Permit Application Status

PRCOM20192096


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20192096
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
NEW COMMERCIAL
****NEW 4 STORY APARTMENT BUILDING WITH RETAIL SHELLS ON MAIN LEVEL AND PARKING BENEATH Constr Types: Bldg A - 1A (parking) Bldg B - 5A (south apt tower - includes retail) Bldg C - 2B (lobby) Bldg D - 5A (mid/west apt tower) Bldg E - 5A (north apt tower - includes retail) Foundation permit PRCOM20192706
08/05/2019
01/03/2020
01/02/2021
08/03/2021
Locations
Contacts
BRINKMANN CONSTRUCTORS, Address:8700 INDIAN CREEK PKWY, SUITE 150, Phone:(913) 717-9007  
TRI Architects, Address:9812 Manchester rd, Phone:(314) 395-9750  
WELKER HEATING & COOLING, Address:2221 N 147TH STREET, Phone:(913) 669-7555  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
DLARKINS@BRINKMANNCONSTRUCTORS.COM  
CFS ENGINEERS, Address:1421 EAST 104TH STREET STE 100, Phone:(816) 333-4477  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
Midwest Custom Pools, Address:600 Lincoln Street, Phone:(785) 843-9119  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 04/14/2021 04/09/2021
Joe Frogge
Elevator Equipment Permit
Corrective Action Required
04/05/2021

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
04/05/2021

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
04/05/2021

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
04/05/2021

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Engineered truss package
Corrective Action Required
04/05/2021

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss packages or request deferral. 9/11/19 - deferred per request
Miscellaneous Correction
Corrective Action Required
04/05/2021

2018 706.6 Vertical continuity. Fire walls shall extend from the foundation to a termination point not less than 30 inches above both adjacent roofs. Exceptions: (see code for complete list) 4. In buildings of Types III, IV and V construction, walls shall be permitted to terminate at the underside of combustible roof sheathing or decks provide that all of the following are met: (see code for complete list) 4.1. Roof openings are not less than 4 feet from the fire wall. Action required: There shall be no roof penetrations within 4' of fire walls. (to be field verified) 9/11/19 - acknowledged in letter
Fire Plan Review Approved 04/14/2021 04/05/2021
Michael Weissenbach
Posting of occupant load
Corrective Action Required
04/05/2021

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection)
Construction documents for fire alarm systems
Corrective Action Required
04/05/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the alarm system.
Tenant identification
Corrective Action Required
04/05/2021

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. (Verified At Inspection)
Address numbers required
Corrective Action Required
04/05/2021

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
04/05/2021

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Verified At Inspection) Order one Knox Box for the exterior of the building and two Elevator Knox Boxes. Place order through knoxbox.com.
Fire protection equipment identification
Corrective Action Required
04/05/2021

2018 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. (Verified At Inspection)
Construction documents - Fire protection systems
Corrective Action Required
04/05/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system. Class 1 standpipes to be installed.
Installation acceptance testing
Corrective Action Required
04/05/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. All life safety must pass before a final occupancy can take place.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
04/05/2021

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection)
Stairway identification signs
Corrective Action Required
04/05/2021

2018 IFC (B) 1023.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open an dclosed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level. (Verified At Inspection)
Discharge identification
Corrective Action Required
04/05/2021

2018 IFC (B) 1023.8 Discharge identification. An interior exit stairway and ramp shall not continue below its level of exit discharge to prevent persons from unintentionally continuing into levels below. Directional exit signs shall be provided as specified in Section 1011. (Informational Purposes)
Door operations
Corrective Action Required
04/05/2021

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Building Plan Review Approved with Conditions 11/06/2020 11/02/2020
Joe Frogge
Elevator Equipment Permit
Corrective Action Required
10/30/2020

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
10/30/2020

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
10/30/2020

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
10/30/2020

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Engineered truss package
Corrective Action Required
10/30/2020

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss packages or request deferral. 9/11/19 - deferred per request
Miscellaneous Correction
Corrective Action Required
10/30/2020

2018 706.6 Vertical continuity. Fire walls shall extend from the foundation to a termination point not less than 30 inches above both adjacent roofs. Exceptions: (see code for complete list) 4. In buildings of Types III, IV and V construction, walls shall be permitted to terminate at the underside of combustible roof sheathing or decks provide that all of the following are met: (see code for complete list) 4.1. Roof openings are not less than 4 feet from the fire wall. Action required: There shall be no roof penetrations within 4' of fire walls. (to be field verified) 9/11/19 - acknowledged in letter
Fire Plan Review Approved with Conditions 11/06/2020 10/30/2020
Michael Weissenbach
Posting of occupant load
Corrective Action Required
10/30/2020

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection)
Construction documents for fire alarm systems
Corrective Action Required
10/30/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the alarm system.
Tenant identification
Corrective Action Required
10/30/2020

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. (Verified At Inspection)
Address numbers required
Corrective Action Required
10/30/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
10/30/2020

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Verified At Inspection) Order one Knox Box for the exterior of the building and two Elevator Knox Boxes. Place order through knoxbox.com.
Fire protection equipment identification
Corrective Action Required
10/30/2020

2018 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. (Verified At Inspection)
Construction documents - Fire protection systems
Corrective Action Required
10/30/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system. Class 1 standpipes to be installed.
Installation acceptance testing
Corrective Action Required
10/30/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. All life safety must pass before a final occupancy can take place.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
10/30/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection)
Stairway identification signs
Corrective Action Required
10/30/2020

2018 IFC (B) 1023.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open an dclosed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level. (Verified At Inspection)
Discharge identification
Corrective Action Required
10/30/2020

2018 IFC (B) 1023.8 Discharge identification. An interior exit stairway and ramp shall not continue below its level of exit discharge to prevent persons from unintentionally continuing into levels below. Directional exit signs shall be provided as specified in Section 1011. (Informational Purposes)
Door operations
Corrective Action Required
10/30/2020

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Building Plan Review Approved with Conditions 08/18/2020
Joe Frogge
Elevator Equipment Permit
Corrective Action Required
07/15/2020

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
07/15/2020

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
07/15/2020

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Health Dept Review
Resolved
07/15/2020

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 12/31/19 - Health department approval deferred along with pool design.
Health Dept Inspection
Corrective Action Required
07/15/2020

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Engineered truss package
Corrective Action Required
07/15/2020

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss packages or request deferral. 9/11/19 - deferred per request
Misc
Resolved
07/15/2020

Copies of the pool design package was not provided at the time of permit application. Action required: Provide pool design package or request deferral. 9/11/19 - deferred per request
Miscellaneous Correction
Corrective Action Required
07/15/2020

2018 706.6 Vertical continuity. Fire walls shall extend from the foundation to a termination point not less than 30 inches above both adjacent roofs. Exceptions: (see code for complete list) 4. In buildings of Types III, IV and V construction, walls shall be permitted to terminate at the underside of combustible roof sheathing or decks provide that all of the following are met: (see code for complete list) 4.1. Roof openings are not less than 4 feet from the fire wall. Action required: There shall be no roof penetrations within 4' of fire walls. (to be field verified) 9/11/19 - acknowledged in letter
NEC Article 680.26 Equipotential bonding at pools
Resolved
08/18/2020

2017 NEC Article 680.26 Equipotential Bonding. (A) Performance. The equipotential bonding required by this section shall be installed to reduce voltage gradients in the pool area. 2017 NEC Article 680.26 (B)(7) Fixed Metal Parts. All fixed metal parts shall be bonded including, but not limited to, metal-sheathed cables and raceways, metal piping, metal awnings, metal fences, and metal door and window frames. Action required: Update incorrect code reference in notes under "work to be done by others." Bonding is covered in NEC 680.26. (not 680.25)
IBC 1011.11 Handrails - handrails at stairways
Resolved
08/18/2020

2018 IBC 1011.11 Handrails. Flights of stairways shall have handrails on each side and shall comply with Section 1014. Where glass is used to provide the handrail, the handrail shall also comply with Section 2407. (see code for exceptions) Action required: Provide handrails on both sides of stairs.
Building Plan Review Approved with Conditions 07/13/2020 07/14/2020
Joe Frogge
Elevator Equipment Permit
Corrective Action Required
07/06/2020

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
07/06/2020

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
07/06/2020

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Health Dept Review
Corrective Action Required
07/06/2020

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 12/31/19 - Health department approval deferred along with pool design.
Health Dept Inspection
Corrective Action Required
07/06/2020

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Engineered truss package
Corrective Action Required
07/06/2020

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss packages or request deferral. 9/11/19 - deferred per request
Misc
Corrective Action Required
07/06/2020

Copies of the pool design package was not provided at the time of permit application. Action required: Provide pool design package or request deferral. 9/11/19 - deferred per request
Miscellaneous Correction
Corrective Action Required
07/06/2020

2018 706.6 Vertical continuity. Fire walls shall extend from the foundation to a termination point not less than 30 inches above both adjacent roofs. Exceptions: (see code for complete list) 4. In buildings of Types III, IV and V construction, walls shall be permitted to terminate at the underside of combustible roof sheathing or decks provide that all of the following are met: (see code for complete list) 4.1. Roof openings are not less than 4 feet from the fire wall. Action required: There shall be no roof penetrations within 4' of fire walls. (to be field verified) 9/11/19 - acknowledged in letter
Fire Plan Review Approved with Conditions 07/13/2020 07/07/2020
Michael Weissenbach
Posting of occupant load
Corrective Action Required
07/06/2020

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection)
Construction documents for fire alarm systems
Corrective Action Required
07/06/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the alarm system.
Tenant identification
Corrective Action Required
07/06/2020

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. (Verified At Inspection)
Address numbers required
Corrective Action Required
07/06/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
07/06/2020

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Verified At Inspection) Order one Knox Box for the exterior of the building and two Elevator Knox Boxes. Place order through knoxbox.com.
Fire protection equipment identification
Corrective Action Required
07/06/2020

2018 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. (Verified At Inspection)
Construction documents - Fire protection systems
Corrective Action Required
07/06/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system. Class 1 standpipes to be installed.
Installation acceptance testing
Corrective Action Required
07/06/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. All life safety must pass before a final occupancy can take place.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
07/06/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection)
Stairway identification signs
Corrective Action Required
07/06/2020

2018 IFC (B) 1023.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open an dclosed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level. (Verified At Inspection)
Discharge identification
Corrective Action Required
07/06/2020

2018 IFC (B) 1023.8 Discharge identification. An interior exit stairway and ramp shall not continue below its level of exit discharge to prevent persons from unintentionally continuing into levels below. Directional exit signs shall be provided as specified in Section 1011. (Informational Purposes)
Door operations
Corrective Action Required
07/06/2020

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Licensed Contractors Approved 07/06/2020 07/06/2020
Joe Frogge
Sprinkler Plan Review Released for Construction 06/09/2020 06/09/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
06/09/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a hydrostatic test and a water flow test
Miscellaneous Correction
Corrective Action Required
06/09/2020

(Action Required) Provide a 4 inch Storz connection
Miscellaneous Correction
Corrective Action Required
06/09/2020

(Action Required) Provide a sign over the FDC to read "Pump at 175"
Alarm Plan Review Released for Construction 02/21/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
02/21/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule alarm testing.
Miscellaneous Correction
Resolved
02/21/2020

(Action Required) 1.Provide CO detection on first floor as discussed. Chapter 9 2018 IFC Section 915 Carbon Monoxide Detection. 2.Smoke/CO detector in riser room on parking garage level. 3.Add notification in fitness area. 4.Add notification on roof top.
Building Plan Review Approved with Conditions 02/06/2020 02/03/2020
Joe Frogge
Elevator Equipment Permit
Corrective Action Required
01/30/2020

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
01/30/2020

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
01/30/2020

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Health Dept Review
Corrective Action Required
01/30/2020

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 12/31/19 - Health department approval deferred along with pool design.
Health Dept Inspection
Corrective Action Required
01/30/2020

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Engineered truss package
Corrective Action Required
01/30/2020

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss packages or request deferral. 9/11/19 - deferred per request
Misc
Corrective Action Required
01/30/2020

Copies of the pool design package was not provided at the time of permit application. Action required: Provide pool design package or request deferral. 9/11/19 - deferred per request
Miscellaneous Correction
Corrective Action Required
01/30/2020

2018 706.6 Vertical continuity. Fire walls shall extend from the foundation to a termination point not less than 30 inches above both adjacent roofs. Exceptions: (see code for complete list) 4. In buildings of Types III, IV and V construction, walls shall be permitted to terminate at the underside of combustible roof sheathing or decks provide that all of the following are met: (see code for complete list) 4.1. Roof openings are not less than 4 feet from the fire wall. Action required: There shall be no roof penetrations within 4' of fire walls. (to be field verified) 9/11/19 - acknowledged in letter
Fire Plan Review Approved with Conditions 02/06/2020 01/31/2020
Michael Weissenbach
Posting of occupant load
Corrective Action Required
01/30/2020

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection)
Construction documents for fire alarm systems
Corrective Action Required
01/30/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the alarm system.
Tenant identification
Corrective Action Required
01/30/2020

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. (Verified At Inspection)
Address numbers required
Corrective Action Required
01/30/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
01/30/2020

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Verified At Inspection) Order one Knox Box for the exterior of the building and two Elevator Knox Boxes. Place order through knoxbox.com.
Fire protection equipment identification
Corrective Action Required
01/30/2020

2018 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. (Verified At Inspection)
Construction documents - Fire protection systems
Corrective Action Required
01/30/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system. Class 1 standpipes to be installed.
Installation acceptance testing
Corrective Action Required
01/30/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. All life safety must pass before a final occupancy can take place.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
01/30/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection)
Stairway identification signs
Corrective Action Required
01/30/2020

2018 IFC (B) 1023.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open an dclosed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level. (Verified At Inspection)
Discharge identification
Corrective Action Required
01/30/2020

2018 IFC (B) 1023.8 Discharge identification. An interior exit stairway and ramp shall not continue below its level of exit discharge to prevent persons from unintentionally continuing into levels below. Directional exit signs shall be provided as specified in Section 1011. (Informational Purposes)
Door operations
Corrective Action Required
01/30/2020

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Alarm Plan Review Rejected 01/27/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
01/27/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule alarm testing.
Miscellaneous Correction
Corrective Action Required
01/27/2020

(Action Required) 1.Provide CO detection on first floor as discussed. Chapter 9 2018 IFC Section 915 Carbon Monoxide Detection. 2.Smoke/CO detector in riser room on parking garage level. 3.Add notification in fitness area. 4.Add notification on roof top.
Sprinkler Plan Review Released for Construction 01/17/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
01/17/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a hydrostatic Test and a Water Flow test.
Misc
Corrective Action Required
01/17/2020

1.Provide a 4 inch Storz connection for the FDC. 2.Add additional Class 1 Standpipe throughout each floor where discussed. 3.Signage to read Pump at 175 at FDC.
Special Inspections Review Approved 01/03/2020
Joe Frogge
Licensed Contractors Approved 09/13/2019 12/31/2019
Dawn Bell
LC - MEP Subs
Resolved
12/31/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Rejected 09/20/2019 10/31/2019
Joe Frogge
Final Development Plan
Resolved
10/31/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Elevator Equipment Permit
Corrective Action Required
09/13/2019

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
09/13/2019

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
09/13/2019

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Health Dept Review
Corrective Action Required
09/13/2019

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 12/31/19 - Health department approval deferred along with pool design.
Health Dept Inspection
Corrective Action Required
09/13/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Engineered truss package
Corrective Action Required
09/13/2019

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss packages or request deferral. 9/11/19 - deferred per request
Misc
Corrective Action Required
09/13/2019

Copies of the pool design package was not provided at the time of permit application. Action required: Provide pool design package or request deferral. 9/11/19 - deferred per request
Miscellaneous Correction
Resolved
09/13/2019

2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanouts where sanitary drain piping leaves building footprint. 9/11/19 - Response letter refers to sheet P1.10 which has not been provided. (original submittal did not have any P1.xx sheets) Underslab plan P103 does not show all of the required cleanouts.
Miscellaneous Correction
Resolved
09/13/2019

Insufficient information to complete review. Provide the following: - Plumbing DWV riser diagrams. 9/11/19 - Response letter refers to sheets P1.14 and P1.16 which have not been provided. (original submittal did not have any P1.xx sheets) - Feeder info approved
Miscellaneous Correction
Corrective Action Required
09/13/2019

2018 706.6 Vertical continuity. Fire walls shall extend from the foundation to a termination point not less than 30 inches above both adjacent roofs. Exceptions: (see code for complete list) 4. In buildings of Types III, IV and V construction, walls shall be permitted to terminate at the underside of combustible roof sheathing or decks provide that all of the following are met: (see code for complete list) 4.1. Roof openings are not less than 4 feet from the fire wall. Action required: There shall be no roof penetrations within 4' of fire walls. (to be field verified) 9/11/19 - acknowledged in letter
Final Development Plan Review Approved 10/31/2019
Joe Frogge
Fire Plan Review Approved with Conditions 09/20/2019 09/13/2019
Joe Frogge
Posting of occupant load
Corrective Action Required
09/13/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection)
Construction documents for fire alarm systems
Corrective Action Required
09/13/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the alarm system.
Tenant identification
Corrective Action Required
09/13/2019

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. (Verified At Inspection)
Address numbers required
Corrective Action Required
09/13/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
09/13/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Verified At Inspection) Order one Knox Box for the exterior of the building and two Elevator Knox Boxes. Place order through knoxbox.com.
Fire protection equipment identification
Corrective Action Required
09/13/2019

2018 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. (Verified At Inspection)
Construction documents - Fire protection systems
Corrective Action Required
09/13/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system. Class 1 standpipes to be installed.
Installation acceptance testing
Corrective Action Required
09/13/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. All life safety must pass before a final occupancy can take place.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
09/13/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection)
Stairway identification signs
Corrective Action Required
09/13/2019

2018 IFC (B) 1023.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open an dclosed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level. (Verified At Inspection)
Discharge identification
Corrective Action Required
09/13/2019

2018 IFC (B) 1023.8 Discharge identification. An interior exit stairway and ramp shall not continue below its level of exit discharge to prevent persons from unintentionally continuing into levels below. Directional exit signs shall be provided as specified in Section 1011. (Informational Purposes)
Door operations
Corrective Action Required
09/13/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Building Plan Review Rejected 09/16/2019 09/11/2019
Joe Frogge
Final Development Plan
Corrective Action Required
09/09/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Misc
Resolved
09/11/2019

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Elevator Equipment Permit
Corrective Action Required
09/09/2019

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
09/09/2019

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
09/09/2019

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Health Dept Review
Corrective Action Required
09/09/2019

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
09/09/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Engineered truss package
Corrective Action Required
09/09/2019

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss packages or request deferral. 9/11/19 - deferred per request
Misc
Corrective Action Required
09/09/2019

Copies of the pool design package was not provided at the time of permit application. Action required: Provide pool design package or request deferral. 9/11/19 - deferred per request
Code analysis required
Resolved
09/11/2019

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Update code analysis to show correct maximum area at building C.
Miscellaneous Correction
Resolved
09/11/2019

2018 IBC 711.2.3 Supporting Construction. The supporting construction shall be protected to afford the required fire-resistance rating of the horizontal assembly supported. (see code for exceptions. Action required: Shaft enclosures at garage level that support structure above must be 3 hour rated. Doors to be 3hr rated also per 716.1(2).
Bldg - Door swing 1008.1.2
Resolved
09/11/2019

2018 IBC 1010.1.2 - Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Exceptions: (See code for exceptions.) 2018 IBC 1010.1.2.1 Direction of Swing. Pivot or side-hinged swinging doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Action required: Doors at Fitness Room 135 to swing outward.
Bldg - Types I and II construction allowable materials 602.2
Resolved
09/11/2019

2018 IBC 602.2 – Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: Designate walls in building C to verify materials.
Miscellaneous Correction
Resolved
09/11/2019

2018 IBC 1106.2 Group R-2. Accessible units, Type A units and Type B units shall be provided in Group R-2 occupancies in accordance with Sections 1106.2.1 through 1102.6.2.3. Action required: Designate on 2nd & 3rd floor plans which units will be Type 'A'.
NEC - Spaces about electrical equipment 110.26
Resolved
09/11/2019

2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: At Electrical Rooms in garage - Doors 005A & 006A are to swing in direction of travel.
Miscellaneous Correction
Corrective Action Required
09/09/2019

2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanouts where sanitary drain piping leaves building footprint. 9/11/19 - Response letter refers to sheet P1.10 which has not been provided. (original submittal did not have any P1.xx sheets) Underslab plan P103 does not show all of the required cleanouts.
Plumb - Water hammer 604.9
Resolved
09/11/2019

2018 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Remove references to air chambers as they are not allowed.
Miscellaneous Correction
Corrective Action Required
09/09/2019

Insufficient information to complete review. Provide the following: - Plumbing DWV riser diagrams. 9/11/19 - Response letter refers to sheets P1.14 and P1.16 which have not been provided. (original submittal did not have any P1.xx sheets) - Feeder info approved
Miscellaneous Correction
Corrective Action Required
09/09/2019

2018 706.6 Vertical continuity. Fire walls shall extend from the foundation to a termination point not less than 30 inches above both adjacent roofs. Exceptions: (see code for complete list) 4. In buildings of Types III, IV and V construction, walls shall be permitted to terminate at the underside of combustible roof sheathing or decks provide that all of the following are met: (see code for complete list) 4.1. Roof openings are not less than 4 feet from the fire wall. Action required: There shall be no roof penetrations within 4' of fire walls. (to be field verified) 9/11/19 - acknowledged in letter
Miscellaneous Correction
Resolved
09/11/2019

2018 IPC 502.1 General. Water heaters shall be installed in accordance with the manufacturer’s installation instructions. Oil-fired water heaters shall conform to the requirements of this code and the International Mechanical Code. Electric water heaters shall conform to the requirements of this code and provisions of NFPA 70. Gas-fired water heaters shall conform to the requirements of the International Fuel Gas Code. Action required: Provide expansion tank at water heater or provide verification that water heater installed will not require expansion tank in the manufacturer's written instructions.
Plumb - Freezing 305.4
Resolved
09/11/2019

2018 IPC 305.4 Freezing. Water, soil, and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision is made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than 6” below the frost line (42” below grade) and not less than 12 inches below grade. Action required: Provide means of heating fire/water riser room in garage.
Bldg - Emergency power for illumination 1006.3
Resolved
09/11/2019

2018 IBC 1008.2.3 Exit discharge. Illumination shall be provided along the path of travel for the exit discharge from each exit to the public way. (see code for exceptions) 2018 IBC 1008.3 – Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency lighting at exterior side of: - Lobby 163 front doors - Garage doors 003A & 003D
Miscellaneous Correction
Resolved
09/11/2019

2018 IBC Exit Signs 1013.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Provide exit signs at garage doors 003A & 003D.
NEC - Equipment outlet 210.63
Resolved
09/11/2019

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacles on roofs within 25' of all mechanical equipment including condensing units.
Miscellaneous Correction
Resolved
09/11/2019

2017 NEC Article 210.52 (A) General Provisions. In every kitchen, family room, dining room, living room, parlor, library, den, sunroom, bedroom, recreation room, or similar room or area of dwelling units, receptacle outlets shall be installed in accordance with the general provisions specified in 210.52(A)(1) through (A)(4). (1) Spacing. Receptacles shall be installed such that no point measured horizontally along the floor line of any wall space is more than 6 feet from a receptacle outlet. (2) Wall Space. As used by this section, a wall space shall include the following: 1. Any space 2 feet or more in width (including space measured around corners) and unbroken along the floor line by doorways and similar openings, fireplaces, and fixed cabinets that do not have countertops or similar work surfaces. 2. The space occupied by fixed panels in walls, excluding sliding panels. 3. The space afforded by fixed room dividers, such as freestanding bar-type counters or railings. (3) Floor Receptacles. Receptacle outlets in or on floors shall not be counted as part of the required number of receptacle outlets unless located within 18 inches of the wall. (4) Countertop and Similar Work Surface Receptacle Outlets. Receptacles installed for countertop and similar work surfaces as specified in 210.52(C) shall not be considered as the receptacle outlets required by 210.52(A). (D) Bathrooms. At least one receptacle outlet shall be installed in bathrooms within 3 ft of the outside edge of each basin. (see code for location regulations) Action required: Provide additional outlets at: - Unit wall sections 2' or greater in length. - Within 3' of all lavatories. (re: double lave at unit D2)
Miscellaneous Correction
Resolved
09/11/2019

2017 NEC Article 230.2 (E) Identification. Where a building or structure is supplied by more than one service, or any combination of branch circuits, feeders, and services, a permanent plaque or directory shall be installed at each service disconnect location denoting all other services, feeders, and branch circuits supplying that building or structure and the area served by each. See 225.37. Action required: Provide signage to comply.
Miscellaneous Correction
Resolved
09/11/2019

2017 NEC 230.72 Grouping of disconnects. (A) General. The two to six disconnects as permitted in 230.71 shall be grouped. Each disconnect shall be marked to indicate the load served. (see code for exception) Action required: Modify documents to demonstrate compliance. Number of switches at both switchgear shall not exceed 6. Label equipment accordingly and take whatever other physical measures as are prudent and practical to prevent additions in the future.
Licensed Contractors Rejected 09/16/2019 09/11/2019
Joe Frogge
LC - MEP Subs
Corrective Action Required
09/09/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 09/16/2019 09/10/2019
Michael Weissenbach
Posting of occupant load
Corrective Action Required
09/09/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection)
Construction documents for fire alarm systems
Corrective Action Required
09/09/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the alarm system.
Tenant identification
Corrective Action Required
09/09/2019

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. (Verified At Inspection)
Address numbers required
Corrective Action Required
09/09/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
09/09/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Verified At Inspection) Order one Knox Box for the exterior of the building and two Elevator Knox Boxes. Place order through knoxbox.com.
Fire protection equipment identification
Corrective Action Required
09/09/2019

2018 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. (Verified At Inspection)
Construction documents - Fire protection systems
Corrective Action Required
09/09/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system. Class 1 standpipes to be installed.
Installation acceptance testing
Corrective Action Required
09/09/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. All life safety must pass before a final occupancy can take place.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
09/09/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection)
Misc
Resolved
09/10/2019

1. (Suggestion) Provide exterior access to the sprinkler room. 2. Provide a sheet showing the FDC and the hydrant within 100 ft. 3. Provide Panic Hardware and exit signs in Rooms 005 and 006. (IFC 2018 1010.1.10)
Stairway identification signs
Corrective Action Required
09/09/2019

2018 IFC (B) 1023.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open an dclosed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level. (Verified At Inspection)
Discharge identification
Corrective Action Required
09/09/2019

2018 IFC (B) 1023.8 Discharge identification. An interior exit stairway and ramp shall not continue below its level of exit discharge to prevent persons from unintentionally continuing into levels below. Directional exit signs shall be provided as specified in Section 1011. (Informational Purposes)
Duct smoke detectors
Resolved
09/10/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) Duct detection required with CFM over 2000.
Door operations
Corrective Action Required
09/09/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Fire Plan Review Rejected 08/19/2019 08/19/2019
Michael Weissenbach
Posting of occupant load
Corrective Action Required
08/19/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection)
Construction documents for fire alarm systems
Corrective Action Required
08/19/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the alarm system.
Tenant identification
Corrective Action Required
08/19/2019

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. (Verified At Inspection)
Address numbers required
Corrective Action Required
08/19/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
08/19/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Action Required) Order one Knox Box for the exterior of the building and two Elevator Knox Boxes. Place order through knoxbox.com.
Fire protection equipment identification
Corrective Action Required
08/19/2019

2018 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. (Verified At Inspection)
Construction documents - Fire protection systems
Corrective Action Required
08/19/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system. Class 1 standpipes to be installed.
Installation acceptance testing
Corrective Action Required
08/19/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. All life safety must pass before a final occupancy can take place.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
08/19/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection)
Misc
Corrective Action Required
08/19/2019

1. (Suggestion) Provide exterior access to the sprinkler room. 2. Provide a sheet showing the FDC and the hydrant within 100 ft. 3. Provide Panic Hardware and exit signs in Rooms 005 and 006. (IFC 2018 1010.1.10)
Stairway identification signs
Corrective Action Required
08/19/2019

2018 IFC (B) 1023.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open an dclosed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level. (Verified At Inspection)
Discharge identification
Corrective Action Required
08/19/2019

2018 IFC (B) 1023.8 Discharge identification. An interior exit stairway and ramp shall not continue below its level of exit discharge to prevent persons from unintentionally continuing into levels below. Directional exit signs shall be provided as specified in Section 1011. (Informational Purposes)
Duct smoke detectors
Corrective Action Required
08/19/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) Duct detection required with CFM over 2000.
Door operations
Corrective Action Required
08/19/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Building Plan Review Rejected 08/19/2019 08/17/2019
Joe Frogge
Final Development Plan
Corrective Action Required
08/17/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
08/17/2019

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Elevator Equipment Permit
Corrective Action Required
08/17/2019

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
08/17/2019

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
08/17/2019

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Health Dept Review
Corrective Action Required
08/17/2019

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
08/17/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Engineered truss package
Corrective Action Required
08/17/2019

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss packages or request deferral.
Misc
Corrective Action Required
08/17/2019

Copies of the pool design package was not provided at the time of permit application. Action required: Provide pool design package or request deferral.
Code analysis required
Corrective Action Required
08/17/2019

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Update code analysis to show correct maximum area at building C.
Miscellaneous Correction
Corrective Action Required
08/17/2019

2018 IBC 711.2.3 Supporting Construction. The supporting construction shall be protected to afford the required fire-resistance rating of the horizontal assembly supported. (see code for exceptions. Action required: Shaft enclosures at garage level that support structure above must be 3 hour rated. Doors to be 3hr rated also per 716.1(2).
Bldg - Door swing 1008.1.2
Corrective Action Required
08/17/2019

2018 IBC 1010.1.2 - Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Exceptions: (See code for exceptions.) 2018 IBC 1010.1.2.1 Direction of Swing. Pivot or side-hinged swinging doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Action required: Doors at Fitness Room 135 to swing outward.
Bldg - Types I and II construction allowable materials 602.2
Corrective Action Required
08/17/2019

2018 IBC 602.2 – Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: Designate walls in building C to verify materials.
Miscellaneous Correction
Corrective Action Required
08/17/2019

2018 IBC 1106.2 Group R-2. Accessible units, Type A units and Type B units shall be provided in Group R-2 occupancies in accordance with Sections 1106.2.1 through 1102.6.2.3. Action required: Designate on 2nd & 3rd floor plans which units will be Type 'A'.
NEC - Spaces about electrical equipment 110.26
Corrective Action Required
08/17/2019

2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: At Electrical Rooms in garage - Doors 005A & 006A are to swing in direction of travel.
Miscellaneous Correction
Corrective Action Required
08/17/2019

2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanouts where sanitary drain piping leaves building footprint.
Plumb - Water hammer 604.9
Corrective Action Required
08/17/2019

2018 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Remove references to air chambers as they are not allowed.
Miscellaneous Correction
Corrective Action Required
08/17/2019

Insufficient information to complete review. Provide the following: - Plumbing DWV riser diagrams. - Feeder sizes serving panels DP-S & DP-N. (at wiring diagram)
Miscellaneous Correction
Corrective Action Required
08/17/2019

2018 706.6 Vertical continuity. Fire walls shall extend from the foundation to a termination point not less than 30 inches above both adjacent roofs. Exceptions: (see code for complete list) 4. In buildings of Types III, IV and V construction, walls shall be permitted to terminate at the underside of combustible roof sheathing or decks provide that all of the following are met: (see code for complete list) 4.1. Roof openings are not less than 4 feet from the fire wall. Action required: There shall be no roof penetrations within 4' of fire walls. (to be field verified)
Miscellaneous Correction
Corrective Action Required
08/17/2019

2018 IPC 502.1 General. Water heaters shall be installed in accordance with the manufacturer’s installation instructions. Oil-fired water heaters shall conform to the requirements of this code and the International Mechanical Code. Electric water heaters shall conform to the requirements of this code and provisions of NFPA 70. Gas-fired water heaters shall conform to the requirements of the International Fuel Gas Code. Action required: Provide expansion tank at water heater or provide verification that water heater installed will not require expansion tank in the manufacturer's written instructions.
Plumb - Freezing 305.4
Corrective Action Required
08/17/2019

2018 IPC 305.4 Freezing. Water, soil, and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision is made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than 6” below the frost line (42” below grade) and not less than 12 inches below grade. Action required: Provide means of heating fire/water riser room in garage.
Bldg - Emergency power for illumination 1006.3
Corrective Action Required
08/17/2019

2018 IBC 1008.2.3 Exit discharge. Illumination shall be provided along the path of travel for the exit discharge from each exit to the public way. (see code for exceptions) 2018 IBC 1008.3 – Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency lighting at exterior side of: - Lobby 163 front doors - Garage doors 003A & 003D
Miscellaneous Correction
Corrective Action Required
08/17/2019

2018 IBC Exit Signs 1013.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Provide exit signs at garage doors 003A & 003D.
NEC - Equipment outlet 210.63
Corrective Action Required
08/17/2019

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacles on roofs within 25' of all mechanical equipment including condensing units.
Miscellaneous Correction
Corrective Action Required
08/17/2019

2017 NEC Article 210.52 (A) General Provisions. In every kitchen, family room, dining room, living room, parlor, library, den, sunroom, bedroom, recreation room, or similar room or area of dwelling units, receptacle outlets shall be installed in accordance with the general provisions specified in 210.52(A)(1) through (A)(4). (1) Spacing. Receptacles shall be installed such that no point measured horizontally along the floor line of any wall space is more than 6 feet from a receptacle outlet. (2) Wall Space. As used by this section, a wall space shall include the following: 1. Any space 2 feet or more in width (including space measured around corners) and unbroken along the floor line by doorways and similar openings, fireplaces, and fixed cabinets that do not have countertops or similar work surfaces. 2. The space occupied by fixed panels in walls, excluding sliding panels. 3. The space afforded by fixed room dividers, such as freestanding bar-type counters or railings. (3) Floor Receptacles. Receptacle outlets in or on floors shall not be counted as part of the required number of receptacle outlets unless located within 18 inches of the wall. (4) Countertop and Similar Work Surface Receptacle Outlets. Receptacles installed for countertop and similar work surfaces as specified in 210.52(C) shall not be considered as the receptacle outlets required by 210.52(A). (D) Bathrooms. At least one receptacle outlet shall be installed in bathrooms within 3 ft of the outside edge of each basin. (see code for location regulations) Action required: Provide additional outlets at: - Unit wall sections 2' or greater in length. - Within 3' of all lavatories. (re: double lave at unit D2)
Miscellaneous Correction
Corrective Action Required
08/17/2019

2017 NEC Article 230.2 (E) Identification. Where a building or structure is supplied by more than one service, or any combination of branch circuits, feeders, and services, a permanent plaque or directory shall be installed at each service disconnect location denoting all other services, feeders, and branch circuits supplying that building or structure and the area served by each. See 225.37. Action required: Provide signage to comply.
Miscellaneous Correction
Corrective Action Required
08/17/2019

2017 NEC 230.72 Grouping of disconnects. (A) General. The two to six disconnects as permitted in 230.71 shall be grouped. Each disconnect shall be marked to indicate the load served. (see code for exception) Action required: Modify documents to demonstrate compliance. Number of switches at both switchgear shall not exceed 6. Label equipment accordingly and take whatever other physical measures as are prudent and practical to prevent additions in the future.
Licensed Contractors Rejected 08/19/2019 08/17/2019
Joe Frogge
LC - MEP Subs
Corrective Action Required
08/17/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $151,720.92 $151,720.92 Paid Not payable online 12/19/2019
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid Not payable online 12/19/2019
7232302-Residential License Tax Fee $113,456.64 $113,456.64 Paid Not payable online 12/19/2019
Outstanding Fees Amount Paid Owing Date Paid
7232302-Commercial License Tax Fee $39,360.00 $0.00 $39,360.00 Not Paid
9110080-Not Ready Inspection Fee $50.00 $0.00 $50.00 Not Paid


$39,410.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Electrical Inspection - Commercial Partial 5/7/2020 05/07/2020
Misc
Corrective Action Required
05/07/2020
CONDUIT BETWEEN LIGHT POLES- FRONT EAST FACE: NE CORNER SOUTH 3 POLES;
Underground Electrical Inspection - Commercial Partial 5/7/2020 5/7/2020 05/07/2020
Misc
Corrective Action Required
05/07/2020
CONDUIT BETWEEN LIGHT POLES- FRONT EAST FACE: NE CORNER SOUTH 3 POLES; WEST FACE NW LIGHT POLES
Underground Electrical Inspection - Commercial Partial 5/11/2020 5/11/2020 05/11/2020
Misc
Corrective Action Required
05/07/2020
CONDUIT BETWEEN LIGHT POLES- FRONT EAST FACE: NE CORNER SOUTH 3 POLES; WEST FACE NW LIGHT POLES * - CONDUIT NORTH END & SOUTH END WOOD FRAME TO REAR & TO BUILDING FOUNDATION - - CONDUIT 2 TRENCHES FRONT OF STEEL BLDG TO STREET -
Underground Electrical Inspection - Commercial Partial 5/20/2020 05/20/2020
Misc
Corrective Action Required
05/11/2020
CONDUIT BETWEEN LIGHT POLES- FRONT EAST FACE: NE CORNER SOUTH 3 POLES; WEST FACE NW LIGHT POLES * - CONDUIT NORTH END & SOUTH END WOOD FRAME TO REAR & TO BUILDING FOUNDATION - - CONDUIT 2 TRENCHES FRONT OF STEEL BLDG TO STREET - WEST SIDE-- NORTH TO THE SOUTH CONDUIT 1,2,3;
Rated Assembly Inspection Partial 5/27/2020 5/27/2020 05/27/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/27/2020
pre-inspection walk through.
STAIR TOWER 1
Corrective Action Required
05/27/2020
STAIR TOWER 2
Corrective Action Required
05/27/2020
STAIR TOWER 3
Corrective Action Required
05/27/2020
FIRST FLOOR
Corrective Action Required
05/27/2020
SECOND FLOOR
Corrective Action Required
05/27/2020
THIRD FLOOR
Corrective Action Required
05/27/2020
FOURTH FLOOR
Corrective Action Required
05/27/2020
ELEVATOR 1
Corrective Action Required
05/27/2020
ELEVATOR 2
Corrective Action Required
05/27/2020
ELEVATOR 3
Corrective Action Required
05/27/2020
Underground Electrical Inspection - Commercial Partial 5/27/2020 5/27/2020 05/27/2020
Misc
Corrective Action Required
05/20/2020
CONDUIT BETWEEN LIGHT POLES- FRONT EAST FACE: NE CORNER SOUTH 3 POLES; WEST FACE NW LIGHT POLES * - CONDUIT NORTH END & SOUTH END WOOD FRAME TO REAR & TO BUILDING FOUNDATION - - CONDUIT 2 TRENCHES FRONT OF STEEL BLDG TO STREET - WEST SIDE-- NORTH TO THE SOUTH CONDUIT 1,2,3;
Misc
Informational
05/27/2020
140’ Conduit for light poles rear of apt building near retaining wall from transformer to fire hydrant
In-wall Inspection Partial 6/4/2020 6/4/2020 06/04/2020
Misc
Informational
06/04/2020
- "E" PHASE 1 1ST FLOOR ANCHOR BOLTS PATIOS OK TO COVER - - JOIST HANGERS IN CORRIDOR COMPLETE -
Piers/Caissons Inspection - Commercial Partial 5/27/2020 (3:30) 5/27/2020 06/08/2020
Miscellaneous Correction
Informational
06/08/2020
LIGHT POLE BASE: -1 24” SOUTH SIDE -1 24” NORTH SIDE -1 24” SOUTHEAST CORNER -4 6’X6’ PADS EAST SIDE -1 24” SOUTHWEST CORNER
Miscellaneous Correction
Corrective Action Required
06/08/2020
Underground Electrical Inspection - Commercial Partial 6/8/2020 6/8/2020 06/08/2020
Misc
Corrective Action Required
05/27/2020
CONDUIT BETWEEN LIGHT POLES- FRONT EAST FACE: NE CORNER SOUTH 3 POLES; WEST FACE NW LIGHT POLES * - CONDUIT NORTH END & SOUTH END WOOD FRAME TO REAR & TO BUILDING FOUNDATION - - CONDUIT 2 TRENCHES FRONT OF STEEL BLDG TO STREET - WEST SIDE-- NORTH TO THE SOUTH CONDUIT 1,2,3; -CONDUIT AND GROUND RODS FOR LIGHT POLE BASES (1) NORTH, (5) EAST, (1) SOUTH, (1) SOUTHWEST -CONDUIT FROM SOUTHWEST LIGHT POLE UNDER STREET TO SOUTH LIGHT POLES WITH CONDUIT NORTH BACK TO BUILDING AND CONNECTING WEST LIGHT POLE
Misc
Informational
05/27/2020
140’ Conduit for light poles rear of apt building near retaining wall from transformer to fire hydrant
Above Ceiling Inspection Partial 6/9/2020 6/9/2020 06/09/2020
SECOND FLOOR
Corrective Action Required
06/09/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS -
THIRD FLOOR
Corrective Action Required
06/09/2020
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS -
FOURTH FLOOR
Corrective Action Required
06/09/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR -
All Rough Inspection - Commercial Partial 6/11/2020 6/11/2020 06/11/2020
Misc
Informational
06/11/2020
- METAL STUD FRAMING AT LOBBY ENTRANCE - - METAL STUD WALL NORTH SIDE LOBBY -
In-wall Inspection Partial 6/12/2020 6/12/2020 06/12/2020
Misc
Informational
06/04/2020
- "E" PHASE 1 1ST FLOOR ANCHOR BOLTS PATIOS OK TO COVER - - JOIST HANGERS IN CORRIDOR COMPLETE - - METAL STUD FACADE NORTH OF MAIN ENTRY 3 SHEETS DUROCK - - METAL STUDS MIDDLE SECTION NORTH END OF RETAIL -
Piers/Caissons Inspection - Commercial Partial 6/15/2020 06/15/2020
Miscellaneous Correction
Informational
06/08/2020
LIGHT POLE BASE: -1 24” SOUTH SIDE -1 24” NORTH SIDE -1 24” SOUTHEAST CORNER -4 6’X6’ PADS EAST SIDE -1 24” SOUTHWEST CORNER -6/15/20- RETAINING WALL REAR OF APTS (4) LIGHT POLE BASE REBAR CAGES, DRIVEN GROUND ROUND
Miscellaneous Correction
Corrective Action Required
06/08/2020
Rated Assembly Inspection Partial 6/15/2020 6/15/2020 06/15/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/27/2020
pre-inspection walk through.
STAIR TOWER 1
Corrective Action Required
05/27/2020
STAIR TOWER 2
Corrective Action Required
05/27/2020
-STAIRWELL "B"- -1ST FLOOR SHAFT WALL-
STAIR TOWER 3
Corrective Action Required
05/27/2020
STAIRWELL "C" -1ST FLOOR 1ST LAYER SCREW PATTERN -
FIRST FLOOR
Corrective Action Required
05/27/2020
SECOND FLOOR
Corrective Action Required
05/27/2020
THIRD FLOOR
Corrective Action Required
05/27/2020
FOURTH FLOOR
Corrective Action Required
05/27/2020
ELEVATOR 1
Corrective Action Required
05/27/2020
ELEVATOR 2
Corrective Action Required
05/27/2020
ELEVATOR 3
Corrective Action Required
05/27/2020
Rough Framing Inspection - Commercial Partial 6/16/2020 06/16/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/16/2020
STEEL FRAMING STORE FRONT AND DEMISING WALLS: - METAL STUD FRAMING AT LOBBY ENTRANCE - - METAL STUD WALL NORTH SIDE LOBBY -RETAIL SSOTE FRONT UPPER-K LINE 1.4-5; LOBBY-5LINE-G
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/16/2020
EXTERIOR SHEATHING/ SHEAR WALL: NORTH WALL-F-G;12-14;
Rated Assembly Inspection Partial 6/16/2020 6/16/2020 06/16/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/15/2020
pre-inspection walk through.
STAIR TOWER 1
Corrective Action Required
06/15/2020
STAIR TOWER 2
Corrective Action Required
06/15/2020
-STAIRWELL "B"- -1ST FLOOR SHAFT WALL-
STAIR TOWER 3
Corrective Action Required
06/15/2020
STAIRWELL "C" INSIDE FACE: -1ST LAYER 1ST,2ND,3RD,
FIRST FLOOR
Corrective Action Required
06/15/2020
SECOND FLOOR
Corrective Action Required
06/15/2020
THIRD FLOOR
Corrective Action Required
06/15/2020
FOURTH FLOOR
Corrective Action Required
06/15/2020
ELEVATOR 1
Corrective Action Required
06/15/2020
ELEVATOR 2
Corrective Action Required
06/15/2020
ELEVATOR 3
Corrective Action Required
06/15/2020
Rated Assembly Inspection Partial 6/22/2020 6/22/2020 06/22/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/16/2020
pre-inspection walk through.
STAIR TOWER 1
Corrective Action Required
06/16/2020
STAIR TOWER 2
Corrective Action Required
06/16/2020
-STAIRWELL "B"- -1ST FLOOR SHAFT WALL-
STAIR TOWER 3
Corrective Action Required
06/16/2020
STAIRWELL "C" INSIDE FACE: -1ST LAYER 1ST,2ND,3RD,floors - 2ND LAYER 1ST,2ND, 3RD FLOORS -
FIRST FLOOR
Corrective Action Required
06/16/2020
- RC AREA "E' CORRIDOR 119, 122 -
SECOND FLOOR
Corrective Action Required
06/16/2020
- RC AREA "E" CORRIDOR 219, 222 -
THIRD FLOOR
Corrective Action Required
06/16/2020
- RC AREA "E' CORRIDOR 319, 322 -
FOURTH FLOOR
Corrective Action Required
06/16/2020
- RC AREA "E" CORRIDOR 419, 422 -
ELEVATOR 1
Corrective Action Required
06/16/2020
ELEVATOR 2
Corrective Action Required
06/16/2020
ELEVATOR 3
Corrective Action Required
06/16/2020
Rated Assembly Inspection Partial 6/26/2020 6/26/2020 06/26/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/22/2020
pre-inspection walk through.
STAIR TOWER 1
Corrective Action Required
06/22/2020
STAIR TOWER 2
Corrective Action Required
06/22/2020
-STAIRWELL "B"- -1ST FLOOR SHAFT WALL-
STAIR TOWER 3
Corrective Action Required
06/22/2020
STAIRWELL "C" INSIDE FACE: -1ST LAYER 1ST,2ND,3RD,floors - 2ND LAYER 1ST,2ND, 3RD FLOORS -
FIRST FLOOR
Corrective Action Required
06/22/2020
- RC AREA "E' CORRIDOR 119, 122 - - AREA "E" CORRIDOR LIDS 119, -
SECOND FLOOR
Corrective Action Required
06/22/2020
- RC AREA "E" CORRIDOR 219, 222 - - AREA "E' CORRIDOR LID 219 COMPLETE, 222 TO STAIRS, -
THIRD FLOOR
Corrective Action Required
06/22/2020
- RC AREA "E' CORRIDOR 319, 322 - - AREA "E" CORRIDOR LIDS 319 COMPLETE, 322 TO STAIRS -
FOURTH FLOOR
Corrective Action Required
06/22/2020
- RC AREA "E" CORRIDOR 419, 422 - - AREA "E" CORRIDOR LIDS 419 COMPLETE, 422 TO STAIRS -
ELEVATOR 1
Corrective Action Required
06/22/2020
ELEVATOR 2
Corrective Action Required
06/22/2020
ELEVATOR 3
Corrective Action Required
06/22/2020
Rough Framing Inspection - Commercial Partial 7/1/2020 7/1/2020 07/01/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/16/2020
STEEL FRAMING STORE FRONT AND DEMISING WALLS: - METAL STUD FRAMING AT LOBBY ENTRANCE - - METAL STUD WALL NORTH SIDE LOBBY -RETAIL SSOTE FRONT UPPER-K LINE 1.4-5; LOBBY-5LINE-G - METAL STUD FRAMING UPPER LOBBY, CANOPY AT ENTRANCE, PARTIAL WALLS IN REAR AT POOL ( DOOR & WINDOW OPENINGS) -
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/16/2020
EXTERIOR SHEATHING/ SHEAR WALL: NORTH WALL-F-G;12-14;
Rough Framing Inspection - Commercial Partial 7/13/2020 7/13/2020 07/13/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/01/2020
STEEL FRAMING STORE FRONT AND DEMISING WALLS: - METAL STUD FRAMING AT LOBBY ENTRANCE - - METAL STUD WALL NORTH SIDE LOBBY -RETAIL SSOTE FRONT UPPER-K LINE 1.4-5; -Metal stud framing Area B and C Demising wall framing corridor 103, 128; LOBBY-5LINE-G - METAL STUD FRAMING UPPER LOBBY, CANOPY AT ENTRANCE, PARTIAL WALLS IN REAR AT POOL ( DOOR & WINDOW OPENINGS) -
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/01/2020
EXTERIOR SHEATHING/ SHEAR WALL: NORTH WALL-F-G;12-14;
Rated Assembly Inspection Partial 7/13/2020 7/13/2020 07/13/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/26/2020
pre-inspection walk through.
STAIR TOWER 1
Corrective Action Required
06/26/2020
STAIR TOWER 2
Corrective Action Required
06/26/2020
-STAIRWELL "B"- -1ST FLOOR SHAFT WALL-
STAIR TOWER 3
Corrective Action Required
06/26/2020
STAIRWELL "C" INSIDE FACE: -1ST LAYER 1ST,2ND,3RD,floors - 2ND LAYER 1ST,2ND, 3RD FLOORS -
FIRST FLOOR
Corrective Action Required
06/26/2020
- RC AREA "E' CORRIDOR 119, 122 - - AREA "E" CORRIDOR LIDS 119, -UNITS FURNACE ROOMS,
SECOND FLOOR
Corrective Action Required
06/26/2020
- RC AREA "E" CORRIDOR 219, 222 - - AREA "E' CORRIDOR LID 219 COMPLETE, 222 TO STAIRS, --UNITS FURNACE ROOMS,
THIRD FLOOR
Corrective Action Required
06/26/2020
- RC AREA "E' CORRIDOR 319, 322 - - AREA "E" CORRIDOR LIDS 319 COMPLETE, 322 TO STAIRS -
FOURTH FLOOR
Corrective Action Required
06/26/2020
- RC AREA "E" CORRIDOR 419, 422 - - AREA "E" CORRIDOR LIDS 419 COMPLETE, 422 TO STAIRS -
ELEVATOR 1
Corrective Action Required
06/26/2020
ELEVATOR 2
Corrective Action Required
06/26/2020
ELEVATOR 3
Corrective Action Required
06/26/2020
All Rough Inspection - Commercial Failed 7/13/2020 7/13/2020 07/13/2020
Misc
Informational
06/11/2020
- METAL STUD FRAMING AT LOBBY ENTRANCE - - METAL STUD WALL NORTH SIDE LOBBY -
FOURTH FLOOR
Corrective Action Required
07/13/2020
AREA"E"- UNITS-(2 far south not ready) Section E phase 1 439 Rock and caulk shower wall. 440- Truss bearing at corridor wall nail Joist Hangers. 461- elect land ground 460-washer puddy pads or 5 side box. 441- elect land ground 442-elect land ground, Provide 1 1/2 “ bearing truss East bath wall- 443-OK 459-laundry & dryer box-5side Need Clarification on Egress window opening. Install 5 sided box for dryer boxes.
All Rough Inspection - Commercial Partial 7/15/2020 7/15/2020 07/15/2020
Misc
Resolved
07/15/2020
- METAL STUD FRAMING AT LOBBY ENTRANCE - - METAL STUD WALL NORTH SIDE LOBBY -
FOURTH FLOOR
Corrective Action Required
07/13/2020
AREA"E"- UNITS-(2 far south not ready) Section E phase 1 439,440,461,441,442,459-ok 460- washer box 5 side. Need Clarification on Egress window opening. Install 5 sided box for dryer boxes.
THIRD FLOOR
Corrective Action Required
07/15/2020
Section “E” 345-Ok 344-Ok 343- shower valve water lines brought down into 5side box. 342-ok 361-ok 362-5 side washer box. 363-BDL wall at both bedrooms fire stop between floors. Puddy pad corridor outlet. 341-ok 364- 340-hold down living room wall. Mid supports are plumbing south units.
All Rough Inspection - Commercial Partial 7/17/2020 7/17/2020 07/17/2020
FOURTH FLOOR
Corrective Action Required
07/15/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460-
THIRD FLOOR
Corrective Action Required
07/15/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-corridor framing ceiling
Rated Assembly Inspection Failed 7/20/2020 7/20/2020 07/20/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/13/2020
pre-inspection walk through.
STAIR TOWER 1
Corrective Action Required
07/13/2020
STAIR TOWER 2
Corrective Action Required
07/13/2020
-STAIRWELL "B"- -1ST FLOOR SHAFT WALL-
STAIR TOWER 3
Corrective Action Required
07/13/2020
STAIRWELL "C" INSIDE FACE: -1ST LAYER 1ST,2ND,3RD,floors - 2ND LAYER 1ST,2ND, 3RD FLOORS -
FIRST FLOOR
Corrective Action Required
07/13/2020
- RC AREA "E' CORRIDOR 119, 122 - - AREA "E" CORRIDOR LIDS 119, -UNITS FURNACE ROOMS, All units covered in mechanical rooms. 7/20
SECOND FLOOR
Corrective Action Required
07/13/2020
- RC AREA "E" CORRIDOR 219, 222 - - AREA "E' CORRIDOR LID 219 COMPLETE, 222 TO STAIRS, --UNITS FURNACE ROOMS,
THIRD FLOOR
Corrective Action Required
07/13/2020
- RC AREA "E' CORRIDOR 319, 322 - - AREA "E" CORRIDOR LIDS 319 COMPLETE, 322 TO STAIRS -
FOURTH FLOOR
Corrective Action Required
07/13/2020
- RC AREA "E" CORRIDOR 419, 422 - - AREA "E" CORRIDOR LIDS 419 COMPLETE, 422 TO STAIRS -
ELEVATOR 1
Corrective Action Required
07/13/2020
ELEVATOR 2
Corrective Action Required
07/13/2020
ELEVATOR 3
Corrective Action Required
07/13/2020
All Rough Inspection - Commercial Failed 7/20/2020 7/20/2020 07/20/2020
FOURTH FLOOR
Corrective Action Required
07/17/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460-
THIRD FLOOR
Corrective Action Required
07/17/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-corridor framing ceiling
SECOND FLOOR
Corrective Action Required
07/20/2020
Section “E” 240- install stud under joist left of 3” vent at kit sink. 241- 242-plumbing , Remove bonding screw. 243-caulk shower valve boxes. -Rock dead space from Joist space left of laundry . - seal holes in bottom plate. 244- 245-plumbing straps mid story. 261- dryer box incomplete. 262- plumb , dryer box incomplete, SE cable at top plate needs sealed Left of panel. -Corridor tension rod left of door 263 not sealed. - 263- shower valve in party wall. - block between floor bedroom walls. -264- shower valve box corridor wall incomplete. - truss gussets bent up for dryer vent over hallway. - ac line penetrations at top plates. Remove all bonding screws Strap all plumbing at mid point. Tighten and Seal all tension rods.
All Rough Inspection - Commercial Partial 7/21/2020 07/21/2020
FOURTH FLOOR
Corrective Action Required
07/20/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460-
THIRD FLOOR
Corrective Action Required
07/20/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-corridor framing ceiling
SECOND FLOOR
Corrective Action Required
07/20/2020
Section “E” Ok-241,242,243,244,245,261,262,24O 263- shower valve in party wall..Add stud at right of shower valve. -264- shower valve box corridor wall incomplete..
Rated Assembly Inspection Partial 7/21/2020 7/21/2020 07/21/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/20/2020
pre-inspection walk through.
STAIR TOWER 1
Corrective Action Required
07/20/2020
STAIR TOWER 2
Corrective Action Required
07/20/2020
-STAIRWELL "B"- -1ST FLOOR SHAFT WALL-
STAIR TOWER 3
Corrective Action Required
07/20/2020
STAIRWELL "C" INSIDE FACE: -1ST LAYER 1ST,2ND,3RD,floors - 2ND LAYER 1ST,2ND, 3RD FLOORS -
FIRST FLOOR
Corrective Action Required
07/20/2020
- RC AREA "E' CORRIDOR 119, 122 - - AREA "E" CORRIDOR LIDS 119, -UNITS FURNACE ROOMS, All units covered in mechanical rooms. 7/20
SECOND FLOOR
Corrective Action Required
07/20/2020
- RC AREA "E" CORRIDOR ceiling & wall 219, - AREA "E' , --UNITS FURNACE ROOM-OK, CORRIDOR CEILING219 COMPLETE, 222, RC CHANNEL CORRIDOR WALLS 219.
THIRD FLOOR
Corrective Action Required
07/20/2020
- RC AREA "E' CORRIDOR 319- walls ceiling - AREA "E" CORRIDOR CEILING 319 COMPLETE, 322 , -RC- corridor walls 319, 322, >SCREWS ABOVE CEILING ROCK OK319=322.
FOURTH FLOOR
Corrective Action Required
07/20/2020
- RC AREA "E" CORRIDOR 419, 422 - - AREA "E" CORRIDOR LIDS 419 COMPLETE, 422 TO STAIRS -
ELEVATOR 1
Corrective Action Required
07/20/2020
ELEVATOR 2
Corrective Action Required
07/20/2020
ELEVATOR 3
Corrective Action Required
07/20/2020
All Rough Inspection - Commercial Partial 7/23/2020 7/23/2020 07/23/2020
FOURTH FLOOR
Corrective Action Required
07/21/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460-
THIRD FLOOR
Corrective Action Required
07/21/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-corridor framing ceiling
SECOND FLOOR
Corrective Action Required
07/21/2020
Section “E” Ok-241,242,243,244,245,261,262. 263- shower valve in party wall..Add stud at right of shower valve. Add full stud. -264- shower valve box corridor wall incomplete..
Rated Assembly Inspection Partial 7/23/2020 7/23/2020 07/23/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/21/2020
pre-inspection walk through.
STAIR TOWER 1
Corrective Action Required
07/21/2020
STAIR TOWER 2
Corrective Action Required
07/21/2020
-STAIRWELL "B"- -1ST FLOOR SHAFT WALL-
STAIR TOWER 3
Corrective Action Required
07/21/2020
STAIRWELL "C" INSIDE FACE: -1ST LAYER 1ST,2ND,3RD,floors - 2ND LAYER 1ST,2ND, 3RD FLOORS -
FIRST FLOOR
Corrective Action Required
07/21/2020
- RC AREA "E' CORRIDOR 119, 122 - - AREA "E" CORRIDOR LIDS 119, -UNITS FURNACE ROOMS,
SECOND FLOOR
Corrective Action Required
07/21/2020
- RC AREA "E" CORRIDOR ceiling & wall 219, - AREA "E' CORRIDOR CEILING 219 COMPLETE, 222 ; - ROCK CORRIDOR WALL 3FT DOWN-219,222
THIRD FLOOR
Corrective Action Required
07/21/2020
- RC AREA "E' CORRIDOR 319- walls ceiling - AREA "E" CORRIDOR CEILING 319, 322. RC CHANNEL- COORIDOR 319,322 CORRIDOR WALL DOWN 3FT
FOURTH FLOOR
Corrective Action Required
07/21/2020
- RC AREA "E" CORRIDOR 419, 422 - - AREA "E" CORRIDOR LIDS 419 COMPLETE, 422 TO STAIRS -
ELEVATOR 1
Corrective Action Required
07/21/2020
ELEVATOR 2
Corrective Action Required
07/21/2020
ELEVATOR 3
Corrective Action Required
07/21/2020
Rated Assembly Inspection Partial 7/24/2020 7/24/2020 07/24/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/23/2020
pre-inspection walk through.
STAIR TOWER 1
Corrective Action Required
07/23/2020
STAIR TOWER 2
Corrective Action Required
07/23/2020
-STAIRWELL "B"- -1ST FLOOR SHAFT WALL-
STAIR TOWER 3
Corrective Action Required
07/23/2020
STAIRWELL "C" INSIDE FACE: -1ST LAYER 1ST,2ND,3RD,floors - 2ND LAYER 1ST,2ND, 3RD FLOORS -
FIRST FLOOR
Corrective Action Required
07/23/2020
- RC AREA "E' CORRIDOR 119 TO RM 124, CORRIDOR 122 - - AREA "E" CORRIDOR LIDS 119, -UNITS FURNACE ROOMS,
SECOND FLOOR
Corrective Action Required
07/23/2020
- RC AREA "E" CORRIDOR ceiling & wall 219, - AREA "E' CORRIDOR CEILING 219 COMPLETE, 222 ; - ROCK CORRIDOR WALL 3FT DOWN-219,222
THIRD FLOOR
Corrective Action Required
07/23/2020
- RC AREA "E' CORRIDOR 319- walls ceiling - AREA "E" CORRIDOR CEILING 319, 322. RC CHANNEL- COORIDOR 319,322 CORRIDOR WALL DOWN 3FT
FOURTH FLOOR
Corrective Action Required
07/23/2020
- RC AREA "E" CORRIDOR 419, 422 - - AREA "E" CORRIDOR LIDS 419 COMPLETE, 422 TO STAIRS -
ELEVATOR 1
Corrective Action Required
07/23/2020
ELEVATOR 2
Corrective Action Required
07/23/2020
ELEVATOR 3
Corrective Action Required
07/23/2020
Rated Assembly Inspection Partial 7/28/2020 7/28/2020 07/28/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/24/2020
pre-inspection walk through.
STAIR TOWER 1
Corrective Action Required
07/24/2020
STAIR TOWER 2
Corrective Action Required
07/24/2020
-STAIRWELL "B"- -1ST FLOOR SHAFT WALL-
STAIR TOWER 3
Corrective Action Required
07/24/2020
STAIRWELL "C" INSIDE FACE: -1ST LAYER 1ST,2ND,3RD,floors - 2ND LAYER 1ST,2ND, 3RD FLOORS -
FIRST FLOOR
Corrective Action Required
07/24/2020
- RC AREA "E' CORRIDOR 119 TO RM 124, CORRIDOR 122 - - AREA "E" CORRIDOR LIDS 119, -UNITS FURNACE ROOMS,
SECOND FLOOR
Corrective Action Required
07/24/2020
- RC AREA "E" CORRIDOR ceiling & wall 219, - AREA "E' CORRIDOR CEILING 219 COMPLETE, 222 ; - ROCK CORRIDOR WALL 3FT DOWN-219,222 -RC CHANNEL CEILINGS AND DEMISING WALLS COMPLETE ROOMS: 240, 241, 242, 244, 245, 261, 263, 264 -243- PROTECTION PLATES AT DWV IN DEMISING WALL -262- PROTECTION PLATES AT DWV IN DEMISING WALL
THIRD FLOOR
Corrective Action Required
07/24/2020
- RC AREA "E' CORRIDOR 319- walls ceiling - AREA "E" CORRIDOR CEILING 319, 322. RC CHANNEL- COORIDOR 319,322 CORRIDOR WALL DOWN 3FT -RC CHANNEL CEILINGS AND DEMISING WALLS COMPLETE ROOMS: 340, 341, 342, 344, 345, 361, 362, 363, 364 -343 PROTECTION PLATES AT SHOWER VALVE IN DEMISING WALL
FOURTH FLOOR
Corrective Action Required
07/24/2020
- RC AREA "E" CORRIDOR 419, 422 - - AREA "E" CORRIDOR LIDS 419 COMPLETE, 422 TO STAIRS - -RC CHANNEL CEILINGS AND DEMISING WALLS COMPLETE ROOMS: 439,440,441,442,443,459, 461 -460 MISSING RC CHANNEL IN LIVING ROOM, AND SUPPORT AT NORTH WALL
ELEVATOR 1
Corrective Action Required
07/24/2020
ELEVATOR 2
Corrective Action Required
07/24/2020
ELEVATOR 3
Corrective Action Required
07/24/2020
All Rough Inspection - Commercial Partial 7/28/2020 07/28/2020
FOURTH FLOOR
Corrective Action Required
07/23/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460-
THIRD FLOOR
Corrective Action Required
07/23/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-corridor framing ceiling
SECOND FLOOR
Corrective Action Required
07/23/2020
Section “E” Ok-241,242,243,244,245,261,262. -264- shower valve box corridor wall incomplete
All Rough Inspection - Commercial Partial 7/30/2020 07/30/2020
FOURTH FLOOR
Corrective Action Required
07/28/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426-
THIRD FLOOR
Corrective Action Required
07/28/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327-corridor framing ceiling
SECOND FLOOR
Corrective Action Required
07/28/2020
Section “E” Ok-241,242,243,244,245,261,262. 226. -264- shower valve box corridor wall incomplete
Rated Assembly Inspection Partial 7/30/2020 7/30/2020 07/30/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/28/2020
pre-inspection walk through.
STAIR TOWER 1
Corrective Action Required
07/28/2020
STAIR TOWER 2
Corrective Action Required
07/28/2020
-STAIRWELL "B"- -1ST FLOOR SHAFT WALL-
STAIR TOWER 3
Corrective Action Required
07/28/2020
STAIRWELL "C" INSIDE FACE: -1ST LAYER 1ST,2ND,3RD,floors - 2ND LAYER 1ST,2ND, 3RD FLOORS -
FIRST FLOOR
Corrective Action Required
07/28/2020
- RC AREA "E' CORRIDOR 119 TO RM 124, CORRIDOR 122 - - AREA "E" CORRIDOR LIDS 119, -UNITS FURNACE ROOMS,
SECOND FLOOR
Corrective Action Required
07/28/2020
- RC AREA "E" CORRIDOR ceiling & wall 219, - AREA "E' CORRIDOR CEILING 219 COMPLETE, 222 ; - ROCK CORRIDOR WALL 3FT DOWN-219,222 -RC CHANNEL CEILINGS AND DEMISING WALLS COMPLETE ROOMS: 240, 241, 242, 244, 245, 261, 263, 264, 262, 243
THIRD FLOOR
Corrective Action Required
07/28/2020
- RC AREA "E' CORRIDOR 319- walls ceiling - AREA "E" CORRIDOR CEILING 319, 322. RC CHANNEL- COORIDOR 319,322 CORRIDOR WALL DOWN 3FT -RC CHANNEL CEILINGS AND DEMISING WALLS COMPLETE ROOMS: 340, 341, 342, 344, 345, 361, 362, 363, 364, 343
FOURTH FLOOR
Corrective Action Required
07/28/2020
- RC AREA "E" CORRIDOR 419, 422 - - AREA "E" CORRIDOR LIDS 419 COMPLETE, 422 TO STAIRS - -RC CHANNEL CEILINGS AND DEMISING WALLS COMPLETE ROOMS: 439,440,441,442,443,459, 461, 460
ELEVATOR 1
Corrective Action Required
07/28/2020
ELEVATOR 2
Corrective Action Required
07/28/2020
ELEVATOR 3
Corrective Action Required
07/28/2020
All Rough Inspection - Commercial Partial 7/31/2020 7/31/2020 07/31/2020
FOURTH FLOOR
Corrective Action Required
07/30/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426- Corridor 419 to room 439 ok Corridor 422 to stairs ok
THIRD FLOOR
Corrective Action Required
07/30/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327-corridor framing ceiling Corridor 319 to room 364 ok Corridor 322 to stairs ok
SECOND FLOOR
Corrective Action Required
07/30/2020
Section “E” Ok-241,242,243,244,245,261,262. 226. Corridor 219 to room 240 ok Corridor 222 to stairs ok -264- shower valve box corridor wall incomplete
FIRST FLOOR
Corrective Action Required
07/31/2020
CORRIDOR 119 and 122 CORRECT FIRESTOP THROUGHOUT 134 -PROVIDE VERTICAL/ HORIZONTAL FIRESTOP AT DEMISING WALL 133 -CORRECT JOIST HANGERS AT PATIO -PROVIDE PROTECTION PLATE FOR PEX AT DEMISING WALL -MOVE CLEANOUT AT SHOWER TO ACCESSIBLE LOCATION -CORRECT SCREW PATTERN AT ROCK BEHIND SHOWER -PROVIDE NAIL GAURD FOR DWV IN SHOWER 127 -CORRECT FIRE RATING AT SHOWER VALVE IN DEMISING WALL 125 -SEAL PENETRATION IN BOTTOM PLATE AT BATH/ CLARIFY PROPER FIRE ASSEMBLY
All Rough Inspection - Commercial Partial 8/6/2020 8/6/2020 08/06/2020
FOURTH FLOOR
Corrective Action Required
07/31/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426- Corridor 419 to room 439 ok Corridor 422 to stairs ok
THIRD FLOOR
Corrective Action Required
07/31/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327-corridor framing ceiling Corridor 319 to room 364 ok Corridor 322 to stairs ok
SECOND FLOOR
Corrective Action Required
07/31/2020
Section “E” Ok-241,242,243,244,245,261,262. 226. Corridor 219 to room 240 ok Corridor 222 to stairs ok -264- shower valve box corridor wall incomplete
FIRST FLOOR
Corrective Action Required
07/31/2020
-CORRECT FIRESTOP AT CORRIDORS 119 and 122 134 -PROVIDE VERTICAL/ HORIZONTAL FIRESTOP AT DEMISING WALL 133 -PROVIDE PROTECTION PLATE FOR PEX AT DEMISING WALL -MOVE CLEANOUT AT SHOWER TO ACCESSIBLE LOCATION -CORRECT SCREW PATTERN AT ROCK BEHIND SHOWER -PROVIDE NAIL GAURD FOR DWV IN SHOWER 127 -CORRECT FIRE RATING AT SHOWER VALVE IN DEMISING WALL 125 -SEAL PENETRATION IN BOTTOM PLATE AT BATH/ CLARIFY PROPER FIRE ASSEMBLY
Rough Framing Inspection - Commercial Partial 8/7/2020 8/7/2020 08/07/2020
Miscellaneous Correction
Corrective Action Required
08/07/2020
-PROVIDE H2.5 CLIPS AT TRUSSES OVER ELEVATOR IN CORRIDOR 427
Miscellaneous Correction
Corrective Action Required
08/07/2020
-BRACE TOP OF WALLS AT RETAIL 7 AND 8 ON ON EAST SIDE OF CORRIDOR 4’ OC BY DOORWAYS -FASTEN END STUD/ TOP TRACK AT EAST WALL BY NORTH EXIT
Miscellaneous Correction
Corrective Action Required
08/07/2020
-BRACE TOP OF WALLS AT RETAIL 7 AND 8 ON ON EAST SIDE OF CORRIDOR 4’ OC BY DOORWAYS -FASTEN END STUD/ TOP TRACK AT EAST WALL BY NORTH EXIT
All Rough Inspection - Commercial Partial 8/7/2020 8/7/2020 08/07/2020
FOURTH FLOOR
Corrective Action Required
08/06/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426- Corridor 419 to room 439 ok Corridor 422 to stairs ok
THIRD FLOOR
Corrective Action Required
08/06/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327-corridor framing ceiling Corridor 319 to room 364 ok Corridor 322 to stairs ok
SECOND FLOOR
Corrective Action Required
08/06/2020
Section “E” Ok-241,242,243,244,245,261,262. 226. Corridor 219 to room 240 ok Corridor 222 to stairs ok -264- shower valve box corridor wall incomplete
FIRST FLOOR
Corrective Action Required
08/06/2020
Section “E” OK-125, 126, 127, 128, 129, 133, 134 Corridor 119 to room 125 ok Corridor 122 to stairs ok
Rated Assembly Inspection Partial 8/10/2020 8/10/2020 08/10/2020
Miscellaneous Correction
Corrective Action Required
08/10/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
Rated Assembly Inspection Partial 8/11/2020 8/11/2020 08/11/2020
Miscellaneous Correction
Corrective Action Required
08/10/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
Miscellaneous Correction
Corrective Action Required
08/11/2020
BUILDING “E” -AREAS APPROVED- -RC CHANNEL CORRIDOR 222 FROM STAIRS TO CORRIDOR 226 -RC CHANNEL CORRIDOR 226 TO ROOM 250 -RC CHANNEL CORRIDOR 322 TO CORRIDOR 326 -RC CHANNEL CORRIDOR 326 TO ROOM 358 -RC CHANNEL CORRIDOR 422 FROM STAIRS TO CORRIDOR 426
All Rough Inspection - Commercial Partial 8/11/2020 08/11/2020
FOURTH FLOOR
Corrective Action Required
08/07/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426- Corridor 419 to room 439 ok Corridor 422 to stairs ok -CORRIDOR 427 CEILING FRAMING
THIRD FLOOR
Corrective Action Required
08/07/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327-corridor framing ceiling Corridor 319 to room 364 ok Corridor 322 to stairs ok
SECOND FLOOR
Corrective Action Required
08/07/2020
Section “E” Ok-241,242,243,244,245,261,262. 226. Corridor 219 to room 240 ok Corridor 222 to stairs ok -264- shower valve box corridor wall incomplete
FIRST FLOOR
Corrective Action Required
08/07/2020
Section “E” OK-125, 126, 127, 128, 129, 133, 134 Corridor 119 to room 125 ok Corridor 122 to stairs ok -CORRIDOR 126 METAL STUD FRAMING FROM NORTH EXIT TO LINE 8.6
All Rough Inspection - Commercial Partial 8/13/2020 08/13/2020
FOURTH FLOOR
Corrective Action Required
08/11/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426- Corridor 419 to room 439 ok Corridor 422 to stairs ok -CORRIDOR 426 AND 427 CEILING FRAMING OK
THIRD FLOOR
Corrective Action Required
08/11/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327-corridor framing ceiling Corridor 319 to room 364 ok Corridor 322 to stairs ok -CORRIDOR 326 AND 327 CEILING FRAMING OK
SECOND FLOOR
Corrective Action Required
08/11/2020
Section “E” Ok-241,242,243,244,245,261,262. 226. —ROOM 240- SEAL PENETRATIONS IN TOP PLATE AT CLOSET—CEILING OK Corridor 219 to room 240 ok Corridor 222 to stairs ok -264- shower valve box corridor wall incomplete -CORRIDOR 326 AND 327 CEILING FRAMING OK
FIRST FLOOR
Corrective Action Required
08/11/2020
Section “E” OK-125, 126, 127, 128, 129, 133, 134 Corridor 119 to room 125 ok Corridor 122 to stairs ok -CORRIDOR 126 METAL STUD FRAMING FROM NORTH EXIT TO LINE 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS-
Rated Assembly Inspection Partial 8/13/2020 8/13/2020 08/13/2020
Miscellaneous Correction
Corrective Action Required
08/11/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
Miscellaneous Correction
Resolved
08/13/2020
FIRST FLOOR
Corrective Action Required
08/13/2020
AREA “E” -AREAS APPROVED- RC CHANNEL ROOMS 125,126,127,128,133,134 CEILINGS
SECOND FLOOR
Corrective Action Required
08/13/2020
AREA “E” -AREAS APPROVED- RC CHANNEL CORRIDOR 222 FROM STAIRS TO CORRIDOR 226 RC CHANNEL CORRIDOR 226 TO ROOM 258
THIRD FLOOR
Corrective Action Required
08/13/2020
AREA “E” -AREAS APPROVED- RC CHANNEL CORRIDOR 322 TO CORRIDOR 326 RC CHANNEL CORRIDOR 326 AND 327
FOURTH FLOOR
Corrective Action Required
08/13/2020
AREA “E” -AREAS APPROVED- RC CHANNEL CORRIDOR 422 FROM STAIRS TO CORRIDOR 426 RC CHANNEL CORRIDOR 426 AND 427
All Rough Inspection - Commercial Partial 8/14/2020 8/14/2020 08/14/2020
FOURTH FLOOR
Corrective Action Required
08/13/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426- Corridor 419 to room 439 ok Corridor 422 to stairs ok -CORRIDOR 426 AND 427 CEILING FRAMING OK
THIRD FLOOR
Corrective Action Required
08/13/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327-corridor framing ceiling Corridor 319 to room 364 ok Corridor 322 to stairs ok -CORRIDOR 326 AND 327 CEILING FRAMING OK
SECOND FLOOR
Corrective Action Required
08/13/2020
Section “E” Ok-240,241,242,243,244,245,261,262. 226. Corridor 219 to room 240 ok Corridor 222 to stairs ok -264- shower valve box corridor wall incomplete -CORRIDOR 326 AND 327 CEILING FRAMING OK
FIRST FLOOR
Corrective Action Required
08/13/2020
Section “E” OK-125, 126, 127, 128, 129, 133, 134 Corridor 119 to room 125 ok Corridor 122 to stairs ok -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -FASTEN ANCHOR BOLT BY WINDOW -SEAL TOP OF WALL AT DEMISING WALL/ CORRIDOR -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
Rated Assembly Inspection Partial 8/14/2020 8/14/2020 08/14/2020
Miscellaneous Correction
Corrective Action Required
08/13/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
08/13/2020
AREA “E” -AREAS APPROVED- RC CHANNEL ROOMS 125,126,127,128,133,134 CEILINGS
SECOND FLOOR
Corrective Action Required
08/13/2020
AREA “E” -AREAS APPROVED- RC CHANNEL CORRIDOR 222 RC CHANNEL CORRIDOR 226 TO ROOM 250 SCREW PATTERN ON FIRST LAYER WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS
THIRD FLOOR
Corrective Action Required
08/13/2020
AREA “E” -AREAS APPROVED- RC CHANNEL CORRIDOR 322 TO CORRIDOR 326 RC CHANNEL CORRIDOR 326 AND 327 SCREW PATTERN ON CEILING CORRIDOR 322 SCREW PATTERN ON CEILING CORRIDOR 326 TO ROOM 355 SCREW PATTERN ON FIRST LAYER WALLS CORRIDOR 319 TO ROOM 341, CORRIDOR 322 TO STAIRS
FOURTH FLOOR
Corrective Action Required
08/13/2020
AREA “E” -AREAS APPROVED- RC CHANNEL CORRIDOR 422 FROM STAIRS TO CORRIDOR 426 RC CHANNEL CORRIDOR 426 AND 427 SCREW PATTER ON FIRST LAYER WALLS CORRIDOR 419 TO ROOM 439
Rated Assembly Inspection Partial 8/17/2020 8/17/2020 08/17/2020
Miscellaneous Correction
Corrective Action Required
08/14/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
08/14/2020
AREA “E” -AREAS APPROVED- RC CHANNEL ROOMS 128,133 CEILINGS RC CHANNEL ROOMS 125,126,127,129,134,135 WALLS AND CEILING
SECOND FLOOR
Corrective Action Required
08/14/2020
AREA “E” -AREAS APPROVED- RC CHANNEL CORRIDOR 222 RC CHANNEL CORRIDOR 226 TO ROOM 250 RC CHANNEL WALLS AND CEILING 240,264 SCREW PATTERN ON FIRST LAYER WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS
THIRD FLOOR
Corrective Action Required
08/14/2020
AREA “E” -AREAS APPROVED- RC CHANNEL CORRIDOR 322 TO CORRIDOR 326 RC CHANNEL CORRIDOR 326 AND 327 SCREW PATTERN ON CEILING CORRIDOR 322 SCREW PATTERN ON CEILING CORRIDOR 326 TO ROOM 355 SCREW PATTERN ON FIRST LAYER WALLS CORRIDOR 319 TO ROOM 341, CORRIDOR 322 TO STAIRS
FOURTH FLOOR
Corrective Action Required
08/14/2020
AREA “E” -AREAS APPROVED- RC CHANNEL CORRIDOR 422, CORRIDOR 426 RC CHANNEL CORRIDOR 427 SCREW PATTER ON FIRST LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS 439,440,441,442,443,459,460
All Rough Inspection - Commercial Partial 8/17/2020 8/17/2020 08/17/2020
FOURTH FLOOR
Corrective Action Required
08/14/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426- Corridor 419 to room 439 ok Corridor 422 to stairs ok -CORRIDOR 426 AND 427 CEILING FRAMING OK
THIRD FLOOR
Corrective Action Required
08/14/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327-corridor framing ceiling Corridor 319 to room 364 ok Corridor 322 to stairs ok -CORRIDOR 326 AND 327 CEILING FRAMING OK
SECOND FLOOR
Corrective Action Required
08/14/2020
Section “E” Ok-240,241,242,243,244,245,261,262. 226, 264 Corridor 219 to room 240 ok Corridor 222 to stairs ok -CORRIDOR 326 AND 327 CEILING FRAMING OK
FIRST FLOOR
Corrective Action Required
08/14/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2- BRACE TOP OF WALL PER PLANS BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL Section “E” OK-124,125, 126, 127, 128, 129, 132, 133, 134, 135 Corridor 119 to room 125 ok Corridor 122 to stairs ok -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -FASTEN ANCHOR BOLT BY WINDOW -SEAL TOP OF WALL AT DEMISING WALL/ CORRIDOR -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
Rated Assembly Inspection Partial 8/18/2020 8/18/2020 08/18/2020
Miscellaneous Correction
Corrective Action Required
08/17/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
08/17/2020
AREA “E” -AREAS APPROVED- RC CHANNEL ROOMS 125,126,127,128,129,133,134,135 WALLS AND CEILING
SECOND FLOOR
Corrective Action Required
08/17/2020
AREA “E” -AREAS APPROVED- RC CHANNEL CORRIDOR 222 RC CHANNEL CORRIDOR 226 TO ROOM 250 RC CHANNEL WALLS AND CEILING 240,264 SCREW PATTERN ON FIRST LAYER WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS
THIRD FLOOR
Corrective Action Required
08/17/2020
AREA “E” -AREAS APPROVED- RC CHANNEL WALLS AND CEILINGS 340,364 RC CHANNEL CORRIDOR 322 TO CORRIDOR 326 RC CHANNEL CORRIDOR 326 AND 327 SCREW PATTERN ON CEILING CORRIDOR 322 SCREW PATTERN ON CEILING CORRIDOR 326 TO ROOM 355 SCREW PATTERN ON FIRST LAYER WALLS CORRIDOR 319 TO ROOM 341, CORRIDOR 322 TO STAIRS
FOURTH FLOOR
Corrective Action Required
08/17/2020
AREA “E” -AREAS APPROVED- RC CHANNEL WALLS AND CEILING 438,462 RC CHANNEL CORRIDOR 422, CORRIDOR 426 RC CHANNEL CORRIDOR 427 SCREW PATTER ON FIRST LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS 439,440,441,442,443,459,460
All Rough Inspection - Commercial Partial 8/18/2020 8/18/2020 08/18/2020
FOURTH FLOOR
Corrective Action Required
08/17/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426- -444,447,450,451,457 -SEAL GAP AT TOP PLATES BETWEEN WALLS IN 448,447 Corridor 419 to room 439 ok Corridor 422 to stairs ok -CORRIDOR 422,426, 427
THIRD FLOOR
Corrective Action Required
08/17/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327-corridor framing ceiling Corridor 319 to room 364 ok Corridor 322 to stairs ok -CORRIDOR 326 AND 327 CEILING FRAMING OK
SECOND FLOOR
Corrective Action Required
08/17/2020
Section “E” Ok-240,241,242,243,244,245,261,262. 226, 264 Corridor 219 to room 240 ok Corridor 222 to stairs ok -CORRIDOR 326 AND 327 CEILING FRAMING OK
FIRST FLOOR
Corrective Action Required
08/17/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2- BRACE TOP OF WALL PER PLANS. ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY Section “E” OK-124,125, 126, 127, 128, 129, 132, 133, 134, 135 Corridor 119 to room 125 ok Corridor 122 to stairs ok -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
Rated Assembly Inspection Partial 8/20/2020 8/20/2020 08/20/2020
Miscellaneous Correction
Corrective Action Required
08/18/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
08/18/2020
AREA “E” -AREAS APPROVED- RC CHANNEL ROOMS 124,125,126,127,128,129,133,134,135 WALLS AND CEILING
SECOND FLOOR
Corrective Action Required
08/18/2020
AREA “E” -AREAS APPROVED- RC CHANNEL CORRIDOR 222 RC CHANNEL CORRIDOR 226 TO ROOM 250 RC CHANNEL WALLS AND CEILING 240,264 SCREW PATTERN ON FIRST LAYER WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS
THIRD FLOOR
Corrective Action Required
08/18/2020
AREA “E” -AREAS APPROVED- RC CHANNEL WALLS AND CEILINGS 340,364 RC CHANNEL CORRIDOR 322 TO CORRIDOR 326 RC CHANNEL CORRIDOR 326 AND 327 SCREW PATTERN ON CEILING CORRIDOR 322 SCREW PATTERN ON CEILING CORRIDOR 326 TO ROOM 355 SCREW PATTERN ON FIRST LAYER WALLS CORRIDOR 319 TO ROOM 341, CORRIDOR 322 TO STAIRS
FOURTH FLOOR
Corrective Action Required
08/18/2020
AREA “E” -AREAS APPROVED- RC CHANNEL WALLS AND CEILING 438,462 RC CHANNEL CORRIDOR 422, CORRIDOR 426 RC CHANNEL CORRIDOR 427 SCREW PATTERN ON FIRST AND SECOND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND SECOND LAYER DIMISING WALL 439,440,441,442,443,459,460,461
All Rough Inspection - Commercial Partial 8/20/2020 8/20/2020 08/20/2020
FOURTH FLOOR
Corrective Action Required
08/18/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426- -444,447,448,449,450,451,457,424A Corridor 419 to room 439 ok Corridor 422 to stairs ok -CORRIDOR 422,426, 427
THIRD FLOOR
Corrective Action Required
08/18/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327-corridor framing ceiling Corridor 319 to room 364 ok Corridor 322, 326, 327 -346 NO ACCESS -UNITS-COMPLETE SHOWER PANS THROUGHOUT, PROVIDE STRAP AT TOP PLATE WHERE DWV BORED MORE THAN 50% AND PROVIDE STUD FOR PROPER JOIST BEARING AT ALL LOCATIONS 360- NAIL THROUGH NM IN BATHROOM 348- SEAL PENETRATIONS IN TOP PLATE, PROVIDE FIREBLOCKING AT TUB
SECOND FLOOR
Corrective Action Required
08/18/2020
Section “E” Ok-240,241,242,243,244,245,261,262. 226, 264, Corridor 219 to room 240 ok Corridor 222 to stairs ok -CORRIDOR 326 AND 327 CEILING FRAMING OK
FIRST FLOOR
Corrective Action Required
08/18/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY Section “E” OK-124,125, 126, 127, 128, 129, 132, 133, 134, 135 Corridor 119 to room 125 ok Corridor 122 to stairs ok -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
Rated Assembly Inspection Partial 8/21/2020 8/21/2020 08/21/2020
Miscellaneous Correction
Corrective Action Required
08/20/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
08/20/2020
AREA “E” -AREAS APPROVED- RC CHANNEL ROOMS 124,125,126,127,128,129,133,134,135 WALLS AND CEILING
SECOND FLOOR
Corrective Action Required
08/20/2020
AREA “E” -AREAS APPROVED- RC CHANNEL CORRIDOR 222 RC CHANNEL CORRIDOR 226 RC CHANNEL WALLS AND CEILING 240,264 SCREW PATTERN ON FIRST LAYER WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS
THIRD FLOOR
Corrective Action Required
08/20/2020
AREA “E” -AREAS APPROVED- RC CHANNEL WALLS AND CEILINGS 340,364 RC CHANNEL CORRIDOR 322 TO CORRIDOR 326 RC CHANNEL CORRIDOR 326 AND 327 SCREW PATTERN ON CEILING CORRIDOR 322 SCREW PATTERN ON CEILING CORRIDOR 326 TO ROOM 355 SCREW PATTERN ON FIRST LAYER WALLS CORRIDOR 319 TO ROOM 341, CORRIDOR 322 TO STAIRS SCREW PATTERN ROOMS AND FIRST LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363
FOURTH FLOOR
Corrective Action Required
08/20/2020
AREA “E” -AREAS APPROVED- RC CHANNEL WALLS AND CEILING 438-453, 459-462 RC CHANNEL CORRIDOR 422, CORRIDOR 426 RC CHANNEL CORRIDOR 427 SCREW PATTERN ON FIRST AND SECOND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND SECOND LAYER DIMISING WALL 439,440,441,442,443,459,460,461
STAIR TOWER 1
Corrective Action Required
08/21/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR
All Rough Inspection - Commercial Partial 8/21/2020 8/21/2020 08/21/2020
FOURTH FLOOR
Corrective Action Required
08/20/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426- -444,447,448,449,450,451,457,424A Corridor 419 to room 439 ok Corridor 422 to stairs ok -CORRIDOR 422,426, 427
THIRD FLOOR
Corrective Action Required
08/20/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327-corridor framing ceiling -321A, 324A, 347, 348, 349, 350, 351, 352, 353, 354, 356, 357, 358, 359, 360 Corridor 319 to room 364 ok Corridor 322, 326, 327 -346 NO ACCESS -355 PROVIDE STRAP AND BEARING STUD AT DWV
SECOND FLOOR
Corrective Action Required
08/20/2020
Section “E” Ok-240,241,242,243,244,245,261,262. 226, 264, Corridor 219 to room 240 ok Corridor 222 to stairs ok -CORRIDOR 326 AND 327 CEILING FRAMING OK
FIRST FLOOR
Corrective Action Required
08/20/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY Section “E” OK-124,125, 126, 127, 128, 129, 132, 133, 134, 135 Corridor 119 to room 125 ok Corridor 122 to stairs ok -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
Rated Assembly Inspection Partial 8/24/2020 8/24/2020 08/24/2020
Miscellaneous Correction
Corrective Action Required
08/21/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
08/21/2020
AREA “E” -AREAS APPROVED- RC CHANNEL ROOMS 124,125,126,127,128,129,133,134,135 WALLS AND CEILING
SECOND FLOOR
Corrective Action Required
08/21/2020
AREA “E” -AREAS APPROVED- RC CHANNEL CORRIDOR 222 RC CHANNEL CORRIDOR 226 RC CHANNEL WALLS AND CEILING 240,264 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS SCREW PATTERN FIRST LAYER UNITS: 241,242,243,244,245,262,262,263
THIRD FLOOR
Corrective Action Required
08/21/2020
AREA “E” -AREAS APPROVED- RC CHANNEL WALLS AND CEILINGS 340,364 RC CHANNEL CORRIDOR 322 TO CORRIDOR 326 RC CHANNEL CORRIDOR 326 AND 327 SCREW PATTERN ON CEILING CORRIDOR 322 SCREW PATTERN ON CEILING CORRIDOR 326 TO ROOM 355 SCREW PATTERN ON FIRST LAYER WALLS CORRIDOR 319 TO ROOM 341, CORRIDOR 322 TO STAIRS SCREW PATTERN ROOMS AND FIRST LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363
FOURTH FLOOR
Corrective Action Required
08/21/2020
AREA “E” -AREAS APPROVED- RC CHANNEL WALLS AND CEILING 438-453, 459-462 RC CHANNEL CORRIDOR 422, CORRIDOR 426 RC CHANNEL CORRIDOR 427 SCREW PATTERN ON FIRST AND SECOND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND SECOND LAYER DIMISING WALL 439,440,441,442,443,459,460,461
STAIR TOWER 1
Corrective Action Required
08/21/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
08/24/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A)
All Rough Inspection - Commercial Partial 8/24/2020 8/24/2020 08/24/2020
FOURTH FLOOR
Corrective Action Required
08/21/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426- -444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok Corridor 422 to stairs ok -CORRIDOR 422,426, 427
THIRD FLOOR
Corrective Action Required
08/21/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327-corridor framing ceiling -321A, 324A, 325A, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360 Corridor 319 to room 364 ok Corridor 322, 326, 327 -346 NO ACCESS -355 PROVIDE STRAP AND BEARING STUD AT DWV
SECOND FLOOR
Corrective Action Required
08/21/2020
Section “E” Ok-240,241,242,243,244,245,261,262. 226, 264, Corridor 219 to room 240 ok Corridor 222 to stairs ok -CORRIDOR 326 AND 327 CEILING FRAMING OK
FIRST FLOOR
Corrective Action Required
08/21/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY Section “E” OK-124,125, 126, 127, 128, 129, 132, 133, 134, 135 Corridor 119 to room 125 ok Corridor 122 to stairs ok -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
Rated Assembly Inspection Partial 8/25/2020 8/25/2020 08/25/2020
Miscellaneous Correction
Corrective Action Required
08/24/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
08/24/2020
AREA “E” -AREAS APPROVED- RC CHANNEL ROOMS 124,125,126,127,128,129,133,134,135 WALLS AND CEILING
SECOND FLOOR
Corrective Action Required
08/24/2020
AREA “E”-AREAS APPROVED- CORRIDORS- 222 RC CHANNEL , 1ST LAYER; 226 RC CHANNEL , 1ST LAYER; SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 241,242,243,244,245,262,262,263; 240,264
THIRD FLOOR
Corrective Action Required
08/24/2020
AREA “E” -AREAS APPROVED- RC CHANNEL WALLS AND CEILINGS 340,364 RC CHANNEL CORRIDOR 322 TO CORRIDOR 326 RC CHANNEL CORRIDOR 326 AND 327 SCREW PATTERN ON CEILING CORRIDOR 322 SCREW PATTERN ON CEILING CORRIDOR 326 TO ROOM 355 SCREW PATTERN ON FIRST LAYER WALLS CORRIDOR 319 TO ROOM 341, CORRIDOR 322 TO STAIRS SCREW PATTERN ROOMS AND FIRST LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363
FOURTH FLOOR
Corrective Action Required
08/24/2020
AREA “E” -AREAS APPROVED- RC CHANNEL WALLS AND CEILING 438-453, 459-462 RC CHANNEL CORRIDOR 422, CORRIDOR 426 RC CHANNEL CORRIDOR 427 SCREW PATTERN ON FIRST AND SECOND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND SECOND LAYER DIMISING WALL 439,440,441,442,443,459,460,461
STAIR TOWER 1
Corrective Action Required
08/24/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
08/24/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A)
Pool Steel/Bonding - Commercial Partial 8/25/2020 08/25/2020
Misc
Corrective Action Required
08/25/2020
--POOL BONDINGFLOOR AND WALLS 4 LOCATIONS.
Rough Framing Inspection - Commercial Partial 7/21/2020 8/25/2020 08/25/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/13/2020
STEEL FRAMING STORE FRONT AND DEMISING WALLS: - METAL STUD FRAMING AT LOBBY ENTRANCE - - METAL STUD WALL NORTH SIDE LOBBY -RETAIL SROTE FRONT UPPER-K LINE 1.4-5; -Metal stud framing Area B and C Demising wall framing corridor 103, 128; LOBBY-5LINE-G CORNICE-"E" AREA - METAL STUD FRAMING UPPER LOBBY, CANOPY AT ENTRANCE, PARTIAL WALLS IN REAR AT POOL ( DOOR & WINDOW OPENINGS) -
Rated Assembly Inspection Partial 8/26/2020 8/26/2020 08/26/2020
Miscellaneous Correction
Corrective Action Required
08/25/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
08/25/2020
-AREAS APPROVED- AREA “E” RC CHANNEL ROOMS 124,125,126,127,128,129,133,134,135 WALLS AND CEILING UNITS-126
SECOND FLOOR
Corrective Action Required
08/25/2020
\\-AREAS APPROVED- AREA “E” CORRIDORS-RC CHANNEL 222,226 . 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 241,242,243,244,245,262,262,263; 240,264
THIRD FLOOR
Corrective Action Required
08/25/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 340,364 RC CHANNEL CORRIDORS- 322,326,327, 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363
FOURTH FLOOR
Corrective Action Required
08/25/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILING 438-453, 459-462 RC CORRIDOR 422, 426, 427. SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND SECOND LAYER DIMISING WALL 439,440,441,442,443,459,460,461
STAIR TOWER 1
Corrective Action Required
08/25/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
08/25/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A)
Rated Assembly Inspection Partial 8/27/2020 8/27/2020 08/27/2020
Miscellaneous Correction
Corrective Action Required
08/26/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
08/26/2020
-AREAS APPROVED- AREA “E” RC CHANNEL ROOMS 124,125,126,127,128,129,133,134,135 WALLS AND CEILING UNITS-126
SECOND FLOOR
Corrective Action Required
08/26/2020
\\-AREAS APPROVED- AREA “E” CORRIDORS-RC CHANNEL 222,226 . 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 241,242,243,244,245,262,262,263; 240,264
THIRD FLOOR
Corrective Action Required
08/26/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363
FOURTH FLOOR
Corrective Action Required
08/26/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILING 438-453, 459-462 RC CORRIDOR 421A,422, 426, 427 SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461
STAIR TOWER 1
Corrective Action Required
08/26/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
08/26/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS
All Rough Inspection - Commercial Partial 8/27/2020 8/27/2020 08/27/2020
FOURTH FLOOR
Corrective Action Required
08/24/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427
THIRD FLOOR
Corrective Action Required
08/24/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327-corridor framing ceiling -321A, 324A, 325A, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360 Corridor 319 to room 364 ok Corridor 322, 326, 327
SECOND FLOOR
Corrective Action Required
08/24/2020
Section “E” Ok-240,241,242,243,244,245,261,262. 226, 264, -,247,249,251,256,257,258,259,260, -250-FINISH DWV DRAIN LINE BY PATIO -252-PROVIDE BOTTOM PLATE AT BEARING STUD, SEAL DEAD SPACE -253-SEAL DEAD SPACE -254-STRAP TOP PLATE, TIE EXTERIOR WALLS TOGETHER AT CORNER -255 COMPLETE SERVICE CABLES Corridor 219 to room 240 ok Corridor 222 to stairs ok -CORRIDOR 326 AND 327 CEILING FRAMING OK
FIRST FLOOR
Corrective Action Required
08/24/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY Section “E” OK-124,125, 126, 127, 128, 129, 132, 133, 134, 135 Corridor 119 to room 125 ok Corridor 122 to stairs ok -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
Rated Assembly Inspection Partial 8/28/2020 8/28/2020 08/28/2020
Miscellaneous Correction
Corrective Action Required
08/27/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
08/27/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS CORRIDOR 119 RC CHANNEL ROOMS 121A,124,125,126,127,128,129,133,134,135 WALLS AND CEILING UNITS-126
SECOND FLOOR
Corrective Action Required
08/27/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226,221A,240-245,261-264 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 241,242,243,244,245,262,262,263; 240,264
THIRD FLOOR
Corrective Action Required
08/27/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363
FOURTH FLOOR
Corrective Action Required
08/27/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILING 438-453, 459-462 RC CORRIDOR 421A,422, 426, 427 SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461
STAIR TOWER 1
Corrective Action Required
08/27/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
08/27/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS
All Rough Inspection - Commercial Partial 8/28/2020 8/28/2020 08/28/2020
FOURTH FLOOR
Corrective Action Required
08/27/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427
THIRD FLOOR
Corrective Action Required
08/27/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327-corridor framing ceiling -321A, 324A, 325A, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360 Corridor 319 to room 364 ok Corridor 322, 326, 327
SECOND FLOOR
Corrective Action Required
08/27/2020
Section “E” Ok-240,241,242,243,244,245,261,262. 225A, 226, 264, -,247,249,250,251,252, 253, 256,257,258,259,260, -224A- SEAL DEAD SPACE, NAIL TRIPLE JOIST TOGETHER -248- REPLACE BROKEN STUD AT DWV, SEAL DEAD SPACE AT FUTURE SHAFT -254-TIE EXTERIOR WALLS TOGETHER AT CORNER Corridor 219 to room 240 ok Corridor 222 to stairs ok -CORRIDOR 326 AND 327 CEILING FRAMING OK
FIRST FLOOR
Corrective Action Required
08/27/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY Section “E” OK-124,125, 126, 127, 128, 129, 132, 133, 134, 135 Corridor 119 to room 125 ok Corridor 122 to stairs ok -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
All Rough Inspection - Commercial Partial 8/31/2020 8/31/2020 08/31/2020
FOURTH FLOOR
Corrective Action Required
08/28/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, AREA "D" CORRIDOR 412,
THIRD FLOOR
Corrective Action Required
08/28/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -321A, 324A, 325A, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312,
SECOND FLOOR
Corrective Action Required
08/28/2020
Section “E” Ok-240,241,242,243,244,245,261,262. 225A, 226, 264, -,247,249,250,251,252, 253, 256,257,258,259,260, -224A- SEAL DEAD SPACE, NAIL TRIPLE JOIST TOGETHER -248- REPLACE BROKEN STUD AT DWV, SEAL DEAD SPACE AT FUTURE SHAFT -254-TIE EXTERIOR WALLS TOGETHER AT CORNER Corridor 219 to room 240 ok Corridor 222 to stairs ok SECTION "E" CORRIDOR FRAMING CEILING 229, SECTION "D" CORRIDOR CEILING FRAMING 212,
FIRST FLOOR
Corrective Action Required
08/28/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY Section “E” OK-124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135 Corridor 119 to room 125 ok Corridor 122 to stairs ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
Rated Assembly Inspection Partial 8/31/2020 8/31/2020 08/31/2020
Miscellaneous Correction
Corrective Action Required
08/28/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
08/28/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS CORRIDOR 119 RC CHANNEL ROOMS 121A,124,125,126,127,128,129,133,134,135 WALLS AND CEILING - UNITS-126 2ND LAYER -
SECOND FLOOR
Corrective Action Required
08/28/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226,221A,240-245,261-264 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 241,242,243,244,245,262,262,263; 240,264
THIRD FLOOR
Corrective Action Required
08/28/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363
FOURTH FLOOR
Corrective Action Required
08/28/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILING 438-453, 459-462 RC CORRIDOR 421A,422, 426, 427 SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST LAYER -
STAIR TOWER 1
Corrective Action Required
08/28/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
08/28/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS
All Rough Inspection - Commercial Partial 9/1/2020 9/1/2020 09/01/2020
FOURTH FLOOR
Corrective Action Required
08/31/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, AREA "D" CORRIDOR 412,
THIRD FLOOR
Corrective Action Required
08/31/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -321A, 324A, 325A, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312,
SECOND FLOOR
Corrective Action Required
08/31/2020
Section “E” Ok- 224A, 240,241,242,243,244,245, 246, 261,262. 225A, 226, 264, -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok SECTION "E" CORRIDOR FRAMING CEILING 229, SECTION "D" CORRIDOR CEILING FRAMING 212,
FIRST FLOOR
Corrective Action Required
08/31/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY Section “E” OK-124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135 Corridor 119 to room 125 ok Corridor 122 to stairs ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
Rated Assembly Inspection Partial 9/1/2020 9/1/2020 09/01/2020
Miscellaneous Correction
Corrective Action Required
08/31/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
08/31/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS CORRIDOR 119 RC CHANNEL ROOMS 121A,124,125,126,127,128,129,133,134,135 WALLS AND CEILING - UNITS-126 2ND LAYER - - 1ST LAYER 124,125,128,129, 132, 133,134, 1ST LAYER CORRIDOR AT THESE UNITS - - UNIT 127 COMPLETE ROCK LIVING ROOM -
SECOND FLOOR
Corrective Action Required
08/31/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226,221A,240-245,261-264 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 241,242,243,244,245,262,262,263; 240,264 - - 2ND LAYER UNITS 241,242,243, 244, 245,262,262,263 -
THIRD FLOOR
Corrective Action Required
08/31/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,348,349,350,351,352,353,354,355,356,357,358,359,360, - -347 RC @ TRUSS GUSSET REPAIR LIVING ROOM - - 1ST LAYER UNIT 340, 364, -
FOURTH FLOOR
Corrective Action Required
08/31/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILING 438-453, 459-462 RC CORRIDOR 421A,422, 426, 427 SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST LAYER -- RC CHANNEL 414A, 444,445,446,447,448,449,450,451 ,452,453,454,455,456,457, - - 1ST LAYER UNITS 438, 462 -
STAIR TOWER 1
Corrective Action Required
08/31/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
08/31/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS
Rated Assembly Inspection Partial 9/2/2020 9/2/2020 09/02/2020
Miscellaneous Correction
Corrective Action Required
09/01/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/01/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS CORRIDOR 119 RC CHANNEL ROOMS 121A,124,125,126,127,128,129,133,134,135 WALLS AND CEILING - UNITS-126 2ND LAYER - - 1ST LAYER 124,125,127,128,129, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS -
SECOND FLOOR
Corrective Action Required
09/01/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226,221A,240-245,261-264 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 241,242,243,244,245,262,262,263; 240,264 - - 2ND LAYER UNITS 241,242,243, 244, 245,262,262,263 -
THIRD FLOOR
Corrective Action Required
09/01/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,348,349,350,351,352,353,354,355,356,357,358,359,360, - -347 RC @ TRUSS GUSSET REPAIR LIVING ROOM - - 1ST LAYER UNIT 340, 364, -
FOURTH FLOOR
Corrective Action Required
09/01/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILING 438-453, 459-462 RC CORRIDOR 421A,422, 426, 427 SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST LAYER -- RC CHANNEL 414A, 444,445,446,447,448,449,450,451 ,452,453,454,455,456,457, - - 1ST LAYER UNITS 438, 462 -
STAIR TOWER 1
Corrective Action Required
09/01/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/01/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS
All Rough Inspection - Commercial Partial 9/2/2020 9/2/2020 09/02/2020
FOURTH FLOOR
Corrective Action Required
09/01/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, AREA "D" CORRIDOR 412,
THIRD FLOOR
Corrective Action Required
09/01/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -321A, 324A, 325A, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312,
SECOND FLOOR
Corrective Action Required
09/01/2020
Section “E” Ok- 224A, 240,241,242,243,244,245, 246, 261,262. 225A, 226, 264, -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" CORRIDOR FRAMING CEILING 229, SECTION "D" CORRIDOR CEILING FRAMING 212,
FIRST FLOOR
Corrective Action Required
09/01/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY Section “E” OK-124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135 Corridor 119 to room 125 ok Corridor 122 to stairs ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
All Rough Inspection - Commercial Partial 9/3/2020 9/3/2020 09/03/2020
FOURTH FLOOR
Corrective Action Required
09/02/2020
AREA"E"- UNITS-438439,440,461,441,442,459-443-459-461-462–460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, AREA "D" CORRIDOR 412,
THIRD FLOOR
Corrective Action Required
09/02/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -321A, 324A, 325A, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312,
SECOND FLOOR
Corrective Action Required
09/02/2020
Section “E” Ok- 224A, 240,241,242,243,244,245, 246, 261,262. 225A, 226, 264, -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" CORRIDOR FRAMING CEILING 229, SECTION "D" CORRIDOR CEILING FRAMING 212,
FIRST FLOOR
Corrective Action Required
09/02/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY Section “E” OK-124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135 Corridor 119 to room 125 ok Corridor 122 to stairs ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
STAIR TOWER 3
Informational
09/03/2020
- STAIR TOWER "C" - - ALL ROUGH APPROVED -
Rated Assembly Inspection Partial 9/3/2020 9/3/2020 09/03/2020
Miscellaneous Correction
Corrective Action Required
09/02/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/02/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS CORRIDOR 119 RC CHANNEL ROOMS 121A,124,125,126,127,128,129,133,134,135 WALLS AND CEILING - UNITS-126 2ND LAYER - - 1ST LAYER 124,125,127,128,129, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS -
SECOND FLOOR
Corrective Action Required
09/02/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 241,242,243,244,245,262,262,263; 240,264 - - 2ND LAYER UNITS 241,242,243, 244, 245,262,262,263 - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR -
THIRD FLOOR
Corrective Action Required
09/02/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 - RC CHANNEL PARTY WALLS 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - ( PROVIDE RC CHANNEL 325A ) 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,348,349,350,351,352,353,354,355,356,357,358,359,360, - -347 RC @ TRUSS GUSSET REPAIR LIVING ROOM - - 1ST LAYER UNIT 340, 364, -
FOURTH FLOOR
Corrective Action Required
09/02/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILING 438-453, 459-462 RC CORRIDOR 421A,422, 426, 427, - - RC CHANNEL PARTY WALLS 424,425A,444,445,446,447,448,450,451,452,453,454,455,456,457,456, ( 449 PROVIDE RC CHANNEL @ PARTY WALL ) SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST LAYER -- RC CHANNEL 414A, 444,445,446,447,448,449,450,451 ,452,453,454,455,456,457, - - 1ST LAYER UNITS 438, 462 -
STAIR TOWER 1
Corrective Action Required
09/02/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/02/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS
Rated Assembly Inspection Partial 9/4/2020 9/4/2020 09/04/2020
Miscellaneous Correction
Corrective Action Required
09/03/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/03/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS CORRIDOR 119 RC CHANNEL ROOMS 121A,124,125,126,127,128,129,133,134,135 WALLS AND CEILING - UNITS-126 2ND LAYER - - 1ST LAYER 124,125,127,128,129, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS -
SECOND FLOOR
Corrective Action Required
09/03/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 241,242,243,244,245,262,262,263; 240,264 - - 2ND LAYER UNITS 241,242,243, 244, 245,262,262,263 - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, -
THIRD FLOOR
Corrective Action Required
09/03/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 - RC CHANNEL PARTY WALLS 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346, 347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 340, 364, - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER ( REAR CHASE AT UNIT 353 NOT ROCKED)
FOURTH FLOOR
Corrective Action Required
09/03/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILING 438-453, 459-462 RC CORRIDOR 421A,422, 426, 427, - - RC CHANNEL PARTY WALLS 424,425A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,456, SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST LAYER -- RC CHANNEL 414A, 444,445,446,447,448,449,450,451 ,452,453,454,455,456,457, - - 1ST LAYER UNITS 438, 462 -
STAIR TOWER 1
Corrective Action Required
09/03/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/03/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS
Rated Assembly Inspection Partial 9/8/2020 9/8/2020 09/08/2020
Miscellaneous Correction
Corrective Action Required
09/04/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/04/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS CORRIDOR 119 RC CHANNEL ROOMS 121A,124,125,126,127,128,129,133,134,135 WALLS AND CEILING - UNITS-126 2ND LAYER - - 1ST LAYER 124,125,127,128,129, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER INCOMPLETE UNITS 124, 135,
SECOND FLOOR
Corrective Action Required
09/04/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264 - - RC CHANNEL CORRIDOR 229 CEILING ONLY - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 241,242,243,244,245,262,262,263; 240,264 - - 2ND LAYER UNITS 240,241,242,243, 244, 245,262,262,263, 264, - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, -
THIRD FLOOR
Corrective Action Required
09/04/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR CEILING ONLY 329, - RC CHANNEL PARTY WALLS 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346, 347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 340, 364, - - 2ND LAYER UNIT 364- ( 340 SCREW 2ND LAYER AT TOP ) - 3RD FLOOR MECHANICAL CHASE 1ST LAYER COMPLETE -
FOURTH FLOOR
Corrective Action Required
09/04/2020
-AREAS APPROVED- AREA “E” -RC CHANNEL WALLS AND CEILING 438-453, 459-462 -RC CORRIDOR 421A,422, 426, 427, - RC CORRIDOR 429 CEILING ONLY - - RC CHANNEL PARTY WALLS 424,425A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,456, SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST LAYER -- RC CHANNEL 414A, 444,445,446,447,448,449,450,451 ,452,453,454,455,456,457, - - 1ST LAYER UNITS 438, 462 - - 2ND LAYER UNITS 438, 462 -
STAIR TOWER 1
Corrective Action Required
09/04/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/04/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS
Rated Assembly Inspection Partial 9/9/2020 9/9/2020 09/09/2020
Miscellaneous Correction
Corrective Action Required
09/08/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/08/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS CORRIDOR 119 RC CHANNEL ROOMS 121A,124,125,126,127,128,129,133,134,135 WALLS AND CEILING - UNITS-126 2ND LAYER - - 1ST LAYER 124,125,127,128,129, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER INCOMPLETE UNITS 124, 135,
SECOND FLOOR
Corrective Action Required
09/08/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264 - - RC CHANNEL CORRIDOR 229 CEILING ONLY - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 241,242,243,244,245,262,262,263; 240,264 - - 2ND LAYER UNITS 240,241,242,243, 244, 245,262,262,263, 264, - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, -
THIRD FLOOR
Corrective Action Required
09/08/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR CEILING ONLY 329, - RC CHANNEL PARTY WALLS 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346, 347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 340, 364, - - 2ND LAYER UNIT 340,364, - 3RD FLOOR MECHANICAL CHASE 1ST LAYER COMPLETE -
FOURTH FLOOR
Corrective Action Required
09/08/2020
-AREAS APPROVED- AREA “E” -RC CHANNEL WALLS AND CEILING 438-453, 459-462 -RC CORRIDOR 421A,422, 426, 427, - RC CORRIDOR 429 CEILING ONLY - - RC CHANNEL PARTY WALLS 424,425A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,456, SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST LAYER -- RC CHANNEL 414A, 444,445,446,447,448,449,450,451 ,452,453,454,455,456,457, - - 1ST LAYER UNITS 438, 462 - - 2ND LAYER UNITS 438, 462 - - BLDG "E" PHASE 2 1ST LAYER 444,445,446,447,448,449,450,451,453,454,455,456, 457,458 -
STAIR TOWER 1
Corrective Action Required
09/08/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/08/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS
ELEVATOR 3
Informational
09/09/2020
- ELEVATOR "B" - 1ST LAYER WALLS FLOORS 3 & 4 -
Rated Assembly Inspection Partial 9/10/2020 9/10/2020 09/10/2020
Miscellaneous Correction
Corrective Action Required
09/09/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/09/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS CORRIDOR 119 RC CHANNEL ROOMS 121A,124,125,126,127,128,129,133,134,135 WALLS AND CEILING - UNITS-126 2ND LAYER - - 1ST LAYER 124,125,127,128,129, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER INCOMPLETE UNITS 124, 135,
SECOND FLOOR
Corrective Action Required
09/09/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264 - - RC CHANNEL CORRIDOR 229 CEILING ONLY - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 241,242,243,244,245,262,262,263; 240,264 - - 2ND LAYER UNITS 240,241,242,243, 244, 245,262,262,263, 264, - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, -
THIRD FLOOR
Corrective Action Required
09/09/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR CEILING ONLY 329, - RC CHANNEL PARTY WALLS 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346, 347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 340, 364, - - 2ND LAYER UNIT 340,364, - 3RD FLOOR MECHANICAL CHASE 1ST LAYER COMPLETE -
FOURTH FLOOR
Corrective Action Required
09/09/2020
-AREAS APPROVED- AREA “E” -RC CHANNEL WALLS AND CEILING 438-453, 459-462 -RC CORRIDOR 421A,422, 426, 427, - RC CORRIDOR 429 CEILING ONLY - - RC CHANNEL PARTY WALLS 424,425A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,456, SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST LAYER -- RC CHANNEL 414A, 444,445,446,447,448,449,450,451 ,452,453,454,455,456,457, - - 1ST LAYER UNITS 438, 462 - - 2ND LAYER UNITS 438, 462 - - BLDG "E" PHASE 2 1ST LAYER 444,445,446,447,448,449,450,451,453,454,455,456, 457,458 -
STAIR TOWER 1
Corrective Action Required
09/09/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/09/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
All Rough Inspection - Commercial Partial 9/14/2020 9/14/2020 09/14/2020
FOURTH FLOOR
Corrective Action Required
09/03/2020
AREA"E"- UNITS- ( 436 DRAFT STOP N & S KITCHEN WALLS) ( 465 FIRE STOP LID DEAD SPACE AT SHOWER) 435,437,438,439,440,461,441,442,459-443-459-461-462–463-464-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, AREA "D" CORRIDOR 412,
THIRD FLOOR
Corrective Action Required
09/03/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -321A, 324A, 325A, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312,
SECOND FLOOR
Corrective Action Required
09/03/2020
Section “E” Ok- 224A, 240,241,242,243,244,245, 246, 261,262. 225A, 226, 264, -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" CORRIDOR FRAMING CEILING 229, SECTION "D" CORRIDOR CEILING FRAMING 212,
FIRST FLOOR
Corrective Action Required
09/03/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY Section “E” OK-124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135 Corridor 119 to room 125 ok Corridor 122 to stairs ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
STAIR TOWER 3
Informational
09/03/2020
- STAIR TOWER "C" - - ALL ROUGH APPROVED -
Rated Assembly Inspection Partial 9/14/2020 9/14/2020 09/14/2020
Miscellaneous Correction
Corrective Action Required
09/10/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/10/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS CORRIDOR 119 RC CHANNEL ROOMS 121A,124,125,126,127,128,129,133,134,135 WALLS AND CEILING - UNITS-126 2ND LAYER - - 1ST LAYER 124,125,127,128,129, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 124,125,127,128,129,132,133,134, 135, -
SECOND FLOOR
Corrective Action Required
09/10/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264 - - RC CHANNEL CORRIDOR 229 CEILING ONLY - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 241,242,243,244,245,262,262,263; 240,264 - - 2ND LAYER UNITS 240,241,242,243, 244, 245,262,262,263, 264, - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, -
THIRD FLOOR
Corrective Action Required
09/10/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR CEILING ONLY 329, - RC CHANNEL PARTY WALLS 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346, 347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 340, 364, - - 2ND LAYER UNIT 340,364, - 3RD FLOOR MECHANICAL CHASE 1ST LAYER COMPLETE -
FOURTH FLOOR
Corrective Action Required
09/10/2020
-AREAS APPROVED- AREA “E” -RC CHANNEL WALLS AND CEILING 438-453, 459-462 -RC CORRIDOR 421A,422, 426, 427, - RC CORRIDOR 429 CEILING ONLY - - RC CHANNEL PARTY WALLS 424,425A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,456, SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST LAYER -- RC CHANNEL 414A, 444,445,446,447,448,449,450,451 ,452,453,454,455,456,457, - - 1ST LAYER UNITS 438, 462, 421A, 425A - - 2ND LAYER UNITS 438, 462 - - BLDG "E" PHASE 2 1ST LAYER 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458 - 2ND LAYER: 444,445,447,448,449,450,451,454,455,457,458 -
STAIR TOWER 1
Corrective Action Required
09/10/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/10/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
All Rough Inspection - Commercial Partial 9/15/2020 9/15/2020 09/15/2020
FOURTH FLOOR
Corrective Action Required
09/14/2020
AREA"E"- UNITS- 435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - AREA "D" CORRIDOR 412,
THIRD FLOOR
Corrective Action Required
09/14/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -321A, 324A, 325A, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312,
SECOND FLOOR
Corrective Action Required
09/14/2020
Section “E” Ok- 224A, 240,241,242,243,244,245, 246, 261,262. 225A, 226, 264, -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" CORRIDOR FRAMING CEILING 229, SECTION "D" CORRIDOR CEILING FRAMING 212,
FIRST FLOOR
Corrective Action Required
09/14/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY Section “E” OK-124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135 Corridor 119 to room 125 ok Corridor 122 to stairs ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
STAIR TOWER 3
Informational
09/14/2020
- STAIR TOWER "C" - - ALL ROUGH APPROVED -
Rated Assembly Inspection Partial 9/15/2020 9/15/2020 09/15/2020
Miscellaneous Correction
Corrective Action Required
09/14/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/14/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS CORRIDOR 119 RC CHANNEL ROOMS 121A,124,125,126,127,128,129,133,134,135 WALLS AND CEILING - UNITS-126 2ND LAYER - - 1ST LAYER 124,125,127,128,129, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 124,125,127,128,129,132,133,134, 135, -
SECOND FLOOR
Corrective Action Required
09/14/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264 - - RC CHANNEL CORRIDOR 229 CEILING ONLY - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 241,242,243,244,245,262,262,263; 240,264 - - 2ND LAYER UNITS 240,241,242,243, 244, 245,262,262,263, 264, - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, -
THIRD FLOOR
Corrective Action Required
09/14/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR CEILING ONLY 329, - RC CHANNEL PARTY WALLS 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346, 347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,349,350,351,352,353,354,355,356,357,358,359,360,364, - - 2ND LAYER UNIT 340,364, - 3RD FLOOR MECHANICAL CHASE 1ST LAYER COMPLETE -
FOURTH FLOOR
Corrective Action Required
09/14/2020
-AREAS APPROVED- AREA “E” -RC CHANNEL WALLS AND CEILING 438-453, 459-462 -RC CORRIDOR 421A,422, 426, 427, - RC CORRIDOR 429 CEILING ONLY - - RC CHANNEL PARTY WALLS 424,425A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,456, SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST LAYER -- RC CHANNEL 414A, 444,445,446,447,448,449,450,451 ,452,453,454,455,456,457, - - 1ST LAYER UNITS 438, 462, 421A,424A, 425A - - 2ND LAYER UNITS 438, 462,421A,425A - - BLDG "E" PHASE 2 1ST LAYER 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458 - 2ND LAYER: 444,445,447,448,449,450,451,452,453,454,455,456, 457,458 - - CORRIDOR 429 1ST LAYER LID -
STAIR TOWER 1
Corrective Action Required
09/14/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/14/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
Rated Assembly Inspection Partial 9/16/2020 9/16/2020 09/16/2020
Miscellaneous Correction
Corrective Action Required
09/15/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/15/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS CORRIDOR 119 RC CHANNEL ROOMS 121A,124,125,126,127,128,129,133,134,135 WALLS AND CEILING - UNITS-126 2ND LAYER - - 1ST LAYER 121A, 124,125,127,128,129, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 124,125,127,128,129,132,133,134, 135, -
SECOND FLOOR
Corrective Action Required
09/15/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264 - - RC CHANNEL CORRIDOR 229 CEILING ONLY - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 221A,241,242,243,244,245,262,262,263; 240,264 - - 2ND LAYER UNITS 240,241,242,243, 244, 245,262,262,263, 264, - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, -
THIRD FLOOR
Corrective Action Required
09/15/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR CEILING ONLY 329, - RC CHANNEL PARTY WALLS 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346, 347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,349,350,351,352,353,354,355,356,357,358,359,360,364, - - 2ND LAYER UNIT 340,364, - 3RD FLOOR MECHANICAL CHASE 1ST LAYER COMPLETE - - CORRIDOR 322 1ST LAYER WALL - - CORRIDOR 326 1ST LAYER WEST WALL -
FOURTH FLOOR
Corrective Action Required
09/15/2020
-AREAS APPROVED- AREA “E” -RC CHANNEL WALLS AND CEILING 438-453, 459-462 -RC CORRIDOR 421A,422, 426, 427, - RC CORRIDOR 429 CEILING ONLY - - RC CHANNEL PARTY WALLS 424,425A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,456, SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST LAYER -- RC CHANNEL 414A, 444,445,446,447,448,449,450,451 ,452,453,454,455,456,457, - - 1ST LAYER UNITS 438, 462, 421A,424A, 425A - - 2ND LAYER UNITS 438, 462,421A,425A - - BLDG "E" PHASE 2 1ST LAYER 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458 - 2ND LAYER: 444,445,447,448,449,450,451,452,453,454,455,456, 457,458 - - CORRIDOR 429 1ST LAYER LID - - CORRIDOR 422 1ST LAYER - - CORRIDOR 426 1ST LAYER WEST WALL -
STAIR TOWER 1
Corrective Action Required
09/15/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/15/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
Rated Assembly Inspection Partial 9/17/2020 9/17/2020 09/17/2020
Miscellaneous Correction
Corrective Action Required
09/16/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/16/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS CORRIDOR 119 RC CHANNEL ROOMS 121A,124,125,126,127,128,129,133,134,135 WALLS AND CEILING - UNITS-126 2ND LAYER - - 1ST LAYER 121A, 124,125,127,128,129, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 124,125,127,128,129,132,133,134, 135, -
SECOND FLOOR
Corrective Action Required
09/16/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264 - - RC CHANNEL CORRIDOR 229 CEILING ONLY - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 221A,241,242,243,244,245,262,262,263; 240,264 - - 2ND LAYER UNITS 240,241,242,243, 244, 245,262,262,263, 264, - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, -
THIRD FLOOR
Corrective Action Required
09/16/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR CEILING ONLY 329, - RC CHANNEL PARTY WALLS 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346, 347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,349,350,351,352,353,354,355,356,357,358,359,360,364, - - 2ND LAYER UNIT 340,364, - 3RD FLOOR MECHANICAL CHASE 1ST LAYER COMPLETE - - CORRIDOR 322 1ST LAYER WALL - - CORRIDOR 326 1ST LAYER WEST WALL -
FOURTH FLOOR
Corrective Action Required
09/16/2020
-AREAS APPROVED- AREA “E” -RC CHANNEL WALLS AND CEILING 438-453, 459-462 -RC CORRIDOR 421A,422, 426, 427, - RC CORRIDOR 429 CEILING ONLY - - RC CHANNEL PARTY WALLS 424,425A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,456, SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST &SECOND LAYER SCREW PATTERN RC CHANNEL 414A, 444,445,446,447,448,449,450,451 ,452,453,454,455,456,457, - - 1ST LAYER UNITS 438, 462, 421A,424A, 425A - - 2ND LAYER UNITS 438, 462,421A,425A - - BLDG "E" PHASE 2 1ST LAYER 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458 - 2ND LAYER: 444,445,447,448,449,450,451,452,453,454,455,456, 457,458 - - CORRIDOR 429 1ST LAYER LID - - CORRIDOR 422 1ST LAYER - - CORRIDOR 426 1ST LAYER WEST WALL -
STAIR TOWER 1
Corrective Action Required
09/16/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/16/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
All Rough Inspection - Commercial Partial 9/17/2020 9/17/2020 09/17/2020
FOURTH FLOOR
Corrective Action Required
09/15/2020
AREA"E"- UNITS- 435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - AREA "D" CORRIDOR 412,
THIRD FLOOR
Corrective Action Required
09/15/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -321A, 324A, 325A, 338, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312,
SECOND FLOOR
Corrective Action Required
09/15/2020
Section “E” Ok- 224A, 240,241,242,243,244,245, 246, 261,262. 225A, 226, 264, -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" CORRIDOR FRAMING CEILING 229, SECTION "D" CORRIDOR CEILING FRAMING 212,
FIRST FLOOR
Corrective Action Required
09/15/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY Section “E” OK-124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135 Corridor 119 to room 125 ok Corridor 122 to stairs ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
STAIR TOWER 3
Informational
09/15/2020
- STAIR TOWER "C" - - ALL ROUGH APPROVED -
All Rough Inspection - Commercial Partial 9/18/2020 9/18/2020 09/18/2020
FOURTH FLOOR
Corrective Action Required
09/17/2020
AREA"E"- UNITS- 435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - AREA "D" CORRIDOR 412,
THIRD FLOOR
Corrective Action Required
09/17/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -321A, 324A, 325A, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312,
SECOND FLOOR
Corrective Action Required
09/17/2020
Section “E” Ok- 224A, 240,241,242,243,244,245, 246, 261,262. 225A, 226, 264, -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" CORRIDOR FRAMING CEILING 229, SECTION "D" CORRIDOR CEILING FRAMING 212,
FIRST FLOOR
Corrective Action Required
09/17/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY Section “E” OK-124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135 Corridor 119 to room 125 ok Corridor 122 to stairs ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
STAIR TOWER 3
Informational
09/17/2020
- STAIR TOWER "C" - - ALL ROUGH APPROVED -
Rated Assembly Inspection Partial 9/18/2020 9/18/2020 09/18/2020
Miscellaneous Correction
Corrective Action Required
09/17/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/17/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS CORRIDOR 119 RC CHANNEL ROOMS 121A,124,125,126,127,128,129, 130, 131, 133,134,135 WALLS AND CEILING - UNITS-126 2ND LAYER - - 1ST LAYER 121A, 124,125,127,128,129, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 124,125,127,128,129,132,133,134, 135, -
SECOND FLOOR
Corrective Action Required
09/17/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264 - - RC CHANNEL CORRIDOR 229 CEILING ONLY - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 221A,241,242,243,244,245,262,262,263; 240,264 - - 2ND LAYER UNITS 240,241,242,243, 244, 245,262,262,263, 264, - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, -
THIRD FLOOR
Corrective Action Required
09/17/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR CEILING ONLY 329, - RC CHANNEL PARTY WALLS 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346, 347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,349,350,351,352,353,354,355,356,357,358,359,360,364, - - 2ND LAYER UNIT 340,364, - 3RD FLOOR MECHANICAL CHASE 1ST LAYER COMPLETE - - CORRIDOR 322 1ST LAYER WALL - - CORRIDOR 326 1ST LAYER ALL WEST WALL 1ST LAYER TO MECH SHAFT EAST WALL - - CORRIDOR 329 LID -
FOURTH FLOOR
Corrective Action Required
09/17/2020
-AREAS APPROVED- AREA “E” -RC CHANNEL WALLS AND CEILING 438-453, 459-462 -RC CORRIDOR 421A,422, 426, 427, - RC CORRIDOR 429 CEILING ONLY - - RC CHANNEL PARTY WALLS 424,425A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,456, SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST &SECOND LAYER SCREW PATTERN RC CHANNEL 414A, 444,445,446,447,448,449,450,451 ,452,453,454,455,456,457, - - 1ST LAYER UNITS 438, 462, 421A,424A, 425A - - 2ND LAYER UNITS 438, 462,421A,425A - - BLDG "E" PHASE 2 1ST LAYER 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458 - 2ND LAYER: 444,445,447,448,449,450,451,452,453,454,455,456, 457,458 - - CORRIDOR 429 1ST LAYER LID - - CORRIDOR 422 1ST LAYER 2ND LAYER- - CORRIDOR 426 1ST LAYER WEST WALL -
STAIR TOWER 1
Corrective Action Required
09/17/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/17/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
09/18/2020
- ELEVATOR " C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS -
All Rough Inspection - Commercial Partial 9/21/2020 9/21/2020 09/21/2020
FOURTH FLOOR
Corrective Action Required
09/18/2020
AREA"E"- UNITS- 435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - AREA "D" CORRIDOR 412,
THIRD FLOOR
Corrective Action Required
09/18/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312,
SECOND FLOOR
Corrective Action Required
09/18/2020
Section “E” Ok- 224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" CORRIDOR FRAMING CEILING 229, SECTION "D" CORRIDOR CEILING FRAMING 212,
FIRST FLOOR
Corrective Action Required
09/18/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY Section “E” OK-124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135 Corridor 119 to room 125 ok Corridor 122 to stairs ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
STAIR TOWER 3
Informational
09/18/2020
- STAIR TOWER "C" - - ALL ROUGH APPROVED -
Rated Assembly Inspection Partial 9/21/2020 9/21/2020 09/21/2020
Miscellaneous Correction
Corrective Action Required
09/18/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/18/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS CORRIDOR 119 RC CHANNEL ROOMS 121A,124,125,126,127,128,129, 130, 131, 133,134,135 WALLS AND CEILING - UNITS-126 2ND LAYER - - 1ST LAYER 121A, 124,125,127,128,129, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,127,128,129,132,133,134, 135, -
SECOND FLOOR
Corrective Action Required
09/18/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264 - - RC CHANNEL CORRIDOR 229 CEILING ONLY - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 221A,241,242,243,244,245,262,262,263; 240,264 - - 2ND LAYER UNITS 221A,236,240,241,242,243, 244, 245,262,262,263, 264, - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, -
THIRD FLOOR
Corrective Action Required
09/18/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR CEILING ONLY 329, - RC CHANNEL PARTY WALLS 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,349,350,351,352,353,354,355,356,357,358,359,360,364, - - 2ND LAYER UNIT 324A,340,347,348,349,350,351,352,353,354,356,357,358,359,360, 364, - 3RD FLOOR MECHANICAL CHASE 1ST LAYER COMPLETE - - CORRIDOR 322 1ST LAYER WALL - - CORRIDOR 326 1ST LAYER ALL WEST WALL 1ST LAYER TO MECH SHAFT EAST WALL - - CORRIDOR 329 LID -
FOURTH FLOOR
Corrective Action Required
09/18/2020
-AREAS APPROVED- AREA “E” -RC CHANNEL WALLS AND CEILING 438-453, 459-462 -RC CORRIDOR 421A,422, 426, 427, - RC CORRIDOR 429 CEILING ONLY - - RC CHANNEL PARTY WALLS 424,425A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,456, SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST &SECOND LAYER SCREW PATTERN RC CHANNEL 414A, 444,445,446,447,448,449,450,451 ,452,453,454,455,456,457, - - 1ST LAYER UNITS 438, 462, 421A,424A, 425A - - 2ND LAYER UNITS 438, 462,421A,425A - - BLDG "E" PHASE 2 1ST LAYER 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458 - 2ND LAYER: 444,445,446,447,448,449,450,451,452,453,454,455,456, 457,458 - - CORRIDOR 429 1ST LAYER LID - - CORRIDOR 422 1ST LAYER 2ND LAYER- - CORRIDOR 426 1ST LAYER WEST WALL -
STAIR TOWER 1
Corrective Action Required
09/18/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/18/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
09/18/2020
- ELEVATOR " C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS -
Pool Steel/Bonding - Commercial Partial 9/22/2020 9/22/2020 09/22/2020
Misc
Corrective Action Required
08/25/2020
--POOL BONDINGFLOOR AND WALLS 4 LOCATIONS. - POOL STAIRS & SHELL -
All Rough Inspection - Commercial Partial 9/22/2020 9/22/2020 09/22/2020
FOURTH FLOOR
Corrective Action Required
09/21/2020
AREA"E"- UNITS- 435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - AREA "D" CORRIDOR 412,
THIRD FLOOR
Corrective Action Required
09/21/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312,
SECOND FLOOR
Corrective Action Required
09/21/2020
Section “E” Ok- 224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" CORRIDOR FRAMING CEILING 229, SECTION "D" CORRIDOR CEILING FRAMING 212,
FIRST FLOOR
Corrective Action Required
09/21/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY Section “E” OK-121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
STAIR TOWER 3
Informational
09/21/2020
- STAIR TOWER "C" - - ALL ROUGH APPROVED -
Rated Assembly Inspection Partial 9/22/2020 9/22/2020 09/22/2020
Miscellaneous Correction
Corrective Action Required
09/21/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/21/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122 - RC CHANNEL ROOMS 121A,124,125,126,127,128,129, 130, 131, 133,134,135 WALLS AND CEILING - UNITS-126 2ND LAYER - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,127,128,129,132,133,134, 135, -
SECOND FLOOR
Corrective Action Required
09/21/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264 - - RC CHANNEL CORRIDOR 229 CEILING ONLY - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 221A,241,242,243,244,245,262,262,263; 240,264 - - 2ND LAYER UNITS 221A,236,240,241,242,243, 244, 245, 254,262,262,263, 264, - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, -
THIRD FLOOR
Corrective Action Required
09/21/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR CEILING ONLY 329, - RC CHANNEL PARTY WALLS 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,349,350,351,352,353,354,355,356,357,358,359,360,364, - - 2ND LAYER UNIT 324A,340,347,348,349,350,351,352,353,354,356,357,358,359,360, 364, - 3RD FLOOR MECHANICAL CHASE 1ST LAYER COMPLETE - - CORRIDOR 322 1ST LAYER WALL - - CORRIDOR 326 1ST LAYER ALL WEST WALL 1ST LAYER TO MECH SHAFT EAST WALL - - CORRIDOR 329 LID -
FOURTH FLOOR
Corrective Action Required
09/21/2020
-AREAS APPROVED- AREA “E” -RC CHANNEL WALLS AND CEILING 438-453, 459-462 -RC CORRIDOR 421A,422, 426, 427, - RC CORRIDOR 429 CEILING ONLY - - RC CHANNEL PARTY WALLS 424,425A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,456, SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST &SECOND LAYER SCREW PATTERN FIRE TAPE COMPLETE - RC CHANNEL 414A, 444,445,446,447,448,449,450,451 ,452,453,454,455,456,457, - - 1ST LAYER UNITS 438, 462, 421A,424A, 425A - - 2ND LAYER UNITS 438, 462,421A,425A - - BLDG "E" PHASE 2 1ST LAYER 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458 - 2ND LAYER: 444,445,446,447,448,449,450,451,452,453,454,455,456, 457,458 - - CORRIDOR 429 1ST LAYER LID - - CORRIDOR 422 1ST LAYER 2ND LAYER- - CORRIDOR 426 1ST LAYER WEST WALL -
STAIR TOWER 1
Corrective Action Required
09/21/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/21/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
09/21/2020
- ELEVATOR " C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS-
All Rough Inspection - Commercial Partial 9/23/2020 09/23/2020
FOURTH FLOOR
Corrective Action Required
09/22/2020
AREA"E"- UNITS- 435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - AREA "D" CORRIDOR 412,
THIRD FLOOR
Corrective Action Required
09/22/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312,
SECOND FLOOR
Corrective Action Required
09/22/2020
Section “E” Ok- 224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" CORRIDOR FRAMING CEILING 229, SECTION "D" CORRIDOR CEILING FRAMING 212,
FIRST FLOOR
Corrective Action Required
09/22/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - NORTH RETAIL ALL ROUGH - Section “E” OK-121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
STAIR TOWER 3
Informational
09/22/2020
- STAIR TOWER "C" - - ALL ROUGH APPROVED -
Rated Assembly Inspection Partial 9/23/2020 9/23/2020 09/23/2020
Miscellaneous Correction
Corrective Action Required
09/22/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/22/2020
-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122 - RC CHANNEL ROOMS 121A,124,125,126,127,128,129, 130, 131, 133,134,135 WALLS AND CEILING - UNITS-126 2ND LAYER - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,127,128,129,132,133,134, 135, -
SECOND FLOOR
Corrective Action Required
09/22/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264 - - RC CHANNEL CORRIDOR 229 CEILING ONLY - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 221A,225A,241,242,243,244,245,246,247,249,250,251,252,253,255,256,257,258,259,260,262,262,263; 240,264 - - 2ND LAYER UNITS 221A,236,240,241,242,243, 244, 245,254,262,262,263, 264, - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 226 1ST LAYER WEST WALL -
THIRD FLOOR
Corrective Action Required
09/22/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR CEILING ONLY 329, - RC CHANNEL PARTY WALLS 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,349,350,351,352,353,354,355,356,357,358,359,360,364, - - 2ND LAYER UNIT 321A,324A,340,347,348,349,350,351,352,353,354,356,357,358,359,360, 364, - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL 1ST LAYER TO MECH SHAFT EAST WALL - - CORRIDOR 329 LID -
FOURTH FLOOR
Corrective Action Required
09/22/2020
-AREAS APPROVED- AREA “E” -RC CHANNEL WALLS AND CEILING 438-453, 459-462 -RC CORRIDOR 421A,422, 426, 427, - RC CORRIDOR 429 CEILING ONLY - - RC CHANNEL PARTY WALLS 424,425A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,456, SCREW PATTERN 1ST, 2ND LAYER WALLS CORRIDOR 419 TO ROOM 439 SCREW PATTEN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST &SECOND LAYER SCREW PATTERN FIRE TAPE COMPLETE - RC CHANNEL 414A, 444,445,446,447,448,449,450,451 ,452,453,454,455,456,457, - - 1ST LAYER UNITS 438, 462, 421A,424A, 425A - - 2ND LAYER UNITS 438, 462,421A,425A - - BLDG "E" PHASE 2 1ST LAYER 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458 - 2ND LAYER: 444,445,446,447,448,449,450,451,452,453,454,455,456, 457,458 - - CORRIDOR 429 1ST LAYER LID - - CORRIDOR 422 1ST LAYER 2ND LAYER- - CORRIDOR 426 1ST LAYER / 2ND LAYER WEST WALL- -
STAIR TOWER 1
Corrective Action Required
09/22/2020
STAIR TOWER “A” AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/22/2020
ELEVATOR “B” AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
09/22/2020
- ELEVATOR " C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS-
All Rough Inspection - Commercial Partial 9/24/2020 9/24/2020 09/24/2020
FOURTH FLOOR
Corrective Action Required
09/23/2020
AREA"E"- UNITS- 435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - AREA "D" CORRIDOR 412,
THIRD FLOOR
Corrective Action Required
09/23/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312,
SECOND FLOOR
Corrective Action Required
09/23/2020
Section “E” Ok- 224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212,
FIRST FLOOR
Corrective Action Required
09/23/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - NORTH RETAIL ALL ROUGH --- - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - Section “E” OK-121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
STAIR TOWER 3
Informational
09/23/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
09/24/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 1
Corrective Action Required
09/24/2020
STAIR TOWER 107 “A” SOUTH AREAS INSPECTED:
Corrective Action Required
09/24/2020
Rated Assembly Inspection Partial 9/24/2020 9/24/2020 09/24/2020
Miscellaneous Correction
Corrective Action Required
09/23/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/23/2020
-AREAS APPROVED- AREA “E” RC CHANNEL CEILING 112,129, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122 - RC CHANNEL ROOMS 121A,124,125,126,127,128,129, 130, 131, 133,134,135 WALLS AND CEILING - UNITS-126 2ND LAYER - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,127,128,129,132,133,134, 135, -
SECOND FLOOR
Corrective Action Required
09/23/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264 - - RC CHANNEL CORRIDOR 212,229 CEILING ONLY - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 221A,225A,241,242,243,244,245,246,247,249,250,251,252,253,255,256,257,258,259,260,262,262,263; 240,264 - - 2ND LAYER UNITS 221A,236,240,241,242,243, 244, 245,254,262,262,263, 264, - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 226 1ST LAYER WEST WALL - - CORRIDOR 227,229 CEILING -
THIRD FLOOR
Corrective Action Required
09/23/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR CEILING ONLY 329, - RC CHANNEL PARTY WALLS 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,349,350,351,352,353,354,355,356,357,358,359,360,364, - - 2ND LAYER UNIT 321A,324A,340,347,348,349,350,351,352,353,354,356,357,358,359,360, 364, - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL 1ST LAYER TO MECH SHAFT EAST WALL - - CORRIDOR 329 LID - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING -
FOURTH FLOOR
Corrective Action Required
09/23/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 438-453, 459-462-424,425A, 414A, 444,445,446,447,448,449,450,451,452,453,454,455,456,457, - -RC CORRIDOR 421A,422, 426, 427, -429 CEILING ONLY - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 444,445,446,447,448,449,450,451,452,453,454,455,456, 457,458, 438, 462,421A,425A -- 419 TO ROOM 439 1ST,2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - CORRIDOR NUMBERS #: 429 1ST LAYER LID -;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST, 2ND LAYER WEST WALL-; " D" - CORRIDOR 412 RC CHANNEL CEILING -
STAIR TOWER 1
Corrective Action Required
09/23/2020
STAIR TOWER 107 “A” SOUTH AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/23/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
09/23/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL -
STAIR TOWER 2
Corrective Action Required
09/24/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
09/24/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
09/24/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 9/28/2020 9/28/2020 09/28/2020
Miscellaneous Correction
Corrective Action Required
09/24/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/24/2020
-AREAS APPROVED- AREA “E” RC CHANNEL CEILING 112,129, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122 - RC CHANNEL ROOMS 102A,121A,124,125,126,127,128,129, 130, 131, 133,134,135 WALLS AND CEILING - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135, - - CORRIDOR 119 1ST LAYER BOTH SIDES -
SECOND FLOOR
Corrective Action Required
09/24/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264 - - RC CHANNEL CORRIDOR 212,229 CEILING ONLY - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,249,250,251,252,253,254,255,256,257,258,259, 260,262,263,264- - 2ND LAYER UNITS 221A,225A,236,240,241,242,243, 244,245,246,247,249,250,251,252,253,254,255,256, 257,258,259,260,262,263, 264, - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST LAYER EAST WALL (EXCEPT CHASES ) - - CORRIDOR 227,229 CEILING -
THIRD FLOOR
Corrective Action Required
09/24/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR CEILING ONLY 329, - RC CHANNEL PARTY WALLS 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,349,350,351,352,353,354,355,356,357,358,359,360,364, - - 2ND LAYER UNIT 321A,324A,325A,340,347,348,349,350,351,352,353,354,356,357,358,359,360, 364, - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL 1ST LAYER EAST WALL - - CORRIDOR 329 LID - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING - - CORRIDOR 312 LID -
FOURTH FLOOR
Corrective Action Required
09/24/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 438-453, 459-462-424,425A, 414A, 444,445,446,447,448,449,450,451,452,453,454,455,456,457, - -RC CORRIDOR 421A,422, 426, 427, -429 CEILING ONLY - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458, 438, 462,421A,425A - - 420A PREROCK CORRIDOR WALL WALL LAYER - - 419 TO ROOM 439 1ST,2ND LAYER; - 419 END OF CORRIDOR 2ND LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - CORRIDOR NUMBERS #: 429 1ST LAYER LID -;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST, 2ND LAYER WEST WALL-; - 426 1ST LAYER EAST WALL - " D" - CORRIDOR 412 RC CHANNEL CEILING -
STAIR TOWER 1
Corrective Action Required
09/24/2020
STAIR TOWER 107 “A” SOUTH AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/24/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
09/24/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8' -
STAIR TOWER 2
Corrective Action Required
09/24/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
09/24/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
09/24/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 9/29/2020 9/29/2020 09/29/2020
Miscellaneous Correction
Corrective Action Required
09/28/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/28/2020
-AREAS APPROVED- AREA “E” RC CHANNEL CEILING 112,129, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122 - RC CHANNEL ROOMS 102A,121A,124,125,126,127,128,129, 130, 131, 133,134,135 WALLS AND CEILING - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135, - - CORRIDOR 119 1ST LAYER BOTH SIDES -
SECOND FLOOR
Corrective Action Required
09/28/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264 - - RC CHANNEL CORRIDOR 212,229 CEILING ONLY - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,249,250,251,252,253,254,255,256,257,258,259, 260,262,263,264- - 2ND LAYER UNITS 221A,225A,236,240,241,242,243, 244,245,246,247,249,250,251,252,253,254,255,256, 257,258,259,260,262,263, 264, - - TRASH CHUTE 1ST LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST LAYER EAST WALL (EXCEPT CHASES ) - - CORRIDOR 227,229 CEILING -
THIRD FLOOR
Corrective Action Required
09/28/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR CEILING ONLY 329, - RC CHANNEL PARTY WALLS 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,349,350,351,352,353,354,355,356,357,358,359,360,364, - - 2ND LAYER UNIT 321A,324A,325A,340,347,348,349,350,351,352,353,354,356,357,358,359,360, 364, - TRASH CHUTE 1ST LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL 1ST LAYER EAST WALL - - CORRIDOR 329 LID - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING - - CORRIDOR 312 LID -
FOURTH FLOOR
Corrective Action Required
09/28/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 438-453, 459-462-424,425A, 414A, 444,445,446,447,448,449,450,451,452,453,454,455,456,457, - -RC CORRIDOR 421A,422, 426, 427, -429 CEILING ONLY - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458, 438, 462,421A,425A - - TRASH CHUTE 1ST LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - 419 TO ROOM 439 1ST,2ND LAYER; - 419 END OF CORRIDOR 2ND LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - CORRIDOR NUMBERS #: 429 1ST LAYER LID -;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - " D" - CORRIDOR 412 RC CHANNEL CEILING -
STAIR TOWER 1
Corrective Action Required
09/28/2020
STAIR TOWER 107 “A” SOUTH AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/28/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
09/28/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8' -
STAIR TOWER 2
Corrective Action Required
09/28/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
09/28/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
09/28/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 9/30/2020 9/30/2020 09/30/2020
Miscellaneous Correction
Corrective Action Required
09/29/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/29/2020
-AREAS APPROVED- AREA “E” RC CHANNEL CEILING 112,129, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122 - RC CHANNEL ROOMS 102A,121A,124,125,126,127,128,129, 130, 131, 133,134,135 WALLS AND CEILING - - 120A, 142, 1 LAYER BEHIND PANEL - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135, - - CORRIDOR 119 1ST LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER BOTH SIDES -
SECOND FLOOR
Corrective Action Required
09/29/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264 - - RC CHANNEL CORRIDOR 212,229 CEILING ONLY - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,249,250,251,252,253,254,255,256,257,258,259, 260,262,263,264- - 2ND LAYER UNITS 221A,225A,236,240,241,242,243, 244,245,246,247,249,250,251,252,253,254,255,256, 257,258,259,260,262,263, 264, - - TRASH CHUTE 1ST LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST LAYER EAST WALL (EXCEPT CHASES ) - - CORRIDOR 227,229 CEILING -
THIRD FLOOR
Corrective Action Required
09/29/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR CEILING ONLY 329, - RC CHANNEL PARTY WALLS 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,349,350,351,352,353,354,355,356,357,358,359,360,364, - - 2ND LAYER UNIT 321A,324A,325A,340,347,348,349,350,351,352,353,354,356,357,358,359,360, 364, - TRASH CHUTE 1ST LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL 1ST LAYER EAST WALL - - CORRIDOR 329 LID - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING - - CORRIDOR 312 LID -
FOURTH FLOOR
Corrective Action Required
09/29/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 437,438-453, 459-462,-424,425A,414A,444,445,446,447,448,449,450,451,452,453,454,455,456,457, - - RC CHANNEL CEILING ONLY 420,437,463,464,465, - -RC CORRIDOR 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458, 438, 462,421A,425A - - TRASH CHUTE 1ST LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - CORRIDOR NUMBERS #: 429 1ST LAYER LID -;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - " D" - CORRIDOR 412 RC CHANNEL CEILING -
STAIR TOWER 1
Corrective Action Required
09/29/2020
STAIR TOWER 107 “A” SOUTH AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/29/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
09/29/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8' -
STAIR TOWER 2
Corrective Action Required
09/29/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
09/29/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
09/29/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 10/1/2020 10/1/2020 10/01/2020
FOURTH FLOOR
Corrective Action Required
09/24/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - AREA "D" CORRIDOR 412,
THIRD FLOOR
Corrective Action Required
09/24/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312,
SECOND FLOOR
Corrective Action Required
09/24/2020
Section “E” Ok- 320A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212,
FIRST FLOOR
Corrective Action Required
09/24/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - NORTH RETAIL ALL ROUGH --- - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
STAIR TOWER 3
Informational
09/24/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
09/24/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 10/1/2020 10/1/2020 10/01/2020
Miscellaneous Correction
Corrective Action Required
09/30/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
09/30/2020
-AREAS APPROVED- AREA “E” RC CHANNEL CEILING 112,129, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122 - RC CHANNEL ROOMS 102A,121A,124,125,126,127,128,129, 130, 131, 133,134,135 WALLS AND CEILING - - 120A, 142, 1 LAYER BEHIND PANEL - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135, - - CORRIDOR 119 1ST LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER BOTH SIDES -
SECOND FLOOR
Corrective Action Required
09/30/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212,229 CEILING ONLY - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,249,250,251,252,253,254,255,256,257,258,259, 260,262,263,264- - 2ND LAYER UNITS 221A,225A,236,240,241,242,243, 244,245,246,247,249,250,251,252,253,254,255,256, 257,258,259,260,262,263, 264, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST LAYER EAST WALL (EXCEPT CHASES ) - - CORRIDOR 227,229 CEILING -
THIRD FLOOR
Corrective Action Required
09/30/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360,365,366,367 - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,349,350,351,352,353,354,355,356,357,358,359,360,364, - - 2ND LAYER UNIT 321A,324A,325A,340,347,348,349,350,351,352,353,354,356,357,358,359,360, 364, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL 1ST LAYER EAST WALL - - CORRIDOR 329 LID - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING - - CORRIDOR 312 LID -
FOURTH FLOOR
Corrective Action Required
09/30/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 420,437,463,464,465, - -RC CORRIDOR 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - CORRIDOR NUMBERS #: 429 1ST LAYER LID -;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - " D" - CORRIDOR 412 RC CHANNEL CEILING -
STAIR TOWER 1
Corrective Action Required
09/30/2020
STAIR TOWER 107 “A” SOUTH AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
09/30/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
09/30/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR -
STAIR TOWER 2
Corrective Action Required
09/30/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
09/30/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
09/30/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 10/2/2020 10/2/2020 10/02/2020
Miscellaneous Correction
Corrective Action Required
10/01/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
10/01/2020
-AREAS APPROVED- AREA “E” RC CHANNEL CEILING 112,129, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122 - RC CHANNEL ROOMS 120A,121A,124,125,126,127,128,129, 130, 131, 133,134,135 WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135, - - CORRIDOR 119 1ST LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER BOTH SIDES, LID PREROCK -
SECOND FLOOR
Corrective Action Required
10/01/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212,229 CEILING ONLY - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,249,250,251,252,253,254,255,256,257,258,259, 260,262,263,264- - 2ND LAYER UNITS 221A,225A,236,240,241,242,243, 244,245,246,247,249,250,251,252,253,254,255,256, 257,258,259,260,262,263, 264, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST LAYER EAST WALL (EXCEPT CHASES ) - - CORRIDOR 227,229 CEILING -
THIRD FLOOR
Corrective Action Required
10/01/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360,365,366,367 - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,349,350,351,352,353,354,355,356,357,358,359,360,364, - - 2ND LAYER UNIT 321A,324A,325A,340,347,348,349,350,351,352,353,354,356,357,358,359,360, 364, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL - 1ST LAYER EAST WALL - - CORRIDOR 327 WALLS & CEILING - - CORRIDOR 329 LID - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING - - CORRIDOR 312 LID -
FOURTH FLOOR
Corrective Action Required
10/01/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 420,437,463,464,465, - -RC CORRIDOR 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - CORRIDOR NUMBERS #: 429 1ST LAYER LID -;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 WALLS & CEILING - " D" - CORRIDOR 412 RC CHANNEL CEILING -
STAIR TOWER 1
Corrective Action Required
10/01/2020
STAIR TOWER 107 “A” SOUTH AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR
ELEVATOR 2
Corrective Action Required
10/01/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
10/01/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND -
STAIR TOWER 2
Corrective Action Required
10/01/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
10/01/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
10/01/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 10/5/2020 10/5/2020 10/05/2020
Miscellaneous Correction
Corrective Action Required
10/02/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
10/02/2020
-AREAS APPROVED- AREA “E” RC CHANNEL CEILING 112,129, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122 - RC CHANNEL ROOMS 120A,121A,124,125,126,127,128,129, 130, 131, 133,134,135 WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK -
SECOND FLOOR
Corrective Action Required
10/02/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING ONLY - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST LAYER EAST WALL (EXCEPT CHASES ) - - CORRIDOR 227,229 CEILING - :AREA "D": - CORRIDOR 212 (LID)
THIRD FLOOR
Corrective Action Required
10/02/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360,365,366,367 - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364, - - 2ND LAYER UNIT 321A,324A,325A,340,347,348,349,350,351,352,353, 354,356,357,358,359,360, 364, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 WALLS & CEILING - - CORRIDOR 329 LID - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING - - CORRIDOR 312 LID -
FOURTH FLOOR
Corrective Action Required
10/02/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 420,437,463,464,465, - -RC CORRIDOR 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - CORRIDOR NUMBERS #: 429 1ST LAYER LID -;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 WALLS & CEILING - " D" - CORRIDOR 412 RC CHANNEL CEILING -
STAIR TOWER 1
Corrective Action Required
10/02/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
10/02/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
10/02/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND -
STAIR TOWER 2
Corrective Action Required
10/02/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
10/02/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
10/02/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 10/7/2020 10/07/2020
FOURTH FLOOR
Corrective Action Required
10/01/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - AREA "D" CORRIDOR 412, -AREA "B"- -CORRIDOR 409 JOIST HANGERS- - CORRIDOR 405 409 TO UNIT 407 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
10/01/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" -CORRIDOR 309 JOIST HANGERS - - CORRIODR 305, 309 TO UNIT 307 JOIST HANGERS -
SECOND FLOOR
Corrective Action Required
10/01/2020
Section “E” Ok- 320A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212,
FIRST FLOOR
Corrective Action Required
10/01/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - NORTH RETAIL ALL ROUGH --- - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT
STAIR TOWER 3
Informational
10/01/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
10/01/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 10/7/2020 10/7/2020 10/07/2020
Miscellaneous Correction
Corrective Action Required
10/05/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
10/05/2020
-AREAS APPROVED- AREA “E” RC CHANNEL CEILING 112,129, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 120A,121A,124,125,126,127,128,129, 130, 131, 133,134,135 WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER EAST WALL BEHIND SWITCH GEAR - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK -
SECOND FLOOR
Corrective Action Required
10/05/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING ONLY - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST LAYER EAST WALL (EXCEPT CHASES ) - - CORRIDOR 227, CEILING 1ST LAYER WALLS - - CORRIDOR 229 CEILING - :AREA "D": - CORRIDOR 212 (LID)
THIRD FLOOR
Corrective Action Required
10/05/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360,365,366,367 - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364, - - 2ND LAYER UNIT 321A,324A,325A,340,347,348,349,350,351,352,353, 354,356,357,358,359,360, 364, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 WALLS & CEILING - - CORRIDOR 329 LID - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING - - CORRIDOR 312 LID -
FOURTH FLOOR
Corrective Action Required
10/05/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 420,437,463,464,465, - -RC CORRIDOR 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - CORRIDOR NUMBERS #: 429 1ST LAYER LID -;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 WALLS & CEILING - " D" - CORRIDOR 412 RC CHANNEL CEILING -
STAIR TOWER 1
Corrective Action Required
10/05/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
10/05/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
10/05/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND -
STAIR TOWER 2
Corrective Action Required
10/05/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
10/05/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
10/05/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 10/8/2020 10/8/2020 10/08/2020
FOURTH FLOOR
Corrective Action Required
10/07/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - AREA "D" CORRIDOR 412, -AREA "B"- -CORRIDOR 409 JOIST HANGERS- - CORRIDOR 405 409 TO UNIT 407 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
10/07/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" -CORRIDOR 309 JOIST HANGERS - - CORRIODR 305, 309 TO UNIT 307 JOIST HANGERS -
SECOND FLOOR
Corrective Action Required
10/07/2020
Section “E” Ok- 320A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, 209 TO UNIT 207 -
FIRST FLOOR
Corrective Action Required
10/07/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - NORTH RETAIL ALL ROUGH --- - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109 JOIST HANGERS - - CORRIDOR 105, 109 TO UNIT 107 -
STAIR TOWER 3
Informational
10/07/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
10/07/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 10/8/2020 10/8/2020 10/08/2020
Miscellaneous Correction
Corrective Action Required
10/07/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
10/07/2020
-AREAS APPROVED- AREA “E” RC CHANNEL CEILING 112,129, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 120A,121A,124,125,126,127,128,129, 130, 131, 133,134,135 WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK -
SECOND FLOOR
Corrective Action Required
10/07/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING ONLY - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST LAYER EAST WALL (EXCEPT CHASES ) - - CORRIDOR 227, CEILING 1ST LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER - :AREA "D": - CORRIDOR 212 (LID)
THIRD FLOOR
Corrective Action Required
10/07/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360,365,366,367 - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364, - - 2ND LAYER UNIT 321A,324A,325A,340,347,348,349,350,351,352,353, 354,356,357,358,359,360, 364, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 WALLS & CEILING - - CORRIDOR 329 LID, 1ST LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING - - CORRIDOR 312 LID - - UNIT 332 LIDS FOR DUCTS LAUNDRY & CLOSET -
FOURTH FLOOR
Corrective Action Required
10/07/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 420,437,463,464,465, - -RC CORRIDOR 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - CORRIDOR NUMBERS #: - 429 LID,1ST LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 WALLS & CEILING - " D" - CORRIDOR 412 RC CHANNEL CEILING -
STAIR TOWER 1
Corrective Action Required
10/07/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
10/07/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
10/07/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND -
STAIR TOWER 2
Corrective Action Required
10/07/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
10/07/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
10/07/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 10/9/2020 10/9/2020 10/09/2020
FOURTH FLOOR
Corrective Action Required
10/08/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,434,- -AREA "B"- -CORRIDOR 409 JOIST HANGERS- - CORRIDOR 405 409 TO UNIT 407 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
10/08/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" -CORRIDOR 309 JOIST HANGERS - - CORRIODR 305, 309 TO UNIT 307 JOIST HANGERS - - 333,334,336,-
SECOND FLOOR
Corrective Action Required
10/08/2020
Section “E” Ok- 320A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, 209 TO UNIT 207 -
FIRST FLOOR
Corrective Action Required
10/08/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - NORTH RETAIL ALL ROUGH --- - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109 JOIST HANGERS - - CORRIDOR 105, 109 TO UNIT 107 -
STAIR TOWER 3
Informational
10/08/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
10/08/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 10/13/2020 10/13/2020 10/13/2020
FOURTH FLOOR
Corrective Action Required
10/09/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- -AREA "B"- -CORRIDOR 409 JOIST HANGERS- - CORRIDOR 405 409 TO UNIT 407 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
10/09/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" -CORRIDOR 309 JOIST HANGERS - - CORRIODR 305, 309 TO UNIT 307 JOIST HANGERS - - 333,334,336,-
SECOND FLOOR
Corrective Action Required
10/09/2020
Section “E” Ok- 320A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, 209 TO UNIT 207 -
FIRST FLOOR
Corrective Action Required
10/09/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109 JOIST HANGERS - - CORRIDOR 105, 109 TO UNIT 107 -
STAIR TOWER 3
Informational
10/09/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
10/09/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 10/13/2020 10/13/2020 10/13/2020
Miscellaneous Correction
Corrective Action Required
10/08/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
10/08/2020
-AREAS APPROVED- AREA “E” RC CHANNEL CEILING 112,129, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 120A,121A,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
10/08/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING ONLY - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST LAYER EAST WALL (EXCEPT CHASES ) - - CORRIDOR 227, CEILING 1ST LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER - :AREA "D": - CORRIDOR 212 (LID)
THIRD FLOOR
Corrective Action Required
10/08/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360,365,366,367 - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364, - - 2ND LAYER UNIT 321A,324A,325A,340,347,348,349,350,351,352,353, 354,356,357,358,359,360, 364, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 WALLS & CEILING - - CORRIDOR 329 LID, 1ST LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING - - CORRIDOR 312 LID - - UNIT 332 LIDS FOR DUCTS LAUNDRY & CLOSET - - AREA "B" - - CORRIDOR 309 RC LID -
FOURTH FLOOR
Corrective Action Required
10/08/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 420,437,463,464,465, - -RC CORRIDOR 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - CORRIDOR NUMBERS #: - 429 LID,1ST LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 WALLS & CEILING - " D" - CORRIDOR 412 RC CHANNEL CEILING -
STAIR TOWER 1
Corrective Action Required
10/08/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
10/08/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
10/08/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND -
STAIR TOWER 2
Corrective Action Required
10/08/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
10/08/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
10/08/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 10/14/2020 10/14/2020 10/14/2020
Miscellaneous Correction
Corrective Action Required
10/13/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
10/13/2020
-AREAS APPROVED- AREA “E” RC CHANNEL CEILING 112,129, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 120A,121A,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK - - AREA " B" - - CORRIDOR 109 RC LID - - CORRIODR 105 RC LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
10/13/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING ONLY - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST LAYER EAST WALL (EXCEPT CHASES ) - - CORRIDOR 227, CEILING 1ST LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER - :AREA "D": - CORRIDOR 212 (LID) - AREA "B" - CORRIDOR 209 RC LID - - CORRIDOR 205 RC LID 209 TO STAIRWAY A -
THIRD FLOOR
Corrective Action Required
10/13/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360,365,366,367 - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364, - - 2ND LAYER UNIT 321A,324A,325A,340,347,348,349,350,351,352,353, 354,356,357,358,359,360, 364, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 WALLS & CEILING - - CORRIDOR 329 LID, 1ST LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING - - CORRIDOR 312 LID - - UNIT 332 LIDS FOR DUCTS LAUNDRY & CLOSET - - AREA "B" - - CORRIDOR 309 RC LID - - CORRIDOR 305 RC LID 309 TO STAIRWAY A -
FOURTH FLOOR
Corrective Action Required
10/13/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 420,437,463,464,465, - -RC CORRIDOR 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 444,445,446,447,448,449,450,451,452,453,454,455, 456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - CORRIDOR NUMBERS #: - 429 LID,1ST LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 WALLS & CEILING - " D" - CORRIDOR 412 RC CHANNEL CEILING - " B " -CORRIDOR 409 RC LID - - CORRIDOR 405 409 TO STAIRWAY A -
STAIR TOWER 1
Corrective Action Required
10/13/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
10/13/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
10/13/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND -
STAIR TOWER 2
Corrective Action Required
10/13/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
10/13/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
10/13/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 10/14/2020 10/14/2020 10/14/2020
FOURTH FLOOR
Corrective Action Required
10/13/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- -AREA "B"- -CORRIDOR 409 JOIST HANGERS- - CORRIDOR 405 409 TO UNIT 407 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
10/13/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367 Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" -CORRIDOR 309 JOIST HANGERS - - CORRIODR 305, 309 TO UNIT 307 JOIST HANGERS - - 333,334,335,336,-
SECOND FLOOR
Corrective Action Required
10/13/2020
'Section “E” Ok- 320A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, 209 TO UNIT 207 - - 234,235,236 - :RE-INSPECT BELOW: - 233 SUPPORT DWV EVERY 4' - - 232 SUPPORT DWV EVERY 4', LAND GROUND SERVICE PANEL -
FIRST FLOOR
Corrective Action Required
10/13/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109 JOIST HANGERS - - CORRIDOR 105, 109 TO UNIT 107 - : RE-INSPECT BELOW : -120 LAND GROUND SERVICE PANEL, ANCHOR BOLTS - -119 LAND GROUND SERVICE PANEL, ANCHOR BOLTS -
STAIR TOWER 3
Informational
10/13/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
10/13/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 10/15/2020 10/15/2020 10/15/2020
Miscellaneous Correction
Corrective Action Required
10/14/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
10/14/2020
-AREAS APPROVED- AREA “E” RC CHANNEL CEILING 112,129, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 120A,121A,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID - - CORRIODR 105 RC LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
10/14/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING ONLY - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST LAYER EAST WALL (EXCEPT CHASES ) - - CORRIDOR 227, CEILING 1ST LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER - :AREA "D": - CORRIDOR 212 (LID) - AREA "B" - CORRIDOR 209 RC LID - - CORRIDOR 205 RC LID 209 TO STAIRWAY A -
THIRD FLOOR
Corrective Action Required
10/14/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360,365,366,367 - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364, - - 2ND LAYER UNIT 321A,324A,325A,340,347,348,349,350,351,352,353, 354,356,357,358,359,360, 364, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 WALLS & CEILING - - CORRIDOR 329 LID, 1ST LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING - - CORRIDOR 312 LID - - UNIT 332 LIDS FOR DUCTS LAUNDRY & CLOSET - - AREA "B" - - CORRIDOR 309 RC LID - - CORRIDOR 305 RC LID 309 TO STAIRWAY A -
FOURTH FLOOR
Corrective Action Required
10/14/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 420,437,463,464,465, - -RC CORRIDOR 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - CORRIDOR NUMBERS #: - 429 LID,1ST LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 WALLS & CEILING - " D" - CORRIDOR 412 RC CHANNEL CEILING - " B " -CORRIDOR 409 RC LID - - CORRIDOR 405 409 TO STAIRWAY A -
STAIR TOWER 1
Corrective Action Required
10/14/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
10/14/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
10/14/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND -
STAIR TOWER 2
Corrective Action Required
10/14/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
10/14/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
10/14/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 10/15/2020 10/15/2020 10/15/2020
FOURTH FLOOR
Corrective Action Required
10/14/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING ONLY - -AREA "B"- -CORRIDOR 409 JOIST HANGERS- - CORRIDOR 405 409 TO UNIT 407 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
10/14/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - - 332 ABOVE CEILING ONLY - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" -CORRIDOR 309 JOIST HANGERS - - CORRIODR 305, 309 TO UNIT 307 JOIST HANGERS - - 333,334,335,336,-
SECOND FLOOR
Corrective Action Required
10/14/2020
'Section “E” Ok- 320A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, 209 TO UNIT 207 - - 232,233,234,235,236 -
FIRST FLOOR
Corrective Action Required
10/14/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109 JOIST HANGERS - - CORRIDOR 105, 109 TO UNIT 107 - -119,120,
STAIR TOWER 3
Informational
10/14/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
10/14/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 10/19/2020 10/19/2020 10/19/2020
Miscellaneous Correction
Corrective Action Required
10/15/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
10/15/2020
-AREAS APPROVED- AREA “E” RC CHANNEL CEILING 112,129, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 120A,121A,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
10/15/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING ONLY - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) - AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - INNER MECH CHASES: 1ST LAYER -
THIRD FLOOR
Corrective Action Required
10/15/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360,365,366,367 - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364, - - 2ND LAYER UNIT 321A,324A,325A,340,347,348,349,350,351,352,353, 354,356,357,358,359,360, 364, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING - - CORRIDOR 312 LID - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - AREA "B" - - CORRIDOR 309 RC LID - - CORRIDOR 305 RC LID 309 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER -
FOURTH FLOOR
Corrective Action Required
10/15/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 420,437,463,464,465, - -RC CORRIDOR 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - CORRIDOR NUMBERS #: - 429 LID,1ST LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 WALLS & CEILING - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER -
STAIR TOWER 1
Corrective Action Required
10/15/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
10/15/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
10/15/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND -
STAIR TOWER 2
Corrective Action Required
10/15/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
10/15/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
10/15/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 10/19/2020 10/19/2020 10/19/2020
FOURTH FLOOR
Corrective Action Required
10/15/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING ONLY - - CORRECTIONS REQUIRED - - 403 H2.5s CORRIDOR SIDE TRUSSES - - 404 OK - - 405 FIRE BLOCK TOP PLATE DBL WALL BEDROOM, ROOF BOOTS - - 406 H2.5S AT DECK, ADDRESS NOTCHED TRUSS DECK - - 407 ROOF BOOTS VENT TO ROOF, SUPPORT DWV ABOVE CEILING LAUNDRY & KITCHEN - - 423 ROOF BOOTS - - 424 OK - - 425 MISSING WINDOW REQUIRES FLASHING - - 426 ROOF BOOT VTR - - 427 ROOF BOOT VTR - - 428,429, 430, 431, - -AREA "B"- -CORRIDOR 409 JOIST HANGERS- - CORRIDOR 405 409 TO UNIT 407 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
10/15/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - - 332 ABOVE CEILING ONLY - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" -CORRIDOR 309 JOIST HANGERS - - CORRIODR 305, 309 TO UNIT 307 JOIST HANGERS - - 333,334,335,336,-
SECOND FLOOR
Corrective Action Required
10/15/2020
'Section “E” Ok- 320A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, 209 TO UNIT 207 - - 232,233,234,235,236 -
FIRST FLOOR
Corrective Action Required
10/15/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - :- UPPER & LOWER LOBBY CORRECTIONS -: - SUPPORT VERTICAL DWV 2" & SMALLER AT MIDPOINT - - PROVIDE BOCA PLATES DWV @ BOTTOM PLATE - - SECURE PEX LINES TO HOSE BIBS & VANITIES - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109 JOIST HANGERS - - CORRIDOR 105, 109 TO UNIT 107 - -119,120,
STAIR TOWER 3
Informational
10/15/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
10/15/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 10/20/2020 10/20/2020 10/20/2020
FOURTH FLOOR
Corrective Action Required
10/19/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING ONLY - - CORRECTIONS REQUIRED - - 406 , ADDRESS NOTCHED TRUSS DECK, MISSING WINDOW - - 425 MISSING WINDOW REQUIRES FLASHING OK TO INSULATE & ROCK - - 403,404,405,406,407,423,424,427,428,429, 430, 431, - -AREA "B"- -CORRIDOR 409 JOIST HANGERS- - CORRIDOR 405 409 TO UNIT 407 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
10/19/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - - 332 ABOVE CEILING ONLY - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" -CORRIDOR 309 JOIST HANGERS - - CORRIODR 305, 309 TO UNIT 307 JOIST HANGERS - - 333,334,335,336,-
SECOND FLOOR
Corrective Action Required
10/19/2020
'Section “E” Ok- 320A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, 209 TO UNIT 207 - - 232,233,234,235,236 -
FIRST FLOOR
Corrective Action Required
10/19/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109 JOIST HANGERS - - CORRIDOR 105, 109 TO UNIT 107 - -119,120,
STAIR TOWER 3
Informational
10/19/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
10/19/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 10/20/2020 10/20/2020 10/20/2020
Miscellaneous Correction
Corrective Action Required
10/19/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
10/19/2020
-AREAS APPROVED- AREA “E” -112 RC CHANNEL CEILING, SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 120A,121A,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
10/19/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING ONLY - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - - RC CHANNEL CEILING 220A - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) - AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - INNER MECH CHASES: 1ST LAYER -
THIRD FLOOR
Corrective Action Required
10/19/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360,365,366,367 - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING - - CORRIDOR 312 LID - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - AREA "B" - - CORRIDOR 309 RC LID - - CORRIDOR 305 RC LID 309 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER -
FOURTH FLOOR
Corrective Action Required
10/19/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 420,437,463,464,465, - -RC CORRIDOR 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 WALLS & CEILING - - 417 RC CHANNEL CEILING - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER -
STAIR TOWER 1
Corrective Action Required
10/19/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
10/19/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
10/19/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND -
STAIR TOWER 2
Corrective Action Required
10/19/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
10/19/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
10/19/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 10/21/2020 10/21/2020 10/21/2020
Miscellaneous Correction
Corrective Action Required
10/20/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
10/20/2020
-AREAS APPROVED- AREA “E” -112 RC CHANNEL CEILING, SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 120A,121A,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
10/20/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING ONLY - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - - RC CHANNEL CEILING 220A - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) - AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - INNER MECH CHASES: 1ST LAYER -
THIRD FLOOR
Corrective Action Required
10/20/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360,365,366,367 - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING - - CORRIDOR 312 LID - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - AREA "B" - - CORRIDOR 309 RC LID - - CORRIDOR 305 RC LID 309 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER -
FOURTH FLOOR
Corrective Action Required
10/20/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER -
STAIR TOWER 1
Corrective Action Required
10/20/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
10/20/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
10/20/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND -
STAIR TOWER 2
Corrective Action Required
10/20/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
10/20/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
10/20/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 10/22/2020 10/22/2020 10/22/2020
FOURTH FLOOR
Corrective Action Required
10/20/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING ONLY - - CORRECTIONS REQUIRED - - 406 , ADDRESS NOTCHED TRUSS DECK - - 425 MISSING WINDOW REQUIRES FLASHING OK TO INSULATE & ROCK - - 426 MISSING WINDOW REQUIRES FLASHING OK TO INSULATE & ROCK - - 403,404,405,406,407,423,424,427,428,429, 430, 431, - -AREA "B"- -CORRIDOR 409 JOIST HANGERS- - CORRIDOR 405 409 TO UNIT 407 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
10/20/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - - 332 ABOVE CEILING ONLY - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" -CORRIDOR 309 JOIST HANGERS - - CORRIODR 305, 309 TO UNIT 307 JOIST HANGERS - -304,305,306,307,323,325,326,327,328,329,333,334, 335,336,- - CORRECTIONS REQUIRED IN BELWO UNITS - - 330 SUPPORT PVC CONDENSATE LINE - - 331 SUPPORT WATER HEATER LINE - - 324 CONNECT DRYER VENT REAR WALL, SUPPORT PEX REFER LINE KITCHEN - -
SECOND FLOOR
Corrective Action Required
10/20/2020
'Section “E” Ok- 320A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, 209 TO UNIT 207 - - 232,233,234,235,236 -
FIRST FLOOR
Corrective Action Required
10/20/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109 JOIST HANGERS - - CORRIDOR 105, 109 TO UNIT 107 - -119,120,
STAIR TOWER 3
Informational
10/20/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
10/20/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 10/22/2020 10/22/2020 10/22/2020
Miscellaneous Correction
Corrective Action Required
10/21/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
10/21/2020
-AREAS APPROVED- AREA “E” -112 RC CHANNEL CEILING, SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 120A,121A,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
10/21/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING & WALLS - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - - RC CHANNEL CEILING 220A - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) - AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - INNER MECH CHASES: 1ST LAYER -
THIRD FLOOR
Corrective Action Required
10/21/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366, - : RE INSPECT 367 NEED 2ND LAYER MECH ROOM : 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 320A, 321A,324A,325A,328,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - AREA "B" - - CORRIDOR 309 RC LID - - CORRIDOR 305 RC LID 309 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER -
FOURTH FLOOR
Corrective Action Required
10/21/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464, 2ND LAYER : RE INSPECT 465 NEED 2ND LAYER MECH ROOM : - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER -
STAIR TOWER 1
Corrective Action Required
10/21/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
10/21/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
10/21/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND -
STAIR TOWER 2
Corrective Action Required
10/21/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
10/21/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
10/21/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 10/23/2020 10/23/2020 10/23/2020
FOURTH FLOOR
Corrective Action Required
10/22/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING ONLY - - CORRECTIONS REQUIRED - - 406 , ADDRESS NOTCHED TRUSS DECK - - 425 MISSING WINDOW REQUIRES FLASHING OK TO INSULATE & ROCK - - 426 MISSING WINDOW REQUIRES FLASHING OK TO INSULATE & ROCK - - 403,404,405,406,407,423,424,427,428,429, 430, 431, - -AREA "B"- -CORRIDOR 409 JOIST HANGERS- - CORRIDOR 405 409 TO UNIT 407 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
10/22/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - - 332 ABOVE CEILING ONLY - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" -CORRIDOR 309 JOIST HANGERS - - CORRIODR 305, 309 TO UNIT 307 JOIST HANGERS - -304,305,306,307,323,324,325,326,327,328,329,330, 331,333,334,335,336,- - CORRECTIONS REQUIRED IN BELOW UNITS - - 303 FIRE CAULK LAUNDRY ROOM TOP & BOTTOM PLATES, & DRYER BOX -
SECOND FLOOR
Corrective Action Required
10/22/2020
'Section “E” Ok- 320A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, 209 TO UNIT 207 - - 232,233,234,235,236 -
FIRST FLOOR
Corrective Action Required
10/22/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109 JOIST HANGERS - - CORRIDOR 105, 109 TO UNIT 107 - -119,120, - 135 FITNESS ROOM ABOVE CEILING ROUGH ONLY - : CORRECTIONS BELOW : - 134 FITNESS ROOM PROVIDE JOIST HANGERS PER PLAN -
STAIR TOWER 3
Informational
10/22/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
10/22/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 10/23/2020 10/23/2020 10/23/2020
Miscellaneous Correction
Corrective Action Required
10/22/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
10/22/2020
-AREAS APPROVED- AREA “E” -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR - - 135 FITNESS ROOM RC CEILING - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
10/22/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING & WALLS - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - - RC CHANNEL CEILING 220A - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) - AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - INNER MECH CHASES: 1ST LAYER -
THIRD FLOOR
Corrective Action Required
10/22/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366, - : RE INSPECT 367 NEED 2ND LAYER MECH ROOM : 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 320A, 321A,324A,325A,328,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - AREA "B" - - CORRIDOR 309 RC LID - - CORRIDOR 305 RC LID 309 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER -
FOURTH FLOOR
Corrective Action Required
10/22/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER -
STAIR TOWER 1
Corrective Action Required
10/22/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
10/22/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
10/22/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND -
STAIR TOWER 2
Corrective Action Required
10/22/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
10/22/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
10/22/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 10/26/2020 10/26/2020 10/26/2020
Miscellaneous Correction
Corrective Action Required
10/23/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
10/23/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 135 FITNESS ROOM RC CEILING - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
10/23/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING & WALLS - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - - RC CHANNEL CEILING 220A - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) - AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - INNER MECH CHASES: 1ST LAYER -
THIRD FLOOR
Corrective Action Required
10/23/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366, - : RE INSPECT 367 NEED 2ND LAYER MECH ROOM : 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - AREA "B" - - CORRIDOR 309 RC LID - - CORRIDOR 305 RC LID 309 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER -
FOURTH FLOOR
Corrective Action Required
10/23/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER -
STAIR TOWER 1
Corrective Action Required
10/23/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
10/23/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
10/23/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND -
STAIR TOWER 2
Corrective Action Required
10/23/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
10/23/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
10/23/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 10/28/2020 10/28/2020 10/28/2020
Miscellaneous Correction
Corrective Action Required
10/26/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
10/26/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 135 FITNESS ROOM RC CEILING - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
10/26/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING & WALLS - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - - RC CHANNEL CEILING 220A - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) - AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - INNER MECH CHASES: 1ST LAYER -
THIRD FLOOR
Corrective Action Required
10/26/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366, - : RE INSPECT 367 NEED 2ND LAYER MECH ROOM : 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - AREA "B" - - CORRIDOR 309 RC LID - - CORRIDOR 305 RC LID 309 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER -
FOURTH FLOOR
Corrective Action Required
10/26/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER -
STAIR TOWER 1
Corrective Action Required
10/26/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
10/26/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
10/26/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND -
STAIR TOWER 2
Corrective Action Required
10/26/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
10/26/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
10/26/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 10/28/2020 10/28/2020 10/28/2020
FOURTH FLOOR
Corrective Action Required
10/23/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING ONLY - - CORRECTIONS REQUIRED - - 406 , ADDRESS NOTCHED TRUSS DECK - - 425 MISSING WINDOW REQUIRES FLASHING OK TO INSULATE & ROCK - - 426 MISSING WINDOW REQUIRES FLASHING OK TO INSULATE & ROCK - - 403,404,405,406,407,423,424,427,428,429, 430, 431, - -AREA "B"- -CORRIDOR 409 JOIST HANGERS- - CORRIDOR 405 409 TO UNIT 407 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
10/23/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - - 332 ABOVE CEILING ONLY - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" -CORRIDOR 309 JOIST HANGERS - - CORRIODR 305, 309 TO UNIT 307 JOIST HANGERS - -303,304,305,306,307,323,324,325,326,327,328,329, 330,331,333,334,335,336,- : CORRECTIONS BELOW : - 332 SECURE BOX FOR SMOKE DETECTOR BEDROOM, FIRE ALARM BOX BEDROOM -
SECOND FLOOR
Corrective Action Required
10/23/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, 209 TO UNIT 207 - - 203,205,206,207,223,224,225,226,227,228,229,230, 231,232,233,234,235,236 - : CORRECTIONS BELOW : - 204 JOIST HANGERS DECK -
FIRST FLOOR
Corrective Action Required
10/23/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109 JOIST HANGERS - - CORRIDOR 105, 109 TO UNIT 107 - -119,120, - 135 FITNESS ROOM ABOVE CEILING ROUGH ONLY - : CORRECTIONS BELOW : - 134 FITNESS ROOM PROVIDE JOIST HANGERS PER PLAN -
STAIR TOWER 3
Informational
10/23/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
10/23/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: FLOORS 1 THRU 4 CORRECT BELOW ITEMS : 4TH FLOOR H 2.5s TRUSSES 1ST FLOOR SQUASH BLOCKS @ DOORWAY
All Rough Inspection - Commercial Partial 10/29/2020 10/29/2020 10/29/2020
FOURTH FLOOR
Corrective Action Required
10/28/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING ONLY - - CORRECTIONS REQUIRED - - 406 , ADDRESS NOTCHED TRUSS DECK - - 425 MISSING WINDOW REQUIRES FLASHING OK TO INSULATE & ROCK - - 426 MISSING WINDOW REQUIRES FLASHING OK TO INSULATE & ROCK - - 403,404,405,406,407,423,424,427,428,429, 430, 431, - -AREA "B"- -CORRIDOR 409 JOIST HANGERS- - CORRIDOR 405 409 TO UNIT 407 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
10/28/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" -CORRIDOR 309 JOIST HANGERS - - CORRIODR 305, 309 TO UNIT 307 JOIST HANGERS - -303,304,305,306,307,323,324,325,326,327,328,329, 330,331,332,333,334,335,336,-
SECOND FLOOR
Corrective Action Required
10/28/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, 209 TO UNIT 207 - - 203,205,206,207,223,224,225,226,227,228,229,230, 231,232,233,234,235,236 - : CORRECTIONS BELOW : - 204 JOIST HANGERS DECK -
FIRST FLOOR
Corrective Action Required
10/28/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109 JOIST HANGERS - - CORRIDOR 105, 109 TO UNIT 107 - -119,120, - 135 FITNESS ROOM ABOVE CEILING ROUGH ONLY - : CORRECTIONS BELOW : - 134 FITNESS ROOM PROVIDE JOIST HANGERS PER PLAN -
STAIR TOWER 3
Informational
10/28/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
10/28/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: FLOORS 1 THRU 4 CORRECT BELOW ITEMS : 4TH FLOOR H 2.5s TRUSSES 1ST FLOOR SQUASH BLOCKS @ DOORWAY
Rated Assembly Inspection Partial 10/29/2020 10/29/2020 10/29/2020
Miscellaneous Correction
Corrective Action Required
10/28/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
10/28/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 135 FITNESS ROOM RC CEILING - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
10/28/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING & WALLS - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - - RC CHANNEL CEILING 220A - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) - AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - INNER MECH CHASES: 1ST LAYER -
THIRD FLOOR
Corrective Action Required
10/28/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366, - : RE INSPECT 367 NEED 2ND LAYER MECH ROOM : 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - AREA "B" - - CORRIDOR 309 RC LID - - CORRIDOR 305 RC LID 309 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER -
FOURTH FLOOR
Corrective Action Required
10/28/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER -
STAIR TOWER 1
Corrective Action Required
10/28/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
10/28/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
10/28/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER -
STAIR TOWER 2
Corrective Action Required
10/28/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
10/28/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
10/28/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 10/30/2020 10/30/2020 10/30/2020
FOURTH FLOOR
Corrective Action Required
10/29/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - - CORRECTIONS REQUIRED - - 406 , ADDRESS NOTCHED TRUSS DECK - - 425 MISSING WINDOW REQUIRES FLASHING OK TO INSULATE & ROCK - - 426 MISSING WINDOW REQUIRES FLASHING OK TO INSULATE & ROCK - - 403,404,405,406,407,423,424,427,428,429, 430, 431, - -AREA "B"- -CORRIDOR 409 JOIST HANGERS- - CORRIDOR 405 409 TO UNIT 407 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
10/29/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" -CORRIDOR 309 JOIST HANGERS - - CORRIODR 305, 309 TO UNIT 307 JOIST HANGERS - -303,304,305,306,307,323,324,325,326,327,328,329, 330,331,332,333,334,335,336,-
SECOND FLOOR
Corrective Action Required
10/29/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, 209 TO UNIT 207 - - 203,205,206,207,223,224,225,226,227,228,229,230, 231,232,233,234,235,236 - : CORRECTIONS BELOW : - 204 JOIST HANGERS DECK -
FIRST FLOOR
Corrective Action Required
10/29/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109 JOIST HANGERS - - CORRIDOR 105, 109 TO UNIT 107 - -119,120, - 135 FITNESS ROOM ABOVE CEILING ROUGH ONLY - : CORRECTIONS BELOW : - 134 FITNESS ROOM PROVIDE JOIST HANGERS PER PLAN -
STAIR TOWER 3
Informational
10/29/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
10/29/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: FLOORS 1 THRU 4 CORRECT BELOW ITEMS : 4TH FLOOR H 2.5s TRUSSES 1ST FLOOR SQUASH BLOCKS @ DOORWAY
Rated Assembly Inspection Partial 10/30/2020 10/30/2020 10/30/2020
Miscellaneous Correction
Corrective Action Required
10/29/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
10/29/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 135 FITNESS ROOM RC CEILING - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
10/29/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING & WALLS - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - - RC CHANNEL CEILING 220A - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) - AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - INNER MECH CHASES: 1ST LAYER -
THIRD FLOOR
Corrective Action Required
10/29/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 333,334,335,336,337,338,339,- - AREA "B" - - CORRIDOR 309 RC LID - - CORRIDOR 305 RC LID 309 TO STAIRWAY A - - INNER MECH CHASES 1ST / 2ND LAYER -
FOURTH FLOOR
Corrective Action Required
10/29/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
10/29/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
10/29/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
10/29/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER -
STAIR TOWER 2
Corrective Action Required
10/29/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
10/29/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
10/29/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 11/2/2020 11/02/2020
FOURTH FLOOR
Corrective Action Required
10/30/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - - CORRECTIONS REQUIRED - - 425 MISSING WINDOW REQUIRES FLASHING OK TO INSULATE & ROCK - - 426 MISSING WINDOW REQUIRES FLASHING OK TO INSULATE & ROCK - - 403,404,405,406,407,423,424,427,428,429, 430, 431, - -AREA "B"- -CORRIDOR 409 JOIST HANGERS- - CORRIDOR 405 409 TO UNIT 407 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
10/30/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" -CORRIDOR 309 JOIST HANGERS - - CORRIODR 305, 309 TO UNIT 307 JOIST HANGERS - -303,304,305,306,307,323,324,325,326,327,328,329, 330,331,332,333,334,335,336,-
SECOND FLOOR
Corrective Action Required
10/30/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, 209 TO UNIT 207 - - 203,205,206,207,223,224,225,226,227,228,229,230, 231,232,233,234,235,236 - : CORRECTIONS BELOW : - 204 JOIST HANGERS DECK -
FIRST FLOOR
Corrective Action Required
10/30/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109 JOIST HANGERS - - CORRIDOR 105, 109 TO UNIT 107 - - CORRIDOR 111 CEILING JOIST HANGERS : (COMPLETE NAILING 1ST HANGER NEAR RETAIL SPACE) -119,120, - 135 FITNESS ROOM ABOVE CEILING ROUGH ONLY - : CORRECTIONS BELOW : - 134 FITNESS ROOM PROVIDE JOIST HANGERS PER PLAN -
STAIR TOWER 3
Informational
10/30/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
10/30/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: FLOORS 1 THRU 4 CORRECT BELOW ITEMS : 4TH FLOOR H 2.5s TRUSSES 1ST FLOOR SQUASH BLOCKS @ DOORWAY
Rated Assembly Inspection Partial 11/2/2020 11/2/2020 11/02/2020
Miscellaneous Correction
Corrective Action Required
10/30/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
10/30/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 135 FITNESS ROOM RC CEILING - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
10/30/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING & WALLS - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - - RC CHANNEL CEILING 220A - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) - AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - INNER MECH CHASES: 1ST LAYER -
THIRD FLOOR
Corrective Action Required
10/30/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 333,334,335,336,337,338,339,- - AREA "B" - - CORRIDOR 309 RC LID - - CORRIDOR 305 RC LID 309 TO STAIRWAY A - - INNER MECH CHASES 1ST / 2ND LAYER -
FOURTH FLOOR
Corrective Action Required
10/30/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
10/30/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
10/30/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
10/30/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER -
STAIR TOWER 2
Corrective Action Required
10/30/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
10/30/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
10/30/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 11/3/2020 11/3/2020 11/03/2020
Miscellaneous Correction
Corrective Action Required
11/02/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
11/02/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 135 FITNESS ROOM RC CEILING - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
11/02/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING & WALLS - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - - RC CHANNEL CEILING 220A - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) - AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - INNER MECH CHASES: 1ST LAYER -
THIRD FLOOR
Corrective Action Required
11/02/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - AREA "B" - - CORRIDOR 309 RC LID - - CORRIDOR 305 RC LID 309 TO STAIRWAY A - - INNER MECH CHASES 1ST / 2ND LAYER -
FOURTH FLOOR
Corrective Action Required
11/02/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
11/02/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
11/02/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
11/02/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER -
STAIR TOWER 2
Corrective Action Required
11/02/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
11/02/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
11/02/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 11/3/2020 11/3/2020 11/03/2020
FOURTH FLOOR
Corrective Action Required
11/02/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - - CORRECTIONS REQUIRED - - 425 MISSING WINDOW REQUIRES FLASHING OK TO INSULATE & ROCK - - 426 MISSING WINDOW REQUIRES FLASHING OK TO INSULATE & ROCK - 403,404,405,406,407,415A,416A,423,424,427,428, 429, 430, 431, - -AREA "B"- -CORRIDOR 409 JOIST HANGERS- - CORRIDOR 405 409 TO UNIT 407 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
11/02/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" -CORRIDOR 309 JOIST HANGERS - - CORRIODR 305, 309 TO UNIT 307 JOIST HANGERS - -303,304,305,306,307,323,324,325,326,327,328,329, 330,331,332,333,334,335,336,-
SECOND FLOOR
Corrective Action Required
11/02/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, 209 TO UNIT 207 - - 203,205,206,207,223,224,225,226,227,228,229,230, 231,232,233,234,235,236 - : CORRECTIONS BELOW : - 204 JOIST HANGERS DECK -
FIRST FLOOR
Corrective Action Required
11/02/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : -119,120, - 135 FITNESS ROOM ABOVE CEILING ROUGH ONLY - : CORRECTIONS BELOW : - 134 FITNESS ROOM PROVIDE JOIST HANGERS PER PLAN -
STAIR TOWER 3
Informational
11/02/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
11/02/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: FLOORS 1 THRU 4 CORRECT BELOW ITEMS : 4TH FLOOR H 2.5s TRUSSES 1ST FLOOR SQUASH BLOCKS @ DOORWAY
All Rough Inspection - Commercial Partial 11/4/2020 11/4/2020 11/04/2020
FOURTH FLOOR
Corrective Action Required
11/03/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 403,404,405,406,407,415A,416A,423,424,425,426,427,428, 429, 430, 431, - -AREA "B"- -CORRIDOR 409 JOIST HANGERS- - CORRIDOR 405 409 TO UNIT 407 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
11/03/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -303,304,305,306,307,323,324,325,326,327,328,329, 330,331,332,333,334,335,336,-
SECOND FLOOR
Corrective Action Required
11/03/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, 209 TO UNIT 207 - - 203,204,205,206,207,223,224,225,226,227,228,229, 230,231,232,233,234,235,236 -
FIRST FLOOR
Corrective Action Required
11/03/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : -108,112,118,119,120, - - OTHER 15 UNITS NOT READY Michael Harkins 11/04/2020 12:01 PM - - 135 FITNESS ROOM ABOVE CEILING ROUGH ONLY - : CORRECTIONS BELOW : - 134 FITNESS ROOM PROVIDE JOIST HANGERS PER PLAN -
STAIR TOWER 3
Informational
11/03/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
11/03/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
Rated Assembly Inspection Partial 11/5/2020 11/5/2020 11/05/2020
Miscellaneous Correction
Corrective Action Required
11/03/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
11/03/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 135 FITNESS ROOM RC CEILING - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
11/03/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING & WALLS - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - - RC CHANNEL CEILING 220A - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) - 1ST LAYER 232,233,234,235,236,237,238,239, AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - INNER MECH CHASES: 1ST LAYER -
THIRD FLOOR
Corrective Action Required
11/03/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - AREA "B" - - CORRIDOR 309 RC LID - - CORRIDOR 305 RC LID 309 TO STAIRWAY A - - INNER MECH CHASES 1ST / 2ND LAYER -
FOURTH FLOOR
Corrective Action Required
11/03/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
11/03/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
11/03/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
11/03/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER -
STAIR TOWER 2
Corrective Action Required
11/03/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
11/03/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
11/03/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 11/5/2020 11/5/2020 11/05/2020
FOURTH FLOOR
Corrective Action Required
11/04/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 403,404,405,406,407,415A,416A,423,424,425,426,427,428, 429, 430, 431, - -AREA "B"- -CORRIDOR 409 JOIST HANGERS- - CORRIDOR 405 409 TO UNIT 407 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
11/04/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -303,304,305,306,307,323,324,325,326,327,328,329, 330,331,332,333,334,335,336,-
SECOND FLOOR
Corrective Action Required
11/04/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - -CORRECTIONS BELOW - - CORRIDOR 201 NAIL HANGERS MARKED WITH BLK X- - CORRIDOR 211 NAIL HANGERS MARKED WITH BLK X - - 203,204,205,206,207,223,224,225,226,227,228,229, 230,231,232,233,234,235,236 -
FIRST FLOOR
Corrective Action Required
11/04/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : -108,112,118,119,120, - - OTHER 15 UNITS NOT READY Michael Harkins 11/04/2020 12:01 PM - - 134,135 YOGA,FITNESS ROOM ABOVE CEILING ROUGH ONLY -
STAIR TOWER 3
Informational
11/04/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
11/04/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
Rated Assembly Inspection Partial 11/6/2020 11/6/2020 11/06/2020
Miscellaneous Correction
Corrective Action Required
11/05/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
11/05/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
11/05/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING & WALLS - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - - RC CHANNEL CEILING 220A - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) - 1ST LAYER 232,233,234,235,236,237,238,239, AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER -
THIRD FLOOR
Corrective Action Required
11/05/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - AREA "B" - - CORRIDOR 311 RC LID - - CORRIDOR 309 RC LID - - CORRIDOR 305 RC LID - - CORRIDOR 303 RC LID - - CORRIDOR 301 RC LID - - INNER MECH CHASES 1ST / 2ND LAYER -
FOURTH FLOOR
Corrective Action Required
11/05/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
11/05/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
11/05/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
11/05/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER -
STAIR TOWER 2
Corrective Action Required
11/05/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
11/05/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
11/05/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 11/6/2020 11/6/2020 11/06/2020
FOURTH FLOOR
Corrective Action Required
11/05/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 403,404,405,406,407,415A,416A,423,424,425,426,427,428, 429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS - : CORRECTIONS BELOW : :- CORRIDOR 411 ADD BLOCKING & NAIL J HANGER -:
THIRD FLOOR
Corrective Action Required
11/05/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -303,304,305,306,307,323,324,325,326,327,328,329, 330,331,332,333,334,335,336,-
SECOND FLOOR
Corrective Action Required
11/05/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 203,204,205,206,207,223,224,225,226,227,228,229, 230,231,232,233,234,235,236 -
FIRST FLOOR
Corrective Action Required
11/05/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,106,107,108,109,111,112,113,117,118, 119,120, - - 104,105,110,114,115,116 NOT READY Michael Harkins 11/06/2020 1:20 PM - 134,135 YOGA,FITNESS ROOM ABOVE CEILING ROUGH ONLY -
STAIR TOWER 3
Informational
11/05/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
11/05/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
Rated Assembly Inspection Partial 11/9/2020 11/9/2020 11/09/2020
Miscellaneous Correction
Corrective Action Required
11/06/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
11/06/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
11/06/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING & WALLS - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - - RC CHANNEL CEILING 220A - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) - 1ST LAYER 232,233,234,235,236,237,238,239, AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER -
THIRD FLOOR
Corrective Action Required
11/06/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - AREA "B" - - CORRIDOR 311 RC LID, SCREWS LID,- - CORRIDOR 309 RC LID, - - CORRIDOR 305 RC LID, SCREWS LID, - - CORRIDOR 303 RC LID, SCREWS LID, - - CORRIDOR 301 RC LID, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER -
FOURTH FLOOR
Corrective Action Required
11/06/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
11/06/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
11/06/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
11/06/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER -
STAIR TOWER 2
Corrective Action Required
11/06/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
11/06/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
11/06/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 11/9/2020 11/9/2020 11/09/2020
FOURTH FLOOR
Corrective Action Required
11/06/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 403,404,405,406,407,415A,416A,423,424,425,426,427,428, 429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS - : CORRECTIONS BELOW : :- CORRIDOR 411 ADD BLOCKING & NAIL J HANGER -:
THIRD FLOOR
Corrective Action Required
11/06/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -303,304,305,306,307,323,324,325,326,327,328,329, 330,331,332,333,334,335,336,-
SECOND FLOOR
Corrective Action Required
11/06/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 203,204,205,206,207,223,224,225,226,227,228,229, 230,231,232,233,234,235,236 -
FIRST FLOOR
Corrective Action Required
11/06/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ABOVE CEILING ROUGH ONLY -
STAIR TOWER 3
Informational
11/06/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
11/06/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
Rated Assembly Inspection Partial 11/10/2020 11/10/2020 11/10/2020
Miscellaneous Correction
Corrective Action Required
11/09/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
11/09/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
11/09/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING & WALLS - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - - RC CHANNEL CEILING 220A - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259,260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - 1ST LAYER 232,233,234,235,236,237,238,239, AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER -
THIRD FLOOR
Corrective Action Required
11/09/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - AREA "B" - - CORRIDOR 311 RC LID, SCREWS LID,- - CORRIDOR 309 RC LID, - - CORRIDOR 305 RC LID, SCREWS LID, - - CORRIDOR 303 RC LID, SCREWS LID, - - CORRIDOR 301 RC LID, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER -
FOURTH FLOOR
Corrective Action Required
11/09/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
11/09/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
11/09/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
11/09/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER -
STAIR TOWER 2
Corrective Action Required
11/09/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
11/09/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
11/09/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 11/10/2020 11/10/2020 11/10/2020
FOURTH FLOOR
Corrective Action Required
11/09/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 403,404,405,406,407,408,409,411,412,413,415A,416A,417,418,419,420,421,422,423,424,425,426,427,428, 429, 430, 431, - : BELOW REQUIRE CORRECTIONS : - 401,410,414,415,416, H2.5S PER PLAN - - 402 FIRE BLOCKING CORNER OF BEDROONM NEAR DECK - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS - : CORRECTIONS BELOW : :- CORRIDOR 411 ADD BLOCKING & NAIL J HANGER -:
THIRD FLOOR
Corrective Action Required
11/09/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -303,304,305,306,307,323,324,325,326,327,328,329, 330,331,332,333,334,335,336,-
SECOND FLOOR
Corrective Action Required
11/09/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 203,204,205,206,207,223,224,225,226,227,228,229, 230,231,232,233,234,235,236 -
FIRST FLOOR
Corrective Action Required
11/09/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ABOVE CEILING ROUGH ONLY -
STAIR TOWER 3
Informational
11/09/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
11/09/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
Rated Assembly Inspection Partial 11/11/2020 11/11/2020 11/11/2020
Miscellaneous Correction
Corrective Action Required
11/10/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
11/10/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - -
SECOND FLOOR
Corrective Action Required
11/10/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING & WALLS - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - 1ST LAYER 232,233,234,235,236,237,238,239, AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER -
THIRD FLOOR
Corrective Action Required
11/10/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - AREA "B" - - CORRIDOR 311 RC LID, SCREWS LID,- - CORRIDOR 309 RC LID, - - CORRIDOR 305 RC LID, SCREWS LID, - - CORRIDOR 303 RC LID, SCREWS LID, - - CORRIDOR 301 RC LID, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER -
FOURTH FLOOR
Corrective Action Required
11/10/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
11/10/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
11/10/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL -
ELEVATOR 3
Corrective Action Required
11/10/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER -
STAIR TOWER 2
Corrective Action Required
11/10/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
11/10/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
11/10/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 11/11/2020 11/11/2020 11/11/2020
FOURTH FLOOR
Corrective Action Required
11/10/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,405,406,407,408,409,410,411,412, 413,414,415,415A,416,416A,417,418,419,420,421,422,423,424,425,426,427,428, 429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS - : CORRECTIONS BELOW : :- CORRIDOR 411 ADD BLOCKING & NAIL J HANGER -:
THIRD FLOOR
Corrective Action Required
11/10/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -303,304,305,306,307,323,324,325,326,327,328,329, 330,331,332,333,334,335,336,-
SECOND FLOOR
Corrective Action Required
11/10/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 203,204,205,206,207,223,224,225,226,227,228,229, 230,231,232,233,234,235,236 -
FIRST FLOOR
Corrective Action Required
11/10/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ABOVE CEILING ROUGH ONLY -
STAIR TOWER 3
Informational
11/10/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
11/10/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
Gas Piping Inspection - Commercial Passed 11/11/2020 11/11/2020 11/11/2020
Misc
Informational
11/11/2020
- PRESSURE STEADT AT 15 PSI - - GUAGES SOUTH COURTYARD & CLUB HOUSE DECK -
Gas Service Inspection - Commercial Passed 11/11/2020 11/11/2020
Rated Assembly Inspection Partial 11/12/2020 11/12/2020 11/12/2020
Miscellaneous Correction
Corrective Action Required
11/11/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
11/11/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - CORRIDOR 111 RC LID - - CORRIDOR 105 RC LID - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST LAYER EAST WALL BEHIND PANELS -
SECOND FLOOR
Corrective Action Required
11/11/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING & WALLS - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - 1ST LAYER 232,233,234,235,236,237,238,239, AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER -
THIRD FLOOR
Corrective Action Required
11/11/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - AREA "B" - - CORRIDOR 311 RC LID, SCREWS LID,- - CORRIDOR 309 RC LID, - - CORRIDOR 305 RC LID, SCREWS LID, - - CORRIDOR 303 RC LID, SCREWS LID, - - CORRIDOR 301 RC LID, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER -
FOURTH FLOOR
Corrective Action Required
11/11/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464 - - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
11/11/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
11/11/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
11/11/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER -
STAIR TOWER 2
Corrective Action Required
11/11/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
11/11/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
11/11/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 11/12/2020 11/12/2020 11/12/2020
FOURTH FLOOR
Corrective Action Required
11/11/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,405,406,407,408,409,410,411,412, 413,414,415,415A,416,416A,417,418,419,420,421,422,423,424,425,426,427,428,429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS - : CORRECTIONS BELOW : :- CORRIDOR 411 ADD BLOCKING & NAIL J HANGER -:
THIRD FLOOR
Corrective Action Required
11/11/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,305,306,307,309,310,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333,334,335,336,- :BELOW REQUIRE CORRECTIONS : - 308 FIRE BLOCKING BEDROOMS CORNERS AT DECK - - 311 FIRE BLOCKING BEDROOMS CORNERS AT DECKS -
SECOND FLOOR
Corrective Action Required
11/11/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 203,204,205,206,207,223,224,225,226,227,228,229, 230,231,232,233,234,235,236 -
FIRST FLOOR
Corrective Action Required
11/11/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ABOVE CEILING ROUGH ONLY -
STAIR TOWER 3
Informational
11/11/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
11/11/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
Above Ceiling Inspection Failed 7/21/2020 11/12/2020 11/12/2020
SECOND FLOOR
Corrective Action Required
06/09/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS -
THIRD FLOOR
Corrective Action Required
06/09/2020
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS -
FOURTH FLOOR
Corrective Action Required
06/09/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - BELOW HARD LIDS NEED CORRECTIONS CORRIDOR 419 SEAL PENETRATIONS IN LID, FIRE CAULK PENETRATIONS IN WALLS, SECURE CONDUCTORS EVERY 4.5' CORRIDOR 422 SAME AS ABOVE CORRIDOR 423 SAME AS ABOVE
All Rough Inspection - Commercial Partial 11/13/2020 11/13/2020 11/13/2020
FOURTH FLOOR
Corrective Action Required
11/12/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,405,406,407,408,409,410,411,412, 413,414,415,415A,416,416A,417,418,419,420,421,422,423,424,425,426,427,428,429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS - : CORRECTIONS BELOW : :- CORRIDOR 411 ADD BLOCKING & NAIL J HANGER -:
THIRD FLOOR
Corrective Action Required
11/12/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,305,306,307,309,310,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333,334,335,336,- 310A rough approved
SECOND FLOOR
Corrective Action Required
11/12/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 203,204,205,206,207,223,224,225,226,227,228,229, 230,231,232,233,234,235,236 -
FIRST FLOOR
Corrective Action Required
11/12/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ABOVE CEILING ROUGH ONLY -
STAIR TOWER 3
Informational
11/12/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
11/12/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
Rated Assembly Inspection Partial 11/13/2020 11/13/2020 11/13/2020
Miscellaneous Correction
Corrective Action Required
11/12/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
11/12/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - CORRIDOR 111 RC LID - - CORRIDOR 105 RC LID - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST LAYER EAST WALL BEHIND PANELS -
SECOND FLOOR
Corrective Action Required
11/12/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 CEILING & WALLS - - RC CHANNEL CORRIDOR 229 WALLS & CEILING - - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - 1ST LAYER 232,233,234,235,236,237,238,239, AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER -
THIRD FLOOR
Corrective Action Required
11/12/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - AREA "B" - - CORRIDOR 311 RC LID, SCREWS LID,- - CORRIDOR 309 RC LID, - - CORRIDOR 305 RC LID, SCREWS LID, - - CORRIDOR 303 RC LID, SCREWS LID, - - CORRIDOR 301 RC LID, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER -
FOURTH FLOOR
Corrective Action Required
11/12/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
11/12/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
11/12/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
11/12/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER -
STAIR TOWER 2
Corrective Action Required
11/12/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
11/12/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
11/12/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 11/16/2020 11/16/2020 11/16/2020
Miscellaneous Correction
Corrective Action Required
11/13/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
11/13/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - CORRIDOR 111 RC LID - - CORRIDOR 105 RC LID - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS -
SECOND FLOOR
Corrective Action Required
11/13/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - 1ST LAYER 232,233,234,235,236,237,238,239, AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER -
THIRD FLOOR
Corrective Action Required
11/13/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - AREA "B" - - CORRIDOR 311 RC LID, SCREWS LID,- - CORRIDOR 309 RC LID, - - CORRIDOR 305 RC LID, SCREWS LID, - - CORRIDOR 303 RC LID, SCREWS LID, - - CORRIDOR 301 RC LID, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER -
FOURTH FLOOR
Corrective Action Required
11/13/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
11/13/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
11/13/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
11/13/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER -
STAIR TOWER 2
Corrective Action Required
11/13/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
11/13/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
11/13/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 11/17/2020 11/17/2020 11/17/2020
FOURTH FLOOR
Corrective Action Required
11/13/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,405,406,407,408,409,410,411,412, 413,414,415,415A,416,416A,417,418,419,420,421,422,423,424,425,426,427,428,429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS - : CORRECTIONS BELOW : :- CORRIDOR 411 ADD BLOCKING & NAIL J HANGER -:
THIRD FLOOR
Corrective Action Required
11/13/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,305,306,307,309,310,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333,334,335,336,- 310A rough approved
SECOND FLOOR
Corrective Action Required
11/13/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,205,206,207,209,210,211,212,214, 215,216,217,218,219,220,221,222,223,224,225,226, 227,228,229,230,231,232,233,234,235,236 - : BELOW UNITS REQUIRE CORRECTIONS : - 208 INSTALL SERVICE PANEL - - 213 TIGHTEN ANCHOR BOLT SHEAR WALL KITCHEN -
FIRST FLOOR
Corrective Action Required
11/13/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ABOVE CEILING ROUGH ONLY -
STAIR TOWER 3
Informational
11/13/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
11/13/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
Rated Assembly Inspection Partial 11/17/2020 11/17/2020 11/17/2020
Miscellaneous Correction
Corrective Action Required
11/16/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
11/16/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - CORRIDOR 111 RC LID - - CORRIDOR 105 RC LID - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS -
SECOND FLOOR
Corrective Action Required
11/16/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - 1ST LAYER 232,233,234,235,236,237,238,239, AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER -
THIRD FLOOR
Corrective Action Required
11/16/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338, - - AREA "B" - - CORRIDOR 311 RC LID, SCREWS LID,- - CORRIDOR 309 RC LID, - - CORRIDOR 305 RC LID, SCREWS LID, - - CORRIDOR 303 RC LID, SCREWS LID, - - CORRIDOR 301 RC LID, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER -
FOURTH FLOOR
Corrective Action Required
11/16/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
11/16/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
11/16/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
11/16/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER -
STAIR TOWER 2
Corrective Action Required
11/16/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
11/16/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
11/16/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Above Ceiling Inspection Partial 11/17/2020 11/18/2020 11/18/2020
SECOND FLOOR
Corrective Action Required
11/12/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS -
THIRD FLOOR
Corrective Action Required
11/12/2020
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS -
FOURTH FLOOR
Corrective Action Required
11/12/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426
Rated Assembly Inspection Partial 11/18/2020 11/18/2020 11/18/2020
Miscellaneous Correction
Corrective Action Required
11/17/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
11/17/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID 109 TO STAIRWAY A - - CORRIDOR 111 RC LID - - CORRIDOR 105 RC LID - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS -
SECOND FLOOR
Corrective Action Required
11/17/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - 1ST LAYER 232,233,234,235,236,237,238,239, AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER -
THIRD FLOOR
Corrective Action Required
11/17/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338, - - AREA "B" - - CORRIDOR 311 RC LID, SCREWS LID,- - CORRIDOR 309 RC LID, - - CORRIDOR 305 RC LID, SCREWS LID, - - CORRIDOR 303 RC LID, SCREWS LID, - - CORRIDOR 301 RC LID, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 303,304,305,306,307,323,324,325,326,327 ,328,329,330,331,-
FOURTH FLOOR
Corrective Action Required
11/17/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
11/17/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
11/17/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
11/17/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER -
STAIR TOWER 2
Corrective Action Required
11/17/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
11/17/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
11/17/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 11/18/2020 11/19/2020 11/19/2020
FOURTH FLOOR
Corrective Action Required
11/17/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,405,406,407,408,409,410,411,412, 413,414,415,415A,416,416A,417,418,419,420,421,422,423,424,425,426,427,428,429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS - : CORRECTIONS BELOW : :- CORRIDOR 411 ADD BLOCKING & NAIL J HANGER -:
THIRD FLOOR
Corrective Action Required
11/17/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,305,306,307,309,310,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333,334,335,336,- 310A rough approved
SECOND FLOOR
Corrective Action Required
11/17/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,205,206,207,209,210,211,212,213, 214,215,216,217,218,219,220,221,222,223,224,225, 226,227,228,229,230,231,232,233,234,235,236 - : BELOW UNITS REQUIRE CORRECTIONS : - 208 INSTALL SERVICE PANEL -
FIRST FLOOR
Corrective Action Required
11/17/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ABOVE CEILING ROUGH ONLY -
STAIR TOWER 3
Informational
11/17/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
11/17/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
Rated Assembly Inspection Partial 11/19/2020 11/19/2020 11/19/2020
Miscellaneous Correction
Corrective Action Required
11/18/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
11/18/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID - - CORRIDOR 111 RC LID/SCREW PATTERN LID - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1 LAYER BEHIND PANEL -
SECOND FLOOR
Corrective Action Required
11/18/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - 1ST LAYER 232,233,234,235,236,237,238,239, AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER -
THIRD FLOOR
Corrective Action Required
11/18/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338, - - AREA "B" - - CORRIDOR 311 RC LID, SCREWS LID,- - CORRIDOR 309 RC LID, - - CORRIDOR 305 RC LID, SCREWS LID, - - CORRIDOR 303 RC LID, SCREWS LID, - - CORRIDOR 301 RC LID, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 303,304,305,306,307,323,324,325,326,327 ,328,329,330,331,-
FOURTH FLOOR
Corrective Action Required
11/18/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1 LAYER BEHIND PANEL -
STAIR TOWER 1
Corrective Action Required
11/18/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
11/18/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
11/18/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
11/18/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
11/18/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
11/18/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 11/20/2020 11/20/2020 11/20/2020
Miscellaneous Correction
Corrective Action Required
11/19/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
11/19/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 121A,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID - - CORRIDOR 111 RC LID/SCREW PATTERN LID - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY -
SECOND FLOOR
Corrective Action Required
11/19/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - 1ST LAYER 232,233,234,235,236,237,238,239, AREA "B" - CORRIDOR 209 RC LID/ SCREW PATTERN LID - - CORRIDOR 205 RC LID/ SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER -
THIRD FLOOR
Corrective Action Required
11/19/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338, - - AREA "B" - - CORRIDOR 311 RC LID, SCREWS LID,- - CORRIDOR 309 RC LID, - - CORRIDOR 305 RC LID, SCREWS LID, - - CORRIDOR 303 RC LID, SCREWS LID, - - CORRIDOR 301 RC LID, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 303,304,305,306,307,323,324,325,326,327 ,328,329,330,331,-
FOURTH FLOOR
Corrective Action Required
11/19/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID - - CORRIDOR 405 RC LID / SCREW PATTERN LID 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY -
STAIR TOWER 1
Corrective Action Required
11/19/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
11/19/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
11/19/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
11/19/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
11/19/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
11/19/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 11/23/2020 11/23/2020 11/23/2020
Miscellaneous Correction
Corrective Action Required
11/20/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
11/20/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID - - CORRIDOR 111 RC LID/SCREW PATTERN LID - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY -
SECOND FLOOR
Corrective Action Required
11/20/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 203,204,205,206,207,223,224,225,226,227,228,229, 230,231,
THIRD FLOOR
Corrective Action Required
11/20/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338, - - AREA "B" - - CORRIDOR 311 RC LID, SCREWS LID,- - CORRIDOR 309 RC LID, - - CORRIDOR 305 RC LID, SCREWS LID, - - CORRIDOR 303 RC LID, SCREWS LID, - - CORRIDOR 301 RC LID, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 303,304,305,306,307,323,324,325,326,327 ,328,329,330,331,-
FOURTH FLOOR
Corrective Action Required
11/20/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 -
STAIR TOWER 1
Corrective Action Required
11/20/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
11/20/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
11/20/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
11/20/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
11/20/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
11/20/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 11/24/2020 11/24/2020 11/24/2020
Miscellaneous Correction
Corrective Action Required
11/23/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
11/23/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID - - CORRIDOR 111 RC LID/SCREW PATTERN LID - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY -
SECOND FLOOR
Corrective Action Required
11/23/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 203,204,205,206,207,223,224,225,226,227,228,229, 230,231,
THIRD FLOOR
Corrective Action Required
11/23/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338, - - AREA "B" - - CORRIDOR 311 RC LID, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID, SCREWS LID, - - CORRIDOR 301 RC LID, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 303,304,305,306,307,323,324,325,326,327 ,328,329,330,331,-
FOURTH FLOOR
Corrective Action Required
11/23/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID - - CORRIDOR 403 RC LID - - CORRIDOR 411 RC LID - - CORRIODR 401 RC LID - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 -
STAIR TOWER 1
Corrective Action Required
11/23/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
11/23/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
11/23/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
11/23/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
11/23/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
11/23/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Rated Assembly Inspection Partial 11/25/2020 11/25/2020 11/25/2020
Miscellaneous Correction
Corrective Action Required
11/24/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
11/24/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID - - CORRIDOR 111 RC LID/SCREW PATTERN LID - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA -
SECOND FLOOR
Corrective Action Required
11/24/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 203,204,205,206,207,223,224,225,226,227,228,229, 230,231,
THIRD FLOOR
Corrective Action Required
11/24/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, 365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338, - - AREA "B" - - CORRIDOR 311 RC LID, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID, SCREWS LID, - - CORRIDOR 301 RC LID, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 303,304,305,306,307,323,324,325,326,327 ,328,329,330,331,-
FOURTH FLOOR
Corrective Action Required
11/24/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID - - CORRIDOR 403 RC LID - - CORRIDOR 411 RC LID - - CORRIODR 401 RC LID - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 -
STAIR TOWER 1
Corrective Action Required
11/24/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
11/24/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
11/24/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
11/24/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
11/24/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
11/24/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Above Ceiling Inspection Partial 11/25/2020 11/25/2020 11/25/2020
SECOND FLOOR
Corrective Action Required
11/18/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS -
THIRD FLOOR
Corrective Action Required
11/18/2020
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID-
FOURTH FLOOR
Corrective Action Required
11/18/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429
Rated Assembly Inspection Partial 12/1/2020 12/1/2020 12/01/2020
Miscellaneous Correction
Corrective Action Required
11/25/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
11/25/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID - - CORRIDOR 111 RC LID/SCREW PATTERN LID - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA -
SECOND FLOOR
Corrective Action Required
11/25/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 203,204,205,206,207,223,224,225,226,227,228,229, 230,231,
THIRD FLOOR
Corrective Action Required
11/25/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID, SCREWS LID, - - CORRIDOR 301 RC LID, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 303,304,305,306,307,323,324,325,326,327 ,328,329,330,331,-
FOURTH FLOOR
Corrective Action Required
11/25/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,SCREW PATTERN LID - - CORRIDOR 403 RC LID, SCREW PATTERN LID - - CORRIDOR 411 RC LID, SCREW PATTERN LID - - CORRIODR 401 RC LID, SCREW PATTERN LID - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 -
STAIR TOWER 1
Corrective Action Required
11/25/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
11/25/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
11/25/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
11/25/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
11/25/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
11/25/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Failed 12/3/2020 12/3/2020 12/03/2020
FOURTH FLOOR
Corrective Action Required
11/19/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,405,406,407,408,409,410,411,412, 413,414,415,415A,416,416A,417,418,419,420,421,422,423,424,425,426,427,428,429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS - : CORRECTIONS BELOW : :- CORRIDOR 411 ADD BLOCKING & NAIL J HANGER -:
THIRD FLOOR
Corrective Action Required
11/19/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,305,306,307,309,310,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333,334,335,336,- 310A rough approved
SECOND FLOOR
Corrective Action Required
11/19/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,205,206,207,209,210,211,212,213, 214,215,216,217,218,219,220,221,222,223,224,225, 226,227,228,229,230,231,232,233,234,235,236 - : BELOW UNITS REQUIRE CORRECTIONS : - 208 LAND GROUND IN SERVICE PANEL -
FIRST FLOOR
Corrective Action Required
11/19/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ABOVE CEILING ROUGH ONLY -
STAIR TOWER 3
Informational
11/19/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
11/19/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
Rated Assembly Inspection Partial 12/3/2020 12/3/2020 12/03/2020
Miscellaneous Correction
Corrective Action Required
12/01/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/01/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID - - CORRIDOR 111 RC LID/SCREW PATTERN LID - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE -
SECOND FLOOR
Corrective Action Required
12/01/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 203,204,205,206,207,223,224,225,226,227,228,229, 230,231,
THIRD FLOOR
Corrective Action Required
12/01/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID, SCREWS LID, - - CORRIDOR 301 RC LID, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 303,304,305,306,307,323,324,325,326,327 ,328,329,330,331,-
FOURTH FLOOR
Corrective Action Required
12/01/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,SCREW PATTERN LID - - CORRIDOR 403 RC LID, SCREW PATTERN LID - - CORRIDOR 411 RC LID, SCREW PATTERN LID - - CORRIODR 401 RC LID, SCREW PATTERN LID - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 -
STAIR TOWER 1
Corrective Action Required
12/01/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/01/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/01/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/01/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
12/01/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/01/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
All Rough Inspection - Commercial Partial 12/4/2020 12/4/2020 12/04/2020
FOURTH FLOOR
Corrective Action Required
12/03/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,405,406,407,408,409,410,411,412, 413,414,415,415A,416,416A,417,418,419,420,421,422,423,424,425,426,427,428,429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS - : CORRECTIONS BELOW : :- CORRIDOR 411 ADD BLOCKING & NAIL J HANGER -:
THIRD FLOOR
Corrective Action Required
12/03/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,305,306,307,309,310,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333,334,335,336,- 310A rough approved
SECOND FLOOR
Corrective Action Required
12/03/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231,232,233,234,235,236 -
FIRST FLOOR
Corrective Action Required
12/03/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ABOVE CEILING ROUGH ONLY -
STAIR TOWER 3
Informational
12/03/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
12/03/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
Above Ceiling Inspection Partial 12/4/2020 12/4/2020 12/04/2020
SECOND FLOOR
Corrective Action Required
11/25/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID
THIRD FLOOR
Corrective Action Required
11/25/2020
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID-
FOURTH FLOOR
Corrective Action Required
11/25/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429
Rated Assembly Inspection Partial 12/4/2020 12/4/2020 12/04/2020
Miscellaneous Correction
Corrective Action Required
12/03/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/03/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID/ SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID - - CORRIDOR 111 RC LID/SCREW PATTERN LID - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE -
SECOND FLOOR
Corrective Action Required
12/03/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 203,204,205,206,207,223,224,225,226,227,228,229, 230,231,
THIRD FLOOR
Corrective Action Required
12/03/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID, SCREWS LID, - - CORRIDOR 301 RC LID, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 303,304,305,306,307,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -304,305,306,307,323,324,325,326,327,328,329,330, 331, -
FOURTH FLOOR
Corrective Action Required
12/03/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,SCREW PATTERN LID - - CORRIDOR 403 RC LID, SCREW PATTERN LID - - CORRIDOR 411 RC LID, SCREW PATTERN LID - - CORRIODR 401 RC LID, SCREW PATTERN LID - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 -
STAIR TOWER 1
Corrective Action Required
12/03/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/03/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/03/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/03/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
12/03/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/03/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED:
Underslab Electrical Inspection - Commercial Partial 8/25/2020 12/7/2020 12/07/2020
THE FOLLOWING AREAS ARE APPROVED
Informational
12/07/2020
- LOBBY FLOOR LIGHTS AT STAIRS -
Rated Assembly Inspection Partial 12/7/2020 12/7/2020 12/07/2020
Miscellaneous Correction
Corrective Action Required
12/04/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/04/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID - - CORRIDOR 111 RC LID/SCREW PATTERN LID - - RC CHANNEL 101,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - UNIT 102 CEILING COMPLETE, WALLS INCOMPLETE - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE -
SECOND FLOOR
Corrective Action Required
12/04/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 203,204,205,206,207,223,224,225,226,227,228,229, 230,231,
THIRD FLOOR
Corrective Action Required
12/04/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID, SCREWS LID, - - CORRIDOR 301 RC LID, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 303,304,305,306,307,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -304,305,306,307,323,324,325,326,327,328,329,330, 331, -
FOURTH FLOOR
Corrective Action Required
12/04/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,SCREW PATTERN LID - - CORRIDOR 403 RC LID, SCREW PATTERN LID - - CORRIDOR 411 RC LID, SCREW PATTERN LID - - CORRIODR 401 RC LID, SCREW PATTERN LID - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 -
STAIR TOWER 1
Corrective Action Required
12/04/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/04/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/04/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/04/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
12/04/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/04/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER -
Electrical Service Inspection Partial 12/1/2020 12/8/2020 12/08/2020
Misc
Partial Correction
12/08/2020
- OK TO RELEASE METERS FOR NORTH END OF BUILDING ONLY -
Rated Assembly Inspection Partial 12/8/2020 12/8/2020 12/08/2020
Miscellaneous Correction
Corrective Action Required
12/07/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/07/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID - - CORRIDOR 111 RC LID/SCREW PATTERN LID - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE -
SECOND FLOOR
Corrective Action Required
12/07/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 203,204,205,206,207,223,224,225,226,227,228,229, 230,231, - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 -
THIRD FLOOR
Corrective Action Required
12/07/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, - - CORRIDOR 301 RC LID, WALLS, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323, 324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -304,305,306,307,323,324,325,326,327,328,329,330, 331, -
FOURTH FLOOR
Corrective Action Required
12/07/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,SCREW PATTERN LID - - CORRIDOR 403 RC LID, SCREW PATTERN LID - - CORRIDOR 411 RC LID, SCREW PATTERN LID - - CORRIODR 401 RC LID, SCREW PATTERN LID - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 -
STAIR TOWER 1
Corrective Action Required
12/07/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/07/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/07/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/07/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED:
STAIR TOWER 3
Corrective Action Required
12/07/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/07/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER -
Rated Assembly Inspection Partial 12/9/2020 12/9/2020 12/09/2020
Miscellaneous Correction
Corrective Action Required
12/08/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/08/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID - - CORRIDOR 111 RC LID/SCREW PATTERN LID - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE -
SECOND FLOOR
Corrective Action Required
12/08/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 203,204,205,206,207,223,224,225,226,227,228,229, 230,231, - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 -
THIRD FLOOR
Corrective Action Required
12/08/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, - - CORRIDOR 301 RC LID, WALLS, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323, 324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -304,305,306,307,323,324,325,326,327,328,329,330, 331, - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
12/08/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,SCREW PATTERN LID - - CORRIDOR 403 RC LID, SCREW PATTERN LID - - CORRIDOR 411 RC LID, SCREW PATTERN LID - - CORRIODR 401 RC LID, SCREW PATTERN LID - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 -
STAIR TOWER 1
Corrective Action Required
12/08/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/08/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/08/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/08/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR -
STAIR TOWER 3
Corrective Action Required
12/08/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/08/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE -
Rated Assembly Inspection Partial 12/10/2020 12/10/2020
Miscellaneous Correction
Corrective Action Required
12/09/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/09/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID - - CORRIDOR 111 RC LID/SCREW PATTERN LID - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE -
SECOND FLOOR
Corrective Action Required
12/09/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 203,204,205,206,207,223,224,225,226,227,228,229, 230,231, - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 -
THIRD FLOOR
Corrective Action Required
12/09/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, - - CORRIDOR 301 RC LID, WALLS, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323, 324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -304,305,306,307,323,324,325,326,327,328,329,330, 331, - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
12/09/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,SCREW PATTERN LID - - CORRIDOR 403 RC LID, SCREW PATTERN LID - - CORRIDOR 411 RC LID, SCREW PATTERN LID - - CORRIODR 401 RC LID, SCREW PATTERN LID - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 -
STAIR TOWER 1
Corrective Action Required
12/09/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/09/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/09/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/09/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR -
STAIR TOWER 3
Corrective Action Required
12/09/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/09/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE -
Above Ceiling Inspection Partial 12/10/2020 12/10/2020 12/10/2020
SECOND FLOOR
Corrective Action Required
12/04/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID
THIRD FLOOR
Corrective Action Required
12/04/2020
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID-
FOURTH FLOOR
Corrective Action Required
12/04/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER -
FIRST FLOOR
Corrective Action Required
12/10/2020
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER -
Above Ceiling Inspection Partial 12/11/2020 12/11/2020 12/11/2020
SECOND FLOOR
Corrective Action Required
12/10/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID
THIRD FLOOR
Corrective Action Required
12/10/2020
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID-
FOURTH FLOOR
Corrective Action Required
12/10/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER -
FIRST FLOOR
Corrective Action Required
12/10/2020
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 REPAIR DRYWALL ABOVE CEILING GRID -
Rated Assembly Inspection Partial 12/11/2020 12/11/2020 12/11/2020
Miscellaneous Correction
Corrective Action Required
12/10/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/10/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID - - CORRIDOR 111 RC LID/SCREW PATTERN LID - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE -
SECOND FLOOR
Corrective Action Required
12/10/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 203,204,205,206,207,223,224,225,226,227,228,229, 230,231, - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 -
THIRD FLOOR
Corrective Action Required
12/10/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, - - CORRIDOR 301 RC LID, WALLS, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323, 324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -304,305,306,307,323,324,325,326,327,328,329,330, 331, - - 2ND LAYER 305,306,323,324,327,328,329,330,331 - - FOLLOWING UNITS REQUIRE CORRECTIONS - 304 PROVIDE 2ND LAYER BEDROOM WALL 307 PROVIDE 2ND LAYER KITCHEN/LIVING ROOM 325 PROVIDE 2ND LAYER NORTH WALL 326 PROVIDE 2ND LAYER NORTH WALL - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
12/10/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,SCREW PATTERN LID - - CORRIDOR 403 RC LID, SCREW PATTERN LID - - CORRIDOR 411 RC LID, SCREW PATTERN LID - - CORRIODR 401 RC LID, SCREW PATTERN LID - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 -
STAIR TOWER 1
Corrective Action Required
12/10/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/10/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/10/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/10/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR -
STAIR TOWER 3
Corrective Action Required
12/10/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/10/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE -
Above Ceiling Inspection Partial 12/14/2020 12/14/2020 12/14/2020
SECOND FLOOR
Corrective Action Required
12/11/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID
THIRD FLOOR
Corrective Action Required
12/11/2020
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID-
FOURTH FLOOR
Corrective Action Required
12/11/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER -
FIRST FLOOR
Corrective Action Required
12/11/2020
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID -
Rated Assembly Inspection Partial 12/14/2020 12/14/2020 12/14/2020
Miscellaneous Correction
Corrective Action Required
12/11/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/11/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID - - CORRIODR 105 RC LID/SCREW PATTERN LID - - CORRIDOR 111 RC LID/SCREW PATTERN LID - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE -
SECOND FLOOR
Corrective Action Required
12/11/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 202,203,204,204A,205,206,206A,207,209,210,212,213,215,216,218,219,220,222,223,224,225,226,227,228, 229,230,231, ::FOLLOWING REQUIRE CORRECTIONS :: - 201 RC CEILING AT VENT NEAR SGD - - 208 RC CEILING COMPLETE, MISSING WALL AT LAUNDRY - - 211 CEILING COMPLETE, MISSING RC BED WALL - - 214 CEILING COMPLETE, MISSING RC BED CLOSET - - 217 CEILING COMPLETE, MISSING RC KITCHEN WALL - - 221 CEILING COMPLETE, MISSING RC BED & BATH WALLS - - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 -
THIRD FLOOR
Corrective Action Required
12/11/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, - - CORRIDOR 301 RC LID, WALLS, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323, 324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -304,305,306,307,323,324,325,326,327,328,329,330, 331, - - 2ND LAYER 305,306,323,324,327,328,329,330,331 - - FOLLOWING UNITS REQUIRE CORRECTIONS - 304 PROVIDE 2ND LAYER BEDROOM WALL 307 PROVIDE 2ND LAYER KITCHEN/LIVING ROOM 325 PROVIDE 2ND LAYER NORTH WALL 326 PROVIDE 2ND LAYER NORTH WALL - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
12/11/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,SCREW PATTERN LID - - CORRIDOR 403 RC LID, SCREW PATTERN LID - - CORRIDOR 411 RC LID, SCREW PATTERN LID - - CORRIODR 401 RC LID, SCREW PATTERN LID - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 -
STAIR TOWER 1
Corrective Action Required
12/11/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/11/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/11/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/11/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR -
STAIR TOWER 3
Corrective Action Required
12/11/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/11/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE -
Rated Assembly Inspection Partial 12/15/2020 12/15/2020 12/15/2020
Miscellaneous Correction
Corrective Action Required
12/14/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/14/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER -
SECOND FLOOR
Corrective Action Required
12/14/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 202,203,204,204A,205,206,206A,207,209,210,212,213,215,216,218,219,220,222,223,224,225,226,227,228, 229,230,231, ::FOLLOWING REQUIRE CORRECTIONS :: - 201 RC CEILING AT VENT NEAR SGD - - 208 RC CEILING COMPLETE, MISSING WALL AT LAUNDRY - - 211 CEILING COMPLETE, MISSING RC BED WALL - - 214 CEILING COMPLETE, MISSING RC BED CLOSET - - 217 CEILING COMPLETE, MISSING RC KITCHEN WALL - - 221 CEILING COMPLETE, MISSING RC BED & BATH WALLS - - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A TRASH CHUTE 1ST LAYER-
THIRD FLOOR
Corrective Action Required
12/14/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, - - CORRIDOR 301 RC LID, WALLS, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323, 324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -304,305,306,307,323,324,325,326,327,328,329,330, 331, - - 2ND LAYER 305,306,323,324,327,328,329,330,331 - - FOLLOWING UNITS REQUIRE CORRECTIONS - 304 PROVIDE 2ND LAYER BEDROOM WALL 307 PROVIDE 2ND LAYER KITCHEN/LIVING ROOM 325 PROVIDE 2ND LAYER NORTH WALL 326 PROVIDE 2ND LAYER NORTH WALL - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A TRASH CHUTE 1ST LAYER -
FOURTH FLOOR
Corrective Action Required
12/14/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,SCREW PATTERN LID - - CORRIDOR 403 RC LID, SCREW PATTERN LID - - CORRIDOR 411 RC LID, SCREW PATTERN LID - - CORRIODR 401 RC LID, SCREW PATTERN LID - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER -
STAIR TOWER 1
Corrective Action Required
12/14/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/14/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/14/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/14/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR -
STAIR TOWER 3
Corrective Action Required
12/14/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/14/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER -
Rated Assembly Inspection Partial 12/16/2020 12/16/2020 12/16/2020
Miscellaneous Correction
Corrective Action Required
12/15/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/15/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER -
SECOND FLOOR
Corrective Action Required
12/15/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID 209 TO STAIRWAY A - - CORRIDOR 205 RC LID/WALLS - - CORRIDOR 203 RC LID/WALLS- - CORRIDOR 211 RC LID/WALLS - - CORRIDOR 201 RC LID/WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,209,210,211,212,213,214,215,216,217,218,219,220,221,222, 223,224,225,226,227,228,229,230,231, - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A TRASH CHUTE 1ST LAYER-
THIRD FLOOR
Corrective Action Required
12/15/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, - - CORRIDOR 301 RC LID, WALLS, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323, 324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -304,305,306,307,323,324,325,326,327,328,329,330, 331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A TRASH CHUTE 1ST LAYER -
FOURTH FLOOR
Corrective Action Required
12/15/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,SCREW PATTERN LID - - CORRIDOR 403 RC LID, SCREW PATTERN LID - - CORRIDOR 411 RC LID, SCREW PATTERN LID - - CORRIODR 401 RC LID, SCREW PATTERN LID - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER -
STAIR TOWER 1
Corrective Action Required
12/15/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/15/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/15/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/15/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR -
STAIR TOWER 3
Corrective Action Required
12/15/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/15/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER -
Rated Assembly Inspection Partial 12/17/2020 12/17/2020 12/17/2020
Miscellaneous Correction
Corrective Action Required
12/16/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/16/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER -
SECOND FLOOR
Corrective Action Required
12/16/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,209,210,211,212,213,214,215,216,217,218,219,220,221,222, 223,224,225,226,227,228,229,230,231, - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 2ND LAYER 204,205,206,223,224,225,226,227,228,229,230,231 - :FOLLOWING REQUIRE CORRECTIONS : 207 PROVIDE 2ND LAYER BEDROOM CLOSET AT CORRIDOR - - 206A TRASH CHUTE 1ST LAYER-
THIRD FLOOR
Corrective Action Required
12/16/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, - - CORRIDOR 301 RC LID, WALLS, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323, 324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -304,305,306,307,323,324,325,326,327,328,329,330, 331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A TRASH CHUTE 1ST LAYER -
FOURTH FLOOR
Corrective Action Required
12/16/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID - - RC CHANNEL 401,402,406B,408,409,410,411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER -
STAIR TOWER 1
Corrective Action Required
12/16/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/16/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/16/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/16/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR -
STAIR TOWER 3
Corrective Action Required
12/16/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/16/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER -
Rated Assembly Inspection Partial 12/18/2020 12/18/2020 12/18/2020
Miscellaneous Correction
Corrective Action Required
12/17/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/17/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER -
SECOND FLOOR
Corrective Action Required
12/17/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,209,210,211,212,213,214,215,216,217,218,219,220,221,222, 223,224,225,226,227,228,229,230,231, - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A TRASH CHUTE 1ST LAYER-
THIRD FLOOR
Corrective Action Required
12/17/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, - - CORRIDOR 301 RC LID, WALLS, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323, 324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -304,305,306,307,323,324,325,326,327,328,329,330, 331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A TRASH CHUTE 1ST LAYER -
FOURTH FLOOR
Corrective Action Required
12/17/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID - - RC CHANNEL 401,402,406B,408,409,410,411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER -
STAIR TOWER 1
Corrective Action Required
12/17/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/17/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/17/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/17/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR -
STAIR TOWER 3
Corrective Action Required
12/17/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/17/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER -
Pool Steel/Bonding - Commercial Partial 12/21/2020 12/21/2020 12/21/2020
Misc
Corrective Action Required
09/22/2020
--POOL BONDINGFLOOR AND WALLS 4 LOCATIONS. - POOL STAIRS & SHELL - - PERGOLA CENTER COURTYARD STEEL -
Above Ceiling Inspection Partial 12/21/2020 12/21/2020 12/21/2020
SECOND FLOOR
Corrective Action Required
12/14/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID
THIRD FLOOR
Corrective Action Required
12/14/2020
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID-
FOURTH FLOOR
Corrective Action Required
12/14/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER -
FIRST FLOOR
Corrective Action Required
12/14/2020
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID -
Rated Assembly Inspection Partial 12/21/2020 12/21/2020 12/21/2020
Miscellaneous Correction
Corrective Action Required
12/18/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/18/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER -
SECOND FLOOR
Corrective Action Required
12/18/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,209,210,211,212,213,214,215,216,217,218,219,220,221,222, 223,224,225,226,227,228,229,230,231, - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER -
THIRD FLOOR
Corrective Action Required
12/18/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, - - CORRIDOR 301 RC LID, WALLS, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323, 324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -304,305,306,307,323,324,325,326,327,328,329,330, 331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER -
FOURTH FLOOR
Corrective Action Required
12/18/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID - - RC CHANNEL 401,402,406B,408,409,410,411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST LAYER BEHIND PANEL -
STAIR TOWER 1
Corrective Action Required
12/18/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/18/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/18/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/18/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR -
STAIR TOWER 3
Corrective Action Required
12/18/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/18/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER -
Electrical Service Inspection Failed 12/22/2020 12/22/2020 12/22/2020
Misc
Partial Correction
12/08/2020
- OK TO RELEASE METERS FOR NORTH END OF BUILDING ONLY -
Misc
Corrective Action Required
12/22/2020
- LAND CONDUCTORS IN METER CANS 1ST & 3RD FLOORS -
Rated Assembly Inspection Partial 12/22/2020 12/22/2020 12/22/2020
Miscellaneous Correction
Corrective Action Required
12/21/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/21/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 104,105,106,107,110,111,112,113,114,115,116,117, 118, - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER -
SECOND FLOOR
Corrective Action Required
12/21/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,209,210,211,212,213,214,215,216,217,218,219,220,221,222, 223,224,225,226,227,228,229,230,231, - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER -
THIRD FLOOR
Corrective Action Required
12/21/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, - - CORRIDOR 301 RC LID, WALLS, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323, 324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -304,305,306,307,323,324,325,326,327,328,329,330, 331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER -
FOURTH FLOOR
Corrective Action Required
12/21/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID - - RC CHANNEL 401,402,406B,408,409,410,411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST LAYER BEHIND PANEL -
STAIR TOWER 1
Corrective Action Required
12/21/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/21/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/21/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/21/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR -
STAIR TOWER 3
Corrective Action Required
12/21/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/21/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER -
Electrical Service Inspection Passed 12/23/2020 12/23/2020 12/23/2020
Misc
Resolved
12/23/2020
- OK TO RELEASE METERS FOR NORTH END OF BUILDING - - OK TO RELEASE METERS FOR SOUTH END OF BUILDING -
Misc
Resolved
12/23/2020
All Rough Inspection - Commercial Partial 12/23/2020 12/23/2020 12/23/2020
FOURTH FLOOR
Corrective Action Required
12/04/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,405,406,407,408,409,410,411,412, 413,414,415,415A,416,416A,417,418,419,420,421,422,423,424,425,426,427,428,429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS - : CORRECTIONS BELOW : :- CORRIDOR 411 ADD BLOCKING & NAIL J HANGER -:
THIRD FLOOR
Corrective Action Required
12/04/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,305,306,307,309,310,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333,334,335,336,- 310A rough approved
SECOND FLOOR
Corrective Action Required
12/04/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231,232,233,234,235,236 -
FIRST FLOOR
Corrective Action Required
12/04/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ABOVE CEILING ROUGH ONLY - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID -
STAIR TOWER 3
Informational
12/04/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
12/04/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
Rated Assembly Inspection Partial 12/23/2020 12/23/2020 12/23/2020
Miscellaneous Correction
Corrective Action Required
12/22/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/22/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 104,105,106,107,110,111,112,113,114,115,116,117, 118, - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER -
SECOND FLOOR
Corrective Action Required
12/22/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,209,210,211,212,213,214,215,216,217,218,219,220,221,222, 223,224,225,226,227,228,229,230,231, - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
12/22/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, - - CORRIDOR 301 RC LID, WALLS, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323, 324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -304,305,306,307,323,324,325,326,327,328,329,330, 331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
12/22/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID - - RC CHANNEL 401,402,406B,408,409,410,411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
12/22/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/22/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/22/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/22/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR -
STAIR TOWER 3
Corrective Action Required
12/22/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/22/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS -
All Rough Inspection - Commercial Partial 12/29/2020 12/29/2020 12/29/2020
FOURTH FLOOR
Corrective Action Required
12/23/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,405,406,407,408,409,410,411,412, 413,414,415,415A,416,416A,417,418,419,420,421,422,423,424,425,426,427,428,429, 430, 431, - : 410A SEAL LINE SET PENETRATIONS :: -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS - : CORRECTIONS BELOW : :- CORRIDOR 411 ADD BLOCKING & NAIL J HANGER -:
THIRD FLOOR
Corrective Action Required
12/23/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,305,306,307,309,310,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333,334,335,336,- 310A rough approved
SECOND FLOOR
Corrective Action Required
12/23/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231,232,233,234,235,236 - - 210A SEAL PENETRATIONS AT LINE SET & LOW VOLT -
FIRST FLOOR
Corrective Action Required
12/23/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,109,110,110A,111,112,113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ABOVE CEILING ROUGH ONLY - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID -
STAIR TOWER 3
Informational
12/23/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
12/23/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
Rated Assembly Inspection Partial 12/29/2020 12/29/2020 12/29/2020
Miscellaneous Correction
Corrective Action Required
12/23/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/23/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 104,105,106,107,110,111,112,113,114,115,116,117, 118, - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER -
SECOND FLOOR
Corrective Action Required
12/23/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,209,210,211,212,213,214,215,216,217,218,219,220,221,222, 223,224,225,226,227,228,229,230,231, - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
12/23/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, - - CORRIDOR 301 RC LID, WALLS, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323, 324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -304,305,306,307,323,324,325,326,327,328,329,330, 331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
12/23/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID - - RC CHANNEL 401,402,406B,408,409,410,411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
12/23/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/23/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/23/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/23/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR -
STAIR TOWER 3
Corrective Action Required
12/23/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/23/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,-
Rated Assembly Inspection Partial 12/30/2020 12/30/2020 12/30/2020
Miscellaneous Correction
Corrective Action Required
12/29/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/29/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 104,105,106,107,110,111,112,113,114,115,116,117, 118, - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER -
SECOND FLOOR
Corrective Action Required
12/29/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,209,210,211,212,213,214,215,216,217,218,219,220,221,222, 223,224,225,226,227,228,229,230,231, - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
12/29/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, - - CORRIDOR 301 RC LID, WALLS, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323, 324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -304,305,306,307,323,324,325,326,327,328,329,330, 331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
12/29/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID - - RC CHANNEL 401,402,406B,408,409,410,411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
12/29/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/29/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/29/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/29/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
12/29/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/29/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,-
All Rough Inspection - Commercial Partial 1/4/2021 1/4/2021 01/04/2021
FOURTH FLOOR
Corrective Action Required
12/29/2020
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,405,406,407,408,409,410,410A,411,412,413,414,415,415A,416,416A,417,418,419,420,421,422,423,424,425,426,427,428,429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
12/29/2020
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,305,306,307,309,310,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333,334,335,336,- 310A rough approved
SECOND FLOOR
Corrective Action Required
12/29/2020
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,205,206,207,208,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223, 224,225,226,227,228,229,230,231,232,233,234,235, 236 - - 210A SEAL PENETRATIONS AT LINE SET & LOW VOLT -
FIRST FLOOR
Corrective Action Required
12/29/2020
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,109,110,110A,111,112,113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ABOVE CEILING ROUGH ONLY - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID -
STAIR TOWER 3
Informational
12/29/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
12/29/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
Rated Assembly Inspection Partial 1/5/2021 1/5/2021 01/05/2021
Miscellaneous Correction
Corrective Action Required
12/30/2020
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
12/30/2020
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118, - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER -
SECOND FLOOR
Corrective Action Required
12/30/2020
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,209,210,211,212,213,214,215,216,217,218,219,220,221,222, 223,224,225,226,227,228,229,230,231, - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
12/30/2020
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID,- - CORRIDOR 309 RC LID, SCREWS LID/WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID/WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, - - CORRIDOR 301 RC LID, WALLS, SCREWS LID, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323, 324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,302,303,304,305,306,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325, 326,327,328,329,330,331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
12/30/2020
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID - - RC CHANNEL 401,402,406B,408,409,410,411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
12/30/2020
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
12/30/2020
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
12/30/2020
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE -
STAIR TOWER 2
Corrective Action Required
12/30/2020
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
12/30/2020
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
12/30/2020
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , -
All Rough Inspection - Commercial Partial 1/6/2021 1/6/2021 01/06/2021
FOURTH FLOOR
Corrective Action Required
01/04/2021
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,405,406,407,408,408A,409,410,410A,411,412,413,414,415,415A,416,416A,417,418,419, 420,421,422,423,424,425,426,427,428,429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
01/04/2021
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,305,306,307,308A,309,310,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333,334,335,336,- 310A rough approved
SECOND FLOOR
Corrective Action Required
01/04/2021
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,205,206,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222, 223,224,225,226,227,228,229,230,231,232,233,234, 235,236 - - 210A SEAL PENETRATIONS AT LINE SET & LOW VOLT -
FIRST FLOOR
Corrective Action Required
01/04/2021
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ALL ROUGH - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID, ALL ROUGH -
STAIR TOWER 3
Informational
01/04/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
01/04/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
Rated Assembly Inspection Partial 1/6/2021 1/6/2021 01/06/2021
Miscellaneous Correction
Corrective Action Required
01/05/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
01/05/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118, - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER -
SECOND FLOOR
Corrective Action Required
01/05/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,209,210,211,212,213,214,215,216,217,218,219,220,221,222, 223,224,225,226,227,228,229,230,231, - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
01/05/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323, 324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,305,306,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325, 326,327,328,329,330,331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
01/05/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID - - RC CHANNEL 401,402,406B,408,409,410,411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
01/05/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
01/05/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
01/05/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
01/05/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
01/05/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
01/05/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , -
All Rough Inspection - Commercial Partial 1/7/2021 1/7/2021 01/07/2021
FOURTH FLOOR
Corrective Action Required
01/06/2021
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,405,406,406A,407,408,408A,409,410,410A,411,412,413,414,415,415A,416,416A,417,418, 419,420,421,422,423,424,425,426,427,428,429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
01/06/2021
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,305,306,306A,307,308A,309,310,312,313,314,315,316,317,318,319,320,321,322,323,324, 325,326,327,328,329,330,331,332,333,334,335,336,- 310A rough approved
SECOND FLOOR
Corrective Action Required
01/06/2021
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,205,206,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222, 223,224,225,226,227,228,229,230,231,232,233,234, 235,236 - - 210A SEAL PENETRATIONS AT LINE SET & LOW VOLT -
FIRST FLOOR
Corrective Action Required
01/06/2021
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ALL ROUGH - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID, ALL ROUGH - :: BELOW ITEM REQUIRE CORRECTIONS :: - SOUTH RETAIL WALL ROUGH, PROVIDE BOCA PLATES DWV AT BOTTOM PLATE, NAIL BOTTOM PLATE AT PLATE BREAK, REPAIR DRYWALL REAR WALL IN CORRIDOR -
STAIR TOWER 3
Informational
01/06/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
01/06/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
STAIR TOWER 1
Corrective Action Required
01/07/2021
- STAIR TOWER "A" - - PROVIDE MISSING JOIST HANGERS AT LANDING -
Rated Assembly Inspection Partial 1/7/2021 1/7/2021 01/07/2021
Miscellaneous Correction
Corrective Action Required
01/06/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
01/06/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118, - - 2ND LAYER 104,105,106,107,110,111,112,113,114,115,116,117, - : PROVIDE 2ND LAYER CORRIDOR WALL UNIT 118 : - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER -
SECOND FLOOR
Corrective Action Required
01/06/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,209,210,211,212,213,214,215,216,217,218,219,220,221,222, 223,224,225,226,227,228,229,230,231, - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
01/06/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323, 324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,305,306,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325, 326,327,328,329,330,331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
01/06/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID - - RC CHANNEL 401,402,406B,408,409,410,411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
01/06/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
01/06/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
01/06/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
01/06/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
01/06/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
01/06/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , -
Above Ceiling Inspection Partial 1/8/2021 1/8/2021 01/08/2021
SECOND FLOOR
Corrective Action Required
12/21/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID
THIRD FLOOR
Corrective Action Required
12/21/2020
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID-
FOURTH FLOOR
Corrective Action Required
12/21/2020
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER - - 415A,416A, AMENITY DECK RESTROOMS HARD LIDS -
FIRST FLOOR
Corrective Action Required
12/21/2020
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID -
Rated Assembly Inspection Partial 1/8/2021 1/8/2021 01/08/2021
Miscellaneous Correction
Corrective Action Required
01/07/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
01/07/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118, - - 2ND LAYER 104,105,106,107,110,111,112,113,114,115,116,117, - : PROVIDE 2ND LAYER CORRIDOR WALL UNIT 118 : - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER -
SECOND FLOOR
Corrective Action Required
01/07/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,208A, 209,210,211,212,213,214,215,216,217,218,219,220, 221,222,223,224,225,226,227,228,229,230,231, - 1ST LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
01/07/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,308A,309,310,311,312,313,314,315,316,317,318,319,320,321,322, 323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,305,306,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325, 326,327,328,329,330,331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
01/07/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID - - RC CHANNEL 401,402,406B,408,408A,409,410,411,412,413,414, 415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
01/07/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
01/07/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
01/07/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
01/07/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
01/07/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
01/07/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , -
All Rough Inspection - Commercial Partial 1/11/2021 1/11/2021 01/11/2021
FOURTH FLOOR
Corrective Action Required
01/07/2021
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,405,406,406A,407,408,408A,409,410,410A,411,412,413,414,415,415A,416,416A,417,418, 419,420,421,422,423,424,425,426,427,428,429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
01/07/2021
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,305,306,306A,307,308A,309,310,312,313,314,315,316,317,318,319,320,321,322,323,324, 325,326,327,328,329,330,331,332,333,334,335,336,- 310A rough approved
SECOND FLOOR
Corrective Action Required
01/07/2021
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,205,206,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222, 223,224,225,226,227,228,229,230,231,232,233,234, 235,236 - - 210A SEAL PENETRATIONS AT LINE SET & LOW VOLT -
FIRST FLOOR
Corrective Action Required
01/07/2021
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ALL ROUGH - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID, ALL ROUGH - :: BELOW ITEM REQUIRE CORRECTIONS :: - SOUTH RETAIL WALL ROUGH, PROVIDE BOCA PLATES DWV AT BOTTOM PLATE, NAIL BOTTOM PLATE AT PLATE BREAK, REPAIR DRYWALL REAR WALL IN CORRIDOR -
STAIR TOWER 3
Informational
01/07/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
01/07/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
STAIR TOWER 1
Corrective Action Required
01/07/2021
- STAIR TOWER "A" - - ALL ROUGH STAIR "A" FLOORS 1 THRU 4 APPROVED -
All Rough Inspection - Commercial Partial 1/12/2021 1/12/2021 01/12/2021
FOURTH FLOOR
Corrective Action Required
01/11/2021
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,405,406,406A,407,408,408A,409,410,410A,411,412,413,414,415,415A,416,416A,417,418, 419,420,421,422,423,424,425,426,427,428,429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
01/11/2021
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,305,306,306A,307,308A,309,310,312,313,314,315,316,317,318,319,320,321,322,323,324, 325,326,327,328,329,330,331,332,333,334,335,336,- 310A rough approved
SECOND FLOOR
Corrective Action Required
01/11/2021
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,205,206,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222, 223,224,225,226,227,228,229,230,231,232,233,234, 235,236 - - 210A SEAL PENETRATIONS AT LINE SET & LOW VOLT -
FIRST FLOOR
Corrective Action Required
01/11/2021
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ALL ROUGH - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID, ALL ROUGH - - SOUTH RETAIL WALL ROUGH-
STAIR TOWER 3
Informational
01/11/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
01/11/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
STAIR TOWER 1
Corrective Action Required
01/11/2021
- STAIR TOWER "A" - - ALL ROUGH STAIR "A" FLOORS 1 THRU 4 APPROVED -
Above Ceiling Inspection Failed 1/13/2021 1/13/2021 01/13/2021
SECOND FLOOR
Corrective Action Required
01/08/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID
THIRD FLOOR
Corrective Action Required
01/08/2021
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID-
FOURTH FLOOR
Corrective Action Required
01/08/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER - - 415A,416A, AMENITY DECK RESTROOMS HARD LIDS - : BELOW REQUIRES CORRECTIONS : - AREA D CORRIDOR 412 FIRE CAULK LOW VOLT & HOLE NEAR FIRE DOOR -
FIRST FLOOR
Corrective Action Required
01/08/2021
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID -
Rated Assembly Inspection Partial 1/13/2021 1/13/2021 01/13/2021
Miscellaneous Correction
Corrective Action Required
01/08/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
01/08/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118, - - 2ND LAYER 104,105,106,107,110,111,112,113,114,115,116,117, 118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER -
SECOND FLOOR
Corrective Action Required
01/08/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,208A, 209,210,211,212,213,214,215,216,217,218,219,220, 221,222,223,224,225,226,227,228,229,230,231, - 1ST LAYER 201,203,204,205,206,207,208,209,210,211,212,214, 215,216,217,218,219,220,221,222,223,224,225,226, 227,228,229,230,231 - :: BELOW UNITS REQUIRE CORRECTIONS :: 202 PROVIDE SHEETROCK CEILING ABOVE SERVICE PANEL- - 213 SCREW CEILING BEDROOM - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
01/08/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,308A,309,310,311,312,313,314,315,316,317,318,319,320,321,322, 323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,305,306,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325, 326,327,328,329,330,331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
01/08/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID - - RC CHANNEL 401,402,406B,408,408A,409,410,411,412,413,414, 415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
01/08/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
01/08/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
01/08/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
01/08/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
01/08/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
01/08/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE -
Above Ceiling Inspection Partial 1/14/2021 1/14/2021 01/14/2021
SECOND FLOOR
Corrective Action Required
01/13/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID
THIRD FLOOR
Corrective Action Required
01/13/2021
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID-
FOURTH FLOOR
Corrective Action Required
01/13/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER - - 415A,416A, AMENITY DECK RESTROOMS HARD LIDS - - AREA D CORRIDOR 412 ABOVE GRID FOR HARD LID -
FIRST FLOOR
Corrective Action Required
01/13/2021
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID -
Pool Steel/Bonding - Commercial Partial 1/14/2021 1/14/2021 01/14/2021
Misc
Corrective Action Required
12/21/2020
--POOL BONDINGFLOOR AND WALLS 4 LOCATIONS. - POOL STAIRS & SHELL - - PERGOLA CENTER COURTYARD STEEL - - ANCHOR SOCKETS FOR HANDRAIL -
Rated Assembly Inspection Partial 1/15/2021 1/15/2021 01/15/2021
Miscellaneous Correction
Corrective Action Required
01/13/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
01/13/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118, - - 2ND LAYER 104,105,106,107,110,111,112,113,114,115,116,117, 118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER -
SECOND FLOOR
Corrective Action Required
01/13/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,208A, 209,210,211,212,213,214,215,216,217,218,219,220, 221,222,223,224,225,226,227,228,229,230,231, - 1ST LAYER 201,203,204,205,206,207,208,209,210,211,212,214, 215,216,217,218,219,220,221,222,223,224,225,226, 227,228,229,230,231 - :: BELOW UNITS REQUIRE CORRECTIONS :: 202 PROVIDE SHEETROCK CEILING ABOVE SERVICE PANEL- - 213 SCREW CEILING BEDROOM - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
01/13/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,308A,309,310,311,312,313,314,315,316,317,318,319,320,321,322, 323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,305,306,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325, 326,327,328,329,330,331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
01/13/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,406B,408,408A,409,410,411,412,413,414, 415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,409,410,411,412,413,414,415,416,418, 419,421,422, - ::BELOW REQUIRE CORRECTIONS:: - 408 DRYWALL CEILING - - 417 DRYWALL ABOVE VANITY - - 420 DRYWALL CLOSET - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
01/13/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
01/13/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL -
ELEVATOR 3
Corrective Action Required
01/13/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
01/13/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
01/13/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
01/13/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE -
All Rough Inspection - Commercial Partial 1/19/2021 1/19/2021 01/19/2021
FOURTH FLOOR
Corrective Action Required
01/12/2021
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,404A,405,406,406A,407,408,408A, 409,410,410A,411,412,413,414,415,415A,416,416A, 417,418,419,420,421,422,423,424,425,426,427,428, 429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
01/12/2021
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,305,306,306A,307,308A,309,310,312,313,314,315,316,317,318,319,320,321,322,323,324, 325,326,327,328,329,330,331,332,333,334,335,336,- :: BELOW REQUIRE CORRECTIONS:: - 304A SEAL TOP PLATE ELECTRICAL PENETRATION CORRIDOR WALL- 310A rough approved
SECOND FLOOR
Corrective Action Required
01/12/2021
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,205,206,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222, 223,224,225,226,227,228,229,230,231,232,233,234, 235,236 - :: BELOW REQUIRE CORRECTIONS:: - 204A SEAL BAD BORE TOP PLATE BEHIND DOOR - - 210A SEAL PENETRATIONS AT LINE SET & LOW VOLT -
FIRST FLOOR
Corrective Action Required
01/12/2021
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ALL ROUGH - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID, ALL ROUGH - - SOUTH RETAIL WALL ROUGH-
STAIR TOWER 3
Informational
01/12/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
01/12/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
STAIR TOWER 1
Corrective Action Required
01/12/2021
- STAIR TOWER "A" - - ALL ROUGH STAIR "A" FLOORS 1 THRU 4 APPROVED -
Rated Assembly Inspection Partial 1/19/2021 1/19/2021 01/19/2021
Miscellaneous Correction
Corrective Action Required
01/15/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
01/15/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118, - - 2ND LAYER 104,105,106,107,110,111,112,113,114,115,116,117, 118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER -
SECOND FLOOR
Corrective Action Required
01/15/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,208A, 209,210,211,212,213,214,215,216,217,218,219,220, 221,222,223,224,225,226,227,228,229,230,231, - 1ST LAYER 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231 - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
01/15/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,305,306,306A,307,308,308A,309,310,311,312,313,314,315,316,317,318,319,320,321,322, 323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,305,306,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325, 326,327,328,329,330,331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
01/15/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,406B,408,408A,409,410,411,412,413,414, 415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
01/15/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
01/15/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR PROVIDE SCREWS LEFT SIDE -
ELEVATOR 3
Corrective Action Required
01/15/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
01/15/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
01/15/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
01/15/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE -
All Rough Inspection - Commercial Partial 1/20/2021 1/20/2021 01/20/2021
FOURTH FLOOR
Corrective Action Required
01/19/2021
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,404A,405,406,406A,407,408,408A, 409,410,410A,411,412,413,414,415,415A,416,416A, 417,418,419,420,421,422,423,424,425,426,427,428, 429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
01/19/2021
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,304A,305,306,306A,307,308A,309, 310,310A,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333, 334,335,336,-
SECOND FLOOR
Corrective Action Required
01/19/2021
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,204A,205,206,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231,232,233, 234,235,236 -
FIRST FLOOR
Corrective Action Required
01/19/2021
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ALL ROUGH - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID, ALL ROUGH - - SOUTH RETAIL WALL ROUGH-
STAIR TOWER 3
Informational
01/19/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
01/19/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
STAIR TOWER 1
Corrective Action Required
01/19/2021
- STAIR TOWER "A" - - ALL ROUGH STAIR "A" FLOORS 1 THRU 4 APPROVED -
Rated Assembly Inspection Partial 1/20/2021 1/20/2021 01/20/2021
Miscellaneous Correction
Corrective Action Required
01/19/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
01/19/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118, - - 2ND LAYER 104,105,106,107,110,111,112,113,114,115,116,117, 118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER -
SECOND FLOOR
Corrective Action Required
01/19/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,208A, 209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231, - 1ST LAYER 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231 - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
01/19/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,305,306,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325, 326,327,328,329,330,331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
01/19/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - 2ND LAYER 415,416 CORRIDOR WALL - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
01/19/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
01/19/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR PROVIDE SCREWS LEFT SIDE -
ELEVATOR 3
Corrective Action Required
01/19/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
01/19/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
01/19/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
01/19/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 -
Rated Assembly Inspection Partial 1/21/2021 1/21/2021 01/21/2021
Miscellaneous Correction
Corrective Action Required
01/20/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
01/20/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118, - - 2ND LAYER 104,105,106,107,110,111,112,113,114,115,116,117, 118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER CORRIDOR SIDE -
SECOND FLOOR
Corrective Action Required
01/20/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID - - CORRIDOR 203 RC LID - - CORRIDOR 211 RC LID - - CORRIDOR 201 RC LID - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,208A, 209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231, - 1ST LAYER 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231 - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
01/20/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,305,306,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325, 326,327,328,329,330,331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
01/20/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - 2ND LAYER 415,416 CORRIDOR WALL - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
01/20/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
01/20/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR PROVIDE SCREWS LEFT SIDE -
ELEVATOR 3
Corrective Action Required
01/20/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
01/20/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
01/20/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
01/20/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 -
Rated Assembly Inspection Partial 1/22/2021 1/22/2021 01/22/2021
Miscellaneous Correction
Corrective Action Required
01/21/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
01/21/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118, - - 2ND LAYER 104,105,106,107,110,111,112,113,114,115,116,117, 118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER CORRIDOR SIDE -
SECOND FLOOR
Corrective Action Required
01/21/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID / WALLS - - CORRIDOR 203 RC LID / WALLS - - CORRIDOR 211 RC LID / WALLS- - CORRIDOR 201 RC LID / WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,208A, 209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231, - 1ST LAYER 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231 - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
01/21/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,305,306,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325, 326,327,328,329,330,331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
01/21/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - 2ND LAYER 415,416 CORRIDOR WALL - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
01/21/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
01/21/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE -
ELEVATOR 3
Corrective Action Required
01/21/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
01/21/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
01/21/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
01/21/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 -
Rated Assembly Inspection Partial 1/25/2021 1/25/2021 01/25/2021
Miscellaneous Correction
Corrective Action Required
01/22/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
01/22/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118, - - 2ND LAYER 104,105,106,107,110,111,112,113,114,115,116,117, 118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER CORRIDOR SIDE -
SECOND FLOOR
Corrective Action Required
01/22/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID / WALLS - - CORRIDOR 203 RC LID / WALLS - - CORRIDOR 211 RC LID / WALLS- - CORRIDOR 201 RC LID / WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,207,208,208A, 209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231, - 1ST LAYER 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231 - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
01/22/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,305,306,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325, 326,327,328,329,330,331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
01/22/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - 2ND LAYER 415,416 CORRIDOR WALL - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
01/22/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
01/22/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE -
ELEVATOR 3
Corrective Action Required
01/22/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
01/22/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
01/22/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
01/22/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 -
All Rough Inspection - Commercial Partial 1/26/2021 1/26/2021 01/26/2021
FOURTH FLOOR
Corrective Action Required
01/20/2021
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,404A,405,406,406A,407,408,408A, 409,410,410A,411,412,413,414,415,415A,416,416A, 417,418,419,420,421,422,423,424,425,426,427,428, 429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
01/20/2021
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,304A,305,306,306A,307,308A,309, 310,310A,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333, 334,335,336,-
SECOND FLOOR
Corrective Action Required
01/20/2021
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,204A,205,206,206B,207,208,208A, 209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231, 232,233, 234,235,236 -
FIRST FLOOR
Corrective Action Required
01/20/2021
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ALL ROUGH - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID, ALL ROUGH - - SOUTH RETAIL WALL ROUGH-
STAIR TOWER 3
Informational
01/20/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
01/20/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
STAIR TOWER 1
Corrective Action Required
01/20/2021
- STAIR TOWER "A" - - ALL ROUGH STAIR "A" FLOORS 1 THRU 4 APPROVED -
Above Ceiling Inspection Partial 1/26/2021 1/26/2021 01/26/2021
SECOND FLOOR
Corrective Action Required
01/14/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID
THIRD FLOOR
Corrective Action Required
01/14/2021
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID- - AREA "D" - CORRIDOR 312 ABOVE CEILING GRID -
FOURTH FLOOR
Corrective Action Required
01/14/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER - - 415A,416A, AMENITY DECK RESTROOMS HARD LIDS - - AREA D CORRIDOR 412 ABOVE GRID FOR HARD LID -
FIRST FLOOR
Corrective Action Required
01/14/2021
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID - - 138A, 139A FITNESS RESTROOM ABOVE HARD LID -
Rated Assembly Inspection Partial 1/26/2021 1/26/2021 01/26/2021
Miscellaneous Correction
Corrective Action Required
01/25/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
01/25/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118, - - 2ND LAYER 104,105,106,107,110,111,112,113,114,115,116,117, 118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER CORRIDOR SIDE -
SECOND FLOOR
Corrective Action Required
01/25/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID / WALLS - - CORRIDOR 203 RC LID / WALLS - - CORRIDOR 211 RC LID / WALLS- - CORRIDOR 201 RC LID / WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231 - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
01/25/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,305,306,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325, 326,327,328,329,330,331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
01/25/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - 2ND LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
01/25/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
01/25/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE -
ELEVATOR 3
Corrective Action Required
01/25/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
01/25/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
01/25/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
01/25/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 -
Rated Assembly Inspection Partial 1/28/2021 1/28/2021 01/28/2021
Miscellaneous Correction
Corrective Action Required
01/26/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
01/26/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118, - - 2ND LAYER 104,105,106,107,110,111,112,113,114,115,116,117, 118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER CORRIDOR SIDE -
SECOND FLOOR
Corrective Action Required
01/26/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID / WALLS - - CORRIDOR 203 RC LID / WALLS - - CORRIDOR 211 RC LID / WALLS- - CORRIDOR 201 RC LID / WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231 - - 2ND LAYER 204,205,206,207,223,224,225,226,227,228,229,230, 231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
01/26/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,305,306,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325, 326,327,328,329,330,331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
01/26/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - 2ND LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
01/26/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
01/26/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
01/26/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
01/26/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
01/26/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
01/26/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 -
Rated Assembly Inspection Partial 1/29/2021 1/29/2021 01/29/2021
Miscellaneous Correction
Corrective Action Required
01/28/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
01/28/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118, - - 2ND LAYER 104,105,106,107,110,111,112,113,114,115,116,117, 118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER -
SECOND FLOOR
Corrective Action Required
01/28/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID& WALLS / SCREW PATTERN LID, & WALLS, 209 TO STAIRWAY A - - CORRIDOR 205 RC LID / WALLS - - CORRIDOR 203 RC LID / WALLS - - CORRIDOR 211 RC LID / WALLS- - CORRIDOR 201 RC LID / WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
01/28/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,305,306,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325, 326,327,328,329,330,331, - - 2ND LAYER 304,305,306,307,323,324,325,326,327,328,329,330, 331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
01/28/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - 2ND LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
01/28/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
01/28/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
01/28/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
01/28/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
01/28/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
01/28/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 -
Rated Assembly Inspection Partial 2/1/2021 2/1/2021 02/01/2021
Miscellaneous Correction
Corrective Action Required
01/29/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
01/29/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118, - - 2ND LAYER 104,105,106,107,110,111,112,113,114,115,116,117, 118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER -
SECOND FLOOR
Corrective Action Required
01/29/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
01/29/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,305,306,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323,324, 325,326,327,328,329,330,331, - - 2ND LAYER 301,302,303,304,305,306,307,308,309,310,311,312, 313,314,315,316,317,318,319,320,321,322,323,324, 325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
01/29/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - 2ND LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
01/29/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
01/29/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
01/29/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
01/29/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
01/29/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
01/29/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 -
Above Ceiling Inspection Partial 2/2/2021 2/2/2021 02/02/2021
SECOND FLOOR
Corrective Action Required
01/26/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID AREA D CORRIDOR 212 ABOVE GRID
THIRD FLOOR
Corrective Action Required
01/26/2021
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID- - AREA "D" - CORRIDOR 312 ABOVE CEILING GRID -
FOURTH FLOOR
Corrective Action Required
01/26/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER - - 415A,416A, AMENITY DECK RESTROOMS HARD LIDS - - AREA D CORRIDOR 412 ABOVE GRID FOR HARD LID -
FIRST FLOOR
Corrective Action Required
01/26/2021
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID - - 138A, 139A FITNESS RESTROOM ABOVE HARD LID -
Rated Assembly Inspection Partial 2/2/2021 2/2/2021 02/02/2021
Miscellaneous Correction
Corrective Action Required
02/01/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
02/01/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER -
SECOND FLOOR
Corrective Action Required
02/01/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
02/01/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,305,306,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323,324, 325,326,327,328,329,330,331, - - 2ND LAYER 301,302,303,304,305,306,307,308,309,310,311,312, 313,314,315,316,317,318,319,320,321,322,323,324, 325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
02/01/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - 2ND LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
02/01/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR -
ELEVATOR 2
Corrective Action Required
02/01/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
02/01/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
02/01/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
02/01/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
02/01/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 -
Rated Assembly Inspection Partial 2/3/2021 2/3/2021 02/03/2021
Miscellaneous Correction
Corrective Action Required
02/02/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
02/02/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER -
SECOND FLOOR
Corrective Action Required
02/02/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
02/02/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,305,306,307,308,309,310,311,312,313,314,315,316,317,318,319,320,321,322,323,324, 325,326,327,328,329,330,331, - - 2ND LAYER 301,302,303,304,305,306,307,308,309,310,311,312, 313,314,315,316,317,318,319,320,321,322,323,324, 325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
02/02/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - 2ND LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
02/02/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Corrective Action Required
02/02/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
02/02/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
02/02/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
02/02/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
02/02/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 -
Rated Assembly Inspection Partial 2/4/2021 2/4/2021 02/04/2021
Miscellaneous Correction
Corrective Action Required
02/03/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
02/03/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119, 120, 121, 123;121A, 124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, 1ST LAYER CORRIDOR AT THESE UNITS - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER -
SECOND FLOOR
Corrective Action Required
02/03/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,204A,205,206,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,205,206,207,208,209,210,211,212, 213,214,215,216,217,218,219,220,221,222,223,224, 225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
02/03/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,304A,305,306,307,308,308A,309, 310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331, - - 2ND LAYER 301,302,303,304,305,306,307,308,309,310,311,312, 313,314,315,316,317,318,319,320,321,322,323,324, 325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
02/03/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,404A,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 2ND LAYER 401,402,403,408,409,410,411,412,413,414,415,416, 417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
02/03/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Corrective Action Required
02/03/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
02/03/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
02/03/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
02/03/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
02/03/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 -
Above Ceiling Inspection Partial 2/10/2021 2/10/2021 02/10/2021
SECOND FLOOR
Corrective Action Required
02/02/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID AREA D CORRIDOR 212 ABOVE GRID CORRIDOR 227 ABOVE GRID
THIRD FLOOR
Corrective Action Required
02/02/2021
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID- - AREA "D" - CORRIDOR 312 ABOVE CEILING GRID - - CORRIDOR 327 ABOVE CEILING GRID -
FOURTH FLOOR
Corrective Action Required
02/02/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER - - 415A,416A, AMENITY DECK RESTROOMS HARD LIDS - - AREA D CORRIDOR 412 ABOVE GRID FOR HARD LID - - CORRIODR 427 ABOVE GRID -
FIRST FLOOR
Corrective Action Required
02/02/2021
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID - - 138A, 139A FITNESS RESTROOM ABOVE HARD LID -
ELEVATOR 2
Corrective Action Required
02/10/2021
- ELEVATOR "B" LOBBY FLOORS 1,2,3 -
Rated Assembly Inspection Partial 2/10/2021 2/10/2021 02/10/2021
Miscellaneous Correction
Corrective Action Required
02/04/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
02/04/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119,120,121,123;121A,124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,109,110,111,112, 113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER -
SECOND FLOOR
Corrective Action Required
02/04/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,204A,205,206,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
02/04/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,304A,305,306,307,308,308A,309, 310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331, - :: 306B REPAIR DRYWALL :: - 2ND LAYER 301,302,303,304,304A,305,306,307,308,308A,309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
02/04/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,404A,406B,408,408A,409,410,410A,411, 412,413,414,415,416,417,418,419,420,421,422, - - 2ND LAYER 401,402,403,404A,408,409,410,411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
02/04/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Corrective Action Required
02/04/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
02/04/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
02/04/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
02/04/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
02/04/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 -
Rated Assembly Inspection Partial 2/11/2021 2/11/2021 02/11/2021
Miscellaneous Correction
Corrective Action Required
02/10/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
02/10/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119,120,121,123;121A,124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER -
SECOND FLOOR
Corrective Action Required
02/10/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,204A,205,206,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
02/10/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,304A,305,306,307,308,308A,309, 310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331, - :: 306B REPAIR DRYWALL :: - 2ND LAYER 301,302,303,304,304A,305,306,307,308,308A,309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
02/10/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,404A,406B,408,408A,409,410,410A,411, 412,413,414,415,416,417,418,419,420,421,422, - - 2ND LAYER 401,402,403,404A,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
02/10/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Corrective Action Required
02/10/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
02/10/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
02/10/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
02/10/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
02/10/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 -
Above Ceiling Inspection Partial 2/18/2021 2/18/2021 02/18/2021
SECOND FLOOR
Corrective Action Required
02/10/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID AREA D CORRIDOR 212 ABOVE GRID CORRIDOR 227 ABOVE GRID
THIRD FLOOR
Corrective Action Required
02/10/2021
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID- - AREA "D" - CORRIDOR 312 ABOVE CEILING GRID - - CORRIDOR 327 ABOVE CEILING GRID -
FOURTH FLOOR
Corrective Action Required
02/10/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER - - 415A,416A, AMENITY DECK RESTROOMS HARD LIDS - - AREA D CORRIDOR 412 ABOVE GRID FOR HARD LID - - CORRIODR 427 ABOVE GRID -
FIRST FLOOR
Corrective Action Required
02/10/2021
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID - - 138A, 139A FITNESS RESTROOM ABOVE HARD LID -
ELEVATOR 2
Corrective Action Required
02/10/2021
- ELEVATOR "B" LOBBY FLOORS 1,2,3,4, -
All Rough Inspection - Commercial Partial 2/18/2021 2/18/2021 02/18/2021
FOURTH FLOOR
Corrective Action Required
01/26/2021
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,404A,405,406,406A,407,408,408A, 409,410,410A,411,412,413,414,415,415A,416,416A, 417,418,419,420,421,422,423,424,425,426,427,428, 429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
01/26/2021
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,304A,305,306,306A,307,308A,309, 310,310A,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333, 334,335,336,-
SECOND FLOOR
Corrective Action Required
01/26/2021
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,204A,205,206,206B,207,208,208A, 209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231, 232,233, 234,235,236 -
FIRST FLOOR
Corrective Action Required
01/26/2021
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ALL ROUGH - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID, ALL ROUGH - - SOUTH RETAIL WALL ROUGH- - 131,143, STORAGE ROOMS -
STAIR TOWER 3
Informational
01/26/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
01/26/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
STAIR TOWER 1
Corrective Action Required
01/26/2021
- STAIR TOWER "A" - - ALL ROUGH STAIR "A" FLOORS 1 THRU 4 APPROVED -
All Rough Inspection - Commercial Partial 2/19/2021 2/19/2021 02/19/2021
FOURTH FLOOR
Corrective Action Required
02/18/2021
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,404A,405,406,406A,407,408,408A, 409,410,410A,411,412,413,414,415,415A,416,416A, 417,418,419,420,421,422,423,424,425,426,427,428, 429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
02/18/2021
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,304A,305,306,306A,307,308A,309, 310,310A,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333, 334,335,336,-
SECOND FLOOR
Corrective Action Required
02/18/2021
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,204A,205,206,206B,207,208,208A, 209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231, 232,233, 234,235,236 -
FIRST FLOOR
Corrective Action Required
02/18/2021
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ALL ROUGH - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID, ALL ROUGH - - SOUTH RETAIL WALL ROUGH- - 131,143, STORAGE ROOMS -
STAIR TOWER 3
Informational
02/18/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
02/18/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
STAIR TOWER 1
Corrective Action Required
02/18/2021
- STAIR TOWER "A" - - ALL ROUGH STAIR "A" FLOORS 1 THRU 4 APPROVED -
LOWER LEVEL
Corrective Action Required
02/19/2021
- 020,021,022,024, GARAGE BIKE STORAGE & STORAGE ROOMS -
Rated Assembly Inspection Partial 2/19/2021 2/19/2021 02/19/2021
Miscellaneous Correction
Corrective Action Required
02/11/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
02/11/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119,120,121,123;121A,124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER -
SECOND FLOOR
Corrective Action Required
02/11/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,204A,205,206,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
02/11/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,304A,305,306,307,308,308A,309, 310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331, - :: 306B REPAIR DRYWALL :: - 2ND LAYER 301,302,303,304,304A,305,306,307,308,308A,309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
02/11/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,404A,406B,408,408A,409,410,410A,411, 412,413,414,415,416,417,418,419,420,421,422, - - 2ND LAYER 401,402,403,404A,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
02/11/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Corrective Action Required
02/11/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
02/11/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
02/11/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
02/11/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
02/11/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 - ELEVATOR "A" LOBBY 1ST LAYER FLOOR 1 & 4 -
Rated Assembly Inspection Partial 2/22/2021 2/22/2021 02/22/2021
Miscellaneous Correction
Corrective Action Required
02/19/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
02/19/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119,120,121,123;121A,124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER -
SECOND FLOOR
Corrective Action Required
02/19/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,204A,205,206,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
02/19/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,304A,305,306,307,308,308A,309, 310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331, - :: 306B REPAIR DRYWALL :: - 2ND LAYER 301,302,303,304,304A,305,306,307,308,308A,309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
02/19/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,404A,406B,408,408A,409,410,410A,411, 412,413,414,415,416,417,418,419,420,421,422, - - 2ND LAYER 401,402,403,404A,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
02/19/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Corrective Action Required
02/19/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
02/19/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
02/19/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
02/19/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
02/19/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 - ELEVATOR "A" LOBBY 1ST LAYER FLOOR 1 & 4 - - ELEVATOR "A" FACE 1ST LAYER FLOORS 2,3,4, -
Rated Assembly Inspection Partial 2/23/2021 2/23/2021 02/23/2021
Miscellaneous Correction
Corrective Action Required
02/22/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
02/22/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119,120,121,123;121A,124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER -
SECOND FLOOR
Corrective Action Required
02/22/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,204A,205,206,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
02/22/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,304A,305,306,306B,307,308,308A,309, 310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331, - - 2ND LAYER 301,302,303,304,304A,305,306,307,308,308A,309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
02/22/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,404A,406B,408,408A,409,410,410A,411, 412,413,414,415,416,417,418,419,420,421,422, - - 2ND LAYER 401,402,403,404A,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
02/22/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Corrective Action Required
02/22/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
02/22/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
02/22/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
02/22/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
02/22/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 - ELEVATOR "A" LOBBY 1ST LAYER FLOOR 1 & 4 - - ELEVATOR "A" FACE 1ST/2ND LAYERS FLOORS 2,3,4, -
Above Ceiling Inspection Partial 2/24/2021 2/24/2021 02/24/2021
SECOND FLOOR
Corrective Action Required
02/18/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID AREA D CORRIDOR 212 ABOVE GRID CORRIDOR 227 ABOVE GRID
THIRD FLOOR
Corrective Action Required
02/18/2021
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID- - AREA "D" - CORRIDOR 312 ABOVE CEILING GRID - - CORRIDOR 327 ABOVE CEILING GRID - - AREA "B" - - CORRIDOR 303 ABOVE CEILING GRID - CORRIODR 305 ABOVE CEILING GRID- - CORRIODR 311 ABOVE CEILING GRID -
FOURTH FLOOR
Corrective Action Required
02/18/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER - - 415A,416A, AMENITY DECK RESTROOMS HARD LIDS - - AREA D CORRIDOR 412 ABOVE GRID FOR HARD LID - - CORRIODR 427 ABOVE GRID - - AREA "B" - CORRIDOR 403 ABOVE GRID - - CORRIODR 405 ABOVE GRID - - CORRIODR 409 ABOVE GRID - - CORRIDOR 411 ABOVE GRID -
FIRST FLOOR
Corrective Action Required
02/18/2021
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID - - 138A, 139A FITNESS RESTROOM ABOVE HARD LID -
ELEVATOR 2
Corrective Action Required
02/18/2021
- ELEVATOR "B" LOBBY FLOORS 1,2,3,4, -
ELEVATOR 3
Corrective Action Required
02/24/2021
ELEVATOR "C" - ABOVE CEILING LOBBY 1ST FLOOR -
Above Ceiling Inspection Partial 2/26/2021 2/26/2021 02/26/2021
SECOND FLOOR
Corrective Action Required
02/24/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID AREA D CORRIDOR 212 ABOVE GRID CORRIDOR 227 ABOVE GRID
THIRD FLOOR
Corrective Action Required
02/24/2021
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID- - AREA "D" - CORRIDOR 312 ABOVE CEILING GRID - - CORRIDOR 327 ABOVE CEILING GRID - - AREA "B" - - CORRIDOR 303 ABOVE CEILING GRID - CORRIDOR 305 ABOVE CEILING GRID- - CORRIDOR 311 ABOVE CEILING GRID - - CORRIDOR 309 ABOVE CEILING GRID - - CORRIDOR 309 EXPANSION JOINT WALLS & CEILING -
FOURTH FLOOR
Corrective Action Required
02/24/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER - - 415A,416A, AMENITY DECK RESTROOMS HARD LIDS - - AREA D CORRIDOR 412 ABOVE GRID FOR HARD LID - - CORRIODR 427 ABOVE GRID - - AREA "B" - CORRIDOR 403 ABOVE GRID - - CORRIODR 405 ABOVE GRID - - CORRIODR 409 ABOVE GRID - - CORRIDOR 411 ABOVE GRID - - CORRIDOR 411 EXPANSION JOINT WALLS & ABOVE CEILING -
FIRST FLOOR
Corrective Action Required
02/24/2021
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID - - 138A, 139A FITNESS RESTROOM ABOVE HARD LID -
ELEVATOR 2
Corrective Action Required
02/24/2021
- ELEVATOR "B" LOBBY FLOORS 1,2,3,4, -
ELEVATOR 3
Corrective Action Required
02/24/2021
ELEVATOR "C" - ABOVE CEILING LOBBY 1ST FLOOR -
Rated Assembly Inspection Partial 3/1/2021 3/1/2021 03/01/2021
Miscellaneous Correction
Corrective Action Required
02/23/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
02/23/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119,120,121,123;121A,124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER -
SECOND FLOOR
Corrective Action Required
02/23/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
02/23/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,304A,305,306,306B,307,308,308A,309, 310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331, - - 2ND LAYER 301,302,303,304,304A,305,306,306B,307,308,308A,309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
02/23/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - 2ND LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
02/23/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Corrective Action Required
02/23/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
02/23/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
02/23/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
02/23/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
02/23/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 - ELEVATOR "A" LOBBY 1ST LAYER FLOOR 1 & 4 - - ELEVATOR "A" FACE 1ST/2ND LAYERS FLOORS 2,3,4, -
Above Ceiling Inspection Partial 3/2/2021 3/2/2021 03/02/2021
SECOND FLOOR
Corrective Action Required
02/26/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID AREA D CORRIDOR 212 ABOVE GRID CORRIDOR 227 ABOVE GRID
THIRD FLOOR
Corrective Action Required
02/26/2021
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID- - AREA "D" - CORRIDOR 312 ABOVE CEILING GRID - - CORRIDOR 327 ABOVE CEILING GRID - - AREA "B" - - CORRIDOR 303 ABOVE CEILING GRID - CORRIDOR 305 ABOVE CEILING GRID- - CORRIDOR 311 ABOVE CEILING GRID - - CORRIDOR 309 ABOVE CEILING GRID - - CORRIDOR 309 EXPANSION JOINT WALLS & CEILING -
FOURTH FLOOR
Corrective Action Required
02/26/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER - - 415A,416A, AMENITY DECK RESTROOMS HARD LIDS - - AREA D CORRIDOR 412 ABOVE GRID FOR HARD LID - - CORRIODR 427 ABOVE GRID - - AREA "B" - CORRIDOR 403 ABOVE GRID - - CORRIODR 405 ABOVE GRID - - CORRIODR 409 ABOVE GRID - - CORRIDOR 411 ABOVE GRID - - CORRIDOR 411 EXPANSION JOINT WALLS & ABOVE CEILING -
FIRST FLOOR
Corrective Action Required
02/26/2021
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID - - 138A, 139A FITNESS RESTROOM ABOVE HARD LID - - 135B FITNESS MECH ROOM ABOVE CEILING -
ELEVATOR 2
Corrective Action Required
02/26/2021
- ELEVATOR "B" LOBBY FLOORS 1,2,3,4, -
ELEVATOR 3
Corrective Action Required
02/26/2021
ELEVATOR "C" - ABOVE CEILING LOBBY 1ST FLOOR -
All Rough Inspection - Commercial Partial 3/4/2021 3/4/2021 03/04/2021
FOURTH FLOOR
Corrective Action Required
02/19/2021
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,404A,405,406,406A,407,408,408A, 409,410,410A,411,412,413,414,415,415A,416,416A, 417,418,419,420,421,422,423,424,425,426,427,428, 429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
02/19/2021
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,304A,305,306,306A,307,308A,309, 310,310A,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333, 334,335,336,-
SECOND FLOOR
Corrective Action Required
02/19/2021
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,204A,205,206,206B,207,208,208A, 209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231, 232,233, 234,235,236 -
FIRST FLOOR
Corrective Action Required
02/19/2021
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ALL ROUGH - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID, ALL ROUGH - - SOUTH RETAIL WALL ROUGH- - 131,143, STORAGE ROOMS - - 142 MECH ROOM - - 141 TRASH ROOM MISSING NORTH WALL -
STAIR TOWER 3
Informational
02/19/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
02/19/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
STAIR TOWER 1
Corrective Action Required
02/19/2021
- STAIR TOWER "A" - - ALL ROUGH STAIR "A" FLOORS 1 THRU 4 APPROVED -
LOWER LEVEL
Corrective Action Required
02/19/2021
- 020,021,022,024, GARAGE BIKE STORAGE & STORAGE ROOMS -
Above Ceiling Inspection Partial 3/4/2021 3/4/2021 03/04/2021
SECOND FLOOR
Corrective Action Required
03/02/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID AREA D CORRIDOR 212 ABOVE GRID CORRIDOR 227 ABOVE GRID CORRIDOR 201 ABOVE GRID CORRIDOR 203 ABOVE GRID CORRIDOR 205 ABOVE GRID CORRIDOR 209 ABOVE GRID CORRIDOR 211 ABOVE GRID
THIRD FLOOR
Corrective Action Required
03/02/2021
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID- - AREA "D" - CORRIDOR 312 ABOVE CEILING GRID - - CORRIDOR 327 ABOVE CEILING GRID - - AREA "B" - - CORRIDOR 303 ABOVE CEILING GRID - CORRIDOR 305 ABOVE CEILING GRID- - CORRIDOR 311 ABOVE CEILING GRID - - CORRIDOR 309 ABOVE CEILING GRID - - CORRIDOR 309 EXPANSION JOINT WALLS & CEILING - - CORRIDOR 301 ABOVE CEILING GRID -
FOURTH FLOOR
Corrective Action Required
03/02/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER - - 415A,416A, AMENITY DECK RESTROOMS HARD LIDS - - AREA D CORRIDOR 412 ABOVE GRID FOR HARD LID - - CORRIODR 427 ABOVE GRID - - AREA "B" - CORRIDOR 403 ABOVE GRID - - CORRIODR 405 ABOVE GRID - - CORRIODR 409 ABOVE GRID - - CORRIDOR 411 ABOVE GRID - - CORRIDOR 411 EXPANSION JOINT WALLS & ABOVE CEILING - - CORRIDOR 401 ABOVE GRID -
FIRST FLOOR
Corrective Action Required
03/02/2021
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID - - 138A, 139A FITNESS RESTROOM ABOVE HARD LID - - 135B FITNESS MECH ROOM ABOVE CEILING - - CORRIDOR 105 ABOVE CEILING GRID - - CORRIDOR 109 ABOVE CEILING GRID - - CORRIDOR 111 ABOVE CEILING GRID TO STEEL COLUMN AT ELEVATOR -
ELEVATOR 2
Corrective Action Required
03/02/2021
- ELEVATOR "B" LOBBY FLOORS 1,2,3,4, -
ELEVATOR 3
Corrective Action Required
03/02/2021
ELEVATOR "C" - ABOVE CEILING LOBBY 1ST FLOOR -
All Rough Inspection - Commercial Partial 3/5/2021 03/05/2021
FOURTH FLOOR
Corrective Action Required
03/04/2021
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,404A,405,406,406A,407,408,408A, 409,410,410A,411,412,413,414,415,415A,416,416A, 417,418,419,420,421,422,423,424,425,426,427,428, 429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
03/04/2021
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,304A,305,306,306A,307,308A,309, 310,310A,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333, 334,335,336,-
SECOND FLOOR
Corrective Action Required
03/04/2021
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,204A,205,206,206B,207,208,208A, 209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231, 232,233, 234,235,236 -
FIRST FLOOR
Corrective Action Required
03/04/2021
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ALL ROUGH - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID, ALL ROUGH - - SOUTH RETAIL WALL ROUGH- - 131,143, STORAGE ROOMS - - 142 MECH ROOM - - 141 TRASH ROOM MISSING NORTH WALL -
STAIR TOWER 3
Informational
03/04/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
03/04/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
STAIR TOWER 1
Corrective Action Required
03/04/2021
- STAIR TOWER "A" - - ALL ROUGH STAIR "A" FLOORS 1 THRU 4 APPROVED -
LOWER LEVEL
Corrective Action Required
03/04/2021
- 020,021,022,024, GARAGE BIKE STORAGE & STORAGE ROOMS - - ELEVATOR A & C VESTIBULES AT GARAGE LEVEL -
Above Ceiling Inspection Partial 3/5/2021 3/5/2021 03/05/2021
SECOND FLOOR
Corrective Action Required
03/04/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID AREA D CORRIDOR 212 ABOVE GRID CORRIDOR 227 ABOVE GRID CORRIDOR 201 ABOVE GRID CORRIDOR 203 ABOVE GRID CORRIDOR 205 ABOVE GRID CORRIDOR 209 ABOVE GRID CORRIDOR 211 ABOVE GRID
THIRD FLOOR
Corrective Action Required
03/04/2021
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID- - AREA "D" - CORRIDOR 312 ABOVE CEILING GRID - - CORRIDOR 327 ABOVE CEILING GRID - - AREA "B" - - CORRIDOR 303 ABOVE CEILING GRID - CORRIDOR 305 ABOVE CEILING GRID- - CORRIDOR 311 ABOVE CEILING GRID - - CORRIDOR 309 ABOVE CEILING GRID - - CORRIDOR 309 EXPANSION JOINT WALLS & CEILING - - CORRIDOR 301 ABOVE CEILING GRID -
FOURTH FLOOR
Corrective Action Required
03/04/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER - - 415A,416A, AMENITY DECK RESTROOMS HARD LIDS - - AREA D CORRIDOR 412 ABOVE GRID FOR HARD LID - - CORRIODR 427 ABOVE GRID - - AREA "B" - CORRIDOR 403 ABOVE GRID - - CORRIODR 405 ABOVE GRID - - CORRIODR 409 ABOVE GRID - - CORRIDOR 411 ABOVE GRID - - CORRIDOR 411 EXPANSION JOINT WALLS & ABOVE CEILING - - CORRIDOR 401 ABOVE GRID -
FIRST FLOOR
Corrective Action Required
03/04/2021
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID - - 138A, 139A FITNESS RESTROOM ABOVE HARD LID - - 135B FITNESS MECH ROOM ABOVE CEILING - - CORRIDOR 105 ABOVE CEILING GRID - - CORRIDOR 109 ABOVE CEILING GRID - - CORRIDOR 111 ABOVE CEILING GRID TO STEEL COLUMN AT ELEVATOR -
ELEVATOR 2
Corrective Action Required
03/04/2021
- ELEVATOR "B" LOBBY FLOORS 1,2,3,4, -
ELEVATOR 3
Corrective Action Required
03/04/2021
ELEVATOR "C" - ABOVE CEILING LOBBY 1ST FLOOR -
LOWER LEVEL
Corrective Action Required
03/05/2021
- ELEVATOR A & c VESTIBULES AT GARAGE LEVEL -
Sprinkler - Hydrostatic Test Partial 3/9/2021 03/09/2021
Rated Assembly Inspection Partial 3/9/2021 3/9/2021 03/09/2021
Miscellaneous Correction
Corrective Action Required
03/01/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
03/01/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119,120,121,123;121A,124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER -
SECOND FLOOR
Corrective Action Required
03/01/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
03/01/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,304A,305,306,306B,307,308,308A,309, 310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331, - - 2ND LAYER 301,302,303,304,304A,305,306,306B,307,308,308A,309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
03/01/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - 2ND LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
03/01/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Corrective Action Required
03/01/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
03/01/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
03/01/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
03/01/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
03/01/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 - ELEVATOR "A" LOBBY 1ST LAYER FLOOR 1 & 4 - - ELEVATOR "A" FACE 1ST/2ND LAYERS FLOORS 2,3,4, - - FIRE LID SCREW PATTERN OUTSIDE ELEVATOR "A" LOBBY -
Rated Assembly Inspection Partial 3/12/2021 03/12/2021
Miscellaneous Correction
Corrective Action Required
03/09/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
03/09/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119,120,121,123;121A,124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER - - 106, 133 RC CHANNEL CEILING -
SECOND FLOOR
Corrective Action Required
03/09/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
03/09/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,304A,305,306,306B,307,308,308A,309, 310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331, - - 2ND LAYER 301,302,303,304,304A,305,306,306B,307,308,308A,309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
03/09/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - 2ND LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
03/09/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Corrective Action Required
03/09/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
03/09/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
03/09/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
03/09/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
03/09/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 - ELEVATOR "A" LOBBY 1ST LAYER FLOOR 1 & 4 - - ELEVATOR "A" FACE 1ST/2ND LAYERS FLOORS 2,3,4, - - FIRE LID SCREW PATTERN OUTSIDE ELEVATOR "A" LOBBY -
All Rough Inspection - Commercial Partial 3/12/2021 3/12/2021 03/12/2021
FOURTH FLOOR
Corrective Action Required
03/05/2021
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,404A,405,406,406A,407,408,408A, 409,410,410A,411,412,413,414,415,415A,416,416A, 417,418,419,420,421,422,423,424,425,426,427,428, 429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
03/05/2021
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,304A,305,306,306A,307,308A,309, 310,310A,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333, 334,335,336,-
SECOND FLOOR
Corrective Action Required
03/05/2021
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,204A,205,206,206B,207,208,208A, 209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231, 232,233, 234,235,236 -
FIRST FLOOR
Corrective Action Required
03/05/2021
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ALL ROUGH - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID, ALL ROUGH - - SOUTH RETAIL WALL ROUGH- - 131,143, STORAGE ROOMS - - 142 MECH ROOM - - 141 TRASH ROOM MISSING NORTH WALL - - 106,132 - : 133 PROVIDE ANCHOR BOLTS BOTTOM PLATE OVERHEAD DOOR @ SOUTH TRASH ROOM :
STAIR TOWER 3
Informational
03/05/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
03/05/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
STAIR TOWER 1
Corrective Action Required
03/05/2021
- STAIR TOWER "A" - - ALL ROUGH STAIR "A" FLOORS 1 THRU 4 APPROVED -
LOWER LEVEL
Corrective Action Required
03/05/2021
- 020,021,022,024, GARAGE BIKE STORAGE & STORAGE ROOMS - - ELEVATOR A & C VESTIBULES AT GARAGE LEVEL -
All Rough Inspection - Commercial Partial 3/15/2021 3/15/2021 03/15/2021
FOURTH FLOOR
Corrective Action Required
03/12/2021
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,404A,405,406,406A,407,408,408A, 409,410,410A,411,412,413,414,415,415A,416,416A, 417,418,419,420,421,422,423,424,425,426,427,428, 429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
03/12/2021
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,304A,305,306,306A,307,308A,309, 310,310A,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333, 334,335,336,-
SECOND FLOOR
Corrective Action Required
03/12/2021
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,204A,205,206,206B,207,208,208A, 209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231, 232,233, 234,235,236 -
FIRST FLOOR
Corrective Action Required
03/12/2021
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ALL ROUGH - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID, ALL ROUGH - - SOUTH RETAIL WALL ROUGH- - 131,143, STORAGE ROOMS - - 142 MECH ROOM - - 141 TRASH ROOM MISSING NORTH WALL - - 106,132, 133 -
STAIR TOWER 3
Informational
03/12/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
03/12/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
STAIR TOWER 1
Corrective Action Required
03/12/2021
- STAIR TOWER "A" - - ALL ROUGH STAIR "A" FLOORS 1 THRU 4 APPROVED -
LOWER LEVEL
Corrective Action Required
03/12/2021
- 020,021,022,024, GARAGE BIKE STORAGE & STORAGE ROOMS - - ELEVATOR A & C VESTIBULES AT GARAGE LEVEL -
Above Ceiling Inspection Partial 3/16/2021 3/16/2021 03/16/2021
SECOND FLOOR
Corrective Action Required
03/05/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID AREA D CORRIDOR 212 ABOVE GRID CORRIDOR 227 ABOVE GRID CORRIDOR 201 ABOVE GRID CORRIDOR 203 ABOVE GRID CORRIDOR 205 ABOVE GRID CORRIDOR 209 ABOVE GRID CORRIDOR 211 ABOVE GRID
THIRD FLOOR
Corrective Action Required
03/05/2021
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID- - AREA "D" - CORRIDOR 312 ABOVE CEILING GRID - - CORRIDOR 327 ABOVE CEILING GRID - - AREA "B" - - CORRIDOR 303 ABOVE CEILING GRID - CORRIDOR 305 ABOVE CEILING GRID- - CORRIDOR 311 ABOVE CEILING GRID - - CORRIDOR 309 ABOVE CEILING GRID - - CORRIDOR 309 EXPANSION JOINT WALLS & CEILING - - CORRIDOR 301 ABOVE CEILING GRID -
FOURTH FLOOR
Corrective Action Required
03/05/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER - - 415A,416A, AMENITY DECK RESTROOMS HARD LIDS - - AREA D CORRIDOR 412 ABOVE GRID FOR HARD LID - - CORRIODR 427 ABOVE GRID - - AREA "B" - CORRIDOR 403 ABOVE GRID - - CORRIODR 405 ABOVE GRID - - CORRIODR 409 ABOVE GRID - - CORRIDOR 411 ABOVE GRID - - CORRIDOR 411 EXPANSION JOINT WALLS & ABOVE CEILING - - CORRIDOR 401 ABOVE GRID -
FIRST FLOOR
Corrective Action Required
03/05/2021
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID - - 138A, 139A FITNESS RESTROOM ABOVE HARD LID - - 135B FITNESS MECH ROOM ABOVE CEILING - - CORRIDOR 105 ABOVE CEILING GRID - - CORRIDOR 109 ABOVE CEILING GRID - - CORRIDOR 111 ABOVE CEILING GRID TO STEEL COLUMN AT ELEVATOR -
ELEVATOR 2
Corrective Action Required
03/05/2021
- ELEVATOR "B" LOBBY FLOORS 1,2,3,4, -
ELEVATOR 3
Corrective Action Required
03/05/2021
ELEVATOR "C" - ABOVE CEILING LOBBY 1ST FLOOR -
LOWER LEVEL
Corrective Action Required
03/05/2021
- ELEVATOR A & c VESTIBULES AT GARAGE LEVEL -
All Rough Inspection - Commercial Partial 3/16/2021 3/16/2021 03/16/2021
FOURTH FLOOR
Corrective Action Required
03/15/2021
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,404A,405,406,406A,407,408,408A, 409,410,410A,411,412,413,414,415,415A,416,416A, 417,418,419,420,421,422,423,424,425,426,427,428, 429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS -
THIRD FLOOR
Corrective Action Required
03/15/2021
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,304A,305,306,306A,307,308A,309, 310,310A,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333, 334,335,336,-
SECOND FLOOR
Corrective Action Required
03/15/2021
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,204A,205,206,206B,207,208,208A, 209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231, 232,233, 234,235,236 -
FIRST FLOOR
Corrective Action Required
03/15/2021
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ALL ROUGH - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID, ALL ROUGH - - SOUTH RETAIL WALL ROUGH- - 131,143, STORAGE ROOMS - - 142 MECH ROOM - - 141 TRASH ROOM MISSING STUDS NORTH WALL - - 106,132, 133, 124 -
STAIR TOWER 3
Informational
03/15/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Corrective Action Required
03/15/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
STAIR TOWER 1
Corrective Action Required
03/15/2021
- STAIR TOWER "A" - - ALL ROUGH STAIR "A" FLOORS 1 THRU 4 APPROVED -
LOWER LEVEL
Corrective Action Required
03/15/2021
- 020,021,022,024, GARAGE BIKE STORAGE & STORAGE ROOMS - - ELEVATOR A & C VESTIBULES AT GARAGE LEVEL -
Rated Assembly Inspection Partial 3/16/2021 3/16/2021 03/16/2021
Miscellaneous Correction
Corrective Action Required
03/12/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
03/12/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119,120,121,123;121A,124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER - - 106, 133 RC CHANNEL CEILING - - 124,141,142A RC CHANNEL CEILING -
SECOND FLOOR
Corrective Action Required
03/12/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A -
THIRD FLOOR
Corrective Action Required
03/12/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,304A,305,306,306B,307,308,308A,309, 310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331, - - 2ND LAYER 301,302,303,304,304A,305,306,306B,307,308,308A,309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A -
FOURTH FLOOR
Corrective Action Required
03/12/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - 2ND LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A -
STAIR TOWER 1
Corrective Action Required
03/12/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Corrective Action Required
03/12/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
03/12/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
03/12/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
03/12/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
03/12/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 - ELEVATOR "A" LOBBY 1ST LAYER FLOOR 1 & 4 - - ELEVATOR "A" FACE 1ST/2ND LAYERS FLOORS 2,3,4, - - FIRE LID SCREW PATTERN OUTSIDE ELEVATOR "A" LOBBY -
Rated Assembly Inspection Partial 3/18/2021 3/18/2021 03/18/2021
Miscellaneous Correction
Corrective Action Required
03/16/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
03/16/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119,120,121,123;121A,124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER - - 106, 133, 132, RC CHANNEL CEILING - - 124,141,142A RC CHANNEL CEILING -
SECOND FLOOR
Corrective Action Required
03/16/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A - - 206B TRASH CHUTE FACE -
THIRD FLOOR
Corrective Action Required
03/16/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,304A,305,306,306B,307,308,308A,309, 310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331, - - 2ND LAYER 301,302,303,304,304A,305,306,306B,307,308,308A,309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A - - 306B TRASH CHUTE FACE -
FOURTH FLOOR
Corrective Action Required
03/16/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - 2ND LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A - - 406B TRASH CHUTE FACE -
STAIR TOWER 1
Corrective Action Required
03/16/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Corrective Action Required
03/16/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
03/16/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
03/16/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
03/16/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
03/16/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 - ELEVATOR "A" LOBBY 1ST LAYER FLOOR 1 & 4 - - ELEVATOR "A" FACE 1ST/2ND LAYERS FLOORS 2,3,4, - - FIRE LID SCREW PATTERN OUTSIDE ELEVATOR "A" LOBBY -
Above Ceiling Inspection Partial 3/22/2021 03/22/2021
SECOND FLOOR
Corrective Action Required
03/16/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID AREA D CORRIDOR 212 ABOVE GRID CORRIDOR 227 ABOVE GRID CORRIDOR 201 ABOVE GRID CORRIDOR 203 ABOVE GRID CORRIDOR 205 ABOVE GRID CORRIDOR 209 ABOVE GRID CORRIDOR 211 ABOVE GRID
THIRD FLOOR
Corrective Action Required
03/16/2021
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID- - AREA "D" - CORRIDOR 312 ABOVE CEILING GRID - - CORRIDOR 327 ABOVE CEILING GRID - - AREA "B" - - CORRIDOR 303 ABOVE CEILING GRID - CORRIDOR 305 ABOVE CEILING GRID- - CORRIDOR 311 ABOVE CEILING GRID - - CORRIDOR 309 ABOVE CEILING GRID - - CORRIDOR 309 EXPANSION JOINT WALLS & CEILING - - CORRIDOR 301 ABOVE CEILING GRID -
FOURTH FLOOR
Corrective Action Required
03/16/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER - - 415A,416A, AMENITY DECK RESTROOMS HARD LIDS - - AREA D CORRIDOR 412 ABOVE GRID FOR HARD LID - - CORRIODR 427 ABOVE GRID - - AREA "B" - CORRIDOR 403 ABOVE GRID - - CORRIODR 405 ABOVE GRID - - CORRIODR 409 ABOVE GRID - - CORRIDOR 411 ABOVE GRID - - CORRIDOR 411 EXPANSION JOINT WALLS & ABOVE CEILING - - CORRIDOR 401 ABOVE GRID -
FIRST FLOOR
Corrective Action Required
03/16/2021
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID - - 138A, 139A FITNESS RESTROOM ABOVE HARD LID - - 135B FITNESS MECH ROOM ABOVE CEILING - - CORRIDOR 105 ABOVE CEILING GRID - - CORRIDOR 109 ABOVE CEILING GRID - - CORRIDOR 111 ABOVE CEILING GRID TO STEEL COLUMN AT ELEVATOR - - LOBBY ELEVATOR "A" ABOVE CEILING -
ELEVATOR 2
Corrective Action Required
03/16/2021
- ELEVATOR "B" LOBBY FLOORS 1,2,3,4, -
ELEVATOR 3
Corrective Action Required
03/16/2021
ELEVATOR "C" - ABOVE CEILING LOBBY 1ST FLOOR -
LOWER LEVEL
Corrective Action Required
03/16/2021
- ELEVATOR A & c VESTIBULES AT GARAGE LEVEL -
Rated Assembly Inspection Partial 3/22/2021 3/22/2021 03/22/2021
Miscellaneous Correction
Corrective Action Required
03/18/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
03/18/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119,120,121,123;121A,124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER - - 106, 133, 132, RC CHANNEL CEILING - - 124,141,142A RC CHANNEL CEILING -
SECOND FLOOR
Corrective Action Required
03/18/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A - - 206B TRASH CHUTE FACE 1ST/2ND LAYER -
THIRD FLOOR
Corrective Action Required
03/18/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,304A,305,306,306B,307,308,308A,309, 310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331, - - 2ND LAYER 301,302,303,304,304A,305,306,306B,307,308,308A,309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A - - 306B TRASH CHUTE FACE 1ST/2ND LAYER -
FOURTH FLOOR
Corrective Action Required
03/18/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - 2ND LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A - - 406B TRASH CHUTE FACE 1ST/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
03/18/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Corrective Action Required
03/18/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
03/18/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
03/18/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
03/18/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
03/18/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 - ELEVATOR "A" LOBBY 1ST LAYER FLOOR 1 & 4 - - ELEVATOR "A" FACE 1ST/2ND LAYERS FLOORS 2,3,4, - - FIRE LID SCREW PATTERN OUTSIDE ELEVATOR "A" LOBBY -
Sprinkler - Hydrostatic Test Partial 3/22/2021 03/22/2021
Rated Assembly Inspection Partial 3/23/2021 3/23/2021 03/23/2021
Miscellaneous Correction
Corrective Action Required
03/22/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
03/22/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119,120,121,123;121A,124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER - - 106, 133, 132, RC CHANNEL CEILING - - 124,141,142,142A RC CHANNEL CEILING, 1ST LAYER -
SECOND FLOOR
Corrective Action Required
03/22/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A - - 206B TRASH CHUTE FACE 1ST/2ND LAYER -
THIRD FLOOR
Corrective Action Required
03/22/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,304A,305,306,306B,307,308,308A,309, 310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331, - - 2ND LAYER 301,302,303,304,304A,305,306,306B,307,308,308A,309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A - - 306B TRASH CHUTE FACE 1ST/2ND LAYER -
FOURTH FLOOR
Corrective Action Required
03/22/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - 2ND LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A - - 406B TRASH CHUTE FACE 1ST/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
03/22/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Corrective Action Required
03/22/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
03/22/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
03/22/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
03/22/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
03/22/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 - ELEVATOR "A" LOBBY 1ST LAYER FLOOR 1 & 4 - - ELEVATOR "A" FACE 1ST/2ND LAYERS FLOORS 2,3,4, - - FIRE LID SCREW PATTERN OUTSIDE ELEVATOR "A" LOBBY -
Above Ceiling Inspection Partial 3/25/2021 3/25/2021 03/25/2021
SECOND FLOOR
Corrective Action Required
03/22/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID AREA D CORRIDOR 212 ABOVE GRID CORRIDOR 227 ABOVE GRID CORRIDOR 201 ABOVE GRID CORRIDOR 203 ABOVE GRID CORRIDOR 205 ABOVE GRID CORRIDOR 209 ABOVE GRID CORRIDOR 211 ABOVE GRID
THIRD FLOOR
Corrective Action Required
03/22/2021
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID- - AREA "D" - CORRIDOR 312 ABOVE CEILING GRID - - CORRIDOR 327 ABOVE CEILING GRID - - AREA "B" - - CORRIDOR 303 ABOVE CEILING GRID - CORRIDOR 305 ABOVE CEILING GRID- - CORRIDOR 311 ABOVE CEILING GRID - - CORRIDOR 309 ABOVE CEILING GRID - - CORRIDOR 309 EXPANSION JOINT WALLS & CEILING - - CORRIDOR 301 ABOVE CEILING GRID -
FOURTH FLOOR
Corrective Action Required
03/22/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER - - 415A,416A, AMENITY DECK RESTROOMS HARD LIDS - - AREA D CORRIDOR 412 ABOVE GRID FOR HARD LID - - CORRIODR 427 ABOVE GRID - - AREA "B" - CORRIDOR 403 ABOVE GRID - - CORRIODR 405 ABOVE GRID - - CORRIODR 409 ABOVE GRID - - CORRIDOR 411 ABOVE GRID - - CORRIDOR 411 EXPANSION JOINT WALLS & ABOVE CEILING - - CORRIDOR 401 ABOVE GRID -
FIRST FLOOR
Corrective Action Required
03/22/2021
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID - - 138A, 139A FITNESS RESTROOM ABOVE HARD LID - - 135B FITNESS MECH ROOM ABOVE CEILING - - CORRIDOR 105 ABOVE CEILING GRID - - CORRIDOR 109 ABOVE CEILING GRID - - CORRIDOR 111 ABOVE CEILING GRID TO STEEL COLUMN AT ELEVATOR - - LOBBY ELEVATOR "A" ABOVE CEILING - - LOBBY ICE MAKER ROOM ABOVE CEILING -
ELEVATOR 2
Corrective Action Required
03/22/2021
- ELEVATOR "B" LOBBY FLOORS 1,2,3,4, -
ELEVATOR 3
Corrective Action Required
03/22/2021
ELEVATOR "C" - ABOVE CEILING LOBBY 1ST FLOOR -
LOWER LEVEL
Corrective Action Required
03/22/2021
- ELEVATOR A & c VESTIBULES AT GARAGE LEVEL -
Rated Assembly Inspection Partial 3/25/2021 3/25/2021 03/25/2021
Miscellaneous Correction
Corrective Action Required
03/23/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
03/23/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119,120,121,123;121A,124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER - - 106, 133, 132, RC CHANNEL CEILING - - 124,141,142,142A RC CHANNEL CEILING, 1ST LAYER/2ND LAYER -
SECOND FLOOR
Corrective Action Required
03/23/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A - - 206B TRASH CHUTE FACE 1ST/2ND LAYER -
THIRD FLOOR
Corrective Action Required
03/23/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,304A,305,306,306B,307,308,308A,309, 310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331, - - 2ND LAYER 301,302,303,304,304A,305,306,306B,307,308,308A,309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A - - 306B TRASH CHUTE FACE 1ST/2ND LAYER -
FOURTH FLOOR
Corrective Action Required
03/23/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - 2ND LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A - - 406B TRASH CHUTE FACE 1ST/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
03/23/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Corrective Action Required
03/23/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
03/23/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
03/23/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
03/23/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
03/23/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 - ELEVATOR "A" LOBBY 1ST LAYER FLOOR 1 & 4 - - ELEVATOR "A" FACE 1ST/2ND LAYERS FLOORS 2,3,4, - - FIRE LID SCREW PATTERN OUTSIDE ELEVATOR "A" LOBBY -
Miscellaneous Inspection Failed 3/25/2021 03/25/2021
Misc
Corrective Action Required
03/25/2021
- PROVIDE GFCI PROTECTION @ LAUNDRY OUTLETS ( 2017 NEC 210.8 (A) (10) - - PROVIDE GFCI PROTECTION @ KITCHEN DISH WASHER OUTLETS PER ( 2017 NEC 210.8 (D) - - PROVIDE SECONDARY LOCK @ SLIDING GLASS DOORS ( LEE"S SUMMIT SECTION 7 1406 (B) ) : ABOVE ALL UNITS 444 THRU 459 : - 444 ANTI TIP DEVICE RANGE - - 445 GFCI EACH SIDE OF RANGE AND ISLAND WON'T RESET, DECK RAIL MISSING - - 446 DECK RAIL MISSING, FIRE CAULK LINE SET MECH ROOM CEILING - - 447 - - 448 GUARDS SHALL NOT HAVE OPENINGS THAT ALLOW PASSAGE OF A SPHERE 4" IN DIAMETER (PER 2018 IBC 1015.4 ) - 449 FIRE CAULK LINE SETS MECH ROOM CEILING - - 450 - - 451 FIRE CAULK CEILING MECH ROOM - - 452 GFCI"s LEFT OF FRIDGE WON'T RESET, FIRE CAULK LINE SET MECH ROOM CEILING - - 453- - 454 - - 455- - 456 DECK RAILING 4" SPHERE SHALL NOT PASS - - 457 - - 458 GFCI BEDROOM BATH WON'T RESET - - 459 -
Miscellaneous Inspection Failed 3/26/2021 03/26/2021
Misc
Corrective Action Required
03/26/2021
- PROVIDE GFCI PROTECTION @ LAUNDRY OUTLETS ( 2017 NEC 210.8 (A) (10) - - PROVIDE GFCI PROTECTION @ KITCHEN DISH WASHER OUTLETS PER ( 2017 NEC 210.8 (D) - - PROVIDE SECONDARY LOCK @ SLIDING GLASS DOORS ( LEE"S SUMMIT SECTION 7 1406 (B) ) : ABOVE ALL UNITS 444 THRU 459 & 437 THRU 443 & 460 THRU 465: - 444 ANTI TIP DEVICE RANGE - - 445 GFCI EACH SIDE OF RANGE AND ISLAND WON'T RESET, DECK RAIL MISSING - - 446 DECK RAIL MISSING, FIRE CAULK LINE SET MECH ROOM CEILING - - 447 - - 448 GUARDS SHALL NOT HAVE OPENINGS THAT ALLOW PASSAGE OF A SPHERE 4" IN DIAMETER (PER 2018 IBC 1015.4 ) - 449 FIRE CAULK LINE SETS MECH ROOM CEILING - - 450 - - 451 FIRE CAULK CEILING MECH ROOM - - 452 GFCI"s LEFT OF FRIDGE WON'T RESET, FIRE CAULK LINE SET MECH ROOM CEILING - - 453- - 454 - - 455- - 456 DECK RAILING 4" SPHERE SHALL NOT PASS - - 457 - - 458 GFCI BEDROOM BATH WON'T RESET - - 459 - - 437- - 438 - - 439 - - 440 DECK RAIL 4" SPHERE - - 441 - - 442 MISSING DECK RAIL & 4" SPHERE - - 443 DECK RAIL 4" SPHERE - - 460 - - 461 (ADA UNIT) THE WORK SURFACE SHALL BE 34" INCHES MAXIMUM ABOVE THE FLOOR ( 1103.12.3.2 PER ICC A117.1-2017) - STROBES, GRAB BARS, THRESHOLD SGD, INSULATE PIPES UNDER SINKS - - 462 DECK RAIL 4" SPHERE - - 463 - - 464 DECK RAIL 4" SPHERE - - 465 DECK RAIL 4" SPHERE -
Miscellaneous Inspection Failed 3/30/2021 3/29/2021 03/29/2021
Misc
Corrective Action Required
03/26/2021
- PROVIDE GFCI PROTECTION @ LAUNDRY OUTLETS ( 2017 NEC 210.8 (A) (10) - - PROVIDE GFCI PROTECTION @ KITCHEN DISH WASHER OUTLETS PER ( 2017 NEC 210.8 (D) - - PROVIDE SECONDARY LOCK @ SLIDING GLASS DOORS ( LEE"S SUMMIT SECTION 7 1406 (B) ) : ABOVE ALL UNITS 444 THRU 459 & 437 THRU 443 & 460 THRU 465: - 444 ANTI TIP DEVICE RANGE - - 445 GFCI EACH SIDE OF RANGE AND ISLAND WON'T RESET, DECK RAIL MISSING - - 446 DECK RAIL MISSING, FIRE CAULK LINE SET MECH ROOM CEILING - - 447 - - 448 GUARDS SHALL NOT HAVE OPENINGS THAT ALLOW PASSAGE OF A SPHERE 4" IN DIAMETER (PER 2018 IBC 1015.4 ) - 449 FIRE CAULK LINE SETS MECH ROOM CEILING - - 450 - - 451 FIRE CAULK CEILING MECH ROOM - - 452 GFCI"s LEFT OF FRIDGE WON'T RESET, FIRE CAULK LINE SET MECH ROOM CEILING - - 453- - 454 - - 455- - 456 DECK RAILING 4" SPHERE SHALL NOT PASS - - 457 - - 458 GFCI BEDROOM BATH WON'T RESET - - 459 - - 437- - 438 - - 439 - - 440 DECK RAIL 4" SPHERE - - 441 - - 442 MISSING DECK RAIL & 4" SPHERE - - 443 DECK RAIL 4" SPHERE - - 460 - - 461 (ADA UNIT) THE WORK SURFACE SHALL BE 34" INCHES MAXIMUM ABOVE THE FLOOR ( 1103.12.3.2 PER ICC A117.1-2017) - STROBES, GRAB BARS, THRESHOLD SGD, INSULATE PIPES UNDER SINKS - - 462 DECK RAIL 4" SPHERE - - 463 - - 464 DECK RAIL 4" SPHERE - - 465 DECK RAIL 4" SPHERE - : 3/29/21: - 346 FIRE CAULK MECH CLOSET CEILING, DECK RAIL OVER 4", SPRINKLER ESCHLONS DECK, GFCI DISHWASHER - - 347 ENTRY DOOR SHALL BE SELF CLOSING & SELF LATCHING, GFCI DISHWASHER, FIRE CAULK CEILING MECH CLOSET - - 348 FIRE CAULK MECH CLOSET CEILING, GFCI DISHWASHER, - - 349 FIRE CAULK MECH CLOSET CEILING, GFCI LEFT OF RANGE & ON DECK HOT NEUTRAL REVERSED, GFCI DISHWASHER - - 350 FIRE CAULK MECH CLOSET CEILING, GFCI DISHWASHER, DECK RAILING OVER 4" - - 351 FIRE CAULK CEILING MECH CLOSET, GFCI DISHWASHER - - 352 GFCI DISHWASHER, DECK RAIL OVER 4" - - 353 GFCI DISHWASHER & WASHING MACHINE - - 354 MECH CLOSET LOCKED NO ACCESS, GFCI DISHWASHER & WASHING MACHINE - - 355 FIRE CAULK MECH CLOSET CEILING, GFCI DISHWASHER - - 356 FIRE CAULK MECH ROOM, DECK RAIL OVER 4" - - 357 MECH CLOSET LOCKED NO ACCESS, GFCI DISHWASHER, GFCI BETWEEN RANGE & REFER HTO NEUTRAL REVERESED, - - 358 FIRE CAULK MECH CLOSET, GFCI GFCI DISHWASHER, DECK RAIL OVER 4" - - 359 DECK RAIL OVER 4" GFCI DISHWASHER, - - 360 FIRE CAULK MECH CLOSET, GFCI DISHWASHER, GFCI BEDROOM BATH HOT NEUTRAL REVERESED, -
Rated Assembly Inspection Partial 3/31/2021 03/31/2021
Miscellaneous Correction
Corrective Action Required
03/25/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
03/25/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119,120,121,123;121A,124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER - - 106, 133, 132, RC CHANNEL CEILING, 1ST LAYER - - 124,141,142,142A RC CHANNEL CEILING, 1ST LAYER/2ND LAYER - - 131 1 LAYER COURTYARD STORAGE -
SECOND FLOOR
Corrective Action Required
03/25/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A - - 206B TRASH CHUTE FACE 1ST/2ND LAYER -
THIRD FLOOR
Corrective Action Required
03/25/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,304A,305,306,306B,307,308,308A,309, 310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331, - - 2ND LAYER 301,302,303,304,304A,305,306,306B,307,308,308A,309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A - - 306B TRASH CHUTE FACE 1ST/2ND LAYER -
FOURTH FLOOR
Corrective Action Required
03/25/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - 2ND LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A - - 406B TRASH CHUTE FACE 1ST/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
03/25/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Corrective Action Required
03/25/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
03/25/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
03/25/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
03/25/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
03/25/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 - ELEVATOR "A" LOBBY 1ST LAYER FLOOR 1 & 4 - - ELEVATOR "A" FACE 1ST/2ND LAYERS FLOORS 2,3,4, - - FIRE LID SCREW PATTERN OUTSIDE ELEVATOR "A" LOBBY -
Rated Assembly Inspection Partial 4/2/2021 4/2/2021 04/02/2021
Miscellaneous Correction
Corrective Action Required
03/31/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Corrective Action Required
03/31/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119,120,121,123;121A,124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER - - 106, 133, 132, SOUTH TRASH, RC CHANNEL CEILING, 1ST LAYER/2ND LAYER - - 124,141,142,142A RC CHANNEL CEILING, 1ST LAYER/2ND LAYER - - 131 1 LAYER COURTYARD STORAGE -
SECOND FLOOR
Corrective Action Required
03/31/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A - - 206B TRASH CHUTE FACE 1ST/2ND LAYER -
THIRD FLOOR
Corrective Action Required
03/31/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,304A,305,306,306B,307,308,308A,309, 310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331, - - 2ND LAYER 301,302,303,304,304A,305,306,306B,307,308,308A,309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A - - 306B TRASH CHUTE FACE 1ST/2ND LAYER -
FOURTH FLOOR
Corrective Action Required
03/31/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - 2ND LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A - - 406B TRASH CHUTE FACE 1ST/2ND LAYER -
STAIR TOWER 1
Corrective Action Required
03/31/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Corrective Action Required
03/31/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Corrective Action Required
03/31/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Corrective Action Required
03/31/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Corrective Action Required
03/31/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
ELEVATOR 1
Corrective Action Required
03/31/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 - ELEVATOR "A" LOBBY 1ST LAYER FLOOR 1 & 4 - - ELEVATOR "A" FACE 1ST/2ND LAYERS FLOORS 2,3,4, - - FIRE LID SCREW PATTERN OUTSIDE ELEVATOR "A" LOBBY -
Above Ceiling Inspection Partial 4/7/2021 4/7/2021 04/07/2021
SECOND FLOOR
Corrective Action Required
03/25/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID AREA D CORRIDOR 212 ABOVE GRID CORRIDOR 227 ABOVE GRID CORRIDOR 201 ABOVE GRID CORRIDOR 203 ABOVE GRID CORRIDOR 205 ABOVE GRID CORRIDOR 209 ABOVE GRID CORRIDOR 211 ABOVE GRID
THIRD FLOOR
Corrective Action Required
03/25/2021
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID- - AREA "D" - CORRIDOR 312 ABOVE CEILING GRID - - CORRIDOR 327 ABOVE CEILING GRID - - AREA "B" - - CORRIDOR 303 ABOVE CEILING GRID - CORRIDOR 305 ABOVE CEILING GRID- - CORRIDOR 311 ABOVE CEILING GRID - - CORRIDOR 309 ABOVE CEILING GRID - - CORRIDOR 309 EXPANSION JOINT WALLS & CEILING - - CORRIDOR 301 ABOVE CEILING GRID -
FOURTH FLOOR
Corrective Action Required
03/25/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER - - 415A,416A, AMENITY DECK RESTROOMS HARD LIDS - - AREA D CORRIDOR 412 ABOVE GRID FOR HARD LID - - CORRIODR 427 ABOVE GRID - - AREA "B" - CORRIDOR 403 ABOVE GRID - - CORRIODR 405 ABOVE GRID - - CORRIODR 409 ABOVE GRID - - CORRIDOR 411 ABOVE GRID - - CORRIDOR 411 EXPANSION JOINT WALLS & ABOVE CEILING - - CORRIDOR 401 ABOVE GRID -
FIRST FLOOR
Corrective Action Required
03/25/2021
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID - - 138A, 139A FITNESS RESTROOM ABOVE HARD LID - - 135B FITNESS MECH ROOM ABOVE CEILING - - CORRIDOR 105 ABOVE CEILING GRID - - CORRIDOR 109 ABOVE CEILING GRID - - CORRIDOR 111 ABOVE CEILING GRID TO STEEL COLUMN AT ELEVATOR - - LOBBY ELEVATOR "A" ABOVE CEILING - - LOBBY ICE MAKER ROOM ABOVE CEILING -
ELEVATOR 2
Corrective Action Required
03/25/2021
- ELEVATOR "B" LOBBY FLOORS 1,2,3,4, -
ELEVATOR 3
Corrective Action Required
03/25/2021
ELEVATOR "C" - ABOVE CEILING LOBBY 1ST FLOOR -
LOWER LEVEL
Corrective Action Required
03/25/2021
- ELEVATOR A & C VESTIBULES AT GARAGE LEVEL - - ELEVATOR B WEST EXTERIOR VESTIBULE -
Miscellaneous Inspection Partial 4/8/2021 4/8/2021 04/08/2021
Misc
Corrective Action Required
03/29/2021
: 4TH & 3RD FLOOR REQUIRED INSPECTIONS : - STAIRWAYS, CORRIDORS, ELECTRICAL & IT ROOMS - - 442 DECK RAIL SHALL WITHSTAND 200 LBS FORCE - 461 (ADA UNIT) THE WORK SURFACE SHALL BE 34" INCHES MAXIMUM ABOVE THE FLOOR ( 1103.12.3.2 PER ICC A117.1-2017) - STROBES, GRAB BARS, THRESHOLD SGD, INSULATE PIPES UNDER SINKS - - 366 REPAIR DRYWALL CEILING LIVING ROOM & MASTER BATH -
Miscellaneous Inspection Partial 4/9/2021 4/9/2021 04/09/2021
Misc
Corrective Action Required
04/08/2021
: 4TH & 3RD,2ND FLOOR REQUIRED INSPECTIONS : - STAIRWAYS, CORRIDORS, ELECTRICAL & IT ROOMS - - 461 (ADA UNIT) THE WORK SURFACE SHALL BE 34" INCHES MAXIMUM ABOVE THE FLOOR ( 1103.12.3.2 PER ICC A117.1-2017) - STROBES, GRAB BARS, THRESHOLD SGD, INSULATE PIPES UNDER SINKS - - 366 REPAIR DRYWALL CEILING LIVING ROOM & MASTER BATH - - MECH ROOM NEXT TO UNITS 265/249 FIRE CAULK- - ELECTRICAL ROOM NEAR 243/244 FIRE CAULK - - 254 PROVIDE 42" DECK RAIL - - 264 TIGHTEN GUARDRAIL ON DECK -
Sprinkler - Hydrostatic Test Passed 4/12/2021 04/12/2021
Miscellaneous Inspection Partial 4/12/2021 04/12/2021
Misc
Corrective Action Required
04/09/2021
: 4TH & 3RD,2ND FLOOR REQUIRED INSPECTIONS : - STAIRWAYS, CORRIDORS, ELECTRICAL & IT ROOMS - - 461 (ADA UNIT) THE WORK SURFACE SHALL BE 34" INCHES MAXIMUM ABOVE THE FLOOR ( 1103.12.3.2 PER ICC A117.1-2017) - STROBES, GRAB BARS, THRESHOLD SGD, INSULATE PIPES UNDER SINKS - - 366 REPAIR DRYWALL CEILING LIVING ROOM & MASTER BATH - - MECH ROOM NEXT TO UNITS 265/249 FIRE CAULK- - ELECTRICAL ROOM NEAR 243/244 FIRE CAULK - - 254 PROVIDE 42" DECK RAIL - - 264 TIGHTEN GUARDRAIL ON DECK -
Misc
Corrective Action Required
04/12/2021
3/25/21 Pre final 444 Ok 445 Ok 446 ok 447 ok 448 ok 449 Ok 450 Ok 451 ok 452 Ok 453 ok 454 Ok 455 Ok 456 Ok 457 Ok 458 Ok 459 Ok 3/26/21 437 GFCI ok 438 GFCI ok 439 GFCI ok 440 GFCI ok 441 GFCI ok 442 GFCI ok 443 GFCI ok 460 GFCI ok 461 ADA countertops 34", insulating sink drains, strobes, grab bars, threshold sgd ? Code section ? 462 ok 463 ok 464 ok 465 ok 3/29/21 346 ok 347 Ok 348 ok 349 ok 350 ok 351 ok 352 ok 353 ok 354 ok 355 ok 356 ok 357 ok 358 ok 359 ok 360 ok 4/8/21 345 ok 344 ok 366 ceiling drywall repair 4/8/21 4/9/21 239 ok 240 ok 241 ok 242 ok 243 ok 244 ok 245 ok 246 ok 247 ok 248 ok 249 ok 250 ok 251 ok 252 ok 253 ok 254 deck rail 42" 255 ok 256 ok 257 ok 258 ok 259 ok 260 ok 261 ok 262 ok 263 ok 264 tighten guardrail deck 265 ok 266 ok 267 ok Mech room next to unit 265 /249 Electrical room 243/244 Fire caulk 4/12/21 123 cover plate light switch bed closet, entry door sweep drags 124 entry door sweep drags, fire caulk MC ceiling mech closet 125 sprinkler Eschlon deck 126 fire caulk pex water heater 127 GFCI deck open neutral, deck ceiling repair 128 short deck rail not 42", fire caulk pex at water heater 129 missing receptacle cover plate near SGD 130 fire caulk mech closet, 131 fire caulk pex at water heater, GFCI kitchen corner above dishwasher open neutral, deck ceiling repair 132 fire caulk pex at water heater, NO range anti tip device 133 fire caulk pex at water heater 134 entry door shall be self closing & self latching, fire caulk pex at water heater 135 entry door shall be self latching, 136 entry door shall be self closing & self latching, fire caulk pex at water heater, complete shower enclosure 137 entry door shall be self closing, fire caulk pex lines at water heater, no dishwasher 138 entry door shall be self closing & self latching, fire caulk MC cable ceiling mech room, missing switch plate cover mech room, Complete shower enclosure, no dishwasher Corridors 419 ok 422 ok 426 ok 427 ok 429 ok 319 ok bug light, fire extinguisher cabinet 322 ok 326 ok 327 ok 329 ok 219 ok 222 ok 226 ok 227 ok 229 ok 119 ok 122 ok 129 ok Electrical rooms not ready per peter 121A 221A 321A 421A 225A 325A 425A Trash rooms 206B. Called wrong unit 306B called wrong unit 406B called wrong unit 224B switch plate cover missing 324B switch plate cover missing , sprinkler Eschlons 424B switch plate cover missing
Miscellaneous Inspection Failed 4/13/2021 4/13/2021 04/13/2021
Misc
Corrective Action Required
04/12/2021
: 4TH & 3RD,2ND FLOOR REQUIRED INSPECTIONS : - STAIRWAYS, CORRIDORS, ELECTRICAL & IT ROOMS :- 461 (ADA UNIT) THE WORK SURFACE SHALL BE 34" INCHES MAXIMUM ABOVE THE FLOOR ( 1103.12.3.2 PER ICC A117.1-2017) - STROBES, GRAB BARS, THRESHOLD SGD, INSULATE PIPES UNDER SINKS - - 366 REPAIR DRYWALL CEILING LIVING ROOM & MASTER BATH - - MECH ROOM NEXT TO UNITS 265/249 FIRE CAULK- - ELECTRICAL ROOM NEAR 243/244 FIRE CAULK - - 254 PROVIDE 42" DECK RAIL - - 264 TIGHTEN GUARDRAIL ON DECK - Trash rooms 224B switch plate cover missing 324B switch plate cover missing , sprinkler Eschlons 424B switch plate cover missing; Electrical rooms not ready per peter 121A,221A,321A,421A,225A,235A,425A. 332-#11 AFCI breaker will not trip. 333-Light switch in mechanical room. -254 deck rail 42" -264 tighten guardrail deck Mech room next to unit 265 /249 Electrical room 243/244 Fire caulk not complete list. MARK HARDING 04/13/2021 2:34 PM
Misc
Resolved
04/13/2021
3/25/21 Pre final 444 Ok 445 Ok 446 ok 447 ok 448 ok 449 Ok 450 Ok 451 ok 452 Ok 453 ok 454 Ok 455 Ok 456 Ok 457 Ok 458 Ok 459 Ok 3/26/21 437 GFCI ok 438 GFCI ok 439 GFCI ok 440 GFCI ok 441 GFCI ok 442 GFCI ok 443 GFCI ok 460 GFCI ok 461 ADA countertops 34", insulating sink drains, strobes, grab bars, threshold sgd ? Code section ? 462 ok 463 ok 464 ok 465 ok 3/29/21 346 ok 347 Ok 348 ok 349 ok 350 ok 351 ok 352 ok 353 ok 354 ok 355 ok 356 ok 357 ok 358 ok 359 ok 360 ok 4/8/21 345 ok 344 ok 366 ceiling drywall repair 4/8/21 4/9/21 239 ok 240 ok 241 ok 242 ok 243 ok 244 ok 245 ok 246 ok 247 ok 248 ok 249 ok 250 ok 251 ok 252 ok 253 ok 254 deck rail 42" 255 ok 256 ok 257 ok 258 ok 259 ok 260 ok 261 ok 262 ok 263 ok 264 tighten guardrail deck 265 ok 266 ok 267 ok Mech room next to unit 265 /249 Electrical room 243/244 Fire caulk 4/12/21 123 cover plate light switch bed closet, entry door sweep drags 124 entry door sweep drags, fire caulk MC ceiling mech closet 125 sprinkler Eschlon deck 126 fire caulk pex water heater 127 GFCI deck open neutral, deck ceiling repair 128 short deck rail not 42", fire caulk pex at water heater 129 missing receptacle cover plate near SGD 130 fire caulk mech closet, 131 fire caulk pex at water heater, GFCI kitchen corner above dishwasher open neutral, deck ceiling repair 132 fire caulk pex at water heater, NO range anti tip device 133 fire caulk pex at water heater 134 entry door shall be self closing & self latching, fire caulk pex at water heater 135 entry door shall be self latching, 136 entry door shall be self closing & self latching, fire caulk pex at water heater, complete shower enclosure 137 entry door shall be self closing, fire caulk pex lines at water heater, no dishwasher 138 entry door shall be self closing & self latching, fire caulk MC cable ceiling mech room, missing switch plate cover mech room, Complete shower enclosure, no dishwasher Corridors 419 ok 422 ok 426 ok 427 ok 429 ok 319 ok bug light, fire extinguisher cabinet 322 ok 326 ok 327 ok 329 ok 219 ok 222 ok 226 ok 227 ok 229 ok 119 ok 122 ok 129 ok Electrical rooms not ready per peter 121A 221A 321A 421A 225A 325A 425A
FOURTH FLOOR
Corrective Action Required
04/12/2021
Pre final -units approved: 444,445,446,447,448,449,450,451 ,452 ,453 ,454 ,455 ,456 ,457 ,458 ,459,437,438,439 , 440,441,442, 443 ,460 ,462,463 ,464 ,465. 431-436; 461 ADA countertops 34", insulating sink drains, strobes, grab bars, threshold sgd ? Code section ?
THIRD FLOOR
Corrective Action Required
04/12/2021
3/29/21 339 ,340 ,341 ,342 ,343;345, 346-365;367; 345,344. 331-338, 366 need to correct ceiling drywall repair
SECOND FLOOR
Corrective Action Required
04/12/2021
4/8/21 4/9/21 239-253; 255 -263 ;265-267;
FIRST FLOOR
Corrective Action Required
04/12/2021
4/12/21 119; 122-138;
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/12/2021
Pre Final areas approved are the following; see sepertate floor levels. *:
Rough Framing Inspection - Commercial Passed 4/13/2021 04/13/2021
Miscellaneous Correction
Resolved
04/13/2021
-PROVIDE H2.5 CLIPS AT TRUSSES OVER ELEVATOR IN CORRIDOR 427
Miscellaneous Correction
Resolved
04/13/2021
-BRACE TOP OF WALLS AT RETAIL 7 AND 8 ON ON EAST SIDE OF CORRIDOR 4’ OC BY DOORWAYS -FASTEN END STUD/ TOP TRACK AT EAST WALL BY NORTH EXIT
Miscellaneous Correction
Resolved
04/13/2021
-BRACE TOP OF WALLS AT RETAIL 7 AND 8 ON ON EAST SIDE OF CORRIDOR 4’ OC BY DOORWAYS -FASTEN END STUD/ TOP TRACK AT EAST WALL BY NORTH EXIT
Above Ceiling Inspection Passed 4/13/2021 04/13/2021
SECOND FLOOR
Resolved
04/13/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR & DECKS - CORRIDOR 219 ABOVE GRID CORRIDOR 222 ABOVE GRID CORRIDOR 226 ABOVE GRID CORRIDOR 229 ABOVE GRID AREA D CORRIDOR 212 ABOVE GRID CORRIDOR 227 ABOVE GRID CORRIDOR 201 ABOVE GRID CORRIDOR 203 ABOVE GRID CORRIDOR 205 ABOVE GRID CORRIDOR 209 ABOVE GRID CORRIDOR 211 ABOVE GRID
THIRD FLOOR
Resolved
04/13/2021
- SECTION E PHASE 1 JOIST HANGER CORRIDOR & DECKS - - CORRIDOR 319 ABOVE CEILING GRID- - CORRIDOR 322 ABOVE CEILING GRID- - CORRIDOR 326 ABOVE CEILING GRID- - CORRIODR 329 ABOVE CEILING GRID- - AREA "D" - CORRIDOR 312 ABOVE CEILING GRID - - CORRIDOR 327 ABOVE CEILING GRID - - AREA "B" - - CORRIDOR 303 ABOVE CEILING GRID - CORRIDOR 305 ABOVE CEILING GRID- - CORRIDOR 311 ABOVE CEILING GRID - - CORRIDOR 309 ABOVE CEILING GRID - - CORRIDOR 309 EXPANSION JOINT WALLS & CEILING - - CORRIDOR 301 ABOVE CEILING GRID -
FOURTH FLOOR
Resolved
04/13/2021
- SECTION E PHASE 1 JOIST HANGERS CORRIDOR - ABOVE CEILING GRID CORRIDORS CORRIDOR 419,422,423,426,429 - 417 AMENITY DECK ROOM ABOVE CEILING OK TO COVER - - 415A,416A, AMENITY DECK RESTROOMS HARD LIDS - - AREA D CORRIDOR 412 ABOVE GRID FOR HARD LID - - CORRIODR 427 ABOVE GRID - - AREA "B" - CORRIDOR 403 ABOVE GRID - - CORRIODR 405 ABOVE GRID - - CORRIODR 409 ABOVE GRID - - CORRIDOR 411 ABOVE GRID - - CORRIDOR 411 EXPANSION JOINT WALLS & ABOVE CEILING - - CORRIDOR 401 ABOVE GRID -
FIRST FLOOR
Resolved
04/13/2021
- LOWER LEVEL LOBBY SOUTH MECH ROOM ABOVE CEILING OK TO COVER - - CORRIDOR 119 ABOVE CEILING GRID - - CORRIDOR 122 ABOVE CEILING GRID - - CORRIDOR 129 ABOVE CEILING GRID - - 134 & 135 YOGA/FITNESS ROOMS HARD LID - - 138A, 139A FITNESS RESTROOM ABOVE HARD LID - - 135B FITNESS MECH ROOM ABOVE CEILING - - CORRIDOR 105 ABOVE CEILING GRID - - CORRIDOR 109 ABOVE CEILING GRID - - CORRIDOR 111 ABOVE CEILING GRID TO STEEL COLUMN AT ELEVATOR - - LOBBY ELEVATOR "A" ABOVE CEILING - - LOBBY ICE MAKER ROOM ABOVE CEILING -
ELEVATOR 2
Resolved
04/13/2021
- ELEVATOR "B" LOBBY FLOORS 1,2,3,4, -
ELEVATOR 3
Resolved
04/13/2021
ELEVATOR "C" - ABOVE CEILING LOBBY 1ST FLOOR -
LOWER LEVEL
Resolved
04/13/2021
- ELEVATOR A & C VESTIBULES AT GARAGE LEVEL - - ELEVATOR B WEST EXTERIOR VESTIBULE -
Underground Electrical Inspection - Commercial Passed 4/13/2021 04/13/2021
Misc
Resolved
04/13/2021
CONDUIT BETWEEN LIGHT POLES- FRONT EAST FACE: NE CORNER SOUTH 3 POLES; WEST FACE NW LIGHT POLES * - CONDUIT NORTH END & SOUTH END WOOD FRAME TO REAR & TO BUILDING FOUNDATION - - CONDUIT 2 TRENCHES FRONT OF STEEL BLDG TO STREET - WEST SIDE-- NORTH TO THE SOUTH CONDUIT 1,2,3; -CONDUIT AND GROUND RODS FOR LIGHT POLE BASES (1) NORTH, (5) EAST, (1) SOUTH, (1) SOUTHWEST
Misc
Resolved
04/13/2021
140’ Conduit for light poles rear of apt building near retaining wall from transformer to fire hydrant
In-wall Inspection Passed 4/13/2021 04/13/2021
Misc
Resolved
04/13/2021
- "E" PHASE 1 1ST FLOOR ANCHOR BOLTS PATIOS OK TO COVER - - JOIST HANGERS IN CORRIDOR COMPLETE - - METAL STUD FACADE NORTH OF MAIN ENTRY 3 SHEETS DUROCK - - METAL STUDS MIDDLE SECTION NORTH END OF RETAIL -
Piers/Caissons Inspection - Commercial Passed 4/13/2021 04/13/2021
Miscellaneous Correction
Resolved
04/13/2021
LIGHT POLE BASE: -1 24” SOUTH SIDE -1 24” NORTH SIDE -1 24” SOUTHEAST CORNER -4 6’X6’ PADS EAST SIDE -1 24” SOUTHWEST CORNER -6/15/20- RETAINING WALL REAR OF APTS (4) LIGHT POLE BASE REBAR CAGES, DRIVEN GROUND ROUND
Miscellaneous Correction
Resolved
04/13/2021
All Rough Inspection - Commercial Passed 4/13/2021 04/13/2021
FOURTH FLOOR
Resolved
04/13/2021
AREA"E"- UNITS- 420A,435,436,437,438,439,440,461,441,442,459-443-459-461-462–463-464-465-460- 426;444,447,448,449,450,451,457,424A, 425A Corridor 419 to room 439 ok -CORRIDOR 419,422,426, 427, 429, CEILINGS & WALLS - -AREA "D"- -CORRIDOR 412,- -432,433,434,- - 417 COMMUNITY ROOM ABOVE CEILING & WALLS - 401,402,403,404,404A,405,406,406A,407,408,408A, 409,410,410A,411,412,413,414,415,415A,416,416A, 417,418,419,420,421,422,423,424,425,426,427,428, 429, 430, 431, - -AREA "B"- - CORRIDOR 409 JOIST HANGERS - - CORRIDOR 405 JOIST HANGERS - - CORRIDOR 403 JOIST HANGERS -
THIRD FLOOR
Resolved
04/13/2021
Section “E” 345-344-343- 342-361-362-363-341-364-340-322-326-327, 329, -corridor framing ceiling -320A,321A, 324A, 325A, 337, 338, 339, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360,365, 366, 367, - Corridor 319 to room 364 ok Corridor 322, 326, 327, 329, SECTION "D" CORRIDOR FRAMING CEILING 312, - AREA "B" - CORRIDOR 311, JOIST HANGERS - - CORRIDOR 309, JOIST HANGERS - - CORRIODR 305, JOIST HANGERS - - CORRIDOR 301, JOIST HANGERS - -301,302,303,304,304A,305,306,306A,307,308A,309, 310,310A,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331,332,333, 334,335,336,-
SECOND FLOOR
Resolved
04/13/2021
'Section “E” Ok- 220A,224A,237,238,239,240,241,242,243,244,245, 246, 261,262. 225A, 226, 264,265,266,267 - -,247,249,250,251,252, 253,254,256,257,258,259,260, -248- SEAL DEAD SPACE AT FUTURE SHAFT Corridor 219 to room 240 ok Corridor 222 to stairs ok - CORRIDOR 222 FROM STAIRS TO END OF CORRIDOR 226 - SECTION "E" - CORRIDOR 229 ALL ROUGH - SECTION "D" CORRIDOR CEILING FRAMING 212, -SECTION "B" - -CORRIDOR 209 JOIST HANGERS - - CORRIDOR 205, JOIST HANGERS - - CORRIDOR 203, JOIST HANGERS - - CORRIDOR 201 JOIST HANGERS - - CORRIDOR 211 JOIST HANGERS - - 201,202,203,204,204A,205,206,206B,207,208,208A, 209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231, 232,233, 234,235,236 -
FIRST FLOOR
Resolved
04/13/2021
BUILDING “B” -CORRIDOR 103 LINE 4.3 TO 2 ** METAL FRAMING ONLY BUILDING “C” AREAS OK; -LOBBY EXTERIOR EAST WALL **METAL FRAMING ONLY - - 2ND TIER LOBBY NORTH & SOUTH WALLS AT RESTROOMS - - NORTH RETAIL ALL ROUGH --- - RETAIL E WEST WALL - - LOWER LOBBY NORTH & SOUTH ENDS 2HR DEMISING WALL - - UPPER & LOWER LOBBY ALL ROUGH - Section “E” OK-120A,121,122,123,124,125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, Corridor 119 to room 125 ok Corridor 122,129 ok CORRIDOR CEILING 112, 129, -Corridor 126 Metal Stud Framing from north exit to line 8.6 -CORRIDOR 124- PROVIDE HANGERS/ CONNECTIONS ON FLOOR JOISTS BOTH ENDS- -ROOM 132- -SEAL HOLE IN CORRIDOR WALL AT CLEAN OUT - SECTION "B" - - CORRIDOR 109, JOIST HANGERS - - CORRIDOR 105, JOIST HANGERS - - CORRIDOR 111, CEILING JOIST HANGERS : - 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118,119,120, - - 134,135 YOGA,FITNESS ROOM ALL ROUGH - - 138,139, MECH ROOM WEST OF RESTROOMS ABOVE CEILING FOR FIRE LID, ALL ROUGH - - SOUTH RETAIL WALL ROUGH- - 131,143, STORAGE ROOMS - - 142 MECH ROOM - - 141 TRASH ROOM MISSING STUDS NORTH WALL - - 106,132, 133, 124 -
STAIR TOWER 3
Resolved
04/13/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - STAIR TOWER "C" - - ALL ROUGH APPROVED -
STAIR TOWER 2
Resolved
04/13/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - ROUGH - IN APPROVED FLOORS 1 THRU 4 -
STAIR TOWER 1
Resolved
04/13/2021
- STAIR TOWER "A" - - ALL ROUGH STAIR "A" FLOORS 1 THRU 4 APPROVED -
LOWER LEVEL
Resolved
04/13/2021
- 020,021,022,024, GARAGE BIKE STORAGE & STORAGE ROOMS - - ELEVATOR A & C VESTIBULES AT GARAGE LEVEL -
Rated Assembly Inspection Passed 4/13/2021 04/13/2021
Miscellaneous Correction
Resolved
04/13/2021
RETAIL AREA “B” -AREAS APPROVED- -CORRIDOR 103 WEST WALL FROM COLUMN LINE 2 TO 4.4 EXTERIOR SHEATHING SCREW PATTERN
FIRST FLOOR
Resolved
04/13/2021
-AREAS APPROVED- AREA “E” - 112C 1 lLAYER BEHIND PANEL LOCATION - -112 RC CHANNEL CEILING/WALLS SCREW PATTERN LID/WALLS - - 129 RC CHANNEL CEILING, RC CHANNEL WALLS AND CEILINGS CORRIDORS 119,122, 129 - RC CHANNEL ROOMS 119,120,120A,121,121A,122,123,124,125,126,127,128,129, 130, 131, 133,134,135,136,137,138,WALLS AND CEILING - - 120A, 1ST LAYER/2ND LAYER BEHIND PANEL, 1ST/2ND LAYER OTHER 3 WALLS, RC CEILING - - 142 1ST LAYER BEHIND PANEL - - 141 1ST/2ND LAYER EAST WALL BEHIND PANEL, 1ST LAYER/2ND LAYER EAST WALL BEHIND SWITCH GEAR, 1ST/2ND LAYER TO SLAP STUD IN CORNER - - 134,135 FITNESS ROOM/YOGA RC CEILING - - 1ST LAYER 119,120,121,123;121A,124,125,127,128,129, 130,131, 132, 133,134, 135, 136,137,138, - 2ND LAYER UNITS 119,120,121,121A,122,123,124,125,126,127,128,129,130,131,132,133,134, 135,136,137,138, - - CORRIDOR 119 1ST LAYER/2ND LAYER BOTH SIDES - - CORRIDOR 122 1ST LAYER/ 2ND LAYER BOTH SIDES, LID PREROCK - - CORRIDOR 129 (LID) PREROCK, 1ST/2ND LAYER WALLS,- - AREA " B" - - CORRIDOR 109 RC LID&WALLS/SCREW PATTERN LID & WALLS - - CORRIODR 105 RC LID/WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 111 RC LID/WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,113,114,115,116,117,118, - 1ST LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118, - - 2ND LAYER 101,102,103,104,105,106,107,108,108A,109,110,110A,111,112,112C,113,114,115,116,117,118 - - LOBBY NORTH & SOUTH WALLS SCREW PATTERN 1 LAYER - - 133 SOUTH TRASH ROOM 1ST,2nd LAYER EAST WALL BEHIND PANELS - - 110A ELEC ROOM 1st/2nd LAYER BEHIND PANEL ONLY - - 134,135,135A, FIRE LID SCREW PATTERN FITNESS & YOGA - - FITNESS ROOM WALL SCREW PATTERN - - CORRIDOR WALL SCREWS OUTSIDE FITNESS - - CORRIDOR 126 1ST LAYER SCREW PATTERN ELECTRICAL ROOM SIDE - - 106A TRASH CHUTE 1ST LAYER - -138A,139A FITNESS RESTROOMS 1ST LAYER/2ND LAYER - - 106, 133, 132, SOUTH TRASH, RC CHANNEL CEILING, 1ST LAYER/2ND LAYER - - 124,141,142,142A RC CHANNEL CEILING, 1ST LAYER/2ND LAYER - - 131 1 LAYER COURTYARD STORAGE -
SECOND FLOOR
Resolved
04/13/2021
\\-AREAS APPROVED- AREA “E” RC CHANNEL WALLS AND CEILINGS: CORRIDORS 219 222,226, 227, 221A,240-245,261-264,265,266,267 - - RC CHANNEL CORRIDOR 212 ,229 - RC CHANNEL CEILING 220A, 1ST/2ND LAYER - 1ST LAYER-222,226 SCREW PATTERN ON FIRST & SECOND LAYERS WALLS CORRIDOR 219 TO ROOM 241, CORRIDOR 222 TO STAIRS 1ST LAYER UNITS: 224A,221A,224A,225A,240,241,242,243,244,245,246, 247,248,249,250,251,252,253,254,255,256,257,258, 259,260,262,263,264,265,266,267,- - 2ND LAYER UNITS 221A,224A,225A,236,240,241,242,243, 244,245,246,247,248,249,250,251,252,253,254,255, 256,257,258,259,260,262,263, 264,265,266,267, 233, 232, 235, 234, 36, 237, 238, 239 - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 1ST LAYER MECHANCICAL CHASES 2ND FLOOR - - 2ND LAYER MECHANICAL CHASES 2ND FLOOR/FIRE TAPE COMPLETE OK TO COVER - - "E" RC CHANNEL CELINGS & WALLS 224A,225A,232,233,234,235,236,237,238,239,246,247,248,249,250,251,252,253,254,255,256,257,258,259, 260, - - CORRIDOR 222 2ND LAYER BOTH SIDES - - CORRIDOR 226 1ST & 2ND LAYER WEST WALL - - CORRIDOR 226 1ST & 2ND LAYER EAST WALL & MECH CHASES - - CORRIDOR 227, CEILING, 1ST LAYER / 2ND LAYER WALLS - - CORRIDOR 229 CEILING, 1ST LAYER / 2ND LAYER - 211, 201, 203, 205, :AREA "D": - CORRIDOR 212 (LID) 1 LAYER WALLS - - 1ST LAYER 232,233,234,235,236,237,238,239, - - 2ND LAYER 239, - AREA "B" - CORRIDOR 209 RC LID & WALLS / SCREW PATTERN LID & WALLS - - CORRIDOR 205 RC LID & WALLS / SCREW PATTERN LID, & WALLS, - - CORRIDOR 205 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 203 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 211 RC LID / WALLS, SCREW PATTERN LID & WALLS - - CORRIDOR 201 RC LID / WALLS, SCREW PATTERN LID & WALLS - -CORRIDOR 203 INNER MECH CHASES: 1ST/2ND LAYER - - RC CHANNEL 201,202,203,204,204A,205,206,206A,206B,207,208, 208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230, 231, - - 1ST LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 2ND LAYER 201,202,203,204,204A,205,206,206B,207,208,208A,209,210,210A,211,212,213,214,215,216,217,218,219,220,221,222,223,224,225,226,227,228,229,230,231 - - 206A SOUTH TRASH CHUTE 1ST LAYER/2ND LAYER - - CORRIDOR 201 1ST LAYER EAST SIDE ELEVATOR A - - 206B TRASH CHUTE FACE 1ST/2ND LAYER -
THIRD FLOOR
Resolved
04/13/2021
AREA “E” -AREAS APPROVED- RC CHANNEL - 320A,321A,340,364 RC CHANNEL CORRIDORS- 322,326,327,319 RC CHANNEL CORRIDOR 329 WALLS & CEILING - - RC CHANNEL 324A,325A,332,333,334,335,336,337,338,339,346,347,348,349,350,351,352,353,354,355,356,357,358,359, 360,365,366,367, - 1ST LAYER CEILING- 322, 326 TO ROOM 355. 1STLAYER WALLS CORRIDORS 319 TO ROOM 341,322 TO STAIRS SCREW PATTERN ROOMS AND FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 326,341,342,343,344,345,361,362,363 - RC CHANNEL 324A,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360, - 1ST LAYER UNIT 320A, 321A,324A,325A,340, 346,347,348,349,350,351,352,353,354,355,356,357, 358,359,360,364,365,366,367, - - 2ND LAYER UNIT 320A,321A,324A,325A,340,347,348,349,350,351,352, 353,354,356,357,358,359,360, 364,365,366,367, - - ROOM 328 1ST/ 2ND LAYER BEHIND PANELS - - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 3RD FLOOR MECHANICAL CHASE 1ST LAYER/2ND LAYER COMPLETE - - CORRIDOR 319 1ST LAYER/2ND LAYER - - CORRIDOR 322 1ST LAYER/2ND LAYER WALLS - - CORRIDOR 326 1ST LAYER/2ND LAYER WEST WALL, 1ST LAYER/2ND LAYER EAST WALL - - CORRIDOR 327 CEILING, 1ST LAYER / 2ND LAYER - - CORRIDOR 329 LID, 1ST LAYER / 2ND LAYER - - AREA "D" - - CORRIDOR 312 RC CHANNEL CEILING & WALLS - - CORRIDOR 312 LID, 1ST LAYER WALLS - - UNIT 332 PREROCK LIDS FOR DUCTS LAUNDRY, CLOSETS & BEDROOMS - - 1ST LAYER 332,333,334,335,336,337,338,339,- - 2ND LAYER 332,333,334,335,336,337,338,339 - - AREA "B" - - CORRIDOR 311 RC LID, WALLS, SCREWS LID, & WALLS - - CORRIDOR 309 RC LID, SCREWS LID, & WALLS - - CORRIDOR 305 RC LID, WALLS, SCREWS LID, & WALLS, - - CORRIDOR 303 RC LID,WALLS, SCREWS LID, & WALLS - - CORRIDOR 301 RC LID, WALLS, SCREWS LID& WALLS, - - INNER MECH CHASES 1ST / 2ND LAYER - - RC CHANNEL 301,302,303,304,304A,305,306,306A,307,308,308A, 309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327 ,328,329,330,331,- - 1ST LAYER - -,301,302,303,304,304A,305,306,306B,307,308,308A,309, 310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331, - - 2ND LAYER 301,302,303,304,304A,305,306,306B,307,308,308A,309,310,310A,311,312,313,314,315,316,317,318,319,320,321,322,323,324,325,326,327,328,329,330,331 - - 3RD FLOOR SWITCHGEAR ROOM 1ST/2ND LAYER BEHIND PANEL AT ELEVATOR A - - 306A SOUTH TRASH CHUTE 1ST LAYER / 2ND LAYER - - CORRIDOR 301 1ST LAYER EAST SIDE ELEVATOR A - - 306B TRASH CHUTE FACE 1ST/2ND LAYER -
FOURTH FLOOR
Resolved
04/13/2021
4TH FL- -AREAS APPROVED- AREA “E” RC CHANNEL AREAS: -RC CHANNEL UNITS: 420A,437,438-453, 459-462,-424,425A,414A,432,433,434,444,445,446,447,448,449,450,451,452,453,454,455,456,457,463,464, 430, 431, 429, 403, 428, 404, 427, 405, 426, 406, 425, 424, 423, 407 - RC CHANNEL CEILING ONLY 415A,416A,420,435,436,437,463,464,465, - -RC CORRIDOR 412, 421A,422, 426, 427, 409 & 405 to stairwell -CORRIDOR 429 WALLS & CEILING - - AREA "E" 4TH FLOOR MECH CHASE OUTSIDE UNITS 448, 450, 451 1ST, 2ND LAYER ; FIRE TAPE COMPLETE - - 415A, 416A RESTROOM LIDS - - BLDG "E" PHASE 2 UNITS: 1ST LAYER :420A,424A,432,433,434,435,436,437,444,445,446, 447,448,449,450,451,452,453,454,455,456,457,458 -438, 462, 421A,424A, 425A - 2ND LAYER: 420A,424A,432,433,434,435,436,437,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458, 438, 462,421A,425A, - NORTH TRASH CHUTE 1ST LAYER/2ND LAYER - - 420A PREROCK CORRIDOR WALL WALL LAYER - - CORRIDOR 419 1ST/2ND LAYER; - CORRIDOR 412 1ST LAYER - FIRST & SECOND LAYER CORRIDOR AND DIMISING WALLS: 439,440,441,442,443,459,460,461 - 463,464,465 1ST LAYER - - 463,464,465, 2ND LAYER - - CORRIDOR NUMBERS #: - 429 LID,1ST / 2ND LAYER - ;;439,440,441,442,443,459,460,461; - WALLS: 422 1ST, 2ND LAYER-; - 426 1ST,& 2ND LAYER WEST WALL-; - 426 1ST & 2ND LAYER EAST WALL - - CORRIDOR 427 CEILING, 1ST/2ND LAYER - - 417 RC CHANNEL CEILING, 1 LAYER CEILING & WALLS, 2ND LAYER CORRIDOR WALL SIDE - " D" - CORRIDOR 412 RC CHANNEL LID, CEILING COMPLETE - " B " -CORRIDOR 409 RC LID / SCREW PATTERN LID/WALLS - - CORRIDOR 405 RC LID / SCREW PATTERN LID/WALLS 409 TO STAIRWAY A - - CORRIDOR 405 RC LID,WALLS, SCREW PATTERN LID - - CORRIDOR 403 RC LID,WALLS, SCREW PATTERN LID & WALLS - :: 403 REPAIR DRYWALL AT ELECTRICAL ROOM :: - CORRIDOR 411 RC LID,WALLS, SCREW PATTERN LID & WALLS - - CORRIODR 401 RC LID, WALLS, SCREW PATTERN LID & WALLS - - RC CHANNEL 401,402,404A,406B,408,408A,409,410,410A,411,412, 413,414,415,416,417,418,419,420,421,422, - - 1ST LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - 2ND LAYER 401,402,403,404A,406B,408,408A,409,410,410A, 411,412,413,414,415,416,417,418,419,420,421,422, - - INNER MECH CHASES 1ST LAYER/2ND LAYER - - 410A ELEC ROOM 1ST/2ND LAYER BEHIND PANEL ONLY - - 1ST LAYER/ 2ND LAYER -- 404,405,406,407,423,424,425,426,427,428,429,430, 431 - - 406A TRASH CHUTE 1ST LAYER /2ND LAYER - - 404A 1ST/ 2ND LAYER BEHIND PANEL - - CORRIDOR 401 1ST LAYER EAST SIDE ELEVATOR A - - 406B TRASH CHUTE FACE 1ST/2ND LAYER -
STAIR TOWER 1
Resolved
04/13/2021
STAIR TOWER 107 “A” SOUTH AREA "B" AREAS OK: -1ST LAYER SHEATHING TO 3RD FLOOR; -2ND LAYER SHEATHING TO 3RD FLOOR: - 1ST LAYER/2ND LAYER SHEATHING 4TH FLOOR - - STAIRWAY "A" 1ST LAYER FLOORS 1 THRU 4 - - STAIRWAY "A" RC CHANNEL CEILING 4TH FLOOR - - STAIRWAY "A" 2ND LAYER FLOORS 1 THRU 4 - - 4TH FLOOR CEILING COMPLETE -
ELEVATOR 2
Resolved
04/13/2021
ELEVATOR 118 "B" WEST CENTER AREAS INSPECTED: AREAS OK: -SHEATHING ON NORTH AND SOUTH WALLS (TYPE A) -FIRST LAYER SHEATHING ON (TYPE E2) WALLS FIRST AND SECOND FLOORS - - 2ND LAYER "B" ELEVATOR WALLS - 1ST LAYER "B" 3RD & 4TH FLOOR SHAFT WALL- - 2ND LAYER "B" 3RD & 4TH FLOOR SHAFT WALL - - ELEVATOR "B" 1ST LAYER FLOORS 1 THRU 4 INNER SHAFT - - ELEVATOR "B" 4TH FLOOR CEILING RC CHANNEL - - ELEVATOR "B" 3RD FLOOR 1ST FACE LAYER - :: BELOW REQUIRE CORRECTIONS :: - ELEVATOR "B" 4TH FLOOR 1ST LAYER FACE - - ELEVATOR "B" 1ST & 2ND FLOOR 1ST LAYER FACE - - "B" 2ND LAYER FRONTS FLOORS 1 THRU 4 -
ELEVATOR 3
Resolved
04/13/2021
ELEVATOR 128 "C" NORTH EAST-AREAS INSPECTED: - ELEVATOR 128" C " - - 1ST LAYER WEST WALL 2ND,3RD,4TH FLOORS - - 2ND LAYER WEST WALL 2ND, 3RD & 4TH FLOORS- - 1ST LAYER 4TH FLOOR SOUTH WALL SHAFT & EXTERIOR WALL - - ELEVATOR C 4TH FLOOR SHAFT WALL 2ND LAYER CEILING TO 8', 8' TO ACCESS HOLE IN CORRIDOR - - ELEVATOR SHAFT 1ST LAYER 4TH FLOOR, 3RD FLOOR, 2ND FLOOR - - ELEVATOR SHAFT 2ND LAYER 4TH, 3RD, 2ND - - DEAD SPACE 3RD FLOOR FIRST LAYER/2ND LAYER - - ELEVATOR C DEAD SPACE 2ND FLOOR 1ST LAYER/2ND BACKSIDE SHAFT AT DEAD SPACE - - LAYER 1/ LAYER 2 FACE OF ELEVATOR "C" 2ND, 3RD, 4TH FLOORS -
STAIR TOWER 2
Resolved
04/13/2021
STAIR TOWER 113 “B” WEST CENTER AREAS INSPECTED: - STAIRWAY "B" 1ST LAYER FLOORS 1 THRU 4 - - RC CHANNEL CEILING 4TH FLOOR - - "B" 2ND LAYER 1 THRU 4 -
STAIR TOWER 3
Resolved
04/13/2021
STAIR TOWER 123 “C” NORTH AREAS INSPECTED: - 1ST LAYER FLOORS 1 THRU 4 - - 2ND LAYER FLOORS 1 THRU 4 - - CEILING - - RC CHANNEL CEILING -
Miscellaneous Correction
Resolved
04/13/2021
ELEVATOR 102 "A" SOUTH CENTER AREAS INSPECTED: - 4TH FLOOR BACK CHASE RC CEILING COMPLETE, 1ST LAYER / 2ND LAYER BACKSIDE OF CHASE - - 3RD FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - 2ND FLOOR BACK CHASE 1ST LAYER/2ND LAYER - - SHAFT FIRST LAYER 2ND,3RD,4TH FLOORS - - SHAFT 2ND LAYER 2ND,3RD,4TH FLOORS - - SHAFT CEILING 4TH FLOOR - - BACKSIDE SHAFT 2ND LAYER WEST WALL UNITS 201,301,401,- - 1 LAYER AT SHAFT UNITS 201,301,401 , - - FIRST FLOOR DEAD SPACE - - LAYER 2 EAST FACE ELEVATOR "A" FLOORS 2 & 4 - ELEVATOR "A" LOBBY 1ST LAYER FLOOR 1 & 4 - - ELEVATOR "A" FACE 1ST/2ND LAYERS FLOORS 2,3,4, - - FIRE LID SCREW PATTERN OUTSIDE ELEVATOR "A" LOBBY -
THE FOLLOWING AREAS ARE APPROVED
Resolved
04/13/2021
Miscellaneous Inspection Failed 4/14/2021 4/14/2021 04/14/2021
Misc
Corrective Action Required
04/13/2021
: 4TH & 3RD,2ND FLOOR REQUIRED INSPECTIONS : - STAIRWAYS, CORRIDORS, ELECTRICAL & IT ROOMS :- 461 (ADA UNIT) THE WORK SURFACE SHALL BE 34" INCHES MAXIMUM ABOVE THE FLOOR ( 1103.12.3.2 PER ICC A117.1-2017) - STROBES, GRAB BARS, THRESHOLD SGD, INSULATE PIPES UNDER SINKS - - 366 REPAIR DRYWALL CEILING LIVING ROOM & MASTER BATH - - MECH ROOM NEXT TO UNITS 265/249 FIRE CAULK- - ELECTRICAL ROOM NEAR 243/244 FIRE CAULK - - 254 PROVIDE 42" DECK RAIL - - 264 TIGHTEN GUARDRAIL ON DECK - Trash rooms 224B switch plate cover missing 324B switch plate cover missing , sprinkler Eschlons 424B switch plate cover missing; Electrical rooms not ready per peter 121A,221A,321A,421A,225A,235A,425A. 332-#11 AFCI breaker will not trip. 333-Light switch in mechanical room. -254 deck rail 42" -264 tighten guardrail deck Mech room next to unit 265 /249 Electrical room 243/244 Fire caulk not complete list. MARK HARDING 04/13/2021 2:34 PM
FOURTH FLOOR
Corrective Action Required
04/13/2021
Pre final -units approved: 444,445,446,447,448,449,450,451 ,452 ,453 ,454 ,455 ,456 ,457 ,458 ,459,437,438,439 , 440,441,442, 443 ,460 ,462,463 ,464 ,465. 431-436; 461 ADA countertops 34", insulating sink drains, strobes, grab bars, threshold sgd ? Code section ?
THIRD FLOOR
Corrective Action Required
04/13/2021
3/29/21 339 ,340 ,341 ,342 ,343;345, 346-365;367; 345,344. 331-338, 366 need to correct ceiling drywall repair
SECOND FLOOR
Corrective Action Required
04/13/2021
4/8/21 4/9/21 239-253; 255 -263 ;265-267;
FIRST FLOOR
Corrective Action Required
04/13/2021
4/12/21 119; 122-138; 117 seal exterior GFCI, seal pex line going to hallway, label service panel 118 provide unit #, fire caulk pex laundry at water heater, secondary lock SGD , 119 ok 120 unit #, provide GFCI dishwasher, sprinkler escutcheon deck 121 label service panel, sprinkler head escutcheon deck seal it 122 seal at sprinkler mech room, secondary lock SGD, label service panel, bath exhaust fan 230 seal penetrations mech closet, sprinkler head escutcheon deck seal it 231 ok 232 ok 233 secure #9 breaker service panel 234 seal penetrations mech closet 235 check GFCI behind stack washer & dryer 236 fire caulk MC cable mech closet ceiling 237 service panel secure #9 breaker 238 label service panel, GFCI deck not working
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/13/2021
Pre Final areas approved are the following; see sepertate floor levels. *:
Miscellaneous Inspection Partial 4/15/2021 4/15/2021 04/15/2021
Misc
Resolved
04/16/2021
FOURTH FLOOR
Resolved
04/16/2021
Pre final -units approved: 444,445,446,447,448,449,450,451 ,452 ,453 ,454 ,455 ,456 ,457 ,458 ,459,437,438,439 , 440,441,442, 443 ,460 ,462,463 ,464 ,465. 431-436; 461 , 425A,421A,424B, Corridor 412
THIRD FLOOR
Corrective Action Required
04/14/2021
3/29/21 339 ,340 ,341 ,342 ,343;345, 346-365;366, 367; 345,344. 331-338, 324B 332,333,
SECOND FLOOR
Corrective Action Required
04/14/2021
4/8/21 4/9/21 239-253; 255 -263 ;265-267;221A,230,231,232,234,235,236,238,
FIRST FLOOR
Corrective Action Required
04/14/2021
4/12/21 119; 122-138; 117 ok 118 ok 119 ok 120 ok 121 ok 120A ok 122 ok 120A ok 230 ok 231 ok 232 ok 233 ok 234 ok 235 ok 236 ok 237 ok 238 ok 225A ok 220A ok
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/14/2021
Pre Final areas approved are the following; see sepertate floor levels. *:
Alarm Test Partial 4/15/2021 04/15/2021
Sprinkler - Flow Test Passed 4/15/2021 04/15/2021
Occupancy Inspection - Planning Temporary C of O 4/16/2021 04/16/2021
Corrective Action Required
04/16/2021
The landscaping was incomplete at the time of inspection.
Corrective Action Required
04/16/2021
Many areas were missing sod/grass.
Corrective Action Required
04/16/2021
An interior garage/parking inspection will be needed prior to utilizing it for parking.
Corrective Action Required
04/16/2021
Some exterior finishing still is needed for the building. It was noted some kind of barrier sheeting was visible.
Corrective Action Required
04/16/2021
General site clean up is needed.
Occupancy Inspection - Engineering Temporary C of O 4/16/2021 04/16/2021
Misc
Informational
04/16/2021
4-16-21 8:39am Punch list items: The cables on inlet and vault lids will need to be cut off and grouted over. Vegetation will need to be installed and established at 70 percent. All debris on site will need to be picked up. After vegetation has been established gutter buddy’s and other erosion controls will need to be removed as well as street signs , port-a-potty’s, trash dumpster’s etc.
Occupancy Inspection - Fire Failed 4/16/2021 4/16/2021 04/16/2021
Occupancy Inspection - Planning Temporary C of O 4/16/2021 04/16/2021
Occupancy Inspection - Planning Temporary C of O 4/16/2021 04/16/2021
Occupancy Inspection - Planning Temporary C of O 4/16/2021 04/16/2021
Occupancy Inspection - Codes Commercial Failed 4/16/2021 4/16/2021 04/16/2021
Miscellaneous Correction
Corrective Action Required
04/16/2021
1.Provide permanent handrails lobby area 2. Stencil rated walls above ceiling in corridor and retail side. 3. Mechanical room near fitness center not ready Fitness center & Restrooms not inspected. 4. 4th floor Community room, Deck & Restrooms Not Inspected. 5. Roof- label RTUs, Mini splits, secure A/C whips, Label with Room number. 6. complete GFCIs on Roof deck. 7. Pool & Courtyards not inspected. 8. Lobby wet bar not ready . 9. Trash room, electrical room north , open junction box, cover plate, sprinkler escutcheon. Area "E", "D" Rooms on 1,2,3,4th floors 10. Garage- check all penetrations through floor. Complete rail at ramp. Glass enclosure at Elevator and stairs. 11. Penetrations at south stair enclosure. 12. permanent gates on stair towers need to be complete. 13 Label all electrical panels, meter cans with room numbers. 14. Permanent label all retail corridor doors. 15. 120A- caulk and label main panel. 16.142A- seal damper and receptacle cover. 17.122C- water heater not installed, open electrical box, label panel. 18. 176B Ice room incomplete. 19. Lobby stairs - handrails need to be complete for TCO. 20. block off lobby area for TCO where incomplete, block off other areas pending inspection for TCO as discussed. AREAS not inspected : SOUTH of fire doors phase 2: South units not inspected, south corridor, 141 trash, electrical room, 4th fl amenity, bathrooms 4th fl. gas and fire place, patio 4ht floor. Complete Fire dept. list
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/16/2021
The Following areas are approved for a TCO and to be Occupied. None at this time MARK HARDING 04/16/2021 2:57 PM
Alarm Test Passed 4/19/2021 04/19/2021
Occupancy Inspection - Fire Failed 4/19/2021 04/19/2021
Miscellaneous Inspection Partial 4/20/2021 4/20/2021 04/20/2021
Misc
Corrective Action Required
04/15/2021
not complete list. MARK HARDING 04/13/2021 2:34 PM
FOURTH FLOOR
Corrective Action Required
04/15/2021
Pre final -units approved: 444,445,446,447,448,449,450,451 ,452 ,453 ,454 ,455 ,456 ,457 ,458 ,459,437,438,439 , 440,441,442, 443 ,460 ,462,463 ,464 ,465. 431-436; 461 , 425A,421A,424B, Corridor 412
THIRD FLOOR
Corrective Action Required
04/15/2021
3/29/21 339 ,340 ,341 ,342 ,343;345, 346-365;366, 367; 345,344. 331-338, 324B 332,333,
SECOND FLOOR
Corrective Action Required
04/15/2021
4/8/21 4/9/21 239-253; 255 -263 ;265-267;221A,230,231,232,234,235,236,238,
FIRST FLOOR
Corrective Action Required
04/15/2021
4/12/21 119; 122-138; 117 ok 118 ok 119 ok 120 ok 121 ok 120A ok 122 ok 120A ok 230 ok 231 ok 232 ok 233 ok 234 ok 235 ok 236 ok 237 ok 238 ok 225A ok 220A ok
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/15/2021
Pre Final areas approved are the following; see sepertate floor levels. *:
Occupancy Inspection - Codes Commercial Failed 4/20/2021 04/20/2021
Miscellaneous Correction
Corrective Action Required
04/16/2021
1.Provide permanent handrails lobby area 2. Stencil rated walls above ceiling in corridor and retail side. 3. Mechanical room complete Fitness center & Restrooms not inspected. 4. 4th floor Community room, Deck & Restrooms Not Inspected. 5. Roof- label RTUs, Mini splits, secure A/C whips, Label with Room number. 6. complete GFCIs on Roof deck. 7. Pool & Courtyards not inspected. 8. Lobby wet bar not ready . 9. Trash room, electrical room north , open junction box, cover plate, sprinkler escutcheon. Area "E", "D" Rooms on 1,2,3,4th floors 10. Garage- check all penetrations through floor. Complete rail at ramp. Glass enclosure at Elevator and stairs. 11. Penetrations at south stair enclosure. 12. permanent gates on stair towers need to be complete. 13 Label all electrical panels, meter cans with room numbers. 14. Permanent label all retail corridor doors. 15. 120A- complete 16.142A- complete 17.112C- complete 18. 176B Complete 19. Lobby stairs - handrails need to be complete for TCO. 20. block off lobby area for TCO where incomplete, block off other areas pending inspection for TCO as discussed. AREAS not inspected : SOUTH of fire doors phase 2: South units not inspected, south corridor, 141 trash, electrical room, 4th fl amenity, bathrooms 4th fl. gas and fire place, patio 4ht floor. Complete Fire dept. list
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/16/2021
The Following areas are approved for a TCO and to be Occupied. None at this time MARK HARDING 04/16/2021 2:57 PM
Occupancy Inspection - Fire Partial 4/21/2021 04/21/2021
Occupancy Inspection - Codes Commercial Failed 4/23/2021 4/23/2021 04/23/2021
Miscellaneous Correction
Corrective Action Required
04/20/2021
1.Provide permanent handrails lobby area. 2. Stencil rated walls above ceiling in corridor and retail side. Fitness center & Restrooms not inspected. 4. 4th floor Community room, Deck & Restrooms Not Inspected. 5. secure A/C whips, address electrcial in liquid tight conduit. 6. complete GFCIs on Roof deck. 7. Pool & Courtyards not inspected. 8. Lobby wet bar not ready . 14. Permanent label all retail corridor doors. 19. Lobby stairs - handrails installed but not compliant. 20. block off lobby area for TCO where incomplete, block off other areas pending inspection for TCO as discussed. Emergency extior lights on retail, being installed. Complete Fire dept. list
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/20/2021
The Following areas are approved for a TCO and to be Occupied. Area "E", "D" Rooms on 1,2,3,4th floors . Parking garage, and basement areas, retail white box areas A-O, Lobby, Sales offices. Approved for Property Manager to occupy and allow Hardhat tours on the approved areas only.
Miscellaneous Inspection Partial 5/13/2021 5/13/2021 05/13/2021
Misc
Corrective Action Required
04/20/2021
4th floor corrections 5/13/21 405locked 426 locked 406-427-424-408-fire caulk hole in ceiling furnace room. 425-painted head in furnace room. Storage ok 423- dishwasher breaker not working. 421-porch railing. 1-4A panel room, open panel for label. Correct fire damper control in wall over door. Inspected and OK -404 ,407,409,410,420,419,422,428,429
FOURTH FLOOR
Corrective Action Required
04/20/2021
Pre final -units approved: 444-459,431- 443 ,460-465. , 425A,421A,424B, Corridor 412 5/13/21 Following "B" side Ok-429,428,404 ,407,422,409,420,419,410,
THIRD FLOOR
Corrective Action Required
04/20/2021
3/29/21 339 ,340 ,341 ,342 ,343;345, 346-365;366, 367; 345,344. 331-338, 324B 332,333,
SECOND FLOOR
Corrective Action Required
04/20/2021
4/8/21 4/9/21 239-253; 255 -263 ;265-267;221A,230,231,232,234,235,236,238,
FIRST FLOOR
Corrective Action Required
04/20/2021
4/12/21 119; 122-138; 117 ok 118 ok 119 ok 120 ok 121 ok 120A ok 122 ok 120A ok 230 ok 231 ok 232 ok 233 ok 234 ok 235 ok 236 ok 237 ok 238 ok 225A ok 220A ok
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/20/2021
Pre Final areas approved are the following; see sepertate floor levels. *:
Miscellaneous Inspection Partial 5/14/2021 05/14/2021
Misc
Corrective Action Required
05/13/2021
413 -AFCI/GFCI at dishwasher circuit 414 -install another tip at range -Self closing and latching door at corridor 415 -faulty exterior GFCI receptacle 418 -loose guardrail at balcony 1-4A panel room, open panel for label. Correct fire damper control in wall over door. Inspected and OK -404 ,407,409,410,420,419,422,428,429, 401, 402, 403, 405, 406, 408, 411, 412, 416, 417, 421, 423, 424, 425, 426, 427
FOURTH FLOOR
Corrective Action Required
05/13/2021
Pre final -units approved: 444-459,431- 443 ,460-465. , 425A,421A,424B, Corridor 412 5/13/21 Following "B" side Ok-429,428,404 ,407,422,409,420,419,410,
THIRD FLOOR
Corrective Action Required
05/13/2021
3/29/21 331-367; 324B
SECOND FLOOR
Corrective Action Required
05/13/2021
4/8/21 4/9/21 ; 255 -263 ;265-267;221A,230-253; 225A ok 220A ok
FIRST FLOOR
Corrective Action Required
05/13/2021
4/12/21 117--138; 120A ok
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/13/2021
Pre Final areas approved are the following; see sepertate floor levels. *:
Miscellaneous Inspection Partial 5/17/2021 5/17/2021 05/17/2021
Misc
Corrective Action Required
05/14/2021
413 -AFCI/GFCI at dishwasher circuit 414 -install another tip at range -Self closing and latching door at corridor 415 -faulty exterior GFCI receptacle 418 -loose guardrail at balcony 1-4A panel room, open panel for label. Correct fire damper control in wall over door. Inspected and OK -404 ,407,409,410,420,419,422,428,429, 401, 402, 403, 405, 406, 408, 411, 412, 416, 417, 421, 423, 424, 425, 426, 427
FOURTH FLOOR
Corrective Action Required
05/14/2021
Pre final -units approved: 444-459,431- 443 ,460-465. , 425A,421A,424B, Corridor 412 5/13/21 Following "B" side Inspected 401- 412; 416,417, 419-429;
THIRD FLOOR
Corrective Action Required
05/14/2021
3/29/21 331-367; 324B 5/17/21 301,303,304,305,306,307, APPROVED 322, 323,324,326,327,328,329, APPROVED 302 REPAIR/REPLACE GFCI BATH NEAR LAUNDRY 325 PROVIDE ANTI TIP DEVICE RANGE PROVIDE ROOM # SIGNS IN CORRIDOR
SECOND FLOOR
Corrective Action Required
05/14/2021
4/8/21 4/9/21 ; 255 -263 ;265-267;221A,230-253; 225A ok 220A ok
FIRST FLOOR
Corrective Action Required
05/14/2021
4/12/21 117--138; 120A ok
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/14/2021
Pre Final areas approved are the following; see sepertate floor levels. *:
Miscellaneous Inspection Partial 5/18/2021 5/18/2021 05/18/2021
Misc
Corrective Action Required
05/17/2021
Inspected and OK -404 , 404A, 406A,406B,408A,407,409,410,410A,413, 414,415,, 420,419,422,428,429, 401, 402, 403, 405, 406, 408, 411, 412, 416, 417,418, 421, 423, 424, 425, 426, 427
FOURTH FLOOR
Corrective Action Required
05/17/2021
Pre final -units approved: 444-459,431- 443 ,460-465. , 425A,421A,424B, Corridor 412 5/13/21 Following "B" side Inspected 401- 412; 416,417, 419-429;
THIRD FLOOR
Corrective Action Required
05/17/2021
3/29/21 331-367; 324B 5/17/21 301,303,304,305,306,307,308,309,310,312,313,315,316,318,319,321,322, 323,324,326,327,328,329, APPROVED 302 REPAIR/REPLACE GFCI BATH NEAR LAUNDRY 325 PROVIDE ANTI TIP DEVICE RANGE 311 BATH EXHAUST, LAUNDRY SPRINKLER ESCUTCHEON 314 NO ACCESS 317 SECURE GFCI BOX DISHWASHER UNDER SINK 320 DECK RAIL OVER 4" PROVIDE ROOM # SIGNS IN CORRIDOR
SECOND FLOOR
Corrective Action Required
05/17/2021
4/8/21 4/9/21 ; 255 -263 ;265-267;221A,230-253; 225A ok 220A ok
FIRST FLOOR
Corrective Action Required
05/17/2021
4/12/21 117--138; 120A ok
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/17/2021
Pre Final areas approved are the following; see sepertate floor levels. *:
Miscellaneous Inspection Partial 5/19/2021 5/19/2021 05/19/2021
Misc
Corrective Action Required
05/18/2021
FOLLOWING UNIT REQUIRE CORRECTIONS 314 ADA PROVIDE INSULATION SINK & VANITIES, SEAL EXTERIOR PENETRATIONS 201 UNIT # CORRIDOR 204 COVER PLATE LAUNDRY,COMPLETE FAUCETS & DRAIN MASTER BATH 207 GFCI DISHWASHER 222 GFCI ISLAND HOT NEUTRAL REVERESED
FOURTH FLOOR
Corrective Action Required
05/18/2021
Pre final -units approved: 444-459,431- 443 ,460-465. , 425A,421A,424B, Corridor 412 5/13/21 Following "B" side Inspected 401-429;
THIRD FLOOR
Corrective Action Required
05/18/2021
3RD FLOOR UNITS APPROVED 3/29/21 331-367; 324B 5/17/21 301-313,315-329, APPROVED
SECOND FLOOR
Corrective Action Required
05/18/2021
2ND FLOOR UNITS APPROVED ; 255 -263 ;265-267;221A,230-253; 225A ok 220A ok 202-203 205-206 223-229
FIRST FLOOR
Corrective Action Required
05/18/2021
4/12/21 117--138;
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/18/2021
Pre Final areas approved are the following; see sepertate floor levels. *:
Miscellaneous Inspection Partial 5/20/2021 5/20/2021 05/20/2021
Misc
Corrective Action Required
05/19/2021
FOLLOWING UNIT REQUIRE CORRECTIONS 314 ADA PROVIDE INSULATION SINK & VANITIES, SEAL EXTERIOR PENETRATIONS 201 UNIT # CORRIDOR 204 COVER PLATE LAUNDRY,COMPLETE FAUCETS & DRAIN MASTER BATH 219 COPING AT DECK RAIL 220 COPING AT DECK RAIL 221 GFCI DISHWASHER,COVER PLATE DINING ROOM 206B TRASH ROOM MISSING COVER PLATE/DEVICE 204A FIRE CAULK CEILNG 210A FIRE CAULK CEILING
FOURTH FLOOR
Corrective Action Required
05/19/2021
Pre final -units approved: 444-459,431- 443 ,460-465. , 425A,421A,424B, Corridor 412 5/13/21 Following "B" side Inspected 401-429;
THIRD FLOOR
Corrective Action Required
05/19/2021
3RD FLOOR UNITS APPROVED 3/29/21 331-367; 324B 5/17/21 301-313,315-329, MECH,TRASH,ELEC APPROVED
SECOND FLOOR
Corrective Action Required
05/19/2021
2ND FLOOR UNITS APPROVED ; 255 -263 ;265-267;221A,230-253; 225A ok 220A ok AREA B 202-203 205-218 222-229
FIRST FLOOR
Corrective Action Required
05/19/2021
4/12/21 117--138;
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/19/2021
Pre Final areas approved are the following; see sepertate floor levels. *:
Miscellaneous Inspection Partial 5/21/2021 5/21/2021 05/21/2021
Misc
Corrective Action Required
05/20/2021
FOLLOWING UNIT REQUIRE CORRECTIONS 4TH FLOOR AMENITY GFCI LEFT OF SINK NOT WORKING 4TH FLOOR PATIO WEST GUARD NORTH SECTION LOOSE, PATIO GRILL NOT INSTALLED 102 BATH EXHAUST FAN NOT WORKING 103 SECURE SMOKE DETECTOR BEDROOM, COVER PLATE CLOSET, NO SHOWER HEAD 105 MISSING LIGHT FIXTURES,OPEN ELEC BOX ISLAND, FIRE CAULK LINE SET MECH CLOSET 106 HAMMER ARRESTOR DISHWASHER 107 COVER PLATE KITCHEN, MISSSING DOOR HARDWARE, SELF CLOSING LATCHING ENTRY DOOR 108 INSTALL WATER HEATER, SHOWER FIXTURES 109 SECURE MC CABLE KITCHEN ISLAND 110 SELF CLOSING DOOR ENTRY, MISSING DOOR HARDWARE, COMPLETE BATHROOM PLUMBING, LOCKOUT DEVICE WATER HEATER, SECURE MC CABLE UNDER KITCHEN ISLAND 111 FIRE CAULK CEILING MECH CLOSET, LOOSE GUARDRAIL DECK, BROKEN WINDOW BEDROOM 112 SELF CLOSING ENTRY DOOR, MISSING DOOR HARDWARE, INSTALL WATER HEATER, LIGHT FIXTURE ABOVE ISLAND,HAMMER ARRESTOR DISHWASHER, COMPLETE BATHROOM PLUMBING 113 COMPLETE PLUMBING 114 SELF CLOSING/LATCHING ENTRY DOOR, MISSING DOOR HARDWARE
FOURTH FLOOR
Corrective Action Required
05/20/2021
Pre final -units approved: 444-459,431- 443 ,460-465. , 425A,421A,424B, Corridor 412 5/13/21 Following "B" side Inspected 401-429; 4TYH FLOOR BATHROOMS ROOF TOP APPROVED PER JOHN MORRIS
THIRD FLOOR
Corrective Action Required
05/20/2021
3RD FLOOR UNITS APPROVED 3/29/21 331-367; 324B 5/17/21 301-329, MECH,TRASH,ELEC APPROVED
SECOND FLOOR
Corrective Action Required
05/20/2021
2ND FLOOR UNITS APPROVED ; 255 -263 ;265-267;221A,230-253; 225A ok 220A ok AREA B 201-229
FIRST FLOOR
Corrective Action Required
05/20/2021
THE FOLLOWING 1ST FLOOR AREAS ARE APPROVED 4/12/21 117--138; "B" AREA 101,104,115,116 YOGA, FITNESS,BATHROOMS, SOUTH TRASH ROOM, COFFEE BAR, ELECTRICAL & MECHANICAL ROOMS
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/20/2021
Pre Final areas approved are the following; see sepertate floor levels. *:
Occupancy Inspection - Water Utilities Passed 5/25/2021 05/24/2021
Miscellaneous Inspection Partial 5/24/2021 5/24/2021 05/24/2021
Misc
Corrective Action Required
05/21/2021
FOLLOWING UNIT REQUIRE CORRECTIONS 4TH FLOOR PATIO WEST GUARD NORTH SECTION LOOSE, PATIO GRILL NOT INSTALLED **Pool and court yards not inspected, check pool room in basment. 105 MISSING LIGHT FIXTURES,OPEN ELEC BOX ISLAND, FIRE CAULK LINE SET MECH CLOSET 107 COVER PLATE KITCHEN, MISSSING DOOR HARDWARE, SELF CLOSING LATCHING ENTRY DOOR 108 INSTALL WATER HEATER, SHOWER FIXTURES 109 SECURE MC CABLE KITCHEN ISLAND 110 SELF CLOSING DOOR ENTRY, MISSING DOOR HARDWARE, COMPLETE BATHROOM PLUMBING, LOCKOUT DEVICE WATER HEATER, SECURE MC CABLE UNDER KITCHEN ISLAND 112 SELF CLOSING ENTRY DOOR, MISSING DOOR HARDWARE, INSTALL WATER HEATER, LIGHT FIXTURE ABOVE ISLAND,HAMMER ARRESTOR DISHWASHER, COMPLETE BATHROOM PLUMBING 114 SELF CLOSING/LATCHING ENTRY DOOR, MISSING DOOR HARDWARE
FOURTH FLOOR
Corrective Action Required
05/21/2021
4TH FLOOR
THIRD FLOOR
Corrective Action Required
05/21/2021
3RD FLOOR UNITS APPROVED
SECOND FLOOR
Corrective Action Required
05/21/2021
2ND FLOOR UNITS APPROVED
FIRST FLOOR
Corrective Action Required
05/21/2021
THE FOLLOWING 1ST FLOOR AREAS ARE APPROVED 4/12/21 117--138; "B" AREA 101-104,106,111,113,115,116 YOGA, FITNESS,BATHROOMS, SOUTH TRASH ROOM, COFFEE BAR, ELECTRICAL & MECHANICAL ROOMS,
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/21/2021
Pre Final areas approved are the following; see sepertate floor levels. *:
Occupancy Inspection - Engineering Temporary C of O 6/9/2021 5/25/2021 05/25/2021
Misc
Informational
04/16/2021
4-16-21 8:39am Punch list items: The cables on inlet and vault lids will need to be cut off and grouted over. Vegetation will need to be installed and established at 70 percent. All debris on site will need to be picked up. After vegetation has been established gutter buddy’s and other erosion controls will need to be removed as well as street signs , port-a-potty’s, trash dumpster’s etc.
Misc
Informational
05/25/2021
5-25-21 9:47am Punch list items: Debris on the north side of the site needs addressed. Port-a-potty’s, trash dumpser’s will need to be removed. Silt fence in the inlets on the north side, all trailers will need removed as well. All constructions materials on site need to be removed.
Occupancy Inspection - Fire Passed 5/25/2021 5/25/2021 05/25/2021
Occupancy Inspection - Planning Temporary C of O 5/25/2021 5/25/2021 05/25/2021
Corrective Action Required
05/25/2021
Upon inspection 25 of the required trees appaired to be dead. The dead trees had little to no leaves/buds on them. A small number of the trees did have a very small amount of buds that where green but did not appear that the tree was healthy. Please replace the dead trees.
Pool Steel/Bonding - Commercial Passed 05/25/2021
Misc
Resolved
05/25/2021
--POOL BONDINGFLOOR AND WALLS 4 LOCATIONS. - POOL STAIRS & SHELL - - PERGOLA CENTER COURTYARD STEEL - - ANCHOR SOCKETS FOR HANDRAIL -
Underslab Electrical Inspection - Commercial Passed 5/26/2021 05/26/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
05/26/2021
- LOBBY FLOOR LIGHTS AT STAIRS -
Occupancy Inspection - Codes Commercial Temporary C of O 5/27/2021 5/27/2021 05/26/2021
Miscellaneous Correction
Corrective Action Required
04/23/2021
4. 4th floor Community room Not Inspected. 7. Pool & Courtyards not inspected. units on 1st floor.
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/23/2021
Pending items for 5/25, 5 doors without hardware- 2 missiing exterior egress lights over north retail east wall. FIRE department approved Water approved Engineering ok for TCO untill 6/9 or before. Planning tree issue , to be complete by 6/1 per landscape contractor.
Miscellaneous Inspection Passed 5/27/2021 5/27/2021 05/27/2021
Misc
Corrective Action Required
05/24/2021
CODES COMPLETE
FOURTH FLOOR
Corrective Action Required
05/24/2021
4TH FLOOR UNITS APPROVED
THIRD FLOOR
Corrective Action Required
05/24/2021
3RD FLOOR UNITS APPROVED
SECOND FLOOR
Corrective Action Required
05/24/2021
2ND FLOOR UNITS APPROVED
FIRST FLOOR
Corrective Action Required
05/24/2021
THE FOLLOWING 1ST FLOOR AREAS ARE APPROVED 4/12/21 117--138; "B" AREA 101-116 YOGA, FITNESS,BATHROOMS, SOUTH TRASH ROOM, COFFEE BAR, ELECTRICAL & MECHANICAL ROOMS,
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/24/2021
Pre Final areas approved are the following; see sepertate floor levels. *:
Occupancy Inspection - Codes Commercial Temporary C of O 5/28/2021 05/27/2021
Miscellaneous Correction
Resolved
05/27/2021
CODES COMPLETE
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/27/2021
CODES approved FIRE department approved Water approved Engineering ok for TCO untill 6/9 or before. Planning tree issue , to be complete by 6/1 per landscape contractor.
Occupancy Inspection - Engineering Not Ready 6/9/2021 06/09/2021
Misc
Informational
05/25/2021
4-16-21 8:39am Punch list items: The cables on inlet and vault lids will need to be cut off and grouted over. Vegetation will need to be installed and established at 70 percent. All debris on site will need to be picked up. After vegetation has been established gutter buddy’s and other erosion controls will need to be removed as well as street signs , port-a-potty’s, trash dumpster’s etc.
Misc
Informational
05/25/2021
5-25-21 9:47am Punch list items: Debris on the north side of the site needs addressed. Port-a-potty’s, trash dumpser’s will need to be removed. Silt fence in the inlets on the north side, all trailers will need removed as well. All constructions materials on site need to be removed. 6-9-21 9:52am No punch list items have been addressed. I will inspect the site again on 6-23-21.
Occupancy Inspection - Codes Commercial Temporary C of O 06/14/2021
Misc
Corrective Action Required
06/14/2021
CODES approved FIRE department approved Water approved Engineering ok for TCO untill 6/23 or before. Planning tree issue , to be complete by 6/1 per landscape contractor.
Occupancy Inspection - Codes Commercial Temporary C of O 07/09/2021
Corrective Action Required
07/09/2021
CODES approved FIRE department approved Water approved Engineering ok for TCO untill 7/23 or before. Planning tree issue
Occupancy Inspection - Engineering Passed 08/03/2021
Misc
Corrective Action Required
06/14/2021
4-16-21 8:39am Punch list items: The cables on inlet and vault lids will need to be cut off and grouted over. Vegetation will need to be installed and established at 70 percent. All debris on site will need to be picked up. After vegetation has been established gutter buddy’s and other erosion controls will need to be removed as well as street signs , port-a-potty’s, trash dumpster’s etc.
Misc
Informational
06/09/2021
5-25-21 9:47am Punch list items: Debris on the north side of the site needs addressed. Port-a-potty’s, trash dumpser’s will need to be removed. Silt fence in the inlets on the north side, all trailers will need removed as well. All constructions materials on site need to be removed. 6-9-21 9:52am No punch list items have been addressed. I will inspect the site again on 6-23-21.
Occupancy Inspection - Codes Commercial Full C of O 08/03/2021
Documents & Images
Date Uploaded File Type Document Name
08/05/2019 Letter License Tax Bill
08/12/2019 Email License tax info
08/19/2019 Letter Fire Building Plan Review
08/19/2019 Letter DS P/R Corrections Document
09/10/2019 Letter Fire Building Plan Review
09/11/2019 Letter DS P/R Corrections Document
11/04/2019 Letter West Pryor Lot #10 - SI Letter of Intent
12/19/2019 Receipt Receipt for transaction: 2019-007774
01/02/2020 Letter DS Building Permit
01/17/2020 Letter Fire (Sprinkler) Plan Review
01/27/2020 Letter Fire (Alarm) Plan Review Notice
01/27/2020 Letter Fire (Sprinkler) Plan Review
01/31/2020 Letter Fire Building Plan Review
02/21/2020 Letter Fire (Alarm) Plan Review Notice
04/10/2020 Plans Revised Sheets - Revision 3_4.3.2020
04/10/2020 Letter Revision 3 Narrative 4.3.2020
04/13/2020 Summit at West Pryor 4.13.2020_Structural & MEP
04/13/2020 Summit at West Pryor 4.13.2020_Full Architectural-FIRST
04/13/2020 Summit at West Pryor 4.13.2020_Full Architectural- SECOND
04/13/2020 Plans Approved - Vol 1
04/13/2020 Plans Approved - Vol 2
04/13/2020 Plans Approved - Vol 3
04/24/2020 Letter Revision 4 Narrative 4.24.2020
04/24/2020 Plans 18-046_Summit at West Pryor - Revision 4_4.24.2020
04/24/2020 Plans Approved revisions 1
05/07/2020 Letter INSPECTION SUMMARY
05/07/2020 Letter INSPECTION SUMMARY
05/11/2020 Letter INSPECTION SUMMARY
05/20/2020 Letter INSPECTION SUMMARY
05/27/2020 Letter INSPECTION SUMMARY
05/27/2020 Letter INSPECTION SUMMARY
06/04/2020 Letter INSPECTION SUMMARY
06/08/2020 Letter INSPECTION SUMMARY
06/08/2020 Letter DS Building Permit
06/08/2020 Letter Codes Plan Review Conditions
06/08/2020 Letter INSPECTION SUMMARY
06/09/2020 Letter Fire (Sprinkler) Plan Review
06/09/2020 Letter INSPECTION SUMMARY
06/11/2020 Letter Fire (Alarm) Plan Review Notice
06/11/2020 Letter INSPECTION SUMMARY
06/12/2020 Letter INSPECTION SUMMARY
06/15/2020 Letter INSPECTION SUMMARY
06/15/2020 Plans Summit at west pryor Pool plan set 6-4-20 Stamped
06/16/2020 Letter INSPECTION SUMMARY
06/16/2020 Letter INSPECTION SUMMARY
06/16/2020 Letter INSPECTION SUMMARY
06/16/2020 Letter INSPECTION SUMMARY
06/18/2020 Summit West - Fire Sprinkler Revised 6-17-20+
06/22/2020 Letter INSPECTION SUMMARY
06/26/2020 Letter INSPECTION SUMMARY
07/01/2020 Letter INSPECTION SUMMARY
07/01/2020 Letter INSPECTION SUMMARY
07/02/2020 Letter Revision 5 Narrative 7_2_2020
07/02/2020 Plans 18-046_Summit at West Pryor - Revision 5_7_2_2020_Part 2
07/02/2020 Plans 18-046_Summit at West Pryor - Revision 5_7_2_2020_Part 1
07/07/2020 Letter Fire Building Plan Review
07/13/2020 Approved Plans Approved - Revision 5_7_2_2020_Part 1
07/13/2020 Approved Plans Approved - Revision 5_7_2_2020_Part 2
07/13/2020 Letter INSPECTION SUMMARY
07/13/2020 Letter INSPECTION SUMMARY
07/15/2020 Email Jxn Cty - pool approval
07/15/2020 Letter INSPECTION SUMMARY
07/15/2020 Letter INSPECTION SUMMARY
07/15/2020 Plans Summit at west pryor Pool plan set 6-4-20 Stamped
07/15/2020 Letter DS P/R Corrections Document
07/17/2020 Letter INSPECTION SUMMARY
07/20/2020 Letter INSPECTION SUMMARY
07/20/2020 Letter INSPECTION SUMMARY
07/21/2020 Letter INSPECTION SUMMARY
07/21/2020 Letter INSPECTION SUMMARY
07/21/2020 Plans Summit at west pryor Pool plan set 6-4-20 Stamped proposed rail revision_VDA Seal_7-21-20
07/23/2020 Letter INSPECTION SUMMARY
07/23/2020 Letter INSPECTION SUMMARY
07/23/2020 Letter INSPECTION SUMMARY
07/23/2020 Letter INSPECTION SUMMARY
07/24/2020 Letter INSPECTION SUMMARY
07/28/2020 Letter INSPECTION SUMMARY
07/28/2020 Letter INSPECTION SUMMARY
07/30/2020 Letter INSPECTION SUMMARY
07/30/2020 Letter INSPECTION SUMMARY
07/31/2020 Letter INSPECTION SUMMARY
07/31/2020 Letter INSPECTION SUMMARY
08/06/2020 Letter INSPECTION SUMMARY
08/06/2020 Letter INSPECTION SUMMARY
08/07/2020 Letter INSPECTION SUMMARY
08/07/2020 Letter INSPECTION SUMMARY
08/08/2020 Letter INSPECTION SUMMARY
08/10/2020 Letter INSPECTION SUMMARY
08/11/2020 Letter INSPECTION SUMMARY
08/11/2020 Letter INSPECTION SUMMARY
08/13/2020 Letter INSPECTION SUMMARY
08/13/2020 Letter INSPECTION SUMMARY
08/14/2020 Letter INSPECTION SUMMARY
08/14/2020 Letter INSPECTION SUMMARY
08/17/2020 Letter INSPECTION SUMMARY
08/17/2020 Letter INSPECTION SUMMARY
08/18/2020 Summit at West Pryor_full set_08_10_20_VDA Seal_8-18-20
08/18/2020 Approved Plans Approved pool plans
08/18/2020 Letter INSPECTION SUMMARY
08/18/2020 Letter INSPECTION SUMMARY
08/20/2020 Letter INSPECTION SUMMARY
08/20/2020 Letter INSPECTION SUMMARY
08/21/2020 Letter INSPECTION SUMMARY
08/21/2020 Letter INSPECTION SUMMARY
08/24/2020 Letter INSPECTION SUMMARY
08/24/2020 Letter INSPECTION SUMMARY
08/25/2020 Letter INSPECTION SUMMARY
08/26/2020 Letter INSPECTION SUMMARY
08/27/2020 Letter INSPECTION SUMMARY
08/27/2020 Letter INSPECTION SUMMARY
08/27/2020 Letter INSPECTION SUMMARY
08/27/2020 Letter INSPECTION SUMMARY
08/28/2020 Letter INSPECTION SUMMARY
08/28/2020 Letter INSPECTION SUMMARY
08/31/2020 Letter INSPECTION SUMMARY
08/31/2020 Letter INSPECTION SUMMARY
09/01/2020 Letter INSPECTION SUMMARY
09/01/2020 Letter INSPECTION SUMMARY
09/02/2020 Letter INSPECTION SUMMARY
09/02/2020 Letter INSPECTION SUMMARY
09/03/2020 Letter INSPECTION SUMMARY
09/03/2020 Letter INSPECTION SUMMARY
09/04/2020 Letter INSPECTION SUMMARY
09/09/2020 Letter INSPECTION SUMMARY
09/10/2020 Letter INSPECTION SUMMARY
09/14/2020 Letter INSPECTION SUMMARY
09/14/2020 Letter INSPECTION SUMMARY
09/15/2020 Letter INSPECTION SUMMARY
09/16/2020 Letter INSPECTION SUMMARY
09/17/2020 Letter INSPECTION SUMMARY
09/17/2020 Letter INSPECTION SUMMARY
09/18/2020 Letter INSPECTION SUMMARY
09/18/2020 Letter INSPECTION SUMMARY
09/21/2020 Letter INSPECTION SUMMARY
09/21/2020 Letter INSPECTION SUMMARY
09/22/2020 Letter INSPECTION SUMMARY
09/22/2020 Letter INSPECTION SUMMARY
09/22/2020 Letter INSPECTION SUMMARY
09/23/2020 Letter INSPECTION SUMMARY
09/24/2020 Letter INSPECTION SUMMARY
09/24/2020 Letter INSPECTION SUMMARY
09/28/2020 Letter INSPECTION SUMMARY
09/29/2020 Letter INSPECTION SUMMARY
09/30/2020 Letter INSPECTION SUMMARY
10/01/2020 Letter INSPECTION SUMMARY
10/01/2020 Letter INSPECTION SUMMARY
10/02/2020 Letter INSPECTION SUMMARY
10/05/2020 Letter INSPECTION SUMMARY
10/07/2020 Letter INSPECTION SUMMARY
10/07/2020 Letter INSPECTION SUMMARY
10/08/2020 Letter INSPECTION SUMMARY
10/09/2020 Letter INSPECTION SUMMARY
10/13/2020 Letter INSPECTION SUMMARY
10/13/2020 Letter INSPECTION SUMMARY
10/14/2020 Letter INSPECTION SUMMARY
10/14/2020 Letter INSPECTION SUMMARY
10/15/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/19/2020 Letter INSPECTION SUMMARY
10/19/2020 Letter INSPECTION SUMMARY
10/20/2020 Letter INSPECTION SUMMARY
10/22/2020 Letter INSPECTION SUMMARY
10/23/2020 Letter INSPECTION SUMMARY
10/23/2020 Letter INSPECTION SUMMARY
10/26/2020 Letter INSPECTION SUMMARY
10/28/2020 Letter INSPECTION SUMMARY
10/28/2020 Letter INSPECTION SUMMARY
10/29/2020 Letter INSPECTION SUMMARY
10/29/2020 Letter INSPECTION SUMMARY
10/30/2020 Letter INSPECTION SUMMARY
10/30/2020 Letter Revision 6 Narrative 10_30_2020
10/30/2020 Plans 18-046_Model_Shell_Central_Revision 6_10_30_2020
10/30/2020 Letter INSPECTION SUMMARY
11/02/2020 Engineer Report/Study 940 Pryor unit 406 truss repair
11/02/2020 Approved Plans approved - 18-046_Model_Shell_Central_Revision 6_10_30_2020
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/03/2020 Letter INSPECTION SUMMARY
11/03/2020 Letter INSPECTION SUMMARY
11/04/2020 Letter INSPECTION SUMMARY
11/05/2020 Letter INSPECTION SUMMARY
11/05/2020 Letter INSPECTION SUMMARY
11/06/2020 Letter INSPECTION SUMMARY
11/06/2020 Letter INSPECTION SUMMARY
11/09/2020 Letter INSPECTION SUMMARY
11/09/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/12/2020 Letter INSPECTION SUMMARY
11/12/2020 Letter INSPECTION SUMMARY
11/12/2020 Letter INSPECTION SUMMARY
11/13/2020 Letter INSPECTION SUMMARY
11/13/2020 Letter INSPECTION SUMMARY
11/16/2020 Letter INSPECTION SUMMARY
11/17/2020 Letter INSPECTION SUMMARY
11/18/2020 Letter INSPECTION SUMMARY
11/18/2020 Letter INSPECTION SUMMARY
11/19/2020 Letter INSPECTION SUMMARY
11/19/2020 Letter INSPECTION SUMMARY
11/20/2020 Letter INSPECTION SUMMARY
11/23/2020 Letter INSPECTION SUMMARY
11/24/2020 Letter INSPECTION SUMMARY
11/24/2020 Letter INSPECTION SUMMARY
11/24/2020 Letter INSPECTION SUMMARY
11/24/2020 Letter INSPECTION SUMMARY
11/24/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
12/01/2020 Letter INSPECTION SUMMARY
12/03/2020 Letter INSPECTION SUMMARY
12/04/2020 Letter INSPECTION SUMMARY
12/04/2020 Letter INSPECTION SUMMARY
12/04/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/08/2020 Letter INSPECTION SUMMARY
12/08/2020 Letter INSPECTION SUMMARY
12/09/2020 Letter INSPECTION SUMMARY
12/10/2020 Letter INSPECTION SUMMARY
12/10/2020 Letter INSPECTION SUMMARY
12/11/2020 Letter INSPECTION SUMMARY
12/11/2020 Letter INSPECTION SUMMARY
12/14/2020 Letter INSPECTION SUMMARY
12/14/2020 Letter INSPECTION SUMMARY
12/15/2020 Letter INSPECTION SUMMARY
12/17/2020 Letter INSPECTION SUMMARY
12/18/2020 Letter INSPECTION SUMMARY
12/21/2020 Letter INSPECTION SUMMARY
12/21/2020 Letter INSPECTION SUMMARY
12/21/2020 Letter INSPECTION SUMMARY
12/22/2020 Letter INSPECTION SUMMARY
12/22/2020 Letter INSPECTION SUMMARY
12/23/2020 Letter INSPECTION SUMMARY
12/23/2020 Letter INSPECTION SUMMARY
12/23/2020 Letter INSPECTION SUMMARY
12/29/2020 Letter INSPECTION SUMMARY
12/29/2020 Letter INSPECTION SUMMARY
12/30/2020 Letter INSPECTION SUMMARY
01/04/2021 Letter INSPECTION SUMMARY
01/05/2021 Drawing addressomg
01/05/2021 Letter INSPECTION SUMMARY
01/06/2021 Letter INSPECTION SUMMARY
01/06/2021 Letter INSPECTION SUMMARY
01/07/2021 Letter INSPECTION SUMMARY
01/07/2021 Letter INSPECTION SUMMARY
01/08/2021 Letter INSPECTION SUMMARY
01/08/2021 Letter INSPECTION SUMMARY
01/11/2021 Letter INSPECTION SUMMARY
01/12/2021 Letter INSPECTION SUMMARY
01/13/2021 Letter INSPECTION SUMMARY
01/13/2021 Letter INSPECTION SUMMARY
01/14/2021 Letter INSPECTION SUMMARY
01/14/2021 Letter INSPECTION SUMMARY
01/15/2021 Letter INSPECTION SUMMARY
01/19/2021 Letter INSPECTION SUMMARY
01/19/2021 Letter INSPECTION SUMMARY
01/20/2021 Letter INSPECTION SUMMARY
01/20/2021 Letter INSPECTION SUMMARY
01/21/2021 Letter INSPECTION SUMMARY
01/22/2021 Letter INSPECTION SUMMARY
01/25/2021 Letter INSPECTION SUMMARY
01/26/2021 Letter INSPECTION SUMMARY
01/26/2021 Letter INSPECTION SUMMARY
01/26/2021 Letter INSPECTION SUMMARY
01/28/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/02/2021 Letter INSPECTION SUMMARY
02/02/2021 Letter INSPECTION SUMMARY
02/03/2021 Letter INSPECTION SUMMARY
02/04/2021 Letter INSPECTION SUMMARY
02/10/2021 Letter INSPECTION SUMMARY
02/10/2021 Letter INSPECTION SUMMARY
02/11/2021 Letter INSPECTION SUMMARY
02/18/2021 Letter INSPECTION SUMMARY
02/18/2021 Letter INSPECTION SUMMARY
02/19/2021 Letter INSPECTION SUMMARY
02/19/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
02/24/2021 Letter INSPECTION SUMMARY
02/26/2021 Letter INSPECTION SUMMARY
03/01/2021 Letter INSPECTION SUMMARY
03/02/2021 Letter INSPECTION SUMMARY
03/02/2021 Summit at West Pryor - addressing
03/04/2021 Letter INSPECTION SUMMARY
03/04/2021 Letter INSPECTION SUMMARY
03/04/2021 Letter INSPECTION SUMMARY
03/05/2021 Letter INSPECTION SUMMARY
03/05/2021 Letter INSPECTION SUMMARY
03/09/2021 Letter Fire Loss Reduction Form
03/09/2021 Letter INSPECTION SUMMARY
03/09/2021 Letter INSPECTION SUMMARY
03/12/2021 Letter INSPECTION SUMMARY
03/12/2021 Letter INSPECTION SUMMARY
03/15/2021 Letter INSPECTION SUMMARY
03/16/2021 Letter INSPECTION SUMMARY
03/16/2021 Letter INSPECTION SUMMARY
03/16/2021 Letter INSPECTION SUMMARY
03/18/2021 Letter INSPECTION SUMMARY
03/22/2021 Letter INSPECTION SUMMARY
03/22/2021 Letter INSPECTION SUMMARY
03/22/2021 Letter Fire Loss Reduction Form
03/23/2021 Letter INSPECTION SUMMARY
03/25/2021 Letter INSPECTION SUMMARY
03/25/2021 Letter INSPECTION SUMMARY
03/25/2021 Letter INSPECTION SUMMARY
03/26/2021 Letter INSPECTION SUMMARY
03/29/2021 Letter INSPECTION SUMMARY
03/31/2021 Plans 18-046_Summit at West Pryor_Tenant finish_3_31_2021
04/02/2021 Letter INSPECTION SUMMARY
04/05/2021 Letter Fire Building Plan Review
04/07/2021 Letter INSPECTION SUMMARY
04/08/2021 Letter INSPECTION SUMMARY
04/08/2021 Approved Plans approved - 18-046_Summit at West Pryor_Tenant finish_3_31_2021
04/09/2021 Letter INSPECTION SUMMARY
04/12/2021 Letter Fire Loss Reduction Form
04/12/2021 Letter INSPECTION SUMMARY
04/12/2021 Letter INSPECTION SUMMARY
04/12/2021 Letter INSPECTION SUMMARY
04/12/2021 Letter INSPECTION SUMMARY
04/12/2021 Letter INSPECTION SUMMARY
04/13/2021 Letter INSPECTION SUMMARY
04/13/2021 Letter INSPECTION SUMMARY
04/13/2021 Letter INSPECTION SUMMARY
04/13/2021 Letter INSPECTION SUMMARY
04/13/2021 Letter INSPECTION SUMMARY
04/13/2021 Letter INSPECTION SUMMARY
04/13/2021 Letter INSPECTION SUMMARY
04/13/2021 Letter INSPECTION SUMMARY
04/13/2021 Letter INSPECTION SUMMARY
04/14/2021 Letter INSPECTION SUMMARY
04/15/2021 Letter INSPECTION SUMMARY
04/15/2021 Letter Fire Loss Reduction Form
04/15/2021 Letter Fire Loss Reduction Form
04/16/2021 Letter INSPECTION SUMMARY
04/16/2021 Letter Fire Loss Reduction Form
04/16/2021 Letter INSPECTION SUMMARY
04/19/2021 Letter Fire Loss Reduction Form
04/19/2021 Letter Fire Loss Reduction Form
04/20/2021 Letter INSPECTION SUMMARY
04/20/2021 Letter INSPECTION SUMMARY
04/21/2021 Letter Fire Loss Reduction Form
04/23/2021 Letter INSPECTION SUMMARY
05/13/2021 Letter INSPECTION SUMMARY
05/14/2021 Letter INSPECTION SUMMARY
05/17/2021 Letter INSPECTION SUMMARY
05/18/2021 Letter INSPECTION SUMMARY
05/19/2021 Letter INSPECTION SUMMARY
05/20/2021 Letter INSPECTION SUMMARY
05/21/2021 Letter INSPECTION SUMMARY
05/24/2021 Letter INSPECTION SUMMARY
05/25/2021 Letter INSPECTION SUMMARY
05/25/2021 Letter Fire Loss Reduction Form
05/26/2021 Letter INSPECTION SUMMARY
05/27/2021 Letter Codes Temporary Certificate of Occupancy
05/27/2021 Letter INSPECTION SUMMARY
05/27/2021 Letter Codes Temporary Certificate of Occupancy
06/09/2021 Letter INSPECTION SUMMARY
06/14/2021 Letter Codes Temporary Certificate of Occupancy
07/09/2021 Letter Codes Temporary Certificate of Occupancy
08/03/2021 Letter Codes Final Certificate of Occupancy
08/03/2021 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home