Permit Application Status

PRCOM20251576


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20251576
Building Permit - Commercial
In Plan Review
NEW MULTI-FAMILY
ALURA APARTMENTS - BUILDING 1 - NEW APARTMENT BUILDING
04/18/2025
11/30/2025
Locations
Contacts
Intrinsic Development, L.L.C., Address:3622 Endeavor Ave., Ste. 101  
Brian Maenner - Intrinsic Development, Address:3622 Endeavor Ave., Ste. 101, Phone:(573) 881-0280  
LGHVAC Mechanical, Address:3616 Utica Square Dr., Phone:(405) 823-6513  
Reks Contractors Inc, Address:2660 Springbluff Ct  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
Wallace Architects LLC, Address:302 Campusview Drive, Suite 208, Phone:(573) 256-7200  
UES dba GEOTECHNOLOGY LLC, Address:5055 ANTIOCH RD, Phone:(913) 438-1900  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Rejected 06/04/2025 06/02/2025
Joe Frogge
Misc
Corrective Action Required
05/28/2025

This review covers all permitted structures on site. Individual permits for each structure will be created after plans are approved. Action required: Comment is informational. 5/30/2025 - Acknowledged in letter.
Final Development Plan
Corrective Action Required
05/28/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 5/30/2025 - Acknowledged in letter.
Misc
Corrective Action Required
05/28/2025

FAA approval required. Action required: Provide verification of FAA 7460 approval. 5/30/2025 - Pending
Health Dept Review (aquatic)
Corrective Action Required
05/28/2025

For the Health Department review of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Services Division, at (816) 223-9769. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational. 5/30/2025 - Deferred to pool permit.
Health Dept Inspection (aquatic)
Corrective Action Required
05/28/2025

For the Health Department inspection of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Health Division at (816) 223-9769. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 5/30/2025 - Deferred to pool permit.
Elevator Equipment Permit
Corrective Action Required
05/28/2025

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 5/30/2025 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
05/28/2025

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 5/30/2025 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
05/28/2025

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 5/30/2025 - Acknowledged in letter.
Project cost
Corrective Action Required
05/28/2025

The project cost, which is used to establish the permit fee, has not been provided. Action required: Provide cost estimates for each apartment, garage, pool, and pool house. 5/30/2025 - Clarification: We need individual costs for each structure. A spreadsheet can be provided if that helps.
IBC 1803.1 General - geotech
Resolved
05/30/2025

"2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. (2,500psf noted on S100 & GS100)
Engineered truss package
Corrective Action Required
05/28/2025

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Truss packages deferred. 5/30/2025 - Deferred per request.
Misc
Resolved
05/30/2025

Water meter scenario not compliant as shown. Action required: Provide detail of how buildings are metered. Coordinate with Water Department to avoid submitting twice. If a concrete pit is used it must be fully engineered and included in submittal. Amend riser diagrams and floor plans. (This information was asked for but not yet provided during FDP review)
Planning - Screening of ground mounted equipment
Corrective Action Required
05/28/2025

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. 5/30/2025 - Deferred to FDP. To be field verified.
IBC 1008.3 Emergency power for illumination - at exit discharge
Resolved
05/30/2025

2018 IBC 1008.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency lighting at exterior landings serving egress doors.
NEC Article 250.66 Size of AC Grounding electrode conductor
Resolved
05/30/2025

2017 NEC Article 250.66 Size of Alternating-Current Grounding Electrode Conductor. The size of the grounding electrode conductor at the service, at each building or structure where supplied by a feeder(s) or branch circuit(s), or at a separately derived system of a grounded or ungrounded ac system shall not be less than given in Table 250.66, except as permitted in 250.66(A) through (C). Action required: Specify size of all grounding electrode conductors. (at all apartments, garage 9, and pool house)
IPC 1101.3 Prohibited drainage
Resolved
05/30/2025

2018 IPC 1101.3 Prohibited drainage. (as amended by LSCO 7-413) Sanitary sewer systems shall be designed, built and maintained in such a manner to prevent all storm or ground water from draining, discharging or entering into the sanitary sewer system. Connection of sump pumps, foundation drains, yard drains, gutter downspouts and any other storm water drainage receptacle(s) or system(s) are specifically prohibited from being connected to the sanitary sewer system. Action required: Elevator sump not allowed to discharged to sewer. Re-route to daylight or storm sewer system. (connection to storm sewer system will need to be approved by our engineering staff) 5/30/2025 - Sumps still routed to floor drains. Amend plans
IBC 1209.2 Finish materials
Resolved
05/30/2025

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish material at mop sink. If paint is used it must be epoxy based.
NEC Article 210.52 (A) Receptacle spacing in dwelling units
Resolved
05/30/2025

2017 NEC Article 210.52 (A) General Provisions. In every kitchen, family room, dining room, living room, parlor, library, den, sunroom, bedroom, recreation room, or similar room or area of dwelling units, receptacle outlets shall be installed in accordance with the general provisions specified in 210.52(A)(1) through (A)(4). (1) Spacing. Receptacles shall be installed such that no point measured horizontally along the floor line of any wall space is more than 6 feet from a receptacle outlet. (2) Wall Space. As used by this section, a wall space shall include the following: 1. Any space 2 feet or more in width (including space measured around corners) and unbroken along the floor line by doorways and similar openings, fireplaces, and fixed cabinets that do not have countertops or similar work surfaces. 2. The space occupied by fixed panels in walls, excluding sliding panels. 3. The space afforded by fixed room dividers, such as freestanding bar-type counters or railings. (3) Floor Receptacles. Receptacle outlets in or on floors shall not be counted as part of the required number of receptacle outlets unless located within 18 inches of the wall. (4) Countertop and Similar Work Surface Receptacle Outlets. Receptacles installed for countertop and similar work surfaces as specified in 210.52(C) shall not be considered as the receptacle outlets required by 210.52(A). (D) Bathrooms. At least one receptacle outlet shall be installed in bathrooms within 3 ft of the outside edge of each basin. (see code for location regulations) Action required: Amend unit plans to comply. Multiple locations where there is a wall section 24" or more that need a receptacle.
NEC Article 230.2 (E) Identification of multiple services
Resolved
05/30/2025

2017 NEC Article 230.2 (E) Identification. Where a building or structure is supplied by more than one service, or any combination of branch circuits, feeders, and services, a permanent plaque or directory shall be installed at each service disconnect location denoting all other services, feeders, and branch circuits supplying that building or structure and the area served by each. See 225.37. Action required: Specify signage to comply. 5/30/2025 - Not addressed.
Misc
Resolved
05/30/2025

Exit and emergency lighting is missing on EL101 of Buildings 1, 4, 5, 8 & 11. Action required: Provide exit and emergency lighting at 1st floor of buildings 1, 4, 5, 8 & 11.
Misc
Corrective Action Required
05/28/2025

2018 IBC 718.4 Draftstopping in attics. Draftstopping shall be installed to subdivide attic spaces where required by Section 708.4.2. In other than Group R, draftstopping shall be installed to subdivide combustible attic spaces and combustible concealed roof spaces such that any horizontal area does not exceed 3,000 square feet (279 m2). Ventilation of concealed roof spaces shall be maintained in accordance with Section 1202.2.1. Exception: Buildings equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1. Action required: Provide draftstopping in attic of Garage 9, Type D. (and adjust attic access accordingly) 6/3/2025 - Garage plans not found in submittal.
Health Dept Review
Resolved
06/10/2025

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7162. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational and concerns function of counter top area in Pool House. 5/30/2025 - Not addressed. 6/10/2025 - not required per JxnCty
Health Dept Inspection
Resolved
06/10/2025

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational and concerns function of counter top area in Pool House. 5/30/2025 - Not addressed. 6/10/2025 - not required per JxnCty
IPC 403.1 Minimum number of fixtures
Corrective Action Required
05/28/2025

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink and drinking fountain (or approved alternate) in Pool House. 5/30/2025 - Not addressed.
IBC 1209.2 Finish materials
Corrective Action Required
05/28/2025

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials in restrooms and at mop sink. If paint is used it must be epoxy based. 5/30/2025 - Restrooms now compliant, but mop sink not found.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Resolved
05/30/2025

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle near condensing unit serving Pool House.
Fire Plan Review Approved with Conditions 06/04/2025 06/02/2025
Craig Hill
Construction documents for fire alarm systems
Informational
05/28/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Informational
05/28/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Knox box required
Corrective Action Required
05/28/2025

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Action Required: Knox box needed at or near the FDC of all buildings. Confirm on final
Illumination required
Resolved
06/02/2025

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. Action Required: Exit and emergency lights needed on the first floor of "4938 Issue Dwgs Bldg 1 25Apr15", "4938 Issue Dwgs Bldg 4 25Apr15", 4938 Issue Dwgs Bldg 6 25Apr15, 4938 Issue Dwgs Bldg 8 25Apr15, and 4938 Issue Dwgs Bldg 11 25Apr15. In adition, add emergency lighting in the restrooms of the pool house.
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
05/28/2025

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. Action Required: Elevator Knox Box is required in all buildings near the elevator that will include keys to operate the elevator and an emergency elevator door key. Confirm on final
Licensed Contractors Approved 06/04/2025 05/30/2025
Joe Frogge
Special Inspections Review Approved 05/21/2025
Joe Frogge
Building Plan Review Rejected 05/09/2025 05/09/2025
Joe Frogge
Misc
Corrective Action Required
05/07/2025

This review covers all permitted structures on site. Individual permits for each structure will be created after plans are approved. Action required: Comment is informational.
IBC 1704.2 Special Inspections
Resolved
05/21/2025

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. Note: Receipt of final, approved inspection report must be received prior to occupancy.
Final Development Plan
Corrective Action Required
05/07/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Misc
Corrective Action Required
05/07/2025

FAA approval required. Action required: Provide verification of FAA 7460 approval.
Health Dept Review (aquatic)
Corrective Action Required
05/07/2025

For the Health Department review of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Services Division, at (816) 223-9769. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational.
Health Dept Inspection (aquatic)
Corrective Action Required
05/07/2025

For the Health Department inspection of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Health Division at (816) 223-9769. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational.
Elevator Equipment Permit
Corrective Action Required
05/07/2025

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational.
Elevator Equipment Inspection
Corrective Action Required
05/07/2025

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational.
Elevator Certificate of Inspection
Corrective Action Required
05/07/2025

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational.
Project cost
Corrective Action Required
05/07/2025

The project cost, which is used to establish the permit fee, has not been provided. Action required: Provide cost estimates for each apartment, garage, pool, and pool house.
IBC 1803.1 General - geotech
Corrective Action Required
05/07/2025

"2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. (2,500psf noted on S100 & GS100)
Engineered truss package
Corrective Action Required
05/07/2025

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Truss packages deferred.
Misc
Corrective Action Required
05/08/2025

Water meter scenario not compliant as shown. Action required: Provide detail of how buildings are metered. Coordinate with Water Department to avoid submitting twice. If a concrete pit is used it must be fully engineered and included in submittal. Amend riser diagrams and floor plans. (This information was asked for but not yet provided during FDP review)
Planning - Screening of ground mounted equipment
Corrective Action Required
05/08/2025

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section.
IBC 1008.3 Emergency power for illumination - at exit discharge
Corrective Action Required
05/08/2025

2018 IBC 1008.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency lighting at exterior landings serving egress doors.
NEC Article 250.66 Size of AC Grounding electrode conductor
Corrective Action Required
05/08/2025

2017 NEC Article 250.66 Size of Alternating-Current Grounding Electrode Conductor. The size of the grounding electrode conductor at the service, at each building or structure where supplied by a feeder(s) or branch circuit(s), or at a separately derived system of a grounded or ungrounded ac system shall not be less than given in Table 250.66, except as permitted in 250.66(A) through (C). Action required: Specify size of all grounding electrode conductors. (at all apartments, garage 9, and pool house)
IPC 1101.3 Prohibited drainage
Corrective Action Required
05/08/2025

2018 IPC 1101.3 Prohibited drainage. (as amended by LSCO 7-413) Sanitary sewer systems shall be designed, built and maintained in such a manner to prevent all storm or ground water from draining, discharging or entering into the sanitary sewer system. Connection of sump pumps, foundation drains, yard drains, gutter downspouts and any other storm water drainage receptacle(s) or system(s) are specifically prohibited from being connected to the sanitary sewer system. Action required: Elevator sump not allowed to discharged to sewer. Re-route to daylight or storm sewer system. (connection to storm sewer system will need to be approved by our engineering staff)
IBC 1209.2 Finish materials
Corrective Action Required
05/08/2025

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish material at mop sink. If paint is used it must be epoxy based.
NEC Article 210.52 (A) Receptacle spacing in dwelling units
Corrective Action Required
05/08/2025

2017 NEC Article 210.52 (A) General Provisions. In every kitchen, family room, dining room, living room, parlor, library, den, sunroom, bedroom, recreation room, or similar room or area of dwelling units, receptacle outlets shall be installed in accordance with the general provisions specified in 210.52(A)(1) through (A)(4). (1) Spacing. Receptacles shall be installed such that no point measured horizontally along the floor line of any wall space is more than 6 feet from a receptacle outlet. (2) Wall Space. As used by this section, a wall space shall include the following: 1. Any space 2 feet or more in width (including space measured around corners) and unbroken along the floor line by doorways and similar openings, fireplaces, and fixed cabinets that do not have countertops or similar work surfaces. 2. The space occupied by fixed panels in walls, excluding sliding panels. 3. The space afforded by fixed room dividers, such as freestanding bar-type counters or railings. (3) Floor Receptacles. Receptacle outlets in or on floors shall not be counted as part of the required number of receptacle outlets unless located within 18 inches of the wall. (4) Countertop and Similar Work Surface Receptacle Outlets. Receptacles installed for countertop and similar work surfaces as specified in 210.52(C) shall not be considered as the receptacle outlets required by 210.52(A). (D) Bathrooms. At least one receptacle outlet shall be installed in bathrooms within 3 ft of the outside edge of each basin. (see code for location regulations) Action required: Amend unit plans to comply. Multiple locations where there is a wall section 24" or more that need a receptacle.
NEC Article 230.2 (E) Identification of multiple services
Corrective Action Required
05/09/2025

2017 NEC Article 230.2 (E) Identification. Where a building or structure is supplied by more than one service, or any combination of branch circuits, feeders, and services, a permanent plaque or directory shall be installed at each service disconnect location denoting all other services, feeders, and branch circuits supplying that building or structure and the area served by each. See 225.37. Action required: Specify signage to comply.
Misc
Corrective Action Required
05/09/2025

Exit and emergency lighting is missing on EL101 of Buildings 1, 4, 5, 8 & 11. Action required: Provide exit and emergency lighting at 1st floor of buildings 1, 4, 5, 8 & 11.
Misc
Corrective Action Required
05/09/2025

2018 IBC 718.4 Draftstopping in attics. Draftstopping shall be installed to subdivide attic spaces where required by Section 708.4.2. In other than Group R, draftstopping shall be installed to subdivide combustible attic spaces and combustible concealed roof spaces such that any horizontal area does not exceed 3,000 square feet (279 m2). Ventilation of concealed roof spaces shall be maintained in accordance with Section 1202.2.1. Exception: Buildings equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1. Action required: Provide draftstopping in attic of Garage 9, Type D. (and adjust attic access accordingly)
Health Dept Review
Corrective Action Required
05/09/2025

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7162. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational and concerns function of counter top area in Pool House.
Health Dept Inspection
Corrective Action Required
05/09/2025

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational and concerns function of counter top area in Pool House.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
05/09/2025

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink and drinking fountain (or approved alternate) in Pool House.
IBC 1209.2 Finish materials
Corrective Action Required
05/09/2025

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials in restrooms and at mop sink. If paint is used it must be epoxy based.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
05/09/2025

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle near condensing unit serving Pool House.
Fire Plan Review Rejected 05/09/2025 05/07/2025
Craig Hill
Construction documents for fire alarm systems
Informational
05/05/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Informational
05/05/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Knox box required
Corrective Action Required
05/05/2025

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Action Required: Knox box needed at or near the FDC of all buildings.
Illumination required
Corrective Action Required
05/05/2025

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. Action Required: Exit and emergency lights needed on the first floor of "4938 Issue Dwgs Bldg 1 25Apr15", "4938 Issue Dwgs Bldg 4 25Apr15", 4938 Issue Dwgs Bldg 6 25Apr15, 4938 Issue Dwgs Bldg 8 25Apr15, and 4938 Issue Dwgs Bldg 11 25Apr15. In adition, add emergency lighting in the restrooms of the pool house.
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
05/05/2025

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. Action Required: Elevator Knox Box is required in all buildings near the elevator that will include keys to operate the elevator and an emergency elevator door key.
Licensed Contractors Approved 04/18/2025 04/18/2025
Joe Frogge
Final Development Plan Review Pending 06/18/2025
Daniel Fernandez
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
04/18/2025 Application Form Alura - Permit application
04/25/2025 Plans 4938 Issue Dwgs Bldg 1 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Bldg 2 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Bldg 3 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Bldg 4 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Bldg 5 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Bldg 6 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Bldg 7 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Bldg 8 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Bldg 9 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Bldg 10 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Bldg 11 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Bldg 12 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Garage 1 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Garage 2 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Garage 3 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Garage 4 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Garage 5 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Garage 6 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Garage 7 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Garage 8 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Garage 9 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Garage 10 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Garage 11 25Apr15
04/25/2025 Plans 4938 Issue Dwgs Master 25Apr18
04/25/2025 Plans 4938 Issue Dwgs Pool House 25Apr15
04/25/2025 Letter License Tax Bill
05/09/2025 Letter DS P/R Corrections Document
05/21/2025 Engineer Report/Study Alura Initial SI Letter
05/27/2025 Plans 4938 Combined Dwgs Bldg 1 25May16
05/27/2025 Plans 4938 Combined Dwgs Bldg 2 25May16
05/27/2025 Plans 4938 Combined Dwgs Bldg 3 25May16
05/27/2025 Plans 4938 Combined Dwgs Bldg 4 25May16
05/27/2025 Plans 4938 Combined Dwgs Bldg 5 25May16
05/27/2025 Plans 4938 Combined Dwgs Bldg 6 25May16
05/27/2025 Plans 4938 Combined Dwgs Bldg 7 25May16
05/27/2025 Plans 4938 Combined Dwgs Bldg 8 25May16
05/27/2025 Plans 4938 Combined Dwgs Bldg 9 25May16
05/27/2025 Plans 4938 Combined Dwgs Bldg 10 25May16
05/27/2025 Plans 4938 Combined Dwgs Bldg 11 25May16
05/27/2025 Plans 4938 Combined Dwgs Bldg 12 25May16
05/27/2025 Plans 4938 Combined Dwgs Master 25May16
05/27/2025 Plans 4938 Combined Dwgs PH 25May16
05/27/2025 Letter 4938 City Plan Rvw Rspns Ltr 25May22
05/27/2025 Engineer Report/Study 4938 Olsson Geotech Rpt 19Aug22
05/27/2025 Letter 4938 UES Special Inspect Services Ltr 25Mar22
05/27/2025 Letter 4938 ADD 1 25May23
06/03/2025 Letter DS P/R Corrections Document
06/10/2025 Email Health Dept - kitchen info
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home