Permit Application Status

PRCOM20235734


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20235734
Building Permit - Commercial
Issued
ORR STREET LOFTS LLC
NEW COMMERCIAL
TOWNEPLACE SUITES - THE VILLAGE AT DISCOVERY PARK - NEW 4 STORY 126 UNIT HOTEL Hotel - VA Parking - IIA
11/01/2023
01/31/2025
03/09/2025
Locations
Contacts
ORR STREET LOFTS LLC, Address:4240 PHILIPS FARM ROAD #109  
ROSEMANN & ASSOCIATES, Address:1526 GRAND BLVD, Phone:(816) 472-1448  
Intrinsic Development, L.L.C., Address:3622 Endeavor Ave., Ste. 101  
Reks Contractors Inc, Address:2660 Springbluff Ct  
LGHVAC Mechanical, Address:3616 Utica Square Dr., Phone:(405) 823-6513  
Flow-Right Plumbing Inc, Address:9507 N 139th E Ct  
Earl Peterson - Intrinsic Development, Phone:(573) 970-8867  
DISCOVERY PARK LEES SUMMIT LLC, Address:4220 PHILIPS FARM RD  
UES dba GEOTECHNOLOGY LLC, Address:5055 ANTIOCH RD, Phone:(913) 438-1900  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 09/17/2024 12/10/2024
Joe Frogge
LC - MEP Subs
Resolved
12/10/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 12/28/23 - Acknowledged in letter.
Fire Plan Review Approved with Conditions 09/17/2024 09/18/2024
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
09/10/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Submit alarm shop drawings (deferred) for review and approval. Provide complete detection and alarm notification in the rooms. Acknowledged.
Construction documents - Fire protection systems
Corrective Action Required
09/10/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Submit sprinkler shop drawings (deferred) for review and approval. Class 1 standpipe/ hose connections shall be provided in both stair towers. Acknowledged
Miscellaneous Correction
Resolved
09/18/2024

Complete all site items listed on the Final Development Plan review.
Fire Plan Review Approved with Conditions 02/12/2024 09/18/2024
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
02/05/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Submit alarm shop drawings (deferred) for review and approval. Provide complete detection and alarm notification in the rooms. Acknowledged.
Construction documents - Fire protection systems
Corrective Action Required
02/05/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Submit sprinkler shop drawings (deferred) for review and approval. Class 1 standpipe/ hose connections shall be provided in both stair towers. Acknowledged
Miscellaneous Correction
Resolved
09/18/2024

Complete all site items listed on the Final Development Plan review.
Building Plan Review Approved with Conditions 09/17/2024 09/16/2024
Joe Frogge
Miscellaneous Correction
Corrective Action Required
09/10/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $61,330.50 12/28/23 - Acknowledged in letter.
Miscellaneous Correction
Corrective Action Required
09/10/2024

Police department has reviewed this project from a security perspective and offer the following recommendations. 1.Not enough information in the plans for me to figure out how the entrances and exits will work for the parking lots. Concerns over traffic congestion in the area are beyond the scope of CPTED so I will defer on those issues to your staff. 2. Being a hotel, we would recommend good external lighting for entrances and the parking lot that make cameras more effective. 3. For cameras, we would like to see internal cameras that cover the hallways and common areas of the hotel as well as complete coverage of the parking lot. The camera system would have a minimum of 30 days of video storage on the system. 12/28/23 - Acknowledged in letter.
IBC 1704.2 Special Inspections
Resolved
09/16/2024

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 12/28/23 - Acknowledged in letter.
Health Dept Inspection
Corrective Action Required
09/10/2024

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 12/28/23 - Acknowledged in letter.
Elevator Equipment Permit
Corrective Action Required
09/10/2024

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 12/28/23 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
09/10/2024

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 12/28/23 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
09/10/2024

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 12/28/23 - Acknowledged in letter.
Special Inspections Review Approved 09/16/2024
Joe Frogge
Final Development Plan Review Approved 08/16/2024 08/16/2024
Daniel Fernandez
Building Plan Review Rejected 02/12/2024 02/06/2024
Joe Frogge
Final Development Plan
Resolved
09/09/2024

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 12/28/23 - Acknowledged in letter.
Miscellaneous Correction
Corrective Action Required
02/05/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $61,330.50 12/28/23 - Acknowledged in letter.
Miscellaneous Correction
Corrective Action Required
02/05/2024

Police department has reviewed this project from a security perspective and offer the following recommendations. 1.Not enough information in the plans for me to figure out how the entrances and exits will work for the parking lots. Concerns over traffic congestion in the area are beyond the scope of CPTED so I will defer on those issues to your staff. 2. Being a hotel, we would recommend good external lighting for entrances and the parking lot that make cameras more effective. 3. For cameras, we would like to see internal cameras that cover the hallways and common areas of the hotel as well as complete coverage of the parking lot. The camera system would have a minimum of 30 days of video storage on the system. 12/28/23 - Acknowledged in letter.
IBC 1704.2 Special Inspections
Corrective Action Required
02/05/2024

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 12/28/23 - Acknowledged in letter.
Health Dept Inspection
Corrective Action Required
02/05/2024

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 12/28/23 - Acknowledged in letter.
Elevator Equipment Permit
Corrective Action Required
02/05/2024

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 12/28/23 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
02/05/2024

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 12/28/23 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
02/05/2024

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 12/28/23 - Acknowledged in letter.
Licensed Contractors Rejected 02/12/2024 02/06/2024
Joe Frogge
LC - General Contractor
Resolved
09/09/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent. 12/28/23 - Acknowledged in letter.
LC - MEP Subs
Corrective Action Required
02/05/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 12/28/23 - Acknowledged in letter.
Health Department Review Approved 01/04/2024
Joe Frogge
Fire Plan Review Rejected 01/03/2024 01/03/2024
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
12/27/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Submit alarm shop drawings (deferred) for review and approval. Provide complete detection and alarm notification in the rooms.
Address numbers required
Resolved
01/03/2024

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required- Provide the correct address. Post on the front and Colbern side of the building. Verified at inspection.
Knox box required
Corrective Action Required
01/03/2024

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Action required- Provide Knox boxes 6' AFF over the FDC. Knox key switches shall be provided on both gates to the parking garage. Do not provide Knox boxes at the gates.
Construction documents - Fire protection systems
Corrective Action Required
12/27/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Submit sprinkler shop drawings (deferred) for review and approval. Class 1 standpipe/ hose connections shall be provided in both stair towers.
Miscellaneous Correction
Corrective Action Required
12/27/2023

Complete all site items listed on the Final Development Plan review.
Miscellaneous Correction
Partial Correction
01/03/2024

[BE] 1013.2 Floor-level exit signs in Group R-1. Where exit signs are required in Group R-1 occupancies by Section 1013.1, additional low-level exit signs shall be provided in all areas serving guestrooms in Group R-1 occupancies and shall comply with Section 1013.5. The bottom of the sign shall be not less than 10 inches (254 mm) nor more than 18 inches (455 mm) above the floor level. The sign shall be flush mounted to the door or wall. Where mounted on the wall, the edge of the sign shall be within 4 inches (102 mm) of the door frame on the latch side. Action required- The face of the low-level exit signage shall be placed facing the direction of travel. Adjust signage location as needed. Verified at inspection.
Key boxes for non-standardized fire service elevator keys
Resolved
01/03/2024

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. Action required- Provide a Knox elevator key box in the first floor elevator lobby.
Miscellaneous Correction
Resolved
01/03/2024

915.1 General. Carbon monoxide detection shall be installed in new buildings in accordance with Sections 915.1.1 through 915.6. Carbon monoxide detection shall be installed in existing buildings in accordance with Section 1103.9. 915.1.1 Where required. Carbon monoxide detection shall be provided in Group I-1, I-2, I-4 and R occupancies and in classrooms in Group E occupancies in the locations specified in Section 915.2 where any of the conditions in Sections 915.1.2 through 915.1.6 exist. Action required- Provide carbon monoxide detection where required.
Miscellaneous Correction
Resolved
01/03/2024

Provide exit signage at the east end of the Area B corridor to direct egress to the stairwell.
Miscellaneous Correction
Resolved
01/03/2024

If roll down steel doors/gates are used in the parking garage, egress doors with signage shall be provided.
Miscellaneous Correction
Corrective Action Required
01/03/2024

The location of door 1022A on drawing A-411 and others does not match EL111. Confirm door location.
Building Plan Review Rejected 01/03/2024 12/28/2023
Joe Frogge
Final Development Plan
Corrective Action Required
12/27/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 12/28/23 - Acknowledged in letter.
Miscellaneous Correction
Corrective Action Required
12/27/2023

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $61,330.50 12/28/23 - Acknowledged in letter.
Misc
Resolved
12/28/2023

Sheets G-200 thru G210 are not legible. Action required: Reprint.
Miscellaneous Correction
Corrective Action Required
12/27/2023

Police department has reviewed this project from a security perspective and offer the following recommendations. 1.Not enough information in the plans for me to figure out how the entrances and exits will work for the parking lots. Concerns over traffic congestion in the area are beyond the scope of CPTED so I will defer on those issues to your staff. 2. Being a hotel, we would recommend good external lighting for entrances and the parking lot that make cameras more effective. 3. For cameras, we would like to see internal cameras that cover the hallways and common areas of the hotel as well as complete coverage of the parking lot. The camera system would have a minimum of 30 days of video storage on the system. 12/28/23 - Acknowledged in letter.
IBC 1704.2 Special Inspections
Corrective Action Required
12/27/2023

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 12/28/23 - Acknowledged in letter.
Health Dept Inspection
Corrective Action Required
12/27/2023

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 12/28/23 - Acknowledged in letter.
Elevator Equipment Permit
Corrective Action Required
12/27/2023

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 12/28/23 - Acknowledged in letter.
Health Dept Review
Resolved
01/04/2024

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7162. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational. 12/28/23 - Acknowledged in letter.
IBC 1010.1.10 Panic and fire exit hardware
Resolved
12/28/2023

2018 IBC 1010.1.10 Panic and fire exit hardware. Swinging doors serving a Group H occupancy and swinging doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock other than panic hardware or fire exit hardware. Exceptions: 1. A main exit of a Group A occupancy shall be permitted to have locking devices in accordance with Section 1010.1.9.4, Item 2. 2. Doors provided with panic hardware or fire exit hardware and serving a Group A or E occupancy shall be permitted to be electrically locked in accordance with Section 1010.1.9.9 or 1010.1.9.10. Action required: Provide panic devices on doors out of pool area. (Doors 1012D & 1012E)
Elevator Equipment Inspection
Corrective Action Required
12/27/2023

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 12/28/23 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
12/27/2023

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 12/28/23 - Acknowledged in letter.
IMC 801.2 Combustion air required
Resolved
12/28/2023

2018 IMC 801.2 General. Every fuel-burning appliance shall discharge the products of combustion to a vent, factory-built chimney or masonry chimney, except for appliances vented in accordance with Section 804. The chimney or vent shall be designed for the type of appliance being ventilated. (see code for exception) Action required: Provide complete design for gas water heater combustion air and venting.
NEC Article 210.52 (A) Receptacle spacing in dwelling units
Resolved
12/28/2023

2017 NEC Article 210.52 (A) General Provisions. In every kitchen, family room, dining room, living room, parlor, library, den, sunroom, bedroom, recreation room, or similar room or area of dwelling units, receptacle outlets shall be installed in accordance with the general provisions specified in 210.52(A)(1) through (A)(4). (1) Spacing. Receptacles shall be installed such that no point measured horizontally along the floor line of any wall space is more than 6 feet from a receptacle outlet. (2) Wall Space. As used by this section, a wall space shall include the following: 1. Any space 2 feet or more in width (including space measured around corners) and unbroken along the floor line by doorways and similar openings, fireplaces, and fixed cabinets that do not have countertops or similar work surfaces. 2. The space occupied by fixed panels in walls, excluding sliding panels. 3. The space afforded by fixed room dividers, such as freestanding bar-type counters or railings. (3) Floor Receptacles. Receptacle outlets in or on floors shall not be counted as part of the required number of receptacle outlets unless located within 18 inches of the wall. (4) Countertop and Similar Work Surface Receptacle Outlets. Receptacles installed for countertop and similar work surfaces as specified in 210.52(C) shall not be considered as the receptacle outlets required by 210.52(A). (D) Bathrooms. At least one receptacle outlet shall be installed in bathrooms within 3 ft of the outside edge of each basin. (see code for location regulations) Action required: Additional receptacles required in units where a wall space is 24" or greater. RE: wall space to the right of closet.
IPC 1101.3 Prohibited drainage
Resolved
12/28/2023

2018 IPC 1101.3 Prohibited drainage. (as amended by LSCO 7-413) Sanitary sewer systems shall be designed, built and maintained in such a manner to prevent all storm or ground water from draining, discharging or entering into the sanitary sewer system. Connection of sump pumps, foundation drains, yard drains, gutter downspouts and any other storm water drainage receptacle(s) or system(s) are specifically prohibited from being connected to the sanitary sewer system. Action required: Route parking garage drains and elevator sump to storm, not sanitary.
IPC 604.8 Water pressure reducing valve
Resolved
12/28/2023

2018 IPC 604.8 Water Pressure reducing valve or regulator. Where water pressure within a building exceeds 80 psi static, an approved water-pressure reducing valve conforming to ASSE 1003 or CSA B356 with strainer shall be installed to reduce the pressure in the building water distribution piping to not greater than 80 psi static. Action required: Provide pressure reducing valve at service entry. (required by Water Dept. regardless of measurement)
MISC
Resolved
01/08/2024

FAA approval required
Licensed Contractors Rejected 01/03/2023 12/28/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
12/27/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent. 12/28/23 - Acknowledged in letter.
LC - MEP Subs
Corrective Action Required
12/27/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 12/28/23 - Acknowledged in letter.
Fire Plan Review Rejected 11/15/2023 11/16/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
11/15/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Submit alarm shop drawings (deferred) for review and approval. Provide complete detection and alarm notification in the rooms.
Address numbers required
Corrective Action Required
11/15/2023

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required- Provide the correct address. Post on the front and Colbern side of the building. Verified at inspection.
Knox box required
Corrective Action Required
11/15/2023

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Action required- Provide Knox boxes 6' AFF over the FDC. Knox key switches shall be provided on both gates to the parking garage.
Construction documents - Fire protection systems
Corrective Action Required
11/15/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Submit sprinkler shop drawings (deferred) for review and approval. Class 1 standpipe/ hose connections shall be provided in both stair towers.
Miscellaneous Correction
Corrective Action Required
11/15/2023

Complete all site items listed on the Final Development Plan review.
Miscellaneous Correction
Corrective Action Required
11/15/2023

[BE] 1013.2 Floor-level exit signs in Group R-1. Where exit signs are required in Group R-1 occupancies by Section 1013.1, additional low-level exit signs shall be provided in all areas serving guestrooms in Group R-1 occupancies and shall comply with Section 1013.5. The bottom of the sign shall be not less than 10 inches (254 mm) nor more than 18 inches (455 mm) above the floor level. The sign shall be flush mounted to the door or wall. Where mounted on the wall, the edge of the sign shall be within 4 inches (102 mm) of the door frame on the latch side. Action required- Provide floor level exit signage.
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
11/15/2023

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. Action required- Provide a KNox elevator key box in the first floor elevator lobby.
Miscellaneous Correction
Corrective Action Required
11/15/2023

915.1 General. Carbon monoxide detection shall be installed in new buildings in accordance with Sections 915.1.1 through 915.6. Carbon monoxide detection shall be installed in existing buildings in accordance with Section 1103.9. 915.1.1 Where required. Carbon monoxide detection shall be provided in Group I-1, I-2, I-4 and R occupancies and in classrooms in Group E occupancies in the locations specified in Section 915.2 where any of the conditions in Sections 915.1.2 through 915.1.6 exist. Action required- Provide carbon monoxide detection where required.
Miscellaneous Correction
Corrective Action Required
11/15/2023

Provide exit signage at the east end of the Area B corridor to direct egress to the stairwell.
Miscellaneous Correction
Corrective Action Required
11/15/2023

If roll down steel doors/gates are used in the parking garage, egress doors fwith signage shall be provided.
Building Plan Review Rejected 11/15/2023 11/14/2023
Joe Frogge
Final Development Plan
Corrective Action Required
11/06/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Miscellaneous Correction
Corrective Action Required
11/06/2023

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $61,330.50
IBC 1704.2 Special Inspections
Corrective Action Required
11/06/2023

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Elevator Equipment Permit
Corrective Action Required
11/06/2023

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational.
Elevator Equipment Inspection
Corrective Action Required
11/06/2023

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational.
Elevator Certificate of Inspection
Corrective Action Required
11/06/2023

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational.
Health Dept Review
Corrective Action Required
11/06/2023

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7162. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational.
Health Dept Inspection
Corrective Action Required
11/06/2023

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational.
Misc
Corrective Action Required
11/10/2023

Sheets G-200 thru G210 are not legible. Action required: Reprint.
IBC 1010.1.10 Panic and fire exit hardware
Corrective Action Required
11/10/2023

2018 IBC 1010.1.10 Panic and fire exit hardware. Swinging doors serving a Group H occupancy and swinging doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock other than panic hardware or fire exit hardware. Exceptions: 1. A main exit of a Group A occupancy shall be permitted to have locking devices in accordance with Section 1010.1.9.4, Item 2. 2. Doors provided with panic hardware or fire exit hardware and serving a Group A or E occupancy shall be permitted to be electrically locked in accordance with Section 1010.1.9.9 or 1010.1.9.10. Action required: Provide panic devices on doors out of pool area. (Doors 1012D & 1012E)
IPC 1101.3 Prohibited drainage
Corrective Action Required
11/10/2023

2018 IPC 1101.3 Prohibited drainage. (as amended by LSCO 7-413) Sanitary sewer systems shall be designed, built and maintained in such a manner to prevent all storm or ground water from draining, discharging or entering into the sanitary sewer system. Connection of sump pumps, foundation drains, yard drains, gutter downspouts and any other storm water drainage receptacle(s) or system(s) are specifically prohibited from being connected to the sanitary sewer system. Action required: Route parking garage drains and elevator sump to storm, not sanitary.
NEC Article 210.52 (A) Receptacle spacing in dwelling units
Corrective Action Required
11/10/2023

2017 NEC Article 210.52 (A) General Provisions. In every kitchen, family room, dining room, living room, parlor, library, den, sunroom, bedroom, recreation room, or similar room or area of dwelling units, receptacle outlets shall be installed in accordance with the general provisions specified in 210.52(A)(1) through (A)(4). (1) Spacing. Receptacles shall be installed such that no point measured horizontally along the floor line of any wall space is more than 6 feet from a receptacle outlet. (2) Wall Space. As used by this section, a wall space shall include the following: 1. Any space 2 feet or more in width (including space measured around corners) and unbroken along the floor line by doorways and similar openings, fireplaces, and fixed cabinets that do not have countertops or similar work surfaces. 2. The space occupied by fixed panels in walls, excluding sliding panels. 3. The space afforded by fixed room dividers, such as freestanding bar-type counters or railings. (3) Floor Receptacles. Receptacle outlets in or on floors shall not be counted as part of the required number of receptacle outlets unless located within 18 inches of the wall. (4) Countertop and Similar Work Surface Receptacle Outlets. Receptacles installed for countertop and similar work surfaces as specified in 210.52(C) shall not be considered as the receptacle outlets required by 210.52(A). (D) Bathrooms. At least one receptacle outlet shall be installed in bathrooms within 3 ft of the outside edge of each basin. (see code for location regulations) Action required: Additional receptacles required in units where a wall space is 24" or greater. RE: wall space to the right of closet.
IMC 801.2 Combustion air required
Corrective Action Required
11/10/2023

2018 IMC 801.2 General. Every fuel-burning appliance shall discharge the products of combustion to a vent, factory-built chimney or masonry chimney, except for appliances vented in accordance with Section 804. The chimney or vent shall be designed for the type of appliance being ventilated. (see code for exception) Action required: Provide complete design for gas water heater combustion air and venting.
IPC 604.8 Water pressure reducing valve
Corrective Action Required
11/10/2023

2018 IPC 604.8 Water Pressure reducing valve or regulator. Where water pressure within a building exceeds 80 psi static, an approved water-pressure reducing valve conforming to ASSE 1003 or CSA B356 with strainer shall be installed to reduce the pressure in the building water distribution piping to not greater than 80 psi static. Action required: Provide pressure reducing valve at service entry. (required by Water Dept. regardless of measurement)
Miscellaneous Correction
Corrective Action Required
11/16/2023

Police department has reviewed this project from a security perspective and offer the following recommendations. 1.Not enough information in the plans for me to figure out how the entrances and exits will work for the parking lots. Concerns over traffic congestion in the area are beyond the scope of CPTED so I will defer on those issues to your staff. 2. Being a hotel, we would recommend good external lighting for entrances and the parking lot that make cameras more effective. 3. For cameras, we would like to see internal cameras that cover the hallways and common areas of the hotel as well as complete coverage of the parking lot. The camera system would have a minimum of 30 days of video storage on the system.
Licensed Contractors Rejected 11/15/2023 11/06/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
11/06/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
11/06/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $64,000.00 $64,000.00 Paid 01/28/2025
7232302-Commercial License Tax Fee $61,330.50 $61,330.50 Paid 01/29/2025
91100C8-Sanitary Sewer Insp Fees $239.25 $239.25 Paid 10/24/2024
91100C9-Water Insp Fee $765.00 $765.00 Paid 10/24/2024
9110068-Storm Fee $1,273.05 $1,273.05 Paid 10/24/2024
9110081-Paved Surface Inspection Fee $7,244.24 $7,244.24 Paid 10/24/2024
9110071-Site Grading Fee $978.00 $978.00 Paid 10/24/2024
8331401-Water Tap Fee $74,160.00 $74,160.00 Paid 10/24/2024
8331507-Sanitary Sewer Development Fee $36,583.00 $36,583.00 Paid 10/24/2024
8350015-Water Meter Fee $9,893.44 $9,893.44 Paid 10/24/2024
9110072-Water Test Fee $200.00 $200.00 Paid 10/24/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Water Line - Construction Inspection Pending
Sanitary Sewer Construction Inspection Pending
Misc
Informational
12/05/2024
12-5-24 DP. Please make sure site is dressed up and erosion control measure are in place as a DNR audit starts next week.
Erosion Control Inspection Residential Pending
Piers/Caissons Inspection - Commercial Pending
Electrical Service Inspection Pending
Gas Service Inspection - Commercial Pending
In-wall Inspection Pending
Above Ceiling Inspection Pending
Rated Assembly Inspection Pending
Grading/Excavation/Fill Inspection Pending
Water Line - Construction Inspection Pending
Pavement-Proof Roll Pending
Pavement-Surface Pending
Install Street and Stop Signs Pending
Pavement-Aggregate Base Pending
Pavement-Curb Construction Pending
Pavement-Stabilized Subgrade Pending
Water Service Inspection Pending
Underground Electrical Inspection - Commercial Pending
Misc
Informational
03/10/2025
-Secondary from CT to service equipment location
Underground Plumbing Inspection - Commercial Pending
Misc
Informational
03/20/2025
-4" domestic water and 6" fire risers- pressure test OK
Erosion Control Inspection Pending
Misc
Informational
04/18/2025
3-26-25 DP. ESC is installed and in good working order. 4-18-25 DP. ESC is in good working order.
Site Visit Pending
Miscellaneous Inspection Pending
Footing Inspection - Commercial Pending
Misc
Corrective Action Required
04/23/2025
Exterior footing: -Grade beam and column footing from J/15.5 to J/21; M.5/24 to T/15.5; cont from T/15.5 to N/2; J/15.5 to E.5/9, 9/D-E.5 -J/14 to K.3/13 -East stair tower footing and f.wall and remaining footing connecting to adjacent footing -West stair tower footing and f.wall Interior footing: -Col ftg K/15-20, M/13-20, P/13-22 , R/13-20; 6.5/F-F.5, F.6/6.9, E.5/7.5, F.3/7.5, N-P.6/6.6, 2 ftg south of elevator, J/8, 5 col footing south of east stair tower -Col pedestal K/15-20; M/13-20; P/13-22; R/13-20
Misc
Corrective Action Required
04/23/2025
-Have engineer address col footing 6.6/N and 6.6/P.6 directly above storm drain
Storm Sewer Construction Inspection Pending 4/18/2025 4/18/2025
Underslab Plumbing Inspection - Commercial Pending 4/28/2025 4/28/2025
Misc
Corrective Action Required
04/21/2025
Storm drain: -Area B. See deficiency below Sanitary drain: -Area B
Misc
Corrective Action Required
04/23/2025
Storm drain under two col pads N/6.6 and P.6/6.6 will have to be relocated
Site Visit Partial 11/21/2024 11/21/2024 11/21/2024
Misc
Informational
11/21/2024
11-21-24 DP. Advanced Excavation was onsite today and they were just grading the building pad area. No work for FEI
Site Visit Partial 12/2/2024 12/2/2024 12/02/2024
Misc
Informational
11/21/2024
11-21-24 DP. Advanced Excavation was onsite today and they were just grading the building pad area. No work for FEI 12-2-24 DP. No site work today
Sanitary Sewer Construction Inspection Partial 12/5/2024 12/5/2024 12/05/2024
Misc
Informational
12/05/2024
12-5-24 DP. Please make sure site is dressed up and erosion control measure are in place as a DNR audit starts next week.
Site Visit Partial 12/17/2024 12/17/2024 12/17/2024
Misc
Informational
12/02/2024
11-21-24 DP. Advanced Excavation was onsite today and they were just grading the building pad area. No work for FEI 12-2-24 DP. No site work today 12-17-24 DP. No site work today.
Erosion Control Inspection Partial 12/23/2024 12/23/2024 12/23/2024
Misc
Informational
12/23/2024
12-23-24 DP. Contractor has installed straw waddles around the perimeter of the site. They are keeping up with cleanliness. They have been sweeping Colburn Rd where their trucks are crossing. The rest of the debris on Colburn is from the CIP Project. No ESC issues at this time.
Erosion Control Inspection Partial 1/14/2025 1/14/2025 01/14/2025
Misc
Informational
12/23/2024
12-23-24 DP. Contractor has installed straw waddles around the perimeter of the site. They are keeping up with cleanliness. They have been sweeping Colburn Rd where their trucks are crossing. The rest of the debris on Colburn is from the CIP Project. No ESC issues at this time. 1-14-25 DP. No ESC issues at this time.
Storm Sewer Construction Inspection Partial 1/28/2025 1/28/2025 01/28/2025
Misc
Informational
01/28/2025
1-28-25 DP. Advanced Excavation is working on Storm line 1
Storm Sewer Construction Inspection Partial 1/29/2025 1/29/2025 01/29/2025
Misc
Informational
01/28/2025
1-28-25 DP. Advanced Excavation is working on Storm line 1 1-28-25 DP. AE is still working on competing storm line 1
Storm Sewer Construction Inspection Partial 2/6/2025 2/6/2025 02/06/2025
Misc
Informational
01/29/2025
1-28-25 DP. Advanced Excavation is working on Storm line 1 1-28-25 DP. AE is still working on competing storm line 1 2-6-25 DP. AE is still working on installing private storm.
Erosion Control Inspection Partial 2/6/2025 2/6/2025 02/06/2025
Misc
Informational
01/14/2025
12-23-24 DP. Contractor has installed straw waddles around the perimeter of the site. They are keeping up with cleanliness. They have been sweeping Colburn Rd where their trucks are crossing. The rest of the debris on Colburn is from the CIP Project. No ESC issues at this time. 1-14-25 DP. No ESC issues at this time. 2-6-25 DP. No ESC issues at this time.
Site Visit Partial 2/6/2025 2/6/2025 02/06/2025
Misc
Informational
12/17/2024
11-21-24 DP. Advanced Excavation was onsite today and they were just grading the building pad area. No work for FEI 12-2-24 DP. No site work today 12-17-24 DP. No site work today. 2-6-25 DP. There is a crew onsite today drilling piers.
Water Service Inspection Partial 2/14/2025 2/14/2025 02/14/2025
Misc
Informational
02/14/2025
2-14-25 DP. Aaron with Advanced Excavation is onsite today digging down and installing the three taps. These are private mains, public meters. The water department scheduled to drop off meters on Tuesday.
Sewer Service Inspection Partial 2/24/2025 2/24/2025 02/26/2025
Misc
Informational
02/26/2025
2-24-25 DP. Aaron's crew tied into the stub and ran the lateral out for this site with clean outs and tracer wire.
Water Service Inspection Partial 2/25/2025 2/25/2025 02/26/2025
Misc
Informational
02/14/2025
2-14-25 DP. Aaron with Advanced Excavation is onsite today digging down and installing the three taps. These are private mains, public meters. The water department scheduled to drop off meters on Tuesday. 2-25-25 DP. Aaron's crew set both meters and meter pits today. They installed copper from the main to the meter, and from the meter 10' out.
Erosion Control Inspection Partial 2/25/2025 2/25/2025 02/26/2025
Misc
Informational
02/06/2025
12-23-24 DP. Contractor has installed straw waddles around the perimeter of the site. They are keeping up with cleanliness. They have been sweeping Colburn Rd where their trucks are crossing. The rest of the debris on Colburn is from the CIP Project. No ESC issues at this time. 1-14-25 DP. No ESC issues at this time. 2-6-25 DP. No ESC issues at this time. 2-25-25 DP. No ESC issues at this time.
Fire Line Construction Inspection Partial 2/27/2025 2/27/2025 02/27/2025
Misc
Informational
02/27/2025
2-27-25 DP. Aaron's crew with Advanced Excavation cut the 8"x6" tee in today for the fire line and installed a 6" isolation valve. This is all on a private line. The fire line will be shorter than a stick of pipe, which will not require samples.
Underground Electrical Inspection - Commercial Partial 3/10/2025 3/10/2025 03/10/2025
Misc
Informational
03/10/2025
-Secondary from CT to service equipment location
Storm Sewer Construction Inspection Partial 3/10/2025 3/10/2025 03/11/2025
Misc
Informational
03/11/2025
3-10-25 DP. Advanced excavation is installing storm
Footing Inspection - Commercial Failed 3/13/2025 03/13/2025
Misc
Corrective Action Required
03/13/2025
Not ready. Provide 3” clearance from soil to rebar. Complete reinforcement
Footing Inspection - Commercial Partial 3/14/2025 3/14/2025 03/14/2025
Misc
Corrective Action Required
03/14/2025
Exterior footing OK: -Grade beam and column footing from J/15.5 to J/21; M.5/24 to T/15.5
Footing Inspection - Commercial Partial 3/18/2025 03/18/2025
Misc
Corrective Action Required
03/14/2025
Exterior footing OK: -Grade beam and column footing from J/15.5 to J/21; M.5/24 to T/15.5; cont from T/15.5 to N/2
Underground Plumbing Inspection - Commercial Partial 3/19/2025 3/19/2025 03/19/2025
Misc
Informational
03/19/2025
-6" fire risers- pressure test OK
Underground Plumbing Inspection - Commercial Partial 3/20/2025 3/20/2025 03/20/2025
Misc
Informational
03/19/2025
-4" domestic water and 6" fire risers- pressure test OK
Footing Inspection - Commercial Partial 3/20/2025 3/20/2025 03/20/2025
Misc
Corrective Action Required
03/18/2025
Exterior footing OK: -Grade beam and column footing from J/15.5 to J/21; M.5/24 to T/15.5; cont from T/15.5 to N/2 -East stair tower
Erosion Control Inspection Partial 3/26/2025 3/26/2025 03/26/2025
Misc
Informational
03/26/2025
3-26-25 DP. ESC is installed and in good working order.
Footing Inspection - Commercial Partial 3/26/2025 3/26/2025 03/26/2025
Misc
Corrective Action Required
03/20/2025
Exterior footing OK: -Grade beam and column footing from J/15.5 to J/21; M.5/24 to T/15.5; cont from T/15.5 to N/2; J/15.5 to E.5/9 -J/14 to K.3/13 -East stair tower
Footing Inspection - Commercial Partial 3/28/2025 3/28/2025 03/28/2025
Misc
Corrective Action Required
03/26/2025
Exterior footing: -Grade beam and column footing from J/15.5 to J/21; M.5/24 to T/15.5; cont from T/15.5 to N/2; J/15.5 to E.5/9 -J/14 to K.3/13 -East stair tower Interior footing: -Col ftg K/15-20, M/17-18, P/17-18 , R/13-20
Footing Inspection - Commercial Partial 4/1/2025 4/1/2025 04/01/2025
Misc
Corrective Action Required
03/28/2025
Exterior footing: -Grade beam and column footing from J/15.5 to J/21; M.5/24 to T/15.5; cont from T/15.5 to N/2; J/15.5 to E.5/9 -J/14 to K.3/13 -East stair tower Interior footing: -Col ftg K/15-20, M/13-20, P/13-22 , R/13-20,
Footing Inspection - Commercial Partial 4/4/2025 4/4/2025 04/04/2025
Misc
Corrective Action Required
04/01/2025
Exterior footing: -Grade beam and column footing from J/15.5 to J/21; M.5/24 to T/15.5; cont from T/15.5 to N/2; J/15.5 to E.5/9 -J/14 to K.3/13 -East stair tower Interior footing: -Col ftg K/15-20, M/13-20, P/13-22 , R/13-20, -Col pedestal M-P/16-18
Footing Inspection - Commercial Partial 4/9/2025 4/9/2025 04/09/2025
Misc
Corrective Action Required
04/04/2025
Exterior footing: -Grade beam and column footing from J/15.5 to J/21; M.5/24 to T/15.5; cont from T/15.5 to N/2; J/15.5 to E.5/9 -J/14 to K.3/13 -East stair tower Interior footing: -Col ftg K/15-20, M/13-20, P/13-22 , R/13-20 -Col pedestal K/15-20; M/13-20; P/13-22; R/13-20
Footing Inspection - Commercial Partial 4/10/2025 4/10/2025 04/10/2025
Misc
Corrective Action Required
04/09/2025
Exterior footing: -Grade beam and column footing from J/15.5 to J/21; M.5/24 to T/15.5; cont from T/15.5 to N/2; J/15.5 to E.5/9 -J/14 to K.3/13 -East stair tower footing and f.wall and remaining footing connecting to adjacent footing Interior footing: -Col ftg K/15-20, M/13-20, P/13-22 , R/13-20 -Col pedestal K/15-20; M/13-20; P/13-22; R/13-20
Footing Inspection - Commercial Partial 4/14/2025 4/14/2025 04/14/2025
Misc
Corrective Action Required
04/10/2025
Exterior footing: -Grade beam and column footing from J/15.5 to J/21; M.5/24 to T/15.5; cont from T/15.5 to N/2; J/15.5 to E.5/9 -J/14 to K.3/13 -East stair tower footing and f.wall and remaining footing connecting to adjacent footing Interior footing: -Col ftg K/15-20, M/13-20, P/13-22 , R/13-20 -Col pedestal K/15-20; M/13-20; P/13-22; R/13-20
Footing Inspection - Commercial Partial 4/15/2025 04/15/2025
Misc
Corrective Action Required
04/14/2025
Exterior footing: -Grade beam and column footing from J/15.5 to J/21; M.5/24 to T/15.5; cont from T/15.5 to N/2; J/15.5 to E.5/9 -J/14 to K.3/13 -East stair tower footing and f.wall and remaining footing connecting to adjacent footing -West stair tower footing Interior footing: -Col ftg K/15-20, M/13-20, P/13-22 , R/13-20 -Col pedestal K/15-20; M/13-20; P/13-22; R/13-20
Footing Inspection - Commercial Partial 4/16/2025 4/16/2025 04/16/2025
Misc
Corrective Action Required
04/15/2025
Exterior footing: -Grade beam and column footing from J/15.5 to J/21; M.5/24 to T/15.5; cont from T/15.5 to N/2; J/15.5 to E.5/9 -J/14 to K.3/13 -East stair tower footing and f.wall and remaining footing connecting to adjacent footing -West stair tower footing Interior footing: -Col ftg K/15-20, M/13-20, P/13-22 , R/13-20; 6.5/F-F.5, F.6/6.9, E.5/7.5, F.3/7.5, N-P.6/6.6, 2 ftg south of elevator, J/8 -Col pedestal K/15-20; M/13-20; P/13-22; R/13-20
Footing Inspection - Commercial Partial 4/17/2025 4/17/2025 04/17/2025
Misc
Corrective Action Required
04/16/2025
Exterior footing: -Grade beam and column footing from J/15.5 to J/21; M.5/24 to T/15.5; cont from T/15.5 to N/2; J/15.5 to E.5/9 -J/14 to K.3/13 -East stair tower footing and f.wall and remaining footing connecting to adjacent footing -West stair tower footing and f.wall Interior footing: -Col ftg K/15-20, M/13-20, P/13-22 , R/13-20; 6.5/F-F.5, F.6/6.9, E.5/7.5, F.3/7.5, N-P.6/6.6, 2 ftg south of elevator, J/8 -Col pedestal K/15-20; M/13-20; P/13-22; R/13-20
Fire Line Construction Inspection Passed 4/16/2025 4/16/2025 04/18/2025
Misc
Informational
02/27/2025
2-27-25 DP. Aaron's crew with Advanced Excavation cut the 8"x6" tee in today for the fire line and installed a 6" isolation valve. This is all on a private line. The fire line will be shorter than a stick of pipe, which will not require samples. 4-16-25 DP. This line passed hydrostatic at 200psi for 2 hours.
Sewer Service Inspection Passed 4/3/2025 4/3/2025 04/18/2025
Misc
Informational
04/18/2025
4-3-25 DP. Aarons crew ran the sewer service to the building pad. Installed clean outs where required.
Erosion Control Inspection Partial 4/18/2025 4/18/2025 04/18/2025
Misc
Informational
03/26/2025
3-26-25 DP. ESC is installed and in good working order. 4-18-25 DP. ESC is in good working order.
Site Visit Partial 4/17/2025 4/17/2025 04/18/2025
Misc
Informational
02/06/2025
11-21-24 DP. Advanced Excavation was onsite today and they were just grading the building pad area. No work for FEI 12-2-24 DP. No site work today 12-17-24 DP. No site work today. 2-6-25 DP. There is a crew onsite today drilling piers. 4-17-25 DP. All work on this site is inside the building pad. Nothing on my end until they are ready for parking lot.
Underslab Plumbing Inspection - Commercial Partial 4/22/2025 4/21/2025 04/21/2025
Misc
Corrective Action Required
04/21/2025
Storm drain: -Partial south of line M
Footing Inspection - Commercial Partial 4/23/2025 4/23/2025 04/23/2025
Misc
Corrective Action Required
04/17/2025
Exterior footing: -Grade beam and column footing from J/15.5 to J/21; M.5/24 to T/15.5; cont from T/15.5 to N/2; J/15.5 to E.5/9, 9/D-E.5 -J/14 to K.3/13 -East stair tower footing and f.wall and remaining footing connecting to adjacent footing -West stair tower footing and f.wall Interior footing: -Col ftg K/15-20, M/13-20, P/13-22 , R/13-20; 6.5/F-F.5, F.6/6.9, E.5/7.5, F.3/7.5, N-P.6/6.6, 2 ftg south of elevator, J/8, 5 col footing south of east stair tower -Col pedestal K/15-20; M/13-20; P/13-22; R/13-20
Misc
Corrective Action Required
04/23/2025
-Have engineer address col footing 6.6/N and 6.6/P.6 directly above storm drain
Underslab Plumbing Inspection - Commercial Partial 4/22/2025 4/23/2025 04/23/2025
Misc
Corrective Action Required
04/21/2025
Storm drain: -Area B. See deficiency below Sanitary drain: -Area B
Misc
Corrective Action Required
04/23/2025
Storm drain under two col pads N/6.6 and P.6/6.6 will have to be relocated
Documents & Images
Date Uploaded File Type Document Name
11/01/2023 Plans 23-1101_DPLS Lot 3 CDs_City Submittal
11/01/2023 Application Form DPLS_Lot#3_Permit Application
11/01/2023 Specifications 23-1101 TownePlace Spec_Volume 1
11/01/2023 Plans 2023-10-31_LSDP_Lot3 FDP_F2104643
11/02/2023 Letter License Tax Bill
11/02/2023 Email PD CPTED notes
11/03/2023 Specifications 23-1101 TownePlace Volume 2_1
11/03/2023 Specifications 23-1101 TownePlace Volume 2_2
11/16/2023 Letter DS P/R Corrections Document
12/22/2023 Plans 23-1222_DPLS_Lot 3_Addendum 1_Drawings
12/22/2023 Letter 23-1222_Towneplace_Addenda #1
12/22/2023 Letter 23-1222_DPLS_Lot 3_Round 1 Response
01/03/2024 Letter Fire Building Plan Review
01/03/2024 Letter DS P/R Corrections Document
01/04/2024 Letter Jackson Cty Health
01/08/2024 Activity Document FAA7460 Part I_PL20235734
01/08/2024 Activity Document FAA7460 Part II_PL20235734
01/20/2024 Plans 24-0119_DPLS_Lot 3_Addendum 2_Drawings
01/20/2024 Letter 24-0119_DPLS_Lot 3_Addendum #2
01/20/2024 Letter 24-0119_DPLS_Lot 3_Round 2 Response
09/09/2024 Plans DPLS Lot 3 CDs
09/10/2024 Letter 23-1222_Towneplace_Addenda #1
09/10/2024 Letter 24-0119_DPLS_Lot 3_Addenda #2
09/10/2024 Letter 24-0306_Towneplace_Addenda #3
09/16/2024 Engineer Report/Study J044702.04 Towneplace Suites Initial SI Letter
09/18/2024 Approved Plans Approved building permit plans
09/19/2024 Plans Stamped Approved Plans_PL2023278
10/24/2024 Receipt Receipt for transaction:2024-008557
10/24/2024 Receipt Receipt for transaction:2024-008558
10/31/2024 Plans J21007 - DPLS Alura Apartments Lot 4 - 2024-10-30 - REV2 Sheets
10/31/2024 Letter DPLS_Lot 4_Round 2 Response
10/31/2024 Approved Plans Approved MEP2 and P501
11/21/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter INSPECTION SUMMARY
12/17/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter 24-1220_DPLS Lot 3 Townplace - City Letter_ASI 3_1
12/23/2024 Letter 24_1220_DPLS Lot 3 ASI 3_1
12/31/2024 Plans 24-1220_DPLS Lot 3_Add 4_ASI 3_1_Sealed
12/31/2024 Approved Plans Approved fdtn and plumbing plans
01/14/2025 Letter INSPECTION SUMMARY
01/28/2025 Letter INSPECTION SUMMARY
01/28/2025 Receipt Receipt for transaction:2025-000529
01/29/2025 Letter INSPECTION SUMMARY
01/29/2025 Receipt Receipt for transaction:2025-000553
02/06/2025 Letter INSPECTION SUMMARY
02/06/2025 Letter INSPECTION SUMMARY
02/06/2025 Letter INSPECTION SUMMARY
02/07/2025 Engineer Report/Study SI Letter #1 12-28-2024 (002)
02/14/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/27/2025 Letter INSPECTION SUMMARY
03/10/2025 Letter INSPECTION SUMMARY
03/11/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter Fire Building Plan Review
03/13/2025 Letter Fire Building Plan Review
03/13/2025 Letter DS Building Permit
03/13/2025 Letter INSPECTION SUMMARY
03/14/2025 Letter INSPECTION SUMMARY
03/18/2025 Letter INSPECTION SUMMARY
03/19/2025 Letter INSPECTION SUMMARY
03/20/2025 Letter INSPECTION SUMMARY
03/20/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/09/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
04/14/2025 Letter INSPECTION SUMMARY
04/15/2025 Letter INSPECTION SUMMARY
04/16/2025 Letter INSPECTION SUMMARY
04/17/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/21/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home