Permit Application Status

PRCOM20203927


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20203927
Building Permit - Commercial
Final Completion
HY VEE FOOD STORES INC
ALTERATION COMMERCIAL
INTERIOR REMODEL OF EXISTING GROCERY STORE
10/23/2020
01/04/2021
04/28/2021
05/09/2022
Locations
Contacts
HYVEE CONSTRUCTION LC, Address:5605 NE 22ND ST, Phone:(515) 645-2300  
BRR ARCHITECTURE - RICH MAJORS, Address:8131 METCALF AVE, STE 300, Phone:(913) 236-3444  
joshua.thrap@hy-veeconstruction.com, Address:joshua.thrap@hy-veeconstruction.com  
HY VEE FOOD STORES INC, Address:5820 WESTOWN PKWY  
MARICK INC, Address:138 JEFFERSON AVE, Phone:(515) 243-8288  
WESTHUES ELECTRIC INC, Address:PO BOX 18220, Phone:(816) 356-5223  
WESTERN ENTERPRISE INC, Address:956 OSAGE AVE, Phone:(913) 342-0505  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 02/10/2021 02/10/2021
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
02/10/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a hydrostatic test.
Fire Plan Review Approved with Conditions 11/23/2020 02/02/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
02/02/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net Note: Space will need to be monitored throughout the construction phases.
Construction documents - Fire protection systems
Corrective Action Required
02/02/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net Note: Fire sprinkler system will need to be operational throughout the construction phases.
Installation acceptance testing
Corrective Action Required
02/02/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. Testing will include Type 1 hood trip, hydrostatic, and alarm/waterflow.
Building Plan Review Approved with Conditions 11/23/2020 12/23/2020
Joe Frogge
IBC 602.1 Type of Construction - general
Resolved
11/18/2020

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Update code analysis to show correct construction type which is IIIB. (Unexpected, we know, but without confirmation that there is no combustible construction on the interior we need to stay with the IIIB)
Health Dept Review
Resolved
12/23/2020

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 11/18/20 - Acknowledged in letter.
Health Dept Inspection
Corrective Action Required
11/16/2020

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 11/18/20 - Acknowledged in letter.
ICC A117.1 902.4 Dining and work surfaces
Resolved
11/18/2020

ICC A117.1 Section 902.4 Height. The tops of dining surfaces and work surfaces shall be 28 inches minimum and 34 inches maximum in height above the floor. Action required: Work surface at soda fountains to be maximum 34" high. ref: 14/A3.9
IBC 1209.2 Finish materials
Resolved
11/18/2020

2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials at mop sinks. If paint is used it must be epoxy based.
IBC 603.1 Type of Construction - Allowable Materials
Resolved
11/18/2020

2018 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Wood blocking in parapet walls and roof curbs only allowed if fire retardant treated. Update details on sheets A8.0 and H4.0.
NEC Article 110.26 (C)(2) Large equipment
Resolved
11/18/2020

2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action suggested: Comment is for informational purposes as the electrical installations mentioned are existing. Please consider modifying doors in Electrical Room and Refrigerant Mezzanine such that they swing outward and are equipped with panic hardware. 11/18/20 - not addressed
Health Department Review Approved 12/23/2020
Joe Frogge
Licensed Contractors Approved 11/23/2020 12/21/2020
Joe Frogge
LC - General Contractor
Resolved
11/18/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
LC - MEP Subs
Resolved
12/21/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/18/20 - Acknowledged in letter. Currently under bid.
Alarm Plan Review Released for Construction 12/15/2020 12/15/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
12/15/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Fire Plan Review Approved with Conditions 11/23/2020 11/18/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
11/16/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net Note: Space will need to be monitored throughout the construction phases.
Construction documents - Fire protection systems
Corrective Action Required
11/16/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net Note: Fire sprinkler system will need to be operational throughout the construction phases.
Installation acceptance testing
Corrective Action Required
11/16/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. Testing will include Type 1 hood trip, hydrostatic, and alarm/waterflow.
Misc
Resolved
11/18/2020

(Action Required) Provide a temporary exiting plan for the different phases of construction.
Fire Plan Review Approved with Conditions 11/11/2020 10/30/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
10/30/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net Note: Space will need to be monitored throughout the construction phases.
Construction documents - Fire protection systems
Corrective Action Required
10/30/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net Note: Fire sprinkler system will need to be operational throughout the construction phases.
Installation acceptance testing
Corrective Action Required
10/30/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. Testing will include Type 1 hood trip, hydrostatic, and alarm/waterflow.
Misc
Corrective Action Required
10/30/2020

(Action Required) Provide a temporary exiting plan for the different phases of construction.
Building Plan Review Rejected 11/11/2020 10/29/2020
Joe Frogge
IBC 602.1 Type of Construction - general
Corrective Action Required
10/29/2020

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Update code analysis to show correct construction type which is IIIB. (Unexpected, we know, but without confirmation that there is no combustible construction on the interior we need to stay with the IIIB)
Health Dept Review
Corrective Action Required
10/29/2020

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
10/29/2020

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
ICC A117.1 902.4 Dining and work surfaces
Corrective Action Required
10/29/2020

ICC A117.1 Section 902.4 Height. The tops of dining surfaces and work surfaces shall be 28 inches minimum and 34 inches maximum in height above the floor. Action required: Work surface at soda fountains to be maximum 34" high. ref: 14/A3.9
IBC 1209.2 Finish materials
Corrective Action Required
10/29/2020

2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials at mop sinks. If paint is used it must be epoxy based.
IBC 603.1 Type of Construction - Allowable Materials
Corrective Action Required
10/29/2020

2018 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Wood blocking in parapet walls and roof curbs only allowed if fire retardant treated. Update details on sheets A8.0 and H4.0.
NEC Article 110.26 (C)(2) Large equipment
Corrective Action Required
10/30/2020

2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action suggested: Comment is for informational purposes as the electrical installations mentioned are existing. Please consider modifying doors in Electrical Room and Refrigerant Mezzanine such that they swing outward and are equipped with panic hardware.
Licensed Contractors Rejected 11/11/2020 10/29/2020
Joe Frogge
LC - General Contractor
Corrective Action Required
10/29/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
LC - MEP Subs
Corrective Action Required
10/29/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $32,000.00 $32,000.00 Paid 01/04/2021
8331507-Sewer Connection Fee $270.00 $270.00 Paid 01/04/2021
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $50.00 $0.00 $50.00 Not Paid
9110080-Not Ready Inspection Fee $50.00 $0.00 $50.00 Not Paid


$100.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 1/20/2021 1/20/2021 01/20/2021
Misc
Informational
01/20/2021
-See onsite city approved plans for dates and sections of partial approvals
Underslab Plumbing Inspection - Commercial Partial 1/26/2021 1/26/2021 01/26/2021
Misc
Informational
01/20/2021
-See onsite city approved plans for dates and sections of partial approvals
Underslab Electrical Inspection - Commercial Partial 1/26/2021 (1:00) 1/26/2021 01/26/2021
Misc
Informational
01/26/2021
See on site city approved plans for date and section of partial approvals
Above Ceiling Inspection Partial 1/28/2021 1/28/2021 01/28/2021
Misc
Informational
01/28/2021
See onsite copy of city approved plans for date and section of partial approvals
Underslab Plumbing Inspection - Commercial Partial 1/28/2021 01/28/2021
Misc
Informational
01/26/2021
-See onsite city approved plans for dates and sections of partial approvals
In-wall Inspection Partial 2/10/2021 2/10/2021 02/05/2021
Misc
Informational
02/05/2021
See onsite copy of city approved plans for dates and sections approved
Above Ceiling Inspection Partial 3/4/2021 3/4/2021 02/05/2021
Misc
Informational
01/28/2021
See onsite copy of city approved plans for date and section of partial approvals
Underslab Plumbing Inspection - Commercial Partial 5/10/2021 5/10/2021 02/10/2021
Misc
Informational
01/28/2021
-See onsite city approved plans for dates and sections of partial approvals
In-wall Inspection Partial 2/10/2021 2/10/2021 02/10/2021
Misc
Informational
02/10/2021
See onsite copy of city approved plans for dates and sections approved
In-wall Inspection Partial 2/12/2021 2/12/2021 02/12/2021
Misc
Informational
02/10/2021
See onsite copy of city approved plans for dates and sections approved
In-wall Inspection Partial 2/16/2021 2/16/2021 02/16/2021
Misc
Informational
02/12/2021
See onsite copy of city approved plans for dates and sections approved
In-wall Inspection Partial 2/24/2021 2/24/2021 02/24/2021
Misc
Informational
02/16/2021
See onsite copy of city approved plans for dates and sections approved
Hood/Duct Inspection Partial 3/4/2021 3/4/2021 03/04/2021
Misc
Informational
03/04/2021
-Light test approved -first and second layer of grease duct wrap inspections required
Hood/Duct Inspection Partial 3/9/2021 3/9/2021 03/09/2021
Misc
Informational
03/04/2021
-ROTISSERIE AREA- -Light test approved -first layer of grease duct wrap approved, second layer inspection required
Alarm Test Partial 3/9/2021 03/09/2021
Sprinkler - Hydrostatic Test Partial 3/9/2021 03/09/2021
Occupancy Inspection - Fire Partial 3/9/2021 03/09/2021
In-wall Inspection Partial 5/25/2021 03/09/2021
Misc
Informational
02/24/2021
See onsite copy of city approved plans for dates and sections approved
Above Ceiling Inspection Partial 3/10/2021 03/10/2021
Misc
Informational
02/05/2021
See onsite copy of city approved plans for date and section of partial approvals
Miscellaneous Inspection Partial 3/10/2021 3/10/2021 03/10/2021
Misc
Informational
03/10/2021
Men's & women's restrooms ok to occupy
Hood/Duct Inspection Partial 3/15/2021 03/15/2021
Misc
Informational
03/09/2021
-ROTISSERIE AREA- -Light test approved -first and second layer of grease duct wrap approved
In-wall Inspection Partial 5/24/2021 03/15/2021
Misc
Informational
03/09/2021
See onsite copy of city approved plans for dates and sections approved
Underslab Plumbing Inspection - Commercial Partial 3/15/2021 3/15/2021 03/15/2021
Misc
Informational
02/10/2021
-See onsite city approved plans for dates and sections of partial approvals
Miscellaneous Inspection Partial 3/18/2021 3/18/2021 03/18/2021
Misc
Informational
03/10/2021
Men's & women's restrooms ok to occupy Office area ok to occupy
Occupancy Inspection - Fire Partial 3/18/2021 3/18/2021 03/18/2021
Underslab Plumbing Inspection - Commercial Partial 3/23/2021 3/23/2021 03/23/2021
Misc
Informational
03/15/2021
-See onsite city approved plans for dates and sections of partial approvals
Above Ceiling Inspection Partial 3/23/2021 03/23/2021
Misc
Informational
03/10/2021
See onsite copy of city approved plans for date and section of partial approvals
In-wall Inspection Partial 3/31/2021 3/31/2021 03/31/2021
Misc
Informational
03/15/2021
See onsite copy of city approved plans for dates and sections approved
Underslab Plumbing Inspection - Commercial Partial 4/7/2021 4/7/2021 04/07/2021
Misc
Informational
03/23/2021
-See onsite city approved plans for dates and sections of partial approvals
Alternate Protection Systems Inspection Failed 4/21/2021 04/21/2021
Alarm Test Partial 4/22/2021 04/22/2021
Occupancy Inspection - Fire Partial 4/22/2021 04/22/2021
Alternate Protection Systems Inspection Partial 4/22/2021 04/22/2021
Occupancy Inspection - Codes Commercial Failed 4/22/2021 4/22/2021 04/22/2021
Misc
Informational
03/10/2021
-PHASED OCCUPANCY APPROVALS- -Restrooms approved for occupancy. 03/10/2021 JM Codes/Fire -Office area approved for occupancy 03/18/2021 JM Codes/Fire
Misc
Corrective Action Required
04/22/2021
-install outlet covers in market grille and deli -install panel covers on wine and spirits side -install beverage backflow devices -install cleanout caps at market grille and deli -install and secure equipment under market grille kitchen hood
Gas Piping Inspection - Commercial Partial 4/22/2021 04/22/2021
Misc
Informational
04/22/2021
gas piping and pressure test approved in market grille area
Misc
Resolved
05/19/2021
Miscellaneous Inspection Partial 4/22/2021 04/23/2021
Misc
Informational
03/18/2021
-Men's & women's restrooms ok to occupy -Office area ok to occupy -Wine and spirits, market grille area, sushi & deli ok to occupy
Underslab Plumbing Inspection - Commercial Partial 4/28/2021 4/28/2021 04/28/2021
Misc
Informational
04/07/2021
-See onsite city approved plans for dates and sections of partial approvals
Underslab Electrical Inspection - Commercial Partial 4/28/2021 04/28/2021
Misc
Informational
01/26/2021
See on site city approved plans for date and section of partial approvals
Underslab Plumbing Inspection - Commercial Partial 5/5/2021 5/5/2021 05/05/2021
Misc
Informational
04/28/2021
-See onsite city approved plans for dates and sections of partial approvals
Underslab Plumbing Inspection - Commercial Partial 5/10/2021 5/10/2021 05/10/2021
Misc
Informational
05/05/2021
-See onsite city approved plans for dates and sections of partial approvals
Miscellaneous Inspection Partial 5/11/2021 05/11/2021
Misc
Informational
04/23/2021
-Men's & women's restrooms ok to occupy -Office area ok to occupy -Wine and spirits, market grille area, sushi & deli ok to occupy -Meat & seafood ok to occupy
Occupancy Inspection - Fire Partial 5/11/2021 05/11/2021
Underslab Plumbing Inspection - Commercial Partial 5/17/2021 5/17/2021 05/17/2021
Misc
Informational
05/10/2021
-See onsite city approved plans for dates and sections of partial approvals
Gas Piping Inspection - Commercial Partial 5/19/2021 05/19/2021
Misc
Informational
04/22/2021
gas piping and pressure test approved in market grille area
Misc
Corrective Action Required
05/19/2021
Welded gas piping on roof top pressure test approved. Secure piping to blocks and paint piping with corrosion resistant material
In-wall Inspection Partial 5/25/2021 5/25/2021 05/25/2021
Misc
Informational
03/31/2021
See onsite copy of city approved plans for dates and sections approved
Hood/Duct Inspection Partial 5/25/2021 5/25/2021 05/25/2021
Misc
Informational
03/15/2021
-ROTISSERIE AREA- -Light test approved -first and second layer of grease duct wrap approved - AREA- -light test approved
Hood/Duct Inspection Partial 5/25/2021 5/25/2021 05/25/2021
Misc
Informational
05/25/2021
-ROTISSERIE AREA- -Light test approved -first and second layer of grease duct wrap approved -ASIAN KITCHEN AREA- -light test approved -1st layer approved
Hood/Duct Inspection Partial 5/25/2021 05/25/2021
Misc
Informational
05/25/2021
-ROTISSERIE AREA- -Light test approved -first and second layers of grease duct wrap approved -HIBACHI GRILL- -light test approved -first and second layers of grease duct wrap approved
In-wall Inspection Partial 5/26/2021 5/26/2021 05/26/2021
Misc
Informational
05/25/2021
See onsite copy of city approved plans for dates and sections approved
Misc
Corrective Action Required
06/09/2021
In wall- ok to one side Pharmacy and pateint rooms without plumbing. As discussed with Thomas and framer. plumbing protectio plates needed where required. electrical incomplete at checking and lab rooms.
Underslab Plumbing Inspection - Commercial Partial 5/27/2021 5/27/2021 05/27/2021
Misc
Informational
05/17/2021
-See onsite city approved plans for dates and sections of partial approvals
Underslab Electrical Inspection - Commercial Partial 5/27/2021 05/27/2021
Misc
Informational
04/28/2021
See on site city approved plans for date and section of partial approvals
Above Ceiling Inspection Partial 6/2/2021 6/2/2021 06/02/2021
Misc
Informational
03/23/2021
See onsite copy of city approved plans for date and section of partial approvals
Underslab Electrical Inspection - Commercial Partial 6/2/2021 06/02/2021
Misc
Informational
05/27/2021
See on site city approved plans for date and section of partial approvals
Underslab Plumbing Inspection - Commercial Partial 6/2/2021 6/2/2021 06/02/2021
Misc
Informational
05/27/2021
-See onsite city approved plans for dates and sections of partial approvals
In-wall Inspection Partial 6/3/2021 6/3/2021 06/03/2021
Misc
Informational
05/26/2021
See onsite copy of city approved plans for dates and sections approved
Hood/Duct Inspection Partial 6/7/2021 6/7/2021 06/07/2021
Misc
Informational
05/25/2021
-ROTISSERIE AREA- -Light test approved -first and second layers of grease duct wrap approved -HIBACHI GRILL- -light test approved -first and second layers of grease duct wrap approved -PIZZA OVEN- -light test approved
Hood/Duct Inspection Partial 6/8/2021 6/8/2021 06/07/2021
Misc
Informational
06/07/2021
-ROTISSERIE AREA- -Light test approved -first and second layers of grease duct wrap approved -HIBACHI GRILL- -light test approved -first and second layers of grease duct wrap approved -PIZZA OVEN- -light test approved -first layer of grease duct wrap approved
Hood/Duct Inspection Partial 6/8/2021 6/8/2021 06/08/2021
Misc
Informational
06/07/2021
-ROTISSERIE AREA- -Light test approved -first and second layers of grease duct wrap approved -HIBACHI GRILL- -light test approved -first and second layers of grease duct wrap approved -PIZZA OVEN- -light test approved -first and second layer of grease duct wrap approved
In-wall Inspection Failed 6/9/2021 06/09/2021
Misc
Informational
06/03/2021
See onsite copy of city approved plans for dates and sections approved
Misc
Corrective Action Required
06/09/2021
In wall- ok to one side Pharmacy and pateint rooms without plumbing. As discussed with Thomas and framer. plumbing protectio plates needed where required. electrical incomplete at checking and lab rooms.
In-wall Inspection Partial 6/10/2021 06/10/2021
Misc
Informational
06/09/2021
See onsite copy of city approved plans for dates and sections approved
Misc
Corrective Action Required
06/09/2021
In wall- Areas approved to coverr: Pharmacy and pateint rooms.
Alarm Test Partial 6/15/2021 06/15/2021
Alternate Protection Systems Inspection Partial 6/15/2021 06/15/2021
Occupancy Inspection - Fire Partial 6/15/2021 06/15/2021
Above Ceiling Inspection Partial 6/16/2021 6/16/2021 06/16/2021
Misc
Informational
06/02/2021
See onsite copy of city approved plans for date and section of partial approvals
Miscellaneous Inspection Partial 6/17/2021 06/17/2021
Misc
Informational
05/11/2021
-Men's & women's restrooms ok to occupy -Office area ok to occupy -Wine and spirits, market grille area, sushi & deli ok to occupy -Meat & seafood ok to occupy -Bakery ok to occupy
In-wall Inspection Partial 6/22/2021 6/22/2021 06/22/2021
Misc
Informational
06/10/2021
See onsite copy of city approved plans for dates and sections approved
Misc
Informational
06/22/2021
In wall- Areas approved to coverr: Pharmacy and pateint rooms.
Above Ceiling Inspection Partial 6/30/2021 6/30/2021 06/30/2021
Misc
Informational
06/16/2021
See onsite copy of city approved plans for date and section of partial approvals
Above Ceiling Inspection Failed 7/2/2021 7/2/2021 07/02/2021
Misc
Informational
06/30/2021
Customer service not ready from red wall to the east sheetrock wall, wires handing below grid. grid incomplete. Clinic area- MC incomplete, plumbing and water lines through ceiling over desk -- existing shopping cart area- open wiring and electrical boxes open to the public . cover or demo out accessible electrical ASAP.\\ Inspection not ready next not ready will result in a fee. MARK HARDING 07/02/2021 9:36 AM
Above Ceiling Inspection Not Ready 7/7/2021 07/07/2021
Misc
Informational
07/02/2021
Customer service not ready from red wall to the east sheetrock wall, wires handing below grid. grid incomplete. Clinic area- MC incomplete, plumbing and water lines through ceiling over desk -- existing shopping cart area- open wiring and electrical boxes open to the public . cover or demo out accessible electrical ASAP.\\ Inspection not ready next not ready will result in a fee. MARK HARDING 07/02/2021 9:36 AM
Misc
Corrective Action Required
07/07/2021
ALL ceiing tile was installed over the clinic area, remve and recall. nothing was approved to installl tile. - customer serivce area: tile installed from red wall to tall wall behind CS red wall without approval, open boxes, low voltage supported by gas pipe, sprinkler piping, ceiling grid. All electrical needs to be supported 4.5 ft and low voltage over the constrution areas need to be supported offf the bar joist not from other equipment.
Alarm Test Partial 7/8/2021 07/08/2021
Occupancy Inspection - Fire Partial 7/9/2021 7/9/2021 07/09/2021
Occupancy Inspection - Codes Commercial Failed 7/9/2021 7/9/2021 07/09/2021
Misc
Informational
04/22/2021
-PHASED OCCUPANCY APPROVALS- -Restrooms approved for occupancy. 03/10/2021 JM Codes/Fire -Office area approved for occupancy 03/18/2021 JM Codes/Fire -Meat & seafood approved for occupancy 05/11/2021 JM Codes/Fire -Bakery approved for occupancy. 06/17/2021 JM Codes/Fire
Misc
Resolved
05/11/2021
-install outlet covers in market grille and deli -install panel covers on wine and spirits side -install beverage backflow devices -install cleanout caps at market grille and deli -install and secure equipment under market grille kitchen hood
Misc
Corrective Action Required
07/09/2021
Clinic area- -install water heater and drain , TRV to the correct location per code. install appoved piping. -insulate water pipes above ceiling. - install mirror in restroom. -signage for restroom
Occupancy Inspection - Codes Commercial Failed 7/12/2021 7/12/2021 07/12/2021
Misc
Informational
07/09/2021
-PHASED OCCUPANCY APPROVALS- -Restrooms -Office area -Meat & seafood -Bakery -Floral -Customer service -Clinic
Misc
Corrective Action Required
07/09/2021
Clinic area- -install water heater and drain , TRV to the correct location per code. install appoved piping. -insulate water pipes above ceiling.
Occupancy Inspection - Fire Partial 7/12/2021 7/12/2021 07/12/2021
Alarm Test Partial 7/12/2021 07/12/2021
Alternate Protection Systems Inspection Passed 7/14/2021 07/14/2021
Alarm Test Partial 7/14/2021 07/14/2021
Underslab Plumbing Inspection - Commercial Partial 7/21/2021 7/21/2021 07/21/2021
Misc
Informational
06/02/2021
South Vestibule
In-wall Inspection Partial 7/21/2021 7/21/2021 07/21/2021
Misc
Informational
06/22/2021
north vestibule -walls at cart storage north and to the south
Misc
Informational
06/22/2021
In wall- Areas approved to coverr: Pharmacy and pateint rooms.
Alarm Test Not Ready 7/22/2021 07/22/2021
Corrective Action Required
07/22/2021
Occupancy Inspection - Fire Partial 7/22/2021 07/22/2021
Occupancy Inspection - Fire Partial 7/22/2021 07/22/2021
Occupancy Inspection - Codes Commercial Failed 7/22/2021 7/22/2021 07/22/2021
Misc
Informational
07/12/2021
-PHASED OCCUPANCY APPROVALS- -Restrooms -Office area -Meat & seafood -Bakery -Floral-Customer service-Clinic,Asian, hibachi, & pizza area;phyarmacy,
Misc
Corrective Action Required
07/12/2021
Clinic area- -install water heater and drain , TRV to the correct location per code. install appoved piping. -insulate water pipes above ceiling.
Underslab Plumbing Inspection - Commercial Partial 7/26/2021 7/26/2021 07/26/2021
Misc
Informational
07/21/2021
South Vestibule New Starbuck's location
Corrective Action Required
07/22/2021
In-wall Inspection Failed 7/28/2021 7/28/2021 07/28/2021
Misc
Informational
07/21/2021
north vestibule -walls at cart storage north and to the south
Misc
Informational
07/21/2021
In wall- Areas approved to coverr: Pharmacy and pateint rooms.
Misc
Corrective Action Required
07/28/2021
- provide detail on spliced studs, support and insulate copper water piping. - DWV, support and provide mid-story guide on sizes 2" and smaller. recall when ready.
In-wall Inspection Partial 7/29/2021 7/29/2021 07/29/2021
Misc
Informational
07/28/2021
In wall- Areas approved to coverr: Pharmacy,pateint rooms; north vestibule -walls at cart storage north, south; starbucks - north wall 10', east wall.
Misc
Resolved
07/29/2021
In wall- Areas approved to coverr: Pharmacy and pateint rooms.
Misc
Resolved
07/29/2021
- provide detail on spliced studs, support and insulate copper water piping. - DWV, support and provide mid-story guide on sizes 2" and smaller. recall when ready.
Underslab Plumbing Inspection - Commercial Partial 8/2/2021 8/2/2021 08/02/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
08/02/2021
- UNDERSLAB PLUMBING NORTH OF GRID LINE 10 DISPLAY COOLERS -
Underslab Plumbing Inspection - Commercial Partial 8/4/2021 8/4/2021 08/04/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
08/02/2021
- UNDERSLAB PLUMBING NORTH OF GRID LINE 10 DISPLAY COOLERS - -UNDERSLAB PLUMBING MEALTIME COOLERS GRIDS 5-6;C AND DAIRY GRID 9 NORTH J LINE
Above Ceiling Inspection Failed 8/11/2021 8/11/2021 08/11/2021
Misc
Informational
08/05/2021
Customer service not ready from red wall to the east sheetrock wall, wires handing below grid. grid incomplete. Clinic area- MC incomplete, plumbing and water lines through ceiling over desk -- existing shopping cart area- open wiring and electrical boxes open to the public . cover or demo out accessible electrical ASAP.\\ Inspection not ready next not ready will result in a fee. MARK HARDING 07/02/2021 9:36 AM
Misc
Corrective Action Required
08/05/2021
ALL ceiing tile was installed over the clinic area, remve and recall. nothing was approved to installl tile. - customer serivce area: tile installed from red wall to tall wall behind CS red wall without approval, open boxes, low voltage supported by gas pipe, sprinkler piping, ceiling grid. All electrical needs to be supported 4.5 ft and low voltage over the constrution areas need to be supported offf the bar joist not from other equipment.
Misc
Corrective Action Required
08/11/2021
8/11/21 - STARBUCKS AREA - SUPPORT MC EVERY 4 1/2', SUPPORT MC UP OFF CEILING GRID, SUPPORT ALL LOW VOLT DATA UP OFF CEILING GRID -FRONT VESTIBULE NORTH SIDE - SUPPORT MC EVERY 4 1/2', SUPPORT MC OFF GRID, COMPLETE ALL ELECTRICAL AT CEILING
Above Ceiling Inspection Partial 8/12/2021 8/12/2021 08/12/2021
Misc
Informational
08/11/2021
Customer service not ready from red wall to the east sheetrock wall, wires handing below grid. grid incomplete. Clinic area- MC incomplete, plumbing and water lines through ceiling over desk -- existing shopping cart area- open wiring and electrical boxes open to the public . cover or demo out accessible electrical ASAP.\\ Inspection not ready next not ready will result in a fee. MARK HARDING 07/02/2021 9:36 AM
Misc
Corrective Action Required
08/11/2021
ALL ceiing tile was installed over the clinic area, remve and recall. nothing was approved to installl tile. - customer serivce area: tile installed from red wall to tall wall behind CS red wall without approval, open boxes, low voltage supported by gas pipe, sprinkler piping, ceiling grid. All electrical needs to be supported 4.5 ft and low voltage over the constrution areas need to be supported offf the bar joist not from other equipment.
Misc
Informational
08/12/2021
8/12 - CEILING ABOVE STARBUCKS AND FRONT NORTH VESTIBULE OK
In-wall Inspection Partial 8/17/2021 8/17/2021 08/17/2021
Misc
Informational
07/29/2021
In wall- Areas approved to coverr: Pharmacy,pateint rooms; north vestibule -walls at cart storage north, south; starbucks - north wall 10', east wall. MILK/DAIRY COOLER, EXTERIOR WALL NORTH GRID 11, AND GRID 9-10 WALL TO STEEL COLUMN OK
Above Ceiling Inspection Failed 8/17/2021 8/17/2021 08/17/2021
Misc
Resolved
08/17/2021
Customer service not ready from red wall to the east sheetrock wall, wires handing below grid. grid incomplete. Clinic area- MC incomplete, plumbing and water lines through ceiling over desk -- existing shopping cart area- open wiring and electrical boxes open to the public . cover or demo out accessible electrical ASAP.\\ Inspection not ready next not ready will result in a fee. MARK HARDING 07/02/2021 9:36 AM
Misc
Resolved
08/17/2021
ALL ceiing tile was installed over the clinic area, remve and recall. nothing was approved to installl tile. - customer serivce area: tile installed from red wall to tall wall behind CS red wall without approval, open boxes, low voltage supported by gas pipe, sprinkler piping, ceiling grid. All electrical needs to be supported 4.5 ft and low voltage over the constrution areas need to be supported offf the bar joist not from other equipment.
Misc
Informational
08/12/2021
8/12 - CEILING ABOVE STARBUCKS AND FRONT NORTH VESTIBULE OK
Misc
Corrective Action Required
08/17/2021
8/17 - PHARMACY/HEALTH ABOVE CEILING, INSTALL ALL SPRINKLER HEADS, COVERS AT ALL BOXES/PANELS, SECURE ALL MC AND LOW VOLT/DATA UP OFF CEILING GRID, SUPPORT ALL MC 4.5', REMOVE UNUSED ELECTRICAL MC HANGING FROM BOX AND PLUG BOX, COMPLETE CEILING GRID BY PHARMACY AROUND COLUMN TEMP LIGHTING AND EXISTING LIGHTING OK DUE TO DELAY IN SHIPMENT OF NEW LIGHTING, WILL NEED TO SEE ABOVE CEILING AT NMEW FIXTURES WHEN INSTALLED FOR FINAL ABOVE CEILING
Above Ceiling Inspection Partial 8/19/2021 8/19/2021 08/19/2021
Misc
Informational
08/17/2021
8/12 - CEILING ABOVE STARBUCKS AND FRONT NORTH VESTIBULE OK
Misc
Corrective Action Required
08/17/2021
8/17 - PHARMACY/HEALTH ABOVE CEILING; TEMP LIGHTING AND EXISTING LIGHTING OK DUE TO DELAY IN SHIPMENT OF NEW LIGHTING, WILL NEED TO SEE ABOVE CEILING AT NMEW FIXTURES WHEN INSTALLED FOR FINAL ABOVE CEILING
Alarm Test Partial 8/25/2021 08/25/2021
Occupancy Inspection - Fire Partial 8/25/2021 08/25/2021
Occupancy Inspection - Codes Commercial Failed 8/26/2021 8/26/2021 08/26/2021
Misc
Informational
07/22/2021
-PHASED OCCUPANCY APPROVALS- -Restrooms -Office area -Meat & seafood -Bakery -Floral-Customer service-Clinic,Asian, hibachi, & pizza area;phyarmacy,
Misc
Corrective Action Required
07/22/2021
Clinic area- -install water heater and drain , TRV to the correct location per code. install appoved piping. -insulate water pipes above ceiling. Starbucks: install 6 backflows : 1 007, and 4 inline 1022s on the coffe and hardpiped appliances.
Occupancy Inspection - Codes Commercial Failed 8/27/2021 08/27/2021
Misc
Informational
08/26/2021
-PHASED OCCUPANCY APPROVALS- -Restrooms -Office area -Meat & seafood -Bakery -Floral-Customer service-Clinic,Asian, hibachi, & pizza area;phyarmacy,Starbuck's
Misc
Corrective Action Required
08/26/2021
Clinic area- -install water heater and drain , TRV to the correct location per code. install appoved piping. -insulate water pipes above ceiling.
Underslab Plumbing Inspection - Commercial Partial 9/13/2021 9/13/2021 09/13/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
08/04/2021
- UNDERSLAB PLUMBING NORTH OF GRID LINE 10 DISPLAY COOLERS - -UNDERSPLAB PLUMBING MEALTIME COOLERS GRIDS 5-6;C AND DAIRY GRID 9 NORTH J LINE -PRODUCE ARE WEST OF LINE 5, NORTH OF LIINE E
In-wall Inspection Partial 9/23/2021 9/23/2021 09/23/2021
Misc
Informational
08/17/2021
In wall- Areas approved to coverr: Pharmacy,pateint rooms; north vestibule -walls at cart storage north, south; starbucks - north wall 10', east wall., sports shop MILK/DAIRY COOLER, EXTERIOR WALL NORTH GRID 11, AND GRID 9-10 WALL TO STEEL COLUMN OK
Above Ceiling Inspection Partial 9/23/2021 9/23/2021 09/23/2021
Misc
Informational
08/19/2021
8/12 - CEILING ABOVE STARBUCKS AND FRONT NORTH VESTIBULE OK 9-23- Hard lid and soffit in sports shop ok
Misc
Corrective Action Required
08/19/2021
8/17 - PHARMACY/HEALTH ABOVE CEILING; TEMP LIGHTING AND EXISTING LIGHTING OK DUE TO DELAY IN SHIPMENT OF NEW LIGHTING, WILL NEED TO SEE ABOVE CEILING AT NMEW FIXTURES WHEN INSTALLED FOR FINAL ABOVE CEILING
In-wall Inspection Partial 10/21/2021 10/21/2021 10/21/2021
Misc
Informational
09/23/2021
In wall- Areas approved to coverr: Pharmacy,pateint rooms; north vestibule -walls at cart storage north, south; starbucks - north wall 10', east wall., sports shop DSW walls north and west MILK/DAIRY COOLER, EXTERIOR WALL NORTH GRID 11, AND GRID 9-10 WALL TO STEEL COLUMN OK
Commercial Curb Inspection Passed 12/02/2021
Pavement-Surface Passed 12/02/2021
Occupancy Inspection - Fire Partial 12/6/2021 12/06/2021
Occupancy Inspection - Codes Commercial Failed 12/6/2021 12/6/2021 12/06/2021
Misc
Informational
08/27/2021
-PHASED OCCUPANCY APPROVALS- -Restrooms -Office area -Meat & seafood -Bakery -Floral-Customer service-Clinic,Asian, hibachi, & pizza area;phyarmacy,Starbuck's, Sports Shop,
Misc
Corrective Action Required
08/27/2021
Clinic area- -install water heater and drain , TRV to the correct location per code. install appoved piping. -insulate water pipes above ceiling.
Above Ceiling Inspection Partial 12/6/2021 12/06/2021
Misc
Informational
09/23/2021
8/12 - CEILING ABOVE STARBUCKS AND FRONT NORTH VESTIBULE OK 9-23- Hard lid and soffit in sports shop ok 12-6-21 AISLES ONLINE AREA REAR OF STORE OK TO DROP CEILING TILE -
Misc
Corrective Action Required
09/23/2021
8/17 - PHARMACY/HEALTH ABOVE CEILING; TEMP LIGHTING AND EXISTING LIGHTING OK DUE TO DELAY IN SHIPMENT OF NEW LIGHTING, WILL NEED TO SEE ABOVE CEILING AT NMEW FIXTURES WHEN INSTALLED FOR FINAL ABOVE CEILING
Alarm Test Passed 12/8/2021 12/08/2021
Sprinkler - Flow Test Passed 12/8/2021 12/09/2021
Alarm Test Passed 12/8/2021 12/09/2021
Occupancy Inspection - Fire Temporary C of O 12/14/2021 12/14/2021 12/14/2021
Hood/Duct Inspection Passed 12/14/2021
Misc
Resolved
12/14/2021
-ROTISSERIE AREA- -Light test approved -first and second layers of grease duct wrap approved -HIBACHI GRILL- -light test approved -first and second layers of grease duct wrap approved -PIZZA OVEN- -light test approved -first and second layer of grease duct wrap approved
In-wall Inspection Passed 12/14/2021
Misc
Resolved
12/14/2021
In wall- Areas approved to coverr: Pharmacy,pateint rooms; north vestibule -walls at cart storage north, south; starbucks - north wall 10', east wall., sports shop DSW walls north and west MILK/DAIRY COOLER, EXTERIOR WALL NORTH GRID 11, AND GRID 9-10 WALL TO STEEL COLUMN OK
Underslab Plumbing Inspection - Commercial Passed 12/14/2021
THE FOLLOWING AREAS ARE APPROVED
Resolved
12/14/2021
- UNDERSLAB PLUMBING NORTH OF GRID LINE 10 DISPLAY COOLERS - -UNDERSPLAB PLUMBING MEALTIME COOLERS GRIDS 5-6;C AND DAIRY GRID 9 NORTH J LINE -PRODUCE ARE WEST OF LINE 5, NORTH OF LIINE E
Miscellaneous Inspection Passed 12/14/2021
Misc
Resolved
12/14/2021
-Men's & women's restrooms ok to occupy -Office area ok to occupy -Wine and spirits, market grille area, sushi & deli ok to occupy -Meat & seafood ok to occupy -Bakery ok to occupy
Underslab Electrical Inspection - Commercial Passed 12/14/2021
Misc
Resolved
12/14/2021
See on site city approved plans for date and section of partial approvals
Gas Piping Inspection - Commercial Passed 12/14/2021
Misc
Resolved
12/14/2021
gas piping and pressure test approved in market grille area
Misc
Resolved
12/14/2021
Welded gas piping on roof top pressure test approved. Secure piping to blocks and paint piping with corrosion resistant material
Occupancy Inspection - Codes Commercial Failed 12/14/2021 12/14/2021 12/14/2021
Misc
Resolved
12/14/2021
-PHASED OCCUPANCY APPROVALS- -Restrooms -Office area -Meat & seafood -Bakery -Floral-Customer service-Clinic,Asian, hibachi, & pizza area;phyarmacy,Starbuck's, Sports Shop,
Misc
Corrective Action Required
12/06/2021
only pending item is the remaining lights on back order and will be installed mid-jan. Thomas will schedule when the lift is still present to inspect the MC and slack wires supporting the lights. all other departments approved.
Occupancy Inspection - Fire Passed 12/17/2021 12/17/2021
Above Ceiling Inspection Passed 05/09/2022
Misc
Resolved
05/09/2022
8/12 - CEILING ABOVE STARBUCKS AND FRONT NORTH VESTIBULE OK 9-23- Hard lid and soffit in sports shop ok 12-6-21 AISLES ONLINE AREA REAR OF STORE OK TO DROP CEILING TILE -
Misc
Resolved
05/09/2022
8/17 - PHARMACY/HEALTH ABOVE CEILING; TEMP LIGHTING AND EXISTING LIGHTING OK DUE TO DELAY IN SHIPMENT OF NEW LIGHTING, WILL NEED TO SEE ABOVE CEILING AT NMEW FIXTURES WHEN INSTALLED FOR FINAL ABOVE CEILING
Final Inspection - Commercial Passed 05/09/2022
Documents & Images
Date Uploaded File Type Document Name
10/23/2020 Application Form Comm Permit Application_BRR
10/23/2020 Application Form License Tax_BRR
10/28/2020 Plans Equipment Set
10/28/2020 Plans Fire Set
10/28/2020 Plans Mechanical Set
10/28/2020 Plans Electrical Set
10/28/2020 Plans Plumbing Set
10/28/2020 Plans Structural Set
10/28/2020 Plans Architecture Set
10/28/2020 Plans Technology Set
10/28/2020 Plans Refrigeration Set
10/28/2020 Plans Register Systems Plan Set
10/30/2020 Letter Fire Building Plan Review
10/30/2020 Email plumbing trap info
10/30/2020 Letter DS P/R Corrections Document
11/02/2020 Email RE Hyvee exterior
11/16/2020 Letter Hy-Vee Lee's Summit #2 - ASI #1 Change Narrative
11/16/2020 Letter Code Response Letter 20 1113
11/16/2020 Plans Hy-Vee Lee's Summit 2 - ASI #1 Combined
11/18/2020 Letter Fire Building Plan Review
12/15/2020 Lees Summit 2 - t4.0 stamped
12/15/2020 Lees Summit 2 - t4.1 stamped
12/15/2020 Lees Summit 2 - t4.2 stamped
12/15/2020 Lees Summit 2 - t4.3 stamped
12/15/2020 Letter Fire (Alarm) Plan Review Notice
12/23/2020 Email Food Establishment Remodel Plan Review - Approved FTG 0001576
12/29/2020 Architecture Set_12_28_20
12/29/2020 Mechanical Set_12_28_20
12/29/2020 Approved Plans approved - Architecture Set_12_28_20
12/29/2020 Approved Plans approved - Electrical Set
12/29/2020 Approved Plans approved - Equipment Set
12/29/2020 Approved Plans approved - Mechanical Set_12_28_20
12/29/2020 Approved Plans approved - Plumbing Set
12/29/2020 Approved Plans approved - Refrigeration Set
12/29/2020 Approved Plans approved - Register Systems Plan Set
12/29/2020 Approved Plans approved - Structural Set
12/29/2020 Approved Plans approved - Technology Set
01/04/2021 Receipt Receipt for transaction: 2021-000015
01/04/2021 Letter DS Building Permit
01/20/2021 Letter INSPECTION SUMMARY
01/20/2021 Letter Codes Plan Review Conditions
01/26/2021 Letter INSPECTION SUMMARY
01/26/2021 Letter INSPECTION SUMMARY
01/28/2021 Letter INSPECTION SUMMARY
01/28/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter ASI #3 Change Narrative
02/01/2021 Letter ASI #2 Change Narrative
02/01/2021 Plans ASI #2 & ASI#3 Combined
02/02/2021 Letter Fire Building Plan Review
02/03/2021 Approved Plans approved - ASI #2 & ASI#3 Combined
02/05/2021 Letter INSPECTION SUMMARY
02/05/2021 Letter INSPECTION SUMMARY
02/09/2021 20217_HYVEE_LS_FULL_SUB
02/10/2021 Letter Fire (Sprinkler) Plan Review
02/10/2021 Letter INSPECTION SUMMARY
02/10/2021 Letter INSPECTION SUMMARY
02/12/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/24/2021 Letter INSPECTION SUMMARY
03/04/2021 Letter INSPECTION SUMMARY
03/09/2021 Letter INSPECTION SUMMARY
03/09/2021 Letter Fire Loss Reduction Form
03/09/2021 Letter INSPECTION SUMMARY
03/09/2021 Letter INSPECTION SUMMARY
03/09/2021 Letter INSPECTION SUMMARY
03/09/2021 Letter INSPECTION SUMMARY
03/10/2021 Letter INSPECTION SUMMARY
03/10/2021 Letter INSPECTION SUMMARY
03/15/2021 Letter INSPECTION SUMMARY
03/15/2021 Letter INSPECTION SUMMARY
03/15/2021 Letter INSPECTION SUMMARY
03/18/2021 Letter INSPECTION SUMMARY
03/18/2021 Letter Fire Loss Reduction Form
03/23/2021 Letter INSPECTION SUMMARY
03/23/2021 Letter INSPECTION SUMMARY
03/31/2021 Letter INSPECTION SUMMARY
03/31/2021 Letter INSPECTION SUMMARY
04/07/2021 Letter INSPECTION SUMMARY
04/21/2021 Letter Fire Loss Reduction Form
04/22/2021 Engineer Report/Study B2100276_Trans2_4.21.2021
04/22/2021 Letter Fire Loss Reduction Form
04/22/2021 Letter Fire Loss Reduction Form
04/22/2021 Letter Fire Loss Reduction Form
04/22/2021 Letter INSPECTION SUMMARY
04/22/2021 Letter Fire Loss Reduction Form
04/22/2021 Letter INSPECTION SUMMARY
04/22/2021 Letter Hy-Vee Lee's Summit #2 - ASI #7 Change Narrative
04/22/2021 Plans 21 0421 Lee's Summit 2_ASI #7 Combined
04/22/2021 Approved Plans approved - 21 0421 Lee's Summit 2_ASI #7 Combined
04/23/2021 Letter INSPECTION SUMMARY
04/28/2021 Letter INSPECTION SUMMARY
04/28/2021 Letter INSPECTION SUMMARY
05/05/2021 Letter INSPECTION SUMMARY
05/10/2021 Letter INSPECTION SUMMARY
05/11/2021 Letter INSPECTION SUMMARY
05/11/2021 Letter Fire Loss Reduction Form
05/17/2021 Letter INSPECTION SUMMARY
05/19/2021 Letter INSPECTION SUMMARY
05/19/2021 Letter INSPECTION SUMMARY
05/25/2021 Letter INSPECTION SUMMARY
05/25/2021 Letter INSPECTION SUMMARY
05/25/2021 Letter INSPECTION SUMMARY
05/25/2021 Letter INSPECTION SUMMARY
05/26/2021 Letter INSPECTION SUMMARY
05/26/2021 Letter Hy-Vee Lee's Summit #2 - ASI #8 Change Narrative
05/26/2021 Plans Lee's Summit 2 - ASI #8_Combined
05/27/2021 Letter INSPECTION SUMMARY
05/27/2021 Letter INSPECTION SUMMARY
06/02/2021 Letter INSPECTION SUMMARY
06/02/2021 Letter INSPECTION SUMMARY
06/02/2021 Letter INSPECTION SUMMARY
06/03/2021 Letter INSPECTION SUMMARY
06/07/2021 Letter INSPECTION SUMMARY
06/07/2021 Letter INSPECTION SUMMARY
06/08/2021 Letter INSPECTION SUMMARY
06/09/2021 Letter INSPECTION SUMMARY
06/10/2021 Letter INSPECTION SUMMARY
06/15/2021 Letter Fire Loss Reduction Form
06/15/2021 Letter Fire Loss Reduction Form
06/15/2021 Letter Fire Loss Reduction Form
06/16/2021 Letter INSPECTION SUMMARY
06/17/2021 Letter INSPECTION SUMMARY
06/22/2021 Letter INSPECTION SUMMARY
06/30/2021 Letter INSPECTION SUMMARY
07/07/2021 Letter INSPECTION SUMMARY
07/09/2021 Letter Fire Loss Reduction Form
07/09/2021 Letter INSPECTION SUMMARY
07/09/2021 Letter Fire Loss Reduction Form
07/12/2021 Letter INSPECTION SUMMARY
07/12/2021 Letter Fire Loss Reduction Form
07/12/2021 Letter Fire Loss Reduction Form
07/14/2021 Letter Fire Loss Reduction Form
07/21/2021 Letter INSPECTION SUMMARY
07/21/2021 Letter INSPECTION SUMMARY
07/22/2021 Letter Fire Loss Reduction Form
07/22/2021 Letter Fire Loss Reduction Form
07/22/2021 Letter Fire Loss Reduction Form
07/22/2021 Letter INSPECTION SUMMARY
07/22/2021 Letter Fire Loss Reduction Form
07/22/2021 Letter INSPECTION SUMMARY
07/26/2021 Letter INSPECTION SUMMARY
07/28/2021 Letter INSPECTION SUMMARY
07/29/2021 Letter INSPECTION SUMMARY
08/02/2021 Letter INSPECTION SUMMARY
08/04/2021 Letter INSPECTION SUMMARY
08/11/2021 Letter INSPECTION SUMMARY
08/12/2021 Letter INSPECTION SUMMARY
08/17/2021 Letter INSPECTION SUMMARY
08/17/2021 Letter INSPECTION SUMMARY
08/19/2021 Letter INSPECTION SUMMARY
08/25/2021 Letter Fire Loss Reduction Form
08/25/2021 Letter Fire Loss Reduction Form
08/25/2021 Letter Fire Loss Reduction Form
08/26/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter INSPECTION SUMMARY
09/13/2021 Letter INSPECTION SUMMARY
09/23/2021 Letter INSPECTION SUMMARY
09/23/2021 Letter INSPECTION SUMMARY
10/21/2021 Letter INSPECTION SUMMARY
12/06/2021 Letter INSPECTION SUMMARY
12/06/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter INSPECTION SUMMARY
12/14/2021 Letter INSPECTION SUMMARY
12/14/2021 Letter Fire Loss Reduction Form
12/14/2021 Letter INSPECTION SUMMARY
12/14/2021 Letter INSPECTION SUMMARY
12/14/2021 Letter INSPECTION SUMMARY
12/14/2021 Letter INSPECTION SUMMARY
12/14/2021 Letter INSPECTION SUMMARY
12/14/2021 Letter INSPECTION SUMMARY
12/15/2021 Email Email Correspondence 121421_City Staff -- HyVee Staff
12/14/2021 Letter Fire Loss Reduction Form
12/17/2021 Letter Fire Loss Reduction Form
05/09/2022 Letter INSPECTION SUMMARY
05/09/2022 Letter INSPECTION SUMMARY
12/06/2021 Letter Fire Loss Reduction Form
12/02/2021 Letter INSPECTION SUMMARY
12/02/2021 Letter INSPECTION SUMMARY
12/02/2021 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home