Planning Application Status

PL2020024




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020024
DOWNTOWN LEE'S SUMMIT APARTMENTS
Commercial Final Development Plan
Commercial Final Development Plan
Approved
02/03/2020
Locations
Contacts
CITYSCAPE RESIDENTIAL , Address:10000 COLLEGE BLVD. #120  
PHELPS ENGINEERING, INC, Address:1270 N WINCHESTER RD, Phone:(913) 393-1155  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 02/26/2021 02/26/2021
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
02/19/2021

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $132,514.02
DE Contact Field Eng. Inspector
Corrective Action Required
02/19/2021

Contact Field Engineering Inspections at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Future Repair Work
Corrective Action Required
02/19/2021

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE Contact ROW Inspector
Corrective Action Required
02/19/2021

Prior to any activities within the right-of-way that are not directly associated with a specific infrastructure or building permit, a separate right-of-way permit may be required. Contact a Right-of-Way Inspector at (816) 969-1800 to obtain the required permit.
Engineering Review Approved with Conditions 03/24/2020 03/24/2020
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
03/24/2020

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $132,514.02
DE Contact Field Eng. Inspector
Corrective Action Required
03/24/2020

Contact Field Engineering Inspections at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Future Repair Work
Corrective Action Required
03/24/2020

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE Contact ROW Inspector
Corrective Action Required
03/24/2020

Prior to any activities within the right-of-way that are not directly associated with a specific infrastructure or building permit, a separate right-of-way permit may be required. Contact a Right-of-Way Inspector at (816) 969-1800 to obtain the required permit.
Traffic Review No Comments 03/24/2020 03/24/2020
Michael Park
Building Codes Review No Comments 03/24/2020 03/24/2020
Joe Frogge
Fire Review Approved with Conditions 03/24/2020 03/24/2020
Jim Eden
Code Statement
Informational
03/17/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Knox Locks
Informational
03/17/2020

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Action required: Knox key switches, elevator boxes and key vaults will be requred.
FDC
Resolved
03/24/2020

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required; Locate the fire hydrant on Main Street on the same side of the driveway to the parking garage as the FDC.
Planning Review Approved with Conditions 03/24/2020 03/17/2020
Shannon McGuire
Corrective Action Required
03/17/2020

Detail #4 on sheet H6 depicts a monument sign that is larger than the Unified Development Ordinance allows. Approval of this FDP does not constitute approval of the oversized sign. Approval of all signs shall be made by separate application. Sign permits shall be obtained prior to installation of any signs through the Development Services Department. For administrative approval, all signs proposed must comply with the sign requirements as outlined in the sign section of the UDO. Signs that do not meet the UDO in terms of size, height or number may only be granted approval by the Planning Commission.
Traffic Review Corrections 02/18/2020 02/18/2020
Michael Park
Corrective Action Required
02/18/2020

Sight distance review needed at the intersection of 1st Street and Main Street with regards to the proposed parallel parking potential visual obstruction. The northern 3 spaces along the east side of Main Street may be in conflict.
Corrective Action Required
02/18/2020

Review the proposed improvements on the northwest corner of Douglas and 2nd Street, especially the monument and landscaping, for intersection sight distance conflicts. The eastbound right turn movement will not be restricted to RED and must have sight distance for a yielding condition. Revise plans as needed and depict the necessary sight distance in a supplemental drawing to illustrate the minimum condition is met.
Corrective Action Required
02/18/2020

Curb reconstruction along the north side of 2nd Street shall be in a location that provides a consistent typical section/width of 2nd Street having at least 45' from back of curb to back of curb between Main Street and Douglas Street (with exception of the eastbound right-turn lane at Douglas and 2nd intersection that adds width). Where additional pavement exceeds 45' BOC to BOC, excess would be associated with a varied paved shoulder/bike lane on the south side of 2nd Street). The existing curb line moves slightly in this section on the north side of 2nd Street and the typical section narrows the 4' paved shoulder/bike lane. This inconsistent road width will be corrected with the proposed improvements. For reference the lane lines and existing curb should be diminsioned on the plans.
Corrective Action Required
02/18/2020

The replacement curb along Douglas should be moved 1' west (reduce the 5' green space to 4' green space between the curb and sidewalk) such that a 19' typical section exists from proposed back of curb to douglas centerline. This will allow for a future 3 lane section at the intersection of 2nd and Douglas, when needed, in coordination with the planned Douglas Street improvement project by the City. This would also better align the west curb line with existing curb south of 2nd Street. The 18' typical section currently shown on the plans leaves a future left-turn lane 1' too narrow in consideration of similar curb reconstruction on the east side associated with the City CIP project.
Corrective Action Required
02/18/2020

Additional plan information/detail is needed along the south side of 1st Street at the Baptist Church parking lot driveway. New curb is shown partially into the driveway/parking area, but existing curb is still shown and ties are unclear.
Corrective Action Required
02/18/2020

The concrete utility pads (electric) shown at the northeast corner of 2nd and Main and southeast corner of 1st and Main need additional information pertaining to the potential enclosure/cabinet that will be installed. These locations may be in conflict with intersection sight distance depending on the utility installation (enclosure/cabnet dimensions) and need further review (see prior sight distance comments).
Building Codes Review Corrections 02/18/2020 02/16/2020
Joe Frogge
Corrective Action Required
02/16/2020

3" water meter specified. Action required: Provide meter pit design. (Note: There is often a substantial savings to be seen by replacing 3" water meter with multiple 2" meters which are a fraction of the cost and the pit is included in the cost)
Corrective Action Required
02/16/2020

RPZ backflow shown in pit. Action required: Clarify. Most RPZ devices are not rated to be installed underground.
Planning Review Corrections 02/18/2020 02/14/2020
Shannon McGuire
Corrective Action Required
02/14/2020

Transitions from the proposed 5’ sidewalk to the existing 4’ sidewalk should be tapered.
Corrective Action Required
02/14/2020

Please provide details on the materials proposed for the retaining walls.
Corrective Action Required
02/14/2020

Is any ground mounted mechanical equipment being proposed? If so please provide the location, size, and type of material to be used in all screening of ground mounted mechanical equipment. Also provide the manufacturer’s specification sheets for proposed mechanical equipment to be used.
Corrective Action Required
02/14/2020

As proposed the monument sign is larger then allowed by the UDO for the CBD zoning district. If you wish to seek approval for signs that are larger, taller or the total number of signs exceed the established UDO regulations a separate sign application will need to be taken to the Planning Commission.
Corrective Action Required
02/14/2020

Please show a dashed line on the elevations sheets indicating the roof line and rooftop mechanical equipment.
Corrective Action Required
02/14/2020

The required trees shall be a minimum of 3’ caliper at the time of planting.
Corrective Action Required
02/14/2020

A detailed drawing of enclosure and screening methods to be used in connection with trash storage containers on the property shall be included. Where will these be located?
Corrective Action Required
02/14/2020

Please label the width and dimension of the proposed parking garage stalls.
Corrective Action Required
02/14/2020

Please label the width of the parking garage drive aisles.
Corrective Action Required
02/14/2020

Accessible parking spaces shall have an adjacent aisle 5 feet wide, and one in every 8 accessible spaces (but no less than one) shall be adjacent to an aisle 8 feet wide and the space shall be clearly marked with a sign indicating that the space is “van accessible.” Accessible parking space aisles shall be clearly demarcated by lines painted on or otherwise applied to the parking lot surface. Access aisles shall be on the same level as the vehicle pull-up space they serve. Please provide details confirming you will meet these requirements.
Corrective Action Required
02/14/2020

Parking spaces for vans shall have a vertical clearance of 98 inches minimum at the space and along the vehicular route thereto. In cases of a loading zone, the vertical clearance of 114 inches minimum shall be provided at passenger loading zones and along vehicle access routes to such areas from site entrances. Please provide details confirming you will meet these requirements.
Corrective Action Required
02/14/2020

A note on Sheet C3 states 8 ADA stalls are being provided. Per the Federal ADA parking requirements 9 accessible stalls (7 car & 2 van) are required for the parking garage and 2 assessable stalls (1 car & 1 van) are required for the surface parking lot. Please update the plans to meet this requirement. Additionally, please provide details on where these will be located in the garage.
Corrective Action Required
02/14/2020

Please provide a narrative explaining the scope of the working being proposed for the existing church building.
Corrective Action Required
02/14/2020

Please provide details on how the new building will be joined to the existing structure.
Engineering Review Corrections 02/18/2020 02/14/2020
Gene Williams, P.E.
Corrective Action Required
02/14/2020

A retaining wall is shown within the right of way near the southwest portion of the project. This is a violation of the City's encroachment policy.
Corrective Action Required
02/14/2020

Sheet 3.2: A retaining wall is shown encroaching within the Main St. right of way. This is a violation of our encroachment policy.
Corrective Action Required
02/14/2020

A profile view of all retaining walls is needed.
Corrective Action Required
02/14/2020

All footings and footing drains for retaining walls must be outside the limits of the right of way.
Corrective Action Required
02/14/2020

Please see specific comments related to public easements on the plat. Public easements are normally dedicated along all street right of way, with a width of ten (10) feet. It appears several monument signs are encroaching within the limits of these easements, which is a violation of our encroachment policy.
Corrective Action Required
02/14/2020

Sheet C4.4: There is a reference to a running slope within the ADA-accessible ramp of 8.1%. The maximum design slope, in accordance with Section 5304.8 of the Design and Construction Manual, is 7.5%.
Corrective Action Required
02/14/2020

Sheet C5: It appears the new sanitary sewer wye is located closer than four (4) feet from the manhole, as measured from the outside of the manhole, to the closest portion of the wye. Please revise.
Corrective Action Required
02/14/2020

All Sheets Related to Sanitary Sewer Connection: It is likely the plans will change, according to the geometry of sanitary sewer within the street. We are currently awaiting a decision from Public Works on: 1) the allowance to place the sanitary sewer beneath the pavement, and 2) the geometry of the placement (i.e., either in the middle of the street, or offset from the center of the street). We will have an answer as soon as possible.
Corrective Action Required
02/14/2020

A special design is required for the 3 inch water meter pit. The City does not have a standard design. Please provide a specific design for the 3 inch meter, and reference the detail on Sheet C5.
Corrective Action Required
02/14/2020

In regard to the above comment concerning the 3 inch meter, the City requires a cut-in tee at the main. We do not allow a "tap" or "wet tap" to be made.
Corrective Action Required
02/14/2020

The 3 inch water meter should be located in an easement.
Corrective Action Required
02/14/2020

Pavement repair details were missing for the water main connection work on Main St. Please see the City of Lee's Summit standard detail for pavement patching and repairing. The limits of anticipated patching and repair should be shown. Finally, boring of water lines beneath Main St. should also be shown, except for areas where the connection is made.
Corrective Action Required
02/14/2020

Public storm lines are shown on the Final Development Plan. These should be included in a set of public improvement plans. They may be incorporated into the separate sanitary sewer plans, traffic improvement plans, or they may be submitted as standalone construction plans.
Corrective Action Required
02/14/2020

Sheet C5.3: These are public sanitary sewer plans, and as such, should be included in the public sanitary sewer plan set.
Corrective Action Required
02/14/2020

Sheet C6: Inserta-tees are not allowed into public storm sewers.
Corrective Action Required
02/14/2020

Sheet C6: The hydraulic grade line should be shown for the design storm. It should be below the crown of the pipe for the design storm, with overflow routes for the 100 year event.
Corrective Action Required
02/14/2020

Independent third party inspection shall be required for the parking garage.
Corrective Action Required
02/14/2020

A SWPPP shall be required prior to formal approval.
Corrective Action Required
02/14/2020

There are several areas along the perimeter of the site and adjacent to retaining walls where the slope is greater than 3:1.
Corrective Action Required
02/14/2020

An Engineer's Estimate of Probable Construction Costs for all sitework is required prior to formal approval. The Engineering Plan Review and Inspection Fee is based on this estimate, and calculated at 3% of the total sitework, plus a nominal trip fee for observation and collection of water samples, and an $80 right of way fee.
Fire Review Approved with Conditions 02/18/2020 02/07/2020
Jim Eden
Code Statement
Informational
02/07/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Knox Locks
Informational
02/07/2020

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Action required: Knox key switches, elevator boxes and key vaults will be requred.
FDC
Corrective Action Required
02/07/2020

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required; Locate the fire hydrant on Main Street on the same side of the driveway to the parking garage as the FDC.
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $600.00 $600.00 Paid 02/03/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
02/03/2020 Receipt Receipt for transaction: 2020-000425
02/03/2020 Letter Routing Sheet - FDP
02/04/2020 Plans Water Demand Calculations
02/04/2020 Plans 2020-01-27 Final Stormwater Report
02/04/2020 Plans C15 DETAILS - PRIVATE - NYLOPLAST
02/04/2020 Plans C16 DETAILS - PRIVATE - ADS-STORMWATER
02/04/2020 Plans C17 DETAILS - PRIVATE - SWR-WTR 1
02/04/2020 Plans C18 DETAILS - PRIVATE - WALL-FENCE
02/04/2020 Plans DTLS Hardscape 012420
02/04/2020 Plans E0.1
02/04/2020 Plans L1 Code Compliance Landscape Plan
02/04/2020 Plans A1.1 Architectural Site Plan
02/04/2020 Plans A2.6 Building Plan - Roof Level
02/04/2020 Plans A3.1 Building Elevations - 20 Scale
02/04/2020 Plans A3.2 Building Elevations - SE Douglas Street
02/04/2020 Plans A3.3 Building Elevations - SE Douglas Street
02/04/2020 Plans A3.4 Building Elevations - SE 1st Street
02/04/2020 Plans A3.5 Building Elevations - SE Main Street
02/04/2020 Plans A3.6 Building Elevations - SE 2nd Street
02/04/2020 Plans C1 DEMO - 1
02/04/2020 Plans C2 PREL PLAT - 1
02/04/2020 Plans C3 SITE - 1
02/04/2020 Plans C3.1 SITE BLOW UP - NORTH
02/04/2020 Plans C3.2 SITE BLOW UP - SOUTH
02/04/2020 Plans C4 GRADING - 1
02/04/2020 Plans C4.1 GRADING - 2
02/04/2020 Plans C4.2 GRADING - 3
02/04/2020 Plans C4.3 GRADING - 4
02/04/2020 Plans C4.4 GRADING - 5
02/04/2020 Plans C4.5 GRADING - 6
02/04/2020 Plans C4.6 GRADING - 7
02/04/2020 Plans C5 UTILITY - 1
02/04/2020 Plans C5.1 BURIED ELECTRIC P&P - 1
02/04/2020 Plans C5.2 BURIED ELECTRIC P&P - 2
02/04/2020 Plans C5.3 SANITARY - 1
02/04/2020 Plans C6 STORM P&P - STORM
02/04/2020 Plans C7 DRAINAGE MAP - 1
02/04/2020 Plans C7.1 Secondary Storm Plan - 1
02/04/2020 Plans C7.2 Secondary Storm Plan - 1 (2)
02/04/2020 Plans C7.3 Secondary Storm Plan - 1 (3)
02/04/2020 Plans C7.4 Secondary Storm Plan - Enlarged-1
02/04/2020 Plans C7.5 Secondary Storm Plan - Enlarged-2
02/04/2020 Plans C7.6 Secondary Storm Plan - Enlarged-3
02/04/2020 Plans C7.7 Secondary Storm Plan - Enlarged-4
02/04/2020 Plans C7.8 Secondary Storm Plan - Enlarged-5
02/04/2020 Plans C8 STORM DETENTION PLAN - 1
02/04/2020 Plans C9 Erosion - 1
02/04/2020 Plans C10 Erosion - 2
02/04/2020 Plans C11 DETAILS - PRIVATE - PAVE 1
02/04/2020 Plans C12 DETAILS - PRIVATE - PAVE 3
02/04/2020 Plans C13 DETAILS - PRIVATE - PAVE 4
02/04/2020 Plans C14 DETAILS - PRIVATE - STORM 1
02/04/2020 Plans Goodman GSX cut
02/04/2020 Plans Roof Top Condenser Cut Sheet
02/04/2020 Plans DSS 2 ton
02/04/2020 Plans Final Development Plan Checklist
02/04/2020 Plans RESIDENTIAL DESIGN STANDARDS_4-19 Checklist
02/04/2020 Plans CBD TABLE Checklist
02/04/2020 Plans DTLS FinalDevelPlanApplication
02/04/2020 Plans FDP Description
02/19/2020 Letter Applicant Letter - FDP (DFDP)
03/17/2020 Letter Resubmittal Routing Sheet - FDP
03/17/2020 Plans Landscape FDP - DTLS
03/17/2020 Plans Lighting FDP -DTLS
03/17/2020 Plans Public Improvement Plans Storm and South Sanitary- DTLS
03/17/2020 Plans Architectural FDP - DTLS
03/17/2020 Plans Civil FDP - DTLS
03/17/2020 Plans Garage Elevations FDP DTLS
03/17/2020 Plans Hardscape FDP - DTLS
03/17/2020 Plans DCM Modification Request
03/17/2020 Plans DTLS planting slope planting detail
03/17/2020 Plans DTLS retaining wall
03/17/2020 Plans Sight Triangle Exhibit-1
03/17/2020 Plans 2020-03-16 Response to Comments Dawn Bell
03/17/2020 Plans 20200316 DTLS Site Improvements OPC
03/24/2020 Copy of FeeWorksheet
03/24/2020 Letter Applicant Letter - FDP (DFDP)
04/08/2020 DTLS Civil Site Plans
04/10/2020 Approved Plans Approved set DTLS Civil Site Plans 4.10.20
02/19/2021 C3_2 SITE BLOW UP - SOUTH - ESI 07
02/19/2021 C4_3 GRADING - 4 - ESI 07
02/19/2021 C7_6 Secondary Storm Plan - Enlarged-3 - ESI 07
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home