Permit Application Status

PRCOM20226232


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20226232
Building Permit - Commercial
Issued
SAINT LUKES EAST HOSPITAL
ADDITION COMMERCIAL
3 STORY ADDITION WITH MULTIPLE CLINICS - AMBULATORY CARE FACILITY *** - 3/9/23 - releasing permit for foundation only
12/22/2022
03/27/2023
09/02/2023
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
MCCARTHY BUILDING COMPANIES INC, Address:12851 MANCHESTER RD, Phone:(314) 646-4179  
ERIC DILL, Phone:(937) 471-0653  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
ACI BOLAND ARCHITECTS, Address:1710 WYANDOTTE ST, Phone:(816) 595-9513  
ALPHA-OMEGA GEOTECH, Address:1701 STATE AVE, Phone:(913) 371-0000  
SITE RITE CONSTRUCTON CO, Address:1601 BELLEFONTAINE AVE, Phone:(816) 561-4890  
Not shown for privacy reasons.
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 03/21/2024 03/22/2024
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
03/22/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Stamped plans recieved 3/7/2024.
Installation acceptance testing
Corrective Action Required
03/22/2024

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule hydrostatic and flow tests.
Miscellaneous Correction
Corrective Action Required
03/22/2024

Confirm the FDC is marked "Pump at 170 psi". Verified at inspection
Miscellaneous Correction
Corrective Action Required
03/22/2024

Plans released for contruction with the upgrade of the 4 inch supply line to a 6 inch line.
Fire Plan Review Approved with Conditions 04/05/2023 04/02/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
03/29/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Corrective Action Required
03/29/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide shop drawings for review and approval.
Miscellaneous Correction
Resolved
04/02/2023

3311.2 Maintenance. Required means of egress and required accessible means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress and accessible means of egress systems and facilities. Action required- All temporary exiting shall be marked and staff trained on emergency egress plans. Temporary exiting is subject to inspection at anytime during the project. Access to all fire protection for the existing building(FDC's) shall be maitained at all times. Any impairment to the existing buildings fire suppression or alarm system shall require notification and approval of the fire marshal.
Miscellaneous Correction
Resolved
04/02/2023

5306.5 Medical gas systems. Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators and relief devices and valves, shall be installed in accordance with NFPA 99 and the general provisions of this chapter. Existing medical gas systems shall be maintained in accordance with the maintenance, inspection and testing provisions of NFPA 99 for medical gas systems. ocumentation of med gas piping presuure testing shall be provided at occupancy inspection.
Miscellaneous Correction
Resolved
04/02/2023

Class 1 hose connections to be provided in stair towers. Verified on sprinkler plans.
Knox box required
Resolved
04/02/2023

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Action required- A Knox elevator key box is required in the new lobby.
Building Plan Review Approved 04/05/2023 03/31/2023
Joe Frogge
Elevator Equipment Permit
Corrective Action Required
03/29/2023

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 3/31/23 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
03/29/2023

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 3/31/23 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
03/29/2023

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 3/31/23 - Acknowledged in letter.
IBC 7013.4 Fire and Smoke Protection - fire-resistance rating
Resolved
03/31/2023

2018 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3. The fire-resistance rating of penetrations and fire-resistant joint systems shall be determined in accordance Sections 714 and 715, respectively. Provide the following: - Complete details, UL information, and penetration instructions for all fire and smoke rated assemblies including exterior walls, floor, and roof construction. - Clarify wall types. Many seem to be missing. Unable to locate some of the walls specified on sheet A030.
Misc
Resolved
03/31/2023

Provide door hardware schedule.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Resolved
03/31/2023

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle(s) within 25' of new roof mounted condensing units.
IMC 403.2 Outdoor air required
Resolved
03/31/2023

2018 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. (see code for exception) Action required: Revise drawings to show outside air calculations as well as method of delivery.
Misc
Resolved
03/31/2023

Provide pipe material schedule. 3/31/23 - Acknowledged in letter to be covered in specifications - field verify
NEC Article 517.13 Grounding of receptacles patient care
Resolved
03/31/2023

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: Modify drawings to show that all circuits in patient care areas will have redundant ground system. 3/31/23 - Acknowledged in letter as intended to be complete metal conduit system
Project cost
Resolved
03/31/2023

The project cost, which is used to establish the permit fee, has not been provided. Action required: Given that cost valuation has fluctuated due to splitting out foundation only permit, please provide cost estimate for addition and alteration including foundations but excluding site work. Currently at $4,634,720.00.
Licensed Contractors Approved 04/05/2023 03/31/2023
Joe Frogge
LC - MEP Subs
Resolved
03/31/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 2/13/23 - acknowledged in letter
Fire Plan Review Rejected 03/02/2023 03/05/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
03/05/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Corrective Action Required
03/05/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide shop drawings for review and approval.
Miscellaneous Correction
Corrective Action Required
03/05/2023

3311.2 Maintenance. Required means of egress and required accessible means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress and accessible means of egress systems and facilities. Action required- All temporary exiting shall be marked and staff trained on emergency egress plans. Temporary exiting is subject to inspection at anytime during the project. Access to all fire protection for the existing building(FDC's) shall be maitained at all times. Any impairment to the existing buildings fire suppression or alarm system shall require notification and approval of the fire marshal.
Miscellaneous Correction
Corrective Action Required
03/05/2023

5306.5 Medical gas systems. Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators and relief devices and valves, shall be installed in accordance with NFPA 99 and the general provisions of this chapter. Existing medical gas systems shall be maintained in accordance with the maintenance, inspection and testing provisions of NFPA 99 for medical gas systems. ocumentation of med gas piping presuure testing shall be provided at occupancy inspection.
Miscellaneous Correction
Corrective Action Required
03/05/2023

Class 1 hose connections to be provided in stair towers. Verified on sprinkler plans.
Knox box required
Corrective Action Required
03/05/2023

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Action required- A Knox elevator key box is required in the new lobby.
Building Plan Review Rejected 03/02/2023 02/24/2023
Joe Frogge
Elevator Equipment Permit
Corrective Action Required
02/24/2023

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational.
Elevator Equipment Inspection
Corrective Action Required
02/24/2023

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational.
Elevator Certificate of Inspection
Corrective Action Required
02/24/2023

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational.
IBC 7013.4 Fire and Smoke Protection - fire-resistance rating
Corrective Action Required
02/24/2023

2018 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3. The fire-resistance rating of penetrations and fire-resistant joint systems shall be determined in accordance Sections 714 and 715, respectively. Provide the following: - Complete details, UL information, and penetration instructions for all fire and smoke rated assemblies including exterior walls, floor, and roof construction. - Clarify wall types. Many seem to be missing. Unable to locate some of the walls specified on sheet A030.
Misc
Corrective Action Required
02/24/2023

Provide door hardware schedule.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
02/24/2023

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle(s) within 25' of new roof mounted condensing units.
IMC 403.2 Outdoor air required
Corrective Action Required
02/24/2023

2018 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. (see code for exception) Action required: Revise drawings to show outside air calculations as well as method of delivery.
Misc
Corrective Action Required
02/24/2023

Provide pipe material schedule.
NEC Article 517.13 Grounding of receptacles patient care
Corrective Action Required
02/24/2023

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: Modify drawings to show that all circuits in patient care areas will have redundant ground system.
Project cost
Corrective Action Required
02/24/2023

The project cost, which is used to establish the permit fee, has not been provided. Action required: Given that cost valuation has fluctuated due to splitting out foundation only permit, please provide cost estimate for addition and alteration including foundations but excluding site work. Currently at $4,634,720.00.
Building Plan Review Approved 02/21/2023 02/13/2023
Joe Frogge
Code analysis required
Resolved
02/13/2023

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Comment is informational.
IBC 1704.2 Special Inspections
Resolved
02/13/2023

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
IBC 1803.1 General - geotech
Resolved
02/13/2023

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf.
Project cost
Resolved
02/13/2023

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is informational. $53m seems high and results in a permit fee in excess of $185k. Is this a typo or maybe includes the site work? Feel free to call and discuss.
Special Inspections Review Approved 02/13/2023
Joe Frogge
Licensed Contractors Rejected 02/21/2023 02/13/2023
Joe Frogge
LC - General Contractor
Resolved
02/24/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
02/13/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 2/13/23 - acknowledged in letter
Building Plan Review Rejected 01/10/2023 02/06/2023
Joe Frogge
Code analysis required
Corrective Action Required
02/06/2023

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Comment is informational.
IBC 1704.2 Special Inspections
Corrective Action Required
02/06/2023

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
IBC 1803.1 General - geotech
Corrective Action Required
02/06/2023

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf.
Project cost
Corrective Action Required
02/06/2023

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is informational. $53m seems high and results in a permit fee in excess of $185k. Is this a typo or maybe includes the site work? Feel free to call and discuss.
Licensed Contractors Rejected 01/10/2023 02/06/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
02/06/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
02/06/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Final Development Plan Review Approved 01/10/2023 02/06/2023
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Addition to Commercial $16,221.52 $16,221.52 Paid 03/27/2023
91100C8-Sanitary Sewer Insp Fees $1,681.50 $1,681.50 Paid 03/27/2023
9110068-Storm Fee $42,796.86 $42,796.86 Paid 03/27/2023
9110081-Paved Surface Inspection Fee $17,486.70 $17,486.70 Paid 03/27/2023
9110071-Site Grading Fee $2,621.40 $2,621.40 Paid 03/27/2023
9110078-Valuation Fee for Addition to Commercial $127,799.08 $127,799.08 Paid 07/26/2023
$144,020.60
Outstanding Fees Amount Paid Owing Date Paid
7232302-Commercial License Tax Fee $62,023.50 $0.00 $62,023.50 Not Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $50.00 $0.00 $50.00 Not Paid


$62,148.50    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Pending
Electrical Service Inspection Pending
Gas Service Inspection - Commercial Pending
Special Inspections Pending
Underground Electrical Inspection - Commercial Pending
Misc
Corrective Action Required
08/21/2024
Partial conduit for communication and light poles from NE corner of additon about 50' to vault.
Underslab Electrical Inspection - Commercial Pending
THE FOLLOWING AREAS ARE APPROVED
Informational
10/03/2024
Existing renovation side: 1E-150
Occupancy Inspection - Engineering Pending
Misc
Corrective Action Required
10/07/2024
9-30-24 JMJ Outstanding items for Certificate of Occupancy. 1) Sodding and Vegetation 2) Site Cleanup 10/07/24 JMJ 1) Sodding and Vegetation 2) Site Cleanup
Occupancy Inspection - Engineering Pending
Miscellaneous Correction
Corrective Action Required
10/16/2024
9-30-24 JMJ Outstanding items for Certificate of Occupancy. 1) Sodding and Vegetation 2) Site Cleanup 10/07/24 JMJ 1) Sodding and Vegetation 2) Site Cleanup
Rated Assembly Inspection Pending
FIRST FLOOR
Corrective Action Required
01/15/2025
Addition side complete except at Clean room 1E-169 (Transition to existing for next phase) *Existing side: -1E-222 shaft layer-Seal penetrations Building Support 02-1E222 & Soiled Hold 02-1E223-Seal all penetrations
SECOND FLOOR
Corrective Action Required
01/15/2025
Addition side complete -2E-237
THIRD FLOOR
Corrective Action Required
01/15/2025
-Shaft and 1st and 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263 -Shaft,1st & 2nd layer at South Elevator -Shaft, 1st and 2nd layer layer at North elevator
Above Ceiling Inspection Pending
FIRST FLOOR
Corrective Action Required
03/07/2025
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Addition complete except as noted -Clean room at existing tie in 1E 169. Address penetrations and incomplete rated assembly **Existing side: Complete except as noted: 149-label smoke/fire walls, complete electrical 150-complete fire walls 100k-complete smoke walls
SECOND FLOOR
Corrective Action Required
03/07/2025
Above-ceiling OK below: **Addition Complete except at existing south stair: label fire wall **Existing side 2E423, 2E421, 2E422, 2E420, 2E242, 2E241,2E200J, 2E240, 2E238, 2E239, 2E-232, 2E-231B, 2E237, 2E-235, 2E-236, Corridor 2E-200F, 2E200F, 2E-119, 2E-120, 2E-200K 2E-121, 2E-112, 2E-113 to 118, 2E-122, 2E-402 to 404, 2E-408 to 412 -Soffits approved
THIRD FLOOR
Corrective Action Required
03/07/2025
**Addition complete
Occupancy Inspection - Codes Commercial Pending
Misc
Informational
03/21/2025
Partial occupancy for ASC Expansion: **OK to occupy the following areas: -1st floor addition side only to column line BB.5 on A221a of approved plans -2nd floor addition side only to column line BB.5 on A221a of approved plans -3rd floor addition side only to column line BB.5 on A221a of approved plans Partial occupancy for ASC Remodel Phase 1 at existing side: **Ok to occupy the following areas: -1st and 2nd floors (from column line 2.7 to 7.6) on A221a of approved plans
Miscellaneous Correction
Corrective Action Required
03/21/2025
-Paint crosswalks to new parking lot -Provide rail or barrier at under stair space less than 80" vertical clearance per A117.1 Sec. 307.4 at both stairwells -Install sprinkler head protection under stairs at new North stair -Remove construction water meter at job trailer
In-wall Inspection Pending
FIRST FLOOR
Corrective Action Required
04/10/2025
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C, 1E202A-1E-202H, 1E-203-1E207, 1E-220-1E-226, 1E-100k, 1E-149 through 1E-151a, 1E202-1E206, 2E-238 through 2E-242, 2E-420 through 2E-423, Corridor02-1E200A, 1E227, 1E-228, OR 7 1E-229, 1E280, 1E-231, 1E-218A, 1E-218B, 1E-216A, 1E-216B, 1E-172, 1E-173, 1E-174, 1E-175., Pre/Post Bays 1E161-1E-157, 1E-181-1E-178, TLT 1E-164 **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
04/10/2025
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side 2E-232, 2E-231B, 2E-234, 2E-235, 2E-237, 2E-236, 2E-112, 2E-121, 2E403, 2E410, 2E-241, 2E-412, 2E-409, corridor 2E-122, Office 2E-338, 2E-339, Exam 2E-331, 2E-332, 2E-337, 2E-336 **ADDITION SIDE -COMPLETE
THIRD FLOOR
Corrective Action Required
04/10/2025
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok cover -Elevator infill walls -North stairwell walls ok
Underslab Plumbing Inspection - Commercial Pending
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/14/2025
*1st Floor addition complete *1st Floor existing; 1E-313-314, 1E-182, 1E-151, 1E-151A, 1E 100P, 1E 169, 1E 200D, 1E 201, 1E 207A, 1E 204A, 1E 205A, 1E 206A, 1E 223-225, 1E-119, 1E-220, 1E 205a, 1E 207a, 1E 208a, 1E 209a, 1E 228, 1E 230, 1E 250, 1E-2-18A, 1E-218B, 1E-216A, 1E-231, 1E-302, 1E0303, 1E-310, 1E-214
Footing Inspection - Commercial Pending 10/5/2023 (8:30)
Underground Plumbing Inspection - Commercial Pending 10/10/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
10/04/2023
DWV From North to South: -Column line 0.0 to 2.6 From West to East: -Line EE to JJ Storm line North to South Line 0.2 to 5.8 Main sanitary line from 0.2 to 3.7
Footing Inspection - Commercial Pending 12/13/2023 (11:15)
Rough Framing Inspection - Commercial Pending 3/14/2024
Underground Plumbing Inspection - Commercial Pending 9/25/2024
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
09/22/2023
Miscellaneous Inspection Pending 4/18/2025
Misc
Corrective Action Required
02/28/2025
**Pre final walkthrough for phase 1, renovations, partial only: 206-GFCI by sink 204-GFCI by sink 2E-232- not ready Install fire door at storage Rate penetration at cable tray in 200a 2e-121 incomplete 2E-120 not ready Exam rooms not ready **OK to bring in equipment and furniture
Occupancy Inspection - Fire Pending 3/20/2025 3/20/2025
Miscellaneous Inspection Partial 5/17/2023 5/17/2023 05/17/2023
Misc
Informational
05/17/2023
05/17/23 Wednesday JMJ ( Rodriguez - Foreman Robert & Site Rite Foreman ) Contractor (Rodriguez) commence working last week on site without notifying inspector (demo as-per plan street). Rodriguez began demo of curb to the parking lot area to install temporary construction entrance. Rodriguez is also hauling soil off site. Inspector reminded Rodriguez to keep a watchful eye on the mud and soil from project tracking over on adjacent streets. Site Rite preparing project site for installation of storm pipe.
Miscellaneous Inspection Partial 5/18/2023 5/18/2023 05/18/2023
Misc
Informational
05/17/2023
05/17/23 Wednesday JMJ ( Rodriguez - Foreman Robert & Site Rite Foreman Derek ) Contractor (Rodriguez) commence working last week on site without notifying inspector (demo as-per plan street). Rodriguez began demo of curb to the parking lot area to install temporary construction entrance. Rodriguez is also hauling soil off site. Inspector reminded Rodriguez to keep a watchful eye on the mud and soil from project tracking over on adjacent streets. Site Rite preparing project site for installation of storm pipe. 05/18/23 Thursday JMJ (The General Contractor McCarthy- Ish, Sub Contractors Rodriguez - Street Foreman Robert & Underground Utilities Foreman Site Rite- Derek ) Rodriguez continues to remove organic soil from site to prepare to fill with proper soil for project site construction. Rodriguez is staging work container at the East end of parking lot near temporary construction entrance. Contractor has poured temporary construction entrance that will returned back to parkway green space at the completion of project. Site Rite unloaded heavy duty metal shoring construction boxes for deep trench excavation.
Miscellaneous Inspection Partial 5/23/2023 5/23/2023 05/23/2023
Misc
Informational
05/18/2023
05/17/23 Wednesday JMJ ( Rodriguez - Foreman Robert & Site Rite Foreman Derek ) Contractor (Rodriguez) commence working last week on site without notifying inspector (demo as-per plan street). Rodriguez began demo of curb to the parking lot area to install temporary construction entrance. Rodriguez is also hauling soil off site. Inspector reminded Rodriguez to keep a watchful eye on the mud and soil from project tracking over on adjacent streets. Site Rite preparing project site for installation of storm pipe. 05/18/23 Thursday JMJ (The General Contractor McCarthy- Ish, Sub Contractors Rodriguez - Street Foreman Robert & Underground Utilities Foreman Site Rite- Derek ) Rodriguez continues to remove organic soil from site to prepare to fill with proper soil for project site construction. Rodriguez is staging work container at the East end of parking lot near temporary construction entrance. Site Rite unloaded heavy duty metal shoring construction boxes for deep trench excavation. 05/23/23 Tuesday JMJ The General Contractor McCarthy- Ish, Sub Contractors Rodriguez - Street Foreman Robert & Underground Utilities Foreman Site Rite- Derek ) Bobby Richest (BR) watch project Friday and Monday Rodriguez continues to remove soil from site and began hauling acceptable soil for project site. Site Rite manage to set the base of storm box and began back excavation is at least 18' deep in street.
Storm Sewer Construction Inspection Partial 5/26/2023 5/26/2023 05/26/2023
Misc
Informational
05/26/2023
05/26/23 Friday JMJ ( Site Rite - Derek ) Contractor has installed storm box and approximately 80' of 36" HDPE corrugated storm pipe. Contractor is continuing installation of storm pipe today.
Storm Sewer Construction Inspection Partial 5/26/2023 05/26/2023
Misc
Informational
05/26/2023
05/26/23 Friday JMJ ( Site Rite - Derek ) Contractor has installed storm box and approximately 80' of 36" HDPE corrugated storm pipe. Contractor is continuing installation of storm pipe today. Contractor tie-in to the existing storm line approximately 100' was laid. 5/30/23 Tuesday JMJ ( Site Rite - Derek ) Contractor backfill excavation in the street area. Contractor used a compaction and vibrator plate connected to the backhoe.
Grading/Excavation/Fill Inspection Partial 5/26/2023 5/26/2023 05/26/2023
Misc
Informational
05/26/2023
05/26/23 JMJ ( Rodriguez Const. ) Contractor continue to backfilled and compact North area of project for future parking lot. 05/30/23 JMJ ( Rodriguez Const. ) Contractor is demo parking lot.
Pavement-Surface Partial 5/30/2023 5/30/2023 05/30/2023
Misc
Informational
05/30/2023
05/30/23 Tuesday JMJ ( Bradley Construction - Mike, Bushey Concrete ) Contractor started pouring concrete @ 5:30AM for parking lot / driveway area on the Eastside of project. Contractor graded gravel for the concrete pour to the Southside of project.
Erosion Control Inspection Partial 6/1/2023 6/1/2023 06/01/2023
Misc
Informational
06/01/2023
06/01/23 Thurs JMJ Erosion appears to be functioning throughout project site.
Storm Sewer Construction Inspection Partial 5/30/2023 5/30/2023 06/01/2023
Misc
Informational
05/26/2023
05/26/23 Friday JMJ ( Site Rite - Derek ) Contractor has installed storm box and approximately 80' of 60" HDPE corrugated storm pipe. Contractor is continuing installation of storm pipe today. Contractor tie-in to the existing storm line approximately 100' was laid. 06/01/23 Thursday JMJ ( Site Rite - Derek ) Contractor worked on pumping water out of excavated trenches yesterday and today restarted excavating to continue installation of 60" HDPE corrugated storm pipe.
Miscellaneous Inspection Partial 5/30/2023 5/30/2023 06/02/2023
Misc
Informational
05/23/2023
05/17/23 Wednesday JMJ ( Rodriguez - Foreman Robert & Site Rite Foreman Derek ) Contractor (Rodriguez) commence working last week on site without notifying inspector (demo as-per plan street). Rodriguez began demo of curb to the parking lot area to install temporary construction entrance. Rodriguez is also hauling soil off site. Inspector reminded Rodriguez to keep a watchful eye on the mud and soil from project tracking over on adjacent streets. Site Rite preparing project site for installation of storm pipe. 05/18/23 Thursday JMJ (The General Contractor McCarthy- Ish, Sub Contractors Rodriguez - Street Foreman Robert & Underground Utilities Foreman Site Rite- Derek ) Rodriguez continues to remove organic soil from site to prepare to fill with proper soil for project site construction. Rodriguez is staging work container at the East end of parking lot near temporary construction entrance. Site Rite unloaded heavy duty metal shoring construction boxes for deep trench excavation. 05/23/23 Tuesday JMJ The General Contractor McCarthy- Ish, Sub Contractors Rodriguez - Street Foreman Robert & Underground Utilities Foreman Site Rite- Derek ) Bobby Richest (BR) watch project Friday and Monday Rodriguez continues to remove soil from site and began hauling acceptable soil for project site. Site Rite manage to set the base of storm box and began back excavation is at least 18' deep in street. 06/01/23 Thursday JMJ ( Rodriguez - Robert ) Continues to demo existing parking lot. 06/02/23 Friday JMJ ( Rodriguez - Robert ) Continued the demo process of parking lot.
Storm Sewer Construction Inspection Partial 6/2/2023 6/2/2023 06/02/2023
Misc
Informational
06/01/2023
05/26/23 Friday JMJ ( Site Rite - Derek ) Contractor has installed storm box and approximately 80' of 60" HDPE corrugated storm pipe. Contractor is continuing installation of storm pipe today. Contractor tie-in to the existing storm line approximately 100' was laid. 06/01/23 Thursday JMJ ( Site Rite - Derek ) Contractor worked on pumping water out of excavated trenches yesterday and today restarted excavating to continue installation of 60" HDPE corrugated storm pipe. 06/02/23 Friday JMJ ( Site Rite - Derek ) Contractor installed one stick of 60" HDPE corrugated storm pipe and the collar was poured on the pipes around the newly installed storm box (in-flow & out-flow).
Miscellaneous Inspection Partial 6/2/2023 6/2/2023 06/02/2023
Misc
Informational
06/02/2023
05/17/23 Wednesday JMJ ( Rodriguez - Foreman Robert & Site Rite Foreman Derek ) Contractor (Rodriguez) commence working last week on site without notifying inspector (demo as-per plan street). Rodriguez began demo of curb to the parking lot area to install temporary construction entrance. Rodriguez is also hauling soil off site. Inspector reminded Rodriguez to keep a watchful eye on the mud and soil from project tracking over on adjacent streets. Site Rite preparing project site for installation of storm pipe. 05/18/23 Thursday JMJ (The General Contractor McCarthy- Ish, Sub Contractors Rodriguez - Street Foreman Robert & Underground Utilities Foreman Site Rite- Derek ) Rodriguez continues to remove organic soil from site to prepare to fill with proper soil for project site construction. Rodriguez is staging work container at the East end of parking lot near temporary construction entrance. Site Rite unloaded heavy duty metal shoring construction boxes for deep trench excavation. 05/23/23 Tuesday JMJ The General Contractor McCarthy- Ish, Sub Contractors Rodriguez - Street Foreman Robert & Underground Utilities Foreman Site Rite- Derek ) Bobby Richest (BR) watch project Friday and Monday Rodriguez continues to remove soil from site and began hauling acceptable soil for project site. Site Rite manage to set the base of storm box and began back excavation is at least 18' deep in street. 06/01/23 Thursday JMJ ( Rodriguez - Robert ) Continues to demo existing parking lot.
Misc
Informational
06/02/2023
06/02/23 Friday JMJ ( LS City Water Department, GC for Project McCarthy Construction ) Contractor called inspector about water main break on the construction site approximately ten feet from where storm sewer excavation. Inspector called LS Water and supervisor Brent Dye. When arrived to site sub contractor was pushed by GC to isolate water break before inspector was on location. Inspector arrived onsite just a few minutes before LS Water Department. LS Water Dept. took over the site logistic for water main repair and coordination with St Luke's hospital staff. I informed the contractor not to touch LS Water main unless directed by LS Water Department I stress this point several times.
Erosion Control Inspection Partial 6/2/2023 6/2/2023 06/05/2023
Misc
Informational
06/01/2023
06/01/23 Thurs JMJ Erosion appears to be functioning throughout project site. 06/05/23 Monday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site.
Miscellaneous Inspection Partial 6/5/2023 6/5/2023 06/05/2023
Misc
Informational
06/02/2023
05/17/23 Wednesday JMJ ( Rodriguez - Foreman Robert & Site Rite Foreman Derek ) Contractor (Rodriguez) commence working last week on site without notifying inspector (demo as-per plan street). Rodriguez began demo of curb to the parking lot area to install temporary construction entrance. Rodriguez is also hauling soil off site. Inspector reminded Rodriguez to keep a watchful eye on the mud and soil from project tracking over on adjacent streets. Site Rite preparing project site for installation of storm pipe. 05/18/23 Thursday JMJ (The General Contractor McCarthy- Ish, Sub Contractors Rodriguez - Street Foreman Robert & Underground Utilities Foreman Site Rite- Derek ) Rodriguez continues to remove organic soil from site to prepare to fill with proper soil for project site construction. Rodriguez is staging work container at the East end of parking lot near temporary construction entrance. Site Rite unloaded heavy duty metal shoring construction boxes for deep trench excavation. 05/23/23 Tuesday JMJ The General Contractor McCarthy- Ish, Sub Contractors Rodriguez - Street Foreman Robert & Underground Utilities Foreman Site Rite- Derek ) Bobby Richest (BR) watch project Friday and Monday Rodriguez continues to remove soil from site and began hauling acceptable soil for project site. Site Rite manage to set the base of storm box and began back excavation is at least 18' deep in street. 06/01/23 Thursday JMJ ( Rodriguez - Robert ) Continues to demo existing parking lot.
Misc
Informational
06/02/2023
06/02/23 Friday JMJ ( LS City Water Department, GC for Project McCarthy Construction ) Contractor called inspector about water main break on the construction site approximately ten feet from where storm sewer excavation. Inspector called LS Water and supervisor Brent Dye. When arrived to site sub contractor was pushed by GC to isolate water break before inspector was on location. Inspector arrived onsite just a few minutes before LS Water Department. LS Water Dept. took over the site logistic for water main repair and coordination with St Luke's hospital staff. I informed the contractor not to touch LS Water main unless directed by LS Water Department I stress this point several times. 06/05/23 Monday JMJ ( LS City Water Department ) Repaired water break Friday after hours. 06/05/23 Monday JMJ ( Rodriguez - Robert ) Contractor continue to demo and survey existing parking lot. Alpha & Omega Geotech was onsite testing soil compaction.
Storm Sewer Construction Inspection Partial 6/6/2023 6/6/2023 06/06/2023
Misc
Informational
06/02/2023
05/26/23 Friday JMJ ( Site Rite - Derek ) Contractor has installed storm box and approximately 80' of 60" HDPE corrugated storm pipe. Contractor is continuing installation of storm pipe today. Contractor tie-in to the existing storm line approximately 100' was laid. 06/01/23 Thursday JMJ ( Site Rite - Derek ) Contractor worked on pumping water out of excavated trenches yesterday and today restarted excavating to continue installation of 60" HDPE corrugated storm pipe. 06/02/23 Friday JMJ ( Site Rite - Derek ) Contractor installed one stick of 60" HDPE corrugated storm pipe and the collar was poured on the pipes around the newly installed storm box (in-flow & out-flow). 06/06/23 Tuesday JMJ ( Site Rite - Derek ) Contractor finished installation of 60" HDPE storm pipe on NE St. Luke Blvd outer road. Collar was poured on the pipe at existing storm box on the Southside yesterday evening. Contractor plans to pour inverts today on the storm box to the North & South on NE St. Luke Blvd outer road as per project plans. Old invert on existing storm box on Southside of road will be removed before new invert is poured to match newly installed 60" HDPE storm pipe.
Storm Sewer Construction Inspection Partial 6/7/2023 6/7/2023 06/07/2023
Misc
Informational
06/06/2023
05/26/23 Friday JMJ ( Site Rite - Derek ) Contractor has installed storm box and approximately 80' of 60" HDPE corrugated storm pipe. Contractor is continuing installation of storm pipe today. Contractor tie-in to the existing storm line approximately 100' was laid. 06/01/23 Thursday JMJ ( Site Rite - Derek ) Contractor worked on pumping water out of excavated trenches yesterday and today restarted excavating to continue installation of 60" HDPE corrugated storm pipe. 06/02/23 Friday JMJ ( Site Rite - Derek ) Contractor installed one stick of 60" HDPE corrugated storm pipe and the collar was poured on the pipes around the newly installed storm box (in-flow & out-flow). 06/06/23 Tuesday JMJ ( Site Rite - Derek ) Contractor finished installation of 60" HDPE storm pipe on NE St. Luke Blvd outer road. Collar was poured on the pipe at existing storm box on the Southside yesterday evening. Contractor plans to pour inverts today on the storm box to the North & South on NE St. Luke Blvd outer road as per project plans. Old invert on existing storm box on Southside of road will be removed before new invert is poured to match newly installed 60" HDPE storm pipe. 06/07/23 Wednesday JMJ ( Site Rite - Derek ) Contractor continues to demo existing 60" RCP storm pipe on the Southside of NE St. Luke Blvd outer road. Contractor poured the invert for the newly installed 60" HDPE storm pipe in storm box in which old invert was removed. Contractor plans to install smaller HDPE storm pipe line under the demo parking lot for the new extend building (as-per project plans). Contractor plans to have storm pipe and storm box delivered to site on the proposed new parking lot area to the North end of project.
Storm Sewer Construction Inspection Partial 6/8/2023 6/8/2023 06/08/2023
Misc
Informational
06/07/2023
05/26/23 Friday JMJ ( Site Rite - Derek ) Contractor has installed storm box and approximately 80' of 60" HDPE corrugated storm pipe. Contractor is continuing installation of storm pipe today. Contractor tie-in to the existing storm line approximately 100' was laid. 06/01/23 Thursday JMJ ( Site Rite - Derek ) Contractor worked on pumping water out of excavated trenches yesterday and today restarted excavating to continue installation of 60" HDPE corrugated storm pipe. 06/02/23 Friday JMJ ( Site Rite - Derek ) Contractor installed one stick of 60" HDPE corrugated storm pipe and the collar was poured on the pipes around the newly installed storm box (in-flow & out-flow). 06/06/23 Tuesday JMJ ( Site Rite - Derek ) Contractor finished installation of 60" HDPE storm pipe on NE St. Luke Blvd outer road. Collar was poured on the pipe at existing storm box on the Southside yesterday evening. Contractor plans to pour inverts today on the storm box to the North & South on NE St. Luke Blvd outer road as per project plans. Old invert on existing storm box on Southside of road will be removed before new invert is poured to match newly installed 60" HDPE storm pipe. 06/07/23 Wednesday JMJ ( Site Rite - Derek ) Contractor continues to demo existing 60" storm pipe on the Southside of NE St. Luke Blvd outer road. Contractor poured the invert for the newly installed 60" HDPE storm pipe in storm box in which old invert was removed. Contractor plans to install smaller HDPE storm pipe line under the demo parking lot for the new extend building (as-per project plans). Contractor plans to have storm pipe and storm box delivered to site on the proposed new parking lot area to the North end of project. 06/08/23 Wednesday JMJ (Site Rite - Derek) Contractor installed approximately 117' of 15" HDPE on storm line 900. Contractor installed storm box 602 on storm line 600 on existing 48" RCP storm pipe.
Storm Sewer Construction Inspection Partial 6/9/2023 6/9/2023 06/09/2023
Misc
Informational
06/08/2023
05/26/23 Friday JMJ ( Site Rite - Derek ) Contractor has installed storm box and approximately 80' of 60" HDPE corrugated storm pipe. Contractor is continuing installation of storm pipe today. Contractor tie-in to the existing storm line approximately 100' was laid. 06/01/23 Thursday JMJ ( Site Rite - Derek ) Contractor worked on pumping water out of excavated trenches yesterday and today restarted excavating to continue installation of 60" HDPE corrugated storm pipe. 06/02/23 Friday JMJ ( Site Rite - Derek ) Contractor installed one stick of 60" HDPE corrugated storm pipe and the collar was poured on the pipes around the newly installed storm box (in-flow & out-flow). 06/06/23 Tuesday JMJ ( Site Rite - Derek ) Contractor finished installation of 60" HDPE storm pipe on NE St. Luke Blvd outer road. Collar was poured on the pipe at existing storm box on the Southside yesterday evening. Contractor plans to pour inverts today on the storm box to the North & South on NE St. Luke Blvd outer road as per project plans. Old invert on existing storm box on Southside of road will be removed before new invert is poured to match newly installed 60" HDPE storm pipe. 06/07/23 Wednesday JMJ ( Site Rite - Derek ) Contractor continues to demo existing 60" storm pipe on the Southside of NE St. Luke Blvd outer road. Contractor poured the invert for the newly installed 60" HDPE storm pipe in storm box in which old invert was removed. Contractor plans to install smaller HDPE storm pipe line under the demo parking lot for the new extend building (as-per project plans). Contractor plans to have storm pipe and storm box delivered to site on the proposed new parking lot area to the North end of project. 06/08/23 Thursday JMJ (Site Rite - Derek) Contractor installed approximately 117' of 15" HDPE on storm line 900. (Site Rite-James) Contractor installed storm box 602 on storm line 600 on existing 48" RCP storm pipe. 06/09/23 Friday JMJ (Site Rite- Derek Crew 1) Contractor installed approximately 50' of 12" HDPE on storm line 900 heading towards storm box 902 that will be installed. Installed 8" HDPE drain and connect to proposed 15" HDPE storm drain on the 15" on storm line 900.Storm box 901 was installed 06/08/23. (Site Rite-James Crew 2) Contractor installed over 132' of 48" RCP storm pipe 8' section storm line 600. Contractor will continue to install line up to existing storm box. Contractor has come across an existing utility encase in concrete that is in the path of 48" RCP storm pipe that is to be installed.
Miscellaneous Inspection Partial 6/9/2023 6/9/2023 06/09/2023
Misc
Informational
06/05/2023
05/17/23 Wednesday JMJ ( Rodriguez - Foreman Robert & Site Rite Foreman Derek ) Contractor (Rodriguez) commence working last week on site without notifying inspector (demo as-per plan street). Rodriguez began demo of curb to the parking lot area to install temporary construction entrance. Rodriguez is also hauling soil off site. Inspector reminded Rodriguez to keep a watchful eye on the mud and soil from project tracking over on adjacent streets. Site Rite preparing project site for installation of storm pipe. 05/18/23 Thursday JMJ (The General Contractor McCarthy- Ish, Sub Contractors Rodriguez - Street Foreman Robert & Underground Utilities Foreman Site Rite- Derek ) Rodriguez continues to remove organic soil from site to prepare to fill with proper soil for project site construction. Rodriguez is staging work container at the East end of parking lot near temporary construction entrance. Site Rite unloaded heavy duty metal shoring construction boxes for deep trench excavation. 05/23/23 Tuesday JMJ The General Contractor McCarthy- Ish, Sub Contractors Rodriguez - Street Foreman Robert & Underground Utilities Foreman Site Rite- Derek ) Bobby Richest (BR) watch project Friday and Monday Rodriguez continues to remove soil from site and began hauling acceptable soil for project site. Site Rite manage to set the base of storm box and began back excavation is at least 18' deep in street. 06/01/23 Thursday JMJ ( Rodriguez - Robert ) Continues to demo existing parking lot.
Misc
Informational
06/05/2023
06/02/23 Friday JMJ ( LS City Water Department, GC for Project McCarthy Construction ) Contractor called inspector about water main break on the construction site approximately ten feet from where storm sewer excavation. Inspector called LS Water and supervisor Brent Dye. When arrived to site sub contractor was pushed by GC to isolate water break before inspector was on location. Inspector arrived onsite just a few minutes before LS Water Department. LS Water Dept. took over the site logistic for water main repair and coordination with St Luke's hospital staff. I informed the contractor not to touch LS Water main unless directed by LS Water Department I stress this point several times. 06/05/23 Monday JMJ ( LS City Water Department ) Repaired water break Friday after hours. 06/05/23 Monday JMJ ( Rodriguez - Robert ) Contractor continue to demo and survey existing parking lot. Alpha & Omega Geotech was onsite testing soil compaction. 06/0923 Friday JMJ (Rodriguez) Contractor moved soil from demo parking lot area to proposed parking lot area and general construction duties as needed.
Sanitary Sewer Construction Inspection Partial 6/13/2023 6/13/2023 06/13/2023
Misc
Informational
06/13/2023
06/13/23 Tuesday JMJ (Site-Rite - Derek) Contractor is locating utilities so they can install MH S101 to existing line and began the laying 8" SDR-26 approximately 46' to S102. 06/16/23 Friday JMJ (Site-Rite - Derek) Contractor installed MH structure and sanitary pipe as-per project plan C401. Contractor also installed approximately 45' of 6" SDR-26 lateral to proposed building, see C401.
Storm Sewer Construction Inspection Partial 6/13/2023 6/13/2023 06/15/2023
Misc
Informational
06/09/2023
05/26/23 Friday JMJ ( Site Rite - Derek ) Contractor has installed storm box and approximately 80' of 60" HDPE corrugated storm pipe. Contractor is continuing installation of storm pipe today. Contractor tie-in to the existing storm line approximately 100' was laid. 06/01/23 Thursday JMJ ( Site Rite - Derek ) Contractor worked on pumping water out of excavated trenches yesterday and today restarted excavating to continue installation of 60" HDPE corrugated storm pipe. 06/02/23 Friday JMJ ( Site Rite - Derek ) Contractor installed one stick of 60" HDPE corrugated storm pipe and the collar was poured on the pipes around the newly installed storm box (in-flow & out-flow). 06/06/23 Tuesday JMJ ( Site Rite - Derek ) Contractor finished installation of 60" HDPE storm pipe on NE St. Luke Blvd outer road. Collar was poured on the pipe at existing storm box on the Southside yesterday evening. Contractor plans to pour inverts today on the storm box to the North & South on NE St. Luke Blvd outer road as per project plans. Old invert on existing storm box on Southside of road will be removed before new invert is poured to match newly installed 60" HDPE storm pipe. 06/07/23 Wednesday JMJ ( Site Rite - Derek ) Contractor continues to demo existing 60" storm pipe on the Southside of NE St. Luke Blvd outer road. Contractor poured the invert for the newly installed 60" HDPE storm pipe in storm box in which old invert was removed. Contractor plans to install smaller HDPE storm pipe line under the demo parking lot for the new extend building (as-per project plans). Contractor plans to have storm pipe and storm box delivered to site on the proposed new parking lot area to the North end of project. 06/08/23 Thursday JMJ (Site Rite - Derek) Contractor installed approximately 117' of 15" HDPE on storm line 900. (Site Rite-James) Contractor installed storm box 602 on storm line 600 on existing 48" RCP storm pipe. 06/09/23 Friday JMJ (Site Rite- Derek Crew 1) Contractor installed approximately 50' of 12" HDPE on storm line 900 heading towards storm box 902 that will be installed. Installed 8" HDPE drain and connect to proposed 15" HDPE storm drain on the 15" on storm line 900.Storm box 901 was installed 06/08/23. (Site Rite-James Crew 2) Contractor installed over 132' of 48" RCP storm pipe 8' section storm line 600. Contractor will continue to install line up to existing storm box. Contractor has come across an existing utility encase in concrete that is in the path of 48" RCP storm pipe that is to be installed. 06/13/23 Tuesday JMJ (Site Rite-James Crew 2) Contractor had to demo existing RCP squash storm pipe. Contractor working on installation on storm box structure 702 will connect where the existing storm line was demo. 06/15/23 Thursday JMJ (Site Rite- James Crew 2) Contractor installed 701 & 702 RCP riser second section. Contractor installed approximately 50' of 36" RCP. Contractor poured collars on storm structure 701 & 702. 06/16/23 Friday JMJ (Site Rite-James Crew 2) Contractor installed the 36" RCP pipe from structure storm box 701 to 702, approximately 91'. Contractor connected the last portion of storm line 600 to storm box 602 approximately 50'.
Storm Sewer Construction Inspection Partial 06/15/2023
Misc
Informational
06/15/2023
05/26/23 Friday JMJ ( Site Rite - Derek ) Contractor has installed storm box and approximately 80' of 60" HDPE corrugated storm pipe. Contractor is continuing installation of storm pipe today. Contractor tie-in to the existing storm line approximately 100' was laid. 06/01/23 Thursday JMJ ( Site Rite - Derek ) Contractor worked on pumping water out of excavated trenches yesterday and today restarted excavating to continue installation of 60" HDPE corrugated storm pipe. 06/02/23 Friday JMJ ( Site Rite - Derek ) Contractor installed one stick of 60" HDPE corrugated storm pipe and the collar was poured on the pipes around the newly installed storm box (in-flow & out-flow). 06/06/23 Tuesday JMJ ( Site Rite - Derek ) Contractor finished installation of 60" HDPE storm pipe on NE St. Luke Blvd outer road. Collar was poured on the pipe at existing storm box on the Southside yesterday evening. Contractor plans to pour inverts today on the storm box to the North & South on NE St. Luke Blvd outer road as per project plans. Old invert on existing storm box on Southside of road will be removed before new invert is poured to match newly installed 60" HDPE storm pipe. 06/07/23 Wednesday JMJ ( Site Rite - Derek ) Contractor continues to demo existing 60" storm pipe on the Southside of NE St. Luke Blvd outer road. Contractor poured the invert for the newly installed 60" HDPE storm pipe in storm box in which old invert was removed. Contractor plans to install smaller HDPE storm pipe line under the demo parking lot for the new extend building (as-per project plans). Contractor plans to have storm pipe and storm box delivered to site on the proposed new parking lot area to the North end of project. 06/08/23 Thursday JMJ (Site Rite - Derek) Contractor installed approximately 117' of 15" HDPE on storm line 900. (Site Rite-James) Contractor installed storm box 602 on storm line 600 on existing 48" RCP storm pipe. 06/09/23 Friday JMJ (Site Rite- Derek Crew 1) Contractor installed approximately 50' of 12" HDPE on storm line 900 heading towards storm box 902 that will be installed. Installed 8" HDPE drain and connect to proposed 15" HDPE storm drain on the 15" on storm line 900.Storm box 901 was installed 06/08/23. (Site Rite-James Crew 2) Contractor installed over 132' of 48" RCP storm pipe 8' section storm line 600. Contractor will continue to install line up to existing storm box. Contractor has come across an existing utility encase in concrete that is in the path of 48" RCP storm pipe that is to be installed. 06/13/23 Tuesday JMJ (Site Rite-James Crew 2) Contractor had to demo existing RCP squash storm pipe. Contractor working on installation on storm box structure 702 will connect where the existing storm line was demo. 06/15/23 Thursday JMJ (Site Rite- James Crew 2) Contractor installed 701 & 702 RCP riser second section. Contractor installed approximately 50' of 36" RCP. Contractor poured collars on 701 & 702 RCP. 06/21/23 Wednesday JMJ (Site Rite- James Crew 2) Contractor has installed the storm lines & structure for proposed parking lot. Contractor is placing rip-rap and backfilling (with geo-grid) for stabilization of area.
Erosion Control Inspection Partial 6/27/2023 6/27/2023 06/27/2023
Misc
Informational
06/05/2023
06/01/23 Thurs JMJ Erosion appears to be functioning throughout project site. 06/05/23 Monday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 06/27/23 Tuesday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site.
Storm Sewer Construction Inspection Partial 6/27/2023 6/27/2023 06/27/2023
Misc
Informational
06/27/2023
06/27/23 Tuesday JMJ (Site Rite) Contractor continued to compact and backfilled proposed parking lot area.
Storm Sewer Construction Inspection Partial 6/28/2023 6/28/2023 06/28/2023
Misc
Informational
06/15/2023
05/26/23 Friday JMJ ( Site Rite - Derek ) Contractor has installed storm box and approximately 80' of 60" HDPE corrugated storm pipe. Contractor is continuing installation of storm pipe today. Contractor tie-in to the existing storm line approximately 100' was laid. 06/01/23 Thursday JMJ ( Site Rite - Derek ) Contractor worked on pumping water out of excavated trenches yesterday and today restarted excavating to continue installation of 60" HDPE corrugated storm pipe. 06/02/23 Friday JMJ ( Site Rite - Derek ) Contractor installed one stick of 60" HDPE corrugated storm pipe and the collar was poured on the pipes around the newly installed storm box (in-flow & out-flow). 06/06/23 Tuesday JMJ ( Site Rite - Derek ) Contractor finished installation of 60" HDPE storm pipe on NE St. Luke Blvd outer road. Collar was poured on the pipe at existing storm box on the Southside yesterday evening. Contractor plans to pour inverts today on the storm box to the North & South on NE St. Luke Blvd outer road as per project plans. Old invert on existing storm box on Southside of road will be removed before new invert is poured to match newly installed 60" HDPE storm pipe. 06/07/23 Wednesday JMJ ( Site Rite - Derek ) Contractor continues to demo existing 60" storm pipe on the Southside of NE St. Luke Blvd outer road. Contractor poured the invert for the newly installed 60" HDPE storm pipe in storm box in which old invert was removed. Contractor plans to install smaller HDPE storm pipe line under the demo parking lot for the new extend building (as-per project plans). Contractor plans to have storm pipe and storm box delivered to site on the proposed new parking lot area to the North end of project. 06/08/23 Thursday JMJ (Site Rite - Derek) Contractor installed approximately 117' of 15" HDPE on storm line 900. (Site Rite-James) Contractor installed storm box 602 on storm line 600 on existing 48" RCP storm pipe. 06/09/23 Friday JMJ (Site Rite- Derek Crew 1) Contractor installed approximately 50' of 12" HDPE on storm line 900 heading towards storm box 902 that will be installed. Installed 8" HDPE drain and connect to proposed 15" HDPE storm drain on the 15" on storm line 900.Storm box 901 was installed 06/08/23. (Site Rite-James Crew 2) Contractor installed over 132' of 48" RCP storm pipe 8' section storm line 600. Contractor will continue to install line up to existing storm box. Contractor has come across an existing utility encase in concrete that is in the path of 48" RCP storm pipe that is to be installed. 06/13/23 Tuesday JMJ (Site Rite-James Crew 2) Contractor had to demo existing RCP squash storm pipe. Contractor working on installation on storm box structure 702 will connect where the existing storm line was demo. 06/15/23 Thursday JMJ (Site Rite- James Crew 2) Contractor installed 701 & 702 RCP riser second section. Contractor installed approximately 50' of 36" RCP. Contractor poured collars on 701 & 702 RCP. 06/28/23 Wednesday JMJ (Site Rite-James Crew 2) Contractor returned to site today off loaded materials, backfilled and compacted of project site.
Storm Sewer Construction Inspection Partial 6/29/2023 6/29/2023 06/29/2023
Misc
Informational
06/29/2023
06/29/23 Thursday JMJ ( Site Rite-James ) Contractor began to excavate existing storm box Southside of the newly proposed parking lot. Contractor is cutting three holes in the existing storm box structure. Lines 200, 400 & 500 feed into exist storm box structure. Contractor projects that installation of pipe into existing pipe will begin tomorrow. 06/30/23 Friday JMJ ( Site Rite-James ) Contractor installed approximately 184' of 24" HDPE storm pipe on line 400. Contractor backfilled excavation. See C502 private storm.
Miscellaneous Inspection Partial 6/30/2023 6/30/2023 06/30/2023
Misc
Informational
06/09/2023
05/17/23 Wednesday JMJ ( Rodriguez - Foreman Robert & Site Rite Foreman Derek ) Contractor (Rodriguez) commence working last week on site without notifying inspector (demo as-per plan street). Rodriguez began demo of curb to the parking lot area to install temporary construction entrance. Rodriguez is also hauling soil off site. Inspector reminded Rodriguez to keep a watchful eye on the mud and soil from project tracking over on adjacent streets. Site Rite preparing project site for installation of storm pipe. 05/18/23 Thursday JMJ (The General Contractor McCarthy- Ish, Sub Contractors Rodriguez - Street Foreman Robert & Underground Utilities Foreman Site Rite- Derek ) Rodriguez continues to remove organic soil from site to prepare to fill with proper soil for project site construction. Rodriguez is staging work container at the East end of parking lot near temporary construction entrance. Site Rite unloaded heavy duty metal shoring construction boxes for deep trench excavation. 05/23/23 Tuesday JMJ The General Contractor McCarthy- Ish, Sub Contractors Rodriguez - Street Foreman Robert & Underground Utilities Foreman Site Rite- Derek ) Bobby Richest (BR) watch project Friday and Monday Rodriguez continues to remove soil from site and began hauling acceptable soil for project site. Site Rite manage to set the base of storm box and began back excavation is at least 18' deep in street. 06/01/23 Thursday JMJ ( Rodriguez - Robert ) Continues to demo existing parking lot.
Misc
Informational
06/09/2023
06/02/23 Friday JMJ ( LS City Water Department, GC for Project McCarthy Construction ) Contractor called inspector about water main break on the construction site approximately ten feet from where storm sewer excavation. Inspector called LS Water and supervisor Brent Dye. When arrived to site sub contractor was pushed by GC to isolate water break before inspector was on location. Inspector arrived onsite just a few minutes before LS Water Department. LS Water Dept. took over the site logistic for water main repair and coordination with St Luke's hospital staff. I informed the contractor not to touch LS Water main unless directed by LS Water Department I stress this point several times. 06/05/23 Monday JMJ ( LS City Water Department ) Repaired water break Friday after hours. 06/05/23 Monday JMJ ( Rodriguez - Robert ) Contractor continue to demo and survey existing parking lot. Alpha & Omega Geotech was onsite testing soil compaction. 06/0923 Friday JMJ (Rodriguez) Contractor moved soil from demo parking lot area to proposed parking lot area and general construction duties as needed. 06/30/23 Friday JMJ ( MSE Hardscape ) Contractor continued to unload retaining wall blocks. Contractor plans to start constructing the retaining wall next week. Contacted the GC Mc Carthy Construction about having the third party inspection on retaining wall, and they relayed that Alpha & Omega Geotech was schedule to begin inspection on retaining as it was being built.
Storm Sewer Construction Inspection Partial 7/6/2023 7/6/2023 07/06/2023
Misc
Informational
07/06/2023
07/06/23 Thursday JMJ (Site Rite) Contractor installed HDPE storm lines 400 and 500 last week to existing storm box last week (note: reported did not save last week about the installation of storm pipe) as-per project plan. Contractor began the installation of storm line 200 from the same existing storm box as lines 400 & 500 (see existing 12'X12' junction box pg C503).
Storm Sewer Construction Inspection Partial 7/7/2023 7/7/2023 07/07/2023
Misc
Informational
07/06/2023
07/06/23 Thursday JMJ (Site Rite) Contractor installed HDPE storm lines 400 and 500 last week to existing storm box last week (note: reported did not save last week about the installation of storm pipe) as-per project plan. Contractor began the installation of storm line 200 from the same existing storm box as lines 400 & 500 (see existing 12'X12' junction box pg C503). 07/06/23 Friday JMJ (Site Rite) Contractor poured the collars for 12'X12' existing junction box. 140' of storm line 500 was installed. Contractor backfilled excavation compaction test were taken by Alpha & Omega testing.
Storm Sewer Construction Inspection Partial 7/10/2023 7/10/2023 07/10/2023
Misc
Informational
07/07/2023
07/06/23 Thursday JMJ (Site Rite) Contractor installed HDPE storm lines 400 and 500 last week to existing storm box last week (note: reported did not save last week about the installation of storm pipe) as-per project plan. Contractor began the installation of storm line 200 from the same existing storm box as lines 400 & 500 (see existing 12'X12' junction box pg C503). 07/06/23 Friday JMJ (Site Rite) Contractor poured the collars for 12'X12' existing junction box. 140' of storm line 500 was installed. Contractor backfilled excavation compaction test were taken by Alpha & Omega testing. 07/10/23 Monday (Site Rite- James Crew) Contractor installed approximately 35' of storm pipe on 500 and storm box 501 as-per project plans to complete line 500. Contractor poured collars and inverts on storm coming out of structure 501. Contractor moved back to line 200 and removed abandon existing casing of power line.
Storm Sewer Construction Inspection Partial 7/11/2023 7/11/2023 07/11/2023
Misc
Informational
07/10/2023
07/06/23 Thursday JMJ (Site Rite) Contractor installed HDPE storm lines 400 and 500 last week to existing storm box last week (note: reported did not save last week about the installation of storm pipe) as-per project plan. Contractor began the installation of storm line 200 from the same existing storm box as lines 400 & 500 (see existing 12'X12' junction box pg C503). 07/06/23 Friday JMJ (Site Rite) Contractor poured the collars for 12'X12' existing junction box. 140' of storm line 500 was installed. Contractor backfilled excavation compaction test were taken by Alpha & Omega testing. 07/10/23 Monday (Site Rite- James Crew) Contractor installed approximately 35' of storm pipe on 500 and storm box 501 as-per project plans to complete line 500. Contractor poured collars and inverts on storm coming out of structure 501. Contractor moved back to line 200 and removed abandon existing casing of power line. 07/11/23 Tuesday (Site Rite- James Crew) Materials to complete storm structures 701 & 800 arrived so, contractor worked to complete structures. Excavation for line 200 was stopped due the arrival of storm structures.
Storm Sewer Construction Inspection Partial 7/12/2023 7/12/2023 07/12/2023
Misc
Informational
07/11/2023
07/06/23 Thursday JMJ (Site Rite) Contractor installed HDPE storm lines 400 and 500 last week to existing storm box last week (note: reported did not save last week about the installation of storm pipe) as-per project plan. Contractor began the installation of storm line 200 from the same existing storm box as lines 400 & 500 (see existing 12'X12' junction box pg C503). 07/06/23 Friday JMJ (Site Rite) Contractor poured the collars for 12'X12' existing junction box. 140' of storm line 500 was installed. Contractor backfilled excavation compaction test were taken by Alpha & Omega testing. 07/10/23 Monday (Site Rite- James Crew) Contractor installed approximately 35' of storm pipe on 500 and storm box 501 as-per project plans to complete line 500. Contractor poured collars and inverts on storm coming out of structure 501. Contractor moved back to line 200 and removed abandon existing casing of power line. 07/11/23 Tuesday (Site Rite- James Crew) Materials to complete storm structures 701 & 800 arrived so, contractor worked to complete structures. Excavation for line 200 was stopped due the arrival of storm structures. 07/12/23 Wednesday (Site Rite-James Crew) Contractor installed approximately 80' of 24 HDPE storm pipe and poured the collars on pipe at the exist storm box. Contractor poured toe wall for storm line 600, installed rip-rap as-per project plans and backfilled excavation.
Retaining Wall Inspection Partial 6/29/2023 6/29/2023 07/12/2023
Misc
Informational
06/29/2023
06/29/23 Thursday JMJ Contractor has been grading and stabilizing foundation for retaining wall. Retaining wall blocks were delivered to site yesterday and today. 07/12/23 Wednesday JMJ Contractor has done some foundation preparation for retaining, but does not appear that the wall is being constructed at this point.
Storm Sewer Construction Inspection Partial 7/14/2023 7/14/2023 07/14/2023
Misc
Informational
07/12/2023
07/06/23 Thursday JMJ (Site Rite) Contractor installed HDPE storm lines 400 and 500 last week to existing storm box last week (note: reported did not save last week about the installation of storm pipe) as-per project plan. Contractor began the installation of storm line 200 from the same existing storm box as lines 400 & 500 (see existing 12'X12' junction box pg C503). 07/06/23 Friday JMJ (Site Rite) Contractor poured the collars for 12'X12' existing junction box. 140' of storm line 500 was installed. Contractor backfilled excavation compaction test were taken by Alpha & Omega testing. 07/10/23 Monday (Site Rite- James Crew) Contractor installed approximately 35' of storm pipe on 500 and storm box 501 as-per project plans to complete line 500. Contractor poured collars and inverts on storm coming out of structure 501. Contractor moved back to line 200 and removed abandon existing casing of power line. 07/11/23 Tuesday (Site Rite- James Crew) Materials to complete storm structures 701 & 800 arrived so, contractor worked to complete structures. Excavation for line 200 was stopped due the arrival of storm structures. 07/12/23 Wednesday (Site Rite-James Crew) Contractor installed approximately 80' of 24" HDPE storm pipe and poured the collars on pipe at the exist storm box. Contractor poured toe wall for storm line 600, installed rip-rap as-per project plans and backfilled excavation. 07/14/23 Friday (Site Rite-James Crew) Contractor installed storm box 202, and approximately 60' of 15" HDPE storm pipe.
Storm Sewer Construction Inspection Partial 7/17/2023 7/17/2023 07/17/2023
Misc
Informational
07/14/2023
07/06/23 Thursday JMJ (Site Rite) Contractor installed HDPE storm lines 400 and 500 last week to existing storm box last week (note: reported did not save last week about the installation of storm pipe) as-per project plan. Contractor began the installation of storm line 200 from the same existing storm box as lines 400 & 500 (see existing 12'X12' junction box pg C503). 07/06/23 Friday JMJ (Site Rite) Contractor poured the collars for 12'X12' existing junction box. 140' of storm line 500 was installed. Contractor backfilled excavation compaction test were taken by Alpha & Omega testing. 07/10/23 Monday (Site Rite- James Crew) Contractor installed approximately 35' of storm pipe on 500 and storm box 501 as-per project plans to complete line 500. Contractor poured collars and inverts on storm coming out of structure 501. Contractor moved back to line 200 and removed abandon existing casing of power line. 07/11/23 Tuesday (Site Rite- James Crew) Materials to complete storm structures 701 & 800 arrived so, contractor worked to complete structures. Excavation for line 200 was stopped due the arrival of storm structures. 07/12/23 Wednesday (Site Rite-James Crew) Contractor installed approximately 80' of 24" HDPE storm pipe and poured the collars on pipe at the exist storm box. Contractor poured toe wall for storm line 600, installed rip-rap as-per project plans and backfilled excavation. 07/14/23 Friday (Site Rite-James Crew) Contractor installed storm box 202, and approximately 60' of 15" HDPE storm pipe. 07/17/23 Monday (Site Rite-James Crew) Contractor also installed storm box 201, and stack it out with lid last week. Contractor continued to install storm pipe on line 200. Contractor continued to grade and complete installation of storm, and support retaining wall construction for parking lot area. Contractor will have primary focus on de-watering project site.
Retaining Wall Inspection Partial 7/17/2023 7/17/2023 07/17/2023
Misc
Informational
07/12/2023
06/29/23 Thursday JMJ Contractor has been grading and stabilizing foundation for retaining wall. Retaining wall blocks were delivered to site yesterday and today. 07/12/23 Wednesday JMJ Contractor has done some foundation preparation for retaining, but does not appear that the wall is being constructed at this point. 07/17/23 Monday JMJ (MSE Hardscape) Contractor is working on the installation of retaining wall. The site has received heavy rain fall over the weekend. 89 degrees is the high for the day current temperature is 76 degrees at 8:45AM possible showers until 6PM today.
Erosion Control Inspection Partial 7/17/2023 7/17/2023 07/17/2023
Misc
Informational
06/27/2023
06/01/23 Thurs JMJ Erosion appears to be functioning throughout project site. 06/05/23 Monday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 06/27/23 Tuesday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 07/17/23 Monday JMJ ( Mc Carthy Construction ) Contractor focus on keeping and maintaining all erosion control devices. Erosion appears to be functioning throughout project site.
Retaining Wall Inspection Partial 7/19/2023 7/19/2023 07/19/2023
Misc
Informational
07/17/2023
06/29/23 Thursday JMJ Contractor has been grading and stabilizing foundation for retaining wall. Retaining wall blocks were delivered to site yesterday and today. 07/12/23 Wednesday JMJ Contractor has done some foundation preparation for retaining, but does not appear that the wall is being constructed at this point. 07/17/23 Monday JMJ (MSE Hardscape) Contractor is working on the installation of retaining wall. The site has received heavy rain fall over the weekend. 89 degrees is the high for the day current temperature is 76 degrees at 8:45AM possible showers until 6PM today. 07/19/23 Wednesday JMJ (MSE Hardscape) Contractor continues to work on the installation of retaining wall Alpha & Omega was the third party.
Retaining Wall Inspection Partial 7/21/2023 7/21/2023 07/21/2023
Misc
Informational
07/19/2023
06/29/23 Thursday JMJ Contractor has been grading and stabilizing foundation for retaining wall. Retaining wall blocks were delivered to site yesterday and today. 07/12/23 Wednesday JMJ Contractor has done some foundation preparation for retaining, but does not appear that the wall is being constructed at this point. 07/17/23 Monday JMJ (MSE Hardscape) Contractor is working on the installation of retaining wall. The site has received heavy rain fall over the weekend. 89 degrees is the high for the day current temperature is 76 degrees at 8:45AM possible showers until 6PM today. 07/19/23 Wednesday JMJ (MSE Hardscape) Contractor continues to work on the installation of retaining wall Alpha & Omega was the third party. 07/21/23 Friday JMJ (MSE Hardscape) Contractor continued work on retaining around storm structures.
Retaining Wall Inspection Partial 7/25/2023 7/25/2023 07/25/2023
Misc
Informational
07/21/2023
06/29/23 Thursday JMJ Contractor has been grading and stabilizing foundation for retaining wall. Retaining wall blocks were delivered to site yesterday and today. 07/12/23 Wednesday JMJ Contractor has done some foundation preparation for retaining, but does not appear that the wall is being constructed at this point. 07/17/23 Monday JMJ (MSE Hardscape) Contractor is working on the installation of retaining wall. The site has received heavy rain fall over the weekend. 89 degrees is the high for the day current temperature is 76 degrees at 8:45AM possible showers until 6PM today. 07/19/23 Wednesday JMJ (MSE Hardscape) Contractor continues to work on the installation of retaining wall Alpha & Omega was the third party. 07/21/23 Friday JMJ (MSE Hardscape) Contractor continued work on retaining wall around storm structures. 07/25/23 Tuesday JMJ (MSE Hardscape) Contractor continued working on retaining wall.
Erosion Control Inspection Partial 7/25/2023 7/25/2023 07/25/2023
Misc
Informational
07/17/2023
06/01/23 Thurs JMJ Erosion appears to be functioning throughout project site. 06/05/23 Monday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 06/27/23 Tuesday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 07/17/23 Monday JMJ ( Mc Carthy Construction ) Contractor focus on keeping and maintaining all erosion control devices. Erosion appears to be functioning throughout project site. 07/25/23 Tuesday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site.
Sanitary Sewer - Mandrel Passed 8/4/2023 8/4/2023 08/04/2023
Misc
Informational
08/04/2023
08/04/23 Friday JMJ ( Site Rite - James ) Mandrel test passed S101 to S102.
Sanitary Sewer - Air Test Passed 8/4/2023 8/4/2023 08/04/2023
Misc
Informational
08/04/2023
08/04/23 Friday JMJ (Site Rite- James) Air test passed from S101 to S102.
Sanitary Sewer - Vacuum Passed 8/4/2023 8/4/2023 08/04/2023
Misc
Informational
08/04/2023
08/04/23 Friday JMJ (Site Rite-James) Vacuum test passed on Manhole S102 & S101.
Sanitary Sewer Construction Inspection Partial 8/4/2023 8/4/2023 08/04/2023
Misc
Informational
06/13/2023
06/13/23 Tuesday JMJ (Site-Rite Derek) Contractor is locating utilities so they can install MH S101 to existing line and began the laying 8" SDR-26 approximately 46' to S102. 08/04/23 Friday JMJ (Site Rite-James) Contractor replaced existing manhole installed cone and 5"DIA including new barrel section see detail 302 on sheet C703 for further details. General work on sanitary replacement and installation as-per project plan.
Retaining Wall Inspection Partial 8/4/2023 8/4/2023 08/04/2023
Misc
Informational
07/25/2023
06/29/23 Thursday JMJ Contractor has been grading and stabilizing foundation for retaining wall. Retaining wall blocks were delivered to site yesterday and today. 07/12/23 Wednesday JMJ Contractor has done some foundation preparation for retaining, but does not appear that the wall is being constructed at this point. 07/17/23 Monday JMJ (MSE Hardscape) Contractor is working on the installation of retaining wall. The site has received heavy rain fall over the weekend. 89 degrees is the high for the day current temperature is 76 degrees at 8:45AM possible showers until 6PM today. 07/19/23 Wednesday JMJ (MSE Hardscape) Contractor continues to work on the installation of retaining wall Alpha & Omega was the third party. 07/21/23 Friday JMJ (MSE Hardscape) Contractor continued work on retaining wall around storm structures. 07/25/23 Tuesday JMJ (MSE Hardscape) Contractor continued working on retaining wall. 08/04/23 Friday JMJ (MSE Hardscape) Contractor continues to work on the installation of retaining wall Alpha & Omega was the third party.
Footing Inspection - Commercial Partial 8/8/2023 08/08/2023
Misc
Informational
08/08/2023
AREAS APPROVED: ***Exterior grade beams: -Line 0.0 from JJ.7 to FF -Line JJ.7 from 0.0 to 0.1
Sanitary Sewer Construction Inspection Partial 8/9/2023 8/9/2023 08/09/2023
Misc
Informational
08/09/2023
08/09/23 Wednesday JMJ (Site Rite- James Crew) Contractor installed MH D-2 on Friday of last week, D4 on Monday of this current week, and D3 yesterday.
Storm Sewer Construction Inspection Partial 8/9/2023 8/9/2023 08/10/2023
Misc
Informational
07/17/2023
07/06/23 Thursday JMJ (Site Rite) Contractor installed HDPE storm lines 400 and 500 last week to existing storm box last week (note: reported did not save last week about the installation of storm pipe) as-per project plan. Contractor began the installation of storm line 200 from the same existing storm box as lines 400 & 500 (see existing 12'X12' junction box pg C503). 07/06/23 Friday JMJ (Site Rite) Contractor poured the collars for 12'X12' existing junction box. 140' of storm line 500 was installed. Contractor backfilled excavation compaction test were taken by Alpha & Omega testing. 07/10/23 Monday (Site Rite- James Crew) Contractor installed approximately 35' of storm pipe on 500 and storm box 501 as-per project plans to complete line 500. Contractor poured collars and inverts on storm coming out of structure 501. Contractor moved back to line 200 and removed abandon existing casing of power line. 07/11/23 Tuesday (Site Rite- James Crew) Materials to complete storm structures 701 & 800 arrived so, contractor worked to complete structures. Excavation for line 200 was stopped due the arrival of storm structures. 07/12/23 Wednesday (Site Rite-James Crew) Contractor installed approximately 80' of 24" HDPE storm pipe and poured the collars on pipe at the exist storm box. Contractor poured toe wall for storm line 600, installed rip-rap as-per project plans and backfilled excavation. 07/14/23 Friday (Site Rite-James Crew) Contractor installed storm box 202, and approximately 60' of 15" HDPE storm pipe. 07/17/23 Monday (Site Rite-James Crew) Contractor also installed storm box 201, and stack it out with lid last week. Contractor continued to install storm pipe on line 200. Contractor continued to grade and complete installation of storm, and support retaining wall construction for parking lot area. 08/10/23 Thursday (Site Rite-James Crew) Contractor installed approximately 100' of 24" HDPE of storm pipe going West ( starting @ near D3 sanitary MH.
Footing Inspection - Commercial Partial 8/11/2023 8/11/2023 08/11/2023
Misc
Informational
08/08/2023
AREAS APPROVED: ***Exterior grade beams: -Line 0.0 from JJ.7 to FF -Line JJ.7 from 0.0 to 0.1 - Line JJ TO FF from 0.1 to 2.0
Retaining Wall Inspection Partial 8/11/2023 8/11/2023 08/11/2023
Misc
Informational
08/04/2023
06/29/23 Thursday JMJ Contractor has been grading and stabilizing foundation for retaining wall. Retaining wall blocks were delivered to site yesterday and today. 07/12/23 Wednesday JMJ Contractor has done some foundation preparation for retaining, but does not appear that the wall is being constructed at this point. 07/17/23 Monday JMJ (MSE Hardscape) Contractor is working on the installation of retaining wall. The site has received heavy rain fall over the weekend. 89 degrees is the high for the day current temperature is 76 degrees at 8:45AM possible showers until 6PM today. 07/19/23 Wednesday JMJ (MSE Hardscape) Contractor continues to work on the installation of retaining wall Alpha & Omega was the third party. 07/21/23 Friday JMJ (MSE Hardscape) Contractor continued work on retaining wall around storm structures. 07/25/23 Tuesday JMJ (MSE Hardscape) Contractor continued working on retaining wall. 08/04/23 Friday JMJ (MSE Hardscape) Contractor continues to work on the installation of retaining wall Alpha & Omega was the third party. 08/11/23 Friday JMJ (MSE Hardscape) Contractor continues to work on the installation of retaining wall Alpha & Omega was the third party.
Footing Inspection - Commercial Partial 8/15/2023 (9:00) 8/15/2023 08/15/2023
Misc
Informational
08/11/2023
AREAS APPROVED: ***Exterior grade beams: -Line 0.0 from JJ.7 to FF -Line JJ.7 from 0.0 to 0.1 -Line 0.2 from JJ to FF -Line JJ from 0.2 to 2.6 -Line 7.6 from DD to KK -Line KK from 7.6 to tunnel
Footing Inspection - Commercial Partial 8/15/2023 8/15/2023 08/15/2023
Misc
Informational
08/15/2023
AREAS APPROVED: ***Exterior grade beams: -Line 0.0 from JJ.7 to FF -Line JJ.7 from 0.0 to 0.1 -Line 0.2 from JJ to FF -Line JJ from 0.2 to 2.6 -Line 7.6 from DD to KK -Line KK from 7.6 to tunnel
Foundation Inspection - Commercial Partial 8/16/2023 8/16/2023 08/16/2023
Misc
Corrective Action Required
08/16/2023
-Stem walls line 7.6 KK to EE
Foundation Inspection - Commercial Partial 8/17/2023 08/16/2023
Misc
Corrective Action Required
08/16/2023
-Stem walls line 0.0 from FF to JJ.7
Footing Inspection - Commercial Partial 8/16/2023 (11:00) 8/16/2023 08/16/2023
Misc
Informational
08/15/2023
AREAS APPROVED: ***Exterior grade beams: -Line 0.0 from JJ.7 to FF -Line JJ.7 from 0.0 to 0.1 -Line 0.2 from JJ to FF -Line JJ from 0.2 to 2.6 -Line 7.6 from DD to KK -Line KK from 7.6 to tunnel -Line 5.8 from EE.1 to FF.5 -Line 4.7 from EE.1 to FF.5 -Line FF from 5.8 to 4.2
Foundation Inspection - Commercial Partial 1/29/2024 8/17/2023 08/17/2023
Misc
Corrective Action Required
08/16/2023
-Stem walls line 0.0 from FF to JJ.7, JJ.7 from 0.0 to 0.1
Footing Inspection - Commercial Partial 8/17/2023 08/17/2023
Misc
Informational
08/16/2023
AREAS APPROVED: ***Exterior grade beams: -Line 0.0 complete -Line JJ.7 complete -Line 0.2 from JJ to FF -Line JJ from 0.2 to 2.6 -Line 7.6 complete -Line KK from 7.6 to tunnel -Line 5.8 from EE.1 to FF.5 -Line 4.7 from EE.1 to FF.5 -Line FF complete -Line 3.7 from EE.1 to FF.5 -Line 2.6 from EE.1 to FF.5
Footing Inspection - Commercial Partial 8/22/2023 (9:00) 8/22/2023 08/22/2023
Misc
Informational
08/17/2023
AREAS APPROVED: ***Exterior grade beams: -Line 0.0 complete -Line JJ.7 complete -Line 0.2 from JJ to FF -Line JJ from 0.2 to 2.6 -Line 7.6 complete -Line KK from 7.6 to tunnel -Line 5.8 from EE.1 to GG.5 -Line 4.7 from EE.1 to GG.5 -Line FF complete -Line 3.7 from EE.1 to FF.5 -Line 2.6 from EE.1 to FF.5 -Line GG from 5.8 to 4.2
Footing Inspection - Commercial Partial 8/22/2023 8/22/2023 08/22/2023
Misc
Informational
08/22/2023
AREAS APPROVED: Elevator pit ***Exterior grade beams: -Line 0.0 complete -Line JJ.7 complete -Line 0.2 from JJ to FF -Line JJ from 0.2 to 2.6 -Line 7.6 complete -Line KK from 7.6 to tunnel -Line 5.8 from EE.1 to GG.5 -Line 4.7 from EE.1 to GG.5 -Line FF complete -Line 3.7 from EE.1 to FF.5 -Line 2.6 from EE.1 to FF.5 -Line GG from 5.8 to 4.2
Foundation Inspection - Commercial Partial 8/23/2023 8/23/2023 08/23/2023
Misc
Corrective Action Required
08/17/2023
-Stem walls: Line 0.0 from FF to JJ.7, JJ.7 from 0.0 to 0.1 Line JJ from 0.1 to 2.6
Footing Inspection - Commercial Partial 8/24/2023 (11:00) 8/24/2023 08/24/2023
Misc
Informational
08/22/2023
AREAS APPROVED: Elevator pit ***Exterior grade beams: -Line 0.0 complete -Line JJ.7 complete -Line 0.2 complete -Line 1 complete -Line JJ from 0.2 to 2.6 -Line 7.6 complete -Line KK from 7.6 to tunnel -Line 5.8 from EE.1 to GG.5 -Line 4.7 from EE.1 to GG.5 -Line FF complete -Line 3.7 from EE.1 to FF.5 -Line 2.6 from EE.1 to FF.5 -Line GG from 5.8 to 4.2, from 0.2 to1.25
Footing Inspection - Commercial Partial 8/28/2023 (10:00) 8/28/2023 08/28/2023
Misc
Informational
08/24/2023
AREAS APPROVED: Elevator pit ***Exterior grade beams: -Line 0.0 complete -Line JJ.7 complete -Line 0.2 complete -Line 1 complete -Line JJ from 0.2 to 2.6 -Line 7.6 complete -Line KK from 7.6 to tunnel -Line 5.8 from EE to GG.5 -Line 4.7 from EE to GG.5 -Line FF complete -Line 3.7 from EE to FF.5 -Line 2.6 from EE to FF.5 -Line GG from 5.8 to 4.2, from 0.2 to1.25
Retaining Wall Inspection Partial 8/29/2023 8/29/2023 08/29/2023
Misc
Informational
08/11/2023
06/29/23 Thursday JMJ Contractor has been grading and stabilizing foundation for retaining wall. Retaining wall blocks were delivered to site yesterday and today. 07/12/23 Wednesday JMJ Contractor has done some foundation preparation for retaining, but does not appear that the wall is being constructed at this point. 07/17/23 Monday JMJ (MSE Hardscape) Contractor is working on the installation of retaining wall. The site has received heavy rain fall over the weekend. 89 degrees is the high for the day current temperature is 76 degrees at 8:45AM possible showers until 6PM today. 07/19/23 Wednesday JMJ (MSE Hardscape) Contractor continues to work on the installation of retaining wall Alpha & Omega was the third party. 07/21/23 Friday JMJ (MSE Hardscape) Contractor continued work on retaining wall around storm structures. 07/25/23 Tuesday JMJ (MSE Hardscape) Contractor continued working on retaining wall. 08/04/23 Friday JMJ (MSE Hardscape) Contractor continues to work on the installation of retaining wall Alpha & Omega was the third party. 08/11/23 Friday JMJ (MSE Hardscape) Contractor continues to work on the installation of retaining wall Alpha & Omega was the third party. 08/28/23 Monday JMJ (MSE Hardscape) Contractor continues to work on the installation of retaining wall Alpha & Omega was the third party.
Foundation Inspection - Commercial Partial 3/20/2024 08/30/2023
Misc
Corrective Action Required
08/23/2023
-Stem walls: Line 0.0 from FF to JJ.7, JJ.7 from 0.0 to 0.1 Line JJ from 0.1 to 2.6 Elevator pit stem walls
Footing Inspection - Commercial Partial 8/30/2023 (10:00) 8/30/2023 08/30/2023
Misc
Informational
08/28/2023
AREAS APPROVED: Elevator pit ***Exterior grade beams: -Line 0.0 complete -Line JJ.7 complete -Line 0.2 complete -Line 1 complete -Line JJ from 0.2 to 3.2 -Line 7.6 complete -Line KK from 7.6 to 3.5 -Line 5.8 from EE to KK -Line 4.7 from EE to KK.5 -Line FF complete -Line 3.7 from EE to JJ.8 -Line 2.6 from EE to JJ -Line GG complete -Line HH complete
Foundation Inspection - Commercial Partial 9/1/2023 9/1/2023 09/01/2023
Misc
Corrective Action Required
08/30/2023
-Stem walls: Line 0.0 from FF to JJ.7, JJ.7 from 0.0 to 0.1 Line JJ from 0.1 to 2.6 Elevator pit stem walls Columns: Line 7.6 complete Line 5.8 at FF, GG Line 4.7 at FF, GG Line 3.7 at FF, GG Line 2.6 at FF, GG Linie 1 at FF Line 0.2 at FF
Footing Inspection - Commercial Partial 9/7/2023 (8:00) 9/7/2023 09/07/2023
Misc
Informational
08/30/2023
AREAS APPROVED: Elevator pit ***Exterior grade beams: -Line 0.0 complete -Line JJ.7 complete -Line 0.2 complete -Line 1 complete -Line JJ from 0.2 to 3.2 -Line 7.6 complete -Line KK from 7.6 to 3.5 -Line 5.8 from EE to KK -Line 4.7 from EE to KK.5 -Line FF complete -Line 3.7 from EE to JJ.8 -Line 2.6 from EE to JJ -Line GG complete -Line HH complete - 6 columns approved 7.6-KK to EE and EE-5.2 to 7.6
Foundation Inspection - Commercial Partial 9/8/2023 09/08/2023
Misc
Corrective Action Required
09/01/2023
-Stem walls: Line 0.0 from FF to JJ.7, JJ.7 from 0.0 to 0.1 Line JJ from 0.1 to 2.6 Elevator pit stem walls Columns: Line 7.6 FF-JJ Line 5.8 at FF-JJ Line 4.7 at FF-JJ Line 3.7 at FF-JJ Line 2.6 at FF-JJ Line 1 at FF-JJ Line 0.2 at FF-JJ
Footing Inspection - Commercial Partial 9/13/2023 (9:00) 9/13/2023 09/13/2023
Misc
Informational
09/07/2023
AREAS APPROVED: Elevator pit ***Exterior grade beams: -Line 0.0 complete -Line JJ.7 complete -Line 0.2 complete -Line 1 complete -Line JJ from 0.2 to 3.2 -Line 7.6 complete -Line KK from 7.6 to 3.5 -Line 5.8 from EE to KK -Line 4.7 from EE to CA (excluding grade beam 17) -Line FF complete -Line 3.7 from EE to JJ.8 -Line 2.6 from EE to JJ -Line GG complete -Line HH complete -Line 3.2 complete -Line LL complete - 6 columns approved 7.6-KK to EE and EE-5.2 to 7.6
Footing Inspection - Commercial Partial 9/15/2023 (1:00) 9/15/2023 09/15/2023
Misc
Informational
09/13/2023
AREAS APPROVED: Elevator pit ***Exterior grade beams: -Line 0.0 complete -Line JJ.7 complete -Line 0.2 complete -Line 1 complete -Line JJ complete -Line 7.6 complete -Line KK from 7.6 to 3.5 -Line 5.8 from EE to KK -Line 4.7 from EE to CA (excluding grade beam 17) -Line FF complete -Line 3.7 from EE to JJ.8 -Line 2.6 complete -Line GG complete -Line HH complete -Line 3.2 complete -Line LL complete -Line CB complete
Foundation Inspection - Commercial Partial 9/15/2023 9/15/2023 09/15/2023
Misc
Corrective Action Required
09/08/2023
-Stem walls: Line 0.0 from FF to JJ.7, JJ.7 from 0.0 to 0.1 Line JJ from 0.1 to 2.6 -Elevator: Stem walls 1st level walls -1st level Columns: Complete except at line EE
Foundation Inspection - Commercial Partial 9/20/2023 09/20/2023
Misc
Corrective Action Required
09/15/2023
-Stem walls: Line 0.0 from FF to JJ.7, JJ.7 from 0.0 to 0.1 Line JJ from 0.1 to 2.6 -Elevator: Stem walls 1st level walls -1st level columns complete except at LINE EE 2.5, 2.6, 5.8
Footing Inspection - Commercial Passed 9/21/2023 (10:00) 9/21/2023 09/21/2023
Misc
Resolved
09/21/2023
AREAS APPROVED: Elevator pit ***Exterior grade beams: -Line 0.0 complete -Line JJ.7 complete -Line 0.2 complete -Line 1 complete -Line JJ complete -Line 7.6 complete -Line KK from 7.6 to 3.5 -Line 5.8 from EE to KK -Line 4.7 from EE to CA (excluding grade beam 17) -Line FF complete -Line 3.7 from EE to JJ.8 -Line 2.6 complete -Line GG complete -Line HH complete -Line 3.2 complete -Line LL complete -Line CB complete
Underslab Plumbing Inspection - Commercial Partial 8/11/2023 9/22/2023 09/22/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
09/22/2023
From North to South: Column line 0.0 to 1 -VISUAL ONLY-COMPLETE WATER COLUMN TEST
Foundation Inspection - Commercial Partial 9/25/2023 09/25/2023
Misc
Corrective Action Required
09/20/2023
-Stem walls: Complete -Elevator: Stem walls 1st level walls -1st level columns complete -Canopy pilasters at CB
Foundation Inspection - Commercial Partial 9/26/2023 9/26/2023 09/26/2023
Misc
Corrective Action Required
09/25/2023
**Foundation stem walls: Complete **Elevator: -Stem walls -1st level walls **Stairwell -1st level walls **Columns -1st level columns complete -Canopy pilasters at CB
Site Visit Partial 09/27/2023
Misc
Informational
08/25/2023
8-25 A.A site visit . no activity 8-28-23 A.A no activity 9-27-23 A.A, MMC doing dirt work
Storm Sewer Construction Inspection Partial 9/28/2023 9/28/2023 09/28/2023
Misc
Informational
08/10/2023
07/06/23 Thursday JMJ (Site Rite) Contractor installed HDPE storm lines 400 and 500 last week to existing storm box last week (note: reported did not save last week about the installation of storm pipe) as-per project plan. Contractor began the installation of storm line 200 from the same existing storm box as lines 400 & 500 (see existing 12'X12' junction box pg C503). 07/06/23 Friday JMJ (Site Rite) Contractor poured the collars for 12'X12' existing junction box. 140' of storm line 500 was installed. Contractor backfilled excavation compaction test were taken by Alpha & Omega testing. 07/10/23 Monday (Site Rite- James Crew) Contractor installed approximately 35' of storm pipe on 500 and storm box 501 as-per project plans to complete line 500. Contractor poured collars and inverts on storm coming out of structure 501. Contractor moved back to line 200 and removed abandon existing casing of power line. 07/11/23 Tuesday (Site Rite- James Crew) Materials to complete storm structures 701 & 800 arrived so, contractor worked to complete structures. Excavation for line 200 was stopped due the arrival of storm structures. 07/12/23 Wednesday (Site Rite-James Crew) Contractor installed approximately 80' of 24" HDPE storm pipe and poured the collars on pipe at the exist storm box. Contractor poured toe wall for storm line 600, installed rip-rap as-per project plans and backfilled excavation. 07/14/23 Friday (Site Rite-James Crew) Contractor installed storm box 202, and approximately 60' of 15" HDPE storm pipe. 07/17/23 Monday (Site Rite-James Crew) Contractor also installed storm box 201, and stack it out with lid last week. Contractor continued to install storm pipe on line 200. Contractor continued to grade and complete installation of storm, and support retaining wall construction for parking lot area. 08/10/23 Thursday (Site Rite-James Crew) Contractor installed approximately 100' of 24" HDPE of storm pipe going West ( starting @ near D3 sanitary MH. 09/28/23 Thursday (Site Rite-James Crew) Contract back onsite and continued to finish installed of storm line 200. Approximately 75' to the end line to storm box 202 and 75' on line 200 to storm box 301 as per project plans.
Underslab Plumbing Inspection - Commercial Partial 9/29/2023 9/29/2023 09/29/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
09/22/2023
DWV From North to South: -Column line 0.0 to 1 From West to East: -Line EE to GG Storm line North to South Line 0.2 to 3.7 Main sanitary line from 0.2 to 3.7
Sanitary Sewer - Vacuum Partial 10/2/2023 10/2/2023 10/02/2023
Misc
Informational
10/02/2023
10/02/23 Monday JMJ ( Site Rite ) Contractor performed 3 vacuum tested on sanitary @ the purposed new parking lot location. All successfully passed.
Foundation Inspection - Commercial Partial 10/3/2023 10/03/2023
Misc
Corrective Action Required
09/26/2023
**Foundation stem walls: Complete **Elevator: -Stem walls -1st level walls **Stairwell -1st level walls **Columns -1st level columns complete -Canopy pilasters at CB -(3) columns on existing rooftop
Underground Electrical Inspection - Commercial Partial 10/3/2023 10/03/2023
Misc
Informational
10/03/2023
Conduit for (5) of (13) light poles at East side of North lot
Foundation Inspection - Commercial Partial 10/4/2023 10/04/2023
Misc
Corrective Action Required
10/03/2023
**Foundation stem walls: Complete **Elevator: -Stem walls -1st level walls **Stairwell -1st level walls **Columns -1st level columns complete -Canopy pilasters at CB -Columns on existing rooftop: #s 8.10,13,15,16,19,21
Underslab Plumbing Inspection - Commercial Partial 10/4/2023 10/4/2023 10/04/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
09/29/2023
DWV From North to South: -Column line 0.0 to 2.6 From West to East: -Line EE to JJ Storm line North to South Line 0.2 to 5.8 Main sanitary line from 0.2 to 3.7
Underground Electrical Inspection - Commercial Partial 10/4/2023 10/4/2023 10/04/2023
Misc
Informational
10/03/2023
Conduit for (6) of (13) light poles at East side of North lot
Foundation Inspection - Commercial Partial 10/5/2023 10/05/2023
Misc
Corrective Action Required
10/04/2023
**Foundation stem walls: Complete **Elevator: -Stem walls -1st level walls **Stairwell -1st level walls **Columns -1st level columns complete -Canopy pilasters at CB -Columns on existing rooftop: #s 1,2,8.9,10,15,16,17,19,20,21
Underground Electrical Inspection - Commercial Partial 10/5/2023 10/5/2023 10/05/2023
Misc
Informational
10/04/2023
Conduit for (6) of (6) light poles at East side of North lot, (2) of (7) in West side of north lot
Foundation Inspection - Commercial Partial 10/6/2023 10/6/2023 10/06/2023
Misc
Corrective Action Required
10/05/2023
**Foundation stem walls: Complete **Elevator: -Stem walls -1st level walls **Stairwell -1st level walls **Columns -1st level columns complete -Canopy pilasters at CB -Columns on existing rooftop: #s 1,2,3,8.9,10,11.15,16,17,18,19,20,21
Underground Electrical Inspection - Commercial Partial 10/6/2023 10/6/2023 10/06/2023
Misc
Informational
10/05/2023
Conduit for (6) of (6) light poles at East side of North lot, (4) of (7) in West side of north lot
Underground Electrical Inspection - Commercial Partial 10/9/2023 10/9/2023 10/09/2023
Misc
Informational
10/06/2023
Conduit for (6) of (6) light poles at East side of North lot, (5) of (7) in West side of north lot
Underslab Plumbing Inspection - Commercial Partial 2/14/2024 2/14/2024 10/10/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
10/10/2023
Ground floor complete
Foundation Inspection - Commercial Partial 10/10/2023 10/10/2023 10/10/2023
Misc
Corrective Action Required
10/06/2023
**Foundation stem walls: Complete **Elevator: -Stem walls -1st level walls **Stairwell -1st level walls **Columns -1st level columns complete -Canopy pilasters at CB -Columns on existing rooftop: #s 1,2,3,4,5,8.9,10,11.12,14,15,13,16,17,18,19,20,21
Foundation Inspection - Commercial Partial 11/9/2023 10/11/2023
Misc
Corrective Action Required
10/10/2023
**Foundation stem walls: Complete **Elevator: -Stem walls -1st level walls **Stairwell -1st level walls **Columns -1st level columns complete -Canopy pilasters at CB -Columns on existing rooftop: Complete
Underground Electrical Inspection - Commercial Partial 10/11/2023 10/11/2023 10/11/2023
Misc
Informational
10/09/2023
**North lot: Conduit for (6) of (6) light poles at East side of North lot, (5) of (7) in West side of north lot **Exterior of addition: -Conduit from existing to NE corner of building pad for future comms
Underground Electrical Inspection - Commercial Partial 10/17/2023 10/17/2023 10/17/2023
Misc
Informational
10/11/2023
**North lot: Conduit for (6) of (6) light poles at East side of North lot, (7) of (7) in West side of north lot **Exterior of addition: -Conduit from existing to NE corner of building pad for future comms
Foundation Inspection - Commercial Partial 10/19/2023 10/19/2023 10/19/2023
Misc
Corrective Action Required
10/11/2023
**Foundation stem walls: Complete **Stairwell and Elevator at existing: -3rd level walls **Addition Elevator: -Stem walls -1st level walls **Addition Stairwell -1st level walls **Columns -1st level columns complete -Canopy pilasters at CB -Columns on existing rooftop: Complete
Pavement-Curb Construction Partial 10/19/2023 10/19/2023 10/19/2023
Misc
Informational
10/19/2023
10/19/23 Thursday JMJ ( George J. Shaw ) Poured approximately 300' of curbs for the new parking lot today. Contractor also poured curbs yesterday.
Foundation Inspection - Commercial Partial 10/20/2023 10/20/2023 10/20/2023
Misc
Corrective Action Required
10/19/2023
**Foundation stem walls: Complete **Stairwell and Elevator at existing: -3rd level walls **Addition Elevator: -Stem walls -1st level walls **Addition Stairwell -1st level walls **Columns -1st level columns complete -Canopy pilasters at CB -Columns on existing rooftop: Complete
Erosion Control Inspection Partial 10/27/2023 10/27/2023 10/27/2023
Misc
Informational
07/25/2023
06/01/23 Thurs JMJ Erosion appears to be functioning throughout project site. 06/05/23 Monday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 06/27/23 Tuesday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 07/17/23 Monday JMJ ( Mc Carthy Construction ) Contractor focus on keeping and maintaining all erosion control devices. Erosion appears to be functioning throughout project site. 07/25/23 Tuesday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 10/27/23 Friday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site.
Pavement-Curb Construction Partial 10/27/2023 10/27/2023 10/27/2023
Misc
Informational
10/27/2023
10/27/23 Friday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Contractor continues to set forms for curbs. Do to extend inclement weather proof roll will be needed before curb pours resume.
Piers/Caissons Inspection - Commercial Failed 10/31/2023 10/31/2023 10/31/2023
Misc
Corrective Action Required
10/31/2023
-Remove loose soil and water from bottom of piers -provide 3 inches of clearance from earth to all reinforcement
Pavement-Curb Construction Partial 11/2/2023 11/2/2023 11/02/2023
Misc
Informational
10/27/2023
10/27/23 Friday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Contractor continues to set forms for curbs. Do to extend inclement weather proof roll will be needed before curb pours resume. 11/02/23 Thursday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Contractor poured curbs yesterday approximately 14 yards and contractor cover curb with blankets.
Pavement-Proof Roll Partial 11/2/2023 11/2/2023 11/02/2023
Misc
Informational
11/02/2023
11/02/23 Thursday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Proof roll was passed by third party Alpha-Omega Testing on 10/31/233 Monday (after weekend rains). Field Engineering Inspector was not present when inspection was performed. Contractor is trying to finish parking lot.
Piers/Caissons Inspection - Commercial Partial 11/7/2023 11/7/2023 11/07/2023
Misc
Corrective Action Required
10/31/2023
*(2) of (13) piers for light pole bases at SW side in North parking lot addition
Piers/Caissons Inspection - Commercial Partial 11/8/2023 11/08/2023
Misc
Corrective Action Required
11/07/2023
*(5) of (13) piers for light pole bases in North parking lot addition
Piers/Caissons Inspection - Commercial Partial 11/9/2023 11/09/2023
Misc
Corrective Action Required
11/08/2023
*(13) of (13) piers for light pole bases in North parking lot addition
Pavement-Curb Construction Partial 11/14/2023 11/14/2023 11/14/2023
Misc
Informational
11/02/2023
10/27/23 Friday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Contractor continues to set forms for curbs. Do to extend inclement weather proof roll will be needed before curb pours resume. 11/02/23 Thursday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Contractor poured curbs yesterday approximately 14 yards and contractor cover curb with blankets. 11/14/23 Tuesday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Contractor poured curbs around reconstructed private street on the Northwest side on going constructed building yesterday.
Pavement-Aggregate Base Partial 11/14/2023 11/14/2023 11/14/2023
Misc
Informational
11/14/2023
11/14/23 Tuesday JMJ ( Hannarhan ) Contractor will begin to lay base today on the newly constructed parking lot. Third party inspector is supposed to be on site to collect density test ( Alpha & Omega ). Contractor will text a picture of the first and last base asphalt ticket for the day.
Pavement-Surface Partial 11/20/2023 11/20/2023 11/20/2023
Misc
Informational
05/30/2023
05/30/23 Tuesday JMJ ( Bradley Construction - Mike, Bushey Concrete ) Contractor started pouring concrete @ 5:30AM for parking lot / driveway area on the Eastside of project. Contractor graded gravel for the concrete pour to the Southside of project.
Misc
Informational
11/20/2023
11/20/23 Monday JMJ ( Hanrahan Asphalt Pavement ) Contractor laid surface APWA Type 3 asphalted on Thursday 11/16/23. The Northwest parking lot was not completed because asphalt paving equipment. It will be completed at a later date.
Erosion Control Inspection Partial 11/21/2023 11/21/2023 11/21/2023
Misc
Informational
10/27/2023
06/01/23 Thurs JMJ Erosion appears to be functioning throughout project site. 06/05/23 Monday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 06/27/23 Tuesday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 07/17/23 Monday JMJ ( Mc Carthy Construction ) Contractor focus on keeping and maintaining all erosion control devices. Erosion appears to be functioning throughout project site. 07/25/23 Tuesday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 10/27/23 Friday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 11/21/23 Tuesday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site.
Site Visit Partial 12/5/2023 12/5/2023 12/05/2023
Misc
Informational
09/27/2023
8-25 A.A site visit . no activity 8-28-23 A.A no activity 9-27-23 A.A, MMC doing dirt work
Misc
Informational
12/05/2023
Not performing working on related.
Piers/Caissons Inspection - Commercial Partial 12/6/2023 12/6/2023 12/06/2023
Misc
Corrective Action Required
11/09/2023
*(13) of (13) piers for light pole bases in North parking lot addition -Second story columns 10-15, 27,28
Pavement-Surface Partial 12/7/2023 12/7/2023 12/07/2023
Misc
Informational
11/20/2023
05/30/23 Tuesday JMJ ( Bradley Construction - Mike, Bushey Concrete ) Contractor started pouring concrete @ 5:30AM for parking lot / driveway area on the Eastside of project. Contractor graded gravel for the concrete pour to the Southside of project.
Misc
Informational
11/20/2023
11/20/23 Monday JMJ ( Hanrahan Asphalt Pavement ) Contractor laid surface APWA Type 3 asphalted on Thursday 11/16/23. The Northwest parking lot was not completed because asphalt paving equipment. It will be completed at a later date. 12/07/23 Thursday JMJ ( Hanrahan Asphalt Pavement ) Contractor schedule to complete surface asphalt on the Northwest parking lot today.
Piers/Caissons Inspection - Commercial Partial 12/8/2023 (1:00) 12/8/2023 12/08/2023
Misc
Corrective Action Required
12/08/2023
*(13) of (13) piers for light pole bases in North parking lot addition -Second story columns 10-15, 17-19,24, 26-28,30, 33
Erosion Control Inspection Partial 12/11/2023 12/11/2023 12/11/2023
Misc
Informational
11/21/2023
06/01/23 Thurs JMJ Erosion appears to be functioning throughout project site. 06/05/23 Monday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 06/27/23 Tuesday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 07/17/23 Monday JMJ ( Mc Carthy Construction ) Contractor focus on keeping and maintaining all erosion control devices. Erosion appears to be functioning throughout project site. 07/25/23 Tuesday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 10/27/23 Friday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 12/11/23 Monday JMJ ( MC Carthy Construction ) Erosion control appears to be functionable.
Piers/Caissons Inspection - Commercial Partial 12/12/2023 (10:00) 12/13/2023 12/13/2023
Misc
Corrective Action Required
12/08/2023
*(13) of (13) piers for light pole bases in North parking lot addition -Second story columns 1-4,10-15, 27,28
Piers/Caissons Inspection - Commercial Partial 12/14/2023 12/14/2023 12/14/2023
Misc
Corrective Action Required
12/13/2023
*(13) of (13) piers for light pole bases in North parking lot addition -Second story columns 1-4,7-15, 20-23, 27,28, 31
Site Visit Partial 12/15/2023 12/15/2023 12/15/2023
Misc
Informational
12/05/2023
8-25 A.A site visit . no activity 8-28-23 A.A no activity 9-27-23 A.A, MMC doing dirt work
Misc
Informational
12/05/2023
Not performing working on related. 12/15/23 Friday JMJ No activity on related work.
Foundation Inspection - Commercial Partial 12/18/2023 12/18/2023
Misc
Corrective Action Required
10/20/2023
**Foundation stem walls: Complete **Stairwell and Elevator at existing: -3rd level walls **Addition Elevator: -Stem walls -1st level walls -2nd level walls **Addition Stairwell -1st level walls **Columns -1st level columns complete -Canopy pilasters at CB -Columns on existing rooftop: Complete
Foundation Inspection - Commercial Partial 12/19/2023 12/19/2023 12/19/2023
Misc
Corrective Action Required
12/18/2023
**Foundation stem walls: Complete **Stairwell and Elevator at existing: -3rd level walls **Addition Elevator: -Stem walls -1st level walls -2nd level walls **Addition Stairwell -1st level walls -2nd level walls **Columns -1st level columns complete -2nd level columns complete -Canopy pilasters at CB -Columns on existing rooftop: Complete
Pavement-Stabilized Subgrade Passed 9/29/2023 9/29/2023 01/05/2024
Misc
Informational
01/05/2024
01/05/24 JMJ Passed with third party approval Alpha & Omega.
Erosion Control Inspection Partial 1/11/2024 1/11/2024 01/11/2024
Misc
Informational
12/11/2023
06/01/23 Thurs JMJ Erosion appears to be functioning throughout project site. 06/05/23 Monday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 06/27/23 Tuesday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 07/17/23 Monday JMJ ( Mc Carthy Construction ) Contractor focus on keeping and maintaining all erosion control devices. Erosion appears to be functioning throughout project site. 07/25/23 Tuesday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 10/27/23 Friday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 12/11/23 Monday JMJ ( MC Carthy Construction ) Erosion control appears to be functionable. 01/11/24 Thursday JMJ Erosion control appears to be working.
Erosion Control Inspection Partial 1/19/2024 1/19/2024 01/19/2024
Misc
Informational
01/11/2024
06/01/23 Thurs JMJ Erosion appears to be functioning throughout project site. 06/05/23 Monday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 06/27/23 Tuesday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 07/17/23 Monday JMJ ( Mc Carthy Construction ) Contractor focus on keeping and maintaining all erosion control devices. Erosion appears to be functioning throughout project site. 07/25/23 Tuesday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 10/27/23 Friday JMJ ( MC Carthy Construction ) Erosion appears to be functioning throughout project site. 12/11/23 Monday JMJ ( MC Carthy Construction ) Erosion control appears to be functionable. 01/11/24 Thursday JMJ Erosion control appears to be working. 01/19/24 Friday JMJ Erosion control appears to be working.
Site Visit Partial 1/22/2024 1/22/2024 01/22/2024
Misc
Informational
12/15/2023
8-25 A.A site visit . no activity 8-28-23 A.A no activity 9-27-23 A.A, MMC doing dirt work
Misc
Informational
12/15/2023
Not performing working on related. 12/15/23 Friday JMJ No activity on related work. 01/22/24 Monday JMJ No work on site.
Foundation Inspection - Commercial Partial 1/29/2024 01/29/2024
Misc
Corrective Action Required
12/19/2023
**Foundation stem walls: Complete **Stairwell and Elevator at existing: -3rd level walls **Addition Elevator: -Stem walls -1st level walls -2nd level walls **Addition Stairwell -1st level walls -2nd level walls **Columns -1st level columns complete -2nd level columns complete -Canopy pilasters at CB -Columns on existing rooftop: Complete **Decks -2nd level addition deck complete
Foundation Inspection - Commercial Partial 2/2/2024 (2:00) 2/2/2024 02/02/2024
Misc
Corrective Action Required
01/29/2024
**Foundation stem walls: Complete **Stairwell and Elevator at existing: -3rd level walls **Addition Elevator: -Stem walls -1st level walls -2nd level walls **Addition Stairwell -1st level walls -2nd level walls **Columns -1st level columns complete -2nd level columns complete -3rd level: north (14) columns -Canopy pilasters at CB -Columns on existing rooftop: Complete **Decks -2nd level addition deck complete
In-wall Inspection Partial 2/2/2024 2/2/2024 02/02/2024
FIRST FLOOR
Corrective Action Required
02/02/2024
SECOND FLOOR
Informational
02/02/2024
*EXISTING SIDE; -2E419 electrical room ok to 1 side
THIRD FLOOR
Corrective Action Required
02/02/2024
Footing Inspection - Commercial Partial 2/2/2024 2/2/2024 02/02/2024
Foundation Inspection - Commercial Partial 2/8/2024 2/8/2024 02/08/2024
Misc
Corrective Action Required
02/02/2024
**Foundation stem walls: Complete **Stairwell and Elevator at existing: -3rd level walls **Addition Elevator: -Stem walls -1st level walls -2nd level walls **Addition Stairwell -1st level walls -2nd level walls **Columns -1st level columns complete -2nd level columns complete -3rd level: north (14) columns -Canopy pilasters at CB -Columns on existing rooftop: Complete **Decks -2nd level addition deck complete -3rd level addition deck complete
Foundation Inspection - Commercial Partial 2/12/2024 2/12/2024 02/12/2024
Misc
Corrective Action Required
02/08/2024
**Foundation stem walls: Complete **Stairwell and Elevator at existing: -3rd level walls **Addition Elevator: -Stem walls -1st level walls -2nd level walls **Addition Stairwell -1st level walls -2nd level walls **Columns -1st level columns complete -2nd level columns complete -3rd level: north (18) columns -Canopy pilasters at CB -Columns on existing rooftop: Complete **Decks -2nd level addition deck complete -3rd level addition deck complete
Foundation Inspection - Commercial Partial 2/13/2024 2/13/2024 02/13/2024
Misc
Corrective Action Required
02/12/2024
**Foundation stem walls: Complete **Stairwell and Elevator at existing: -3rd level walls **Addition Elevator: -Stem walls -1st level walls -2nd level walls **Addition Stairwell -1st level walls -2nd level walls **Columns -1st level columns complete -2nd level columns complete -3rd level columns complete -Canopy pilasters at CB -Columns on existing rooftop: Complete **Decks -2nd level addition deck complete -3rd level addition deck complete
Underslab Plumbing Inspection - Commercial Partial 2/14/2024 02/14/2024
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
10/10/2023
1st Floor addition complete
In-wall Inspection Partial 2/15/2024 2/15/2024 02/15/2024
FIRST FLOOR
Corrective Action Required
02/02/2024
**OK to top out one side for mechanical as neccessary
SECOND FLOOR
Informational
02/02/2024
*EXISTING SIDE; -2E419 electrical room ok to 1 side
THIRD FLOOR
Corrective Action Required
02/02/2024
Footing Inspection - Commercial Partial 3/5/2024 3/5/2024 03/05/2024
Misc
Informational
03/05/2024
- Looked at grid 0.2 - between 4.7 to 5.7 OK
Site Visit Partial 3/6/2024 3/6/2024 03/06/2024
Misc
Informational
01/22/2024
8-25 A.A site visit . no activity 8-28-23 A.A no activity 9-27-23 A.A, MMC doing dirt work
Misc
Informational
01/22/2024
Not performing working on related. 12/15/23 Friday JMJ No activity on related work. 01/22/24 Monday JMJ No work on site. 03/06/24 Wednesday JMJ No activity on related work.
Foundation Inspection - Commercial Partial 3/11/2024 (11:00) 3/11/2024 03/11/2024
Misc
Corrective Action Required
02/13/2024
**Foundation stem walls: Complete **Stairwell and Elevator at existing: -3rd level walls **Addition Elevator: -Stem walls -1st level walls -2nd level walls **Addition Stairwell -1st level walls -2nd level walls **Columns -1st level columns complete -2nd level columns complete -3rd level columns complete -Canopy pilasters at CB -Columns on existing rooftop: Complete **Decks -2nd level addition deck complete -3rd level addition deck complete -Roof deck at addition complete
In-wall Inspection Partial 3/14/2024 03/14/2024
FIRST FLOOR
Corrective Action Required
02/15/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs
SECOND FLOOR
Informational
02/15/2024
*EXISTING SIDE; -2E419 electrical room ok to 1 side
THIRD FLOOR
Corrective Action Required
02/15/2024
Foundation Inspection - Commercial Failed 3/18/2024 3/18/2024 03/18/2024
Misc
Corrective Action Required
03/11/2024
**Foundation stem walls: Complete **Stairwell and Elevator at existing: -3rd level walls **Addition Elevator: -Stem walls -1st level walls -2nd level walls **Addition Stairwell -1st level walls -2nd level walls **Columns -1st level columns complete -2nd level columns complete -3rd level columns complete -Canopy pilasters at CB -Columns on existing rooftop: Complete **Decks -2nd level addition deck complete -3rd level addition deck complete -Roof deck at addition complete
Misc
Corrective Action Required
03/18/2024
Tie all corner bars and laps at rooftop stairwell walls
Foundation Inspection - Commercial Passed 3/20/2024 03/20/2024
Misc
Resolved
03/20/2024
**Foundation stem walls: Complete **Stairwell and Elevator at existing: -3rd level walls **Addition Elevator: -Stem walls -1st level walls -2nd level walls **Addition Stairwell -1st level walls -2nd level walls **Columns -1st level columns complete -2nd level columns complete -3rd level columns complete -Canopy pilasters at CB -Columns on existing rooftop: Complete **Decks -2nd level addition deck complete -3rd level addition deck complete -Roof deck at addition complete
Misc
Resolved
03/20/2024
Tie all corner bars and laps at rooftop stairwell walls
Rated Assembly Inspection Partial 7/19/2024 7/19/2024 04/02/2024
FIRST FLOOR
Corrective Action Required
04/02/2024
-Shaft layer at 2nd floor in AHU 1E-233
In-wall Inspection Partial 4/2/2024 4/2/2024 04/02/2024
FIRST FLOOR
Corrective Action Required
03/14/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs
SECOND FLOOR
Informational
03/14/2024
*EXISTING SIDE; -2E419 electrical room ok to 1 side
THIRD FLOOR
Corrective Action Required
03/14/2024
Rated Assembly Inspection Failed 4/3/2024 4/3/2024 04/03/2024
FIRST FLOOR
Corrective Action Required
04/02/2024
-Shaft layer at 2nd floor in AHU 1E-233 **First layer at 233-install screws as specified in UL details
Rated Assembly Inspection Partial 4/4/2024 4/4/2024 04/04/2024
FIRST FLOOR
Corrective Action Required
04/03/2024
-Shaft layer, 1st layer at 2nd floor separation in AHU 1E-233
In-wall Inspection Failed 4/5/2024 4/5/2024 04/05/2024
FIRST FLOOR
Corrective Action Required
04/02/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs In-wall inspected: rm 1E-103-109; 1E-111-117;1E-122; 1E-124-138; 1E-146-148; corr 1E-100A/C/G. Protected PVC within 1.25" of track surface
SECOND FLOOR
Informational
04/02/2024
*EXISTING SIDE; -2E419 electrical room ok to 1 side
THIRD FLOOR
Corrective Action Required
04/02/2024
Rated Assembly Inspection Partial 4/5/2024 4/5/2024 04/05/2024
FIRST FLOOR
Corrective Action Required
04/04/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233
Site Visit Partial 4/12/2024 4/12/2024 04/12/2024
Misc
Informational
03/06/2024
8-25 A.A site visit . no activity 8-28-23 A.A no activity 9-27-23 A.A, MMC doing dirt work
Misc
Informational
03/06/2024
Not performing working on related. 12/15/23 Friday JMJ No activity on related work. 01/22/24 Monday JMJ No work on site. 03/06/24 Wednesday JMJ No activity on related work. 04/12/24 Friday JMJ Contractor worked hospital annex building, but not on related work today.
In-wall Inspection Partial 4/17/2024 4/17/2024 04/17/2024
FIRST FLOOR
Corrective Action Required
04/05/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs In-wall inspected: rm 1E-103-109; 1E-111-117;1E-122; 1E-124-138; 1E-146-148; corr 1E-100A/C/G. Protected PVC within 1.25" of track surface
SECOND FLOOR
Informational
04/05/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side
THIRD FLOOR
Corrective Action Required
04/05/2024
In-wall Inspection Partial 4/22/2024 4/22/2024 04/22/2024
FIRST FLOOR
Corrective Action Required
04/17/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs In-wall inspected: rm 1E-103-109; 1E-111-148; E1-156; corr 1E-100A/C/D/G
SECOND FLOOR
Informational
04/17/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side
THIRD FLOOR
Corrective Action Required
04/17/2024
Underslab Plumbing Inspection - Commercial Partial 4/29/2024 4/29/2024 04/29/2024
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/14/2024
*1st Floor addition complete *1sr Floor existing; 1E-313-314, 1E-182
In-wall Inspection Partial 4/29/2024 4/29/2024 04/29/2024
FIRST FLOOR
Corrective Action Required
04/22/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs In-wall inspected: rm 1E-103-109; 1E-111-148; E1-156; corr 1E-100A/C/D/G, 1E-183-184
SECOND FLOOR
Informational
04/22/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side
THIRD FLOOR
Corrective Action Required
04/22/2024
In-wall Inspection Partial 5/13/2024 5/13/2024 05/13/2024
FIRST FLOOR
Corrective Action Required
04/29/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs In-wall inspected: rm 1E-103-109; 1E-111-148; E1-156; corr 1E-100A/C/D/G, 1E-183-184
SECOND FLOOR
Informational
04/29/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226
THIRD FLOOR
Corrective Action Required
04/29/2024
In-wall Inspection Partial 5/14/2024 5/14/2024 05/14/2024
FIRST FLOOR
Corrective Action Required
05/14/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs In-wall inspected: rm 1E-103-109; 1E-111-149; E1-156; corr 1E-100A/C/D/G, 1E-182-184
SECOND FLOOR
Corrective Action Required
05/14/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226
THIRD FLOOR
Corrective Action Required
05/14/2024
**Addition side: *Ok to top out for MEPs 3E-209A, 3E-209B
Above Ceiling Inspection Partial 7/10/2023 7/29/2024 05/14/2024
FIRST FLOOR
Corrective Action Required
05/14/2024
**Addition side: -Bulkheads ok to cover -Soffits at 1E-120, 1E-101/103
SECOND FLOOR
Corrective Action Required
05/14/2024
THIRD FLOOR
Corrective Action Required
05/14/2024
In-wall Inspection Partial 5/20/2024 5/20/2024 05/20/2024
FIRST FLOOR
Corrective Action Required
05/14/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side 1E-103-109; 1E-111-149; E1-156; corr 1E-100A/C/D/G, 1E-182-184
SECOND FLOOR
Corrective Action Required
05/14/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226
THIRD FLOOR
Corrective Action Required
05/14/2024
**Addition side: *Ok to top out for MEPs 3E-209A, 3E-209B
In-wall Inspection Partial 5/30/2024 5/30/2024 05/30/2024
FIRST FLOOR
Corrective Action Required
05/20/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side -Complete
SECOND FLOOR
Corrective Action Required
05/20/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226
THIRD FLOOR
Corrective Action Required
05/20/2024
**Addition side: *Ok to top out for MEPs 3E-209A, 3E-209B
In-wall Inspection Partial 6/7/2024 6/7/2024 06/07/2024
FIRST FLOOR
Corrective Action Required
05/30/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
05/30/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226
THIRD FLOOR
Corrective Action Required
05/30/2024
**Addition side: *Ok to top out for MEPs 3E-209A, 3E-209B
Above Ceiling Inspection Partial 6/10/2024 06/10/2024
FIRST FLOOR
Corrective Action Required
05/14/2024
**Addition side: -Bulkheads ok to cover -Soffits at 1E-120, 1E-101/103 -Approved between grid lines EE-JJ and 2.7-6
SECOND FLOOR
Corrective Action Required
05/14/2024
THIRD FLOOR
Corrective Action Required
05/14/2024
In-wall Inspection Partial 6/10/2024 06/11/2024
FIRST FLOOR
Corrective Action Required
06/07/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
06/07/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226
THIRD FLOOR
Corrective Action Required
06/07/2024
**Addition side: *Ok to top out for MEPs 3E-209A, 3E-209B 3E-311-323, 350-369, 3E-252-255, 3E257-261
In-wall Inspection Partial 6/24/2024 06/11/2024
FIRST FLOOR
Corrective Action Required
06/10/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
06/10/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226
THIRD FLOOR
Corrective Action Required
06/10/2024
**Addition side: *Ok to top out for MEPs 3E-209A, 3E-209B, 3E-311 to 3E-323, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261
Rated Assembly Inspection Failed 6/13/2024 6/13/2024 06/13/2024
FIRST FLOOR
Corrective Action Required
04/05/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer mech chase outside of AHU 1E-233 ***1st layer at mech chase provide proper screw pattern
Rated Assembly Inspection Partial 6/14/2024 6/14/2024 06/14/2024
FIRST FLOOR
Informational
06/14/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st layer at mech chase outside of AHU 1E-233
Rated Assembly Inspection Partial 6/19/2024 6/19/2024 06/19/2024
FIRST FLOOR
Informational
06/14/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st and 2nd layer at mech chase outside of AHU 1E-233
Above Ceiling Inspection Partial 6/24/2024 6/24/2024 06/24/2024
FIRST FLOOR
Corrective Action Required
06/10/2024
**Addition side: -Bulkheads ok to cover -Soffits at 1E-120, 1E-101/103 -Approved between grid lines EE-JJ and 2.7-6
SECOND FLOOR
Corrective Action Required
06/10/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors
THIRD FLOOR
Corrective Action Required
06/10/2024
In-wall Inspection Partial 6/24/2024 06/24/2024
FIRST FLOOR
Corrective Action Required
06/11/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
06/11/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226 *6/24-Area colored blue, except 2E-231A, 2E-204&205
THIRD FLOOR
Corrective Action Required
06/11/2024
**Addition side: *Ok to top out for MEPs 3E-209A, 3E-209B, 3E-311 to 3E-323, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261 *6/24-Area colored blue, except restrooms. Need backings for grab bars
Above Ceiling Inspection Failed 6/27/2024 6/27/2024 06/27/2024
FIRST FLOOR
Corrective Action Required
06/24/2024
**Addition side: -Bulkheads ok to cover -Soffits at 1E-120, 1E-101/103 -Approved between grid lines EE-JJ and 2.7-6 *Watiing/ lobby area -complete hvac at entry, complete dwv to second floor, open fire alarm box *Data room -complete hvac and sprinklers *143 -not complete *182 -Open j box, seal and label firewall, install fire damper at through penetration *Corridor 100G -Seal penetrations and label smoke wall *145-148 -Secure 2x4 lights at opposite corners, label fire wall *Corridor 100I -Complete HVAC *155 -Seall penetrations and label firewall *AHU -Address duct penetration/ complete firewall
SECOND FLOOR
Corrective Action Required
06/24/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors
THIRD FLOOR
Corrective Action Required
06/24/2024
In-wall Inspection Failed 7/1/2024 07/01/2024
FIRST FLOOR
Corrective Action Required
06/24/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
06/24/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226 -2E-200A-203;206-209;217-218;227-230;232-233, except 2E-231A, 2E-204&205
THIRD FLOOR
Corrective Action Required
06/24/2024
**Addition side: *Ok to top out for MEPs 3E-209A, 3E-209B, 3E-311 to 3E-323, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261 -Rectangular area covered from point JJ/0.1 to FF.8/4.5, except restrooms. Install backings for grab bars
Above Ceiling Inspection Partial 7/1/2024 07/01/2024
FIRST FLOOR
Corrective Action Required
06/27/2024
*****AREAS APPROVED TO COVER: **Addition side: *Bulkheads ok to cover *Soffits at 1E-120, 1E-101/103 *1E104-108, 112-115, 122-135, 139A-142, 145-148, Corridor 1E-100D,100I, and 100F 6/28/24 *Watiing/ lobby area -complete hvac at entry, complete dwv to second floor *Data room -complete hvac and sprinklers *143 -not complete *182 -seal and label firewall, seal penetrations *Corridor 100G -Seal penetrations and label fire wall *155 -label firewall *AHU -Address duct penetration/ complete firewall
SECOND FLOOR
Corrective Action Required
06/27/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors
THIRD FLOOR
Corrective Action Required
06/27/2024
In-wall Inspection Partial 7/2/2024 7/2/2024 07/02/2024
FIRST FLOOR
Corrective Action Required
07/01/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
07/01/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226 -2E-200A-203;206-209;217-218;227-230;232-233, except 2E-231A, 2E-204&205
THIRD FLOOR
Corrective Action Required
07/01/2024
**Addition side: *Ok to top out for MEPs 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261 -Rectangular area covered from point JJ/0.1 to FF.8/4.5
Above Ceiling Inspection Partial 7/2/2024 07/02/2024
FIRST FLOOR
Corrective Action Required
07/01/2024
*****AREAS APPROVED TO COVER: **Addition side: *Bulkheads ok to cover *Soffits at 1E-120, 1E-101/103 *1E104-108, 112-115, 122-135, 139A-142, 145-148, Corridor 1E-100D,100I, and 100F 6/28/24 *Watiing/ lobby area -complete hvac at entry, complete dwv to second floor *Data room -complete hvac and sprinklers *143 -not complete *182 -seal and label firewall, seal penetrations *Corridor 100N -Seal penetrations and label fire wall *155 -label firewall *AHU -Address duct penetration/ complete firewall
SECOND FLOOR
Corrective Action Required
07/01/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors
THIRD FLOOR
Corrective Action Required
07/01/2024
Above Ceiling Inspection Partial 7/8/2024 7/8/2024 07/08/2024
FIRST FLOOR
Corrective Action Required
07/02/2024
*****AREAS APPROVED TO COVER: **Addition side: *Bulkheads ok to cover *Soffits at 1E-120, 1E-101/103 *1E104-108, 112-115, 122-135, 139A-142, 145-148, Corridor 1E-100D,100I, and 100F 6/28/24 *Watiing/ lobby area -complete hvac at entry, complete dwv to second floor *Data room -complete hvac and sprinklers *143 -not complete *182 -seal and label firewall, seal penetrations *Corridor 100N -Seal penetrations and label fire wall *155 -label firewall *AHU -Address duct penetration/ complete firewall
SECOND FLOOR
Corrective Action Required
07/02/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors
THIRD FLOOR
Corrective Action Required
07/02/2024
In-wall Inspection Partial 7/8/2024 07/08/2024
FIRST FLOOR
Corrective Action Required
07/02/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
07/02/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226 -2E-200A-203;206-209;217-218;227-230;232-233, except 2E-231A, 2E-204&205
THIRD FLOOR
Corrective Action Required
07/02/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261 -Rectangular area covered from point JJ/0.1 to FF.8/4.5
In-wall Inspection Partial 7/9/2024 7/9/2024 07/09/2024
FIRST FLOOR
Corrective Action Required
07/08/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
07/08/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226 -2E-200A-203;206-209;217-218;227-230;232-233, except 2E-231A, 2E-204&205
THIRD FLOOR
Corrective Action Required
07/08/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230 -Rectangular area covered from point JJ/0.1 to FF.8/4.5
Rated Assembly Inspection Failed 7/11/2024 07/11/2024
FIRST FLOOR
Informational
06/19/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st and 2nd layer at mech chase outside of AHU 1E-233
Misc
Corrective Action Required
07/11/2024
3e-322,323,264,264: -COMPLETE SCREW PATTERN AND DRYWALL INSTALLATION, SEAL PENETRATIONS
Rated Assembly Inspection Partial 7/19/2024 7/19/2024 07/19/2024
FIRST FLOOR
Informational
07/11/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st and 2nd layer at mech chase outside of AHU 1E-233
Misc
Corrective Action Required
07/11/2024
3e-322,323,264,264: -COMPLETE SCREW PATTERN AND DRYWALL INSTALLATION, SEAL PENETRATIONS
SECOND FLOOR
Corrective Action Required
07/19/2024
THIRD FLOOR
Corrective Action Required
07/19/2024
-Shaft layer at 3E-303
Rated Assembly Inspection Failed 7/23/2024 07/23/2024
FIRST FLOOR
Informational
07/19/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st and 2nd layer at mech chase outside of AHU 1E-233
Misc
Corrective Action Required
07/19/2024
3e-322,323,264,264: -COMPLETE SCREW PATTERN AND DRYWALL INSTALLATION, SEAL PENETRATIONS
SECOND FLOOR
Corrective Action Required
07/19/2024
THIRD FLOOR
Corrective Action Required
07/19/2024
-Shaft layer at 3E-303
Miscellaneous Inspection Failed 7/24/2024 07/24/2024
Misc
Corrective Action Required
07/24/2024
-Pre final inspection for 1st floor addition: -Complete Above Ceiling inspection items -Complete rated assembly at Soil room and mechanical room -All toilets to be 16-18" from side wall -All sinks to be max 34" to top of sink -Unable to test GFCIs throughout -Install all plumbing protection at sinks -Sidewall grab bars to be spaced max 12" from back wall -Install backwall grab bars per plan -Open all electrical panels for inspection, label all panels *Not a complete inspection
In-wall Inspection Partial 7/24/2024 7/24/2024 07/24/2024
FIRST FLOOR
Corrective Action Required
07/09/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
07/09/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226 -2E-200A-203;206-209;217-218;227-230;232-233, except 2E-231A, 2E-204&205
THIRD FLOOR
Corrective Action Required
07/09/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308 -Rectangular area covered from point JJ/0.1 to FF.8/4.5
In-wall Inspection Partial 7/29/2024 7/29/2024 07/29/2024
FIRST FLOOR
Corrective Action Required
07/24/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
07/24/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226 -2E-200A-203;206-209;217-218;227-230;232-233, except 2E-231A, 2E-204&205
THIRD FLOOR
Corrective Action Required
07/24/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250
Above Ceiling Inspection Partial 7/29/2024 7/29/2024 07/29/2024
FIRST FLOOR
Corrective Action Required
07/08/2024
*****AREAS APPROVED TO COVER: Complete except as noted: 6/28/24 *Watiing/ lobby area -complete dwv to second floor *Corridor 100N -Seal penetrations and label fire wall *AHU -Address duct penetration/ complete firewall
SECOND FLOOR
Corrective Action Required
07/08/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors
THIRD FLOOR
Corrective Action Required
07/08/2024
*****AREAS APPROVED TO COVER: Soffits at 3E-355, 346, 338
Rated Assembly Inspection Partial 7/29/2024 7/29/2024 07/29/2024
FIRST FLOOR
Informational
07/23/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st and 2nd layer at mech chase outside of AHU 1E-233
Misc
Corrective Action Required
07/23/2024
3e-322,323,264,264: -COMPLETE SCREW PATTERN AND DRYWALL INSTALLATION, SEAL PENETRATIONS
SECOND FLOOR
Corrective Action Required
07/23/2024
THIRD FLOOR
Corrective Action Required
07/23/2024
-Shaft layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263
Sprinkler - Hydrostatic Test Passed 07/30/2024
Underground Electrical Inspection - Commercial Partial 7/30/2024 07/30/2024
Misc
Corrective Action Required
07/30/2024
Partial conduit for communication and light poles from NE corner of additon about 50' to vault.
Miscellaneous Inspection Partial 7/31/2024 07/31/2024
Misc
Corrective Action Required
07/30/2024
-Pre final inspection for 1st floor addition: -Complete Above Ceiling inspection items -Complete rated assembly at Soil room and mechanical room -All toilets to be 16-18" from side wall -Unable to test GFCIs throughout -Sidewall grab bars to be spaced max 12" from back wall -Install backwall grab bars per plan -Open all electrical panels for inspection, label all panels -Complete sidewalks and exterior door landings *Not a complete inspection ****OK FOR FURNITURE AND EQUIPMENT SET UP AT 1ST FLOOR ADDITION ONLY
Rated Assembly Inspection Partial 8/2/2024 8/2/2024 08/02/2024
FIRST FLOOR
Corrective Action Required
08/02/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st and 2nd layer at mech chase outside of AHU 1E-233 **COMPLETE RATED SSEMBLY AT SOILS AND MECH ROOMS
Misc
Resolved
08/02/2024
3e-322,323,264,264: -COMPLETE SCREW PATTERN AND DRYWALL INSTALLATION, SEAL PENETRATIONS
SECOND FLOOR
Corrective Action Required
07/29/2024
THIRD FLOOR
Corrective Action Required
07/29/2024
-Shaft and 1st layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263
Rated Assembly Inspection Partial 8/6/2024 8/6/2024 08/06/2024
FIRST FLOOR
Corrective Action Required
08/02/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st and 2nd layer at mech chase outside of AHU 1E-233 **COMPLETE RATED SSEMBLY AT SOILS AND MECH ROOMS
SECOND FLOOR
Corrective Action Required
08/02/2024
THIRD FLOOR
Corrective Action Required
08/02/2024
-Shaft and 1st adn 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263
Sidewalk Inspection Partial 8/6/2024 8/6/2024 08/06/2024
Misc
Informational
08/06/2024
08/06/24 Tuesday JMJ Sidewalk were installed on the Northeast side of newly built hospital wing. Approximately 150' of sidewalk was poured today.
Rated Assembly Inspection Partial 8/7/2024 8/7/2024 08/07/2024
FIRST FLOOR
Corrective Action Required
08/06/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st and 2nd layer at mech chase outside of AHU 1E-233 **COMPLETE RATED SSEMBLY AT SOILS AND MECH ROOMS -Shaft layer at mechanical room duct penetration
SECOND FLOOR
Corrective Action Required
08/06/2024
THIRD FLOOR
Corrective Action Required
08/06/2024
-Shaft and 1st adn 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263
Pavement-Curb Construction Partial 8/7/2024 8/7/2024 08/07/2024
Misc
Informational
11/14/2023
10/27/23 Friday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Contractor continues to set forms for curbs. Do to extend inclement weather proof roll will be needed before curb pours resume. 11/02/23 Thursday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Contractor poured curbs yesterday approximately 14 yards and contractor cover curb with blankets. 11/14/23 Tuesday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Contractor poured curbs around reconstructed private street on the Northwest side on going constructed building yesterday. 08/07/24 Wednesday JMJ Contractor poured 21yards of curbs, sidewalks, & stoops Northside of heading Southeast around building.
Occupancy Inspection - Fire Partial 7/31/2024 08/07/2024
Pavement-Stabilized Subgrade Partial 8/9/2024 8/9/2024 08/09/2024
Misc
Informational
08/09/2024
08/09/24 Friday Geogrid was partial installed for the reconstruction on new parking lot.
Occupancy Inspection - Planning Failed 8/12/2024 8/12/2024 at 8:11 AM 08/12/2024
Corrective Action Required
08/12/2024
Parking lot construction not completed.
Occupancy Inspection - Engineering Failed 8/12/2024 8/12/2024 08/12/2024
Misc
Corrective Action Required
08/12/2024
8-12-24 RH. Contractor is still working on the drive lane and sidewalks in the front of the building expansion. Work is not complete. Punchlist to receive TCO: 1) Pavement 2) Curb 3) Sidewalk 4) Cleanup Site
In-wall Inspection Failed 8/12/2024 08/12/2024
FIRST FLOOR
Corrective Action Required
07/29/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
07/29/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226 -2E-200A-203;206-209;217-218;227-230;232-233, except 2E-231A, 2E-204&205
THIRD FLOOR
Corrective Action Required
07/29/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250
Occupancy Inspection - Codes Commercial Failed 8/12/2024 8/12/2024 08/12/2024
Misc
Corrective Action Required
08/12/2024
Partial occupancy for ASC Expansion at 1st floor: -Submit final 3rd party inpsecion report -Complete fire rated assemblies at AHU and Soils room -Complete corrections for all other departments -Install all exterior lighting at North exit -Submit phasing and Egress plans to City PM for review by all departments **OK TO STOCK AND FURNISH
Above Ceiling Inspection Partial 8/12/2024 08/12/2024
FIRST FLOOR
Corrective Action Required
07/29/2024
*****AREAS APPROVED TO COVER: Complete except as noted: *AHU -Address duct penetration/ complete firewall
SECOND FLOOR
Corrective Action Required
07/29/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors **Complete except as noted below: -Team Center 2E-330, Staff Lounge 2E-232, Staff TLT 2E-231A, Elevator Lobby
THIRD FLOOR
Corrective Action Required
07/29/2024
*****AREAS APPROVED TO COVER: Soffits at 3E-355, 346, 338
Above Ceiling Inspection Partial 8/12/2024 8/12/2024 08/12/2024
FIRST FLOOR
Corrective Action Required
08/12/2024
*****AREAS APPROVED TO COVER: Complete except as noted: *AHU -Address duct penetration/ complete firewall
SECOND FLOOR
Corrective Action Required
08/12/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors **Complete except as noted below: -Vestiblue 2E-109, 2E-330, 2E-105, HVAC Chase
THIRD FLOOR
Corrective Action Required
08/12/2024
*****AREAS APPROVED TO COVER: Soffits at 3E-355, 346, 338
Occupancy Inspection - Fire Partial 8/12/2024 8/12/2024 08/12/2024
Above Ceiling Inspection Partial 8/14/2024 8/14/2024 08/12/2024
FIRST FLOOR
Corrective Action Required
08/12/2024
*****AREAS APPROVED TO COVER: Complete except as noted: *AHU -Address duct penetration/ complete firewall
SECOND FLOOR
Corrective Action Required
08/12/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors **Complete except as noted below: -Team Center 2E-330, Staff Lounge 2E-232, Staff TLT 2E-231A, Elevator Lobby
THIRD FLOOR
Corrective Action Required
08/12/2024
*****AREAS APPROVED TO COVER: Soffits at 3E-355, 346, 338
In-wall Inspection Partial 8/14/2024 8/14/2024 08/14/2024
FIRST FLOOR
Corrective Action Required
08/12/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
08/12/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226 -2E-200A-203;206-209;217-218;227-230;232-233, except 2E-231A, 2E-204&205
THIRD FLOOR
Corrective Action Required
08/12/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok to cover -Elevator walls:-Seal penetrations
Above Ceiling Inspection Failed 8/14/2024 08/14/2024
FIRST FLOOR
Corrective Action Required
08/12/2024
*****AREAS APPROVED TO COVER: Additon complete except as noted: *AHU -Address duct penetration/ complete firewall **Existing side: 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
08/12/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors **Complete except as noted below: -Team Center 2E-330, Staff Lounge 2E-232, Staff TLT 2E-231A, Elevator Lobby
THIRD FLOOR
Corrective Action Required
08/12/2024
*****AREAS APPROVED TO COVER: Soffits at 3E-355, 346, 338
Sidewalk Inspection Partial 8/15/2024 8/15/2024 08/15/2024
Misc
Informational
08/06/2024
08/06/24 Tuesday JMJ Sidewalk were installed on the Northeast side of newly built hospital wing. Approximately 150' of sidewalk was poured today. 08/09/24 Friday JMJ Contractor poured 16 cubic yards for sidewalks and stoops. 08/12/24 Monday JMJ The contractor poured 17 cubic yards for sidewalks and curbs. 08/15/24 Thursday JMJ The contractor poured concrete pad on the Eastside of newly built hospital wing.
Pavement-Proof Roll Partial 8/19/2024 8/19/2024 08/19/2024
Misc
Informational
11/02/2023
11/02/23 Thursday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Proof roll was passed by third party Alpha-Omega Testing on 10/31/233 Monday (after weekend rains). Field Engineering Inspector was not present when inspection was performed. Contractor is trying to finish parking lot. 08/19/24 Monday JMJ ( General Contractor, Mc Carthy ) Proof roll passed, no third party inspector was on site.
In-wall Inspection Partial 8/20/2024 8/20/2024 08/20/2024
FIRST FLOOR
Corrective Action Required
08/14/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
08/14/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226 -2E-200A-203;206-209;217-218;227-230;232-233, except 2E-231A, 2E-204&205
THIRD FLOOR
Corrective Action Required
08/14/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok to cover -Elevator walls:-Seal penetrations -North stairwell walls ok
Above Ceiling Inspection Partial 8/20/2024 08/20/2024
FIRST FLOOR
Corrective Action Required
08/14/2024
*****AREAS APPROVED TO COVER: Additon complete except as noted: *AHU -Address duct penetration/ complete firewall **Existing side: 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
08/14/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors **Complete except as noted below: -Team Center 2E-330, Staff Lounge 2E-232, Staff TLT 2E-231A, Elevator Lobby
THIRD FLOOR
Corrective Action Required
08/14/2024
*****AREAS APPROVED TO COVER: Soffits at 3E-355, 346, 338, 241, 244, 306
Underground Electrical Inspection - Commercial Partial 10/31/2023 8/21/2024 08/21/2024
Misc
Informational
10/17/2023
**North lot: Conduit for (6) of (6) light poles at East side of North lot, (7) of (7) in West side of north lot **Exterior of addition: -Conduit from existing to NE corner of building pad for future comms -Conduit from vault to light (2) poles at new N parking
Piers/Caissons Inspection - Commercial Failed 8/21/2024 08/21/2024
Misc
Informational
08/21/2024
*(13) of (13) piers for light pole bases in North parking lot addition
Miscellaneous Correction
Corrective Action Required
08/21/2024
*(2) piers for light poles at new North addition lot -Piers to be min 5' below grade per detail. -Support rebar min 3" from earth
Above Ceiling Inspection Partial 8/21/2024 8/21/2024 08/21/2024
FIRST FLOOR
Corrective Action Required
08/20/2024
*****AREAS APPROVED TO COVER: Additon complete except as noted: *AHU -Address duct penetration/ complete firewall **Existing side: 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
08/20/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors **Addition Complete except as noted below: -Elevator Lobby
THIRD FLOOR
Corrective Action Required
08/20/2024
*****AREAS APPROVED TO COVER: Soffits at 3E-355, 346, 338, 241, 244, 306
Sidewalk Inspection Partial 8/22/2024 8/22/2024 08/22/2024
Misc
Informational
08/15/2024
08/06/24 Tuesday JMJ Sidewalk were installed on the Northeast side of newly built hospital wing. Approximately 150' of sidewalk was poured today. 08/09/24 Friday JMJ Contractor poured 16 cubic yards for sidewalks and stoops. 08/12/24 Monday JMJ The contractor poured 17 cubic yards for sidewalks and curbs. 08/15/24 Thursday JMJ The contractor poured concrete pad on the Eastside of newly built hospital wing. 08/22/24 Thursday JMJ The contractor poured 27cy of concrete for the sidewalk on the Southeast side of newly built hospital wing.
Above Ceiling Inspection Partial 8/22/2024 8/22/2024 08/22/2024
FIRST FLOOR
Corrective Action Required
08/21/2024
*****AREAS APPROVED TO COVER: Additon complete except as noted: *AHU -Address duct penetration/ complete firewall **Existing side: 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
08/21/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors **Addition Complete except as noted below: -Elevator Lobby
THIRD FLOOR
Corrective Action Required
08/21/2024
*****AREAS APPROVED TO COVER: Soffits at 3E-355, 346, 338, 241, 244, 306
Pavement-Surface Partial 8/23/2024 8/23/2024 08/23/2024
Misc
Informational
12/07/2023
05/30/23 Tuesday JMJ ( Bradley Construction - Mike, Bushey Concrete ) Contractor started pouring concrete @ 5:30AM for parking lot / driveway area on the Eastside of project. Contractor graded gravel for the concrete pour to the Southside of project.
Misc
Informational
12/07/2023
11/20/23 Monday JMJ ( Hanrahan Asphalt Pavement ) Contractor laid surface APWA Type 3 asphalted on Thursday 11/16/23. The Northwest parking lot was not completed because asphalt paving equipment. It will be completed at a later date. 12/07/23 Thursday JMJ ( Hanrahan Asphalt Pavement ) Contractor schedule to complete surface asphalt on the Northwest parking lot today.
Misc
Informational
08/23/2024
08/23/24 Friday JMJ Contractor poured 31cy of yesterday for the drive lane that runs Southeast of the newly constructed hospital wing.
Occupancy Inspection - Planning Temporary C of O 8/26/2024 8/26/2024 08/26/2024
Misc
Corrective Action Required
08/26/2024
Complete landscaping per approved plan.
Misc
Corrective Action Required
08/26/2024
Complete all parking lot improvements per approved plan.
Occupancy Inspection - Codes Commercial Failed 8/26/2024 8/26/2024 08/26/2024
Misc
Corrective Action Required
08/12/2024
Partial occupancy for ASC Expansion at 1st floor: -Submit final 3rd party inpsecion report -Complete fire rated assemblies at AHU and Soils room -Complete corrections for all other departments -Install all exterior lighting at North exit -Submit phasing and Egress plans to City PM for review by all departments **OK TO STOCK AND FURNISH
Misc
Corrective Action Required
08/26/2024
Partial occupancy for existing side recieving area 1E-313-315 and corridor 300C: -Seal above ceiling penetrations at 300c, 313, 314 -Provide GFCI protection at 313 within 6' of water
Pavement-Curb Construction Partial 8/27/2024 8/27/2024 08/27/2024
Misc
Informational
08/07/2024
10/27/23 Friday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Contractor continues to set forms for curbs. Do to extend inclement weather proof roll will be needed before curb pours resume. 11/02/23 Thursday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Contractor poured curbs yesterday approximately 14 yards and contractor cover curb with blankets. 11/14/23 Tuesday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Contractor poured curbs around reconstructed private street on the Northwest side on going constructed building yesterday. 08/07/24 Wednesday JMJ Contractor poured 21yards of curbs, sidewalks, & stoops Northside of heading Southeast around building. 08/27/24 Tuesday JMJ ( General Contractor- Mc Carthy & Sub George Shaw Concrete) Inspecting the aggregate for curbs. Contractor are schedule to pour curbs at on Southside of building at 10:00AM.
Pavement-Surface Partial 8/23/2024 8/23/2024 08/27/2024
Misc
Informational
08/23/2024
05/30/23 Tuesday JMJ ( Bradley Construction - Mike, Bushey Concrete ) Contractor started pouring concrete @ 5:30AM for parking lot / driveway area on the Eastside of project. Contractor graded gravel for the concrete pour to the Southside of project.
Misc
Informational
08/23/2024
11/20/23 Monday JMJ ( Hanrahan Asphalt Pavement ) Contractor laid surface APWA Type 3 asphalted on Thursday 11/16/23. The Northwest parking lot was not completed because asphalt paving equipment. It will be completed at a later date. 12/07/23 Thursday JMJ ( Hanrahan Asphalt Pavement ) Contractor schedule to complete surface asphalt on the Northwest parking lot today.
Misc
Informational
08/23/2024
08/23/24 Friday JMJ Contractor poured 31cy of yesterday for the drive lane that runs Southeast of the newly constructed hospital wing. Contractor finished pouring drive lane today. 08/27/24 Tuesday JMJ (Sub George Shaw Contractor) Contractor plan to pour concrete two inch from the top then use asphalt to complete driveway.
Occupancy Inspection - Fire Partial 8/26/2024 8/26/2024 08/27/2024
Rated Assembly Inspection Partial 8/27/2024 08/27/2024
FIRST FLOOR
Corrective Action Required
08/07/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st and 2nd layer at mech chase outside of AHU 1E-233 **COMPLETE RATED SSEMBLY AT SOILS AND MECH ROOMS -Shaft layer at mechanical room duct penetration
SECOND FLOOR
Corrective Action Required
08/07/2024
THIRD FLOOR
Corrective Action Required
08/07/2024
-Shaft and 1st adn 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263 -Shaft and 1st layer at South Elevator
In-wall Inspection Partial 8/27/2024 08/27/2024
FIRST FLOOR
Corrective Action Required
08/20/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
08/20/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -2E 307-314, 2E 321-328, 2E 108-110, 2E 210-216, 2E 219-221, 2E 224-226 -2E-200A-203;206-209;217-218;227-230;232-233, except 2E-231A, 2E-204&205
THIRD FLOOR
Corrective Action Required
08/20/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok to cover -Elevator walls:-Seal penetrations -North stairwell walls ok
Piers/Caissons Inspection - Commercial Passed 8/27/2024 08/27/2024
Misc
Informational
08/21/2024
*(13) of (13) piers for light pole bases in North parking lot addition (2) light pole bases at addition entry
Miscellaneous Correction
Resolved
08/27/2024
*(2) piers for light poles at new North addition lot -Piers to be min 5' below grade per detail. -Support rebar min 3" from earth
Occupancy Inspection - Codes Commercial Failed 8/27/2024 8/27/2024 08/27/2024
Misc
Corrective Action Required
08/26/2024
Partial occupancy for ASC Expansion at 1st floor: -Submit final 3rd party inpsecion report -Complete fire rated assemblies at AHU and Soils room -Complete corrections for all other departments -Install all exterior lighting at North exit -Submit phasing and Egress plans to City PM for review by all departments **OK TO STOCK AND FURNISH
Misc
Informational
08/27/2024
Partial occupancy for existing side renovations: -1E-315c, 1E-314, 1E-313 and corridor 300C approved to occupy
Above Ceiling Inspection Partial 8/27/2024 8/27/2024 08/27/2024
FIRST FLOOR
Corrective Action Required
08/22/2024
*****AREAS APPROVED TO COVER: Additon complete except as noted: *AHU -Address duct penetration/ complete firewall **Existing side: 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
08/22/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors **Addition Complete except as noted below: -Elevator Lobby
THIRD FLOOR
Corrective Action Required
08/22/2024
*****AREAS APPROVED TO COVER: Soffits at 3E-355, 346, 338, 241, 244, 306 UNITS 300A, 304-320, 361-367,335-349 Seal penetrations and label smoke/fire walls at3E-332, 333, 104, Cor 300B, cor-300C, 205, 206, 327, 324,325, 322,323, 321,
Pavement-Curb Construction Partial 8/28/2024 8/28/2024 08/28/2024
Misc
Informational
08/27/2024
10/27/23 Friday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Contractor continues to set forms for curbs. Do to extend inclement weather proof roll will be needed before curb pours resume. 11/02/23 Thursday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Contractor poured curbs yesterday approximately 14 yards and contractor cover curb with blankets. 11/14/23 Tuesday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Contractor poured curbs around reconstructed private street on the Northwest side on going constructed building yesterday. 08/07/24 Wednesday JMJ Contractor poured 21yards of curbs, sidewalks, & stoops Northside of heading Southeast around building. 08/27/24 Tuesday JMJ ( General Contractor- Mc Carthy & Sub George Shaw Concrete) Inspecting the aggregate for curbs. Contractor are schedule to pour curbs at on Southside of building at 10:00AM. 08/28/24 Wednesday JMJ ( General Contractor- Mc Carthy & Sub George Shaw Concrete) Contractor poured curbs that formed into sidewalk on the Southside of the new hospital wing. Also, about 15' plus the through of storm drain was poured yesterday on the Eastside of new hospital wing parking lot.
Sidewalk Inspection Partial 8/28/2024 8/28/2024 08/28/2024
Misc
Informational
08/22/2024
08/06/24 Tuesday JMJ Sidewalk were installed on the Northeast side of newly built hospital wing. Approximately 150' of sidewalk was poured today. 08/09/24 Friday JMJ Contractor poured 16 cubic yards for sidewalks and stoops. 08/12/24 Monday JMJ The contractor poured 17 cubic yards for sidewalks and curbs. 08/15/24 Thursday JMJ The contractor poured concrete pad on the Eastside of newly built hospital wing. 08/22/24 Thursday JMJ The contractor poured 27cy of concrete for the sidewalk on the Southeast side of newly built hospital wing. 08/28/24 Wednesday JMJ ( General Contractor- Mc Carthy & Sub George Shaw Concrete) Contract more than 120' of concrete around the Southeast corner of the hospital new wing.
Rated Assembly Inspection Partial 8/29/2024 8/29/2024 08/29/2024
FIRST FLOOR
Corrective Action Required
08/27/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st and 2nd layer at mech chase outside of AHU 1E-233 **COMPLETE RATED SSEMBLY AT SOILS AND MECH ROOMS -Shaft layer at mechanical room duct penetration
SECOND FLOOR
Corrective Action Required
08/27/2024
THIRD FLOOR
Corrective Action Required
08/27/2024
-Shaft and 1st adn 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263 -Shaft,1st & 2nd layer at South Elevator
Above Ceiling Inspection Failed 9/4/2024 09/04/2024
FIRST FLOOR
Corrective Action Required
08/27/2024
*****AREAS APPROVED TO COVER: Additon complete except as noted: *AHU -Address duct penetration/ complete firewall **Existing side: 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
08/27/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors **Addition Complete except as noted below: -Elevator Lobby
THIRD FLOOR
Corrective Action Required
08/27/2024
*****AREAS APPROVED TO COVER: Soffits at 3E-355, 346, 338, 241, 244, 306 UNITS 300A, 304-320, 361-367,335-349 Seal penetrations and label smoke/fire walls at3E-332, 333, 104, Cor 300B, cor-300C, 205, 206, 327, 324,325, 322,323, 321,
In-wall Inspection Partial 9/4/2024 09/04/2024
FIRST FLOOR
Corrective Action Required
08/27/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
08/27/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -COMPLETE
THIRD FLOOR
Corrective Action Required
08/27/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok cover -Elevator infill walls -North stairwell walls ok
Above Ceiling Inspection Partial 9/5/2024 9/5/2024 09/05/2024
FIRST FLOOR
Corrective Action Required
09/04/2024
*****AREAS APPROVED TO COVER: Additon complete except as noted: *AHU -Address duct penetration/ complete firewall **Existing side: 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
09/04/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors **Addition Complete except as noted below: -Elevator Lobby
THIRD FLOOR
Corrective Action Required
09/04/2024
*****AREAS APPROVED TO COVER: Soffits at 3E-355, 346, 338, 241, 244, 306 UNITS 300A, 304-320, 361-367,335-349 Seal penetrations and label smoke/fire walls at3E-332, 333, 104, Cor 300B, cor-300C, 205, 206, 327, 324,325, 322,323, 321, 263, 264, 265
Above Ceiling Inspection Failed 9/6/2024 9/6/2024 09/06/2024
FIRST FLOOR
Corrective Action Required
09/05/2024
*****AREAS APPROVED TO COVER: Additon complete except as noted: *AHU -Address duct penetration/ complete firewall **Existing side: 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
09/05/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors **Addition Complete except as noted below: -Elevator Lobby
THIRD FLOOR
Corrective Action Required
09/05/2024
*****AREAS APPROVED TO COVER: Soffits at 3E-355, 346, 338, 241, 244, 306 UNITS 300A, 304-320, 361-367,335-349 Seal penetrations and label smoke/fire walls at3E-332, 333, 104, Cor 300B, cor-300C, 205, 206, 327, 324,325, 322,323, 321, 263, 264, 265
Underslab Plumbing Inspection - Commercial Partial 9/9/2024 09/09/2024
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/29/2024
*1st Floor addition complete *1st Floor existing; 1E-313-314, 1E-182, 1E-151, 1E-151A
Rated Assembly Inspection Partial 9/13/2024 9/13/2024 09/09/2024
FIRST FLOOR
Corrective Action Required
08/29/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st and 2nd layer at mech chase outside of AHU 1E-233 **COMPLETE RATED SSEMBLY AT SOILS AND MECH ROOMS -Shaft layer at mechanical room duct penetration
SECOND FLOOR
Corrective Action Required
08/29/2024
-Shaft layer at north elevator
THIRD FLOOR
Corrective Action Required
08/29/2024
-Shaft and 1st adn 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263 -Shaft,1st & 2nd layer at South Elevator -Shaft layer at North elevator
In-wall Inspection Partial 9/9/2024 9/9/2024 09/09/2024
FIRST FLOOR
Corrective Action Required
09/04/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
09/04/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -COMPLETE
THIRD FLOOR
Corrective Action Required
09/04/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok cover -Elevator infill walls -North stairwell walls ok
Above Ceiling Inspection Partial 9/9/2024 09/09/2024
FIRST FLOOR
Corrective Action Required
09/06/2024
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Additon complete except as noted: *AHU -Address duct penetration/ complete firewall **Existing side: 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
09/06/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors **Addition Complete except as noted below:
THIRD FLOOR
Corrective Action Required
09/06/2024
*****AREAS APPROVED TO COVER: Soffits at 3E-355, 346, 338, 241, 244, 306 UNITS 300A, 304-320, 360-367,335-349, 212, 213, 259-261, 246-258, 268-273, 214-219, 222, 224 Seal penetrations and label smoke/fire walls at3E-332, 333, 104, Cor 300B, cor-300C, 205, 206, 327, 324,325, 322,323, 321, 263, 264, 265
Rated Assembly Inspection Partial 9/11/2024 09/11/2024
FIRST FLOOR
Corrective Action Required
09/09/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st and 2nd layer at mech chase outside of AHU 1E-233 **COMPLETE RATED SSEMBLY AT SOILS AND MECH ROOMS -Shaft layer at mechanical room duct penetration
SECOND FLOOR
Corrective Action Required
09/09/2024
-Shaft layer at north elevator -1st layer at north elevator
THIRD FLOOR
Corrective Action Required
09/09/2024
-Shaft and 1st adn 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263 -Shaft,1st & 2nd layer at South Elevator -Shaft layer at North elevator
Rated Assembly Inspection Partial 9/16/2024 9/16/2024 09/16/2024
FIRST FLOOR
Corrective Action Required
09/13/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st and 2nd layer at mech chase outside of AHU 1E-233 **COMPLETE RATED SSEMBLY AT SOILS AND MECH ROOMS -Shaft and 1st layer at mechanical room duct penetration -Shaft layer at North elevator
SECOND FLOOR
Corrective Action Required
09/13/2024
-Shaft layer at north elevator -1st and 2nd layer at north elevator
THIRD FLOOR
Corrective Action Required
09/13/2024
-Shaft and 1st and 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263 -Shaft,1st & 2nd layer at South Elevator -Shaft, 1st layer layer at North elevator
Rated Assembly Inspection Partial 9/17/2024 09/17/2024
FIRST FLOOR
Corrective Action Required
09/16/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st and 2nd layer at mech chase outside of AHU 1E-233 **COMPLETE RATED SSEMBLY AT SOILS AND MECH ROOMS -Shaft and 1st layer at mechanical room duct penetration -Shaft layer at North elevator
SECOND FLOOR
Corrective Action Required
09/16/2024
-Shaft layer at north elevator -1st and 2nd layer at north elevator
THIRD FLOOR
Corrective Action Required
09/16/2024
-Shaft and 1st and 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263 -Shaft,1st & 2nd layer at South Elevator -Shaft, 1st layer layer at North elevator
Underslab Plumbing Inspection - Commercial Partial 9/17/2024 09/17/2024
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
09/09/2024
*1st Floor addition complete *1st Floor existing; 1E-313-314, 1E-182, 1E-151, 1E-151A, 1E 100P, 1E 169, 1E 200D, 1E 201, 1E 207A, 1E 204A, 1E 205A, 1E 206A
Occupancy Inspection - Engineering Not Ready 9/20/2024 9/20/2024 09/18/2024
Misc
Corrective Action Required
08/12/2024
8-12-24 RH. Contractor is still working on the drive lane and sidewalks in the front of the building expansion. Work is not complete. Punchlist to receive TCO: 1) Pavement 2) Curb 3) Sidewalk 4) Cleanup Site 09/18/24 JMJ Punchlist to receive TCO: 1) Pavement 2) Grinding Existing Parking Lot & Paving 3) Vegetation 4) Cleanup Site
Pavement-Proof Roll Partial 9/18/2024 9/18/2024 09/18/2024
Misc
Informational
08/19/2024
11/02/23 Thursday JMJ ( General Contractor, Mc Carthy & Sub Contractor George Shaw Concrete ) Proof roll was passed by third party Alpha-Omega Testing on 10/31/233 Monday (after weekend rains). Field Engineering Inspector was not present when inspection was performed. Contractor is trying to finish parking lot. 08/19/24 Monday JMJ ( General Contractor, Mc Carthy ) Proof roll passed, no third party inspector was on site. 09/18/24 Wednesday JMJ ( General Contractor, Mc Carthy ) Proof roll passed for geo-grid and rock. On the Eastside of the new building expansion.
Above Ceiling Inspection Failed 9/18/2024 9/18/2024 09/18/2024
FIRST FLOOR
Corrective Action Required
09/09/2024
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Additon complete except as noted: *AHU -Address duct penetration/ complete firewall **Existing side: 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
09/09/2024
Above-ceiling OK below: -Soffits in waiting room area and adjacent corridors **Addition Complete except as noted below:
THIRD FLOOR
Corrective Action Required
09/09/2024
*****AREAS APPROVED TO COVER: Soffits at 3E-355, 346, 338, 241, 244, 306 UNITS 300A, 304-320, 360-367,335-349, 212, 213, 259-261, 246-258, 268-273, 214-219, 222, 224 Seal penetrations and label smoke/fire walls at3E-332, 333, 104, Cor 300B, cor-300C, 205, 206, 327, 324,325, 322,323, 321, 263, 264, 265
Rated Assembly Inspection Partial 9/18/2024 09/18/2024
FIRST FLOOR
Corrective Action Required
09/11/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st and 2nd layer at mech chase outside of AHU 1E-233 **COMPLETE RATED SSEMBLY AT SOILS AND MECH ROOMS -Shaft and 1st layer at mechanical room duct penetration -Shaft and 1st layer at North elevator
SECOND FLOOR
Corrective Action Required
09/11/2024
-Shaft layer at north elevator -1st and 2nd layer at north elevator
THIRD FLOOR
Corrective Action Required
09/11/2024
-Shaft and 1st adn 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263 -Shaft,1st & 2nd layer at South Elevator -Shaft layer at North elevator
Underslab Plumbing Inspection - Commercial Partial 9/19/2024 09/19/2024
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
09/17/2024
*1st Floor addition complete *1st Floor existing; 1E-313-314, 1E-182, 1E-151, 1E-151A, 1E 100P, 1E 169, 1E 200D, 1E 201, 1E 207A, 1E 204A, 1E 205A, 1E 206A, 1E 223-225
Rated Assembly Inspection Failed 9/20/2024 9/20/2024 09/20/2024
FIRST FLOOR
Corrective Action Required
09/18/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st and 2nd layer at mech chase outside of AHU 1E-233 **COMPLETE RATED SSEMBLY AT SOILS AND MECH ROOMS -Shaft and 1st layer at mechanical room duct penetration -Shaft layer at North elevator
SECOND FLOOR
Corrective Action Required
09/18/2024
-Shaft layer at north elevator -1st and 2nd layer at north elevator
THIRD FLOOR
Corrective Action Required
09/18/2024
-Shaft and 1st and 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263 -Shaft,1st & 2nd layer at South Elevator -Shaft, 1st layer layer at North elevator
Underslab Plumbing Inspection - Commercial Partial 9/20/2024 9/20/2024 09/20/2024
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
09/19/2024
*1st Floor addition complete *1st Floor existing; 1E-313-314, 1E-182, 1E-151, 1E-151A, 1E 100P, 1E 169, 1E 200D, 1E 201, 1E 207A, 1E 204A, 1E 205A, 1E 206A, 1E 223-225, 1E-119, 1E-220
Pavement-Aggregate Base Passed 9/20/2024 9/20/2024 09/20/2024
Misc
Informational
09/20/2024
09/20/24 Friday JMJ ( Hannrahan Asphalt ) Contractor began laying base asphalt for the new constructed hospital wing's parking lot area.
Pavement-Surface Partial 9/20/2024 9/20/2024 09/20/2024
Misc
Informational
08/27/2024
05/30/23 Tuesday JMJ ( Bradley Construction - Mike, Bushey Concrete ) Contractor started pouring concrete @ 5:30AM for parking lot / driveway area on the Eastside of project. Contractor graded gravel for the concrete pour to the Southside of project.
Misc
Informational
08/27/2024
11/20/23 Monday JMJ ( Hanrahan Asphalt Pavement ) Contractor laid surface APWA Type 3 asphalted on Thursday 11/16/23. The Northwest parking lot was not completed because asphalt paving equipment. It will be completed at a later date. 12/07/23 Thursday JMJ ( Hanrahan Asphalt Pavement ) Contractor schedule to complete surface asphalt on the Northwest parking lot today.
Misc
Informational
08/27/2024
08/23/24 Friday JMJ Contractor poured 31cy of yesterday for the drive lane that runs Southeast of the newly constructed hospital wing. Contractor finished pouring drive lane today. 08/27/24 Tuesday JMJ (Sub George Shaw Contractor) Contractor plan to pour concrete two inch from the top then use asphalt to complete driveway. 09/20/24 Friday JMJ ( Hannrahan Asphalt ) Contractor started laying top surface asphalt on parking lot area that was milled last week. Contractor will lay the surface coat on base asphalt that was laid this morning.
Rated Assembly Inspection Partial 9/23/2024 9/23/2024 09/23/2024
FIRST FLOOR
Corrective Action Required
09/20/2024
-Shaft layer, 1st and 2nd layer at 2nd floor separation in AHU 1E-233 -Shaft layer and 1st and 2nd layer at mech chase outside of AHU 1E-233 **COMPLETE RATED SSEMBLY AT SOILS AND MECH ROOMS -Shaft and 1st layer at mechanical room duct penetration -Shaft, 1at and 2nd layer at North elevator
SECOND FLOOR
Corrective Action Required
09/20/2024
-Shaft layer at north elevator -1st and 2nd layer at north elevator
THIRD FLOOR
Corrective Action Required
09/20/2024
-Shaft and 1st and 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263 -Shaft,1st & 2nd layer at South Elevator -Shaft, 1st and 2nd layer layer at North elevator
Above Ceiling Inspection Failed 9/24/2024 9/24/2024 09/24/2024
FIRST FLOOR
Corrective Action Required
09/18/2024
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Additon complete except as noted: *AHU -Address duct penetration/ complete firewall **Existing side: 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
09/18/2024
Above-ceiling OK below: **Addition Complete
THIRD FLOOR
Corrective Action Required
09/18/2024
*****AREAS APPROVED TO COVER: Soffits at 3E-355, 346, 338, 241, 244, 306 UNITS 300A, 304-320, 360-367,335-349, 212, 213, 259-261, 246-258, 268-273, 214-219, 222, 224 9/24/24 Seal penetrations and label smoke/fire walls at3E-332, 333, 104, Cor 300B, cor-300C, 205, 206, 327, 324,325, 322,323, 321, 263, 264, 265-REMOVE TILE FOR INSPECTION
Miscellaneous Inspection Failed 8/28/2024 8/28/2024 09/24/2024
Misc
Corrective Action Required
08/26/2024
**Pre final inspection for 2nd floor addition: -GFCIs not working in all front bathrooms -322 GFCI not working -202 Tighten loose receptacle -204, 205, 210 not done **SUBMIT FINAL 3rd PARTY INSPECTION REPORT
Above Ceiling Inspection Failed 9/25/2024 9/25/2024 09/25/2024
FIRST FLOOR
Corrective Action Required
09/24/2024
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Additon complete except as noted: *AHU -Address duct penetration/ complete firewall **Existing side: 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
09/24/2024
Above-ceiling OK below: **Addition Complete
THIRD FLOOR
Corrective Action Required
09/24/2024
*****AREAS APPROVED TO COVER: Soffits at 3E-355, 346, 338, 241, 244, 306 UNITS 300A, 304-320, 360-367,335-349, 212, 213, 259-261, 246-258, 268-273, 214-219, 222, 224 9/24/24 Seal penetrations and label smoke/fire walls at3E-332, 333, 104, Cor 300B, cor-300C, 205, 206, 327, 324,325, 322,323, 321, 263, 264, 265-REMOVE TILE FOR INSPECTION
Underslab Plumbing Inspection - Commercial Partial 9/25/2024 9/25/2024 09/25/2024
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
09/20/2024
*1st Floor addition complete *1st Floor existing; 1E-313-314, 1E-182, 1E-151, 1E-151A, 1E 100P, 1E 169, 1E 200D, 1E 201, 1E 207A, 1E 204A, 1E 205A, 1E 206A, 1E 223-225, 1E-119, 1E-220, 1E 205a, 1E 207a, 1E 208a, 1E 209a
Miscellaneous Inspection Partial 9/26/2024 9/26/2024 09/26/2024
Misc
Corrective Action Required
09/25/2024
**Pre final walkthrough for 2nd floor addition: partial final -GFCIs not working in all front bathrooms -322 GFCI not working -202 Tighten loose receptacle -204, 205, 210 not done **SUBMIT FINAL 3rd PARTY INSPECTION REPORT **Pre final walkthrough for 3rd floor addition Women's health suite: partial final 335-Toilet to be 16-18" from side wall to centerline, GFCI not working 302-GFCI not working 303-GFCI not working, update plan to show no ADA compliance for clearance in front of WC 324-GFCI not working -Complete above ceiling inspection at 323, 101B and lobby -Complete elevator -Complete alarm insepction for LSFD -Submit final 3rd party inspection report as previously requested -Install drinking fountain -Submit phasing plan as previously requested -Complete all sinks and missing fixtures
Above Ceiling Inspection Failed 9/26/2024 9/27/2024 09/27/2024
FIRST FLOOR
Corrective Action Required
09/25/2024
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Additon complete except as noted: *AHU -Address duct penetration/ complete firewall **Existing side: 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
09/25/2024
Above-ceiling OK below: **Addition Complete
THIRD FLOOR
Corrective Action Required
09/25/2024
*****AREAS APPROVED TO COVER: Addition completed except at elevator lobby 101b and 323 Seal penetrations and label fire wall at 323 -SEAL PENETRATIONS AND LEAVE TILE OUT FOR INSPECTION OR INSPECTION WILL BE DENIED
Above Ceiling Inspection Partial 9/27/2024 09/27/2024
FIRST FLOOR
Corrective Action Required
09/26/2024
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Additon complete except as noted: *AHU -Address duct penetration/ complete firewall **Existing side: 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
09/26/2024
Above-ceiling OK below: **Addition Complete
THIRD FLOOR
Corrective Action Required
09/26/2024
*****AREAS APPROVED TO COVER: Soffits at 3E-355, 346, 338, 241, 244, 306 UNITS 300A, 304-320, 360-367,335-349, 212, 213, 259-261, 246-258, 268-273, 214-219, 222, 224, 100a 323 -Seal penetrations and REMOVE TILE FOR INSPECTION
Rated Assembly Inspection Partial 9/30/2024 9/30/2024 09/30/2024
FIRST FLOOR
Corrective Action Required
09/23/2024
Addition side complete except at Clean room 1E-169 (Transition to existing for next phase)
SECOND FLOOR
Corrective Action Required
09/23/2024
Addition side complete
THIRD FLOOR
Corrective Action Required
09/23/2024
-Shaft and 1st and 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263 -Shaft,1st & 2nd layer at South Elevator -Shaft, 1st and 2nd layer layer at North elevator
Above Ceiling Inspection Partial 9/30/2024 9/30/2024 09/30/2024
FIRST FLOOR
Corrective Action Required
09/27/2024
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Additon complete except as noted -Clean room at existing tie in 1E 169. Address penetrations and incomplete rated assembly **Existing side: 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
09/27/2024
Above-ceiling OK below: **Addition Complete
THIRD FLOOR
Corrective Action Required
09/27/2024
Areas approved -Addition side complete except as noted: -Remove tile at lobby 101b, label fire walls at elevators and stairwells, remove tile at south elevator
Miscellaneous Inspection Passed 8/8/2023 09/30/2024
Misc
Informational
06/30/2023
05/17/23 Wednesday JMJ ( Rodriguez - Foreman Robert & Site Rite Foreman Derek ) Contractor (Rodriguez) commence working last week on site without notifying inspector (demo as-per plan street). Rodriguez began demo of curb to the parking lot area to install temporary construction entrance. Rodriguez is also hauling soil off site. Inspector reminded Rodriguez to keep a watchful eye on the mud and soil from project tracking over on adjacent streets. Site Rite preparing project site for installation of storm pipe. 05/18/23 Thursday JMJ (The General Contractor McCarthy- Ish, Sub Contractors Rodriguez - Street Foreman Robert & Underground Utilities Foreman Site Rite- Derek ) Rodriguez continues to remove organic soil from site to prepare to fill with proper soil for project site construction. Rodriguez is staging work container at the East end of parking lot near temporary construction entrance. Site Rite unloaded heavy duty metal shoring construction boxes for deep trench excavation. 05/23/23 Tuesday JMJ The General Contractor McCarthy- Ish, Sub Contractors Rodriguez - Street Foreman Robert & Underground Utilities Foreman Site Rite- Derek ) Bobby Richest (BR) watch project Friday and Monday Rodriguez continues to remove soil from site and began hauling acceptable soil for project site. Site Rite manage to set the base of storm box and began back excavation is at least 18' deep in street. 06/01/23 Thursday JMJ ( Rodriguez - Robert ) Continues to demo existing parking lot.
Misc
Informational
06/30/2023
06/02/23 Friday JMJ ( LS City Water Department, GC for Project McCarthy Construction ) Contractor called inspector about water main break on the construction site approximately ten feet from where storm sewer excavation. Inspector called LS Water and supervisor Brent Dye. When arrived to site sub contractor was pushed by GC to isolate water break before inspector was on location. Inspector arrived onsite just a few minutes before LS Water Department. LS Water Dept. took over the site logistic for water main repair and coordination with St Luke's hospital staff. I informed the contractor not to touch LS Water main unless directed by LS Water Department I stress this point several times. 06/05/23 Monday JMJ ( LS City Water Department ) Repaired water break Friday after hours. 06/05/23 Monday JMJ ( Rodriguez - Robert ) Contractor continue to demo and survey existing parking lot. Alpha & Omega Geotech was onsite testing soil compaction. 06/0923 Friday JMJ (Rodriguez) Contractor moved soil from demo parking lot area to proposed parking lot area and general construction duties as needed. 06/30/23 Friday JMJ ( MSE Hardscape ) Contractor continued to unload retaining wall blocks. Contractor plans to start constructing the retaining wall next week. Contacted the GC Mc Carthy Construction about having the third party inspection on retaining wall, and they relayed that Alpha & Omega Geotech was schedule to begin inspection on retaining as it was being built.
Miscellaneous Inspection Partial 2/27/2025 2/27/2025 09/30/2024
Misc
Corrective Action Required
09/30/2024
**Pre final walkthrough for 2nd floor addition: partial final -GFCIs not working in all front bathrooms -322 GFCI not working -202 Tighten loose receptacle -204, 205, 210 not done **Pre final walkthrough for 3rd floor addition Women's health suite: partial final 302-GFCI not working, provide GFCI protection at fridge 303-GFCI not working, update plan to show no ADA compliance for clearance in front of WC 324-GFCI not working -Complete above ceiling inspection at 101B, lobby-Remove tile and label firewalls -Complete elevator -Install drinking fountain-Provide min 27" knee clearance -Submit phasing and egress plan as previously requested -Complete all sinks and missing fixtures -Paint crosswalk to new parking lot
Occupancy Inspection - Engineering Temporary C of O 9/30/2024 09/30/2024
Misc
Corrective Action Required
09/30/2024
9-30-24 JMJ Outstanding items for Certificate of Occupancy. 1) Sodding and Vegetation 2) Site Cleanup
Occupancy Inspection - Engineering Failed 8/26/2024 8/26/2024 09/30/2024
Misc
Corrective Action Required
08/12/2024
8-12-24 RH. Contractor is still working on the drive lane and sidewalks in the front of the building expansion. Work is not complete. Punchlist to receive TCO: 1) Pavement 2) Curb 3) Sidewalk 4) Cleanup Site 09/30/24 JMJ Contractor appears to have completed a sufficient portion of work to pass TCO. Contractor is completing the sodding and vegetation is being planted. The majority of the work is on South & Southeast side of building. Cleanup of site is on going. Parking lots was stripped. All other items will be place on punch list.
Above Ceiling Inspection Partial 10/1/2024 10/1/2024 10/01/2024
FIRST FLOOR
Corrective Action Required
09/30/2024
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Additon complete except as noted -Clean room at existing tie in 1E 169. Address penetrations and incomplete rated assembly **Existing side: 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
09/30/2024
Above-ceiling OK below: **Addition Complete except at existing south stair: label fire wall
THIRD FLOOR
Corrective Action Required
09/30/2024
**Addition complete
Occupancy Inspection - Codes Commercial Failed 10/1/2024 10/1/2024 10/01/2024
Misc
Informational
10/01/2024
Partial occupancy for ASC Expansion: **OK to occupy 1st floor addition side only
Misc
Informational
08/27/2024
Partial occupancy for existing side renovations: -1E-315c, 1E-314, 1E-313 and corridor 300C approved to occupy
Miscellaneous Correction
Corrective Action Required
09/30/2024
10-1-24 **Partial final for 3rd floor addition Women's health suite: -Complete corrections for all other departments 302- provide GFCI protection at fridge and wall adjacent to sink 303-Remove accessible restroom signage -Complete elevator and State Certification-Upload documents to portal -Complete all sinks and missing fixtures -Paint crosswalks to new parking lot -Install 45 min rated fire doors at 332 -Remove unused open wiring from behind backsplashes in 325 and 327 -Complete break room 266 -Clear out and complete egress path at corridor 200J -GFCI not working in restroom 267 -Provide rail or barrier at under stair space less than 80" vertical clearance per A117.1 Sec. 307.4 -Open hand holes in light poles for inspection
Occupancy Inspection - Planning Temporary C of O 10/1/2024 10/1/2024 10/01/2024
Misc
Corrective Action Required
08/26/2024
Complete landscaping per approved plan.
Misc
Corrective Action Required
08/26/2024
Complete all parking lot improvements per approved plan.
Occupancy Inspection - Codes Commercial Failed 10/2/2024 10/02/2024
Misc
Informational
10/01/2024
Partial occupancy for ASC Expansion: **OK to occupy the following areas: -1st floor addition side only to column line BB.5 on A221a of approved plans -3rd floor Women's Health Suite and corridor 1E-200J only, as noted in Blue on Phase map provided on 10/2/24 (See document on Portal) *****2nd Floor not inspected or approved*****
Misc
Informational
10/01/2024
Partial occupancy for existing side renovations: -1E-315c, 1E-314, 1E-313 and corridor 300C approved to occupy
Miscellaneous Correction
Corrective Action Required
10/01/2024
-Provide State Elevator Certification for new East elevator and existing South elevator -Paint crosswalks to new parking lot -Provide documentation for field installed fire rating at doors in Soiled Rm 3E-322 -Provide rail or barrier at under stair space less than 80" vertical clearance per A117.1 Sec. 307.4 at both stairwells -Open hand holes in light poles for inspection -Remove construction water meter at job trailer
Underslab Plumbing Inspection - Commercial Partial 10/3/2024 10/3/2024 10/03/2024
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
09/25/2024
*1st Floor addition complete *1st Floor existing; 1E-313-314, 1E-182, 1E-151, 1E-151A, 1E 100P, 1E 169, 1E 200D, 1E 201, 1E 207A, 1E 204A, 1E 205A, 1E 206A, 1E 223-225, 1E-119, 1E-220, 1E 205a, 1E 207a, 1E 208a, 1E 209a, 1E 228, 1E 230, 1E 250
Underslab Electrical Inspection - Commercial Partial 10/3/2024 10/3/2024 10/03/2024
THE FOLLOWING AREAS ARE APPROVED
Informational
10/03/2024
Existing renovation side: 1E-150
Miscellaneous Inspection Partial 10/3/2024 10/3/2024 10/03/2024
Misc
Corrective Action Required
09/30/2024
**Pre final walkthrough for 2nd floor addition: partial final -Provide min 27" at drinking fountain -204, 205, not done
Occupancy Inspection - Codes Commercial Failed 10/3/2024 10/3/2024 10/03/2024
Misc
Informational
10/02/2024
Partial occupancy for ASC Expansion: **OK to occupy the following areas: -1st floor addition side only to column line BB.5 on A221a of approved plans -2nd floor addition side only to column line BB.5 except as noted in corrections -3rd floor Women's Health Suite and corridor 1E-200J only, as noted in Blue on Phase map provided on 10/2/24 (See document on Portal)
Misc
Informational
10/02/2024
Partial occupancy for existing side renovations: **OK to occupy the following areas: -1E-315c, 1E-314, 1E-313 and corridor 300C approved to occupy
Miscellaneous Correction
Corrective Action Required
10/02/2024
-Provide State Elevator Certification for new East elevator and existing South elevator -Paint crosswalks to new parking lot -Provide documentation for field installed fire rating at doors in Soiled Rm 3E-322 -Provide rail or barrier at under stair space less than 80" vertical clearance per A117.1 Sec. 307.4 at both stairwells -Open hand holes in light poles for inspection -Remove construction water meter at job trailer **2nd floor addition: -Rm 204, 205 (exam 4 & 5) not complete
Miscellaneous Inspection Partial 10/4/2024 10/4/2024 10/04/2024
Misc
Corrective Action Required
10/03/2024
**Pre final walkthrough for 2nd floor addition: partial final -204, 205, not done **Walkthrough for remaining 3rd floor: -Install all missing light swiches -Missing sprinkler escutcheons throughout -220 not ready -Team center at south exterior wall not ready -Bathrooms at lobby not ready -Provide GFCI protection within 6' of sink at 212, 213, 217, 263
Occupancy Inspection - Codes Commercial Failed 10/7/2024 10/7/2024 10/07/2024
Misc
Informational
10/03/2024
Partial occupancy for ASC Expansion: **OK to occupy the following areas: -1st floor addition side only to column line BB.5 on A221a of approved plans -2nd floor addition side only to column line BB.5 except as noted in corrections -3rd floor Women's Health Suite and corridor 1E-200J only, as noted in Blue on Phase map provided on 10/2/24 (See document on Portal)
Misc
Informational
10/03/2024
Partial occupancy for existing side renovations: **OK to occupy the following areas: -1E-315c, 1E-314, 1E-313 and corridor 300C approved to occupy
Miscellaneous Correction
Corrective Action Required
10/03/2024
-Provide State Elevator Certification for new East elevator and existing South elevator -Paint crosswalks to new parking lot -Provide documentation for field installed fire rating at doors in Soiled Rm 3E-322 -Provide rail or barrier at under stair space less than 80" vertical clearance per A117.1 Sec. 307.4 at both stairwells -Open hand holes in light poles for inspection -Remove construction water meter at job trailer **2nd floor addition: -Rm 204, 205 (exam 4 & 5) not complete
Occupancy Inspection - Engineering Temporary C of O 10/7/2024 10/07/2024
Misc
Corrective Action Required
09/30/2024
9-30-24 JMJ Outstanding items for Certificate of Occupancy. 1) Sodding and Vegetation 2) Site Cleanup 10/07/24 JMJ 1) Sodding and Vegetation 2) Site Cleanup
Miscellaneous Inspection Partial 10/9/2024 10/9/2024 10/09/2024
Misc
Corrective Action Required
10/04/2024
**Pre final walkthrough for 2nd floor addition: partial final -204, 205, not done **Walkthrough for remaining 3rd floor: -Missing sprinkler escutcheons throughout -Bathrooms at lobby not ready
Occupancy Inspection - Codes Commercial Failed 10/14/2024 10/14/2024 10/14/2024
Misc
Informational
10/07/2024
Partial occupancy for ASC Expansion: **OK to occupy the following areas: -1st floor addition side only to column line BB.5 on A221a of approved plans -2nd floor addition side only to column line BB.5 on A221a of approved plans -3rd floor addition side only to column line BB.5 on A221a of approved plans
Misc
Informational
10/07/2024
Partial occupancy for existing side renovations: **OK to occupy the following areas: -1E-315c, 1E-314, 1E-313 and corridor 300C approved to occupy
Miscellaneous Correction
Corrective Action Required
10/07/2024
-Paint crosswalks to new parking lot -Provide documentation for field installed fire rating at doors in Soiled Rm 3E-322 -Provide rail or barrier at under stair space less than 80" vertical clearance per A117.1 Sec. 307.4 at both stairwells -Install sprinkler head protection under stairs at new North stair -Open hand holes in light poles for inspection -Remove construction water meter at job trailer
In-wall Inspection Partial 9/18/2024 11/5/2024 11/05/2024
FIRST FLOOR
Corrective Action Required
09/09/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C, 1E202A-1E-202H, 1E-203-1E207, 1E221, 1E-224, 1E 225, 1E-226 **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
09/09/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -COMPLETE
THIRD FLOOR
Corrective Action Required
09/09/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok cover -Elevator infill walls -North stairwell walls ok
In-wall Inspection Partial 11/6/2024 11/6/2024 11/06/2024
FIRST FLOOR
Corrective Action Required
11/05/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C, 1E202A-1E-202H, 1E-203-1E207, 1E-220, 1E221, 1E-224, 1E 225, 1E-226 **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
11/05/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -COMPLETE
THIRD FLOOR
Corrective Action Required
11/05/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok cover -Elevator infill walls -North stairwell walls ok
In-wall Inspection Partial 11/7/2024 11/7/2024 11/07/2024
FIRST FLOOR
Corrective Action Required
11/06/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C, 1E202A-1E-202H, 1E-203-1E207, 1E-220, 1E221, 1E-224, 1E 225, 1E-226, 1E-100k, 1E-149 through 1E-151a **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
11/06/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -COMPLETE
THIRD FLOOR
Corrective Action Required
11/06/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok cover -Elevator infill walls -North stairwell walls ok
In-wall Inspection Partial 11/22/2024 11/22/2024 11/22/2024
FIRST FLOOR
Corrective Action Required
11/07/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C, 1E202A-1E-202H, 1E-203-1E207, 1E-220, 1E221, 1E-224, 1E 225, 1E-226, 1E-100k, 1E-149 through 1E-151a **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
11/07/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -COMPLETE
THIRD FLOOR
Corrective Action Required
11/07/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok cover -Elevator infill walls -North stairwell walls ok
Rated Assembly Inspection Partial 10/9/2024 11/25/2024
FIRST FLOOR
Corrective Action Required
09/30/2024
Addition side complete except at Clean room 1E-169 (Transition to existing for next phase) *Existing side: -1E-222 shaft layer-Seal penetrations
SECOND FLOOR
Corrective Action Required
09/30/2024
Addition side complete
THIRD FLOOR
Corrective Action Required
09/30/2024
-Shaft and 1st and 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263 -Shaft,1st & 2nd layer at South Elevator -Shaft, 1st and 2nd layer layer at North elevator
In-wall Inspection Partial 11/25/2024 11/25/2024 11/25/2024
FIRST FLOOR
Corrective Action Required
11/22/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C, 1E202A-1E-202H, 1E-203-1E207, 1E-220-1E-226, 1E-100k, 1E-149 through 1E-151a, 1E202-1E206 **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
11/22/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -COMPLETE
THIRD FLOOR
Corrective Action Required
11/22/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok cover -Elevator infill walls -North stairwell walls ok
Underslab Plumbing Inspection - Commercial Partial 12/2/2024 12/2/2024 12/02/2024
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
10/03/2024
*1st Floor addition complete *1st Floor existing; 1E-313-314, 1E-182, 1E-151, 1E-151A, 1E 100P, 1E 169, 1E 200D, 1E 201, 1E 207A, 1E 204A, 1E 205A, 1E 206A, 1E 223-225, 1E-119, 1E-220, 1E 205a, 1E 207a, 1E 208a, 1E 209a, 1E 228, 1E 230, 1E 250, 1E-2-18A, 1E-218B, 1E-216A, 1E-231
Rated Assembly Inspection Failed 12/5/2024 12/5/2024 12/05/2024
FIRST FLOOR
Corrective Action Required
11/25/2024
Addition side complete except at Clean room 1E-169 (Transition to existing for next phase) *Existing side: -1E-222 shaft layer-Seal penetrations Building Support 02-1E222 & Soiled Hold 02-1E223-Seal all penetrations, complete screw pattern
SECOND FLOOR
Corrective Action Required
11/25/2024
Addition side complete
THIRD FLOOR
Corrective Action Required
11/25/2024
-Shaft and 1st and 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263 -Shaft,1st & 2nd layer at South Elevator -Shaft, 1st and 2nd layer layer at North elevator
Above Ceiling Inspection Failed 12/5/2024 12/5/2024 12/05/2024
FIRST FLOOR
Corrective Action Required
10/01/2024
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Additon complete except as noted -Clean room at existing tie in 1E 169. Address penetrations and incomplete rated assembly **Existing side: 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall 02-1E153 & Materials Management 02-1E152-Label firewall, seal all penetrations, remove all penetrations must comply with UL 1479 or ASTM E814
SECOND FLOOR
Corrective Action Required
10/01/2024
Above-ceiling OK below: **Addition Complete except at existing south stair: label fire wall
THIRD FLOOR
Corrective Action Required
10/01/2024
**Addition complete
In-wall Inspection Partial 12/5/2024 12/5/2024 12/05/2024
FIRST FLOOR
Corrective Action Required
11/25/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C, 1E202A-1E-202H, 1E-203-1E207, 1E-220-1E-226, 1E-100k, 1E-149 through 1E-151a, 1E202-1E206, 2E-238 through 2E-242, 2E-420 through 2E-423 **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
11/25/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -COMPLETE
THIRD FLOOR
Corrective Action Required
11/25/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok cover -Elevator infill walls -North stairwell walls ok
Occupancy Inspection - Planning Passed 12/06/2024
Misc
Corrective Action Required
10/01/2024
Complete landscaping per approved plan.
Misc
Corrective Action Required
10/01/2024
Complete all parking lot improvements per approved plan.
Above Ceiling Inspection Partial 12/6/2024 12/6/2024 12/06/2024
FIRST FLOOR
Corrective Action Required
12/05/2024
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Additon complete except as noted -Clean room at existing tie in 1E 169. Address penetrations and incomplete rated assembly **Existing side: 02-1E153 & Materials Management 02-1E152 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
12/05/2024
Above-ceiling OK below: **Addition Complete except at existing south stair: label fire wall
THIRD FLOOR
Corrective Action Required
12/05/2024
**Addition complete
Rated Assembly Inspection Partial 12/6/2024 12/6/2024 12/06/2024
FIRST FLOOR
Corrective Action Required
12/05/2024
Addition side complete except at Clean room 1E-169 (Transition to existing for next phase) *Existing side: -1E-222 shaft layer-Seal penetrations Building Support 02-1E222 & Soiled Hold 02-1E223-Seal all penetrations
SECOND FLOOR
Corrective Action Required
12/05/2024
Addition side complete
THIRD FLOOR
Corrective Action Required
12/05/2024
-Shaft and 1st and 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263 -Shaft,1st & 2nd layer at South Elevator -Shaft, 1st and 2nd layer layer at North elevator
Occupancy Inspection - Codes Commercial Failed 12/12/2024 12/12/2024
Misc
Informational
10/14/2024
Partial occupancy for ASC Expansion: **OK to occupy the following areas: -1st floor addition side only to column line BB.5 on A221a of approved plans -2nd floor addition side only to column line BB.5 on A221a of approved plans -3rd floor addition side only to column line BB.5 on A221a of approved plans
Misc
Informational
10/14/2024
Partial occupancy for existing side renovations: **OK to occupy the following areas: -1E-315c, 1E-314, 1E-313 ; 152,153; and corridor 300C approved to occupy
Miscellaneous Correction
Corrective Action Required
10/14/2024
-Paint crosswalks to new parking lot -Provide documentation for field installed fire rating at doors in Soiled Rm 3E-322 -Provide rail or barrier at under stair space less than 80" vertical clearance per A117.1 Sec. 307.4 at both stairwells -Install sprinkler head protection under stairs at new North stair -Open hand holes in light poles for inspection -Remove construction water meter at job trailer
In-wall Inspection Partial 12/13/2024 12/13/2024 12/13/2024
FIRST FLOOR
Corrective Action Required
12/05/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C, 1E202A-1E-202H, 1E-203-1E207, 1E-220-1E-226, 1E-100k, 1E-149 through 1E-151a, 1E202-1E206, 2E-238 through 2E-242, 2E-420 through 2E-423, Corridor02-1E200A, 1E227, 1E-228, OR 7 1E-229, 1E280 **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
12/05/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side **ADDITION SIDE -COMPLETE
THIRD FLOOR
Corrective Action Required
12/05/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok cover -Elevator infill walls -North stairwell walls ok
In-wall Inspection Partial 12/18/2024 12/18/2024 12/18/2024
FIRST FLOOR
Corrective Action Required
12/13/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C, 1E202A-1E-202H, 1E-203-1E207, 1E-220-1E-226, 1E-100k, 1E-149 through 1E-151a, 1E202-1E206, 2E-238 through 2E-242, 2E-420 through 2E-423, Corridor02-1E200A, 1E227, 1E-228, OR 7 1E-229, 1E280, 1E-231 **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
12/13/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side 2E-232, 2E-231B, 2E-234, 2E-235, 2E-237, 2E-236, 2E-112, 2E-121, 2E403, 2E410, 2E-241, 2E-412, 2E-409 **ADDITION SIDE -COMPLETE
THIRD FLOOR
Corrective Action Required
12/13/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok cover -Elevator infill walls -North stairwell walls ok
Rated Assembly Inspection Failed 12/24/2024 12/24/2024 12/24/2024
FIRST FLOOR
Corrective Action Required
12/06/2024
Addition side complete except at Clean room 1E-169 (Transition to existing for next phase) *Existing side: -1E-222 shaft layer-Seal penetrations Building Support 02-1E222 & Soiled Hold 02-1E223-Seal all penetrations
SECOND FLOOR
Corrective Action Required
12/06/2024
Addition side complete
THIRD FLOOR
Corrective Action Required
12/06/2024
-Shaft and 1st and 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263 -Shaft,1st & 2nd layer at South Elevator -Shaft, 1st and 2nd layer layer at North elevator
In-wall Inspection Partial 1/2/2025 1/2/2025 01/02/2025
FIRST FLOOR
Corrective Action Required
12/18/2024
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C, 1E202A-1E-202H, 1E-203-1E207, 1E-220-1E-226, 1E-100k, 1E-149 through 1E-151a, 1E202-1E206, 2E-238 through 2E-242, 2E-420 through 2E-423, Corridor02-1E200A, 1E227, 1E-228, OR 7 1E-229, 1E280, 1E-231, 1E-218A, 1E-218B, 1E-216A, 1E-216B **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
12/18/2024
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side 2E-232, 2E-231B, 2E-234, 2E-235, 2E-237, 2E-236, 2E-112, 2E-121, 2E403, 2E410, 2E-241, 2E-412, 2E-409 **ADDITION SIDE -COMPLETE
THIRD FLOOR
Corrective Action Required
12/18/2024
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok cover -Elevator infill walls -North stairwell walls ok
In-wall Inspection Partial 1/6/2025 1/7/2025 01/07/2025
FIRST FLOOR
Corrective Action Required
01/02/2025
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C, 1E202A-1E-202H, 1E-203-1E207, 1E-220-1E-226, 1E-100k, 1E-149 through 1E-151a, 1E202-1E206, 2E-238 through 2E-242, 2E-420 through 2E-423, Corridor02-1E200A, 1E227, 1E-228, OR 7 1E-229, 1E280, 1E-231, 1E-218A, 1E-218B, 1E-216A, 1E-216B, 1E-172, 1E-173, 1E-174, 1E-175. **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
01/02/2025
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side 2E-232, 2E-231B, 2E-234, 2E-235, 2E-237, 2E-236, 2E-112, 2E-121, 2E403, 2E410, 2E-241, 2E-412, 2E-409 **ADDITION SIDE -COMPLETE
THIRD FLOOR
Corrective Action Required
01/02/2025
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok cover -Elevator infill walls -North stairwell walls ok
Rated Assembly Inspection Failed 1/6/2025 1/7/2025 01/07/2025
FIRST FLOOR
Corrective Action Required
12/24/2024
Addition side complete except at Clean room 1E-169 (Transition to existing for next phase) *Existing side: -1E-222 shaft layer-Seal penetrations Building Support 02-1E222 & Soiled Hold 02-1E223-Seal all penetrations
SECOND FLOOR
Corrective Action Required
12/24/2024
Addition side complete
THIRD FLOOR
Corrective Action Required
12/24/2024
-Shaft and 1st and 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263 -Shaft,1st & 2nd layer at South Elevator -Shaft, 1st and 2nd layer layer at North elevator
Above Ceiling Inspection Partial 1/6/2025 1/7/2025 01/07/2025
FIRST FLOOR
Corrective Action Required
12/06/2024
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Additon complete except as noted -Clean room at existing tie in 1E 169. Address penetrations and incomplete rated assembly **Existing side: 02-1E153 & Materials Management 02-1E152 1E202A thru 1E202I, 1E203, 1E204 thru 1E209, Corridor 1E200D, 1E200E -Label smoke wall 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall
SECOND FLOOR
Corrective Action Required
12/06/2024
Above-ceiling OK below: **Addition Complete except at existing south stair: label fire wall
THIRD FLOOR
Corrective Action Required
12/06/2024
**Addition complete
In-wall Inspection Partial 1/15/2025 1/15/2025 01/15/2025
FIRST FLOOR
Corrective Action Required
01/07/2025
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C, 1E202A-1E-202H, 1E-203-1E207, 1E-220-1E-226, 1E-100k, 1E-149 through 1E-151a, 1E202-1E206, 2E-238 through 2E-242, 2E-420 through 2E-423, Corridor02-1E200A, 1E227, 1E-228, OR 7 1E-229, 1E280, 1E-231, 1E-218A, 1E-218B, 1E-216A, 1E-216B, 1E-172, 1E-173, 1E-174, 1E-175. **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
01/07/2025
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side 2E-232, 2E-231B, 2E-234, 2E-235, 2E-237, 2E-236, 2E-112, 2E-121, 2E403, 2E410, 2E-241, 2E-412, 2E-409, corridor 2E-122 **ADDITION SIDE -COMPLETE
THIRD FLOOR
Corrective Action Required
01/07/2025
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok cover -Elevator infill walls -North stairwell walls ok
Rated Assembly Inspection Partial 1/15/2025 1/15/2025 01/15/2025
FIRST FLOOR
Corrective Action Required
01/07/2025
Addition side complete except at Clean room 1E-169 (Transition to existing for next phase) *Existing side: -1E-222 shaft layer-Seal penetrations Building Support 02-1E222 & Soiled Hold 02-1E223-Seal all penetrations
SECOND FLOOR
Corrective Action Required
01/07/2025
Addition side complete -2E-237
THIRD FLOOR
Corrective Action Required
01/07/2025
-Shaft and 1st and 2nd layer at 3E-303 -Screw pattern at 3E-322, 323, 365, 264, 263 -Shaft,1st & 2nd layer at South Elevator -Shaft, 1st and 2nd layer layer at North elevator
Above Ceiling Inspection Partial 1/15/2025 1/15/2025 01/15/2025
FIRST FLOOR
Corrective Action Required
01/07/2025
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Additon complete except as noted -Clean room at existing tie in 1E 169. Address penetrations and incomplete rated assembly **Existing side: 02-1E153 & Materials Management 02-1E152 1E202A thru 1E202I, 1E203, 1E204 thru 1E209, Corridor 1E200D, 1E200E -Label smoke wall 1E-314-seal penetrations 300C-seal penetrations and label firewall 1E-315-Label firewall 1E-313-seal penetrations and label firewall Hard lids at: 1E-227, 1E228, 1E229
SECOND FLOOR
Corrective Action Required
01/07/2025
Above-ceiling OK below: **Addition Complete except at existing south stair: label fire wall
THIRD FLOOR
Corrective Action Required
01/07/2025
**Addition complete
Above Ceiling Inspection Partial 1/21/2025 1/21/2025 01/21/2025
FIRST FLOOR
Corrective Action Required
01/15/2025
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Additon complete except as noted -Clean room at existing tie in 1E 169. Address penetrations and incomplete rated assembly **Existing side: 02-1E153 & Materials Management 02-1E152 1E202A thru 1E202I, 1E203, 1E204 thru 1E209, Corridor 1E200D, 1E200E, 1E223, 1E226 Hard lids at: 1E-227, 1E228, 1E229,1E130, 1E131
SECOND FLOOR
Corrective Action Required
01/15/2025
Above-ceiling OK below: **Addition Complete except at existing south stair: label fire wall
THIRD FLOOR
Corrective Action Required
01/15/2025
**Addition complete
Above Ceiling Inspection Partial 1/22/2025 1/22/2025 01/22/2025
FIRST FLOOR
Corrective Action Required
01/21/2025
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Additon complete except as noted -Clean room at existing tie in 1E 169. Address penetrations and incomplete rated assembly **Existing side: 02-1E153 & Materials Management 02-1E152 1E202A thru 1E202I, 1E203, 1E204 thru 1E209, Corridor 1E200D, 1E200E, 1E223, 1E226 Hard lids at: 1E-227, 1E228, 1E229,1E130, 1E131
SECOND FLOOR
Corrective Action Required
01/21/2025
Above-ceiling OK below: **Addition Complete except at existing south stair: label fire wall **Existing side 2E423, 2E421, 2E422, 2E420, 2E242, 2E241,2E200J, 2E240, 2E238, 2E239
THIRD FLOOR
Corrective Action Required
01/21/2025
**Addition complete
Above Ceiling Inspection Partial 2/11/2025 2/11/2025 02/11/2025
FIRST FLOOR
Corrective Action Required
01/22/2025
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Addition complete except as noted -Clean room at existing tie in 1E 169. Address penetrations and incomplete rated assembly **Existing side: Complete except as noted: -Seal penetrations and gaps at Materials Management and Clean Room
SECOND FLOOR
Corrective Action Required
01/22/2025
Above-ceiling OK below: **Addition Complete except at existing south stair: label fire wall **Existing side 2E423, 2E421, 2E422, 2E420, 2E242, 2E241,2E200J, 2E240, 2E238, 2E239 -Soffits approveed
THIRD FLOOR
Corrective Action Required
01/22/2025
**Addition complete
Above Ceiling Inspection Partial 2/20/2025 2/20/2025 02/20/2025
FIRST FLOOR
Corrective Action Required
02/11/2025
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Addition complete except as noted -Clean room at existing tie in 1E 169. Address penetrations and incomplete rated assembly **Existing side: Complete except as noted: -Seal penetrations and gaps at Materials Management and Clean Room
SECOND FLOOR
Corrective Action Required
02/11/2025
Above-ceiling OK below: **Addition Complete except at existing south stair: label fire wall **Existing side 2E423, 2E421, 2E422, 2E420, 2E242, 2E241,2E200J, 2E240, 2E238, 2E239, 2E-232, 2E-231B, 2E237, 2E-235, 2E-236, Corridor 2E-200F, 2E200F, 2E-119, 2E-120, 2E-200K 2E-121, 2e-112, -Soffits approved
THIRD FLOOR
Corrective Action Required
02/11/2025
**Addition complete
Above Ceiling Inspection Partial 2/24/2025 2/24/2025 02/24/2025
FIRST FLOOR
Corrective Action Required
02/20/2025
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Addition complete except as noted -Clean room at existing tie in 1E 169. Address penetrations and incomplete rated assembly **Existing side: Complete except as noted: 149-label smoke/fire walls, complete electrical 150-complete fire walls 100k-complete smoke walls
SECOND FLOOR
Corrective Action Required
02/20/2025
Above-ceiling OK below: **Addition Complete except at existing south stair: label fire wall **Existing side 2E423, 2E421, 2E422, 2E420, 2E242, 2E241,2E200J, 2E240, 2E238, 2E239, 2E-232, 2E-231B, 2E237, 2E-235, 2E-236, Corridor 2E-200F, 2E200F, 2E-119, 2E-120, 2E-200K 2E-121, 2e-112, -Soffits approved
THIRD FLOOR
Corrective Action Required
02/20/2025
**Addition complete
Above Ceiling Inspection Partial 2/28/2025 2/28/2025 02/28/2025
FIRST FLOOR
Corrective Action Required
02/24/2025
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Addition complete except as noted -Clean room at existing tie in 1E 169. Address penetrations and incomplete rated assembly **Existing side: Complete except as noted: 149-label smoke/fire walls, complete electrical 150-complete fire walls 100k-complete smoke walls
SECOND FLOOR
Corrective Action Required
02/24/2025
Above-ceiling OK below: **Addition Complete except at existing south stair: label fire wall **Existing side 2E423, 2E421, 2E422, 2E420, 2E242, 2E241,2E200J, 2E240, 2E238, 2E239, 2E-232, 2E-231B, 2E237, 2E-235, 2E-236, Corridor 2E-200F, 2E200F, 2E-119, 2E-120, 2E-200K 2E-121, 2e-112, -Soffits approved
THIRD FLOOR
Corrective Action Required
02/24/2025
**Addition complete
Miscellaneous Inspection Partial 2/28/2025 2/28/2025 02/28/2025
Misc
Corrective Action Required
10/09/2024
**Pre final walkthrough for phase 1, renovations, partial only: 206-GFCI by sink 204-GFCI by sink 2E-232- not ready Install fire door at storage Rate penetration at cable tray in 200a 2e-121 incomplete 2E-120 not ready Exam rooms not ready **OK to bring in equipment and furniture
Above Ceiling Inspection Partial 3/3/2025 3/3/2025 03/03/2025
FIRST FLOOR
Corrective Action Required
02/28/2025
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Addition complete except as noted -Clean room at existing tie in 1E 169. Address penetrations and incomplete rated assembly **Existing side: Complete except as noted: 149-label smoke/fire walls, complete electrical 150-complete fire walls 100k-complete smoke walls
SECOND FLOOR
Corrective Action Required
02/28/2025
Above-ceiling OK below: **Addition Complete except at existing south stair: label fire wall **Existing side 2E423, 2E421, 2E422, 2E420, 2E242, 2E241,2E200J, 2E240, 2E238, 2E239, 2E-232, 2E-231B, 2E237, 2E-235, 2E-236, Corridor 2E-200F, 2E200F, 2E-119, 2E-120, 2E-200K 2E-121, 2e-112, -Soffits approved **Corrections for 2E-113, 2E-114, 2E-115, 2E-116, 2E-117, 2E-118, 2E-122, 2E-402, 2E-403, 2E-404, 2E-408, 2E-409, 2E-410, 2E-411, 2E-412: -Firecaulk fire-rated wall penetrations -Remove all temporary lights
THIRD FLOOR
Corrective Action Required
02/28/2025
**Addition complete
Above Ceiling Inspection Partial 3/7/2025 3/7/2025 03/07/2025
FIRST FLOOR
Corrective Action Required
03/03/2025
*****AREAS APPROVED TO COVER: -Entry canopy ok to cover Addition complete except as noted -Clean room at existing tie in 1E 169. Address penetrations and incomplete rated assembly **Existing side: Complete except as noted: 149-label smoke/fire walls, complete electrical 150-complete fire walls 100k-complete smoke walls
SECOND FLOOR
Corrective Action Required
03/03/2025
Above-ceiling OK below: **Addition Complete except at existing south stair: label fire wall **Existing side 2E423, 2E421, 2E422, 2E420, 2E242, 2E241,2E200J, 2E240, 2E238, 2E239, 2E-232, 2E-231B, 2E237, 2E-235, 2E-236, Corridor 2E-200F, 2E200F, 2E-119, 2E-120, 2E-200K 2E-121, 2e-112, 2E-113 to 118, 2E-122, 2E-402 to 404, 2E-408 to 412 -Soffits approved
THIRD FLOOR
Corrective Action Required
03/03/2025
**Addition complete
Occupancy Inspection - Codes Commercial Failed 3/7/2025 3/7/2025 03/07/2025
Misc
Informational
10/14/2024
Partial occupancy for ASC Expansion: **OK to occupy the following areas: -1st floor addition side only to column line BB.5 on A221a of approved plans -2nd floor addition side only to column line BB.5 on A221a of approved plans -3rd floor addition side only to column line BB.5 on A221a of approved plans
Misc
Informational
10/14/2024
Partial occupancy for existing side renovations: **OK to occupy the following areas: -1E-315c, 1E-314, 1E-313 ; 152,153; and corridor 300C approved to occupy **3/7-OK to occupy 2E-112/234/235/236/238/239/240/241/242
Miscellaneous Correction
Corrective Action Required
10/14/2024
-Paint crosswalks to new parking lot -Provide documentation for field installed fire rating at doors in Soiled Rm 3E-322 -Provide rail or barrier at under stair space less than 80" vertical clearance per A117.1 Sec. 307.4 at both stairwells -Install sprinkler head protection under stairs at new North stair -Open hand holes in light poles for inspection -Remove construction water meter at job trailer
Occupancy Inspection - Codes Commercial Failed 3/13/2025 3/13/2025 03/13/2025
Misc
Informational
03/07/2025
Partial occupancy for ASC Expansion: **OK to occupy the following areas: -1st floor addition side only to column line BB.5 on A221a of approved plans -2nd floor addition side only to column line BB.5 on A221a of approved plans -3rd floor addition side only to column line BB.5 on A221a of approved plans
Misc
Informational
03/07/2025
Partial occupancy for existing side renovations: **OK to occupy the following areas: -1E-315c, 1E-314, 1E-313 ; 152,153; and corridor 300C approved to occupy **3/7-OK to occupy 2E-112/234/235/236/238/239/240/241/242 **3-13-25 Partial occupancy for ASC Phase 1 (from column line 2.7 to 7.6) -Remove all construction materials from corridors etc. -Complete relocation of electrical panel in corridor 2nd floor -OR rooms not inspected -Complete exam rooms (open boxes, GFCIs, etc) -Upload documents for field installed label at rated doors for storage room -1E 221,220- GFCI receptacles not working -Complete rated assembly at cable tray in corridor 200A -Complete Decon 149
Miscellaneous Correction
Corrective Action Required
03/07/2025
-Paint crosswalks to new parking lot -Provide rail or barrier at under stair space less than 80" vertical clearance per A117.1 Sec. 307.4 at both stairwells -Install sprinkler head protection under stairs at new North stair -Remove construction water meter at job trailer
Occupancy Inspection - Codes Commercial Failed 3/21/2025 3/21/2025 03/21/2025
Misc
Informational
03/13/2025
Partial occupancy for ASC Expansion: **OK to occupy the following areas: -1st floor addition side only to column line BB.5 on A221a of approved plans -2nd floor addition side only to column line BB.5 on A221a of approved plans -3rd floor addition side only to column line BB.5 on A221a of approved plans Partial occupancy for ASC Remodel Phase 1 at existing side: **Ok to occupy the following areas: -1st and 2nd floors (from column line 2.7 to 7.6) on A221a of approved plans
Misc
Resolved
03/21/2025
Miscellaneous Correction
Corrective Action Required
03/13/2025
-Paint crosswalks to new parking lot -Provide rail or barrier at under stair space less than 80" vertical clearance per A117.1 Sec. 307.4 at both stairwells -Install sprinkler head protection under stairs at new North stair -Remove construction water meter at job trailer
In-wall Inspection Partial 4/10/2025 4/10/2025 04/10/2025
FIRST FLOOR
Corrective Action Required
01/15/2025
**OK to top out one side for mechanical as neccessary **OK to top out both sides at corridor1E-100H and 1E-100G for MEPs *Existing side: 1E-314, 315B, 315C, 1E202A-1E-202H, 1E-203-1E207, 1E-220-1E-226, 1E-100k, 1E-149 through 1E-151a, 1E202-1E206, 2E-238 through 2E-242, 2E-420 through 2E-423, Corridor02-1E200A, 1E227, 1E-228, OR 7 1E-229, 1E280, 1E-231, 1E-218A, 1E-218B, 1E-216A, 1E-216B, 1E-172, 1E-173, 1E-174, 1E-175., Pre/Post Bays 1E161-1E-157, 1E-181-1E-178, TLT 1E-164 **Addition side -In wall complete
SECOND FLOOR
Corrective Action Required
01/15/2025
**OK to top out corridors for MEPs as neccessary *EXISTING SIDE; -2E419 electrical room ok to 1 side 2E-232, 2E-231B, 2E-234, 2E-235, 2E-237, 2E-236, 2E-112, 2E-121, 2E403, 2E410, 2E-241, 2E-412, 2E-409, corridor 2E-122, Office 2E-338, 2E-339, Exam 2E-331, 2E-332, 2E-337, 2E-336 **ADDITION SIDE -COMPLETE
THIRD FLOOR
Corrective Action Required
01/15/2025
**Addition side: *Ok to top out for MEPs throughout 3E-104, 3E-209A, 3E-209B, 3E-211 3E-311 to 3E-323, 3E-326, 3E-335, 3E-350 to 3E-369, 3E-252 to 3E-255, 3E-257 to 3E-261,3E-214-230, 3E-302-308, 3E-103, 3E-233, 3E-232, 3E-250' -South exterior framing ok cover -Elevator infill walls -North stairwell walls ok
Underslab Plumbing Inspection - Commercial Partial 4/14/2025 4/14/2025 04/14/2025
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/02/2024
*1st Floor addition complete *1st Floor existing; 1E-313-314, 1E-182, 1E-151, 1E-151A, 1E 100P, 1E 169, 1E 200D, 1E 201, 1E 207A, 1E 204A, 1E 205A, 1E 206A, 1E 223-225, 1E-119, 1E-220, 1E 205a, 1E 207a, 1E 208a, 1E 209a, 1E 228, 1E 230, 1E 250, 1E-2-18A, 1E-218B, 1E-216A, 1E-231, 1E-302, 1E0303, 1E-310, 1E-214
Piers/Caissons Inspection - Commercial Passed 4/18/2025 4/18/2025 04/18/2025
Documents & Images
Date Uploaded File Type Document Name
12/27/2022 Application Form Comm Permit Application - SLE ASC Grading and Foundation 22-1222
01/23/2023 Plans SLE ASC footing and grading permit submittal 23-0123
02/06/2023 Letter DS P/R Corrections Document
02/13/2023 Letter 3-21037-City-Code_Review Response_ASC 23-0213
02/13/2023 Engineer Report/Study 22-353E St_ Luke's East Addition (Revised) - Geotechnical Report
02/13/2023 Drawing A021 - FIRST FLOOR CODE FOOTPRINT PLAN
02/13/2023 Drawing A022 - SECOND AND THIRD FLOOR CODE FOOTPRINT PLAN
02/13/2023 Engineer Report/Study Special Inspections letter
02/15/2023 Approved Plans approved foundation plans
02/17/2023 Plans ASC core and shell MECH package 23-0217
02/17/2023 Plans ASC core and shell FIRE PROTECTION package 23-0217
02/17/2023 Plans ASC core and shell ELECT package 23-0217
02/17/2023 Plans ASC core and shell STRUCT package 23-0217
02/17/2023 Plans ASC core and shell ARCH package 23-0217
02/17/2023 Plans ASC core and shell PLUMB package 23-0217
02/17/2023 Plans ASC core and shell CIVIL package 23-0217
03/06/2023 Letter DS P/R Corrections Document
03/09/2023 Approved Plans approved - STRUCT package 23-0217
03/09/2023 Email Project Costs
03/09/2023 Letter License Tax Bill
03/27/2023 Receipt Receipt for transaction: 2023-001682
03/27/2023 Letter DS Building Permit
03/28/2023 Approved Plans Approved Civil Plans Dated 3.28.2023
03/29/2023 Letter PRCOM20226232-City-Code_Review Response_ASC 23-0329
03/29/2023 Specifications 087100 Hardware Sets 02_14_23
03/29/2023 Drawing A000 COVER SHEET
03/29/2023 Drawing A021 FIRST FLOOR CODE FOOTPRINT PLAN
03/29/2023 Drawing A022 SECOND AND THIRD FLOOR CODE FOOTPRINT PLAN
03/29/2023 Drawing A030 PARTITION TYPES AND DETAILS
03/29/2023 Drawing A043 U_L_ DESIGN ASSEMBLIES
03/29/2023 Drawing A401 FIRST FLOOR AND SECOND FLOOR OPENING SCHEDULE
03/29/2023 Drawing A402 THIRD FLOOR AND FOURTH FLOOR OPENING SCHEDULE
03/29/2023 Drawing E705 - PANEL SCHEDULES
03/29/2023 Drawing MPE234A - ROOF PLAN - AREA A
03/29/2023 Drawing MPE234B - ROOF PLAN - AREA B
03/29/2023 Engineer Report/Study OA calcs
05/17/2023 Letter INSPECTION SUMMARY
05/18/2023 Letter INSPECTION SUMMARY
05/18/2023 Letter INSPECTION SUMMARY
05/23/2023 Letter INSPECTION SUMMARY
05/26/2023 Letter INSPECTION SUMMARY
05/26/2023 Letter INSPECTION SUMMARY
05/26/2023 Letter INSPECTION SUMMARY
05/26/2023 Letter INSPECTION SUMMARY
05/30/2023 Email Tamper on Backhoe for Compaction over the New HDPE Storm Pipe Line
05/30/2023 Letter INSPECTION SUMMARY
05/30/2023 Email Demo St Lukes DrivewayParking Lot
05/30/2023 Letter INSPECTION SUMMARY
05/30/2023 Letter INSPECTION SUMMARY
06/01/2023 Letter INSPECTION SUMMARY
06/01/2023 Letter INSPECTION SUMMARY
06/02/2023 Letter INSPECTION SUMMARY
06/02/2023 Letter INSPECTION SUMMARY
06/02/2023 St Lukes 60 Storm Line HDPE
06/02/2023 Letter INSPECTION SUMMARY
06/02/2023 Letter INSPECTION SUMMARY
06/02/2023 Letter INSPECTION SUMMARY
06/05/2023 Letter INSPECTION SUMMARY
06/05/2023 Letter INSPECTION SUMMARY
06/06/2023 Letter INSPECTION SUMMARY
06/07/2023 Letter INSPECTION SUMMARY
06/07/2023 Letter INSPECTION SUMMARY
06/08/2023 Letter INSPECTION SUMMARY
06/09/2023 Letter INSPECTION SUMMARY
06/09/2023 Letter INSPECTION SUMMARY
06/13/2023 Letter INSPECTION SUMMARY
06/13/2023 Letter INSPECTION SUMMARY
06/15/2023 Email RE_ PRCOM20226232 Saint Luke's East ASC Expansion Project
06/15/2023 Letter INSPECTION SUMMARY
06/15/2023 Letter INSPECTION SUMMARY
06/16/2023 Letter INSPECTION SUMMARY
06/21/2023 Letter INSPECTION SUMMARY
06/27/2023 Letter INSPECTION SUMMARY
06/27/2023 Letter INSPECTION SUMMARY
06/28/2023 Letter INSPECTION SUMMARY
06/29/2023 Letter INSPECTION SUMMARY
06/30/2023 Letter INSPECTION SUMMARY
06/30/2023 Letter INSPECTION SUMMARY
07/06/2023 Letter INSPECTION SUMMARY
07/06/2023 Letter INSPECTION SUMMARY
07/07/2023 Letter INSPECTION SUMMARY
07/10/2023 Letter INSPECTION SUMMARY
07/11/2023 Letter INSPECTION SUMMARY
07/12/2023 Letter INSPECTION SUMMARY
07/12/2023 Letter INSPECTION SUMMARY
07/14/2023 Letter INSPECTION SUMMARY
07/14/2023 Letter INSPECTION SUMMARY
07/17/2023 Letter INSPECTION SUMMARY
07/17/2023 Letter INSPECTION SUMMARY
07/17/2023 Letter INSPECTION SUMMARY
07/17/2023 Letter INSPECTION SUMMARY
07/19/2023 Letter INSPECTION SUMMARY
07/21/2023 Retaining Wall St Lukes (MSE Hardscape)
07/21/2023 St_ Lukes Retaining Wall 072123
07/21/2023 Retaining Wall St Lukes (MSE Hardscape)0
07/25/2023 Letter INSPECTION SUMMARY
07/25/2023 Letter INSPECTION SUMMARY
07/25/2023 Letter INSPECTION SUMMARY
07/26/2023 Receipt Receipt for transaction: 2023-005796
08/04/2023 Letter INSPECTION SUMMARY
08/04/2023 Letter INSPECTION SUMMARY
08/04/2023 Letter INSPECTION SUMMARY
08/04/2023 Letter INSPECTION SUMMARY
08/04/2023 Letter INSPECTION SUMMARY
08/08/2023 Letter INSPECTION SUMMARY
08/09/2023 Letter INSPECTION SUMMARY
08/10/2023 Letter INSPECTION SUMMARY
08/11/2023 Letter INSPECTION SUMMARY
08/11/2023 Letter INSPECTION SUMMARY
08/15/2023 Letter INSPECTION SUMMARY
08/15/2023 Letter INSPECTION SUMMARY
08/15/2023 Letter INSPECTION SUMMARY
08/16/2023 Letter INSPECTION SUMMARY
08/16/2023 Letter INSPECTION SUMMARY
08/16/2023 Letter INSPECTION SUMMARY
08/17/2023 Letter INSPECTION SUMMARY
08/17/2023 Letter INSPECTION SUMMARY
08/22/2023 Letter INSPECTION SUMMARY
08/22/2023 Letter INSPECTION SUMMARY
08/23/2023 Letter INSPECTION SUMMARY
08/24/2023 Letter INSPECTION SUMMARY
08/28/2023 Letter INSPECTION SUMMARY
08/30/2023 Letter INSPECTION SUMMARY
08/30/2023 Letter INSPECTION SUMMARY
09/01/2023 Letter INSPECTION SUMMARY
09/07/2023 Letter INSPECTION SUMMARY
09/08/2023 Letter INSPECTION SUMMARY
09/13/2023 Letter INSPECTION SUMMARY
09/15/2023 Letter INSPECTION SUMMARY
09/15/2023 Letter INSPECTION SUMMARY
09/20/2023 Letter INSPECTION SUMMARY
09/21/2023 Letter INSPECTION SUMMARY
09/22/2023 Letter INSPECTION SUMMARY
09/25/2023 Letter INSPECTION SUMMARY
09/25/2023 Letter INSPECTION SUMMARY
09/26/2023 Letter INSPECTION SUMMARY
09/27/2023 Letter INSPECTION SUMMARY
09/28/2023 Letter INSPECTION SUMMARY
09/29/2023 Letter INSPECTION SUMMARY
10/02/2023 Letter INSPECTION SUMMARY
10/03/2023 Letter INSPECTION SUMMARY
10/03/2023 Letter INSPECTION SUMMARY
10/04/2023 Letter INSPECTION SUMMARY
10/04/2023 Letter INSPECTION SUMMARY
10/04/2023 Letter INSPECTION SUMMARY
10/05/2023 Letter INSPECTION SUMMARY
10/05/2023 Letter INSPECTION SUMMARY
10/06/2023 Letter INSPECTION SUMMARY
10/06/2023 Letter INSPECTION SUMMARY
10/09/2023 Letter INSPECTION SUMMARY
10/10/2023 Letter INSPECTION SUMMARY
10/10/2023 Letter INSPECTION SUMMARY
10/11/2023 Letter INSPECTION SUMMARY
10/11/2023 Letter INSPECTION SUMMARY
10/17/2023 Letter INSPECTION SUMMARY
10/19/2023 Letter INSPECTION SUMMARY
10/19/2023 Letter INSPECTION SUMMARY
10/20/2023 Letter INSPECTION SUMMARY
10/27/2023 Letter INSPECTION SUMMARY
10/27/2023 Letter INSPECTION SUMMARY
10/31/2023 Letter INSPECTION SUMMARY
11/02/2023 Letter INSPECTION SUMMARY
11/02/2023 Letter INSPECTION SUMMARY
11/07/2023 Letter INSPECTION SUMMARY
11/08/2023 Letter INSPECTION SUMMARY
11/09/2023 Letter INSPECTION SUMMARY
11/14/2023 Letter INSPECTION SUMMARY
11/14/2023 Letter INSPECTION SUMMARY
11/14/2023 Letter INSPECTION SUMMARY
11/20/2023 Letter INSPECTION SUMMARY
11/21/2023 Letter INSPECTION SUMMARY
12/05/2023 Letter INSPECTION SUMMARY
12/06/2023 Letter INSPECTION SUMMARY
12/07/2023 Letter INSPECTION SUMMARY
12/08/2023 Letter INSPECTION SUMMARY
12/13/2023 Letter INSPECTION SUMMARY
12/14/2023 Letter INSPECTION SUMMARY
12/15/2023 Letter INSPECTION SUMMARY
12/15/2023 Letter INSPECTION SUMMARY
12/18/2023 Letter INSPECTION SUMMARY
12/19/2023 Letter INSPECTION SUMMARY
01/05/2024 Letter INSPECTION SUMMARY
01/11/2024 Letter INSPECTION SUMMARY
01/19/2024 Letter INSPECTION SUMMARY
01/22/2024 Letter INSPECTION SUMMARY
01/29/2024 Letter INSPECTION SUMMARY
02/02/2024 Letter INSPECTION SUMMARY
02/02/2024 Letter INSPECTION SUMMARY
02/02/2024 Letter INSPECTION SUMMARY
02/12/2024 Letter INSPECTION SUMMARY
02/12/2024 Letter INSPECTION SUMMARY
02/13/2024 Letter INSPECTION SUMMARY
02/14/2024 Letter INSPECTION SUMMARY
02/15/2024 Letter INSPECTION SUMMARY
03/05/2024 Letter INSPECTION SUMMARY
03/06/2024 Letter INSPECTION SUMMARY
03/07/2024 #003 Lee's Summit - For Approval
03/11/2024 Letter INSPECTION SUMMARY
03/14/2024 Letter INSPECTION SUMMARY
03/18/2024 Letter INSPECTION SUMMARY
03/20/2024 Letter INSPECTION SUMMARY
03/20/2024 Letter INSPECTION SUMMARY
03/22/2024 #003 Lee's Summit - For Approval- APPROVED With Conditions
03/22/2024 Letter Fire (Sprinkler) Plan Review
04/02/2024 Letter INSPECTION SUMMARY
04/02/2024 Letter INSPECTION SUMMARY
04/03/2024 Letter INSPECTION SUMMARY
04/04/2024 Letter INSPECTION SUMMARY
04/05/2024 Letter INSPECTION SUMMARY
04/05/2024 Letter INSPECTION SUMMARY
04/12/2024 Letter INSPECTION SUMMARY
04/17/2024 Letter INSPECTION SUMMARY
04/22/2024 Letter INSPECTION SUMMARY
04/29/2024 Letter INSPECTION SUMMARY
04/29/2024 Letter INSPECTION SUMMARY
05/13/2024 Letter INSPECTION SUMMARY
05/14/2024 Letter INSPECTION SUMMARY
05/14/2024 Letter INSPECTION SUMMARY
05/20/2024 Letter INSPECTION SUMMARY
05/30/2024 Letter INSPECTION SUMMARY
06/07/2024 Letter INSPECTION SUMMARY
06/10/2024 Letter INSPECTION SUMMARY
06/10/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
06/14/2024 Letter INSPECTION SUMMARY
06/19/2024 Letter INSPECTION SUMMARY
06/24/2024 Letter INSPECTION SUMMARY
06/24/2024 Letter INSPECTION SUMMARY
06/27/2024 Letter INSPECTION SUMMARY
07/01/2024 Letter INSPECTION SUMMARY
07/01/2024 Letter INSPECTION SUMMARY
07/02/2024 Letter INSPECTION SUMMARY
07/02/2024 Letter INSPECTION SUMMARY
07/08/2024 Letter INSPECTION SUMMARY
07/08/2024 Letter INSPECTION SUMMARY
07/09/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/19/2024 Letter INSPECTION SUMMARY
07/23/2024 Letter INSPECTION SUMMARY
07/24/2024 Letter INSPECTION SUMMARY
07/24/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
07/30/2024 Letter INSPECTION SUMMARY
07/31/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/06/2024 Letter INSPECTION SUMMARY
08/06/2024 Letter INSPECTION SUMMARY
08/07/2024 Letter INSPECTION SUMMARY
08/07/2024 Letter INSPECTION SUMMARY
08/09/2024 Letter INSPECTION SUMMARY
08/12/2024 Letter INSPECTION SUMMARY
08/12/2024 Letter INSPECTION SUMMARY
08/12/2024 Letter INSPECTION SUMMARY
08/12/2024 Letter INSPECTION SUMMARY
08/12/2024 Letter INSPECTION SUMMARY
08/12/2024 Letter INSPECTION SUMMARY
08/12/2024 Letter INSPECTION SUMMARY
08/14/2024 Letter INSPECTION SUMMARY
08/14/2024 Letter INSPECTION SUMMARY
08/14/2024 Letter INSPECTION SUMMARY
08/15/2024 Letter INSPECTION SUMMARY
08/19/2024 Letter INSPECTION SUMMARY
08/20/2024 Letter INSPECTION SUMMARY
08/20/2024 Letter INSPECTION SUMMARY
08/21/2024 Letter INSPECTION SUMMARY
08/21/2024 Letter INSPECTION SUMMARY
08/21/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter INSPECTION SUMMARY
08/23/2024 Letter INSPECTION SUMMARY
08/23/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/28/2024 Letter INSPECTION SUMMARY
08/28/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
09/04/2024 Letter INSPECTION SUMMARY
09/04/2024 Letter INSPECTION SUMMARY
09/05/2024 Letter INSPECTION SUMMARY
09/06/2024 Letter INSPECTION SUMMARY
09/09/2024 Letter INSPECTION SUMMARY
09/09/2024 Letter INSPECTION SUMMARY
09/09/2024 Letter INSPECTION SUMMARY
09/09/2024 Letter INSPECTION SUMMARY
09/09/2024 Email Fire Proofing Reports - St Lukes
09/09/2024 Engineer Report/Study St_ Lukes East ASC cert 7-24-24 J90772
09/09/2024 Engineer Report/Study Structural Steel Inspection Reports - St Lukes
09/11/2024 Letter INSPECTION SUMMARY
09/13/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/19/2024 Letter INSPECTION SUMMARY
09/20/2024 Letter INSPECTION SUMMARY
09/20/2024 Letter INSPECTION SUMMARY
09/20/2024 Letter INSPECTION SUMMARY
09/20/2024 Letter INSPECTION SUMMARY
09/23/2024 Letter INSPECTION SUMMARY
09/24/2024 Letter INSPECTION SUMMARY
09/24/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/27/2024 Letter INSPECTION SUMMARY
09/27/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
10/01/2024 Letter INSPECTION SUMMARY
10/01/2024 Letter INSPECTION SUMMARY
10/02/2024 24
10/02/2024 Letter INSPECTION SUMMARY
10/02/2024 Kone Elevator #16 State Inspection Passed - 10_2_24
10/02/2024 Kone Elevator #17 State Inspection Passed - 9_30_24
10/03/2024 Letter INSPECTION SUMMARY
10/03/2024 Letter INSPECTION SUMMARY
10/03/2024 Letter INSPECTION SUMMARY
10/03/2024 Letter INSPECTION SUMMARY
10/04/2024 3rd-Floor Map turnover zones
10/04/2024 Letter INSPECTION SUMMARY
10/07/2024 Letter INSPECTION SUMMARY
10/07/2024 Letter INSPECTION SUMMARY
10/09/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/16/2024 Approved Plans Approved plans - Arch & MEP
10/22/2024 Letter Field Partial Occupancy for ASC Expansion Area - See comments on document
11/05/2024 Letter INSPECTION SUMMARY
11/06/2024 Letter INSPECTION SUMMARY
11/07/2024 Letter INSPECTION SUMMARY
11/22/2024 Letter INSPECTION SUMMARY
11/25/2024 Letter INSPECTION SUMMARY
11/25/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter INSPECTION SUMMARY
12/06/2024 Letter INSPECTION SUMMARY
12/06/2024 Letter INSPECTION SUMMARY
12/12/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/18/2024 Letter INSPECTION SUMMARY
12/24/2024 Letter INSPECTION SUMMARY
01/02/2025 Letter INSPECTION SUMMARY
01/07/2025 Letter INSPECTION SUMMARY
01/07/2025 Letter INSPECTION SUMMARY
01/07/2025 Letter INSPECTION SUMMARY
01/15/2025 Letter INSPECTION SUMMARY
01/15/2025 Letter INSPECTION SUMMARY
01/15/2025 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
02/11/2025 Letter INSPECTION SUMMARY
02/20/2025 Letter INSPECTION SUMMARY
02/24/2025 Letter INSPECTION SUMMARY
02/28/2025 Letter INSPECTION SUMMARY
02/28/2025 Letter INSPECTION SUMMARY
03/03/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter INSPECTION SUMMARY
03/20/2025 1_ System PDF Files_1_ UL and cUL Systems_wl4043_dl_pdf - Door 2E-200A
03/20/2025 Design Supply-Saint Lukes East Hospital- FD2167- Report- 031025
03/20/2025 Design Supply-Saint Lukes East Hospital- FD2159- Report- 022825
03/21/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
04/14/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home