Inspection |
Outcome |
Requested |
Scheduled |
Date Inspected |
Sprinkler - Flow Test
|
Pending
|
|
|
|
Grading/Excavation/Fill Inspection
|
Pending
|
|
|
|
Sanitary - Material Verification
|
Pending
|
|
|
|
Sanitary Sewer - Air Test
|
Pending
|
|
|
|
Sanitary Sewer - Mandrel
|
Pending
|
|
|
|
Sanitary Sewer - Vacuum
|
Pending
|
|
|
|
Pavement-Surface
|
Pending
|
|
|
|
Install Street and Stop Signs
|
Pending
|
|
|
|
Pavement-Curb Construction
|
Pending
|
|
|
|
Pavement-Stabilized Subgrade
|
Pending
|
|
|
|
Occupancy Inspection - Codes Commercial
|
Pending
|
|
|
|
|
THE FOLLOWING AREAS ARE APPROVED
|
|
Misc
Corrective Action Required
|
Occupancy Inspection - Engineering
|
Pending
|
|
|
|
Occupancy Inspection - Fire
|
Pending
|
|
|
|
Sanitary Sewer Construction Inspection
|
Pending
|
|
|
|
Install Street and Stop Signs
|
Pending
|
|
|
|
Pavement-Aggregate Base
|
Pending
|
|
|
|
Pavement-Curb Construction
|
Pending
|
|
|
|
Pavement-Stabilized Subgrade
|
Pending
|
|
|
|
Storm Sewer Construction Inspection
|
Pending
|
|
|
|
Water Service Inspection
|
Pending
|
|
|
|
Sanitary Sewer Construction Inspection
|
Pending
|
|
|
|
Install Street and Stop Signs
|
Pending
|
|
|
|
Pavement-Aggregate Base
|
Pending
|
|
|
|
Pavement-Curb Construction
|
Pending
|
|
|
|
Pavement-Stabilized Subgrade
|
Pending
|
|
|
|
Storm Sewer Construction Inspection
|
Pending
|
|
|
|
Water Line - Construction Inspection
|
Pending
|
|
|
|
|
Misc
|
Underground Electrical Inspection - Commercial
|
Pending
|
|
|
|
|
Misc
Corrective Action Required
|
|
Misc
Corrective Action Required
|
|
Misc
Corrective Action Required
|
Underslab Electrical Inspection - Commercial
|
Pending
|
|
|
|
|
Misc
Corrective Action Required
|
Water Line - Coliform Test 1
|
Pending
|
|
|
|
|
Misc
|
Water Line - Coliform Test 2
|
Pending
|
|
|
|
|
Misc
|
Detention Basin
|
Pending
|
|
|
|
|
Misc
|
ESC - (Vegetation/Ground Cover)
|
Pending
|
|
|
|
|
Misc
|
Miscellaneous Inspection
|
Pending
|
|
|
|
Sanitary Sewer - Air Test
|
Pending
|
|
|
|
Sanitary Sewer - Mandrel
|
Pending
|
|
|
|
Sanitary Sewer - Vacuum
|
Pending
|
|
|
|
Pavement-Proof Roll
|
Pending
|
|
|
|
|
Misc
|
Sidewalk Inspection
|
Pending
|
|
|
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Pending
|
|
|
|
|
Misc
Corrective Action Required
|
In-wall Inspection
|
Pending
|
|
|
|
|
Misc
|
|
Misc
|
Site Visit
|
Pending
|
|
|
|
|
Misc
|
|
Miscellaneous Correction
Corrective Action Required
|
Pavement-Proof Roll
|
Pending
|
|
|
|
Footing Inspection - Commercial
|
Pending
|
|
|
|
|
Miscellaneous Correction
Corrective Action Required
|
|
Misc
Corrective Action Required
|
Erosion Control Inspection
|
Pending
|
|
|
|
|
Misc
|
Piers/Caissons Inspection - Commercial
|
Pending
|
|
|
|
|
Misc
Corrective Action Required
|
Above Ceiling Inspection
|
Pending
|
|
|
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Pending
|
|
|
|
|
ELEVATOR 1
Corrective Action Required
|
Sanitary Sewer - Camera Test
|
Pending
|
|
3/17/2025
|
|
Underground Plumbing Inspection - Commercial
|
Partial
|
6/5/2024
|
6/5/2024
|
06/05/2024
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
|
6/18/2024
|
06/18/2024
|
|
Misc
Corrective Action Required
|
All Rough Inspection - Commercial
|
Partial
|
|
7/15/2024
|
07/15/2024
|
|
Misc
|
In-wall Inspection
|
Partial
|
7/17/2024
|
7/17/2024
|
07/17/2024
|
|
Misc
Corrective Action Required
|
All Rough Inspection - Commercial
|
Partial
|
|
7/17/2024
|
07/17/2024
|
|
Misc
|
|
Misc
Corrective Action Required
|
Electrical Service Inspection
|
Failed
|
|
7/19/2024
|
07/19/2024
|
|
Misc
Corrective Action Required
|
|
Misc
|
Underground Plumbing Inspection - Commercial
|
Passed
|
|
7/19/2024
|
07/19/2024
|
|
Misc
|
|
Misc
|
Gas Piping Inspection - Commercial
|
Partial
|
|
7/19/2024
|
07/19/2024
|
|
Misc
|
In-wall Inspection
|
Passed
|
|
7/19/2024
|
07/19/2024
|
|
Misc
|
Electrical Service Inspection
|
Passed
|
|
7/22/2024
|
07/22/2024
|
|
Misc
|
|
Misc
|
In-wall Inspection
|
Partial
|
|
7/24/2024
|
07/24/2024
|
|
Misc
Corrective Action Required
|
|
Misc
Corrective Action Required
|
In-wall Inspection
|
Partial
|
|
7/26/2024
|
07/26/2024
|
|
|
All Rough Inspection - Commercial
|
Partial
|
|
8/1/2024
|
08/01/2024
|
|
Misc
|
|
Misc
Corrective Action Required
|
|
MISC
Corrective Action Required
|
Rated Assembly Inspection
|
Passed
|
|
8/7/2024
|
08/07/2024
|
|
Misc
|
Erosion Control Inspection Residential
|
Partial
|
|
8/7/2024
|
08/07/2024
|
|
Misc
Corrective Action Required
|
Gas Piping Inspection - Commercial
|
Passed
|
|
8/7/2024
|
08/07/2024
|
|
Misc
|
Miscellaneous Inspection
|
Passed
|
|
8/7/2024
|
08/07/2024
|
|
Misc
|
|
Misc
|
|
MISC
|
Miscellaneous Inspection
|
Failed
|
|
8/7/2024
|
08/07/2024
|
|
Misc
Corrective Action Required
|
Alarm Test
|
Passed
|
|
8/8/2024 at 2:00 PM
|
08/08/2024
|
Sprinkler - Hydrostatic Test
|
Passed
|
|
8/7/2024
|
08/08/2024
|
Miscellaneous Inspection
|
Passed
|
|
8/12/2024
|
08/12/2024
|
|
Misc
|
Occupancy Inspection - Fire
|
Partial
|
8/12/2024
|
8/12/2024
|
08/12/2024
|
Water Line - Construction Inspection
|
Partial
|
8/21/2024
|
8/21/2024
|
08/22/2024
|
|
Misc
|
Miscellaneous Inspection
|
Passed
|
|
8/22/2024
|
08/22/2024
|
|
Misc
|
Water Line - Construction Inspection
|
Partial
|
8/23/2024
|
8/23/2024
|
08/23/2024
|
|
Misc
|
Site Visit
|
Partial
|
8/26/2024
|
8/26/2024
|
08/27/2024
|
|
Misc
|
Storm Sewer Construction Inspection
|
Partial
|
8/28/2024
|
8/28/2024
|
08/29/2024
|
|
Misc
|
Water Line - Construction Inspection
|
Partial
|
9/4/2024
|
9/4/2024
|
09/04/2024
|
|
Misc
|
Site Visit
|
Partial
|
9/4/2024
|
9/4/2024
|
09/04/2024
|
|
Misc
|
Electrical Service Inspection
|
Passed
|
|
9/6/2024
|
09/06/2024
|
Storm Sewer Construction Inspection
|
Partial
|
9/6/2024
|
9/6/2024
|
09/06/2024
|
|
Misc
|
Erosion Control Inspection
|
Partial
|
9/10/2024
|
9/10/2024
|
09/10/2024
|
|
Misc
|
Occupancy Inspection - Codes Commercial
|
Failed
|
9/13/2024
|
9/13/2024
|
09/13/2024
|
|
THE FOLLOWING AREAS ARE APPROVED
|
|
Misc
Corrective Action Required
|
Water Line - Construction Inspection
|
Partial
|
9/13/2024
|
9/13/2024
|
09/13/2024
|
|
Misc
|
Footing Inspection - Commercial
|
Partial
|
5/27/2025
|
5/27/2025
|
09/16/2024
|
|
Misc
|
Fire Line - Hydrostatic Test
|
Partial
|
9/16/2024
|
9/16/2024
|
09/16/2024
|
|
Misc
|
Site Visit
|
Partial
|
9/17/2024
|
9/17/2024
|
09/17/2024
|
|
Misc
|
Footing Inspection - Commercial
|
Partial
|
9/18/2024
|
9/18/2024
|
09/18/2024
|
|
Misc
|
Footing Inspection - Commercial
|
Partial
|
|
9/19/2024
|
09/19/2024
|
|
Misc
|
Water Line - Coliform Test 1
|
Partial
|
9/16/2024
|
9/16/2024
|
09/20/2024
|
|
Misc
|
Water Line - Coliform Test 1
|
Partial
|
9/17/2024
|
9/17/2024
|
09/20/2024
|
|
Misc
|
Water Line - Coliform Test 1
|
Partial
|
9/18/2024
|
9/18/2024
|
09/20/2024
|
|
Misc
|
Water Line - Coliform Test 1
|
Partial
|
9/19/2024
|
9/19/2024
|
09/20/2024
|
|
Misc
|
Water Line - Coliform Test 1
|
Passed
|
9/20/2024
|
9/20/2024
|
09/20/2024
|
|
Misc
|
Water Line - Coliform Test 2
|
Partial
|
9/19/2024
|
9/19/2024
|
09/20/2024
|
|
Misc
|
Footing Inspection - Commercial
|
Partial
|
|
9/20/2024
|
09/20/2024
|
|
Misc
|
Water Line - Coliform Test 2
|
Passed
|
9/20/2024
|
9/20/2024
|
09/21/2024
|
|
Misc
|
Water Line - Construction Inspection
|
Partial
|
9/21/2024
|
9/21/2024
|
09/21/2024
|
|
Misc
|
Water Line - Construction Inspection
|
Passed
|
9/21/2024
|
9/21/2024
|
09/23/2024
|
|
Misc
|
Footing Inspection - Commercial
|
Not Ready
|
9/24/2024
|
9/24/2024
|
09/24/2024
|
|
Misc
Corrective Action Required
|
Footing Inspection - Commercial
|
Partial
|
9/26/2024
|
9/26/2024
|
09/26/2024
|
|
Misc
Corrective Action Required
|
Gas Service Inspection - Commercial
|
Failed
|
9/26/2024
|
9/26/2024
|
09/26/2024
|
|
Misc
|
|
Misc
Corrective Action Required
|
Site Visit
|
Partial
|
9/26/2024
|
9/26/2024
|
09/26/2024
|
|
Misc
|
Piers/Caissons Inspection - Commercial
|
Partial
|
9/27/2024
|
9/27/2024
|
09/27/2024
|
|
Misc
Corrective Action Required
|
Underslab Plumbing Inspection - Commercial
|
Failed
|
9/27/2024
|
9/27/2024
|
09/27/2024
|
|
Misc
Corrective Action Required
|
Site Visit
|
Partial
|
9/30/2024
|
9/30/2024
|
09/30/2024
|
|
Misc
|
Erosion Control Inspection
|
Partial
|
9/30/2024
|
9/30/2024
|
09/30/2024
|
|
Misc
|
Site Visit
|
Partial
|
10/1/2024
|
10/1/2024
|
10/02/2024
|
|
Misc
|
Footing Inspection - Commercial
|
Partial
|
10/2/2024
|
10/2/2024
|
10/02/2024
|
|
Miscellaneous Correction
Corrective Action Required
|
Underground Electrical Inspection - Commercial
|
Partial
|
10/3/2024
|
10/3/2024
|
10/03/2024
|
|
Misc
Corrective Action Required
|
Footing Inspection - Commercial
|
Partial
|
10/4/2024
|
10/4/2024
|
10/04/2024
|
|
Miscellaneous Correction
Corrective Action Required
|
Detention Basin
|
Partial
|
10/3/2024
|
10/3/2024
|
10/04/2024
|
|
Misc
|
Detention Basin
|
Partial
|
10/4/2024
|
10/4/2024
|
10/04/2024
|
|
Misc
|
Fire Line Construction Inspection
|
Partial
|
10/7/2024
|
10/7/2024
|
10/08/2024
|
|
Misc
|
Underground Electrical Inspection - Commercial
|
Partial
|
10/8/2024
|
10/8/2024
|
10/08/2024
|
|
Misc
Corrective Action Required
|
|
Misc
Corrective Action Required
|
Underground Electrical Inspection - Commercial
|
Partial
|
10/10/2024
|
10/10/2024
|
10/10/2024
|
|
Misc
Corrective Action Required
|
|
Misc
Corrective Action Required
|
Fire Line Construction Inspection
|
Partial
|
10/9/2024
|
10/9/2024
|
10/11/2024
|
|
Misc
|
Fire Line Construction Inspection
|
Partial
|
10/10/2024
|
10/10/2024
|
10/11/2024
|
|
Misc
|
Detention Basin
|
Partial
|
10/10/2024
|
10/10/2024
|
10/11/2024
|
|
Misc
|
Footing Inspection - Commercial
|
Partial
|
10/11/2024
|
10/11/2024
|
10/11/2024
|
|
Miscellaneous Correction
Corrective Action Required
|
Underslab Plumbing Inspection - Commercial
|
Partial
|
|
10/11/2024
|
10/11/2024
|
|
Misc
|
|
Misc
Corrective Action Required
|
Fire Line Construction Inspection
|
Partial
|
10/11/2024
|
10/11/2024
|
10/11/2024
|
|
Misc
|
Footing Inspection - Commercial
|
Partial
|
10/14/2024
|
10/14/2024
|
10/14/2024
|
|
Miscellaneous Correction
Corrective Action Required
|
Underslab Plumbing Inspection - Commercial
|
Partial
|
|
10/14/2024
|
10/14/2024
|
|
Misc
Corrective Action Required
|
Underground Electrical Inspection - Commercial
|
Partial
|
|
10/15/2024
|
10/15/2024
|
|
Misc
Corrective Action Required
|
|
Misc
Corrective Action Required
|
Footing Inspection - Commercial
|
Partial
|
10/15/2024
|
10/15/2024
|
10/15/2024
|
|
Miscellaneous Correction
Corrective Action Required
|
Footing Inspection - Commercial
|
Partial
|
|
10/16/2024
|
10/16/2024
|
|
Miscellaneous Correction
Corrective Action Required
|
Water Line - Construction Inspection
|
Partial
|
10/15/2024
|
10/15/2024
|
10/16/2024
|
|
Misc
|
Water Line - Construction Inspection
|
Partial
|
10/16/2024
|
10/16/2024
|
10/16/2024
|
|
Misc
|
Underground Electrical Inspection - Commercial
|
Partial
|
|
4/1/2025
|
10/17/2024
|
|
Misc
Corrective Action Required
|
|
Misc
Corrective Action Required
|
|
Misc
Corrective Action Required
|
Underslab Plumbing Inspection - Commercial
|
Partial
|
|
10/17/2024
|
10/17/2024
|
|
Misc
Corrective Action Required
|
|
Misc
Corrective Action Required
|
Footing Inspection - Commercial
|
Partial
|
10/17/2024
|
10/18/2024
|
10/18/2024
|
|
Miscellaneous Correction
Corrective Action Required
|
Water Line - Coliform Test 1
|
Partial
|
10/18/2024
|
10/18/2024
|
10/21/2024
|
|
Misc
|
Water Line - Coliform Test 1
|
Partial
|
10/21/2024
|
10/21/2024
|
10/21/2024
|
|
Misc
|
Water Line - Coliform Test 1
|
Passed
|
10/22/2024
|
10/22/2024
|
10/23/2024
|
|
Misc
|
Underslab Electrical Inspection - Commercial
|
Partial
|
10/23/2024
|
10/23/2024
|
10/23/2024
|
|
Misc
Corrective Action Required
|
Water Line - Coliform Test 2
|
Partial
|
10/23/2024
|
10/23/2024
|
10/23/2024
|
|
Misc
|
Footing Inspection - Commercial
|
Partial
|
|
10/24/2024
|
10/24/2024
|
|
Miscellaneous Correction
Corrective Action Required
|
Water Line - Coliform Test 2
|
Partial
|
10/24/2024
|
10/24/2024
|
10/24/2024
|
|
Misc
|
Footing Inspection - Commercial
|
Partial
|
10/28/2024
|
10/28/2024
|
10/28/2024
|
|
Miscellaneous Correction
Corrective Action Required
|
Footing Inspection - Commercial
|
Partial
|
10/29/2024
|
10/29/2024
|
10/29/2024
|
|
Miscellaneous Correction
Corrective Action Required
|
Erosion Control Inspection
|
Partial
|
10/30/2024
|
10/30/2024
|
10/30/2024
|
|
Misc
|
Water Line - Coliform Test 1
|
Partial
|
10/29/2024
|
10/29/2024
|
10/30/2024
|
|
Misc
|
Water Line - Coliform Test 1
|
Partial
|
10/30/2024
|
10/30/2024
|
10/30/2024
|
|
Misc
|
Water Line - Coliform Test 2
|
Partial
|
10/30/2024
|
10/30/2024
|
10/30/2024
|
|
Misc
|
Fire Line - Hydrostatic Test
|
Passed
|
9/16/2024
|
9/16/2024
|
11/04/2024
|
|
Misc
|
Fire Line Construction Inspection
|
Passed
|
10/11/2024
|
10/11/2024
|
11/04/2024
|
|
Misc
|
Footing Inspection - Commercial
|
Partial
|
11/7/2024
|
11/7/2024
|
11/07/2024
|
|
Miscellaneous Correction
Corrective Action Required
|
Underslab Plumbing Inspection - Commercial
|
Passed
|
11/8/2024
|
11/8/2024
|
11/08/2024
|
|
Misc
|
|
Misc
|
|
Misc
|
Site Visit
|
Partial
|
12/2/2024
|
12/2/2024
|
12/02/2024
|
|
Misc
|
Underground Plumbing Inspection - Commercial
|
Partial
|
12/5/2024
|
12/5/2024
|
12/05/2024
|
|
Misc
|
Erosion Control Inspection
|
Partial
|
12/5/2024
|
12/5/2024
|
12/05/2024
|
|
Misc
|
Piers/Caissons Inspection - Commercial
|
Partial
|
12/19/2024
|
12/19/2024
|
12/19/2024
|
|
Misc
Corrective Action Required
|
Erosion Control Inspection
|
Partial
|
12/24/2024
|
12/24/2024
|
12/24/2024
|
|
Misc
|
Detention Basin
|
Partial
|
12/30/2024
|
12/30/2024
|
12/31/2024
|
|
Misc
|
ESC - (Vegetation/Ground Cover)
|
Partial
|
1/15/2025
|
1/15/2025
|
01/15/2025
|
|
Misc
|
Site Visit
|
Partial
|
1/15/2025
|
1/15/2025
|
01/15/2025
|
|
Misc
|
Underground Plumbing Inspection - Commercial
|
Partial
|
1/28/2025
|
1/28/2025
|
01/28/2025
|
|
Misc
|
|
Misc
Corrective Action Required
|
Miscellaneous Inspection
|
Partial
|
1/28/2025
|
1/28/2025
|
01/28/2025
|
|
Misc
|
Occupancy Inspection - Water Utilities
|
Passed
|
|
|
02/05/2025
|
Erosion Control Inspection
|
Partial
|
2/6/2025
|
2/6/2025
|
02/06/2025
|
|
Misc
|
Underground Plumbing Inspection - Commercial
|
Partial
|
2/10/2025
|
2/10/2025
|
02/10/2025
|
|
Misc
|
|
Misc
|
|
|
Underground Plumbing Inspection - Commercial
|
Passed
|
2/11/2025
|
2/11/2025
|
02/11/2025
|
|
Misc
|
Erosion Control Inspection
|
Partial
|
2/11/2025
|
2/11/2025
|
02/11/2025
|
|
Misc
|
Sanitary Sewer Construction Inspection
|
Passed
|
2/12/2025
|
2/12/2025
|
02/14/2025
|
|
Misc
|
Gas Service Inspection - Commercial
|
Passed
|
2/27/2025
|
2/27/2025
|
02/27/2025
|
|
Misc
|
In-wall Inspection
|
Partial
|
3/21/2025
|
3/21/2025
|
03/21/2025
|
|
Misc
|
Piers/Caissons Inspection - Commercial
|
Partial
|
3/24/2025
|
3/24/2025
|
03/24/2025
|
|
Misc
Corrective Action Required
|
Erosion Control Inspection
|
Partial
|
3/26/2025
|
3/26/2025
|
03/26/2025
|
|
Misc
|
In-wall Inspection
|
Partial
|
3/26/2025
|
3/26/2025
|
03/26/2025
|
|
Misc
|
Piers/Caissons Inspection - Commercial
|
Partial
|
4/1/2025
|
4/1/2025
|
03/31/2025
|
|
Misc
Corrective Action Required
|
In-wall Inspection
|
Partial
|
3/31/2025
|
3/31/2025
|
03/31/2025
|
|
Misc
|
Above Ceiling Inspection
|
Partial
|
|
3/31/2025
|
03/31/2025
|
|
Misc
|
In-wall Inspection
|
Partial
|
|
4/1/2025
|
04/01/2025
|
|
Misc
|
In-wall Inspection
|
Partial
|
4/4/2025
|
4/4/2025
|
04/04/2025
|
|
Misc
|
In-wall Inspection
|
Partial
|
4/8/2025
|
4/8/2025
|
04/08/2025
|
|
Misc
|
In-wall Inspection
|
Partial
|
4/9/2025
|
4/9/2025
|
04/09/2025
|
|
Misc
|
In-wall Inspection
|
Partial
|
4/10/2025
|
4/10/2025
|
04/10/2025
|
|
Misc
|
Pavement-Proof Roll
|
Partial
|
4/10/2025
|
4/10/2025
|
04/10/2025
|
|
Misc
|
In-wall Inspection
|
Partial
|
4/14/2025
|
4/14/2025
|
04/14/2025
|
|
Misc
|
In-wall Inspection
|
Partial
|
4/15/2025
|
4/15/2025
|
04/15/2025
|
|
Misc
|
Erosion Control Inspection
|
Partial
|
4/15/2025
|
4/15/2025
|
04/18/2025
|
|
Misc
|
Sidewalk Inspection
|
Partial
|
4/14/2025
|
4/14/2025
|
04/18/2025
|
|
Misc
|
In-wall Inspection
|
Partial
|
4/18/2025
|
4/18/2025
|
04/18/2025
|
|
Misc
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Partial
|
4/22/2025
|
4/22/2025
|
04/22/2025
|
|
Misc
Corrective Action Required
|
Rated Assembly Inspection
|
Partial
|
4/22/2025
|
4/22/2025
|
04/22/2025
|
|
ELEVATOR 1
Corrective Action Required
|
In-wall Inspection
|
Partial
|
4/24/2025
|
4/24/2025
|
04/24/2025
|
|
Misc
|
|
Misc
|
Above Ceiling Inspection
|
Partial
|
4/28/2025
|
4/28/2025
|
04/28/2025
|
|
Misc
|
|
Misc
|
Erosion Control Inspection
|
Partial
|
5/6/2025
|
5/6/2025
|
05/06/2025
|
|
Misc
|
Site Visit
|
Failed
|
5/6/2025
|
5/6/2025
|
05/06/2025
|
|
Misc
|
|
Miscellaneous Correction
Corrective Action Required
|
Above Ceiling Inspection
|
Partial
|
5/8/2025
|
5/8/2025
|
05/08/2025
|
|
Misc
|
|
Misc
|
|
Misc
Corrective Action Required
|
Above Ceiling Inspection
|
Partial
|
5/8/2025
|
5/8/2025
|
05/08/2025
|
|
Misc
|
|
Misc
|
|
Misc
|
Above Ceiling Inspection
|
Partial
|
|
5/12/2025
|
05/12/2025
|
|
Misc
|
|
Misc
|
Above Ceiling Inspection
|
Partial
|
5/15/2025
|
5/15/2025
|
05/15/2025
|
|
Misc
|
|
Misc
|
Above Ceiling Inspection
|
Partial
|
|
5/19/2025
|
05/19/2025
|
|
Misc
|
|
Misc
|
Pavement-Aggregate Base
|
Partial
|
5/19/2025
|
5/19/2025
|
05/20/2025
|
|
Misc
|
Above Ceiling Inspection
|
Partial
|
|
5/20/2025
|
05/20/2025
|
|
Misc
|
|
Misc
|
Above Ceiling Inspection
|
Partial
|
5/23/2025
|
5/23/2025
|
05/23/2025
|
|
Misc
|
|
Misc
|
Footing Inspection - Commercial
|
Partial
|
|
5/27/2025
|
05/27/2025
|
|
Miscellaneous Correction
Corrective Action Required
|
|
Misc
Corrective Action Required
|
Piers/Caissons Inspection - Commercial
|
Partial
|
5/30/2025
|
5/30/2025
|
05/30/2025
|
|
Misc
Corrective Action Required
|
Above Ceiling Inspection
|
Partial
|
5/30/2025
|
5/30/2025
|
05/30/2025
|
|
Misc
|
|
Misc
|
Footing Inspection - Commercial
|
Partial
|
6/2/2025
|
6/2/2025
|
06/02/2025
|
|
Miscellaneous Correction
Corrective Action Required
|
|
Misc
Corrective Action Required
|
Erosion Control Inspection
|
Partial
|
6/4/2025
|
6/4/2025
|
06/04/2025
|
|
Misc
|
Piers/Caissons Inspection - Commercial
|
Partial
|
6/5/2025
|
6/5/2025
|
06/05/2025
|
|
Misc
Corrective Action Required
|
Above Ceiling Inspection
|
Partial
|
6/6/2025
|
6/6/2025
|
06/06/2025
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
6/10/2025
|
6/10/2025
|
06/10/2025
|
|
ELEVATOR 1