Planning Application Status

PL2020380




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020380
Whataburger
Commercial Final Development Plan
Commercial Final Development Plan
Approved
12/22/2020
OAK VIEW LEES SUMMIT LLC
New fastfood restaurant with drive-thru
Locations
Contacts
OAK VIEW LEES SUMMIT LLC, Address:201 HAWKS RIDGE TRL  
MS CONSULTANTS INC, Address:2221 SCHROCK RD, Phone:(614) 898-7100  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Corrections 11/08/2021 11/05/2021
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
11/01/2021

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
11/01/2021

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
11/01/2021

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $xxx.xx
DE Future Repair Work
Corrective Action Required
11/01/2021

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Engineering Review Approved with Conditions 07/28/2021 08/11/2021
Mike Weisenborn
DE C&O #11 Pavement Thickness
Corrective Action Required
07/23/2021

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
07/23/2021

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
07/23/2021

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $xxx.xx
DE Future Repair Work
Corrective Action Required
07/23/2021

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
THIS REVIEW WAS FOR THE BARRIER BETWEEN THE UNDERGROUND DETENTION AND RETAINING WALL. Mike Weisenborn 08/11/2021 4:35 PM
Building Codes Review No Comments 03/18/2021 03/18/2021
Mike Weisenborn
Engineering Review Approved with Conditions 03/18/2021 03/18/2021
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
03/18/2021

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
03/18/2021

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
03/18/2021

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $xxx.xx
DE Future Repair Work
Corrective Action Required
03/18/2021

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Planning Review No Comments 03/18/2021 03/18/2021
Shannon McGuire
Fire Review No Comments 03/18/2021 03/17/2021
Jim Eden
Code Statement
Corrective Action Required
03/11/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Traffic Review Approved with Conditions 03/18/2021 03/15/2021
Michael Park
Corrective Action Required
03/15/2021

Previous traffic circulation management comments apply for future reference.
Planning Review Corrections 03/01/2021 03/01/2021
Mike Weisenborn
Corrective Action Required
02/22/2021

The proposed TWS LED (TWS LED P1 50K MVOLT PE DDB M4) wall pack is not allowable. Wall-mounted lights shall utilize full cut-off fixtures. Please propose a model the meets the UDO requirements.
Engineering Review Corrections 03/01/2021 03/01/2021
Sue Pyles, P.E.
Corrective Action Required
03/01/2021

Sheet C-6.1: • Please revise all rectangular structures in the Storm Structure Data Table to show length and width of these structures. • The HGL between Structures 3-4 is shown above the top of the pipe. This segment is not included in the Storm Water Management Report calculations. Please include. • Please include the storm sewer drainage calculations in the plan set.
Corrective Action Required
03/01/2021

Sheet C-7: Please show and label the irrigation meter size and location.
Corrective Action Required
03/01/2021

The curb and gutter detail or pavement detail must show that the aggregate base and compaction of native subgrade extends a minimum of one (1) foot beyond the back of curb.
Corrective Action Required
03/01/2021

The ADA-Ramp design included is not adequate. The City requires a specific design for each ramp, which includes spot elevations for each corner of each ramp component as appropriate (landing, ramp, turning space), slopes and widths for each side of each ramp component. An example will be provided. Please note that detectable warnings are not required at the commercial entrance ramps.
Corrective Action Required
03/01/2021

Please revise the estimate: • Please revise to show each individual item, rather than lumping a group together (parking lot, SWPPP). For example, individual items for asphalt pavement, concrete pavement, aggregate base, stabilized subgrade, curb& gutter, etc. • Include bends and cleanouts on the estimate. • Include an item for FH, new and relocation as appropriate. • Is the fire protection structure in the estimate the backflow prevention device vault? Please clarify. • Delete grease control and traffic control items, they are not included in the fee calculation.
Building Codes Review No Comments 03/01/2021 02/26/2021
Joe Frogge
Fire Review Approved with Conditions 03/01/2021 02/24/2021
Jim Eden
Code Statement
Corrective Action Required
03/01/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Traffic Review Approved with Conditions 03/01/2021 02/22/2021
Michael Park
Corrective Action Required
03/01/2021

The area for queuing between to the order menu and Douglas is fairly limited. If queuing impacts Douglas (or at times during high volume that results in drive-thru queuing on Douglas), site traffic management practices may be imposed by temporary driveway closure along Douglas to route drive thru activity utilizing the fullest extent of availabe private property (e.g. southwest property entrance in lieu of Douglas and queue along the south side parking lot) in the interest of public safety. Douglas, a public arterial, shall not be used as an extension of private property drive-thru lane.
Building Codes Review No Comments 02/04/2021 02/05/2021
Joe Frogge
Engineering Review Corrections 02/04/2021 02/04/2021
Sue Pyles, P.E.
Corrective Action Required
02/04/2021

Please submit an Engineer’s Estimate of Probable Construction Costs. UDO Section 3.410.D provides guidance.
Corrective Action Required
02/04/2021

• The ADA-accessible route must extend to the public sidewalk along the Douglas Road commercial entrance. • Additional ADA Ramp design information is required. The specific details of these features must include, at a minimum, the design details specified in Section 5304.8 of the Design and Construction Manual. Elevation call-outs, although required, are not sufficient. Other design details specified in this section are required, including slope call-outs which comply with the criteria listed in Table LS-5, and section views specified in 5304.8. I’m happy to provide examples if you’d like.
Corrective Action Required
02/04/2021

Sheet C-6.1: Include structure sizes.
Corrective Action Required
02/04/2021

Enclosed storm sewer systems will use the open channel, or gravity, flow design method for the appropriate design storm (LS Section 5603.1). Please revise to keep the design HGL within the pipe system.
Corrective Action Required
02/04/2021

Sheet C-7: • Specify water and sanitary connection information. Don’t just indicate it should ber local regulations or leave it unspecified. • Show the existing FHs. Verify they do not require relocation. • Show all pipe information (length, material, bends, etc.).
Corrective Action Required
02/04/2021

Include the City’s Curb and Gutter Standard Detail.
Planning Review Corrections 02/04/2021 02/02/2021
Shannon McGuire
Corrective Action Required
02/02/2021

There are 3 unresolved comments from the Applicant’s Letter dated 1/12/2021; #3 - Please provide the manufacturer’s specification sheets for proposed exterior lighting to include both parking lot pole mounted and wall mounted fixtures. The specification sheets shall indicate the exact fixture to be used. #5 - Please provide the manufacturer’s specification sheets for proposed mechanical equipment to be used (roof top and/or ground). #16 - The elevations on sheets A2.1 & A2.2 seem to be labeled with the wrong direction. Please check this and update as needed.
Fire Review Approved with Conditions 02/04/2021 02/01/2021
Jim Eden
Code Statement
Informational
02/01/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Traffic Review Approved with Conditions 02/04/2021 01/28/2021
Michael Park
Informational
01/28/2021

The area for queuing between to the order menu and Douglas is fairly limited. If queuing impacts Douglas (or at times during high volume that results in drive-thru queuing on Douglas), site traffic management practices may be imposed by temporary driveway closure along Douglas to route drive thru activity utilizing the fullest extent of availabe private property (e.g. southwest property entrance in lieu of Douglas and queue along the south side parking lot) in the interest of public safety. Douglas, a public arterial, shall not be used as an extension of private property drive-thru lane.
Engineering Review Corrections 01/12/2021 01/12/2021
Sue Pyles, P.E.
Corrective Action Required
01/12/2021

Please submit the following: • Engineer's Estimate of Probable Construction Costs. •SWPPP and a copy of the MDNR Land Disturbance Permit.
Corrective Action Required
01/12/2021

Substantial Completion Impacts: •The existing public sanitary sewer must be extended to the west property line. Substantial completion of this extension is required prior to substantial completion being given to this FDP. A separate set of engineering plans is required for this extension. •Please note that substantial completion of the associated right-turn lane on Douglas is required prior to substantial completion being given to this FDP.
Corrective Action Required
01/12/2021

General: •The existing private water line must be extended to the west property line as a part of this project. Please add this to the plans accordingly. •Show location of all oil/gas wells, or indicate none are present, and cite the source. •Please add a note stating: “The contractor shall notify the City of Lee’s Summit Development Engineering Inspection at (816) 969-1200 at least 48 hours prior to the commencement of any construction.” • Please add a note stating that "...all construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813. Where discrepancies exist between these plans and the Design and Construction Manual, the Design and Construction Manual shall prevail.” • Please revise plans to indicate Lee’s Summit standard details and design requirements are to be used, rather than MoDOT.
Corrective Action Required
01/12/2021

Site Comments: • Trash enclosures are required to have a minimum of 30’ concrete pavement. Please revise. • Please include curb & gutter across all future drives to the adjacent lot. A temporary asphalt curb may be used in this case. If this option is used, please add a construction detail for the temporary curb. • Please show the ADA-accessible route on the plans. • All ADA-accessible ramps and ADA-accessible ways must have a specific detail associated with them. Please show the locations of these features, and provide a call-out on the plan view with a specific reference to the sheet number and detail number. • Please note that 2.00% cross slope and 8.33% running slope shown are the maximum slopes allowed by ADA, and do not include a construction tolerance. Slopes that exceed the maximum in the field will not be accepted. This is an informational comment.
Corrective Action Required
01/12/2021

Utilities: • Please include connection information for both sanitary and water proposed lines to existing lines. Please note that a sanitary sewer service line must connect to the existing sanitary main with a cut-in wye and not by direct connection to the MH. • Please verify if there is an existing sanitary stub provided within this lot boundary. Record drawings submitted suggest that there may be one, depending on where the new lot line falls. Please coordinate to show this information on the plans. • Please justify the need for a 6” sanitary sewer stub. It doesn’t appear necessary in this instance. • Please label the size of each water meter. • A backflow vault is not required on the domestic line. Please delete. • Please include type of valves proposed on the water lines.
Corrective Action Required
01/12/2021

Please include a phased erosion and sediment control plan for pre, during, and post construction phases. Include installation and removal requirements/phases for each BMP.
Corrective Action Required
01/12/2021

The pavement sections shown do not meet the requirements shown in Section 8.620 of the Unified Development Ordinance. Revise details to City requirements, not MoDOT. Please note that the UDO and Design and Construction Manual requirements govern over any shown in the referenced geotechnical report.
Corrective Action Required
01/12/2021

The curb and gutter detail or pavement detail must show that the aggregate base and compaction of native subgrade extends a minimum of one (1) foot beyond the back of curb.
Corrective Action Required
01/12/2021

Include all relevant City standard details as well as APWA standard erosion and sediment control standard details.
Corrective Action Required
01/12/2021

The methodology of the stormwater design, as detailed in the submitted Storm Drainage Calculation Report, does not meet City requirements of the Comprehensive Method for the analysis and design rather than pre vs post. Please revise the report accordingly. A Stormwater Report Requirements document is available on the City’s website.
Corrective Action Required
01/12/2021

Storm Sewer: • Show and label the design HGL, pipe material, and pipe slope in the storm sewer Profile views. • Please separate storm sewer plan & pro information onto a separate plan sheet. • A complete review of the storm sewer and detention basin plan or design will be done after the stormwater study has been revised. • Include the following note on any profile sheet applicable: “Compacted Fill shall be placed to a minimum 18” above the top of the pipe prior to installation.” • Show and label the limits of the compacted fill placement in the Profile view. Use hatching for clarity.
Planning Review Corrections 01/12/2021 01/08/2021
Shannon McGuire
Corrective Action Required
01/08/2021

Trash enclosure areas shall be improved with a Portland cement concrete pad and a Portland cement concrete approach 30 feet in length, measured from the enclosure opening. The pad and approach shall be improved with a minimum six inches of full depth unreinforced Portland cement concrete constructed on a sub-grade of four inches of granular base course.
Corrective Action Required
01/08/2021

Please show the location of all oil and/or gas wells within the subject property. If none are present, please add a note stating such and cite the source of your information.
Corrective Action Required
01/08/2021

Please provide the manufacturer’s specification sheets for proposed exterior lighting to include both parking lot pole mounted and wall mounted fixtures. The specification sheets shall indicate the exact fixture to be used.
Corrective Action Required
01/08/2021

Is any ground mounted mechanical equipment being proposed? If so please show the location, size, and type of material to be used in all screening. .
Corrective Action Required
01/08/2021

Please provide the manufacturer’s specification sheets for proposed mechanical equipment to be used (roof top and/or ground).
Corrective Action Required
01/08/2021

On the elevation sheets (A2.1 & A2.2) please show a dashed line indicating the roof line and rooftop mechanical equipment.
Corrective Action Required
01/08/2021

In the Site Data table please show the total floor area and the Floor Area Ratio (FAR).
Corrective Action Required
01/08/2021

Parking lots shall be set back a minimum 6 feet from the side or rear property line when not part of shared parking and/or cross access. Please label the parking lot setback from the south and west property lines.
Corrective Action Required
01/08/2021

All vehicle parking lot areas and access drives in all zoning districts shall have a boundary of straight-back curbing (CG-1). Detail C and F on sheet C-9 do not depict the correct CG-1 curbing type. Please update the plan sheets to meet this requirement.
Corrective Action Required
01/08/2021

Temporary asphalt curbs may be used in areas to be expanded (along the west property line) only as shown and approved on the development plan.
Corrective Action Required
01/08/2021

All signs must comply with the sign requirements as outlined in the sign section of the UDO and shall be reviewed under a separate application.
Corrective Action Required
01/08/2021

As propose you do not meet the minimum requirement for parking stalls. If you are requesting approval of an Alternate Parking Plan, please submit a parking demand study or other data that establishes the number of spaces required for the specific use. The study or data may reflect parking for the same use existing at a similar location or for similar uses at other locations. Published studies may be utilized to support alternative parking requests. Please be aware that requests for a reduction of ADA parking stalls that do not meet the minimum ADA standards will not be approved.
Corrective Action Required
01/08/2021

The proposed 7’ minimum to the bottom of the ADA parking sign seems high. Staff typically see a minimum height of 5’. Is the proposed 7’ correct?
Corrective Action Required
01/08/2021

I have concerns that the proposed location of the southernmost ADA parking sign will reduce the accessible route to below the minimum ADA standard. Please check this and update if needed.
Corrective Action Required
01/08/2021

Metal may be used only in an incidental role i.e., trim, architectural features, standing seam metal roofing. Please provide the total percentage of metal panel being proposed for each façade.
Corrective Action Required
01/08/2021

The elevations on sheets A2.1 & A2.2 seem to be labeled with the wrong direction. Please check this and update as needed.
Traffic Review Approved with Conditions 01/12/2021 01/06/2021
Michael Park
Informational
01/06/2021

The area for queuing between to the order menu and Douglas is fairly limited. If queuing impacts Douglas (or at times during high volume that results in drive-thru queuing on Douglas), site traffic management practices may be imposed by temporary driveway closure along Douglas to route drive thru activity utilizing the fullest extent of availabe private property (e.g. southwest property entrance in lieu of Douglas and queue along the south side parking lot) in the interest of public safety. Douglas, a public arterial, shall not be used as an extension of private property drive-thru lane.
Fire Review Approved with Conditions 01/12/2021 01/05/2021
Jim Eden
Code Statement
Corrective Action Required
01/05/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Building Codes Review Corrections 01/12/2021 12/29/2020
Joe Frogge
Corrective Action Required
12/29/2020

Provide pipe materials.
Corrective Action Required
12/29/2020

Specify meter sizes.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 12/23/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
12/22/2020 Application Form application
12/23/2020 Receipt Receipt for transaction:2020-008188
12/23/2020 Engineer Report/Study WB Lees - Storm Water Management Report
12/23/2020 Application Form Final Development Checklist
01/12/2021 Letter Applicant Letter - FDP (DFDP)
01/27/2021 Letter 210125_Response to City of Lee's Summit
01/27/2021 Engineer Report/Study Lee's Summit Whataburger Updated TIS
01/27/2021 Letter WB Parking Count Justification Letter
01/27/2021 Plans WB-Lees Summit-EXT finish calcs
01/27/2021 Engineer Report/Study WB Lees - Storm Water Management Report
03/01/2021 Letter Applicant Letter - FDP (DFDP)
03/10/2021 Engineers Estimate 210309 WB Lee's Summit Construction Cost Estimate
03/10/2021 Letter 210310 Response to City of Lee's Summit
03/10/2021 Engineer Report/Study 210309 WB Lee's Summit Storm Water Management Report_no plans
03/18/2021 Letter Applicant Letter - FDP (DFDP)
03/25/2021 Engineers Estimate 210324 WB Lee's Summit Construction Cost Estimate
03/26/2021 Engineers Estimate 210326 Sealed WB Lee's Summit Construction Cost Estimate
04/05/2021 Activity Document Fees PL2020380 Whataburger FDP
04/13/2021 Approved Plans Approved PL2020380 Whataburger Site Plans
07/12/2021 Activity Document 1989I0901781 UE
07/23/2021 Plans Whataburger-LS_RW1.1 Revised_7-20-21
07/23/2021 Specifications Lotawana Type 5 7-19-21
07/23/2021 Email RE_ Lees Summit Detention System Plans
08/02/2021 Activity Document Plastatech Warranty Application
08/02/2021 Specifications Plastatech 20 Year Sample Warranty
08/02/2021 Plans Whataburger-LS_RW1_1 Revised_7-30-21
08/02/2021 Specifications PL080002-IG_Data_Sheet
08/02/2021 Approved Plans Whataburger-LS_RW1_1 Revised_7-30-21 Approved Revision
09/29/2021 Letter 210928_Bulletin #7 Narrative
09/29/2021 Approved Plans Approved Revised Sheets C-4, 6, 7 & 11
11/01/2021 Plans Whataburger LS_Civil As-Builts
11/05/2021 Email PL2020380 Whataburger FDP Record Drawing Comments
07/26/2021 Plans 210625_Bulletin #3 Narrative
07/26/2021 Plans Whataburger-Lees Summit, MO-Bulletin 3 Civil Set - reduced
02/20/2021 Specifications UH-1_Reznor_EGW_5118_208-1_Spec
02/20/2021 Specifications S6E_Lithonia_LDN4SQ 40 15 LO4AR LSS MVOLT GZ10 EL_Spec
02/20/2021 Specifications S6_Lithonia_LDN4SQ 40 15 LO4AR LSS MVOLT GZ10_Spec - Copy
02/20/2021 Specifications S4_Lithonia_TWS LED P1 50K MVOLT PE DDB_Spec
02/20/2021 Specifications S3_Lithonia_DSXW1 10C 530 40K T3M MVOLT PE DDBXD_Spec
02/20/2021 Specifications S5_Lithonia_OLBF 8 30K DDB_Spec
02/20/2021 Specifications S2_Bega_99 777 SLV-84 623 SLV_Spec
02/20/2021 Specifications S1-29_Techlight_CTL-N-35L-T5W-1_Spec
02/20/2021 Specifications S1_Techlight_CTL-N-35L-T3-1_Spec
02/20/2021 Specifications S1-2_Techlight_CTL-N-20L-T3-1_Spec
02/20/2021 Specifications RTU-1-2_Lennox_LCH156H4M_Spec
02/20/2021 Specifications RTU-3_Lennox_LCH240H4M_Spec
02/20/2021 Specifications 210218 Civil Plan Set
02/20/2021 Specifications KEF-2_Greenheck_CUBE-121_Spec
02/20/2021 Specifications KEF-1_Greenheck_CUBE-161HP_Spec
02/20/2021 Specifications EF-1_Greenheck_G-098-VG_Spec
02/20/2021 Plans A2_2
02/20/2021 Engineer Report/Study 210125 WB Lee's Summit Storm Water Management Report
02/20/2021 Plans A2_1
02/20/2021 Engineers Estimate 210219 WB Lee's Summit Construction Cost Estimate
02/20/2021 Letter 210219_ Response to City of Lee's Summit
02/09/2021 Letter Applicant Letter - FDP (DFDP)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home