Planning Application Status

PL2017026




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2017026
RESIDENCES AT ECHELON
Commercial Final Development Plan
Commercial Final Development Plan
Approved
02/10/2017
ALDERSGATE METHODIST CHURCH
Locations
Contacts
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
ALDERSGATE METHODIST CHURCH, Address:350 SW M 150 HWY  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
CHRIS ROSE, Phone:(785) 829-7775  
CITY OF LEE'S SUMMIT MISSOURI, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Review Approved with Conditions 07/17/2017 07/18/2017
Dawn Bell
Code Statement
Corrective Action Required
07/17/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
FDC
Resolved
07/19/2017

IFC 903.3.7- Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Actions required: 1. Move the fire hydrant from the east side of the roundabout south of Building 7 to the island the east, south of Building 8. 2. Show the location of the FDC on Building 4. 3. Move the FDC closer to the corner of Building 3 to meet the 100'.
Traffic Review No Comments 07/17/2017 07/18/2017
Dawn Bell
Planning Review No Comments 07/17/2017 07/17/2017
Christina Stanton
Engineering Review Approved with Conditions 07/17/2017 07/17/2017
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
07/17/2017

The Engineer’s Estimate of Probable Construction Costs has not been received. In order to calculate the Engineering Plan Review and Inspection Fee, please submit the estimate. .
DE Contact Field Eng. Inspector
Corrective Action Required
07/17/2017

Contact Development Services Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
07/17/2017

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
DE Future Repair Work
Corrective Action Required
07/17/2017

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
PW Submit Land Disturbance (DELETE)
Corrective Action Required
07/17/2017

If ground-breaking is scheduled to take place prior to issuance of a building permit, please submit a Land Disturbance Permit application and the required attachments/fees to the Development Services Department.
DE C&O #12 Cut & Fill
Corrective Action Required
07/17/2017

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Fire Review Approved with Conditions 06/22/2017 06/22/2017
Jim Eden
Code Statement
Corrective Action Required
06/22/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
FDC
Corrective Action Required
06/22/2017

IFC 903.3.7- Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Actions required: 1. Move the fire hydrant from the east side of the roundabout south of Building 7 to the island the east, south of Building 8. 2. Show the location of the FDC on Building 4. 3. Move the FDC closer to the corner of Building 3 to meet the 100'.
Engineering Review Corrections 06/22/2017 06/22/2017
Gene Williams, P.E.
Corrective Action Required
06/22/2017

Please refer to comment #1 of the previous applicant letter dated May 12, 2017 (hereinafter referred to "the applicant letter"). Sheet C.500 still shows a 6" interior fire line, when an 8" fire line is required. Please note that Sheet C.502 appears to show the 8", but Sheet C.500 does not.
Corrective Action Required
06/22/2017

Please refer to comment #1 of the previous applicant letter. Sheet C.500 shows interior water meters, which is in direct conflict with comment #1 of the previous applicant letter. The water meters should be placed within the right of way or an easement along the right of way. If sub-metering is needed, then this should be clearly-shown on the plans as "sub-meter", or equivalent. Finally, there is a note on Sheet C.500 stating "public water main 1" in the northwest portion of the project. This is not a public main. All interior water lines, including the interior domestic lines, are considered private.
Corrective Action Required
06/22/2017

Please refer to comment #2 of the previous applicant letter. The ADA-accessible ramps are not sufficiently detailed. Section 5304.8 contains specific requirements which must be included in the plans. Please review Section 5304.8, and provide the information shown on the fourteen (14) bullet points. The design must also follow the design criteria shown on Table LS-5, but simply including it within the plan set is not sufficient. This table is intended for use to comply with the fourteen (14) bullet point items included in Section 5304.8.
Corrective Action Required
06/22/2017

Please refer to comment #6 of the previous applicant letter. Inlet 7-3 appears to be surcharging, with no provision for an emergency overflow route. In other words, it appears this area will flood adjacent dwellings. An overflow route must be established for this area.
Corrective Action Required
06/22/2017

Sheet C.208: As specified in previous applicant letters, the APWA standard detail for ADA-accessible ramps should be removed.
Corrective Action Required
06/22/2017

Sheet C.404: The requested detail was provided for the public sanitary sewer lid, but not for a private sanitary lid. Provide a blank lid for the private sanitary sewer lid, with a note stating that the blank lid will be used for all private sanitary sewers and private stormwater structures.
Corrective Action Required
06/22/2017

Sheet C.507: The requested detail for the backflow vault does not comply with the City of Lee's Summit standard drawing for a backflow vault. It is recommended that this detail be copied and pasted into the plan set, along with the method used to drain the vault (i.e., either by a aggregate sump or daylighted).
Corrective Action Required
06/22/2017

Please refer to comment #13 of the previous applicant letter. A typical detail for pipe trenching was not provided for the sanitary sewer, water line, or storm lines.
Traffic Review No Comments 06/22/2017 06/20/2017
Michael Park
Planning Review No Comments 06/22/2017 06/16/2017
Christina Stanton
Engineering Review Corrections 05/12/2017 05/12/2017
Gene Williams, P.E.
Corrective Action Required
05/12/2017

The private interior water line loop and domestic water line is still not correct. To reiterate, the City will require an 8" water line to be constructed from Cheddington Dr., to Hollywood Dr., generally running west to east. This line will be private. It will be required to have two (2) backflow vaults at each end of the line. This is not a normal situation, and was selected many months ago as the best method to provide a loop for the system, although the line will be considered private. This private fire line will be able to serve interior private fire hydrants and interior private fire suppression facilities. It may not be tapped for domestic use. A meter (or meters) may be installed within the right of way or an easement along Cheddington Dr. and/or Hollywood Dr. The location of these meters must be shown on the plans. If there is any question concerning this requirement, please contact engineering staff.
Corrective Action Required
05/12/2017

Sheet C.208: The ADA-accessible ramp details do not make sense. Please see Section 5304.8 for the minimum required design detail elements that are needed to perform a review. Simply calling-out elevations is not sufficient to perform a review.
Corrective Action Required
05/12/2017

Sheet C.200: The plan shows off-site grading onto adjacent property to the south. Has a grading easement been obtained for this work?
Corrective Action Required
05/12/2017

Please refer to comment #18 of the applicant letter dated Mar. 31, 2017. The top of the detention basin outlet structure is shown at an elevation of 1005.5. There is a proposed finish contour elevation of 1006 shown "tying-into" this contour elevation. Hence, there will be a natural 6 inch drop-off, with no provision for providing a small headwall or appropriate grading of less than 3:1 slope.
Corrective Action Required
05/12/2017

Please refer to comment #20 of the previous applicant letter dated Mar. 31, 2017. Hydraulic grade lines were missing from the first submittal, but were provided for the latest submittal. However, many of the hydraulic grade lines entering the retention basin do not make sense. The permanent pool elevation is 999.0, and the 100 year water surface elevation is 1005.25. The hydraulic grade lines at the flared end sections are vastly different than the 100 year water surface elevation. Hence, not only does this affect the hydraulic grade line at the end of pipe, but all the way upstream through the system. Please review and revise as appropriate.
Corrective Action Required
05/12/2017

In regard to the above comment, it appears there will be surcharging of inlet 7-3 during the 100 year event. This inlet appears to be in a sump condition, and may flood bldg. #3. A minimum of 2.0 feet freeboard is required between the 100 year water surface elevation and any building opening.
Corrective Action Required
05/12/2017

The finish floor elevation of Bldg. #4 is shown at 1007.00. A minimum of 2.0 feet freeboard between the lowest building opening and the 100 year water surface elevation is required as per the Design and Construction Manual. It appears this requirement is not met.
Corrective Action Required
05/12/2017

Sheet C.400: Please provide a note concerning the public sanitary sewer being a part of the public street, stormwater, and sanitary sewer plans.
Corrective Action Required
05/12/2017

Sheet C.401: This should be deleted from the plans, or a note should be provided stating that these public improvements are part of the street, stormwater, and sanitary sewer plans.
Corrective Action Required
05/12/2017

Sheet C.403: Show the public sanitary sewer line to be installed as part of the street, stormwater, and sanitary sewer plans "grayed-out", with sufficient notes stating that these improvements are covered under the separate plan set. Provide sufficient notes stating that the private sanitary sewer will be connected to the new sanitary sewer at the location shown.
Corrective Action Required
05/12/2017

A detail must be provided for any water meter vault that contains water meters 3" and higher.
Corrective Action Required
05/12/2017

Details must be provided for all curb inlets, junction boxes, field inlets, etc.
Corrective Action Required
05/12/2017

A typical detail must be provided for all pipe trenching.
Corrective Action Required
05/12/2017

A detail must be provided for the backflow vault, including the method to be used to drain the backflow vault (i.e., either by daylighting, or providing a trench sump).
Planning Review No Comments 05/12/2017 05/12/2017
Christina Stanton
Fire Review Corrections 05/12/2017 05/11/2017
Jim Eden
Code Statement
Corrective Action Required
05/11/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code. For information only.
FDC
Corrective Action Required
05/11/2017

IFC 903.3.7- Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: The FDC's are still not shown on the Site Plan or Private Water Main Plan. Schedule a meeting through the City Project Coordinator to discuss locations and show the locations on a revised plan.
Traffic Review No Comments 05/12/2017 05/11/2017
Michael Park
Traffic Review No Comments 03/29/2017 03/30/2017
Michael Park
Planning Review Corrections 03/29/2017 03/29/2017
Christina Stanton
Corrective Action Required
03/29/2017

Revised architectural drawings shall be submitted to address comments #2 and #6 from the previous letter (dated March 2, 2017).
Corrective Action Required
03/29/2017

Revised electrical plans shall be submitted to address comment #4 from the previous letter.
Corrective Action Required
03/29/2017

Water line. It appears that the water line located on the eastern side (near SW Hollywood Drive), which runs east-west between buildings 7/8 and 1/2, was moved south. When this line was moved south the water line to building #8 was not extended and the water line to building #1 was not adjusted (it now goes past the east-west water line). Adjust as needed on all affected plans.
Corrective Action Required
03/29/2017

Clarification is needed for the size of the sidewalk on the north side of the club house. Is is 5' or 6', or 6' and then transitioning to 5' (like it appears to be on the southern side of the club house)?
Corrective Action Required
03/31/2017

2012 IBC 1013.2 – Where required. Guards shall be located along open-sided walking surfaces, including mezzanines, equipment platforms, stairs, ramps and landings that are located more than 30 inches measured vertically to the floor or grade below at any point within 36 inches horizontally to the edge of the open side. Guards shall be adequate in strength and attachment in accordance with Section 1607.8. Guards are required at retaining walls over 30” above grade when walking surfaces are within ten (10) feet of the high side of the retaining wall. (As amended by the City of Lee’s Summit. See code section for possible exceptions.) Action required: Provide guards at pond compliant with 2012 IBC chapter 1013.
Engineering Review Corrections 03/29/2017 03/29/2017
Gene Williams, P.E.
Corrective Action Required
03/29/2017

The "Macro Storm Water Drainage Study" dated Mar. 21, 2017 appears to contain contradictory statements in the first section versus the conclusions section. It appears the detention basin will not be able to achieve the release rate specified in Section 5600 of KCAPWA. Finally, is a CN value of 84 apprppriate for this site?
Corrective Action Required
03/29/2017

Sheet C.001: Public easements appear to be shown for the interior sanitary sewer lines. Please remove these easements so there is no confusion on the ownership of these facilities.
Corrective Action Required
03/29/2017

Sheet C.001: The fire line connection and backflow vaults are not shown correctly. a separate tee is required for each connection to the public water line, and the domestic water meter cannot be connected to the fire line since the water line is on the same side of the street as the connection point.
Corrective Action Required
03/29/2017

Sheet C.001: The sanitary sewer line did not appear to be shown on this sheet, but rather, the outline of easements appear to be shown. Please show the location of the sanitary sewer lines, including the short segment of public sanitary sewer. Please label each as public or private as appropriate.
Corrective Action Required
03/29/2017

Sheet C.001: There is an erroneous note under "Water Maiin Improvements" stating that "the existing 8" water main located on the east side of Lot 1 will be extended along the east side of the proposed Cheddington Drive and run easterly along the north line of Lot 3 to create a loop with the water on Hollywood Drive. The water main will be extended along the east side of Lots 2 and 3 from M-150 Highway to the northeast corner of Lot 3." The loop will not be constructed in this fashion, but rather, the private interior fire line loop will serve as the loop. Please remove the note since this is not valid.
Corrective Action Required
03/29/2017

Sheet C.001: The storm water quality note specifies that "native plantings" will be used to address stormwater quality, but the plans do not reflect this. Either delete this note, or provide details concerning the native plantings.
Corrective Action Required
03/29/2017

Sheet C.100: The interior sanitary sewer line is shown installed within a public easement. Please remove the interior sanitary sewer easements as appropriate.
Corrective Action Required
03/29/2017

Sheet C.100: ADA-accessible ramps were not shown on the west entrance. Please label, and provide a site-specific design for the ADA-accessible ramps across the two (2) commercial entrances. The City will no longer allow for "in-the-field" design of ADA-accessible ramps, and a site-specific design is required. Please refer to Section 5300 of the City of Lee's Summit Design and Construction Manual for specific requirements. The KCAPWA standard details for ADA-accessible ramps are no longer valid in the City of Lee's Summit due to their lack of compliance with PROWAG.
Corrective Action Required
03/29/2017

Sheet C.100: Pavement and curb and gutter is shown north of the two (2) commercial entrances. It was our understanding these were not paved, Please remove these features.
Corrective Action Required
03/29/2017

All Sheets: Pavement and curb and gutter are shown on the northern extension of Cheddington and Hollywood Dr. It was our understanding this was not going to be constructed with this project.
Corrective Action Required
03/29/2017

All Sheets: Please remove the public sanitary sewer easements shown within the interior of the project, with the exception of the public segment near the southwest corner of the project.
Corrective Action Required
03/29/2017

Sidewalk appears to be shown along the northern extension of Cheddington Dr. and Hollywood Dr. It was our understanding these portions of the roadway were not to be constructed.
Corrective Action Required
03/29/2017

Comment Concerning the Retention Pond: A retaining wall is shown for the pond. What provisions are being implemented to prevent residents from falling into the pond? It would appear a fence would be required as per the building code. Please contact Joe Frogge concerning the requirement for a safety railing or fence.
Corrective Action Required
03/29/2017

Please title the "Master Drainage Plan" as "Grading Plan". A Master Drainage Plan is not required for this project.
Corrective Action Required
03/29/2017

Sheet C.206: A Guard Rail is shown, but it is not clear where this will be installed. It is not clear whether this guard rail will meet code requirements. Please contact Joe Frogge for additional information.
Corrective Action Required
03/29/2017

Sheet C.206: How far will the geogrid be installed on the back side of the segmental walls? This does not appear to be shown. Please be aware this retaining wall must be approved by Codes. Please contact Joe Frogge for additional information.
Corrective Action Required
03/29/2017

Sheet C.207: What provisions for anti-clogging are being proposed for the lower 8" orifice?
Corrective Action Required
03/29/2017

Sheet C.207: The top of the detention basin outlet structure is shown at 1005.5, matching up to a proposed grade of 1006.0. Will a small "retaining curb" be installed to make the 6 inch difference? Without it, it does not appear it will be able to match the proposed grade.
Corrective Action Required
03/29/2017

Sheet C.300: A private storm drainage easement is shown from the School District, but we have not yet received it. This will be required prior to approval of the FDP.
Corrective Action Required
03/29/2017

All Stormwater Sheets: Hydraulic grade lines for the design storm do not appear to be shown for any of the profile views.
Corrective Action Required
03/29/2017

Profile views of the stormwater system do not appear to show any utility crossings.
Corrective Action Required
03/29/2017

A profile view of the stormwater segment from CI 1-3 to the flared end section did not appear to be present in the plan set.
Corrective Action Required
03/29/2017

Sheet C.400: The sanitary sewer general layout plan should specifically show the private sanitary sewer, and the public sanitary sewer. It will not be necessary to submit a separate public sanitary sewer plan for this short segment, but rather, include it within the street and stormwater plans since an MDNR permit is not required.
Corrective Action Required
03/29/2017

Sheet C.401: A separate profile view should be provided for the public segment from MH A-1 to MH A-2. Sufficient notes should be provided which call-out the removal of existing City manhole #57-041. This should be included within the street and stormwater plan set since an MDNR permit is not required.
Corrective Action Required
03/29/2017

Sheet C.401: The plan view shows MH A-1 as being the "end of public service." The end of the public sanitary sewer line is actually at MH A-2.
Corrective Action Required
03/29/2017

Sheet C.401: The profile view of Sanitary Sewer Line B appears to be missing the FL In elevation from the east.
Corrective Action Required
03/29/2017

Sheet C.403: Casing pipe is shown, but it does not appear this is needed for the project. If not, please remove the detail.
Corrective Action Required
03/29/2017

Sheet C.403: A drop manhole detail is shown, but it does not appear that any drop manholes will be used on the project. If not, please remove.
Corrective Action Required
03/29/2017

It appears the City standard trench check detail was missing from the detail sheets, and it did not appear that sufficient notes were provided concerning the construction of trench checks on laterals.
Corrective Action Required
03/29/2017

Sheet C.402: The font size for the sanitary sewer service lines are too small. They are illegible at the half size. Please ensure the font size is legible at the half size scale. Finally, the symbol for "CO" should be defined on a legend.
Corrective Action Required
03/29/2017

Sheet C.500: This sheet and subsequent sheets for the interior fire line and domestic line need substantial changes. for instance, a separate tap is required for the domestic service line. It is not clear why an 8" domestic water meter is being called-out. The fire line will require a separate tee connection.
Corrective Action Required
03/29/2017

Sheet C.500: If using a 3 inch or greater size domestic meter, a special design will be required for the meter pit.
Corrective Action Required
03/29/2017

Sheet C.500: Please add sufficient notes stating that the public lines along Cheddington Dr. and Hollywood Dr. are part of the separate construction plan set for the public infrastructure improvements along Cheddington Dr. and Hollywood Dr.
Corrective Action Required
03/29/2017

Sheet C.500: The notes at the upper right side of the sheet state that the 6" fire line shall be DIP. Why is this being specified rather than C900?
Corrective Action Required
03/29/2017

Sheet C.500: Note 1 states that the domestic 2" water service lines shall be tapped into the fire service line. This is not allowed.
Corrective Action Required
03/29/2017

Sheet C.500: It appears the domestic water service lines are shown connecting to the fire line. This is not allowed. It is possible to provde sub-metering within the development, but a separate domestic water line should be installed within the development.
Corrective Action Required
03/29/2017

Sheets C.501 through C.503: These sheets should be labeled as "Private Fire Line". As previously discussed, the domestic service lines will require significant revision since they cannot connect to the fire line. It is not necessary to provide a profile view of the domestic lines, but a plan view at a minimum. A profile view of the private fire line, however, is required.
Corrective Action Required
03/29/2017

It did not appear that utility crossings were shown on the profile views of the water line, storm lines, or sanitary sewer lines. Please show these to determine whether utility conflicts exist.
Corrective Action Required
03/29/2017

The half size set was not legible due to an odd color scheme. Please consider another color scheme, or use black and white.
Corrective Action Required
03/29/2017

An Engineer's Estimate of Probable Construction Costs appeared to be missing from the plan set.
Fire Review Corrections 03/29/2017 03/28/2017
Jim Eden
FDC
Corrective Action Required
03/28/2017

IFC 903.3.7- Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: The FDC's are not shown on either the the Site Plan or Water General Layout plans. Show the location of the FDC to a hydrant within 100 feet for each of the buildings. Coordinate with the sprinkler contractor for proper design in relation to riser location. Contact or office at (816) 969-1303 if you have any questions.
Misc.
Corrective Action Required
03/28/2017

The curb on the island in the roundabout shall be a CG-2 roll back curb.
Traffic Review No Comments 02/27/2017 03/01/2017
Michael Park
Planning Review Corrections 02/27/2017 02/27/2017
Christina Stanton
Corrective Action Required
02/27/2017

Monument signs cannot be located within utility easements.
Corrective Action Required
02/27/2017

Water lines shown on the architectural site plans do not appear to match those shown on the engineering/civil plan sets. Please reconcile.
Corrective Action Required
02/27/2017

Clearly label all structured parking types (i.e., carport or garage).
Corrective Action Required
02/27/2017

Lighting. Per condition #2 of the ordinance which approved the preliminary development plan for this development: "All light fixtures shall be LED". SL3 is called out as compact fluorescent. SL3 shall be changed to a LED light fixture to meet the ordinance.
Corrective Action Required
02/27/2017

Provide updated documentation showing how the sustainability standards are being met.
Corrective Action Required
02/27/2017

The building plans indicate several ground-mounted mechanical units around the clubhouse which are not shown on the final development plan. Ground-mounted units shall be screened with landscaping and/or masonry wall per Section 7.180.F of the UDO. Please revise plans accordingly.
Corrective Action Required
02/27/2017

Call out top of wall elevations for all proposed retaining walls. Retaining walls over 4-feet in height require a structural permit.
Corrective Action Required
02/27/2017

Addressing. Addressing is being assigned as follows: Bldg #1 3520 SW Hollywood Drive Bldg #2 3540 SW Hollywood Drive Bldg #3 3570 SW Hollywood Drive Bldg #4 3590 SW Hollywood Drive Bldg #5 3580 SW Hollywood Drive Bldg #6 3560 SW Hollywood Drive Bldg #7 3530 SW Hollywood Drive Bldg #8 3510 SW Hollywood Drive Monument closest to SW Hollywood Drive shall be 3514 SW Hollywood Drive, and the monument closest to SW Cheddington Drive shall be 3584 SW Hollywood Drive. The clubhouse shall be 3550 SW Hollywood Drive.
Engineering Review Corrections 02/27/2017 02/27/2017
Gene Williams, P.E.
Corrective Action Required
02/23/2017

The Final Development Plan submittal package did not appear to include: 1) public water line improvements along Hollywood Dr. and Cheddington Dr., and 2) public sanitary sewer improvements along Cheddington Dr. These plans must be submitted and approved before approval of the Final Development Plan.
Corrective Action Required
02/23/2017

Substantial changes are needed in regard to the interior fire line service, domestic water service, and sanitary sewer service. As discussed previously, and as a condition of the Preliminary Development Plan, all interior sanitary sewer lines and interior fire lines should be designated as "private". A backflow vault and backflow assembly must be installed at each connection to the public water line along Cheddington Dr. and Hollywood Dr., and all interior sanitary sewer manholes and sewer lines should be designed as "private". A manhole near the southwest corner of the project should be designated as the end of public service.
Corrective Action Required
02/23/2017

The erosion and sediment control plan lacked a temporary sediment basin. It appears this is warranted. Please show the location of the temporary sediment basin, and design details on the outfall structure.
Corrective Action Required
02/23/2017

The Final Restoration Plan portion of the erosion and sediment control plan did not appear to resemble any sort of "final restoration". Notes were provided showing the locations of gutter buddies, and other erosion and sediment control measures, but no provision for removal, final restoration, etc.
Corrective Action Required
02/23/2017

The erosion and sediment control plan shows extensive use of silt fence, but it does not appear to be designed correctly. In general, silt fence should be placed along contour lines, rather than as shown on the plan. The ends of the silt fence should be curled upslope.
Corrective Action Required
02/23/2017

A pavement plan, curb and gutter plan, typical pavement sections, typical curb and gutter sections with subgrade design, and all other elements contained within a site plan appeared to be missing from the plan set.
Corrective Action Required
02/23/2017

A grading plan for the detention basin was missing.
Corrective Action Required
02/23/2017

A final stormwater detention study was not included in the submittal package. The results of the detention study should match what is shown on the design details of the outlet structure.
Corrective Action Required
02/23/2017

The retention basin outlet structure detail is included on the Utility sheet. This does not appear to be a logical location for such a feature since it is not a "utility".
Corrective Action Required
02/23/2017

The retention basin outlet structure does not include any details of construction, such as steel reinforcement, manhole frame and lid, construction material, wall thickness, steps, etc.
Corrective Action Required
02/23/2017

The detail for the retention basin outlet structure includes section views, with no reference to the various sections in the form of a plan view with section cuts.
Corrective Action Required
02/23/2017

An off-site, private drainage easement from the school district shall be required prior to approval of the Final Development Plan. Please submit the proposed language for the private easement prior to execution and recording.
Corrective Action Required
02/23/2017

An agreement for the acquisition of a future sanitary sewer easement shall be executed with the school district. This agreement must be in a form which is agreeable to the City, and shall be executed and recorded prior to approval of the Final Development Plan.
Corrective Action Required
02/23/2017

There appear to be two (2) cover sheets for water line and sanitary sewer improvements. It is not clear why these have separate cover sheets, since both of these interior improvements shall be private. In other words, these improvements should be shown within the Final Development Plan without a separate cover sheet.
Corrective Action Required
02/23/2017

Is there a particular reason that a Master Drainage Plan is provided? Would it be better to re-title these sheets as "Grading Plan", "Drainage Area Maps", and "Drainage Calculations"?
Corrective Action Required
02/23/2017

Numerous drafting issues exist within the private sanitary sewer plans. Manholes are shown sticking out of the ground, and in some cases are shown below grade.
Corrective Action Required
02/23/2017

The location(s) of domestic water meter(s) were not shown. These water meter(s) should be shown within the right of way, or an easement. It is acceptable to provide sub-metering after the master meter(s).
Corrective Action Required
02/23/2017

Are there any irrigation meters proposed for the project? If so, please show their location.
Corrective Action Required
02/23/2017

As per Codes, 2012 IPC 708.3.2 Building sewers: Building sewers shall be provided with cleanouts located not more than 100 feet apart measured from the upstream entrance of the cleanout. For building sewers 8 inches and larger, manholes shall be provided and located not more than 200 feet from the junction of the building drain and building sewer, at each change in direction and at intervals of not more than 400 feet apart. Manholes and manhole covers shall be of an approved type. Please update sewer plan to demonstrate compliance.
Corrective Action Required
02/27/2017

Additional comments may be forthcoming based on the incomplete state of the Final Development Plan.
Corrective Action Required
02/27/2017

An itemized and sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. This estimate should include only the items necessary to construct the improvements shown in the Final Development Plan (i.e., not the public improvements). This estimate is used to calculate the Engineering Plan Review and Inspection Fee, and is calculated at 3% of the total site work, plus a "per trip" fee for the observation and collection of water samples.
Fire Review Corrections 02/27/2017 02/14/2017
Jim Eden
Code Statement
Corrective Action Required
02/14/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Fire Lanes - Marking
Corrective Action Required
02/14/2017

IFC 503.3- Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Action required: Post drive lanes.
FDC
Corrective Action Required
02/14/2017

IFC 903.3.7- Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: Show the location of the FDC's on the plans and a hydrant within 100 feet.
Misc.
Corrective Action Required
02/16/2017

Provide a detail for the island in the roundabout.
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $1,000.00 $1,000.00 Paid 02/10/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
02/10/2017 Receipt Receipt for transaction: 2017-000435
03/02/2017 Letter Applicant Letter - FDP (DFDP)
03/31/2017 Letter Applicant Letter - FDP (DFDP)
12/19/2017 Plans C.307
12/19/2017 Plans C.400
12/19/2017 Plans C.401
12/19/2017 Plans C.402
12/19/2017 Plans C.403
12/19/2017 Plans C.404
12/19/2017 Plans C.500
12/19/2017 Plans C.501
12/19/2017 Plans C.502
12/19/2017 Plans C.503
12/19/2017 Plans C.102
12/19/2017 Plans C.103
12/19/2017 Plans C.104
12/19/2017 Plans C.105
12/19/2017 Plans C.106
12/19/2017 Plans C.200
12/19/2017 Plans C.201
12/19/2017 Plans C.202
12/19/2017 Plans C.203
12/19/2017 Plans C.204
12/19/2017 Plans C.205
12/19/2017 Plans C.206
12/19/2017 Plans C.207
12/19/2017 Plans C.208
12/19/2017 Plans C.300
12/19/2017 Plans C.301
12/19/2017 Plans C.302
12/19/2017 Plans C.303
12/19/2017 Plans C.304
12/19/2017 Plans C.305
12/19/2017 Plans C.306
02/22/2021 RETENTION BASIN ASBUILTS
12/19/2017 Plans C.101
12/19/2017 Plans C.100 SITE PLAN
12/19/2017 Plans C.052 FINAL RESTORATION PLAN
12/19/2017 Plans C.051 INACTIVE STABILIZATION PLAN
12/19/2017 Plans C.050 PRE-CLEARING PLAN
12/19/2017 Plans C.001 COVER SHEET
12/19/2017 Plans FDP pdf sheets 17 1215
12/19/2017 Plans C.601
12/19/2017 Plans C.600
12/19/2017 Plans C.507
12/19/2017 Plans C.506
12/19/2017 Plans C.505
12/19/2017 Plans C.504
12/05/2017 Letter Resubmittal Routing Sheet - FDP
10/30/2017 Activity Document Fee WorksheetFDP
07/25/2017 Letter Applicant Letter - FDP (DFDP)
07/18/2017 Letter Applicant Letter - FDP (DFDP)
07/10/2017 Letter Resubmittal Routing Sheet - FDP
06/23/2017 Letter Applicant Letter - FDP (DFDP)
06/15/2017 Letter Resubmittal Routing Sheet - FDP
05/05/2017 Letter Resubmittal Routing Sheet - FDP
03/22/2017 Letter Resubmittal Routing Sheet - FDP
02/10/2017 Letter Routing Sheet - FDP
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home