Planning Application Status

PL2025085




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2025085
Midwest Avionics Hangar
Commercial Final Development Plan
Commercial Final Development Plan
Approved
04/15/2025
CITY OF LEES SUMMIT
New 12,000 sqft hangar on the west side of the airport at 2751 NE Douglas St
Locations
Contacts
CITY OF LEES SUMMIT, Address:220 S MAIN  
Kevin Sterrett, Address:Hg Consult, Inc, Phone:(816) 759-2285  
Levi Self, Address:2525 DOUGLAS ST NE, Phone:(816) 616-8676  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 05/22/2025 05/21/2025
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
05/21/2025

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap, meter setup, and sanitary sewer fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $34,855.55
DE Contact Field Eng. Inspector
Corrective Action Required
05/21/2025

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to schedule a project coordination meeting with the assigned Field Engineering Inspector.
Misc.
Corrective Action Required
05/21/2025

Prior to commencement of any construction activities, contact the airport manager to coordinate any required activities or NOTAMS for the project.
Engineering Review Approved with Conditions 05/09/2025 05/08/2025
Gene Williams, P.E.
Corrective Action Required
05/08/2025

Itemized and sealed cost estimate required prior to formal approval. This item is needed to calculate the Engineering Plan Review and Inspection Fee. Items to be included are: 1) pavement, 2) demolition, 3) grading, 4) water line and sanitary sewer line, 5) apron repair for water main, and 6) erosion and sediment control and final restoration.
DE Contact Field Eng. Inspector
Corrective Action Required
05/08/2025

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to schedule a project coordination meeting with the assigned Field Engineering Inspector.
Miscellaneous Correction
Corrective Action Required
05/08/2025

All work to be coordinated with the airport manager to ensure runway and taxiway incursions are avoided, and to ensure airport security is maintained.
Building Codes Review No Comments 05/09/2025 05/06/2025
Joe Frogge
Miscellaneous Correction
Resolved
05/06/2025

Provide cleanouts where sanitary leaves the building per 2018 IPC 708.1.3
Miscellaneous Correction
Resolved
05/06/2025

Provide cleanouts where sanitary leaves the building per 2018 IPC 708.1.3
Planning Review No Comments 05/09/2025 05/02/2025
Hector Soto Jr.
Planning Review Corrections 04/29/2025 04/29/2025
Hector Soto Jr.
Corrective Action Required
04/29/2025

SITE BOUNDARY. Label the dimension from the NW hangar building corner to the NW parking lot corner that makes up that particular segment of the property lease boundary.
Corrective Action Required
04/29/2025

SITE DATA TABLE. Provide a site data table that centrally lists the following: 1) site area square footage (i.e. lease area boundary square footage); 2) total building square footage; 3) project area lease area square footage; and 4) number of required and provided parking spaces.
Corrective Action Required
04/29/2025

LIGHTING. Provide a photometric plan and manufacturer specifications for all exterior building fixtures. Exterior light fixture shall have full 90-degree cut-offs so as to direct light downward and so the light source is not visible from off the property.
Corrective Action Required
04/29/2025

PARKING SPACES. City ordinance does not allow the use of wheel stops at the head of parking spaces, except for at the head of ADA accessible parking spaces. All of the wheel stops can be replaced with a single bollard at the head of each space to provide protection to the hangar and to preserve a walking path in front of the spaces.
Engineering Review Corrections 04/29/2025 04/29/2025
Gene Williams, P.E.
Corrective Action Required
04/29/2025

Typical asphaltic concrete section view is required, and shall include KCMMB asphaltic concrete regardless of the thickness and subgrade. Since this is part of the airport, Unified Development Ordinance (UDO) standard pavement design standards shall not apply, but you shall be responsible for verifying the design with the airport manager and Public Works. Provide a typical section view for the asphaltic concrete, and ensure it meets the expectations of the airport manager and Public Works.
Traffic Review No Comments 04/29/2025 04/25/2025
Erin Ralovo
Fire Review Approved with Conditions 04/29/2025 04/24/2025
Jim Eden
Code Statement
Corrective Action Required
04/24/2025

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Building Codes Review Corrections 04/29/2025 04/22/2025
Joe Frogge
Miscellaneous Correction
Corrective Action Required
04/22/2025

Provide cleanouts where sanitary leaves the building per 2018 IPC 708.1.3
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $725.00 $725.00 Paid 04/15/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
04/15/2025 Application Form Application Form_PL2025085
04/15/2025 Plans Plan set_Rev 0_PL2025085
04/15/2025 Engineer Report/Study Storm Memo_Rev 0_PL2025085
04/15/2025 Activity Document FAA letter 1_PL2025085
04/15/2025 Activity Document FAA letter 2_PL2025085
04/15/2025 Receipt Receipt_PL2025085
04/15/2025 Drawing Floor plan sheet_PL2025085
04/15/2025 Drawing Elevations_PL2025085
04/29/2025 Letter Applicant Letter_Rev 0_PL2025085
05/02/2025 Plans Plan set_Rev 1_PL2025085
05/02/2025 Specifications Lighting spec sheet_PL2025085
05/02/2025 Letter Response to Comments letter_Rev 1_PL2025085
05/08/2025 Letter Applicant Letter_Rev 1_PL2025085
05/14/2025 Engineers Estimate Cost Estimate- Midwest Avionics
05/21/2025 FeeWorksheetMidwestAvionicsFDP
05/22/2025 Letter Applicant Letter_approved_PL2025085
05/27/2025 Approved Plans Approved FDP_Midwest Avionics Hangar-Revised 5-27-25_PL2025085
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home