PRSUBD20245195
Public Infrastructure
Issued
CLAYTON PROPERTIES GROUP INC
DEVELOPMENT COMPLETE
Cobey Creek 2nd Plat. 86 lot addition to the existing Cobey Creek Residential neighborhood. -Street & Storm, Sanitary, Water, Site Grading & ESC
10/01/2024
05/06/2025
08/27/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
Jake Konnesky, Address:8455 College Blvd  
Jeff Bartz, Address:8455 College Blvd  
  
  
Marsall Fief, Address:8455 College Blvd  
WELCH SILTFENCE & EROSION CONTROL, Address:P O BOX 526, Phone:(816) 651-7358  
MTD Construction, LLC, Address:159 T Street  
Emery Sapp & Son Construction Co., Address:140 Walnut Street , Phone:(816) 221-3500  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review - Water No Comments 05/06/2025 05/06/2025
Gene Williams, P.E.
Engineering Review - Sanitary No Comments 04/30/2025 04/30/2025
Gene Williams, P.E.
Traffic Review - Streets Approved with Conditions 02/28/2025 02/28/2025
Erin Ralovo
Miscellaneous Correction
Corrective Action Required
02/28/2025

After email conversations with staff and the developer, it has been agreed that a design for a 3-legged intersection will be sufficient submittal for permit. The design must accomodate the improvements required by Ovation so that none of the equipment will need to be moved at a later date.
Traffic Review - Streets Approved with Conditions 02/06/2025 02/05/2025
Erin Ralovo
Misc
Corrective Action Required
02/06/2025

Traffic staff gives conditional approval of the Public Infrastructure plans. MoDOT approval of the plans for the signal at the intersection of MO 150 and Sunset Ridge Drive will be required before any substantial completion will be allowed on the project.
Traffic Review - Streets Corrections 01/24/2025 01/24/2025
Erin Ralovo
Misc
Resolved
01/24/2025

Improvements along 150 HWY should be included with this submittal. MoDOT will have to give final approval but the staff will need to review as well. Staff is in discussions with MODOT about how to procees with the traffic signal required at Sunset Ridge. Final approval will not be given before MoDOT advises how to proceed.
Miscellaneous Correction
Resolved
01/24/2025

The merge lane for northbound traffic seems unnecessary. A single lane with a wider island may be a better fit. Striping for the extra widening should be yellow if on the lfet hand side of the roadway.
Miscellaneous Correction
Corrective Action Required
01/09/2025

Staff has spoken with MoDOT about the planned signal at Sunset Ridge and it has been determined that the signal will be required before occupancy of the project. Plans should be submitted to MoDOT for review and approval must be given to the City before approval is given on these plans with the understanding that construction is not required until a later time.
Engineering Review - Sanitary Approved with Conditions 01/24/2025 01/23/2025
Gene Williams, P.E.
Miscellaneous Correction
Corrective Action Required
01/09/2025

An MDNR permit shall be required for this project. Informational comment.
Engineering Review - Water Approved with Conditions 01/24/2025 01/23/2025
Gene Williams, P.E.
Miscellaneous Correction
Resolved
01/23/2025

There are multiple points on the water line where pipe deflection curvature of radius is less than 1200 ft. Show locations of all fittings needed to keep the deflection curvature greater than 1200 feet. Corrections required.
Miscellaneous Correction
Resolved
01/23/2025

Sheet 4: Station 10+00 is missing 4 gate valves at the cross. Correction required.
Miscellaneous Correction
Resolved
01/23/2025

Sheet 4: Station 12+21 is missing one (1) gate valve on the south side of the tee. Correction required.
Miscellaneous Correction
Resolved
01/23/2025

Sheet 5: Extend water line B and move the hydrant to the next property line so the service line for lot 25 can be connected without crossing the property line. Correction required.
Miscellaneous Correction
Resolved
01/23/2025

Additional fire hydrant is required on Fern Ln. to the south of 26th St. Correction required.
Miscellaneous Correction
Corrective Action Required
01/23/2025

MDNR construction permit shall be required prior to formal approval. Informational comment.
Engineering Review - Street and Storm Approved with Conditions 01/24/2025 01/23/2025
Gene Williams, P.E.
Miscellaneous Correction
Resolved
01/23/2025

S denotes "slab" basement on the Master Drainage Plan. Is this what you intend? Assuming you wish to change this designation to represent a "standard" basement. Informational comment, and corrections required if appropriate. Otherwise, only slab on grade homes will be allowed without special permission from the designer.
Miscellaneous Correction
Resolved
01/23/2025

Cost estimate required prior to formal approval. Informational comment.
Engineering Review - Water Corrections 12/10/2024 12/11/2024
Gene Williams, P.E.
Miscellaneous Correction
Resolved
12/11/2024

Sheet C201: Change Line 2-FF to “PROP 12” WATER". Correction required.
Miscellaneous Correction
Resolved
12/11/2024

Sheet C202: The limits of the casing pipe appear to extend to the 12” water main running along HWY 150 at Sta. 1+15.00. The casing pipe should start north of the butterfly valve. Correction required.
Miscellaneous Correction
Resolved
12/11/2024

Sheet C202: Three (3) valves are required at all tees. There should be three valves installed at the tee at Sta. 1+00. Correction required.
Miscellaneous Correction
Resolved
12/11/2024

Sheet C204: Why move the 12” water main to the west side of Sunset Ridge? There is room to place the 12” water main in the 15’ UE on the east side of Sunset Ridge, and avoids jogs and reducers. Correction required.
Miscellaneous Correction
Resolved
12/11/2024

Overview Sheet: Label all street names on overview sheet. Correction required.
Miscellaneous Correction
Resolved
12/11/2024

Overview Sheet C201: Line FF is mislabeled as an 8 inch line. This should be a 12 inch line. Correction required.
Miscellaneous Correction
Resolved
12/11/2024

Sheet C202: Gate valves are desired for 12 inch lines. Butterfly valves should only be used for valves larger than 12 inch. Correction required.
Miscellaneous Correction
Resolved
12/11/2024

An MDNR permit shall be required prior to formal approval. Informational comment.
Engineering Review - Sanitary Approved with Conditions 12/10/2024 12/10/2024
Gene Williams, P.E.
Miscellaneous Correction
Resolved
12/10/2024

Label all street names on the general overview sheet. Correction required.
Miscellaneous Correction
Resolved
12/10/2024

Please label existing manholes with the official City manhole number. Connection point of line D is 58-063. Line H is 58-067. Line B is 58-051. Correction required.
Miscellaneous Correction
Resolved
12/10/2024

Relocate manhole H-3 to not exceed 400 feet in length from the next manhole H-4. Correction required.
Miscellaneous Correction
Resolved
12/10/2024

Eliminate manhole H-2 and direct connect to existing City manhole 58-067. Correction required.
Miscellaneous Correction
Resolved
12/10/2024

Line B appears to be located in an easement that is too narrow. Required width is twice the depth assuming the line is centered within the easement. Correction required on plans and plat.
Miscellaneous Correction
Corrective Action Required
11/25/2024

An MDNR permit shall be required for this project. Informational comment.
Engineering Review - Street and Storm Corrections 12/10/2024 12/10/2024
Gene Williams, P.E.
Miscellaneous Correction
Resolved
12/10/2024

Stormwater manhole lid shall meet new requirement for lettering. Standard detail to be sent separate from this applicant letter. Corrections required.
Miscellaneous Correction
Resolved
12/10/2024

Sheet C051: All asphaltic concrete to be KCMMB mix. Correction required.
Miscellaneous Correction
Resolved
12/10/2024

Typical Pavement Section Views: Recommend a re-review by the engineer for the most up-to-date design criteria for residential local access, and residential collector. Design criteria is shown on Table LS-2 of the most up-to-date version of the table within Section 5200 of the Lee's Summit Design and Construction Manual. Some criteria became less stringent, others more. Most changes are related to aggregate thickness, which mostly were decreased from the past version of the Design and Construction Manual. Correction required.
Miscellaneous Correction
Resolved
12/10/2024

Recommend removing the light blue, blue, and purple phasing lines from Sheet C101. These plans are for Cobey Creek 2nd Plat, and Sheet C101 should concentrate on the 2nd plat/phase rather than showing the entire phasing of the project. Recommend "graying-out". Correction required.
Miscellaneous Correction
Partial Correction
12/10/2024

S denotes "slab" basement on the Master Drainage Plan. Is this what you intend? Assuming you wish to change this designation to represent a "standard" basement. Informational comment, and corrections required if appropriate. Otherwise, only slab on grade homes will be allowed without special permission from the designer.
Miscellaneous Correction
Resolved
12/10/2024

Sheet C501: A cross-hatched area representing what is shown in the legend to be a drainage swale does not appear to make sense. Correction required.
Miscellaneous Correction
Resolved
12/10/2024

Offsite existing elevation contours shown on Sheet C104 do not appear to match what is shown on Sheet C500 "Inlet Drainage Area". Reviewing Sheet C500, it would appear additional inlets and pipe are needed. Reviewing other sheets, it would appear this is not necessary. Evaluate and correct if necessary.
Miscellaneous Correction
Resolved
12/10/2024

There are mid-block crossings shown on the plans with 1.5% maximum cross-slope callouts. This may introduce a bump in the road, and is not desired. Mid-block crossings can match existing grade as long as the running slope does not exceed 5%. Evaluate and revise as appropriate.
Miscellaneous Correction
Resolved
12/10/2024

The existing north detention basin shall include a detailed design showing how the basin will be converted to a sediment basin. This shall include any skimmer(s) to be installed, sizing of the skimmers, installation of the skimmers, block-offs of the existing outlet structure water quality orifices, etc. Correction required.
Miscellaneous Correction
Resolved
12/10/2024

A note shall be provided on the erosion and sediment control plan in bold lettering that states "SEDIMENT BASIN CONVERSION TO OCCUR PRIOR TO ANY CONSTRUCTION ACTIVITIES" or equivalent language. Correction required.
Miscellaneous Correction
Resolved
12/10/2024

Master Drainage Plan: Label finished elevation contours to the extent they can be understood (i.e., not all need be labeled, only to the extent that others can be interpolated). Correction required.
Miscellaneous Correction
Resolved
12/10/2024

Sheet C400: Notes on bottom left hand corner are incomplete with the "xxxx" designation. Correction required.
Miscellaneous Correction
Resolved
12/10/2024

Sheet C401: The truncated domes on bottom right exceed the maximum 5.0 feet distance to back of curb. Correction required.
Miscellaneous Correction
Resolved
12/10/2024

ADA-accessible routes across intersections: Ensure non-stop controlled intersections match road grade (max 5%) to eliminate any bump (i.e., change in grade) at the non-stop controlled intersection. It appears all ADA-accessible routes across intersections were designed with 1.5% cross-slope, which is not desireable for non-stop controlled intersections. Correction required.
Miscellaneous Correction
Resolved
12/10/2024

Many of the notes for the ADA-accessible routes across streets and intersections state "5.00 ft. max". This should be called out as 5.00 feet, not "max". Correction required.
Miscellaneous Correction
Resolved
12/10/2024

SWPPP is required prior to formal approval. Correction required.
Miscellaneous Correction
Corrective Action Required
12/10/2024

Cost estimate required prior to formal approval. Informational comment.
Traffic Review - Streets Corrections 12/10/2024 12/09/2024
Erin Ralovo
Misc
Corrective Action Required
11/25/2024

Improvements along 150 HWY should be included with this submittal. MoDOT will have to give final approval but the staff will need to review as well. Staff is in discussions with MODOT about how to procees with the traffic signal required at Sunset Ridge. Final approval will not be given before MoDOT advises how to proceed.
Miscellaneous Correction
Resolved
12/09/2024

Speed Limit sign at Sta. 4+28.73 should be 25 MPH not 15.
Miscellaneous Correction
Corrective Action Required
12/09/2024

The merge lane for northbound traffic seems unnecessary. A single lane with a wider island may be a better fit. Striping for the extra widening should be yellow if on the lfet hand side of the roadway.
Miscellaneous Correction
Resolved
12/09/2024

Divided Road sign at Sta. 5+69.76 should be a Keep Right (R4-7).
Miscellaneous Correction
Resolved
12/09/2024

Stop Sign at Sta. 6+72.45 should be removed.
Miscellaneous Correction
Resolved
12/09/2024

Stop signs on side streets should also have street name signs (D-3)
Miscellaneous Correction
Resolved
12/09/2024

Both Sta. 1+83.32 4" solid white are pointing to the wrong lines.
Miscellaneous Correction
Resolved
12/09/2024

The striped out lane should have 24" chevrons not 18".
Miscellaneous Correction
Resolved
12/09/2024

The through arrows going NB are not needed.
Miscellaneous Correction
Corrective Action Required
12/11/2024

Staff has spoken with MoDOT about the planned signal at Sunset Ridge and it has been determined that the signal will be required before occupancy of the project. Plans should be submitted to MoDOT for review and approval must be given to the City before approval is given on these plans with the understanding that construction is not required until a later time.
Engineering Review - Water Corrections 10/30/2024 10/30/2024
Gene Williams, P.E.
Miscellaneous Correction
Corrective Action Required
10/30/2024

Sheet C201: Change Line 2-FF to “PROP 12” WATER". Correction required.
Miscellaneous Correction
Corrective Action Required
10/30/2024

Sheet C202: The limits of the casing pipe appear to extend to the 12” water main running along HWY 150 at Sta. 1+15.00. The casing pipe should start north of the butterfly valve. Correction required.
Miscellaneous Correction
Corrective Action Required
10/30/2024

Sheet C202: Three (3) valves are required at all tees. There should be three valves installed at the tee at Sta. 1+00. Correction required.
Miscellaneous Correction
Corrective Action Required
10/30/2024

Sheet C204: Why move the 12” water main to the west side of Sunset Ridge? There is room to place the 12” water main in the 15’ UE on the east side of Sunset Ridge, and avoids jogs and reducers. Correction required.
Miscellaneous Correction
Corrective Action Required
10/30/2024

Overview Sheet: Label all street names on overview sheet. Correction required.
Miscellaneous Correction
Corrective Action Required
10/30/2024

Overview Sheet C201: Line FF is mislabeled as an 8 inch line. This should be a 12 inch line. Correction required.
Miscellaneous Correction
Corrective Action Required
10/30/2024

Sheet C202: Gate valves are desired for 12 inch lines. Butterfly valves should only be used for valves larger than 12 inch. Correction required.
Miscellaneous Correction
Corrective Action Required
10/30/2024

An MDNR permit shall be required prior to formal approval. Informational comment.
Engineering Review - Sanitary Corrections 10/30/2024 10/30/2024
Gene Williams, P.E.
Miscellaneous Correction
Corrective Action Required
10/30/2024

Label all street names on the general overview sheet. Correction required.
Miscellaneous Correction
Corrective Action Required
10/30/2024

Please label existing manholes with the official City manhole number. Connection point of line D is 58-063. Line H is 58-067. Line B is 58-051. Correction required.
Miscellaneous Correction
Corrective Action Required
10/30/2024

Relocate manhole H-3 to not exceed 400 feet in length from the next manhole H-4. Correction required.
Miscellaneous Correction
Corrective Action Required
10/30/2024

Eliminate manhole H-2 and direct connect to existing City manhole 58-067. Correction required.
Miscellaneous Correction
Corrective Action Required
10/30/2024

Line B appears to be located in an easement that is too narrow. Required width is twice the depth assuming the line is centered within the easement. Correction required on plans and plat.
Miscellaneous Correction
Corrective Action Required
10/30/2024

An MDNR permit shall be required for this project. Informational comment.
Engineering Review - Street and Storm Corrections 10/30/2024 10/30/2024
Gene Williams, P.E.
Miscellaneous Correction
Corrective Action Required
10/21/2024

Stormwater manhole lid shall meet new requirement for lettering. Standard detail to be sent separate from this applicant letter. Corrections required.
Miscellaneous Correction
Corrective Action Required
10/21/2024

Sheet C051: All asphaltic concrete to be KCMMB mix. Correction required.
Miscellaneous Correction
Corrective Action Required
10/21/2024

Typical Pavement Section Views: Recommend a re-review by the engineer for the most up-to-date design criteria for residential local access, and residential collector. Design criteria is shown on Table LS-2 of the most up-to-date version of the table within Section 5200 of the Lee's Summit Design and Construction Manual. Some criteria became less stringent, others more. Most changes are related to aggregate thickness, which mostly were decreased from the past version of the Design and Construction Manual. Correction required.
Miscellaneous Correction
Corrective Action Required
10/29/2024

Recommend removing the light blue, blue, and purple phasing lines from Sheet C101. These plans are for Cobey Creek 2nd Plat, and Sheet C101 should concentrate on the 2nd plat/phase rather than showing the entire phasing of the project. Recommend "graying-out". Correction required.
Miscellaneous Correction
Corrective Action Required
10/29/2024

Master Drainage Plan was missing the basement type for each lot (e.g., walkout, daylight, or standard). Correction required.
Miscellaneous Correction
Corrective Action Required
10/29/2024

Sheet C501: A cross-hatched area representing what is shown in the legend to be a drainage swale does not appear to make sense. Correction required.
Miscellaneous Correction
Corrective Action Required
10/29/2024

Offsite existing elevation contours shown on Sheet C104 do not appear to match what is shown on Sheet C500 "Inlet Drainage Area". Reviewing Sheet C500, it would appear additional inlets and pipe are needed. Reviewing other sheets, it would appear this is not necessary. Evaluate and correct if necessary.
Miscellaneous Correction
Corrective Action Required
10/29/2024

There are mid-block crossings shown on the plans with 1.5% maximum cross-slope callouts. This may introduce a bump in the road, and is not desired. Mid-block crossings can match existing grade as long as the running slope does not exceed 5%. Evaluate and revise as appropriate.
Miscellaneous Correction
Corrective Action Required
10/29/2024

The existing north detention basin shall include a detailed design showing how the basin will be converted to a sediment basin. This shall include any skimmer(s) to be installed, sizing of the skimmers, installation of the skimmers, block-offs of the existing outlet structure water quality orifices, etc. Correction required.
Miscellaneous Correction
Corrective Action Required
10/29/2024

A note shall be provided on the erosion and sediment control plan in bold lettering that states "SEDIMENT BASIN CONVERSION TO OCCUR PRIOR TO ANY CONSTRUCTION ACTIVITIES" or equivalent language. Correction required.
Miscellaneous Correction
Corrective Action Required
10/29/2024

Master Drainage Plan: Label finished elevation contours to the extent they can be understood (i.e., not all need be labeled, only to the extent that others can be interpolated). Correction required.
Miscellaneous Correction
Corrective Action Required
10/29/2024

Sheet C400: Notes on bottom left hand corner are incomplete with the "xxxx" designation. Correction required.
Miscellaneous Correction
Corrective Action Required
10/30/2024

Sheet C401: The truncated domes on bottom right exceed the maximum 5.0 feet distance to back of curb. Correction required.
Miscellaneous Correction
Corrective Action Required
10/30/2024

ADA-accessible routes across intersections: Ensure non-stop controlled intersections match road grade (max 5%) to eliminate any bump (i.e., change in grade) at the non-stop controlled intersection. It appears all ADA-accessible routes across intersections were designed with 1.5% cross-slope, which is not desireable for non-stop controlled intersections. Correction required.
Miscellaneous Correction
Corrective Action Required
10/30/2024

Many of the notes for the ADA-accessible routes across streets and intersections state "5.00 ft. max". This should be called out as 5.00 feet, not "max". Correction required.
Miscellaneous Correction
Corrective Action Required
10/30/2024

SWPPP is required prior to formal approval. Correction required.
Traffic Review - Streets Corrections 10/23/2024 10/11/2024
Erin Ralovo
Misc
Corrective Action Required
10/09/2024

Improvements along 150 HWY should be included with this submittal. MoDOT will have to give final approval but the staff will need to review as well.
Miscellaneous Correction
Corrective Action Required
10/09/2024

Speed Limit sign at Sta. 4+28.73 should be 25 MPH not 15.
Miscellaneous Correction
Corrective Action Required
10/09/2024

The merge lane for northbound traffic seems unnecessary. A single lane with a wider island may be a better fit.
Miscellaneous Correction
Corrective Action Required
10/09/2024

Divided Road sign at Sta. 5+69.76 should be a Keep Right (R4-7).
Miscellaneous Correction
Corrective Action Required
10/09/2024

Stop Sign at Sta. 6+72.45 should be removed.
Miscellaneous Correction
Corrective Action Required
10/09/2024

Stop signs on side streets should also have street name signs (D-3)
Miscellaneous Correction
Corrective Action Required
10/09/2024

Both Sta. 1+83.32 4" solid white are pointing to the wrong lines.
Miscellaneous Correction
Corrective Action Required
10/09/2024

The striped out lane should have 24" chevrons not 18".
Miscellaneous Correction
Corrective Action Required
10/09/2024

The through arrows going NB are not needed.
Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Insp Fees $34,780.92 $34,780.92 Paid 04/14/2025
Water Insp Fee $22,572.51 $22,572.51 Paid 04/14/2025
Paved Surface Inspection Fee $58,958.73 $58,958.73 Paid 03/11/2025
Right of Way Permit Fee $85.00 $85.00 Paid 03/11/2025
Site Grading Fee $111,373.98 $111,373.98 Paid 03/11/2025
Storm Sewer Inspection Fee $16,140.00 $16,140.00 Paid 03/11/2025
Water Test Fee $2,000.00 $2,000.00 Paid 04/14/2025
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Pavement-Proof Roll Pending
Pavement-Surface Pending
Grading/Excavation/Fill Inspection Pending
Install Street and Stop Signs Pending
Pavement-Aggregate Base Pending
Pavement-Curb Construction Pending
Pavement-Stabilized Subgrade Pending
Storm Sewer Construction Inspection Pending
Sanitary Sewer Construction Inspection Pending
Sanitary Sewer - Air Test Pending
Sanitary Sewer - Mandrel Pending
Sanitary Sewer - Vacuum Pending
Water Line - Construction Inspection Pending
Erosion Control Inspection Pending
Sanitary - Material Verification Passed 07/18/2025
Misc
Informational
07/18/2025
07/18/25 Jamie S, Verified materials on site.
Documents & Images
Date Uploaded File Type Document Name
10/01/2024 Plans Sanitary Sewer Plans_Rev 0_PRSBUD20245195
10/01/2024 Engineer Report/Study Stormwater Memo_PRSUBD20245195
10/01/2024 Plans Street Storm and Erosion Plans_Rev 0_PRSUBD20245195
10/01/2024 Plans Street Storm and Erosion Plan Details_Rev 0_PRSUBD20245195
10/01/2024 Plans Water Main Plans_Rev 0_PRSUBD20245195
10/01/2024 Engineers Estimate Erosion Control OPC
10/01/2024 Engineers Estimate Sanitary Sewer OPC
10/01/2024 Engineers Estimate Street & Storm OPC
10/01/2024 Engineers Estimate Water Main OPC
10/10/2024 Engineer Report/Study ACCEPTED STORMWATER MEMO
10/31/2024 Letter SUBD Comment Letter
11/22/2024 Letter Cobey Creek SUBD Comment Response
11/22/2024 Engineer Report/Study Cobey Creek SWPPP
11/22/2024 Email HWY 150 - MoDOT Approval Email
11/22/2024 Email HWY 150 - Permit Process Email
11/22/2024 Plans MoDOT HWY 150 Widening Plans
11/22/2024 Plans Sanitary Sewer Plans_REV1
11/22/2024 Plans Street and Storm Plans_REV1
11/22/2024 Plans Water Main Plans_REV1
12/11/2024 Letter SUBD Comment Letter
01/03/2025 Letter MDNR Concurrence Letter - Cobey Creek - 2nd Sanitary
01/09/2025 Engineers Estimate Erosion Control OPC_REV2
01/09/2025 Engineers Estimate Sanitary Sewer OPC_REV2
01/09/2025 Engineers Estimate Street, Storm, & Grading OPC_REV2
01/09/2025 Engineers Estimate Water Main OPC_REV2
01/09/2025 Letter Comment Response Letter
01/09/2025 Plans Sanitary Sewer Plans_REV2
01/09/2025 Plans Street and Storm Plans_REV2
01/09/2025 Plans Water Main Plans_REV2
01/23/2025 Activity Document FeeWorksheetStrtStormMDPESC
01/23/2025 Activity Document FeeWorksheetSAN
01/23/2025 Activity Document FeeWorkshetWATER
01/28/2025 Letter SUBD Comment Letter
02/04/2025 Letter MDNR CONCURRENCE AND WATER MODEL
02/05/2025 Engineer Report/Study WATER MODEL RUN SEALED
02/05/2025 Letter Water MDNR Concurrence (1)
02/06/2025 Letter SUBD Comment Letter
02/28/2025 Letter SUBD Comment Letter
03/11/2025 Approved Plans Approved Cobey Creek 2nd Plat_Street Storm MDP Grading ESC_PRSUBD20245195_3.11.2025_Admin
03/11/2025 Receipt Receipt for transaction: 2025-001464
04/14/2025 Receipt Receipt for transaction: 2025-002311
04/23/2025 Letter DS Building Permit
04/25/2025 Letter Cobey Creek 2nd Plat - MDNR Permit (Sanitary)
04/25/2025 Email OWN, Inc. Mail - Sanitary Sewer Change Order – Permit Determination
05/01/2025 Approved Plans Approved Cobey Creek 2nd Plat_Sanitary_PRSUBD20245195_Admin_5-1-2025
05/01/2025 Letter Cobey Creek 2nd Plat - MDNR Permit (Water)
05/06/2025 Approved Plans Approved Cobey Creek 2nd Plat_Water_PRSUBD20245195_Admin_5-6-2025
05/07/2025 Letter DE-Permit
07/18/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home