Planning Application Status

PL2019222




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2019222
I 470 Business and Technology Center Lot 13A
Commercial Final Development Plan
Commercial Final Development Plan
Approved
06/21/2019
MARION RIDGE SAFETY STORAGE LLC
Locations
Contacts
MARION RIDGE SAFETY STORAGE LLC, Address:1101 C NW PAMELA BLVD  
QUIST ENGINEERING INC, Address:821 NE COLUMBUS ST, Phone:(816) 550-5675  
MARION RIDGE SAFETY STORAGE LLC, Address:1120 NW EAGLE RIDGE BLVD  
MARION RIDGE SAFETY STORAGE LLC, Address:1120 NW EAGLE RIDGE BLVD  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Approved with Conditions 08/28/2019 09/05/2019
Mike Weisenborn
Resolved
09/05/2019

FDP APPROVAL TIMING. A building permit for the proposed development shall not be issued until such time as the associated minor plat combining Lots 13, 14, 21 and 22 is approved, the plat is recorded and the required copies of the recorded plat are returned to the City. This comment is only reiterated from the last comment letter for informational purposes only.
Informational
09/05/2019

MECHANICAL EQUIPMENT. At this time rooftop mechanical equpment is not planned for this structure. I roof top mechanical equipment is added in the future it shall meet the screening requirements.
Engineering Review Approved with Conditions 08/28/2019 09/05/2019
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
08/28/2019

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
09/05/2019

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
09/05/2019

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $20,563.76
DE Future Repair Work
Corrective Action Required
09/05/2019

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Fire Review Approved with Conditions 08/28/2019 08/29/2019
Mike Weisenborn
Code Statement
Corrective Action Required
08/29/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Fire Lanes - Marking
Corrective Action Required
08/29/2019

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Building Codes Review No Comments 08/28/2019 08/27/2019
Joe Frogge
Traffic Review No Comments 08/28/2019 08/21/2019
Michael Park
Engineering Review Corrections 08/15/2019 08/16/2019
Sue Pyles, P.E.
Miscellaneous Correction
Corrective Action Required
08/16/2019

It has come to our attention the existing drive on the northwest corner of the lot is to be used as the construction entrance and not the entrance shown on the plans. The drive entrance to Independence Ave at the northeast corner of the propert is permitted to be constructed as an entrance for the project to the north and must be constructed for them to obtain an occupancy permit. This project will either need to utilize the construction entrance shown on the plans or propose a different loction. It is possible to construct a construction entrance at the new drive location to McBaine Dr.
Corrective Action Required
08/16/2019

Sheet C200: Revise the Utility Notes, Note 1 is confusing and Note 2 is partially incorrect.
Corrective Action Required
08/16/2019

Sheet C201: Only ornamental varieties of trees can be planted in public easements. Revise as needed.
Corrective Action Required
08/16/2019

Sheet C300: Revise grading to reflect that the area inlet was changed to a curb inlet at the southeast corner of the lot.
Corrective Action Required
08/16/2019

Sheet C402 (First one): • Revise sheet number to C401. • The Line 1 connection to the existing structure does not seem to line up with the wall of the structure. Please provide confirmation that City requirements for connecting to an existing structure are being met. • Indicate how proposed storm sewer pipes will connect to existing structures. • Revise the location of JB 3-1 to the north to provide adequate separation between it and the existing structure immediately south of it. • Remove Note 1 in the Line 4 Plan view or revise to indicate removal of existing line. • Revise the limits of compacted fill for Lines 4 & 5 Profile views. The compacted fill is only required to extend 18” above the tops of the pipes, and there is several feet of it shown. • Are the roof drains that connect to Lines 1, 4 and 5 six inches or less in diameter?
Corrective Action Required
08/16/2019

Sheet C600: • The proposed fire hydrant will be private, please revise the plan labels accordingly. • The water line to the hydrant will have to be bored. Include this requirement in the plans.
Corrective Action Required
08/16/2019

Sheet C700: The irrigation system shall connect to the domestic service line. Revise accordingly.
Planning Review Corrections 08/15/2019 08/16/2019
Hector Soto Jr.
Corrective Action Required
08/16/2019

FDP APPROVAL TIMING. A building permit for the proposed development shall not be issued until such time as the associated minor plat combining Lots 13, 14, 21 and 22 is approved, the plat is recorded and the required copies of the recorded plat are returned to the City. This comment is only reiterated from the last comment letter for informational purposes only.
Corrective Action Required
08/16/2019

MECHANICAL EQUIPMENT. Dash-in the location of the roof top units on the building elevations to the extent possible. Roof top units shall be fully screened from view by parapet walls at least equal to the height of the units being screened. No revised architectural drawings were submitted in response to this comment that was previously made on the past two staff comment letters.
Building Codes Review No Comments 08/15/2019 08/12/2019
Joe Frogge
Miscellaneous Correction
Corrective Action Required
08/08/2019

Provide additional clarification on the domestic, irrigation and fire service lines as requested by engineering.
Traffic Review No Comments 08/15/2019 08/12/2019
Michael Park
Fire Review Approved with Conditions 08/15/2019 08/08/2019
Jim Eden
Fire Review Corrections 08/01/2019 08/08/2019
Jim Eden
Code Statement
Informational
07/31/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Hydrants
Corrective Action Required
07/25/2019

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action Required - Move the additional fire hydrant at the SE corner of the building closer to the entrance of the parking lot.
Building Codes Review Corrections 08/01/2019 08/05/2019
Mike Weisenborn
Miscellaneous Correction
Corrective Action Required
08/05/2019

Provide additional clarification on the domestic, irrigation and fire service lines as requested by engineering.
Engineering Review Corrections 08/01/2019 08/05/2019
Sue Pyles, P.E.
Corrective Action Required
08/05/2019

Sheet C100: • Revise Water Note 5, A.P. Smith series 1000 is not on the City’s approved product list. • Revise Water Note 6, the valve box model number is P1108 on the City’s approved product list.
Corrective Action Required
08/05/2019

Sheet C200: Show the existing pipe to be completely removed along with the existing field inlet, and the existing junction box be patched.
Corrective Action Required
08/05/2019

Sheet C210: Relocate overlapping text for clarity on the Retaining Wall typical section.
Corrective Action Required
08/05/2019

Sheets C400 & C401: • Label the storm sewer structures in order, not based on structure type within a line. • Revise the Line 2 structure numbers on the Drainage Map, they are incorrect. • Show and label all storm sewer on the Drainage Map. • Why is an area inlet with curb cut used (AI 2-1) rather than a curb inlet? No drainage area beyond the curb is shown going to that structure. If there is overland flow to that structure, please revise the drainage map accordingly. • If AI2-1 remains, label the rip-rap that appears to be shown around it throughout the plan set, show it on the Profile, and include design size requirements. • The Lines 1, 2, 4, 5 Plan view structure labels appear incorrect, please revise. • The Line 3 connection to the existing structure does not seem to line up with the wall of the structure. Please provide confirmation that City requirements for connecting to an existing structure are being met. • Add HGL to the Profile views. • The storm sewer does not meet the City’s minimum requirement for drops thru structures. Please revise. • The FL(out) at the existing inlet that Line 3 connects to is missing from the Profile view. Please revise. • Include the following note on the profile sheet: “Compacted Fill shall be placed to a minimum 18” above the top of the pipe prior to installation.” • Show and label the limits of the compacted fill placement in the Profile view. Use hatching for clarity. • Label the Existing Grade in the Line 3 Profile and Existing & Proposed Grades in the Line 4 Profile.
Corrective Action Required
08/05/2019

Sheet C600: Rmove the title block, this is not a cover sheet. Revise notes as per Sheet C100 comments or remove all the notes since it isn’t a cover sheet.
Corrective Action Required
08/05/2019

Sheet C700: Revise the site water plan. It doesn’t make sense with multiple meters on the irrigation, and additional detail is required for connection information and pipe size.
Corrective Action Required
08/05/2019

Revise the Drainage Study and Engineer’s Estimate based on revisions from the review comments. Additional comments will likely be generated based on the number of revisions required by these review comments.
Planning Review Corrections 08/01/2019 07/31/2019
Hector Soto Jr.
Corrective Action Required
07/29/2019

FDP APPROVAL TIMING. A building permit for the proposed development shall not be issued until such time as the associated minor plat combining Lots 13, 14, 21 and 22 is approved, the plat is recorded and the required copies of the recorded plat are returned to the City. This comment is only reiterated from the last comment letter for informational purposes only.
Corrective Action Required
07/29/2019

SITE DATA TABLE. - Lot Area. The listed lot area doesn't match the area labeled on the plan sheet, nor the area listed in the associated minor plat. Reconcile and revise. - Building Area. The listed building area doesn't match the area listed on the architectural drawings from SBC Architectural Services. Reconcile and revise. - Floor Area Ratio (FAR). Revise the FAR calculation as needed to reflect the corrected building area.
Corrective Action Required
07/29/2019

MECHANICAL EQUIPMENT. Dash-in the location of the roof top units on the building elevations to the extent possible. Roof top units shall be fully screened from view by parapet walls at least equal to the height of the units being screened. No revised architectural drawings were submitted in response to this comment that was previously made on the initial staff comment letter.
Traffic Review No Comments 08/01/2019 07/29/2019
Michael Park
Fire Review Corrections 07/09/2019 07/09/2019
Mike Weisenborn
Code Statement
Corrective Action Required
07/09/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
FDC
Corrective Action Required
07/09/2019

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action Required - Show the location of the FDC on the building. It must be within 100 feet of a fire hydrant.
Hydrants
Corrective Action Required
07/09/2019

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action Required - Show or add an additional fire hydrant at the SE corner of the building.
Imposed Loads
Corrective Action Required
07/09/2019

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Planning Review Corrections 07/08/2019 07/08/2019
Hector Soto Jr.
Corrective Action Required
07/08/2019

PARKING LOT. The parking lot shall meet the minimum 20' parking lot setback from the right-of-way. The parking lot is shown as having a 15' setback from the NE McBaine Dr right-of-way.
Corrective Action Required
07/08/2019

FDP APPROVAL TIMING. A building permit for the proposed development shall not be issued until such time as the associated minor plat combining Lots 13, 14, 21 and 22 is approved, the plat is recorded and the required copies of the recorded plat are returned to the City.
Corrective Action Required
07/08/2019

SITE DATA TABLE. Provide a table on Sheet C200 that includes the following information: - Zoning; - Land Use; - Lot Area; - Building Area; - Floor Area Ratio (FAR); - Impervious Coverage Area; - Parking Spaces (Proposed/Required)
Corrective Action Required
07/08/2019

LANDSCAPE PLAN. - The required number of street trees and shrubs shall be planted for each of the lot's two street frontages. The Independence Ave frontage is missing trees; the McBain Dr frontage is missing shrubs. - A minimum 2.5' tall row of evergreen shrubs shall be planted along the parking lot frontages along both Independence Ave and McBaine Dr. This living parking lot screen shall be planted at a ratio of 12 shrubs per 40 linear feet of parking lot frontage. - The plant schedule shows the proposed ornamental trees as being 1.5" caliper. The UDO requires a minimum 3" caliper. - The plant schedule shows the proposed evergreen trees as being 6' in height. The UDO requires a minimum 8' height at the time of planting.
Corrective Action Required
07/08/2019

ADA PARKING SIGN. - The required sign is type R7-8 (white background, green border, green text and blue wheelchair symbol) as identified in the MUTCD. - The sign shall be mounted between 3' and 5' above finished grade, measured to the bottom of the sign. Revise the detail accordingly.
Corrective Action Required
07/08/2019

LIGHTING. Site lighting shall be provided in accordance with Article 8, Division 1, Subdivision 8 of the UDO.
Corrective Action Required
07/08/2019

MECHANICAL EQUIPMENT. Dash-in the location of the roof top units on the building elevations to the extent possible. Roof top units shall be fully screened from view by parapet walls at least equal to the height of the units being screened.
Engineering Review Corrections 07/08/2019 07/08/2019
Sue Pyles, P.E.
Corrective Action Required
07/08/2019

Sheet C100: Revise the Project Title to match what is shown in the title block throughout the plan set
Corrective Action Required
07/08/2019

Sheet C200: Why is there a project title on this sheet when it isn’t a cover sheet?
Corrective Action Required
07/08/2019

Sheet C201: • Remove the note on each pavement section standard detail, only the City Engineer is authorized to approve alternate pavement designs. • Unified Development Ordinance (UDO) Section 8.620 requires a minimum of 6” Portland cement concrete thickness. The light concrete pavement section does not meet this requirement. Please revise.
Corrective Action Required
07/08/2019

Sheet C300: • Review proposed spot grades, many do not seem to match proposed contours. • Include “BC” and “G” in a legend.
Corrective Action Required
07/08/2019

Sheet C301: Include sift fence along the north property line as drainage flows to the northwest.
Corrective Action Required
07/08/2019

Sheet C302: Update the ESC standard details to the current versions. Include standard details for all items in this plan set.
Corrective Action Required
07/08/2019

Sheet C400-C402: • Storm sewer profiles are required for all pipe greater than 6 inches in diameter. This includes roof drains, as well. • Include standard details for Nyloplast Area Inlet and Junction Box since they are included in the storm sewer design. • The Nyloplast details included are too blurry to read, please revise. • Provide notes on how removal of the existing line and connection of new roof drain is to be accomplished at Ex FI 1F. • Storm Sewer Calculations for the existing storm sewer as currently included are not required. Calculations for the proposed storm sewer are required.
Corrective Action Required
07/08/2019

Sheet C700: • Include all water line and water meter size information on this sheet. • Specify the connection to existing sanitary must be by cut-in wye.
Corrective Action Required
07/08/2019

Submit: • Engineer’s Estimate of Probable Construction Costs • SWPPP
Corrective Action Required
07/08/2019

Storm Water Drainage Study: • The study submitted does not include enough information to determine if City requirements are being met. Please expand and revise. I will provide a copy of the City’s Stormwater Report Requirements brochure under separate cover. This brochure aids in verifying all City requirements are addressed.
Traffic Review No Comments 07/08/2019 07/08/2019
Michael Park
Building Codes Review Corrections 07/08/2019 07/03/2019
Joe Frogge
Corrective Action Required
07/03/2019

Specify size of domestic water meter.
Corrective Action Required
07/03/2019

Specify size and type of domestic water tap.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 06/21/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
06/21/2019 Letter Routing Sheet - FDP
06/21/2019 Receipt Receipt for transaction: 2019-004009
06/24/2019 Plans I-470 BUSINESS AND TECH LOT 13A CIVIL PLANS-FIRST SUB SET-6-20-19
06/24/2019 Plans I-470 BUSINESS ANS TECH LOT 13A- BUILDING PLAND -6-12-19
07/09/2019 Letter Applicant Letter - FDP (DFDP)
07/18/2019 Letter FAA Crane Approval
07/24/2019 Letter DOC072419-07242019110758
07/25/2019 Letter Resubmittal Routing Sheet - FDP
07/25/2019 Plans C300 Site Grading Plan
07/25/2019 Plans C301 SITE ESC PHASE 1 AND 2
07/25/2019 Plans C302 SITE ESC DETAILS
07/25/2019 Plans C303 SITE ESC DETAILS
07/25/2019 Plans C400 SITE STORM DRAINAGE PLAN
07/25/2019 Plans C401 STORM LINES 1 THRU 5
07/25/2019 Plans C402 STORM DETAILS
07/25/2019 Plans C600 PUBLIC WATER MAIN IMPROVEMENT PLAN
07/25/2019 Plans C700 SITE UTILITY PLAN
07/25/2019 Letter COMMENT LETTER-7-24-19
07/25/2019 Engineers Estimate COST ESTIMATE-7-26-19
07/25/2019 Engineers Estimate COST ESTIMATE-7-26-19
07/25/2019 Plans I-470 Businees and Tech-lot 13-Rev-Civil Plans-7-24-19
07/25/2019 Plans Photometric Plan
07/25/2019 Plans C100 SITE CIVIL PLANS COVER (2)
07/25/2019 Plans C101-SURVEY
07/25/2019 Plans C200 SITE PLAN
07/25/2019 Plans C201 LANDSCAPING PLAN
07/25/2019 Plans C210 Site Details
08/05/2019 Letter Applicant Letter - FDP (DFDP)
08/08/2019 Plans C402 STORM DETAILS
08/08/2019 Plans C700 SITE UTILITY PLAN
08/08/2019 Letter COMMENT LETTER-8-7-19
08/08/2019 Engineers Estimate cost estimate-8-7-19
08/08/2019 Plans I-470 Businees and Tech-lot 13-Rev-Civil Plans-8-7-19
08/08/2019 Plans I-470 LOT 13A REV STORM STUDY-8-7-19
08/08/2019 Plans C100 SITE CIVIL PLANS COVER
08/08/2019 Plans C101-SURVEY
08/08/2019 Plans C200 SITE PLAN
08/08/2019 Plans C201 LANDSCAPING PLAN
08/08/2019 Plans C210 Site Details
08/08/2019 Plans C300 Site Grading Plan
08/08/2019 Plans C301 SITE ESC PHASE 1 AND 2
08/08/2019 Plans C302 SITE ESC DETAILS
08/08/2019 Plans C303 SITE ESC DETAILS
08/08/2019 Plans C400 SITE STORM DRAINAGE PLAN
08/08/2019 Plans C401 STORM LINES 1 THRU 5
08/08/2019 Letter Resubmittal Routing Sheet - FDP
08/16/2019 Letter Applicant Letter - FDP (DFDP)
08/21/2019 Letter Resubmittal Routing Sheet - FDP
08/21/2019 Plans C600 PUBLIC WATER MAIN IMPROVEMENT PLAN
08/21/2019 Plans C601 WATER MAIN DETAIL SHEET
08/21/2019 Plans C700 SITE UTILITY PLAN
08/21/2019 Letter COMMENT LETTER-8-21-19
08/21/2019 Engineers Estimate cost estimate-8-21-19
08/21/2019 Plans I-470 Businees and Tech-lot 13-Rev-Civil Plans-8-21-19
08/21/2019 Plans C100 SITE CIVIL PLANS COVER (2)
08/21/2019 Plans C101-SURVEY
08/21/2019 Plans C200 SITE PLAN
08/21/2019 Plans C201 LANDSCAPING PLAN
08/21/2019 Plans C210 Site Details
08/21/2019 Plans C300 Site Grading Plan
08/21/2019 Plans C301 SITE ESC PHASE 1 AND 2
08/21/2019 Plans C302 SITE ESC DETAILS
08/21/2019 Plans C303 SITE ESC DETAILS
08/21/2019 Plans C400 SITE STORM DRAINAGE PLAN
08/21/2019 Plans C401 STORM LINES 1 THRU 5
08/21/2019 Plans C402 STORM DETAILS
08/29/2019 Plans C601 WATER MAIN DETAIL SHEET
08/29/2019 Plans C600 PUBLIC WATER MAIN IMPROVEMENT PLAN
08/29/2019 Letter Applicant Letter - FDP (DFDP)
09/05/2019 Activity Document I-470 BUSINESS -LOT 13 REV-COST ESTM-9-4-19
09/05/2019 Activity Document Fees PL2019222 I-470 Business and Technology Center Lot 13A FDP
01/07/2020 Plans Address Plan
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home