Permit Application Status

PRRES20236587


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20236587
Building Permit - Residential
Certificate of Occupancy
SCHADER JAMES CLARK AND GEORGIA GILMAN
NEW SINGLE FAMILY
NEW HOUSE - OWNER BUILDER - FINISHED AND UNFINISHED BASEMENT - COVERED DECK - SUSPENDED SLAB STOP WORK ORDER generated on 02/28/2024 12:00 AM by username 'Khanh Nguyen'. STOP WORK ORDER removed on 06/11/2024 12:00 AM by username 'Khanh Nguyen'. CITY SEWER AND GROUND ROUGH, DID NOT DO WATER SERVICE
12/18/2023
01/06/2024
07/02/2024
Locations
Contacts
JOE MEDLIN, Address:3620 NW PRIMROSE LN, Phone:(816) 704-0427  
SCHADER JAMES CLARK AND GEORGIA GILMAN, Address:1404 NE ERNEST WAY  
Lauren Medlin, Address:3620 NW PRIMROSE LN, Phone:(816) 704-0427 Ext:x  
MEDLIN.JOE@GMAIL.COM  
MARK'S HEATING & COOLING LLC, Address:19524 QUAIL RIDGE RD, Phone:(816) 331-8037  
REDFORD ELECTRIC, Address:4539 RIDGEWAY, Phone:(816) 405-5581  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 01/06/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 01/06/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 01/06/2024
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 01/06/2024
8350015-Water Meter Fee $680.46 $680.46 Paid 01/06/2024
9110078-Valuation Fee New Single Family $1,387.00 $1,387.00 Paid 01/06/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 12/23/2024
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 12/23/2024
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 12/27/2024
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 01/29/2025
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 02/24/2025
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 03/27/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 2/8/2024 02/08/2024
DCM5 ESC INSP DENIED
Corrective Action Required
02/08/2024
REQUESTED INSPECTION(S) DENIED DUE TO LACK OF EROSION CONTROL. EROSION CONTROL SHALL BE INSTALLED ALONG THE DISTURBED SOIL TO PROTECT THE CREEK FROM SILT RUNOFF
Sewer Service Inspection - R Not Ready 2/8/2024 2/8/2024 02/08/2024
Misc
Corrective Action Required
02/08/2024
**REQUESTED INSPECTION(S) DENIED DUE TO LACK OF EROSION CONTROL. EROSION CONTROL SHALL BE INSTALLED ALONG THE DISTURBED SOIL TO PROTECT THE CREEK FROM SILT RUNOFF **FOOTING WAS NOT INSPECTED BY CITY. SUBMIT FOOTING APPROVAL FROM ENGINEER
Sewer Service Inspection - R Passed 2/13/2024 2/13/2024 02/13/2024
Misc
Resolved
02/13/2024
**REQUESTED INSPECTION(S) DENIED DUE TO LACK OF EROSION CONTROL. EROSION CONTROL SHALL BE INSTALLED ALONG THE DISTURBED SOIL TO PROTECT THE CREEK FROM SILT RUNOFF **FOOTING WAS NOT INSPECTED BY CITY. SUBMIT FOOTING APPROVAL FROM ENGINEER
Underslab Plumbing Inspection - Residential Failed 2/26/2024 2/26/2024 02/26/2024
Misc
Corrective Action Required
02/26/2024
-Support piping to structural slab every 4 ft -Vent the NE bathroom per code. Move the 3” waste stack connection min 30” f ft own stream of bath group plumbing -Install foundation drain tiles per code
Erosion Control Inspection Residential Failed - Stop Work 2/28/2024 02/28/2024
DCM5 ESC INSP DENIED
Corrective Action Required
02/08/2024
REQUESTED INSPECTION(S) DENIED DUE TO LACK OF EROSION CONTROL. EROSION CONTROL SHALL BE INSTALLED ALONG THE DISTURBED SOIL TO PROTECT THE CREEK FROM SILT RUNOFF
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/28/2024
DEFICIENT EROSION CONTROL INSTALLATION. WHERE INSTALLED, BOTTOM OF THE SILT FENCE MUST BE BURIED MIN 6" BELOW SOIL. IF WATTLES ARE USED AS EROSION CONTROL, IT MUST BE STAKED DOWN TIGHT TO THE SOIL. ENDS OF WATTLES MUST BE LAPPED WITH NO GAPS. **STOP-WORK ISSUED UNTIL EROSION CONTROL IS IN COMPLIANCE
Erosion Control Inspection Residential Failed 3/1/2024 03/01/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/28/2024
DEFICIENT EROSION CONTROL INSTALLATION. STAKE DOWN THE WATTLE AT LAPPED JOINTS AND STAPLE SILT FENCE TO THE WOOD STAKES **STOP-WORK ISSUED UNTIL EROSION CONTROL IS IN COMPLIANCE AND FOOTING REPORT IS SUBMITTED TO THE CITY
Footing Inspection - Residential Passed 6/11/2024 06/11/2024
Informational
06/11/2024
FOOTING APPROVED BY ENGINEER
Erosion Control Inspection Residential Partial 6/11/2024 6/11/2024 06/11/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
03/01/2024
EROSION CONROL ALONG THE REAR OF THE LOT IS RESTORED AND IN COMPLIANCE WITH CITY REQUIREMENT
Underslab Plumbing Inspection - Residential Failed 6/18/2024 6/18/2024 06/18/2024
Misc
Corrective Action Required
02/26/2024
-Support piping to structural slab every 4 ft -Vent the NE bathroom per code. Move the 3” waste stack connection min 30” f ft own stream of bath group plumbing **Provide verification of the corrections to the above deficiencies **Not related to the underslab plumbing inspection, but the basement structural slab inspection from the engineer must be submitted to the city
Erosion Control Inspection Residential Partial 6/18/2024 06/18/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
06/11/2024
EROSION CONROL ALONG THE REAR OF THE LOT IS RESTORED AND IN COMPLIANCE WITH CITY REQUIREMENT
Erosion Control Inspection Residential Failed 6/26/2024 06/26/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/18/2024
REPAIR EROSION CONROL ALONG THE REAR OF THE LOT. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. FAILURE TO COMPLY WITH THE EROSION CONTROL WILL RESULT IN AN ISSUANCE OF A STOP-WORK ORDER
Water Service Inspection - R Passed 6/26/2024 06/26/2024
Erosion Control Inspection Residential Partial 6/28/2024 06/28/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/26/2024
EROSION CONTROL RESTORED TO COMPLIANCE. MAINTAIN EROSION CONTROL THROUGHOUT CONSTRUCTION
Gas Service Inspection - Residential Failed 8/14/2024 08/14/2024
Misc
Corrective Action Required
08/14/2024
No pressure
Electrical Service Inspection Passed 8/14/2024 08/14/2024
All Rough Inspection - Residential Failed 8/14/2024 8/14/2024 08/14/2024
Misc
Corrective Action Required
08/14/2024
-Under slab plumbing support must be verified -Provide flashings above window trims -Provide intersystem bonding terminal block -Provide a receptacle located within 25 ft of the AC unit -Provide a receptacle at rear of house , accessible from grade and located within 6.5 ft of grade -Provide floodlight for illumination of the backyard, as required per security code -Provide two 1/2” through bolts at deck beam-post connections -Engineer to address cracks in the foundation wall -Support deck ledger board to wall per code -Fully nail all deck joist hangers -Nail garage PFH wall sheathing @ 3” oc to all studs and sill plates; nail sheathing to header @ 3” oc grid pattern. Remove trims for full verification ; provide 3/16”x2”x2” washers for wall anchors; header shall extend from corner to corner; tension straps not installed; wall shall be framed per plan -All gaps between wall plates and sill shall be shimmed; install full height scaf for studs with excessive gap at bottom plates -Provide full stud support for truss girder above garage at both ends -Nail together girder truss per truss detail -Provide 3-studs at wall corners and nail corner studs with 16d@12” oc or equivalent nailing -Sill plates shall be anchored within 12” of breaks and min every 6 ft -Protect wiring home runs at wall plates where within 1.25” of surface -Install stud shoe at over bored laundry stud; protect plumbing at stud and wall top plate. Provide BOCA plate at top plate. Need to move the sink out the way for 5/8” gypsum -Strap wall top plates bored more than 50% above kitchen sink -Bath fan flexible duct cannot exceed 14 ft per UL label. Switch out the remaining length with hard duct -Nail exterior siding per code -Wall appliance flexible cord shall not be concealed inside wall space -Provide security blockings at exterior doors per security code -Window glazing located within 25” of door shall be safety tempered glazing -Tie down rear sunroom girder truss to wall; nail together girder truss per truss detail -Provide sunroom wall receptacle spacing per code -Engineer to address attachment of sunroom lvl beams to house and bracing of exterior wall -Bedroom shall have direct emergency escape out to outside -Tie down north girder truss to wall; nail together girder truss per truss detail; provide 2-stud support for girder truss; **this applies to ALL girder trusses** -Reinforce over-bored studs (>60%) at non-bearing walls with stud shoes throughout house -Install hangers at truss connections above master closet -Cannot drill holes through trusses. -Nail all hangers above stair; provide joist hanger at lvl connection -Provide min 6 ft 8 inches of headroom clearance above stair, as measured vertically from header down to stair nose-nose plane -Protect plumbing at bottom stair landing -Fire block basement wall space vertically at max 10 ft intervals; fb all basement wall spaces from soffit and ceiling space -Anchor steel columns to floor; anchor basement sill plates per code -Provide engineer inspection approval for structural slab over fill; also address broken slab at basement bathroom showing no reinforcement rebar -Protect all plumbing per code throughout house -Provide blockings/studs at basement exterior door hinges and screw hinges to studs -Plan shows foundation wall under stoop, instead of I beam. Provide revised plan showing I beams under stoop and garage slab support I beam at rear wall -Brace trusses per truss detail **DO NOT INSULATE
All Rough Inspection - Residential Failed 8/28/2024 08/28/2024
Misc
Corrective Action Required
08/14/2024
-Under slab plumbing support must be verified **Need pictures -Support deck ledger board to wall per code -Fully nail all deck joist hangers -All gaps between wall plates and sill shall be shimmed -Nail together all girder trusses per truss detail -Nail wall corners studs with 16d@12” oc or equivalent nailing -Protect wiring home runs at wall plates where within 1.25” of surface -Nail exterior siding per code -Wall appliance flexible cord shall not be concealed inside wall space **Need installation instruction for the appliance -Provide security blockings at exterior doors per security code -Window glazing located within 24” of door shall be safety tempered glazing -Tie down rear sunroom girder truss to wall; nail together girder truss per truss detail -Provide sunroom wall receptacle spacing per code **Use appropriate wiring method. UF cable not NM -Bedroom shall have direct emergency escape out to outside -Tie down north girder truss to wall; nail together girder truss per truss detail; provide 2-stud support for girder truss; **this applies to ALL girder trusses** -Reinforce over-bored studs (>60%) at non-bearing walls with stud shoes **1st fl -Cannot drill holes through trusses. -Nail all hangers above stair; provide joist hanger at lvl connection **See below. Might have to move this header -Provide min 6 ft 8 inches of headroom clearance above stair, as measured vertically from header down to stair nose-nose plane -Fire block basement wall space vertically at max 10 ft intervals; fb all basement wall spaces from soffit and ceiling space -Protect water lines in basement bathroom at plates with BOCA plate -Provide blockings/studs at basement exterior door hinges and screw hinges to studs -Brace trusses per truss detail **DO NOT INSULATE
Gas Service Inspection - Residential Failed 9/5/2024 9/5/2024 09/05/2024
Misc
Corrective Action Required
08/14/2024
Pressure not holding
All Rough Inspection - Residential Failed 9/5/2024 9/5/2024 09/05/2024
Misc
Corrective Action Required
08/28/2024
-Support deck ledger board to wall per code **I showed the person there the IRC page showing how the ledger is attached to the building -Nail exterior siding per code **Nail siding to sill plates @6” -Provide security blockings at exterior doors per security code **Install the door frame; shim gap at hinges and at strike plate side; security blocking to extend 3 stud spaces or to corner -Provide min 6 ft 8 inches of headroom clearance above stair, as measured vertically from header down to stair nose-nose plane **Support lvl header; shim gaps at hangers and support stud -Fire block basement bathroom and closet wall spaces from soffit and ceiling space -Protect water lines and pvc in basement bathroom at plates with BOCA plate -Support lvl beams above deck at building ends. Have engineer take a look at this again. **OK TO INSULATE
Gas Service Inspection - Residential Passed 9/9/2024 9/9/2024 09/09/2024
Misc
Resolved
09/09/2024
Pressure not holding
All Rough Inspection - Residential Failed 9/9/2024 9/9/2024 09/09/2024
Misc
Corrective Action Required
09/05/2024
-Support deck ledger board to wall per code **I showed the person there the IRC page showing how the ledger is attached to the building **address deck beam not properly attached to the post. Please google 2018 Johnson County Deck Build guideline for guidance -Protect water lines and pvc in basement bathroom at plates with BOCA plate **flip the strike plate 180 deg so that the water lines are protected to min 2” below the top plate -Support lvl beams above deck at building ends. Have engineer take a look at this again.
All Rough Inspection - Residential Failed 9/12/2024 9/12/2024 09/12/2024
Misc
Corrective Action Required
09/09/2024
-Support lvl beams above deck at building ends. Have engineer take a look at this again. **DO NOT ROCK THE EXTERIOR WALL WHERE THE DECK LVL BEAMS ARE SUPPORTED, UNTIL THE BEAM SUPPORT ISSUE ABOVE IS RESOLVED
Underslab Plumbing Inspection - Residential Passed 09/12/2024
Misc
Resolved
09/12/2024
-Support piping to structural slab every 4 ft -Vent the NE bathroom per code. Move the 3” waste stack connection min 30” f ft own stream of bath group plumbing **Provide verification of the corrections to the above deficiencies **Not related to the underslab plumbing inspection, but the basement structural slab inspection from the engineer must be submitted to the city
Sidewalk Inspection Partial 10/02/2024
Misc
Informational
10/02/2024
10-2-24 NS Site visited for a pre pour inspection and it appears that the drive way meets city standards and I will be back to check the after pour in a couple weeks.
All Rough Inspection - Residential Passed 12/20/2024
Misc
Resolved
12/20/2024
-Support lvl beams above deck at building ends. Have engineer take a look at this again. **DO NOT ROCK THE EXTERIOR WALL WHERE THE DECK LVL BEAMS ARE SUPPORTED, UNTIL THE BEAM SUPPORT ISSUE ABOVE IS RESOLVED
Erosion Control Inspection Residential Passed 12/20/2024 12/20/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
12/20/2024
EROSION CONTROL RESTORED TO COMPLIANCE. MAINTAIN EROSION CONTROL THROUGHOUT CONSTRUCTION
Occupancy Inspection - Codes Residential Failed 12/20/2024 12/20/2024 12/20/2024
Misc
Corrective Action Required
12/20/2024
-All re-inspection fees must be paid prior to issuance of any occupancy -Obtain lawn irrigation permit and submit backflow valve test report to city -Sidewalk and driveway not approved on record -As-graded plot plan is required -Final grade, sod, downspout and sump pump extension -Seal exterior wall penetrations; seal above meter, AC disconnect, seal exterior lights, etc -Install tamper-proof caps at AC valves -The front light fixtures shall be such that the bulbs cannot be removed without the use of tooling (security code requirement) -Provide security strike plate at front door with 4-3” screws -Replace defective receptacle inside half bathroom -Garage stair is not compliant. Maximum stair riser shall be no more than 7.75”. Stair riser height shall be consistent with maximum difference of no more than 3/8”. Treads shall be min 10” in depth -Fire-stop penetrations of garage wall under sink -No power to garage receptacle outlets -Provide a CO/smoke alarm immediately outside master bedroom -Pendant light fixture not allowed within a bath tub zone (space encompassing the tub, measured 3 ft out and 8 ft above the flood rim) -All rceptacles inside master bathroom shall be tamper-resistant receptacles -Access to hydrotub motor and receptacle -Stair handrail shall be continuous and uninterrupted for the entire flight of stair -All receptacles located within six ft of the wet bar sink shall be gfci-protected -Receptacles at wet bar shall be tamper-resistant receptacles; same for basement bathroom; check the whole house. All receptacles shall be TR receptacles -Basement bathroom fan not working -Provide combustion air openings per code for mechanical space. Two openings are required, one within 12” of floor and one within 12” of ceiling. Each opening shall be min 100 square inches -Enclosed and accessible space underneath the stair shall be protected with 1/2” gypsum -Secure LFNC raceway within 12” of floor heater disconnect -Provide means to clean out the furnace condensate drain pipe without requiring removal of the pipe -Receptacles in shop shall be gfci-protected and tamper-resistant -Install backflow preventer at hose bibb -Where is the grounding connection to get rebar?
Driveway Inspection Passed 12/23/2024 12/23/2024 12/23/2024
Misc
Informational
10/02/2024
10-2-24 NS Site visited for a pre pour inspection and it appears that the drive way meets city standards and I will be back to check the after pour in a couple weeks. 12/23/24 Jamie S, DW slope is compliant with city standards. Passed.
Sidewalk Inspection Failed 12/23/2024 12/23/2024 12/23/2024
Misc
Informational
10/02/2024
10-2-24 NS Site visited for a pre pour inspection and it appears that the drive way meets city standards and I will be back to check the after pour in a couple weeks. 12/23/24 Jamie S, SW was poured, forms have been removed, cross slopes are in compliance. They did not use expansion joint where SW meets approach. Will need to remove one SW panel on each side of approach, call a pre-pour inspection back in.
Occupancy Inspection - Codes Residential Ready for Temp CO 12/27/2024 12/27/2024 12/27/2024
Misc
Corrective Action Required
12/20/2024
-Obtain lawn irrigation permit and submit backflow valve test report to city -Sidewalk and driveway not approved on record -As-graded plot plan is required -Final grade, sod, downspout and sump pump extension -Seal exterior wall penetrations; seal above meter,
Occupancy Inspection - Codes Residential Ready for Temp CO 1/26/2025 01/27/2025
Misc
Corrective Action Required
12/27/2024
-Obtain lawn irrigation permit and submit backflow valve test report to city -Sidewalk and driveway not approved on record -As-graded plot plan is required -Final grade, sod, downspout and sump pump extension -Seal exterior wall penetrations; seal above meter,
Occupancy Inspection - Codes Residential Ready for Temp CO 2/24/2025 02/24/2025
Misc
Corrective Action Required
01/27/2025
-Obtain lawn irrigation permit and submit backflow valve test report to city -Sidewalk and driveway not approved on record -As-graded plot plan is required -Final grade, sod, downspout and sump pump extension -Seal exterior wall penetrations; seal above meter,
Occupancy Inspection - Codes Residential Ready for Temp CO 3/26/2025 03/26/2025
Misc
Corrective Action Required
02/24/2025
-Obtain lawn irrigation permit and submit backflow valve test report to city -Sidewalk and driveway not approved on record -As-graded plot plan is required -Final grade, sod, downspout and sump pump extension -Seal exterior wall penetrations; seal above meter,
Occupancy Inspection - Codes Residential Failed 4/23/2025 4/23/2025 04/23/2025
Misc
Corrective Action Required
03/26/2025
-Obtain lawn irrigation permit and submit backflow valve test report to city -Sidewalk not approved on record -Seal above electrical service meter/disconnect enclosure
Sidewalk Inspection Passed 1/3/2025 4/24/2025 04/24/2025
Misc
Informational
12/23/2024
10-2-24 NS Site visited for a pre pour inspection and it appears that the drive way meets city standards and I will be back to check the after pour in a couple weeks. 12/23/24 Jamie S, SW was poured, forms have been removed, cross slopes are in compliance. They did not use expansion joint where SW meets approach. Will need to remove one SW panel on each side of approach, call a pre-pour inspection back in. 4-24-25 NS Site visited for a pre-pour inspection and it appears that sidewalk and driveway meet city standards Passed
Driveway Inspection Passed 10/2/2024 04/24/2025
Misc
Informational
10/02/2024
10-2-24 NS Site visited for a pre pour inspection and it appears that the drive way meets city standards and I will be back to check the after pour in a couple weeks. 4-24-25 NS Site visited and it appears sidewalk and driveway meet city standards passed.
Occupancy Inspection - Codes Residential Full C of O 4/25/2025 04/25/2025
Misc
Resolved
04/25/2025
-Obtain lawn irrigation permit and submit backflow valve test report to city -Seal above electrical service meter/disconnect enclosure
Documents & Images
Date Uploaded File Type Document Name
12/18/2023 License_Tax_Application
12/18/2023 Residental Permit Application_1
12/18/2023 LOT 16 FIT
12/18/2023 Medlin 12-14-23 (2)
12/19/2023 Letter Codes Residential Plan Review
12/27/2023 1404 NE ERNEST WAY 12-26-23
12/27/2023 Residental Permit Application_Dec2723
12/27/2023 Letter Codes Residential Plan Review
01/03/2024 1404 Plot Plan
01/03/2024 Combustion Air Calc
01/03/2024 1404 NE ERNEST WAY 12-26-23 (1)
01/04/2024 DALE DELAMETER PLUMBING- Business License LS
01/04/2024 1404 Rafter Detail
01/04/2024 Letter Codes Residential Plan Review
01/04/2024 Letter Codes Residential Plan Review
01/04/2024 LOT 16 CITY
01/04/2024 Medlin-Page4
01/04/2024 1404 NE ERNEST WAY 1-4-24
01/05/2024 Approved Plans approved plans
01/05/2024 Plot Plan approved plot plan
01/05/2024 Letter Codes Residential Plan Review
01/06/2024 Permit DS Building Permit
01/06/2024 Certificate/License Codes Temporary Certificate of Occupancy
02/08/2024 Letter INSPECTION SUMMARY
02/08/2024 Letter INSPECTION SUMMARY
02/13/2024 Letter INSPECTION SUMMARY
02/26/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter Stop Work Order
03/01/2024 Letter INSPECTION SUMMARY
03/05/2024 3RD Party Insp Report 3rd Party Footing inspection
06/07/2024 1404 NE ERNEST WAY DECK PIER INSP
06/07/2024 1404 NE ERNEST WAY SLAB INSP
06/11/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter INSPECTION SUMMARY
06/18/2024 Letter INSPECTION SUMMARY
06/18/2024 Letter INSPECTION SUMMARY
06/26/2024 MSA2406 L
06/26/2024 I65166543_MSA2406
06/26/2024 Letter INSPECTION SUMMARY
06/26/2024 Letter INSPECTION SUMMARY
06/27/2024 Approved Plans APPROVED TRUSS PACKAGE
06/28/2024 Letter INSPECTION SUMMARY
08/14/2024 Letter INSPECTION SUMMARY
08/14/2024 Letter INSPECTION SUMMARY
08/14/2024 Letter INSPECTION SUMMARY
08/27/2024 Engineer Report/Study ENGINEER ROUGHIN RESPONSE
08/28/2024 Letter INSPECTION SUMMARY
09/05/2024 Letter INSPECTION SUMMARY
09/05/2024 Letter INSPECTION SUMMARY
09/09/2024 Letter INSPECTION SUMMARY
09/09/2024 Letter INSPECTION SUMMARY
09/12/2024 Letter INSPECTION SUMMARY
09/12/2024 Letter INSPECTION SUMMARY
10/02/2024 Letter INSPECTION SUMMARY
10/02/2024 Letter INSPECTION SUMMARY
11/25/2024 Engineer Report/Study ENGINEER LETTER HEADER CONNECTION
12/20/2024 Letter INSPECTION SUMMARY
12/20/2024 Letter INSPECTION SUMMARY
12/20/2024 Letter INSPECTION SUMMARY
12/23/2024 Receipt Receipt for transaction:2024-009641
12/23/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/27/2024 Certificate/License Codes Temporary Certificate of Occupancy
01/09/2025 Plot Plan approved as graded plot plan
01/20/2025 Application Form EXTENSION REQUEST
01/27/2025 Letter INSPECTION SUMMARY
01/27/2025 Letter INSPECTION SUMMARY
01/29/2025 Certificate/License Codes Temporary Certificate of Occupancy
01/29/2025 Receipt Receipt for transaction:2025-000548
02/24/2025 22025 Temp Resident Extension Request To
02/24/2025 Certificate/License Codes Temporary Certificate of Occupancy
02/24/2025 Receipt Receipt for transaction:2025-001052
03/25/2025 Temp Occ Extension Request-
03/26/2025 Codes Temporary Certificate of Occupancy2
04/23/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter INSPECTION SUMMARY
04/24/2025 Letter INSPECTION SUMMARY
04/24/2025 Letter INSPECTION SUMMARY
04/24/2025 Letter INSPECTION SUMMARY
04/25/2025 Letter Field Certificate of Occupancy
04/25/2025 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home