PRCOM20235207


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20235207
Building Permit - Commercial
Issued
RESIDENCES AT BLACKWELL LLC
NEW MULTI-FAMILY
RESIDENCES AT BLACKWELL - BUILDING #3 - 67 UNITS - NEW APARTMENT BUILDING
10/10/2023
08/12/2024
11/06/2023
Locations
Contacts
Jake Loveless, Address:21 SE 29TH TER  
Polar Aire Heating & Cooling Service, Address:400 S. Kansas Ave, Phone:(913) 782-8238  
KDM ELECTRICAL CONTRACTORS, Address:1103 NW CASEY BLVD STE C, Phone:(816) 443-5694  
BENCHMARK MECHANICAL LLC, Address:5 SW 4TH ST, Phone:(816) 524-5616  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
CFS ENGINEERS, Address:1421 EAST 104TH STREET STE 100, Phone:(816) 333-4477  
RESIDENCES AT BLACKWELL LLC, Address:21 SE 29TH TER  
Streamline General Contractors, Address:5 4TH ST SW  
scott@griffinriley.com  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 02/06/2025 02/07/2025
Craig Hill
Alarm Plan Review Rejected 10/01/2024 10/01/2024
Craig Hill
Miscellaneous Correction
Corrective Action Required
10/01/2024

915.1.5 Private garages. Carbon monoxide detection shall be provided in dwelling units, sleeping units and classrooms in buildings with attached private garages. Action Required: Provide Carbon Monoxide detection on the floor above and below the garage levels.
Sprinkler Plan Review Released for Construction 08/21/2024 08/21/2024
Craig Hill
Sprinkler Plan Review Rejected 07/03/2024 07/03/2024
Craig Hill
Miscellaneous Correction
Corrective Action Required
07/03/2024

Fire department connection shows 2 - 2½” siamese connection. FDC needs to be a 4” storz with a 30 degree elbow.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $40,475.00 $40,475.00 Paid 08/12/2024
7232302-Residential License Tax Fee $28,429.44 $28,429.44 Paid 08/12/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Pending
Alarm Test Pending
Sprinkler - Hydrostatic Test Pending
Sprinkler - Flow Test Pending
Erosion Control Inspection Pending
Sewer Service Inspection Pending
Water Service Inspection Pending
Electrical Service Inspection Pending
Gas Piping Inspection - Commercial Pending
Gas Service Inspection - Commercial Pending
Underground Electrical Inspection - Commercial Pending
Misc
Informational
09/24/2024
-Completion of underground raceways into building service equipment location
All Rough Inspection - Commercial Pending
Misc
Corrective Action Required
04/08/2025
Front garage PFH walls only: -Provide 2 anchors per wall sill plate -Nail wall top plate to header w/ 2 rows of 16d @ 3" oc
Misc
Corrective Action Required
04/08/2025
Interior and exterior sheathed shearwalls: -lower level, 1st, and 2nd fl-one side sheathed -exterior shearwalls
LOWER LEVEL
Corrective Action Required
04/08/2025
-Pre-rock behind tubs ad showers
FIRST FLOOR
Corrective Action Required
04/08/2025
-Pre-rock behind tubs ad showers
SECOND FLOOR
Corrective Action Required
04/08/2025
-Pre-rock behind tubs ad showers
THIRD FLOOR
Corrective Action Required
04/08/2025
FOURTH FLOOR
Corrective Action Required
04/08/2025
Above Ceiling Inspection Pending
LOWER LEVEL
Corrective Action Required
04/17/2025
Ok to rock: -Corridor ceiling (top of 1-hr fire barrier), fire sprinler drops
FIRST FLOOR
Corrective Action Required
04/17/2025
OK to rock: -Corridor ceiling (top of 1-hr fire barrier), fire sprinler drops **Area at accessible garages/IT closet/Storage not ready
Miscellaneous Inspection Pending
Misc
Informational
04/25/2025
4/25-Pre-allrough walkthrough with the construction crew
Verify Final Inspection Status - New Com Development Pending
Suspended Slab Inspection Pending 10/1/2024
Misc
Informational
08/02/2024
Podium concrete slab-OK to pour pending approval of SI inspector
Rated Assembly Inspection Pending 4/22/2025
LOWER LEVEL
Corrective Action Required
04/17/2025
-Tub&shower walls -mud&taped
FIRST FLOOR
Corrective Action Required
04/17/2025
-Tub&shower walls -mud&taped -Corridor ceiling nailing
SECOND FLOOR
Corrective Action Required
04/17/2025
-Tub&shower walls -mud&taped -Corridor ceiling nailing
THIRD FLOOR
Corrective Action Required
04/17/2025
-Tub&shower walls -mud&taped -Corridor ceiling pre-rock ok
FOURTH FLOOR
Corrective Action Required
04/17/2025
-Tub&shower walls -mud&taped
STAIR TOWER 2
Corrective Action Required
04/17/2025
**THIS IS SOUTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer 3rd floor: -stair side 2nd layer
STAIR TOWER 3
Corrective Action Required
04/17/2025
**THIS IS REAR STAIR B** OK to rock the shear wall
ELEVATOR 1
Corrective Action Required
04/17/2025
Lower floor: -004 dwelling side 2nd layer 1st floor: -104 dwelling side 2nd layer 2nd floor: -207/209 dwelling side 2nd layer 3rd floor: -307/309 dwelling side 2nd layer 4th floor: -405/407 dwelling side 2nd layer
Misc
Corrective Action Required
04/17/2025
STAIR TOWER 1
Corrective Action Required
04/17/2025
**THIS IS NORTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer 3rd floor: -stair side 2nd layer
Footing Inspection - Commercial Partial 3/6/2024 3/6/2024 03/06/2024
Misc
Informational
03/06/2024
Front wall type 1 footing in progress. OK to pour pending approval of onsite 3rd party engineer
Footing Inspection - Commercial Partial 4/1/2024 4/1/2024 04/01/2024
Misc
Informational
03/06/2024
Footing- OK to pour pending approval of onsite 3rd party engineer: -Ext. wall footing from A/1 to N/2
Footing Inspection - Commercial Partial 4/4/2024 4/4/2024 04/04/2024
Misc
Informational
04/01/2024
Footing- OK to pour pending approval of onsite 3rd party engineer: -Ext. wall footing from A/1 to N/2 -Interior footing from M/5 to N/3
Footing Inspection - Commercial Partial 4/8/2024 4/8/2024 04/08/2024
Misc
Informational
04/04/2024
Footing- OK to pour pending approval of onsite 3rd party engineer: -Ext. wall footing from A/1 to N/2; the rest of ext. GB -Interior footing from M/5 to N/3 -4 column pads in storm shelter
Foundation Inspection - Commercial Partial 4/10/2024 04/10/2024
Misc
Informational
04/10/2024
Foundation wall OK: -A/4 to L.5/4.2
Footing Inspection - Commercial Partial 4/10/2024 (8:00) 4/10/2024 04/10/2024
Misc
Informational
04/08/2024
Footing- OK to pour pending approval of onsite 3rd party engineer: -Ext. wall footing from A/1 to N/2; the rest of ext. GB -Interior footing from M/5 to N/3 -4 column pads in storm shelter. See deficiency for column
Misc
Corrective Action Required
04/10/2024
Rebars for 4 shelter columns not per plan
Foundation Inspection - Commercial Partial 5/3/2024 5/3/2024 05/03/2024
Misc
Informational
04/10/2024
Foundation wall OK: -A/4 to L.5/4.2; storm shelter F. wall and 4 col
Footing Inspection - Commercial Partial 5/14/2024 (1:00) 5/14/2024 05/14/2024
Misc
Informational
04/10/2024
Footing- OK to pour pending approval of onsite 3rd party engineer: -Ext. wall footing from A/1 to N/2; the rest of ext. GB -Interior footing from M/5 to N/3 -4 column pads in storm shelter. See deficiency for column - Footing for elevator 3 ok to pour, has been approved by third party inspector
Misc
Corrective Action Required
04/10/2024
Rebars for 4 shelter columns not per plan
Foundation Inspection - Commercial Partial 5/15/2024 05/15/2024
Misc
Informational
05/03/2024
Foundation wall OK: -A/4 to L.5/4.2; storm shelter F. wall and 4 col -Elev. pit wall
Underslab Plumbing Inspection - Commercial Partial 5/23/2024 5/23/2024 05/23/2024
Misc
Corrective Action Required
05/23/2024
Underslab plumbing OK below: -Area from line A to E; storm shelter
Underslab Plumbing Inspection - Commercial Passed 6/5/2024 6/5/2024 06/05/2024
Misc
Resolved
06/05/2024
Underslab plumbing OK below: -Area from line A to E; storm shelter
Footing Inspection - Commercial Partial 6/14/2024 6/14/2024 06/14/2024
Misc
Informational
05/14/2024
Footing- OK to pour pending approval of onsite 3rd party engineer: -Ext. wall footing from A/1 to N/2; the rest of ext. GB -Interior footing from M/5 to N/3 -4 column pads in storm shelter. -Footing for elevator 3 ok to pour, has been approved by third party inspector -Interior footing
Suspended Slab Inspection Failed 8/1/2024 08/01/2024
Misc
Corrective Action Required
08/01/2024
Provide podium concrete slab reinforcement per plan
Suspended Slab Inspection Partial 8/2/2024 08/02/2024
Misc
Informational
08/02/2024
Podium concrete slab-OK to pour pending approval of SI inspector
Footing Inspection - Commercial Partial 9/12/2024 9/12/2024 09/12/2024
Misc
Informational
06/14/2024
Footing- OK to pour pending approval of onsite 3rd party engineer: -Ext. wall footing from A/1 to N/2; the rest of ext. GB -Interior footing from M/5 to N/3 -4 column pads in storm shelter. -Footing for elevator 3 ok to pour, has been approved by third party inspector -Lower level interior footing -1st fl ext. footing at front
Underground Electrical Inspection - Commercial Partial 9/17/2024 9/17/2024 09/17/2024
Misc
Informational
09/17/2024
-9 underground raceways near entrance to building to connections to previously installed raceways to car ports and garage
Underslab Plumbing Inspection - Commercial Passed 9/18/2024 09/18/2024
Informational
09/18/2024
Completion of underslab plumbing
Footing Inspection - Commercial Partial 9/24/2024 9/24/2024 09/24/2024
Misc
Informational
09/12/2024
Footing- OK to pour pending approval of onsite 3rd party engineer: -Ext. wall footing from A/1 to N/2; the rest of ext. GB -Interior footing from M/5 to N/3 -4 column pads in storm shelter. -Footing for elevator 3 ok to pour, has been approved by third party inspector -Lower level interior footing -1st fl ext. footing at front
Misc
Corrective Action Required
09/24/2024
Move the storm drains away from interior footing pads
Underground Electrical Inspection - Commercial Partial 9/24/2024 9/24/2024 09/24/2024
Misc
Informational
09/17/2024
-Completion of underground raceways into building service equipment location
Foundation Inspection - Commercial Partial 9/25/2024 09/25/2024
Misc
Informational
05/15/2024
Foundation wall OK: -A/4 to L.5/4.2; storm shelter F. wall and 4 col -Elev. pit wall -Stem wall at north side of bdlg
Footing Inspection - Commercial Partial 9/25/2024 09/25/2024
Misc
Informational
09/24/2024
Footing- OK to pour pending approval of onsite 3rd party engineer: -Ext. wall footing from A/1 to N/2; the rest of ext. GB -Interior footing from M/5 to N/3 -4 column pads in storm shelter. -Footing for elevator 3 ok to pour, has been approved by third party inspector -Lower level interior footing -1st fl ext. footing at front
Misc
Corrective Action Required
09/25/2024
Remove the storm drain away from under the 5 ft column pad at north end garage
Footing Inspection - Commercial Partial 9/26/2024 9/26/2024 09/26/2024
Misc
Informational
09/25/2024
Footing- OK to pour pending approval of onsite 3rd party engineer: -Ext. wall footing from A/1 to N/2; the rest of ext. GB -Interior footing from M/5 to N/3 -4 column pads in storm shelter. -Footing for elevator 3 ok to pour, has been approved by third party inspector -Lower level interior footing -1st fl ext. footing and int. footing. Except see correction below
Misc
Corrective Action Required
09/25/2024
Remove the storm drain away from under the 5 ft column pad at north end garage
Foundation Inspection - Commercial Partial 9/26/2024 09/26/2024
Misc
Informational
09/25/2024
Foundation wall OK: -A/4 to L.5/4.2; storm shelter F. wall and 4 col -Elev. pit wall -Stem wall at garages
Footing Inspection - Commercial Partial 10/1/2024 10/01/2024
Misc
Informational
09/26/2024
Footing- OK to pour pending approval of onsite 3rd party engineer: -Ext. wall footing from A/1 to N/2; the rest of ext. GB -Interior footing from M/5 to N/3 -4 column pads in storm shelter. -Footing for elevator 3 ok to pour, has been approved by third party inspector -Lower level interior footing -1st fl ext. footing and int. footing. -Ext and int garage stem walls
Misc
Resolved
10/01/2024
Footing Inspection - Commercial Partial 10/3/2024 10/3/2024 10/03/2024
Misc
Informational
10/01/2024
Footing- OK to pour pending approval of onsite 3rd party engineer: -Ext. wall footing from A/1 to N/2; the rest of ext. GB -Interior footing from M/5 to N/3 -4 column pads in storm shelter. -Footing for elevator 3 ok to pour, has been approved by third party inspector -Lower level interior footing -1st fl ext. footing and int. footing. -Ext and int garage stem walls Misc: -Garage slabs
Above Ceiling Inspection Partial 12/19/2024 12/19/2024
FIRST FLOOR
Informational
12/19/2024
OK to rock: -Corridor ceiling (top of 1-hr fire barrier)
SECOND FLOOR
Informational
12/19/2024
THIRD FLOOR
Informational
12/19/2024
Misc
Informational
12/19/2024
BOTTOM/BASEMENT FLOOR:
Above Ceiling Inspection Partial 1/22/2025 1/22/2025 01/22/2025
Misc
Corrective Action Required
01/22/2025
BASEMENT FLOOR: -Corridor ceiling (top of 1-hr fire barrier)
FIRST FLOOR
Corrective Action Required
01/22/2025
OK to rock: -Corridor ceiling (top of 1-hr fire barrier)
All Rough Inspection - Commercial Failed 1/23/2025 1/23/2025 01/23/2025
Misc
Corrective Action Required
01/23/2025
Front garage PFH walls only: -Provide 2 anchors per wall sill plate -Nail wall top plate to header w/ 2 rows of 16d @ 3" oc
Rated Assembly Inspection Partial 1/28/2025 1/28/2025 01/28/2025
LOWER LEVEL
Corrective Action Required
01/28/2025
Both stair A enclosures: -Door side-1st layer
Rated Assembly Inspection Partial 1/29/2025 1/29/2025 01/29/2025
Misc
Corrective Action Required
01/29/2025
BOTTOM LEVEL: -Both stair A enclosues: stair side 2nd layer
All Rough Inspection - Commercial Failed 1/23/2025 2/3/2025 02/03/2025
Misc
Informational
02/03/2025
-Nailing of exterior wall sheathing-OK to cover front, north, and south walls
Misc
Corrective Action Required
02/03/2025
Front garage PFH walls only: -Provide 2 anchors per wall sill plate -Nail wall top plate to header w/ 2 rows of 16d @ 3" oc
Misc
Resolved
02/11/2025
INSPECTED BUILDING 3 - NORTH STAIR TOWER MAIN FLOOR FIRST LAYER ONLY - SOUTH STAIR TOWER MAIN FLOOR FIRST LAYER ONLY THREE SHEAR WALLS NORTH, MID-NORTH, AND SOUTH BACK OF BUILDING 3
Above Ceiling Inspection Partial 2/3/2025 2/3/2025 02/03/2025
LOWER LEVEL
Corrective Action Required
01/22/2025
Ok to rock: -Corridor ceiling (top of 1-hr fire barrier), fire sprinler drops
FIRST FLOOR
Corrective Action Required
01/22/2025
OK to rock: -Corridor ceiling (top of 1-hr fire barrier), fire sprinler drops
Rated Assembly Inspection Partial 2/3/2025 2/3/2025 02/03/2025
LOWER LEVEL
Corrective Action Required
01/29/2025
-Both stair A enclosues: stair side 2nd layer
All Rough Inspection - Commercial Failed 2/11/2025 02/11/2025
Misc
Informational
02/03/2025
-Nailing of exterior wall sheathing-OK to cover front, north, and south walls
Misc
Corrective Action Required
02/03/2025
Front garage PFH walls only: -Provide 2 anchors per wall sill plate -Nail wall top plate to header w/ 2 rows of 16d @ 3" oc
MISC
Corrective Action Required
02/11/2025
INSPECTED BUILDING 3 - NORTH STAIR TOWER MAIN FLOOR FIRST LAYER ONLY - SOUTH STAIR TOWER MAIN FLOOR FIRST LAYER ONLY THREE SHEAR WALLS NORTH, MID-NORTH, AND SOUTH BACK OF BUILDING 3
Rated Assembly Inspection Partial 2/13/2025 2/13/2025 02/13/2025
LOWER LEVEL
Informational
02/13/2025
-Both stair A enclosues: stair side 2nd layer
FIRST FLOOR
Informational
02/13/2025
-Both stair A enclosues: stair side 1st layer
Rated Assembly Inspection Partial 2/18/2025 2/18/2025 02/18/2025
LOWER LEVEL
Informational
02/13/2025
-Both stair A enclosues: stair side 2nd layer
FIRST FLOOR
Informational
02/13/2025
-Both stair A enclosues: stair side 1st layer ok
Misc
Corrective Action Required
02/18/2025
1st floor north&south stair A: 2nd layer installed; however, provide lapping at edge
Rated Assembly Inspection Partial 2/26/2025 2/26/2025 02/26/2025
LOWER LEVEL
Informational
02/18/2025
-Both stair A enclosues: stair side 2nd layer
FIRST FLOOR
Informational
02/18/2025
-Both stair A enclosues: stair side 2nd layer ok
Misc
Corrective Action Required
02/18/2025
Rated Assembly Inspection Partial 3/5/2025 3/6/2025 03/06/2025
LOWER LEVEL
Corrective Action Required
03/06/2025
FIRST FLOOR
Corrective Action Required
03/06/2025
SECOND FLOOR
Corrective Action Required
03/06/2025
THIRD FLOOR
Corrective Action Required
03/06/2025
STAIR TOWER 1
Corrective Action Required
03/06/2025
**THIS IS NORTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 1st layer
STAIR TOWER 2
Corrective Action Required
03/06/2025
**THIS IS SOUTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer
STAIR TOWER 3
Corrective Action Required
03/06/2025
**THIS IS REAR STAIR B**
ELEVATOR 1
Corrective Action Required
03/06/2025
Rated Assembly Inspection Partial 3/11/2025 3/11/2025 03/11/2025
LOWER LEVEL
Corrective Action Required
03/06/2025
FIRST FLOOR
Corrective Action Required
03/06/2025
SECOND FLOOR
Corrective Action Required
03/06/2025
THIRD FLOOR
Corrective Action Required
03/06/2025
STAIR TOWER 1
Corrective Action Required
03/06/2025
**THIS IS NORTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer **extend 2-hr wall to roof deck
STAIR TOWER 2
Corrective Action Required
03/06/2025
**THIS IS SOUTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 1st layer **extend 2-hr wall to roof deck
STAIR TOWER 3
Corrective Action Required
03/06/2025
**THIS IS REAR STAIR B**
ELEVATOR 1
Corrective Action Required
03/06/2025
Rated Assembly Inspection Partial 3/12/2025 3/12/2025 03/12/2025
LOWER LEVEL
Corrective Action Required
03/11/2025
Pre-rock behind tub/shower-Firecaulk penetrations
FIRST FLOOR
Corrective Action Required
03/11/2025
Pre-rock behind tub/shower-Firecaulk penetrations
SECOND FLOOR
Corrective Action Required
03/11/2025
THIRD FLOOR
Corrective Action Required
03/11/2025
STAIR TOWER 1
Corrective Action Required
03/11/2025
**THIS IS NORTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer **extend 2-hr wall to roof deck
STAIR TOWER 2
Corrective Action Required
03/11/2025
**THIS IS SOUTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 1st layer **extend 2-hr wall to roof deck
STAIR TOWER 3
Corrective Action Required
03/11/2025
**THIS IS REAR STAIR B**
ELEVATOR 1
Corrective Action Required
03/11/2025
Rated Assembly Inspection Partial 3/14/2025 03/14/2025
LOWER LEVEL
Corrective Action Required
03/12/2025
Pre-rock behind tub/shower-Firecaulk penetrations
FIRST FLOOR
Corrective Action Required
03/12/2025
Pre-rock behind tub/shower-Firecaulk penetrations
SECOND FLOOR
Corrective Action Required
03/12/2025
THIRD FLOOR
Corrective Action Required
03/12/2025
STAIR TOWER 1
Corrective Action Required
03/12/2025
**THIS IS NORTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer
STAIR TOWER 2
Corrective Action Required
03/12/2025
**THIS IS SOUTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer
STAIR TOWER 3
Corrective Action Required
03/12/2025
**THIS IS REAR STAIR B**
ELEVATOR 1
Corrective Action Required
03/12/2025
Rated Assembly Inspection Partial 3/18/2025 3/18/2025 03/18/2025
LOWER LEVEL
Corrective Action Required
03/14/2025
Pre-rock behind tub/shower-Firecaulk penetrations
FIRST FLOOR
Corrective Action Required
03/14/2025
Pre-rock behind tub/shower-Firecaulk penetrations
SECOND FLOOR
Corrective Action Required
03/14/2025
THIRD FLOOR
Corrective Action Required
03/14/2025
STAIR TOWER 1
Corrective Action Required
03/14/2025
**THIS IS NORTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer 3rd floor: -stair side 1st layer
STAIR TOWER 2
Corrective Action Required
03/14/2025
**THIS IS SOUTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer
STAIR TOWER 3
Corrective Action Required
03/14/2025
**THIS IS REAR STAIR B**
ELEVATOR 1
Corrective Action Required
03/14/2025
All Rough Inspection - Commercial Partial 3/20/2025 03/20/2025
Misc
Informational
02/11/2025
-Nailing of exterior wall sheathing-OK to cover front, north, and south walls
Misc
Corrective Action Required
02/11/2025
Front garage PFH walls only: -Provide 2 anchors per wall sill plate -Nail wall top plate to header w/ 2 rows of 16d @ 3" oc
Misc
Corrective Action Required
02/11/2025
THREE SHEAR WALLS NORTH, MID-NORTH, AND SOUTH BACK OF BUILDING 3
LOWER LEVEL
Corrective Action Required
03/20/2025
-Pre-rock behind tubs ad showers
FIRST FLOOR
Corrective Action Required
03/20/2025
-Pre-rock behind tubs ad showers
SECOND FLOOR
Corrective Action Required
03/20/2025
-Pre-rock behind tubs ad showers
THIRD FLOOR
Corrective Action Required
03/20/2025
FOURTH FLOOR
Corrective Action Required
03/20/2025
Rated Assembly Inspection Partial 3/20/2025 03/20/2025
LOWER LEVEL
Corrective Action Required
03/18/2025
Pre-rock behind tub/shower-Firecaulk penetrations
FIRST FLOOR
Corrective Action Required
03/18/2025
Pre-rock behind tub/shower-Firecaulk penetrations
SECOND FLOOR
Corrective Action Required
03/18/2025
THIRD FLOOR
Corrective Action Required
03/18/2025
STAIR TOWER 1
Corrective Action Required
03/18/2025
**THIS IS NORTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer 3rd floor: -stair side 1st layer
STAIR TOWER 2
Corrective Action Required
03/18/2025
**THIS IS SOUTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer
STAIR TOWER 3
Corrective Action Required
03/18/2025
**THIS IS REAR STAIR B**
ELEVATOR 1
Corrective Action Required
03/18/2025
Lower floor: -Dwelling side 1st layer First floor: -Dwelling side 1st layer
Rated Assembly Inspection Partial 3/24/2025 3/24/2025 03/24/2025
LOWER LEVEL
Corrective Action Required
03/20/2025
FIRST FLOOR
Corrective Action Required
03/20/2025
SECOND FLOOR
Corrective Action Required
03/20/2025
THIRD FLOOR
Corrective Action Required
03/20/2025
STAIR TOWER 1
Corrective Action Required
03/20/2025
**THIS IS NORTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer 3rd floor: -stair side 2nd layer
STAIR TOWER 2
Corrective Action Required
03/20/2025
**THIS IS SOUTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer 3rd floor: -stair side 1st layer
STAIR TOWER 3
Corrective Action Required
03/20/2025
**THIS IS REAR STAIR B**
ELEVATOR 1
Corrective Action Required
03/20/2025
Lower floor: -Dwelling side 1st layer First floor: -Dwelling side 1st layer
Rated Assembly Inspection Partial 3/26/2025 3/26/2025 03/26/2025
LOWER LEVEL
Corrective Action Required
03/24/2025
-Tub&shower walls
FIRST FLOOR
Corrective Action Required
03/24/2025
-Tub&shower walls
SECOND FLOOR
Corrective Action Required
03/24/2025
-Tub&shower walls
THIRD FLOOR
Corrective Action Required
03/24/2025
-Tub&shower walls
STAIR TOWER 1
Corrective Action Required
03/24/2025
**THIS IS NORTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer 3rd floor: -stair side 2nd layer
STAIR TOWER 2
Corrective Action Required
03/24/2025
**THIS IS SOUTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer 3rd floor: -stair side 2nd layer
STAIR TOWER 3
Corrective Action Required
03/24/2025
**THIS IS REAR STAIR B**
ELEVATOR 1
Corrective Action Required
03/24/2025
Lower floor: -004 dwelling side 1st layer 1st floor: -107 dwelling side 1st layer 2nd floor: -207/209 dwelling side 1st layer 3rd floor: -307/309 dwelling side 1st layer 4th floor: -405/407 dwelling side 1st layer
FOURTH FLOOR
Corrective Action Required
03/26/2025
-Tub&shower walls
Rated Assembly Inspection Partial 4/1/2025 4/1/2025 04/01/2025
LOWER LEVEL
Corrective Action Required
03/26/2025
-Tub&shower walls
FIRST FLOOR
Corrective Action Required
03/26/2025
-Tub&shower walls
SECOND FLOOR
Corrective Action Required
03/26/2025
-Tub&shower walls
THIRD FLOOR
Corrective Action Required
03/26/2025
-Tub&shower walls -mud&taped
FOURTH FLOOR
Corrective Action Required
03/26/2025
-Tub&shower walls -mud&taped
STAIR TOWER 1
Corrective Action Required
03/26/2025
**THIS IS NORTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer 3rd floor: -stair side 2nd layer
STAIR TOWER 2
Corrective Action Required
03/26/2025
**THIS IS SOUTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer 3rd floor: -stair side 2nd layer
STAIR TOWER 3
Corrective Action Required
03/26/2025
**THIS IS REAR STAIR B**
ELEVATOR 1
Corrective Action Required
03/26/2025
Lower floor: -004 dwelling side 2nd layer 1st floor: -104 dwelling side 2nd layer 2nd floor: -207/209 dwelling side 2nd layer 3rd floor: -307/309 dwelling side 2nd layer 4th floor: -405/407 dwelling side 2nd layer
Rated Assembly Inspection Partial 4/3/2025 04/03/2025
LOWER LEVEL
Corrective Action Required
04/01/2025
-Tub&shower walls -mud&taped
FIRST FLOOR
Corrective Action Required
04/01/2025
-Tub&shower walls -mud&taped
SECOND FLOOR
Corrective Action Required
04/01/2025
-Tub&shower walls -mud&taped
THIRD FLOOR
Corrective Action Required
04/01/2025
-Tub&shower walls -mud&taped
FOURTH FLOOR
Corrective Action Required
04/01/2025
-Tub&shower walls -mud&taped
STAIR TOWER 2
Corrective Action Required
04/01/2025
**THIS IS SOUTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer 3rd floor: -stair side 2nd layer
STAIR TOWER 3
Corrective Action Required
04/01/2025
**THIS IS REAR STAIR B**
ELEVATOR 1
Corrective Action Required
04/01/2025
Lower floor: -004 dwelling side 2nd layer 1st floor: -104 dwelling side 2nd layer 2nd floor: -207/209 dwelling side 2nd layer 3rd floor: -307/309 dwelling side 2nd layer 4th floor: -405/407 dwelling side 2nd layer
STAIR TOWER 1
Corrective Action Required
04/01/2025
**THIS IS NORTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer 3rd floor: -stair side 2nd layer
Rated Assembly Inspection Partial 4/8/2025 4/8/2025 04/08/2025
LOWER LEVEL
Corrective Action Required
04/03/2025
-Tub&shower walls -mud&taped
FIRST FLOOR
Corrective Action Required
04/03/2025
-Tub&shower walls -mud&taped
SECOND FLOOR
Corrective Action Required
04/03/2025
-Tub&shower walls -mud&taped
THIRD FLOOR
Corrective Action Required
04/03/2025
-Tub&shower walls -mud&taped
FOURTH FLOOR
Corrective Action Required
04/03/2025
-Tub&shower walls -mud&taped
STAIR TOWER 2
Corrective Action Required
04/03/2025
**THIS IS SOUTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer 3rd floor: -stair side 2nd layer
STAIR TOWER 3
Corrective Action Required
04/03/2025
**THIS IS REAR STAIR B**
ELEVATOR 1
Corrective Action Required
04/03/2025
Lower floor: -004 dwelling side 2nd layer 1st floor: -104 dwelling side 2nd layer 2nd floor: -207/209 dwelling side 2nd layer 3rd floor: -307/309 dwelling side 2nd layer 4th floor: -405/407 dwelling side 2nd layer
STAIR TOWER 1
Corrective Action Required
04/03/2025
**THIS IS NORTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer 3rd floor: -stair side 2nd layer
Misc
Corrective Action Required
04/08/2025
Corridor fire barrier: -1st, 2nd floor ceiling nailing
All Rough Inspection - Commercial Partial 4/8/2025 04/08/2025
Misc
Corrective Action Required
03/20/2025
Front garage PFH walls only: -Provide 2 anchors per wall sill plate -Nail wall top plate to header w/ 2 rows of 16d @ 3" oc
Misc
Corrective Action Required
03/20/2025
Interior and exterior sheathed shearwalls: -lower level, 1st, and 2nd fl -exterior shearwalls
LOWER LEVEL
Corrective Action Required
03/20/2025
-Pre-rock behind tubs ad showers
FIRST FLOOR
Corrective Action Required
03/20/2025
-Pre-rock behind tubs ad showers
SECOND FLOOR
Corrective Action Required
03/20/2025
-Pre-rock behind tubs ad showers
THIRD FLOOR
Corrective Action Required
03/20/2025
FOURTH FLOOR
Corrective Action Required
03/20/2025
Above Ceiling Inspection Partial 4/17/2025 4/17/2025 04/17/2025
LOWER LEVEL
Corrective Action Required
02/03/2025
Ok to rock: -Corridor ceiling (top of 1-hr fire barrier), fire sprinler drops
FIRST FLOOR
Corrective Action Required
02/03/2025
OK to rock: -Corridor ceiling (top of 1-hr fire barrier), fire sprinler drops **Area at accessible garages/IT closet/Storage not ready
Rated Assembly Inspection Partial 4/17/2025 4/17/2025 04/17/2025
LOWER LEVEL
Corrective Action Required
04/08/2025
-Tub&shower walls -mud&taped
FIRST FLOOR
Corrective Action Required
04/08/2025
-Tub&shower walls -mud&taped -Corridor ceiling nailing
SECOND FLOOR
Corrective Action Required
04/08/2025
-Tub&shower walls -mud&taped -Corridor ceiling nailing
THIRD FLOOR
Corrective Action Required
04/08/2025
-Tub&shower walls -mud&taped -Corridor ceiling pre-rock ok
FOURTH FLOOR
Corrective Action Required
04/08/2025
-Tub&shower walls -mud&taped
STAIR TOWER 1
Corrective Action Required
04/08/2025
**THIS IS NORTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer 3rd floor: -stair side 2nd layer
STAIR TOWER 2
Corrective Action Required
04/08/2025
**THIS IS SOUTH STAIR A** Lower floor: -stair side 2nd layer 1st floor: -stair side 2nd layer 2nd floor: -stair side 2nd layer 3rd floor: -stair side 2nd layer
STAIR TOWER 3
Corrective Action Required
04/08/2025
**THIS IS REAR STAIR B** OK to rock the shear wall
ELEVATOR 1
Corrective Action Required
04/08/2025
Lower floor: -004 dwelling side 2nd layer 1st floor: -104 dwelling side 2nd layer 2nd floor: -207/209 dwelling side 2nd layer 3rd floor: -307/309 dwelling side 2nd layer 4th floor: -405/407 dwelling side 2nd layer
Misc
Corrective Action Required
04/08/2025
Footing Inspection - Commercial Passed 04/25/2025
Misc
Resolved
04/25/2025
Footing- OK to pour pending approval of onsite 3rd party engineer: -Ext. wall footing from A/1 to N/2; the rest of ext. GB -Interior footing from M/5 to N/3 -4 column pads in storm shelter. -Footing for elevator 3 ok to pour, has been approved by third party inspector -Lower level interior footing -1st fl ext. footing and int. footing. -Ext and int garage stem walls Misc: -Garage slabs
Foundation Inspection - Commercial Passed 10/3/2024 04/25/2025
Misc
Resolved
04/25/2025
Foundation wall OK: -A/4 to L.5/4.2; storm shelter F. wall and 4 col -Elev. pit wall -Stem wall at garages
Miscellaneous Inspection Partial 4/25/2025 04/25/2025
Misc
Informational
04/25/2025
4/25-Pre-allrough walkthrough with the construction crew
Documents & Images
Date Uploaded File Type Document Name
10/16/2023 Receipt Receipt for transaction: 2023-007795
10/16/2023 Letter DS Building Permit
04/01/2024 Letter INSPECTION SUMMARY
04/04/2024 Letter INSPECTION SUMMARY
04/04/2024 Letter INSPECTION SUMMARY
04/08/2024 Letter INSPECTION SUMMARY
04/10/2024 Letter INSPECTION SUMMARY
04/10/2024 Letter INSPECTION SUMMARY
05/03/2024 Letter INSPECTION SUMMARY
05/14/2024 Letter INSPECTION SUMMARY
05/15/2024 Letter INSPECTION SUMMARY
05/23/2024 Letter INSPECTION SUMMARY
06/05/2024 Letter INSPECTION SUMMARY
06/14/2024 Letter INSPECTION SUMMARY
06/19/2024 RB-0B_LH-Calc-06-18-2024 Stamped
06/19/2024 RB-04-13RCalc-06-18-2024 Stamped
06/19/2024 RB-FP1-06-18-2024 Model Stamped
06/19/2024 RB-FP2-06-18-2024 Model Stamped
06/19/2024 RB-FP3-06-18-2024 Model Stamped
06/19/2024 RB-ST-Calc-06-18-2024 Stamped
07/03/2024 Letter Fire (Sprinkler) Plan Review
08/01/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/07/2024 Alliance Fire Protection Combined FP drawings 8-7-24
08/12/2024 Receipt Receipt for transaction: 2024-006799
08/12/2024 Letter DS Building Permit
09/12/2024 Letter INSPECTION SUMMARY
09/17/2024 24050258 Blackwell product data (apts only)
09/17/2024 24050258 Blackwell CH & apartments-FA-set-rev sealed
09/17/2024 Letter INSPECTION SUMMARY
09/24/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
10/01/2024 Letter INSPECTION SUMMARY
10/01/2024 Letter Fire (Alarm) Plan Review Notice
10/03/2024 Letter INSPECTION SUMMARY
10/30/2024 Letter Fire (Alarm) Plan Review Notice
12/19/2024 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/23/2025 Letter INSPECTION SUMMARY
01/28/2025 Letter INSPECTION SUMMARY
01/29/2025 Letter INSPECTION SUMMARY
01/30/2025 24050258 Blackwell apartment only- FA-set rev_1(sealed)
02/03/2025 Letter INSPECTION SUMMARY
02/03/2025 Letter INSPECTION SUMMARY
02/03/2025 Letter INSPECTION SUMMARY
02/03/2025 Letter INSPECTION SUMMARY
02/07/2025 24050258 Blackwell apartment only- FA-set rev_1(sealed) RFC
02/07/2025 Letter Fire (Alarm) Plan Review Notice
02/11/2025 Letter INSPECTION SUMMARY
02/18/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/11/2025 Letter INSPECTION SUMMARY
03/12/2025 Letter INSPECTION SUMMARY
03/12/2025 Letter INSPECTION SUMMARY
03/12/2025 Letter INSPECTION SUMMARY
03/12/2025 Letter INSPECTION SUMMARY
03/14/2025 Letter INSPECTION SUMMARY
03/18/2025 Letter INSPECTION SUMMARY
03/20/2025 Letter INSPECTION SUMMARY
03/20/2025 Letter INSPECTION SUMMARY
03/24/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/03/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/17/2025 Letter INSPECTION SUMMARY
04/25/2025 Letter INSPECTION SUMMARY
04/25/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home