Permit Application Status

PRCOM20182604


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20182604
Building Permit - Commercial
Certificate of Occupancy
TOWNSEND SUMMIT LLC
NEW MULTI-FAMILY
B#1- 4 STORY APARTMENT BUILDING WITH LEASING OFFICE AND FULL SERVICE CLUBHOUSE *FOUNDATION PERMIT - PRCOM20183262
08/14/2018
07/15/2019
02/18/2019
04/30/2021
Locations
Contacts
NEIGHBORS CONSTRUCTION COMPANY INC, Address:1708 E 123RD ST, Phone:(913) 422-5555  
AIR DOCTOR SOLUTIONS LLC, Address:P O BOX 842400, Phone:(435) 688-3060  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
  
CITY OF LEES SUMMIT MO, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 12/10/2019
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
12/10/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a hydrostatic test and alarm/water flow test.
Sprinkler Plan Review Released for Construction 10/01/2019
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
10/01/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. Hydrostatic Test and a Flow Test will be required.
Misc
Corrective Action Required
10/01/2019

(Informational Purposes) 1.Outside Horn/Strobe x2 by each FDC 2. Label exterior of building with North FDC. Location on plans indicates Left. Label to be over FDC. 3. Label exterior of building with East FDC. Location on plans indicates Right. Label to be over FDC.
Alarm Plan Review Released for Construction 08/12/2019
Michael Weissenbach
Misc
Corrective Action Required
08/12/2019

Smoke/CO detectors to be installed per letter provided with plans.
Special Inspections Review Approved 10/09/2018
Joe Frogge
Final Development Plan Review Approved 02/28/2019 10/08/2018
Joe Frogge
Licensed Contractors Approved 08/31/2018 09/28/2018
Joe Frogge
LC - General Contractor
Resolved
09/06/2018

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 9/6/18 - acknowledged in letter
LC - MEP Subs
Resolved
09/28/2018

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Approved with Conditions 09/10/2018 09/07/2018
Joe Frogge
Misc
Corrective Action Required
08/31/2018

This plan review covers all structures for this project although each structure will be assigned an individual permit number. Action required: Comment is for informational purposes. 9/6/18 - acknowledged in letter
Final Development Plan
Resolved
10/08/2018

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 9/6/18 - acknowledged in letter
Project cost
Resolved
09/07/2018

The project cost, which is used to establish the permit fee, has not been provided for all structures. Provide cost estimates for each of the following: - Detached garages - Detached carports - Pool - Trash enclosure/compactor
Misc
Resolved
10/09/2018

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 9/6/18 - acknowledged in letter
Health Dept Review
Corrective Action Required
08/31/2018

For the Health Department review of pool contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 9/6/18 - acknowledged in letter
Health Dept Inspection
Corrective Action Required
08/31/2018

For the Health Department inspection of pool contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 9/6/18 - acknowledged in letter
Elevator Equipment Permit
Corrective Action Required
08/31/2018

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 9/6/18 - acknowledged in letter
Elevator Equipment Inspection
Corrective Action Required
08/31/2018

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes. 9/6/18 - acknowledged in letter
Elevator Certificate of Inspection
Corrective Action Required
08/31/2018

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 9/6/18 - acknowledged in letter
Mech - Commercial kitchen hoods - Where required 507.2
Resolved
09/07/2018

2012 IMC 507.2 Where Required. A Type I or Type II hood shall be installed at or above all commercial cooking appliances in accordance with Sections 507.2.1 and 507.2.2. Where any cooking appliance under a single hood requires a Type I hood, a Type I hood shall be installed. Where a Type II hood is required, a Type I or Type II hood shall be installed. Exception: Where cooking appliances are equipped with integral down-draft exhaust systems and such appliances and exhaust systems are listed and labeled for the application in accordance with NFPA 96, a hood shall not be required at or above them. Action required: Provide letter from building owner describing use of cooking appliances in Building #1 Community Room.
Bldg - Door swing 1008.1.2
Resolved
09/07/2018

2012 IBC 1008.1.2 - Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Exceptions: (See code for possible exceptions.) Doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Action required: Exterior door at end of corridor opposite Star #3 in Building #1 to swing in direction of egress.
Plan Submittal 2012 Codes
Resolved
09/07/2018

All plans submitted for review on or after January 1, 2014 shall be designed to the requirements of the 2012 International Building Code, 2012 International Mechanical Code, 2012 International Plumbing Code, 2012 International Fuel Gas Code, 2012 International Fire Code, 2011 National Electric Code and the ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Modify code analysis on A0.02 to show correct year of accessibility code which is 2009.
Suite address
Resolved
09/07/2018

These structure have been assigned individual addresses. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Number sequence to follow that of adjacent buildings on street served. Action required: commend is for informational purposes. To be field verified.
Misc
Resolved
09/07/2018

ICC A117.1-2009 Section 1004.3.1 Location. At least one accessible route shall connect all spaces and elements that are a part of the unit. Accessible routes shall coincide with or be located in the same area as a general circulation path. (see code for exceptions) Actions required at Unit Studio 2 at A/A1.11: - Closet to be on accessible route - Path to hangers to be min. 36" wide per 403.5
Misc
Resolved
09/07/2018

Type A units appear to not be completely compliant with ICC/ANSI Section 1003. Actions required: - @ Unit A2 Type 'A' - Provide turning space in restroom per 1003.3.2. - @ @ Unit C3 Type 'A' - Provide minimum water closet clearance per 1003.11.2.4.2 (does not qualify for exception at 1003.11.2.4.4) - Storage units near garages that serve Type A units are required to have a 60" turning radius.
Engineered truss package
Corrective Action Required
08/31/2018

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide roof and floor truss packages or request deferral. (2 copies required - component drawings to be signed/sealed by truss engineer - Layout to be approved by architect prior to submission) 9/6/18 - acknowledged in letter
Bldg - Toilet room wall finish 1210.2.2
Resolved
09/07/2018

2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finishes at restrooms in Clubhouse. If paint is used it must be epoxy based.
Misc
Resolved
09/07/2018

2012 IBC 1103.1 (Accessibility) Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: Spa in Clubhouse to be accessible.
Misc
Resolved
09/07/2018

2012 IBC 711.4 Continuity. Assemblies shall be continuous without openings, penetrations or joints except as permitted by this section and Sections 712.1, 714.4, 715, 1009.3 and 1022.1. Skylights and other penetrations through a fire-resistance-rated roof deck or slab are permitted to be unprotected, provided that the structural integrity of the fire-resistance-rated roof assembly is maintained. Unprotected skylights shall not be permitted in roof assemblies required to be fire-resistance-rated in accordance with Section 705.8.6. The supporting construction shall be protected to afford the required fire-resistance rating of the horizontal assembly supported. Action required: Provide fire rated protection at Glulams shown on S2.18.
Misc
Resolved
09/07/2018

2012 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1, 2, 4, & 5) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. Action required: Modify design to demonstrate compliance for separation distances at exhausts/intakes on Sheet M1.01.
Misc
Resolved
09/07/2018

Return air grilles are shown in ceiling of apartments but don't seem to have a clear purpose. Action required: Clarify. (they are designated with plan note 4, but there are 2 plan note 3s)
Misc
Resolved
09/07/2018

City of LS Code of Ordinances Sec. 7-802. - Residential occupancies. The minimum required R-value for each element of the building thermal envelope shall be in accordance with the following: A. Wall assemblies forming portions of a building envelope shall meet or exceed an R factor rating of R-13. This requirement does not apply to doors, windows, or other openings or approved penetrations nor does it apply to basement concrete walls when the basement is not finished as a habitable space. B. Floor assemblies forming portions of a building envelope shall meet or exceed an R factor rating of 19. Garage ceilings with living area above shall comply with this requirement. Exception: Concrete floors in contact with the earth need not be insulated. C. Roof assemblies forming portions of a building envelope shall meet or exceed an R factor rating of 19. This requirement does not apply to skylights or other approved penetrations. D. Ceilings forming portions of a building envelope shall meet or exceed an R factor rating of thirty (30) at the time of installation. E. Duct insulation. All portions of the air distribution system shall be installed in accordance with Section M1601 and be insulated to an installed R-5 when system components are located within the building but outside of conditioned space, and R-8 when located outside of the building. When located within a building envelope assembly, at least R-8 shall be applied between the duct and that portion of the assembly furthest from conditioned space. Action required: Provide minimum R-5 at ducts mounted in attics.
Misc
Resolved
09/07/2018

HVAC design is missing for Studio 2 unit plan on 3/M2.07. Action required: Provide design.
Misc
Corrective Action Required
08/31/2018

2011 NEC Article 230.2 (E) Identification. Where a building or structure is supplied by more than one service, or any combination of branch circuits, feeders, and services, a permanent plaque or directory shall be installed at each service disconnect location denoting all other services, feeders, and branch circuits supplying that building or structure and the area served by each. See 225.37. Action required: Modify documents to demonstrate how this requirement will be met. 9/6/18 - acknowledged in letter - field verify
NEC - Equipment outlet 210.63
Resolved
09/07/2018

2011 NEC 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide additional roof mounted receptacles to ensure that all serviceable equipment is with 25'.
NEC - Spaces about electrical equipment 110.26
Corrective Action Required
08/31/2018

2011 NEC 110.26 Spaces About Electrical Equipment. Access and working space shall be provided and maintained about all electrical equipment to permit ready and safe operation and maintenance of such equipment. (see code for details) Action required: Comment is for informational purposes. Minimum clearances at Panel HA2B on Sheet E1.06a may be compromised by other equipment. 9/6/18 - acknowledged in letter - To be field verified.
Misc
Resolved
09/07/2018

2012 IBC Exit Signs 1011.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Provide exit signs at all required locations including but not limited to Building #1, stairs 2 & 3 on all floors.
Misc
Corrective Action Required
08/31/2018

ICC A117.1-2009 Section 1004.12.1.1 Minimum Clearance. Clearance between all opposing base cabinets, counter tops, appliances, or walls within kitchen work areas shall be 40 inches minimum. Action required: Comment is for informational purposes. Minimum clearances between counter tops and refrigerators may be compromised by fridge selection or placement. 9/6/18 - acknowledged in letter - To be field verified.
Miscellaneous Correction
Corrective Action Required
07/15/2019

This permit is released for the framing of the grade level only. No work shall proceed beyond this point until released by the City of Lee's Summit.
Fire Plan Review Approved with Conditions 09/10/2018 09/06/2018
Joe Dir
Misc
Corrective Action Required
08/31/2018

This plan review covers all structures for this project although each structure will be assigned an individual permit number. Action required: Comment is for informational purposes.
Material safety and data sheets
Resolved
09/06/2018

2012 IFC 407.2- Material Safety Data Sheets. Material Safety Data Sheets (MSDS) for all hazardous materials shall be readily available on the premises. ACTION REQUIRED:(information purposes Bldg1-5) MSDS shall be maintained on the premises of all chemicals to be used on site.
Construction documents for fire alarm systems
Corrective Action Required
08/31/2018

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes Bldg1-5) Have the Fire alarm system contractor provide shop drawings of the fire alarm system to be installed.
Hazardous material identification
Resolved
09/06/2018

2012 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. ACTION REQUIRED:(veriifed at inspection Bldg 1-5) All rooms, areas ,buildings storing pool chemicals and or other types of acids, solvents, chemicals or fuels shall be posted with the NFPA 704 placard with the MSDS hazard ratings on the placard.
Address numbers required
Corrective Action Required
08/31/2018

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(veriifed at inspection) All buildings 1-5 shall be addressed at all entrances leading into the building. Addressing shall be readable from the roadway.
Knox box required
Corrective Action Required
08/31/2018

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. ACTION REQUIRED:(verified at inspection) All knox boxes for buildings 1-5 and the elevator boxes can be obtained at knoxbox.com The (exterior) knox boxes for access to the buildings and fire sprinkler rooms shall be mounted on the exterior wall of each building above the (FDC) fire department connection. The (interior) knox boxes shall be mounted on the wall by the elevator doors on the return floor level of each elevator.
Type I hood - Where required
Resolved
09/06/2018

2012 IFC 609.2- Where required. A Type I hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors. ACTION REQUIRED: (bldg-1 community space) Type-1 hood and suppression system required for the stove located in the community space A7.03
Construction documents - Fire protection systems
Corrective Action Required
08/31/2018

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes Bldg1-5) Have the fire sprinkler system contractor provide shop drawings for the fire sprinkler system to be installed, including a class 1 standpipe system for all of the stairways.
Installation acceptance testing
Corrective Action Required
08/31/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes Bldg 1-5) Field tests and acceptance tesing of the fire alarm, fire sprinkler systems shall be required prior to the final occupancy inspection. Contact the fire department to schedule testing (816)969-1300
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
08/31/2018

2012 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. ACTION REQUIRED: K-class fire extinguisher is NOT REQUIRED where there are no grease laden vapors being generated.
Portable fire extinguishers - general
Corrective Action Required
08/31/2018

2012 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(verified at inspection Bldg 1-5) Buildings 1-5 provide fire extinguishers in all corridors on all floors, to be mounted by each stairway door on all floors in the corridors.
Misc
Resolved
09/06/2018

Firewall ACTION REQUIRED: Bldg-1 Provide a diagram showing a 2 hour rated wall in the attic, roof/wall detail A4.02
Misc
Resolved
09/06/2018

Door hardware ACTION REQUIRED: Building 1-5 Provide information about each buildings entrances access and egress hardware.
Misc
Resolved
09/06/2018

Exit signage ACTION REQUIRED: Bldg -1 Stairway 1,2,3,4 doors all floors Right side /left side off center space. Provide exits signs over all the stairway doors in the corridors where missing on plans. E1.01 - E1-04, E1.11
Misc
Resolved
09/06/2018

Exit signs ACTION REQUIRED: Type A,B,C,D bldgs All stairways, on all floors, provide exit signs over the stairway doors off the corridors.
Misc
Resolved
09/06/2018

Bldg-1 Center space ACTION REQUIRED: Provide exit signs on both sides of the fire doors in the corridors left/right sides. Provide exit signs over the man doors leading from the center space into the left side and right side corridors. E1.06
Building Plan Review Rejected 08/28/2018 08/21/2018
Joe Frogge
Misc
Corrective Action Required
08/16/2018

This plan review covers all structures for this project although each structure will be assigned an individual permit number. Action required: Comment is for informational purposes.
Final Development Plan
Corrective Action Required
08/16/2018

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Project cost
Corrective Action Required
08/16/2018

The project cost, which is used to establish the permit fee, has not been provided for all structures. Provide cost estimates for each of the following: - Detached garages - Detached carports - Pool - Trash enclosure/compactor
Misc
Corrective Action Required
08/16/2018

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Health Dept Review
Corrective Action Required
08/16/2018

For the Health Department review of pool contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
08/16/2018

For the Health Department inspection of pool contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Elevator Equipment Permit
Corrective Action Required
08/16/2018

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
08/16/2018

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
08/16/2018

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Mech - Commercial kitchen hoods - Where required 507.2
Corrective Action Required
08/16/2018

2012 IMC 507.2 Where Required. A Type I or Type II hood shall be installed at or above all commercial cooking appliances in accordance with Sections 507.2.1 and 507.2.2. Where any cooking appliance under a single hood requires a Type I hood, a Type I hood shall be installed. Where a Type II hood is required, a Type I or Type II hood shall be installed. Exception: Where cooking appliances are equipped with integral down-draft exhaust systems and such appliances and exhaust systems are listed and labeled for the application in accordance with NFPA 96, a hood shall not be required at or above them. Action required: Provide letter from building owner describing use of cooking appliances in Building #1 Community Room.
Bldg - Door swing 1008.1.2
Corrective Action Required
08/16/2018

2012 IBC 1008.1.2 - Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Exceptions: (See code for possible exceptions.) Doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Action required: Exterior door at end of corridor opposite Star #3 in Building #1 to swing in direction of egress.
Plan Submittal 2012 Codes
Corrective Action Required
08/16/2018

All plans submitted for review on or after January 1, 2014 shall be designed to the requirements of the 2012 International Building Code, 2012 International Mechanical Code, 2012 International Plumbing Code, 2012 International Fuel Gas Code, 2012 International Fire Code, 2011 National Electric Code and the ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Modify code analysis on A0.02 to show correct year of accessibility code which is 2009.
Suite address
Corrective Action Required
08/22/2018

These structure have been assigned individual addresses. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Number sequence to follow that of adjacent buildings on street served. Action required: commend is for informational purposes. To be field verified.
Misc
Corrective Action Required
08/22/2018

ICC A117.1-2009 Section 1004.3.1 Location. At least one accessible route shall connect all spaces and elements that are a part of the unit. Accessible routes shall coincide with or be located in the same area as a general circulation path. (see code for exceptions) Actions required at Unit Studio 2 at A/A1.11: - Closet to be on accessible route - Path to hangers to be min. 36" wide per 403.5
Misc
Corrective Action Required
08/22/2018

Type A units appear to not be completely compliant with ICC/ANSI Section 1003. Actions required: - @ Unit A2 Type 'A' - Provide turning space in restroom per 1003.3.2. - @ @ Unit C3 Type 'A' - Provide minimum water closet clearance per 1003.11.2.4.2 (does not qualify for exception at 1003.11.2.4.4) - Storage units near garages that serve Type A units are required to have a 60" turning radius.
Engineered truss package
Corrective Action Required
08/22/2018

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide roof and floor truss packages or request deferral. (2 copies required - component drawings to be signed/sealed by truss engineer - Layout to be approved by architect prior to submission)
Bldg - Toilet room wall finish 1210.2.2
Corrective Action Required
08/22/2018

2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finishes at restrooms in Clubhouse. If paint is used it must be epoxy based.
Misc
Corrective Action Required
08/22/2018

2012 IBC 1103.1 (Accessibility) Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: Spa in Clubhouse to be accessible.
Misc
Corrective Action Required
08/22/2018

2012 IBC 711.4 Continuity. Assemblies shall be continuous without openings, penetrations or joints except as permitted by this section and Sections 712.1, 714.4, 715, 1009.3 and 1022.1. Skylights and other penetrations through a fire-resistance-rated roof deck or slab are permitted to be unprotected, provided that the structural integrity of the fire-resistance-rated roof assembly is maintained. Unprotected skylights shall not be permitted in roof assemblies required to be fire-resistance-rated in accordance with Section 705.8.6. The supporting construction shall be protected to afford the required fire-resistance rating of the horizontal assembly supported. Action required: Provide fire rated protection at Glulams shown on S2.18.
Misc
Corrective Action Required
08/22/2018

2012 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1, 2, 4, & 5) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. Action required: Modify design to demonstrate compliance for separation distances at exhausts/intakes on Sheet M1.01.
Misc
Corrective Action Required
08/22/2018

Return air grilles are shown in ceiling of apartments but don't seem to have a clear purpose. Action required: Clarify. (they are designated with plan note 4, but there are 2 plan note 3s)
Misc
Corrective Action Required
08/22/2018

City of LS Code of Ordinances Sec. 7-802. - Residential occupancies. The minimum required R-value for each element of the building thermal envelope shall be in accordance with the following: A. Wall assemblies forming portions of a building envelope shall meet or exceed an R factor rating of R-13. This requirement does not apply to doors, windows, or other openings or approved penetrations nor does it apply to basement concrete walls when the basement is not finished as a habitable space. B. Floor assemblies forming portions of a building envelope shall meet or exceed an R factor rating of 19. Garage ceilings with living area above shall comply with this requirement. Exception: Concrete floors in contact with the earth need not be insulated. C. Roof assemblies forming portions of a building envelope shall meet or exceed an R factor rating of 19. This requirement does not apply to skylights or other approved penetrations. D. Ceilings forming portions of a building envelope shall meet or exceed an R factor rating of thirty (30) at the time of installation. E. Duct insulation. All portions of the air distribution system shall be installed in accordance with Section M1601 and be insulated to an installed R-5 when system components are located within the building but outside of conditioned space, and R-8 when located outside of the building. When located within a building envelope assembly, at least R-8 shall be applied between the duct and that portion of the assembly furthest from conditioned space. Action required: Provide minimum R-5 at ducts mounted in attics.
Misc
Corrective Action Required
08/22/2018

HVAC design is missing for Studio 2 unit plan on 3/M2.07. Action required: Provide design.
Misc
Corrective Action Required
08/22/2018

2011 NEC Article 230.2 (E) Identification. Where a building or structure is supplied by more than one service, or any combination of branch circuits, feeders, and services, a permanent plaque or directory shall be installed at each service disconnect location denoting all other services, feeders, and branch circuits supplying that building or structure and the area served by each. See 225.37. Action required: Modify documents to demonstrate how this requirement will be met.
NEC - Equipment outlet 210.63
Corrective Action Required
08/22/2018

2011 NEC 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide additional roof mounted receptacles to ensure that all serviceable equipment is with 25'.
NEC - Spaces about electrical equipment 110.26
Corrective Action Required
08/22/2018

2011 NEC 110.26 Spaces About Electrical Equipment. Access and working space shall be provided and maintained about all electrical equipment to permit ready and safe operation and maintenance of such equipment. (see code for details) Action required: Comment is for informational purposes. Minimum clearances at Panel HA2B on Sheet E1.06a may be compromised by other equipment. To be field verified.
Misc
Corrective Action Required
08/22/2018

2012 IBC Exit Signs 1011.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Provide exit signs at all required locations including but not limited to Building #1, stairs 2 & 3 on all floors.
Misc
Corrective Action Required
08/22/2018

ICC A117.1-2009 Section 1004.12.1.1 Minimum Clearance. Clearance between all opposing base cabinets, counter tops, appliances, or walls within kitchen work areas shall be 40 inches minimum. Action required: Comment is for informational purposes. Minimum clearances between counter tops and refrigerators may be compromised by fridge selection or placement. To be field verified.
Fire Plan Review Rejected 08/28/2018 08/17/2018
Joe Dir
Misc
Corrective Action Required
08/16/2018

This plan review covers all structures for this project although each structure will be assigned an individual permit number. Action required: Comment is for informational purposes.
Material safety and data sheets
Corrective Action Required
08/17/2018

2012 IFC 407.2- Material Safety Data Sheets. Material Safety Data Sheets (MSDS) for all hazardous materials shall be readily available on the premises. ACTION REQUIRED:(information purposes Bldg1-5) MSDS shall be maintained on the premises of all chemicals to be used on site.
Construction documents for fire alarm systems
Corrective Action Required
08/17/2018

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes Bldg1-5) Have the Fire alarm system contractor provide shop drawings of the fire alarm system to be installed.
Hazardous material identification
Corrective Action Required
08/17/2018

2012 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. ACTION REQUIRED:(veriifed at inspection Bldg 1-5) All rooms, areas ,buildings storing pool chemicals and or other types of acids, solvents, chemicals or fuels shall be posted with the NFPA 704 placard with the MSDS hazard ratings on the placard.
Address numbers required
Corrective Action Required
08/17/2018

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(veriifed at inspection) All buildings 1-5 shall be addressed at all entrances to the building. Addressing shall be readable from the roadway.
Knox box required
Corrective Action Required
08/17/2018

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. ACTION REQUIRED:(information purposes) All knox boxes for buildings 1-5 and elevators can be obtained at knoxbox.com
Type I hood - Where required
Corrective Action Required
08/17/2018

2012 IFC 609.2- Where required. A Type I hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors. ACTION REQUIRED: (bldg-1 community space) Type-1 hood and suppression system required for the stove located in the community space A7.03
Construction documents - Fire protection systems
Corrective Action Required
08/17/2018

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes Bldg1-5) Have the fire sprinkler system contractor provide shop drawings for the fire sprinkler system to be installed.
Installation acceptance testing
Corrective Action Required
08/17/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes Bldg 1-5) Field tests and acceptance tesing of the fire alarm, fire sprinkler and kitchen hood systems shall be required prior to the final occupancy inspection. Contact the fire department to schedule testing (816)969-1300
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
08/17/2018

2012 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. ACTION REQUIRED:(veriifed at inspection Bldg-1) Provide one K-class fire extinguisher for the community space, to be mounted within 30" of the kitchen hood.
Portable fire extinguishers - general
Corrective Action Required
08/17/2018

2012 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(verified at inspection Bldg 1-5) Buildings 1-5 provide fire extinguishers in all corridors on all floors. to be mounted by each stairway door.
Misc
Corrective Action Required
08/17/2018

Firewall ACTION REQUIRED: Bldg-1 Provide a diagram showing a 2 hour rated wall in the attic, roof/wall detail A4.02
Misc
Corrective Action Required
08/17/2018

Door hardware ACTION REQUIRED: Building 1-5 Provide information about each buildings entrances access and egress hardware.
Misc
Corrective Action Required
08/17/2018

Exit signage ACTION REQUIRED: Bldg -1 Stairway 1,2,3,4 doors all floors Right side /left side off center space. Provide exits signs over all the stairway doors in the corridors where missing on plans. E1.01 - E1-04, E1.11
Misc
Corrective Action Required
08/17/2018

Exit signs ACTION REQUIRED: Type A,B,C,D bldgs All stairways, on all floors, provide exit signs over the stairway doors off the corridors.
Misc
Corrective Action Required
08/17/2018

Bldg-1 Center space ACTION REQUIRED: Provide exit signs on both sides of the fire doors in the corridors left/right sides. Provide exit signs over the man doors leading from the center space into the left side and right side corridors. E1.06
Licensed Contractors Rejected 08/14/2018 08/16/2018
Joe Frogge
LC - General Contractor
Corrective Action Required
08/16/2018

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
08/16/2018

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $45,874.27 $45,874.27 Paid 11/09/2018
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 11/09/2018
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $50.00 $0.00 $50.00 Not Paid


$50.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Partial 8/19/2019 at 2:10 PM 08/19/2019
Misc
Partial Correction
08/19/2019
WALLS TO BE 2-LAYERED AT STAIRWELLS 1ST FLOORS - REQUIRED FIREBLOCKING AND BOCA PLATES TO BE INSPECTED LATER FROM OPPOSITE SIDE
Rated Assembly Inspection Partial 8/21/2019 at 2:45 PM 08/21/2019
Misc
Partial Correction
08/21/2019
STAIRWELLS: WELLS 1&4: OK TO COVER WHEN READY GWB 1ST LAYER AT 1ST FLOOR INCLUDING SPACES BETWEEN JOISTS AT BACKSIDE
Rated Assembly Inspection Partial 8/23/2019 at 7:15 AM 08/23/2019
Misc
Partial Correction
08/21/2019
STAIRWELLS 1&4: OK TO COVER WHEN READY GWB 1ST & 2ND LAYERS AT 1ST FLOOR AT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE
All Rough Inspection - Commercial Partial 8/21/2019 9/4/2019 at 9:45 AM 09/04/2019
Misc
Partial Correction
08/19/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4
Rated Assembly Inspection Partial 9/6/2019 9/6/2019 at 2:15 PM 09/06/2019
Misc
Partial Correction
08/23/2019
OK TO COVER WHEN READY GWB AT AT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER@ INSIDE FACE & BACKSIDE @ N & W WALLS; STAIRWELL 3: 1ST FLOOR: 1ST LAYER@ INSIDE FACE & BACKSIDE @ N & E WALLS; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED.
Rated Assembly Inspection Partial 9/9/2019 at 9:00 AM 09/09/2019
Misc
Partial Correction
09/06/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED.
Misc
Partial Correction
09/09/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS; WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS;
Footing Inspection - Commercial Partial 4/30/2021 4/30/2021 09/20/2019
Misc
Informational
09/20/2019
Bump out on south side of buildiling is approved, also inspected by teracon
All Rough Inspection - Commercial Partial 9/9/2019 9/25/2019 at 3:10 PM 09/25/2019
Misc
Partial Correction
09/04/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, AT 4TH FLOOR: STAIRWELLS BEFORE COVERING INSTALL REINFORCING STRAPS AND BOCA PLATES AS DIRECTED.
Rated Assembly Inspection Partial 9/27/2019 9/27/2019 at 7:40 AM 09/27/2019
Misc
Partial Correction
09/09/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED.
Misc
Partial Correction
09/09/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS; WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS;
Rated Assembly Inspection Partial 9/30/2019 9/30/2019 at 7:55 AM 09/30/2019
Misc
Partial Correction
09/27/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER NOT COMPLETED; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER NOT COMPLETED; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED.
Misc
Partial Correction
09/27/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS; WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS;
Rated Assembly Inspection Failed 10/3/2019 10/3/2019 at 8:40 AM 10/03/2019
Misc
Partial Correction
09/30/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER NOT COMPLETED; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER NOT COMPLETED; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED.
Misc
Partial Correction
09/30/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS; WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS;
Rated Assembly Inspection Partial 10/8/2019 10/8/2019 at 7:20 AM 10/08/2019
Misc
Partial Correction
10/03/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
10/03/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS; WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS;
Rated Assembly Inspection Partial 10/11/2019 10/11/2019 at 7:15 AM 10/11/2019
Misc
Partial Correction
10/08/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
10/08/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
10/11/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; WEST DATA: 1 LAYER; 1ST FLOOR LEFT WING: DATA/ELECT:
Rated Assembly Inspection Partial 10/14/2019 10/14/2019 at 7:10 AM 10/14/2019
Misc
Partial Correction
10/11/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
10/11/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
10/11/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER;
Rated Assembly Inspection Partial 10/16/2019 10/16/2019 at 7:10 AM 10/16/2019
Misc
Partial Correction
10/14/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
10/14/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
10/14/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL;
All Rough Inspection - Commercial Partial 10/16/2019 10/16/2019 at 7:25 AM 10/16/2019
Misc
Partial Correction
09/25/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS BEFORE COVERING INSTALL REINFORCING STRAPS AND BOCA PLATES PER CODES.
All Rough Inspection - Commercial Partial 10/21/2019 at 7:05 AM 10/21/2019
Misc
Partial Correction
10/16/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 3, BEFORE COVERING INSTALL REINFORCING STRAPS AND BOCA PLATES PER CODES.
Rated Assembly Inspection Partial 10/21/2019 10/21/2019 at 7:20 AM 10/21/2019
Misc
Partial Correction
10/16/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
10/16/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
10/16/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL;
Rough Framing Inspection - Commercial Partial 10/24/2019 at 1:15 PM 10/24/2019
Misc
Partial Correction
10/24/2019
INSTALLATION OF ROOF SHEATHING: LEFT WING: SUBSTANTIALLY COMPLETED -- SOME OVER-DRIVEN LOCATIONS TO BE RE-NAILED;
Rated Assembly Inspection Partial 10/25/2019 10/25/2019 at 2:05 PM 10/25/2019
Misc
Partial Correction
10/21/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
10/21/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
10/21/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL;
Rated Assembly Inspection Partial 10/28/2019 10/28/2019 at 7:05 AM 10/28/2019
Misc
Partial Correction
10/25/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
10/25/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
10/25/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL;
Rough Framing Inspection - Commercial Failed 11/4/2019 at 7:10 AM 11/04/2019
Misc
Partial Correction
10/24/2019
INSTALLATION OF ROOF SHEATHING: LEFT WING: SUBSTANTIALLY COMPLETED -- SOME OVER-DRIVEN LOCATIONS TO BE RE-NAILED;
Misc
Partial Correction
11/04/2019
SHEAR WALLS AT BOTH ENDS OF BLDG A: RE-NAIL TO ACHIEVE OR EXCEED SPECIFIED 6"/12" FLUSH NAILING
Rough Framing Inspection - Commercial Partial 11/5/2019 at 10:05 AM 11/05/2019
Misc
Partial Correction
11/04/2019
INSTALLATION OF ROOF SHEATHING: LEFT WING: SUBSTANTIALLY COMPLETED -- SOME OVER-DRIVEN LOCATIONS TO BE RE-NAILED;
Misc
Partial Correction
11/04/2019
OK TO COVER SHEAR WALLS AT ENDS OF BLDG A: NORTH END OF LEFT WING;
Misc
Partial Correction
11/05/2019
DECK COLUMNS OK TO COVER AT: RIGHT WING;
All Rough Inspection - Commercial Partial 11/15/2019 11/15/2019 at 7:05 AM 11/15/2019
Misc
Partial Correction
10/21/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 3, BEFORE COVERING INSTALL REINFORCING STRAPS AND BOCA PLATES PER CODES.
Misc
Partial Correction
11/15/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING;
Rated Assembly Inspection Partial 11/18/2019 11/18/2019 at 1:10 PM 11/18/2019
Misc
Partial Correction
10/28/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
10/28/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
10/28/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL;
Misc
Partial Correction
11/18/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: A.AA FROM A.5 TO A.6 FROM 1ST FLOOR TO 3RD FLOOR ABOVE FIREPLACE;
Rough Framing Inspection - Commercial Partial 11/18/2019 11/18/2019
Misc
Partial Correction
11/05/2019
INSTALLATION OF ROOF SHEATHING: LEFT WING: SUBSTANTIALLY COMPLETED -- SOME OVER-DRIVEN LOCATIONS TO BE RE-NAILED;
Misc
Partial Correction
11/05/2019
OK TO COVER SHEAR WALLS AT ENDS OF BLDG A: NORTH END OF LEFT WING;
Misc
Partial Correction
11/05/2019
DECK COLUMNS OK TO COVER AT: RIGHT WING;
Rough Framing Inspection - Commercial Partial 11/18/2019 at 2:30 PM 11/18/2019
Misc
Partial Correction
11/18/2019
INSTALLATION OF ROOF SHEATHING: LEFT WING: SUBSTANTIALLY COMPLETED -- SOME OVER-DRIVEN LOCATIONS TO BE RE-NAILED;
Misc
Partial Correction
11/18/2019
OK TO COVER SHEAR WALLS AT ENDS OF BLDG A: NORTH END OF LEFT WING;
Misc
Partial Correction
11/18/2019
DECK COLUMNS OK TO COVER AT: RIGHT WING;
Misc
Partial Correction
11/18/2019
OK TO COVER WHEN READY FRAMING AT MAIN FRONT ENTRANCE
All Rough Inspection - Commercial Partial 11/18/2019 11/18/2019 at 1:35 PM 11/18/2019
Misc
Partial Correction
11/15/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 3, BEFORE COVERING INSTALL REINFORCING STRAPS AND BOCA PLATES PER CODES.
Misc
Partial Correction
11/15/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING;
Misc
Partial Correction
11/18/2019
OK TO PLACE WHEN READY COMPONENTS OF RATED ASSEMBLY AT CHASE BEHIND SHOWERS AT: 1ST FLOOR: LEFT WING ONE LAYER;
Rated Assembly Inspection Partial 11/19/2019 11/19/2019 at 9:00 AM 11/19/2019
Misc
Partial Correction
11/18/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
11/18/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
11/18/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL;
Misc
Partial Correction
11/18/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: A.AA FROM A.5 TO A.6 FROM 1ST FLOOR TO 3RD FLOOR ABOVE FIREPLACE 2 LAYERS;
Rough Framing Inspection - Commercial Partial 11/19/2019 at 9:20 AM 11/19/2019
Misc
Resolved
11/19/2019
OK TO COVER WHEN READY ROOF SHEATHING AT: LEFT WING; CENTER SECTION; RIGHT WING
Misc
Partial Correction
11/18/2019
OK TO COVER SHEAR WALLS AT ENDS OF BLDG A: NORTH END OF LEFT WING;
Misc
Partial Correction
11/18/2019
DECK COLUMNS OK TO COVER AT: RIGHT WING;
Misc
Partial Correction
11/18/2019
OK TO COVER WHEN READY FRAMING AT MAIN FRONT ENTRANCE
Rated Assembly Inspection Partial 11/20/2019 at 1:10 PM 11/20/2019
Misc
Partial Correction
11/19/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
11/19/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
11/19/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL;
Misc
Partial Correction
11/19/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: A.AA FROM A.5 TO A.6 FROM 1ST FLOOR TO 3RD FLOOR ABOVE FIREPLACE 2 LAYERS;
Misc
Partial Correction
11/20/2019
OK TO COVER WHEN READY COMPONENTS OF RATED COMMON WALLS & CORRIDOR WALLS AT SHOWERS: 1ST FLOOR: LEFT WING: 1ST LAYER;
All Rough Inspection - Commercial Failed 11/20/2019 11/20/2019 at 1:45 PM 11/20/2019
Misc
Partial Correction
11/18/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 3, BEFORE COVERING INSTALL REINFORCING STRAPS AND BOCA PLATES PER CODES.
Misc
Partial Correction
11/18/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING;
Misc
Partial Correction
11/18/2019
OK TO PLACE WHEN READY COMPONENTS OF RATED ASSEMBLY AT CHASE BEHIND SHOWERS AT: 1ST FLOOR: LEFT WING; LEFT WING 2ND, 3RD, 4TH FLOORS NOT READY: HOLD-DOWN HARDWARE INSTALLATION NOT COMPLETED.
Rated Assembly Inspection Partial 11/21/2019 11/21/2019 at 9:00 AM 11/21/2019
Misc
Partial Correction
11/20/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
11/20/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
11/20/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL;
Misc
Partial Correction
11/20/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: A.AA FROM A.5 TO A.6 FROM 1ST FLOOR TO 3RD FLOOR ABOVE FIREPLACE 2 LAYERS;
Misc
Partial Correction
11/20/2019
OK TO COVER WHEN READY COMPONENTS OF RATED COMMON WALLS & CORRIDOR WALLS AT: 1ST FLOOR: LEFT WING: 1ST LAYER AT SHOWERS; 2ND LAYER AT SHOWERS; 1ST LAYER AT ELECT RM CORR WALL;
All Rough Inspection - Commercial Failed 11/21/2019 11/21/2019 at 9:40 AM 11/21/2019
Misc
Partial Correction
11/20/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 3, BEFORE COVERING INSTALL REINFORCING STRAPS AND BOCA PLATES PER CODES.
Misc
Partial Correction
11/20/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING;
Misc
Partial Correction
11/20/2019
OK TO PLACE WHEN READY COMPONENTS OF RATED ASSEMBLY AT CHASE BEHIND SHOWERS AT: 1ST FLOOR: LEFT WING; LEFT WING 2ND, 3RD, 4TH FLOORS NOT READY: HOLD-DOWN HARDWARE INSTALLATION NOT COMPLETED. COMPLETE ALL HOLD-DOWNS SO ALL CAN BE INSPECTED PER WING. FIRE-BLOCK SHOWER CHASE LIDS WHERE PENETRATED BY PIPE (ANNULAR SPACE).
Rated Assembly Inspection Partial 11/22/2019 11/22/2019 at 7:30 AM 11/22/2019
Misc
Partial Correction
11/21/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
11/21/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
11/21/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
11/21/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: A.AA FROM A.5 TO A.6 FROM 1ST FLOOR TO 3RD FLOOR ABOVE FIREPLACE 2 LAYERS;
Misc
Partial Correction
11/21/2019
OK TO COVER WHEN READY COMPONENTS OF RATED COMMON WALLS & CORRIDOR WALLS AT: 1ST FLOOR: LEFT WING: 1ST LAYER AT SHOWERS; 2ND LAYER AT SHOWERS; 1ST LAYER AT ELECT RM CORR WALL;
All Rough Inspection - Commercial Partial 11/22/2019 at 7:45 AM 11/22/2019
Misc
Partial Correction
11/21/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 3, BEFORE COVERING INSTALL REINFORCING STRAPS AND BOCA PLATES PER CODES.
Misc
Partial Correction
11/21/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING;
Misc
Partial Correction
11/21/2019
OK TO PLACE WHEN READY COMPONENTS OF RATED ASSEMBLY AT CHASE BEHIND SHOWERS AT: 1ST FLOOR: LEFT WING; 2ND FLOOR: LEFT WING; 3RD FLOOR: LEFT WING; 4TH FLOOR: LEFT WING;
Rated Assembly Inspection Partial 11/25/2019 11/25/2019 at 7:30 AM 11/25/2019
Misc
Partial Correction
11/22/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
11/22/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
11/22/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
11/22/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: A.AA FROM A.5 TO A.6 FROM 1ST FLOOR TO 3RD FLOOR ABOVE FIREPLACE 2 LAYERS;
Misc
Partial Correction
11/22/2019
OK TO COVER WHEN READY COMPONENTS OF RATED COMMON WALLS & CORRIDOR WALLS AT: 1ST FLOOR: LEFT WING: 1ST LAYER AT SHOWERS; 2ND LAYER AT SHOWERS; 1ST LAYER AT ELECT RM CORR WALL; 2ND FLOOR: LEFT WING: 1ST LAYER AT SHOWERS & MECH RM WALLS; 3RD FLOOR: LEFT WING: 1ST LAYER AT SHOWERS & MECH RM WALLS; 4TH FLOOR: LEFT WING: 1ST LAYER AT SHOWERS & MECH RM WALLS;
Rated Assembly Inspection Partial 11/26/2019 11/26/2019 at 7:10 AM 11/26/2019
Misc
Partial Correction
11/25/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
11/25/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: EAST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS WEST ELEVATOR: 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
11/25/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
11/25/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: A.AA FROM A.5 TO A.6 FROM 1ST FLOOR TO 3RD FLOOR ABOVE FIREPLACE 2 LAYERS;
Misc
Partial Correction
11/25/2019
OK TO COVER WHEN READY COMPONENTS OF RATED COMMON WALLS & CORRIDOR WALLS AT: 1ST FLOOR: LEFT WING: 1ST LAYER AT SHOWERS; 2ND LAYER AT SHOWERS; 1ST LAYER AT ELECT RM CORR WALL; 2ND FLOOR: LEFT WING: 1ST LAYER AT SHOWERS & MECH RM WALLS; 2ND LAYER AT SHOWERS; 3RD FLOOR: LEFT WING: 1ST LAYER AT SHOWERS & MECH RM WALLS; 2ND LAYER AT SHOWERS; 4TH FLOOR: LEFT WING: 1ST LAYER AT SHOWERS & MECH RM WALLS; 2ND LAYER AT SHOWERS;
Rough Framing Inspection - Commercial Partial 11/26/2019 11/26/2019 at 7:35 AM 11/26/2019
Misc
Partial Correction
11/19/2019
OK TO COVER SHEAR WALLS AT ENDS OF BLDG A: NORTH END OF LEFT WING;
Misc
Partial Correction
11/19/2019
DECK COLUMNS OK TO COVER AT: RIGHT WING;
Misc
Partial Correction
11/19/2019
OK TO COVER WHEN READY FRAMING AT: MAIN FRONT ENTRANCE; TOP OF STAIRWELLS #3 & #4 FOR SCAFFOLDING;
Rough Framing Inspection - Commercial Partial 11/27/2019 at 7:30 AM 11/27/2019
Misc
Partial Correction
11/26/2019
OK TO COVER SHEAR WALLS AT ENDS OF BLDG A: NORTH END OF LEFT WING;
Misc
Partial Correction
11/26/2019
DECK COLUMNS OK TO COVER AT: RIGHT WING;
Misc
Partial Correction
11/26/2019
OK TO COVER WHEN READY FRAMING AT: MAIN FRONT ENTRANCE; TOP OF STAIRWELLS #3 & #4 FOR SCAFFOLDING; ELEVATOR @2 SHAFT OK TO HANG GWB AT INTERIOR FULL HEIGHT;
Rated Assembly Inspection Partial 11/27/2019 11/27/2019 at 7:50 AM 11/27/2019
Misc
Partial Correction
11/26/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
11/26/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: ELEVATOR #1: 1ST FLOOR: 1ST & 2ND LAYERS ELEVATOR #2: 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
11/26/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
11/26/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: A.AA FROM A.5 TO A.6 FROM 1ST FLOOR TO 3RD FLOOR ABOVE FIREPLACE 2 LAYERS;
Misc
Partial Correction
11/26/2019
OK TO COVER WHEN READY COMPONENTS OF RATED COMMON WALLS & CORRIDOR WALLS AT: 1ST FLOOR: LEFT WING: 1ST LAYER AT SHOWERS; 2ND LAYER AT SHOWERS; 1ST LAYER AT ELECT RM CORR WALL; 2ND FLOOR: LEFT WING: 1ST LAYER AT SHOWERS & MECH RM WALLS; 2ND LAYER AT SHOWERS; 3RD FLOOR: LEFT WING: 1ST LAYER AT SHOWERS & MECH RM WALLS; 2ND LAYER AT SHOWERS; 4TH FLOOR: LEFT WING: 1ST LAYER AT SHOWERS & MECH RM WALLS; 2ND LAYER AT SHOWERS;
Rated Assembly Inspection Partial 12/2/2019 12/2/2019 at 2:10 PM 12/02/2019
Misc
Partial Correction
11/27/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
11/27/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFT SPACES BETWEEN JOISTS AT BACKSIDE: ELEVATOR #1: 1ST FLOOR: 1ST & 2ND LAYERS ELEVATOR #2: 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
11/27/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
11/27/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: A.AA FROM A.5 TO A.6 FROM 1ST FLOOR TO 3RD FLOOR ABOVE FIREPLACE 2 LAYERS; FIREWALL AT LEFT WING 1ST LAYER;
Misc
Resolved
12/02/2019
OK TO COVER WHEN READY COMPONENTS OF RATED COMMON WALLS & CORRIDOR WALLS AT: 1ST FLOOR: LEFT WING: 1ST LAYER AT SHOWERS; 2ND LAYER AT SHOWERS; 1ST LAYER AT ELECT RM CORR WALL; 2ND FLOOR: LEFT WING: 1ST LAYER AT SHOWERS & MECH RM WALLS; 2ND LAYER AT SHOWERS; 3RD FLOOR: LEFT WING: 1ST LAYER AT SHOWERS & MECH RM WALLS; 2ND LAYER AT SHOWERS; 4TH FLOOR: LEFT WING: 1ST LAYER AT SHOWERS & MECH RM WALLS; 2ND LAYER AT SHOWERS;
Rated Assembly Inspection Partial 12/3/2019 12/3/2019 at 8:10 AM 12/03/2019
Misc
Partial Correction
12/02/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
12/02/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: SPACES BETWEEN JOISTS AT BACKSIDE 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER
Misc
Partial Correction
12/02/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
12/02/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: A.AA FROM A.5 TO A.6 FROM 1ST FLOOR TO 3RD FLOOR ABOVE FIREPLACE 2 LAYERS; FIREWALL AT LEFT WING 1ST AND 2ND LAYERS;
Rated Assembly Inspection Partial 12/4/2019 12/04/2019
Misc
Partial Correction
12/03/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
12/03/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: SPACES BETWEEN JOISTS AT BACKSIDE 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER (LEFT WEST WING)
Misc
Partial Correction
12/03/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
12/03/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: A.AA FROM A.5 TO A.6 FROM 1ST FLOOR TO 3RD FLOOR ABOVE FIREPLACE 2 LAYERS; FIREWALL AT LEFT WING 1ST AND 2ND LAYERS;
Sprinkler - Hydrostatic Test Partial 12/5/2019 12/05/2019
All Rough Inspection - Commercial Partial 12/5/2019 12/5/2019 at 2:15 PM 12/05/2019
Misc
Partial Correction
11/22/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 3, BEFORE COVERING INSTALL REINFORCING STRAPS AND BOCA PLATES PER CODES.
Misc
Partial Correction
11/22/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING;
Misc
Partial Correction
11/22/2019
OK TO PLACE WHEN READY COMPONENTS OF RATED ASSEMBLY AT CHASE BEHIND SHOWERS AT: 1ST FLOOR: LEFT WING; 2ND FLOOR: LEFT WING; 3RD FLOOR: LEFT WING; 4TH FLOOR: LEFT WING;
Misc
Partial Correction
12/05/2019
OK TO FOAM AND INSULATE ABOVE CEILING AT: LEFT WING: 4TH FLOOR;
Rated Assembly Inspection Partial 12/5/2019 12/05/2019
Misc
Partial Correction
12/04/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
12/04/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: SPACES BETWEEN JOISTS AT BACKSIDE 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL;
Misc
Partial Correction
12/04/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
12/04/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: A.AA FROM A.5 TO A.6 FROM 1ST FLOOR TO 3RD FLOOR ABOVE FIREPLACE 2 LAYERS; FIREWALL AT LEFT WING 1ST AND 2ND LAYERS;
Rated Assembly Inspection Partial 12/6/2019 12/6/2018 at 1:30 PM 12/06/2019
Misc
Partial Correction
12/05/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST LAYER ABOVE CLG @ W WALL; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
12/05/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: SPACES BETWEEN JOISTS AT BACKSIDE 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER
Misc
Partial Correction
12/05/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
12/05/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: A.AA FROM A.5 TO A.6 FROM 1ST FLOOR TO 3RD FLOOR ABOVE FIREPLACE 2 LAYERS; FIREWALL AT LEFT WING 1ST AND 2ND LAYERS;
All Rough Inspection - Commercial Partial 12/6/2019 12/6/2019 at 2:15 PM 12/06/2019
Misc
Partial Correction
12/05/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 3, BEFORE COVERING INSTALL REINFORCING STRAPS AND BOCA PLATES PER CODES.
Misc
Partial Correction
12/05/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING;
Misc
Partial Correction
12/05/2019
OK TO PLACE WHEN READY ROUGH-IN AT CHASE BEHIND SHOWERS AT: 1ST FLOOR: LEFT WING; 2ND FLOOR: LEFT WING; 3RD FLOOR: LEFT WING; 4TH FLOOR: LEFT WING;
Misc
Partial Correction
12/05/2019
OK TO FOAM AND INSULATE ABOVE CEILING AT: LEFT WING: 4TH FLOOR;
Misc
Partial Correction
12/06/2019
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: 4TH FLOOR;
Rated Assembly Inspection Partial 12/9/2019 12/9/2019 at 1:00 PM 12/09/2019
Misc
Partial Correction
12/06/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
12/06/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS EXTERIOR FACE: 4TH FLOOR 1ST LAYER WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER
Misc
Partial Correction
12/06/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
12/06/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: A.AA FROM A.5 TO A.6 FROM 1ST FLOOR TO 3RD FLOOR ABOVE FIREPLACE 2 LAYERS; FIREWALL AT LEFT WING: 4TH FLOOR: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST LAYER;
All Rough Inspection - Commercial Partial 12/9/2019 12/9/2019 at 2:20 PM 12/09/2019
Misc
Partial Correction
12/06/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 3, BEFORE COVERING INSTALL REINFORCING STRAPS AND BOCA PLATES PER CODES.
Misc
Partial Correction
12/06/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING;
Misc
Partial Correction
12/06/2019
OK TO PLACE WHEN READY ROUGH-IN AT CHASE BEHIND SHOWERS AT: 1ST FLOOR: LEFT WING; 2ND FLOOR: LEFT WING; 3RD FLOOR: LEFT WING; 4TH FLOOR: LEFT WING;
Misc
Partial Correction
12/06/2019
OK TO FOAM AND INSULATE ABOVE CEILING AT: LEFT WING: 4TH FLOOR;
Misc
Partial Correction
12/06/2019
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: 4TH FLOOR; 3RD FLOOR;
Rated Assembly Inspection Partial 12/10/2019 12/10/2019 at 2:15 PM 12/10/2019
Misc
Partial Correction
12/09/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
12/09/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER
Misc
Partial Correction
12/09/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
12/09/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: A.AA FROM A.5 TO A.6 FROM 1ST FLOOR TO 3RD FLOOR ABOVE FIREPLACE 2 LAYERS; FIREWALL AT LEFT WING WEST FACE: 4TH FLOOR: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND LAYERS;
All Rough Inspection - Commercial Partial 12/10/2019 at 2:50 PM 12/10/2019
Misc
Partial Correction
12/09/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 3, 4,
Misc
Partial Correction
12/09/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING; CEILING AT GARAGE #1 NORTH 6';
Misc
Partial Correction
12/09/2019
OK TO PLACE WHEN READY ROUGH-IN AT CHASE BEHIND SHOWERS AT: 1ST FLOOR: LEFT WING; 2ND FLOOR: LEFT WING; 3RD FLOOR: LEFT WING; 4TH FLOOR: LEFT WING;
Misc
Partial Correction
12/09/2019
OK TO FOAM AND INSULATE ABOVE CEILING AT: LEFT WING: 4TH FLOOR;
Misc
Partial Correction
12/09/2019
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: 4TH FLOOR; 3RD FLOOR;
Misc
Partial Correction
12/10/2019
OK TO COVER WHEN READY RC CHANNEL AT CEILING AT: LEFT WING: 4TH FLOOR;
All Rough Inspection - Commercial Partial 12/11/2019 12/11/2019 at 3:20 PM 12/11/2019
Misc
Partial Correction
12/10/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 3, 4,
Misc
Partial Correction
12/10/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING; CEILING AT GARAGE #1 NORTH 6';
Misc
Partial Correction
12/10/2019
OK TO PLACE WHEN READY ROUGH-IN AT CHASE BEHIND SHOWERS AT: 1ST FLOOR: LEFT WING; 2ND FLOOR: LEFT WING; 3RD FLOOR: LEFT WING; 4TH FLOOR: LEFT WING;
Misc
Partial Correction
12/10/2019
OK TO FOAM AND INSULATE ABOVE CEILING AT: LEFT WING: 4TH FLOOR;
Misc
Partial Correction
12/10/2019
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: 4TH FLOOR; 3RD FLOOR; 2nD FLOOR;
Misc
Partial Correction
12/10/2019
OK TO COVER WHEN READY RC CHANNEL AT CEILING AT: LEFT WING: 4TH FLOOR;
Rated Assembly Inspection Partial 12/11/2019 12/11/2019 at 3:55 PM 12/11/2019
Misc
Partial Correction
12/10/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
12/10/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER; 3RD FLOOR 1ST LAYER; WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER
Misc
Partial Correction
12/10/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
12/10/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; EAST FACE: 1ST LAYER ABOVE CEILING; 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER;
Rated Assembly Inspection Partial 12/13/2019 12/13/2019 at 1:25 PM 12/13/2019
Misc
Partial Correction
12/11/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
12/11/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER; 3RD FLOOR 1ST LAYER; 2ND LAYER WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER
Misc
Partial Correction
12/11/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
12/11/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER FULL HEIGHT OK TO TAPE, MUD & FIRESTOP 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT
All Rough Inspection - Commercial Partial 12/13/2019 at 2:00 PM 12/13/2019
Misc
Partial Correction
12/11/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 3, 4,
Misc
Partial Correction
12/11/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING; CEILING AT GARAGE #1 NORTH 6';
Misc
Partial Correction
12/11/2019
OK TO COVER WHEN READY RC CHANNEL AT CEILING AT: LEFT WING: 4TH FLOOR;
Misc
Partial Correction
12/11/2019
OK TO PLACE WHEN READY ROUGH-IN AT CHASE BEHIND SHOWERS AT: 1ST FLOOR: LEFT WING; CENTER; 2ND FLOOR: LEFT WING; CENTER; 3RD FLOOR: LEFT WING; CENTER; 4TH FLOOR: LEFT WING; CENTER;
Misc
Partial Correction
12/11/2019
OK TO FOAM AND INSULATE ABOVE CEILING AT: LEFT WING: 4TH FLOOR;
Misc
Partial Correction
12/11/2019
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: 4TH FLOOR; 3RD FLOOR; 2nD FLOOR;
All Rough Inspection - Commercial Partial 12/16/2019 at 8:40 AM 12/16/2019
Misc
Partial Correction
12/13/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING; CEILING AT GARAGE #1 NORTH 6';
Misc
Resolved
12/16/2019
Misc
Partial Correction
12/13/2019
OK TO PLACE WHEN READY ROUGH-IN AT CHASE BEHIND SHOWERS AT: 1ST FLOOR: LEFT WING; CENTER; 2ND FLOOR: LEFT WING; CENTER; 3RD FLOOR: LEFT WING; CENTER; 4TH FLOOR: LEFT WING; CENTER;
Misc
Partial Correction
12/13/2019
OK TO FOAM AND INSULATE ABOVE CEILING AT: LEFT WING: 4TH FLOOR;
Misc
Partial Correction
12/13/2019
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: 4TH FLOOR; ROUGH-IN; RC CHANNEL 3RD FLOOR; ROUGH-IN; RC CHANNEL 2ND FLOOR; 1ST FLOOR;
Misc
Partial Correction
12/13/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 3, 4,
All Rough Inspection - Commercial Partial 12/18/2019 12/18/2019 at 10:35 AM 12/18/2019
Misc
Partial Correction
12/16/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING; CEILING AT GARAGE #1 NORTH 6';
Misc
Partial Correction
12/16/2019
OK TO PLACE WHEN READY ROUGH-IN AT CHASE BEHIND SHOWERS AT: 1ST FLOOR: LEFT WING; CENTER; 2ND FLOOR: LEFT WING; CENTER; 3RD FLOOR: LEFT WING; CENTER; 4TH FLOOR: LEFT WING; CENTER;
Misc
Partial Correction
12/16/2019
OK TO FOAM AND INSULATE ABOVE CEILING AT: LEFT WING: 4TH FLOOR;
Misc
Partial Correction
12/16/2019
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: 4TH FLOOR; ROUGH-IN; RC CHANNEL 3RD FLOOR; ROUGH-IN; RC CHANNEL 2ND FLOOR; 1ST FLOOR;
Misc
Partial Correction
12/16/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 3, 4,
All Rough Inspection - Commercial Partial 12/18/2019 12/18/2019
Misc
Partial Correction
12/18/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS/CEILINGS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING; CEILING AT GARAGE #1 NORTH 6'; WING SEPARATION FIREWALLS AT: LEFT WING: 4TH FLOOR; 3RD FLR; 2ND FLR; 1ST FLR
Misc
Partial Correction
12/18/2019
OK TO PLACE WHEN READY ROUGH-IN AT CHASE BEHIND SHOWERS AT: 1ST FLOOR: LEFT WING; CENTER; 2ND FLOOR: LEFT WING; CENTER; 3RD FLOOR: LEFT WING; CENTER; 4TH FLOOR: LEFT WING; CENTER;
Misc
Partial Correction
12/18/2019
OK TO FOAM AND INSULATE ABOVE CEILING AT: LEFT WING: 4TH FLOOR;
Misc
Partial Correction
12/18/2019
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: 4TH FLOOR; ROUGH-IN; RC CHANNEL 3RD FLOOR; ROUGH-IN; RC CHANNEL 2ND FLOOR; ROUGH-IN; 1ST FLOOR: ROUGH-IN @ UNITS ONLY EXCEPT 111, 119, 121;
Misc
Partial Correction
12/18/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 3, 4,
Rough Framing Inspection - Commercial Partial 12/18/2019 12/18/2019
Misc
Partial Correction
11/27/2019
OK TO COVER SHEAR WALLS AT ENDS OF BLDG A: NORTH END OF LEFT WING;
Misc
Partial Correction
11/27/2019
DECK COLUMNS OK TO COVER AT: RIGHT WING;
Misc
Partial Correction
11/27/2019
OK TO COVER WHEN READY FRAMING AT: MAIN FRONT ENTRANCE; TOP OF STAIRWELLS #3 & #4 FOR SCAFFOLDING; ELEVATOR @2 SHAFT OK TO HANG GWB AT INTERIOR FULL HEIGHT;
Misc
Partial Correction
12/18/2019
SHEAR WALL GWB IN PLACE: SHEAR WALL #6 AT 228 & 229;
Gas Piping Inspection - Commercial Partial 12/18/2019 12/18/2019 at 1:25 PM 12/18/2019
Misc
Partial Correction
12/18/2019
GAS PIPING PRESSURE TEST & VISUAL INSPECTION ON: PIPING FROM COLUMN WRAP OUTSIDE FRONT ENTRANCE TO FIREPLACE ENCLOSURE;
Rated Assembly Inspection Partial 12/16/2019 12/18/2019 at 11:00 AM 12/18/2019
Misc
Partial Correction
12/13/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL; 4TH LAYER STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
12/13/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
12/13/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
12/13/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER FULL HEIGHT OK TO TAPE, MUD & FIRESTOP 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT;
Misc
Partial Correction
12/18/2019
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110
All Rough Inspection - Commercial Partial 12/19/2019 at 7:00 AM 12/19/2019
Misc
Partial Correction
12/18/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS/CEILINGS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING; CEILING AT GARAGE #1 NORTH 6'; WING SEPARATION FIREWALLS AT: LEFT WING: 4TH FLOOR; 3RD FLR; 2ND FLR; 1ST FLR
Misc
Partial Correction
12/18/2019
OK TO PLACE WHEN READY ROUGH-IN AT CHASE BEHIND SHOWERS AT: 1ST FLOOR: LEFT WING; CENTER; 2ND FLOOR: LEFT WING; CENTER; 3RD FLOOR: LEFT WING; CENTER; 4TH FLOOR: LEFT WING; CENTER;
Misc
Partial Correction
12/18/2019
OK TO FOAM AND INSULATE ABOVE CEILING AT: LEFT WING: 4TH FLOOR;
Misc
Partial Correction
12/18/2019
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: 4TH FLOOR; ROUGH-IN; RC CHANNEL 3RD FLOOR; ROUGH-IN; RC CHANNEL 2ND FLOOR; ROUGH-IN; RC CHANNEL 1ST FLOOR: ROUGH-IN @ UNITS ONLY INCLUDING 111, 119, 121;
Misc
Partial Correction
12/18/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 3, 4,
Rated Assembly Inspection Partial 12/19/2019 at 1:55 PM 12/19/2019
Misc
Partial Correction
12/18/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL; 4TH LAYER STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
12/18/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
12/18/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
12/18/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER FULL HEIGHT OK TO TAPE, MUD & FIRESTOP 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING;
Misc
Partial Correction
12/18/2019
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
12/19/2019
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR CEILINGS & WALLS @ UNITS & CORRIDOR CENTER SECTION:
Rated Assembly Inspection Partial 12/20/2019 at 7:00 AM 12/20/2019
Misc
Partial Correction
12/19/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL; 4TH LAYER STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
12/19/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
12/19/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
12/19/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER FULL HEIGHT OK TO TAPE, MUD & FIRESTOP 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING;
Misc
Partial Correction
12/19/2019
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
12/19/2019
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR CEILINGS & WALLS @ UNITS & CORRIDOR CENTER SECTION:
Rough Framing Inspection - Commercial Partial 12/20/2019 at 7:50 AM 12/20/2019
Misc
Partial Correction
12/18/2019
OK TO COVER SHEAR WALLS AT ENDS OF BLDG 1: NORTH END OF LEFT WING; EAST END OF RIGHT WING;
Misc
Partial Correction
12/18/2019
DECK COLUMNS OK TO COVER AT: RIGHT WING;
Misc
Partial Correction
12/18/2019
OK TO COVER WHEN READY FRAMING AT: MAIN FRONT ENTRANCE; TOP OF STAIRWELLS #3 & #4 FOR SCAFFOLDING; ELEVATOR @2 SHAFT OK TO HANG GWB AT INTERIOR FULL HEIGHT;
Misc
Partial Correction
12/18/2019
SHEAR WALL GWB IN PLACE: SHEAR WALL #6 AT 228 & 229;
Electrical Service Inspection Partial 10/30/2019 10/30/2019 at 8:05 AM 12/23/2019
Misc
Partial Correction
10/30/2019
RELEASE SERVICE AT THREE TEMPORARY POST-MOUNTED SERVICES LABELED 837A, 837B, 837C
Rated Assembly Inspection Partial 12/23/2019 12/23/2019 at 10:15 AM 12/23/2019
Misc
Partial Correction
12/20/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL; 4TH LAYER STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
12/20/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
12/20/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
12/20/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER FULL HEIGHT OK TO TAPE, MUD & FIRESTOP 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE UNIT SIDE OF FLOOR: 1ST LAYER; 2ND LAYER
Misc
Partial Correction
12/20/2019
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
12/20/2019
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 2ND FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR; SHEARWALLS #4 & #6 2ND LAYER 1ST FLOOR: CORRIDOR WALLS @ UNIT FACE 1ST LAYER CENTER SECTION:
All Rough Inspection - Commercial Partial 12/23/2019 at 10:00 AM 12/23/2019
Misc
Partial Correction
12/19/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS/CEILINGS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING; CEILING AT GARAGE #1 NORTH 6'; WING SEPARATION FIREWALLS AT: LEFT WING: 4TH FLOOR; 3RD FLR; 2ND FLR; 1ST FLR
Misc
Partial Correction
12/19/2019
OK TO PLACE WHEN READY ROUGH-IN AT CHASE BEHIND SHOWERS AT: 1ST FLOOR: LEFT WING; CENTER; 2ND FLOOR: LEFT WING; CENTER; 3RD FLOOR: LEFT WING; CENTER; 4TH FLOOR: LEFT WING; CENTER;
Misc
Partial Correction
12/19/2019
OK TO FOAM AND INSULATE ABOVE CEILING AT: 4TH FLOOR: LEFT WING;
Misc
Partial Correction
12/19/2019
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: 4TH FLOOR; ROUGH-IN; RC CHANNEL 3RD FLOOR; ROUGH-IN; RC CHANNEL 2ND FLOOR; ROUGH-IN; RC CHANNEL 1ST FLOOR: ROUGH-IN @ UNITS ONLY INCLUDING 111, 119, 121; RC CHANNEL @ UNIT ONLY
Misc
Partial Correction
12/19/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 3, 4,
Rated Assembly Inspection Partial 12/26/2019 at 3:10 PM 12/26/2019
Misc
Partial Correction
12/23/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL; 4TH LAYER STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
12/23/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
12/23/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL
Misc
Partial Correction
12/23/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER FULL HEIGHT OK TO TAPE, MUD & FIRESTOP 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT; GARAGE/CORRIDOR SIDE OF FLOOR 1ST LAYER;
Misc
Partial Correction
12/23/2019
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
12/23/2019
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 2ND FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR; SHEARWALLS #4 & #6 2ND LAYER 1ST FLOOR: CORRIDOR WALLS @ UNIT FACE 1ST LAYER CENTER SECTION:
All Rough Inspection - Commercial Partial 12/26/2019 12/26/2019 at 1:40 PM 12/26/2019
Misc
Partial Correction
12/23/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS/CEILINGS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING; CEILING AT GARAGE #1 NORTH 6'; WING SEPARATION FIREWALLS AT: LEFT WING: 4TH FLOOR; 3RD FLR; 2ND FLR; 1ST FLR
Misc
Partial Correction
12/23/2019
OK TO PLACE WHEN READY ROUGH-IN AT CHASE BEHIND SHOWERS AT: 4TH FLOOR: LEFT WING; CENTER; RIGHT WING 3RD FLOOR: LEFT WING; CENTER; 2ND FLOOR: LEFT WING; CENTER; 1ST FLOOR: LEFT WING; CENTER;
Misc
Partial Correction
12/23/2019
OK TO FOAM AND INSULATE ABOVE CEILING AT: 4TH FLOOR: LEFT WING;
Misc
Partial Correction
12/23/2019
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: 4TH FLOOR; ROUGH-IN; RC CHANNEL; RIGHT WING FIREWALL ABOVE CEILING @ ELEV #2 & UNITS N; 3RD FLOOR; ROUGH-IN; RC CHANNEL 2ND FLOOR; ROUGH-IN; RC CHANNEL 1ST FLOOR: ROUGH-IN @ UNITS ONLY INCLUDING 111, 119, 121; RC CHANNEL @ UNIT ONLY
Misc
Partial Correction
12/23/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 2, 3, 4
Misc
Partial Correction
12/26/2019
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
All Rough Inspection - Commercial Partial 12/27/2019 at 9:20 AM 12/27/2019
Misc
Partial Correction
12/26/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS/CEILINGS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING; CEILING AT GARAGE #1 NORTH 6'; WING SEPARATION FIREWALLS AT: LEFT WING: 4TH FLOOR; 3RD FLR; 2ND FLR; 1ST FLR
Misc
Partial Correction
12/26/2019
OK TO PLACE GWB WHEN READY AT CHASES BEHIND SHOWERS AT: 4TH FLOOR: LEFT WING; CENTER; [RIGHT WING 3RD FLOOR: LEFT WING; CENTER; [RIGHT WING 2ND FLOOR: LEFT WING; CENTER; [RIGHT WING 1ST FLOOR: LEFT WING; CENTER; [RIGHT WING
Misc
Partial Correction
12/26/2019
OK TO FOAM AND INSULATE ABOVE CEILING AT: 4TH FLOOR: LEFT WING;
Misc
Partial Correction
12/26/2019
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: 4TH FLOOR; ROUGH-IN; RC CHANNEL; RIGHT WING FIREWALL ABOVE CEILING @ ELEV #2 & UNITS N; 3RD FLOOR; ROUGH-IN; RC CHANNEL 2ND FLOOR; ROUGH-IN; RC CHANNEL 1ST FLOOR: ROUGH-IN @ UNITS ONLY INCLUDING 111, 119, 121; [GARAGES, CORRIDOR, STORAGE RMS, JAN RM;] RC CHANNEL @ UNITS ONLY
Misc
Partial Correction
12/26/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 2, 3, 4
Misc
Partial Correction
12/26/2019
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
Rated Assembly Inspection Partial 12/27/2019 at 9:00 AM 12/27/2019
Misc
Partial Correction
12/26/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL; 4TH LAYER STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
12/26/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
12/26/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL JAN RM, STORAGE RMS: [1ST LAYER;
Misc
Partial Correction
12/26/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER FULL HEIGHT OK TO TAPE, MUD & FIRESTOP 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT [+ FIRESTOP; GARAGE/ CORRIDOR SIDE OF FLOOR 1ST LAYER;]
Misc
Partial Correction
12/26/2019
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
12/26/2019
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 2ND FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR; SHEARWALLS #4 & #6 2ND LAYER 1ST FLOOR: CORRIDOR WALLS @ UNIT FACE 1ST LAYER CENTER SECTION:
Rated Assembly Inspection Partial 12/30/2019 12/30/2019 at 9:35 AM 12/30/2019
Misc
Partial Correction
12/27/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL; 4TH LAYER STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
12/27/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
12/27/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT/JAN/STOR RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL JAN RM, STORAGE RMS: 1ST & 2ND LAYERS; ITS/DATA RM CEILING 1ST LAYER;
Misc
Partial Correction
12/27/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER FULL HEIGHT OK TO TAPE, MUD & FIRESTOP 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 3RD FLOOR: 2ND FLOOR: 1ST FLOOR:
Misc
Partial Correction
12/27/2019
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
12/27/2019
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 2ND FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR; SHEARWALLS #4 & #6 2ND LAYER 1ST FLOOR: CORRIDOR WALLS @ UNIT FACE 1ST LAYER; SHEARWALL #4 2ND LAYER; UNITS ONLY; CENTER SECTION:
Rated Assembly Inspection Partial 12/31/2019 12/31/2019 at 10:15 AM 12/31/2019
Misc
Partial Correction
12/30/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL; 4TH LAYER STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
12/30/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
12/30/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT/JAN/ELEV MACH RM/STOR RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL JAN RM, STORAGE RMS: 1ST & 2ND LAYERS; ITS/DATA RM CEILING 1ST LAYER; ELEV MACH RM: WALLS: 1ST LAYER; CEILING: 1ST & 2ND LAYERS;
Misc
Partial Correction
12/30/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER FULL HEIGHT OK TO TAPE, MUD & FIRESTOP 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: 1ST FLOOR:
Misc
Partial Correction
12/30/2019
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; RIGHT WING: ONE LAYER @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
12/30/2019
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 2ND FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR; SHEARWALLS #4 & #6 2ND LAYER 1ST FLOOR: CORRIDOR WALLS @ UNIT FACE 1ST LAYER; SHEARWALL #4 @ GAR 3 & GAR 4 2ND LAYER; CENTER SECTION:
Rated Assembly Inspection Partial 1/2/2020 1/2/2020 at 8:30 AM 01/02/2020
Misc
Partial Correction
12/31/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT/JAN/ELEV MACH RM/STOR RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL JAN RM, STORAGE RMS: 1ST & 2ND LAYERS; ITS/DATA RM CEILING 1ST LAYER; ELEV MACH RM: WALLS: 2 LAYERS; CEILING: 1ST & 2ND LAYERS; 3RD LAYER + HAT CHANNEL;
Misc
Partial Correction
12/31/2019
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER FULL HEIGHT OK TO TAPE, MUD & FIRESTOP 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: 1ST FLOOR:
Misc
Partial Correction
12/31/2019
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
12/31/2019
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 2ND FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR; SHEARWALLS #4 & #6 2ND LAYER 1ST FLOOR: CORRIDOR WALLS @ UNIT FACE 1ST LAYER; SHEARWALL #4 @ GAR 3 & GAR 4 2ND LAYER; CENTER SECTION:
Misc
Partial Correction
12/31/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL; 4TH LAYER STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
12/31/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
All Rough Inspection - Commercial Partial 1/2/2020 at 9:10 AM 01/02/2020
Misc
Partial Correction
12/27/2019
OK TO COVER WHEN READY WOOD FRAMED WALLS/CEILINGS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING; CEILING AT GARAGE #1 NORTH 6'; WING SEPARATION FIREWALLS AT: LEFT WING: 4TH FLOOR; 3RD FLR; 2ND FLR; 1ST FLR
Misc
Partial Correction
12/27/2019
OK TO PLACE GWB WHEN READY AT CHASES BEHIND SHOWERS AT: 4TH FLOOR: LEFT WING; CENTER; [RIGHT WING 3RD FLOOR: LEFT WING; CENTER; [RIGHT WING 2ND FLOOR: LEFT WING; CENTER; [RIGHT WING 1ST FLOOR: LEFT WING; CENTER; [RIGHT WING
Misc
Partial Correction
12/27/2019
OK TO FOAM AND INSULATE ABOVE CEILING AT: 4TH FLOOR: LEFT WING;
Misc
Partial Correction
12/27/2019
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: 4TH FLOOR; ROUGH-IN; RC CHANNEL; RIGHT WING FIREWALL ABOVE CEILING @ ELEV #2 & UNITS N; 3RD FLOOR; ROUGH-IN; RC CHANNEL 2ND FLOOR; ROUGH-IN; RC CHANNEL 1ST FLOOR: ROUGH-IN @ UNITS ONLY INCLUDING 111, 119, 121; GARAGES, CORRIDOR, STORAGE RMS, JAN RM; RC CHANNEL @ UNITS ONLY; RC CHANNEL @ CEILINGS AT GARAGES, STORAGE, ELECT/MECH, JAN RMS; RC CHANNEL @ CEILINGS & WALLS AT CORRIDOR CENTER SECTION: RIGHT WING:
Misc
Partial Correction
12/27/2019
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 2, 3, 4
Misc
Partial Correction
12/27/2019
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
Electrical Service Inspection Partial 1/3/2020 1/3/2020 at 11:00 AM 01/03/2020
Misc
Resolved
01/03/2020
RELEASE SERVICE AT THREE TEMPORARY POST-MOUNTED SERVICES LABELED 837A, 837B, 837C
Misc
Partial Correction
01/03/2020
RELEASE METERS AT ELECTRICAL SERVICE METER BANK AT: NORTH END OF LEFT WING;
All Rough Inspection - Commercial Partial 1/3/2020 at 11:25 AM 01/03/2020
Misc
Partial Correction
01/02/2020
OK TO COVER WHEN READY WOOD FRAMED WALLS/CEILINGS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING; CEILING AT GARAGE #1 NORTH 6'; WING SEPARATION FIREWALLS AT: LEFT WING: 4TH FLOOR; 3RD FLR; 2ND FLR; 1ST FLR
Misc
Partial Correction
01/02/2020
OK TO PLACE GWB WHEN READY AT CHASES BEHIND SHOWERS AT: 4TH FLOOR: LEFT WING; CENTER; [RIGHT WING 3RD FLOOR: LEFT WING; CENTER; [RIGHT WING 2ND FLOOR: LEFT WING; CENTER; [RIGHT WING 1ST FLOOR: LEFT WING; CENTER; [RIGHT WING
Misc
Partial Correction
01/02/2020
OK TO FOAM AND INSULATE ABOVE CEILING AT: 4TH FLOOR: LEFT WING;
Misc
Partial Correction
01/02/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: 4TH FLOOR; ROUGH-IN; RC CHANNEL; RIGHT WING FIREWALL ABOVE CEILING @ ELEV #2 & UNITS N; 3RD FLOOR; ROUGH-IN; RC CHANNEL 2ND FLOOR; ROUGH-IN; RC CHANNEL 1ST FLOOR: ROUGH-IN @ UNITS ONLY INCLUDING 111, 119, 121; GARAGES, CORRIDOR, STORAGE RMS, JAN RM; RC CHANNEL @ UNITS ONLY; RC CHANNEL @ CEILINGS AT GARAGES, STORAGE, ELECT/MECH, JAN RMS; RC CHANNEL @ CEILINGS & WALLS AT CORRIDOR; OSB SHEATHING AT SHEAR WALL 6 AT SPRINKLER ROOM; CENTER SECTION: RIGHT WING:
Misc
Partial Correction
01/02/2020
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR: STAIRWELLS 2, 3, 4
Misc
Partial Correction
01/02/2020
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
Rated Assembly Inspection Partial 1/3/2020 at 11:40 AM 01/03/2020
Misc
Partial Correction
01/02/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT/JAN/ELEV MACH RM/STOR RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL JAN RM, STORAGE RMS: 1ST & 2ND LAYERS; ITS/DATA RM CEILING 1ST LAYER; ELEV MACH RM: WALLS: 2 LAYERS; CEILING: 1ST & 2ND LAYERS; 3RD LAYER + HAT CHANNEL;
Misc
Partial Correction
01/02/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER FULL HEIGHT OK TO TAPE, MUD & FIRESTOP 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: 1ST FLOOR: 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- FULL HEIGHT.
Misc
Partial Correction
01/02/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
01/02/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 2ND FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR; SHEARWALLS #4 & #6 2ND LAYER 1ST FLOOR: CORRIDOR WALLS @ UNIT FACE 1ST LAYER; SHEARWALL #4 @ GAR 3 & GAR 4 2ND LAYER; CENTER SECTION:
Misc
Partial Correction
01/02/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL; 4TH LAYER STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
01/02/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
All Rough Inspection - Commercial Partial 1/6/2020 1/6/2020 at 8:50 AM 01/06/2020
Misc
Partial Correction
01/03/2020
OK TO COVER WHEN READY WOOD FRAMED WALLS/CEILINGS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING; CEILING AT GARAGE #1 NORTH 6'; WING SEPARATION FIREWALLS AT: LEFT WING: 4TH FLOOR; 3RD FLR; 2ND FLR; 1ST FLR
Misc
Partial Correction
01/03/2020
OK TO PLACE GWB WHEN READY AT CHASES BEHIND SHOWERS AT: 4TH FLOOR: LEFT WING; CENTER; [RIGHT WING 3RD FLOOR: LEFT WING; CENTER; [RIGHT WING 2ND FLOOR: LEFT WING; CENTER; [RIGHT WING 1ST FLOOR: LEFT WING; CENTER; [RIGHT WING
Misc
Partial Correction
01/03/2020
OK TO FOAM AND INSULATE ABOVE CEILING AT: 4TH FLOOR: LEFT WING;
Misc
Partial Correction
01/03/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: 4TH FLOOR; ROUGH-IN; RC CHANNEL; RIGHT WING FIREWALL ABOVE CEILING @ ELEV #2 & UNITS N; 3RD FLOOR; ROUGH-IN; RC CHANNEL 2ND FLOOR; ROUGH-IN; RC CHANNEL 1ST FLOOR: ROUGH-IN @ UNITS ONLY INCLUDING 111, 119, 121; GARAGES, CORRIDOR, STORAGE RMS, JAN RM; RC CHANNEL @ UNITS ONLY; RC CHANNEL @ CEILINGS AT GARAGES, STORAGE, ELECT/MECH, JAN RMS; RC CHANNEL @ CEILINGS & WALLS AT CORRIDOR; OSB SHEATHING AT SHEAR WALL 6 AT SPRINKLER ROOM; CENTER SECTION: RIGHT WING:
Misc
Partial Correction
01/03/2020
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR/TOWER: STAIRWELLS 1, 2, 3, 4
Misc
Partial Correction
01/03/2020
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
Rated Assembly Inspection Partial 1/6/2020 1/6/2020 at 9:10 AM 01/06/2020
Misc
Partial Correction
01/03/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT/JAN/ELEV MACH RM/STOR RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL JAN RM, STORAGE RMS: 1ST & 2ND LAYERS; ITS/DATA RM CEILING 1ST LAYER; ELEV MACH RM: WALLS: 2 LAYERS; CEILING: 1ST & 2ND LAYERS; 3RD LAYER + HAT CHANNEL; 4TH LAYER SPRINKLER RISER ROOM: ONE LAYER;
Misc
Partial Correction
01/03/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER FULL HEIGHT OK TO TAPE, MUD & FIRESTOP 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- FULL HEIGHT.
Misc
Partial Correction
01/03/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
01/03/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 2ND FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR; SHEARWALLS #4 & #6 2ND LAYER 1ST FLOOR: CORRIDOR WALLS @ UNIT FACE 1ST LAYER; SHEARWALL #4 @ GAR 3 & GAR 4 2ND LAYER; ALL WALLS & CEILINGS OK TO TAPE, MUD & FIRESTOP AT CORRIDOR, STORAGE, GARAGES, JAN; CENTER SECTION:
Misc
Partial Correction
01/03/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL; 4TH LAYER STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
01/03/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
All Rough Inspection - Commercial Partial 1/7/2020 1/7/2020 at 2:15 PM 01/07/2020
Misc
Resolved
01/07/2020
OK TO COVER WHEN READY WOOD FRAMED WALLS/CEILINGS AND SYSTEMS TO BE ENCLOSED AT: A.AA FROM A.5 TO A.6 AT SECOND FLOOR ABOVE FIREPLACE AFTER DOUBLE TOP TOP PLATE IS REINFORCED WHERE NOTCHED FOR PLUMBING; CEILING AT GARAGE #1 NORTH 6'; WING SEPARATION FIREWALLS AT: LEFT WING: 4TH FLOOR; 3RD FLR; 2ND FLR; 1ST FLR
Misc
Resolved
01/07/2020
OK TO PLACE GWB WHEN READY AT CHASES BEHIND SHOWERS AT: 4TH FLOOR: LEFT WING; CENTER; RIGHT WING 3RD FLOOR: LEFT WING; CENTER; RIGHT WING 2ND FLOOR: LEFT WING; CENTER; RIGHT WING 1ST FLOOR: LEFT WING; CENTER; RIGHT WING
Misc
Partial Correction
01/06/2020
OK TO FOAM AND INSULATE ABOVE CEILING AT: 4TH FLOOR: LEFT WING;
Misc
Partial Correction
01/06/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE CENTER SECTION: OK TO INSTALL GWB RIGHT WING:
Misc
Resolved
01/07/2020
OK TO COVER THREE WALLS AT STAIRWELLS: AT 1ST FLOOR: STAIRWELLS 1, 2, 3, 4 AT 2ND FLOOR: STAIRWELLS 1, 4, 2, 3 AT 3RD FLOOR: STAIRWELLS 1, 4, 2, 3 AT 4TH FLOOR/TOWER: STAIRWELLS 1, 2, 3, 4
Misc
Partial Correction
01/06/2020
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
Rated Assembly Inspection Partial 1/7/2020 1/7/2020 at 3:25 PM 01/07/2020
Misc
Partial Correction
01/06/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT/JAN/ELEV MACH RM/STOR RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL JAN RM, STORAGE RMS: 1ST & 2ND LAYERS; ITS/DATA RM CEILING 1ST LAYER; ELEV MACH RM: WALLS: 2 LAYERS; CEILING: 1ST & 2ND LAYERS; 3RD LAYER + HAT CHANNEL; 4TH LAYER SPRINKLER RISER ROOM: ONE LAYER;
Misc
Partial Correction
01/06/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER FULL HEIGHT FIRESTOPPED 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
Misc
Partial Correction
01/06/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
01/06/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 2ND FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR; SHEARWALLS #4 & #6 2ND LAYER 1ST FLOOR: CORRIDOR WALLS @ UNIT FACE 1ST LAYER; SHEARWALL #4 @ GAR 3 & GAR 4 2ND LAYER; ALL WALLS & CEILINGS OK TO TAPE, MUD & FIRESTOP AT CORRIDOR, STORAGE, GARAGES, JAN; CENTER SECTION:
Misc
Partial Correction
01/06/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST LAYER; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL; 4TH LAYER STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
01/06/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
All Rough Inspection - Commercial Partial 1/8/2020 1/8/2020 at 10:25 AM 01/08/2020
Misc
Partial Correction
01/07/2020
OK TO FOAM AND INSULATE ABOVE CEILING AT: 4TH FLOOR: LEFT WING;
Misc
Partial Correction
01/07/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE CENTER SECTION: OK TO INSTALL GWB AT: 4TH FLOOR; 3RD FLOOR; RIGHT WING:
Misc
Partial Correction
01/07/2020
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; LEFT WING: 4TH FLOOR; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
Rated Assembly Inspection Partial 1/8/2020 at 11:35 AM 01/08/2020
Misc
Partial Correction
01/07/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT/JAN/ELEV MACH RM/STOR RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL JAN RM, STORAGE RMS: 1ST & 2ND LAYERS; ITS/DATA RM CEILING 1ST LAYER; ELEV MACH RM: WALLS: 2 LAYERS; CEILING: 1ST & 2ND LAYERS; 3RD LAYER + HAT CHANNEL; 4TH LAYER SPRINKLER RISER ROOM: ONE LAYER;
Misc
Partial Correction
01/07/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER FULL HEIGHT FIRESTOPPED 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
Misc
Partial Correction
01/07/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
01/07/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 2ND FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR; SHEARWALLS #4 & #6 2ND LAYER 1ST FLOOR: CORRIDOR WALLS @ UNIT FACE 1ST LAYER; SHEARWALL #4 @ GAR 3 & GAR 4 2ND LAYER; ALL WALLS & CEILINGS OK TO TAPE, MUD & FIRESTOP AT CORRIDOR, STORAGE, GARAGES, JAN; CENTER SECTION:
Misc
Partial Correction
01/07/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER @ WELL FACE BELOW TOWER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL; 4TH LAYER STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
01/07/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Rated Assembly Inspection Partial 1/9/2020 1/9/2020 at 1:05 PM 01/09/2020
Misc
Partial Correction
01/08/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT/JAN/ELEV MACH RM/STOR RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL JAN RM, STORAGE RMS: 1ST & 2ND LAYERS; ITS/DATA RM CEILING 1ST LAYER; ELEV MACH RM: WALLS: 2 LAYERS; CEILING: 1ST & 2ND LAYERS; 3RD LAYER + HAT CHANNEL; 4TH LAYER SPRINKLER RISER ROOM: ONE LAYER;
Misc
Partial Correction
01/08/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER HUNG & FIRESTOPPED; BELOW CEILING 1ST LAYER; 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED; UNIT FACE: BELOW CEILING 1ST LAYER 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
Misc
Partial Correction
01/08/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
01/08/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 2ND FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR; SHEARWALLS #4 & #6 2ND LAYER 1ST FLOOR: CORRIDOR WALLS @ UNIT FACE 1ST LAYER; SHEARWALL #4 @ GAR 3 & GAR 4 2ND LAYER; ALL WALLS & CEILINGS OK TO TAPE, MUD & FIRESTOP AT CORRIDOR, STORAGE, GARAGES, JAN; CENTER SECTION:
Misc
Partial Correction
01/08/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER @ WELL FACE BELOW TOWER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER: 1ST LAYER; CEILINGS HIGH & LOW: 1ST LAYER STAIRWELL 3: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER INSIDE ONLY; BACKSIDE FACE: E & N WALLS 1ST LAYER; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL, 4TH LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
01/08/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
All Rough Inspection - Commercial Partial 1/9/2020 1/9/2020 at 2:00 PM 01/09/2020
Misc
Partial Correction
01/08/2020
OK TO FOAM AND INSULATE ABOVE CEILING AT: 4TH FLOOR: LEFT WING;
Misc
Partial Correction
01/08/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE INCLUDING RC CHANNEL CENTER SECTION: 4TH FLOOR INCLUDING RC CHANNEL AT CEILINGS ONLY; 3RD FLOOR; RIGHT WING:
Misc
Partial Correction
01/08/2020
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; LEFT WING: 4TH FLOOR; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
Sprinkler - Hydrostatic Test Passed 1/10/2020 01/10/2020
Rated Assembly Inspection Partial 1/10/2020 1/10/2020 at 3:05 PM 01/10/2020
Misc
Partial Correction
01/09/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT/JAN/ELEV MACH RM/STOR RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL JAN RM, STORAGE RMS: 1ST & 2ND LAYERS; ITS/DATA RM CEILING 1ST LAYER; ELEV MACH RM: WALLS: 2 LAYERS; CEILING: 1ST & 2ND LAYERS; 3RD LAYER + HAT CHANNEL; 4TH LAYER SPRINKLER RISER ROOM: ONE LAYER;
Misc
Partial Correction
01/09/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER HUNG & FIRESTOPPED; BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT; EAST FACE 1ST LAYER 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED; UNIT FACE: BELOW CEILING 1ST & 2ND LAYERS FIRESTOPPED 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
Misc
Partial Correction
01/09/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
01/09/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 2ND FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR; SHEARWALLS #4 & #6 2ND LAYER 1ST FLOOR: CORRIDOR WALLS @ UNIT FACE 1ST LAYER; SHEARWALL #4 @ GAR 3 & GAR 4 2ND LAYER; ALL WALLS & CEILINGS OK TO TAPE, MUD & FIRESTOP AT CORRIDOR, STORAGE, GARAGES, JAN; CENTER SECTION:
Misc
Partial Correction
01/09/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER @ WELL FACE BELOW TOWER; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS STAIRWELL 3: 1ST FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; 2ND FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 2 LAYERS 3RD FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER 4TH FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYER; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL, 4TH LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
01/09/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: FRAMING - FLOORS 4,3,2,1 SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER 2ND FLOOR: 3RD FLOOR: 4TH FLOOR: ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
01/10/2020
COMPONENTS OF RATED ASSEMBLIES AT MECHANICAL CHASES: AT UNIT 409: FRAMING + 1ST LAYER;
All Rough Inspection - Commercial Partial 1/10/2020 1/10/2020 at 2:05 PM 01/10/2020
Misc
Partial Correction
01/09/2020
OK TO FOAM AND INSULATE AT: ABOVE CEILING AT: 4TH FLOOR: LEFT WING; WALL FURRED-OUT TO ENCLOSE ELECTRICAL CABLES AND INSULATION AT GOLF ROOM
Misc
Partial Correction
01/09/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE INCLUDING RC CHANNEL CENTER SECTION: 4TH FLOOR INCLUDING RC CHANNEL AT CEILINGS ONLY; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR UNIT 110; RIGHT WING:
Misc
Partial Correction
01/09/2020
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; LEFT WING: 4TH FLOOR; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
Rated Assembly Inspection Partial 1/13/2020 1/13/2020 01/13/2020
Misc
Partial Correction
01/10/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT/JAN/ELEV MACH RM/STOR RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL JAN RM, STORAGE RMS: 1ST & 2ND LAYERS; ITS/DATA RM CEILING 1ST LAYER; ELEV MACH RM: WALLS: 2 LAYERS; CEILING: 1ST & 2ND LAYERS; 3RD LAYER + HAT CHANNEL; 4TH LAYER SPRINKLER RISER ROOM: ONE LAYER;
Misc
Partial Correction
01/10/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER HUNG & FIRESTOPPED; BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT; EAST FACE 1ST LAYER 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED; UNIT FACE: BELOW CEILING 1ST & 2ND LAYERS FIRESTOPPED 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
Misc
Partial Correction
01/10/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
01/10/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 2ND FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR; SHEARWALLS #4 & #6 2ND LAYER 1ST FLOOR: CORRIDOR WALLS @ UNIT FACE 1ST LAYER; SHEARWALL #4 @ GAR 3 & GAR 4 2ND LAYER; ALL WALLS & CEILINGS OK TO TAPE, MUD & FIRESTOP AT CORRIDOR, STORAGE, GARAGES, JAN; CENTER SECTION: HAT CHANNEL 3RD CORRIDOR
Misc
Partial Correction
01/10/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER @ WELL FACE BELOW TOWER; 1ST CEILING STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS; 4TH RC STAIRWELL 3: 1ST FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; 2ND FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 2 LAYERS 3RD FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER 4TH FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYER; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL, 4TH LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
01/10/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: FRAMING - FLOORS 4,3,2,1 SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER 2ND FLOOR: 1ST 3RDFLOOR: 1ST 4TH FLOOR: 1ST ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
01/10/2020
COMPONENTS OF RATED ASSEMBLIES AT MECHANICAL CHASES: AT UNIT 409: FRAMING + 1ST LAYER;
Rated Assembly Inspection Partial 1/14/2020 01/14/2020
Misc
Partial Correction
01/13/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT/JAN/ELEV MACH RM/STOR RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL JAN RM, STORAGE RMS: 1ST & 2ND LAYERS; ITS/DATA RM CEILING 1ST LAYER; ELEV MACH RM: WALLS: 2 LAYERS; CEILING: 1ST & 2ND LAYERS; 3RD LAYER + HAT CHANNEL; 4TH LAYER SPRINKLER RISER ROOM: ONE LAYER;
Misc
Partial Correction
01/13/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER HUNG & FIRESTOPPED; BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT; EAST FACE 1ST LAYER 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED; UNIT FACE: BELOW CEILING 1ST & 2ND LAYERS FIRESTOPPED 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
Misc
Partial Correction
01/13/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
01/13/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 2ND FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR; SHEARWALLS #4 & #6 2ND LAYER 1ST FLOOR: CORRIDOR WALLS @ UNIT FACE 1ST LAYER; SHEARWALL #4 @ GAR 3 & GAR 4 2ND LAYER; ALL WALLS & CEILINGS OK TO TAPE, MUD & FIRESTOP AT CORRIDOR, STORAGE, GARAGES, JAN; 1st floor Mechanical HVAC 5 rooms 1st layer rock walls & ceilings CENTER SECTION: HAT CHANNEL 3RD CORRIDOR Center Building RC Channels 3rd floor corridor walls & ceiling, 3rd floor unit ceilings
Misc
Partial Correction
01/13/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER @ WELL FACE BELOW TOWER; 1ST CEILING STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS; 4TH RC STAIRWELL 3: 1ST FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; 2ND FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 2 LAYERS 3RD FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER 4TH FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYER; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL, 4TH LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
01/13/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: FRAMING - FLOORS 4,3,2,1 SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER 2ND FLOOR: 1ST 3RDFLOOR: 1ST 4TH FLOOR: 1ST ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
01/13/2020
COMPONENTS OF RATED ASSEMBLIES AT MECHANICAL CHASES: AT UNIT 409: FRAMING + 1ST LAYER;
Rated Assembly Inspection Partial 1/15/2020 01/15/2020
Misc
Partial Correction
01/14/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT/JAN/ELEV MACH RM/STOR RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL JAN RM, STORAGE RMS: 1ST & 2ND LAYERS; ITS/DATA RM CEILING 1ST LAYER; ELEV MACH RM: WALLS: 2 LAYERS; CEILING: 1ST & 2ND LAYERS; 3RD LAYER + HAT CHANNEL; 4TH LAYER SPRINKLER RISER ROOM: ONE LAYER;
Misc
Partial Correction
01/14/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER HUNG & FIRESTOPPED; BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT; EAST FACE 1ST LAYER; 2NDLAYER CORRIDOR, 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED; UNIT FACE: BELOW CEILING 1ST & 2ND LAYERS FIRESTOPPED 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
Misc
Partial Correction
01/14/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
01/14/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 2ND FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR; SHEARWALLS #4 & #6 2ND LAYER 1ST FLOOR: CORRIDOR WALLS @ UNIT FACE 1ST LAYER; SHEARWALL #4 @ GAR 3 & GAR 4 2ND LAYER; ALL WALLS & CEILINGS OK TO TAPE, MUD & FIRESTOP AT CORRIDOR, STORAGE, GARAGES, JAN; 1st floor Mechanical HVAC 5 rooms 1st layer rock walls & ceilings CENTER SECTION: HAT CHANNEL 3RD CORRIDOR Center Building RC Channels 3rd floor corridor walls & ceiling, 3rd floor unit ceilings
Misc
Partial Correction
01/14/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER @ WELL FACE BELOW TOWER; 1ST CEILING STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS; 4TH RC, 4TH LAYER STAIRWELL 3: 1ST FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; 2ND FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 2 LAYERS 3RD FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER 4TH FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYER; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL, 4TH LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
01/14/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: FRAMING - FLOORS 4,3,2,1 SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER 2ND FLOOR: 1ST 3RDFLOOR: 1ST 4TH FLOOR: 1ST ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
01/14/2020
COMPONENTS OF RATED ASSEMBLIES AT MECHANICAL CHASES: AT UNIT 409: FRAMING + 1ST LAYER;
Rated Assembly Inspection Partial 1/16/2020 01/16/2020
Misc
Partial Correction
01/15/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT/JAN/ELEV MACH RM/STOR RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL JAN RM, STORAGE RMS: 1ST & 2ND LAYERS; ITS/DATA RM CEILING 1ST LAYER; ELEV MACH RM: WALLS: 2 LAYERS; CEILING: 1ST & 2ND LAYERS; 3RD LAYER + HAT CHANNEL; 4TH LAYER SPRINKLER RISER ROOM: ONE LAYER;
Misc
Partial Correction
01/15/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER HUNG & FIRESTOPPED; BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT; EAST FACE 1ST LAYER; 2NDLAYER CORRIDOR, 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED; UNIT FACE: BELOW CEILING 1ST & 2ND LAYERS FIRESTOPPED 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
Misc
Partial Correction
01/15/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
01/15/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 2ND FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR; SHEARWALLS #4 & #6 2ND LAYER 1ST FLOOR: CORRIDOR WALLS @ UNIT FACE 1ST LAYER; SHEARWALL #4 @ GAR 3 & GAR 4 2ND LAYER; ALL WALLS & CEILINGS OK TO TAPE, MUD & FIRESTOP AT CORRIDOR, STORAGE, GARAGES, JAN; 1st floor Mechanical HVAC 5 rooms 1st layer rock walls & ceilings CENTER SECTION: HAT CHANNEL 3RD CORRIDOR Center Building RC Channels 3rd floor corridor walls & ceiling, 3rd floor unit ceilings
Misc
Partial Correction
01/15/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER @ WELL FACE BELOW TOWER; 1ST CEILING STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS; 4TH RC, 4TH LAYER STAIRWELL 3: 1ST FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; 2ND FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 2 LAYERS 3RD FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER 4TH FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYER; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL, 4TH LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
01/15/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: FRAMING - FLOORS 4,3,2,1 SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER 2ND FLOOR: 1ST 3RDFLOOR: 1ST 4TH FLOOR: 1ST ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
01/15/2020
COMPONENTS OF RATED ASSEMBLIES AT MECHANICAL CHASES: AT UNIT 409: FRAMING + 1ST LAYER;
SECOND FLOOR
Corrective Action Required
01/16/2020
CENTER SECTION: 1ST LAYER UNITS 210-217; CORRIDOR: 1ST LAYER;
Rated Assembly Inspection Partial 1/17/2020 01/17/2020
Misc
Partial Correction
01/16/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT/JAN/ELEV MACH RM/STOR RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL JAN RM, STORAGE RMS: 1ST & 2ND LAYERS; ITS/DATA RM CEILING 1ST LAYER; ELEV MACH RM: WALLS: 2 LAYERS; CEILING: 1ST & 2ND LAYERS; 3RD LAYER + HAT CHANNEL; 4TH LAYER SPRINKLER RISER ROOM: ONE LAYER;
Misc
Partial Correction
01/16/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER HUNG & FIRESTOPPED; BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT; EAST FACE 1ST LAYER; 2NDLAYER CORRIDOR, 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED; UNIT FACE: BELOW CEILING 1ST & 2ND LAYERS FIRESTOPPED 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
Misc
Partial Correction
01/16/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; 2nd floor shearwalls & firewalls 2nd layer type X RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
01/16/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: LEFT WING: 4TH FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 3RD FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR 2ND FLOOR: CEILINGS & WALLS @ UNITS & CORRIDOR; SHEARWALLS #4 & #6 2ND LAYER 1ST FLOOR: CORRIDOR WALLS @ UNIT FACE 1ST LAYER; SHEARWALL #4 @ GAR 3 & GAR 4 2ND LAYER; ALL WALLS & CEILINGS OK TO TAPE, MUD & FIRESTOP AT CORRIDOR, STORAGE, GARAGES, JAN; 1st floor Mechanical HVAC 5 rooms 1st layer rock walls & ceilings CENTER SECTION: HAT CHANNEL 3RD CORRIDOR Center Building RC Channels 3rd floor corridor walls & ceiling, 3rd floor unit ceilings
Misc
Partial Correction
01/16/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER @ WELL FACE BELOW TOWER; 1ST CEILING 4th floor stairwell #1 2nd layer ceiling & walls STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS; 4TH RC, 4TH LAYER STAIRWELL 3: 1ST FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; 2ND FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 2 LAYERS 3RD FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER 4TH FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYER; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL, 4TH LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
01/16/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: FRAMING - FLOORS 4,3,2,1 SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER 2ND FLOOR: 1ST 2nd layer walls & ceiling 3RDFLOOR: 1ST 2nd layer walls & ceiling 4TH FLOOR: 1ST 2nd layer walls & ceiling ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
01/16/2020
COMPONENTS OF RATED ASSEMBLIES AT MECHANICAL CHASES: AT UNIT 409: FRAMING + 1ST LAYER;
SECOND FLOOR
Corrective Action Required
01/16/2020
CENTER SECTION: 1ST LAYER UNITS 210-217; CORRIDOR: 1ST LAYER;
Misc
Informational
01/17/2020
Right wing 3rd floor stairway wall & ceiling 1 layer type X 3rd floor units & corridor walls & ceiling 1 layer type X Center RC channel 1st floor A5 RC channel 2nd floor units corridor walls & ceiling
Rated Assembly Inspection Partial 1/21/2020 1/21/2020 at 8:30 AM 01/21/2020
Misc
Resolved
01/21/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB @ DATA/ELECT/JAN/ELEV MACH RM/STOR RMS AT: 1ST FLOOR RIGHT WING: EAST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; WEST DATA: 1 LAYER; 2 LAYERS @ CORR WALL; 1ST FLOOR LEFT WING: DATA/ELECT: 1 LAYER; 2 LAYERS @ CORR WALL; MECH RM: 2 LAYERS @ CORR WALL JAN RM, STORAGE RMS: 1ST & 2ND LAYERS; ITS/DATA RM CEILING 1ST LAYER; ELEV MACH RM: WALLS: 2 LAYERS; CEILING: 1ST & 2ND LAYERS; 3RD LAYER + HAT CHANNEL; 4TH LAYER SPRINKLER RISER ROOM: ONE LAYER;
Misc
Partial Correction
01/17/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER HUNG & FIRESTOPPED; BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT; EAST FACE 1ST LAYER; 2NDLAYER CORRIDOR, 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED; UNIT FACE: BELOW CEILING 1ST & 2ND LAYERS FIRESTOPPED 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST LAYER BELOW CEILING; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
Misc
Partial Correction
01/17/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; 2nd floor shearwalls & firewalls 2nd layer type X RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
01/17/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: CENTER SECTION: HAT CHANNEL 3RD CORRIDOR RC Channels 3rd floor corridor walls & ceiling, 3rd floor unit ceilings 2ND FLOOR: CEILINGS & WALLS UNITS & CORRIDOR
Misc
Partial Correction
01/17/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER @ WELL FACE BELOW TOWER; CEILINGS HIGH & LOW 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS; 4TH RC, 4TH LAYER STAIRWELL 3: 1ST FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; CORR / UNIT 110 FACE 1ST LAYER; 2ND FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 2 LAYERS; LOW CEILING 1ST LAYER; 3RD FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER 4TH FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYER; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL, 4TH LAYER; STAIRWELL 4: 1ST FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE @ UNITS ONLY 1ST LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE & ACROSS FLOOR 1ST LAYER ; TWO LAYERS @ BACKSIDE 3RD FLOOR: 1ST LAYER; 2ND LAYER; 2ND LAYER AT BACKSIDE @ UNITS & CORRIDOR 4TH FLOOR: 1ST & 2ND LAYERS INSIDE FACE ONLY; 1ST LAYER AT BACKSIDE; 2ND LAYER AT BACKSIDE TOP OF TOWER: 1ST LAYER; 2ND LAYER AT WALLS & AT UPPER & LOWER CEILINGS; 3RD LAYER + HAT CHANNEL; 4TH LAYER; BACKSIDE @ UNITS & CORRIDOR 2ND LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
01/17/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: FRAMING - FLOORS 4,3,2,1 SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 2ND FLOOR: 1ST 2nd layer walls 3RDFLOOR: 1ST 2nd layer walls 4TH FLOOR: 1ST 2nd layer walls & ceiling ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
01/17/2020
COMPONENTS OF RATED ASSEMBLIES AT MECHANICAL CHASES: AT UNIT 409: FRAMING + 1ST LAYER;
SECOND FLOOR
Partial Correction
01/21/2020
CENTER SECTION: 1ST LAYER UNITS 210-217; CORRIDOR: 1ST LAYER; SHEAR WALLS AT: UNIT 110: SW #3 1ST LAYER; SW #4 1ST LAYER;
Misc
Partial Correction
01/21/2020
Right wing 3rd floor stairway wall & ceiling 1 layer type X 3rd floor units & corridor walls & ceiling 1 layer type X Center RC channel 1st floor A5 RC channel 2nd floor units corridor walls & ceiling
All Rough Inspection - Commercial Partial 1/21/2020 at 2:30 PM 01/21/2020
Misc
Partial Correction
01/10/2020
OK TO FOAM AND INSULATE AT: ABOVE CEILING AT: 4TH FLOOR: LEFT WING; WALL FURRED-OUT TO ENCLOSE ELECTRICAL CABLES AND INSULATION AT GOLF ROOM
Misc
Partial Correction
01/10/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE INCLUDING RC CHANNEL CENTER SECTION: 4TH FLOOR INCLUDING RC CHANNEL AT CEILINGS ONLY; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR UNIT 110; RIGHT WING:
Misc
Partial Correction
01/10/2020
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; LEFT WING: 4TH FLOOR; CENTER SECTION: 4TH FLOOR; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
Rated Assembly Inspection Partial 1/22/2020 1/22/2020 at 10:30 AM 01/22/2020
Misc
Partial Correction
01/21/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER HUNG & FIRESTOPPED; BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT; EAST FACE 1ST LAYER; 2NDLAYER CORRIDOR, 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED; UNIT FACE: BELOW CEILING 1ST & 2ND LAYERS FIRESTOPPED 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST LAYER BELOW CEILING; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
Misc
Partial Correction
01/21/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; 2nd floor shearwalls & firewalls 2nd layer type X RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
01/21/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: CENTER SECTION: HAT CHANNEL 3RD CORRIDOR RC Channels 3rd floor corridor walls & ceiling, 3rd floor unit ceilings 2ND FLOOR: CEILINGS & WALLS UNITS & CORRIDOR
Misc
Partial Correction
01/21/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER @ WELL FACE BELOW TOWER; CEILINGS HIGH & LOW 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS; 4TH RC, 4TH LAYER STAIRWELL 3: 1ST FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; CORR / UNIT 110 FACE 1ST LAYER + 2ND LAYER; 2ND FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 2 LAYERS; LOW CEILING 1ST LAYER; 3RD FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER 4TH FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYER; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL, 4TH LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
01/21/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: FRAMING - FLOORS 4,3,2,1 SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER 2ND FLOOR: 1ST 2nd layer walls 3RDFLOOR: 1ST 2nd layer walls 4TH FLOOR: 1ST 2nd layer walls ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
01/21/2020
COMPONENTS OF RATED ASSEMBLIES AT MECHANICAL CHASES: AT UNIT 409: FRAMING + 1ST LAYER;
SECOND FLOOR
Partial Correction
01/21/2020
CENTER SECTION: 1ST LAYER UNITS 210-217; CORRIDOR: 1ST LAYER; SHEAR WALLS AT: UNIT 110: SW #3 1ST LAYER + 2ND LAYER; SW #4 1ST LAYER + 2ND LAYER;
Misc
Partial Correction
01/21/2020
Right wing 3rd floor stairway wall & ceiling 1 layer type X 3rd floor units & corridor walls & ceiling 1 layer type X Center RC channel 1st floor A5 RC channel 2nd floor units corridor walls & ceiling
Rated Assembly Inspection Partial 1/23/2020 1/23/2020 at 10:35 AM 01/23/2020
Misc
Partial Correction
01/22/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER HUNG & FIRESTOPPED; BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT; EAST FACE 1ST LAYER; 2NDLAYER CORRIDOR, 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED; UNIT FACE: BELOW CEILING 1ST & 2ND LAYERS FIRESTOPPED 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST LAYER BELOW CEILING; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
Misc
Partial Correction
01/22/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; 2nd floor shearwalls & firewalls 2nd layer type X RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
01/22/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: CENTER SECTION: HAT CHANNEL 3RD CORRIDOR RC Channels 3rd floor corridor walls & ceiling, 3rd floor unit ceilings 2ND FLOOR: CEILINGS & WALLS UNITS & CORRIDOR
Misc
Partial Correction
01/22/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER @ WELL FACE BELOW TOWER; CEILINGS HIGH & LOW 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS; 4TH RC, 4TH LAYER STAIRWELL 3: 1ST FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; CORR / UNIT 110 FACE 1ST LAYER + 2ND LAYER; LOW CEILING ONE LAYER; 2ND FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 2 LAYERS; LOW CEILING 1ST LAYER; 3RD FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER 4TH FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYER; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL, 4TH LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
01/22/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: FRAMING - FLOORS 4,3,2,1 SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER 2ND FLOOR: 1ST 2nd layer walls 3RDFLOOR: 1ST 2nd layer walls 4TH FLOOR: 1ST 2nd layer walls ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
01/22/2020
COMPONENTS OF RATED ASSEMBLIES AT MECHANICAL CHASES: AT UNIT 409: FRAMING + 1ST LAYER;
SECOND FLOOR
Partial Correction
01/22/2020
CENTER SECTION: 1ST LAYER UNITS 210-217; CORRIDOR: 1ST LAYER; SHEAR WALLS AT: UNIT 110: SW #3 1ST LAYER + 2ND LAYER; SW #4 1ST LAYER + 2ND LAYER;
Misc
Partial Correction
01/22/2020
Right wing 3rd floor stairway wall & ceiling 1 layer type X 3rd floor units & corridor walls & ceiling 1 layer type X Center RC channel 1st floor A5 RC channel 2nd floor units corridor walls & ceiling
All Rough Inspection - Commercial Partial 1/23/2020 at 11:10 AM 01/23/2020
Misc
Partial Correction
01/21/2020
OK TO FOAM AND INSULATE AT: ABOVE CEILING AT: 4TH FLOOR: LEFT WING; WALL FURRED-OUT TO ENCLOSE ELECTRICAL CABLES AND INSULATION AT GOLF ROOM
Misc
Partial Correction
01/21/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE INCLUDING RC CHANNEL CENTER SECTION: 4TH FLOOR INCLUDING RC CHANNEL AT CEILINGS ONLY; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR UNIT 110; RIGHT WING:
Misc
Partial Correction
01/21/2020
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; LEFT WING: 4TH FLOOR; CENTER SECTION: 4TH FLOOR; 2ND FLOOR UNITS 211, MOTHER-IN-LAW, 217; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
Electrical Service Inspection Partial 1/30/2020 at 1:00 PM 01/30/2020
Misc
Partial Correction
01/03/2020
RELEASE METERS AT ELECTRICAL SERVICE METER BANK AT: METER BANK "A" AT NORTH END OF LEFT WING; METER BANK "B" AT CENTER SECTION;
All Rough Inspection - Commercial Partial 1/30/2020 at 1:20 PM 01/30/2020
Misc
Partial Correction
01/23/2020
OK TO FOAM AND INSULATE AT: ABOVE CEILING AT: 4TH FLOOR: LEFT WING; WALL FURRED-OUT TO ENCLOSE ELECTRICAL CABLES AND INSULATION AT GOLF ROOM
Misc
Partial Correction
01/23/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE INCLUDING RC CHANNEL CENTER SECTION: 4TH FLOOR INCLUDING RC CHANNEL AT CEILINGS ONLY; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR UNIT 110; 1ST FLOOR MECH ROOM W/ DOORS #C16 & C17; RIGHT WING:
Misc
Partial Correction
01/23/2020
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; LEFT WING: 4TH FLOOR; CENTER SECTION: 4TH FLOOR; 2ND FLOOR UNITS 211, MOTHER-IN-LAW, 217; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
All Rough Inspection - Commercial Partial 1/31/2020 1/31/2020 at 8:45 AM 01/31/2020
Misc
Partial Correction
01/30/2020
OK TO FOAM AND INSULATE AT: ABOVE CEILING AT: 4TH FLOOR: LEFT WING; WALL FURRED-OUT TO ENCLOSE ELECTRICAL CABLES AND INSULATION AT GOLF ROOM
Misc
Partial Correction
01/30/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE INCLUDING RC CHANNEL CENTER SECTION: 4TH FLOOR INCLUDING RC CHANNEL AT CEILINGS ONLY; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR UNIT 110; 1ST FLOOR MECH ROOM W/ DOORS #C16 & C17; RIGHT WING: 4TH FLOOR;
Misc
Partial Correction
01/30/2020
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; LEFT WING: 4TH FLOOR; CENTER SECTION: 4TH FLOOR; 2ND FLOOR UNITS 211, MOTHER-IN-LAW, 217; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
Rated Assembly Inspection Partial 1/31/2020 at 9:45 AM 01/31/2020
Misc
Partial Correction
01/23/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER HUNG & FIRESTOPPED; BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT; EAST FACE 1ST LAYER; 2NDLAYER CORRIDOR, 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED; UNIT FACE: BELOW CEILING 1ST & 2ND LAYERS FIRESTOPPED 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST LAYER BELOW CEILING; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
Misc
Partial Correction
01/23/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; 2nd floor shearwalls & firewalls 2nd layer type X RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
01/23/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: CENTER SECTION: HAT CHANNEL 3RD CORRIDOR RC Channels 3rd floor corridor walls & ceiling, 3rd floor unit ceilings 2ND FLOOR: CEILINGS & WALLS UNITS & CORRIDOR
Misc
Partial Correction
01/23/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER @ WELL FACE BELOW TOWER; CEILINGS HIGH & LOW 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS; 4TH RC, 4TH LAYER STAIRWELL 3: 1ST FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; CORR / UNIT 110 FACE 1ST LAYER + 2ND LAYER; LOW CEILING ONE LAYER; 2ND FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 2 LAYERS; LOW CEILING 1ST LAYER; 3RD FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER 4TH FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYER; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL, 4TH LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
01/23/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: FRAMING - FLOORS 4,3,2,1 SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER 2ND FLOOR: 1ST 2nd layer walls 3RDFLOOR: 1ST 2nd layer walls 4TH FLOOR: 1ST 2nd layer walls ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
01/23/2020
COMPONENTS OF RATED ASSEMBLIES AT MECHANICAL CHASES: AT UNIT 409: FRAMING + 1ST LAYER;
SECOND FLOOR
Partial Correction
01/23/2020
CENTER SECTION: 1ST LAYER UNITS 210-217; CORRIDOR: 1ST LAYER; SHEAR WALLS AT: UNIT 110: SW #3 1ST LAYER + 2ND LAYER; SW #4 1ST LAYER + 2ND LAYER;
Misc
Partial Correction
01/23/2020
Right wing 3rd floor stairway wall & ceiling 1 layer type X 3rd floor units & corridor walls & ceiling 1 layer type X Center RC channel 1st floor A5 RC channel 2nd floor units corridor walls & ceiling 1ST FLOOR MECH ROOM CEILING 1ST LAYER;
Rated Assembly Inspection Partial 2/3/2020 2/3/2020 at 11:00 AM 02/03/2020
Misc
Partial Correction
01/31/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER HUNG & FIRESTOPPED; BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT; EAST FACE 1ST LAYER; 2NDLAYER CORRIDOR, 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED; UNIT FACE: BELOW CEILING 1ST LAYER; 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST LAYER BELOW CEILING; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
STAIR TOWER 1
Partial Correction
01/31/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; 2nd floor shearwalls & firewalls 2nd layer type X RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
ELEVATOR 4
Partial Correction
01/31/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: CENTER SECTION: HAT CHANNEL 3RD CORRIDOR RC Channels 3rd floor corridor walls & ceiling, 3rd floor unit ceilings 2ND FLOOR: CEILINGS & WALLS UNITS & CORRIDOR
Misc
Partial Correction
01/31/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER @ WELL FACE BELOW TOWER; BACKSIDE 1ST LAYER; CEILINGS HIGH & LOW 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS; 4TH RC, 4TH LAYER STAIRWELL 3: 1ST FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; CORR / UNIT 110 FACE 1ST LAYER + 2ND LAYER; LOW CEILING ONE LAYER; 2ND FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 2 LAYERS; LOW CEILING 1ST LAYER; 3RD FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER 4TH FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYER; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL, 4TH LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
01/31/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: FRAMING - FLOORS 4,3,2,1 SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER 2ND FLOOR: 1ST 2nd layer walls 3RDFLOOR: 1ST 2nd layer walls 4TH FLOOR: 1ST 2nd layer walls WELL FACE; BACKSIDE 1ST LAYER; ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
01/31/2020
COMPONENTS OF RATED ASSEMBLIES AT MECHANICAL CHASES: AT UNIT 409: FRAMING + 1ST LAYER;
SECOND FLOOR
Partial Correction
01/31/2020
CENTER SECTION: 1ST LAYER UNITS 210-217; CORRIDOR: 1ST LAYER; SHEAR WALLS AT: UNIT 110: SW #3 1ST LAYER + 2ND LAYER; SW #4 1ST LAYER + 2ND LAYER;
Misc
Partial Correction
01/31/2020
Right wing 3rd floor stairway wall & ceiling 1 layer type X 3rd floor units & corridor walls & ceiling 1 layer type X Center RC channel 1st floor A5 RC channel 2nd floor units corridor walls & ceiling 1ST FLOOR MECH ROOM CEILING 1ST LAYER;
All Rough Inspection - Commercial Partial 2/3/2020 2/3/2020 at 11:25 AM 02/03/2020
Misc
Partial Correction
01/31/2020
OK TO FOAM AND INSULATE AT: ABOVE CEILING AT: 4TH FLOOR: LEFT WING; WALL FURRED-OUT TO ENCLOSE ELECTRICAL CABLES AND INSULATION AT GOLF ROOM
Misc
Partial Correction
01/31/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE INCLUDING RC CHANNEL CENTER SECTION: 4TH FLOOR INCLUDING RC CHANNEL AT CEILINGS ONLY; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR UNIT 110; 1ST FLOOR CENTER SECTION MECH ROOM; RIGHT WING: 4TH FLOOR; 3RD FLOOR;
Misc
Partial Correction
01/31/2020
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; LEFT WING: 4TH FLOOR; CENTER SECTION: 4TH FLOOR; 2ND FLOOR UNITS 211, MOTHER-IN-LAW, 217; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
All Rough Inspection - Commercial Partial 2/4/2020 2/4/2020 at 1:10 PM 02/04/2020
Misc
Partial Correction
02/03/2020
OK TO FOAM AND INSULATE AT: ABOVE CEILING AT: 4TH FLOOR: LEFT WING; WALL FURRED-OUT TO ENCLOSE ELECTRICAL CABLES AND INSULATION AT GOLF ROOM
Misc
Partial Correction
02/03/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE INCLUDING RC CHANNEL CENTER SECTION: 4TH FLOOR INCLUDING RC CHANNEL AT CEILINGS ONLY; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR UNIT 110; 1ST FLOOR CENTER SECTION MECH ROOM; 1ST FLOOR CENTER SECTION CLUBHOUSE RIGHT WING: 4TH FLOOR INCLUDING RC CHANNEL; 3RD FLOOR;
Misc
Partial Correction
02/03/2020
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; LEFT WING: 4TH FLOOR; CENTER SECTION: 4TH FLOOR; 2ND FLOOR UNITS 211, MOTHER-IN-LAW, 217; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
Rated Assembly Inspection Partial 2/4/2020 2/4/2020 at 1:50 PM 02/04/2020
Misc
Partial Correction
02/03/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER HUNG & FIRESTOPPED; BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT; EAST FACE 1ST LAYER; 2NDLAYER CORRIDOR, 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED; BACKSIDE: BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST LAYER BELOW CEILING; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
Misc
Partial Correction
02/03/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; 2nd floor shearwalls & firewalls 2nd layer type X RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
02/03/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: CENTER SECTION: HAT CHANNEL 3RD CORRIDOR RC Channels 3rd floor corridor walls & ceiling, 3rd floor unit ceilings 2ND FLOOR: CEILINGS & WALLS UNITS & CORRIDOR
Misc
Partial Correction
02/03/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE 1ST LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER @ WELL FACE BELOW TOWER; BACKSIDE 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS; 4TH RC, 4TH LAYER STAIRWELL 3: 1ST FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; CORR / UNIT 110 FACE 1ST LAYER + 2ND LAYER; LOW CEILING ONE LAYER; 2ND FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 2 LAYERS; LOW CEILING 1ST LAYER; 3RD FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER 4TH FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYER; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL, 4TH LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
02/03/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: FRAMING - FLOORS 4,3,2,1 SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER 2ND FLOOR: 1ST 2nd layer walls 3RDFLOOR: 1ST 2nd layer walls; BACKSIDE & ADJACENT SHEARWALL 1ST LAYER; 4TH FLOOR: 1ST 2nd layer walls WELL FACE; BACKSIDE 1ST & 2ND LAYERS; ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
02/03/2020
COMPONENTS OF RATED ASSEMBLIES AT MECHANICAL CHASES: AT UNIT 409: FRAMING + 1ST LAYER;
SECOND FLOOR
Partial Correction
02/03/2020
CENTER SECTION: 1ST LAYER UNITS 210-217; CORRIDOR: 1ST LAYER; SHEAR WALLS AT: UNIT 110: SW #3 1ST LAYER + 2ND LAYER; SW #4 1ST LAYER + 2ND LAYER;
Misc
Partial Correction
02/03/2020
Right wing 3rd floor stairway wall & ceiling 1 layer type X 3rd floor units & corridor walls & ceiling 1 layer type X Center RC channel 1st floor A5 RC channel 2nd floor units corridor walls & ceiling 1ST FLOOR MECH ROOM: CEILING 1ST LAYER + 2ND LAYER; WALLS ONE LAYER
Rated Assembly Inspection Partial 2/5/2020 2/5/2020 at 9:35 AM 02/05/2020
Misc
Partial Correction
02/04/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER HUNG & FIRESTOPPED; BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT; EAST FACE 1ST LAYER; 2NDLAYER CORRIDOR, 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED; BACKSIDE: BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; BELOW CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST LAYER BELOW CEILING; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
Misc
Partial Correction
02/04/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; 2nd floor shearwalls & firewalls 2nd layer type X RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Partial Correction
02/04/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: CENTER SECTION: HAT CHANNEL 3RD CORRIDOR RC Channels 3rd floor corridor walls & ceiling, 3rd floor unit ceilings 2ND FLOOR: CEILINGS & WALLS UNITS & CORRIDOR
Misc
Partial Correction
02/04/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE 1ST & 2ND LAYERS; 4TH FLOOR: 1ST LAYER; 2ND LAYER @ WELL FACE BELOW TOWER; BACKSIDE 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS; 4TH RC, 4TH LAYER STAIRWELL 3: 1ST FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; CORR / UNIT 110 FACE 1ST LAYER + 2ND LAYER; LOW CEILING ONE LAYER; 2ND FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 2 LAYERS; LOW CEILING 1ST LAYER; 3RD FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER 4TH FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYER; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL, 4TH LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
02/04/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: FRAMING - FLOORS 4,3,2,1 SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER 2ND FLOOR: 1ST 2nd layer walls 3RDFLOOR: 1ST 2nd layer walls; BACKSIDE & ADJACENT SHEARWALL 1ST & 2ND LAYERS; 4TH FLOOR: 1ST 2nd layer walls WELL FACE; BACKSIDE 1ST & 2ND LAYERS; ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
02/04/2020
COMPONENTS OF RATED ASSEMBLIES AT MECHANICAL CHASES: AT UNIT 409: FRAMING + 1ST LAYER;
SECOND FLOOR
Partial Correction
02/04/2020
CENTER SECTION: 1ST LAYER UNITS 210-217; CORRIDOR: 1ST LAYER; SHEAR WALLS AT: UNIT 110: SW #3 1ST LAYER + 2ND LAYER; SW #4 1ST LAYER + 2ND LAYER;
Misc
Partial Correction
02/04/2020
Right wing 3rd floor stairway wall & ceiling 1 layer type X 3rd floor units & corridor walls & ceiling 1 layer type X Center RC channel 1st floor A5 RC channel 2nd floor units corridor walls & ceiling 1ST FLOOR MECH ROOM: CEILING 1ST LAYER + 2ND LAYER; WALLS ONE LAYER
All Rough Inspection - Commercial Partial 2/5/2020 2/5/2020 at 10:05 AM 02/05/2020
Misc
Partial Correction
02/04/2020
OK TO FOAM AND INSULATE AT: ABOVE CEILING AT: 4TH FLOOR: LEFT WING; WALL FURRED-OUT TO ENCLOSE ELECTRICAL CABLES AND INSULATION AT GOLF ROOM
Misc
Partial Correction
02/04/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE INCLUDING RC CHANNEL CENTER SECTION: 4TH FLOOR INCLUDING RC CHANNEL AT CEILINGS ONLY; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR UNIT 110; 1ST FLOOR CENTER SECTION MECH ROOM; 1ST FLOOR CENTER SECTION CLUBHOUSE RIGHT WING: 4TH FLOOR INCLUDING RC CHANNEL; 3RD FLOOR; 2ND FLOOR;
Misc
Partial Correction
02/04/2020
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; LEFT WING: 4TH FLOOR; CENTER SECTION: 4TH FLOOR; 2ND FLOOR UNITS 211, MOTHER-IN-LAW, 217; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
Rated Assembly Inspection Partial 2/6/2020 2/6/2020 at 9:15 AM 02/06/2020
Misc
Partial Correction
02/05/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER HUNG & FIRESTOPPED; BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT; EAST FACE 1ST LAYER; 2NDLAYER CORRIDOR, 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED; BACKSIDE: BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; BELOW CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST LAYER BELOW CEILING; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
Misc
Resolved
02/06/2020
OK TO COVER WHEN READY GWB BEHIND TUBS & SHOWERS AT: CENTER SECTION: ONE LAYER AT 4TH, 3RD, 2ND FLRS; 1ST FLR RM 110; 2ND LAYER @ 2ND FLR & 1ST FLR RM 110; 2nd floor shearwalls & firewalls 2nd layer type X RIGHT WING: TWO LAYERS WHERE REQUIRED @ 4TH, 3RD, 2ND, 1ST FLRS 2ND LAYER AT 417, 409, 211, 221
Misc
Resolved
02/06/2020
5/8" TYPE X GWB OK TO TAPE, MUD, AND FIRESTOP AT: CENTER SECTION: HAT CHANNEL 3RD CORRIDOR RC Channels 3rd floor corridor walls & ceiling, 3rd floor unit ceilings 2ND FLOOR: CEILINGS & WALLS UNITS & CORRIDOR
Misc
Partial Correction
02/05/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE 1ST & 2ND LAYERS; 4TH FLOOR: 1ST LAYER; 2ND LAYER @ WELL FACE BELOW TOWER; BACKSIDE 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS; 4TH RC, 4TH LAYER STAIRWELL 3: 1ST FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; CORR / UNIT 110 FACE 1ST LAYER + 2ND LAYER; LOW CEILING ONE LAYER; 2ND FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 2 LAYERS; LOW CEILING 1ST LAYER; 3RD FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER 4TH FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYER; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL, 4TH LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
02/05/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: FRAMING - FLOORS 4,3,2,1 SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER 2ND FLOOR: 1ST 2nd layer walls 3RDFLOOR: 1ST 2nd layer walls; BACKSIDE & ADJACENT SHEARWALL 1ST & 2ND LAYERS; 4TH FLOOR: 1ST 2nd layer walls WELL FACE; BACKSIDE 1ST & 2ND LAYERS; ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Resolved
02/06/2020
COMPONENTS OF RATED ASSEMBLIES AT MECHANICAL CHASES: AT UNIT 409: FRAMING + 1ST LAYER;
SECOND FLOOR
Resolved
02/06/2020
CENTER SECTION: 1ST LAYER UNITS 210-217; CORRIDOR: 1ST LAYER; SHEAR WALLS AT: UNIT 110: SW #3 1ST LAYER + 2ND LAYER; SW #4 1ST LAYER + 2ND LAYER;
Misc
Resolved
02/06/2020
Right wing 3rd floor stairway wall & ceiling 1 layer type X 3rd floor units & corridor walls & ceiling 1 layer type X Center RC channel 1st floor A5 RC channel 2nd floor units corridor walls & ceiling 1ST FLOOR MECH ROOM: CEILING 1ST LAYER + 2ND LAYER; WALLS ONE LAYER
Misc
Partial Correction
02/06/2020
FIREWALLS AND SHEARWALLS AT CENTER SECTION 1ST FLOOR. OK TO COVER WHEN READY: 1ST LAYER;
All Rough Inspection - Commercial Partial 2/7/2020 2/7/2020 at 11:15 AM 02/07/2020
Misc
Resolved
02/07/2020
OK TO FOAM AND INSULATE AT: ABOVE CEILING AT: 4TH FLOOR: LEFT WING; WALL FURRED-OUT TO ENCLOSE ELECTRICAL CABLES AND INSULATION AT GOLF ROOM
Misc
Partial Correction
02/05/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE INCLUDING RC CHANNEL CENTER SECTION: 4TH FLOOR INCLUDING RC CHANNEL AT CEILINGS ONLY; 3RD FLOOR; 2ND FLOOR, INCLUDING ELECTRICAL CLOSET; 1ST FLOOR UNIT 110; 1ST FLOOR CENTER SECTION MECH ROOM; 1ST FLOOR CENTER SECTION CLUBHOUSE RIGHT WING: 4TH FLOOR INCLUDING RC CHANNEL; 3RD FLOOR COMPLETE INCLUDING RC CHANNEL; 2ND FLOOR COMPLETE; SHEAR WALLS #4 & #6 FIRST LAYER; 1ST FLOOR UNITS EXCEPT EQUIPMENT GROUNDS NOT CONNECTED; CORRIDOR GARAGE SIDE OK TO ONE-SIDE; CORRIDOR UNIT WALL OK TO INSULATE; SHEAR WALL AT EAST END OK FOR OSB;
Misc
Partial Correction
02/05/2020
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; LEFT WING: 4TH FLOOR; CENTER SECTION: 4TH FLOOR; 2ND FLOOR UNITS 211, MOTHER-IN-LAW, 217; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
Rated Assembly Inspection Partial 2/7/2020 2/7/2020 at 12:15 PM 02/07/2020
Misc
Partial Correction
02/06/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL: LEFT WING: 4TH FLOOR: WEST FACE: 1ST AND 2ND LAYERS ABOVE CEILING; BELOW CEILING 1ST AND 2ND LAYERS; FULL HEIGHT FIRESTOPPED EAST FACE: 1ST LAYER ABOVE CEILING; 2ND LAYER HUNG & FIRESTOPPED; BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: WEST FACE: BELOW CEILING: 1ST LAYER; 2ND LAYER FULL HEIGHT; EAST FACE 1ST LAYER; 2NDLAYER CORRIDOR, 2ND FLOOR: WEST FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER ABOVE CEILING; 1ST FLOOR: WEST FACE: UNIT SIDE OF FLOOR TWO LAYERS FULL HEIGHT + FIRESTOP; GARAGE/ CORRIDOR/GARAGE SIDE OF FLOOR 1ST & 2ND LAYERS; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT. RIGHT WING: 4TH FLOOR: BOTH FACES ABOVE CEILING 1ST LAYER; 2ND LAYER ABOVE CEILING B/F; FIRESTOPPED; BACKSIDE: BELOW CEILING 1ST & 2ND LAYERS; 3RD FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; BELOW CEILING 1ST & 2ND LAYERS; 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; BELOW CEILING EAST FACE 1ST LAYER; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; 1ST LAYER BELOW CEILING; 4' SECUROCK SHEATHING PROJECTION OUTSIDE SOUTH BUILDING WALL -- TWO LAYERS FULL HEIGHT.
Misc
Partial Correction
02/06/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 1ST FLOOR: SHAFT 1ST LAYER, 2ND LAYER; 2ND FLOOR: SHAFT 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER, 3RD FLOOR: 1ST LAYER; 2ND LAYER; BACKSIDE 1ST & 2ND LAYERS; 4TH FLOOR: 1ST LAYER; 2ND LAYER @ WELL FACE BELOW TOWER; BACKSIDE 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS; 4TH RC, 4TH LAYER STAIRWELL 3: 1ST FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; CORR / UNIT 110 FACE 1ST LAYER + 2ND LAYER; LOW CEILING ONE LAYER; 2ND FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 2 LAYERS; LOW CEILING 1ST LAYER; 3RD FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER 4TH FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYER; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL, 4TH LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
02/06/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: FRAMING - FLOORS 4,3,2,1 SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER 2ND FLOOR: SHAFT 1ST, 2nd layer walls; BACKSIDE 1ST LAYER, 3RDFLOOR: 1ST 2nd layer walls; BACKSIDE & ADJACENT SHEARWALL 1ST & 2ND LAYERS; 4TH FLOOR: 1ST 2nd layer walls WELL FACE; BACKSIDE 1ST & 2ND LAYERS; ELEVATOR #2: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER; 2ND LAYER CEILING: 1ST LAYER; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER EXTERIOR FACE: 4TH FLOOR 1ST LAYER + 2ND LAYER FULL HEIGHT 3RD FLOOR 1ST LAYER; 2ND LAYER FULL HEIGHT 2ND FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT 1ST FLOOR: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SPACES BETWEEN JOISTS AT BACKSIDE : 1ST FLOOR: 1ST & 2ND LAYERS
Misc
Partial Correction
02/06/2020
FIREWALLS AND SHEARWALLS AT CENTER SECTION 1ST FLOOR. OK TO COVER WHEN READY: 1ST LAYER;
Rough Electrical Inspection - Commercial Passed 2/10/2020 2/10/2020 at 9:15 AM 02/10/2020
All Rough Inspection - Commercial Partial 2/10/2020 at 9:35 AM 02/10/2020
Misc
Partial Correction
02/07/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE INCLUDING RC CHANNEL CENTER SECTION: 4TH FLOOR INCLUDING RC CHANNEL 3RD FLOOR INCLUDING RC CHANNEL; 2ND FLOOR, INCLUDING ELECTRICAL CLOSET; INCLUDING RC CHANNEL 1ST FLOOR UNIT 110; 1ST FLOOR CENTER SECTION MECH ROOM; 1ST FLOOR CENTER SECTION CLUBHOUSE RIGHT WING: 4TH FLOOR INCLUDING RC CHANNEL; 3RD FLOOR COMPLETE INCLUDING RC CHANNEL; 2ND FLOOR COMPLETE; SHEAR WALLS #4 & #6 FIRST LAYER; 1ST FLOOR UNITS EXCEPT EQUIPMENT GROUNDS NOT CONNECTED; CORRIDOR GARAGE SIDE OK TO ONE-SIDE; CORRIDOR UNIT WALL OK TO INSULATE; SHEAR WALL AT EAST END OK FOR OSB;
Misc
Partial Correction
02/07/2020
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; LEFT WING: 4TH FLOOR; CENTER SECTION: 4TH FLOOR; 2ND FLOOR UNITS 211, MOTHER-IN-LAW, 217; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
Rated Assembly Inspection Partial 2/10/2020 2/10/2020 at 9:55 AM 02/10/2020
Misc
Partial Correction
02/07/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL & SHEARWALLS: RIGHT WING: 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; BELOW CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; BELOW CEILING 1ST & 2ND LAYERS;
Misc
Partial Correction
02/07/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 1ST FLOOR: SHAFT 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER 2ND FLOOR: SHAFT 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYERS STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS; 4TH RC, 4TH LAYER STAIRWELL 3: 1ST FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; CORR / UNIT 110 FACE 1ST LAYER + 2ND LAYER; LOW CEILING ONE LAYER; 2ND FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 2 LAYERS; LOW CEILING 1ST LAYER; 3RD FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST LAYER 4TH FLOOR: WELL FACE 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYER; TOP OF TOWER: 1ST & 2ND LAYERS ABOVE CLG @ W WALL; CEILING AND WALLS BELOW CEILING 1ST & 2ND LAYERS; HIGH & LOW CEILINGS 3 LAYERS + HAT CHANNEL, 4TH LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
02/07/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: WALL INTERIOR FACE: FULL HEIGHT 1ST LAYER CEILING: 1ST LAYER ; 2ND LAYER; 3RD LAYER + HAT CHANNEL; 4TH LAYER 2ND FLOOR: SHAFT 1ST, 2nd layer walls; BACKSIDE 1ST & 2ND LAYERS
Misc
Partial Correction
02/07/2020
FIREWALLS AND SHEARWALLS AT CENTER SECTION 1ST FLOOR. OK TO COVER WHEN READY: 1ST & 2ND LAYERS
Misc
Partial Correction
02/10/2020
OK TO COVER WHEN READY CEILING & COMMON/CORRIDOR WALL RATED ASSEMBLIES: RIGHT WING: 4TH FLOOR;
Rated Assembly Inspection Partial 2/11/2020 2/11/2020 at 7:55 AM 02/11/2020
Misc
Partial Correction
02/10/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL & SHEARWALLS: RIGHT WING: 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; BELOW CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; BELOW CEILING 1ST & 2ND LAYERS;
Misc
Partial Correction
02/10/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 2ND FLOOR: SHAFT 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYERS 1ST FLOOR: SHAFT 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYERS STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS; 4TH RC, 4TH LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Partial Correction
02/10/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: 2ND FLOOR: SHAFT 1ST, 2nd layer walls; BACKSIDE 1ST & 2ND LAYERS 1ST FLOOR: BACKSIDE 1ST & 2ND LAYERS
Misc
Resolved
02/11/2020
FIREWALLS AND SHEARWALLS AT CENTER SECTION 1ST FLOOR. OK TO COVER WHEN READY: 1ST & 2ND LAYERS
Misc
Partial Correction
02/10/2020
OK TO COVER WHEN READY CEILING & COMMON /CORRIDOR WALL RATED ASSEMBLIES: RIGHT WING: 4TH FLOOR; 3RD FLOOR; 1ST FLOOR: CORRIDOR WALLS UNIT/STOR RM FACE 1ST & 2ND LAYERS;
All Rough Inspection - Commercial Partial 2/13/2020 at 1:05 PM 02/13/2020
Misc
Partial Correction
02/10/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE INCLUDING RC CHANNEL CENTER SECTION: 4TH FLOOR INCLUDING RC CHANNEL 3RD FLOOR INCLUDING RC CHANNEL; 2ND FLOOR, INCLUDING ELECTRICAL CLOSET; INCLUDING RC CHANNEL 1ST FLOOR UNIT 110; 1ST FLOOR CENTER SECTION; MECH ROOM; 1ST FLOOR CENTER SECTION CLUBHOUSE INCLUDING RC CHANNEL AT CEILINGS + CORRIDOR WALLS RIGHT WING: 4TH FLOOR INCLUDING RC CHANNEL; 3RD FLOOR COMPLETE INCLUDING RC CHANNEL; 2ND FLOOR COMPLETE; SHEAR WALLS #4 & #6 FIRST LAYER; 1ST FLOOR UNITS EXCEPT EQUIPMENT GROUNDS NOT CONNECTED; CORRIDOR GARAGE SIDE OK TO ONE-SIDE; CORRIDOR UNIT WALL OK TO INSULATE; SHEAR WALL AT EAST END OK FOR OSB;
Misc
Partial Correction
02/10/2020
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; LEFT WING: 4TH FLOOR; CENTER SECTION: 4TH FLOOR; 2ND FLOOR UNITS 211, MOTHER-IN-LAW, 217; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
Rated Assembly Inspection Partial 2/13/2020 2/13/2020 at 1:30 PM 02/13/2020
Misc
Resolved
02/13/2020
OK TO COVER WHEN READY 5/8" TYPE X GWB AT FIREWALL & SHEARWALLS: RIGHT WING: 2ND FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; BELOW CEILING 1ST & 2ND LAYERS; 1ST FLOOR: BOTH FACES ABOVE CEILING 1ST & 2ND LAYERS; BELOW CEILING 1ST & 2ND LAYERS;
Misc
Resolved
02/13/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELL WALLS/CEILINGS: STAIRWELL 1: 2ND FLOOR: SHAFT 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYERS 1ST FLOOR: SHAFT 1ST LAYER, 2ND LAYER; BACKSIDE 1ST & 2ND LAYERS STAIRWELL 2: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER @ 2 OF 3 WALLS; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER INSIDE FACE; 2ND LAYER BOTH FACES; WALLS ABOVE CEILING AT TOWER 1ST AND 2ND LAYERS; WALLS BELOW CEILING AT TOWER 1ST & 2ND LAYERS; CEILINGS HIGH & LOW 1ST & 2ND LAYERS; 4TH RC, 4TH LAYER NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK;
Misc
Resolved
02/13/2020
OK TO COVER WHEN READY FRAMING, THEN 5/8" MOLD-RESISTANT FIRECODE X GWB @ ELEVATOR SHAFTS: ELEVATOR #1: 2ND FLOOR: SHAFT 1ST, 2nd layer walls; BACKSIDE 1ST & 2ND LAYERS 1ST FLOOR: BACKSIDE 1ST & 2ND LAYERS
Misc
Partial Correction
02/11/2020
OK TO COVER WHEN READY CEILING & COMMON /CORRIDOR WALL RATED ASSEMBLIES: RIGHT WING: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR: CORRIDOR WALLS UNIT/STOR RM FACE 1ST & 2ND LAYERS; CENTER SECTION / CLUBHOUSE:
All Rough Inspection - Commercial Partial 2/14/2020 02/14/2020
Misc
Partial Correction
02/13/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE INCLUDING RC CHANNEL CENTER SECTION: 4TH FLOOR INCLUDING RC CHANNEL 3RD FLOOR INCLUDING RC CHANNEL; 2ND FLOOR, INCLUDING ELECTRICAL CLOSET; INCLUDING RC CHANNEL 1ST FLOOR UNIT 110; 1ST FLOOR CENTER SECTION; MECH ROOM; 1ST FLOOR CENTER SECTION CLUBHOUSE INCLUDING RC CHANNEL AT CEILINGS + CORRIDOR WALLS RIGHT WING: 4TH FLOOR INCLUDING RC CHANNEL; 3RD FLOOR COMPLETE INCLUDING RC CHANNEL; 2ND FLOOR COMPLETE; SHEAR WALLS #4 & #6 FIRST LAYER; 1ST FLOOR UNITS EXCEPT EQUIPMENT GROUNDS NOT CONNECTED; CORRIDOR GARAGE SIDE OK TO ONE-SIDE; CORRIDOR UNIT WALL OK TO INSULATE; SHEAR WALL AT EAST END OK FOR OSB;1ST FLOOR CORRIDOR,GARAGES.
Misc
Partial Correction
02/13/2020
OK TO COVER WHEN READY: LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: (1)228; (1)229; LEFT WING: 4TH FLOOR; CENTER SECTION: 4TH FLOOR; 2ND FLOOR UNITS 211, MOTHER-IN-LAW, 217; SPACE ABOVE BOTTOM CHORD OF JOISTS AT: BA IN MOTHER-IN-LAW UNIT @ RIGHT WING; VESTIBULES AT (1)211 & (1)217;
Rated Assembly Inspection Partial 2/17/2020 at 8:05 AM 02/17/2020
Misc
Partial Correction
02/13/2020
OK TO COVER WHEN READY CEILING & COMMON /CORRIDOR WALL RATED ASSEMBLIES: CENTER SECTION / CLUBHOUSE: HIGH CEILINGS: ONE LAYER 5/8" TYPE "C" 10' CEILINGS: ONE LAYER 5/8" TYPE "X";
All Rough Inspection - Commercial Partial 2/18/2020 2/18/2020 at 9:40 AM 02/18/2020
Misc
Partial Correction
02/14/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE INCLUDING RC CHANNEL CENTER SECTION: COMPLETE RIGHT WING: 4TH FLOOR INCLUDING RC CHANNEL; 3RD FLOOR COMPLETE INCLUDING RC CHANNEL; 2ND FLOOR COMPLETE; SHEAR WALLS #4 & #6 FIRST LAYER; 1ST FLOOR UNITS EXCEPT EQUIPMENT GROUNDS NOT CONNECTED; CORRIDOR GARAGE SIDE OK TO ONE-SIDE; CORRIDOR UNIT WALL OK TO INSULATE; SHEAR WALL AT EAST END OK FOR OSB; 1ST FLOOR CORRIDOR, GARAGES INCLUDING RC CHANNEL;
Misc
Partial Correction
02/14/2020
OK TO COVER WHEN READY LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: LEFT WING: COMPLETE CENTER SECTION: COMPLETE RIGHT WING: 4TH FLOOR;
Rated Assembly Inspection Partial 2/18/2020 2/18/2020 at 10:15 AM 02/18/2020
Misc
Partial Correction
02/17/2020
OK TO COVER WHEN READY CEILING & COMMON /CORRIDOR WALL RATED ASSEMBLIES: CENTER SECTION / CLUBHOUSE: HIGH CEILINGS: ONE LAYER 5/8" TYPE "C" 10' CEILINGS: ONE LAYER 5/8" TYPE "X"; RIGHT WING 1ST FLOOR: FIREWALL EAST FACE: 1ST LAYER; BACKSIDE OF ELEVATOR #1: 1ST LAYER; SHEARWALL #4: 1ST LAYER; ELEVATOR EQUIPMENT ROOM: CEILING & WALLS 1ST LAYER;
Rated Assembly Inspection Partial 2/19/2020 2/19/2020 at 8:05 AM 02/19/2020
Misc
Partial Correction
02/18/2020
OK TO COVER WHEN READY CEILING & COMMON /CORRIDOR WALL RATED ASSEMBLIES: CENTER SECTION / CLUBHOUSE: HIGH CEILINGS: ONE LAYER 5/8" TYPE "C" WALLS: ONE LAYER 5/8" TYPE "C" 10' CEILINGS: ONE LAYER 5/8" TYPE "X"; ONE LAYER 1/2" TYPE "C"; RIGHT WING 1ST FLOOR: FIREWALL EAST FACE: 1ST LAYER; BACKSIDE OF ELEVATOR #1: 1ST LAYER; SHEARWALL #4: 1ST LAYER; ELEVATOR EQUIPMENT ROOM: CEILING & WALLS 1ST LAYER;
Rated Assembly Inspection Partial 2/25/2020 2/25/2020 at 9:45 AM 02/25/2020
Misc
Partial Correction
02/19/2020
OK TO COVER WHEN READY RATED CEILING & WALL ASSEMBLIES: RIGHT WING 1ST FLOOR COMPLETE
All Rough Inspection - Commercial Partial 2/25/2020 2/25/2020 at 10:40 AM 02/25/2020
Misc
Partial Correction
02/18/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE INCLUDING RC CHANNEL CENTER SECTION: COMPLETE RIGHT WING: 4TH FLOOR INCLUDING RC CHANNEL; 3RD FLOOR COMPLETE INCLUDING RC CHANNEL; 2ND FLOOR COMPLETE; SHEAR WALLS #4 & #6 FIRST LAYER; 1ST FLOOR UNITS EXCEPT EQUIPMENT GROUNDS NOT CONNECTED; CORRIDOR GARAGE SIDE OK TO ONE-SIDE; CORRIDOR UNIT WALL OK TO INSULATE; SHEAR WALL AT EAST END OK FOR OSB; 1ST FLOOR CORRIDOR, GARAGES INCLUDING RC CHANNEL;
Misc
Partial Correction
02/18/2020
OK TO COVER WHEN READY LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: LEFT WING: COMPLETE CENTER SECTION: COMPLETE INCLUDING CLUBHOUSE RIGHT WING: 4TH FLOOR;
Rated Assembly Inspection Partial 2/26/2020 2/26/2020 02/26/2020
Misc
Partial Correction
02/25/2020
OK TO COVER WHEN READY RATED CEILING & WALL ASSEMBLIES: RIGHT WING 1ST FLOOR COMPLETE
ELEVATOR 1
Corrective Action Required
02/26/2020
RIGH WING ELEVATOR SHAFT MACHANICAL ROOM; 1ST FLOOR CEILING-3RD LAYER AND RC CHANNEL;
Rated Assembly Inspection Partial 2/27/2020 2/27/2020 at 2:30 PM 02/27/2020
Misc
Partial Correction
02/26/2020
OK TO COVER WHEN READY RATED CEILING & WALL ASSEMBLIES: RIGHT WING 1ST FLOOR COMPLETE
ELEVATOR 1
Partial Correction
02/27/2020
RIGH WING ELEVATOR SHAFT MECHANICAL ROOM; 1ST FLOOR CEILING-3RD LAYER AND RC CHANNEL; 4TH LAYER;
Electrical Service Inspection Passed 2/19/2020 2/19/2020 at 9:40 AM 02/27/2020
Misc
Resolved
02/27/2020
RELEASE METERS AT ELECTRICAL SERVICE METER BANK AT: METER BANK "A" AT NORTH END OF LEFT WING; METER BANK "B" AT CENTER SECTION; METER BANK "C" AT RIGHT WING
Gas Piping Inspection - Commercial Not Ready 3/16/2020 03/16/2020
Misc
Partial Correction
01/16/2020
GAS PIPING PRESSURE TEST & VISUAL INSPECTION ON: PIPING FROM COLUMN WRAP OUTSIDE FRONT ENTRANCE TO FIREPLACE ENCLOSURE; GAS PIPING FRMO EXTERIOR TO INSIDE POOL PUMP ROOM HOLDING 15 PSI; 2ND FAILED INSPECTION ON GAS LINE TO FIREPLACE EXTERIOR, NEEDS TO BE 12" UNDER GRADE
Gas Piping Inspection - Commercial Partial 4/9/2020 4/9/2020 04/09/2020
Misc
Partial Correction
03/16/2020
GAS PIPING PRESSURE TEST & VISUAL INSPECTION ON: PIPING FROM COLUMN WRAP OUTSIDE FRONT ENTRANCE TO FIREPLACE ENCLOSURE; GAS PIPING FRMO EXTERIOR TO INSIDE POOL PUMP ROOM HOLDING 15 PSI; Exterior meter to front column.
Pool Steel/Bonding - Commercial Partial 4/15/2020 04/15/2020
Misc
Corrective Action Required
04/15/2020
POOL SPA BONDING OF LADDERS AND HANDRAILS
Gas Piping Inspection - Commercial Partial 5/21/2020 5/21/2020 05/21/2020
Misc
Partial Correction
04/09/2020
GAS PIPING PRESSURE TEST & VISUAL INSPECTION ON: PIPING FROM COLUMN WRAP OUTSIDE FRONT ENTRANCE TO FIREPLACE ENCLOSURE; GAS PIPING FRMO EXTERIOR TO INSIDE POOL PUMP ROOM HOLDING 15 PSI; Exterior meter to front column. EXTERIOR-POOL LOCATION; UNDERGROUND FROM BUILDING AT PATIO TO GRILL, LEAVE OPEN ALONG POOL FOR INSPECTION. OK TO COVER PATIO AREAS.
Underground Electrical Inspection - Commercial Partial 6/2/2020 6/2/2020 06/02/2020
Miscellaneous Correction
Corrective Action Required
06/02/2020
ELECTRIC FOR FOUNTAIN AND PUMPS TO WITHIN 20’ OF POOL ELECTRICAL ROOM
Alarm Test Failed 6/8/2020 06/08/2020
Sprinkler - Flow Test Passed 6/8/2020 06/08/2020
Miscellaneous Inspection Partial 6/9/2020 06/09/2020
Miscellaneous Correction
Corrective Action Required
06/09/2020
-4TH FLOOR CENTER- INSTALL ALL PATIO GFCI 413 COMPLETE GUARDRAIL AT PATIO
Miscellaneous Correction
Corrective Action Required
06/09/2020
-3RD FLOOR CENTER- -INSTALL ALL GFCI ON PATIOS 310 GFCI IN BATHROOM WIRED WRONG 311 LOCKOUT ON BREAKER FOR WATER HEATER 312 SEAL WALL PENETRATIONS IN MECHANICAL CLOSET 313 SEAL PENETRATIONS IN MECHANICAL CLOSET 314 RAILING ON DECK LOOSE, PLYWOOD PANELS WITH GREATER THAT 4” GAP 315 LOOSE DECK RAILING 317 SEAL PENETRATIONS IN MECH CLOSET-COVER MESH TAPE
Miscellaneous Correction
Corrective Action Required
06/09/2020
-2ND FLOOR CENTER- -INSTALL ALL GFCI ON PATIOS -210 MISSING SHOWER TILE -216 BATH EXHAUST FAN, MISSING SHOWER TILE -MOTHER IN LAW- WATER HEATER DISCHARGE IN PAN DRAIN, NO OUTLET FOR DISHWASHER AND DISPOSAL, MISSING ARCH FALULT BREAKER
Miscellaneous Correction
Corrective Action Required
06/09/2020
-1ST FLOOR- CLUBHOUSE -SINKS IN FRONT FOYER INCOMPLETE -CYBER CAFE MISSING SINK, NO GFCI ABOVE SINK -SPORTS LOUNGE INCOMPLETE CABINETS, SPARK RING AT OUTLET IN CABINET -MISSING THRESHOLDS AT PATIO DOORS -SINK IN WORK ROOM INCOMPLETE -INSTALL MIRRORS IN BATHROOMS -INSTALL SIGNAGE THROUGHOUT 110- SPARK RING ABOVE MICROWAVE
Verify Final Inspection (Final) Complete 6/15/2020 06/15/2020
Alarm Test Partial 6/16/2020 06/16/2020
Alarm Test Partial 6/17/2020 06/17/2020
Occupancy Inspection - Fire Partial 6/17/2020 06/17/2020
Occupancy Inspection - Codes Commercial Failed 6/17/2020 6/17/2020 06/17/2020
Misc
Corrective Action Required
06/17/2020
THE FOLLOWING AREAS ARE APROVED-PENDING TCO BEING ISSUED -LOBBY 1ST FLOOR (EXCEPT SPA AND HOT TUB)
STAIR TOWER 1
Corrective Action Required
06/17/2020
LEFT WING WEST OF LOBBY
ELEVATOR 1
Corrective Action Required
06/17/2020
WEST OF LOBBY - REPORT SUBMITTED
STAIR TOWER 2
Corrective Action Required
06/17/2020
RIGHT OF LOBBY ,
Misc
Corrective Action Required
06/17/2020
stairwell door PULL OVER 5 LBS CHECK REQUIRED DOORS 319 missing siding on exterior gfcI 311 lockout on WATER HEATER PERMANENT GLASS FOR PATIO CENTER SECTIONS 2ND FLOOR GUEST ROOM: WATER HEATER PAN AND BLOW OFF PIPE. EMERGENCY SHUT OFF FOR HOT TUB. LANDING OUT REAR POOL SIDE DOORS, SIDEWALKS ETC. BLOCK EXIT OUT REAR OF BUILDING TO POOL AREA SO NOT TO DIRECT PEOPLE OUT TO CONSTRUCTION AREA AS AN EXIT ON HOT TUB DOOR AND HALL DOOR BATHROOM SIDE. PROVIDE HEALTH DEPT. APPROVAL ON HOT TUB.
Occupancy Inspection - Engineering Failed 6/17/2020 06/17/2020
Misc
Corrective Action Required
06/17/2020
Waiting on sidewalk to be installed. Emery Sapp said they will have it in by the friday June 19. If they do not they will have to put up money in escrow in order to get occupancy.
Miscellaneous Inspection Partial 6/18/2020 6/18/2020 06/18/2020
Miscellaneous Correction
Corrective Action Required
06/17/2020
-4TH FLOOR CENTER- -INSTALL SIGNAGE THROUGHOUT
Miscellaneous Correction
Corrective Action Required
06/17/2020
-3RD FLOOR CENTER- -INSTALL SIGNAGE THROUGHOUT -INSTALL SIDING/TRIM AT PATIO GFCI
Miscellaneous Correction
Corrective Action Required
06/17/2020
-2ND FLOOR CENTER- -INSTALL SIGNAGE THROUGHOUT -MOTHER IN LAW- WATER HEATER DISCHARGE IN PAN DRAIN, NO OUTLET FOR DISHWASHER AND DISPOSAL, MISSING ARCH FALULT BREAKER
Miscellaneous Correction
Corrective Action Required
06/17/2020
-1ST FLOOR- CLUBHOUSE -INSTALL SIGNAGE THROUGHOUT -EPO FOR SPA
Miscellaneous Correction
Corrective Action Required
06/18/2020
-4TH FLOOR LEFT WING- -INSTALL SIGNAGE THROUGHOUT -425-SOFT OUTLET GFCI AT PAIO -426-TIGHTEN MIDDLE POST ON PATIO RAILING SOUTH SIDE -427-HAMMER ARRESTORS AT KITCHEN SINK, INSTALL SHOWER HEAD, FAULTY GFCI BY FRIDGE, MISSING COVER PLATE IN OFFICE -430 TIGHTEN MIDDLE POST ON PATIO RAILING, 3 KITCHEN OUTLETS NEED GFCI PROTECTION
Occupancy Inspection - Engineering Temporary C of O 6/18/2020 06/18/2020
Misc
Informational
06/18/2020
The sidewalk has been installed , they can now have temporary occupancy.
Occupancy Inspection - Codes Commercial Temporary C of O 6/24/2020 6/24/2020 06/18/2020
Misc
Corrective Action Required
06/17/2020
THE FOLLOWING AREAS ARE APROVED-PENDING TCO BEING ISSUED -LOBBY 1ST FLOOR (EXCEPT SPA AND HOT TUB)
STAIR TOWER 1
Corrective Action Required
06/17/2020
LEFT WING WEST OF LOBBY
ELEVATOR 1
Corrective Action Required
06/17/2020
WEST OF LOBBY - REPORT SUBMITTED
STAIR TOWER 2
Corrective Action Required
06/17/2020
RIGHT OF LOBBY ,
Misc
Corrective Action Required
06/17/2020
stairwell door PULL OVER 5 LBS CHECK REQUIRED DOORS 319 missing siding on exterior gfcI 311 lockout on WATER HEATER PERMANENT GLASS FOR PATIO CENTER SECTIONS 2ND FLOOR GUEST ROOM: WATER HEATER PAN AND BLOW OFF PIPE. EMERGENCY SHUT OFF FOR HOT TUB. LANDING OUT REAR POOL SIDE DOORS, SIDEWALKS ETC. BLOCK EXIT OUT REAR OF BUILDING TO POOL AREA SO NOT TO DIRECT PEOPLE OUT TO CONSTRUCTION AREA AS AN EXIT ON HOT TUB DOOR AND HALL DOOR BATHROOM SIDE. PROVIDE HEALTH DEPT. APPROVAL ON HOT TUB.
Miscellaneous Inspection Partial 6/19/2020 6/19/2020 06/19/2020
Misc
Corrective Action Required
06/19/2020
-3RD FLOOR LEFT WING- -SIGNAGE THROUGHOUT -SEAL PENETRATIONS IN ELEVATOR EQUIPMENT ROOM -322 LOOSE OUTLET IN BATHROOM -329 FAULTY GFCI BY FRIDGE -330 BATH FAN NOT FUNCTIONING IN 2ND BATH -331 TIGHTEN MIDDLE POST ON PATIO RAILING -333 BATH FAN NOT FUNCTIONING
Miscellaneous Inspection Partial 6/23/2020 06/23/2020
Miscellaneous Correction
Corrective Action Required
06/19/2020
-4TH FLOOR CENTER- -INSTALL SIGNAGE THROUGHOUT
Miscellaneous Correction
Corrective Action Required
06/19/2020
-3RD FLOOR CENTER- -INSTALL SIGNAGE THROUGHOUT
Miscellaneous Correction
Corrective Action Required
06/19/2020
-2ND FLOOR CENTER- -INSTALL SIGNAGE THROUGHOUT -MOTHER IN LAW- WATER HEATER DISCHARGE IN PAN DRAIN, NO OUTLET FOR DISHWASHER AND DISPOSAL, MISSING ARCH FALULT BREAKER
Miscellaneous Correction
Corrective Action Required
06/19/2020
-1ST FLOOR- CLUBHOUSE -INSTALL SIGNAGE THROUGHOUT -EPO FOR SPA
Miscellaneous Correction
Corrective Action Required
06/19/2020
-4TH FLOOR LEFT WING- -INSTALL SIGNAGE THROUGHOUT -427 MISSING COVER PLATE IN OFFICE
Miscellaneous Correction
Corrective Action Required
06/23/2020
-3RD FLOOR LEFT WING- -INSTALL SIGNAGE THROUGHOUT -333- BATH FAN
Miscellaneous Correction
Corrective Action Required
06/23/2020
-2ND FLOOR LEFT WING- -INSTALL SIGNAGE THROUGHOUT -219 SPARK RING ON MICROWAVE RECEPTACLE -221 BROKEN WINDOW ON PATIO -224 RAILING GREATER THAN 4” GAP AT SIDING -225 BATH FAN -229 BATH FAN IN BATH 2 -228 SOFT GFCI NORTH PATIO
Miscellaneous Correction
Corrective Action Required
06/23/2020
-1ST FLOOR LEFT WING- -INSTALL SIGNAGE THROUGHOUT -SEAL GAPS AND PENETRATIONS IN GARAGES -INSTALL SECURITY SCREWS IN ALL EXTERIOR DOORS (2) 3” SCREWS PER HINGE -PATCH HOLE OR PROVIDE COVER PLATE ON BOX OUTSIDE OF RM 111 BY FIRE STROBE -SELF CLOSING HINGES OR CLOSURE ON CORRIDOR DOOR OUTSIDE OF 121 -PERMANENT FIRE SEAL PVC SLEEVES IN ELECTRICAL/DATA ROOM -MISSING COVER PLATE IN CORRIDOR DOORWAY TO CLUBHOUSE G2- ADJUST DOOR TO LATCH G10- UNCOVER SPRINKLER HEADS AND INSTALL ESCUTCHEONS G14- COVER/ IDENTIFY CLEANOUT 110-COVER PLATE ON CEILING IN LAUNDRY, SEAL WALL PENETRATIONS IN LAUNDRY, COVER/ IDENTIFY CLEANOUT 111-COMPLETE SHOWER, HOT/NEUTRAL REVERSED ON GFCI BY FRIDGE 115- NO GRAB BARS IN BATHROOM/SHOWER, NO ADA CLEARANCE AT SINKS, MIRROR TO BE 40” TO REFLECTIVE SURFACE, ELECTRICAL ABOVE RANGE NOT LANDED, INSTALL COMPLIANT DOOR VIEWER 117-MISSING SIDING AT GFCI ON PATIO 119- ADUST DOOR TO LATCH 121- PATCH HOLE IN BEDROOM CEILING, NEED GFCI BY OVEN AND IN ISLAND
Occupancy Inspection - Fire Partial 6/24/2020 06/24/2020
Alarm Test Partial 6/24/2020 06/24/2020
Miscellaneous Inspection Failed 6/24/2020 06/24/2020
Misc
Resolved
06/24/2020
-------------------------------------- -4TH FLOOR CENTER- -INSTALL SIGNAGE THROUGHOUT
Miscellaneous Correction
Resolved
06/24/2020
-3RD FLOOR CENTER- -INSTALL SIGNAGE THROUGHOUT
Miscellaneous Correction
Resolved
06/24/2020
-2ND FLOOR CENTER- -INSTALL SIGNAGE THROUGHOUT -MOTHER IN LAW- WATER HEATER DISCHARGE IN PAN DRAIN, NO OUTLET FOR DISHWASHER AND DISPOSAL, MISSING ARCH FALULT BREAKER
Miscellaneous Correction
Resolved
06/24/2020
-1ST FLOOR- CLUBHOUSE -INSTALL SIGNAGE THROUGHOUT -EPO FOR SPA
Miscellaneous Correction
Resolved
06/24/2020
-4TH FLOOR LEFT WING- -INSTALL SIGNAGE THROUGHOUT -427 MISSING COVER PLATE IN OFFICE
Miscellaneous Correction
Resolved
06/24/2020
-3RD FLOOR LEFT WING- -INSTALL SIGNAGE THROUGHOUT -333- BATH FAN
Miscellaneous Correction
Resolved
06/24/2020
-2ND FLOOR LEFT WING- -INSTALL SIGNAGE THROUGHOUT -219 SPARK RING ON MICROWAVE RECEPTACLE -221 BROKEN WINDOW ON PATIO -224 RAILING GREATER THAN 4” GAP AT SIDING -225 BATH FAN -229 BATH FAN IN BATH 2 -228 SOFT GFCI NORTH PATIO
Miscellaneous Correction
Corrective Action Required
06/23/2020
115- NO GRAB BARS IN BATHROOM/SHOWER, NO ADA
Occupancy Inspection - Water Utilities Passed 6/25/2020 06/25/2020
Miscellaneous Inspection Passed 6/26/2020 6/26/2020 06/26/2020
Misc
Informational
06/26/2020
-Grab bars in bathroom -Electrical in kitchen
Occupancy Inspection - Codes Commercial Temporary C of O 6/26/2020 06/26/2020
Misc
Corrective Action Required
06/18/2020
THE FOLLOWING AREAS ARE APROVED- CENTER -LOBBY 1ST,2ND,3RD,4TH LEFT WING 1ST,2ND,3RD,4TH
STAIR TOWER 1
Corrective Action Required
06/18/2020
LEFT WING WEST OF LOBBY-INSPECTED
ELEVATOR 1
Corrective Action Required
06/18/2020
WEST OF LOBBY - REPORT SUBMITTED INSPECTED
STAIR TOWER 2
Corrective Action Required
06/18/2020
RIGHT OF LOBBY INSPECTED
Misc
Corrective Action Required
06/18/2020
CENTER SECTION- >PERMANENT GLASS FOR PATIO CENTER SECTIONS >LANDING OUT REAR POOL SIDE DOORS, SIDEWALKS ETC. >PROVIDE HEALTH DEPT. APPROVAL ON HOT TUB. LEFT WING> RIGHT WING>
STAIR TOWER 3
Corrective Action Required
06/24/2020
WEST LEFT WING
Miscellaneous Inspection Partial 6/17/2020 07/14/2020
Miscellaneous Correction
Corrective Action Required
06/24/2020
**RIGHT WING*** -4TH FLOOR- SIGNAGE THROUGHOUT CLARIFY LACK OF OVERFLOW PROTECTION FOR HOT WATER HEATERS-ALL UNITS 401-TIGHTEN CENTER POST AT PATIO RAILING, LOOSE OUTLET AT BAR 405- BAD GFCI AT EXTERIOR 407- MISSING SINK FIXTURE IN BATHROOM MECHANICAL CLOSET- MISSING COVER PLATE AND BONDING OF METALLIC BOX AT CEILING ELEVATOR EQUIPMENT ROOM- COMPLETE INSTALLATION OF WIRING NO OVERFLOW PROTECTION FOR HOT WATER HEATERS-ALL UNITS
Miscellaneous Inspection Partial 7/15/2020 7/15/2020 07/15/2020
Miscellaneous Correction
Informational
07/15/2020
**RIGHT WING*** -4TH FLOOR- SIGNAGE THROUGHOUT CLARIFY LACK OF OVERFLOW PROTECTION FOR HOT WATER HEATERS-ALL UNITS 401-TIGHTEN CENTER POST AT PATIO RAILING, LOOSE OUTLET AT BAR 405- BAD GFCI AT EXTERIOR 407- MISSING SINK FIXTURE IN BATHROOM MECHANICAL CLOSET- MISSING COVER PLATE AND BONDING OF METALLIC BOX AT CEILING ELEVATOR EQUIPMENT ROOM- COMPLETE INSTALLATION OF WIRING NO OVERFLOW PROTECTION FOR HOT WATER HEATERS-ALL UNITS -3RD FLOOR- SIGNAGE THROUGHOUT CLARIFY LACK OF OVERFLOW PROTECTION FOR HOT WATER HEATERS-ALL UNITS 302- SEAL PENETRATION IN MECHANICAL ROOM, FAULTY GFCI BY RANGE TIED TO ISLAND RECEPTACLES 303- LOOSE GFCI AND RECEPTACLE IN BATHROOM 307- SOFT GFCI AT EXTERIOR PATIO, BAD GFCI BY RANGE TIED TO ISLAND RECEPTACLES 309- OPEN GROUND AT GFCI BY RANGE STAIRWELL 2- SECURE OPERABLE WINDOW FOR FALL PROTECTION
Pool Steel/Bonding - Commercial Partial 7/24/2020 7/24/2020 07/24/2020
Misc
Corrective Action Required
04/15/2020
POOL SPA BONDING OF LADDERS AND HANDRAILS -BONDING FOR SHELL, LADDERS, & FIXTURES
Miscellaneous Inspection Partial 7/27/2020 7/27/2020 07/27/2020
Miscellaneous Correction
Informational
07/15/2020
**RIGHT WING*** -4TH FLOOR- SIGNAGE THROUGHOUT CLARIFY LACK OF OVERFLOW PROTECTION FOR HOT WATER HEATERS-ALL UNITS 401-TIGHTEN CENTER POST AT PATIO RAILING, LOOSE OUTLET AT BAR 405- BAD GFCI AT EXTERIOR 407- MISSING SINK FIXTURE IN BATHROOM MECHANICAL CLOSET- MISSING COVER PLATE AND BONDING OF METALLIC BOX AT CEILING ELEVATOR EQUIPMENT ROOM- COMPLETE INSTALLATION OF WIRING NO OVERFLOW PROTECTION FOR HOT WATER HEATERS-ALL UNITS -3RD FLOOR- SIGNAGE THROUGHOUT CLARIFY LACK OF OVERFLOW PROTECTION FOR HOT WATER HEATERS-ALL UNITS 302- SEAL PENETRATION IN MECHANICAL ROOM, FAULTY GFCI BY RANGE TIED TO ISLAND RECEPTACLES 303- LOOSE GFCI AND RECEPTACLE IN BATHROOM 307- SOFT GFCI AT EXTERIOR PATIO, BAD GFCI BY RANGE TIED TO ISLAND RECEPTACLES 309- OPEN GROUND AT GFCI BY RANGE STAIRWELL 2- SECURE OPERABLE WINDOW FOR FALL PROTECTION -2ND FLOOR- SIGNAGE THROUGHOUT CLARIFY LACK OF OVERFLOW PROTECTION FOR HOT WATER HEATERS-ALL UNITS 201- BATH FAN INOPERABLE 203- SOFT GFCI AT EXTERIOR, FAULTY GFCI BY RANGE 207- GFCI RECEPTACLE NOT INSTALLED BY RANGE 209- NO RANGE/ ANTI TIP DEVICE INSTALLED
Miscellaneous Inspection Partial 7/28/2020 7/28/2020 07/28/2020
Miscellaneous Correction
Informational
07/27/2020
**RIGHT WING*** -4TH FLOOR- SIGNAGE THROUGHOUT CLARIFY LACK OF OVERFLOW PROTECTION FOR HOT WATER HEATERS-ALL UNITS 401-TIGHTEN CENTER POST AT PATIO RAILING, LOOSE OUTLET AT BAR 405- BAD GFCI AT EXTERIOR 407- MISSING SINK FIXTURE IN BATHROOM MECHANICAL CLOSET- MISSING COVER PLATE AND BONDING OF METALLIC BOX AT CEILING ELEVATOR EQUIPMENT ROOM- COMPLETE INSTALLATION OF WIRING NO OVERFLOW PROTECTION FOR HOT WATER HEATERS-ALL UNITS -3RD FLOOR- SIGNAGE THROUGHOUT CLARIFY LACK OF OVERFLOW PROTECTION FOR HOT WATER HEATERS-ALL UNITS 302- SEAL PENETRATION IN MECHANICAL ROOM, FAULTY GFCI BY RANGE TIED TO ISLAND RECEPTACLES 303- LOOSE GFCI AND RECEPTACLE IN BATHROOM 307- SOFT GFCI AT EXTERIOR PATIO, BAD GFCI BY RANGE TIED TO ISLAND RECEPTACLES 309- OPEN GROUND AT GFCI BY RANGE STAIRWELL 2- SECURE OPERABLE WINDOW FOR FALL PROTECTION -2ND FLOOR- SIGNAGE THROUGHOUT CLARIFY LACK OF OVERFLOW PROTECTION FOR HOT WATER HEATERS-ALL UNITS 201- BATH FAN INOPERABLE 203- SOFT GFCI AT EXTERIOR, FAULTY GFCI BY RANGE 207- GFCI RECEPTACLE NOT INSTALLED BY RANGE 209- NO RANGE/ ANTI TIP DEVICE INSTALLED -1ST FLOOR SIGNAGE THROUGHOUT CLARIFY LACK OF OVERFLOW PROTECTION FOR HOT WATER HEATERS 101-MISSING COVER PLATE AT LIGHT SWITCH IN LAUNDRY, SEAL GAP IN GB AT DRYER RECEPTACLE, NO GFCI IN BATHROOM, MOLD IN MECHANICAL CLOSET CEILING AND WALLS, FAULTY GFCI AT EXTERIOR, COMPLETE SINK, MISSING BATH FAN IN MASTER BATH 103- DOOR DOESN'T CLOSE AND LATCH PROPERLY, MISSING COVER PLATE AT RECEPTACLE IN LIVING ROOM, RANGE NOT ON ANTI TIP DEVICE, MOLD IN PANTRY 105- DOOR DOESN'T CLOSE AND LATCH PROPERLY, BROKEN GLASS IN WINDOW AT LIVING ROOM, RECEPTACLE BOX AT ISLAND NOT INSTALLED FLUSH, NO RANGE/ ANTI TIP DEVICE, 107- DOOR DOESN’T CLOSE AND LATCH PROPERLY, RANGE NOT ON ANTI TIP DEVICE 109- SEAL HOLE IN LAUNDRY ROOM WALL, BROKEN GLASS IN BEDROOM WINDOW, DEAD BOLT ON PATIO DOOR DOESN’T THROW AND LATCH DATA ROOM- SEAL UPWARD PENETRATIONS ELEVATOR EQUIPMENT ROOM- SEAL DRYWALL PATCH G17- MISSING ESCUTCHEON AT SPRINKLER G21-INACCESSIBLE G28- CARBON MONOXIDE DEVICE NOT HOOKED UP FOR INSPECTION -INSURE ALL GARAGE, STORAGE, UNIT AND MECHANICAL ROOM DOORS SELF CLOSE AND LATCH PROPERLY
Miscellaneous Inspection Partial 8/3/2020 8/3/2020 08/03/2020
Miscellaneous Correction
Informational
07/28/2020
**RIGHT WING*** SIGNAGE THROUGHOUT PROVIDE OVERFLOW PROTECTION ON HOT WATER HEATERS THROUGHOUT -4TH FLOOR- -3RD FLOOR- -1ST FLOOR
Occupancy Inspection - Fire Passed 8/6/2020 8/6/2020 08/06/2020
Alarm Test Passed 8/6/2020 08/06/2020
Sprinkler - Flow Test Passed 6/18/2020 08/06/2020
Miscellaneous Inspection Passed 8/6/2020 08/06/2020
Miscellaneous Correction
Informational
08/03/2020
**RIGHT WING*** SIGNAGE THROUGHOUT PROVIDE OVERFLOW PROTECTION ON HOT WATER HEATERS THROUGHOUT -4TH FLOOR- 405-BAD GFCI AT EXTERIOR MECHANICAL CLOSET- MISSING COVER MISSING COVER PLATE AND BONDING OF METALLIC BOX AT CEILING ELEVATOR EQUIPMENT ROOM- COMPLETE INSTALLATION OF WIRING-LAND IN BOX -3RD FLOOR- 302- SEAL PENETRATION IN MECHANICAL ROOM 307- SOFT GFCI AT EXTERIOR PATIO STAIRWELL 2- SECURE OPERABLE WINDOW FOR FALL PROTECTION -1ST FLOOR 101-SEAL GAP IN GB AT DRYER RECEPTACLE, MOLD IN MECHANICAL CLOSET CEILING AND WALLS, MISSING BATH FAN IN MASTER BATH 103- MOLD IN PANTRY 105-RANGE NOT ON ANTI TIP DEVICE, 107- DOOR DOESN’T CLOSE AND LATCH PROPERLY 109- SEAL HOLE IN LAUNDRY ROOM WALL, DEAD BOLT ON PATIO DOOR DOESN’T THROW AND LATCH DATA ROOM WEST SIDE-SEAL UPWARD PENETRATIONS ELEVATOR EQUIPMENT ROOM- SEAL DRYWALL PATCH G17- MISSING ESCUTCHEON AT SPRINKLER G28- CARBON MONOXIDE DEVICE NOT WORKING PROPERLY UP -INSURE ALL GARAGE, STORAGE, UNIT AND MECHANICAL ROOM DOORS SELF CLOSE AND LATCH PROPERLY
Occupancy Inspection - Codes Commercial Temporary C of O 8/6/2020 8/6/2020 08/06/2020
Misc
Corrective Action Required
06/24/2020
THE FOLLOWING AREAS ARE APROVED- CENTER -LOBBY 1ST,2ND,3RD,4TH RIGHT WING TCO
STAIR TOWER 1
Corrective Action Required
06/24/2020
LEFT WING WEST OF LOBBY-INSPECTED
ELEVATOR 1
Corrective Action Required
06/24/2020
WEST OF LOBBY - REPORT SUBMITTED INSPECTED
STAIR TOWER 2
Corrective Action Required
06/24/2020
RIGHT OF LOBBY INSPECTED
Misc
Corrective Action Required
06/24/2020
CENTER SECTION- >PERMANENT GLASS FOR PATIO CENTER SECTIONS >LANDING OUT REAR POOL SIDE DOORS, SIDEWALKS ETC. >PROVIDE HEALTH DEPT. APPROVAL ON HOT TUB. LEFT WING> > INSTALL REQUIRED FIXTURES FOR ADA UNIT 115. RIGHT WING>
STAIR TOWER 3
Corrective Action Required
06/24/2020
WEST LEFT WING
Gas Piping Inspection - Commercial Partial 8/12/2020 8/12/2020 08/12/2020
Misc
Partial Correction
05/21/2020
GAS PIPING PRESSURE TEST & VISUAL INSPECTION ON: PIPING FROM COLUMN WRAP OUTSIDE FRONT ENTRANCE TO FIREPLACE ENCLOSURE; GAS PIPING FRMO EXTERIOR TO INSIDE POOL PUMP ROOM HOLDING 15 PSI; Exterior meter to front column. EXTERIOR-POOL LOCATION; UNDERGROUND FROM BUILDING AT PATIO TO GRILL AND FIRE PIT OK TO COVER PATIO AREAS.
Pool Steel/Bonding - Commercial Passed 8/28/2020 08/28/2020
Misc
Informational
08/28/2020
POOL SPA BONDING OF LADDERS AND HANDRAILS -BONDING FOR SHELL, LADDERS, & FIXTURES
Gas Piping Inspection - Commercial Passed 8/28/2020 08/28/2020
Misc
Resolved
08/28/2020
GAS PIPING PRESSURE TEST & VISUAL INSPECTION ON: PIPING FROM COLUMN WRAP OUTSIDE FRONT ENTRANCE TO FIREPLACE ENCLOSURE; GAS PIPING FRMO EXTERIOR TO INSIDE POOL PUMP ROOM HOLDING 15 PSI; Exterior meter to front column. EXTERIOR-POOL LOCATION; UNDERGROUND FROM BUILDING AT PATIO TO GRILL AND FIRE PIT OK TO COVER PATIO AREAS.
Rough Framing Inspection - Commercial Passed 8/28/2020 08/28/2020
Misc
Resolved
02/07/2020
DECK COLUMNS OK TO COVER AT: RIGHT WING;
Misc
Resolved
02/07/2020
OK TO COVER WHEN READY FRAMING AT: MAIN FRONT ENTRANCE; TOP OF STAIRWELLS #3 & #4 FOR SCAFFOLDING; ELEVATOR @2 SHAFT OK TO HANG GWB AT INTERIOR FULL HEIGHT;
Misc
Resolved
02/07/2020
SHEAR WALL GWB IN PLACE: SHEAR WALL #6 AT 228 & 229;
Misc
Resolved
02/07/2020
SHEATHING AT EXTENSIONS OF XXXXXXXXXX AT: LEFT WING; RIGHT WING
All Rough Inspection - Commercial Passed 7/28/2020 08/28/2020
Misc
Resolved
08/28/2020
OK TO COVER WALLS AND CEILINGS AT: LEFT WING: COMPLETE INCLUDING RC CHANNEL CENTER SECTION: COMPLETE RIGHT WING: 4TH FLOOR INCLUDING RC CHANNEL; 3RD FLOOR COMPLETE INCLUDING RC CHANNEL; 2ND FLOOR COMPLETE; SHEAR WALLS #4 & #6 FIRST LAYER; 1ST FLOOR UNITS EXCEPT EQUIPMENT GROUNDS NOT CONNECTED; CORRIDOR GARAGE SIDE OK TO ONE-SIDE; CORRIDOR UNIT WALL OK TO INSULATE; SHEAR WALL AT EAST END OK FOR OSB; 1ST FLOOR CORRIDOR, GARAGES INCLUDING RC CHANNEL;
Misc
Resolved
08/28/2020
OK TO COVER WHEN READY LIGHT-GAUGE STEEL FRAMED CEILING FUR-DOWNS AT: LEFT WING: COMPLETE CENTER SECTION: COMPLETE INCLUDING CLUBHOUSE RIGHT WING: 4TH FLOOR;
Rated Assembly Inspection Passed 3/9/2020 8/28/2020 08/28/2020
Misc
Resolved
08/28/2020
OK TO COVER WHEN READY RATED CEILING & WALL ASSEMBLIES: RIGHT WING 1ST FLOOR COMPLETE
ELEVATOR 1
Resolved
08/28/2020
RIGH WING ELEVATOR SHAFT MECHANICAL ROOM; 1ST FLOOR CEILING-3RD LAYER AND RC CHANNEL; 4TH LAYER;
Occupancy Inspection - Engineering Temporary C of O 2/11/2021 02/11/2021
Misc
Informational
06/18/2020
The sidewalk has been installed , they can now have temporary occupancy.
Misc
Informational
02/11/2021
2-11-21 11:02am Punch List 1. Building materials need to be picked up under the car port at building 5. 2. All port-a-potty’s at building 5 need to be removed. 3. The dumpster at building 5 needs to be removed. 4. The office trailer, fuel tank and equipment need to be removed from the parking lot at building 5. All punch list items need to be completed by March 11th 2021 “30 Days”.
Occupancy Inspection - Planning Temporary C of O 2/11/2021 02/11/2021
Corrective Action Required
02/11/2021
Complete street tree landscaping, per the approved landscape plan, west of Building #5 in the area of the construction trailer.
Occupancy Inspection - Engineering Passed 3/11/2021 3/11/2021 03/09/2021
Misc
Informational
02/11/2021
The sidewalk has been installed , they can now have temporary occupancy.
Misc
Informational
02/11/2021
2-11-21 11:02am Punch List 1. Building materials need to be picked up under the car port at building 5. 2. All port-a-potty’s at building 5 need to be removed. 3. The dumpster at building 5 needs to be removed. 4. The office trailer, fuel tank and equipment need to be removed from the parking lot at building 5. All punch list items need to be completed by March 11th 2021 “30 Days”.
Occupancy Inspection - Planning Passed 4/16/2021 04/16/2021
Gas Service Inspection - Commercial Passed 04/30/2021
Miscellaneous Inspection Passed 4/30/2021 04/30/2021
Misc
Informational
04/30/2021
POOL EQUIPMENT ROOM CEILING
Underground Electrical Inspection - Commercial Passed 9/14/2020 9/14/2020 04/30/2021
Occupancy Inspection - Codes Commercial Full C of O 4/30/2021 04/30/2021
Misc
Corrective Action Required
08/06/2020
THE FOLLOWING AREAS ARE APROVED- CENTER -LOBBY 1ST,2ND,3RD,4TH RIGHT WING TCO
STAIR TOWER 1
Resolved
04/23/2021
LEFT WING WEST OF LOBBY-INSPECTED
ELEVATOR 1
Resolved
04/23/2021
WEST OF LOBBY - REPORT SUBMITTED INSPECTED
STAIR TOWER 2
Resolved
04/23/2021
RIGHT OF LOBBY INSPECTED
Misc
Resolved
04/23/2021
CENTER SECTION- >PERMANENT GLASS FOR PATIO CENTER SECTIONS >LANDING OUT REAR POOL SIDE DOORS, SIDEWALKS ETC. >PROVIDE HEALTH DEPT. APPROVAL ON HOT TUB. LEFT WING> > INSTALL REQUIRED FIXTURES FOR ADA UNIT 115. RIGHT WING>
STAIR TOWER 3
Resolved
04/23/2021
WEST LEFT WING
Documents & Images
Date Uploaded File Type Document Name
08/14/2018 Summit SqPhII - Site
08/14/2018 Summit Sq Ph II - Permits
08/17/2018 Letter Fire Building Plan Review
08/22/2018 Letter Codes P/R Corrections Document
09/06/2018 Letter Fire Building Plan Review
10/09/2018 3rd Party Permit/Approval 02181390 Letter of Intent
11/09/2018 Receipt Receipt for transaction: 2018-007174
07/15/2019 Letter DS Building Permit
08/12/2019 Letter Fire (Alarm) Plan Review Notice
08/19/2019 Letter INSPECTION SUMMARY
08/21/2019 Letter INSPECTION SUMMARY
08/23/2019 Letter INSPECTION SUMMARY
09/04/2019 Letter INSPECTION SUMMARY
09/06/2019 Letter INSPECTION SUMMARY
09/09/2019 Letter INSPECTION SUMMARY
09/18/2019 Summit Sq II - ASI #016 - Parcel Stor & Misc Revisions_Clarifications FOR CITY
09/20/2019 Letter INSPECTION SUMMARY
09/25/2019 Letter INSPECTION SUMMARY
09/27/2019 Letter INSPECTION SUMMARY
09/30/2019 Letter INSPECTION SUMMARY
10/01/2019 Letter Fire (Sprinkler) Plan Review
10/08/2019 Letter INSPECTION SUMMARY
10/11/2019 Letter INSPECTION SUMMARY
10/14/2019 Letter INSPECTION SUMMARY
10/16/2019 Letter INSPECTION SUMMARY
10/16/2019 Letter INSPECTION SUMMARY
10/21/2019 Letter INSPECTION SUMMARY
10/21/2019 Letter INSPECTION SUMMARY
10/24/2019 Letter INSPECTION SUMMARY
10/25/2019 Letter INSPECTION SUMMARY
10/30/2019 Letter INSPECTION SUMMARY
11/04/2019 Letter INSPECTION SUMMARY
11/05/2019 Letter INSPECTION SUMMARY
11/15/2019 Letter INSPECTION SUMMARY
11/18/2019 Letter INSPECTION SUMMARY
11/18/2019 Letter INSPECTION SUMMARY
11/18/2019 Letter INSPECTION SUMMARY
11/19/2019 Letter INSPECTION SUMMARY
11/19/2019 Letter INSPECTION SUMMARY
11/20/2019 Letter INSPECTION SUMMARY
11/20/2019 Letter INSPECTION SUMMARY
11/21/2019 Letter INSPECTION SUMMARY
11/21/2019 Letter INSPECTION SUMMARY
11/22/2019 Letter INSPECTION SUMMARY
11/22/2019 Letter INSPECTION SUMMARY
11/25/2019 Letter INSPECTION SUMMARY
11/26/2019 Letter INSPECTION SUMMARY
11/26/2019 Letter INSPECTION SUMMARY
11/27/2019 Letter INSPECTION SUMMARY
11/27/2019 Letter INSPECTION SUMMARY
12/02/2019 Letter INSPECTION SUMMARY
12/03/2019 Letter INSPECTION SUMMARY
12/04/2019 Letter INSPECTION SUMMARY
12/05/2019 Letter INSPECTION SUMMARY
12/05/2019 Letter INSPECTION SUMMARY
12/06/2019 Letter INSPECTION SUMMARY
12/06/2019 Letter INSPECTION SUMMARY
12/09/2019 Letter INSPECTION SUMMARY
12/09/2019 Letter INSPECTION SUMMARY
12/10/2019 Letter Fire (Sprinkler) Plan Review
12/10/2019 Letter INSPECTION SUMMARY
12/11/2019 Letter INSPECTION SUMMARY
12/11/2019 Letter INSPECTION SUMMARY
12/13/2019 Letter INSPECTION SUMMARY
12/13/2019 Letter INSPECTION SUMMARY
12/16/2019 Letter INSPECTION SUMMARY
12/18/2019 Letter INSPECTION SUMMARY
12/18/2019 Letter INSPECTION SUMMARY
12/18/2019 Letter INSPECTION SUMMARY
12/18/2019 Letter INSPECTION SUMMARY
12/19/2019 Letter INSPECTION SUMMARY
12/19/2019 Letter INSPECTION SUMMARY
12/20/2019 Letter INSPECTION SUMMARY
12/20/2019 Letter INSPECTION SUMMARY
12/23/2019 Letter INSPECTION SUMMARY
12/23/2019 Letter INSPECTION SUMMARY
12/26/2019 Letter INSPECTION SUMMARY
12/26/2019 Letter INSPECTION SUMMARY
12/27/2019 Letter INSPECTION SUMMARY
12/27/2019 Letter INSPECTION SUMMARY
12/30/2019 Letter INSPECTION SUMMARY
01/02/2020 Letter INSPECTION SUMMARY
01/02/2020 Letter INSPECTION SUMMARY
01/03/2020 Letter INSPECTION SUMMARY
01/06/2020 Letter INSPECTION SUMMARY
01/06/2020 Letter INSPECTION SUMMARY
01/07/2020 Letter INSPECTION SUMMARY
01/07/2020 Letter INSPECTION SUMMARY
01/08/2020 Letter INSPECTION SUMMARY
01/08/2020 Letter INSPECTION SUMMARY
01/09/2020 Letter INSPECTION SUMMARY
01/10/2020 Letter INSPECTION SUMMARY
01/10/2020 Letter INSPECTION SUMMARY
01/13/2020 Letter INSPECTION SUMMARY
01/14/2020 Letter INSPECTION SUMMARY
01/15/2020 Letter INSPECTION SUMMARY
01/16/2020 Letter INSPECTION SUMMARY
01/16/2020 Letter INSPECTION SUMMARY
01/21/2020 Letter INSPECTION SUMMARY
01/21/2020 Letter INSPECTION SUMMARY
01/22/2020 Letter INSPECTION SUMMARY
01/23/2020 Letter INSPECTION SUMMARY
01/23/2020 Letter INSPECTION SUMMARY
01/24/2020 Letter INSPECTION SUMMARY
01/30/2020 Letter INSPECTION SUMMARY
01/30/2020 Letter INSPECTION SUMMARY
01/30/2020 Letter INSPECTION SUMMARY
01/31/2020 Letter INSPECTION SUMMARY
01/31/2020 Letter INSPECTION SUMMARY
02/03/2020 Letter INSPECTION SUMMARY
02/03/2020 Letter INSPECTION SUMMARY
02/04/2020 Letter INSPECTION SUMMARY
02/04/2020 Letter INSPECTION SUMMARY
02/05/2020 Letter INSPECTION SUMMARY
02/05/2020 Letter INSPECTION SUMMARY
02/06/2020 Letter INSPECTION SUMMARY
02/07/2020 Letter INSPECTION SUMMARY
02/07/2020 Letter INSPECTION SUMMARY
02/10/2020 Letter INSPECTION SUMMARY
02/10/2020 Letter INSPECTION SUMMARY
02/10/2020 Letter INSPECTION SUMMARY
02/11/2020 Letter INSPECTION SUMMARY
02/13/2020 Letter INSPECTION SUMMARY
02/13/2020 Letter INSPECTION SUMMARY
02/14/2020 Letter INSPECTION SUMMARY
02/17/2020 Letter INSPECTION SUMMARY
02/18/2020 Letter INSPECTION SUMMARY
02/18/2020 Letter INSPECTION SUMMARY
02/19/2020 Letter INSPECTION SUMMARY
02/19/2020 Letter INSPECTION SUMMARY
02/25/2020 Letter INSPECTION SUMMARY
02/25/2020 Letter INSPECTION SUMMARY
02/26/2020 Letter INSPECTION SUMMARY
02/27/2020 Letter INSPECTION SUMMARY
03/16/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter Codes Plan Review Conditions
04/09/2020 Letter DS Building Permit
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/15/2020 Letter INSPECTION SUMMARY
05/21/2020 Letter INSPECTION SUMMARY
06/02/2020 Letter INSPECTION SUMMARY
06/09/2020 Letter INSPECTION SUMMARY
06/09/2020 Letter INSPECTION SUMMARY
06/09/2020 Letter INSPECTION SUMMARY
06/17/2020 Letter INSPECTION SUMMARY
06/17/2020 Letter DE-Daily Inspection Summary
06/18/2020 Letter INSPECTION SUMMARY
06/18/2020 Letter INSPECTION SUMMARY
06/18/2020 Letter DE-Daily Inspection Summary
06/18/2020 Letter Codes Temporary Certificate of Occupancy
06/19/2020 Letter INSPECTION SUMMARY
06/23/2020 Letter INSPECTION SUMMARY
06/24/2020 Letter INSPECTION SUMMARY
06/24/2020 Letter INSPECTION SUMMARY
06/26/2020 Letter INSPECTION SUMMARY
06/26/2020 Letter Codes Temporary Certificate of Occupancy
07/14/2020 Letter INSPECTION SUMMARY
07/14/2020 Letter Codes Temporary Certificate of Occupancy
07/15/2020 Letter INSPECTION SUMMARY
07/24/2020 Letter INSPECTION SUMMARY
07/27/2020 Letter INSPECTION SUMMARY
07/28/2020 Letter INSPECTION SUMMARY
07/28/2020 Letter INSPECTION SUMMARY
08/03/2020 Letter INSPECTION SUMMARY
08/06/2020 Letter Codes Temporary Certificate of Occupancy
08/12/2020 Letter INSPECTION SUMMARY
02/11/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
04/30/2021 Letter INSPECTION SUMMARY
04/30/2021 Letter INSPECTION SUMMARY
04/30/2021 Letter Field Certificate of Occupancy
04/30/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home