Permit Application Status

PRSUBD20201467


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20201467
Public Infrastructure
Final Acceptance
ABP FUNDING LLC
DEVELOPMENT COMPLETE
Full development for a subdivision
06/03/2020
06/08/2021
07/19/2023
Locations
Contacts
ABP FUNDING LLC, Address:11040 OAKMONT ST  
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
KAT EXCAVATION INC, Address:309 N OAK, Phone:(816) 690-4611  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 06/03/2020 06/08/2021
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 05/04/2021
91100C8-Sanitary Sewer Insp Fees $6,969.45 $6,969.45 Paid 05/04/2021
91100C9-Water Insp Fee $3,237.00 $3,237.00 Paid 05/04/2021
9110072-Water Test Fee $600.00 $600.00 Paid 05/04/2021
9110068-Storm Fee $8,121.15 $8,121.15 Paid 07/29/2021
9110081-Street Inspections $8,571.15 $8,571.15 Paid 07/29/2021
9110071-Site Grading Fee $985.86 $985.86 Paid 07/29/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Partial 8/25/2021 8/25/2021 08/25/2021
Misc
Informational
08/25/2021
8/25/21 14:40 - Kat excavating is doing tree removals, started mid morning today. Will get with them tomorrow and make sure that they get esc in place since ground is being disturbed.
Erosion Control Inspection Partial 8/26/2021 8/26/2021 08/26/2021
Misc
Informational
08/25/2021
8/25/21 14:40 - Kat excavating is doing tree removals, started mid morning today. Will get with them tomorrow and make sure that they get esc in place since ground is being disturbed.
Misc
Informational
08/26/2021
8/26/21 9:00 - Spoke to the contractor about esc, was informed it would be installed tomorrow morning. Resident stopped by and expressed concerns about construction messing up the pavers off of Ward and also off Scherer. Planning to attach photos or retake tomorrow morning. Resident also expressed type 3 barricade locations and why they haven’t been installed, due to the roads that these signs are called out for have wood barricades in place which was placed years prior to this project starting.
Site Visit Partial 9/1/2021 9/1/2021 09/01/2021
Misc
Informational
09/01/2021
9/1/21 9:00 - Spoke with the contractor about keeping the water shed entrance open and not blocked, he also told me the resident at 1630 SW Hedgewood Ln had some issues about what was his property line and that the contractor was encroaching it. Sent the residents name and number to Development Supervisor to call. Talked to the resident Gary about the power lines on Ward, he asked if they was going to be removed and informed him probably not. We also spoke about the rod iron fence and informed him that the plans showed it following the retaining wall. 13:50 - Stopped by to see how progress is going, hauling trees from the South side of Winthrop to the main area for the project on the North side. Contractor told me styrene the would be cleaned up by the end of the day. After further discussion with the contractor something messed up with them going onto the property of 1630 SW Hedgewood Ln and that has now been corrected.
Site Visit Partial 9/2/2021 9/2/2021 09/02/2021
Misc
Informational
09/01/2021
9/1/21 9:00 - Spoke with the contractor about keeping the water shed entrance open and not blocked, he also told me the resident at 1630 SW Hedgewood Ln had some issues about what was his property line and that the contractor was encroaching it. Sent the residents name and number to Development Supervisor to call. Talked to the resident Gary about the power lines on Ward, he asked if they was going to be removed and informed him probably not. We also spoke about the rod iron fence and informed him that the plans showed it following the retaining wall. 13:50 - Stopped by to see how progress is going, hauling trees from the South side of Winthrop to the main area for the project on the North side. Contractor told me styrene the would be cleaned up by the end of the day. After further discussion with the contractor something messed up with them going onto the property of 1630 SW Hedgewood Ln and that has now been corrected.
Misc
Informational
09/02/2021
9/2/21 13:30 - Spoke to the contractor briefly about what was going on for the day. He was waiting for the erosion control people to show up to show them where to place it, informed me that Friday they would be grinding trees.
Site Visit Partial 9/8/2021 9/8/2021 09/08/2021
Misc
Informational
09/02/2021
9/1/21 9:00 - Spoke with the contractor about keeping the water shed entrance open and not blocked, he also told me the resident at 1630 SW Hedgewood Ln had some issues about what was his property line and that the contractor was encroaching it. Sent the residents name and number to Development Supervisor to call. Talked to the resident Gary about the power lines on Ward, he asked if they was going to be removed and informed him probably not. We also spoke about the rod iron fence and informed him that the plans showed it following the retaining wall. 13:50 - Stopped by to see how progress is going, hauling trees from the South side of Winthrop to the main area for the project on the North side. Contractor told me styrene the would be cleaned up by the end of the day. After further discussion with the contractor something messed up with them going onto the property of 1630 SW Hedgewood Ln and that has now been corrected.
Misc
Informational
09/02/2021
9/2/21 13:30 - Spoke to the contractor briefly about what was going on for the day. He was waiting for the erosion control people to show up to show them where to place it, informed me that Friday they would be grinding trees.
Misc
Informational
09/07/2021
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
09/07/2021
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
09/08/2021
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
09/08/2021
9/8/21 9:20 - Trees are being ground up on site. Sent an email to the contractors project manager about some ESC issues. Fence has been knocked down close to Winthrop Dr. 14:00 - No workers on site, trees have been chipped up.
Misc
Informational
04/18/2022
On Thursday, 4-14-2022 The modular wall company installing first coarse of wall for Detention Basin.
Sanitary - Material Verification Partial 11/08/2021
Misc
Informational
11/08/2021
On Monday, 11-08-2021. The contractor began Sanitary Sewer installation at line A. Contractor encountered a existing 48” CMP culvert and the sewer service passes underneath the culvert pipe. A section of the CMP pipe was cut out to place the sewer main and well be reinstalled with band restraints. The existing Man Hole core will be completed tomorrow.
Erosion Control Inspection Passed 8/27/2021 8/27/2021 04/06/2022
Misc
Informational
08/26/2021
8/25/21 14:40 - Kat excavating is doing tree removals, started mid morning today. Will get with them tomorrow and make sure that they get esc in place since ground is being disturbed.
Misc
Informational
08/26/2021
8/26/21 9:00 - Spoke to the contractor about esc, was informed it would be installed tomorrow morning. Resident stopped by and expressed concerns about construction messing up the pavers off of Ward and also off Scherer. Planning to attach photos or retake tomorrow morning. Resident also expressed type 3 barricade locations and why they haven’t been installed, due to the roads that these signs are called out for have wood barricades in place which was placed years prior to this project starting.
Misc
Informational
08/27/2021
8/27/21 12:00 - ESC has been placed along the creek and in front of the storm inlets that was called out on the plans. Class 3 barricades was also placed at Winthrop and Winthrop Terr.
Misc
Informational
04/06/2022
On Wednesday, 4-06-2022 I am performing a erosion review and found all erosion measures still working and performing as designed.
Misc
Informational
05/02/2022
On Monday 5-02-2022. The project got a complaint about mud from the rain fall on Friday. A lot of rain fail all day and night on Friday. The contractor has mobilized a skid steer and broom to clean roadway. Forecast is calling for rain all day today and night. May be a on going problem.
Storm Sewer Construction Inspection Partial 04/13/2022
Misc
Informational
04/28/2022
On Wednesday, 4-27-2022 Holt House Contracting Installed Detention Basin structure 201 and line 200 with end section. Also it was determined, the CI line for the Modular wall basin has a problem with the pipe elevation entering the basin. The designer has been notified and changes are expected. On Thursday, 4-28-2022. Contractor resumes storm sewer installation. Contractor is installing structure 101 with 24” HDPE pipe. Rain has came and stop installation at 9:25am. On Friday, 4-29-2022 Site Rite Construction resumes storm sewer installation for structure 102 and 103. Contractor placed approx 120LF of 18” HDPE pipe. Contractor poured dog houses and inverts for structures.
Misc
Informational
05/02/2022
On Monday, 5-02-2022. Contractor resumes storm sewer installation. Contractor installed structures 103, 104 and 105. Approx 120LF of 15” HDPE Pipe was placed and compacted. (1) invert poured on Friday will be patched and dog houses and inverts for structures placed today will be poured.
Misc
Informational
05/09/2022
ON Monday 5-09-2022, Holt House construction resumed Storm Sewer installation. The contractor installed approx 240 LF of 36” HDPE pipe from line structure 800 to 801. And back filled. On Thursday, 5-12-2022. The contractor resumed storm sewer installation placing approx 200 LF of 24” HDPE pipe from structures 301 to 303 and back filled about 160 LF. On Friday, 5-13-2022. Holt House contractors resumed placement of Storm Sewers. The contractor set CI’s 501 & 303. Rock fill was placed between the water lines and the storm sewer where they crossed. Schlagel designer made a location change for the Detention out flow structure that sits just north of 14th St. and proposes structure be moved to the south side of the detention basin.
Misc
Informational
05/16/2022
On Monday, 5-16-2022. Contractor Holt House resumed storm sewer installation. installing CI’s 501 and 401. Contractor also laid 98 LF of 15” HDPE pipe.
Misc
Informational
06/29/2022
On Wednesday, 6-29-2022 Kat Excavating began the installation of the structure #802. This structure ties into the existing CI located on the north side of the 14th street entrance and then ties into structure #801. On Thursday, 6-30-2022 Kat Excavating resumed installation of structure 801 and 802. Contractor installed approx 36LF of 36” HDPE pipe and the middle section of the 6’x7’ box section. Contractor also places approx 16’ of 36” RCP connecting system to the main storm system. The invert for the structure was poured for both boxes. On Friday, 7-01-2022 contractor Holt House grouted lift rings and areas that needed grouting in inverts for boxes set yesterday.
Retaining Wall Inspection Partial 04/18/2022
Misc
Informational
04/21/2022
On Thursday 4-21-2022 ,They wall contractor resumed modular wall installation. I mistakenly placed (2) wall inspection in the site visit section.
Misc
Informational
04/25/2022
On Monday 4-25-2022, Wall installers resumed modular wall installation. Contractor worked installing 1st coarse for south wall in basin. On Tuesday, 4-26-2022. Contractor resumes wall erection. Contractor working on the south wall and the SW corner of the wall in the Detention Basin.
Misc
Informational
05/02/2022
On Monday, 5-02-2022 the contractor resumed the modular will installation south wall. Rain starting of and on. Scheduled for afternoon and evening.
Misc
Informational
05/05/2022
On Thursday, 5-05-2022. Modular wall contractor placing South wall for Detention Basin.
Misc
Informational
05/09/2022
On Monday 5-09-2022 contractor completed small grading for first row of base wall for the north wall. Holt House has not replaced pipe that needs to be RCP instead of HDPE pipe.
Misc
Informational
05/12/2022
On Thursday, 5-12-2022. The contractor resumed modular wall installation for Detention Basin. Contractor worked on the north wall of the basin.
Misc
Informational
05/16/2022
On Monday, 5-16-2022 the contractor resumed wall installation working on the north wall in the basin.
Misc
Informational
06/03/2022
On Thursday, 6-02-2022 the contractor completed the removal and re-setting of the Detention Basin structure and pipe installation to the south side of the basin. On Friday, 6-03-2022, contractor cut existing CI Box on Winthrop Terrace for the installation of Storm Sewer at line #901 from EX-G2. Contractor found a Gas Line that will be approx 6” under the new proposed 15” HDPE pipe. Gas Company came out and said the contractor could install the pipe with the minimal cover. Contractor resumed installation of the Storm Sewer.
Misc
Informational
06/16/2022
The contractor has been continually working to install the Modular Wall located at the south West end of the project. This wall installation started on approx 6-01-2022 through today, Thursday, 6-16-2022
Misc
Informational
06/24/2022
On Friday, 6-24-2022. Contractor constructing modular wall located at the south west end of the project.
Misc
Informational
06/30/2022
On Wednesday and Thursday, 6-29 and 6-30-2022 wall contractor resumed modular wall installation for wall 2 located at the SE side of the project.
Misc
Informational
07/06/2022
On Wednesday, 7-06-2022. The modular wall company is finishing the south wall.
Site Visit Partial 9/20/2021 9/20/2021 04/20/2022
Misc
Informational
09/08/2021
9/1/21 9:00 - Spoke with the contractor about keeping the water shed entrance open and not blocked, he also told me the resident at 1630 SW Hedgewood Ln had some issues about what was his property line and that the contractor was encroaching it. Sent the residents name and number to Development Supervisor to call. Talked to the resident Gary about the power lines on Ward, he asked if they was going to be removed and informed him probably not. We also spoke about the rod iron fence and informed him that the plans showed it following the retaining wall. 13:50 - Stopped by to see how progress is going, hauling trees from the South side of Winthrop to the main area for the project on the North side. Contractor told me styrene the would be cleaned up by the end of the day. After further discussion with the contractor something messed up with them going onto the property of 1630 SW Hedgewood Ln and that has now been corrected.
Misc
Informational
09/08/2021
9/2/21 13:30 - Spoke to the contractor briefly about what was going on for the day. He was waiting for the erosion control people to show up to show them where to place it, informed me that Friday they would be grinding trees.
Misc
Informational
09/08/2021
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
09/08/2021
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
09/08/2021
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
09/08/2021
9/8/21 9:20 - Trees are being ground up on site. Sent an email to the contractors project manager about some ESC issues. Fence has been knocked down close to Winthrop Dr. 14:00 - No workers on site, trees have been chipped up.
Misc
Informational
04/20/2022
On Tuesday, 4-19-2022 The contractor resumed Modular wall installation. Contractor installed up 9 courses high and back filled and compacted the rock fill.
Erosion Control Inspection Failed 5/3/2022 05/04/2022
Misc
Informational
08/27/2021
8/25/21 14:40 - Kat excavating is doing tree removals, started mid morning today. Will get with them tomorrow and make sure that they get esc in place since ground is being disturbed.
Misc
Informational
08/27/2021
8/26/21 9:00 - Spoke to the contractor about esc, was informed it would be installed tomorrow morning. Resident stopped by and expressed concerns about construction messing up the pavers off of Ward and also off Scherer. Planning to attach photos or retake tomorrow morning. Resident also expressed type 3 barricade locations and why they haven’t been installed, due to the roads that these signs are called out for have wood barricades in place which was placed years prior to this project starting.
Misc
Informational
08/27/2021
8/27/21 12:00 - ESC has been placed along the creek and in front of the storm inlets that was called out on the plans. Class 3 barricades was also placed at Winthrop and Winthrop Terr.
PW-Misc
Corrective Action Required
05/04/2022
Received a complaint from homeowners in subdivision about flooding and erosion control problems. Had some mud on 14th street, also found a few area's that needs silt fence installed. The silt fence around the perameters of the site were good. Contractor is cleaning up silt in the street where failures occurred. Silt fence is to be installed ASAP in failed area's.
Storm Sewer Construction Inspection Partial 05/11/2022
Misc
Informational
05/11/2022
Removed HDPE pipe going into the detention basin. Replaced with required RCP pipe. Poured collars for the 2 structures installed by the basin. Working on installing the outflow structure in the basin. 5/11/22
Retaining Wall Inspection Partial 05/11/2022
Misc
Informational
05/11/2022
Installing the retaining wall in the basin. They are installing over the rcp pipe.
Misc
Informational
05/11/2022
Storm Sewer Construction Inspection Partial 5/17/2022 05/17/2022
Misc
Informational
05/11/2022
Removed HDPE pipe going into the detention basin. Replaced with required RCP pipe. Poured collars for the 2 structures installed by the basin. Working on installing the outflow structure in the basin. 5/11/22
Misc
Informational
05/17/2022
Pouring collars on the last few curb inlets by the street.
Retaining Wall Inspection Partial 5/17/2022 05/17/2022
Misc
Informational
05/11/2022
Installing the retaining wall in the basin. They are installing over the rcp pipe.
Misc
Informational
05/11/2022
Misc
Informational
05/17/2022
Contractor is continuing installing the retaining wall on the north side of the basin.
Water Line - Construction Inspection Partial 05/19/2022
Misc
Informational
05/19/2022
On Thursday, 5-19-2022 Holt House Excavating installed approx 300 LF of 6” water line. On Friday Holt House contractor resumed 8” water main installation placing approx 600 LF of 8” water main and set (1) Hydrant at sta 7+47 and back filled system.
Misc
Informational
05/23/2022
On Monday Contractor resumed water main installation. Contractor started at approx sta 10+00 heading north across 14 th St. Contractor set (1) hydrant at sta 10+98
Sanitary Sewer - Vacuum Failed 06/06/2022
Misc
Informational
06/06/2022
6-6-22 AN 10psi 4min D4 passed D3 passed D2 passed D1 passed A1 passed A2 passed A3 broken riser ring FAILED B5 leaking air FAILED B4 shifted rise leaking air FAILED B3 passed B2 passed B1 passed C1 passed
Sanitary Sewer - Air Test Passed 06/06/2022
Misc
Informational
06/06/2022
6-6-22 AN pressure test 4psi for 7:30min B2 to B1 passed B2 to C1 passed B2 to B3. Passed B3 to B4 passed B4 to B5 passed A3 to A2 passed A2 to A1 passed A1 to existing MH passed D4 to D3 passed D3 to D2 passed D2 to D1 passed D1 To existing MH Passed
Sanitary Sewer - Mandrel Passed 06/06/2022
Misc
Informational
06/06/2022
6-6-22 AN mandrel test B2 to B1 passed B2 to C1 passed B2 to B3. Passed B3 to B4 passed B4 to B5 passed A3 to A2 passed A2 to A1 passed A1 to existing MH passed D4 to D3 passed D3 to D2 passed D2 to D1 passed D! To existing MH Passed
Water Line - Hydrostatic Test Partial 06/07/2022
Misc
Informational
06/07/2022
6-7-22 AN. The water line on Winthrop terrace passed the hydrostatic test at 150 psi for 2hours
Sanitary Sewer - Vacuum Passed 06/07/2022
Misc
Informational
06/07/2022
6-6-22 AN 10psi 4min D4 passed D3 passed D2 passed D1 passed A1 passed A2 passed A3 broken riser ring FAILED (fixed MH and it passed) B5 leaking air FAILED (fixed MH and it passed) B4 shifted rise leaking air FAILED (fixed MH and it passed) B3 passed B2 passed B1 passed C1 passed
Water Line - Construction Inspection Partial 06/08/2022
Misc
Informational
06/08/2022
6-8-22 AN. Crew finished up the smaller water main run but still needs to hydrostatic test the line.
Grading/Excavation/Fill Inspection Partial 06/08/2022
Misc
Informational
04/05/2022
On Monday 4-04-2022. Kat Excavating remobilized and started re-graded and adding fill, built a detention basin and raised fill dirt. On Tuesday 4-05-2022. Kat Contracting resumed mass fill grading.
Misc
Informational
06/08/2022
6-8-22 AN. Kat was doing grading on the road to get it to the proper grade.
Retaining Wall Inspection Partial 06/08/2022
Misc
Informational
05/17/2022
Installing the retaining wall in the basin. They are installing over the rcp pipe.
Misc
Informational
05/17/2022
Misc
Informational
05/17/2022
Contractor is continuing installing the retaining wall on the north side of the basin.
Misc
Informational
06/08/2022
6-8-22 AN crew has been working on the retaining wall off of ward road.
Sanitary Sewer - Camera Test Partial 4/1/2022 06/08/2022
Misc
Corrective Action Required
06/08/2022
6-8-22 AN. Let Holthouse know that they need to 1. Make sure all inverts are done, 2. Cut all the mastic out , and 3. Flush the sewer line to get all the debris out of the line. All of this needs to be done before the camera test can be done.
Water Line - Hydrostatic Test Passed 06/09/2022
Misc
Informational
06/07/2022
6-7-22 AN. The water line on Winthrop terrace passed the hydrostatic test at 150 psi for 2hours
Misc
Informational
06/09/2022
6-8-22 AN the second small water main run passed the hydrostatic test 150 psi for 2 hours
Water Line - Construction Inspection Partial 06/09/2022
Misc
Informational
06/09/2022
6-8-22 AN. The larger and smaller water mains are both installed. There is still a water main and meter that needs to be abandoned
Misc
Informational
07/11/2022
On Monday, 7-11-2022. Holt House contracting completed chlorination of the water line for the project. This will stay in the line until Wednesday and we will de-chlorinate and take water samples.
Water Line - Coliform Test 1 Partial 06/09/2022
Misc
Informational
06/09/2022
6-9-22 AN. Both water mains have been chlorinated on 6-8-22
Water Line - Coliform Test 1 Partial 06/14/2022
Misc
Informational
06/09/2022
6-9-22 AN. Both water mains have been chlorinated on 6-8-22 6-13-22 AN first round of water samples were done 4 samples
Grading/Excavation/Fill Inspection Partial 06/15/2022
Misc
Informational
04/05/2022
On Monday 4-04-2022. Kat Excavating remobilized and started re-graded and adding fill, built a detention basin and raised fill dirt. On Tuesday 4-05-2022. Kat Contracting resumed mass fill grading. On Wednesday, 4-06-2022 Kat Excavating resumes grading detention basin north of 14th St. Contractor completing mass grading at various locations. On Thursday 4-07-2022. The contractor resumed mass grading throughout project. On Friday 4-08-2022. Kat Excavating resumes fill grading and installation of the detention basin north of 14th street.
Misc
Informational
04/11/2022
On Monday, 4-11-2022 Kat Excavating resumes mass grading fr various locations. Contractor Diggs for Detention Basin walls next to 14th St road and also Both walls located on the east side of Ward street at both north and south ends of the project. On Tuesday, 4-12-2022. Kat Excavating resumes grading. Contractor working on middle Detention Basin. Contractor Down to Earth starts modular wall for the north Detention Basin. Started first coarse.
Misc
Informational
06/10/2022
On Friday, 6-10-2022. I and the contractor Kat Excavating performed a proof roll for the sub-base. Base Failed proof roll. Contractor will til and let fill dry, then re-compact. We will perform another proof roll next week.
Misc
Informational
06/13/2022
On Monday, 6-13-2022. Holt House Contractor resumed grading sub-base for roadway. Sub-base failed proof roll. On Tuesday, 6-14-2022. Kat Excavating performed and passed a proof roll on the sub-base. On Wednesday, 6-15-2022. Kat excavating begin geo-grid and type 5 base aggregate base placement. On Thursday, 6-16-2022, Kat Excavating completed geo-grid and type 5 rock fill and compaction for the intersection roadway stub on SW Heartwood Drive. Contractor completed demo and saw cut street for curb and hauled.
Misc
Informational
07/06/2022
On Wednesday, 7-06-2022 Kat Excavating graded various areas that needed fill. On Friday, 7-08-2022. KAT Excavating worked grading various areas around project. Fill dirt was placed behind Modular wall #2 at the SW end of project. Final grading was completed to lay the first coarse for Modular wall #3
Misc
Informational
07/11/2022
On Monday, 7-11-2022. Kat Excavating is fine grading for placement of curb scheduled for Tuesday.
Misc
Informational
07/15/2022
On Friday, 7-15-2022. Kat Excavating fine grading for type 5 aggr for roadway surface. Also contractor is grading fill dirt at various areas.
Water Line - Coliform Test 1 Partial 06/21/2022
Misc
Informational
06/14/2022
6-9-22 AN. Both water mains have been chlorinated on 6-8-22 6-13-22 AN first round of water samples were done 4 samples
Misc
Corrective Action Required
06/21/2022
6-15-22—- 6-21-22 AN first round of samples fail both mains . Will have to flush and chlorinate the both mains again
Water Line - Coliform Test 2 Partial 06/21/2022
Misc
Informational
06/14/2022
6-14-22 AN second round of samples taken . 4 samples
Misc
Corrective Action Required
06/21/2022
6-15-22—- 6-21-22 AN first round of samples fail both mains . Will have to flush and chlorinate the both mains again
Water Line - Coliform Test 1 Partial 06/21/2022
Misc
Informational
06/21/2022
6-9-22 AN. Both water mains have been chlorinated on 6-8-22 6-13-22 AN first round of water samples were done 4 samples
Misc
Corrective Action Required
06/21/2022
6-15-22—- 6-21-22 AN first round of samples fail both mains . Will have to flush and chlorinate the both mains again
Misc
Informational
06/21/2022
6-21-22 AN holthouse is flushing both mains and chlorinating again
Water Line - Coliform Test 2 Partial 06/21/2022
Misc
Informational
06/21/2022
6-14-22 AN second round of samples taken . 4 samples
Misc
Corrective Action Required
06/21/2022
6-15-22—- 6-21-22 AN first round of samples fail both mains . Will have to flush and chlorinate the both mains again
Misc
Informational
06/21/2022
6-21-22 AN holthouse is flushing both mains and chlorinating again
Erosion Control Inspection Partial 07/13/2022
Misc
Informational
05/04/2022
8/25/21 14:40 - Kat excavating is doing tree removals, started mid morning today. Will get with them tomorrow and make sure that they get esc in place since ground is being disturbed.
Misc
Informational
05/04/2022
8/26/21 9:00 - Spoke to the contractor about esc, was informed it would be installed tomorrow morning. Resident stopped by and expressed concerns about construction messing up the pavers off of Ward and also off Scherer. Planning to attach photos or retake tomorrow morning. Resident also expressed type 3 barricade locations and why they haven’t been installed, due to the roads that these signs are called out for have wood barricades in place which was placed years prior to this project starting.
Misc
Informational
05/04/2022
8/27/21 12:00 - ESC has been placed along the creek and in front of the storm inlets that was called out on the plans. Class 3 barricades was also placed at Winthrop and Winthrop Terr.
PW-Misc
Corrective Action Required
05/04/2022
Received a complaint from homeowners in subdivision about flooding and erosion control problems. Had some mud on 14th street, also found a few area's that needs silt fence installed. The silt fence around the perameters of the site were good. Contractor is cleaning up silt in the street where failures occurred. Silt fence is to be installed ASAP in failed area's.
Misc
Informational
07/13/2022
7-13-22 RH. Silt fence was installed and in working order.
Storm Sewer Construction Inspection Partial 07/13/2022
Misc
Informational
05/17/2022
Removed HDPE pipe going into the detention basin. Replaced with required RCP pipe. Poured collars for the 2 structures installed by the basin. Working on installing the outflow structure in the basin. 5/11/22
Misc
Informational
05/17/2022
Pouring collars on the last few curb inlets by the street.
Misc
Informational
07/13/2022
7-13-22 RH. Grouting of CI’s of the street inlets was occurring while on site.
Pavement-Curb Construction Partial 07/13/2022
Misc
Informational
07/13/2022
7-13-22 RH. On Tuesday the 12th Freedom installed all CS lazy-back curbs around pavement and installed all CI catch basin throats around project.
Erosion Control Inspection Partial 07/18/2022
Misc
Informational
07/13/2022
8/25/21 14:40 - Kat excavating is doing tree removals, started mid morning today. Will get with them tomorrow and make sure that they get esc in place since ground is being disturbed.
Misc
Informational
07/13/2022
8/26/21 9:00 - Spoke to the contractor about esc, was informed it would be installed tomorrow morning. Resident stopped by and expressed concerns about construction messing up the pavers off of Ward and also off Scherer. Planning to attach photos or retake tomorrow morning. Resident also expressed type 3 barricade locations and why they haven’t been installed, due to the roads that these signs are called out for have wood barricades in place which was placed years prior to this project starting.
Misc
Informational
07/13/2022
8/27/21 12:00 - ESC has been placed along the creek and in front of the storm inlets that was called out on the plans. Class 3 barricades was also placed at Winthrop and Winthrop Terr.
PW-Misc
Corrective Action Required
07/13/2022
Received a complaint from homeowners in subdivision about flooding and erosion control problems. Had some mud on 14th street, also found a few area's that needs silt fence installed. The silt fence around the perameters of the site were good. Contractor is cleaning up silt in the street where failures occurred. Silt fence is to be installed ASAP in failed area's.
Misc
Informational
07/13/2022
7-13-22 RH. Silt fence was installed and in working order.
Misc
Informational
07/18/2022
On Monday, 7-18-2022 I performed and erosion inspection and found all fencing working properly.
Pavement-Proof Roll Passed 07/18/2022
Water Line - Coliform Test 2 Passed 07/19/2022
Misc
Informational
06/21/2022
6-14-22 AN second round of samples taken . 4 samples
Misc
Corrective Action Required
06/21/2022
6-15-22—- 6-21-22 AN first round of samples fail both mains . Will have to flush and chlorinate the both mains again
Misc
Informational
06/21/2022
6-21-22 AN holthouse is flushing both mains and chlorinating again
Misc
Informational
07/13/2022
7-13-22 RH. Contractor provided water samples for 4 locations. Samples were brought to Keystone laboratories to be tested. Results will be sent to Tom Taylor after samples are tested. On Thursday, 7-14-2022. I acquired 2nd water sample for testing and took it to Keystone test lab.
Misc
Informational
07/18/2022
On Friday, 7-15-2022. Test results for water sample taken on Wednesday 7-13-2022 came in and were passing free from any contamination. A 2nd sample was taken today and taken to Keystone Lab for testing.
Misc
Informational
07/19/2022
On Monday, 7-18-2022. Water sample results from Thursday 7-14-2022 are in and passed bacteria and water testing for this project.
Erosion Control Inspection Partial 07/26/2022
Misc
Informational
07/18/2022
8/25/21 14:40 - Kat excavating is doing tree removals, started mid morning today. Will get with them tomorrow and make sure that they get esc in place since ground is being disturbed.
Misc
Informational
07/18/2022
8/26/21 9:00 - Spoke to the contractor about esc, was informed it would be installed tomorrow morning. Resident stopped by and expressed concerns about construction messing up the pavers off of Ward and also off Scherer. Planning to attach photos or retake tomorrow morning. Resident also expressed type 3 barricade locations and why they haven’t been installed, due to the roads that these signs are called out for have wood barricades in place which was placed years prior to this project starting.
Misc
Informational
07/18/2022
8/27/21 12:00 - ESC has been placed along the creek and in front of the storm inlets that was called out on the plans. Class 3 barricades was also placed at Winthrop and Winthrop Terr.
PW-Misc
Corrective Action Required
07/18/2022
Received a complaint from homeowners in subdivision about flooding and erosion control problems. Had some mud on 14th street, also found a few area's that needs silt fence installed. The silt fence around the perameters of the site were good. Contractor is cleaning up silt in the street where failures occurred. Silt fence is to be installed ASAP in failed area's.
Misc
Informational
07/18/2022
7-13-22 RH. Silt fence was installed and in working order.
Misc
Informational
07/18/2022
On Monday, 7-18-2022 I performed and erosion inspection and found all fencing working properly.
Misc
Informational
07/26/2022
7-26-22 RH. Silt fence is up and in working order.
Site Visit Complete 07/27/2022
Misc
Informational
04/20/2022
9/1/21 9:00 - Spoke with the contractor about keeping the water shed entrance open and not blocked, he also told me the resident at 1630 SW Hedgewood Ln had some issues about what was his property line and that the contractor was encroaching it. Sent the residents name and number to Development Supervisor to call. Talked to the resident Gary about the power lines on Ward, he asked if they was going to be removed and informed him probably not. We also spoke about the rod iron fence and informed him that the plans showed it following the retaining wall. 13:50 - Stopped by to see how progress is going, hauling trees from the South side of Winthrop to the main area for the project on the North side. Contractor told me styrene the would be cleaned up by the end of the day. After further discussion with the contractor something messed up with them going onto the property of 1630 SW Hedgewood Ln and that has now been corrected.
Misc
Informational
04/20/2022
9/2/21 13:30 - Spoke to the contractor briefly about what was going on for the day. He was waiting for the erosion control people to show up to show them where to place it, informed me that Friday they would be grinding trees.
Misc
Informational
04/20/2022
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
04/20/2022
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
04/20/2022
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
04/20/2022
9/8/21 9:20 - Trees are being ground up on site. Sent an email to the contractors project manager about some ESC issues. Fence has been knocked down close to Winthrop Dr. 14:00 - No workers on site, trees have been chipped up.
Misc
Informational
04/20/2022
On Tuesday, 4-19-2022 The contractor resumed Modular wall installation. Contractor installed up 9 courses high and back filled and compacted the rock fill. On Wednesday, 4-20-2022. The wall contractor resumed wall installation. Contractor has installed to 12 courses height and back filled.
Misc
Informational
07/27/2022
On Wednesday, 7-27-2022. Holt House Excavating repaired the water sprinkler system they damaged at the SW Heartwood Dr. in the creek at the sewer & man hole connection. On Wednesday, 7-27-2022. The contractor removed the Meter and valve located at the curb line in the SW Heartwood Dr area by sta. 1o+oo
Water Line - Construction Inspection Partial 07/28/2022
Misc
Informational
06/09/2022
6-8-22 AN. The larger and smaller water mains are both installed. There is still a water main and meter that needs to be abandoned
Misc
Informational
07/27/2022
On Tuesday,7-26-2022, A water main connection was performed for the 8” main at 14th street. The contractor cut in a 8”x8” T with Two valves. Water was off from approx 12:00 pm until 4:00 pm, All services restored. On Wednesday, 7-27-2022. Holt House Contractors completed the water main capping of the existing 8” water main located at the east side of Heartwood Dr. It was determined after repairs were made to fix (2) broken lines and the contractor completed, the meter was part of the irrigation system to the entrance and median areas, as well as the fountain located back of the homes on tract E2 for homes for lot 56 thru 58 on Heartwood Dr. The design engineer was notified for a solution. On Thursday, 7-28-2022. I met with Ryan from Schlage Engineering to view the area and surrounding for a solution. Well get back with me soon for the solution.
Pavement-Surface Passed 08/02/2022
Misc
Informational
08/02/2022
On Tuesday, 8-02-2022. Base asphalt was placed and Kruger Technologies took compaction densities for pavement. On Wednesday, 8-03-2022. Tandem Asphalt returned to lay surface asphalt. Contractor began placement of surface asphalt when rain began to fall causing stoppage of overlay. On Thursday, 8-04-2022, Tandem Asphalt resumed surfac overlay and completed surface pavement for roadway completing all surface pavement.
Grading/Excavation/Fill Inspection Partial 08/19/2022
Misc
Informational
06/08/2022
On Monday 4-04-2022. Kat Excavating remobilized and started re-graded and adding fill, built a detention basin and raised fill dirt. On Tuesday 4-05-2022. Kat Contracting resumed mass fill grading.
Misc
Informational
06/08/2022
6-8-22 AN. Kat was doing grading on the road to get it to the proper grade.
Misc
Informational
08/19/2022
On Friday, 8-19-2022. Kat Excavating worked installing conduit and back filling throughout project. And pro logistic placed conduit at the southeast end of the project on Woodridge.
Erosion Control Inspection Passed 08/29/2022
Misc
Informational
07/26/2022
8/25/21 14:40 - Kat excavating is doing tree removals, started mid morning today. Will get with them tomorrow and make sure that they get esc in place since ground is being disturbed.
Misc
Informational
07/26/2022
8/26/21 9:00 - Spoke to the contractor about esc, was informed it would be installed tomorrow morning. Resident stopped by and expressed concerns about construction messing up the pavers off of Ward and also off Scherer. Planning to attach photos or retake tomorrow morning. Resident also expressed type 3 barricade locations and why they haven’t been installed, due to the roads that these signs are called out for have wood barricades in place which was placed years prior to this project starting.
Misc
Informational
07/26/2022
8/27/21 12:00 - ESC has been placed along the creek and in front of the storm inlets that was called out on the plans. Class 3 barricades was also placed at Winthrop and Winthrop Terr.
PW-Misc
Corrective Action Required
07/26/2022
Received a complaint from homeowners in subdivision about flooding and erosion control problems. Had some mud on 14th street, also found a few area's that needs silt fence installed. The silt fence around the perameters of the site were good. Contractor is cleaning up silt in the street where failures occurred. Silt fence is to be installed ASAP in failed area's.
Misc
Informational
07/26/2022
7-13-22 RH. Silt fence was installed and in working order.
Misc
Informational
07/26/2022
On Monday, 7-18-2022 I performed and erosion inspection and found all fencing working properly.
Misc
Informational
07/26/2022
7-26-22 RH. Silt fence is up and in working order.
Misc
Informational
08/16/2022
On Tuesday, 8-16-2022. I performed an erosion control inspection after the rain stopped. All fencing is performing as installed.
Misc
Informational
08/29/2022
On Monday 8-29-2022. Advance Erosion Control placed hay mats in and down outer hill sides of all Detention Basins.
Grading/Excavation/Fill Inspection Partial 09/13/2022
Misc
Informational
08/19/2022
On Monday 4-04-2022. Kat Excavating remobilized and started re-graded and adding fill, built a detention basin and raised fill dirt. On Tuesday 4-05-2022. Kat Contracting resumed mass fill grading.
Misc
Informational
08/19/2022
6-8-22 AN. Kat was doing grading on the road to get it to the proper grade.
Misc
Informational
08/19/2022
On Friday, 8-19-2022. Kat Excavating worked installing conduit and back filling throughout project. And pro logistic placed conduit at the southeast end of the project on Woodridge.
Misc
Informational
09/13/2022
On Tuesday, Kat Excavating completed a small amount of dirt fill throughout.
Site Visit Partial 09/20/2022
Misc
Informational
04/20/2022
9/1/21 9:00 - Spoke with the contractor about keeping the water shed entrance open and not blocked, he also told me the resident at 1630 SW Hedgewood Ln had some issues about what was his property line and that the contractor was encroaching it. Sent the residents name and number to Development Supervisor to call. Talked to the resident Gary about the power lines on Ward, he asked if they was going to be removed and informed him probably not. We also spoke about the rod iron fence and informed him that the plans showed it following the retaining wall. 13:50 - Stopped by to see how progress is going, hauling trees from the South side of Winthrop to the main area for the project on the North side. Contractor told me styrene the would be cleaned up by the end of the day. After further discussion with the contractor something messed up with them going onto the property of 1630 SW Hedgewood Ln and that has now been corrected.
Misc
Informational
04/20/2022
9/2/21 13:30 - Spoke to the contractor briefly about what was going on for the day. He was waiting for the erosion control people to show up to show them where to place it, informed me that Friday they would be grinding trees.
Misc
Informational
04/20/2022
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
04/20/2022
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
04/20/2022
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
04/20/2022
9/8/21 9:20 - Trees are being ground up on site. Sent an email to the contractors project manager about some ESC issues. Fence has been knocked down close to Winthrop Dr. 14:00 - No workers on site, trees have been chipped up.
Misc
Informational
04/20/2022
On Tuesday, 4-19-2022 The contractor resumed Modular wall installation. Contractor installed up 9 courses high and back filled and compacted the rock fill. On Wednesday, 4-20-2022. The wall contractor resumed wall installation. Contractor has installed to 12 courses height and back filled.
Misc
Informational
09/20/2022
On Tuesday, 9-20-2022. Wall contractor resumed Modular wall construction for the North wall adjacent Ward Street.
Retaining Wall Inspection Partial 09/26/2022
Misc
Informational
06/08/2022
Installing the retaining wall in the basin. They are installing over the rcp pipe.
Misc
Informational
06/08/2022
Misc
Informational
06/08/2022
Contractor is continuing installing the retaining wall on the north side of the basin.
Misc
Informational
06/08/2022
6-8-22 AN crew has been working on the retaining wall off of ward road.
Misc
Informational
09/26/2022
On Monday, 9-26-2022 contractor resumed modular wall erection for north wall.
Retaining Wall Inspection Passed 10/07/2022
Misc
Informational
09/26/2022
Installing the retaining wall in the basin. They are installing over the rcp pipe.
Misc
Informational
09/26/2022
Misc
Informational
09/26/2022
Contractor is continuing installing the retaining wall on the north side of the basin.
Misc
Informational
09/26/2022
6-8-22 AN crew has been working on the retaining wall off of ward road.
Misc
Informational
09/26/2022
On Monday, 9-26-2022 contractor resumed modular wall erection for north wall.
Misc
Informational
10/07/2022
On Monday, 10-03 through Friday, 10-07-2022 Wall contractor worked erecting and finishing last modular wall at the north end of the project next to Ward Rd.
Site Visit Partial 10/10/2022
Misc
Informational
09/20/2022
9/1/21 9:00 - Spoke with the contractor about keeping the water shed entrance open and not blocked, he also told me the resident at 1630 SW Hedgewood Ln had some issues about what was his property line and that the contractor was encroaching it. Sent the residents name and number to Development Supervisor to call. Talked to the resident Gary about the power lines on Ward, he asked if they was going to be removed and informed him probably not. We also spoke about the rod iron fence and informed him that the plans showed it following the retaining wall. 13:50 - Stopped by to see how progress is going, hauling trees from the South side of Winthrop to the main area for the project on the North side. Contractor told me styrene the would be cleaned up by the end of the day. After further discussion with the contractor something messed up with them going onto the property of 1630 SW Hedgewood Ln and that has now been corrected.
Misc
Informational
09/20/2022
9/2/21 13:30 - Spoke to the contractor briefly about what was going on for the day. He was waiting for the erosion control people to show up to show them where to place it, informed me that Friday they would be grinding trees.
Misc
Informational
09/20/2022
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
09/20/2022
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
09/20/2022
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
09/20/2022
9/8/21 9:20 - Trees are being ground up on site. Sent an email to the contractors project manager about some ESC issues. Fence has been knocked down close to Winthrop Dr. 14:00 - No workers on site, trees have been chipped up.
Misc
Informational
09/20/2022
On Tuesday, 4-19-2022 The contractor resumed Modular wall installation. Contractor installed up 9 courses high and back filled and compacted the rock fill. On Wednesday, 4-20-2022. The wall contractor resumed wall installation. Contractor has installed to 12 courses height and back filled.
Misc
Informational
09/20/2022
On Tuesday, 9-20-2022. Wall contractor resumed Modular wall construction for the North wall adjacent Ward Street.
Misc
Informational
10/10/2022
On Monday 10-10-2022. Concrete Contractor began forming sidewalk and ADA Ramps for installation of sidewalks. Contractor also forming utility cuts areas for sidewalk installation.
Water Line - Construction Inspection Partial 10/10/2022
Misc
Informational
07/28/2022
6-8-22 AN. The larger and smaller water mains are both installed. There is still a water main and meter that needs to be abandoned
Misc
Informational
07/28/2022
On Tuesday,7-26-2022, A water main connection was performed for the 8” main at 14th street. The contractor cut in a 8”x8” T with Two valves. Water was off from approx 12:00 pm until 4:00 pm, All services restored. On Wednesday, 7-27-2022. Holt House Contractors completed the water main capping of the existing 8” water main located at the east side of Heartwood Dr. It was determined after repairs were made to fix (2) broken lines and the contractor completed, the meter was part of the irrigation system to the entrance and median areas, as well as the fountain located back of the homes on tract E2 for homes for lot 56 thru 58 on Heartwood Dr. The design engineer was notified for a solution. On Thursday, 7-28-2022. I met with Ryan from Schlage Engineering to view the area and surrounding for a solution. Well get back with me soon for the solution.
Misc
Informational
10/10/2022
On Monday, 10-10-2022. Holt House Contractors began curb and pavement removals for the water main “T” cap for the water line abandonment on SW Heartwood Dr. Contractor is also reviewing how and where they will relocate the meter from plat #57. It has been determined, the meter shall be relocated north of plate #56 and 2” copper will be bored under roadway and connected to existing 6” main across the street.
Water Line - Construction Inspection Passed 10/11/2022
Misc
Informational
10/10/2022
6-8-22 AN. The larger and smaller water mains are both installed. There is still a water main and meter that needs to be abandoned
Misc
Informational
10/10/2022
On Tuesday,7-26-2022, A water main connection was performed for the 8” main at 14th street. The contractor cut in a 8”x8” T with Two valves. Water was off from approx 12:00 pm until 4:00 pm, All services restored. On Wednesday, 7-27-2022. Holt House Contractors completed the water main capping of the existing 8” water main located at the east side of Heartwood Dr. It was determined after repairs were made to fix (2) broken lines and the contractor completed, the meter was part of the irrigation system to the entrance and median areas, as well as the fountain located back of the homes on tract E2 for homes for lot 56 thru 58 on Heartwood Dr. The design engineer was notified for a solution. On Thursday, 7-28-2022. I met with Ryan from Schlage Engineering to view the area and surrounding for a solution. Well get back with me soon for the solution.
Misc
Informational
10/10/2022
On Monday, 10-10-2022. Holt House Contractors began curb and pavement removals for the water main “T” cap for the water line abandonment on SW Heartwood Dr. Contractor is also reviewing how and where they will relocate the meter from plat #57. It has been determined, the meter shall be relocated north of plate #56 and 2” copper will be bored under roadway and connected to existing 6” main across the street. The “T” was uncovered and the cap was completed. Contractor will pour the restraint on tomorrow. Meter and valve was removed. On Tuesday, 10-11-2022. Holt House Contracting dug the bore pit for the company to bore the copper pipe underneath the street to connect the meter and the main to the sprinkler system. Will request the construction tap for bore. Bore was completed by ALL Pro Excavation.
Site Visit Partial 10/12/2022
Misc
Informational
10/10/2022
9/1/21 9:00 - Spoke with the contractor about keeping the water shed entrance open and not blocked, he also told me the resident at 1630 SW Hedgewood Ln had some issues about what was his property line and that the contractor was encroaching it. Sent the residents name and number to Development Supervisor to call. Talked to the resident Gary about the power lines on Ward, he asked if they was going to be removed and informed him probably not. We also spoke about the rod iron fence and informed him that the plans showed it following the retaining wall. 13:50 - Stopped by to see how progress is going, hauling trees from the South side of Winthrop to the main area for the project on the North side. Contractor told me styrene the would be cleaned up by the end of the day. After further discussion with the contractor something messed up with them going onto the property of 1630 SW Hedgewood Ln and that has now been corrected.
Misc
Informational
10/10/2022
9/2/21 13:30 - Spoke to the contractor briefly about what was going on for the day. He was waiting for the erosion control people to show up to show them where to place it, informed me that Friday they would be grinding trees.
Misc
Informational
10/10/2022
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
10/10/2022
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
10/10/2022
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
10/10/2022
9/8/21 9:20 - Trees are being ground up on site. Sent an email to the contractors project manager about some ESC issues. Fence has been knocked down close to Winthrop Dr. 14:00 - No workers on site, trees have been chipped up.
Misc
Informational
10/10/2022
On Tuesday, 4-19-2022 The contractor resumed Modular wall installation. Contractor installed up 9 courses high and back filled and compacted the rock fill. On Wednesday, 4-20-2022. The wall contractor resumed wall installation. Contractor has installed to 12 courses height and back filled.
Misc
Informational
10/10/2022
On Tuesday, 9-20-2022. Wall contractor resumed Modular wall construction for the North wall adjacent Ward Street.
Misc
Informational
10/10/2022
On Monday 10-10-2022. Concrete Contractor began forming sidewalk and ADA Ramps for installation of sidewalks. Contractor also forming utility cuts areas for sidewalk installation. On Wednesday, 10-12-2022. The Water Service Dept. completed the construction carp request on yesterday for the contractors completion for the irrigation repair and meter relocation. While testing for leaks we found (1) leak and the contractor will come back to complete the repair.
Site Visit Partial 10/17/2022
Misc
Informational
10/12/2022
9/1/21 9:00 - Spoke with the contractor about keeping the water shed entrance open and not blocked, he also told me the resident at 1630 SW Hedgewood Ln had some issues about what was his property line and that the contractor was encroaching it. Sent the residents name and number to Development Supervisor to call. Talked to the resident Gary about the power lines on Ward, he asked if they was going to be removed and informed him probably not. We also spoke about the rod iron fence and informed him that the plans showed it following the retaining wall. 13:50 - Stopped by to see how progress is going, hauling trees from the South side of Winthrop to the main area for the project on the North side. Contractor told me styrene the would be cleaned up by the end of the day. After further discussion with the contractor something messed up with them going onto the property of 1630 SW Hedgewood Ln and that has now been corrected.
Misc
Informational
10/12/2022
9/2/21 13:30 - Spoke to the contractor briefly about what was going on for the day. He was waiting for the erosion control people to show up to show them where to place it, informed me that Friday they would be grinding trees.
Misc
Informational
10/12/2022
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
10/12/2022
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
10/12/2022
9/7/21 13:30 - Trees are being ground up.
Misc
Informational
10/12/2022
9/8/21 9:20 - Trees are being ground up on site. Sent an email to the contractors project manager about some ESC issues. Fence has been knocked down close to Winthrop Dr. 14:00 - No workers on site, trees have been chipped up.
Misc
Informational
10/12/2022
On Tuesday, 4-19-2022 The contractor resumed Modular wall installation. Contractor installed up 9 courses high and back filled and compacted the rock fill. On Wednesday, 4-20-2022. The wall contractor resumed wall installation. Contractor has installed to 12 courses height and back filled.
Misc
Informational
10/12/2022
On Tuesday, 9-20-2022. Wall contractor resumed Modular wall construction for the North wall adjacent Ward Street.
Misc
Informational
10/12/2022
On Monday 10-10-2022. Concrete Contractor began forming sidewalk and ADA Ramps for installation of sidewalks. Contractor also forming utility cuts areas for sidewalk installation. On Wednesday, 10-12-2022. The Water Service Dept. completed the construction carp request on yesterday for the contractors completion for the irrigation repair and meter relocation. While testing for leaks we found (1) leak and the contractor will come back to complete the repair.
Misc
Informational
10/17/2022
On Monday, 10-17-2022 Kat Excavating forming and pouring approx. 250 LF of 5’ wide sidewalk.
Sidewalk Inspection Partial 10/19/2022
Sidewalk Inspection Passed 10/21/2022
Misc
Informational
10/21/2022
On Thursday,10-20-2022. Kat Excavating poured remaining sidewalk throughout project. All utility cut sidewalk, curb cuts, etc.. are completed.
Documents & Images
Date Uploaded File Type Document Name
05/04/2021 Receipt Receipt for transaction:2021-002490
06/08/2021 Letter DE-Permit
06/07/2021 Approved Plans Woodland Glen, 2nd Plat - Sanitary Sewer extention Approved 6.7.21
06/08/2021 Approved Plans Woodland Glen, 2nd Plat - Waterline Approved 6.8.21
06/08/2021 Approved Plans Woodland Glen, 2nd Plat - Waterline Approved 6.8.21
07/29/2021 Receipt Receipt for transaction:2021-006069
08/02/2021 Approved Plans Woodland Glen, 2nd Plat - Street, Stormwater, MDP & ESC Approved 8.2.21
08/25/2021 Letter INSPECTION SUMMARY
08/26/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter INSPECTION SUMMARY
08/31/2021 image.jpg
08/31/2021 48D44F3D-CD02-423E-89C4-79357A185E41.png
08/31/2021 AFFDFD3C-A249-4069-95C9-42FC6B235F4A.jpeg
08/31/2021 Pavers 8-27-21.jpeg
08/31/2021 Pavers on Winthrop 8-27-21.jpeg
08/31/2021 Pavers on Winthrop 8-27-21 pic 3.jpeg
08/31/2021 Pavers on Winthrop 8-27-21 Pic 4.jpeg
08/31/2021 Pavers on Winthrop 8-27-21 Pic 5.jpeg
08/31/2021 Pavers on Winthrop 8-27-21 Pic 5.jpeg0
08/31/2021 Class 3 Barricades 8-27-21.jpeg
08/31/2021 Pavers on Heartwood 8-26-21 pic 1.jpeg
08/31/2021 Pavers on Heartwood 8-26-21 pic 2.jpeg
08/31/2021 Pavers on Heartwood 8-26-21 pic 3.jpeg
08/31/2021 Pavers on Heartwood 8-26-21 pic 4.jpeg
08/31/2021 Pavers on Heartwood 8-26-21 pic 5.jpeg
08/31/2021 Pavers on Heartwood 8-26-21 pic 6.jpeg
09/01/2021 Letter INSPECTION SUMMARY
09/02/2021 Letter INSPECTION SUMMARY
09/08/2021 Letter INSPECTION SUMMARY
10/20/2021 Approved Plans Woodland Glen 2nd Plat Street, Storm, MDP and ESC Revisions Approved 10.20.21
11/08/2021 Letter INSPECTION SUMMARY
11/10/2021 Letter INSPECTION SUMMARY
11/15/2021 Letter INSPECTION SUMMARY
01/28/2022 Letter INSPECTION SUMMARY
02/01/2022 Letter INSPECTION SUMMARY
03/03/2022 Letter INSPECTION SUMMARY
03/04/2022 Letter INSPECTION SUMMARY
03/22/2022 Letter INSPECTION SUMMARY
03/22/2022 Letter INSPECTION SUMMARY
04/05/2022 Letter INSPECTION SUMMARY
04/06/2022 Letter INSPECTION SUMMARY
04/06/2022 Letter INSPECTION SUMMARY
04/13/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/20/2022 Letter INSPECTION SUMMARY
04/20/2022 Letter INSPECTION SUMMARY
04/21/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
05/02/2022 Letter INSPECTION SUMMARY
05/04/2022 Letter INSPECTION SUMMARY
05/05/2022 Letter INSPECTION SUMMARY
05/11/2022 Letter INSPECTION SUMMARY
05/11/2022 Letter INSPECTION SUMMARY
05/17/2022 Letter INSPECTION SUMMARY
05/17/2022 Letter INSPECTION SUMMARY
05/19/2022 Letter INSPECTION SUMMARY
05/23/2022 Letter INSPECTION SUMMARY
05/24/2022 Plans Woodland Glen 2nd Plat Street, Storm, MDP, and ESC Revisions Approved 05.24.22
06/01/2022 Letter INSPECTION SUMMARY
06/01/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/07/2022 Letter INSPECTION SUMMARY
06/07/2022 Letter INSPECTION SUMMARY
06/08/2022 Letter INSPECTION SUMMARY
06/08/2022 Letter INSPECTION SUMMARY
06/08/2022 Letter INSPECTION SUMMARY
06/08/2022 Letter INSPECTION SUMMARY
06/09/2022 Letter INSPECTION SUMMARY
06/09/2022 Letter INSPECTION SUMMARY
06/09/2022 Letter INSPECTION SUMMARY
06/10/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/16/2022 Letter INSPECTION SUMMARY
06/21/2022 Letter INSPECTION SUMMARY
06/21/2022 Letter INSPECTION SUMMARY
06/21/2022 Letter INSPECTION SUMMARY
06/21/2022 Letter INSPECTION SUMMARY
06/21/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/13/2022 Letter INSPECTION SUMMARY
07/13/2022 Letter INSPECTION SUMMARY
07/13/2022 Letter INSPECTION SUMMARY
07/13/2022 Letter INSPECTION SUMMARY
07/14/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
07/19/2022 Letter INSPECTION SUMMARY
07/20/2022 Woodland Glen 2nd Plat Passing Water Samples
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/26/2022 Letter INSPECTION SUMMARY
07/27/2022 Letter INSPECTION SUMMARY
07/27/2022 Letter INSPECTION SUMMARY
07/28/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/19/2022 Letter INSPECTION SUMMARY
08/29/2022 Letter INSPECTION SUMMARY
09/13/2022 Letter INSPECTION SUMMARY
09/20/2022 Letter INSPECTION SUMMARY
09/26/2022 Letter INSPECTION SUMMARY
10/05/2022 Plans 20220926_18-017 SANIATARY AS-BUILTS
10/05/2022 Plans 20220926_18-017 WATER AS-BUILTS
10/07/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/11/2022 Letter INSPECTION SUMMARY
10/12/2022 Letter INSPECTION SUMMARY
10/17/2022 Letter INSPECTION SUMMARY
10/19/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
10/21/2022 3RD Party Insp Report 10-17-22_Final RW Woodland Glen 2nd Plat
11/09/2022 Letter INSPECTION SUMMARY
12/01/2022 Plans 20221114_18-017 SS SET-Rev_11-AB
01/04/2023 Letter Woodland Glen 2nd Plat Substantial Completion
01/04/2023 Letter Woodland Glen 2nd Plat Punch List
01/19/2023 Activity Document Woodland Glen 2nd Plat Final Affidavit and Agreement Form - FE
01/19/2023 Security Document Woodland Glen - 2nd Plat - Main. Bond
07/19/2023 Letter DE-Certificate of Final Acceptance (Commercial)
07/19/2023 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home