Permit Application Status

PRCOM20200811


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20200811
Building Permit - Commercial
Certificate of Occupancy
ROBINSON E L JR & LETHA M - TRUSTEES
NEW COMMERCIAL
NEW BUILDING FOR TIRE STORE WITH 7 SERVICE BAYS
03/31/2020
07/10/2020
01/02/2021
01/12/2022
Locations
Contacts
ROBINSON E L JR & LETHA M - TRUSTEES, Address:37004 E CLINE RD  
Westport Group, Inc., Address:1008 S Rock Street  
SGA DESIGN GROUP PC, Address:1437 SOUTH BOULDER STE 550, Phone:(915) 587-8600  
ACE ELECTRICAL CONTRACTORS, Address:1353 NE BRANDYWINE RD, Phone:(816) 875-4761  
GREEN FIELD ENERGY GROUP INC, Address:5 SW 4TH ST, Phone:(816) 524-5616  
MJ INTERIORS, Address:7915 HEMLOCK ST, Phone:(913) 313-6565  
John Dyess, Address:Westport Group, Phone:(480) 490-2701  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 10/19/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
10/19/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a hydrostatic test and a alarm/ water flow test.
Alarm Plan Review Released for Construction 10/06/2020 10/06/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
10/06/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Misc
Corrective Action Required
10/06/2020

(Action Required) Mount exterior horn/strobe by the FDC.
Fire Plan Review Approved with Conditions 09/25/2020 09/18/2020
Michael Weissenbach
Material safety and data sheets
Corrective Action Required
09/18/2020

2018 IFC 407.2- Safety Data Sheets. Safety Data Sheets (SDS) for all hazardous materials shall be readily available on the premises. (Verified At Inspection)
Construction documents for fire alarm systems
Corrective Action Required
09/18/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
09/18/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
09/18/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Misc
Corrective Action Required
09/18/2020

2018 IFC 5704.2.3 Labeling and Signs. Labeling and signs for storage tanks and storage areas shall comply with sections 5704.2.3.1 and 5704.2.3.2. (Verified At Inspection) Label the used oil tank and tank oil system, including the storage areas with NFPA 704 Placards.
Building Plan Review Approved with Conditions 09/25/2020 09/18/2020
Joe Frogge
Miscellaneous Correction
Corrective Action Required
09/18/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 4/20/20 - acknowledged in letter.
Final Development Plan Review Approved 07/10/2020
Joe Frogge
Building Plan Review Approved with Conditions 07/13/2020 07/10/2020
Joe Frogge
Final Development Plan
Resolved
07/10/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 4/20/20 - acknowledged in letter.
Miscellaneous Correction
Corrective Action Required
07/06/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 4/20/20 - acknowledged in letter.
Licensed Contractors Approved 07/13/2020 07/10/2020
Joe Frogge
LC - General Contractor
Resolved
07/10/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 4/20/20 - not addressed
LC - MEP Subs
Resolved
07/10/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 4/20/20 - not addressed
Fire Plan Review Approved with Conditions 07/13/2020 07/07/2020
Michael Weissenbach
Material safety and data sheets
Corrective Action Required
07/06/2020

2018 IFC 407.2- Safety Data Sheets. Safety Data Sheets (SDS) for all hazardous materials shall be readily available on the premises. (Verified At Inspection)
Construction documents for fire alarm systems
Corrective Action Required
07/06/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
07/06/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
07/06/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Misc
Corrective Action Required
07/06/2020

2018 IFC 5704.2.3 Labeling and Signs. Labeling and signs for storage tanks and storage areas shall comply with sections 5704.2.3.1 and 5704.2.3.2. (Verified At Inspection) Label the used oil tank and tank oil system, including the storage areas with NFPA 704 Placards.
Licensed Contractors Rejected 04/24/2020 04/20/2020
Joe Frogge
LC - General Contractor
Corrective Action Required
04/17/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 4/20/20 - not addressed
LC - MEP Subs
Corrective Action Required
04/17/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 4/20/20 - not addressed
Building Plan Review Rejected 04/24/2020 04/20/2020
Joe Frogge
Final Development Plan
Corrective Action Required
04/17/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 4/20/20 - acknowledged in letter.
Miscellaneous Correction
Corrective Action Required
04/17/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 4/20/20 - acknowledged in letter.
IBC 502.1 - Address Identification
Resolved
04/20/2020

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: This site has been assigend the address 3561 SW Market St. Please update your records and inform your client.
IBC 1803.1 General - geotech
Resolved
04/20/2020

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf.
IBC 1809.5 Frost protection - foundation
Resolved
04/20/2020

2018 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Modify exterior footing details to show that bottom of footing is minimum 3'-0" deep measured at grade, not floor slab.
Misc
Resolved
04/20/2020

Wood is not an approvable material at trash enclosure. Coordinate with Planning Department. Action required: Comment is for informational purposes.
NEC Article 210.8 (B) Other than dwelling units GFCI
Resolved
04/20/2020

2017 NEC Article 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (10) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas other than vehicle exhibition halls and showrooms. (9) Crawl spaces – at or below grade level. (10) Unfinished portions or areas of the basement not intended as habitable rooms. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles in garage service bays will by GFCI protected.
Fire Plan Review Approved with Conditions 04/24/2020 04/17/2020
Michael Weissenbach
Material safety and data sheets
Corrective Action Required
04/17/2020

2018 IFC 407.2- Safety Data Sheets. Safety Data Sheets (SDS) for all hazardous materials shall be readily available on the premises. (Verified At Inspection)
Construction documents for fire alarm systems
Corrective Action Required
04/17/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
04/17/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
04/17/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Misc
Corrective Action Required
04/17/2020

2018 IFC 5704.2.3 Labeling and Signs. Labeling and signs for storage tanks and storage areas shall comply with sections 5704.2.3.1 and 5704.2.3.2. (Verified At Inspection) Label the used oil tank and tank oil system, including the storage areas with NFPA 704 Placards.
Building Plan Review Rejected 04/14/2020 04/03/2020
Joe Frogge
Final Development Plan
Corrective Action Required
04/01/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
04/01/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
IBC 502.1 - Address Identification
Corrective Action Required
04/01/2020

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: This site has been assigend the address 3561 SW Market St. Please update your records and inform your client.
IBC 1803.1 General - geotech
Corrective Action Required
04/03/2020

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf.
IBC 1809.5 Frost protection - foundation
Corrective Action Required
04/03/2020

2018 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Modify exterior footing details to show that bottom of footing is minimum 3'-0" deep measured at grade, not floor slab.
Misc
Corrective Action Required
04/06/2020

Wood is not an approvable material at trash enclosure. Coordinate with Planning Department. Action required: Comment is for informational purposes.
NEC Article 210.8 (B) Other than dwelling units GFCI
Corrective Action Required
04/06/2020

2017 NEC Article 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (10) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas other than vehicle exhibition halls and showrooms. (9) Crawl spaces – at or below grade level. (10) Unfinished portions or areas of the basement not intended as habitable rooms. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles in garage service bays will by GFCI protected.
Fire Plan Review Approved with Conditions 04/14/2020 04/02/2020
Michael Weissenbach
Material safety and data sheets
Corrective Action Required
04/02/2020

2018 IFC 407.2- Safety Data Sheets. Safety Data Sheets (SDS) for all hazardous materials shall be readily available on the premises. (Verified At Inspection)
Construction documents for fire alarm systems
Corrective Action Required
04/02/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
04/02/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
04/02/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Misc
Corrective Action Required
04/02/2020

2018 IFC 5704.2.3 Labeling and Signs. Labeling and signs for storage tanks and storage areas shall comply with sections 5704.2.3.1 and 5704.2.3.2. (Verified At Inspection) Label the used oil tank and tank oil system, including the storage areas with NFPA 704 Placards.
Licensed Contractors Rejected 04/14/2020 04/01/2020
Joe Frogge
LC - General Contractor
Corrective Action Required
04/01/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
04/01/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $4,800.00 $4,800.00 Paid 06/24/2020
8331507-Sewer Connection Fee $360.00 $360.00 Paid 06/24/2020
7232302-Commercial Excise Tax Fee $13,477.50 $13,477.50 Paid 06/24/2020
8331401-Water Tap Fee $20,862.00 $20,862.00 Paid 06/24/2020
8350015-Water Meter Fee $3,377.34 $3,377.34 Paid 06/24/2020
91100C8-Sanitary Sewer Insp Fees $339.00 $339.00 Paid 06/24/2020
91100C9-Water Insp Fee $1,407.75 $1,407.75 Paid 06/24/2020
9110068-Storm Sewer Inspection Fee $1,375.35 $1,375.35 Paid 06/24/2020
9110081-Paved Surface Inspection Fee $3,345.90 $3,345.90 Paid 06/24/2020
9110071-Site Grading Fee $885.33 $885.33 Paid 06/24/2020
9110072-Water Test Fee $200.00 $200.00 Paid 06/24/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 06/24/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Passed 8/6/2020 (A.M.) 8/6/2020 08/06/2020
Misc
Informational
08/06/2020
On Thursday, 8-06-2020. Contractor installed silt fencing and rock entrance for project erosion control.
Footing Inspection - Commercial Partial 8/28/2020 (11:00) 8/28/2020 08/28/2020
Miscellaneous Correction
Informational
08/28/2020
-FOOTING AND PADS FOR BUILDING COMPLETE PERIMETER EXCEPT EAST WALL AT STORM LINE, TO BE POURED 8” BELOW INSULATION FOR SLAB TIE IN
Underground Plumbing Inspection - Commercial Passed 9/9/2020 9/9/2020 09/09/2020
Underground Plumbing Inspection - Commercial Passed 9/16/2020 9/16/2020 09/16/2020
Misc
Informational
09/16/2020
- Inspected underground oil interceptor
Underground Electrical Inspection - Commercial Partial 9/17/2020 9/17/2020 09/17/2020
Miscellaneous Correction
Corrective Action Required
09/17/2020
AREAS APPROVED: -CONDUIT FOR SECONDARY POWER FROM TRANSFORMER ON NORTH CORNER OF LOT TO SOUTHEAST CORNER OF BUILDING
All Rough Inspection - Commercial Partial 9/30/2020 9/30/2020 09/30/2020
Misc
Informational
09/30/2020
- INSPECTED BUILDING STRUCTURAL STEEL FRAMING
Underground Electrical Inspection - Commercial Partial 10/2/2020 10/2/2020 10/02/2020
Miscellaneous Correction
Corrective Action Required
09/17/2020
AREAS APPROVED: -CONDUIT FOR SECONDARY POWER FROM TRANSFORMER ON NORTH CORNER OF LOT TO SOUTHEAST CORNER OF BUILDING -CONDUIT FROM SOUTHEAST CORNER OF BUILDING TO SOUTHWEST CORNER OF BUILDING FOR MONUMENT SIGN, VAULT, AND FIRE BOX AND EAST FOR FUTURE USE AND SITE LIGHTING LOOP
Underground Electrical Inspection - Commercial Partial 10/2/2020 (1:30) 10/2/2020 10/02/2020
Miscellaneous Correction
Corrective Action Required
10/02/2020
AREAS APPROVED: -CONDUIT FOR SECONDARY POWER FROM TRANSFORMER ON NORTH CORNER OF LOT TO SOUTHEAST CORNER OF BUILDING -CONDUIT FROM SOUTHEAST CORNER OF BUILDING TO SOUTHWEST CORNER OF BUILDING FOR MONUMENT SIGN, VAULT, AND FIRE BOX AND EAST FOR FUTURE USE AND SITE LIGHTING LOOP -CONDUIT AT SOUTHEAST CORNER OF LOT FOR LIGHT POLE AND FUTURE USE
In-wall Inspection Failed 10/26/2020 10/26/2020 10/26/2020
Misc
Corrective Action Required
10/26/2020
INSPECTED PARTIAL IN WALL AT RETAIL, RESTROOMS - MAKE CRC LATERAL BRACING CONTINUOUS -COMPLETE ELECTRICAL -SECURE DWV 2” OR LESS -BLOCKING REQUIRED AT HARD LID CEILING LINE IN BATHROOMS - OK TO ONE SIDE ROCK PORTIONS INSPECTED
In-wall Inspection Partial 11/2/2020 11/2/2020 11/02/2020
Misc
Resolved
11/02/2020
All Rough Inspection - Commercial Partial 11/2/2020 11/2/2020 11/02/2020
Misc
Resolved
11/02/2020
Underground Electrical Inspection - Commercial Failed 12/4/2020 12/4/2020 12/04/2020
Miscellaneous Correction
Corrective Action Required
10/02/2020
AREAS APPROVED: -CONDUIT FOR SECONDARY POWER FROM TRANSFORMER ON NORTH CORNER OF LOT TO SOUTHEAST CORNER OF BUILDING -CONDUIT FROM SOUTHEAST CORNER OF BUILDING TO SOUTHWEST CORNER OF BUILDING FOR MONUMENT SIGN, VAULT, AND FIRE BOX AND EAST FOR FUTURE USE AND SITE LIGHTING LOOP -CONDUIT AT SOUTHEAST CORNER OF LOT FOR LIGHT POLE AND FUTURE USE
Misc
Corrective Action Required
12/04/2020
- 12/4 - UNDERGROUND ELECTRICAL TRENCH DUG BUT NO CODUIT IN TRENCH, RESCHEDULE WHEN CONDUIT COMPLETE
Underground Electrical Inspection - Commercial Partial 12/7/2020 12/7/2020 12/07/2020
Miscellaneous Correction
Corrective Action Required
12/04/2020
AREAS APPROVED: -CONDUIT FOR SECONDARY POWER FROM TRANSFORMER ON NORTH CORNER OF LOT TO SOUTHEAST CORNER OF BUILDING -CONDUIT FROM SOUTHEAST CORNER OF BUILDING TO SOUTHWEST CORNER OF BUILDING FOR MONUMENT SIGN, VAULT, AND FIRE BOX AND EAST FOR FUTURE USE AND SITE LIGHTING LOOP -CONDUIT AT SOUTHEAST CORNER OF LOT FOR LIGHT POLE AND FUTURE USE -12/7 - CODUIT AT EAST SIDE BEHIND BUILDING SOUTH HEADING WEST AT PARKING LOT CORNER ABOUT 40’ PAST CORNER OF LOT
Misc
Resolved
12/07/2020
Underground Electrical Inspection - Commercial Partial 12/8/2020 12/8/2020 12/08/2020
Miscellaneous Correction
Corrective Action Required
12/07/2020
AREAS APPROVED: -CONDUIT FOR SECONDARY POWER FROM TRANSFORMER ON NORTH CORNER OF LOT TO SOUTHEAST CORNER OF BUILDING -CONDUIT FROM SOUTHEAST CORNER OF BUILDING TO SOUTHWEST CORNER OF BUILDING FOR MONUMENT SIGN, VAULT, AND FIRE BOX AND EAST FOR FUTURE USE AND SITE LIGHTING LOOP -CONDUIT AT SOUTHEAST CORNER OF LOT FOR LIGHT POLE AND FUTURE USE -12/7 - CODUIT AT EAST SIDE BEHIND BUILDING SOUTH HEADING WEST AT PARKING LOT CORNER ABOUT 40’ PAST CORNER OF LOT -12/8 - CODUIT AT SOUTH SIDE OF LOT RUNNING WEST FOR MONUMENT SIGN ALONG WEST SIDE OF LOT ENDING AT MAIN PARKING LOT ENTRANCE FOR LIGHT POLE BASES
Electrical Service Inspection Failed 12/15/2020 12/15/2020 12/15/2020
Misc
Corrective Action Required
12/15/2020
INSTALL BONDING BUSHING AT MAIN MDP, 250.92 (A) (B)
Piers/Caissons Inspection - Commercial Passed 12/17/2020 12/17/2020
Misc
Informational
12/17/2020
-INSPECTED (4) LIGHT POLE BASES, CONDUIT AND GROUND ROD INSTALLED IN BASE
Electrical Service Inspection Passed 12/17/2020 12/17/2020
Misc
Resolved
12/17/2020
Gas Service Inspection - Commercial Passed 12/28/2020 12/28/2020 12/28/2020
All Rough Inspection - Commercial Partial 12/29/2020 12/29/2020 12/29/2020
Misc
Corrective Action Required
12/29/2020
-12/29 INSPECTED INTERIOR PLUMBING
Sprinkler - Hydrostatic Test Passed 1/4/2021 01/04/2021
Above Ceiling Inspection Passed 2/23/2021 02/23/2021
All Rough Inspection - Commercial Passed 2/23/2021 02/23/2021
Misc
Resolved
02/23/2021
-12/29 INSPECTED INTERIOR PLUMBING
Underground Electrical Inspection - Commercial Passed 2/23/2021 02/23/2021
Miscellaneous Correction
Resolved
02/23/2021
AREAS APPROVED: -CONDUIT FOR SECONDARY POWER FROM TRANSFORMER ON NORTH CORNER OF LOT TO SOUTHEAST CORNER OF BUILDING -CONDUIT FROM SOUTHEAST CORNER OF BUILDING TO SOUTHWEST CORNER OF BUILDING FOR MONUMENT SIGN, VAULT, AND FIRE BOX AND EAST FOR FUTURE USE AND SITE LIGHTING LOOP -CONDUIT AT SOUTHEAST CORNER OF LOT FOR LIGHT POLE AND FUTURE USE -12/7 - CODUIT AT EAST SIDE BEHIND BUILDING SOUTH HEADING WEST AT PARKING LOT CORNER ABOUT 40’ PAST CORNER OF LOT -12/8 - CODUIT AT SOUTH SIDE OF LOT RUNNING WEST FOR MONUMENT SIGN ALONG WEST SIDE OF LOT ENDING AT MAIN PARKING LOT ENTRANCE FOR LIGHT POLE BASES
In-wall Inspection Passed 2/23/2021 02/23/2021
Footing Inspection - Commercial Passed 2/23/2021 02/23/2021
Miscellaneous Correction
Resolved
02/23/2021
-FOOTING AND PADS FOR BUILDING COMPLETE PERIMETER EXCEPT EAST WALL AT STORM LINE, TO BE POURED 8” BELOW INSULATION FOR SLAB TIE IN
Underslab Plumbing Inspection - Commercial Passed 2/23/2021 02/23/2021
Gas Piping Inspection - Commercial Passed 2/23/2021 02/23/2021
Foundation Inspection - Commercial Passed 2/23/2021 02/23/2021
Alarm Test Passed 3/2/2021 03/02/2021
Sprinkler - Flow Test Passed 3/2/2021 03/02/2021
Occupancy Inspection - Planning Passed 3/4/2021 03/03/2021
Occupancy Inspection - Engineering Failed 3/4/2021 03/04/2021
Misc
Corrective Action Required
03/04/2021
Need as-builts for detention basin in order to receive TCO. Contractor has been notified of this requirejment.
Occupancy Inspection - Fire Temporary C of O 3/4/2021 03/04/2021
Occupancy Inspection - Water Utilities Temporary C of O 3/4/2021 03/04/2021
Water - Material Verification Passed 03/04/2021
Water Line - Construction Inspection Passed 03/04/2021
Pavement-Proof Roll Passed 03/04/2021
Pavement-Surface Passed 03/04/2021
Install Street and Stop Signs Passed 03/04/2021
Storm - Material Verification Passed 03/04/2021
Storm - Pipe Passed 03/04/2021
Storm - Swales Passed 03/04/2021
Sidewalk Inspection Passed 03/04/2021
ESC - (Vegetation/Ground Cover) Passed 03/04/2021
Sewer Service Inspection Passed 03/04/2021
Water Service Inspection Passed 12/29/2020 (2:00) 03/04/2021
Occupancy Inspection - Codes Commercial Failed 3/4/2021 3/4/2021 03/04/2021
Misc
Corrective Action Required
03/04/2021
-PARKING LIGHT POLE GROUND ROD CONNECTION -SPARK RINGS AT RECEPTACLES ON ALL COMBUSTIBLE SURFACES NOT FLUSH WITH SURFACE -BOND AT WATER LINE ACROSS FROM BACKFLOW VALVE -COMPLETE BOX/CONDUIT INSTALLATION AT SALES FLOOR, SOUTH WALL -GFCI RECEPACTLE AT CUSTOMER SALES FLOOR BATHROOM NOT TRIPPING WHEN TESTED
Occupancy Inspection - Water Utilities Passed 03/19/2021
Occupancy Inspection - Fire Passed 3/31/2021 03/31/2021
Occupancy Inspection - Codes Commercial Failed 4/8/2021 04/08/2021
Misc
Corrective Action Required
03/04/2021
-PARKING LIGHT POLE GROUND ROD CONNECTION -SPARK RINGS AT RECEPTACLES ON ALL COMBUSTIBLE SURFACES NOT FLUSH WITH SURFACE -BOND AT WATER LINE ACROSS FROM BACKFLOW VALVE -COMPLETE BOX/CONDUIT INSTALLATION AT SALES FLOOR, SOUTH WALL -GFCI RECEPACTLE AT CUSTOMER SALES FLOOR BATHROOM NOT TRIPPING WHEN TESTED
Miscellaneous Correction
Corrective Action Required
04/08/2021
Released to set up, stock inventory and train staff. Not allowed to open for business to the public.
Occupancy Inspection - Codes Commercial Failed 4/9/2021 4/9/2021 04/09/2021
Misc
Corrective Action Required
04/08/2021
-RESOLVE OUTSTANDING ISSUES WITH ENGINEERING FOR RETENTION BASIN, SEE ENGINEERING INSPECTION REPORT
Miscellaneous Correction
Corrective Action Required
04/08/2021
Released to set up, stock inventory and train staff. Not allowed to open for business to the public.
Occupancy Inspection - Engineering Temporary C of O 4/16/2021 04/16/2021
Misc
Corrective Action Required
03/04/2021
Need as-builts for detention basin in order to receive TCO. Contractor has been notified of this requirejment.
Misc
Corrective Action Required
04/16/2021
Items needed for Final Occupancy- To be done in 60 days from TCO. 1. All issues on detention basin needs to be corrected. Lower structure- the correct orifice needs to be installed. re-grading will need to be done after all pipe and structure has been re-installed. 2. We will need new as-built shots of basin, pipe and structure when finished. 3.70% vegetation will need to be established after all re-work has been completed.
Occupancy Inspection - Codes Commercial Temporary C of O 4/16/2021 04/16/2021
Misc
Corrective Action Required
04/09/2021
TCO issued. See seperate report from Engineering Tco issued for 60days on open items. Documents and re-inspections need to be completed and approved by 6/14/2021 contact the Development inspector or the Project Manager at 969-1200 for the remaining items.
Occupancy Inspection - Codes Commercial Temporary C of O 6/15/2021 06/15/2021
Misc
Corrective Action Required
04/16/2021
TCO issued. See seperate report from Engineering Tco issued for 60days on open items. Documents and re-inspections need to be completed and approved by 6/14/2021 contact the Development inspector or the Project Manager at 969-1200 for the remaining items.
Misc
Corrective Action Required
06/15/2021
as per email and Mike W- to extend TCO 30days. MARK HARDING 06/15/2021 9:05 AM 7/15/21
Occupancy Inspection - Codes Commercial Temporary C of O 9/8/2021 09/08/2021
Misc
Corrective Action Required
06/15/2021
TCO issued. See seperate report from Engineering Tco issued for 60days on open items. Documents and re-inspections need to be completed and approved by 6/14/2021 contact the Development inspector or the Project Manager at 969-1200 for the remaining items.
Misc
Corrective Action Required
06/15/2021
as per email and Mike W- to extend TCO 30days. MARK HARDING 06/15/2021 9:05 AM 7/15/2021 Mike Weisenborn 09/08/2021 9:09 AM - The repair work has been completed. Tom asked that they add some seed to the area that was worked for the detention repairs. Extended the TCO 30 days to allow seed to establish
Occupancy Inspection - Codes Commercial Full C of O 12/13/2021 12/13/2021 01/12/2022
Misc
Resolved
12/13/2021
TCO issued. See seperate report from Engineering Tco issued for 60days on open items. Documents and re-inspections need to be completed and approved by 6/14/2021 contact the Development inspector or the Project Manager at 969-1200 for the remaining items.
Misc
Resolved
12/13/2021
as per email and Mike W- to extend TCO 30days. MARK HARDING 06/15/2021 9:05 AM 7/15/2021 Mike Weisenborn 09/08/2021 9:09 AM - The repair work has been completed. Tom asked that they add some seed to the area that was worked for the detention repairs. Extended the TCO 30 days to allow seed to establish
Occupancy Inspection - Engineering Passed 12/3/2021 12/8/2021 01/12/2022
Misc
Corrective Action Required
04/16/2021
Need as-builts for detention basin in order to receive TCO. Contractor has been notified of this requirejment.
Misc
Corrective Action Required
04/16/2021
Items needed for Final Occupancy- To be done in 60 days from TCO. 1. All issues on detention basin needs to be corrected. Lower structure- the correct orifice needs to be installed. re-grading will need to be done after all pipe and structure has been re-installed. 2. We will need new as-built shots of basin, pipe and structure when finished. 3.70% vegetation will need to be established after all re-work has been completed.
Documents & Images
Date Uploaded File Type Document Name
03/31/2020 Application Form Commercial Permit Application
03/31/2020 Letter License_Tax_Application (002)
04/01/2020 Specifications Lees Summit MO_Permit Spec
04/01/2020 Engineer Report/Study BSRO - Lee's Summit, MO - MEP COMcheck
04/01/2020 Engineer Report/Study BSRO - Lee's Summit, MO - Envelope COMcheck
04/02/2020 Letter Fire Building Plan Review
04/02/2020 Plans Firestone Complete Auto Care_Permit Set
04/06/2020 Letter DS P/R Corrections Document
04/17/2020 Letter Lee's Summit MO_ADD 1_Plan review response letter
04/17/2020 Specifications Firestone Complete Auto Care_Permit Spec_ADD 1
04/17/2020 Letter Lee's Summit MO_ADD 1_Narrative
04/17/2020 Plans Firestone Complete Auto Care_Permit Set_ADD 1
04/17/2020 Letter Fire Building Plan Review
06/24/2020 Receipt Receipt for transaction:2020-003543
06/30/2020 Specifications Firestone Complete Auto Care_Permit Spec_CB 1
06/30/2020 Letter Lee's Summit MO_CB 1_Narrative
06/30/2020 Plans Firestone Complete Auto Care_Permit Set_CB 1
07/07/2020 Letter Fire Building Plan Review
07/10/2020 Approved Plans Approved Firestone Site Plans
07/10/2020 Approved Plans Approved - permit drawings
07/10/2020 Letter License Tax Bill
07/10/2020 Letter DS Building Permit
08/28/2020 Letter INSPECTION SUMMARY
09/09/2020 Letter INSPECTION SUMMARY
09/16/2020 Letter INSPECTION SUMMARY
09/18/2020 Letter Lee's Summit MO_CB 2_Narrative
09/18/2020 Specifications Firestone Complete Auto Care_Permit Spec_IFC
09/18/2020 Letter Lee's Summit MO_IFC_Narrative
09/18/2020 Plans Firestone Complete Auto Care_Permit Set_IFC & CB 2
09/18/2020 Letter Fire Building Plan Review
09/21/2020 Approved Plans approved - Firestone Complete Auto Care
09/30/2020 Letter INSPECTION SUMMARY
10/02/2020 Letter INSPECTION SUMMARY
10/02/2020 Letter INSPECTION SUMMARY
10/02/2020 Letter INSPECTION SUMMARY
10/06/2020 Firestone Lees Summit Front Page_stamped
10/06/2020 Firestone Lees Summit._stamped
10/06/2020 Letter Fire (Alarm) Plan Review Notice
10/19/2020 Letter Fire (Sprinkler) Plan Review
10/26/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
12/04/2020 Letter INSPECTION SUMMARY
12/04/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/08/2020 Letter INSPECTION SUMMARY
12/15/2020 Letter INSPECTION SUMMARY
12/17/2020 Letter INSPECTION SUMMARY
12/17/2020 Letter INSPECTION SUMMARY
12/17/2020 Letter INSPECTION SUMMARY
12/28/2020 Letter INSPECTION SUMMARY
12/29/2020 Letter INSPECTION SUMMARY
01/04/2021 Letter Fire Loss Reduction Form
01/11/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
03/02/2021 Letter Fire Loss Reduction Form
03/02/2021 Letter INSPECTION SUMMARY
03/02/2021 Letter Fire Loss Reduction Form
03/04/2021 Letter INSPECTION SUMMARY
03/04/2021 Letter Fire Loss Reduction Form
03/04/2021 Letter INSPECTION SUMMARY
03/31/2021 Letter Fire Loss Reduction Form
04/08/2021 Letter INSPECTION SUMMARY
04/09/2021 Letter INSPECTION SUMMARY
04/12/2021 Plans C301_STORM PLAN AND PROFILE_ASBUILT
04/12/2021 Plans C300_ GRADING AND DRAINAGE PLAN_ASBUILT
04/12/2021 Plans C903_SITE DETAILS_ASBUILT
04/12/2021 Plans Hydraflow_AsBuilt 100 Yr Clogged Conditions
04/12/2021 Plans Hydraflow_AsBuilt Regular Conditions
04/16/2021 Letter INSPECTION SUMMARY
04/16/2021 Letter Codes Temporary Certificate of Occupancy
06/15/2021 Letter Codes Temporary Certificate of Occupancy
07/07/2021 4083145_CompiledAs-builtFixPlans_07_07_02021
07/08/2021 Approved Plans Firestone Detention Basin Redesign Approved 7.8.21
09/08/2021 Letter Codes Temporary Certificate of Occupancy
10/25/2021 Engineer Report/Study Approved As-Built_ReportNarrativeCOMPILED
12/20/2021 Letter Field Certificate of Occupancy
01/12/2022 Letter INSPECTION SUMMARY
01/12/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home