Permit Application Status

PRCOM20234293


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20234293
Building Permit - Commercial
Certificate of Occupancy
NEW TENANT FINISH
NEW TENANT OFFICE AND WAREHOUSE FOR PRE PACKAGED FOOD DISTRIBUTION STOP WORK ORDER generated on 09/19/2023 12:00 AM by username 'Mark Harding' STOP WORK ORDER removed on 10/03/2023 12:00 AM by username 'Robb Popp'
08/29/2023
09/26/2023
01/25/2024
Locations
Contacts
Forge Construction LLC, Address:1307 Union Avenue  
RANDY BUCK, Address:FORGE CONSTRUCTION SR. SUPERINTENDENT, Phone:(816) 516-1517  
CHIEF HEATING & COOLING INC, Address:920 NW TECHNOLOGY DR, Phone:(816) 246-4646  
HERITAGE ELECTRIC, Address:841 N MARTWAY DR, Phone:(913) 747-0528  
ACCURATE MECHANICAL LLC, Address:205 E 13TH AVE, Phone:(816) 471-2272  
Curran Architecture, Address:5719 Lawton Loop E. Dr. @212, Phone:(317) 288-0681  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 11/02/2023 10/31/2023
Joe Frogge
Miscellaneous Correction
Corrective Action Required
10/26/2023

3201.3 Construction documents. At the time of building permit application for new structures designed to accommodate high-piled storage or for requesting a change of occupancy/ use, and at the time of application for a storage permit, plans and specifications shall be submitted for review and approval. In addition to the information required by the International Building Code, the storage permit submittal shall include the information specified in this section. The construction documents shall include all of the following: 1. Floor plan of the building showing locations and dimensions of high-piled storage areas. 2. Usable storage height for each storage area. 3. Number of tiers within each rack, if applicable. 4. Commodity clearance between top of storage and the sprinkler deflector for each storage arrangement. 5. Aisle dimensions between each storage array. 6. Maximum pile volume for each storage array. 7. Location and classification of commodities in accordance with Section 3203. 8. Location of commodities that are banded or encapsulated. 9. Location of required fire department access doors. 10. Type of fire suppression and fire detection systems. 11. Location of valves controlling the water supply of ceiling and in-rack sprinklers. 12. Type, location and specifications of smoke removal and curtain board systems. 13. Dimension and location of transverse and longitudinal flue spaces. 14. Additional information regarding required design features, commodities, storage arrangement and fire protection features within the high-piled storage area shall be provided at the time of permit, where required by the fire code official. Action required- Provide the information needed for the rack storage. 9/25/2023 Provide details on racking type. 10/26/2023- The unstamped drawing submitted 10/11/2023 from the contractor did not show rack design, or provide a plan for emergency or exit lighting in the rack storage area.
Miscellaneous Correction
Corrective Action Required
10/26/2023

Show exit and emergency lighting in the warehouse (New and existing). 9/25/2023- Provide exit signage on the north wall to the east of the rack storage directing to the exit north of the racking.
Building Plan Review Approved 11/02/2023 10/27/2023
Joe Frogge
Misc
Corrective Action Required
10/26/2023

Plans must be stamped by licensed architect or engineer and must show floor connection methods.
Building Plan Review Rejected 09/11/2023 10/24/2023
Joe Frogge
Misc
Corrective Action Required
10/24/2023

Plans must be stamped by licensed architect or engineer and must show floor connection methods.
Fire Plan Review Rejected 10/30/2023 10/24/2023
Jim Eden
Miscellaneous Correction
Corrective Action Required
10/12/2023

3201.3 Construction documents. At the time of building permit application for new structures designed to accommodate high-piled storage or for requesting a change of occupancy/ use, and at the time of application for a storage permit, plans and specifications shall be submitted for review and approval. In addition to the information required by the International Building Code, the storage permit submittal shall include the information specified in this section. The construction documents shall include all of the following: 1. Floor plan of the building showing locations and dimensions of high-piled storage areas. 2. Usable storage height for each storage area. 3. Number of tiers within each rack, if applicable. 4. Commodity clearance between top of storage and the sprinkler deflector for each storage arrangement. 5. Aisle dimensions between each storage array. 6. Maximum pile volume for each storage array. 7. Location and classification of commodities in accordance with Section 3203. 8. Location of commodities that are banded or encapsulated. 9. Location of required fire department access doors. 10. Type of fire suppression and fire detection systems. 11. Location of valves controlling the water supply of ceiling and in-rack sprinklers. 12. Type, location and specifications of smoke removal and curtain board systems. 13. Dimension and location of transverse and longitudinal flue spaces. 14. Additional information regarding required design features, commodities, storage arrangement and fire protection features within the high-piled storage area shall be provided at the time of permit, where required by the fire code official. Action required- Provide the information needed for the rack storage. 9/25/2023 Provide details on racking type. 10/26/2023- The unstamped drawing submitted 10/11/2023 from the contractor did not show rack design, or provide a plan for emergency or exit lighting in the rack storage area.
Miscellaneous Correction
Corrective Action Required
10/12/2023

Show exit and emergency lighting in the warehouse (New and existing). 9/25/2023- Provide exit signage on the north wall to the east of the rack storage directing to the exit north of the racking.
Construction documents - Fire protection systems
Resolved
10/24/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. 9/25/2023-Provide a complete set of shop drawings for the ENTIRE space.
Sprinkler Plan Review Released for Construction 10/26/2023 10/24/2023
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
10/24/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Call(816) 969-1303 to schedule a hydrostatic test. A visual inspection will be completed at occupany. A flow test will be conducted on the shell building inspection.
Installation acceptance testing
Corrective Action Required
10/24/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Revised plans recieved 10/19/2023. Plans indicated approximately where the demising wall will go, but the wall was not shown. Verified at inspection.
Alarm Plan Review Released for Construction 09/25/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
09/25/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Stamped plans received 9/19/2023.
Installation acceptance testing
Corrective Action Required
09/25/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call 816-969-1300 to schedule alarm testing. Coordinate with sprinkler testing.
Fire Plan Review Approved with Conditions 09/20/2023 09/25/2023
Jim Eden
Miscellaneous Correction
Corrective Action Required
09/13/2023

3201.3 Construction documents. At the time of building permit application for new structures designed to accommodate high-piled storage or for requesting a change of occupancy/ use, and at the time of application for a storage permit, plans and specifications shall be submitted for review and approval. In addition to the information required by the International Building Code, the storage permit submittal shall include the information specified in this section. The construction documents shall include all of the following: 1. Floor plan of the building showing locations and dimensions of high-piled storage areas. 2. Usable storage height for each storage area. 3. Number of tiers within each rack, if applicable. 4. Commodity clearance between top of storage and the sprinkler deflector for each storage arrangement. 5. Aisle dimensions between each storage array. 6. Maximum pile volume for each storage array. 7. Location and classification of commodities in accordance with Section 3203. 8. Location of commodities that are banded or encapsulated. 9. Location of required fire department access doors. 10. Type of fire suppression and fire detection systems. 11. Location of valves controlling the water supply of ceiling and in-rack sprinklers. 12. Type, location and specifications of smoke removal and curtain board systems. 13. Dimension and location of transverse and longitudinal flue spaces. 14. Additional information regarding required design features, commodities, storage arrangement and fire protection features within the high-piled storage area shall be provided at the time of permit, where required by the fire code official. Action required- Provide the information needed for the rack storage. 9/25/2023 Provide details on racking type racking type.
Miscellaneous Correction
Corrective Action Required
09/13/2023

Show exit and emergency lighting in the warehouse (New and existing). 9/25/2023- Provide exit signage on the north wall to the east of the rack storage directing to the exit north of the racking.
Construction documents - Fire protection systems
Corrective Action Required
09/13/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. 9/25/2023-Provide a complete set of shop drawings for the ENTIRE space.
Building Plan Review Approved 09/20/2023 09/14/2023
Joe Frogge
IBC 1016.2 Egress through intervening spaces
Resolved
09/14/2023

2018 IBC 1016.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section. Item 5. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes. (See code section for additional items and exceptions) Action required: Egress not to be directed out of office area through warehouse. Remove path reference on Life Safety Plan A100.
Miscellaneous Correction
Resolved
09/14/2023

Key Plan references incorrect building. Action required: Modify Key Plans to comply.
Licensed Contractors Approved 09/20/2023 09/14/2023
Joe Frogge
LC - General Contractor
Resolved
09/14/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent.
Fire Plan Review Rejected 09/11/2023 09/12/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
09/12/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide shop drawings for the alrm system.
Portable fire extinguishers - general
Corrective Action Required
09/12/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required- Provide a layout of fire extinguishers.
Miscellaneous Correction
Corrective Action Required
09/12/2023

510.1 Emergency responder radio coverage in new buildings. New buildings shall have approved radio coverage for emergency responders within the building based on the existing coverage levels of the public safety communication systems utilized by the jurisdiction, measured at the exterior of the building. This section shall not require improvement of the existing public safety communication systems. Exceptions: 1. Where approved by the building official and the fire code official, a wired communication system in accordance with Section 907.2.12.2 shall be permitted to be installed or maintained instead of an approved radio coverage system. 2. Where it is determined by the fire code official that the radio coverage system is not needed. 3. In facilities where emergency responder radio coverage is required and such systems, components or equipment required could have a negative impact on the normal operations of that facility, the fire code official shall have the authority to accept an automatically activated emergency responder radio coverage system.- Action required- Provide a study of radio signal coverage in the building and provide the necessary equipment to maintain appropriate signal strength.
Miscellaneous Correction
Corrective Action Required
09/12/2023

3201.3 Construction documents. At the time of building permit application for new structures designed to accommodate high-piled storage or for requesting a change of occupancy/ use, and at the time of application for a storage permit, plans and specifications shall be submitted for review and approval. In addition to the information required by the International Building Code, the storage permit submittal shall include the information specified in this section. The construction documents shall include all of the following: 1. Floor plan of the building showing locations and dimensions of high-piled storage areas. 2. Usable storage height for each storage area. 3. Number of tiers within each rack, if applicable. 4. Commodity clearance between top of storage and the sprinkler deflector for each storage arrangement. 5. Aisle dimensions between each storage array. 6. Maximum pile volume for each storage array. 7. Location and classification of commodities in accordance with Section 3203. 8. Location of commodities that are banded or encapsulated. 9. Location of required fire department access doors. 10. Type of fire suppression and fire detection systems. 11. Location of valves controlling the water supply of ceiling and in-rack sprinklers. 12. Type, location and specifications of smoke removal and curtain board systems. 13. Dimension and location of transverse and longitudinal flue spaces. 14. Additional information regarding required design features, commodities, storage arrangement and fire protection features within the high-piled storage area shall be provided at the time of permit, where required by the fire code official. Action required- Provide the information needed for the rack storage.
MISC
Corrective Action Required
09/12/2023

The location of the building on the Key Notes is incorrect.
Miscellaneous Correction
Corrective Action Required
09/12/2023

309.1 General. Powered industrial trucks and similar equipment including, but not limited to, floor scrubbers and floorbuffers, shall be operated and maintained in accordance 309.2 through 309.7.Provide information on the power supply for lift trucks to be used in the warehouse. Action required- Provide information on the type of industrial trucks and equipment to be used and how this section will be met.
Miscellaneous Correction
Corrective Action Required
09/12/2023

Show exit and emergency lighting in the warehouse (New and existing).
Address numbers required
Corrective Action Required
09/12/2023

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required- All fire access doors shall be posted with the suite designation for the space. Verified at inspection.
Construction documents - Fire protection systems
Corrective Action Required
09/12/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide a complete set of shop drawings for the space.
Building Plan Review Rejected 09/11/2023 09/07/2023
Joe Frogge
IBC 1016.2 Egress through intervening spaces
Corrective Action Required
09/07/2023

2018 IBC 1016.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section. Item 5. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes. (See code section for additional items and exceptions) Action required: Egress not to be directed out of office area through warehouse. Remove path reference on Life Safety Plan A100.
Miscellaneous Correction
Corrective Action Required
09/07/2023

Key Plan references incorrect building. Action required: Modify Key Plans to comply.
IBC 1606.2 Design dead load - structural
Resolved
09/11/2023

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Provide the following: - Engineer’s report (or design) to verify that existing roof structure will support additional load imposed by roof mounted equipment. - Detailed roof curb construction information.
Gen - Plan submittals 2018 codes
Corrective Action Required
03/31/2025

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit.
Licensed Contractors Rejected 09/11/2023 09/07/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
09/07/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $4,600.00 $4,600.00 Paid 09/08/2023
7232302-Industrial/Warehouse Excise Tax Fee $9,493.00 $9,493.00 Paid 10/27/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 11/13/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 12/12/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 01/11/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 9/12/2023 9/12/2023 09/12/2023
Underslab Electrical Inspection - Commercial Passed 9/12/2023 09/12/2023
Miscellaneous Inspection Failed - Stop Work 09/19/2023
Misc
Corrective Action Required
09/19/2023
work being performed on walls and tenant finish that the permit has not been issued. Stop Construction posted 9/18/23 Robb talked with contractor-Greg Mitchem 913-529 9193
In-wall Inspection Partial 10/3/2023 10/3/2023 10/03/2023
Misc
Corrective Action Required
10/03/2023
***Demising wall framing only: -OK to start rock, continue framing 16" oc above bar joist
In-wall Inspection Partial 10/6/2023 10/6/2023 10/06/2023
Misc
Corrective Action Required
10/03/2023
***Demising wall framing ok ***Office area: provide Bocca plates at top and bottom track where dwv is less than 1.25” to face of framing -OK TO ONE SIDE AND CLOSE NON PLUMBING WALLS
Rated Assembly Inspection Partial 10/6/2023 10/6/2023 10/06/2023
Misc
Corrective Action Required
10/06/2023
Demining wall: -South side screw pattern ok
In-wall Inspection Passed 10/9/2023 10/9/2023 10/09/2023
Misc
Resolved
10/09/2023
***Demising wall framing ok ***Office area: provide Bocca plates at top and bottom track where dwv is less than 1.25” to face of framing -OK TO ONE SIDE AND CLOSE NON PLUMBING WALLS
Electrical Service Inspection Passed 10/11/2023 10/11/2023 10/11/2023
MISC
Informational
10/11/2023
Service for 1220 A
Rated Assembly Inspection Partial 10/17/2023 10/17/2023 10/17/2023
Misc
Corrective Action Required
10/06/2023
Demining wall: -South side screw pattern ok -North side: Complete screw pattern at west end, patch hole in rock stud to stud near east column *Ok to tape
Above Ceiling Inspection Partial 10/25/2023 10/25/2023 10/25/2023
Misc
Corrective Action Required
10/25/2023
-Stencil firewall above ceiling at riser room **OK TO COVER ALL OTHER AREAS, LEAVE TILES OUT FOR REINSPECTION AT FIREWALL
Gas Service Inspection - Commercial Passed 10/26/2023
Gas Piping Inspection - Commercial Failed 10/26/2023 10/26/2023 10/26/2023
Misc
Corrective Action Required
10/26/2023
-Provide permanent address tag for unit A meter -Paint all exterior metallic gas lines with corrosion resistant paint
Rated Assembly Inspection Partial 10/27/2023 10/27/2023 10/27/2023
Misc
Corrective Action Required
10/17/2023
Demining wall: Screw pattern ok *Ok to tape -Seal penetrations at bar joists on north side and seal conduit at south side
Miscellaneous Inspection Passed 10/30/2023
Misc
Resolved
10/30/2023
work being performed on walls and tenant finish that the permit has not been issued. Stop Construction posted 9/18/23 Robb talked with contractor-Greg Mitchem 913-529 9193
Above Ceiling Inspection Passed 10/30/2023 10/30/2023 10/30/2023
Misc
Resolved
10/30/2023
-Stencil firewall above ceiling at riser room **OK TO COVER ALL OTHER AREAS, LEAVE TILES OUT FOR REINSPECTION AT FIREWALL
Rated Assembly Inspection Passed 10/30/2023 10/30/2023 10/30/2023
Misc
Resolved
10/30/2023
Demining wall: Screw pattern ok *Ok to tape -Seal penetrations at bar joists on north side and seal conduit at south side
Occupancy Inspection - Codes Commercial Failed 10/30/2023 10/30/2023 10/30/2023
Misc
Corrective Action Required
10/30/2023
-Complete all corrections for LSFD -Shell must have TCO before occupancy -Complete break room sink and countertop -Label RTUs -Paint exterior metallic gas lines on roof -Provide permanent tag at separate gas services -Provide unit address at all doors ***OK TO STOCK AND TRAIN ONLY, DO NOT OCCUPY
Occupancy Inspection - Codes Commercial Failed 11/10/2023
Misc
Corrective Action Required
10/30/2023
-Complete all corrections for LSFD -Shell must have TCO before occupancy -Complete break room sink and countertop -Label RTUs -Paint exterior metallic gas lines on roof -Provide permanent tag at separate gas services -Provide unit address at all doors ***OK TO STOCK AND TRAIN ONLY, DO NOT OCCUPY -11/10/23 -NO OCCUPANCY IS ABLE TO BE ISSUED UNTIL SHELL HAS OCCUPANCY -SPACE IS BEING OCCUPIED WITHOUT APPROVAL -RACKS STOCKED WITHOUT INSPECTION -BUSINESS NOT APPROVED TO BE CONDUCTED UNTIL ALL SHELL AND TENANT FINISH CORRECTIONS HAVE BEEN INSPECTED AND APPROVED
Occupancy Inspection - Codes Commercial Ready for Temp CO 11/13/2023 11/13/2023 11/13/2023
Misc
Corrective Action Required
11/10/2023
-Complete all corrections for LSFD -Bolts at racking not per plan, all nuts not tightened down
Occupancy Inspection - Codes Commercial Failed 12/5/2023 12/5/2023 12/05/2023
Misc
Corrective Action Required
11/13/2023
-Bolts at racking not per plan; have engineer approve shorter expansion anchors used throughout, or install Hilti KWIK-X 1/2 anchors with 4 1/4” embedment per plan
Gas Piping Inspection - Commercial Passed 12/12/2023
Misc
Corrective Action Required
10/26/2023
-Provide permanent address tag for unit A meter -Paint all exterior metallic gas lines with corrosion resistant paint
Occupancy Inspection - Codes Commercial Ready for Temp CO 12/12/2023
Misc
Corrective Action Required
12/05/2023
-Bolts at racking not per plan; have engineer approve shorter expansion anchors used throughout, or install Hilti KWIK-X 1/2 anchors with 4 1/4” embedment per plan
Occupancy Inspection - Codes Commercial Ready for Temp CO 1/11/2024 01/11/2024
Misc
Corrective Action Required
12/12/2023
-Bolts at racking not per plan; have engineer approve shorter expansion anchors used throughout, or install Hilti KWIK-X 1/2 anchors with 4 1/4” embedment per plan
Occupancy Inspection - Codes Commercial Full C of O 1/25/2024 1/25/2024 01/25/2024
Misc
Resolved
01/25/2024
-Bolts at racking not per plan; have engineer approve shorter expansion anchors used throughout, or install Hilti KWIK-X 1/2 anchors with 4 1/4” embedment per plan
Documents & Images
Date Uploaded File Type Document Name
08/29/2023 Application Form APPLICATION
08/31/2023 Plans Architecturals - Midwest Distribution 8_29_23 - Permit
08/31/2023 Plans Plumbing - 2023_08_25 Midwest PERMIT
08/31/2023 Plans Mechanical - Midwest Distribution - Permit Set
08/31/2023 Plans Electrical - Midwest Distribution - Permit Set 8_30_23
09/07/2023 Plans FP27203 Midwest Distribution PE Stamped Drawing
09/08/2023 Receipt Receipt for transaction:2023-006915
09/08/2023 Letter DS Building Permit
09/11/2023 Approved Plans approved plumbing designs
09/11/2023 Plans Structural - Midwest Dist - RTU Joist Reinf
09/12/2023 Letter INSPECTION SUMMARY
09/12/2023 Letter INSPECTION SUMMARY
09/12/2023 Plans REVISED Midwest Distribution 9_12_23 - Permit
09/14/2023 Plans FP27203 Midwest Distribution Revised
09/18/2023 REVISED Architecturals - Midwest Dist 9_12_23 - Permit w FE Locations
09/18/2023 Electrical REV - Midwest Dist - 9_14_23
09/18/2023 Midwest Distribution Permit Response - 20234293 - 9_18_23
09/19/2023 Letter Stop Work Order
09/19/2023 Shell Bldg B - NFPA BDA Survey (Radio Survey)
09/19/2023 Shell Bldg B - Permit Application Status - CityView Portal
09/20/2023 FIRE ALARM SET - Midwest - Stamped 9_19_23
09/25/2023 FIRE ALARM SET - Midwest - Stamped 9_19_23 APPROVED
09/25/2023 FIRE ALARM SET - Midwest - Stamped 9_19_23 APPROVED
09/25/2023 Letter Fire (Alarm) Plan Review Notice
09/26/2023 Plans Midwest Distribution Combined Permit Set 9_26_23
09/26/2023 Approved Plans approved - Midwest Distribution Combined Permit Set 9_26_23
09/26/2023 Letter License Tax Bill
09/26/2023 Letter DS Building Permit
10/03/2023 Letter INSPECTION SUMMARY
10/06/2023 Letter INSPECTION SUMMARY
10/06/2023 Letter INSPECTION SUMMARY
10/09/2023 Letter INSPECTION SUMMARY
10/11/2023 Letter INSPECTION SUMMARY
10/11/2023 Drawing Warehouse Layout - Racking Submission 10_11_23
10/11/2023 Letter Midwest Distribution Racking Submission Letter - 10_11_23
10/17/2023 Letter INSPECTION SUMMARY
10/19/2023 Plans FP27203 Midwest Distribution with ESFR-FHV PE Stamped
10/22/2023 A100 with Racking 10-20-23
10/24/2023 Letter Fire (Sprinkler) Plan Review
10/24/2023 FP27203 Midwest Distribution with ESFR-FHV PE Stamped Approved
10/24/2023 Letter DS P/R Corrections Document
10/25/2023 Letter INSPECTION SUMMARY
10/26/2023 Letter INSPECTION SUMMARY
10/26/2023 Letter INSPECTION SUMMARY
10/26/2023 Drawing E110 racking plan
10/26/2023 Drawing Midwest Dist - Rack Anchorage Detail - Sealed and Signed
10/26/2023 Engineer Report/Study Midwest Dist - Storage Rack Anchorage Calcs - Sealed and Signed
10/27/2023 Letter INSPECTION SUMMARY
10/27/2023 Receipt Receipt for transaction: 2023-008115
10/30/2023 Letter INSPECTION SUMMARY
10/30/2023 Letter INSPECTION SUMMARY
10/30/2023 Letter INSPECTION SUMMARY
10/30/2023 Letter INSPECTION SUMMARY
10/31/2023 Approved Plans approved - racking plan
11/10/2023 Letter INSPECTION SUMMARY
11/10/2023 Letter Codes 10 Day Letter
11/10/2023 Do Not Occupy
11/10/2023 Do Not Occupy 0
11/10/2023 Do Not Occupy 1
11/10/2023 Do Not Occupy 2
11/10/2023 Do Not Occupy 3
11/13/2023 Certificate/License Codes Temporary Certificate of Occupancy
11/13/2023 Receipt Receipt for transaction:2023-008465
12/05/2023 Letter INSPECTION SUMMARY
12/11/2023 TCO Extension Request Form 12_11_23
12/12/2023 Letter INSPECTION SUMMARY
12/12/2023 Certificate/License Codes Temporary Certificate of Occupancy
12/12/2023 Receipt Receipt for transaction:2023-009059
01/11/2024 TCO Extension Request Form 1_11_24
01/11/2024 Certificate/License Codes Temporary Certificate of Occupancy
01/11/2024 Receipt Receipt for transaction:2024-000193
01/25/2024 Midwest Distribution Anchor Resolution Letter
01/25/2024 Letter Codes Final Certificate of Occupancy
01/25/2024 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home