Planning Application Status

PL2020274




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020274
LOT 7 AND TRACT C STREETS OF WEST PRYOR
Commercial Rezoning with Preliminary Development Plan
Commercial Rezoning with Preliminary Development Plan
Approved
09/17/2020
CITY OF LEES SUMMIT
Locations
Contacts
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
WEST PRYOR OWNERS ASSOCIATION INC, Address:7200 W 132ND ST STE 109  
STREETS OF WEST PRYOR LLC, Address:7200 W 132ND ST STE 150  
SM ENGINEERING, Address:919 W STEWART RD, Phone:(785) 341-9747  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Approved with Conditions 12/14/2020 12/14/2020
Jennifer Thompson
Corrective Action Required
12/14/2020

Additional discussion is needed regarding the updating of the Land Use Table.
Engineering Review Approved with Conditions 12/14/2020 12/14/2020
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
12/14/2020

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
12/14/2020

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #06 Land Disturbance
Corrective Action Required
12/14/2020

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #09 FDP Reviews
Corrective Action Required
12/14/2020

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
12/14/2020

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE C&O #12 Cut & Fill
Corrective Action Required
12/14/2020

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Traffic Review Approved with Conditions 12/14/2020 12/14/2020
Michael Park
Informational
12/14/2020

Approval will be conditioned upon urban road improvements to Lowenstein from Blacktwig to the westernmost property line of the development as previously noted in association with adjacent development in accordance with the Unimproved Road Policy. These improvements have been generally shown on the PDP.
Fire Review Approved with Conditions 12/14/2020 12/09/2020
Jim Eden
Code Statement
Corrective Action Required
12/07/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code and local amendments.
Misc.
Resolved
12/09/2020

D105.3 Proximity to building. One or more of the required access routes meeting this condition shall be located not less than 15 feet (4572 mm) and not greater than 30 feet (9144 mm) from the building, and shall be positioned parallel to one entire side of the building. The side of the building on which the aerial fire apparatus access road is positioned shall be approved by the fire code official. Action required: How will this be met with the two apartment buildings and the hotel?
Dead Ends
Resolved
12/09/2020

IFC 503.2.5 - Dead-end fire apparatus access roads in excess of 150 feet (45 720 mm) in length shall be provided with an approved area for turning around fire apparatus. Action required: Provide circulation arpound the hotel or provide an approved turn around at the end of parking lots.
Misc.
Corrective Action Required
12/07/2020

Black Twig Circle needs to be built to 28' (City Standard).
Miscellaneous Correction
Resolved
12/09/2020

D105.2 Width. Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet (7925 mm), exclusive of shoulders, in the immediate vicinity of the building or portion thereof. Action required: The fire access lane to the hotel, along the north side of Building 2, and the south side of Building 1 shall have a minimum of a 26' drivable surface. It is currently shown as 24'.
Water Supply
Corrective Action Required
12/07/2020

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required: Provide a water model to show that adequate fire flow will be supplied for all of buildings (Building 1 3,875 gpm, Building 2 3,000 gpm).
FDC
Resolved
12/09/2020

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: Show the location of the FDC on the hotel.
Fire Lanes - Marking
Informational
12/09/2020

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Action required: One side of Black Twig shall be posted No Parking.
Imposed Loads
Resolved
12/09/2020

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. Action required: All lanes around the apartment buildings and hotel shall be designed and marked to be utilized for fire department access.
Misc.
Partial Correction
12/09/2020

Vertical combustible construction may no not take place until the required water supply, private streets, and base asphalt of all of the parking lots are in place.
Misc.
Corrective Action Required
12/07/2020

A Mine Safety Plan is required before any work on the mine filling project.
Engineering Review Corrections 11/16/2020 11/16/2020
Sue Pyles, P.E.
Corrective Action Required
11/16/2020

Please revise the Sanitary Sewer Study to include existing sanitary sewer calculations beginning at the connection point. Also include calculations that reflect any modifications to the existing sanitary lines recommended.
Traffic Review No Comments 11/16/2020 11/16/2020
Michael Park
Planning Review Corrections 11/16/2020 11/15/2020
Jennifer Thompson
Corrective Action Required
11/15/2020

I failed to comment on this previously. A rezoning and a preliminary development plan application requires a response to the criteria listed in the UDO. Staff needs this information to be submitted by the applicant as we include this information in our staff report packet as it moves forward to Planning Commission and City Council. Refer to Article 2, Sec. 2.260 B and C for criteria for a rezoning and preliminary development plan. Please respond to these items in writing.
Corrective Action Required
11/15/2020

Provide the legal descriptions (in Word format), for the boundaries of the rezoning and the perspective development areas. If I have missed this, my apologies.
Corrective Action Required
11/15/2020

Add a vicinity map to the Rezoning sheet/exhibit.
Corrective Action Required
11/15/2020

Is there any proposed phasing to this project?
Corrective Action Required
11/15/2020

Please submit all modification requests as it relates to this preliminary development plan. We received correspondence regarding this but it is included with of the other PDP for Lots 1 and 2. Is a parking modification needed? It seems there is surplus parking for Bldg. 1 and for the Hotel. Could this be addressed in an shared parking plan between the hotel and the apartments? If this was submitted and I have overlooked it, my apologies.
Corrective Action Required
11/15/2020

Ongoing discussion continues on how best to update the Land Use Table for the overall Streets of West Pryor project, Lots 1 and 2, Lot 7 and Tract C, future lots, etc.
Corrective Action Required
11/15/2020

It has been noted that the total number of dwelling units for apartment building 2 is 84 units. The original plan indicated 184. Staff notes this as a revision to the original submittal.
Corrective Action Required
11/15/2020

On Sheet C3.0 please include the asterisk reference table, it was left off from the original submittal.
Corrective Action Required
11/15/2020

Provide an updated platting scheme. It's our understanding the intent is to keep it contained within 3 lots, rather than 4. Also, use the Lot 7A, 7B, 7C numbering scheme.
Corrective Action Required
11/15/2020

Is there an update to the overall parking reduction request that will be submitted to the Director?
Corrective Action Required
11/15/2020

On Sheet C3.0 the parking label for the hotel indicates 102 stalls and the land use table references 110 parking spaces. Sheet C16.0 indicates 102 stalls. Please clarify.
Corrective Action Required
11/15/2020

Additional architectural detail will be needed for particularly the west elevation for the proposed hotel. Staff may include a condition of approval in the staff report, indicating such.
Corrective Action Required
11/15/2020

Sheet C2.0 indicates a 185' buffer for the subject development area. Please note, current notification standards is 300'.
Corrective Action Required
11/15/2020

The apartment building elevations indicate the roof top units do not have adequate screening. The units are required to be screened via parapet.
Corrective Action Required
11/15/2020

On Sheet C3.0, the parking calculations for the apartment building 1 and 2 (required by UDO), are not accurate. Please revise/clarify.
Corrective Action Required
11/15/2020

The parking lot screening has not been met along NW Lownestein Dr. 197 shrubs are required and 170 shrubs have been provided according to the Lot 7 site data table on Sheet C16.0.
Corrective Action Required
11/15/2020

Revise on all sheets (I noticed specifically on Landscape Sheets), the street name of NW Black Twig Lane. As discussed, this will be private and it should be NW Black Twig Cir. Also revise the street name within the landscape tables.
Corrective Action Required
11/15/2020

Additional clarification is needed from staff regarding the shrub requirement along NW Black Twig Cir. Currently the # of shrubs isn't met.
Corrective Action Required
11/15/2020

There still seems to be some discrepancies within the landscape tables for required vs. proposed, in terms of the counts aren't met. Further discussion is needed.
Fire Review Corrections 11/11/2020 11/10/2020
Jim Eden
Code Statement
Corrective Action Required
11/12/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code and local amendments.
Misc.
Corrective Action Required
11/10/2020

D105.3 Proximity to building. One or more of the required access routes meeting this condition shall be located not less than 15 feet (4572 mm) and not greater than 30 feet (9144 mm) from the building, and shall be positioned parallel to one entire side of the building. The side of the building on which the aerial fire apparatus access road is positioned shall be approved by the fire code official. Action required: How will this be met with the two apartment buildings and the hotel?
Dead Ends
Corrective Action Required
11/10/2020

IFC 503.2.5 - Dead-end fire apparatus access roads in excess of 150 feet (45 720 mm) in length shall be provided with an approved area for turning around fire apparatus. Action required: Provide circulation arpound the hotel or provide an approved turn around at the end of parking lots.
Misc.
Corrective Action Required
11/10/2020

Black Twig Circle needs to be built to 28' (City Standard).
Miscellaneous Correction
Corrective Action Required
11/10/2020

D105.2 Width. Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet (7925 mm), exclusive of shoulders, in the immediate vicinity of the building or portion thereof. Action required: The fire access lane to the hotel, along the north side of Building 2, and the south side of Building 1 shall have a minimum of a 26' drivable surface. It is currently shown as 24'.
Water Supply
Corrective Action Required
11/10/2020

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required: Provide a water model to show that adequate fire flow will be supplied for all of buildings (Building 1 3,875 gpm, Building 2 3,000 gpm).
FDC
Corrective Action Required
11/10/2020

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: Show the location of the FDC on the hotel.
Fire Lanes - Marking
Corrective Action Required
11/10/2020

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Action required: One side of Black Twig shall be posted No Parking.
Imposed Loads
Corrective Action Required
11/10/2020

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. Action required: All lanes around the apartment buildings and hotel shall be designed and marked to be utilized for fire department access.
Misc.
Corrective Action Required
11/12/2020

Vertical combustible construction may no not take place until the required water supply, private streets, and base asphalt of all of the parking lots are in place.
Misc.
Corrective Action Required
11/12/2020

A Mine Safety Plan is required before any on the mine filling project.
Planning Review Corrections 10/12/2020 10/12/2020
Dawn Bell
Corrective Action Required
10/12/2020

A Rezoning exhibit was not submitted. Please refer to the Unified Development Ordinance Article 2. Section 2.240 for rezoning exhibit content requirements. Staff recommends rezoning to RP-4 rather than PMIX.
Corrective Action Required
10/12/2020

Please revise the modification request letter to only include the modification requests as it relates to this preliminary development plan. It appears the modification requests would be for parking for the apartment building (387 spaces needed and 369 are provided), the density for the apartments (34.5 proposed and the previous approved preliminary development plan had 24.2 proposed for the senior living facility), and potentially for the high impact buffer requirement along Lowenstein Dr, (assuming a 6' fence would not be proposed). Staff doesn't see a need to formally request a modification for Lot 8 parking. The director has the authority to approve an alternate parking plan and we are in agreement for the justification of parking needs for that lot.
Corrective Action Required
10/12/2020

Additional discussion is needed for the updated Land Use Table. Lot 1 and 2 is reversed and the total square footage for Lot 1 is 5,549 sq. ft. according to submitted plans. The apartment sq. ftg. isn't matching submitted plans. Please provide a table that indicates the former Lot numbering and the current corresponding lot numbering. The lot numbering in the land use table in the previously approved pdp doesn't match what has been platted.
Corrective Action Required
10/12/2020

It is noted the previous proposed hotel is now replaced with a sit-down restaurant, however a site plan and elevations were not received for this change. Please provide additional information for that lot in order to achieve approval for this change.
Corrective Action Required
10/12/2020

Provide the overall hotel and apartment square footage (in addition to the envelope sq. ftg.).
Corrective Action Required
10/12/2020

What is the intent for possible replatting of Tract C? Is it the intent for this to remain in a Tract? Will the units be sold or are they proposed to be rentals? Will there be common area? If no common area is proposed it should be platted into a lot. Is there an intent to replat Lot 7? If replatting is proposed please provide as part of the PDP a proposed platting exhibit.
Corrective Action Required
10/12/2020

Street trees are required along the entire length of NW Lowenstein Dr. A high impact buffer is also required along the entire length of NW Lowenstein Dr., perhaps requirements will be met once the buffer is reflected within the landscape table. Any tree proposed within an easement shall be of ornamental variety.
Corrective Action Required
10/12/2020

Label all street names.
Corrective Action Required
10/12/2020

The parking lot screening is not met along NW Lowenstein Dr. 197 shrubs are required and 150 shrubs are proposed.
Corrective Action Required
10/12/2020

Additional clarification is needed for landscaping requirements along NW Black Twig Ln. and the private drive east.
Corrective Action Required
10/12/2020

On Sheet C13.0 revise the building area for Lot 7 to 92,931 sq. ft. The open space total is correct as shown. Clarify the open yard tree requirements for Lot 7. 53 trees are required and the table shows that 14 are provided.
Corrective Action Required
10/12/2020

Provide the manufacture's specifications for the exterior wall lighting.
Corrective Action Required
10/12/2020

Hotel Elevations. Provide additional elevations for the hotel (all four sides). Additional comments may be needed once received. Staff is unsure about the current "look" of the hotel.
Corrective Action Required
10/12/2020

Townhome Elevations. Staff doesn't have any concerns with the elevations, however the look is very modern and it will be interesting how they will be perceived from the adjacent single-family neighborhood.
Corrective Action Required
10/12/2020

Apartment Elevations. Staff has concerns the roof line is to flat on several of the elevations. Please provide varying heights and modulation to break up the long massive facades.
Corrective Action Required
10/12/2020

Standard detail sheets were not received (i.e. pavement, curbing, accessible signage, trash enclosure, etc.).
Corrective Action Required
10/12/2020

Indicate the location of all roof-top units for the hotel and apartment buildings. All RTU's shall be screened via parapet.
Engineering Review Corrections 10/09/2020 10/09/2020
Sue Pyles, P.E.
Corrective Action Required
10/09/2020

Please submit a stormwater study matching the plan shown. References to the previously approved stormwater study may be made within the study, but this study must also address how the water will be discharged off the site.
Corrective Action Required
10/09/2020

The sanitary sewer study submitted is inadequate. While references to the previous study are acceptable, this report still needs to have exhibits and calculation results applicable to this plan, as appropriate.
Corrective Action Required
10/09/2020

Filling the mined area will require specialized third-party review as well as inspection, both of which will be at the developer’s expense. Conditions of Approval will be written and incorporated into the Ordinance should this plan be approved. Those conditions will be forthcoming.
Corrective Action Required
10/09/2020

The southwest corner of the project area seems to be cut off on the plan sheets. Please expand views in the plan set, especially since the storm sewer system is critical in this area.
Corrective Action Required
10/09/2020

There appears to be multiple labels shown for existing water lines. Please revise for clarity.
Corrective Action Required
10/09/2020

There appear to be different line types used for existing storm sewer. Please be consistent for clarity.
Corrective Action Required
10/09/2020

Additional comments are likely after complete stormwater and sanitary studies have been submitted.
Traffic Review Corrections 10/09/2020 10/07/2020
Michael Park
Corrective Action Required
10/07/2020

A Traffic Study Update/Memo was submitted for the subject PDP Application and companion PDP Application, both associated with Streets of West Pryor. The study should be included with both PDP Applications. The following comments pertain to the traffic study and may or may not directly relate to the subject PDP. However, some of these comments address clarity for which each application may be independently evaluated.
Corrective Action Required
10/07/2020

Traffic Study-Does the additional traffic generated and (re)distributed traffic (due to internal access and building layout changes) on Blacktwig at Chipman warrant a traffic signal? Address in update memo.
Corrective Action Required
10/07/2020

Traffic Study-Does the additional traffic generated and (re)distributed traffic (due to internal access and building layout changes) on Blacktwig at Lowenstein warrant an all-way stop condition? Address in update memo.
Corrective Action Required
10/07/2020

Traffic Study-An illustration depicting the location of new trips (in comparison to the previously approved plan) would be helpful in addressing resident concerns about impacts to Lowenstien, Blacktwig and intersection at Chipman.
Corrective Action Required
10/07/2020

Traffic Study-An assessment of impacted trip distribution needs to be included. It appears there’s significant change in traffic circulation (e.g. connection to the private roadways from the commercial development to Blacktwig via the west direct connection and apartment orientation). An exhibit that compares 2018 Generated Trip Distribution (Volume, Not Percentage) to Proposed Generated Trip Distribution (Volume, Not Percentage).
Corrective Action Required
10/07/2020

Traffic Study-The proposed sport courts/outdoor athletic club needs to be accounted for in the trip generation.
Fire Review Corrections 10/09/2020 09/29/2020
Jim Eden
Code Statement
Informational
09/29/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Misc.
Corrective Action Required
09/29/2020

Provide a complete site plan.
Water Supply
Corrective Action Required
09/29/2020

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required: Provide utilty plan that will meet the fire flow requirements for the proposed buildings.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Commercial Rezoning and Preliminary Development Plan fee $3,600.00 $3,600.00 Paid 10/12/2020
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 10/12/2020
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 10/12/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 01/28/2021 05:00 PM Council Chambers 01/28/2021 05:00 PM
Public Hearing Review
Approved
01/07/2021
City Council Public Hearing 02/23/2021 06:00 PM Council Chambers 02/23/2021 06:15 PM
Public Hearing Review
Pending
02/02/2021
City Council Ordinance 2nd Reading 03/09/2021 12:00 AM 06:00 PM Council Chambers 03/09/2021 06:00 PM
Public Hearing Review
Pending
Documents & Images
Date Uploaded File Type Document Name
09/24/2020 Lot 7 Tract C PDP Application - 09.14.2020
09/24/2020 NW Lowenstein Drive & NW Black Twig Lane - Rezoning & PDP Application - 09.14.2020
09/24/2020 Lot 7 Tract C PDP Ownership Affidavit - 09.14.2020
09/24/2020 Rezoning Ownership Affidavit - 09.14.2020
09/25/2020 20001_SampleBd
09/25/2020 Apartment Perspective
09/25/2020 6812 - Phase 2 Site Lighting
09/25/2020 Apt Bldg 1 Floor Plan
09/25/2020 Apt Bldg 2 Floor Plan
09/25/2020 Apt Bldg 2 Elevations
09/25/2020 Apt Bldg 1 Elevations
09/25/2020 Lees Summit Streets of West Pryor Mod Request 092520 Binder
09/25/2020 Mine Filling at Pryor Crossing - Technical Manual
09/25/2020 SWP - Hotel Elevations 3D 110518
09/25/2020 SOWP Lot 7 Tract C Sanitary Sewer Study
09/25/2020 Townhome Floor Plan
09/25/2020 Townhome Elevations
09/25/2020 Townhome Perspective
09/25/2020 SOWP Lot 7 & TRACT C PDP
09/25/2020 Traffic Impact Study Memo 09252020
10/12/2020 Receipt Receipt for transaction:2020-006870
10/12/2020 Letter Applicant Letter - Dev. Apps (DRCP)
11/04/2020 11.4.20 Apt and Townhome Lights mcgraw-impact-elite-led-specsheet
11/04/2020 11.4.20 Apt and Townhome lumiere-eon-303-b1-ledb1-spec
11/04/2020 11.4.20 Apt Bldg 1 Floor Plan - Summit at West Pryor_Phase 2
11/04/2020 11.4.20 Apt Bldg 2 Floor Plan - Summit at West Pryor_Phase 2
11/04/2020 Latest Apt elevations sheet 111.4.20 Colored Elevation Apt Bldg 1
11/04/2020 Photometric Sheet
11/04/2020 Latest Apt elevations sheet_2
11/04/2020 Latest Apt. and townhome material board
11/04/2020 Latest Hote elevations
11/04/2020 Latest Hotel material board
11/04/2020 11.4.20 SWP Lot 7 and Tract C Response Letter
11/04/2020 Latest Hotel perspective
11/04/2020 Latest Rezoning Exhibit
11/04/2020 11.4.20 Mine Filling at Pryor Crossing - Technical Manual
11/04/2020 11.4.20 Final-West Pryor Village TIS Memo
11/04/2020 11.4.20 SWP Lot 7 Tract C Sanitary Sewer Study Rev 11-2-20
11/04/2020 11.4.20 Townhome Elevations
11/04/2020 11.4.20 Townhome Floor Plan
11/04/2020 11.4.20 Stormwater Report SWP Lot 7 and Tract C Rev 11-1-20
11/04/2020 11.4.20 Townhome Perspective
11/04/2020 11.4.20 SWP Lot 7 & TRACT C PDP
11/17/2020 Letter Applicant Letter - Dev. Apps (DRCP)
11/30/2020 Lees Summit Streets of West Pryor Parking Mod Request 111620 Binder
12/06/2020 Correspondence Letter12.6.20 SWP Lot 7 and Tract C Response Letter
12/06/2020 Apartment Elevations12.6.20 20001-ceBldg1_2020-11-30
12/06/2020 Criteria for Rezoning Narrative12.6.20 SWP Lot 7 and Tract C UDO Criteria Response Letter 112420
12/06/2020 12.6.20 Legal Description ROW Vacation
12/06/2020 12.6.20 Legal Descriptions Rezoning
12/06/2020 Apartment Elevations12.6.20 20001-ceBldg2_2020-11-30
12/06/2020 Modification Request12.6.20 SWP Lot 7 Mod Request 112420 Binder
12/06/2020 Sanitary Sewer Study12.6.20 SWP Lot 7 Tract C Sanitary Sewer Study Rev
12/06/2020 Preliminary Development Plan12.6.20 SWP Lot 7 PDP
12/16/2020 LEGAL PL2020-274 REZ PDP PC
12/18/2020 PL2020274 SWP Lots 7 & Tract C TIA
01/07/2021 property owner list - lot 7 SWP
01/18/2021 SWP Lot 7 - Affidavit of Notice to Property Owners - 1_11_2021
01/20/2021 P035637.02 Filling of Portions of Union Quarry Mine COMPLETE DRAFT_Optimized
01/20/2021 J035637_02 Mine Mitigation Study - Mine Filling at Pryor Crossing (1)
01/21/2021 SOWP Lot 7 PDP 12-4-20
01/21/2021 Plans Pages 1-14 from Mine mitigation study
01/22/2021 Plans SOWP Lot 7 PDP 12-4-20
01/27/2021 LEGAL PL2020-274 REZ PDP
02/03/2021 Legal Notice and Affidavit for PC
02/03/2021 LEGAL PL2020-274 REZ PDP
02/12/2021 J035637_02 Mine Mitigation Study - Mine Filling at Pryor Crossing
03/08/2021 Public Notice Document DOC030821-003
04/26/2021 Public Notice Document DOC042621-006
06/15/2021 Ordinance #9090
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home