Permit Application Status

PRCOM20232768


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20232768
Building Permit - Commercial
Issued
NEW MULTI-FAMILY
TRILIOGY - BUILDING 2 NEW APARTMENT BUILDING WITH PARKING BENEATH
06/14/2023
12/20/2023
11/06/2023
Locations
Contacts
NEIGHBORS CONSTRUCTION COMPANY INC, Address:1708 E 123RD ST, Phone:(913) 422-5555  
MARK RINE, Address:NEIGHBORS CONSTRUCTION, Phone:(913) 515-9613  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
MTD Electric, LLC, Address:22004 S Waverly Rd  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
CFS ENGINEERS, Address:1421 EAST 104TH STREET STE 100, Phone:(816) 333-4477  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 01/12/2024 01/18/2024
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
01/17/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Plans received January 5, 2024. Includes Building 1, 800 NW Ward.
Miscellaneous Correction
Corrective Action Required
01/17/2024

Confirm all dry system risers in interior rooms shall be provided with adequate drains capable of handling full discharge from the riser drain.
Miscellaneous Correction
Corrective Action Required
01/17/2024

Correct code information to reference the 2016 editions of NFPA 13R and NFPA 13 as the guiding documents for the project.
Installation acceptance testing
Corrective Action Required
01/17/2024

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to hydrostatic and flow tests.
Licensed Contractors Rejected 03/30/2023 03/29/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
03/29/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
03/29/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Final Development Plan Review Approved 03/30/2023 03/20/2023
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
Residential Excise Tax Fee $61,950.72 $61,950.72 Paid 12/20/2023
Water Tap Fee $79,575.00 $79,575.00 Paid 06/19/2023
Water Meter Fee $1,642.50 $1,642.50 Paid 06/19/2023
Sanitary Sewer Development Fee $32,303.00 $32,303.00 Paid 06/19/2023
Valuation Fee for New Multi-Family $500.00 $500.00 Paid 06/14/2023
$104,971.69
Valuation Fee for New Multi-Family $104,471.69 $104,471.69 Paid 12/20/2023
$104,971.69
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Pending
Sewer Service Inspection Pending
Water Service Inspection Pending
Alarm Test Pending
Erosion Control Inspection Pending
Rated Assembly Inspection Pending
Underground Electrical Inspection - Commercial Pending
Misc
Informational
06/17/2025
Conduit in place for 2 light poles on East side parking lot. 1 just South of main entrance then 1 South foot 100. Ok to cover
Occupancy Inspection - Planning Pending
Misc
Corrective Action Required
07/01/2025
Complete landscaping per approved plan.
Misc
Corrective Action Required
07/01/2025
Complete the trash complactor enclosure.
Miscellaneous Correction
Corrective Action Required
07/01/2025
Provide parking as necessary based on occupied units.
Occupancy Inspection - Codes Commercial Pending
Misc
Corrective Action Required
07/01/2025
Partial only: -Segments F and G ok to occupy
Misc
Corrective Action Required
07/01/2025
-Complete corrections for all other departments
Occupancy Inspection - Engineering Pending
Misc
Informational
07/02/2025
No outstanding issues for field engineering inspection.
Miscellaneous Inspection Pending
Misc
Corrective Action Required
07/02/2025
Pre final units only segment H 4th floor 2421-smoke detector not permitted within 6’ of range, secure electrical at island, afci protection required at laundry 2420-secure mc at island 2419-afci at laundry 2414- GFCi within 6’ of sink required 2413-secure mc at island
Retaining Wall Inspection Pending 8/4/2023
Occupancy Inspection - Fire Pending 7/1/2025 7/1/2025
Footing Inspection - Commercial Partial 7/6/2023 (10:30) 7/6/2023 07/06/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/06/2023
-Footing for basement wall at segments G and H
Footing Inspection - Commercial Partial 7/10/2023 (11:00) 7/10/2023 07/10/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/06/2023
-Footing for basement wall at segments G and H -Line A from 1-4 -Line 1 from A to B
Foundation Inspection - Commercial Partial 7/11/2023 (11:00) 7/11/2023 07/11/2023
Misc
Corrective Action Required
07/11/2023
Foundation wall at G/H basement from C-G
Footing Inspection - Commercial Partial 7/11/2023 (11:00) 7/11/2023 07/11/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/10/2023
-Footing for basement wall at segments G and H -Line A from 1-4 -Line 1 from A to B -Line 94 from J-N -Line N from 94-44
Foundation Inspection - Commercial Partial 7/19/2023 7/19/2023 07/19/2023
Misc
Informational
07/19/2023
Segments G and H basement foundation wall: -Line 1 complete -Line 94 complete -Line N from 94-44
Footing Inspection - Commercial Partial 7/20/2023 (11:00) 7/20/2023 07/20/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/11/2023
-Footing for basement wall at segments G and H -Line A from 1-4 -Line 1 Complete -Line 94 from J-N -Line N from 94-44
Foundation Inspection - Commercial Partial 7/21/2023 7/21/2023 07/21/2023
Misc
Informational
07/19/2023
Segments G and H basement foundation wall: -Line 1 complete -Line 94 complete -Line N from 94-44 - Segment J: - Line 1 complete -A, 1 through 4 Complete
Footing Inspection - Commercial Partial 7/26/2023 (11:00) 7/26/2023 07/26/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/20/2023
-Footing for basement wall at segments G and H -Line A from 1-4 -Line 1 Complete -Footing for elevator at Segment G complete -Column pads at basement line 2 from G to B Segment F -Line 94 complete -Line N complete -Line 36 complete -Line L from 36 to 39
Footing Inspection - Commercial Failed 8/1/2023 8/1/2023 08/01/2023
Misc
Corrective Action Required
08/01/2023
Remove water and debris from elevator pits
Foundation Inspection - Commercial Partial 08/04/2023
Misc
Informational
07/21/2023
Segments G and H basement foundation wall: -Line 1 complete -Line 94 complete -Line N from 94-44 - Segment J: -Patio retaining wall - Line 1 complete -A, 1 through 4 Complete
Footing Inspection - Commercial Partial 9/1/2023 09/01/2023
Misc
Resolved
09/01/2023
Remove water and debris from elevator pits
THE FOLLOWING AREAS ARE APPROVED
Informational
09/01/2023
-Footing for basement wall at segments G and H -Line A from 1-4 -Line 1 Complete -Footing for elevator at Segment G complete -Column pads at basement line 2 from G to B Segment F -Line 94 complete -Line N complete -Line 36 complete -Line L from 36 to 39 -line L 38-43 segment G -43.1 L-J -43-43.1 L Segment H -43.1(3) to G
Footing Inspection - Commercial Partial 9/7/2023 (10:00) 9/7/2023 09/07/2023
THE FOLLOWING AREAS ARE APPROVED
Informational
09/01/2023
-Footing for basement wall at segments G and H -Line A from 1-4 -Line 1 Complete -Footing for elevator at Segment G complete -Column pads at basement line 2 from G to B Segment F -Line 94 complete -Line N complete -Line 36 complete -Line L from 36 to 39 -line L 38-43 segment G -43.1 L-J -43-43.1 L - Elevator basemrnt walls Segment H -43.1(3) to G
Underslab Plumbing Inspection - Commercial Partial 9/18/2023 9/18/2023 09/18/2023
Misc
Corrective Action Required
09/18/2023
Segment F: -Main sanitary line ok
Footing Inspection - Commercial Partial 10/11/2023 10/11/2023 09/19/2023
THE FOLLOWING AREAS ARE APPROVED
Informational
09/07/2023
-Footing for basement wall at segments G and H -Line A from 1-4 -Line 1 Complete -Footing for elevator at Segment G complete -Column pads at basement line 2 from G to B Segment F -Line 94 complete -Line N complete -Line 36 complete -Line L from 36 to 39 -line L 38-43 -Elevator pit segment G -43.1 L-J -43-43.1 L - Elevator basemrnt walls Segment H -43.1(3) to G
Underslab Electrical Inspection - Commercial Partial 09/19/2023
Misc
Corrective Action Required
09/19/2023
Segment F complete
Footing Inspection - Commercial Partial 9/20/2023 (1:00) 9/20/2023 09/20/2023
THE FOLLOWING AREAS ARE APPROVED
Informational
09/19/2023
Segment F -perimeters footings complete -Elevator pit segment G -perimeters footings complete - Elevator basemrnt walls -Footing for elevator Segment H -perimeters footings complete Segment J -perimeters footings complete
Foundation Inspection - Commercial Partial 9/21/2023 (10:00) 9/21/2023 09/21/2023
Misc
Informational
08/04/2023
Segments G and H basement foundation wall: -Line 1 complete -Line 94 complete -Line N from 94-44 - Segment J: -Patio retaining wall - Line 1 complete -A, 1 through 4 Complete Segment F: -Elevator pit walls
Underslab Plumbing Inspection - Commercial Partial 9/22/2023 9/22/2023 09/22/2023
Misc
Corrective Action Required
09/18/2023
Segment F: -Complete Segment G: -Complete
Underslab Plumbing Inspection - Commercial Partial 9/28/2023 9/28/2023 09/28/2023
Misc
Corrective Action Required
09/22/2023
Segment F: -Complete Segment G: -Complete Segment J: -Complete
Underslab Electrical Inspection - Commercial Partial 9/28/2023 9/28/2023 09/28/2023
Misc
Corrective Action Required
09/19/2023
Segment F complete Segment G complete
Underslab Electrical Inspection - Commercial Partial 10/2/2023 10/2/2023 10/02/2023
Misc
Corrective Action Required
09/28/2023
Segment F complete Segment G complete Segment H complete
Underslab Electrical Inspection - Commercial Partial 10/3/2023 10/3/2023 10/03/2023
Misc
Corrective Action Required
10/02/2023
Segment F complete Segment G complete Segment H complete Segment J complete
Underslab Plumbing Inspection - Commercial Passed 10/4/2023 10/4/2023 10/04/2023
Misc
Resolved
10/04/2023
Segment F: -Complete Segment G: -Complete Segment J: -Complete
Footing Inspection - Commercial Partial 10/10/2023 (1:00) 10/10/2023 10/10/2023
THE FOLLOWING AREAS ARE APPROVED
Informational
09/20/2023
Segment F -perimeters footings complete -Elevator pit segment G -perimeters footings complete - Elevator basemrnt walls -Footing for elevator Segment H -perimeters footings complete Segment J -perimeters footings complete -Footing for elevator pit
Foundation Inspection - Commercial Passed 11/22/2023 (9:00) 11/22/2023 10/11/2023
Misc
Resolved
10/11/2023
Segments G and H basement foundation wall: -Line 1 complete -Line 94 complete -Line N from 94-44 - Segment J: -Patio retaining wall - Line 1 complete -A, 1 through 4 Complete Segment F: -Elevator pit walls
Footing Inspection - Commercial Partial 10/11/2023
THE FOLLOWING AREAS ARE APPROVED
Informational
10/10/2023
Segment F -perimeters footings complete -Elevator pit (2) ufer locations (one each end) per engineered detail segment G -perimeters footings complete - Elevator basemrnt walls -Footing for elevator -Ufer per engineered drawing Segment H -perimeters footings complete -Ufer per engineered detail Segment J -perimeters footings complete -Footing for elevator pit
Electrical Service Inspection Failed 10/16/2023 10/16/2023 10/16/2023
Misc
Corrective Action Required
10/16/2023
**Must obtain separate permit for temp power
Footing Inspection - Commercial Partial 11/17/2023 11/17/2023 11/17/2023
THE FOLLOWING AREAS ARE APPROVED
Informational
10/11/2023
Segment F -perimeters footings complete -Elevator pit (2) ufer locations (one each end) per engineered detail segment G -perimeters footings complete - Elevator basemrnt walls -Footing for elevator -Ufer per engineered drawing Segment H -perimeters footings complete -Ufer per engineered detail Segment J -perimeters footings complete -Footing for elevator pit Trash enclosure footings
Foundation Inspection - Commercial Partial 12/13/2023 12/13/2023 12/13/2023
Misc
Informational
12/13/2023
12-13-23 -Submit change to detail of concrete walls in place of masonary walls at trash enclosure. Rebar witnessed is #4 at 12" oc horizonatal and vertical
Rated Assembly Inspection Failed 1/31/2024 1/31/2024 01/31/2024
All Rough Inspection - Commercial Partial 6/11/2024 6/11/2024 06/11/2024
STAIR TOWER 1
Corrective Action Required
06/11/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3
Rated Assembly Inspection Partial 7/17/2024 7/17/2024 07/17/2024
STAIR TOWER 1
Corrective Action Required
07/17/2024
-1st layer behind stringers only at floors 1-3
Rated Assembly Inspection Partial 07/18/2024
STAIR TOWER 1
Corrective Action Required
07/17/2024
-1st layer behind stringers only at floors 1-3 -2nd layer behind stringers at floors 1-2 ***not complete at truss space, ok for stringers
STAIR TOWER 2
Corrective Action Required
07/18/2024
STAIR TOWER 3
Corrective Action Required
07/18/2024
STAIR TOWER 4
Corrective Action Required
07/18/2024
STAIR TOWER 5
Corrective Action Required
07/18/2024
ELEVATOR 1
Corrective Action Required
07/18/2024
-1st layer, unit side behind trusses
ELEVATOR 2
Corrective Action Required
07/18/2024
Rated Assembly Inspection Partial 7/19/2024 7/19/2024 07/19/2024
STAIR TOWER 1
Corrective Action Required
07/18/2024
-1st layer behind stringers only at all floors -2nd layer behind stringers at floors 1-2
STAIR TOWER 2
Corrective Action Required
07/18/2024
STAIR TOWER 3
Corrective Action Required
07/18/2024
STAIR TOWER 4
Corrective Action Required
07/18/2024
STAIR TOWER 5
Corrective Action Required
07/18/2024
ELEVATOR 1
Corrective Action Required
07/18/2024
-1st layer, unit side behind trusses
ELEVATOR 2
Corrective Action Required
07/18/2024
Rated Assembly Inspection Partial 7/23/2024 7/23/2024 07/23/2024
STAIR TOWER 1
Corrective Action Required
07/19/2024
-1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
07/19/2024
STAIR TOWER 3
Corrective Action Required
07/19/2024
STAIR TOWER 4
Corrective Action Required
07/19/2024
STAIR TOWER 5
Corrective Action Required
07/19/2024
ELEVATOR 1
Corrective Action Required
07/19/2024
-1st and 2nd layer unit side behind trusses
ELEVATOR 2
Corrective Action Required
07/19/2024
All Rough Inspection - Commercial Partial 8/8/2024 8/8/2024 08/08/2024
STAIR TOWER 1
Corrective Action Required
06/11/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3
STAIR TOWER 2
Corrective Action Required
08/08/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
08/08/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
Rated Assembly Inspection Partial 8/12/2024 8/12/2024 08/12/2024
STAIR TOWER 1
Corrective Action Required
07/23/2024
-1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
07/23/2024
STAIR TOWER 3
Corrective Action Required
07/23/2024
Stair 3 in Building J: -1st layer at stringer side only floors 1-2
STAIR TOWER 4
Corrective Action Required
07/23/2024
STAIR TOWER 5
Corrective Action Required
07/23/2024
ELEVATOR 1
Corrective Action Required
07/23/2024
-1st and 2nd layer unit side behind trusses
ELEVATOR 2
Corrective Action Required
07/23/2024
Rated Assembly Inspection Partial 8/15/2024 8/15/2024 08/15/2024
STAIR TOWER 1
Corrective Action Required
08/12/2024
-1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
08/12/2024
STAIR TOWER 3
Corrective Action Required
08/12/2024
Stair 3 in Building J: -1st layer at stringer side only floors 1-3
STAIR TOWER 4
Corrective Action Required
08/12/2024
STAIR TOWER 5
Corrective Action Required
08/12/2024
ELEVATOR 1
Corrective Action Required
08/12/2024
-1st and 2nd layer unit side behind trusses
ELEVATOR 2
Corrective Action Required
08/12/2024
Rated Assembly Inspection Partial 8/19/2024 8/19/2024 08/19/2024
STAIR TOWER 1
Corrective Action Required
08/15/2024
-1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
08/15/2024
STAIR TOWER 3
Corrective Action Required
08/15/2024
Stair 3 in Building J: -1st layer at stringer side only floors 1-3 - 2ND layer at stringer side only floors 1-2
STAIR TOWER 4
Corrective Action Required
08/15/2024
STAIR TOWER 5
Corrective Action Required
08/15/2024
ELEVATOR 1
Corrective Action Required
08/15/2024
-1st and 2nd layer unit side behind trusses
ELEVATOR 2
Corrective Action Required
08/15/2024
Rated Assembly Inspection Partial 8/26/2024 8/26/2024 08/26/2024
STAIR TOWER 1
Corrective Action Required
08/19/2024
-1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
08/19/2024
STAIR TOWER 3
Corrective Action Required
08/19/2024
Stair 3 in Building J: -1st and 2nd layer at stringer side only floors 1-3
STAIR TOWER 4
Corrective Action Required
08/19/2024
STAIR TOWER 5
Corrective Action Required
08/19/2024
ELEVATOR 1
Corrective Action Required
08/19/2024
-1st and 2nd layer unit side behind trusses
ELEVATOR 2
Corrective Action Required
08/19/2024
Rated Assembly Inspection Partial 8/28/2024 8/28/2024 08/28/2024
STAIR TOWER 1
Corrective Action Required
08/26/2024
Stair in building F -1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
08/26/2024
-Stair in building G -1st and 2nd layer behind stringers only
STAIR TOWER 3
Corrective Action Required
08/26/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
08/26/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3
STAIR TOWER 5
Corrective Action Required
08/26/2024
ELEVATOR 1
Corrective Action Required
08/26/2024
-1st and 2nd layer unit side behind trusses
ELEVATOR 2
Corrective Action Required
08/26/2024
Rated Assembly Inspection Partial 8/30/2024 8/30/2024 08/30/2024
STAIR TOWER 1
Corrective Action Required
08/28/2024
Stair in building F -1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
08/28/2024
-Stair in building G -1st and 2nd layer behind stringers only
STAIR TOWER 3
Corrective Action Required
08/28/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
08/28/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
08/28/2024
ELEVATOR 1
Corrective Action Required
08/28/2024
-1st and 2nd layer unit side behind trusses
ELEVATOR 2
Corrective Action Required
08/28/2024
Rated Assembly Inspection Partial 08/30/2024
STAIR TOWER 1
Corrective Action Required
08/30/2024
Stair in building F -1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
08/30/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-2
STAIR TOWER 3
Corrective Action Required
08/30/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
08/30/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
08/30/2024
ELEVATOR 1
Corrective Action Required
08/30/2024
-1st and 2nd layer unit side behind trusses
ELEVATOR 2
Corrective Action Required
08/30/2024
Rated Assembly Inspection Partial 9/6/2024 9/6/2024 09/06/2024
STAIR TOWER 1
Corrective Action Required
08/30/2024
Stair in building F -1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
08/30/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-2
STAIR TOWER 3
Corrective Action Required
08/30/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
08/30/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
08/30/2024
ELEVATOR 1
Corrective Action Required
08/30/2024
-1st and 2nd layer unit side behind trusses
ELEVATOR 2
Corrective Action Required
08/30/2024
FIRST FLOOR
Corrective Action Required
09/06/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
SECOND FLOOR
Corrective Action Required
09/06/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
THIRD FLOOR
Corrective Action Required
09/06/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
FOURTH FLOOR
Corrective Action Required
09/06/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
All Rough Inspection - Commercial Partial 9/11/2024 9/11/2024 09/11/2024
STAIR TOWER 1
Corrective Action Required
08/08/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3
STAIR TOWER 2
Corrective Action Required
08/08/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
08/08/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
09/11/2024
SECOND FLOOR
Corrective Action Required
09/11/2024
THIRD FLOOR
Corrective Action Required
09/11/2024
*Building F -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
09/11/2024
*Building F -Behind tubs and showers ok to cover
All Rough Inspection - Commercial Partial 9/18/2024 9/18/2024 09/18/2024
STAIR TOWER 1
Corrective Action Required
09/11/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3
STAIR TOWER 2
Corrective Action Required
09/11/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
09/11/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
09/11/2024
SECOND FLOOR
Corrective Action Required
09/11/2024
Building F: -Behind tubs and showers ok to cover -Deck framing at west side only ok to cover
THIRD FLOOR
Corrective Action Required
09/11/2024
*Building F -Behind tubs and showers ok to cover -Deck framing at west side only ok to cover
FOURTH FLOOR
Corrective Action Required
09/11/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover
Rated Assembly Inspection Partial 9/19/2024 9/19/2024 09/19/2024
STAIR TOWER 1
Corrective Action Required
09/06/2024
Stair in building F -1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
09/06/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-2
STAIR TOWER 3
Corrective Action Required
09/06/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
09/06/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
09/06/2024
ELEVATOR 1
Corrective Action Required
09/06/2024
-1st and 2nd layer unit side behind trusses
ELEVATOR 2
Corrective Action Required
09/06/2024
FIRST FLOOR
Corrective Action Required
09/06/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
SECOND FLOOR
Corrective Action Required
09/06/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
THIRD FLOOR
Corrective Action Required
09/06/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
FOURTH FLOOR
Corrective Action Required
09/06/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs
All Rough Inspection - Commercial Partial 9/19/2024 9/19/2024 09/19/2024
STAIR TOWER 1
Corrective Action Required
09/18/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3
STAIR TOWER 2
Corrective Action Required
09/18/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
09/18/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
09/18/2024
SECOND FLOOR
Corrective Action Required
09/18/2024
Building F: -Behind tubs and showers ok to cover -Deck framing at west side only ok to cover
THIRD FLOOR
Corrective Action Required
09/18/2024
*Building F -Behind tubs and showers ok to cover -Deck framing at west side only ok to cover
FOURTH FLOOR
Corrective Action Required
09/18/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover
ELEVATOR 1
Corrective Action Required
09/19/2024
Interior framing ok all floors
Rated Assembly Inspection Partial 9/20/2024 9/20/2024 09/20/2024
STAIR TOWER 1
Corrective Action Required
09/19/2024
Stair in building F -1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
09/19/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-2
STAIR TOWER 3
Corrective Action Required
09/19/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
09/19/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
09/19/2024
ELEVATOR 1
Corrective Action Required
09/19/2024
-1st and 2nd layer unit side behind trusses
ELEVATOR 2
Corrective Action Required
09/19/2024
FIRST FLOOR
Corrective Action Required
09/19/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
SECOND FLOOR
Corrective Action Required
09/19/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
THIRD FLOOR
Corrective Action Required
09/19/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
09/19/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs
Rated Assembly Inspection Partial 9/23/2024 9/23/2024 09/23/2024
STAIR TOWER 1
Corrective Action Required
09/20/2024
Stair in building F -1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
09/20/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-2
STAIR TOWER 3
Corrective Action Required
09/20/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
09/20/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
09/20/2024
ELEVATOR 1
Corrective Action Required
09/20/2024
-1st and 2nd layer unit side behind trusses
ELEVATOR 2
Corrective Action Required
09/20/2024
FIRST FLOOR
Corrective Action Required
09/20/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
SECOND FLOOR
Corrective Action Required
09/20/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
THIRD FLOOR
Corrective Action Required
09/20/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
09/20/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs
Rated Assembly Inspection Partial 9/24/2024 9/24/2024 09/24/2024
STAIR TOWER 1
Corrective Action Required
09/23/2024
Stair in building F -1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
09/23/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-2
STAIR TOWER 3
Corrective Action Required
09/23/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
09/23/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
09/23/2024
ELEVATOR 1
Corrective Action Required
09/23/2024
-1st and 2nd layer unit side behind trusses -1st layer at ceiling
ELEVATOR 2
Corrective Action Required
09/23/2024
FIRST FLOOR
Corrective Action Required
09/23/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
SECOND FLOOR
Corrective Action Required
09/23/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
THIRD FLOOR
Corrective Action Required
09/23/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
09/23/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs
Rated Assembly Inspection Partial 9/26/2024 9/26/2024 09/26/2024
STAIR TOWER 1
Corrective Action Required
09/24/2024
Stair in building F -1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
09/24/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
09/24/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
09/24/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
09/24/2024
ELEVATOR 1
Corrective Action Required
09/24/2024
-1st and 2nd layer unit side behind trusses -1st layer at ceiling -Hat channel at ceiling 2st layer floors 1,2,4
ELEVATOR 2
Corrective Action Required
09/24/2024
FIRST FLOOR
Corrective Action Required
09/24/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
SECOND FLOOR
Corrective Action Required
09/24/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
THIRD FLOOR
Corrective Action Required
09/24/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
09/24/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs
Rated Assembly Inspection Partial 9/27/2024 9/27/2024 09/27/2024
STAIR TOWER 1
Corrective Action Required
09/26/2024
Stair in building F -1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
09/26/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
09/26/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
09/26/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
09/26/2024
ELEVATOR 1
Corrective Action Required
09/26/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd layer at ceiling -Hat channel at ceiling 1st layer interior all floors
ELEVATOR 2
Corrective Action Required
09/26/2024
FIRST FLOOR
Corrective Action Required
09/26/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
SECOND FLOOR
Corrective Action Required
09/26/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
THIRD FLOOR
Corrective Action Required
09/26/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
09/26/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs
Rated Assembly Inspection Failed 9/30/2024 9/30/2024 09/30/2024
STAIR TOWER 1
Corrective Action Required
09/27/2024
Stair in building F -1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
09/27/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
09/27/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
09/27/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
09/27/2024
ELEVATOR 1
Corrective Action Required
09/27/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd layer at ceiling -Hat channel at ceiling 1st layer interior all floors
ELEVATOR 2
Corrective Action Required
09/27/2024
FIRST FLOOR
Corrective Action Required
09/27/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
SECOND FLOOR
Corrective Action Required
09/27/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
09/27/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
09/27/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs
Rated Assembly Inspection Partial 10/1/2024 10/1/2024 10/01/2024
STAIR TOWER 1
Corrective Action Required
09/30/2024
Stair in building F -1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
09/30/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
09/30/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
09/30/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
09/30/2024
ELEVATOR 1
Corrective Action Required
09/30/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors
ELEVATOR 2
Corrective Action Required
09/30/2024
FIRST FLOOR
Corrective Action Required
09/30/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
SECOND FLOOR
Corrective Action Required
09/30/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
09/30/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
09/30/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs
All Rough Inspection - Commercial Partial 10/01/2024
STAIR TOWER 1
Corrective Action Required
09/19/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3
STAIR TOWER 2
Corrective Action Required
09/19/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
09/19/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
09/19/2024
SECOND FLOOR
Corrective Action Required
09/19/2024
Building F: -Behind tubs and showers ok to cover -Deck framing ok to cover
THIRD FLOOR
Corrective Action Required
09/19/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover
FOURTH FLOOR
Corrective Action Required
09/19/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover
ELEVATOR 1
Corrective Action Required
09/19/2024
Interior framing ok all floors
All Rough Inspection - Commercial Partial 10/3/2024 10/3/2024 10/03/2024
STAIR TOWER 1
Corrective Action Required
10/01/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell
STAIR TOWER 2
Corrective Action Required
10/01/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
10/01/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
10/01/2024
SECOND FLOOR
Corrective Action Required
10/01/2024
Building F: -Behind tubs and showers ok to cover -Deck framing ok to cover
THIRD FLOOR
Corrective Action Required
10/01/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover
FOURTH FLOOR
Corrective Action Required
10/01/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover
ELEVATOR 1
Corrective Action Required
10/01/2024
Interior framing ok all floors
Rated Assembly Inspection Partial 10/4/2024 10/4/2024 10/04/2024
STAIR TOWER 1
Corrective Action Required
10/01/2024
Stair in building F -1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
10/01/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
10/01/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
10/01/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
10/01/2024
ELEVATOR 1
Corrective Action Required
10/01/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors
ELEVATOR 2
Corrective Action Required
10/01/2024
FIRST FLOOR
Corrective Action Required
10/01/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
SECOND FLOOR
Corrective Action Required
10/01/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
10/01/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
10/01/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building G: -1st layer at truss spaces for firewall, stairwell and elevator corridor side only
All Rough Inspection - Commercial Partial 10/4/2024 10/4/2024 10/04/2024
STAIR TOWER 1
Corrective Action Required
10/03/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell
STAIR TOWER 2
Corrective Action Required
10/03/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
10/03/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
10/03/2024
SECOND FLOOR
Corrective Action Required
10/03/2024
Building F: -Behind tubs and showers ok to cover -Deck framing ok to cover
THIRD FLOOR
Corrective Action Required
10/03/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover
FOURTH FLOOR
Corrective Action Required
10/03/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover 448-add stud at corridor and bathroom at bearing walls 449-add stud at corridor, install stud shoe at party wall, missing truss hanger at kitchen, correct hanger at entry 447-correct hanger at entry, strap top plate at party wall 446-strap top plate at corridor, install stud at exterior corner, nail per code 445-Provide truss hold down at entry 444-ok 443-install stud shoe at bathroom 442-strap top plate at party walls, fireblock dead space at party walls 441-strap top plate at party walls 440-fireblock party wall, nail corners 439-missing h2.5 at entry, nail stud 438-missing h2.5 at entry
ELEVATOR 1
Corrective Action Required
10/03/2024
Interior framing ok all floors
All Rough Inspection - Commercial Partial 10/7/2024 10/7/2024 10/07/2024
STAIR TOWER 1
Corrective Action Required
10/04/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell
STAIR TOWER 2
Corrective Action Required
10/04/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
10/04/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
10/04/2024
SECOND FLOOR
Corrective Action Required
10/04/2024
Building F: -Behind tubs and showers ok to cover -Deck framing ok to cover
THIRD FLOOR
Corrective Action Required
10/04/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover
FOURTH FLOOR
Corrective Action Required
10/04/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved
ELEVATOR 1
Corrective Action Required
10/04/2024
Interior framing ok all floors
Rated Assembly Inspection Partial 10/7/2024 10/7/2024 10/07/2024
STAIR TOWER 1
Corrective Action Required
10/04/2024
Stair in building F -1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
10/04/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
10/04/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
10/04/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
10/04/2024
ELEVATOR 1
Corrective Action Required
10/04/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors
ELEVATOR 2
Corrective Action Required
10/04/2024
FIRST FLOOR
Corrective Action Required
10/04/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
SECOND FLOOR
Corrective Action Required
10/04/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
THIRD FLOOR
Corrective Action Required
10/04/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
FOURTH FLOOR
Corrective Action Required
10/04/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
Rated Assembly Inspection Partial 10/8/2024 10/8/2024 10/08/2024
STAIR TOWER 1
Corrective Action Required
10/07/2024
Stair in building F -1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
10/07/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-3
STAIR TOWER 3
Corrective Action Required
10/07/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
10/07/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
10/07/2024
ELEVATOR 1
Corrective Action Required
10/07/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors
ELEVATOR 2
Corrective Action Required
10/07/2024
FIRST FLOOR
Corrective Action Required
10/07/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
SECOND FLOOR
Corrective Action Required
10/07/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
THIRD FLOOR
Corrective Action Required
10/07/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
FOURTH FLOOR
Corrective Action Required
10/07/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
All Rough Inspection - Commercial Partial 10/8/2024 10/8/2024 10/08/2024
STAIR TOWER 1
Corrective Action Required
10/07/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell
STAIR TOWER 2
Corrective Action Required
10/07/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
10/07/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
10/07/2024
SECOND FLOOR
Corrective Action Required
10/07/2024
Building F: -Behind tubs and showers ok to cover -Deck framing ok to cover
THIRD FLOOR
Corrective Action Required
10/07/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover
FOURTH FLOOR
Corrective Action Required
10/07/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building J -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
10/07/2024
Interior framing ok all floors
All Rough Inspection - Commercial Partial 10/9/2024 10/9/2024 10/09/2024
STAIR TOWER 1
Corrective Action Required
10/08/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
10/08/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
10/08/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
10/08/2024
SECOND FLOOR
Corrective Action Required
10/08/2024
Building F: -Behind tubs and showers ok to cover -Deck framing ok to cover
THIRD FLOOR
Corrective Action Required
10/08/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover
FOURTH FLOOR
Corrective Action Required
10/08/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building J -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
10/08/2024
Interior framing ok all floors
Rated Assembly Inspection Partial 10/10/2024 10/10/2024 10/10/2024
STAIR TOWER 1
Corrective Action Required
10/08/2024
Stair in building F -1st land 2nd ayer behind stringers only at all floors
STAIR TOWER 2
Corrective Action Required
10/08/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-3
STAIR TOWER 3
Corrective Action Required
10/08/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
10/08/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
10/08/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
10/08/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors
ELEVATOR 2
Corrective Action Required
10/08/2024
FIRST FLOOR
Corrective Action Required
10/08/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
SECOND FLOOR
Corrective Action Required
10/08/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
THIRD FLOOR
Corrective Action Required
10/08/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
FOURTH FLOOR
Corrective Action Required
10/08/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
All Rough Inspection - Commercial Partial 10/10/2024 10/10/2024 10/10/2024
STAIR TOWER 1
Corrective Action Required
10/09/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
10/09/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
10/09/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
10/09/2024
SECOND FLOOR
Corrective Action Required
10/09/2024
Building F: -Behind tubs and showers ok to cover -Deck framing ok to cover
THIRD FLOOR
Corrective Action Required
10/09/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved except as noted: 336-Complete DWV at party wall 337-Complete DWV at party wall 343-Provide truss repair 349-Install (3) stud shoe at corridor
FOURTH FLOOR
Corrective Action Required
10/09/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building J -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
10/09/2024
Interior framing ok all floors
Rated Assembly Inspection Partial 10/11/2024 10/11/2024 10/11/2024
STAIR TOWER 1
Corrective Action Required
10/10/2024
Stair in building F -1st land 2nd layer behind stringers only at all floors -1st layer at ceiling
STAIR TOWER 2
Corrective Action Required
10/10/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
10/10/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
10/10/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
10/10/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
10/10/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors
ELEVATOR 2
Corrective Action Required
10/10/2024
FIRST FLOOR
Corrective Action Required
10/10/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
SECOND FLOOR
Corrective Action Required
10/10/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
THIRD FLOOR
Corrective Action Required
10/10/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
FOURTH FLOOR
Corrective Action Required
10/10/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building J: -1st layer behind tubs and showers
Rated Assembly Inspection Partial 10/14/2024 10/14/2024 10/14/2024
STAIR TOWER 1
Corrective Action Required
10/11/2024
Stair in building F -1st land 2nd layer behind stringers only at all floors -1st layer at ceiling -Hat channel at ceiling
STAIR TOWER 2
Corrective Action Required
10/11/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
10/11/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
10/11/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
10/11/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
10/11/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors
ELEVATOR 2
Corrective Action Required
10/11/2024
FIRST FLOOR
Corrective Action Required
10/11/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
SECOND FLOOR
Corrective Action Required
10/11/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
THIRD FLOOR
Corrective Action Required
10/11/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
FOURTH FLOOR
Corrective Action Required
10/11/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building J: -1st and 2nd layer behind tubs and showers
Rated Assembly Inspection Partial 10/15/2024 10/15/2024 10/15/2024
STAIR TOWER 1
Corrective Action Required
10/14/2024
Stair in building F -1st land 2nd layer behind stringers only at all floors -1st, 2nd layer at ceiling -Hat channel at ceiling
STAIR TOWER 2
Corrective Action Required
10/14/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
10/14/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
10/14/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
10/14/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
10/14/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors
ELEVATOR 2
Corrective Action Required
10/14/2024
FIRST FLOOR
Corrective Action Required
10/14/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
SECOND FLOOR
Corrective Action Required
10/14/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st layer fire walls Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
THIRD FLOOR
Corrective Action Required
10/14/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only
FOURTH FLOOR
Corrective Action Required
10/14/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building J: -1st and 2nd layer behind tubs and showers
All Rough Inspection - Commercial Partial 10/15/2024 10/15/2024 10/15/2024
STAIR TOWER 1
Corrective Action Required
10/10/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
10/10/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
10/10/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
10/10/2024
SECOND FLOOR
Corrective Action Required
10/10/2024
Building F: -Behind tubs and showers ok to cover -Deck framing ok to cover 249-Dryer duct not allowed in 2x4 wall, top plate overbored at dryer, protect dryer at corridor, strap top plates at back wall 248-Dryer duct not allowed in 2x4 wall, top plate overbored at dryer, protect dryer at corridor 247-Repair stud at laundry, install truss bracing 244-Secure nm by corridor 243-Strap top plates at LBWs 242-Install stud shoe at laundry 239-Install stud shoe at laundry 238-Tape dead sace 237-Protect nm at island, stud shoe at laundry 236-stud shoe at laundry
THIRD FLOOR
Corrective Action Required
10/10/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved except as noted: 336-Complete DWV at party wall 337-Complete DWV at party wall 343-Provide truss repair 349-Install (3) stud shoe at corridor
FOURTH FLOOR
Corrective Action Required
10/10/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building J -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
10/10/2024
Interior framing ok all floors
All Rough Inspection - Commercial Partial 10/16/2024 10/16/2024 10/16/2024
STAIR TOWER 1
Corrective Action Required
10/15/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
10/15/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
10/15/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
10/15/2024
SECOND FLOOR
Corrective Action Required
10/15/2024
Building F: -Behind tubs and showers ok to cover -Deck framing ok to cover 249-Dryer duct not allowed in 2x4 wall, top plate overbored at dryer, protect dryer at corridor, strap top plates at back wall 248-Dryer duct not allowed in 2x4 wall, top plate overbored at dryer, protect dryer at corridor 247-Repair stud at laundry, install truss bracing 244-Secure nm by corridor 243-Strap top plates at LBWs 242-Install stud shoe at laundry 239-Install stud shoe at laundry 238-Tape dead sace 237-Protect nm at island, stud shoe at laundry 236-stud shoe at laundry
THIRD FLOOR
Corrective Action Required
10/15/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved except as noted: 336-Complete DWV at party wall 337-Complete DWV at party wall 343-Provide truss repair 349-Install (3) stud shoe at corridor
FOURTH FLOOR
Corrective Action Required
10/15/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building J -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
10/15/2024
Interior framing ok all floors
Rated Assembly Inspection Partial 10/16/2024 10/16/2024 10/16/2024
STAIR TOWER 1
Corrective Action Required
10/15/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
10/15/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
10/15/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
10/15/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
10/15/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
10/15/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors
ELEVATOR 2
Corrective Action Required
10/15/2024
FIRST FLOOR
Corrective Action Required
10/15/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
SECOND FLOOR
Corrective Action Required
10/15/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st layer fire walls Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
THIRD FLOOR
Corrective Action Required
10/15/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
FOURTH FLOOR
Corrective Action Required
10/15/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
Rated Assembly Inspection Partial 10/17/2024 10/17/2024 10/17/2024
STAIR TOWER 1
Corrective Action Required
10/16/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
10/16/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
10/16/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
10/16/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
10/16/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
10/16/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors
ELEVATOR 2
Corrective Action Required
10/16/2024
FIRST FLOOR
Corrective Action Required
10/16/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock
SECOND FLOOR
Corrective Action Required
10/16/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st layer fire walls Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
THIRD FLOOR
Corrective Action Required
10/16/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
FOURTH FLOOR
Corrective Action Required
10/16/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
All Rough Inspection - Commercial Partial 10/17/2024 10/17/2024 10/17/2024
STAIR TOWER 1
Corrective Action Required
10/16/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
10/16/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
10/16/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
10/16/2024
Building J: -Balconies ok to cover
SECOND FLOOR
Corrective Action Required
10/16/2024
Building F: -Behind tubs and showers ok to cover -Deck framing ok to cover 249-Dryer duct not allowed in 2x4 wall, top plate overbored at dryer 248-Dryer duct not allowed in 2x4 wall, top plate overbored at dryer, 242-Install stud shoe at laundry 237-Protect nm at island Building J: -Balconies ok to cover
THIRD FLOOR
Corrective Action Required
10/16/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved except as noted: 349-Install (3) stud shoe at corridor Building J: -Balconies ok to cover
FOURTH FLOOR
Corrective Action Required
10/16/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building J -Behind tubs and showers ok to cover Building J: -Balconies ok to cover
ELEVATOR 1
Corrective Action Required
10/16/2024
Interior framing ok all floors
Rated Assembly Inspection Partial 10/21/2024 10/21/2024 10/21/2024
STAIR TOWER 1
Corrective Action Required
10/17/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
10/17/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
10/17/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
10/17/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
10/17/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
10/17/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors
ELEVATOR 2
Corrective Action Required
10/17/2024
FIRST FLOOR
Corrective Action Required
10/17/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock
SECOND FLOOR
Corrective Action Required
10/17/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st layer fire walls Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
THIRD FLOOR
Corrective Action Required
10/17/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
FOURTH FLOOR
Corrective Action Required
10/17/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
All Rough Inspection - Commercial Failed 10/21/2024 10/21/2024 10/21/2024
STAIR TOWER 1
Corrective Action Required
10/17/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
10/17/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
10/17/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
10/17/2024
Building F -Not ready Building J: -Balconies ok to cover
SECOND FLOOR
Corrective Action Required
10/17/2024
Building F: -Behind tubs and showers ok to cover -Deck framing ok to cover 249-Dryer duct not allowed in 2x4 wall, top plate overbored at dryer 248-Dryer duct not allowed in 2x4 wall, top plate overbored at dryer, 242-Install stud shoe at laundry 237-Protect nm at island Building J: -Balconies ok to cover
THIRD FLOOR
Corrective Action Required
10/17/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved except as noted: 349-Install (3) stud shoe at corridor Building J: -Balconies ok to cover
FOURTH FLOOR
Corrective Action Required
10/17/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building J -Behind tubs and showers ok to cover Building J: -Balconies ok to cover
ELEVATOR 1
Corrective Action Required
10/17/2024
Interior framing ok all floors
Rated Assembly Inspection Failed 10/22/2024 10/22/2024 10/22/2024
STAIR TOWER 1
Corrective Action Required
10/21/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
10/21/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
10/21/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
10/21/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
10/21/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
10/21/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors
ELEVATOR 2
Corrective Action Required
10/21/2024
FIRST FLOOR
Corrective Action Required
10/21/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock
SECOND FLOOR
Corrective Action Required
10/21/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st layer fire walls Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
THIRD FLOOR
Corrective Action Required
10/21/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls **RC not ready Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
FOURTH FLOOR
Corrective Action Required
10/21/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern not ready Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
All Rough Inspection - Commercial Partial 10/22/2024 10/22/2024 10/22/2024
STAIR TOWER 1
Corrective Action Required
10/21/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
10/21/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
10/21/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
10/21/2024
Building F *Provide fireproofing report for structural steel, Install joist hangers at corridor fur down and secure all electrical in joist space 157-NOT READY 389-Walls only ok 181-install anchor bolt at plate break, strap walls at chase and over garage door 168-Seal draft stop 186-Install anchor bolt at plate break Building J: -Balconies ok to cover
SECOND FLOOR
Corrective Action Required
10/21/2024
Building F: -Behind tubs and showers ok to cover -Deck framing ok to cover 249-Dryer duct not allowed in 2x4 wall, top plate overbored at dryer 248-Dryer duct not allowed in 2x4 wall, top plate overbored at dryer, 242-Install stud shoe at laundry 237-Protect nm at island Building J: -Balconies ok to cover
THIRD FLOOR
Corrective Action Required
10/21/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved except as noted: 349-Install (3) stud shoe at corridor Building J: -Balconies ok to cover
FOURTH FLOOR
Corrective Action Required
10/21/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building J -Behind tubs and showers ok to cover Building J: -Balconies ok to cover
ELEVATOR 1
Corrective Action Required
10/21/2024
Interior framing ok all floors
All Rough Inspection - Commercial Partial 10/23/2024 10/23/2024 10/23/2024
STAIR TOWER 1
Corrective Action Required
10/22/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
10/22/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
10/22/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
10/22/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building J: -Balconies ok to cover
SECOND FLOOR
Corrective Action Required
10/22/2024
Building F: Complete except as noted: 237-Protect nm at island Building J: -Balconies ok to cover
THIRD FLOOR
Corrective Action Required
10/22/2024
*Building F -Units and corridor approved except as noted: 349-Install (3) stud shoe at corridor Building J: -Balconies ok to cover
FOURTH FLOOR
Corrective Action Required
10/22/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building J -Behind tubs and showers ok to cover Building J: -Balconies ok to cover
ELEVATOR 1
Corrective Action Required
10/22/2024
Interior framing ok all floors
Rated Assembly Inspection Partial 10/23/2024 10/23/2024 10/23/2024
STAIR TOWER 1
Corrective Action Required
10/22/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
10/22/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
10/22/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
10/22/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
10/22/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
10/22/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors
ELEVATOR 2
Corrective Action Required
10/22/2024
FIRST FLOOR
Corrective Action Required
10/22/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock
SECOND FLOOR
Corrective Action Required
10/22/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st layer fire walls Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
THIRD FLOOR
Corrective Action Required
10/22/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls **RC at units and corridors Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
FOURTH FLOOR
Corrective Action Required
10/22/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
Rated Assembly Inspection Partial 10/24/2024 10/24/2024 10/24/2024
STAIR TOWER 1
Corrective Action Required
10/23/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
10/23/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
10/23/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
10/23/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
10/23/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
10/23/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors
ELEVATOR 2
Corrective Action Required
10/23/2024
FIRST FLOOR
Corrective Action Required
10/23/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock
SECOND FLOOR
Corrective Action Required
10/23/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st layer fire walls -RC at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
THIRD FLOOR
Corrective Action Required
10/23/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls **RC at units and corridors Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
FOURTH FLOOR
Corrective Action Required
10/23/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
All Rough Inspection - Commercial Partial 10/29/2024 10/29/2024 10/29/2024
STAIR TOWER 1
Corrective Action Required
10/23/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
10/23/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
10/23/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
10/23/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building J: -Balconies ok to cover
SECOND FLOOR
Corrective Action Required
10/23/2024
Building F: Complete except as noted: 237-Protect nm at island Building J: -Balconies ok to cover
THIRD FLOOR
Corrective Action Required
10/23/2024
*Building F -Units and corridor approved except as noted: 349-Install (3) stud shoe at corridor Building J: -Balconies ok to cover
FOURTH FLOOR
Corrective Action Required
10/23/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building G: -Behind tubs and showers ok *Building J -Behind tubs and showers ok to cover Building J: -Balconies ok to cover
ELEVATOR 1
Corrective Action Required
10/23/2024
Interior framing ok all floors
Rated Assembly Inspection Partial 10/30/2024 10/30/2024 10/30/2024
STAIR TOWER 1
Corrective Action Required
10/24/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
10/24/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
10/24/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
10/24/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
10/24/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
10/24/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors
ELEVATOR 2
Corrective Action Required
10/24/2024
1st layer at ceiling
FIRST FLOOR
Corrective Action Required
10/24/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 160,164,166 Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock
SECOND FLOOR
Corrective Action Required
10/24/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
THIRD FLOOR
Corrective Action Required
10/24/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
FOURTH FLOOR
Corrective Action Required
10/24/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
All Rough Inspection - Commercial Partial 10/30/2024 10/30/2024 10/30/2024
STAIR TOWER 1
Corrective Action Required
10/29/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
10/29/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
10/29/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
10/29/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building J: -Balconies ok to cover
SECOND FLOOR
Corrective Action Required
10/29/2024
Building F: Complete except as noted: 237-Protect nm at island Building J: -Balconies ok to cover
THIRD FLOOR
Corrective Action Required
10/29/2024
*Building F -Units and corridor approved except as noted: 349-Install (3) stud shoe at corridor Building J: -Balconies ok to cover
FOURTH FLOOR
Corrective Action Required
10/29/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building G: -Behind tubs and showers ok *Building J -Behind tubs and showers ok to cover Building J: -Balconies ok to cover
ELEVATOR 1
Corrective Action Required
10/29/2024
Interior framing ok all floors
Rated Assembly Inspection Partial 10/31/2024 10/31/2024 10/31/2024
STAIR TOWER 1
Corrective Action Required
10/30/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
10/30/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
10/30/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
10/30/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only floors 1-3 -1st layer at 4th floor
STAIR TOWER 5
Corrective Action Required
10/30/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
10/30/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors
ELEVATOR 2
Corrective Action Required
10/30/2024
1st layer and hat channel at ceiling 1st layer all floors interior
FIRST FLOOR
Corrective Action Required
10/30/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 160,164,166 Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock
SECOND FLOOR
Corrective Action Required
10/30/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
THIRD FLOOR
Corrective Action Required
10/30/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
FOURTH FLOOR
Corrective Action Required
10/30/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
All Rough Inspection - Commercial Partial 10/31/2024 10/31/2024 10/31/2024
STAIR TOWER 1
Corrective Action Required
10/30/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
10/30/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
10/30/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
10/30/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock Building J: -Balconies ok to cover
SECOND FLOOR
Corrective Action Required
10/30/2024
Building F: Complete except as noted: 237-Protect nm at island Building G: -Behind tubs and showers for pre rock Building J: -Balconies ok to cover
THIRD FLOOR
Corrective Action Required
10/30/2024
*Building F -Units and corridor approved except as noted: 349-Install (3) stud shoe at corridor Building G: -Behind tubs and showers for pre rock Building J: -Balconies ok to cover
FOURTH FLOOR
Corrective Action Required
10/30/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building G: -Behind tubs and showers ok *Building J -Behind tubs and showers ok to cover Building J: -Balconies ok to cover
ELEVATOR 1
Corrective Action Required
10/30/2024
Interior framing ok all floors
All Rough Inspection - Commercial Partial 11/1/2024 11/1/2024 11/01/2024
STAIR TOWER 1
Corrective Action Required
10/31/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
10/31/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
10/31/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
10/31/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
10/31/2024
Building F: Complete except as noted: 237-Protect nm at island Building G: -Behind tubs and showers for pre rock Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
10/31/2024
*Building F -Units and corridor approved except as noted: 349-Install (3) stud shoe at corridor Building G: -Behind tubs and showers for pre rock Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
10/31/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building G: -Behind tubs and showers ok Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
10/31/2024
Interior framing ok all floors
Rated Assembly Inspection Partial 11/4/2024 11/4/2024 11/04/2024
STAIR TOWER 1
Corrective Action Required
10/31/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
10/31/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
10/31/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
10/31/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only -1st layer all floors -1st layer at ceilng
STAIR TOWER 5
Corrective Action Required
10/31/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
10/31/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors
ELEVATOR 2
Corrective Action Required
10/31/2024
1st layer,2nd layer and hat channel at ceiling 1st and 2nd layer all floors interior
FIRST FLOOR
Corrective Action Required
10/31/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 160,164,166 Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock
SECOND FLOOR
Corrective Action Required
10/31/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
THIRD FLOOR
Corrective Action Required
10/31/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
FOURTH FLOOR
Corrective Action Required
10/31/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
Rated Assembly Inspection Partial 11/5/2024 11/5/2024 11/05/2024
STAIR TOWER 1
Corrective Action Required
11/04/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
11/04/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
11/04/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
11/04/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only -1st layer all floors -1st layer and hat channel at ceilng
STAIR TOWER 5
Corrective Action Required
11/04/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
11/04/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors -1st layer at unit side
ELEVATOR 2
Corrective Action Required
11/04/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior
FIRST FLOOR
Corrective Action Required
11/04/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock
SECOND FLOOR
Corrective Action Required
11/04/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
THIRD FLOOR
Corrective Action Required
11/04/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
FOURTH FLOOR
Corrective Action Required
11/04/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
All Rough Inspection - Commercial Partial 11/6/2024 11/6/2024 11/06/2024
STAIR TOWER 1
Corrective Action Required
11/01/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
11/01/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2
STAIR TOWER 3
Corrective Action Required
11/01/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
11/01/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
11/01/2024
Building F: Complete except as noted: 237-Protect nm at island Building G: -Behind tubs and showers for pre rock Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
11/01/2024
*Building F -Units and corridor approved except as noted: 349-Install (3) stud shoe at corridor Building G: -Behind tubs and showers for pre rock Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
11/01/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building G: -Behind tubs and showers ok Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
11/01/2024
Interior framing ok all floors
Rated Assembly Inspection Partial 11/6/2024 11/6/2024 11/06/2024
STAIR TOWER 1
Corrective Action Required
11/05/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
11/05/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
11/05/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
11/05/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only -1st layer all floors -1st ,2nd layer and hat channel at ceiling
STAIR TOWER 5
Corrective Action Required
11/05/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
11/05/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors -1st layer at unit side
ELEVATOR 2
Corrective Action Required
11/05/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior
FIRST FLOOR
Corrective Action Required
11/05/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock
SECOND FLOOR
Corrective Action Required
11/05/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
THIRD FLOOR
Corrective Action Required
11/05/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs Building H: -1st layer at truss spaces pre rock
FOURTH FLOOR
Corrective Action Required
11/05/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
Rated Assembly Inspection Partial 11/7/2024 11/7/2024 11/07/2024
STAIR TOWER 1
Corrective Action Required
11/06/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
11/06/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4 *ok for plywood on lower level stringer side
STAIR TOWER 3
Corrective Action Required
11/06/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
11/06/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only -1st layer all floors -1st ,2nd layer and hat channel at ceiling
STAIR TOWER 5
Corrective Action Required
11/06/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
11/06/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors -1st layer at unit side
ELEVATOR 2
Corrective Action Required
11/06/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior
FIRST FLOOR
Corrective Action Required
11/06/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock
SECOND FLOOR
Corrective Action Required
11/06/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
THIRD FLOOR
Corrective Action Required
11/06/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs Building H: -1st layer at truss spaces pre rock
FOURTH FLOOR
Corrective Action Required
11/06/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
Rated Assembly Inspection Partial 11/8/2024 11/8/2024 11/08/2024
STAIR TOWER 1
Corrective Action Required
11/07/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
11/07/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4 *ok for plywood on lower level stringer side
STAIR TOWER 3
Corrective Action Required
11/07/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
11/07/2024
Stair 4 in Building J: -1st and 2nd layer at stringer side only -1st layer all floors -1st ,2nd layer and hat channel at ceiling
STAIR TOWER 5
Corrective Action Required
11/07/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
11/07/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors -1st layer at unit side
ELEVATOR 2
Corrective Action Required
11/07/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior
FIRST FLOOR
Corrective Action Required
11/07/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern inspection for wall and ceiling, except at G157,G164,G166,S389. Install fire collars for penetrations in garages -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st and 2nd layer at truss spaces pre rock
SECOND FLOOR
Corrective Action Required
11/07/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only Building H: -1st layer at truss spaces pre rock
THIRD FLOOR
Corrective Action Required
11/07/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs Building H: -1st layer at truss spaces pre rock
FOURTH FLOOR
Corrective Action Required
11/07/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
Rated Assembly Inspection Partial 11/12/2024 11/12/2024 11/12/2024
STAIR TOWER 1
Corrective Action Required
11/08/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
11/08/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4 *ok for plywood on lower level stringer side
STAIR TOWER 3
Corrective Action Required
11/08/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
11/08/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
11/08/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
11/08/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors -1st layer at unit side
ELEVATOR 2
Corrective Action Required
11/08/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior
FIRST FLOOR
Corrective Action Required
11/08/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock
SECOND FLOOR
Corrective Action Required
11/08/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers Building H: -1st layer at truss spaces pre rock
THIRD FLOOR
Corrective Action Required
11/08/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building H: -1st layer at truss spaces pre rock Building J: -1st layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
11/08/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
Above Ceiling Inspection Partial 11/12/2024 11/12/2024 11/12/2024
Rated Assembly Inspection Partial 11/13/2024 11/13/2024 11/13/2024
STAIR TOWER 1
Corrective Action Required
11/12/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
11/12/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4 *ok for plywood on lower level stringer side
STAIR TOWER 3
Corrective Action Required
11/12/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
11/12/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
11/12/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
11/12/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors -1st layer at unit side
ELEVATOR 2
Corrective Action Required
11/12/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior
FIRST FLOOR
Corrective Action Required
11/12/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock
SECOND FLOOR
Corrective Action Required
11/12/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers Building H: -1st layer at truss spaces pre rock
THIRD FLOOR
Corrective Action Required
11/12/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building H: -1st layer at truss spaces pre rock Building J: -1st layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
11/12/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
Rated Assembly Inspection Partial 11/14/2024 11/14/2024 11/14/2024
STAIR TOWER 1
Corrective Action Required
11/13/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
11/13/2024
-Stair in building G -1st and 2nd layer behind stringer only floors 1-4
STAIR TOWER 3
Corrective Action Required
11/13/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
11/13/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
11/13/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
11/13/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors -1st layer at unit side
ELEVATOR 2
Corrective Action Required
11/13/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior
FIRST FLOOR
Corrective Action Required
11/13/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock
SECOND FLOOR
Corrective Action Required
11/13/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st layer at truss spaces pre rock
THIRD FLOOR
Corrective Action Required
11/13/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building H: -1st layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
11/13/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
All Rough Inspection - Commercial Partial 11/14/2024
STAIR TOWER 1
Corrective Action Required
11/06/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
11/06/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
11/06/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
11/06/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
11/06/2024
Building F: Complete except as noted: 237-Protect nm at island Building G: -Behind tubs and showers for pre rock Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
11/06/2024
*Building F -Units and corridor approved except as noted: 349-Install (3) stud shoe at corridor Building G: -Behind tubs and showers for pre rock Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
11/06/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building G: -Behind tubs and showers ok Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
11/06/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
11/14/2024
Elevator in G: Framing approved
All Rough Inspection - Commercial Partial 11/15/2024 11/15/2024 11/15/2024
STAIR TOWER 1
Corrective Action Required
11/14/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
11/14/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
11/14/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
11/14/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock Building H: -South side patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
11/14/2024
Building F: Complete except as noted: 237-Protect nm at island Building G: -Behind tubs and showers for pre rock Building H: -South side patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
11/14/2024
*Building F -Units and corridor approved except as noted: 349-Install (3) stud shoe at corridor Building G: -Behind tubs and showers for pre rock Building H: -South side patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
11/14/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building G: -Behind tubs and showers ok Building H: -South side patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
11/14/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
11/14/2024
Elevator in G: Framing approved
Rated Assembly Inspection Partial 11/15/2024 11/15/2024 11/15/2024
STAIR TOWER 1
Corrective Action Required
11/14/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
11/14/2024
-Stair in building G -1st and 2nd layer behind stringer all floors -1st layer all floors
STAIR TOWER 3
Corrective Action Required
11/14/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
11/14/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
11/14/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
11/14/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors -1st layer at unit side
ELEVATOR 2
Corrective Action Required
11/14/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior
FIRST FLOOR
Corrective Action Required
11/14/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
11/14/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st layer at truss spaces pre rock Building J: -1st layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
11/14/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building H: -1st layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
11/14/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
Rated Assembly Inspection Partial 11/18/2024 11/18/2024 11/18/2024
STAIR TOWER 1
Corrective Action Required
11/15/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
11/15/2024
-Stair in building G -1st and 2nd layer behind stringer all floors -1st layer all floors
STAIR TOWER 3
Corrective Action Required
11/15/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
11/15/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
11/15/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
11/15/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors -1st layer at unit side
ELEVATOR 2
Corrective Action Required
11/15/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior
FIRST FLOOR
Corrective Action Required
11/15/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
11/15/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st layer at truss spaces pre rock Building J: -1st layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
11/15/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building H: -1st layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
11/15/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
All Rough Inspection - Commercial Partial 11/18/2024 11/18/2024 11/18/2024
STAIR TOWER 1
Corrective Action Required
11/15/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
11/15/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
11/15/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
11/15/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock Building H: -South side patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
11/15/2024
Building F: Complete except as noted: 237-Protect nm at island Building G: -Behind tubs and showers for pre rock Building H: -South side patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
11/15/2024
*Building F -Units and corridor approved except as noted: 349-Install (3) stud shoe at corridor Building G: -Behind tubs and showers for pre rock Building H: -South side patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
11/15/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building G: -Behind tubs and showers ok Building H: -South side patios ok to cover -Behind tubs and showers ok Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
11/15/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
11/15/2024
Elevator in G: Framing approved
Rated Assembly Inspection Partial 11/19/2024 11/19/2024 11/19/2024
STAIR TOWER 1
Corrective Action Required
11/18/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
11/18/2024
-Stair in building G -1st and 2nd layer behind stringer all floors -1st layer all floors -1st layer at ceiling
STAIR TOWER 3
Corrective Action Required
11/18/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
11/18/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
11/18/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
11/18/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors -1st layer at unit side
ELEVATOR 2
Corrective Action Required
11/18/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st layer outside all floors -1st layer inside at 4th and 2nd
FIRST FLOOR
Corrective Action Required
11/18/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
11/18/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st layer at truss spaces pre rock Building J: -1st layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
11/18/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building H: -1st layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
11/18/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
All Rough Inspection - Commercial Partial 11/19/2024 11/19/2024 11/19/2024
STAIR TOWER 1
Corrective Action Required
11/18/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
11/18/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
11/18/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
11/18/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock Building H: -South side patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
11/18/2024
Building F: Complete except as noted: 237-Protect nm at island Building G: -Behind tubs and showers for pre rock Building H: -South side patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
11/18/2024
*Building F -Units and corridor approved except as noted: 349-Install (3) stud shoe at corridor Building G: -Behind tubs and showers for pre rock Building H: -South side patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
11/18/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building G: -Behind tubs and showers o 423-Install truss hold down in back corner 424-ok 425-ok 426-missing h2.5 at double truss 428-ok 429-seal draft stop 432-Strap over bored top plates at LBWs -Support DWV and storm in corridor 434-Tighten hold down device, seal firewall penetration, strap LBWs 435-Complete mechanical, firecaulk dryer duct to exterior, support duct to bath fans, strap LBWs, seal draft stop, tighten hold down device Building H: -South side patios ok to cover -Behind tubs and showers ok Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
11/18/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
11/18/2024
Elevator in G: Framing approved
Rated Assembly Inspection Partial 11/20/2024 11/20/2024 11/20/2024
STAIR TOWER 1
Corrective Action Required
11/19/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
11/19/2024
-Stair in building G -1st and 2nd layer behind stringer all floors -1st layer all floors -1st layer and RC at ceiling
STAIR TOWER 3
Corrective Action Required
11/19/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
11/19/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
11/19/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
11/19/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors -1st layer at unit side
ELEVATOR 2
Corrective Action Required
11/19/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st layer outside all floors -1st layer inside at 4th and 2nd
FIRST FLOOR
Corrective Action Required
11/19/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
11/19/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
11/19/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building H: -1st layer at truss spaces pre rock Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
11/19/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 Building H: -1st and 2nd layer at truss spaces pre rock -1st layer behind tubs and showers Building J: -1st and 2nd layer behind tubs and showers
All Rough Inspection - Commercial Partial 11/20/2024 11/20/2024 11/20/2024
STAIR TOWER 1
Corrective Action Required
11/19/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
11/19/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
11/19/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
11/19/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock Building H: -South side patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
11/19/2024
Building F: Complete except as noted: 237-Protect nm at island Building G: -Behind tubs and showers for pre rock Building H: -South side patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
11/19/2024
*Building F -Units and corridor approved except as noted: 349-Install (3) stud shoe at corridor Building G: -Behind tubs and showers for pre rock Building H: -South side patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
11/19/2024
*Building F -Behind tubs and showers ok to cover -Deck framing ok to cover -Units and corridor approved *Building G: -Behind tubs and showers ok 434-Tighten hold down device 435-tighten hold down device Building H: -South side patios ok to cover -Behind tubs and showers ok Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
11/19/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
11/19/2024
Elevator in G: Framing approved
Rated Assembly Inspection Partial 11/21/2024 11/21/2024 11/21/2024
STAIR TOWER 1
Corrective Action Required
11/20/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
11/20/2024
-Stair in building G -1st and 2nd layer behind stringer all floors -1st layer all floors -1st and 2nd layer and RC at ceiling
STAIR TOWER 3
Corrective Action Required
11/20/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
11/20/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
11/20/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
11/20/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors -1st layer at unit side
ELEVATOR 2
Corrective Action Required
11/20/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st layer outside all floors -1st layer inside at 4th and 2nd
FIRST FLOOR
Corrective Action Required
11/20/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock -1st layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
11/20/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st layer at truss spaces pre rock -1st layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
11/20/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building H: -1st layer at truss spaces pre rock -1st layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
11/20/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 Building H: -1st and 2nd layer at truss spaces pre rock -1st layer behind tubs and showers -1st layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
All Rough Inspection - Commercial Partial 11/21/2024 11/21/2024 11/21/2024
STAIR TOWER 1
Corrective Action Required
11/20/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
11/20/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
11/20/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
11/20/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock Building H: -patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
11/20/2024
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock Building H: -patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
11/20/2024
*Building F -Units and corridor approved Building G: -Behind tubs and showers for pre rock Building H: -patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
11/20/2024
*Building F -Units and corridor approved *Building G: Units and corridor complete Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
11/20/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
11/20/2024
Elevator in G: Framing approved
Rated Assembly Inspection Partial 11/22/2024 11/22/2024 11/22/2024
STAIR TOWER 1
Corrective Action Required
11/21/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
11/21/2024
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
11/21/2024
Stair 3 in Building J (J2)
STAIR TOWER 4
Corrective Action Required
11/21/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
11/21/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
11/21/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -Hat channel at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side
ELEVATOR 2
Corrective Action Required
11/21/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st layer inside at 4th and 2nd
FIRST FLOOR
Corrective Action Required
11/21/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
11/21/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
11/21/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
11/21/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
All Rough Inspection - Commercial Partial 11/22/2024 11/22/2024 11/22/2024
STAIR TOWER 1
Corrective Action Required
11/21/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
11/21/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
11/21/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
11/21/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock Building H: -patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
11/21/2024
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock Building H: -patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
11/21/2024
*Building F -Units and corridor approved Building G: -Behind tubs and showers for pre rock -Complete HVAC at firewall 323-Missing hanger nails at beam 324-Seal dead space, strap top plates at column, fireblock mechanical, correct hanger at beam 328-Complete electrical at bath fan 329-Secure SER by panel, install truss bracing Building H: -patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
11/21/2024
*Building F -Units and corridor approved *Building G: Units and corridor complete Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
11/21/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
11/21/2024
Elevator in G: Framing approved
Rated Assembly Inspection Partial 11/25/2024 11/25/2024 11/25/2024
STAIR TOWER 1
Corrective Action Required
11/22/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
11/22/2024
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
11/22/2024
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
11/22/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
11/22/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
11/22/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side
ELEVATOR 2
Corrective Action Required
11/22/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st layer inside at 4th and 2nd
FIRST FLOOR
Corrective Action Required
11/22/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
11/22/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
11/22/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
11/22/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
11/25/2024
-1st layer at (3) interior walls -1st, hat channel and 2nd layer at ceiling
All Rough Inspection - Commercial Partial 11/25/2024 11/25/2024 11/25/2024
STAIR TOWER 1
Corrective Action Required
11/22/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
11/22/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
11/22/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
11/22/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock Building H: -patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
11/22/2024
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock Building H: -patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
11/22/2024
*Building F -Units and corridor approved Building G: -Behind tubs and showers for pre rock -Complete HVAC at firewall 323-Missing hanger nails at beam 324-Seal dead space Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
11/22/2024
*Building F -Units and corridor approved *Building G: Units and corridor complete Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
11/22/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
11/22/2024
Elevator in G: Framing approved
All Rough Inspection - Commercial Partial 11/26/2024 11/26/2024 11/26/2024
STAIR TOWER 1
Corrective Action Required
11/25/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
11/25/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
11/25/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
11/25/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
11/25/2024
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
11/25/2024
*Building F -Units and corridor approved Building G: -Behind tubs and showers for pre rock -Complete HVAC at firewall 323-Missing hanger nails at beam 324-Seal dead space Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
11/25/2024
*Building F -Units and corridor approved *Building G: Units and corridor complete Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
11/25/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
11/25/2024
Elevator in G: Framing approved
Rated Assembly Inspection Partial 11/27/2024 11/27/2024 11/27/2024
STAIR TOWER 1
Corrective Action Required
11/25/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
11/25/2024
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
11/25/2024
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
11/25/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
11/25/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
11/25/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side
ELEVATOR 2
Corrective Action Required
11/25/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
11/25/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
11/25/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
11/25/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
11/25/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
11/25/2024
-1st layer at (3) interior walls -1st, hat channel and 2nd layer at ceiling
Rated Assembly Inspection Partial 12/2/2024 12/2/2024 12/02/2024
STAIR TOWER 1
Corrective Action Required
11/27/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
11/27/2024
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
11/27/2024
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
11/27/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
11/27/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
11/27/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side
ELEVATOR 2
Corrective Action Required
11/27/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
11/27/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
11/27/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
11/27/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
11/27/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
11/27/2024
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
All Rough Inspection - Commercial Partial 12/2/2024 12/2/2024 12/02/2024
STAIR TOWER 1
Corrective Action Required
11/26/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
11/26/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
11/26/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
11/26/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
11/26/2024
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock Corridor- Strap overbored corridor wall outside of 223, install draftstop max 1000 sq feet 223-Complete dryer vent, seal penetrations 224-Secure nm by corridor, replace crushed ductwork, complete chase wall and fireblocking at riser, nail corners 225-complete truss bracing per plan 226-complete truss bracing per plan 227-Secure SER cables, truss bracing 228-Strap overbored top plates at LBW 229-Secure nm at corridor, install putty packs at party wall 230-Fireblock dead space, protect dryer box at corridor 232-complete all bath vents, seal penetration and protect dryer duct, nail corners, truss bracing 234-Seal penetration at corridor, complete bath fans and dryer exhaust 235-Secure nm at range, tighten hold down device, complete all exhaust fans, seal firewall, support SER cables at firewall and throughout, seal penetrations at bathroom Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
11/26/2024
*Building F -Units and corridor approved Building G: -Behind tubs and showers for pre rock -Complete HVAC at firewall 323-Missing hanger nails at beam Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
11/26/2024
*Building F -Units and corridor approved *Building G: Units and corridor complete Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
11/26/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
11/26/2024
Elevator in G: Framing approved
All Rough Inspection - Commercial Partial 12/3/2024 12/3/2024 12/03/2024
STAIR TOWER 1
Corrective Action Required
12/02/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
12/02/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
12/02/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
12/02/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
12/02/2024
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock Corridor- Strap overbored corridor wall outside of 223, install draftstop max 1000 sq feet 223-Complete dryer vent, seal penetrations 224-Secure nm by corridor, replace crushed ductwork, complete chase wall and fireblocking at riser, nail corners 225-complete truss bracing per plan 226-complete truss bracing per plan 227-Secure SER cables, truss bracing 228-Strap overbored top plates at LBW 229-Secure nm at corridor, install putty packs at party wall 230-Fireblock dead space, protect dryer box at corridor 232-complete all bath vents, seal penetration and protect dryer duct, nail corners, truss bracing 234-Seal penetration at corridor, complete bath fans and dryer exhaust 235-Secure nm at range, tighten hold down device, complete all exhaust fans, seal firewall, support SER cables at firewall and throughout, seal penetrations at bathroom Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
12/02/2024
*Building F -Units and corridor approved Building G: -Behind tubs and showers for pre rock -Complete HVAC at firewall 323-Missing hanger nails at beam Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
12/02/2024
*Building F -Units and corridor approved *Building G: Units and corridor complete Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
12/02/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
12/02/2024
Elevator in G: Framing approved
All Rough Inspection - Commercial Partial 12/03/2024
STAIR TOWER 1
Corrective Action Required
12/03/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
12/03/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
12/03/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
12/03/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock -Balconies ok to cover Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
12/03/2024
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock -Balconies ok to cover Corridor- Strap overbored corridor wall outside of 223, install draftstop max 1000 sq feet 223-Complete dryer vent, seal penetrations 224-Secure nm by corridor, replace crushed ductwork, complete chase wall and fireblocking at riser, nail corners 225-complete truss bracing per plan 226-complete truss bracing per plan 227-Secure SER cables, truss bracing 228-Strap overbored top plates at LBW 229-Secure nm at corridor, install putty packs at party wall 230-Fireblock dead space, protect dryer box at corridor 232-complete all bath vents, seal penetration and protect dryer duct, nail corners, truss bracing 234-Seal penetration at corridor, complete bath fans and dryer exhaust 235-Secure nm at range, tighten hold down device, complete all exhaust fans, seal firewall, support SER cables at firewall and throughout, seal penetrations at bathroom Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
12/03/2024
*Building F -Units and corridor approved Building G: -Behind tubs and showers for pre rock -Complete HVAC at firewall -Balconies ok to cover Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
12/03/2024
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
12/03/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
12/03/2024
Elevator in G: Framing approved
Rated Assembly Inspection Partial 12/3/2024 12/3/2024 12/03/2024
STAIR TOWER 1
Corrective Action Required
12/02/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
12/02/2024
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
12/02/2024
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
12/02/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
12/02/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
12/02/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side
ELEVATOR 2
Corrective Action Required
12/02/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
12/02/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
12/02/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
12/02/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
12/02/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
12/02/2024
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
Rated Assembly Inspection Partial 12/4/2024 12/4/2024 12/04/2024
STAIR TOWER 1
Corrective Action Required
12/03/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
12/03/2024
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
12/03/2024
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
12/03/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
12/03/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
12/03/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
12/03/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
12/03/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
12/03/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
12/03/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
12/03/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
12/03/2024
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
All Rough Inspection - Commercial Partial 12/4/2024 12/4/2024 12/04/2024
STAIR TOWER 1
Corrective Action Required
12/03/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
12/03/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
12/03/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
12/03/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock -Balconies ok to cover Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
12/03/2024
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock -Balconies ok to cover Corridor- Strap overbored corridor wall outside of 223, install draftstop max 1000 sq feet 223-Complete dryer vent, seal penetrations 224-Secure nm by corridor, replace crushed ductwork, complete chase wall and fireblocking at riser, nail corners 225-complete truss bracing per plan 226-complete truss bracing per plan 227-Secure SER cables, truss bracing 228-Strap overbored top plates at LBW 229-Secure nm at corridor, install putty packs at party wall 230-Fireblock dead space, protect dryer box at corridor 232-complete all bath vents, seal penetration and protect dryer duct, nail corners, truss bracing 234-Seal penetration at corridor, complete bath fans and dryer exhaust 235-Secure nm at range, tighten hold down device, complete all exhaust fans, seal firewall, support SER cables at firewall and throughout, seal penetrations at bathroom Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
12/03/2024
*Building F -Units and corridor approved Building G: -Behind tubs and showers for pre rock -Complete HVAC at firewall -Balconies ok to cover Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
12/03/2024
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
12/03/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
12/03/2024
Elevator in G: Framing approved
Electrical Service Inspection Failed 12/5/2024 1/13/2025 12/05/2024
Misc
Corrective Action Required
10/16/2023
**Must obtain separate permit for temp power
All Rough Inspection - Commercial Partial 12/5/2024 12/5/2024 12/05/2024
STAIR TOWER 1
Corrective Action Required
12/04/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
12/04/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
12/04/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
12/04/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock -Balconies ok to cover Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
12/04/2024
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock -Balconies ok to cover Corridor- Strap overbored corridor wall outside of 223, install draftstop max 1000 sq feet-seal gaps 223-Complete dryer vent, seal penetrations 224-complete chase wall and fireblocking at riser 230-protect dryer box at corridor 234-Seal penetration at corridor 235-Protect dryer box Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
12/04/2024
*Building F -Units and corridor approved Building G: -Behind tubs and showers for pre rock -Complete HVAC at firewall -Balconies ok to cover Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
12/04/2024
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
12/04/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
12/04/2024
Elevator in G: Framing approved
Electrical Service Inspection Partial 12/6/2024 12/6/2024 12/06/2024
Misc
Informational
12/06/2024
Partial Only: -Service at building F labeled "2-F (4) of (4)". 1600 amp disconnect for (34) units and 400 amp HP approved.
Electrical Service Inspection Partial 12/06/2024
Misc
Informational
12/06/2024
Partial Only: -Service at building F labeled "2-F (4) of (4)". 1600 amp disconnect for (34) units and 400 amp HP approved.
All Rough Inspection - Commercial Partial 12/10/2024 12/10/2024 12/10/2024
STAIR TOWER 1
Corrective Action Required
12/05/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
12/05/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
12/05/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
12/05/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock -Balconies ok to cover Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
12/05/2024
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock -Balconies ok to cover 224-complete chase wall and fireblocking at riser Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
12/05/2024
*Building F -Units and corridor approved Building G: -Behind tubs and showers for pre rock -Complete HVAC at firewall -Balconies ok to cover Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
12/05/2024
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
12/05/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
12/05/2024
Elevator in G: Framing approved
Rated Assembly Inspection Partial 12/10/2024 12/10/2024 12/10/2024
STAIR TOWER 1
Corrective Action Required
12/04/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
12/04/2024
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
12/04/2024
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
12/04/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
12/04/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
12/04/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
12/04/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
12/04/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
12/04/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
12/04/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws -RC at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
12/04/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
12/04/2024
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
Rated Assembly Inspection Partial 12/11/2024 12/11/2024 12/11/2024
STAIR TOWER 1
Corrective Action Required
12/10/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
12/10/2024
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
12/10/2024
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
12/10/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
12/10/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
12/10/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
12/10/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
12/10/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
12/10/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
12/10/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws -RC at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
12/10/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
12/10/2024
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
All Rough Inspection - Commercial Partial 12/11/2024 12/11/2024 12/11/2024
STAIR TOWER 1
Corrective Action Required
12/10/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
12/10/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
12/10/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
12/10/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock -Balconies ok to cover -Complete HVAC at firewall in corridor 149-Seal draft stop 2142-Bocca plates and seal penetrations at DWV, Seal dead spaces, strap load bearing walls, draft stop vertical at 10' oc, nail corners 421 and 422 not ready Mechanical closet-walls only ok to cover Maintenance garage- have engineer provide correction for (3) joist to beam where hanger is not connected Basement:- -Seal draft stops between garages, complete chase walls, furdowns and fireblocking Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
12/10/2024
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock -Balconies ok to cover 224-complete chase wall and fireblocking at riser Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
12/10/2024
*Building F -Units and corridor approved Building G: -Behind tubs and showers for pre rock -Complete HVAC at firewall -Balconies ok to cover Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
12/10/2024
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
12/10/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
12/10/2024
Elevator in G: Framing approved
Rated Assembly Inspection Partial 12/12/2024 12/12/2024 12/12/2024
STAIR TOWER 1
Corrective Action Required
12/11/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
12/11/2024
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
12/11/2024
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
12/11/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
12/11/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
12/11/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
12/11/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
12/11/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except 166 -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
12/11/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
12/11/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws -RC at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
12/11/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
12/11/2024
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
All Rough Inspection - Commercial Partial 12/12/2024 12/12/2024 12/12/2024
STAIR TOWER 1
Corrective Action Required
12/11/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
12/11/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
12/11/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
12/11/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock -Balconies ok to cover -Complete HVAC at firewall in corridor 149-Seal draft stop 2142-Bocca plates and seal penetrations at DWV, Seal dead spaces, strap load bearing walls, draft stop vertical at 10' oc, nail corners 421 and 422 not ready Mechanical closet-walls only ok to cover Maintenance garage- have engineer provide correction for (3) joist to beam where hanger is not connected Basement:- -Seal draft stops between garages, complete chase walls, furdowns and fireblocking Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
12/11/2024
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock -Balconies ok to cover 224-complete chase wall and fireblocking at riser Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
12/11/2024
*Building F -Units and corridor approved Building G: -Behind tubs and showers for pre rock -Complete HVAC at firewall -Balconies ok to cover Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
12/11/2024
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
12/11/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
12/11/2024
Elevator in G: Framing approved
Rated Assembly Inspection Partial 12/13/2024 12/13/2024 12/13/2024
STAIR TOWER 1
Corrective Action Required
12/12/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
12/12/2024
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
12/12/2024
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
12/12/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
12/12/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
12/12/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
12/12/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
12/12/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
12/12/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -RC at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
12/12/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws -RC at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
12/12/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
12/12/2024
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
All Rough Inspection - Commercial Partial 12/13/2024 12/13/2024 12/13/2024
STAIR TOWER 1
Corrective Action Required
12/12/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
12/12/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
12/12/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
12/12/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock -Balconies ok to cover -Complete HVAC at firewall in corridor 421 and 422 not ready Mechanical closet-walls only ok to cover Maintenance garage- have engineer provide correction for (3) joist to beam where hanger is not connected Basement:- -Seal draft stops between garages, complete chase walls, furdowns and fireblocking Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
12/12/2024
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock -Balconies ok to cover 224-complete chase wall and fireblocking at riser Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
12/12/2024
*Building F -Units and corridor approved Building G: -Behind tubs and showers for pre rock -Complete HVAC at firewall -Balconies ok to cover Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
12/12/2024
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
12/12/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
12/12/2024
Elevator in G: Framing approved
Rated Assembly Inspection Partial 12/17/2024 12/17/2024 12/17/2024
STAIR TOWER 1
Corrective Action Required
12/13/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
12/13/2024
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
12/13/2024
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
12/13/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
12/13/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
12/13/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
12/13/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
12/13/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
12/13/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st layer at 2 hour walls Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
12/13/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws -RC at units and corridor -Screw pattern at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
12/13/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
12/13/2024
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
Rated Assembly Inspection Partial 12/18/2024 12/18/2024 12/18/2024
STAIR TOWER 1
Corrective Action Required
12/17/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
12/17/2024
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
12/17/2024
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
12/17/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
12/17/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
12/17/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
12/17/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
12/17/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
12/17/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
12/17/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws -RC at units and corridor -Screw pattern at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
12/17/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
12/17/2024
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
Rated Assembly Inspection Partial 12/19/2024 12/19/2024 12/19/2024
STAIR TOWER 1
Corrective Action Required
12/18/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
12/18/2024
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
12/18/2024
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
12/18/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
12/18/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
12/18/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
12/18/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
12/18/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
SECOND FLOOR
Corrective Action Required
12/18/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
12/18/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws -RC at units and corridor -Screw pattern at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
12/18/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
12/18/2024
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
All Rough Inspection - Commercial Partial 12/19/2024 12/19/2024 12/19/2024
STAIR TOWER 1
Corrective Action Required
12/13/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
12/13/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
12/13/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
12/13/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock -Balconies ok to cover -Complete HVAC at firewall in corridor 421 and 422 not ready Mechanical closet-walls only ok to cover Basement:- -Seal draft stops between garages, complete chase walls, furdowns and fireblocking Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
12/13/2024
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock -Balconies ok to cover Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
12/13/2024
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
12/13/2024
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
12/13/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
12/13/2024
Elevator in G: Framing approved
Rated Assembly Inspection Partial 12/20/2024 12/20/2024 12/20/2024
STAIR TOWER 1
Corrective Action Required
12/19/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
12/19/2024
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
12/19/2024
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
12/19/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
12/19/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
12/19/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
12/19/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
12/19/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
12/19/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
12/19/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws -RC at units and corridor -Screw pattern at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
12/19/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
12/19/2024
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
Rated Assembly Inspection Partial 12/23/2024 12/23/2024 12/23/2024
STAIR TOWER 1
Corrective Action Required
12/20/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
12/20/2024
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
12/20/2024
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
12/20/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
12/20/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
12/20/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
12/20/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
12/20/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
12/20/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
12/20/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws -RC at units and corridor -Screw pattern at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
12/20/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
12/20/2024
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
All Rough Inspection - Commercial Partial 12/23/2024
STAIR TOWER 1
Corrective Action Required
12/19/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
12/19/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
12/19/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
12/19/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock -Balconies ok to cover 421 and 422 not ready Mechanical closet-walls only ok to cover Basement:- -Seal draft stops between garages, complete chase walls, furdowns and fireblocking Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
12/19/2024
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock -Balconies ok to cover Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
12/19/2024
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
12/19/2024
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
12/19/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
12/19/2024
Elevator in G: Framing approved
Rated Assembly Inspection Partial 12/30/2024
STAIR TOWER 1
Corrective Action Required
12/23/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
12/23/2024
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
12/23/2024
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
12/23/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
12/23/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
12/23/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
12/23/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
12/23/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
12/23/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
12/23/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws -RC at units and corridor -Screw pattern at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
12/23/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
12/23/2024
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
Rated Assembly Inspection Partial 1/2/2025 1/2/2025 01/02/2025
STAIR TOWER 1
Corrective Action Required
12/30/2024
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
12/30/2024
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
12/30/2024
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
12/30/2024
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
12/30/2024
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
12/30/2024
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
12/30/2024
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
12/30/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
12/30/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
12/30/2024
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws -RC at units and corridor -Screw pattern at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
12/30/2024
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st layer at 2 hour walls Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
12/30/2024
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
All Rough Inspection - Commercial Partial 1/3/2025 1/3/2025 01/03/2025
STAIR TOWER 1
Corrective Action Required
12/23/2024
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
12/23/2024
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
12/23/2024
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
12/23/2024
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock -Balconies ok to cover 421 and 422 not ready Mechanical closet-walls only ok to cover Basement:- -Seal draft stops between garages, complete chase walls, furdowns and fireblocking Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
12/23/2024
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock -Balconies ok to cover Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
12/23/2024
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -patios ok to cover -Behind tubs and showers ok to cover Units and corridor approved except as noted: 314-Secure SER Protect nm 6" above the floor at islands throughout Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
12/23/2024
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
12/23/2024
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
12/23/2024
Elevator in G: Framing approved
All Rough Inspection - Commercial Partial 1/8/2025 1/8/2025 01/08/2025
STAIR TOWER 1
Corrective Action Required
01/03/2025
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
01/03/2025
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
01/03/2025
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
01/03/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock -Balconies ok to cover 421 and 422 not ready Mechanical closet-walls only ok to cover Basement:- -Seal draft stops between garages, complete chase walls, furdowns and fireblocking Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
01/03/2025
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock -Balconies ok to cover Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
01/03/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -patios ok to cover -Behind tubs and showers ok to cover Units and corridor approved except as noted: 314-Secure SER Protect nm 6" above the floor at islands throughout Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
01/03/2025
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
01/03/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
01/03/2025
Elevator in G: Framing approved
Rated Assembly Inspection Partial 1/8/2025 1/8/2025 01/08/2025
STAIR TOWER 1
Corrective Action Required
01/02/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
01/02/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
01/02/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
01/02/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
01/02/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
01/02/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
01/02/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
01/02/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layers at firewalls Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
01/02/2025
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
01/02/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws -RC at units and corridor -Screw pattern at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
01/02/2025
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st layer at 2 hour walls Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
01/02/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
Electrical Service Inspection Partial 12/23/2024 1/13/2025 01/13/2025
Misc
Informational
12/06/2024
Partial Only: -Service at building F labeled "2-H, 2 of 4" 1000 amp disconnect for (30) units
Rated Assembly Inspection Partial 1/13/2025 1/13/2025 01/13/2025
STAIR TOWER 1
Corrective Action Required
01/08/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
01/08/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
01/08/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
01/08/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
01/08/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
01/08/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
01/08/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
01/08/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layers at firewalls Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
01/08/2025
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
01/08/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws -RC at units and corridor -Screw pattern at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer at firewalls and shear walls -RC at units and corridor Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
01/08/2025
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridor Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
01/08/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
All Rough Inspection - Commercial Partial 1/13/2025 1/13/2025 01/13/2025
STAIR TOWER 1
Corrective Action Required
01/08/2025
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
01/08/2025
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
01/08/2025
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
01/08/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: -Behind tubs and showers for pre rock -Balconies ok to cover 421 and 422 not ready Mechanical closet-walls only ok to cover Basement:- -Seal draft stops between garages, complete chase walls, furdowns and fireblocking Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
01/08/2025
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock -Balconies ok to cover Building H: -patios ok to cover -Behind tubs and showers ok to cover In corridor-support and secure SER cables throughout, seal draft stops and 2 hour walls 221-Support and secure SER cables, seal penetrations 222-Install fire collar at dead space 220-Strap corridor wall at line set, support/ secure ser cables 216-Protect dryer box at party wall Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
01/08/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
01/08/2025
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
01/08/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
01/08/2025
Elevator in G: Framing approved
Electrical Service Inspection Partial 5/29/2025 5/29/2025 01/13/2025
Misc
Informational
01/13/2025
Partial Only: -Service at building H labeled "2-H, 2 of 4" 1000 amp disconnect for (30) units
Rated Assembly Inspection Partial 1/14/2025 1/14/2025 01/14/2025
STAIR TOWER 1
Corrective Action Required
01/13/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
01/13/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
01/13/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
01/13/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
01/13/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
01/13/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
01/13/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
01/13/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layers at firewalls Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
01/13/2025
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs - 2nd layer fire tape and mud at top plate of fire walls Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
01/13/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws -RC at units and corridor -Screw pattern at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer at firewalls and shear walls - 2nd layer fire tap and mud top plate at fire walls -RC at units and corridor Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
01/13/2025
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridor Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
01/13/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
All Rough Inspection - Commercial Partial 1/14/2025 1/14/2025 01/14/2025
STAIR TOWER 1
Corrective Action Required
01/13/2025
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
01/13/2025
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
01/13/2025
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
01/13/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: - Seal ceiling penitrations in mechanical room at line set throughput -Behind tubs and showers for pre rock -Balconies ok to cover - Inspected 4 soffit fur outs - 118 fire caulk top plate penitrations at tension rods 421 and 422 not ready Mechanical closet-walls only ok to cover Basement:- -Seal draft stops between garages, complete chase walls, furdowns and fireblocking Building H: -patios ok to cover -Behind tubs and showers ok to cover Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
01/13/2025
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock -Balconies ok to cover - Fire caulk DWV in coridor near 217 Building H: -patios ok to cover -Behind tubs and showers ok to cover In corridor-support and secure SER cables throughout, seal draft stops and 2 hour walls 221-Support and secure SER cables, seal penetrations 222-Install fire collar at dead space 220-Strap corridor wall at line set, support/ secure ser cables 216-Protect dryer box at party wall Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
01/13/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
01/13/2025
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
01/13/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
01/13/2025
Elevator in G: Framing approved
All Rough Inspection - Commercial Partial 1/15/2025 1/15/2025 01/15/2025
STAIR TOWER 1
Corrective Action Required
01/14/2025
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
01/14/2025
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
01/14/2025
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
01/14/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: - Seal ceiling penitrations in mechanical room at line set throughput -Behind tubs and showers for pre rock -Balconies ok to cover - Inspected 4 soffit fur outs - 118 fire caulk top plate penitrations at tension rods 421 and 422 not ready Mechanical closet-walls only ok to cover Basement:- -Seal draft stops between garages, complete chase walls, furdowns and fireblocking Building H: -patios ok to cover -Behind tubs and showers ok to cover 139-Seal draftstop, ilnstall anchor at plate break 114-Strap top plate and protect dryer duct 116-Strap top plate above panel, replace broken box by dryer 120-Add studs under joist in party wall where studs are over bored 147-Seal draft stop Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
01/14/2025
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock -Balconies ok to cover - Fire caulk DWV in coridor near 217 Building H: Units and corridor complete Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
01/14/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
01/14/2025
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
01/14/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
01/14/2025
Elevator in G: Framing approved
All Rough Inspection - Commercial Partial 1/16/2025 1/16/2025 01/16/2025
STAIR TOWER 1
Corrective Action Required
01/15/2025
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
01/15/2025
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
01/15/2025
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
01/15/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: - Seal ceiling penitrations in mechanical room at line set throughput -Behind tubs and showers for pre rock -Balconies ok to cover - Inspected 4 soffit fur outs - 118 fire caulk top plate penitrations at tension rods 421 and 422 not ready Mechanical closet-walls only ok to cover Basement:- -Seal draft stops between garages, complete chase walls, furdowns and fireblocking Building H: -patios ok to cover -Behind tubs and showers ok to cover 139-ilnstall anchor at plate break 114-Strap top plate and protect dryer duct 116-Strap top plate above panel, replace broken box by dryer 120-Add studs under joist in party wall where studs are over bored Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
01/15/2025
Building F: Complete except as noted: -Units and corridor complete Building G: -Behind tubs and showers for pre rock -Balconies ok to cover - Fire caulk DWV in coridor near 217 Building H: Units and corridor complete Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
01/15/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
01/15/2025
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
01/15/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
01/15/2025
Elevator in G: Framing approved
Rated Assembly Inspection Partial 1/16/2025 1/16/2025 01/16/2025
STAIR TOWER 1
Corrective Action Required
01/14/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
01/14/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
01/14/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
01/14/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
01/14/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
01/14/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
01/14/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
01/14/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layers at firewalls Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
01/14/2025
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs - 2nd layer fire tape and mud at top plate of fire walls Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
01/14/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws -RC at units and corridor -Screw pattern at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer at firewalls and shear walls - 2nd layer fire tap and mud top plate at fire walls -RC at units and corridor Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
01/14/2025
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridor Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
01/14/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
All Rough Inspection - Commercial Partial 1/17/2025 1/17/2025 01/17/2025
STAIR TOWER 1
Corrective Action Required
01/16/2025
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
01/16/2025
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
01/16/2025
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
01/16/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: - Seal ceiling penitrations in mechanical room at line set throughput -Behind tubs and showers for pre rock -Balconies ok to cover - Inspected 4 soffit fur outs - 118 fire caulk top plate penitrations at tension rods 421 and 422 not ready Mechanical closet-walls only ok to cover Building H: 114-Strap top plate and protect dryer duct 116-Strap top plate above panel, replace broken box by dryer Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
01/16/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
01/16/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
01/16/2025
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
01/16/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
01/16/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
01/17/2025
Throughout: -Support all DWV 48" oc -Support all SER cables through draft strops each side -Seal all dead spaces Riser Rooms- Seal vertical draft stop Corridor-Missing alarm box by Stairwell 252-Strap exterior corner 279-Missing vertical draft stop 10' oc Stair J: -Fireblock top of fur out walls in basement
Rated Assembly Inspection Partial 1/17/2025 1/17/2025 01/17/2025
STAIR TOWER 1
Corrective Action Required
01/16/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
01/16/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
01/16/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
01/16/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
01/16/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
01/16/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
01/16/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
01/16/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layers at firewalls Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
01/16/2025
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs - 2nd layer fire tape and mud at top plate of fire walls Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
01/16/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws -RC at units and corridor -Screw pattern at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer at firewalls and shear walls - 2nd layer fire tap and mud top plate at fire walls -RC at units and corridor Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
01/16/2025
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridor Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
01/16/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
Rated Assembly Inspection Partial 1/21/2025 1/21/2025 01/21/2025
STAIR TOWER 1
Corrective Action Required
01/17/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
01/17/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
01/17/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
01/17/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
01/17/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
01/17/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
01/17/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
01/17/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layers at firewalls Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
01/17/2025
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building G: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer behind tubs and showers -1st and 2nd layer fire walls -RC at units and corridor -Screw pattern at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs - 2nd layer fire tape and mud at top plate of fire walls Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
01/17/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st layer at shear walls and 2 hour walls -RC at units and corridors -Screw pattern at units and corridor Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -1st layer at sws -RC at units and corridor -Screw pattern at units and corridor Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer at firewalls and shear walls - 2nd layer fire tap and mud top plate at fire walls -RC at units and corridor Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
01/17/2025
Building F: -1st layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs -RC at units and corridor **Screw pattern at units and corridor except at elevator Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridor Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
01/17/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
All Rough Inspection - Commercial Failed 1/21/2025 1/21/2025 01/21/2025
STAIR TOWER 1
Corrective Action Required
01/17/2025
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
01/17/2025
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
01/17/2025
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
01/17/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: - Seal ceiling penitrations in mechanical room at line set throughput -Behind tubs and showers for pre rock -Balconies ok to cover - Inspected 4 soffit fur outs - 118 fire caulk top plate penitrations at tension rods 421 and 422 not ready Mechanical closet-walls only ok to cover Building H: 114-Strap top plate and protect dryer duct 116-Strap top plate above panel, replace broken box by dryer Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
01/17/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
01/17/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
01/17/2025
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
01/17/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
01/17/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
01/17/2025
Throughout: -Support all DWV 48" oc -Support all SER cables through draft strops each side -Seal all dead spaces Riser Rooms- Seal vertical draft stop Corridor-Missing alarm box by Stairwell 252-Strap exterior corner 279-Missing vertical draft stop 10' oc Stair J: -Fireblock top of fur out walls in basement
Rated Assembly Inspection Partial 1/22/2025 1/22/2025 01/22/2025
STAIR TOWER 1
Corrective Action Required
01/21/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
01/21/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
01/21/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
01/21/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
01/21/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
01/21/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
01/21/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
01/21/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layers at firewalls Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
01/21/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs - 2nd layer fire tape and mud at top plate of fire walls -RC at units and corridor Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
01/21/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer at firewalls and shear walls - 2nd layer fire tap and mud top plate at fire walls -RC at units and corridor -Screw pattern units and corridor Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
01/21/2025
Building F: Complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridor Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
01/21/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
All Rough Inspection - Commercial Partial 1/22/2025 1/22/2025 01/22/2025
STAIR TOWER 1
Corrective Action Required
01/21/2025
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
01/21/2025
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
01/21/2025
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
01/21/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: - Seal ceiling penitrations in mechanical room at line set throughput -Behind tubs and showers for pre rock -Balconies ok to cover - Inspected 4 soffit fur outs - 118 fire caulk top plate penitrations at tension rods 421 and 422 not ready Mechanical closet-walls only ok to cover Building H: 114-Strap top plate and protect dryer duct 116-Strap top plate above panel, replace broken box by dryer Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
01/21/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
01/21/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
01/21/2025
*Building F -Units and corridor approved *Building G: Units and corridor complete -Balconies ok to cover Building H: -South side patios ok to cover -Behind tubs and showers ok -Patios ok to cover -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
ELEVATOR 1
Corrective Action Required
01/21/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
01/21/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
01/21/2025
H, I, J approved
Rated Assembly Inspection Partial 1/23/2025 1/23/2025 01/23/2025
STAIR TOWER 1
Corrective Action Required
01/22/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
01/22/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
01/22/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
01/22/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
01/22/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
01/22/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
01/22/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
01/22/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layers at firewalls -RC at units and corridor Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
01/22/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs - 2nd layer fire tape and mud at top plate of fire walls -RC at units and corridor -Screw pattern units and corridor Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
01/22/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer at firewalls and shear walls - 2nd layer fire tap and mud top plate at fire walls -RC at units and corridor -1st layer at 2 hour walls Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
01/22/2025
Building F: Complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridor Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
01/22/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
Rated Assembly Inspection Partial 1/24/2025 1/24/2025 01/24/2025
STAIR TOWER 1
Corrective Action Required
01/23/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
01/23/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
01/23/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
01/23/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
01/23/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
01/23/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
01/23/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
01/23/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layers at firewalls -RC at units and corridor Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
01/23/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs - 2nd layer fire tape and mud at top plate of fire walls -RC at units and corridor -Screw pattern units and corridor Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
01/23/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer at firewalls and shear walls - 2nd layer fire tap and mud top plate at fire walls -RC at units and corridor -1st layer at 2 hour walls Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
01/23/2025
Building F: Complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridor Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
01/23/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
All Rough Inspection - Commercial Partial 1/24/2025 1/24/2025 01/24/2025
STAIR TOWER 1
Corrective Action Required
01/22/2025
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
01/22/2025
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
01/22/2025
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
01/22/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: - Seal ceiling penitrations in mechanical room at line set throughput -Behind tubs and showers for pre rock -Balconies ok to cover - Inspected 4 soffit fur outs - 118 fire caulk top plate penitrations at tension rods 421 and 422 not ready Mechanical closet-walls only ok to cover Building H: 114-Strap top plate and protect dryer duct 116-Strap top plate above panel, replace broken box by dryer Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
01/22/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
01/22/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
01/22/2025
*Building F Complete *Building G: complete Building H: Complete Building J: -Balconies ok to cover -Behind tubs and showers ok to cover Units and corridor approved except as noted -Support storm line in corridor 401-Support DWV in bathroom attic space 403-Install H2.5 at double truss in living and at bed 2 404-Install H2.5 at corridor wall, support storm line in attic space 406-Seal dead space, missing H2.5 in living 412-Missing H2.5s at entry, complete DWV in attic space roof penetration, Seal dead space
ELEVATOR 1
Corrective Action Required
01/22/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
01/22/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
01/22/2025
H, I, J approved
Rated Assembly Inspection Failed 1/27/2025 1/27/2025 01/27/2025
STAIR TOWER 1
Corrective Action Required
01/24/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
01/24/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
01/24/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
01/24/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
01/24/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
01/24/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
01/24/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
01/24/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layers at firewalls -RC at units and corridor Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
01/24/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs - 2nd layer fire tape and mud at top plate of fire walls -RC at units and corridor -Screw pattern units and corridor Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
01/24/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer at firewalls and shear walls - 2nd layer fire tap and mud top plate at fire walls -RC at units and corridor -1st layer at 2 hour walls Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
01/24/2025
Building F: Complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridor Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
01/24/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
All Rough Inspection - Commercial Partial 1/27/2025 1/27/2025 01/27/2025
STAIR TOWER 1
Corrective Action Required
01/24/2025
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
01/24/2025
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
01/24/2025
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
01/24/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: - Seal ceiling penitrations in mechanical room at line set throughput -Behind tubs and showers for pre rock -Balconies ok to cover - Inspected 4 soffit fur outs - 118 fire caulk top plate penitrations at tension rods 421 and 422 not ready Mechanical closet-walls only ok to cover Building H: 114-Strap top plate and protect dryer duct 116-Strap top plate above panel, replace broken box by dryer Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
01/24/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
01/24/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
FOURTH FLOOR
Corrective Action Required
01/24/2025
*Building F Complete *Building G: complete Building H: Complete Building J: -Balconies ok to cover -Behind tubs and showers ok to cover Units and corridor approved except as noted 412 Seal dead space, correct fire collar 411-Install stud shoe at corridor
ELEVATOR 1
Corrective Action Required
01/24/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
01/24/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
01/24/2025
H, I, J approved
Rated Assembly Inspection Partial 1/28/2025 1/28/2025 01/28/2025
STAIR TOWER 1
Corrective Action Required
01/27/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
01/27/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
01/27/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
01/27/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
01/27/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
01/27/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
01/27/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
01/27/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st layer at firewalls Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
01/27/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs - 2nd layer fire tape and mud at top plate of fire walls -RC at units and corridor -Screw pattern units and corridor Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
01/27/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer at firewalls and shear walls - 2nd layer fire tap and mud top plate at fire walls -RC at units and corridor -1st layer at 2 hour walls Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
01/27/2025
Building F: Complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridor Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
01/27/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
Rated Assembly Inspection Partial 1/29/2025 1/29/2025 01/29/2025
STAIR TOWER 1
Corrective Action Required
01/28/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
01/28/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
01/28/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
01/28/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
01/28/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
01/28/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
01/28/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
01/28/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layer at firewalls Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
01/28/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs - 2nd layer fire tape and mud at top plate of fire walls -RC at units and corridor -Screw pattern units and corridor Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
01/28/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer at firewalls and shear walls - 2nd layer fire tap and mud top plate at fire walls -RC at units and corridor -1st layer at 2 hour walls Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
01/28/2025
Building F: Complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridor Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
01/28/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
All Rough Inspection - Commercial Partial 1/30/2025 1/30/2025 01/30/2025
STAIR TOWER 1
Corrective Action Required
01/27/2025
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
01/27/2025
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
01/27/2025
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
01/27/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: - Seal ceiling penitrations in mechanical room at line set throughput -Behind tubs and showers for pre rock -Balconies ok to cover - Inspected 4 soffit fur outs - 118 fire caulk top plate penitrations at tension rods 421 and 422 not ready Mechanical closet-walls only ok to cover Building H: 114-Strap top plate and protect dryer duct 116-Strap top plate above panel, replace broken box by dryer Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
01/27/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
01/27/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Units and corridor approved
FOURTH FLOOR
Corrective Action Required
01/27/2025
*Building F Complete *Building G: complete Building H: Complete Building J: Complete
ELEVATOR 1
Corrective Action Required
01/27/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
01/27/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
01/27/2025
H, I, J approved
Electrical Service Inspection Partial 1/30/2025 1/30/2025 01/30/2025
Misc
Informational
01/13/2025
Partial Only: -Service at building J labeled "2-J, 1 of 4" 1600 amp disconnect for (36) units and House Panel
All Rough Inspection - Commercial Partial 1/31/2025 1/31/2025 01/31/2025
STAIR TOWER 1
Corrective Action Required
01/30/2025
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
01/30/2025
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
01/30/2025
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
01/30/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: - Seal ceiling penitrations in mechanical room at line set throughput -Behind tubs and showers for pre rock -Balconies ok to cover - Inspected 4 soffit fur outs - 118 fire caulk top plate penitrations at tension rods 421 and 422 not ready Mechanical closet-walls only ok to cover Building H: 114-Strap top plate and protect dryer duct 116-Strap top plate above panel, replace broken box by dryer Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
SECOND FLOOR
Corrective Action Required
01/30/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
01/30/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Units and corridor approved
FOURTH FLOOR
Corrective Action Required
01/30/2025
*Building F Complete *Building G: complete Building H: Complete Building J: Complete
ELEVATOR 1
Corrective Action Required
01/30/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
01/30/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
01/30/2025
H, I, J approved
Rated Assembly Inspection Partial 1/31/2025 1/31/2025 01/31/2025
STAIR TOWER 1
Corrective Action Required
01/29/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
01/29/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
01/29/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
01/29/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
01/29/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
01/29/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
01/29/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
01/29/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layer at firewalls Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
01/29/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs - 2nd layer fire tape and mud at top plate of fire walls -RC at units and corridor -Screw pattern units and corridor Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
01/29/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer at firewalls and shear walls - 2nd layer fire tap and mud top plate at fire walls -RC at units and corridor -1st layer at 2 hour walls Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
01/29/2025
Building F: Complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridor Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
01/29/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
LOWER LEVEL
Corrective Action Required
01/31/2025
RC at G,H,J approved
Rated Assembly Inspection Failed 2/3/2025 2/3/2025 02/03/2025
STAIR TOWER 1
Corrective Action Required
01/31/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
01/31/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
01/31/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
01/31/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
01/31/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
01/31/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
01/31/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
01/31/2025
Building F: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st layer at 2 stairs and firewall -RC at walls and ceilings except -Screw pattern at wall and ceiling approved except at G157 and elevator -2nd layer around elevator and at 2-hr wall between F and G Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layer at firewalls Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
01/31/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs - 2nd layer fire tape and mud at top plate of fire walls -RC at units and corridor -Screw pattern units and corridor Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
01/31/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer at firewalls and shear walls - 2nd layer fire tap and mud top plate at fire walls -RC at units and corridor -1st layer at 2 hour walls Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
01/31/2025
Building F: Complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridor Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
01/31/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
LOWER LEVEL
Corrective Action Required
01/31/2025
RC at G,H,J approved
Rated Assembly Inspection Partial 2/4/2025 2/4/2025 02/04/2025
STAIR TOWER 1
Corrective Action Required
02/03/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/03/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/03/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/03/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/03/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/03/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/03/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/03/2025
Building F: complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layer at firewalls -Screw pattern at walls and ceiling Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
02/03/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs - 2nd layer fire tape and mud at top plate of fire walls -RC at units and corridor -Screw pattern units and corridor Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
02/03/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer at firewalls and shear walls - 2nd layer fire tap and mud top plate at fire walls -RC at units and corridor -1st layer at 2 hour walls Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
02/03/2025
Building F: Complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridor Building J: -1st and 2nd layer behind tubs and showers
ELEVATOR 3
Corrective Action Required
02/03/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
LOWER LEVEL
Corrective Action Required
02/03/2025
RC at G,H,J approved 1st layer at G,H,J firewalls
Rated Assembly Inspection Partial 2/6/2025 2/6/2025 02/06/2025
STAIR TOWER 1
Corrective Action Required
02/04/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/04/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/04/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/04/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/04/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/04/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/04/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/04/2025
Building F: complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layer at firewalls -Screw pattern at walls and ceiling Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
02/04/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs - 2nd layer fire tape and mud at top plate of fire walls -RC at units and corridor -Screw pattern units and corridor Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
02/04/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer at firewalls and shear walls - 2nd layer fire tap and mud top plate at fire walls -RC at units and corridor -1st layer at 2 hour walls Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
02/04/2025
Building F: Complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridor Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors
ELEVATOR 3
Corrective Action Required
02/04/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
LOWER LEVEL
Corrective Action Required
02/04/2025
RC at G,H,J approved 1st layer at G,H,J firewalls
Rated Assembly Inspection Partial 2/7/2025 2/7/2025 02/07/2025
STAIR TOWER 1
Corrective Action Required
02/06/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/06/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/06/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/06/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/06/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/06/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/06/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/06/2025
Building F: complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layer at firewalls -Screw pattern at walls and ceiling Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
02/06/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs - 2nd layer fire tape and mud at top plate of fire walls -RC at units and corridor -Screw pattern units and corridor Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
02/06/2025
Building F: Complete Building G: Complete Building H: -1st layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st layer at firewalls and shear walls - 2nd layer fire tap and mud top plate at fire walls -RC at units and corridor -1st layer at 2 hour walls Building J: -1st and 2nd layer behind tubs and showers
FOURTH FLOOR
Corrective Action Required
02/06/2025
Building F: Complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -Pre-rock 2nd layer behind showers at units 2424,2426,2434, and 2435 -1st layer at firewalls **Screw pattern at units and corridor except at elevator Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer behind tubs and showers -1st and 2nd layer at firewall extensions at deck -RC at units and corridor except at fire walls ok -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridor Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors
ELEVATOR 3
Corrective Action Required
02/06/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
LOWER LEVEL
Corrective Action Required
02/06/2025
RC at G,H,J approved 1st layer at G,H,J firewalls -Stair J2 RC at ceiling
All Rough Inspection - Commercial Partial 2/7/2025 2/7/2025 02/07/2025
STAIR TOWER 1
Corrective Action Required
01/31/2025
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
01/31/2025
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
01/31/2025
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
01/31/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: - Seal ceiling penitrations in mechanical room at line set throughput -Behind tubs and showers for pre rock -Balconies ok to cover - Inspected 4 soffit fur outs - 118 fire caulk top plate penitrations at tension rods 421 and 422 not ready Mechanical closet-walls only ok to cover Building H: 114-Strap top plate and protect dryer duct 116-Strap top plate above panel, replace broken box by dryer Building J: -Balconies ok to cover -Behind tubs and showers ok to cover 200-Seal dead space 204-Strap overbored top plate, Fireblock top of double wall at elevator Corridor-Strap top plate outside of 206, complete lv at firewall 208-Provide truss repair documents, secure/support SER cables, seal dead space at shower 210-Secure/support SER Mechanical room-Secure ser, seal plate penetrations, seal draft stop 212-Support/secure SER
SECOND FLOOR
Corrective Action Required
01/31/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: -Balconies ok to cover -Behind tubs and showers ok to cover
THIRD FLOOR
Corrective Action Required
01/31/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Units and corridor approved
FOURTH FLOOR
Corrective Action Required
01/31/2025
*Building F Complete *Building G: complete Building H: Complete Building J: Complete
ELEVATOR 1
Corrective Action Required
01/31/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
01/31/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
01/31/2025
H, I, J approved
Rated Assembly Inspection Partial 2/10/2025 2/10/2025 02/10/2025
STAIR TOWER 1
Corrective Action Required
02/07/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/07/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/07/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/07/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/07/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/07/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/07/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/07/2025
Building F: complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layer at firewalls -Screw pattern at walls and ceiling Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
02/07/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
02/07/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls
FOURTH FLOOR
Corrective Action Required
02/07/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors
ELEVATOR 3
Corrective Action Required
02/07/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
LOWER LEVEL
Corrective Action Required
02/07/2025
RC at G,H,J approved 1st layer at G,H,J firewalls -Stair J2 RC at ceiling
All Rough Inspection - Commercial Partial 2/10/2025 2/10/2025 02/10/2025
STAIR TOWER 1
Corrective Action Required
02/07/2025
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
02/07/2025
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
02/07/2025
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
02/07/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: - Seal ceiling penitrations in mechanical room at line set throughput -Behind tubs and showers for pre rock -Balconies ok to cover - Inspected 4 soffit fur outs - 118 fire caulk top plate penitrations at tension rods 421 and 422 not ready Mechanical closet-walls only ok to cover Building H: 114-Strap top plate and protect dryer duct 116-Strap top plate above panel, replace broken box by dryer
SECOND FLOOR
Corrective Action Required
02/07/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: -Balconies ok to cover -Behind tubs and showers ok to cover Mechanical room-Secure ser, seal plate penetrations, seal draft stop 212-Support/secure SER
THIRD FLOOR
Corrective Action Required
02/07/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Units and corridor approved
FOURTH FLOOR
Corrective Action Required
02/07/2025
*Building F Complete *Building G: complete Building H: Complete Building J: Complete
ELEVATOR 1
Corrective Action Required
02/07/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
02/07/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
02/07/2025
H, I, J approved
Rated Assembly Inspection Partial 2/11/2025 2/11/2025 02/11/2025
STAIR TOWER 1
Corrective Action Required
02/10/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/10/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/10/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/10/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/10/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/10/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/10/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/10/2025
Building F: complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layer at firewalls -Screw pattern at walls and ceiling Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
02/10/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
02/10/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls
FOURTH FLOOR
Corrective Action Required
02/10/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls
ELEVATOR 3
Corrective Action Required
02/10/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
LOWER LEVEL
Corrective Action Required
02/10/2025
RC at G,H,J approved 1st layer at G,H,J firewalls -Stair J2 RC at ceiling
All Rough Inspection - Commercial Partial 2/11/2025 2/11/2025 02/11/2025
STAIR TOWER 1
Corrective Action Required
02/10/2025
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
02/10/2025
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
02/10/2025
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
02/10/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: 421 and 422 not ready Mechanical closet-walls only ok to cover Building H: complete Building J: Seal dead spaces throughout 129-Strap top plate at DWV 131-Nail sheathing 125-Complete electrical 133-Fireblock furout wall at elevator 108-support lineset, complete dwv 110-complete mechanical and electrical, seal penetrations at bath, protect nm Mechanical room-no access 112-protect SER cables at bedroom Dog Spa-fireblock double wall
SECOND FLOOR
Corrective Action Required
02/10/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: 208-Provide truss repair 212-Protecet SER at bedroom
THIRD FLOOR
Corrective Action Required
02/10/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Units and corridor approved
FOURTH FLOOR
Corrective Action Required
02/10/2025
*Building F Complete *Building G: complete Building H: Complete Building J: Complete
ELEVATOR 1
Corrective Action Required
02/10/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
02/10/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
02/10/2025
H, I, J approved
Rated Assembly Inspection Failed 2/12/2025 2/12/2025 02/12/2025
STAIR TOWER 1
Corrective Action Required
02/11/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/11/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/11/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/11/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/11/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/11/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/11/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/11/2025
Building F: complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layer at firewalls -Screw pattern at walls and ceiling Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
02/11/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
02/11/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls
FOURTH FLOOR
Corrective Action Required
02/11/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls
ELEVATOR 3
Corrective Action Required
02/11/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
LOWER LEVEL
Corrective Action Required
02/11/2025
RC at G,H,J approved 1st layer at G,H,J firewalls -Stair J2 RC at ceiling
All Rough Inspection - Commercial Partial 2/12/2025 2/12/2025 02/12/2025
STAIR TOWER 1
Corrective Action Required
02/11/2025
Stair tower 1 in Building F: -Shear wall nailng pattern behind stringers at floors 1-3 *OK for first layer all floors inside of stairwell -1st layer all floors
STAIR TOWER 2
Corrective Action Required
02/11/2025
-Stair tower 2 in building G -Shear wall nailing pattern behind stringers at floors 1-2 -Framing approved at all floors
STAIR TOWER 3
Corrective Action Required
02/11/2025
-Stair tower 3 in building J -Shear wall nailing pattern behind stringers floors 1-3
FIRST FLOOR
Corrective Action Required
02/11/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: 421 and 422 not ready Mechanical closet-walls only ok to cover Building H: complete Building J: Seal dead spaces throughout 108-complete dwv 110-complete mechanical and electrical, seal penetrations at bath, protect nm Mechanical room-no access
SECOND FLOOR
Corrective Action Required
02/11/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: 208-Provide truss repair 212-Protecet SER at bedroom
THIRD FLOOR
Corrective Action Required
02/11/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Units and corridor approved
FOURTH FLOOR
Corrective Action Required
02/11/2025
*Building F Complete *Building G: complete Building H: Complete Building J: Complete
ELEVATOR 1
Corrective Action Required
02/11/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
02/11/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
02/11/2025
H, I, J approved
Rated Assembly Inspection Partial 2/13/2025 2/13/2025 02/13/2025
STAIR TOWER 1
Corrective Action Required
02/12/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/12/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/12/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/12/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/12/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/12/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/12/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/12/2025
Building F: complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: -1st and 2nd layer at truss spaces pre rock -1st and 2nd layer at firewall extensions at deck -1st and 2nd layer behind tubs -1st and 2nd layer at firewalls -Screw pattern at walls and ceiling Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
02/12/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
02/12/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls
FOURTH FLOOR
Corrective Action Required
02/12/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls
ELEVATOR 3
Corrective Action Required
02/12/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
LOWER LEVEL
Corrective Action Required
02/12/2025
RC at G,H,J approved 1st layer at G,H,J firewalls -Stair J2 RC at ceiling
All Rough Inspection - Commercial Partial 2/13/2025 2/13/2025 02/13/2025
STAIR TOWER 1
Corrective Action Required
02/12/2025
complete
STAIR TOWER 2
Corrective Action Required
02/12/2025
complete
STAIR TOWER 3
Corrective Action Required
02/12/2025
complete
FIRST FLOOR
Corrective Action Required
02/12/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: complete Building H: complete Building J: Seal dead spaces throughout 108-complete dwv 110-complete electrical, seal penetrations at bath, protect nm Mechanical room walls only
SECOND FLOOR
Corrective Action Required
02/12/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: 208-Provide truss repair 212-Protecet SER at bedroom
THIRD FLOOR
Corrective Action Required
02/12/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Units and corridor approved
FOURTH FLOOR
Corrective Action Required
02/12/2025
*Building F Complete *Building G: complete Building H: Complete Building J: Complete
ELEVATOR 1
Corrective Action Required
02/12/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
02/12/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
02/12/2025
H, I, J approved
Rated Assembly Inspection Partial 2/14/2025 2/14/2025 02/14/2025
STAIR TOWER 1
Corrective Action Required
02/13/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/13/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/13/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/13/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/13/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/13/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/13/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/13/2025
Building F: complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
02/13/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
02/13/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls
FOURTH FLOOR
Corrective Action Required
02/13/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls
ELEVATOR 3
Corrective Action Required
02/13/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
LOWER LEVEL
Corrective Action Required
02/13/2025
Complete except at elevator and stair J2
Rated Assembly Inspection Partial 2/18/2025 2/18/2025 02/18/2025
STAIR TOWER 1
Corrective Action Required
02/14/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/14/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/14/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/14/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/14/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/14/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/14/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/14/2025
Building F: complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
02/14/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
02/14/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls
FOURTH FLOOR
Corrective Action Required
02/14/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls
ELEVATOR 3
Corrective Action Required
02/14/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
LOWER LEVEL
Corrective Action Required
02/14/2025
Complete except at elevator and stair J2
Rated Assembly Inspection Partial 2/19/2025 2/19/2025 02/19/2025
STAIR TOWER 1
Corrective Action Required
02/18/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/18/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/18/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/18/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/18/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/18/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/18/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/18/2025
Building F: complete Building G: -1st and 2nd layer at truss space at firewall, stairwell and elevator for trusses at corridor side only -1st and 2nd layer behind tubs and showers -1st and 2nd layer at 2 hr walls -Screw pattern complete except at 421 & 422 Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
02/18/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
02/18/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls
FOURTH FLOOR
Corrective Action Required
02/18/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
02/18/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
LOWER LEVEL
Corrective Action Required
02/18/2025
Complete except at elevator and stair J2
All Rough Inspection - Commercial Partial 02/19/2025
STAIR TOWER 1
Corrective Action Required
02/13/2025
complete
STAIR TOWER 2
Corrective Action Required
02/13/2025
complete
STAIR TOWER 3
Corrective Action Required
02/13/2025
complete
FIRST FLOOR
Corrective Action Required
02/13/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: complete Building H: complete Building J: Seal dead spaces throughout 108-complete dwv 110-complete electrical, seal penetrations at bath, protect nm Mechanical room walls only
SECOND FLOOR
Corrective Action Required
02/13/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: complete
THIRD FLOOR
Corrective Action Required
02/13/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Units and corridor approved
FOURTH FLOOR
Corrective Action Required
02/13/2025
*Building F Complete *Building G: complete Building H: Complete Building J: Complete
ELEVATOR 1
Corrective Action Required
02/13/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
02/13/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
02/13/2025
H, I, J approved
Electrical Service Inspection Passed 2/19/2025 2/19/2025 02/19/2025
Misc
Informational
02/19/2025
-Service for building G , labeled "Service 2-G, 3 of 4. 1200 amp disconnect for (45) units
Rated Assembly Inspection Partial 2/20/2025 2/20/2025 02/20/2025
STAIR TOWER 1
Corrective Action Required
02/19/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/19/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/19/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/19/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/19/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/19/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/19/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/19/2025
Building F: complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
02/19/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
02/19/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls
FOURTH FLOOR
Corrective Action Required
02/19/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
02/19/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
LOWER LEVEL
Corrective Action Required
02/19/2025
Complete except at elevator and stair J2
Rated Assembly Inspection Failed 2/21/2025 2/21/2025 02/21/2025
STAIR TOWER 1
Corrective Action Required
02/20/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/20/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/20/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/20/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/20/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/20/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/20/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/20/2025
Building F: complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA
SECOND FLOOR
Corrective Action Required
02/20/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
02/20/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls
FOURTH FLOOR
Corrective Action Required
02/20/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
02/20/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
LOWER LEVEL
Corrective Action Required
02/20/2025
Complete except at elevator and stair J2
Rated Assembly Inspection Partial 2/24/2025 2/24/2025 02/24/2025
STAIR TOWER 1
Corrective Action Required
02/21/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/21/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/21/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/21/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/21/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/21/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/21/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/21/2025
Building F: complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA -1st layer at 2 hour walls -RC complete except at mechanical room
SECOND FLOOR
Corrective Action Required
02/21/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
02/21/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls
FOURTH FLOOR
Corrective Action Required
02/21/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
02/21/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling
LOWER LEVEL
Corrective Action Required
02/21/2025
Complete except at elevator and stair J2
All Rough Inspection - Commercial Partial 2/25/2025 2/25/2025 02/25/2025
STAIR TOWER 1
Corrective Action Required
02/19/2025
complete
STAIR TOWER 2
Corrective Action Required
02/19/2025
complete
STAIR TOWER 3
Corrective Action Required
02/19/2025
complete
FIRST FLOOR
Corrective Action Required
02/19/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: complete Building H: complete Building J: Seal dead spaces throughout 108-complete dwv 110-complete electrical, seal penetrations at bath, protect nm Mechanical room walls only
SECOND FLOOR
Corrective Action Required
02/19/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: complete
THIRD FLOOR
Corrective Action Required
02/19/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Units and corridor approved
FOURTH FLOOR
Corrective Action Required
02/19/2025
*Building F Complete *Building G: complete Building H: Complete Building J: Complete
ELEVATOR 1
Corrective Action Required
02/19/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
02/19/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
02/19/2025
H, I, J approved
Rated Assembly Inspection Partial 2/25/2025 2/25/2025 02/25/2025
STAIR TOWER 1
Corrective Action Required
02/24/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/24/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/24/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/24/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/24/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/24/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/24/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/24/2025
Building F: complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA -1st layer at 2 hour walls -RC complete except at mechanical room
SECOND FLOOR
Corrective Action Required
02/24/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers
THIRD FLOOR
Corrective Action Required
02/24/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls -Screw pattern complete except at fire wall and elevator ceilng
FOURTH FLOOR
Corrective Action Required
02/24/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
02/24/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st layer at corridor side doorway walls
LOWER LEVEL
Corrective Action Required
02/24/2025
Complete except at elevator and stair J2
All Rough Inspection - Commercial Partial 2/26/2025 2/26/2025 02/26/2025
STAIR TOWER 1
Corrective Action Required
02/25/2025
complete
STAIR TOWER 2
Corrective Action Required
02/25/2025
complete
STAIR TOWER 3
Corrective Action Required
02/25/2025
complete
FIRST FLOOR
Corrective Action Required
02/25/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: complete Building H: complete Building J: Seal dead spaces throughout 108-complete dwv Mechanical room walls only
SECOND FLOOR
Corrective Action Required
02/25/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: complete
THIRD FLOOR
Corrective Action Required
02/25/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Units and corridor approved
FOURTH FLOOR
Corrective Action Required
02/25/2025
*Building F Complete *Building G: complete Building H: Complete Building J: Complete
ELEVATOR 1
Corrective Action Required
02/25/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
02/25/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
02/25/2025
H, I, J approved
Rated Assembly Inspection Partial 2/26/2025 2/26/2025 02/26/2025
STAIR TOWER 1
Corrective Action Required
02/25/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/25/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/25/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/25/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/25/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/25/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/25/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/25/2025
Building F: complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA -1st layer at 2 hour walls -RC complete except at mechanical room
SECOND FLOOR
Corrective Action Required
02/25/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor 1st and 2nd layer 2 hour walls
THIRD FLOOR
Corrective Action Required
02/25/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls -Screw pattern complete except at fire wall and elevator ceilng
FOURTH FLOOR
Corrective Action Required
02/25/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
02/25/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st land 2nd layer at corridor side doorway walls
LOWER LEVEL
Corrective Action Required
02/25/2025
Complete except at elevator and stair J2
Rated Assembly Inspection Partial 2/27/2025 2/27/2025 02/27/2025
STAIR TOWER 1
Corrective Action Required
02/26/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/26/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/26/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/26/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/26/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/26/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/26/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/26/2025
Building F: complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA -1st layer at 2 hour walls -RC complete except at mechanical room
SECOND FLOOR
Corrective Action Required
02/26/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor 1st and 2nd layer 2 hour walls
THIRD FLOOR
Corrective Action Required
02/26/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls -Screw pattern complete except at fire wall and elevator ceilng
FOURTH FLOOR
Corrective Action Required
02/26/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
02/26/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st land 2nd layer at corridor side doorway walls -1st layer at inside doorway floors 1,2,4
LOWER LEVEL
Corrective Action Required
02/26/2025
Complete except at elevator and stair J2
Rated Assembly Inspection Partial 2/28/2025 2/28/2025 02/28/2025
STAIR TOWER 1
Corrective Action Required
02/27/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/27/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/27/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/27/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/27/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/27/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/27/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/27/2025
Building F: complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA -1st layer at 2 hour walls -RC complete except at mechanical room
SECOND FLOOR
Corrective Action Required
02/27/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st layer at 2 hour walls
THIRD FLOOR
Corrective Action Required
02/27/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls -Screw pattern complete except at fire wall and elevator ceilng
FOURTH FLOOR
Corrective Action Required
02/27/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
02/27/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st land 2nd layer at corridor side doorway walls -1st layer at inside doorway floors 1,2,4
LOWER LEVEL
Corrective Action Required
02/27/2025
Complete except at elevator and stair J2
All Rough Inspection - Commercial Partial 3/3/2025 3/3/2025 03/03/2025
STAIR TOWER 1
Corrective Action Required
02/26/2025
complete
STAIR TOWER 2
Corrective Action Required
02/26/2025
complete
STAIR TOWER 3
Corrective Action Required
02/26/2025
complete
FIRST FLOOR
Corrective Action Required
02/26/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: complete Building H: complete Building J: Seal dead spaces throughout 108-complete dwv Mechanical room walls only
SECOND FLOOR
Corrective Action Required
02/26/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: complete
THIRD FLOOR
Corrective Action Required
02/26/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Units and corridor approved
FOURTH FLOOR
Corrective Action Required
02/26/2025
*Building F Complete *Building G: complete Building H: Complete Building J: Complete
ELEVATOR 1
Corrective Action Required
02/26/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
02/26/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
02/26/2025
H, I, J approved -Exterior garage light metal boxes-all bonded
Rated Assembly Inspection Partial 3/3/2025 3/3/2025 03/03/2025
STAIR TOWER 1
Corrective Action Required
02/28/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
02/28/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
02/28/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
02/28/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
02/28/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
02/28/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
02/28/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
02/28/2025
Building F: complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA -1st layer at 2 hour walls -RC complete except at mechanical room
SECOND FLOOR
Corrective Action Required
02/28/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls Correction-complete fire tape at 212 bathroom and closet
THIRD FLOOR
Corrective Action Required
02/28/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls -Screw pattern complete except at fire wall and elevator ceilng
FOURTH FLOOR
Corrective Action Required
02/28/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
02/28/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st and 2nd layer at corridor side doorway walls -1st and 2nd layer at inside doorway floors 1,2,4
LOWER LEVEL
Corrective Action Required
02/28/2025
Complete except at elevator and stair J2
Rated Assembly Inspection Partial 3/4/2025 3/4/2025 03/04/2025
STAIR TOWER 1
Corrective Action Required
03/03/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
03/03/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
03/03/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
03/03/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
03/03/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
03/03/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
03/03/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
03/03/2025
Building F: complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA -1st layer at 2 hour walls **only 1st layer inspected at 2 hr wall? -all wall and ceiling except at garage fur-outs
SECOND FLOOR
Corrective Action Required
03/03/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls
THIRD FLOOR
Corrective Action Required
03/03/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls -Screw pattern complete except at fire wall and elevator ceilng
FOURTH FLOOR
Corrective Action Required
03/03/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
03/03/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st and 2nd layer at corridor side doorway walls -1st and 2nd layer at inside doorway floors 1,2,4
LOWER LEVEL
Corrective Action Required
03/03/2025
Complete except at elevator and stair J2
Rated Assembly Inspection Partial 3/7/2025 3/7/2025 03/07/2025
STAIR TOWER 1
Corrective Action Required
03/04/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
03/04/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
03/04/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
03/04/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
03/04/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
03/04/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
03/04/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors
FIRST FLOOR
Corrective Action Required
03/04/2025
Building F: complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA -1st layer at 2 hour walls **only 1st layer inspected at 2 hr wall? -all wall and ceiling
SECOND FLOOR
Corrective Action Required
03/04/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridors except at elevator
THIRD FLOOR
Corrective Action Required
03/04/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls -Screw pattern complete except at fire wall and elevator ceilng
FOURTH FLOOR
Corrective Action Required
03/04/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
03/04/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st and 2nd layer at corridor side doorway walls -1st and 2nd layer at inside doorway floors 1,2,4
LOWER LEVEL
Corrective Action Required
03/04/2025
Complete except at elevator and stair J2
All Rough Inspection - Commercial Partial 3/13/2025 3/13/2025 03/13/2025
STAIR TOWER 1
Corrective Action Required
03/03/2025
complete
STAIR TOWER 2
Corrective Action Required
03/03/2025
complete
STAIR TOWER 3
Corrective Action Required
03/03/2025
complete
FIRST FLOOR
Corrective Action Required
03/03/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: complete Building H: complete Building J: Seal dead spaces throughout 108-complete dwv Mechanical room walls only
SECOND FLOOR
Corrective Action Required
03/03/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: complete
THIRD FLOOR
Corrective Action Required
03/03/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Units and corridor approved
FOURTH FLOOR
Corrective Action Required
03/03/2025
*Building F Complete *Building G: complete Building H: Complete Building J: Complete
ELEVATOR 1
Corrective Action Required
03/03/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
03/03/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
03/03/2025
H, I, J approved -Exterior garage light metal boxes-all bonded
Rated Assembly Inspection Partial 3/17/2025 3/17/2025 03/17/2025
STAIR TOWER 1
Corrective Action Required
03/07/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
03/07/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
03/07/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
03/07/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
03/07/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
03/07/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
03/07/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors -1st layer at corridor side all floors
FIRST FLOOR
Corrective Action Required
03/07/2025
Building F: complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA -1st layer at 2 hour walls **only 1st layer inspected at 2 hr wall? -all wall and ceiling
SECOND FLOOR
Corrective Action Required
03/07/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridors except at elevator
THIRD FLOOR
Corrective Action Required
03/07/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls -Screw pattern complete except at fire wall and elevator ceilng
FOURTH FLOOR
Corrective Action Required
03/07/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
03/07/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st and 2nd layer at corridor side doorway walls -1st and 2nd layer at inside doorway floors 1,2,4
LOWER LEVEL
Corrective Action Required
03/07/2025
Complete except at elevator and stair J2
Rated Assembly Inspection Partial 3/18/2025 3/18/2025 03/18/2025
STAIR TOWER 1
Corrective Action Required
03/17/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
03/17/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
03/17/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
03/17/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
03/17/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
03/17/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
03/17/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors -1st and 2nd layer at corridor side all floors
FIRST FLOOR
Corrective Action Required
03/17/2025
Building F: complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA -1st layer at 2 hour walls **only 1st layer inspected at 2 hr wall? -all wall and ceiling
SECOND FLOOR
Corrective Action Required
03/17/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridors except at elevator
THIRD FLOOR
Corrective Action Required
03/17/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls -Screw pattern complete except at fire wall and elevator ceilng
FOURTH FLOOR
Corrective Action Required
03/17/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
03/17/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st and 2nd layer at corridor side doorway walls -1st and 2nd layer at inside doorway floors 1,2,4
LOWER LEVEL
Corrective Action Required
03/17/2025
Complete except at elevator and stair J2
Rated Assembly Inspection Partial 3/19/2025 3/19/2025 03/19/2025
STAIR TOWER 1
Corrective Action Required
03/18/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
03/18/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
03/18/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
03/18/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
03/18/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
03/18/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
03/18/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors -1st and 2nd layer at corridor side all floors -1st layer at door side basement, 1st and 4th floor
FIRST FLOOR
Corrective Action Required
03/18/2025
Building F: complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA -1st layer at 2 hour walls **only 1st layer inspected at 2 hr wall? -all wall and ceiling
SECOND FLOOR
Corrective Action Required
03/18/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridors except at elevator
THIRD FLOOR
Corrective Action Required
03/18/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls -Screw pattern complete except at fire wall and elevator ceilng
FOURTH FLOOR
Corrective Action Required
03/18/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
03/18/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st and 2nd layer at corridor side doorway walls -1st and 2nd layer at inside doorway floors 1,2,4
LOWER LEVEL
Corrective Action Required
03/18/2025
Complete except at elevator and stair J2
Rated Assembly Inspection Failed 3/20/2025 3/20/2025 03/20/2025
STAIR TOWER 1
Corrective Action Required
03/19/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
03/19/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
03/19/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
03/19/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
03/19/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
03/19/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
03/19/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer inside at 4th, 2nd, 1st floors -1st and 2nd layer at corridor side all floors -1st layer at door side basement, 1st and 4th floor
FIRST FLOOR
Corrective Action Required
03/19/2025
Building F: complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA -1st layer at 2 hour walls **only 1st layer inspected at 2 hr wall? -all wall and ceiling
SECOND FLOOR
Corrective Action Required
03/19/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridors except at elevator
THIRD FLOOR
Corrective Action Required
03/19/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls -Screw pattern complete except at fire wall and elevator ceilng
FOURTH FLOOR
Corrective Action Required
03/19/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
03/19/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st and 2nd layer at corridor side doorway walls -1st and 2nd layer at inside doorway floors 1,2,4
LOWER LEVEL
Corrective Action Required
03/19/2025
Complete except at elevator and stair J2
Rated Assembly Inspection Partial 3/21/2025 3/21/2025 03/21/2025
STAIR TOWER 1
Corrective Action Required
03/20/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
03/20/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
03/20/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
03/20/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
03/20/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
03/20/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
03/20/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer at corridor side all floors -1st layer at door side basement, 1st, 2nd and 4th floor
FIRST FLOOR
Corrective Action Required
03/20/2025
Building F: complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA -1st layer at 2 hour walls **only 1st layer inspected at 2 hr wall? -all wall and ceiling
SECOND FLOOR
Corrective Action Required
03/20/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridors except at elevator
THIRD FLOOR
Corrective Action Required
03/20/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls -Screw pattern complete except at fire wall and elevator ceilng
FOURTH FLOOR
Corrective Action Required
03/20/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
03/20/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st and 2nd layer at corridor side doorway walls -1st and 2nd layer at inside doorway floors 1,2,4
LOWER LEVEL
Corrective Action Required
03/20/2025
Complete except at elevator and stair J2
Rated Assembly Inspection Failed 3/24/2025 3/24/2025 03/24/2025
STAIR TOWER 1
Corrective Action Required
03/21/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
03/21/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
03/21/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
03/21/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
03/21/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
03/21/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
03/21/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer at corridor side all floors -1st layer at door side basement, 1st, 2nd and 4th floor
FIRST FLOOR
Corrective Action Required
03/21/2025
Building F: complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA -1st layer at 2 hour walls **only 1st layer inspected at 2 hr wall? -all wall and ceiling
SECOND FLOOR
Corrective Action Required
03/21/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridors except at elevator
THIRD FLOOR
Corrective Action Required
03/21/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls -Screw pattern complete except at fire wall and elevator ceilng
FOURTH FLOOR
Corrective Action Required
03/21/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
03/21/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st and 2nd layer at corridor side doorway walls -1st and 2nd layer at inside doorway floors 1,2,4
LOWER LEVEL
Corrective Action Required
03/21/2025
Complete except at elevator and stair J2
All Rough Inspection - Commercial Partial 3/26/2025 3/26/2025 03/26/2025
STAIR TOWER 1
Corrective Action Required
03/13/2025
complete
STAIR TOWER 2
Corrective Action Required
03/13/2025
complete
STAIR TOWER 3
Corrective Action Required
03/13/2025
complete
FIRST FLOOR
Corrective Action Required
03/13/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: complete Building H: complete Building J: complete
SECOND FLOOR
Corrective Action Required
03/13/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: complete
THIRD FLOOR
Corrective Action Required
03/13/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Units and corridor approved
FOURTH FLOOR
Corrective Action Required
03/13/2025
*Building F Complete *Building G: complete Building H: Complete Building J: Complete
ELEVATOR 1
Corrective Action Required
03/13/2025
Interior framing ok all floors
ELEVATOR 2
Corrective Action Required
03/13/2025
Elevator in G: Framing approved
LOWER LEVEL
Corrective Action Required
03/13/2025
H, I, J approved -Exterior garage light metal boxes-all bonded
All Rough Inspection - Commercial Passed 3/27/2025 3/27/2025 03/27/2025
STAIR TOWER 1
Resolved
03/27/2025
complete
STAIR TOWER 2
Resolved
03/27/2025
complete
STAIR TOWER 3
Resolved
03/27/2025
complete
FIRST FLOOR
Resolved
03/27/2025
Building F Complete except as noted: 157-NOT READY 389-Walls only ok-complete meps at ceiling and seal dead space Building G: complete Building H: complete Building J: complete
SECOND FLOOR
Resolved
03/27/2025
Building F: -Units and corridor complete Building G: -Units and corridor complete Building H: Units and corridor complete Building J: complete
THIRD FLOOR
Resolved
03/27/2025
*Building F -Units and corridor approved Building G: -Units and corridor approved Building H: -Units and corridor approved Building J: -Units and corridor approved
FOURTH FLOOR
Resolved
03/27/2025
*Building F Complete *Building G: complete Building H: Complete Building J: Complete
ELEVATOR 1
Resolved
03/27/2025
Interior framing ok all floors
ELEVATOR 2
Resolved
03/27/2025
Elevator in G: Framing approved
LOWER LEVEL
Resolved
03/27/2025
H, I, J approved -Exterior garage light metal boxes-all bonded
Rated Assembly Inspection Partial 3/28/2025 3/28/2025 03/28/2025
STAIR TOWER 1
Corrective Action Required
03/24/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
03/24/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
03/24/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
03/24/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
03/24/2025
Stair at Building K -1st layer stringer side only all floors
ELEVATOR 1
Corrective Action Required
03/24/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
03/24/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer at corridor side all floors -1st layer at door side basement, 1st, 2nd and 4th floor
FIRST FLOOR
Corrective Action Required
03/24/2025
Building F: complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -1st layer at pet SPA -1st layer at 2 hour walls **only 1st layer inspected at 2 hr wall? -all wall and ceiling
SECOND FLOOR
Corrective Action Required
03/24/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st and 2nd layer at 2 hour walls -Screw pattern at units and corridors except at elevator
THIRD FLOOR
Corrective Action Required
03/24/2025
Building F: Complete Building G: Complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridor -1st Layer firewalls -Screw pattern complete except at fire wall and elevator ceilng
FOURTH FLOOR
Corrective Action Required
03/24/2025
Building F: Complete Building G: complete Building H: complete Building J: -1st and 2nd layer behind tubs and showers -RC at units and corridors -1st layer at 2 HOUR walls -Screw pattern at units and corridors except at elevator
ELEVATOR 3
Corrective Action Required
03/24/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st and 2nd layer at corridor side doorway walls -1st and 2nd layer at inside doorway floors 1,2,4
LOWER LEVEL
Corrective Action Required
03/24/2025
Complete except at elevator and stair J2
Rated Assembly Inspection Partial 3/31/2025 3/31/2025 03/31/2025
STAIR TOWER 1
Corrective Action Required
03/28/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
03/28/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
03/28/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
03/28/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
03/28/2025
Stair at Building K complete
ELEVATOR 1
Corrective Action Required
03/28/2025
-1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors
ELEVATOR 2
Corrective Action Required
03/28/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer at corridor side all floors -1st layer at door side basement, 1st, 2nd and 4th floor
FIRST FLOOR
Corrective Action Required
03/28/2025
Building F: complete Building G: complete except screw pattern at mechanical room Building H: complete Building J: complete
SECOND FLOOR
Corrective Action Required
03/28/2025
Building F: Complete Building G: Complete Building H: complete Building J: complete
THIRD FLOOR
Corrective Action Required
03/28/2025
Building F: Complete Building G: Complete Building H: complete Building J: complete
FOURTH FLOOR
Corrective Action Required
03/28/2025
Building F: Complete Building G: complete Building H: complete Building J: complete
ELEVATOR 3
Corrective Action Required
03/28/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st and 2nd layer at corridor side doorway walls -1st and 2nd layer at inside doorway floors 1,2,4
LOWER LEVEL
Corrective Action Required
03/28/2025
Complete
Rated Assembly Inspection Partial 4/2/2025 4/2/2025 04/02/2025
STAIR TOWER 1
Corrective Action Required
03/31/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
03/31/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
03/31/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
03/31/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
03/31/2025
Stair at Building K complete
ELEVATOR 1
Corrective Action Required
03/31/2025
Elevator F -1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors -1st layer inside at 3rd floor
ELEVATOR 2
Corrective Action Required
03/31/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer at corridor side all floors -1st layer at door side basement, 1st, 2nd and 4th floor
FIRST FLOOR
Corrective Action Required
03/31/2025
Building F: complete Building G: complete except screw pattern at mechanical room Building H: complete Building J: complete
SECOND FLOOR
Corrective Action Required
03/31/2025
Building F: Complete Building G: Complete Building H: complete Building J: complete
THIRD FLOOR
Corrective Action Required
03/31/2025
Building F: Complete Building G: Complete Building H: complete Building J: complete
FOURTH FLOOR
Corrective Action Required
03/31/2025
Building F: Complete Building G: complete Building H: complete Building J: complete
ELEVATOR 3
Corrective Action Required
03/31/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st and 2nd layer at corridor side doorway walls -1st and 2nd layer at inside doorway floors 1,2,4
LOWER LEVEL
Corrective Action Required
03/31/2025
Complete
Rated Assembly Inspection Partial 4/3/2025 4/3/2025 04/03/2025
STAIR TOWER 1
Corrective Action Required
04/02/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
04/02/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
04/02/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
04/02/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
04/02/2025
Stair at Building K complete
ELEVATOR 1
Corrective Action Required
04/02/2025
Elevator F -1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors -1st and 2nd layer inside at 3rd floor
ELEVATOR 2
Corrective Action Required
04/02/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer at corridor side all floors -1st layer at door side basement, 1st, 2nd and 4th floor
FIRST FLOOR
Corrective Action Required
04/02/2025
Building F: complete Building G: complete except screw pattern at mechanical room Building H: complete Building J: complete
SECOND FLOOR
Corrective Action Required
04/02/2025
Building F: Complete Building G: Complete Building H: complete Building J: complete
THIRD FLOOR
Corrective Action Required
04/02/2025
Building F: Complete Building G: Complete Building H: complete Building J: complete
FOURTH FLOOR
Corrective Action Required
04/02/2025
Building F: Complete Building G: complete Building H: complete Building J: complete
ELEVATOR 3
Corrective Action Required
04/02/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st and 2nd layer at corridor side doorway walls -1st and 2nd layer at inside doorway floors 1,2,4
LOWER LEVEL
Corrective Action Required
04/02/2025
Complete
Rated Assembly Inspection Failed 4/14/2025 4/14/2025 04/14/2025
STAIR TOWER 1
Corrective Action Required
04/03/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
04/03/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
04/03/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
04/03/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
04/03/2025
Stair at Building K complete
ELEVATOR 1
Corrective Action Required
04/03/2025
Elevator F -1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 2nd , 1st floors -1st and 2nd layer inside at 3rd floor
ELEVATOR 2
Corrective Action Required
04/03/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer at corridor side all floors -1st layer at door side basement, 1st, 2nd and 4th floor
FIRST FLOOR
Corrective Action Required
04/03/2025
Building F: complete Building G: complete except screw pattern at mechanical room Building H: complete Building J: complete
SECOND FLOOR
Corrective Action Required
04/03/2025
Building F: Complete Building G: Complete Building H: complete Building J: complete
THIRD FLOOR
Corrective Action Required
04/03/2025
Building F: Complete Building G: Complete Building H: complete Building J: complete
FOURTH FLOOR
Corrective Action Required
04/03/2025
Building F: Complete Building G: complete Building H: complete Building J: complete
ELEVATOR 3
Corrective Action Required
04/03/2025
-1st and 2nd layer at (3) interior walls -1st, hat channel 2nd and 3rd layer at ceiling -1st and 2nd layer at corridor side doorway walls -1st and 2nd layer at inside doorway floors 1,2,4
LOWER LEVEL
Corrective Action Required
04/03/2025
Complete
Rated Assembly Inspection Partial 4/16/2025 4/16/2025 04/16/2025
STAIR TOWER 1
Corrective Action Required
04/14/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
04/14/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
04/14/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
04/14/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
04/14/2025
Stair at Building K complete
ELEVATOR 1
Corrective Action Required
04/14/2025
Elevator F -1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 3rd, 2nd , 1st floors -1st and 2nd layer inside at 3rd floor
ELEVATOR 2
Corrective Action Required
04/14/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer at corridor side all floors -1st layer at door side basement, 1st, 2nd,3rd, 4th floor
FIRST FLOOR
Corrective Action Required
04/14/2025
Building F: complete Building G: complete except screw pattern at mechanical room Building H: complete Building J: complete
SECOND FLOOR
Corrective Action Required
04/14/2025
Building F: Complete Building G: Complete Building H: complete Building J: complete
THIRD FLOOR
Corrective Action Required
04/14/2025
Building F: Complete Building G: Complete Building H: complete Building J: complete
FOURTH FLOOR
Corrective Action Required
04/14/2025
Building F: Complete Building G: complete Building H: complete Building J: complete
ELEVATOR 3
Corrective Action Required
04/14/2025
complete
LOWER LEVEL
Corrective Action Required
04/14/2025
Complete
Rated Assembly Inspection Partial 4/17/2025 4/17/2025 04/17/2025
STAIR TOWER 1
Corrective Action Required
04/16/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
04/16/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
04/16/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
04/16/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
04/16/2025
Stair at Building K complete
ELEVATOR 1
Corrective Action Required
04/16/2025
Elevator F -1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 3rd, 2nd , 1st floors -1st and 2nd layer inside at 3rd floor
ELEVATOR 2
Corrective Action Required
04/16/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer at corridor side all floors -1st layer at door side basement, 1st, 2nd,3rd, 4th floor
FIRST FLOOR
Corrective Action Required
04/16/2025
Building F: complete Building G: complete Building H: complete Building J: complete
SECOND FLOOR
Corrective Action Required
04/16/2025
Building F: Complete Building G: Complete Building H: complete Building J: complete
THIRD FLOOR
Corrective Action Required
04/16/2025
Building F: Complete Building G: Complete Building H: complete Building J: complete
FOURTH FLOOR
Corrective Action Required
04/16/2025
Building F: Complete Building G: complete Building H: complete Building J: complete
ELEVATOR 3
Corrective Action Required
04/16/2025
complete
LOWER LEVEL
Corrective Action Required
04/16/2025
Complete
Rated Assembly Inspection Failed 4/22/2025 4/22/2025 04/22/2025
STAIR TOWER 1
Corrective Action Required
04/17/2025
Stair in building F Complete
STAIR TOWER 2
Corrective Action Required
04/17/2025
-Stair in building G Complete
STAIR TOWER 3
Corrective Action Required
04/17/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Corrective Action Required
04/17/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Corrective Action Required
04/17/2025
Stair at Building K complete
ELEVATOR 1
Corrective Action Required
04/17/2025
Elevator F -1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 3rd, 2nd , 1st floors -1st and 2nd layer inside at 3rd floor
ELEVATOR 2
Corrective Action Required
04/17/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer at corridor side all floors -1st layer at door side basement, 1st, 2nd,3rd, 4th floor
FIRST FLOOR
Corrective Action Required
04/17/2025
Building F: complete Building G: complete Building H: complete Building J: complete
SECOND FLOOR
Corrective Action Required
04/17/2025
Building F: Complete Building G: Complete Building H: complete Building J: complete
THIRD FLOOR
Corrective Action Required
04/17/2025
Building F: Complete Building G: Complete Building H: complete Building J: complete
FOURTH FLOOR
Corrective Action Required
04/17/2025
Building F: Complete Building G: complete Building H: complete Building J: complete
ELEVATOR 3
Corrective Action Required
04/17/2025
complete
LOWER LEVEL
Corrective Action Required
04/17/2025
Complete
Misc
Corrective Action Required
04/21/2025
Segment J 3rd floor elevator drywall 2nd layer Waiting on elevator people to move elevator re- scheduled to 4/22/25
Piers/Caissons Inspection - Commercial Passed 10/11/2023 (1:00) 04/25/2025
Footing Inspection - Commercial Passed 04/25/2025
THE FOLLOWING AREAS ARE APPROVED
Informational
11/17/2023
Segment F -perimeters footings complete -Elevator pit (2) ufer locations (one each end) per engineered detail segment G -perimeters footings complete - Elevator basemrnt walls -Footing for elevator -Ufer per engineered drawing Segment H -perimeters footings complete -Ufer per engineered detail Segment J -perimeters footings complete -Footing for elevator pit Trash enclosure footings
Underslab Electrical Inspection - Commercial Passed 1/13/2025 04/25/2025
Misc
Corrective Action Required
10/03/2023
Segment F complete Segment G complete Segment H complete Segment J complete
Miscellaneous Inspection Failed 4/25/2025 4/25/2025 04/25/2025
Misc
Corrective Action Required
04/25/2025
4/25/25 4F pre final-not ready
Miscellaneous Inspection Partial 5/1/2025 5/1/2025 05/01/2025
Misc
Corrective Action Required
04/25/2025
4F pre final -Submit final third party inspection reports -Install smoke seals at corridor doors -Missing drywall at mechanical room walls -Landing at rooftop stairs required to be min 30" by 30" clear 2449-Loose receptacle at end of countertop, install spark rings at kitchen backsplash 2448-Install spark rings at backsplash 2447-Install smoke detector at bedroom, fire caulk mechanical room ceiling 2445-Bath fan not working properly
Miscellaneous Inspection Partial 5/2/2025 5/2/2025 05/02/2025
Misc
Corrective Action Required
05/01/2025
4F pre final -Submit final third party inspection reports -Install smoke seals at corridor doors
Miscellaneous Inspection Partial 5/6/2025 5/6/2025 05/06/2025
Misc
Corrective Action Required
05/02/2025
4F pre final -Submit final third party inspection reports -Install smoke seals at corridor doors 3F -Install smoke seals at corridor, mechanical and stairwell -EM light outside of 2345 not working 2349-Seal mechanical room ceiling 2348-Exterior GFCI faulty, check kitchen circuit (lights tied to multiple breakers) Mechanical room-Seal all penetrations, remove dwv from fire partition 2342-Seal exterior penetration 2341-Exterior GFCI hot and ground reversed
Underground Electrical Inspection - Commercial Failed 5/7/2025 05/07/2025
Miscellaneous Correction
Corrective Action Required
05/07/2025
Conduit requires min 18" coverage
Electrical Service Inspection Failed 5/9/2025 5/9/2025 05/09/2025
Miscellaneous Correction
Corrective Action Required
05/09/2025
-Provide ufer ground per code -Install 60 amp enclosure and fuses per plan -Remove bonding screw at sub panel
Underground Electrical Inspection - Commercial Partial 5/9/2025 5/9/2025 05/09/2025
Miscellaneous Correction
Corrective Action Required
05/07/2025
Island between building 1 and 2 site lighting ok
Miscellaneous Inspection Partial 5/9/2025 5/9/2025 05/09/2025
Misc
Corrective Action Required
05/06/2025
4F pre final -Submit final third party inspection reports -Install smoke seals at corridor doors 3F -Install smoke seals at corridor, mechanical and stairwell -EM light outside of 2345 not working 2349-Seal mechanical room ceiling 2348-Exterior GFCI faulty, check kitchen circuit (lights tied to multiple breakers) Mechanical room-Seal all penetrations 2342-Seal exterior penetration 2341-Exterior GFCI hot and ground reversed 2F 2248-GFCI at washing machine not working 2242-Loose receptacle right of range -Close opening in ceiling box at stairwell
Sprinkler - Hydrostatic Test Passed 05/09/2025
Sprinkler - Flow Test Passed 05/09/2025
Miscellaneous Inspection Partial 5/16/2025 5/16/2025 05/16/2025
Misc
Corrective Action Required
05/09/2025
4F pre final -Submit final third party inspection reports -Install smoke seals at corridor doors 3F -Install smoke seals at corridor, mechanical and stairwell -EM light outside of 2345 not working 2349-Seal mechanical room ceiling 2348-Exterior GFCI faulty, check kitchen circuit (lights tied to multiple breakers) Mechanical room-Seal all penetrations 2342-Seal exterior penetration 2341-Exterior GFCI hot and ground reversed 2F 2248-GFCI at washing machine not working 2242-Loose receptacle right of range -Close opening in ceiling box at stairwell 1F G52-CO detector not functioning G58-Seal penetration
Rated Assembly Inspection Passed 5/19/2025 5/19/2025 05/19/2025
STAIR TOWER 1
Resolved
05/19/2025
Stair in building F Complete
STAIR TOWER 2
Resolved
05/19/2025
-Stair in building G Complete
STAIR TOWER 3
Resolved
05/19/2025
Stair 3 in Building G -Complete
STAIR TOWER 4
Resolved
05/19/2025
Stair 4 in Building J: complete
STAIR TOWER 5
Resolved
05/19/2025
Stair at Building K complete
ELEVATOR 1
Resolved
05/19/2025
Elevator F -1st and 2nd layer unit side behind trusses -1st, 2nd and 3rd layer at ceiling -1st and 2nd layer interior all floors -1st, 2nd layer at unit side -1st and 2nd layer inside at 4th, 3rd, 2nd , 1st floors -1st and 2nd layer inside at 3rd floor
ELEVATOR 2
Resolved
05/19/2025
1st layer,2nd, 3rd layer and hat channel at ceiling 1st and 2nd layer all floors interior 3 walls -1st and 2nd layer outside all floors -1st and 2nd layer at corridor side all floors -1st layer at door side basement, 1st, 2nd,3rd, 4th floor
FIRST FLOOR
Resolved
05/19/2025
Building F: complete Building G: complete Building H: complete Building J: complete
SECOND FLOOR
Resolved
05/19/2025
Building F: Complete Building G: Complete Building H: complete Building J: complete
THIRD FLOOR
Resolved
05/19/2025
Building F: Complete Building G: Complete Building H: complete Building J: complete
FOURTH FLOOR
Resolved
05/19/2025
Building F: Complete Building G: complete Building H: complete Building J: complete
ELEVATOR 3
Resolved
05/19/2025
complete
LOWER LEVEL
Resolved
05/19/2025
Complete
Misc
Resolved
05/19/2025
Segment J 3rd floor elevator drywall 2nd layer Waiting on elevator people to move elevator re- scheduled to 4/22/25
Miscellaneous Inspection Partial 5/19/2025 5/19/2025 05/19/2025
Misc
Corrective Action Required
05/16/2025
F pre final -Install smoke seals at corridor, stairwell and mechanical room doors 2F -Close opening in ceiling box at stairwell and secure electrical
Foundation Inspection - Commercial Passed 05/21/2025
Misc
Informational
12/13/2023
12-13-23 -Submit change to detail of concrete walls in place of masonary walls at trash enclosure. Rebar witnessed is #4 at 12" oc horizonatal and vertical
Occupancy Inspection - Planning Temporary C of O 5/21/2025 5/21/2025 05/21/2025
Misc
Corrective Action Required
05/21/2025
Complete landscaping per approved plan.
Miscellaneous Correction
Corrective Action Required
05/21/2025
Complete the trash complactor enclosure.
Miscellaneous Correction
Corrective Action Required
05/21/2025
Provide parking as necessary based on occupied units.
Occupancy Inspection - Engineering Temporary C of O 5/21/2025 5/21/2025 05/21/2025
Misc
Informational
05/21/2025
No outstanding issues for field engineering inspection.
Occupancy Inspection - Codes Commercial Failed 5/21/2025 5/21/2025 05/21/2025
Misc
Corrective Action Required
05/21/2025
Partial only: -Segment F ok to occupy
Misc
Corrective Action Required
05/21/2025
-Complete corrections for all other departments
Electrical Service Inspection Passed 6/4/2025 06/04/2025
Misc
Informational
06/04/2025
Service located at trash enclosure addressed as "810 NW Ward RD Unit TC" approved
Miscellaneous Inspection Partial 6/11/2025 6/11/2025 06/11/2025
Misc
Corrective Action Required
05/19/2025
G pre final 4th floor: 2425- seal fire sprinkler sconce in front hallway 2427- missing fire sprinkler sconce in living room 2432 - receptacle not GFCI protected kitchen counter far left of refrigerator
Miscellaneous Inspection Partial 6/12/2025 6/12/2025 06/12/2025
Misc
Corrective Action Required
06/11/2025
G pre final -Install smoke seals at corridor doors 4th floor: 2425- seal fire sprinkler sconce in front hallway 2427- missing fire sprinkler sconce in living room 2432 - receptacle not GFCI protected kitchen counter far left of refrigerator 3rd Floor: 2324-Install smoke seal at entry door, tape drywall at mech room ceiling 2327-Secure dishwasher discharge line above bowl of sink 2329-GFCI protection required within 6' of kitchen sink MEP ROOM- Seal penetrations, install knockout cover at ceiling J box, install smoke seals 2332- Smoke detector not permitted within 6' or range 2334-GFCI at laundry not working, must also be AFCI
Miscellaneous Inspection Partial 6/13/2025 6/13/2025 06/13/2025
Misc
Corrective Action Required
06/12/2025
G pre final -Install smoke seals at corridor doors 4th floor: 2425- seal fire sprinkler sconce in front hallway 2427- missing fire sprinkler sconce in living room 2432 - receptacle not GFCI protected kitchen counter far left of refrigerator, Smoke detector not permitted within 6' or range 3rd Floor: 2324-Install smoke seal at entry door, tape drywall at mech room ceiling 2327-Secure dishwasher discharge line above bowl of sink 2329-GFCI protection required within 6' of kitchen sink MEP ROOM- Seal penetrations, install knockout cover at ceiling J box, install smoke seals 2332- Smoke detector not permitted within 6' or range 2334-GFCI at laundry not working, must also be AFCI 2nd floor: -Install smoke seals at corridor doors, secure mc inside of islands 2224-GFCI protection required within 6' of kitchen sink 2223-Seal mechanical room ceiling Electrical room-provide signage, label panel, provide panel schedule, seal penetrations 2225-GFCI protection required within 6' of kitchen sink 2226-Provide AFCI protection at wall receptacle in laundry 2227-Provide AFCI protection at wall receptacle in laundry 2228-Provide AFCI protection at wall receptacle in laundry, adjust door to self close and latch 2229-GFCI protection required within 6' of kitchen sink, secure dishwasher discharge line above bowl of sink 2230-GFCI protection required within 6' of kitchen sink MEP-install smoke seals and seal penetrations 2332-exterior box installed upside down, Smoke detector not permitted within 6' or range 2234-Provide AFCI protection at wall receptacle in laundry, secure dishwasher discharge line above bowl of sink, missing cover at dryer exhaust exterior, seal mechanical room ceiling
Miscellaneous Inspection Failed 6/17/2025 6/17/2025 06/17/2025
Misc
Corrective Action Required
06/13/2025
G pre final -Install smoke seals at corridor doors 4th floor: OK 3rd Floor: 2324-Install smoke seal at entry door, tape drywall at mech room ceiling 2327-Secure dishwasher discharge line above bowl of sink 2329-GFCI protection required within 6' of kitchen sink MEP ROOM- Seal penetrations, install knockout cover at ceiling J box, install smoke seals 2332- Smoke detector not permitted within 6' or range 2334-GFCI at laundry not working, must also be AFCI 2nd floor: -Install smoke seals at corridor doors, secure mc inside of islands 2224-GFCI protection required within 6' of kitchen sink 2223-Seal mechanical room ceiling Electrical room-provide signage, label panel, provide panel schedule, seal penetrations 2225-GFCI protection required within 6' of kitchen sink 2226-Provide AFCI protection at wall receptacle in laundry 2227-Provide AFCI protection at wall receptacle in laundry 2228-Provide AFCI protection at wall receptacle in laundry, adjust door to self close and latch 2229-GFCI protection required within 6' of kitchen sink, secure dishwasher discharge line above bowl of sink 2230-GFCI protection required within 6' of kitchen sink MEP-install smoke seals and seal penetrations 2332-exterior box installed upside down, Smoke detector not permitted within 6' or range 2234-Provide AFCI protection at wall receptacle in laundry, secure dishwasher discharge line above bowl of sink, missing cover at dryer exhaust exterior, seal mechanical room ceiling
Underground Electrical Inspection - Commercial Partial 6/17/2025 6/17/2025 06/17/2025
Misc
Informational
06/17/2025
Conduit in place for 2 light poles on East side parking lot. 1 just South of main entrance then 1 South foot 100. Ok to cover
Miscellaneous Inspection Partial 6/20/2025 6/20/2025 06/20/2025
Misc
Corrective Action Required
06/17/2025
G pre final -Install smoke seals at corridor doors 4th floor: OK MEP patch hole in wall 2327-Secure dishwasher discharge line above bowl of sink 2329-GFCI protection required within 6' of kitchen sink MEP ROOM- install knockout cover at ceiling J box 2334-GFCI at laundry not working 2nd floor: -Electrical room-provide signage, label panel, provide panel 2228-adjust door to self close and latch 2229-secure dishwasher discharge line above bowl of sink 2230-Secure MC at island 2332-exterior box installed upside down, secure MC at island 2234-Provide AFCI protection at wall receptacle in laundry, secure dishwasher discharge line above bowl of sink, missing cover at dryer exhaust exterior, 2235-Secure MC 1st floor units only MEP-Seal penetration at wall 2124-Secure mc at island, combo outside of bedroom, adjust door 2126- install device or cover plate at bedroom wall 2130-GFCI within 6’ of sink MEP-Tighten pans around HVAC to ceiling 2134-secure dishwasher line, seal hole at mechanical wall, uncover smoke detector, breaker 16 defective
Miscellaneous Inspection Partial 6/24/2025 6/24/2025 06/24/2025
Misc
Corrective Action Required
06/20/2025
G pre final -Install smoke seals at corridor doors 4th floor: OK 3rd Floor: MEP Seal penetrations 2nd floor: -Electrical room-provide signage, label panel, provide panel 1st floor units only MEP-Seal penetration at wall 212-combo detector required outside of bedroom MEP-Tighten pans around HVAC to ceiling
Miscellaneous Inspection Partial 6/25/2025 6/25/2025 06/25/2025
Misc
Corrective Action Required
06/24/2025
G pre final -Install smoke seals at corridor doors 4th floor: OK 3rd Floor: OK 2nd floor: -Electrical room-provide signage, - garages and storage garage: OK 1st floor units only 2 garages door opener not tied to smoke alarm
Occupancy Inspection - Planning Temporary C of O 7/1/2025 7/1/2025 07/01/2025
Misc
Corrective Action Required
05/21/2025
Complete landscaping per approved plan.
Misc
Corrective Action Required
05/21/2025
Complete the trash complactor enclosure.
Miscellaneous Correction
Corrective Action Required
05/21/2025
Provide parking as necessary based on occupied units.
Occupancy Inspection - Codes Commercial Failed 7/1/2025 7/1/2025 07/01/2025
Misc
Corrective Action Required
05/21/2025
Partial only: -Segments F and G ok to occupy
Misc
Corrective Action Required
05/21/2025
-Complete corrections for all other departments
Occupancy Inspection - Water Utilities Passed 7/1/2025 7/1/2025 07/01/2025
Occupancy Inspection - Engineering Temporary C of O 7/1/2025 7/1/2025 07/02/2025
Misc
Informational
05/21/2025
No outstanding issues for field engineering inspection.
Miscellaneous Inspection Partial 7/2/2025 7/2/2025 07/02/2025
Misc
Corrective Action Required
06/25/2025
Pre final units only segment H 4th floor 2421-smoke detector not permitted within 6’ of range, secure electrical at island, afci protection required at laundry 2420-secure mc at island 2419-afci at laundry 2414- GFCi within 6’ of sink required 2413-secure mc at island
Documents & Images
Date Uploaded File Type Document Name
06/14/2023 Receipt Receipt for transaction:2023-004387
06/15/2023 Letter DS Building Permit
06/12/2023 Approved Plans Approved Fdtn & Underslab
06/19/2023 Receipt Receipt for transaction:2023-004576
06/19/2023 Receipt Receipt for transaction:2023-004577
07/06/2023 Letter INSPECTION SUMMARY
07/10/2023 Letter INSPECTION SUMMARY
07/11/2023 Letter INSPECTION SUMMARY
07/11/2023 Letter INSPECTION SUMMARY
07/19/2023 Letter INSPECTION SUMMARY
07/20/2023 Letter INSPECTION SUMMARY
07/21/2023 Letter INSPECTION SUMMARY
07/26/2023 Letter INSPECTION SUMMARY
08/01/2023 Letter INSPECTION SUMMARY
08/04/2023 Letter INSPECTION SUMMARY
09/01/2023 Letter INSPECTION SUMMARY
09/07/2023 Letter INSPECTION SUMMARY
09/15/2023 Approved Plans APPROVED CIVIL REVISED 9.7.2023 TRILOGY APARTMENTS
09/18/2023 Letter INSPECTION SUMMARY
09/19/2023 Letter INSPECTION SUMMARY
09/19/2023 Letter INSPECTION SUMMARY
09/20/2023 Letter INSPECTION SUMMARY
09/21/2023 Letter INSPECTION SUMMARY
09/22/2023 Letter INSPECTION SUMMARY
09/28/2023 Letter INSPECTION SUMMARY
09/28/2023 Letter INSPECTION SUMMARY
10/02/2023 Letter INSPECTION SUMMARY
10/03/2023 Letter INSPECTION SUMMARY
10/04/2023 Letter INSPECTION SUMMARY
10/10/2023 Letter INSPECTION SUMMARY
10/11/2023 Letter INSPECTION SUMMARY
10/11/2023 Letter INSPECTION SUMMARY
10/16/2023 Letter INSPECTION SUMMARY
11/17/2023 Letter INSPECTION SUMMARY
12/13/2023 Letter INSPECTION SUMMARY
12/20/2023 Receipt Receipt for transaction: 2023-009232
01/03/2024 Letter DS Building Permit
01/05/2024 Plans Summit Square III Fire Sprinkler Plans - Sealed - Signed - Flat
01/05/2024 Specifications Summit Square III Calcs - Sealed - Signed - Flat
01/05/2024 Engineer Report/Study Summit Square III Submittal Book
01/18/2024 Letter Fire (Sprinkler) Plan Review
01/31/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter Codes Residential Plan Review
07/17/2024 Letter INSPECTION SUMMARY
07/18/2024 Letter INSPECTION SUMMARY
07/19/2024 Letter INSPECTION SUMMARY
07/23/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/12/2024 Letter INSPECTION SUMMARY
08/15/2024 Letter INSPECTION SUMMARY
08/19/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/28/2024 Letter INSPECTION SUMMARY
08/30/2024 Letter INSPECTION SUMMARY
08/30/2024 Letter INSPECTION SUMMARY
09/06/2024 Letter INSPECTION SUMMARY
09/11/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/19/2024 Letter INSPECTION SUMMARY
09/19/2024 Letter INSPECTION SUMMARY
09/20/2024 Letter INSPECTION SUMMARY
09/23/2024 Letter INSPECTION SUMMARY
09/24/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/27/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
10/01/2024 Letter INSPECTION SUMMARY
10/01/2024 Letter INSPECTION SUMMARY
10/03/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/07/2024 Letter INSPECTION SUMMARY
10/07/2024 Letter INSPECTION SUMMARY
10/08/2024 Letter INSPECTION SUMMARY
10/08/2024 Letter INSPECTION SUMMARY
10/09/2024 Letter INSPECTION SUMMARY
10/10/2024 Letter INSPECTION SUMMARY
10/10/2024 Letter INSPECTION SUMMARY
10/11/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/15/2024 Letter INSPECTION SUMMARY
10/15/2024 Letter INSPECTION SUMMARY
10/16/2024 Letter INSPECTION SUMMARY
10/16/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/21/2024 Letter INSPECTION SUMMARY
10/21/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/23/2024 Letter INSPECTION SUMMARY
10/23/2024 Letter INSPECTION SUMMARY
10/24/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
10/30/2024 Letter INSPECTION SUMMARY
10/30/2024 Letter INSPECTION SUMMARY
10/31/2024 Letter INSPECTION SUMMARY
10/31/2024 Letter INSPECTION SUMMARY
11/01/2024 Letter INSPECTION SUMMARY
11/04/2024 Letter INSPECTION SUMMARY
11/05/2024 Letter INSPECTION SUMMARY
11/06/2024 Letter INSPECTION SUMMARY
11/06/2024 Letter INSPECTION SUMMARY
11/07/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/13/2024 Letter INSPECTION SUMMARY
11/13/2024 Letter INSPECTION SUMMARY
11/14/2024 Letter INSPECTION SUMMARY
11/14/2024 Letter INSPECTION SUMMARY
11/15/2024 Letter INSPECTION SUMMARY
11/15/2024 Letter INSPECTION SUMMARY
11/18/2024 Letter INSPECTION SUMMARY
11/18/2024 Letter INSPECTION SUMMARY
11/19/2024 Letter INSPECTION SUMMARY
11/19/2024 Letter INSPECTION SUMMARY
11/20/2024 Letter INSPECTION SUMMARY
11/20/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/22/2024 Letter INSPECTION SUMMARY
11/22/2024 Letter INSPECTION SUMMARY
11/25/2024 Letter INSPECTION SUMMARY
11/25/2024 Letter INSPECTION SUMMARY
11/26/2024 Letter INSPECTION SUMMARY
11/27/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter INSPECTION SUMMARY
12/06/2024 Letter INSPECTION SUMMARY
12/06/2024 Letter INSPECTION SUMMARY
12/10/2024 Letter INSPECTION SUMMARY
12/10/2024 Letter INSPECTION SUMMARY
12/11/2024 Letter INSPECTION SUMMARY
12/11/2024 Letter INSPECTION SUMMARY
12/12/2024 Letter INSPECTION SUMMARY
12/12/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/17/2024 Letter INSPECTION SUMMARY
12/18/2024 Letter INSPECTION SUMMARY
12/19/2024 Letter INSPECTION SUMMARY
12/19/2024 Letter INSPECTION SUMMARY
12/20/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/30/2024 Letter INSPECTION SUMMARY
01/02/2025 Letter INSPECTION SUMMARY
01/03/2025 Letter INSPECTION SUMMARY
01/08/2025 Letter INSPECTION SUMMARY
01/08/2025 Letter INSPECTION SUMMARY
01/13/2025 Letter INSPECTION SUMMARY
01/13/2025 Letter INSPECTION SUMMARY
01/13/2025 Letter INSPECTION SUMMARY
01/13/2025 Letter INSPECTION SUMMARY
01/14/2025 Letter INSPECTION SUMMARY
01/14/2025 Letter INSPECTION SUMMARY
01/15/2025 Letter INSPECTION SUMMARY
01/16/2025 Letter INSPECTION SUMMARY
01/16/2025 Letter INSPECTION SUMMARY
01/17/2025 Letter INSPECTION SUMMARY
01/17/2025 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/23/2025 Letter INSPECTION SUMMARY
01/24/2025 Letter INSPECTION SUMMARY
01/24/2025 Letter INSPECTION SUMMARY
01/27/2025 Letter INSPECTION SUMMARY
01/27/2025 Letter INSPECTION SUMMARY
01/28/2025 Letter INSPECTION SUMMARY
01/29/2025 Letter INSPECTION SUMMARY
01/30/2025 Letter INSPECTION SUMMARY
01/30/2025 Letter INSPECTION SUMMARY
01/31/2025 Letter INSPECTION SUMMARY
01/31/2025 Letter INSPECTION SUMMARY
02/03/2025 Letter INSPECTION SUMMARY
02/04/2025 Letter INSPECTION SUMMARY
02/06/2025 Letter INSPECTION SUMMARY
02/07/2025 Letter INSPECTION SUMMARY
02/07/2025 Letter INSPECTION SUMMARY
02/10/2025 Letter INSPECTION SUMMARY
02/10/2025 Letter INSPECTION SUMMARY
02/11/2025 Letter INSPECTION SUMMARY
02/11/2025 Letter INSPECTION SUMMARY
02/12/2025 Letter INSPECTION SUMMARY
02/12/2025 Letter INSPECTION SUMMARY
02/13/2025 Letter INSPECTION SUMMARY
02/13/2025 Letter INSPECTION SUMMARY
02/14/2025 Letter INSPECTION SUMMARY
02/18/2025 Letter INSPECTION SUMMARY
02/19/2025 Letter INSPECTION SUMMARY
02/19/2025 Letter INSPECTION SUMMARY
02/19/2025 Letter INSPECTION SUMMARY
02/19/2025 Letter INSPECTION SUMMARY
02/20/2025 Letter INSPECTION SUMMARY
02/21/2025 Letter INSPECTION SUMMARY
02/24/2025 Letter INSPECTION SUMMARY
02/25/2025 Letter INSPECTION SUMMARY
02/25/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/27/2025 Letter INSPECTION SUMMARY
02/28/2025 Letter INSPECTION SUMMARY
03/03/2025 Letter INSPECTION SUMMARY
03/03/2025 Letter INSPECTION SUMMARY
03/04/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
03/17/2025 Letter INSPECTION SUMMARY
03/18/2025 Letter INSPECTION SUMMARY
03/19/2025 Letter INSPECTION SUMMARY
03/20/2025 Letter INSPECTION SUMMARY
03/21/2025 Letter INSPECTION SUMMARY
03/24/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/14/2025 Letter INSPECTION SUMMARY
04/16/2025 Letter INSPECTION SUMMARY
04/16/2025 Letter INSPECTION SUMMARY
04/17/2025 Letter INSPECTION SUMMARY
04/22/2025 Letter INSPECTION SUMMARY
04/25/2025 Letter INSPECTION SUMMARY
05/01/2025 Letter INSPECTION SUMMARY
05/02/2025 Letter INSPECTION SUMMARY
05/06/2025 Letter INSPECTION SUMMARY
05/07/2025 3rd Party Permit/Approval Summit Square Building 2 Final
05/07/2025 Letter INSPECTION SUMMARY
05/09/2025 3rd Party Permit/Approval operating cert 000185812
05/09/2025 3RD Party Insp Report Inspection LSFD-INS-2025-0000654
05/09/2025 Letter INSPECTION SUMMARY
05/09/2025 Letter INSPECTION SUMMARY
05/09/2025 Letter INSPECTION SUMMARY
05/15/2025 Letter 25 0507 - Trilogy Apts Threshold Compliance-Bldg 2
05/16/2025 Letter INSPECTION SUMMARY
05/19/2025 Letter INSPECTION SUMMARY
05/19/2025 Letter INSPECTION SUMMARY
05/21/2025 Letter INSPECTION SUMMARY
05/21/2025 Letter INSPECTION SUMMARY
05/21/2025 Letter INSPECTION SUMMARY
05/23/2025 Letter Segment F Occupancy Letter
06/04/2025 Letter INSPECTION SUMMARY
06/11/2025 Letter INSPECTION SUMMARY
06/12/2025 Letter INSPECTION SUMMARY
06/12/2025 Letter INSPECTION SUMMARY
06/12/2025 Letter INSPECTION SUMMARY
06/12/2025 Letter INSPECTION SUMMARY
06/12/2025 Letter INSPECTION SUMMARY
06/12/2025 Letter INSPECTION SUMMARY
06/12/2025 Letter INSPECTION SUMMARY
06/13/2025 Letter INSPECTION SUMMARY
06/17/2025 Letter INSPECTION SUMMARY
06/17/2025 Letter INSPECTION SUMMARY
06/20/2025 Letter INSPECTION SUMMARY
06/24/2025 Letter INSPECTION SUMMARY
06/25/2025 Letter INSPECTION SUMMARY
07/01/2025 Letter INSPECTION SUMMARY
07/01/2025 Letter INSPECTION SUMMARY
07/02/2025 Letter INSPECTION SUMMARY
07/02/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home