEILING: 1036,1060 -SCREW PATTERN STAIRWELLS S1,2,3 -RATED LAYER AT CEILINGS: 1016,1018,1043,1044,1046,1047,1053,1053A -SOFFIT AT CORRIDOR FROM BUILDING B TO ELEVATOR OK TO COVER -SCREW PATTERN ROOMS: 1016,1018,1032,1034,1037,1039,1040,1042, 1049-1052,1054,1056,1057,1057A,1055,1059,1061,1062 -RATED CEILING LAYER ROOMS 1040,1041,1046-1052 -RATED LAYER AT CORRIDORS 1036 TO ELEVATOR, 1060 TO 1036 ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN UNITS 1-18, 1041-1044 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45,46 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS --(2) of 3 columns complete-COMPLETE WRAP OF BEAM IN 162/163 -RATED LAYER AT 149,154,171, 162 TO UNFINISHED COLUMN -MCAL 2hr wall OK -SOFFITS IN CORRIDORS 177A,176, 34,39,42, -SCREW PATTERN MC THROUGHOUT
Miscellaneous Correction
Corrective Action Required
11/04/2021
-ADDRESS COLUMN RATING AT 162/163
All Rough Inspection - Commercial Partial 11/5/2021 11/5/2021 11/05/2021
THIRD FLOOR
Informational
11/03/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/03/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE EXCEPT ELEVATOR
FIRST FLOOR
Informational
11/03/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUIDING A*** COMPLETE **MCAL BUILDING** Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,176,177a,177, 173, 34,39,42,48 MC UNITS 1-18, 21,24-33, 36,37,44,45,46 SHARED SPACES: 149,150,152,153,154,156,157,159,161,162, 162A,174,174A,175 AL UNITS: 102-147 164 walls ok except at column
Miscellaneous Correction
Corrective Action Required
11/03/2021
KITCHEN AREA, Complete plumbing and sprinkler above ceiling
Rated Assembly Inspection Partial 11/8/2021 11/8/2021 11/08/2021
THIRD FLOOR
Informational
11/05/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/05/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
11/05/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN UNITS 1-18, 1041-1044 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45,46 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS -SECOND LAYER AT COLUMNS 163 NORTH AND SOUTH INSIDE WALLS OK -RATED LAYER AT 149,154,171, 162 TO UNFINISHED COLUMN -MCAL 2hr wall OK -SOFFITS IN CORRIDORS 177A, 177,176, 34,39,42, -SCREW PATTERN MC THROUGHOUT
Miscellaneous Correction
Corrective Action Required
11/05/2021
-ADDRESS COLUMN RATING AT 162/163-SECOND LAYER REQUIRED AT WALL SIDES -PROVIDE 5/8" GLASS MAT SHEATHING AT CANOPIES PER PLAN
All Rough Inspection - Commercial Partial 11/8/2021 11/8/2021 11/08/2021
THIRD FLOOR
Informational
11/05/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/05/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE EXCEPT ELEVATOR
FIRST FLOOR
Informational
11/05/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUIDING A*** COMPLETE **MCAL BUILDING** Kitchen 164 OK-CEILING OK FOR ROCK NOT AT HOODS CORRIDOR 167 TO 10' FROM SHAFT WALL CORRIDOR 169,172,176,177a,177, 173, 34,39,42,48 MC UNITS 1-18, 21,24-33, 36,37,44,45,46 SHARED SPACES: 149,150,152,153,154,156,157,159,161,162, 162A,174,174A,175 AL UNITS: 102-147 164 walls ok except at column
Miscellaneous Correction
Corrective Action Required
11/05/2021
KITCHEN AREA, Complete plumbing and sprinkler above ceiling
Rated Assembly Inspection Partial 11/10/2021 11/10/2021 11/10/2021
THIRD FLOOR
Informational
11/08/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/08/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
11/08/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN UNITS 1-18, 1041-1044 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45,46 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18,28,29 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS -SECOND LAYER AT COLUMNS 163 NORTH AND SOUTH INSIDE WALLS OK -RATED LAYER AT 149,154,171, 162 TO UNFINISHED COLUMN -MCAL 2hr wall OK -SOFFITS IN CORRIDORS 177A, 177,176, 34,39,42,48 -SCREW PATTERN MC THROUGHOUT
Miscellaneous Correction
Corrective Action Required
11/08/2021
-ADDRESS COLUMN RATING AT 162/163-SECOND LAYER REQUIRED AT WALL SIDES -PROVIDE 5/8" GLASS MAT SHEATHING AT CANOPIES PER PLAN
All Rough Inspection - Commercial Partial 11/10/2021 11/10/2021 11/10/2021
THIRD FLOOR
Informational
11/08/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/08/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE EXCEPT ELEVATOR
FIRST FLOOR
Informational
11/08/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUIDING A*** COMPLETE **MCAL BUILDING** COMPLETE EXCEPT AS NOTED: Kitchen 164-INCOMPLETE ABOVE CEILING AND AT RATED COLUMN 165, 1051 INCOMPLETE 166- INCOMPLETE ABOVE CEILING
Miscellaneous Correction
Corrective Action Required
11/08/2021
KITCHEN AREA, Complete plumbing and sprinkler above ceiling
Rated Assembly Inspection Partial 11/11/2021 11/11/2021 11/11/2021
THIRD FLOOR
Informational
11/10/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/10/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
11/10/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN UNITS 1-18, 1041-1044 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45,46 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18,28,29 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS -SECOND LAYER AT COLUMNS 163 NORTH AND SOUTH WALLS OK -RATED LAYER AT 149,154,171, 162 TO UNFINISHED COLUMN -MCAL 2hr wall OK -SOFFITS IN CORRIDORS 177A, 177,176, 34,39,42,48 -SCREW PATTERN MC THROUGHOUT
Miscellaneous Correction
Corrective Action Required
11/10/2021
-ADDRESS COLUMN RATING AT 162/163-SECOND LAYER REQUIRED AT WALL SIDES -PROVIDE 5/8" GLASS MAT SHEATHING AT CANOPIES PER PLAN
Hood/Duct Inspection Partial 11/12/2021 11/12/2021 11/12/2021
Misc
Corrective Action Required
11/12/2021
-LIGHT TEST: NORTH DUCT OK, SOUTH DUCT WELD HOLES AND RECALL
Rated Assembly Inspection Partial 11/12/2021 11/12/2021 11/12/2021
THIRD FLOOR
Informational
11/11/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/11/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
11/11/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN UNITS 1-18, 1041-1044 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45,46 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18,28,29 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS -SECOND LAYER AT COLUMNS 163 NORTH AND SOUTH WALLS OK -RATED LAYER AT 149,154,171, 162 TO UNFINISHED COLUMN -MCAL 2hr wall OK -SOFFITS IN CORRIDORS 177A, 177,176, 34,39,42,48 -SCREW PATTERN MC THROUGHOUT -SEPARATION WALL: ROOM 166 SECOND LAYER OK, MC CORIDOOR SIDE 1ST LAYER OK
Miscellaneous Correction
Corrective Action Required
11/11/2021
-ADDRESS COLUMN RATING AT 162/163-SECOND LAYER REQUIRED AT WALL SIDES -PROVIDE 5/8" GLASS MAT SHEATHING AT CANOPIES PER PLAN
Hood/Duct Inspection Failed 11/15/2021 11/15/2021 11/15/2021
Misc
Corrective Action Required
11/12/2021
-LIGHT TEST: NORTH DUCT OK, SOUTH DUCT WELD HOLES AND RECALL
Rated Assembly Inspection Partial 11/15/2021 11/15/2021 11/15/2021
THIRD FLOOR
Informational
11/12/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/12/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
11/12/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN UNITS 1-18, 1041-1044 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45,46 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18,28,29 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS -SECOND LAYER AT COLUMNS 163 NORTH AND SOUTH WALLS OK -RATED LAYER AT 149,154,171, 162 TO UNFINISHED COLUMN -MCAL 2hr wall OK -SOFFITS IN CORRIDORS 177A, 177,176, 34,39,42,48 -SCREW PATTERN MC THROUGHOUT -SEPARATION WALL AT IL/AL: IL SIDE 1st LAYET OK, AL SIDE 1st LAYER AT CORRIDOR OK, 2nd LAYER AT ROOM 166 OK
Miscellaneous Correction
Corrective Action Required
11/12/2021
-PROVIDE 5/8" GLASS MAT SHEATHING AT CANOPIES PER PLAN
Hood/Duct Inspection Partial 11/16/2021 11/16/2021 11/16/2021
Misc
Corrective Action Required
11/15/2021
-LIGHT TEST: NORTH DUCT OK, SOUTH DUCT OK
Hood/Duct Inspection Partial 11/18/2021 11/18/2021 11/18/2021
Misc
Corrective Action Required
11/16/2021
-LIGHT TEST: NORTH DUCT OK, SOUTH DUCT OK -FIRST LAYER WRAP OK
Rated Assembly Inspection Partial 11/18/2021 11/18/2021 11/18/2021
THIRD FLOOR
Informational
11/15/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/15/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
11/15/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN UNITS 1-18, 1041-1044 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45,46 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18,28,29 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS -SECOND LAYER AT COLUMNS 163 NORTH AND SOUTH WALLS OK -RATED LAYER AT 149,154,171, 162 TO UNFINISHED COLUMN -MCAL 2hr wall OK -SOFFITS IN CORRIDORS 177A, 177,176, 34,39,42,48 -SCREW PATTERN MC THROUGHOUT -KITCHEN 166 SCREW PATTERN WALLS OK -SEPARATION WALL AT IL/AL: IL SIDE 1st LAYER OK, AL SIDE 1st LAYER AT CORRIDOR OK, 2nd LAYER AT ROOM 166 OK
Miscellaneous Correction
Corrective Action Required
11/15/2021
Rated Assembly Inspection Failed 11/23/2021 11/23/2021 11/23/2021
THIRD FLOOR
Informational
11/18/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/18/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
11/18/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN UNITS 1-18, 1041-1044 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45,46 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18,28,29 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS -SECOND LAYER AT COLUMNS 163 NORTH AND SOUTH WALLS OK -RATED LAYER AT 149,154,171, 162 TO UNFINISHED COLUMN -MCAL 2hr wall OK -SOFFITS IN CORRIDORS 177A, 177,176, 34,39,42,48 -SCREW PATTERN MC THROUGHOUT -KITCHEN 166 SCREW PATTERN WALLS OK -SEPARATION WALL AT IL/AL: IL SIDE 1st LAYER OK, AL SIDE 1st LAYER AT CORRIDOR OK, 2nd LAYER AT ROOM 166 OK
Miscellaneous Correction
Corrective Action Required
11/18/2021
COMPLETE SCREW PATTERN AT SECOND LAYER OF SEPARATION WALL AT IL/AL
All Rough Inspection - Commercial Partial 11/23/2021 11/23/2021 11/23/2021
THIRD FLOOR
Informational
11/10/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/10/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE EXCEPT ELEVATOR
FIRST FLOOR
Informational
11/10/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUIDING A*** COMPLETE **MCAL BUILDING** COMPLETE EXCEPT AS NOTED: Kitchen 164-INCOMPLETE ABOVE CEILING 1051 INCOMPLETE 166- INCOMPLETE ABOVE CEILING
Miscellaneous Correction
Corrective Action Required
11/10/2021
Hood/Duct Inspection Passed 11/24/2021 11/29/2021 11/29/2021
Misc
Informational
11/29/2021
-LIGHT TEST: NORTH DUCT OK, SOUTH DUCT OK -FIRST LAYER WRAP OK -SECOND LAYER OK
Rated Assembly Inspection Failed 11/24/2021 11/29/2021 11/29/2021
THIRD FLOOR
Informational
11/23/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/23/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
11/23/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN UNITS 1-18, 1041-1044 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45,46 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18,28,29 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS -SECOND LAYER AT COLUMNS 163 NORTH AND SOUTH WALLS OK -RATED LAYER AT 149,154,171, 162 TO UNFINISHED COLUMN -MCAL 2hr wall OK -SOFFITS IN CORRIDORS 177A, 177,176, 34,39,42,48 -SCREW PATTERN MC THROUGHOUT -KITCHEN 166 SCREW PATTERN WALLS OK -SEPARATION WALL AT IL/AL: IL SIDE 1st LAYER OK, AL SIDE 1st LAYER AT CORRIDOR OK, 2nd LAYER AT ROOM 166 OK
Miscellaneous Correction
Corrective Action Required
11/23/2021
COMPLETE SCREW PATTERN AT SECOND LAYER OF SEPARATION WALL AT IL/AL
Rated Assembly Inspection Partial 11/30/2021 11/30/2021 11/30/2021
THIRD FLOOR
Informational
11/29/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/29/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
11/29/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN UNITS 1-18, 1041-1044 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45,46 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18,28,29 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS -SECOND LAYER AT COLUMNS 163 NORTH AND SOUTH WALLS OK -RATED LAYER AT 149,154,171, 162 TO UNFINISHED COLUMN -MCAL 2hr wall OK -SOFFITS IN CORRIDORS 177A, 177,176, 34,39,42,48 -SCREW PATTERN MC THROUGHOUT -KITCHEN 166 SCREW PATTERN WALLS OK -SEPARATION WALL AT IL/AL: IL SIDE 1st LAYER OK, AL SIDE 1st LAYER AT CORRIDOR OK, 2nd LAYER AT ROOM 166 OK
Miscellaneous Correction
Corrective Action Required
11/29/2021
COMPLETE SCREW PATTERN AT SECOND LAYER OF SEPARATION WALL AT IL/AL
Rated Assembly Inspection Partial 12/1/2021 12/1/2021 12/01/2021
THIRD FLOOR
Informational
11/30/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/30/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
11/30/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE ****MCAL BUILDING*** RM 165 NORTH WALL LAYER OVER SHAFT WALL 1057 WALLS FOR ELECTRICAL GEAR RC OK ABOVE COOLER SCREW PATTERN AT WALLS AND CEILINGS FOR COOLER RC IN CORRIDORS FIRST 16" FOR SOFFITS: CORRIDORS 167,176,177,177A,178A,169,172,173,39,42,31,34,48 PRE ROCK AT CORRIDOR SOFFITS: 176,177,177A RC ROOMS 101-147, 181,182 RC CHANNEL ROOMS: 102-153,161-163 RC CORRIDORS 169,172,173,176,177a,177,48,39,42 -SCREW PATTERN UNITS 1-18, 1041-1044 -SCREW PATTERN CORRIDORS 160,169,172,173,176,177,177a walls -RATED LAYER AT BATHROOM CEILINGS 101-145, 147 -SCREW PATTERN AT AT AL UNITS: 101-158, 161-163 -RC AT MC UNITS 1-18,21,24-33, 36,45,46 -RC SHARED SPACES 150-158, 162, 163,159,161,162A,170,171,179 -RATED LAYER AT BATHROOMS 1-18,28,29 -162 FIRST LAYER AT COLUMNS AND BEAMS, PRE ROCK FOR SOFFITS -SECOND LAYER AT COLUMNS 163 NORTH AND SOUTH WALLS OK -RATED LAYER AT 149,154,171, 162 TO UNFINISHED COLUMN -MCAL 2hr wall OK -SOFFITS IN CORRIDORS 177A, 177,176, 34,39,42,48 -SCREW PATTERN MC THROUGHOUT -KITCHEN 166 SCREW PATTERN WALLS OK -SEPARATION WALL AT IL/AL: 1ST LAYER, 2ND LAYER OK
Miscellaneous Correction
Corrective Action Required
11/30/2021
SEAL PENETRATIONS AND FIRE TAPE AT SECOND LAYER OF SEPARATION WALL AT IL/AL
All Rough Inspection - Commercial Partial 12/6/2021 12/6/2021 12/06/2021
THIRD FLOOR
Informational
11/23/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
11/23/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE EXCEPT ELEVATOR
FIRST FLOOR
Informational
11/23/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUIDING A*** COMPLETE **MCAL BUILDING** COMPLETE EXCEPT AS NOTED: Kitchen 164-INCOMPLETE ABOVE CEILING 166- INCOMPLETE ABOVE CEILING
Miscellaneous Correction
Corrective Action Required
11/23/2021
Above Ceiling Inspection Failed 5/3/2021 12/6/2021 12/06/2021
Misc
Corrective Action Required
12/06/2021
-Procide (3) wraps at ceiling wire -Support grid mx 4' OC -Complete electrical, support mc and lights -Complete duct at dishwasher hood
Rated Assembly Inspection Partial 12/8/2021 12/8/2021 12/08/2021
THIRD FLOOR
Informational
12/06/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
12/06/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
12/06/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE ****MCAL BUILDING*** COMPLETE EXCEPT AS NOTED: -165- RC OK -164- COMPLETE RATED LAYER AT DISHWASHER HOOD, RC OK
Miscellaneous Correction
Corrective Action Required
12/06/2021
ELEVATOR 1
Corrective Action Required
12/06/2021
-FUR OUT WALLS OK -RC AT CEILING OK
Above Ceiling Inspection Failed 12/8/2021 12/8/2021 12/08/2021
Misc
Corrective Action Required
12/06/2021
-Procide (3) wraps at ceiling wire -Support grid max 4' OC -Complete electrical, support mc and lights -Complete duct at dishwasher hood
All Rough Inspection - Commercial Passed 12/14/2021 12/09/2021
THIRD FLOOR
Informational
12/09/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
12/09/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE EXCEPT ELEVATOR
FIRST FLOOR
Informational
12/09/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUIDING A*** COMPLETE **MCAL BUILDING** COMPLETE EXCEPT AS NOTED: Kitchen 164-INCOMPLETE ABOVE CEILING 166- INCOMPLETE ABOVE CEILING
Miscellaneous Correction
Corrective Action Required
12/09/2021
Rated Assembly Inspection Partial 12/9/2021 12/9/2021 12/09/2021
THIRD FLOOR
Informational
12/01/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
12/01/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
12/01/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE ****MCAL BUILDING*** COMPLETE EXCEPT AS NOTED: -166-COMPLETE SECOND LAYER ABOVE CEILING -165- RC OK -164- COMPLETE RATED LAYER AT DISHWASHER HOOD, RC OK
Miscellaneous Correction
Corrective Action Required
12/01/2021
SEAL PENETRATIONS AND FIRE TAPE AT SECOND LAYER OF SEPARATION WALL AT IL/AL-ROOM 166
ELEVATOR 1
Corrective Action Required
12/06/2021
-FUR OUT WALLS OK -RC AND SCREW PATTERN OK -SEAL BLOCK AT DOOR SIDE CEILING LEVEL, FIRE TAPE AND SEAL GAPS
All Rough Inspection - Commercial Partial 12/9/2021 12/9/2021 12/09/2021
THIRD FLOOR
Informational
12/06/2021
—AREAS APPROVED— ***BUIDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A**** -COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
12/06/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE EXCEPT ELEVATOR
FIRST FLOOR
Informational
12/06/2021
—AREAS APPROVED— ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUIDING A*** COMPLETE **MCAL BUILDING** COMPLETE EXCEPT AS NOTED: Kitchen 164-INCOMPLETE ABOVE CEILING 166- INCOMPLETE ABOVE CEILING
Miscellaneous Correction
Corrective Action Required
12/06/2021
Rated Assembly Inspection Partial 12/10/2021 12/10/2021 12/10/2021
THIRD FLOOR
Informational
12/09/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
12/09/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
12/09/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE ****MCAL BUILDING*** COMPLETE EXCEPT AS NOTED: -165- RC OK -164- COMPLETE RATED LAYER AT DISHWASHER HOOD, RC OK
Miscellaneous Correction
Corrective Action Required
12/09/2021
ELEVATOR 1
Corrective Action Required
12/09/2021
-FUR OUT WALLS OK -RC AT CEILING OK
Rated Assembly Inspection Failed 12/14/2021 12/14/2021 12/14/2021
THIRD FLOOR
Informational
12/10/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
12/10/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
12/10/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE ****MCAL BUILDING*** COMPLETE EXCEPT AS NOTED: -165- RC OK -164- COMPLETE RATED LAYER AT DISHWASHER HOOD, RC OK
Miscellaneous Correction
Corrective Action Required
12/10/2021
-SEAL GAPS IN BLOCK COURSES INSIDE ELEVATOR SHAFT -COMPLETE SCREW PATTERN AND SEAL GAPS AND PENETRATIONS AT MECHANICAL ROOM 165
ELEVATOR 1
Corrective Action Required
12/10/2021
-FUR OUT WALLS OK -RC AT CEILING OK
Piers/Caissons Inspection - Commercial Passed 12/16/2021 12/16/2021 12/16/2021
Misc
Informational
10/19/2021
-Piers and ground rods for (21) light pole bases around drive -Piers and ground rods for (5) light pole bases in MCAL courtyards -Piers and ground rods for (23) sight lighting pole bases at East, west and south -Piers and ground rods for (7) light poles in center court yard
Rated Assembly Inspection Partial 12/17/2021 12/17/2021 12/17/2021
THIRD FLOOR
Informational
12/14/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
12/14/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
12/14/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE ****MCAL BUILDING*** COMPLETE EXCEPT AS NOTED: -165- RC OK -164- COMPLETE RATED LAYER AT DISHWASHER HOOD, RC OK
Miscellaneous Correction
Corrective Action Required
12/14/2021
-COMPLETE SCREW PATTERN AND SEAL GAPS AND PENETRATIONS AT MECHANICAL ROOM 165
ELEVATOR 1
Corrective Action Required
12/14/2021
-FUR OUT WALLS OK -RC AT CEILING OK -RATED LAYER AT CEILING OK
Underground Electrical Inspection - Commercial Failed 12/17/2021 12/17/2021 12/17/2021
Miscellaneous Correction
Corrective Action Required
12/17/2021
-ADDRESS UNDERMINED PIERS AT LIGHT POLES AND EXPOSE OR COMPLETE ALL UNDERGROUND ELECTRICAL FOR INSPECTION -CONDUIT FOR (2) LIGHT POLES AT SOUTH ENTRANCE
Rated Assembly Inspection Partial 12/20/2021 12/20/2021 12/20/2021
THIRD FLOOR
Informational
12/17/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
12/17/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
12/17/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE ****MCAL BUILDING*** COMPLETE EXCEPT AS NOTED: -165- RC OK -164- COMPLETE RATED LAYER AT DISHWASHER HOOD, RC OK
Miscellaneous Correction
Corrective Action Required
12/17/2021
-COMPLETE SCREW PATTERN AND SEAL GAPS AND PENETRATIONS AT MECHANICAL ROOM 165
ELEVATOR 1
Corrective Action Required
12/17/2021
-FUR OUT WALLS OK -RC AT CEILING OK -RATED LAYER AT CEILING OK
Underground Electrical Inspection - Commercial Partial 12/20/2021 12/20/2021 12/20/2021
Miscellaneous Correction
Corrective Action Required
12/17/2021
-CONDUIT FOR (2) LIGHT POLES AT SOUTH ENTRANCE, (6) AT EAST COURTYARD BETWEEN AL AND IL, (2) SOUTHEAST CORNER OF BUILDING
Above Ceiling Inspection Partial 12/21/2021 12/21/2021 12/21/2021
Misc
Corrective Action Required
12/08/2021
-Procide (3) wraps at ceiling wire -Support grid max 4' OC -Complete electrical, support mc and lights -Complete duct at dishwasher hood Kitchen ok for skirts at dishwasher and hood
Sprinkler - Hydrostatic Test Passed 1/4/2022 01/04/2022
Above Ceiling Inspection Partial 1/5/2022 1/5/2022 01/05/2022
Misc
Corrective Action Required
12/21/2021
-Procide (3) wraps at ceiling wire -Support grid max 4' OC -Complete electrical, support mc and lights -Complete duct at dishwasher hood Kitchen ok for skirts at dishwasher and hood
Above Ceiling Inspection Partial 1/12/2022 1/12/2022 01/12/2022
Misc
Informational
01/12/2022
Kitchen ok for skirts at dishwasher and hood
Misc
Corrective Action Required
01/12/2022
KITCHEN AREA: -Seal penetrations, complete access panel, complete electrical above dishwasher, support mc per code, add tie wire at opposite corner of light near entry, add wire near exhaust hood where over 48" oc. OK FOR BORDERS ONLY
Above Ceiling Inspection Partial 1/13/2022 1/13/2022 01/13/2022
Misc
Informational
01/12/2022
Kitchen ok for skirts at dishwasher and hood
Misc
Corrective Action Required
01/12/2022
KITCHEN AREA:--NEED TO VERIFY ACCESS PANELS, OK FOR TILE
Above Ceiling Inspection Partial 1/18/2022 1/18/2022 01/18/2022
Misc
Informational
01/13/2022
Kitchen ok for skirts at dishwasher and hood Memory Care corridors approved except as noted, room 21 approved
Misc
Corrective Action Required
01/13/2022
KITCHEN AREA:--NEED TO VERIFY ACCESS PANELS, OK FOR TILE MC AREA: CORRIDOR 34,39 DAMPERS, ROOM 25, 22 SEAL PENETRATIONS, COMPLETE MECHANICAL
Above Ceiling Inspection Partial 1/25/2022 1/25/2022 01/25/2022
Misc
Informational
01/18/2022
Kitchen ok for skirts at dishwasher and hood Memory Care corridors approved except as noted, room 21,22,25 approved corridor 167
Misc
Corrective Action Required
01/18/2022
KITCHEN AREA:--NEED TO VERIFY ACCESS PANELS, OK FOR TILE MC AREA: CORRIDOR 34,39 DAMPERS,
Miscellaneous Inspection Partial 1/26/2022 1/26/2022 01/26/2022
Misc
Corrective Action Required
01/26/2022
PRE FINAL IL BUILDING: -Complete fire doors and exit lights at separation walls -Roof not inspected -Check handrails in stairways for code compliance 3001-Locked 3002-Fire caulk penetrations at mechanical room 3003-3005 ok 3006-Smoke gasket 3007-3008 ok 3009-Countertop receptacles spaced greater than 48" 3010-3011 ok 3012-GFCI protection at dishwasher 3013-Place range on anti tip device 3014-Secure GFCI receptacle and cover at exterior 3015-Adjust door to self close and latch, correct fire tape behind hvac in mech. closet 3016- ok 3017-ADA- Missing grab bars in restroom, install mirror to be max 40" to reflective surface, undercounter sink clearance required at kitchen,check slider for threshold height and clearance for accessibility 3018-GFCI protection at dishwasher, adjust sprinkler escutcheon at mech. closet to cover gaps 3019-Secure receptacle and cover at exterior 3020-Firecaulk low volt penetration at mech. room 3021-Adjust door to close and latch 3022-3023- ok 3024-Tighten receptacle at bath countertop, adjust box at deck receptacle to close 3025-ok 3026-Adjust sprinkler esc. at mech. room 3027- ok 3028-Adjust sprinkler esc. at mech. room 3029-Breaker 7 is bad 3030-Defective outlet at kitchen, check breakers at reinspect 3031-Secure exterior receptacle and cover 3037-Spark rings at plywood sheathing, finish door/ seal use approved methods for fire stopping at low volt in conduit 3038-Complete electrical, anti siphon at mop sink 3038A- Hammer arrestors 3039-3042- Incomplete 3043-Door hardware, remove foil tape from ceilings and properly seal penetrations at hvac 3045-Open panels for inspection, use approved methods of firestopping at conduit and low volt in conduit 3047-Seal penetrations to hallway
Miscellaneous Inspection Failed 1/27/2022 1/27/2022 01/27/2022
Misc
Corrective Action Required
01/26/2022
PRE FINAL IL BUILDING: -Complete fire doors and exit lights at separation walls -Roof AC disconnect need labeled & missing covers, -Check handrails in stairways for code compliance 3001-Ok 3002- ok 3003-3005 ok 3006- ok 3007-3008 ok 3009- ok 3010-3011 ok 3012- ok 3013- ok 3014- ok 3015- ok 3016- ok 3017-ADA- Missing vertical grab bar in restroom, install mirror to be max 40" to reflective surface, undercounter sink clearance required at kitchen,check slider for threshold height and clearance for accessibility ( not ready ) 3018- ok 3019- ok 3020- ok 3021- ok 3022-3023- ok 3024- ok 3025-ok 3026- ok 3027- ok 3028- ok 3029- ok 3030- ok 3031 - ok 3037-Spark rings at plywood sheathing, finish door/ seal use approved methods for fire stopping at low volt in conduit 3038 - tighten & shear pin anti siphon at mop sink 3038A- ok 3039 Fire caulk low volt mech closet ceiling, missing plate covers both sides range & Check GFCI , provide GFCI protection dishwasher 3040 install sink, door hardware 3041 install sink, door hardware 3042 provide open toilet seat, complete countertop 3043-Door hardware backordered 3044 - ok 3045-use approved methods of firestopping at conduit and low volt in conduit 3047- ok
Miscellaneous Inspection Partial 1/28/2022 1/28/2022 01/28/2022
Misc
Corrective Action Required
01/27/2022
PRE FINAL IL BUILDING: -Complete fire doors and exit lights at separation walls -Roof AC disconnect need labeled & missing covers, -Check handrails in stairways for code compliance 3rd Floor: 3001-3016 OK 3017-ADA- Missing vertical grab bar in restroom, install mirror to be max 40" to reflective surface, undercounter sink clearance required at kitchen,check slider for threshold height and clearance for accessibility ( not ready ) 3018-3031 OK 3037-Spark rings at plywood sheathing, finish door/ seal use approved methods for fire stopping at low volt in conduit 3038 - tighten & shear pin anti siphon at mop sink 3038A- ok 3039 Fire caulk low volt mech closet ceiling, missing plate covers both sides range & Check GFCI , provide GFCI protection dishwasher 3040 install sink, door hardware 3041 install sink, door hardware 3042 provide open toilet seat, complete countertop 3043-Door hardware backordered 3044 - ok 3045-use approved methods of firestopping at conduit and low volt in conduit 3047- ok 2nd Floor: 2001-adjust both doors to. Lose and latch, 2002- firecaulk ceiling at mech, remove tape from sprinkler head 2003-install guardrail at deck, install light fixture and receptacle at deck 2004-Secure cover/receptacle and seal gaps around box at exterior, seal line sets and at back of ductwork 2005-firecaulk mech ceiling at AC Lineset, Install receptacle and light fixture at deck 2006-Seal line sets and behind ductwork , anti tip device at range, secure dishwasher discharge above bowl of sink 2007-firecaulk mech ceiling 2008-Bad receptacle at exterior, seal penetrations at line sets 2009-Install light fixture and receptacle at deck, firecaulk mech ceiling 2010-Seal line sets, install receptacle and bubble cover at exterior 2011-firecaulk mech ceiling, door must be self closing, missing sprinkler head at bathroom,closet Emergency light not testing outside of 2011 2012-firecaulk mech ceiling 2013-firecaulk mech ceiling, nail off joist hangers for deck above 2014-firecaulk AC penetrations at ceiling and around HVAC duct mech room 2015 - firecaulk at AC ceiling penetrations mech closet 2016 - ok 2017-hammer arrestors at laundry, seal gaps at hot water line and line set 2018 entry door shall be self closing & self latching, complete gfci end of kitchen island, fire caulk mech room ceiling 2019-Gap at guardrail greater than 4” at stone, exterior GFCI receptacle faulty, seal penetrations at line sets and electrical and repair/seal damaged fire taping behind hvac 2020 fire caulk/ fire tape line set mech closet 2021-Seal gaps at penetrations at back wall for line set and at cold water line, 2022 fire caulk/ fire tape line set mech closet 2023-missing joist hanger nails north and south end joists, secure dishwasher discharge line ABOVE BOWL OF SINK 2024 fire caulk line set mech closet 2025-seal gap at cold water line mechanical ceiling, joist hanger nails south joist, secure dishwasher discharge line ABOVE BOWL OF SINK 2026 ok 2027-locked, seal ductwork at back of mechanical closet 2018 entry door shall be self closing & self latching, complete gfci end of kitchen island, fire caulk mech room ceiling 2019-Gap at guardrail greater than 4” at stone, exterior GFCI receptacle faulty, seal penetrations at line sets and electrical and repair/seal damaged fire taping behind hvac 2020 fire caulk/ fire tape line set mech closet 2021-Seal gaps at penetrations at back wall for line set and at cold water line, 2022 fire caulk/ fire tape line set mech closet 2023-missing joist hanger nails north and south end joists, secure dishwasher discharge line ABOVE BOWL OF SINK 2024 fire caulk line set mech closet, 2025-seal gap at cold water line mechanical ceiling, joist hanger nails south joist, secure dishwasher discharge line ABOVE BOWL OF SINK 2026 ok 2027-locked, seal ductwork at back of mechanical closet 2028-ok 2029 nail joist hangers deck 2031-Missing nails at joist hangers south side at building 2035A-Weather strip and threshold at door, repair shaft assembly, anti siphon at sink, gfci required at receptacle 2037/2038-incomplete, missing guard rail, gaps over 4” at guardrail 2045/2046- remove cover at sprinkler in data, seal sleeves with approved methods throughout, label all panels, seal at junction box in ceiling, access to fire damper? Label disconnect 2047-fire collar at riser line, fire caulk gap at ceiling to wall behind ductwork, 2039 incomplete 2042 incomplete 2044 incomplete 2040 storage- repair fire rated assembly on ceiling 2041 telecom - firecaulk data tubes at ceiling south roof- GFCI by door no power, label disconnect at pool dehumidifier, label all RTUs, secure all electrical, label ALL units
Miscellaneous Inspection Failed 2/1/2022 2/1/2022 02/01/2022
Misc
Corrective Action Required
01/28/2022
PRE FINAL IL BUILDING: PRE FINAL IL BUILDING: -Complete fire doors and exit lights at separation walls -Roof AC disconnect need labeled & missing covers, -Check handrails in stairways for code compliance 3rd Floor: 3001-3016 OK 3017-ADA- Missing vertical grab bar in restroom 3018-3031 OK 3037-Ok 3038 - ok 3038A- ok 3039 Fire caulk low volt mech and ductwork closet 3039-2, provide GFCI protection dishwasher, loose receptacle right of range, seal penetration at fire alarm by door 3040 -ok 3041-ok 3042 - grab bars per A117.1 , cover plate, mirror, permanent sign with braille, Mount fire alarm 3043-ok 3044 - ok 3045-ok 3047- ok 2nd Floor: 2001-adjust both doors to. Lose and latch, 2002- firecaulk ceiling at mech, remove tape from sprinkler head 2003-install guardrail at deck, install light fixture and receptacle at deck 2004-Secure cover/receptacle and seal gaps around box at exterior, seal line sets and at back of ductwork 2005-firecaulk mech ceiling at AC Lineset, Install receptacle and light fixture at deck 2006-Seal line sets and behind ductwork , anti tip device at range, secure dishwasher discharge above bowl of sink 2007-firecaulk mech ceiling 2008-Bad receptacle at exterior, seal penetrations at line sets 2009-Install light fixture and receptacle at deck, firecaulk mech ceiling 2010-Seal line sets, install receptacle and bubble cover at exterior 2011-firecaulk mech ceiling, door must be self closing, missing sprinkler head at bathroom,closet Emergency light not testing outside of 2011 2012-firecaulk mech ceiling 2013-firecaulk mech ceiling, nail off joist hangers for deck above 2014-firecaulk AC penetrations at ceiling and around HVAC duct mech room 2015 - firecaulk at AC ceiling penetrations mech closet 2016 - ok 2017-hammer arrestors at laundry, seal gaps at hot water line and line set 2018 entry door shall be self closing & self latching, complete gfci end of kitchen island, fire caulk mech room ceiling 2019-Gap at guardrail greater than 4” at stone, exterior GFCI receptacle faulty, seal penetrations at line sets and electrical and repair/seal damaged fire taping behind hvac 2020 fire caulk/ fire tape line set mech closet 2021-Seal gaps at penetrations at back wall for line set and at cold water line, 2022 fire caulk/ fire tape line set mech closet 2023-missing joist hanger nails north and south end joists, secure dishwasher discharge line ABOVE BOWL OF SINK 2024 fire caulk line set mech closet 2025-seal gap at cold water line mechanical ceiling, joist hanger nails south joist, secure dishwasher discharge line ABOVE BOWL OF SINK 2026 ok 2027-locked, seal ductwork at back of mechanical closet 2018 entry door shall be self closing & self latching, complete gfci end of kitchen island, fire caulk mech room ceiling 2019-seal penetrations at line sets and electrical and repair/seal damaged fire taping behind hvac 2020 fire caulk/ fire tape line set mech closet 2021-Seal gaps at penetrations at back wall for line set and at cold water line, 2022 fire caulk/ fire tape line set mech closet 2023-ok 2024 - fire caulk line set mech closet-Against wall 2025-ok 2026 ok 2027-seal ductwork at back of mechanical closet 2028-ok 2029 -ok 2030-ok 2031-Ok 2035A-Weather strip and threshold at door, repair shaft assembly, anti siphon at sink, gfci required at receptacle 2037/2038-incomplete, missing guard rail, gaps over 4” at guardrail 2045/2046- remove cover at sprinkler in data, seal sleeves with approved methods throughout, label all panels, seal at junction box in ceiling, access to fire damper? Label disconnect 2047-fire collar at riser line, fire caulk gap at ceiling to wall behind ductwork, 2039 incomplete 2042 incomplete 2044 incomplete 2040 storage- repair fire rated assembly on ceiling 2041 telecom - firecaulk data tubes at ceiling south roof- GFCI by door no power, label disconnect at pool dehumidifier, label all RTUs, secure all electrical, label ALL units
Miscellaneous Inspection Failed 2/2/2022 2/2/2022 02/02/2022
Misc
Corrective Action Required
02/01/2022
PRE FINAL IL BUILDING: PRE FINAL IL BUILDING: -Complete fire doors and exit lights at separation walls -Roof AC disconnect need labeled & missing covers, -Check handrails in stairways for code compliance 3rd Floor: 3001-3016 OK 3017-ADA- Missing vertical grab bar in restroom 3018-3031 OK 3037-Ok 3038 - ok 3038A- ok 3039 Fire caulk low volt mech and ductwork closet 3039-2, provide GFCI protection dishwasher, loose receptacle right of range, seal penetration at fire alarm by door 3040 -ok 3041-ok 3042 - grab bars per A117.1 , cover plate, mirror, permanent sign with braille, Mount fire alarm 3043-ok 3044 - ok 3045-ok 3047- ok 2nd Floor: 2001-adjust both doors to. Lose and latch, 2002- firecaulk ceiling at mech, remove tape from sprinkler head 2003-install guardrail at deck, install light fixture and receptacle at deck 2004-Secure cover/receptacle and seal gaps around box at exterior, seal line sets and at back of ductwork 2005-firecaulk mech ceiling at AC Lineset, Install receptacle and light fixture at deck 2006-Seal line sets and behind ductwork , anti tip device at range, secure dishwasher discharge above bowl of sink 2007-firecaulk mech ceiling 2008-Bad receptacle at exterior, seal penetrations at line sets 2009-Install light fixture and receptacle at deck, firecaulk mech ceiling 2010-Seal line sets, install receptacle and bubble cover at exterior 2011-firecaulk mech ceiling, door must be self closing, missing sprinkler head at bathroom,closet Emergency light not testing outside of 2011 2012-firecaulk mech ceiling 2013-firecaulk mech ceiling, nail off joist hangers for deck above 2014-firecaulk AC penetrations at ceiling and around HVAC duct mech room 2015 - firecaulk at AC ceiling penetrations mech closet 2016 - ok 2017-hammer arrestors at laundry, seal gaps at hot water line and line set 2018 entry door shall be self closing & self latching, complete gfci end of kitchen island, fire caulk mech room ceiling 2019-Gap at guardrail greater than 4” at stone, exterior GFCI receptacle faulty, seal penetrations at line sets and electrical and repair/seal damaged fire taping behind hvac 2020 fire caulk/ fire tape line set mech closet 2021-Seal gaps at penetrations at back wall for line set and at cold water line, 2022 fire caulk/ fire tape line set mech closet 2023-missing joist hanger nails north and south end joists, secure dishwasher discharge line ABOVE BOWL OF SINK 2024 fire caulk line set mech closet 2025-seal gap at cold water line mechanical ceiling, joist hanger nails south joist, secure dishwasher discharge line ABOVE BOWL OF SINK 2026 ok 2027-locked, seal ductwork at back of mechanical closet 2018 entry door shall be self closing & self latching, complete gfci end of kitchen island, fire caulk mech room ceiling 2019-seal penetrations at line sets and electrical and repair/seal damaged fire taping behind hvac 2020 fire caulk/ fire tape line set mech closet 2021-Seal gaps at penetrations at back wall for line set and at cold water line, 2022 fire caulk/ fire tape line set mech closet 2023-ok 2024 - fire caulk line set mech closet-Against wall 2025-ok 2026 ok 2027-seal ductwork at back of mechanical closet 2028-ok 2029 -ok 2030-ok 2031-Ok 2035A-Weather strip and threshold at door, repair shaft assembly, anti siphon at sink, gfci required at receptacle 2037/2038-incomplete, missing guard rail, gaps over 4” at guardrail 2045/2046- remove cover at sprinkler in data, seal sleeves with approved methods throughout, label all panels, seal at junction box in ceiling, access to fire damper? Label disconnect 2047-fire collar at riser line, fire caulk gap at ceiling to wall behind ductwork, 2039 incomplete 2042 incomplete 2044 incomplete 2040 storage- repair fire rated assembly on ceiling 2041 telecom - firecaulk data tubes at ceiling south roof- GFCI by door no power, label disconnect at pool dehumidifier, label all RTUs, secure all electrical, label ALL units 1st Floor: BUILDING A NOT READY -WALK ALL UNITS, MECHANICAL ROOMS AND OTHER SPACES FOR COMPLETION BEFORE SCHEDULING FURTHER INSPECTION 1030- Fire caulk pex at ceiling mech room, Provide cover plate kitchen counter, cover plate for clean out bathroom, lock SGD, 1029- LOCKED 1028 - sprinkler head missing at living room, firecaulk mech ceiling 1027 - firecaulk penetrations mech closet 1026 open box GFCI patio, lock SGD, Furnished model unit with no TCO 1025-INCOMPLETE 1024 fire caulk pex ceiling mechanical room, Drywall repair ceiling bathroom, cover plate clean out bathroom, spark rings & cover plate kitchen counter, latch SGD, GFCI patio dead 1023 - GFCI protection at kitchen counter receptacles, ADA unit/install grab bars, kitchen sink accessibility, remove smoke covers , firecaulk penetrations, tape and mud corner at mech closet 1022-seal at lv/mc and behind ductwork, 1021-remove cover from smoke 1020-Install cover plate at kitchen, seal penetrations at hot water line 1019-mechanical closet won’t open, secure dishwasher discharge above bowl of sink 1018-spark rings at receptacles, slider door latch, missing exterior receptacle, repair damaged sheathing and moisture barrier , remove tape from sprinkler, seal penetrations 1017-Seal lv penetration-missing breakers 15/17, missing exterior gfc, repair damaged sheathing and moisture barrier 1016-missing exterior receptacle, repair damaged sheathing and moisture barrier, remove tape at ceiling and seal penetrations, remove tape from sprinkler Building A incomplete 1015-seal gap at bottom of receptacle next to sink, sess as l pex penetrations at closet
Miscellaneous Inspection Failed 2/3/2022 2/3/2022 02/03/2022
Misc
Corrective Action Required
02/02/2022
PRE FINAL IL BUILDING: PRE FINAL IL BUILDING: -Complete fire doors and exit lights at separation walls -Roof AC disconnect need labeled & missing covers, -Check handrails in stairways for code compliance 3rd Floor: 3001-3016 OK 3017-ADA- Missing vertical grab bar in restroom 3018-3031 OK 3037-Ok 3038 - ok 3038A- ok 3039 Fire caulk low volt mech and ductwork closet 3039-2, provide GFCI protection dishwasher, loose receptacle right of range, seal penetration at fire alarm by door 3040 -ok 3041-ok 3042 - grab bars per A117.1 , cover plate, mirror, permanent sign with braille, Mount fire alarm 3043-ok 3044 - ok 3045-ok 3047- ok 2nd Floor: 2001-adjust both doors to. Lose and latch, 2002- firecaulk ceiling at mech, remove tape from sprinkler head 2003-install guardrail at deck, install light fixture and receptacle at deck 2004-Secure cover/receptacle and seal gaps around box at exterior, seal line sets and at back of ductwork 2005-firecaulk mech ceiling at AC Lineset, Install receptacle and light fixture at deck 2006-Seal line sets and behind ductwork , anti tip device at range, secure dishwasher discharge above bowl of sink 2007-firecaulk mech ceiling 2008-Bad receptacle at exterior, seal penetrations at line sets 2009-Install light fixture and receptacle at deck, firecaulk mech ceiling 2010-Seal line sets, install receptacle and bubble cover at exterior 2011-firecaulk mech ceiling, door must be self closing, missing sprinkler head at bathroom,closet Emergency light not testing outside of 2011 2012-firecaulk mech ceiling 2013-firecaulk mech ceiling, nail off joist hangers for deck above 2014-firecaulk AC penetrations at ceiling and around HVAC duct mech room 2015 - firecaulk at AC ceiling penetrations mech closet 2016 - ok 2017-hammer arrestors at laundry, seal gaps at hot water line and line set 2018 entry door shall be self closing & self latching, complete gfci end of kitchen island, fire caulk mech room ceiling 2019-Gap at guardrail greater than 4” at stone, exterior GFCI receptacle faulty, seal penetrations at line sets and electrical and repair/seal damaged fire taping behind hvac 2020 fire caulk/ fire tape line set mech closet 2021-Seal gaps at penetrations at back wall for line set and at cold water line, 2022 fire caulk/ fire tape line set mech closet 2023-missing joist hanger nails north and south end joists, secure dishwasher discharge line ABOVE BOWL OF SINK 2024 fire caulk line set mech closet 2025-seal gap at cold water line mechanical ceiling, joist hanger nails south joist, secure dishwasher discharge line ABOVE BOWL OF SINK 2026 ok 2027-locked, seal ductwork at back of mechanical closet 2018 entry door shall be self closing & self latching, complete gfci end of kitchen island, fire caulk mech room ceiling 2019-seal penetrations at line sets and electrical and repair/seal damaged fire taping behind hvac 2020 fire caulk/ fire tape line set mech closet 2021-Seal gaps at penetrations at back wall for line set and at cold water line, 2022 fire caulk/ fire tape line set mech closet 2023-ok 2024 - fire caulk line set mech closet-Against wall 2025-ok 2026 ok 2027-seal ductwork at back of mechanical closet 2028-ok 2029 -ok 2030-ok 2031-Ok 2035A-Weather strip and threshold at door, repair shaft assembly, anti siphon at sink, gfci required at receptacle 2037/2038-incomplete, missing guard rail, gaps over 4” at guardrail 2045/2046- remove cover at sprinkler in data, seal sleeves with approved methods throughout, label all panels, seal at junction box in ceiling, access to fire damper? Label disconnect 2047-fire collar at riser line, fire caulk gap at ceiling to wall behind ductwork, 2039 incomplete 2042 incomplete 2044 incomplete 2040 storage- repair fire rated assembly on ceiling 2041 telecom - firecaulk data tubes at ceiling south roof- GFCI by door no power, label disconnect at pool dehumidifier, label all RTUs, secure all electrical, label ALL units 1st Floor: BUILDING A NOT READY -WALK ALL UNITS, MECHANICAL ROOMS AND OTHER SPACES FOR COMPLETION BEFORE SCHEDULING FURTHER INSPECTION 1030- Fire caulk pex at ceiling mech room, Provide cover plate kitchen counter, cover plate for clean out bathroom, lock SGD, 1029- LOCKED 1028 - sprinkler head missing at living room, firecaulk mech ceiling 1027 - firecaulk penetrations mech closet 1026 open box GFCI patio, lock SGD, Furnished model unit with no TCO 1025-INCOMPLETE 1024 fire caulk pex ceiling mechanical room, Drywall repair ceiling bathroom, cover plate clean out bathroom, spark rings & cover plate kitchen counter, latch SGD, GFCI patio dead 1023 - GFCI protection at kitchen counter receptacles, ADA unit/install grab bars, kitchen sink accessibility, remove smoke covers , firecaulk penetrations, tape and mud corner at mech closet 1022-seal at lv/mc and behind ductwork, 1021-remove cover from smoke 1020-Install cover plate at kitchen, seal penetrations at hot water line 1019-mechanical closet won’t open, secure dishwasher discharge above bowl of sink 1018-spark rings at receptacles, slider door latch, missing exterior receptacle, repair damaged sheathing and moisture barrier , remove tape from sprinkler, seal penetrations 1017-Seal lv penetration-missing breakers 15/17, missing exterior gfc, repair damaged sheathing and moisture barrier 1016-missing exterior receptacle, repair damaged sheathing and moisture barrier, remove tape at ceiling and seal penetrations, remove tape from sprinkler Building A incomplete 1015-seal gap at bottom of receptacle next to sink, sess as l pex penetrations at closet
Miscellaneous Correction
Corrective Action Required
02/03/2022
2-3-22 3rd inspection of 2nd floor not ready. Please correct all items from previous inspections before scheduling re inspection
Miscellaneous Inspection Partial 2/4/2022 2/4/2022 02/04/2022
Misc
Corrective Action Required
02/03/2022
PRE FINAL IL BUILDING: PRE FINAL IL BUILDING: -Complete fire doors and exit lights at separation walls -Roof AC disconnect need labeled & missing covers, -Check handrails in stairways for code compliance ***3rd Floor: 3001-3016 OK 3017-ADA- Missing vertical grab bar in restroom 3018-3031 OK 3037-3038A-ok 3039 Fire caulk low volt mech and ductwork closet 3039-2, provide GFCI protection dishwasher, loose receptacle right of range, seal penetration at fire alarm by door 3040 -ok 3041-ok 3042 - grab bars per A117.1 , cover plate, mirror, permanent sign with braille, Mount fire alarm 3043-ok 3044 - ok 3045-ok 3047- ok ***2nd Floor: 2001-ok 2002- firecaulk ceiling at mech at pex 2003-install guardrail at deck, install light fixture and receptacle at deck-LOCKED 2004-ok 2005-ok 2006-anti tip device at range 2007-2018 ok 2019-seal penetrations at electrical conduit 2020 -2031 ok 2035A-Weather strip and threshold at door 2037/2038-ok 2040 -ok 2041-Incomplete 2042 - permanent sign, grab bar behind toilet max 6” gap from side wall 2045- Signage at electrical room door per nec 110, seal penetrations at lineset, ductwork and conduit 2046-ok 2047-Seal behind riser, screw fire collar 2039-Ok 2044 -ok south roof- GFCI by door no power, label disconnect at pool dehumidifier, label all RTUs, secure all electrical, label ALL units 1st Floor: BUILDING "A" NOT READY -WALK ALL UNITS, MECHANICAL ROOMS AND OTHER SPACES FOR COMPLETION BEFORE SCHEDULING FURTHER INSPECTION 1030- Fire caulk pex at ceiling mech room, Provide cover plate kitchen counter, cover plate for clean out bathroom, lock SGD, 1029- LOCKED 1028 - sprinkler head missing at living room, firecaulk mech ceiling 1027 - firecaulk penetrations mech closet 1026 open box GFCI patio, lock SGD, Furnished model unit with no TCO 1025-INCOMPLETE 1024 fire caulk pex ceiling mechanical room, Drywall repair ceiling bathroom, cover plate clean out bathroom, spark rings & cover plate kitchen counter, latch SGD, GFCI patio dead 1023 - GFCI protection at kitchen counter receptacles, ADA unit/install grab bars, kitchen sink accessibility, remove smoke covers , firecaulk penetrations, tape and mud corner at mech closet 1022-seal at lv/mc and behind ductwork, 1021-remove cover from smoke 1020-Install cover plate at kitchen, seal penetrations at hot water line 1019-mechanical closet won’t open, secure dishwasher discharge above bowl of sink 1018-spark rings at receptacles, slider door latch, missing exterior receptacle, repair damaged sheathing and moisture barrier , remove tape from sprinkler, seal penetrations 1017-Seal lv penetration-missing breakers 15/17, missing exterior gfc, repair damaged sheathing and moisture barrier 1016-missing exterior receptacle, repair damaged sheathing and moisture barrier, remove tape at ceiling and seal penetrations, remove tape from sprinkler Building A incomplete 1015-seal gap at bottom of receptacle next to sink, sess as l pex penetrations at closet
Miscellaneous Correction
Corrective Action Required
02/03/2022
Miscellaneous Inspection Not Ready 2/7/2022 2/7/2022 02/07/2022
Misc
Corrective Action Required
02/04/2022
PRE FINAL IL BUILDING: PRE FINAL IL BUILDING: -Complete fire doors and exit lights at separation walls -Roof AC disconnect need labeled & missing covers, -Check handrails in stairways for code compliance ***3rd Floor: 3001-3016 OK 3017-ADA- Missing vertical grab bar in restroom 3018-3031 OK 3037-3038A-ok 3039 Fire caulk low volt mech and ductwork closet 3039-2, provide GFCI protection dishwasher, loose receptacle right of range, seal penetration at fire alarm by door 3040 -ok 3041-ok 3042 - grab bars per A117.1 , cover plate, mirror, permanent sign with braille, Mount fire alarm 3043-ok 3044 - ok 3045-ok 3047- ok ***2nd Floor: 2001-2018 ok 2019-seal penetrations at electrical conduit 2020 -2031 ok 2035A-Weather strip and threshold at door 2037/2038-ok 2040 -ok 2041-Incomplete 2042 - permanent sign, grab bar behind toilet max 6” gap from side wall 2045- Signage at electrical room door per nec 110, seal penetrations at lineset, ductwork and conduit 2046-ok 2047-Seal behind riser, screw fire collar 2039-Ok 2044 -ok south roof- GFCI by door no power, label disconnect at pool dehumidifier, label all RTUs, secure all electrical, label ALL units 1st Floor: BUILDING "A" NOT READY -WALK ALL UNITS, MECHANICAL ROOMS AND OTHER SPACES FOR COMPLETION BEFORE SCHEDULING FURTHER INSPECTION 1030- Provide cover plates kitchen counter, 1028 - sprinkler head missing at living room 1027 - firecaulk penetrations mech closet-pex,sprinkler 1026 open box GFCI patio, lock SGD, Furnished model unit with no TCO, fire tape rock behind hvac 1025-Anti tip device at range, spark rings at all kitchen receptacles, hardware on sliding glass door, penetration at wall behind line set and behind pex lines 1024 fire caulk pex ceiling mechanical room, Drywall repair ceiling bathroom, cover plate clean out bathroom, spark rings & cover plate kitchen counter, latch SGD, GFCI patio dead 1023 - GFCI protection at kitchen counter receptacle left of sink,ADA unit/install grab bars, kitchen sink accessibility, remove smoke covers , firecaulk penetrations, tape and mud corner at mech closet 1022-seal at lv/mc and behind ductwork, 1021-remove cover from smoke 1020-Install cover plate at kitchen, seal penetrations at hot water line 1019-mechanical closet won’t open, secure dishwasher discharge above bowl of sink 1018-spark rings at receptacles, slider door latch, missing exterior receptacle, repair damaged sheathing and moisture barrier , remove tape from sprinkler, seal penetrations 1017-Seal lv penetration-missing breakers 15/17, missing exterior gfc, repair damaged sheathing and moisture barrier 1016-missing exterior receptacle, repair damaged sheathing and moisture barrier, remove tape at ceiling and seal penetrations, remove tape from sprinkler 1015-seal gap at bottom of receptacle next to sink, seal all pex penetrations at closet
Miscellaneous Correction
Corrective Action Required
02/04/2022
2-7-22 NOT READY, UNITS ON 1ST FLOOR STILL INCOMPLETE. COMPLETE ALL ITEMS FROM LIST AND WALK REMAINING UNITS BEFORE CALLING FOR AN INSPECTION
Alarm Test Partial 2/8/2022 02/08/2022
Sprinkler - Flow Test Partial 2/8/2022 02/08/2022
Alarm Test Partial 2/9/2022 02/09/2022
Sprinkler - Flow Test Failed 2/9/2022 02/09/2022
Corrective Action Required
02/09/2022
Label sprinkler room door. Label riser with area of protection. Dry system in memory care failed, need to re-test. Add wrench to spare head box.
Alternate Protection Systems Inspection Not Ready 2/9/2022 02/09/2022
Miscellaneous Inspection Partial 2/9/2022 2/9/2022 02/09/2022
Misc
Corrective Action Required
02/07/2022
PRE FINAL IL BUILDING: PRE FINAL IL BUILDING: -Complete fire doors and exit lights at separation walls -Roof AC disconnect need labeled & missing covers, -Check handrails in stairways for code compliance ***3rd Floor: 3001-3016 OK 3017-ADA- Missing vertical grab bar in restroom 3018-3031 OK 3037-3038A-ok 3039 Fire caulk low volt mech and ductwork closet 3039-2, provide GFCI protection dishwasher, loose receptacle right of range, seal penetration at fire alarm by door 3040 -ok 3041-ok 3042 - grab bars per A117.1 , cover plate, mirror, permanent sign with braille, Mount fire alarm 3043-ok 3044 - ok 3045-ok 3047- ok ***2nd Floor: 2001-2018 ok 2019-seal penetrations at electrical conduit 2020 -2031 ok 2035A-Weather strip and threshold at door 2037/2038-ok 2040 -ok 2041-Incomplete 2042 - permanent sign, grab bar behind toilet max 6” gap from side wall 2045- Signage at electrical room door per nec 110, seal penetrations at lineset, ductwork and conduit 2046-ok 2047-Seal behind riser, screw fire collar 2039-Ok 2044 -ok south roof- GFCI by door no power, label disconnect at pool dehumidifier, label all RTUs, secure all electrical, label ALL units ***1st Floor: BUILDING "A" NOT COMPLETE 1002 anti tip, loose receptacle at washer, secure diswaher discharge line above sink, 1004- GFCI protection at dishwasher 1007 clean paint from sprinkler head 1008-Terminate electrical at range, complete discharge and water at dishwasher, secure exterior gfci box and seal perimeter, address storm discharge, grab bars 1019-secure dishwasher discharge above bowl of sink 1025-spark rings at all kitchen receptacles, hardware on sliding glass door, 1024-spark rings & cover plate kitchen counter 1023 - GFCI protection at kitchen counter receptacle left of sink,ADA unit/install grab bars, kitchen sink accessibility, 1059 OK 1062 OK 1058 OK 1053a OK 1053 incomplete 1056 OK 1054 OK 1055 OK 1033 OK 1046-1047 address floor height greater than 1/2" difference, grab bars, signs etc. Pool equipment- Protect bond wire, 1” clearance at vent Pool- permanant handrail, drinking fountains, all bathroom accessories and signs -SUPPLY CODE COMPLIANT BUILDING ADDRESS, 6" CONTRASTING NUMBERS AT MAIN ENTRANCE CANOPY -SUBMIT ALL 3RD PARTY INSPECTIONS FOR ALL FLOORS
Miscellaneous Correction
Corrective Action Required
02/07/2022
Miscellaneous Inspection Partial 2/10/2022 2/10/2022 02/10/2022
Misc
Corrective Action Required
02/09/2022
PRE FINAL IL BUILDING: PRE FINAL IL BUILDING: -Complete fire doors and exit lights at separation walls -Roof AC disconnect need labeled & missing covers, -Check handrails in stairways for code compliance ***3rd Floor: 3001-3016 OK 3017-OK 3018-3031 OK 3037-3038A-ok 3039 -ok 3040 -GFCI far right 3041-ok 3042 - grab bars per A117.1 , cover plate, mirror, permanent sign with braille, Mount fire alarm 3045-penetration above panel IL3A 3043-ok 3044 - ok 3045-ok 3047- ok ***2nd Floor: 2001-2018 ok 2019-seal penetrations at electrical conduit 2020 -2031 ok 2035A-Weather strip and threshold at door 2037/2038-ok 2040 -ok 2041-Incomplete 2042 - permanent sign, grab bar behind toilet max 6” gap from side wall 2045- Signage at electrical room door per nec 110, seal penetrations at lineset, ductwork and conduit 2046-ok 2047-Seal behind riser, screw fire collar 2039-Ok 2044 -ok south roof- GFCI by door no power, label disconnect at pool dehumidifier, label all RTUs, secure all electrical, label ALL units ***1st Floor: BUILDING "A" NOT COMPLETE 1002 anti tip, loose receptacle at washer, secure diswaher discharge line above sink, 1004- GFCI protection at dishwasher 1007 clean paint from sprinkler head 1008-Terminate electrical at range, complete discharge and water at dishwasher, secure exterior gfci box and seal perimeter, address storm discharge, grab bars 1019-secure dishwasher discharge above bowl of sink 1025-spark rings at all kitchen receptacles, hardware on sliding glass door, 1024-spark rings & cover plate kitchen counter 1023 - GFCI protection at kitchen counter receptacle left of sink,ADA unit/install grab bars, kitchen sink accessibility, 1059 OK 1062 OK 1058 OK 1053a OK 1053 incomplete 1056 OK 1054 OK 1055 OK 1033 OK 1046-1047 address floor height greater than 1/2" difference, grab bars, signs etc. Pool equipment- Protect bond wire, 1” clearance at vent Pool- permanant handrail, drinking fountains, all bathroom accessories and signs -SUPPLY CODE COMPLIANT BUILDING ADDRESS, 6" CONTRASTING NUMBERS AT MAIN ENTRANCE CANOPY -SUBMIT ALL 3RD PARTY INSPECTIONS FOR ALL FLOORS
Miscellaneous Correction
Corrective Action Required
02/09/2022
Occupancy Inspection - Planning Temporary C of O 2/11/2022 02/11/2022
Misc
Corrective Action Required
02/11/2022
Complete landscaping per the approved plan.
Misc
Corrective Action Required
02/11/2022
Complete construction of the trash dumpster enclosures. Solid steel gates shall be installed per the approved plan.
Occupancy Inspection - Codes Commercial Failed 2/11/2022 2/11/2022 02/11/2022
Miscellaneous Correction
Corrective Action Required
02/11/2022
TCO has not been issued on this project. See separate divisions for other reports from Fire, Water, Planning, Engineering. Building is not to be occupied by sales team or open to the public for walk throughs until a TCO has been issued. Please contract the Project Manager for further questions. -Complete all items for all other departments -Submit missing Special inspections final inspection report , see plan review comments when permit was issued. -Provide Health Dept approval from Jackson County. -Complete all sight lighting and receptacles at lights -Backfill at open trenches for electrical -Missing vent covers at NW exterior -Hood system not approved-Gas to remain off until approved -Open public street for access -5 LB Max force to open all egress doors -Roofs-Label all units, AC disconnect need labeled & missing covers, GFCI proteced receptacles, secure whips within 12"-WORKING ON ELECTRICAL AT TIME OF INSPECTION -Pool equipment room-Reconnect bond wire -Pool- complete drinking fountain installation, missing accessible bathroom signs, mirrors are not ADA compliant -Complete electrical at corridor to kitchen -All hard piped appliances require back flow devices- ice/water maker, coffee machine, soda dispenser etc. -Secure electrical panel covers at kitchen -Correct gaps greater than 4" at 2nd floor gaurdrail -Paint all exterior metallic gas lines with corrosion preventitive paint 2042 - permanent sign, grab bar behind toilet max 6” gap from side wall 2045- Signage at electrical room door per nec 110, seal penetrations at lineset, ductwork and conduit 2047-Seal behind riser, screw fire collar 1002- loose receptacle at washer, secure diswaher discharge line above sink, 1004- GFCI protection at dishwasher-LOCKED AT FINAL 1007 clean paint from sprinkler head and install eschucheon-NOT DONE AT FINAL 1008- complete discharge and water at dishwasher, secure exterior gfci box and seal perimeter, address storm discharge, grab bars-NOT DONE AT FINAL 1019-secure dishwasher discharge above bowl of sink-NOT DONE AT FINAL 1025-spark rings at all kitchen receptacles, hardware on sliding glass door,_NOT DONE AT FINAL 1024-spark rings & cover plate kitchen counter -NOT DONE AT FINAL 1023 - GFCI protection at kitchen counter receptacle left of sink,ADA unit/install grab bars, kitchen sink accessibility,-NOT DONE AT FINAL 1038-Complete condensate line 1053 incomplete 1046-1047-Permanent accessible signs 1045-Seal penetration at dwv to hallway
Occupancy Inspection - Fire Failed 2/11/2022 02/14/2022
Corrective Action Required
02/11/2022
2026 covered sprinkler head 3042 horn strobe hanging from the wall 1022 with a covered sprinkler head 1017 with a covered sprinkler head First floor north hallway fire door exit signs are covered North hallway exterior illumination does not work Sprinkler system needs to be tagged current.
Occupancy Inspection - Health Failed 2/11/2022 02/14/2022
Misc
Corrective Action Required
02/14/2022
Failed - no report provided.
Occupancy Inspection - Engineering Failed 2/11/2022 02/14/2022
Misc
Informational
02/11/2022
Items needed for TCO: 1. Detention basin needs to be completed and as-builts need to be turned in and approved for basin. 2. The public road needs to be open and given substantial completion. The fence needs to be removed so fire can get through if needed. 3.Erosion control devices need to be installed and mud and silt need to be cleaned off the streets and sidewalks. Items needed for Final Acceptance: 1. All items for TCO. 2. All trash and debris need to be removed from the site. 3. All equipment and trailers need to be removed from the site. 4. There are 3 private sanitary MH's that need some work around the pipes and inverts. 5. Water valves need to be lowered to grade. 6. Record drawings for all public infrastructure need to be submitted and approved. 7. Provide a 3 year maintenance bond for all public infrastructure. 8. Provide a final affidavit and agreement for all public infrastructure. 9. Need to have a minimum of 70% vegetation to be established.
Alternate Protection Systems Inspection Passed 2/14/2022 02/14/2022
Occupancy Inspection - Planning Temporary C of O 2/16/2022 2/16/2022 02/16/2022
Misc
Corrective Action Required
02/11/2022
Complete landscaping per the approved plan.
Misc
Corrective Action Required
02/11/2022
Complete construction of the trash dumpster enclosures. Solid steel gates shall be installed per the approved plan.
Occupancy Inspection - Codes Commercial Failed 2/16/2022 2/16/2022 02/16/2022
Miscellaneous Correction
Informational
02/16/2022
All residential units and common spaces in buildings A,B and C, and kitchen 164 approved for TCO
Miscellaneous Correction
Corrective Action Required
02/16/2022
-Complete all items for all other departments -Provide Health Dept approval from Jackson County for swimming pool -Complete all sight lighting and receptacles at lights-bond poles to ground rod -Install louvered covers for fresh air at rooftops
Occupancy Inspection - Fire Failed 2/16/2022 2/16/2022 02/17/2022
Misc
Corrective Action Required
02/14/2022
2026 covered sprinkler head 3042 horn strobe hanging from the wall 1022 with a covered sprinkler head 1017 with a covered sprinkler head First floor north hallway fire door exit signs are covered North hallway exterior illumination does not work Sprinkler system needs to be tagged current.
Occupancy Inspection - Engineering Temporary C of O 2/16/2022 2/18/2022 02/18/2022
Misc
Informational
02/14/2022
Items needed for TCO: 1. Detention basin needs to be completed and as-builts need to be turned in and approved for basin. 2. The public road needs to be open and given substantial completion. The fence needs to be removed so fire can get through if needed. 3.Erosion control devices need to be installed and mud and silt need to be cleaned off the streets and sidewalks. Items needed for Final Acceptance: 1. All items for TCO. 2. All trash and debris need to be removed from the site. 3. All equipment and trailers need to be removed from the site. 4. There are 3 private sanitary MH's that need some work around the pipes and inverts. 5. Water valves need to be lowered to grade. 6. Record drawings for all public infrastructure need to be submitted and approved. 7. Provide a 3 year maintenance bond for all public infrastructure. 8. Provide a final affidavit and agreement for all public infrastructure. 9. Need to have a minimum of 70% vegetation to be established.
Misc
Informational
02/18/2022
TCO is Accepted Need to have these items completed in 30 days. No further occupancy until as-builts for detention basin has been accepted. 1. As-builts for detention basin need to be turned in and accepted 2. All trash and debris need to be removed from the site. 3. All equipment and trailers need to be removed from the site. 4. There are 3 private storm MH's that need some work around the pipes and inverts. 5. Water valves need to be lowered to grade. 6. Record drawings for all public infrastructure need to be submitted and approved. 7. Provide a 3 year maintenance bond for all public infrastructure. 8. Provide a final affidavit and agreement for all public infrastructure. 9. Need to have a minimum of 70% vegetation to be established.
Occupancy Inspection - Codes Commercial Failed 2/22/2022 02/22/2022
Miscellaneous Correction
Corrective Action Required
02/16/2022
- Complete all items for all other departments - Provide Health Dept approval from Jackson County for swimming pool -Complete all sight lighting and receptacles at lights-bond poles to ground rod -Install louvered covers for fresh air at rooftops
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/22/2022
All residential units and common spaces in buildings A,B and C, and kitchen 164 approved for Occupancy
Occupancy Inspection - Codes Commercial Failed 2/22/2022 02/22/2022
Miscellaneous Correction
Corrective Action Required
02/22/2022
- Complete all items for all other departments - Provide Health Dept approval from Jackson County for swimming pool -Complete all sight lighting and receptacles at lights-bond poles to ground rod -Install louvered covers for fresh air at rooftops
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/22/2022
All residential units and common spaces in buildings A,B and C, and kitchen 164 approved for Occupancy
Occupancy Inspection - Planning Temporary C of O 2/23/2022 02/23/2022
Misc
Corrective Action Required
02/16/2022
Complete landscaping per the approved plan.
Misc
Resolved
03/21/2022
Complete construction of the trash dumpster enclosures. Solid steel gates shall be installed per the approved plan.
Footing Inspection - Commercial Passed 3/1/2022 (1:30) 3/1/2022 03/01/2022
Underground Electrical Inspection - Commercial Passed 3/2/2022 03/02/2022
Miscellaneous Correction
Corrective Action Required
03/02/2022
-CONDUIT FOR MONUMENT SIGN FROM NW LIGHT POLE TO MONUMENT
Underground Electrical Inspection - Commercial Partial 3/2/2022 3/2/2022 03/02/2022
Miscellaneous Correction
Corrective Action Required
12/20/2021
-CONDUIT FOR MONUMENT SIGN FROM NW LIGHT POLE TO MONUMENT
Miscellaneous Inspection Failed 3/2/2022 3/2/2022 03/02/2022
Misc
Corrective Action Required
02/10/2022
PRE FINAL AL BUILDING **EAST WING UNITS ONLY -PROVIDE AFCI PROTECTION PER 210.12 -PROVIDE GFCI PROTECTION AT ALL RECEPTACLES WITHIN 6’ OF KITCHEN SINK -COMPLETE GRAB BARS AT ADA ROOMS
Miscellaneous Correction
Resolved
03/02/2022
Miscellaneous Inspection Partial 3/14/2022 3/14/2022 03/14/2022
Misc
Corrective Action Required
03/02/2022
PRE FINAL AL BUILDING **EAST WING UNITS ONLY -PROVIDE AFCI PROTECTION PER 210.12 -107 NOT READY -109 FIRE CAULK MC IN CLOSET -110 FIRE CAULK THERMOSTAT WIRE -112 MISSING ADA CABINET IN KITCHEN -117 ANTI SIPHON DEVICE AT MOP SINK, PROVIDE 1" CLEARANCE ABOVE RIM OF SINK FOR DRAINS ***MC UNITS ONLY -PROVIDE AFCI PROTECTION PER 210,12 -16 PROVIDE SPARK RING AND CORRECT GAP AT RECEPTACLE - 6 FIRE CAULK HVAC -1 FIRE CAULK THERMOSTAT WIRE -STORAGE CLOSETS- REMOVE TAPE ETC. FROM SPRINKLER HEADS, SEAL ALL PENETRATIONS -CORRIDORS- FIRE CAULK AROUND ALL SPEAKERS IN CEILING -PROVIDE WORKING SPACE AT ELECTRICAL PANEL IN CORRIDOR CLOSET
Miscellaneous Inspection Failed 3/15/2022 3/15/2022 03/15/2022
Misc
Corrective Action Required
03/14/2022
PRE FINAL AL BUILDING -SECURE ALL HVAC MC IN CLOSETS TO UNIT, FIRE CAULK ALL PENETRATIONS, ENSURE ALL DOORS SELF CLOSE AND LATCH **EAST WING UNITS ONLY -PROVIDE AFCI PROTECTION PER 210.12 -107 NOT READY -109 FIRE CAULK MC IN CLOSET -110 FIRE CAULK THERMOSTAT WIRE -112 MISSING ADA CABINET IN KITCHEN -117 ANTI SIPHON DEVICE AT MOP SINK, PROVIDE 1" CLEARANCE ABOVE RIM OF SINK FOR DRAINS ***WEST WING UNITS ONLY - INSPECTION STOPPED, TOO MANY DEFICIENCIES -147 SEAL BEHIND MC, SECURE MC -142 REPLACE DAMAGED MC, SEAL PENETRATION, SECURE MC -145 FIRE CALULK MC, SECURE MC -138 CORRECT DAMAGED MC, SECURE -137 SECURE MC -136 ADJUST DOOR, SEAL GAP AT RECEPTACLE BY SINK, SECURE MC -135 ADJUST DOOR, SECURE WHIP, GFCI BY SINK NOT WORKING -130 NOT READY ***MC UNITS ONLY -PROVIDE AFCI PROTECTION PER 210,12 -16 PROVIDE SPARK RING AND CORRECT GAP AT RECEPTACLE - 6 FIRE CAULK HVAC -1 FIRE CAULK THERMOSTAT WIRE -STORAGE CLOSETS- REMOVE TAPE ETC. FROM SPRINKLER HEADS, SEAL ALL PENETRATIONS -CORRIDORS- FIRE CAULK AROUND ALL SPEAKERS IN CEILING -PROVIDE WORKING SPACE AT ELECTRICAL PANEL IN CORRIDOR CLOSET
Miscellaneous Inspection Failed 3/16/2022 3/16/2022 03/16/2022
Misc
Corrective Action Required
03/15/2022
PRE FINAL AL BUILDING -SECURE ALL HVAC MC IN CLOSETS TO UNIT, FIRE CAULK ALL PENETRATIONS, ENSURE ALL DOORS SELF CLOSE AND LATCH -COMPLETE ALL EXTERIOR ELECTRICAL, MECHANICAL, ETC IN COURTYARD, CARPORTS AND ALL OTHER LOCATIONS -REPAIR DAMAGED SITE LIGHTING AT NORTH AND NORTHWEST -COMPLETE SITE ELECTRICAL AT FLAG POLE, MONUMENT SIGN **EAST WING UNITS ONLY -PROVIDE AFCI PROTECTION PER 210.12 -107 NOT READY -112 MISSING ADA CABINET IN KITCHEN -117 PROVIDE 1" CLEARANCE ABOVE RIM OF SINK FOR DRAINS -178 PROVIDE WORKING SPACE AT PANELS PER ARTICLE 110 **WEST WING UNITS ONLY - INSPECTION STOPPED, TOO MANY DEFICIENCIES -145 FIRE CALULK MC, SECURE MC -139 ADJUST DOOR -130 GRAB BARS, SECURE RECEPTACLE AT BATH SINK -127 MC SHORT OF CEILING, FIRE CAULK -125 MC SHORT OF CEILING, TAPE GAP AT HVAC, FIRE CAULK PENETRATION -124 GFCI AT BATHROOM NOT WORKING ***MC UNITS ONLY -PROVIDE AFCI PROTECTION PER 210,12 -1 FIRE CAULK THERMOSTAT WIRE -STORAGE CLOSETS- REMOVE TAPE ETC. FROM SPRINKLER HEADS, SEAL ALL PENETRATIONS -CORRIDORS- FIRE CAULK AROUND ALL SPEAKERS IN CEILING
Miscellaneous Inspection Failed 3/17/2022 3/17/2022 03/17/2022
Misc
Corrective Action Required
03/16/2022
PRE FINAL AL BUILDING -SECURE ALL HVAC MC IN CLOSETS TO UNIT, FIRE CAULK ALL PENETRATIONS, ENSURE ALL DOORS SELF CLOSE AND LATCH -COMPLETE ALL EXTERIOR ELECTRICAL, MECHANICAL, ETC IN COURTYARD, CARPORTS AND ALL OTHER LOCATIONS -REPAIR DAMAGED SITE LIGHTING AT NORTH AND NORTHWEST -COMPLETE SITE ELECTRICAL AT FLAG POLE, MONUMENT SIGN -WEST COURTYARD- GFCI NOT WORKING -EAST COURTYARD- SECURE WHIP IN STORAGE CLOSET, LAND ELECTRICAL AT FOUNTAIN -BATHROOMS- PLUMBING PROTECTION -AL EAST EXTERIOR TERMINATE WATER LINE -COMPLETE SIDEWALKS FOR EGRESS -SECURE GFCI SOUTHWEST CORNER -PROVIDE TAMPER RESISTANT SCHRADER VALVE COVERS AT COURTYARD UNITS -REMOVE JOB TRAILERS AND COMPLETE SIDEWALK -156- CLEARANCE AND RING AT B VENT -175- COVER PLATE, FIRE CAULK, HAMMER ARRESTORS AND GFCI AT DISHWASHER -BISTRO-SET OUTLETS AT COUNTER -COMPLETE ALL ITEMS FROM PREVIOUS INSPECTIONS **EAST WING UNITS ONLY -PROVIDE AFCI PROTECTION PER 210.12 -107 NOT READY -112 MISSING ADA CABINET IN KITCHEN -117 PROVIDE 1" CLEARANCE ABOVE RIM OF SINK FOR DRAINS -178 PROVIDE WORKING SPACE AT PANELS PER ARTICLE 110 **WEST WING UNITS ONLY - INSPECTION STOPPED, TOO MANY DEFICIENCIES -145 FIRE CALULK MC, SECURE MC -139 ADJUST DOOR -130 GRAB BARS, SECURE RECEPTACLE AT BATH SINK -127 MC SHORT OF CEILING, FIRE CAULK -125 MC SHORT OF CEILING, TAPE GAP AT HVAC, FIRE CAULK PENETRATION -124 GFCI AT BATHROOM NOT WORKING -153 COVER PLATE, PENETRATIONS AND GAP AT CEILING, CLEARANCE AND RING AT HVAC ***MC UNITS ONLY -PROVIDE AFCI PROTECTION PER 210,12 -1 FIRE CAULK THERMOSTAT WIRE -STORAGE CLOSETS- REMOVE TAPE ETC. FROM SPRINKLER HEADS, SEAL ALL PENETRATIONS -CORRIDORS- FIRE CAULK AROUND ALL SPEAKERS IN CEILING COURTYARD IN COMPLETE -ALL DOORS TO CLOSE AND LATCH -27- INCOMPLETE -LAUNDRY- INCOMPLETE -26- SEAL PENETRATIONS, HVAC COVER, LABEL PANEL, INSTALL DEAD FRONT AT PANEL -BATHROOMS INCOMPLETE -25- SECURE MC SECURE DRAIN, DRAIN TO DISCHARGE MIN 2 PIPE SIZES ABOVE DRAIN -21-ESCUTCHEON AT CLOSET
Occupancy Inspection - Fire Failed 3/18/2022 3/18/2022 03/18/2022
Misc
Corrective Action Required
02/17/2022
2026 covered sprinkler head 1022 with a covered sprinkler head 1017 with a covered sprinkler head First floor north hallway fire door exit signs are covered
Occupancy Inspection - Fire Failed 3/18/2022 03/18/2022
Misc
Corrective Action Required
03/18/2022
2026 covered sprinkler head 3042 horn strobe hanging from the wall 1022 with a covered sprinkler head 1017 with a covered sprinkler head First floor north hallway fire door exit signs are covered North hallway exterior illumination does not work Sprinkler system needs to be tagged current.
Occupancy Inspection - Codes Commercial Failed 3/18/2022 3/18/2022 03/18/2022
Miscellaneous Correction
Corrective Action Required
02/22/2022
-COMPLETE CORRECTIONS FOR ALL OTHER DEPARTMENTS -INSTALL LOUVERED COVERS FOR FRESH AIR AT ROOFTOPS -COMPLETE ALL EXTERIOR ELECTRICAL, MECHANICAL, ETC IN COURTYARD, CARPORTS AND ALL OTHER LOCATIONS -REPAIR DAMAGED SITE LIGHTING AT NORTH AND NORTHWEST -COMPLETE SITE ELECTRICAL AT FLAG POLE, MONUMENT SIGN -WEST COURTYARD- GFCI NOT WORKING -EAST COURTYARD- SECURE WHIP IN STORAGE CLOSET, LAND ELECTRICAL AT FOUNTAIN -AL EAST EXTERIOR TERMINATE WATER LINE -COMPLETE SIDEWALKS FOR EGRESS -SECURE GFCI SOUTHWEST CORNER -PROVIDE TAMPER RESISTANT SCHRADER VALVE COVERS AT COURTYARD UNITS -REMOVE JOB TRAILERS AND COMPLETE SIDEWALK -PROVIDE AFCI PROTECTION THROUGHOUT PER ARTICLE 210.12 -SUBMIT 3RD PARTY INSPECTION FOR FOOTINGS AT CARPORTS 175-HAMMER ARRESTORS AT DISHWASHER 107- ADJUST DOOR TO CLOSE AND LATCH 178-PROVIDE WORKING SPACE AT PANELS PER ARTICLE 110
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/22/2022
All residential units and common spaces in buildings A,B and C, and kitchen 164 approved for Occupancy
Occupancy Inspection - Codes Commercial Failed 3/18/2022 03/18/2022
Miscellaneous Correction
Corrective Action Required
03/18/2022
-COMPLETE CORRECTIONS FOR ALL OTHER DEPARTMENTS -INSTALL LOUVERED COVERS FOR FRESH AIR AT ROOFTOPS -COMPLETE ALL EXTERIOR ELECTRICAL, MECHANICAL, ETC IN COURTYARD, CARPORTS AND ALL OTHER LOCATIONS -REPAIR DAMAGED SITE LIGHTING AT NORTH AND NORTHWEST -COMPLETE SITE ELECTRICAL AT FLAG POLE, MONUMENT SIGN -WEST COURTYARD- GFCI NOT WORKING -EAST COURTYARD- SECURE WHIP IN STORAGE CLOSET, LAND ELECTRICAL AT FOUNTAIN -AL EAST EXTERIOR TERMINATE WATER LINE -COMPLETE SIDEWALKS FOR EGRESS -SECURE GFCI SOUTHWEST CORNER -PROVIDE TAMPER RESISTANT SCHRADER VALVE COVERS AT COURTYARD UNITS -REMOVE JOB TRAILERS AND COMPLETE SIDEWALK -PROVIDE AFCI PROTECTION THROUGHOUT PER ARTICLE 210.12 -SUBMIT 3RD PARTY INSPECTION FOR FOOTINGS AT CARPORTS -FLOOR ELEVATIONS DUE TO FINISHES NOT TO VARY MORE THAN 1/2" AT BATHROOMS 175-HAMMER ARRESTORS AT DISHWASHER 107- ADJUST DOOR TO CLOSE AND LATCH 178-PROVIDE WORKING SPACE AT PANELS PER ARTICLE 110
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/18/2022
All residential units and common spaces in buildings A,B and C, and kitchen 164 approved for Occupancy
Occupancy Inspection - Planning Temporary C of O 3/18/2022 3/18/2022 03/21/2022
Misc
Corrective Action Required
02/23/2022
Complete landscaping per the approved plan.
Occupancy Inspection - Engineering Failed 3/18/2022 03/21/2022
Misc
Informational
02/18/2022
Items needed for TCO: 1. Detention basin needs to be completed and as-builts need to be turned in and approved for basin. 2. The public road needs to be open and given substantial completion. The fence needs to be removed so fire can get through if needed. 3.Erosion control devices need to be installed and mud and silt need to be cleaned off the streets and sidewalks. Items needed for Final Acceptance: 1. All items for TCO. 2. All trash and debris need to be removed from the site. 3. All equipment and trailers need to be removed from the site. 4. There are 3 private sanitary MH's that need some work around the pipes and inverts. 5. Water valves need to be lowered to grade. 6. Record drawings for all public infrastructure need to be submitted and approved. 7. Provide a 3 year maintenance bond for all public infrastructure. 8. Provide a final affidavit and agreement for all public infrastructure. 9. Need to have a minimum of 70% vegetation to be established.
Misc
Informational
02/18/2022
TCO is Accepted Need to have these items completed in 30 days. No further occupancy until as-builts for detention basin has been accepted. 1. As-builts for detention basin need to be turned in and accepted 2. All trash and debris need to be removed from the site. 3. All equipment and trailers need to be removed from the site. 4. There are 3 private storm MH's that need some work around the pipes and inverts. 5. Water valves need to be lowered to grade. 6. Record drawings for all public infrastructure need to be submitted and approved. 7. Provide a 3 year maintenance bond for all public infrastructure. 8. Provide a final affidavit and agreement for all public infrastructure. 9. Need to have a minimum of 70% vegetation to be established.
Occupancy Inspection - Planning Temporary C of O 3/23/2022 03/23/2022
Misc
Corrective Action Required
03/21/2022
Complete landscaping per the approved plan.
Occupancy Inspection - Planning Temporary C of O 3/24/2022 03/24/2022
Misc
Corrective Action Required
03/23/2022
Complete landscaping per the approved plan.
Occupancy Inspection - Planning Temporary C of O 3/24/2022 03/24/2022
Misc
Corrective Action Required
03/24/2022
Complete landscaping per the approved plan.
Occupancy Inspection - Codes Commercial Failed 3/24/2022 3/24/2022 03/24/2022
Miscellaneous Correction
Corrective Action Required
03/18/2022
-COMPLETE CORRECTIONS FOR ALL OTHER DEPARTMENTS -COMPLETE HEALTH DEPARTMENT INSPECTION AT MC KITCHEN -INSTALL LOUVERED COVERS FOR FRESH AIR AT ROOFTOPS -COMPLETE ALL EXTERIOR ELECTRICAL, MECHANICAL, ETC IN MC COURTYARD -REPAIR DAMAGED SITE LIGHTING AT NORTH AND NORTHWEST -COMPLETE SITE ELECTRICAL AT FLAG POLE, MONUMENT SIGN -EAST COURTYARD- LAND ELECTRICAL AT FOUNTAIN -REMOVE JOB TRAILERS AND COMPLETE SIDEWALK -PROVIDE AFCI PROTECTION THROUGHOUT PER ARTICLE 210.12 -44 COMPLETE DRYER HOOK UP -AL WEST EXTERIOR DOOR DOES NOT OPEN
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/18/2022
All residential units and common spaces in buildings A,B and C, and kitchen 164 approved for Occupancy
Occupancy Inspection - Fire Failed 3/24/2022 3/24/2022 03/25/2022
Misc
Corrective Action Required
03/18/2022
2026 covered sprinkler head 3042 horn strobe hanging from the wall 1022 with a covered sprinkler head 1017 with a covered sprinkler head First floor north hallway fire door exit signs are covered North hallway exterior illumination does not work Sprinkler system needs to be tagged current.
Misc
Corrective Action Required
03/25/2022
Dry System needs to be plumbed into the floor Spa smoke is covered Test door mag locks in the memory care unit
Occupancy Inspection - Engineering Temporary C of O 3/24/2022 03/25/2022
Misc
Informational
03/21/2022
Items needed for TCO: 1. Detention basin needs to be completed and as-builts need to be turned in and approved for basin. 2. The public road needs to be open and given substantial completion. The fence needs to be removed so fire can get through if needed. 3.Erosion control devices need to be installed and mud and silt need to be cleaned off the streets and sidewalks. Items needed for Final Acceptance: 1. All items for TCO. 2. All trash and debris need to be removed from the site. 3. All equipment and trailers need to be removed from the site. 4. There are 3 private sanitary MH's that need some work around the pipes and inverts. 5. Water valves need to be lowered to grade. 6. Record drawings for all public infrastructure need to be submitted and approved. 7. Provide a 3 year maintenance bond for all public infrastructure. 8. Provide a final affidavit and agreement for all public infrastructure. 9. Need to have a minimum of 70% vegetation to be established.
Misc
Informational
03/21/2022
TCO is Accepted Need to have these items completed in 30 days. No further occupancy until as-builts for detention basin has been accepted. 1. As-builts for detention basin need to be turned in and accepted 2. All trash and debris need to be removed from the site. 3. All equipment and trailers need to be removed from the site. 4. There are 3 private storm MH's that need some work around the pipes and inverts. 5. Water valves need to be lowered to grade. 6. Record drawings for all public infrastructure need to be submitted and approved. 7. Provide a 3 year maintenance bond for all public infrastructure. 8. Provide a final affidavit and agreement for all public infrastructure. 9. Need to have a minimum of 70% vegetation to be established.
Corrective Action Required
03/21/2022
We are still waiting on As-builts for the detention basin. When we receive and accepts the as-builts we will be able to give TCO for the remainding building. Then we will be working off the previous punch list.
Misc
Informational
03/25/2022
We are granting TCO on our end. Items needed for Final Acceptance: 1. All items for TCO. 2. All trash and debris need to be removed from the site. 3. All equipment and trailers need to be removed from the site. 4. There are 3 private sanitary MH's that need some work around the pipes and inverts. 5. Water valves need to be lowered to grade. 6. Record drawings for all public infrastructure need to be submitted and approved. 7. Provide a 3 year maintenance bond for all public infrastructure. 8. Provide a final affidavit and agreement for all public infrastructure. 9. Need to have a minimum of 70% vegetation to be established. 10. All items from the Public Street, Storm and Water need to be completed. 11. Check back in 30 days for these items.
Occupancy Inspection - Codes Commercial Failed 3/25/2022 3/25/2022 03/25/2022
Miscellaneous Correction
Corrective Action Required
03/24/2022
-COMPLETE CORRECTIONS FOR ALL OTHER DEPARTMENTS -COMPLETE HEALTH DEPARTMENT INSPECTION AT MC KITCHEN -INSTALL LOUVERED COVERS FOR FRESH AIR AT ROOFTOPS -COMPLETE ALL EXTERIOR ELECTRICAL, MECHANICAL, ETC IN MC COURTYARD -REPAIR DAMAGED SITE LIGHTING AT NORTH AND NORTHWEST -COMPLETE SITE ELECTRICAL AT FLAG POLE, MONUMENT SIGN -EAST COURTYARD- LAND ELECTRICAL AT FOUNTAIN -REMOVE JOB TRAILERS AND COMPLETE SIDEWALK -PROVIDE AFCI PROTECTION THROUGHOUT PER ARTICLE 210.12 -44 COMPLETE DRYER HOOK UP
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/24/2022
All residential units and common spaces in buildings A,B and C, and kitchen 164 approved for Occupancy **Memory Care and Assisted Living building approved for furniture only
Occupancy Inspection - Planning Temporary C of O 3/29/2022 03/29/2022
Misc
Corrective Action Required
03/24/2022
Complete landscaping per the approved plan.
Occupancy Inspection - Codes Commercial Failed 3/30/2022 3/30/2022 03/30/2022
Miscellaneous Correction
Corrective Action Required
03/25/2022
-COMPLETE CORRECTIONS FOR ALL OTHER DEPARTMENTS -OBTAIN FINAL HEALTH DEPARTMENT APPROVAL AT MC KITCHEN (DISHWASHER) -COMPLETE SITE ELECTRICAL AT FLAG POLE, MONUMENT SIGN -PROVIDE AFCI PROTECTION THROUGHOUT PER ARTICLE 210.12- UNIT KITCHENS
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/25/2022
All residential units and common spaces in buildings A,B and C, and kitchen 164 approved for Occupancy **Memory Care and Assisted Living building approved for furniture only
Above Ceiling Inspection Passed 1/25/2021 03/31/2022
Misc
Informational
01/25/2022
Kitchen ok for skirts at dishwasher and hood Memory Care corridors approved except as noted, room 21,22,25 approved corridor 167
Misc
Corrective Action Required
01/25/2022
KITCHEN AREA:--NEED TO VERIFY ACCESS PANELS, OK FOR TILE MC AREA: CORRIDOR 34,39 DAMPERS,
In-wall Inspection Passed 12/22/2020 3/31/2022 03/31/2022
Misc
Informational
12/21/2020
Miscellaneous Inspection Passed 3/31/2022 03/31/2022
Misc
Corrective Action Required
03/17/2022
PRE FINAL AL BUILDING -SECURE ALL HVAC MC IN CLOSETS TO UNIT, FIRE CAULK ALL PENETRATIONS, ENSURE ALL DOORS SELF CLOSE AND LATCH -COMPLETE ALL EXTERIOR ELECTRICAL, MECHANICAL, ETC IN COURTYARD, CARPORTS AND ALL OTHER LOCATIONS -REPAIR DAMAGED SITE LIGHTING AT NORTH AND NORTHWEST -COMPLETE SITE ELECTRICAL AT FLAG POLE, MONUMENT SIGN -WEST COURTYARD- GFCI NOT WORKING -EAST COURTYARD- SECURE WHIP IN STORAGE CLOSET, LAND ELECTRICAL AT FOUNTAIN -BATHROOMS- PLUMBING PROTECTION -AL EAST EXTERIOR TERMINATE WATER LINE -COMPLETE SIDEWALKS FOR EGRESS -SECURE GFCI SOUTHWEST CORNER -PROVIDE TAMPER RESISTANT SCHRADER VALVE COVERS AT COURTYARD UNITS -REMOVE JOB TRAILERS AND COMPLETE SIDEWALK -156- CLEARANCE AND RING AT B VENT -175- COVER PLATE, FIRE CAULK, HAMMER ARRESTORS AND GFCI AT DISHWASHER -BISTRO-SET OUTLETS AT COUNTER -COMPLETE ALL ITEMS FROM PREVIOUS INSPECTIONS **EAST WING UNITS ONLY -PROVIDE AFCI PROTECTION PER 210.12 -107 NOT READY -112 MISSING ADA CABINET IN KITCHEN -117 PROVIDE 1" CLEARANCE ABOVE RIM OF SINK FOR DRAINS -178 PROVIDE WORKING SPACE AT PANELS PER ARTICLE 110 **WEST WING UNITS ONLY - INSPECTION STOPPED, TOO MANY DEFICIENCIES -145 FIRE CALULK MC, SECURE MC -139 ADJUST DOOR -130 GRAB BARS, SECURE RECEPTACLE AT BATH SINK -127 MC SHORT OF CEILING, FIRE CAULK -125 MC SHORT OF CEILING, TAPE GAP AT HVAC, FIRE CAULK PENETRATION -124 GFCI AT BATHROOM NOT WORKING -153 COVER PLATE, PENETRATIONS AND GAP AT CEILING, CLEARANCE AND RING AT HVAC ***MC UNITS ONLY -PROVIDE AFCI PROTECTION PER 210,12 -1 FIRE CAULK THERMOSTAT WIRE -STORAGE CLOSETS- REMOVE TAPE ETC. FROM SPRINKLER HEADS, SEAL ALL PENETRATIONS -CORRIDORS- FIRE CAULK AROUND ALL SPEAKERS IN CEILING COURTYARD IN COMPLETE -ALL DOORS TO CLOSE AND LATCH -27- INCOMPLETE -LAUNDRY- INCOMPLETE -26- SEAL PENETRATIONS, HVAC COVER, LABEL PANEL, INSTALL DEAD FRONT AT PANEL -BATHROOMS INCOMPLETE -25- SECURE MC SECURE DRAIN, DRAIN TO DISCHARGE MIN 2 PIPE SIZES ABOVE DRAIN -21-ESCUTCHEON AT CLOSET
Rated Assembly Inspection Passed 2/10/2022 3/31/2022 03/31/2022
THIRD FLOOR
Informational
12/20/2021
-AREAS APPROVED- BUILDING C COMPLETE BUILDING B COMPLETE BUILDING A COMPLETE EXCEPT ELEVATOR
SECOND FLOOR
Informational
12/20/2021
-AREAS APPROVED- BUILDING C: COMPLETE BUILDING B: COMPLETE BUILDING A: COMPLETE EXCEPT AT ELEVATOR
FIRST FLOOR
Informational
12/20/2021
-AREAS APPROVED- ***BUILDING C*** COMPLETE ***BUILDING B*** COMPLETE ***BUILDING A*** COMPLETE ****MCAL BUILDING*** COMPLETE EXCEPT AS NOTED: -165- RC OK -164- COMPLETE RATED LAYER AT DISHWASHER HOOD, RC OK
Miscellaneous Correction
Corrective Action Required
12/20/2021
-COMPLETE SCREW PATTERN AND SEAL GAPS AND PENETRATIONS AT MECHANICAL ROOM 165
ELEVATOR 1
Corrective Action Required
12/20/2021
-FUR OUT WALLS OK -RC AT CEILING OK -RATED LAYER AT CEILING OK
Underslab Plumbing Inspection - Commercial Passed 5/27/2021 03/31/2022
Occupancy Inspection - Codes Commercial Temporary C of O 3/31/2022 3/31/2022 03/31/2022
Miscellaneous Correction
Corrective Action Required
03/30/2022
***TCO UNTIL 5-16-22 -COMPLETE CORRECTIONS FOR ALL OTHER DEPARTMENTS -CODES COMPLETE -OBTAIN FINAL HEALTH DEPARTMENT APPROVAL AT MC KITCHEN (DISHWASHER)
THE FOLLOWING AREAS ARE APPROVED
Resolved
03/31/2022
All residential units and common spaces in buildings A,B and C, and kitchen 164 approved for Occupancy **Memory Care and Assisted Living building approved for furniture only
Occupancy Inspection - Water Utilities Passed 3/18/2022 3/18/2022 05/12/2022
Occupancy Inspection - Health Passed 5/17/2022 05/17/2022
Misc
Corrective Action Required
02/14/2022
Failed - no report provided.
Occupancy Inspection - Planning Passed 7/27/2022 07/27/2022
Misc
Corrective Action Required
03/29/2022
Complete landscaping per the approved plan.
Occupancy Inspection - Fire Failed 7/27/2022 7/27/2022 07/27/2022
Misc
Corrective Action Required
03/25/2022
2026 covered sprinkler head 3042 horn strobe hanging from the wall 1022 with a covered sprinkler head 1017 with a covered sprinkler head First floor north hallway fire door exit signs are covered North hallway exterior illumination does not work Sprinkler system needs to be tagged current.
Misc
Corrective Action Required
03/25/2022
Dry System needs to be plumbed into the floor Spa smoke is covered Test door mag locks in the memory care unit
Corrective Action Required
07/27/2022
Need alarm re to test magh safe doors to memory care.
Occupancy Inspection - Fire Passed 8/8/2022 08/08/2022
Misc
Corrective Action Required
07/27/2022
2026 covered sprinkler head 3042 horn strobe hanging from the wall 1022 with a covered sprinkler head 1017 with a covered sprinkler head First floor north hallway fire door exit signs are covered North hallway exterior illumination does not work Sprinkler system needs to be tagged current.
Misc
Corrective Action Required
07/27/2022
Dry System needs to be plumbed into the floor Spa smoke is covered Test door mag locks in the memory care unit
Corrective Action Required
08/08/2022
All life safety was appropriate. Okay to occupy with approval form codes.
Occupancy Inspection - Engineering Temporary C of O 4/25/2022 08/09/2022
Misc
Informational
03/25/2022
Items needed for TCO: 1. Detention basin needs to be completed and as-builts need to be turned in and approved for basin. 2. The public road needs to be open and given substantial completion. The fence needs to be removed so fire can get through if needed. 3.Erosion control devices need to be installed and mud and silt need to be cleaned off the streets and sidewalks. Items needed for Final Acceptance: 1. All items for TCO. 2. All trash and debris need to be removed from the site. 3. All equipment and trailers need to be removed from the site. 4. There are 3 private sanitary MH's that need some work around the pipes and inverts. 5. Water valves need to be lowered to grade. 6. Record drawings for all public infrastructure need to be submitted and approved. 7. Provide a 3 year maintenance bond for all public infrastructure. 8. Provide a final affidavit and agreement for all public infrastructure. 9. Need to have a minimum of 70% vegetation to be established.
Misc
Informational
03/25/2022
TCO is Accepted Need to have these items completed in 30 days. No further occupancy until as-builts for detention basin has been accepted. 1. As-builts for detention basin need to be turned in and accepted 2. All trash and debris need to be removed from the site. 3. All equipment and trailers need to be removed from the site. 4. There are 3 private storm MH's that need some work around the pipes and inverts. 5. Water valves need to be lowered to grade. 6. Record drawings for all public infrastructure need to be submitted and approved. 7. Provide a 3 year maintenance bond for all public infrastructure. 8. Provide a final affidavit and agreement for all public infrastructure. 9. Need to have a minimum of 70% vegetation to be established.
Misc
Informational
08/09/2022
Needed for Final Acceptance 1.Record drawings for public water and public storm need to be turned in and accepted by the City. 2.70% vegetation needs to be established throughout the site that has been disturbed. 3. The public hydrants that were painted silver need to be yellow. 4. All trash and debris need to be removed from the site.
Occupancy Inspection - Codes Commercial Ready for Temp CO 7/27/2022 7/27/2022 10/18/2022
Miscellaneous Correction
Corrective Action Required
03/31/2022
***TCO UNTIL 5-16-22 -COMPLETE CORRECTIONS FOR ALL OTHER DEPARTMENTS -CODES COMPLETE -OBTAIN FINAL HEALTH DEPARTMENT APPROVAL AT MC KITCHEN (DISHWASHER)
Occupancy Inspection - Engineering Failed 11/15/2022 11/15/2022
Misc
Informational
08/09/2022
Items needed for TCO: 1. Detention basin needs to be completed and as-builts need to be turned in and approved for basin. 2. The public road needs to be open and given substantial completion. The fence needs to be removed so fire can get through if needed. 3.Erosion control devices need to be installed and mud and silt need to be cleaned off the streets and sidewalks. Items needed for Final Acceptance: 1. All items for TCO. 2. All trash and debris need to be removed from the site. 3. All equipment and trailers need to be removed from the site. 4. There are 3 private sanitary MH's that need some work around the pipes and inverts. 5. Water valves need to be lowered to grade. 6. Record drawings for all public infrastructure need to be submitted and approved. 7. Provide a 3 year maintenance bond for all public infrastructure. 8. Provide a final affidavit and agreement for all public infrastructure. 9. Need to have a minimum of 70% vegetation to be established.
Misc
Informational
08/09/2022
TCO is Accepted Need to have these items completed in 30 days. No further occupancy until as-builts for detention basin has been accepted. 1. As-builts for detention basin need to be turned in and accepted 2. All trash and debris need to be removed from the site. 3. All equipment and trailers need to be removed from the site. 4. There are 3 private storm MH's that need some work around the pipes and inverts. 5. Water valves need to be lowered to grade. 6. Record drawings for all public infrastructure need to be submitted and approved. 7. Provide a 3 year maintenance bond for all public infrastructure. 8. Provide a final affidavit and agreement for all public infrastructure. 9. Need to have a minimum of 70% vegetation to be established.
Misc
Informational
08/09/2022
Needed for Final Acceptance 1.Record drawings for public water and public storm need to be turned in and accepted by the City. 2.70% vegetation needs to be established throughout the site that has been disturbed. 3. The public hydrants that were painted silver need to be yellow. 4. All trash and debris need to be removed from the site.
Informational
11/15/2022
Remainding for full occupancy 1. Approved as-builts for public infrastructure
Occupancy Inspection - Codes Commercial Temporary C of O 2/1/2023 02/06/2023
Miscellaneous Correction
Corrective Action Required
10/18/2022
***TCO UNTIL 2/28/2023 -COMPLETE CORRECTIONS FOR ALL OTHER DEPARTMENTS - RECORD DRAWINGS ON WATER LINE -CODES COMPLETE
Occupancy Inspection - Codes Commercial Ready for Temp CO 02/06/2023
Miscellaneous Correction
Corrective Action Required
02/06/2023
***TCO UNTIL 2/28/2023 -COMPLETE CORRECTIONS FOR ALL OTHER DEPARTMENTS - RECORD DRAWINGS ON WATER LINE -CODES COMPLETE
Occupancy Inspection - Codes Commercial Temporary C of O 02/06/2023
Miscellaneous Correction
Corrective Action Required
02/06/2023
***TCO UNTIL 2/28/2023 -COMPLETE CORRECTIONS FOR ALL OTHER DEPARTMENTS - RECORD DRAWINGS ON WATER LINE -CODES COMPLETE
Occupancy Inspection - Engineering Passed 03/07/2023
Misc
Informational
11/15/2022
Items needed for TCO: 1. Detention basin needs to be completed and as-builts need to be turned in and approved for basin. 2. The public road needs to be open and given substantial completion. The fence needs to be removed so fire can get through if needed. 3.Erosion control devices need to be installed and mud and silt need to be cleaned off the streets and sidewalks. Items needed for Final Acceptance: 1. All items for TCO. 2. All trash and debris need to be removed from the site. 3. All equipment and trailers need to be removed from the site. 4. There are 3 private sanitary MH's that need some work around the pipes and inverts. 5. Water valves need to be lowered to grade. 6. Record drawings for all public infrastructure need to be submitted and approved. 7. Provide a 3 year maintenance bond for all public infrastructure. 8. Provide a final affidavit and agreement for all public infrastructure. 9. Need to have a minimum of 70% vegetation to be established.
Misc
Informational
11/15/2022
TCO is Accepted Need to have these items completed in 30 days. No further occupancy until as-builts for detention basin has been accepted. 1. As-builts for detention basin need to be turned in and accepted 2. All trash and debris need to be removed from the site. 3. All equipment and trailers need to be removed from the site. 4. There are 3 private storm MH's that need some work around the pipes and inverts. 5. Water valves need to be lowered to grade. 6. Record drawings for all public infrastructure need to be submitted and approved. 7. Provide a 3 year maintenance bond for all public infrastructure. 8. Provide a final affidavit and agreement for all public infrastructure. 9. Need to have a minimum of 70% vegetation to be established.
Occupancy Inspection - Codes Commercial Full C of O 03/07/2023
Miscellaneous Correction
Resolved
03/07/2023
***TCO UNTIL 2/28/2023 -COMPLETE CORRECTIONS FOR ALL OTHER DEPARTMENTS - RECORD DRAWINGS ON WATER LINE -CODES COMPLETE
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home