Summary
PRSUBD20232726
Public Infrastructure
Issued
DISCOVERY PARK LEES SUMMIT LLC
DEVELOPMENT COMPLETE
VILLAGE AT DISCOVERY PARK - MASS GRADING IN ZONES 1, 2 & 4, PUBLIC WATER, STORM SEWER, SANITARY SEWER, TURNLANE IMPROVEMENTS TO DOUGLAS ANS STREET.
06/12/2023
11/07/2023
04/22/2024
Locations
Contacts
DISCOVERY PARK LEES SUMMIT LLC, Address:4220 PHILIPS FARM RD  
ORR STREETS LOFTS LLC, Address:4240 PHILIPS FARM ROAD #109  
ANDY SVEHLA, Address:EMERY SAPP & SONS, Phone:(573) 355-3551  
DAVID EICKMAN, Address:OLSSON ASSOCIATES, Phone:(816) 361-1177  
EMERY SAPP AND SONS INC, Address:2301 I-70 DR NW, Phone:(573) 445-8331  
ORR STREET LOFTS LLC, Address:4240 PHILIPS FARM ROAD #109  
OLSSON ASSOCIATES, Address:550 ST LOUIS ST, Phone:(573) 875-5151  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineer Review - Grading No Comments 11/02/2023 10/27/2023
Gene Williams, P.E.
Miscellaneous Correction
Corrective Action Required
10/26/2023

Please combine Zone 2 with the Zone 4 plans. In other words, please submit one (1) plan set for both Zones.
Miscellaneous Correction
Corrective Action Required
10/26/2023

Please rename the plans as "Mass Grading and Erosion and Sediment Control Zones 2 and 4" or equivalent language.
Miscellaneous Correction
Corrective Action Required
10/26/2023

The Zone 4 cover sheet includes a pictorial location map that appears incorrect. Aria Apartment project appears to be in the wrong location, and the Discovery Park Zone 1 project is also shown in wrong location. Please revise.
Engineering Review Rejected 11/01/2023 10/26/2023
Gene Williams, P.E.
Misc
Corrective Action Required
10/26/2023

Please combine Zone 2 with the Zone 4 plans. In other words, please submit one (1) plan set for both Zones.
MISC
Corrective Action Required
10/26/2023

Please rename the plans as "Mass Grading and Erosion and Sediment Control Zones 2 and 4" or equivalent language.
Miscellaneous Correction
Corrective Action Required
10/26/2023

The Zone 4 cover sheet includes a pictorial location map that appears incorrect. Aria Apartment project appears to be in the wrong location, and the Discovery Park Zone 1 project is also shown in wrong location. Please revise.
Licensed Contractors Approved 09/29/2023 10/25/2023
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110071-Land Disturbance Fee $1,200.00 $1,200.00 Paid 09/27/2023
9110071-Site Grading Fee $82,186.43 $82,186.43 Paid 10/25/2023
9110068-Storm Fee $48,101.45 $48,101.45 Paid 11/16/2023
9110071-Site Grading Fee $36,546.15 $36,546.15 Paid 11/16/2023
$84,647.60
9110081-Paved Surface Inspection Fee $23,513.31 $23,513.31 Paid 05/13/2024
91100C9-Water Insp Fee $14,213.43 $14,213.43 Paid 11/21/2023
9110072-Water Test Fee $1,200.00 $1,200.00 Paid 11/21/2023
91100C8-Sanitary Sewer Insp Fees $20,786.39 $20,786.39 Paid 01/22/2024
Outstanding Fees Amount Paid Owing Date Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $300.00 $0.00 $300.00 Not Paid


$300.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Grading/Excavation/Fill Inspection Pending
Misc
Informational
12/20/2023
12-20-23 DP. All of my initial grading inspections are under site visit. Crew started back today moving dirt from the South side of Colburn Rd. to the site North of Colburn Rd. today. All sediment basins have been installed and all of the temporary storm pipes have been laid.
Install Street and Stop Signs Pending
Pavement-Aggregate Base Pending
Pavement-Stabilized Subgrade Pending
Storm Sewer Construction Inspection Pending
Misc
Informational
05/31/2024
5-30-24 DP. Crew is working on the RCB along Douglas Rd.
Pavement-Curb Construction Pending
Misc
Informational
07/23/2024
7-23-24 DP. Crew poured curb today for the turn lanes on the east side of Douglass.
Sanitary Sewer - Air Test Pending
Sanitary Sewer - Mandrel Pending
Sanitary Sewer - Vacuum Pending
Sidewalk Inspection Pending
Misc
Informational
09/04/2024
9-4-24 DP. ESS was forming up public sidewalk next to Lee's Summit Road. The forms were very chewed up so reading cross slopes was wishy washy. The foreman knows that I will be out tomorrow to check final pour. They were told to use white cure and broom finish.
Sanitary Sewer Construction Inspection Pending
Misc
Informational
02/26/2025
2-6-25 DP. ESS is onsite and has started fusing pipe together for the relocation of the force main. 2-11-25 DP. ESS still on site just fusing together HDPE. Haven't started trenching yet 2-24-25 DP. ESS is on site digging the trench for the force main and deleting the existing spire main 2-25-25 DP. ESS is continuing to work South with their trench. They buried 1/4 of the force main and back filled.
Water Line - Construction Inspection Pending
Misc
Informational
04/18/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
04/18/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in 2-24-25 DP. Advanced Excavation is onsite continuing to install the north phase water line. Brent's crew was onsite completing the test shut for the tie in. 2-25-25 DP Advanced Excavation is onsite and still working on the north phase water line, they are close to where the bore under Douglas is. 2-27-25 DP. Advanced Excavation is onsite and completed laying the 12" c900 water line to the bore crossing. When I was on site today the contractor called to schedule the bore. They are planning to come out next week after the rain and bore the encasement under Douglass. The test shut from the Water department is complete and I will hang door hangers 48 hours before any tie in. 3-10-25 DP. Aaron's crew was digging the bore pit for the boring company. The tie in for the Tee and valve is now scheduled for 3/18/25 at 5 PM 3-14-25 DP. I went to the houses today that will be affected by the tie in and provided notice of the shut down for 3/18/25 3-18-25 DP. Advanced Excavation cut the tee in the public 12". Tomorrow they plan to push pipe under Lee's Summit Road and we will still need to test before connecting to Tee. 3-21-25 DP. Aaron's crew is onsite and pushing water pipe through the encasement under Lee's Summit Road. 3-24-25 DP. Aaron's crew is onsite tying together the water life from the tie in back. Today they were installing ceta lok c900 pipe and are leaving open fittings for kickers. 3-26-25 DP. Aarons crew performed they hydrostatic test which held at 150 psi for 2 hours. 3-26-25 DP. Crew chlorinated the water line 3-27-25 DP. Water line was flushed 3-31-25 All fittings are tired together with all thread. They only have 1 45 left to install to complete the line to the tie in. 4-1-25 DP. Crew passed the hydrostatic test on the north phase 12 in water line. It held 150 psi for 2 hours. 4-1-25 DP. Crew chlorinated the water line. 4-2-25 DP. Crew flushed the water line.
Misc
Informational
04/18/2025
4-18-25 DP. All public water lines on this permit have been installed except the short line C on the southwest side of the property by Colbern Rd. This can not be installed until the force main is tied in.
Erosion Control Inspection Pending
Misc
Informational
04/18/2025
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
04/18/2025
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue. 5-6-24 DP. ESC is still in good working order. ESS ran a temporary ditch for storm water to prevent Colburn from flooding again. 5-15-24 DP. ESC is still in good working order. 5-20-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order. 6-17-24 DP. ESC is in good working order. 6-25-24 DP. ESC is in good working order 7-16-24 DP. ESC is in good working order. 7-23-24 DP. ESC is in good working order. 8-15-24 DP. ESC is in good working order. 9-10-24 DP. ESC is in good working order. 9-30-24 DP. ESC is in good working order. 11-12-24 DP. ESC is in good working order. 11-19-24 DP. ESC is in good working order 2-25-25 DP. ESC is in good working order. Most areas are getting ESC inspections under FDP permits. 3-26-25 DP ESC is in good working order. Crews were onsite this week addressing potential problem areas. 4-18-25 DP. ESC is in good working order.
Site Visit Pending 12/17/2024 12/17/2024
Misc
Informational
11/12/2024
3-27-24 Dustin A, Forming storm box corners, working on storm, and other crew working on bore hole 4-2-24 Dustin A, No activity due to weather 5-2-24 Dustin A, No activity due to rain 5-3-24 Dustin A, Form crew working, have concrete scheduled for 245 but doubtful due to muddy conditions. Will call if needed 5-17-24 DP. Travis' crew is onsite and were digging to set storm boxes that will be in the curb line of Colbern. They exposed the 20" transmission water main and the box is going to set 3/10ths of an inch off the top of the water main. Earl with Insentric is sending this issue back to their engineers and will resubmit a plan. 6-17-24 DP. Travis' crew was pulled off site for now. Currently no work for development onsite. They do have a excavator on the south side just breaking rock. The final segment of sewer can be tested on 6/28/24. The LS Water Dept. is currently onsite doing the camera test with what is already tested. 8-5 to 8-9-24 NS No work is being done 8-12-24 NS Work is being done on street. Ryan put in a inspection because Larry did not call in for a proof roll and they had started pouring and did not stop them because they had already put 40 yards of concrete down. 9-13-24 DP. No work onsite today. 9-16-24 DP. No site work today 9-17-24 NS It appears not work is being done today.
Misc
Informational
11/12/2024
11-12-24 DP. Work is being held up my Spire. They need to move their gas main before we can finish utility work.
Site Visit Partial 10/26/2023 10/26/2023 10/27/2023
Misc
Informational
10/27/2023
10-27-23 DP. Early this week ESS was on site and I met the grading Super, James. Contractor has been on site all week removing trees from the water way and mulching into piles. They also cut grade on a small piece along Douglas. That is where they are going to install storm pipes, fill in and create a construction entrance. They are staging their fuel tank at this location.
Erosion Control Inspection Partial 11/1/2023 11/1/2023 11/01/2023
Misc
Informational
11/01/2023
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site.
Site Visit Partial 11/1/2023 11/1/2023 11/01/2023
Misc
Informational
10/27/2023
10-27-23 DP. Early this week ESS was on site and I met the grading Super, James. Contractor has been on site all week removing trees from the water way and mulching into piles. They also cut grade on a small piece along Douglas. That is where they are going to install storm pipes, fill in and create a construction entrance. They are staging their fuel tank at this location. 11-1-23 DP. Ess has cut grade and installed storm tubes under the area for the construction entrance. They are currently laying fabric on the area and installing rip rap. This area is large, they are planning on staging their fuel tank there. The contractor is also continuing on with mulching trees and does have one scraper starting to cut dirt.
Erosion Control Inspection Partial 11/6/2023 11/6/2023 11/06/2023
Misc
Informational
11/01/2023
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition.
Site Visit Partial 11/6/2023 11/6/2023 11/06/2023
Misc
Informational
11/01/2023
10-27-23 DP. Early this week ESS was on site and I met the grading Super, James. Contractor has been on site all week removing trees from the water way and mulching into piles. They also cut grade on a small piece along Douglas. That is where they are going to install storm pipes, fill in and create a construction entrance. They are staging their fuel tank at this location. 11-1-23 DP. Ess has cut grade and installed storm tubes under the area for the construction entrance. They are currently laying fabric on the area and installing rip rap. This area is large, they are planning on staging their fuel tank there. The contractor is also continuing on with mulching trees and does have one scraper starting to cut dirt. 11-6-23 DP the main construction entrance off of Douglas north of Colburn has been properly installed. Their fuel tank is also staged at this location. Crew is cutting and moving dirt all over the property north of Colburn.
Site Visit Partial 11/7/2023 11/7/2023 11/07/2023
Misc
Informational
11/06/2023
10-27-23 DP. Early this week ESS was on site and I met the grading Super, James. Contractor has been on site all week removing trees from the water way and mulching into piles. They also cut grade on a small piece along Douglas. That is where they are going to install storm pipes, fill in and create a construction entrance. They are staging their fuel tank at this location. 11-1-23 DP. Ess has cut grade and installed storm tubes under the area for the construction entrance. They are currently laying fabric on the area and installing rip rap. This area is large, they are planning on staging their fuel tank there. The contractor is also continuing on with mulching trees and does have one scraper starting to cut dirt. 11-6-23 DP the main construction entrance off of Douglas north of Colburn has been properly installed. Their fuel tank is also staged at this location. Crew is cutting and moving dirt all over the property north of Colburn. 11-7-23 DP. Contractor is continuing with grading and cutting dirt with no issues.
Site Visit Partial 11/9/2023 11/9/2023 11/09/2023
Misc
Informational
11/07/2023
10-27-23 DP. Early this week ESS was on site and I met the grading Super, James. Contractor has been on site all week removing trees from the water way and mulching into piles. They also cut grade on a small piece along Douglas. That is where they are going to install storm pipes, fill in and create a construction entrance. They are staging their fuel tank at this location. 11-1-23 DP. Ess has cut grade and installed storm tubes under the area for the construction entrance. They are currently laying fabric on the area and installing rip rap. This area is large, they are planning on staging their fuel tank there. The contractor is also continuing on with mulching trees and does have one scraper starting to cut dirt. 11-6-23 DP the main construction entrance off of Douglas north of Colburn has been properly installed. Their fuel tank is also staged at this location. Crew is cutting and moving dirt all over the property north of Colburn. 11-7-23 DP. Contractor is continuing with grading and cutting dirt with no issues. 11-9-23 DP. Contractor is continuing on with grading and cutting dirt. No issues and they have been great at keeping up with everything we asked so far.
Erosion Control Inspection Partial 11/9/2023 11/9/2023 11/09/2023
Misc
Informational
11/06/2023
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order.
Site Visit Partial 11/10/2023 11/10/2023 11/10/2023
Misc
Informational
11/09/2023
10-27-23 DP. Early this week ESS was on site and I met the grading Super, James. Contractor has been on site all week removing trees from the water way and mulching into piles. They also cut grade on a small piece along Douglas. That is where they are going to install storm pipes, fill in and create a construction entrance. They are staging their fuel tank at this location. 11-1-23 DP. Ess has cut grade and installed storm tubes under the area for the construction entrance. They are currently laying fabric on the area and installing rip rap. This area is large, they are planning on staging their fuel tank there. The contractor is also continuing on with mulching trees and does have one scraper starting to cut dirt. 11-6-23 DP the main construction entrance off of Douglas north of Colburn has been properly installed. Their fuel tank is also staged at this location. Crew is cutting and moving dirt all over the property north of Colburn. 11-7-23 DP. Contractor is continuing with grading and cutting dirt with no issues. 11-9-23 DP. Contractor is continuing on with grading and cutting dirt. No issues and they have been great at keeping up with everything we asked so far. 11-10-23 DP. ESS is continuing to grade and cut dirt, they are also doing some ditching work for storm water runoff and flow. They are still hauling mulch off site. I spoke with James today about establishing an official construction entrance off of Colburn at the top of the hill for phase 1. He has a crew coming out monday to hydro excavate utilities so they can get the area to grade. The construction entrance off of Colburn should be established by the end of next week.
Site Visit Partial 11/15/2023 11/15/2023 11/15/2023
Misc
Informational
11/10/2023
10-27-23 DP. Early this week ESS was on site and I met the grading Super, James. Contractor has been on site all week removing trees from the water way and mulching into piles. They also cut grade on a small piece along Douglas. That is where they are going to install storm pipes, fill in and create a construction entrance. They are staging their fuel tank at this location. 11-1-23 DP. Ess has cut grade and installed storm tubes under the area for the construction entrance. They are currently laying fabric on the area and installing rip rap. This area is large, they are planning on staging their fuel tank there. The contractor is also continuing on with mulching trees and does have one scraper starting to cut dirt. 11-6-23 DP the main construction entrance off of Douglas north of Colburn has been properly installed. Their fuel tank is also staged at this location. Crew is cutting and moving dirt all over the property north of Colburn. 11-7-23 DP. Contractor is continuing with grading and cutting dirt with no issues. 11-9-23 DP. Contractor is continuing on with grading and cutting dirt. No issues and they have been great at keeping up with everything we asked so far. 11-10-23 DP. ESS is continuing to grade and cut dirt, they are also doing some ditching work for storm water runoff and flow. They are still hauling mulch off site. I spoke with James today about establishing an official construction entrance off of Colburn at the top of the hill for phase 1. He has a crew coming out monday to hydro excavate utilities so they can get the area to grade. The construction entrance off of Colburn should be established by the end of next week. 11-15-23 DP. Ess is continuing to grade and cut dirt. They are doing a good job at using their water truck to minimize dust. They are still needing to get the construction entrance on Colburn in.
Erosion Control Inspection Partial 11/15/2023 11/15/2023 11/15/2023
Misc
Informational
11/09/2023
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues.
Erosion Control Inspection Partial 11/17/2023 11/17/2023 11/17/2023
Misc
Informational
11/15/2023
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues.
Site Visit Partial 11/27/2023 11/27/2023 11/27/2023
Misc
Informational
11/15/2023
10-27-23 DP. Early this week ESS was on site and I met the grading Super, James. Contractor has been on site all week removing trees from the water way and mulching into piles. They also cut grade on a small piece along Douglas. That is where they are going to install storm pipes, fill in and create a construction entrance. They are staging their fuel tank at this location. 11-1-23 DP. Ess has cut grade and installed storm tubes under the area for the construction entrance. They are currently laying fabric on the area and installing rip rap. This area is large, they are planning on staging their fuel tank there. The contractor is also continuing on with mulching trees and does have one scraper starting to cut dirt. 11-6-23 DP the main construction entrance off of Douglas north of Colburn has been properly installed. Their fuel tank is also staged at this location. Crew is cutting and moving dirt all over the property north of Colburn. 11-7-23 DP. Contractor is continuing with grading and cutting dirt with no issues. 11-9-23 DP. Contractor is continuing on with grading and cutting dirt. No issues and they have been great at keeping up with everything we asked so far. 11-10-23 DP. ESS is continuing to grade and cut dirt, they are also doing some ditching work for storm water runoff and flow. They are still hauling mulch off site. I spoke with James today about establishing an official construction entrance off of Colburn at the top of the hill for phase 1. He has a crew coming out monday to hydro excavate utilities so they can get the area to grade. The construction entrance off of Colburn should be established by the end of next week. 11-15-23 DP. Ess is continuing to grade and cut dirt. They are doing a good job at using their water truck to minimize dust. They are still needing to get the construction entrance on Colburn in. 11-27-23 DP. No site work going on today.
Erosion Control Inspection Partial 12/4/2023 12/4/2023 12/04/2023
Misc
Informational
11/17/2023
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today.
Site Visit Partial 12/4/2023 12/4/2023 12/04/2023
Misc
Informational
11/27/2023
10-27-23 DP. Early this week ESS was on site and I met the grading Super, James. Contractor has been on site all week removing trees from the water way and mulching into piles. They also cut grade on a small piece along Douglas. That is where they are going to install storm pipes, fill in and create a construction entrance. They are staging their fuel tank at this location. 11-1-23 DP. Ess has cut grade and installed storm tubes under the area for the construction entrance. They are currently laying fabric on the area and installing rip rap. This area is large, they are planning on staging their fuel tank there. The contractor is also continuing on with mulching trees and does have one scraper starting to cut dirt. 11-6-23 DP the main construction entrance off of Douglas north of Colburn has been properly installed. Their fuel tank is also staged at this location. Crew is cutting and moving dirt all over the property north of Colburn. 11-7-23 DP. Contractor is continuing with grading and cutting dirt with no issues. 11-9-23 DP. Contractor is continuing on with grading and cutting dirt. No issues and they have been great at keeping up with everything we asked so far. 11-10-23 DP. ESS is continuing to grade and cut dirt, they are also doing some ditching work for storm water runoff and flow. They are still hauling mulch off site. I spoke with James today about establishing an official construction entrance off of Colburn at the top of the hill for phase 1. He has a crew coming out monday to hydro excavate utilities so they can get the area to grade. The construction entrance off of Colburn should be established by the end of next week. 11-15-23 DP. Ess is continuing to grade and cut dirt. They are doing a good job at using their water truck to minimize dust. They are still needing to get the construction entrance on Colburn in. 11-27-23 DP. No site work going on today. 12-4-23 DP. No site work for ESS today. The old "historic house" was moved on saturday.
Site Visit Partial 12/5/2023 12/5/2023 12/05/2023
Misc
Informational
12/04/2023
10-27-23 DP. Early this week ESS was on site and I met the grading Super, James. Contractor has been on site all week removing trees from the water way and mulching into piles. They also cut grade on a small piece along Douglas. That is where they are going to install storm pipes, fill in and create a construction entrance. They are staging their fuel tank at this location. 11-1-23 DP. Ess has cut grade and installed storm tubes under the area for the construction entrance. They are currently laying fabric on the area and installing rip rap. This area is large, they are planning on staging their fuel tank there. The contractor is also continuing on with mulching trees and does have one scraper starting to cut dirt. 11-6-23 DP the main construction entrance off of Douglas north of Colburn has been properly installed. Their fuel tank is also staged at this location. Crew is cutting and moving dirt all over the property north of Colburn. 11-7-23 DP. Contractor is continuing with grading and cutting dirt with no issues. 11-9-23 DP. Contractor is continuing on with grading and cutting dirt. No issues and they have been great at keeping up with everything we asked so far. 11-10-23 DP. ESS is continuing to grade and cut dirt, they are also doing some ditching work for storm water runoff and flow. They are still hauling mulch off site. I spoke with James today about establishing an official construction entrance off of Colburn at the top of the hill for phase 1. He has a crew coming out monday to hydro excavate utilities so they can get the area to grade. The construction entrance off of Colburn should be established by the end of next week. 11-15-23 DP. Ess is continuing to grade and cut dirt. They are doing a good job at using their water truck to minimize dust. They are still needing to get the construction entrance on Colburn in. 11-27-23 DP. No site work going on today. 12-4-23 DP. No site work for ESS today. The old "historic house" was moved on saturday. 12-5-23 DP. ESS only has 1 person on site today compacting blue shell. They have a third party inspector for all of their compaction. Unrelated to this project, spire is on site along Colburn Rd installing their new gas main and clarkson is doing work to widen Colburn.
Site Visit Partial 12/11/2023 12/11/2023 12/12/2023
Misc
Informational
12/05/2023
10-27-23 DP. Early this week ESS was on site and I met the grading Super, James. Contractor has been on site all week removing trees from the water way and mulching into piles. They also cut grade on a small piece along Douglas. That is where they are going to install storm pipes, fill in and create a construction entrance. They are staging their fuel tank at this location. 11-1-23 DP. Ess has cut grade and installed storm tubes under the area for the construction entrance. They are currently laying fabric on the area and installing rip rap. This area is large, they are planning on staging their fuel tank there. The contractor is also continuing on with mulching trees and does have one scraper starting to cut dirt. 11-6-23 DP the main construction entrance off of Douglas north of Colburn has been properly installed. Their fuel tank is also staged at this location. Crew is cutting and moving dirt all over the property north of Colburn. 11-7-23 DP. Contractor is continuing with grading and cutting dirt with no issues. 11-9-23 DP. Contractor is continuing on with grading and cutting dirt. No issues and they have been great at keeping up with everything we asked so far. 11-10-23 DP. ESS is continuing to grade and cut dirt, they are also doing some ditching work for storm water runoff and flow. They are still hauling mulch off site. I spoke with James today about establishing an official construction entrance off of Colburn at the top of the hill for phase 1. He has a crew coming out monday to hydro excavate utilities so they can get the area to grade. The construction entrance off of Colburn should be established by the end of next week. 11-15-23 DP. Ess is continuing to grade and cut dirt. They are doing a good job at using their water truck to minimize dust. They are still needing to get the construction entrance on Colburn in. 11-27-23 DP. No site work going on today. 12-4-23 DP. No site work for ESS today. The old "historic house" was moved on saturday. 12-5-23 DP. ESS only has 1 person on site today compacting blue shell. They have a third party inspector for all of their compaction. Unrelated to this project, spire is on site along Colburn Rd installing their new gas main and clarkson is doing work to widen Colburn. 12-11-23 DP. ESS is still scraping and moving dirt. Today they started cutting dirt from the south side of Colburn Rd. and moving it to the site on the north side of colburn rd.
Site Visit Partial 12/12/2023 12/12/2023 12/12/2023
Misc
Informational
12/12/2023
10-27-23 DP. Early this week ESS was on site and I met the grading Super, James. Contractor has been on site all week removing trees from the water way and mulching into piles. They also cut grade on a small piece along Douglas. That is where they are going to install storm pipes, fill in and create a construction entrance. They are staging their fuel tank at this location. 11-1-23 DP. Ess has cut grade and installed storm tubes under the area for the construction entrance. They are currently laying fabric on the area and installing rip rap. This area is large, they are planning on staging their fuel tank there. The contractor is also continuing on with mulching trees and does have one scraper starting to cut dirt. 11-6-23 DP the main construction entrance off of Douglas north of Colburn has been properly installed. Their fuel tank is also staged at this location. Crew is cutting and moving dirt all over the property north of Colburn. 11-7-23 DP. Contractor is continuing with grading and cutting dirt with no issues. 11-9-23 DP. Contractor is continuing on with grading and cutting dirt. No issues and they have been great at keeping up with everything we asked so far. 11-10-23 DP. ESS is continuing to grade and cut dirt, they are also doing some ditching work for storm water runoff and flow. They are still hauling mulch off site. I spoke with James today about establishing an official construction entrance off of Colburn at the top of the hill for phase 1. He has a crew coming out monday to hydro excavate utilities so they can get the area to grade. The construction entrance off of Colburn should be established by the end of next week. 11-15-23 DP. Ess is continuing to grade and cut dirt. They are doing a good job at using their water truck to minimize dust. They are still needing to get the construction entrance on Colburn in. 11-27-23 DP. No site work going on today. 12-4-23 DP. No site work for ESS today. The old "historic house" was moved on saturday. 12-5-23 DP. ESS only has 1 person on site today compacting blue shell. They have a third party inspector for all of their compaction. Unrelated to this project, spire is on site along Colburn Rd installing their new gas main and clarkson is doing work to widen Colburn. 12-11-23 DP. ESS is still scraping and moving dirt. Today they started cutting dirt from the south side of Colburn Rd. and moving it to the site on the north side of colburn rd. 12-12-23 DP. Ess hit the Sewer force main on the north side of colburn road while scraping dirt today. The marks from USIC were off 7-8 feet. ESS has the spillage contained onsite and has a pipe crew currently in route with replacement pipe to fix the affected areas.
Erosion Control Inspection Partial 12/12/2023 12/12/2023 12/12/2023
Misc
Informational
12/04/2023
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road
Erosion Control Inspection Partial 12/20/2023 12/20/2023 12/20/2023
Misc
Informational
12/12/2023
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Storm Sewer Construction Inspection Partial 12/19/2023 12/19/2023 12/20/2023
Misc
Informational
12/20/2023
12-19-23 DP. Tyler's crew started installing the 72"x60" box culvert today. They installed 4 sections. They spent most of the day securing the base laying multiple inches of 3" shot rock.
Storm Sewer Construction Inspection Partial 12/20/2023
Misc
Informational
12/20/2023
12-19-23 DP. Tyler's crew started installing the 72"x60" box culvert today. They installed 4 sections. They spent most of the day securing the base laying multiple inches of 3" shot rock. 12-20-23 DP. Tyler's crew was finishing up the 72"x60" box culvert (line A) today. They were digging in the deep detention basin on the west side of the outlet this afternoon. There are also installing a nice ditch check on the east side of the culvert before the rain comes this week.
Grading/Excavation/Fill Inspection Partial 12/20/2023 12/20/2023 12/20/2023
Misc
Informational
12/20/2023
12-20-23 DP. All of my initial grading inspections are under site visit. Crew started back today moving dirt from the South side of Colburn Rd. to the site North of Colburn Rd. today. All sediment basins have been installed and all of the temporary storm pipes have been laid.
Site Visit Partial 1/2/2024 1/2/2024 01/02/2024
Misc
Informational
12/12/2023
10-27-23 DP. Early this week ESS was on site and I met the grading Super, James. Contractor has been on site all week removing trees from the water way and mulching into piles. They also cut grade on a small piece along Douglas. That is where they are going to install storm pipes, fill in and create a construction entrance. They are staging their fuel tank at this location. 11-1-23 DP. Ess has cut grade and installed storm tubes under the area for the construction entrance. They are currently laying fabric on the area and installing rip rap. This area is large, they are planning on staging their fuel tank there. The contractor is also continuing on with mulching trees and does have one scraper starting to cut dirt. 11-6-23 DP the main construction entrance off of Douglas north of Colburn has been properly installed. Their fuel tank is also staged at this location. Crew is cutting and moving dirt all over the property north of Colburn. 11-7-23 DP. Contractor is continuing with grading and cutting dirt with no issues. 11-9-23 DP. Contractor is continuing on with grading and cutting dirt. No issues and they have been great at keeping up with everything we asked so far. 11-10-23 DP. ESS is continuing to grade and cut dirt, they are also doing some ditching work for storm water runoff and flow. They are still hauling mulch off site. I spoke with James today about establishing an official construction entrance off of Colburn at the top of the hill for phase 1. He has a crew coming out monday to hydro excavate utilities so they can get the area to grade. The construction entrance off of Colburn should be established by the end of next week. 11-15-23 DP. Ess is continuing to grade and cut dirt. They are doing a good job at using their water truck to minimize dust. They are still needing to get the construction entrance on Colburn in. 11-27-23 DP. No site work going on today. 12-4-23 DP. No site work for ESS today. The old "historic house" was moved on saturday. 12-5-23 DP. ESS only has 1 person on site today compacting blue shell. They have a third party inspector for all of their compaction. Unrelated to this project, spire is on site along Colburn Rd installing their new gas main and clarkson is doing work to widen Colburn. 12-11-23 DP. ESS is still scraping and moving dirt. Today they started cutting dirt from the south side of Colburn Rd. and moving it to the site on the north side of colburn rd. 12-12-23 DP. Ess hit the Sewer force main on the north side of colburn road while scraping dirt today. The marks from USIC were off 7-8 feet. ESS has the spillage contained onsite and has a pipe crew currently in route with replacement pipe to fix the affected areas. 12-28-23 Dustin A, No Activity for our dept . 12-29-23 Dustin A, No activity today for our department. 1-2-24 DP. No site work for development today.
Erosion Control Inspection Partial 1/2/2024 1/2/2024 01/02/2024
Misc
Informational
12/20/2023
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
01/02/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained.
Sanitary Sewer Construction Inspection Partial 1/3/2024 1/3/2024 01/05/2024
Misc
Informational
01/05/2024
1-3-23 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted.
Site Visit Partial 1/18/2024 1/18/2024 01/18/2024
Misc
Informational
01/02/2024
10-27-23 DP. Early this week ESS was on site and I met the grading Super, James. Contractor has been on site all week removing trees from the water way and mulching into piles. They also cut grade on a small piece along Douglas. That is where they are going to install storm pipes, fill in and create a construction entrance. They are staging their fuel tank at this location. 11-1-23 DP. Ess has cut grade and installed storm tubes under the area for the construction entrance. They are currently laying fabric on the area and installing rip rap. This area is large, they are planning on staging their fuel tank there. The contractor is also continuing on with mulching trees and does have one scraper starting to cut dirt. 11-6-23 DP the main construction entrance off of Douglas north of Colburn has been properly installed. Their fuel tank is also staged at this location. Crew is cutting and moving dirt all over the property north of Colburn. 11-7-23 DP. Contractor is continuing with grading and cutting dirt with no issues. 11-9-23 DP. Contractor is continuing on with grading and cutting dirt. No issues and they have been great at keeping up with everything we asked so far. 11-10-23 DP. ESS is continuing to grade and cut dirt, they are also doing some ditching work for storm water runoff and flow. They are still hauling mulch off site. I spoke with James today about establishing an official construction entrance off of Colburn at the top of the hill for phase 1. He has a crew coming out monday to hydro excavate utilities so they can get the area to grade. The construction entrance off of Colburn should be established by the end of next week. 11-15-23 DP. Ess is continuing to grade and cut dirt. They are doing a good job at using their water truck to minimize dust. They are still needing to get the construction entrance on Colburn in. 11-27-23 DP. No site work going on today. 12-4-23 DP. No site work for ESS today. The old "historic house" was moved on saturday. 12-5-23 DP. ESS only has 1 person on site today compacting blue shell. They have a third party inspector for all of their compaction. Unrelated to this project, spire is on site along Colburn Rd installing their new gas main and clarkson is doing work to widen Colburn. 12-11-23 DP. ESS is still scraping and moving dirt. Today they started cutting dirt from the south side of Colburn Rd. and moving it to the site on the north side of colburn rd. 12-12-23 DP. Ess hit the Sewer force main on the north side of colburn road while scraping dirt today. The marks from USIC were off 7-8 feet. ESS has the spillage contained onsite and has a pipe crew currently in route with replacement pipe to fix the affected areas. 12-28-23 Dustin A, No Activity for our dept . 12-29-23 Dustin A, No activity today for our department. 1-2-24 DP. No site work for development today. 1-18-24 DP. Crews have not been on site since before the Holidays due to the holidays and then the weather to follow.
Site Visit Partial 1/23/2024 1/23/2024 01/23/2024
Misc
Informational
01/18/2024
10-27-23 DP. Early this week ESS was on site and I met the grading Super, James. Contractor has been on site all week removing trees from the water way and mulching into piles. They also cut grade on a small piece along Douglas. That is where they are going to install storm pipes, fill in and create a construction entrance. They are staging their fuel tank at this location. 11-1-23 DP. Ess has cut grade and installed storm tubes under the area for the construction entrance. They are currently laying fabric on the area and installing rip rap. This area is large, they are planning on staging their fuel tank there. The contractor is also continuing on with mulching trees and does have one scraper starting to cut dirt. 11-6-23 DP the main construction entrance off of Douglas north of Colburn has been properly installed. Their fuel tank is also staged at this location. Crew is cutting and moving dirt all over the property north of Colburn. 11-7-23 DP. Contractor is continuing with grading and cutting dirt with no issues. 11-9-23 DP. Contractor is continuing on with grading and cutting dirt. No issues and they have been great at keeping up with everything we asked so far. 11-10-23 DP. ESS is continuing to grade and cut dirt, they are also doing some ditching work for storm water runoff and flow. They are still hauling mulch off site. I spoke with James today about establishing an official construction entrance off of Colburn at the top of the hill for phase 1. He has a crew coming out monday to hydro excavate utilities so they can get the area to grade. The construction entrance off of Colburn should be established by the end of next week. 11-15-23 DP. Ess is continuing to grade and cut dirt. They are doing a good job at using their water truck to minimize dust. They are still needing to get the construction entrance on Colburn in. 11-27-23 DP. No site work going on today. 12-4-23 DP. No site work for ESS today. The old "historic house" was moved on saturday. 12-5-23 DP. ESS only has 1 person on site today compacting blue shell. They have a third party inspector for all of their compaction. Unrelated to this project, spire is on site along Colburn Rd installing their new gas main and clarkson is doing work to widen Colburn. 12-11-23 DP. ESS is still scraping and moving dirt. Today they started cutting dirt from the south side of Colburn Rd. and moving it to the site on the north side of colburn rd. 12-12-23 DP. Ess hit the Sewer force main on the north side of colburn road while scraping dirt today. The marks from USIC were off 7-8 feet. ESS has the spillage contained onsite and has a pipe crew currently in route with replacement pipe to fix the affected areas. 12-28-23 Dustin A, No Activity for our dept . 12-29-23 Dustin A, No activity today for our department. 1-2-24 DP. No site work for development today. 1-18-24 DP. Crews have not been on site since before the Holidays due to the holidays and then the weather to follow. 1-23-24 DP. Crews are still not on site because of weather. No work for development.
Site Visit Partial 1/29/2024 1/29/2024 01/29/2024
Misc
Informational
01/23/2024
10-27-23 DP. Early this week ESS was on site and I met the grading Super, James. Contractor has been on site all week removing trees from the water way and mulching into piles. They also cut grade on a small piece along Douglas. That is where they are going to install storm pipes, fill in and create a construction entrance. They are staging their fuel tank at this location. 11-1-23 DP. Ess has cut grade and installed storm tubes under the area for the construction entrance. They are currently laying fabric on the area and installing rip rap. This area is large, they are planning on staging their fuel tank there. The contractor is also continuing on with mulching trees and does have one scraper starting to cut dirt. 11-6-23 DP the main construction entrance off of Douglas north of Colburn has been properly installed. Their fuel tank is also staged at this location. Crew is cutting and moving dirt all over the property north of Colburn. 11-7-23 DP. Contractor is continuing with grading and cutting dirt with no issues. 11-9-23 DP. Contractor is continuing on with grading and cutting dirt. No issues and they have been great at keeping up with everything we asked so far. 11-10-23 DP. ESS is continuing to grade and cut dirt, they are also doing some ditching work for storm water runoff and flow. They are still hauling mulch off site. I spoke with James today about establishing an official construction entrance off of Colburn at the top of the hill for phase 1. He has a crew coming out monday to hydro excavate utilities so they can get the area to grade. The construction entrance off of Colburn should be established by the end of next week. 11-15-23 DP. Ess is continuing to grade and cut dirt. They are doing a good job at using their water truck to minimize dust. They are still needing to get the construction entrance on Colburn in. 11-27-23 DP. No site work going on today. 12-4-23 DP. No site work for ESS today. The old "historic house" was moved on saturday. 12-5-23 DP. ESS only has 1 person on site today compacting blue shell. They have a third party inspector for all of their compaction. Unrelated to this project, spire is on site along Colburn Rd installing their new gas main and clarkson is doing work to widen Colburn. 12-11-23 DP. ESS is still scraping and moving dirt. Today they started cutting dirt from the south side of Colburn Rd. and moving it to the site on the north side of colburn rd. 12-12-23 DP. Ess hit the Sewer force main on the north side of colburn road while scraping dirt today. The marks from USIC were off 7-8 feet. ESS has the spillage contained onsite and has a pipe crew currently in route with replacement pipe to fix the affected areas. 12-28-23 Dustin A, No Activity for our dept . 12-29-23 Dustin A, No activity today for our department. 1-2-24 DP. No site work for development today. 1-18-24 DP. Crews have not been on site since before the Holidays due to the holidays and then the weather to follow. 1-23-24 DP. Crews are still not on site because of weather. No work for development. 1-29-23 DP. Crews planned to start working today but didn't end up getting started because of the mud.
Sanitary Sewer Construction Inspection Partial 1/30/2024 1/30/2024 01/30/2024
Misc
Informational
01/05/2024
1-3-23 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-23 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes.
Sanitary Sewer Construction Inspection Partial 2/1/2024 2/1/2024 02/02/2024
Misc
Informational
01/30/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project.
Sanitary Sewer Construction Inspection Partial 2/5/2024 2/5/2024 02/05/2024
Misc
Informational
02/02/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process.
Sanitary Sewer Construction Inspection Partial 2/6/2024 2/6/2024 02/06/2024
Misc
Informational
02/05/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z
Sanitary Sewer Construction Inspection Partial 2/8/2024 2/8/2024 02/08/2024
Misc
Informational
02/06/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday.
Sanitary Sewer Construction Inspection Partial 2/9/2024 2/9/2024 02/09/2024
Misc
Informational
02/08/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday
Sanitary Sewer - Air Test Passed 2/13/2024 2/13/2024 02/13/2024
Misc
Informational
02/13/2024
2-12-24 DP. Air test from MH 16-006 to Z-1 passed- 7:34 MH Z1- Z2- passed- 7:34 Z2- MH 16-008 Passed- 8:00
Sanitary Sewer Construction Inspection Partial 2/12/2024 2/12/2024 02/13/2024
Misc
Informational
02/09/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z
Sanitary Sewer - Mandrel Passed 2/12/2024 2/12/2024 02/13/2024
Misc
Informational
02/13/2024
2-12-24 DP. Mandrel tests performed. 16-006- Z1- passed Z1 -Z2- passed Z2- 16-008- passed. Line Z is complete with mandrel testing.
Sanitary Sewer Construction Inspection Partial 2/13/2024 2/13/2024 02/13/2024
Misc
Informational
02/13/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well.
Sanitary Sewer Construction Inspection Partial 2/15/2024 2/15/2024 02/15/2024
Misc
Informational
02/13/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-16-24 DP. Jays crew was on site today to tie in the other new manhole on existing sewer. It was made wrong. After talking with Brent who chatted with Amanda, I told them they needed to have a new base made with A locks. plugs and new core holes and a new base with boots will not be sufficient.
Sanitary Sewer Construction Inspection Partial 2/19/2024 2/19/2024 02/19/2024
Misc
Informational
02/15/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters.
Erosion Control Inspection Partial 2/19/2024 2/19/2024 02/19/2024
Misc
Informational
01/02/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
01/02/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly.
Sanitary Sewer Construction Inspection Partial 2/22/2024 2/22/2024 02/22/2024
Misc
Informational
02/19/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP.
Storm Sewer Construction Inspection Partial 2/26/2024 2/26/2024 02/28/2024
Misc
Informational
12/20/2023
12-19-23 DP. Tyler's crew started installing the 72"x60" box culvert today. They installed 4 sections. They spent most of the day securing the base laying multiple inches of 3" shot rock. 12-20-23 DP. Tyler's crew was finishing up the 72"x60" box culvert (line A) today. They were digging in the deep detention basin on the west side of the outlet this afternoon. There are also installing a nice ditch check on the east side of the culvert before the rain comes this week. 2-26-24 DP Jays crew is installing box culvert.
Storm Sewer Construction Inspection Partial 2/27/2024 2/27/2024 02/28/2024
Misc
Informational
02/28/2024
12-19-23 DP. Tyler's crew started installing the 72"x60" box culvert today. They installed 4 sections. They spent most of the day securing the base laying multiple inches of 3" shot rock. 12-20-23 DP. Tyler's crew was finishing up the 72"x60" box culvert (line A) today. They were digging in the deep detention basin on the west side of the outlet this afternoon. There are also installing a nice ditch check on the east side of the culvert before the rain comes this week. 2-26-24 DP Jays crew is installing box culvert. 2-27-24 DP. Jays cew is still on site installing this box culvert. They are using required mastic and sealant. They are also gator wrapping the joints.
Storm Sewer Construction Inspection Partial 2/28/2024 2/28/2024 02/28/2024
Misc
Informational
02/28/2024
12-19-23 DP. Tyler's crew started installing the 72"x60" box culvert today. They installed 4 sections. They spent most of the day securing the base laying multiple inches of 3" shot rock. 12-20-23 DP. Tyler's crew was finishing up the 72"x60" box culvert (line A) today. They were digging in the deep detention basin on the west side of the outlet this afternoon. There are also installing a nice ditch check on the east side of the culvert before the rain comes this week. 2-26-24 DP Jays crew is installing box culvert. 2-27-24 DP. Jays cew is still on site installing this box culvert. They are using required mastic and sealant. They are also gator wrapping the joints. 2-28-24 DP. Jays crew is still working towards completing the box covert.
Storm Sewer Construction Inspection Partial 3/4/2024 3/4/2024 03/04/2024
Misc
Informational
02/28/2024
12-19-23 DP. Tyler's crew started installing the 72"x60" box culvert today. They installed 4 sections. They spent most of the day securing the base laying multiple inches of 3" shot rock. 12-20-23 DP. Tyler's crew was finishing up the 72"x60" box culvert (line A) today. They were digging in the deep detention basin on the west side of the outlet this afternoon. There are also installing a nice ditch check on the east side of the culvert before the rain comes this week. 2-26-24 DP Jays crew is installing box culvert. 2-27-24 DP. Jays cew is still on site installing this box culvert. They are using required mastic and sealant. They are also gator wrapping the joints. 2-28-24 DP. Jays crew is still working towards completing the box covert. 3-4-24 DP. Jays crew is still working on the big box culvert.
Sanitary Sewer Construction Inspection Partial 3/4/2024 3/4/2024 03/04/2024
Misc
Informational
02/22/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP. 3-4-24 DP. AJ's crew is on site today. They installed the outside drop in manhole 16-010 and are now installing like A coming out of 16-010. They are installing tracer wire on new line A
Site Visit Complete 3/6/2024 3/6/2024 03/06/2024
Misc
Informational
03/06/2024
3-5-24 Dustin, Met with both crews, Sewer crew was breaking rock hoping to set few manholes. storm crew was moving dirt 3-6-24 Dustin A, Storm crew spreading dirt, sewer crew got 2 manholes set, still breaking rock
Sanitary Sewer Construction Inspection Partial 3/7/2024 3/7/2024 03/07/2024
Misc
Informational
03/04/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP. 3-4-24 DP. AJ's crew is on site today. They installed the outside drop in manhole 16-010 and are now installing like A coming out of 16-010. They are installing tracer wire on new line A 3-7-24 DP. AJ's crew has installed MH A-1. They are into about 8' of rock, so only have made it about 40' in 3 days.
Sanitary Sewer Construction Inspection Partial 3/11/2024 3/11/2024 03/11/2024
Misc
Informational
03/07/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP. 3-4-24 DP. AJ's crew is on site today. They installed the outside drop in manhole 16-010 and are now installing like A coming out of 16-010. They are installing tracer wire on new line A 3-7-24 DP. AJ's crew has installed MH A-1. They are into about 8' of rock, so only have made it about 40' in 3 days. 3-11-24 DP. AJ's crew is still working on line A. They are still in rock and haven't made it to A-2 yet.
Sanitary Sewer Construction Inspection Partial 3/14/2024 3/14/2024 03/15/2024
Misc
Informational
03/11/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP. 3-4-24 DP. AJ's crew is on site today. They installed the outside drop in manhole 16-010 and are now installing like A coming out of 16-010. They are installing tracer wire on new line A 3-7-24 DP. AJ's crew has installed MH A-1. They are into about 8' of rock, so only have made it about 40' in 3 days. 3-11-24 DP. AJ's crew is still working on line A. They are still in rock and haven't made it to A-2 yet. 3-14-24 DP. AJ's crew was on site today working on line A. They are still in rock and only installed 2 sticks of pipe.
Storm Sewer Construction Inspection Partial 3/15/2024 3/15/2024 03/15/2024
Misc
Informational
03/04/2024
12-19-23 DP. Tyler's crew started installing the 72"x60" box culvert today. They installed 4 sections. They spent most of the day securing the base laying multiple inches of 3" shot rock. 12-20-23 DP. Tyler's crew was finishing up the 72"x60" box culvert (line A) today. They were digging in the deep detention basin on the west side of the outlet this afternoon. There are also installing a nice ditch check on the east side of the culvert before the rain comes this week. 2-26-24 DP Jays crew is installing box culvert. 2-27-24 DP. Jays cew is still on site installing this box culvert. They are using required mastic and sealant. They are also gator wrapping the joints. 2-28-24 DP. Jays crew is still working towards completing the box covert. 3-4-24 DP. Jays crew is still working on the big box culvert. 3-15-24 DP. Jays crew has started on strom line D. They have installed D1 and D2 today.
Sanitary Sewer Construction Inspection Partial 3/15/2024 3/15/2024 03/15/2024
Misc
Informational
03/15/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP. 3-4-24 DP. AJ's crew is on site today. They installed the outside drop in manhole 16-010 and are now installing like A coming out of 16-010. They are installing tracer wire on new line A 3-7-24 DP. AJ's crew has installed MH A-1. They are into about 8' of rock, so only have made it about 40' in 3 days. 3-11-24 DP. AJ's crew is still working on line A. They are still in rock and haven't made it to A-2 yet. 3-14-24 DP. AJ's crew was on site today working on line A. They are still in rock and only installed 2 sticks of pipe. 3-15-24 DP. AJ's crew is still working on SS line A.
Sanitary Sewer Construction Inspection Partial 3/18/2024 3/18/2024 03/18/2024
Misc
Informational
03/15/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP. 3-4-24 DP. AJ's crew is on site today. They installed the outside drop in manhole 16-010 and are now installing like A coming out of 16-010. They are installing tracer wire on new line A 3-7-24 DP. AJ's crew has installed MH A-1. They are into about 8' of rock, so only have made it about 40' in 3 days. 3-11-24 DP. AJ's crew is still working on line A. They are still in rock and haven't made it to A-2 yet. 3-14-24 DP. AJ's crew was on site today working on line A. They are still in rock and only installed 2 sticks of pipe. 3-15-24 DP. AJ's crew is still working on SS line A. 3-18-24 DP. AJ's crew is still working on SS line A. They are out of the rock now and are making progress, they have set MH A-2 through A-5. They are going to get to A-6 and stop to wait on Travis's crew which is digging bore pits in preparation for them to bore under Colburn Road for line A tie in. There are currently three pipe crews (2 on sewer) at Discovery Park right now.
Storm Sewer Construction Inspection Partial 3/18/2024 3/18/2024 03/18/2024
Misc
Informational
03/15/2024
12-19-23 DP. Tyler's crew started installing the 72"x60" box culvert today. They installed 4 sections. They spent most of the day securing the base laying multiple inches of 3" shot rock. 12-20-23 DP. Tyler's crew was finishing up the 72"x60" box culvert (line A) today. They were digging in the deep detention basin on the west side of the outlet this afternoon. There are also installing a nice ditch check on the east side of the culvert before the rain comes this week. 2-26-24 DP Jays crew is installing box culvert. 2-27-24 DP. Jays cew is still on site installing this box culvert. They are using required mastic and sealant. They are also gator wrapping the joints. 2-28-24 DP. Jays crew is still working towards completing the box covert. 3-4-24 DP. Jays crew is still working on the big box culvert. 3-15-24 DP. Jays crew has started on strom line D. They have installed D1 and D2 today. 3-17-24 DP. Jays crew is onsite today still working on installing 16" storm pipe.
Sanitary Sewer Construction Inspection Partial 3/21/2024 3/21/2024 03/21/2024
Misc
Informational
03/18/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP. 3-4-24 DP. AJ's crew is on site today. They installed the outside drop in manhole 16-010 and are now installing like A coming out of 16-010. They are installing tracer wire on new line A 3-7-24 DP. AJ's crew has installed MH A-1. They are into about 8' of rock, so only have made it about 40' in 3 days. 3-11-24 DP. AJ's crew is still working on line A. They are still in rock and haven't made it to A-2 yet. 3-14-24 DP. AJ's crew was on site today working on line A. They are still in rock and only installed 2 sticks of pipe. 3-15-24 DP. AJ's crew is still working on SS line A. 3-18-24 DP. AJ's crew is still working on SS line A. They are out of the rock now and are making progress, they have set MH A-2 through A-5. They are going to get to A-6 and stop to wait on Travis's crew which is digging bore pits in preparation for them to bore under Colburn Road for line A tie in. There are currently three pipe crews (2 on sewer) at Discovery Park right now. 3-21-24 DP. AJ's crew Installed A line up to Mh A-4 and stopped on A line. They are waiting to see where the bore pits are finished to line up before moving forward with A line towards Colburn Rd. Out of MH A-4 B line goes back to the West. They have installed MH B-1, B-2 and B-3 today.
Storm Sewer Construction Inspection Partial 3/22/2024 3/22/2024 03/22/2024
Misc
Informational
03/18/2024
12-19-23 DP. Tyler's crew started installing the 72"x60" box culvert today. They installed 4 sections. They spent most of the day securing the base laying multiple inches of 3" shot rock. 12-20-23 DP. Tyler's crew was finishing up the 72"x60" box culvert (line A) today. They were digging in the deep detention basin on the west side of the outlet this afternoon. There are also installing a nice ditch check on the east side of the culvert before the rain comes this week. 2-26-24 DP Jays crew is installing box culvert. 2-27-24 DP. Jays cew is still on site installing this box culvert. They are using required mastic and sealant. They are also gator wrapping the joints. 2-28-24 DP. Jays crew is still working towards completing the box covert. 3-4-24 DP. Jays crew is still working on the big box culvert. 3-15-24 DP. Jays crew has started on strom line D. They have installed D1 and D2 today. 3-17-24 DP. Jays crew is onsite today still working on installing 16" storm pipe. 3-22-24 DP. ESS is onsite today tying rebar to pour the bends of the box culverts on line B. I inspected the rebar and it was per plan. They poured the flow line today onto B-6. KCMMB 4k concrete.
Storm Sewer Construction Inspection Partial 3/22/2024 3/22/2024 03/22/2024
Misc
Informational
03/22/2024
12-19-23 DP. Tyler's crew started installing the 72"x60" box culvert today. They installed 4 sections. They spent most of the day securing the base laying multiple inches of 3" shot rock. 12-20-23 DP. Tyler's crew was finishing up the 72"x60" box culvert (line A) today. They were digging in the deep detention basin on the west side of the outlet this afternoon. There are also installing a nice ditch check on the east side of the culvert before the rain comes this week. 2-26-24 DP Jays crew is installing box culvert. 2-27-24 DP. Jays cew is still on site installing this box culvert. They are using required mastic and sealant. They are also gator wrapping the joints. 2-28-24 DP. Jays crew is still working towards completing the box covert. 3-4-24 DP. Jays crew is still working on the big box culvert. 3-15-24 DP. Jays crew has started on strom line D. They have installed D1 and D2 today. 3-17-24 DP. Jays crew is onsite today still working on installing 16" storm pipe. 3-22-24 DP. ESS is onsite today tying rebar to pour the bends of the box culverts on line B. I inspected the rebar and it was per plan. They poured the flow line today onto B-6. KCMMB 4k concrete. 3-22-24 DP. A different ESS crew is also working on Storm line E
Sanitary Sewer Construction Inspection Partial 3/22/2024 3/22/2024 03/22/2024
Misc
Informational
03/21/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP. 3-4-24 DP. AJ's crew is on site today. They installed the outside drop in manhole 16-010 and are now installing like A coming out of 16-010. They are installing tracer wire on new line A 3-7-24 DP. AJ's crew has installed MH A-1. They are into about 8' of rock, so only have made it about 40' in 3 days. 3-11-24 DP. AJ's crew is still working on line A. They are still in rock and haven't made it to A-2 yet. 3-14-24 DP. AJ's crew was on site today working on line A. They are still in rock and only installed 2 sticks of pipe. 3-15-24 DP. AJ's crew is still working on SS line A. 3-18-24 DP. AJ's crew is still working on SS line A. They are out of the rock now and are making progress, they have set MH A-2 through A-5. They are going to get to A-6 and stop to wait on Travis's crew which is digging bore pits in preparation for them to bore under Colburn Road for line A tie in. There are currently three pipe crews (2 on sewer) at Discovery Park right now. 3-21-24 DP. AJ's crew Installed A line up to Mh A-4 and stopped on A line. They are waiting to see where the bore pits are finished to line up before moving forward with A line towards Colburn Rd. Out of MH A-4 B line goes back to the West. They have installed MH B-1, B-2 and B-3 today. 3-22-24 DP. AJ's crew is on site today, They finished setting B-3. They also went through and placed all riser rings on Manholes on like B, they are now working back on Line A, installing A-6.
Erosion Control Inspection Partial 3/25/2024 3/25/2024 03/25/2024
Misc
Informational
02/19/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
02/19/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order.
Sanitary Sewer Construction Inspection Partial 3/25/2024 3/25/2024 03/25/2024
Misc
Informational
03/22/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP. 3-4-24 DP. AJ's crew is on site today. They installed the outside drop in manhole 16-010 and are now installing like A coming out of 16-010. They are installing tracer wire on new line A 3-7-24 DP. AJ's crew has installed MH A-1. They are into about 8' of rock, so only have made it about 40' in 3 days. 3-11-24 DP. AJ's crew is still working on line A. They are still in rock and haven't made it to A-2 yet. 3-14-24 DP. AJ's crew was on site today working on line A. They are still in rock and only installed 2 sticks of pipe. 3-15-24 DP. AJ's crew is still working on SS line A. 3-18-24 DP. AJ's crew is still working on SS line A. They are out of the rock now and are making progress, they have set MH A-2 through A-5. They are going to get to A-6 and stop to wait on Travis's crew which is digging bore pits in preparation for them to bore under Colburn Road for line A tie in. There are currently three pipe crews (2 on sewer) at Discovery Park right now. 3-21-24 DP. AJ's crew Installed A line up to Mh A-4 and stopped on A line. They are waiting to see where the bore pits are finished to line up before moving forward with A line towards Colburn Rd. Out of MH A-4 B line goes back to the West. They have installed MH B-1, B-2 and B-3 today. 3-22-24 DP. AJ's crew is on site today, They finished setting B-3. They also went through and placed all riser rings on Manholes on like B, they are now working back on Line A, installing A-6. 3-25-24 DP. AJ's Crew is on site today and installed MH on A where D line exits. D line is ductile and they installed up to D-5. They are currently on SS Q line.
Site Visit Partial 03/26/2024
Misc
Informational
01/29/2024
10-27-23 DP. Early this week ESS was on site and I met the grading Super, James. Contractor has been on site all week removing trees from the water way and mulching into piles. They also cut grade on a small piece along Douglas. That is where they are going to install storm pipes, fill in and create a construction entrance. They are staging their fuel tank at this location. 11-1-23 DP. Ess has cut grade and installed storm tubes under the area for the construction entrance. They are currently laying fabric on the area and installing rip rap. This area is large, they are planning on staging their fuel tank there. The contractor is also continuing on with mulching trees and does have one scraper starting to cut dirt. 11-6-23 DP the main construction entrance off of Douglas north of Colburn has been properly installed. Their fuel tank is also staged at this location. Crew is cutting and moving dirt all over the property north of Colburn. 11-7-23 DP. Contractor is continuing with grading and cutting dirt with no issues. 11-9-23 DP. Contractor is continuing on with grading and cutting dirt. No issues and they have been great at keeping up with everything we asked so far. 11-10-23 DP. ESS is continuing to grade and cut dirt, they are also doing some ditching work for storm water runoff and flow. They are still hauling mulch off site. I spoke with James today about establishing an official construction entrance off of Colburn at the top of the hill for phase 1. He has a crew coming out monday to hydro excavate utilities so they can get the area to grade. The construction entrance off of Colburn should be established by the end of next week. 11-15-23 DP. Ess is continuing to grade and cut dirt. They are doing a good job at using their water truck to minimize dust. They are still needing to get the construction entrance on Colburn in. 11-27-23 DP. No site work going on today. 12-4-23 DP. No site work for ESS today. The old "historic house" was moved on saturday. 12-5-23 DP. ESS only has 1 person on site today compacting blue shell. They have a third party inspector for all of their compaction. Unrelated to this project, spire is on site along Colburn Rd installing their new gas main and clarkson is doing work to widen Colburn. 12-11-23 DP. ESS is still scraping and moving dirt. Today they started cutting dirt from the south side of Colburn Rd. and moving it to the site on the north side of colburn rd. 12-12-23 DP. Ess hit the Sewer force main on the north side of colburn road while scraping dirt today. The marks from USIC were off 7-8 feet. ESS has the spillage contained onsite and has a pipe crew currently in route with replacement pipe to fix the affected areas. 12-28-23 Dustin A, No Activity for our dept . 12-29-23 Dustin A, No activity today for our department. 1-2-24 DP. No site work for development today. 1-18-24 DP. Crews have not been on site since before the Holidays due to the holidays and then the weather to follow. 1-23-24 DP. Crews are still not on site because of weather. No work for development. 1-29-23 DP. Crews planned to start working today but didn't end up getting started because of the mud. 2-26-24 Dustin A, just doing some back filling , due to weather
Site Visit Partial 03/27/2024
Misc
Informational
03/27/2024
3-27-24 Dustin A, Forming storm box corners, working on storm, and other crew working on bore hole
Storm Sewer Construction Inspection Partial 3/28/2024 3/28/2024 03/28/2024
Misc
Informational
03/22/2024
12-19-23 DP. Tyler's crew started installing the 72"x60" box culvert today. They installed 4 sections. They spent most of the day securing the base laying multiple inches of 3" shot rock. 12-20-23 DP. Tyler's crew was finishing up the 72"x60" box culvert (line A) today. They were digging in the deep detention basin on the west side of the outlet this afternoon. There are also installing a nice ditch check on the east side of the culvert before the rain comes this week. 2-26-24 DP Jays crew is installing box culvert. 2-27-24 DP. Jays cew is still on site installing this box culvert. They are using required mastic and sealant. They are also gator wrapping the joints. 2-28-24 DP. Jays crew is still working towards completing the box covert. 3-4-24 DP. Jays crew is still working on the big box culvert. 3-15-24 DP. Jays crew has started on strom line D. They have installed D1 and D2 today. 3-17-24 DP. Jays crew is onsite today still working on installing 16" storm pipe. 3-22-24 DP. ESS is onsite today tying rebar to pour the bends of the box culverts on line B. I inspected the rebar and it was per plan. They poured the flow line today onto B-6. KCMMB 4k concrete. 3-22-24 DP. A different ESS crew is also working on Storm line E 3-28-24 DP. Both crews are working on storm line D
Sanitary Sewer Construction Inspection Partial 3/28/2024 3/28/2024 03/28/2024
Misc
Informational
03/25/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP. 3-4-24 DP. AJ's crew is on site today. They installed the outside drop in manhole 16-010 and are now installing like A coming out of 16-010. They are installing tracer wire on new line A 3-7-24 DP. AJ's crew has installed MH A-1. They are into about 8' of rock, so only have made it about 40' in 3 days. 3-11-24 DP. AJ's crew is still working on line A. They are still in rock and haven't made it to A-2 yet. 3-14-24 DP. AJ's crew was on site today working on line A. They are still in rock and only installed 2 sticks of pipe. 3-15-24 DP. AJ's crew is still working on SS line A. 3-18-24 DP. AJ's crew is still working on SS line A. They are out of the rock now and are making progress, they have set MH A-2 through A-5. They are going to get to A-6 and stop to wait on Travis's crew which is digging bore pits in preparation for them to bore under Colburn Road for line A tie in. There are currently three pipe crews (2 on sewer) at Discovery Park right now. 3-21-24 DP. AJ's crew Installed A line up to Mh A-4 and stopped on A line. They are waiting to see where the bore pits are finished to line up before moving forward with A line towards Colburn Rd. Out of MH A-4 B line goes back to the West. They have installed MH B-1, B-2 and B-3 today. 3-22-24 DP. AJ's crew is on site today, They finished setting B-3. They also went through and placed all riser rings on Manholes on like B, they are now working back on Line A, installing A-6. 3-25-24 DP. AJ's Crew is on site today and installed MH on A where D line exits. D line is ductile and they installed up to D-5. They are currently on SS Q line. 3-28-24 DP. Crew is on the south side of Colburn Rd. pouring a concrete base in the bore pit in prep for boring the sewer line under Colburn.
Site Visit Partial 04/02/2024
Misc
Informational
03/27/2024
3-27-24 Dustin A, Forming storm box corners, working on storm, and other crew working on bore hole 4-2-24 Dustin A, No activity due to weather
Storm Sewer Construction Inspection Partial 4/5/2024 4/5/2024 04/05/2024
Misc
Informational
03/28/2024
12-19-23 DP. Tyler's crew started installing the 72"x60" box culvert today. They installed 4 sections. They spent most of the day securing the base laying multiple inches of 3" shot rock. 12-20-23 DP. Tyler's crew was finishing up the 72"x60" box culvert (line A) today. They were digging in the deep detention basin on the west side of the outlet this afternoon. There are also installing a nice ditch check on the east side of the culvert before the rain comes this week. 2-26-24 DP Jays crew is installing box culvert. 2-27-24 DP. Jays cew is still on site installing this box culvert. They are using required mastic and sealant. They are also gator wrapping the joints. 2-28-24 DP. Jays crew is still working towards completing the box covert. 3-4-24 DP. Jays crew is still working on the big box culvert. 3-15-24 DP. Jays crew has started on strom line D. They have installed D1 and D2 today. 3-17-24 DP. Jays crew is onsite today still working on installing 16" storm pipe. 3-22-24 DP. ESS is onsite today tying rebar to pour the bends of the box culverts on line B. I inspected the rebar and it was per plan. They poured the flow line today onto B-6. KCMMB 4k concrete. 3-22-24 DP. A different ESS crew is also working on Storm line E 3-28-24 DP. Both crews are working on storm line D 4-5-24 Crews have been pouring collars on storm pipes and also poured the flow line on bend 1 on the box culvert.
Erosion Control Inspection Partial 4/8/2024 4/8/2024 04/08/2024
Misc
Informational
03/25/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
03/25/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen.
Sanitary Sewer Construction Inspection Partial 4/8/2024 4/8/2024 04/08/2024
Misc
Informational
03/28/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP. 3-4-24 DP. AJ's crew is on site today. They installed the outside drop in manhole 16-010 and are now installing like A coming out of 16-010. They are installing tracer wire on new line A 3-7-24 DP. AJ's crew has installed MH A-1. They are into about 8' of rock, so only have made it about 40' in 3 days. 3-11-24 DP. AJ's crew is still working on line A. They are still in rock and haven't made it to A-2 yet. 3-14-24 DP. AJ's crew was on site today working on line A. They are still in rock and only installed 2 sticks of pipe. 3-15-24 DP. AJ's crew is still working on SS line A. 3-18-24 DP. AJ's crew is still working on SS line A. They are out of the rock now and are making progress, they have set MH A-2 through A-5. They are going to get to A-6 and stop to wait on Travis's crew which is digging bore pits in preparation for them to bore under Colburn Road for line A tie in. There are currently three pipe crews (2 on sewer) at Discovery Park right now. 3-21-24 DP. AJ's crew Installed A line up to Mh A-4 and stopped on A line. They are waiting to see where the bore pits are finished to line up before moving forward with A line towards Colburn Rd. Out of MH A-4 B line goes back to the West. They have installed MH B-1, B-2 and B-3 today. 3-22-24 DP. AJ's crew is on site today, They finished setting B-3. They also went through and placed all riser rings on Manholes on like B, they are now working back on Line A, installing A-6. 3-25-24 DP. AJ's Crew is on site today and installed MH on A where D line exits. D line is ductile and they installed up to D-5. They are currently on SS Q line. 3-28-24 DP. Crew is on the south side of Colburn Rd. pouring a concrete base in the bore pit in prep for boring the sewer line under Colburn. 4-8-24 DP. Crew is boring under colburn road. They got 1 stick started, hoping to speed up after today. All sewer lines are finished with the exception of A line tie in and moving the force main.
Storm Sewer Construction Inspection Partial 4/8/2024 4/8/2024 04/08/2024
Misc
Informational
04/05/2024
12-19-23 DP. Tyler's crew started installing the 72"x60" box culvert today. They installed 4 sections. They spent most of the day securing the base laying multiple inches of 3" shot rock. 12-20-23 DP. Tyler's crew was finishing up the 72"x60" box culvert (line A) today. They were digging in the deep detention basin on the west side of the outlet this afternoon. There are also installing a nice ditch check on the east side of the culvert before the rain comes this week. 2-26-24 DP Jays crew is installing box culvert. 2-27-24 DP. Jays cew is still on site installing this box culvert. They are using required mastic and sealant. They are also gator wrapping the joints. 2-28-24 DP. Jays crew is still working towards completing the box covert. 3-4-24 DP. Jays crew is still working on the big box culvert. 3-15-24 DP. Jays crew has started on strom line D. They have installed D1 and D2 today. 3-17-24 DP. Jays crew is onsite today still working on installing 16" storm pipe. 3-22-24 DP. ESS is onsite today tying rebar to pour the bends of the box culverts on line B. I inspected the rebar and it was per plan. They poured the flow line today onto B-6. KCMMB 4k concrete. 3-22-24 DP. A different ESS crew is also working on Storm line E 3-28-24 DP. Both crews are working on storm line D 4-5-24 Crews have been pouring collars on storm pipes and also poured the flow line on bend 1 on the box culvert. 4-8-24 DP. Crew had bend 3 by box B5 ready for a rebar inspection today. They will be pouring in the morning.
Sanitary Sewer Construction Inspection Partial 04/09/2024
Misc
Informational
04/08/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP. 3-4-24 DP. AJ's crew is on site today. They installed the outside drop in manhole 16-010 and are now installing like A coming out of 16-010. They are installing tracer wire on new line A 3-7-24 DP. AJ's crew has installed MH A-1. They are into about 8' of rock, so only have made it about 40' in 3 days. 3-11-24 DP. AJ's crew is still working on line A. They are still in rock and haven't made it to A-2 yet. 3-14-24 DP. AJ's crew was on site today working on line A. They are still in rock and only installed 2 sticks of pipe. 3-15-24 DP. AJ's crew is still working on SS line A. 3-18-24 DP. AJ's crew is still working on SS line A. They are out of the rock now and are making progress, they have set MH A-2 through A-5. They are going to get to A-6 and stop to wait on Travis's crew which is digging bore pits in preparation for them to bore under Colburn Road for line A tie in. There are currently three pipe crews (2 on sewer) at Discovery Park right now. 3-21-24 DP. AJ's crew Installed A line up to Mh A-4 and stopped on A line. They are waiting to see where the bore pits are finished to line up before moving forward with A line towards Colburn Rd. Out of MH A-4 B line goes back to the West. They have installed MH B-1, B-2 and B-3 today. 3-22-24 DP. AJ's crew is on site today, They finished setting B-3. They also went through and placed all riser rings on Manholes on like B, they are now working back on Line A, installing A-6. 3-25-24 DP. AJ's Crew is on site today and installed MH on A where D line exits. D line is ductile and they installed up to D-5. They are currently on SS Q line. 3-28-24 DP. Crew is on the south side of Colburn Rd. pouring a concrete base in the bore pit in prep for boring the sewer line under Colburn. 4-8-24 DP. Crew is boring under colburn road. They got 1 stick started, hoping to speed up after today. All sewer lines are finished with the exception of A line tie in and moving the force main. 4-9-24 DP. This inspection is to summarize dates for sewer testing. Vacuum testing on MH- Z2, 16-008,16-009 and 16-010. Line D was finished installing on 3/25/24 which means testing can begin 4/25/24. Line B was finished 3/22/24 with testing being able to begin 4/22/24. Line A is still not completely tied in, waiting for the bore under Colburn Road which they are currently still working on. The camera test with LS water Dept. will not be scheduled until all testing is complete with me (Air, vacuum and mandrel) are completed and passed.
Sanitary Sewer Construction Inspection Partial 04/09/2024
Misc
Informational
04/09/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP. 3-4-24 DP. AJ's crew is on site today. They installed the outside drop in manhole 16-010 and are now installing like A coming out of 16-010. They are installing tracer wire on new line A 3-7-24 DP. AJ's crew has installed MH A-1. They are into about 8' of rock, so only have made it about 40' in 3 days. 3-11-24 DP. AJ's crew is still working on line A. They are still in rock and haven't made it to A-2 yet. 3-14-24 DP. AJ's crew was on site today working on line A. They are still in rock and only installed 2 sticks of pipe. 3-15-24 DP. AJ's crew is still working on SS line A. 3-18-24 DP. AJ's crew is still working on SS line A. They are out of the rock now and are making progress, they have set MH A-2 through A-5. They are going to get to A-6 and stop to wait on Travis's crew which is digging bore pits in preparation for them to bore under Colburn Road for line A tie in. There are currently three pipe crews (2 on sewer) at Discovery Park right now. 3-21-24 DP. AJ's crew Installed A line up to Mh A-4 and stopped on A line. They are waiting to see where the bore pits are finished to line up before moving forward with A line towards Colburn Rd. Out of MH A-4 B line goes back to the West. They have installed MH B-1, B-2 and B-3 today. 3-22-24 DP. AJ's crew is on site today, They finished setting B-3. They also went through and placed all riser rings on Manholes on like B, they are now working back on Line A, installing A-6. 3-25-24 DP. AJ's Crew is on site today and installed MH on A where D line exits. D line is ductile and they installed up to D-5. They are currently on SS Q line. 3-28-24 DP. Crew is on the south side of Colburn Rd. pouring a concrete base in the bore pit in prep for boring the sewer line under Colburn. 4-8-24 DP. Crew is boring under colburn road. They got 1 stick started, hoping to speed up after today. All sewer lines are finished with the exception of A line tie in and moving the force main. 4-9-24 DP. This inspection is to summarize dates for sewer testing. Vacuum testing on MH- Z2, 16-008,16-009 and 16-010. Line D was finished installing on 3/25/24 which means testing can begin 4/25/24. Line B was finished 3/22/24 with testing being able to begin 4/22/24. Line A is still not completely tied in, waiting for the bore under Colburn Road which they are currently still working on. The camera test with LS water Dept. will not be scheduled until all testing is complete with me (Air, vacuum and mandrel) are completed and passed.
Storm Sewer Construction Inspection Partial 4/11/2024 4/11/2024 04/11/2024
Misc
Informational
04/08/2024
12-19-23 DP. Tyler's crew started installing the 72"x60" box culvert today. They installed 4 sections. They spent most of the day securing the base laying multiple inches of 3" shot rock. 12-20-23 DP. Tyler's crew was finishing up the 72"x60" box culvert (line A) today. They were digging in the deep detention basin on the west side of the outlet this afternoon. There are also installing a nice ditch check on the east side of the culvert before the rain comes this week. 2-26-24 DP Jays crew is installing box culvert. 2-27-24 DP. Jays cew is still on site installing this box culvert. They are using required mastic and sealant. They are also gator wrapping the joints. 2-28-24 DP. Jays crew is still working towards completing the box covert. 3-4-24 DP. Jays crew is still working on the big box culvert. 3-15-24 DP. Jays crew has started on strom line D. They have installed D1 and D2 today. 3-17-24 DP. Jays crew is onsite today still working on installing 16" storm pipe. 3-22-24 DP. ESS is onsite today tying rebar to pour the bends of the box culverts on line B. I inspected the rebar and it was per plan. They poured the flow line today onto B-6. KCMMB 4k concrete. 3-22-24 DP. A different ESS crew is also working on Storm line E 3-28-24 DP. Both crews are working on storm line D 4-5-24 Crews have been pouring collars on storm pipes and also poured the flow line on bend 1 on the box culvert. 4-8-24 DP. Crew had bend 3 by box B5 ready for a rebar inspection today. They will be pouring in the morning. 4-11-24 DP. Crew poured the top of the tie in point on the big box culvert today.
Water Line - Construction Inspection Partial 4/11/2024 4/11/2024 04/11/2024
Misc
Informational
04/11/2024
4/11/24 DP. Travis' crew started installing Public water line B today. They have adequate aggregate under the pipe, and above the pipe. They are running tracer wire and wate tape as well. On Colburn Road where they are suppose to tie into the 12" pipe that CIP is laying, isn't in yet. ESS plans show installing 1 valve to the CROSS but their plans were drawn off of that CROSS already being installed. I touched base with ESS and Insentric and also CIP inspector Joe which sent to his PM. ESS knows if they do install the CROSS, it will require 4 valves.
Water Line - Construction Inspection Partial 4/12/2024 4/12/2024 04/12/2024
Misc
Informational
04/11/2024
4/11/24 DP. Travis' crew started installing Public water line B today. They have adequate aggregate under the pipe, and above the pipe. They are running tracer wire and wate tape as well. On Colburn Road where they are suppose to tie into the 12" pipe that CIP is laying, isn't in yet. ESS plans show installing 1 valve to the CROSS but their plans were drawn off of that CROSS already being installed. I touched base with ESS and Insentric and also CIP inspector Joe which sent to his PM. ESS knows if they do install the CROSS, it will require 4 valves. 4-12-24 DP. Travis' crew is still installing the public water line "B" today. They have almost made it to the corner of Colburn and Lee's Summit Rd. where they had a third party contractor potholing utilities.
Water Line - Construction Inspection Partial 4/16/2024 4/16/2024 04/16/2024
Misc
Informational
04/12/2024
4/11/24 DP. Travis' crew started installing Public water line B today. They have adequate aggregate under the pipe, and above the pipe. They are running tracer wire and wate tape as well. On Colburn Road where they are suppose to tie into the 12" pipe that CIP is laying, isn't in yet. ESS plans show installing 1 valve to the CROSS but their plans were drawn off of that CROSS already being installed. I touched base with ESS and Insentric and also CIP inspector Joe which sent to his PM. ESS knows if they do install the CROSS, it will require 4 valves. 4-12-24 DP. Travis' crew is still installing the public water line "B" today. They have almost made it to the corner of Colburn and Lee's Summit Rd. where they had a third party contractor potholing utilities. 4-16-24 DP. Travis' Crew is onsite today installing public water line B. They are at the intersection of Colburn and Douglass working towards the Tee where they will bore under Colburn to the south property.
Sanitary Sewer Construction Inspection Partial 4/16/2024 4/16/2024 04/16/2024
Misc
Informational
04/09/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP. 3-4-24 DP. AJ's crew is on site today. They installed the outside drop in manhole 16-010 and are now installing like A coming out of 16-010. They are installing tracer wire on new line A 3-7-24 DP. AJ's crew has installed MH A-1. They are into about 8' of rock, so only have made it about 40' in 3 days. 3-11-24 DP. AJ's crew is still working on line A. They are still in rock and haven't made it to A-2 yet. 3-14-24 DP. AJ's crew was on site today working on line A. They are still in rock and only installed 2 sticks of pipe. 3-15-24 DP. AJ's crew is still working on SS line A. 3-18-24 DP. AJ's crew is still working on SS line A. They are out of the rock now and are making progress, they have set MH A-2 through A-5. They are going to get to A-6 and stop to wait on Travis's crew which is digging bore pits in preparation for them to bore under Colburn Road for line A tie in. There are currently three pipe crews (2 on sewer) at Discovery Park right now. 3-21-24 DP. AJ's crew Installed A line up to Mh A-4 and stopped on A line. They are waiting to see where the bore pits are finished to line up before moving forward with A line towards Colburn Rd. Out of MH A-4 B line goes back to the West. They have installed MH B-1, B-2 and B-3 today. 3-22-24 DP. AJ's crew is on site today, They finished setting B-3. They also went through and placed all riser rings on Manholes on like B, they are now working back on Line A, installing A-6. 3-25-24 DP. AJ's Crew is on site today and installed MH on A where D line exits. D line is ductile and they installed up to D-5. They are currently on SS Q line. 3-28-24 DP. Crew is on the south side of Colburn Rd. pouring a concrete base in the bore pit in prep for boring the sewer line under Colburn. 4-8-24 DP. Crew is boring under colburn road. They got 1 stick started, hoping to speed up after today. All sewer lines are finished with the exception of A line tie in and moving the force main. 4-9-24 DP. This inspection is to summarize dates for sewer testing. Vacuum testing on MH- Z2, 16-008,16-009 and 16-010. Line D was finished installing on 3/25/24 which means testing can begin 4/25/24. Line B was finished 3/22/24 with testing being able to begin 4/22/24. Line A is still not completely tied in, waiting for the bore under Colburn Road which they are currently still working on. The camera test with LS water Dept. will not be scheduled until all testing is complete with me (Air, vacuum and mandrel) are completed and passed. 4-16-24 DP. Crew is still working on boring SS line A under Colburn Rd.
Water Line - Construction Inspection Partial 4/17/2024 4/17/2024 04/17/2024
Misc
Informational
04/16/2024
4/11/24 DP. Travis' crew started installing Public water line B today. They have adequate aggregate under the pipe, and above the pipe. They are running tracer wire and wate tape as well. On Colburn Road where they are suppose to tie into the 12" pipe that CIP is laying, isn't in yet. ESS plans show installing 1 valve to the CROSS but their plans were drawn off of that CROSS already being installed. I touched base with ESS and Insentric and also CIP inspector Joe which sent to his PM. ESS knows if they do install the CROSS, it will require 4 valves. 4-12-24 DP. Travis' crew is still installing the public water line "B" today. They have almost made it to the corner of Colburn and Lee's Summit Rd. where they had a third party contractor potholing utilities. 4-16-24 DP. Travis' Crew is onsite today installing public water line B. They are at the intersection of Colburn and Douglass working towards the Tee where they will bore under Colburn to the south property. 4/17/24 DP. Travis' crew jumped on the south side of Colbern today and is working on Line A.
Sanitary Sewer Construction Inspection Partial 4/17/2024 4/17/2024 04/17/2024
Misc
Informational
04/16/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP. 3-4-24 DP. AJ's crew is on site today. They installed the outside drop in manhole 16-010 and are now installing like A coming out of 16-010. They are installing tracer wire on new line A 3-7-24 DP. AJ's crew has installed MH A-1. They are into about 8' of rock, so only have made it about 40' in 3 days. 3-11-24 DP. AJ's crew is still working on line A. They are still in rock and haven't made it to A-2 yet. 3-14-24 DP. AJ's crew was on site today working on line A. They are still in rock and only installed 2 sticks of pipe. 3-15-24 DP. AJ's crew is still working on SS line A. 3-18-24 DP. AJ's crew is still working on SS line A. They are out of the rock now and are making progress, they have set MH A-2 through A-5. They are going to get to A-6 and stop to wait on Travis's crew which is digging bore pits in preparation for them to bore under Colburn Road for line A tie in. There are currently three pipe crews (2 on sewer) at Discovery Park right now. 3-21-24 DP. AJ's crew Installed A line up to Mh A-4 and stopped on A line. They are waiting to see where the bore pits are finished to line up before moving forward with A line towards Colbern Rd. Out of MH A-4 B line goes back to the West. They have installed MH B-1, B-2 and B-3 today. 3-22-24 DP. AJ's crew is on site today, They finished setting B-3. They also went through and placed all riser rings on Manholes on like B, they are now working back on Line A, installing A-6. 3-25-24 DP. AJ's Crew is on site today and installed MH on A where D line exits. D line is ductile and they installed up to D-5. They are currently on SS Q line. 3-28-24 DP. Crew is on the south side of Colbern Rd. pouring a concrete base in the bore pit in prep for boring the sewer line under Colbern. 4-8-24 DP. Crew is boring under colbern road. They got 1 stick started, hoping to speed up after today. All sewer lines are finished with the exception of A line tie in and moving the force main. 4-9-24 DP. This inspection is to summarize dates for sewer testing. Vacuum testing on MH- Z2, 16-008,16-009 and 16-010. Line D was finished installing on 3/25/24 which means testing can begin 4/25/24. Line B was finished 3/22/24 with testing being able to begin 4/22/24. Line A is still not completely tied in, waiting for the bore under Colbern Road which they are currently still working on. The camera test with LS water Dept. will not be scheduled until all testing is complete with me (Air, vacuum and mandrel) are completed and passed. 4-16-24 DP. Crew is still working on boring SS line A under Colbern Rd. 4-17-24 Boring crew is still working on boring line A under Colbern.
Erosion Control Inspection Partial 4/18/2024 4/18/2024 04/18/2024
Misc
Informational
04/08/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
04/08/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Alot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up.
Water Line - Construction Inspection Partial 4/22/2024 4/22/2024 04/23/2024
Misc
Informational
04/17/2024
4/11/24 DP. Travis' crew started installing Public water line B today. They have adequate aggregate under the pipe, and above the pipe. They are running tracer wire and wate tape as well. On Colburn Road where they are suppose to tie into the 12" pipe that CIP is laying, isn't in yet. ESS plans show installing 1 valve to the CROSS but their plans were drawn off of that CROSS already being installed. I touched base with ESS and Insentric and also CIP inspector Joe which sent to his PM. ESS knows if they do install the CROSS, it will require 4 valves. 4-12-24 DP. Travis' crew is still installing the public water line "B" today. They have almost made it to the corner of Colburn and Lee's Summit Rd. where they had a third party contractor potholing utilities. 4-16-24 DP. Travis' Crew is onsite today installing public water line B. They are at the intersection of Colburn and Douglass working towards the Tee where they will bore under Colburn to the south property. 4/17/24 DP. Travis' crew jumped on the south side of Colbern today and is working on Line A. 4-22-24 DP. Travis' crew is working on Line A
Water Line - Construction Inspection Partial 4/23/2024 4/23/2024 04/23/2024
Misc
Informational
04/23/2024
4/11/24 DP. Travis' crew started installing Public water line B today. They have adequate aggregate under the pipe, and above the pipe. They are running tracer wire and wate tape as well. On Colburn Road where they are suppose to tie into the 12" pipe that CIP is laying, isn't in yet. ESS plans show installing 1 valve to the CROSS but their plans were drawn off of that CROSS already being installed. I touched base with ESS and Insentric and also CIP inspector Joe which sent to his PM. ESS knows if they do install the CROSS, it will require 4 valves. 4-12-24 DP. Travis' crew is still installing the public water line "B" today. They have almost made it to the corner of Colburn and Lee's Summit Rd. where they had a third party contractor potholing utilities. 4-16-24 DP. Travis' Crew is onsite today installing public water line B. They are at the intersection of Colburn and Douglass working towards the Tee where they will bore under Colburn to the south property. 4/17/24 DP. Travis' crew jumped on the south side of Colbern today and is working on Line A. 4-22-24 DP. Travis' crew is working on Line A 4-23-24 DP. Crew is finishing up what they can install on line A. They are to the ending point where they need to tie in with the 12" that CIP is bringing up Colburn, which isn't installed yet.
Sanitary Sewer Construction Inspection Partial 4/23/2024 4/23/2024 04/23/2024
Misc
Informational
04/17/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP. 3-4-24 DP. AJ's crew is on site today. They installed the outside drop in manhole 16-010 and are now installing like A coming out of 16-010. They are installing tracer wire on new line A 3-7-24 DP. AJ's crew has installed MH A-1. They are into about 8' of rock, so only have made it about 40' in 3 days. 3-11-24 DP. AJ's crew is still working on line A. They are still in rock and haven't made it to A-2 yet. 3-14-24 DP. AJ's crew was on site today working on line A. They are still in rock and only installed 2 sticks of pipe. 3-15-24 DP. AJ's crew is still working on SS line A. 3-18-24 DP. AJ's crew is still working on SS line A. They are out of the rock now and are making progress, they have set MH A-2 through A-5. They are going to get to A-6 and stop to wait on Travis's crew which is digging bore pits in preparation for them to bore under Colburn Road for line A tie in. There are currently three pipe crews (2 on sewer) at Discovery Park right now. 3-21-24 DP. AJ's crew Installed A line up to Mh A-4 and stopped on A line. They are waiting to see where the bore pits are finished to line up before moving forward with A line towards Colbern Rd. Out of MH A-4 B line goes back to the West. They have installed MH B-1, B-2 and B-3 today. 3-22-24 DP. AJ's crew is on site today, They finished setting B-3. They also went through and placed all riser rings on Manholes on like B, they are now working back on Line A, installing A-6. 3-25-24 DP. AJ's Crew is on site today and installed MH on A where D line exits. D line is ductile and they installed up to D-5. They are currently on SS Q line. 3-28-24 DP. Crew is on the south side of Colbern Rd. pouring a concrete base in the bore pit in prep for boring the sewer line under Colbern. 4-8-24 DP. Crew is boring under colbern road. They got 1 stick started, hoping to speed up after today. All sewer lines are finished with the exception of A line tie in and moving the force main. 4-9-24 DP. This inspection is to summarize dates for sewer testing. Vacuum testing on MH- Z2, 16-008,16-009 and 16-010. Line D was finished installing on 3/25/24 which means testing can begin 4/25/24. Line B was finished 3/22/24 with testing being able to begin 4/22/24. Line A is still not completely tied in, waiting for the bore under Colbern Road which they are currently still working on. The camera test with LS water Dept. will not be scheduled until all testing is complete with me (Air, vacuum and mandrel) are completed and passed. 4-16-24 DP. Crew is still working on boring SS line A under Colbern Rd. 4-17-24 DP Boring crew is still working on boring line A under Colbern. 4-23-24 DP. The boring crew removed all of their boring equipment and is going to start over soon.
Erosion Control Inspection Partial 4/25/2024 4/25/2024 04/25/2024
Misc
Informational
04/18/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
04/18/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order.
Erosion Control Inspection Partial 4/30/2024 4/30/2024 04/30/2024
Misc
Informational
04/25/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
04/25/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue.
Site Visit Partial 05/02/2024
Misc
Informational
04/02/2024
3-27-24 Dustin A, Forming storm box corners, working on storm, and other crew working on bore hole 4-2-24 Dustin A, No activity due to weather 5-2-24 Dustin A, No activity due to rain
Site Visit Partial 05/03/2024
Misc
Informational
05/02/2024
3-27-24 Dustin A, Forming storm box corners, working on storm, and other crew working on bore hole 4-2-24 Dustin A, No activity due to weather 5-2-24 Dustin A, No activity due to rain 5-3-24 Dustin A, Form crew working, have concrete scheduled for 245 but doubtful due to muddy conditions. Will call if needed
Storm Sewer Construction Inspection Partial 5/6/2024 5/6/2024 05/06/2024
Misc
Informational
04/11/2024
12-19-23 DP. Tyler's crew started installing the 72"x60" box culvert today. They installed 4 sections. They spent most of the day securing the base laying multiple inches of 3" shot rock. 12-20-23 DP. Tyler's crew was finishing up the 72"x60" box culvert (line A) today. They were digging in the deep detention basin on the west side of the outlet this afternoon. There are also installing a nice ditch check on the east side of the culvert before the rain comes this week. 2-26-24 DP Jays crew is installing box culvert. 2-27-24 DP. Jays cew is still on site installing this box culvert. They are using required mastic and sealant. They are also gator wrapping the joints. 2-28-24 DP. Jays crew is still working towards completing the box covert. 3-4-24 DP. Jays crew is still working on the big box culvert. 3-15-24 DP. Jays crew has started on strom line D. They have installed D1 and D2 today. 3-17-24 DP. Jays crew is onsite today still working on installing 16" storm pipe. 3-22-24 DP. ESS is onsite today tying rebar to pour the bends of the box culverts on line B. I inspected the rebar and it was per plan. They poured the flow line today onto B-6. KCMMB 4k concrete. 3-22-24 DP. A different ESS crew is also working on Storm line E 3-28-24 DP. Both crews are working on storm line D 4-5-24 Crews have been pouring collars on storm pipes and also poured the flow line on bend 1 on the box culvert. 4-8-24 DP. Crew had bend 3 by box B5 ready for a rebar inspection today. They will be pouring in the morning. 4-11-24 DP. Crew poured the top of the tie in point on the big box culvert today. 5-6-24 DP. Crew is on site today working on storm line E.
Erosion Control Inspection Partial 5/6/2024 5/6/2024 05/06/2024
Misc
Informational
04/30/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
04/30/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue. 5-6-24 DP. ESC is still in good working order. ESS ran a temporary ditch for storm water to prevent Colburn from flooding again.
Storm Sewer Construction Inspection Partial 5/8/2024 5/8/2024 05/08/2024
Misc
Informational
05/06/2024
12-19-23 DP. Tyler's crew started installing the 72"x60" box culvert today. They installed 4 sections. They spent most of the day securing the base laying multiple inches of 3" shot rock. 12-20-23 DP. Tyler's crew was finishing up the 72"x60" box culvert (line A) today. They were digging in the deep detention basin on the west side of the outlet this afternoon. There are also installing a nice ditch check on the east side of the culvert before the rain comes this week. 2-26-24 DP Jays crew is installing box culvert. 2-27-24 DP. Jays cew is still on site installing this box culvert. They are using required mastic and sealant. They are also gator wrapping the joints. 2-28-24 DP. Jays crew is still working towards completing the box covert. 3-4-24 DP. Jays crew is still working on the big box culvert. 3-15-24 DP. Jays crew has started on strom line D. They have installed D1 and D2 today. 3-17-24 DP. Jays crew is onsite today still working on installing 16" storm pipe. 3-22-24 DP. ESS is onsite today tying rebar to pour the bends of the box culverts on line B. I inspected the rebar and it was per plan. They poured the flow line today onto B-6. KCMMB 4k concrete. 3-22-24 DP. A different ESS crew is also working on Storm line E 3-28-24 DP. Both crews are working on storm line D 4-5-24 Crews have been pouring collars on storm pipes and also poured the flow line on bend 1 on the box culvert. 4-8-24 DP. Crew had bend 3 by box B5 ready for a rebar inspection today. They will be pouring in the morning. 4-11-24 DP. Crew poured the top of the tie in point on the big box culvert today. 5-6-24 DP. Crew is on site today working on storm line E. 5-8-24 DP. Crew is onsite working on line D
Erosion Control Inspection Partial 5/15/2024 5/15/2024 05/15/2024
Misc
Informational
05/06/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
05/06/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue. 5-6-24 DP. ESC is still in good working order. ESS ran a temporary ditch for storm water to prevent Colburn from flooding again. 5-15-24 DP. ESC is still in good working order.
Sanitary Sewer Construction Inspection Partial 5/15/2024 5/15/2024 05/15/2024
Misc
Informational
04/23/2024
1-3-24 DP. I met with Reese, Brandon and Andy from ESS on a zoom call today. Per Amanda and Brent with LS Water I presented a proposal to do a temporary tie in on their Force main relocation up by colburn. This is being done because ESS will be ahead of the CIP project replacing the force main that runs east and west on colburn. At the 45* ESS is going to install a TEE with the base of the TEE facing east. They will run straight east and do their temporary tie in to the existing force main with a 90*. Once CIP comes through and replaces the main along colburn, CIP will Go from ESS's Tee and run up to the correct tie in spot, they will then abandoned whatever existing force main is left that needs to be abandoned. ESS and CIP have agreed on this. Amanda with water is suppose to be communicating with Gene to get some temporary plans drafted. 1-30-24 DP. ESS was on site today. They had precision cut come out and core EX. MH 16-006 for their new tie in. They are inserting the boot today and building trench boxes. 2-1-24 DP ESS installed SDR 21 sewer pipe from existing MH 16-006 to New MH Z-1. They have the base of the MH set. Tyler with ESS decided to run tracer wire on all S.S. main like the updated design and construction manual calls for. Even though it wasn't required on this job due to timing, since we started with running it, we will continue to run tracer wire on all sewer pipe for duration of the project. 2-5-24 DP. ESS is on site continuing to install SS line Z. They are into rock so it is still a very slow process. 2-6-24 DP. Tylers crew is still continuing to break rock and install sewer pipe on line Z 2-8-24 DP. Tylers crew is on site today still working on Line Z. They are planning on making it to the existing manhole tomorrow. Their plan on saturday is to set up the pump around, testing on monday with camera test on Tuesday. 2-9-24 DP. Tylers crew finished running line Z today. Still planning on replacing the MH and tying in on Monday 2-12-24 DP. Crew finished tying in the sewer main, and stacked out manholes. Starting testing on line Z 2-13-24 DP. Crew hit the force main which was located 1' off the edge of MH 16-006. They had the cone section off of the manhole so all of the sewer was contained and went into the gravity feed line. There is a 5" hole from the tooth of the hoe, and they are going to fix it with a 12x24" repair clamp. This main will be abandoned and relocated within the next few months. The city's camera crew is suppose to come out today and inspect line Z today as well. 2-15-24 Jays crew is on site today and tied in MH Z-3 to existing. They used max adapters. 2-19-24 DP. Jays crew is on site today. They are replacing existing manholes. MH 16-009 has the wrong base and they are getting it remade. Today they are replacing MH 16-010. They also found a section of existing sewer pipe on line Z by the box culvert that crosses under Douglass that was broken from what we assume was a scraper truck. They repaired that today with a stick of pipe and two max adapters. 2-22-24 DP. Jays crew is on site today and are replacing existing MH 16-008. They also installed the metal sleeve on SS line Z and are welding that solid just to the upstream side of 16-008. They will have 1' of backfill on top of the existing SS before installing the RCP. 3-4-24 DP. AJ's crew is on site today. They installed the outside drop in manhole 16-010 and are now installing like A coming out of 16-010. They are installing tracer wire on new line A 3-7-24 DP. AJ's crew has installed MH A-1. They are into about 8' of rock, so only have made it about 40' in 3 days. 3-11-24 DP. AJ's crew is still working on line A. They are still in rock and haven't made it to A-2 yet. 3-14-24 DP. AJ's crew was on site today working on line A. They are still in rock and only installed 2 sticks of pipe. 3-15-24 DP. AJ's crew is still working on SS line A. 3-18-24 DP. AJ's crew is still working on SS line A. They are out of the rock now and are making progress, they have set MH A-2 through A-5. They are going to get to A-6 and stop to wait on Travis's crew which is digging bore pits in preparation for them to bore under Colburn Road for line A tie in. There are currently three pipe crews (2 on sewer) at Discovery Park right now. 3-21-24 DP. AJ's crew Installed A line up to Mh A-4 and stopped on A line. They are waiting to see where the bore pits are finished to line up before moving forward with A line towards Colbern Rd. Out of MH A-4 B line goes back to the West. They have installed MH B-1, B-2 and B-3 today. 3-22-24 DP. AJ's crew is on site today, They finished setting B-3. They also went through and placed all riser rings on Manholes on like B, they are now working back on Line A, installing A-6. 3-25-24 DP. AJ's Crew is on site today and installed MH on A where D line exits. D line is ductile and they installed up to D-5. They are currently on SS Q line. 3-28-24 DP. Crew is on the south side of Colbern Rd. pouring a concrete base in the bore pit in prep for boring the sewer line under Colbern. 4-8-24 DP. Crew is boring under colbern road. They got 1 stick started, hoping to speed up after today. All sewer lines are finished with the exception of A line tie in and moving the force main. 4-9-24 DP. This inspection is to summarize dates for sewer testing. Vacuum testing on MH- Z2, 16-008,16-009 and 16-010. Line D was finished installing on 3/25/24 which means testing can begin 4/25/24. Line B was finished 3/22/24 with testing being able to begin 4/22/24. Line A is still not completely tied in, waiting for the bore under Colbern Road which they are currently still working on. The camera test with LS water Dept. will not be scheduled until all testing is complete with me (Air, vacuum and mandrel) are completed and passed. 4-16-24 DP. Crew is still working on boring SS line A under Colbern Rd. 4-17-24 DP Boring crew is still working on boring line A under Colbern. 4-23-24 DP. The boring crew removed all of their boring equipment and is going to start over soon. 5-15-24 DP. Boring crew made it under Colbern Rd. last week but crew has not made the tie in yet.
Site Visit Partial 5/17/2024 5/17/2024 05/17/2024
Misc
Informational
05/03/2024
3-27-24 Dustin A, Forming storm box corners, working on storm, and other crew working on bore hole 4-2-24 Dustin A, No activity due to weather 5-2-24 Dustin A, No activity due to rain 5-3-24 Dustin A, Form crew working, have concrete scheduled for 245 but doubtful due to muddy conditions. Will call if needed 5-17-24 DP. Travis' crew is onsite and were digging to set storm boxes that will be in the curb line of Colbern. They exposed the 20" transmission water main and the box is going to set 3/10ths of an inch off the top of the water main. Earl with Insentric is sending this issue back to their engineers and will resubmit a plan.
Sanitary Sewer Construction Inspection Partial 5/20/2024 5/20/2024 05/21/2024
Misc
Informational
05/21/2024
5-20-24 DP. ESS was onsite today to push the casing for SS line A under Colbern Rd. They had to cut more of the abandoned 8" water main. There was a constant stream coming out of the pipe. I called the water department out to assist and they couldn't get it completely stopped. They broke the nut off of the top of the valve. ESS had a HI-MAX cap on site and installed that on the end of the 8" pipe to stop the small water flow. Sent pictures and videos to Brent. I believe it is on CIP's Colbern road improvement plans to remove most of that pipe. If the valve doesn't get fixed, I suggested to Brent that the 8" gets removed from the TEE and capped. The valve that is leaking is valve #58
Erosion Control Inspection Partial 5/20/2024 5/20/2024 05/21/2024
Misc
Informational
05/15/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
05/15/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue. 5-6-24 DP. ESC is still in good working order. ESS ran a temporary ditch for storm water to prevent Colburn from flooding again. 5-15-24 DP. ESC is still in good working order. 5-20-24 DP. ESC is in good working order.
Sanitary Sewer Construction Inspection Partial 05/21/2024
Misc
Informational
05/21/2024
5-20-24 DP. ESS was onsite today to push the casing for SS line A under Colbern Rd. They had to cut more of the abandoned 8" water main. There was a constant stream coming out of the pipe. I called the water department out to assist and they couldn't get it completely stopped. They broke the nut off of the top of the valve. ESS had a HI-MAX cap on site and installed that on the end of the 8" pipe to stop the small water flow. Sent pictures and videos to Brent. I believe it is on CIP's Colbern road improvement plans to remove most of that pipe. If the valve doesn't get fixed, I suggested to Brent that the 8" gets removed from the TEE and capped. The valve that is leaking is valve #58 5-21-24 DP. Crew was onsite today still working on sewer line A. Also reditching the temporary ditch along Colbern Dr. in anticipation of rain this evening.
Sanitary Sewer Construction Inspection Partial 5/22/2024 5/22/2024 05/23/2024
Misc
Informational
05/21/2024
5-20-24 DP. ESS was onsite today to push the casing for SS line A under Colbern Rd. They had to cut more of the abandoned 8" water main. There was a constant stream coming out of the pipe. I called the water department out to assist and they couldn't get it completely stopped. They broke the nut off of the top of the valve. ESS had a HI-MAX cap on site and installed that on the end of the 8" pipe to stop the small water flow. Sent pictures and videos to Brent. I believe it is on CIP's Colbern road improvement plans to remove most of that pipe. If the valve doesn't get fixed, I suggested to Brent that the 8" gets removed from the TEE and capped. The valve that is leaking is valve #58 5-21-24 DP. Crew was onsite today still working on sewer line A. Also reditching the temporary ditch along Colbern Dr. in anticipation of rain this evening. 5-22-24 DP. Crew finished running line A under Colbern through the encasement pipe. They still need to set MH A-8 on the south side of Colbern Rd. They tied the pipe under Colbern into MH A7 and still need to run the pipe from MH A7 to MH A6.
Sanitary Sewer Construction Inspection Partial 5/28/2024 5/28/2024 05/29/2024
Misc
Informational
05/23/2024
5-20-24 DP. ESS was onsite today to push the casing for SS line A under Colbern Rd. They had to cut more of the abandoned 8" water main. There was a constant stream coming out of the pipe. I called the water department out to assist and they couldn't get it completely stopped. They broke the nut off of the top of the valve. ESS had a HI-MAX cap on site and installed that on the end of the 8" pipe to stop the small water flow. Sent pictures and videos to Brent. I believe it is on CIP's Colbern road improvement plans to remove most of that pipe. If the valve doesn't get fixed, I suggested to Brent that the 8" gets removed from the TEE and capped. The valve that is leaking is valve #58 5-21-24 DP. Crew was onsite today still working on sewer line A. Also reditching the temporary ditch along Colbern Dr. in anticipation of rain this evening. 5-22-24 DP. Crew finished running line A under Colbern through the encasement pipe. They still need to set MH A-8 on the south side of Colbern Rd. They tied the pipe under Colbern into MH A7 and still need to run the pipe from MH A7 to MH A6. 5-28-24 DP. Crew tied together sewer line A and backfilled. The 30 day clock starts 5/28/24 on Sewer line A
Storm Sewer Construction Inspection Partial 5/29/2024 5/29/2024 05/30/2024
Misc
Informational
05/08/2024
12-19-23 DP. Tyler's crew started installing the 72"x60" box culvert today. They installed 4 sections. They spent most of the day securing the base laying multiple inches of 3" shot rock. 12-20-23 DP. Tyler's crew was finishing up the 72"x60" box culvert (line A) today. They were digging in the deep detention basin on the west side of the outlet this afternoon. There are also installing a nice ditch check on the east side of the culvert before the rain comes this week. 2-26-24 DP Jays crew is installing box culvert. 2-27-24 DP. Jays cew is still on site installing this box culvert. They are using required mastic and sealant. They are also gator wrapping the joints. 2-28-24 DP. Jays crew is still working towards completing the box covert. 3-4-24 DP. Jays crew is still working on the big box culvert. 3-15-24 DP. Jays crew has started on strom line D. They have installed D1 and D2 today. 3-17-24 DP. Jays crew is onsite today still working on installing 16" storm pipe. 3-22-24 DP. ESS is onsite today tying rebar to pour the bends of the box culverts on line B. I inspected the rebar and it was per plan. They poured the flow line today onto B-6. KCMMB 4k concrete. 3-22-24 DP. A different ESS crew is also working on Storm line E 3-28-24 DP. Both crews are working on storm line D 4-5-24 Crews have been pouring collars on storm pipes and also poured the flow line on bend 1 on the box culvert. 4-8-24 DP. Crew had bend 3 by box B5 ready for a rebar inspection today. They will be pouring in the morning. 4-11-24 DP. Crew poured the top of the tie in point on the big box culvert today. 5-6-24 DP. Crew is on site today working on storm line E. 5-8-24 DP. Crew is onsite working on line D 5-30-24 DP. ESS shut down Douglas yesterday and installed the concrete strom pipe
Storm Sewer Construction Inspection Partial 5/30/2024 5/30/2024 05/31/2024
Misc
Informational
05/31/2024
5-30-24 DP. Crew is working on the RCB along Douglas Rd.
Erosion Control Inspection Partial 5/31/2024 5/31/2024 05/31/2024
Misc
Informational
05/21/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
05/21/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue. 5-6-24 DP. ESC is still in good working order. ESS ran a temporary ditch for storm water to prevent Colburn from flooding again. 5-15-24 DP. ESC is still in good working order. 5-20-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order.
Sanitary Sewer - Vacuum Passed 6/11/2024 6/11/2024 06/11/2024
Misc
Informational
06/11/2024
6-11-24 DP. ESS fixed manholes that needed repaired and all Manholes have now passed a vacuum test. MH16-008 PASSED MH16-009 PASSED MH A4 PASSED
Sanitary - Material Verification Passed 06/11/2024
Erosion Control Inspection Partial 6/17/2024 6/17/2024 06/18/2024
Misc
Informational
05/31/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
05/31/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue. 5-6-24 DP. ESC is still in good working order. ESS ran a temporary ditch for storm water to prevent Colburn from flooding again. 5-15-24 DP. ESC is still in good working order. 5-20-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order. 6-17-24 DP. ESC is in good working order.
Site Visit Partial 6/17/2024 6/17/2024 06/18/2024
Misc
Informational
05/17/2024
3-27-24 Dustin A, Forming storm box corners, working on storm, and other crew working on bore hole 4-2-24 Dustin A, No activity due to weather 5-2-24 Dustin A, No activity due to rain 5-3-24 Dustin A, Form crew working, have concrete scheduled for 245 but doubtful due to muddy conditions. Will call if needed 5-17-24 DP. Travis' crew is onsite and were digging to set storm boxes that will be in the curb line of Colbern. They exposed the 20" transmission water main and the box is going to set 3/10ths of an inch off the top of the water main. Earl with Insentric is sending this issue back to their engineers and will resubmit a plan. 6-17-24 DP. Travis' crew was pulled off site for now. Currently no work for development onsite. They do have a excavator on the south side just breaking rock. The final segment of sewer can be tested on 6/28/24. The LS Water Dept. is currently onsite doing the camera test with what is already tested.
Erosion Control Inspection Partial 6/25/2024 6/25/2024 06/25/2024
Misc
Informational
06/18/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
06/18/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue. 5-6-24 DP. ESC is still in good working order. ESS ran a temporary ditch for storm water to prevent Colburn from flooding again. 5-15-24 DP. ESC is still in good working order. 5-20-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order. 6-17-24 DP. ESC is in good working order. 6-25-24 DP. ESC is in good working order
Sanitary Sewer Construction Inspection Partial 6/26/2024 6/26/2024 06/26/2024
Misc
Informational
05/29/2024
5-20-24 DP. ESS was onsite today to push the casing for SS line A under Colbern Rd. They had to cut more of the abandoned 8" water main. There was a constant stream coming out of the pipe. I called the water department out to assist and they couldn't get it completely stopped. They broke the nut off of the top of the valve. ESS had a HI-MAX cap on site and installed that on the end of the 8" pipe to stop the small water flow. Sent pictures and videos to Brent. I believe it is on CIP's Colbern road improvement plans to remove most of that pipe. If the valve doesn't get fixed, I suggested to Brent that the 8" gets removed from the TEE and capped. The valve that is leaking is valve #58 5-21-24 DP. Crew was onsite today still working on sewer line A. Also reditching the temporary ditch along Colbern Dr. in anticipation of rain this evening. 5-22-24 DP. Crew finished running line A under Colbern through the encasement pipe. They still need to set MH A-8 on the south side of Colbern Rd. They tied the pipe under Colbern into MH A7 and still need to run the pipe from MH A7 to MH A6. 5-28-24 DP. Crew tied together sewer line A and backfilled. The 30 day clock starts 5/28/24 on Sewer line A 6-26-24 DP. We are able to finish sewer testing starting this friday.
Sanitary Sewer - Air Test Partial 6/7/2024 6/7/2024 07/01/2024
Misc
Informational
07/01/2024
6-7-24 DP. Air pressure testing Line D Z3-C1 Passed Z3-D1 Passed Line A A1-16-010 Passed A1-A2 Passed A3-A4 Passed A5-A4 Passed A5-B1 Passed A5-A6 Passed Line E A6-E1 Passed Line B B2-B1 Passed B2-B3 Passed **STILL NEEDING TO BE TESTED** Line A from MH A6 to MH A8
Sanitary Sewer - Vacuum Partial 6/7/2024 6/7/2024 07/01/2024
Misc
Informational
07/01/2024
6-7-24 DP. Vacuum testing MH 16-006 Passed MH Z1 Passed MH Z2 Passed MH D1 Passed MH Z3 Passed MH C1 Passed MH 16-010 Passed MH A1 Passed MH A2 Passed MH A3 Passed MH A5 Passed MH A6 Passed MH E1 Passed MH B1 Passed MH B2 Passed MH B3 Passed **STILL NEED TO TEST** MH A-7 MH A-8
Water Line - Construction Inspection Partial 7/10/2024 7/10/2024 07/11/2024
Misc
Informational
04/23/2024
4/11/24 DP. Travis' crew started installing Public water line B today. They have adequate aggregate under the pipe, and above the pipe. They are running tracer wire and wate tape as well. On Colburn Road where they are suppose to tie into the 12" pipe that CIP is laying, isn't in yet. ESS plans show installing 1 valve to the CROSS but their plans were drawn off of that CROSS already being installed. I touched base with ESS and Insentric and also CIP inspector Joe which sent to his PM. ESS knows if they do install the CROSS, it will require 4 valves. 4-12-24 DP. Travis' crew is still installing the public water line "B" today. They have almost made it to the corner of Colburn and Lee's Summit Rd. where they had a third party contractor potholing utilities. 4-16-24 DP. Travis' Crew is onsite today installing public water line B. They are at the intersection of Colburn and Douglass working towards the Tee where they will bore under Colburn to the south property. 4/17/24 DP. Travis' crew jumped on the south side of Colbern today and is working on Line A. 4-22-24 DP. Travis' crew is working on Line A 4-23-24 DP. Crew is finishing up what they can install on line A. They are to the ending point where they need to tie in with the 12" that CIP is bringing up Colburn, which isn't installed yet. 7-10-24 DP. Crew is picking up the 12" public water line and working towards the north. They are setting the first backflow vault where the 6" private will tie into the 12" public.
Water Line - Construction Inspection Partial 7/12/2024 7/12/2024 07/15/2024
Misc
Informational
07/15/2024
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn Rd.
Water Line - Construction Inspection Partial 7/15/2024 7/15/2024 07/15/2024
Misc
Informational
07/15/2024
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon.
Sanitary Sewer - Vacuum Passed 7/12/2024 7/12/2024 07/15/2024
Misc
Informational
07/01/2024
6-7-24 DP. Vacuum testing MH 16-006 Passed MH Z1 Passed MH Z2 Passed MH D1 Passed MH Z3 Passed MH C1 Passed MH 16-010 Passed MH A1 Passed MH A2 Passed MH A3 Passed MH A5 Passed MH A6 Passed MH E1 Passed MH B1 Passed MH B2 Passed MH B3 Passed **STILL NEED TO TEST** MH A-7 MH A-8 7-12-24 DP. MH A-7 and A-8 passed. All vacuums testing is complete.
Sanitary Sewer - Air Test Passed 7/15/2024 7/15/2024 07/15/2024
Misc
Informational
07/01/2024
6-7-24 DP. Air pressure testing Line D Z3-C1 Passed Z3-D1 Passed Line A A1-16-010 Passed A1-A2 Passed A3-A4 Passed A5-A4 Passed A5-B1 Passed A5-A6 Passed Line E A6-E1 Passed Line B B2-B1 Passed B2-B3 Passed **STILL NEEDING TO BE TESTED** Line A from MH A6 to MH A8 7-15-24 DP. Line A MH A6 to MH A7 and A7 to MH A8 has both passed air pressure testing. All sanitary has passed air pressure testing now.
Sanitary Sewer Construction Inspection Partial 7/15/2024 7/15/2024 07/15/2024
Misc
Informational
06/26/2024
5-20-24 DP. ESS was onsite today to push the casing for SS line A under Colbern Rd. They had to cut more of the abandoned 8" water main. There was a constant stream coming out of the pipe. I called the water department out to assist and they couldn't get it completely stopped. They broke the nut off of the top of the valve. ESS had a HI-MAX cap on site and installed that on the end of the 8" pipe to stop the small water flow. Sent pictures and videos to Brent. I believe it is on CIP's Colbern road improvement plans to remove most of that pipe. If the valve doesn't get fixed, I suggested to Brent that the 8" gets removed from the TEE and capped. The valve that is leaking is valve #58 5-21-24 DP. Crew was onsite today still working on sewer line A. Also reditching the temporary ditch along Colbern Dr. in anticipation of rain this evening. 5-22-24 DP. Crew finished running line A under Colbern through the encasement pipe. They still need to set MH A-8 on the south side of Colbern Rd. They tied the pipe under Colbern into MH A7 and still need to run the pipe from MH A7 to MH A6. 5-28-24 DP. Crew tied together sewer line A and backfilled. The 30 day clock starts 5/28/24 on Sewer line A 6-26-24 DP. We are able to finish sewer testing starting this friday. 7-15-24 DP. All sewer testing is complete. Sewer bond inspection was received on Friday and sent to Andy and Reese with ESS this morning. They are suppose to start on repairs today.
Erosion Control Inspection Partial 7/16/2024 7/16/2024 07/16/2024
Misc
Informational
06/25/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
06/25/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue. 5-6-24 DP. ESC is still in good working order. ESS ran a temporary ditch for storm water to prevent Colburn from flooding again. 5-15-24 DP. ESC is still in good working order. 5-20-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order. 6-17-24 DP. ESC is in good working order. 6-25-24 DP. ESC is in good working order 7-16-24 DP. ESC is in good working order.
Pavement-Proof Roll Passed 7/22/2024 7/22/2024 07/22/2024
Misc
Informational
07/22/2024
7-22-24 DP. Met Larry with ESS on site as well as 3rd party. We proof rolled both turn lanes on the east side of Douglass with a 20 ton certified road. Proof roll passed and they plan to start curb in the morning.
Pavement-Curb Construction Partial 7/23/2024 7/23/2024 07/23/2024
Misc
Informational
07/23/2024
7-23-24 DP. Crew poured curb today for the turn lanes on the east side of Douglass.
Erosion Control Inspection Partial 7/23/2024 7/23/2024 07/23/2024
Misc
Informational
07/16/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
07/16/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue. 5-6-24 DP. ESC is still in good working order. ESS ran a temporary ditch for storm water to prevent Colburn from flooding again. 5-15-24 DP. ESC is still in good working order. 5-20-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order. 6-17-24 DP. ESC is in good working order. 6-25-24 DP. ESC is in good working order 7-16-24 DP. ESC is in good working order. 7-23-24 DP. ESC is in good working order.
Pavement-Surface Partial 7/26/2024 7/26/2024 07/26/2024
Misc
Informational
07/26/2024
7-26-24 DP. ESS is onsite pouring the north turn lane off Douglas. They poured with KCMMB 4K concrete, 10" thick. Broom finish and white cure.
Water Line - Construction Inspection Partial 7/30/2024 7/30/2024 07/30/2024
Misc
Informational
07/15/2024
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS.
Sanitary Sewer Construction Inspection Passed 7/30/2024 7/30/2024 07/30/2024
Misc
Informational
07/15/2024
5-20-24 DP. ESS was onsite today to push the casing for SS line A under Colbern Rd. They had to cut more of the abandoned 8" water main. There was a constant stream coming out of the pipe. I called the water department out to assist and they couldn't get it completely stopped. They broke the nut off of the top of the valve. ESS had a HI-MAX cap on site and installed that on the end of the 8" pipe to stop the small water flow. Sent pictures and videos to Brent. I believe it is on CIP's Colbern road improvement plans to remove most of that pipe. If the valve doesn't get fixed, I suggested to Brent that the 8" gets removed from the TEE and capped. The valve that is leaking is valve #58 5-21-24 DP. Crew was onsite today still working on sewer line A. Also reditching the temporary ditch along Colbern Dr. in anticipation of rain this evening. 5-22-24 DP. Crew finished running line A under Colbern through the encasement pipe. They still need to set MH A-8 on the south side of Colbern Rd. They tied the pipe under Colbern into MH A7 and still need to run the pipe from MH A7 to MH A6. 5-28-24 DP. Crew tied together sewer line A and backfilled. The 30 day clock starts 5/28/24 on Sewer line A 6-26-24 DP. We are able to finish sewer testing starting this friday. 7-15-24 DP. All sewer testing is complete. Sewer bond inspection was received on Friday and sent to Andy and Reese with ESS this morning. They are suppose to start on repairs today. 7-30-24 DP. All sewer repairs are complete. Lee's Summit Water Dept. has sign off and approved all gravity fed sanitary sewer onsite.
Site Visit Partial 08/14/2024
Misc
Informational
06/18/2024
3-27-24 Dustin A, Forming storm box corners, working on storm, and other crew working on bore hole 4-2-24 Dustin A, No activity due to weather 5-2-24 Dustin A, No activity due to rain 5-3-24 Dustin A, Form crew working, have concrete scheduled for 245 but doubtful due to muddy conditions. Will call if needed 5-17-24 DP. Travis' crew is onsite and were digging to set storm boxes that will be in the curb line of Colbern. They exposed the 20" transmission water main and the box is going to set 3/10ths of an inch off the top of the water main. Earl with Insentric is sending this issue back to their engineers and will resubmit a plan. 6-17-24 DP. Travis' crew was pulled off site for now. Currently no work for development onsite. They do have a excavator on the south side just breaking rock. The final segment of sewer can be tested on 6/28/24. The LS Water Dept. is currently onsite doing the camera test with what is already tested. 8-5 to 8-9-24 NS No work is being done 8-12-24 NS Work is being done on street. Ryan put in a inspection because Larry did not call in for a proof roll and they had started pouring and did not stop them because they had already put 40 yards of concrete down.
Water Line - Hydrostatic Test Passed 8/15/2024 8/15/2024 08/15/2024
Misc
Informational
08/15/2024
8-15-24 DP. AJ's crew with ESS was onsite and completed a hydrostatic test on the public 12" water main, line A and line B south phase. This was the entire line from the tie in point on Colburn road around to just passed the backflow vault along Lee's Summit RD. The pressure held at 175 psi for 2 hours and passed.
Water Line - Construction Inspection Partial 8/12/2024 8/12/2024 08/15/2024
Misc
Informational
07/30/2024
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A.
Erosion Control Inspection Partial 8/15/2024 8/15/2024 08/15/2024
Misc
Informational
07/23/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
07/23/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue. 5-6-24 DP. ESC is still in good working order. ESS ran a temporary ditch for storm water to prevent Colburn from flooding again. 5-15-24 DP. ESC is still in good working order. 5-20-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order. 6-17-24 DP. ESC is in good working order. 6-25-24 DP. ESC is in good working order 7-16-24 DP. ESC is in good working order. 7-23-24 DP. ESC is in good working order. 8-15-24 DP. ESC is in good working order.
Water Line - Construction Inspection Partial 8/16/2024 8/16/2024 08/16/2024
Misc
Informational
08/15/2024
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following.
Water Line - Construction Inspection Partial 8/19/2024 8/19/2024 08/20/2024
Misc
Informational
08/16/2024
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Water Line - Coliform Test 1 Partial 8/20/2024 8/20/2024 08/21/2024
Misc
Informational
08/21/2024
8-20-24 DP. I met Seth with ESS on site and pulled 2 samples off the 12" public south phase. Samples were delivered to Blue Valley Lab.
Water Line - Coliform Test 1 Partial 8/21/2024 8/21/2024 08/22/2024
Misc
Informational
08/21/2024
8-20-24 DP. I met Seth with ESS on site and pulled 2 samples off the 12" public south phase. Samples were delivered to Blue Valley Lab. 8-21-24 DP. Both samples failed.
Water Line - Coliform Test 1 Partial 8/21/2024 8/21/2024 08/22/2024
Misc
Informational
08/22/2024
8-20-24 DP. I met Seth with ESS on site and pulled 2 samples off the 12" public south phase. Samples were delivered to Blue Valley Lab. 8-21-24 DP. Both samples failed. 8-21-24 DP. Met Matt with ESS on site and pulled a second set of samples. We pulled these before knowing the first samples failed. So if these pass, these samples will count as sample 1.
Water Line - Coliform Test 1 Partial 8/23/2024 8/23/2024 08/23/2024
Misc
Informational
08/22/2024
8-20-24 DP. I met Seth with ESS on site and pulled 2 samples off the 12" public south phase. Samples were delivered to Blue Valley Lab. 8-21-24 DP. Both samples failed. 8-21-24 DP. Met Matt with ESS on site and pulled a second set of samples. We pulled these before knowing the first samples failed. So if these pass, these samples will count as sample 1. 8-23-24 DP. Second set of samples failed. Talked to Reese with ESS and the plan going forward is to start over and rechlorinate next week.
Water Line - Coliform Test 1 Partial 8/26/2024 8/26/2024 08/27/2024
Misc
Informational
08/23/2024
8-20-24 DP. I met Seth with ESS on site and pulled 2 samples off the 12" public south phase. Samples were delivered to Blue Valley Lab. 8-21-24 DP. Both samples failed. 8-21-24 DP. Met Matt with ESS on site and pulled a second set of samples. We pulled these before knowing the first samples failed. So if these pass, these samples will count as sample 1. 8-23-24 DP. Second set of samples failed. Talked to Reese with ESS and the plan going forward is to start over and rechlorinate next week. 8-26-24 DP. Met Reese and Matt onsite and rechlorinated the public water main
Water Line - Coliform Test 1 Partial 8/27/2024 8/27/2024 08/27/2024
Misc
Informational
08/27/2024
8-20-24 DP. I met Seth with ESS on site and pulled 2 samples off the 12" public south phase. Samples were delivered to Blue Valley Lab. 8-21-24 DP. Both samples failed. 8-21-24 DP. Met Matt with ESS on site and pulled a second set of samples. We pulled these before knowing the first samples failed. So if these pass, these samples will count as sample 1. 8-23-24 DP. Second set of samples failed. Talked to Reese with ESS and the plan going forward is to start over and rechlorinate next week. 8-26-24 DP. Met Reese and Matt onsite and rechlorinated the public water main 8-27-24 DP. Met Reese with ESS onsite and dechlorinated the public water main with samples beginning tomorrow.
Sidewalk Inspection Partial 9/4/2024 9/4/2024 09/04/2024
Misc
Informational
09/04/2024
9-4-24 DP. ESS was forming up public sidewalk next to Lee's Summit Road. The forms were very chewed up so reading cross slopes was wishy washy. The foreman knows that I will be out tomorrow to check final pour. They were told to use white cure and broom finish.
Pavement-Surface Passed 9/6/2024 9/6/2024 09/06/2024
Misc
Informational
07/26/2024
7-26-24 DP. ESS is onsite pouring the north turn lane off Douglas. They poured with KCMMB 4K concrete, 10" thick. Broom finish and white cure 9-6-24 DP. ESS finished pouring both turn lanes. All paint has been completed and lane drop has been removed.
Erosion Control Inspection Partial 9/10/2024 9/10/2024 09/10/2024
Misc
Informational
08/15/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
08/15/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue. 5-6-24 DP. ESC is still in good working order. ESS ran a temporary ditch for storm water to prevent Colburn from flooding again. 5-15-24 DP. ESC is still in good working order. 5-20-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order. 6-17-24 DP. ESC is in good working order. 6-25-24 DP. ESC is in good working order 7-16-24 DP. ESC is in good working order. 7-23-24 DP. ESC is in good working order. 8-15-24 DP. ESC is in good working order. 9-10-24 DP. ESC is in good working order.
Site Visit Partial 9/13/2024 9/13/2024 09/13/2024
Misc
Informational
08/14/2024
3-27-24 Dustin A, Forming storm box corners, working on storm, and other crew working on bore hole 4-2-24 Dustin A, No activity due to weather 5-2-24 Dustin A, No activity due to rain 5-3-24 Dustin A, Form crew working, have concrete scheduled for 245 but doubtful due to muddy conditions. Will call if needed 5-17-24 DP. Travis' crew is onsite and were digging to set storm boxes that will be in the curb line of Colbern. They exposed the 20" transmission water main and the box is going to set 3/10ths of an inch off the top of the water main. Earl with Insentric is sending this issue back to their engineers and will resubmit a plan. 6-17-24 DP. Travis' crew was pulled off site for now. Currently no work for development onsite. They do have a excavator on the south side just breaking rock. The final segment of sewer can be tested on 6/28/24. The LS Water Dept. is currently onsite doing the camera test with what is already tested. 8-5 to 8-9-24 NS No work is being done 8-12-24 NS Work is being done on street. Ryan put in a inspection because Larry did not call in for a proof roll and they had started pouring and did not stop them because they had already put 40 yards of concrete down. 9-13-24 DP. No work onsite today.
Site Visit Partial 9/16/2024 9/16/2024 09/16/2024
Misc
Informational
09/13/2024
3-27-24 Dustin A, Forming storm box corners, working on storm, and other crew working on bore hole 4-2-24 Dustin A, No activity due to weather 5-2-24 Dustin A, No activity due to rain 5-3-24 Dustin A, Form crew working, have concrete scheduled for 245 but doubtful due to muddy conditions. Will call if needed 5-17-24 DP. Travis' crew is onsite and were digging to set storm boxes that will be in the curb line of Colbern. They exposed the 20" transmission water main and the box is going to set 3/10ths of an inch off the top of the water main. Earl with Insentric is sending this issue back to their engineers and will resubmit a plan. 6-17-24 DP. Travis' crew was pulled off site for now. Currently no work for development onsite. They do have a excavator on the south side just breaking rock. The final segment of sewer can be tested on 6/28/24. The LS Water Dept. is currently onsite doing the camera test with what is already tested. 8-5 to 8-9-24 NS No work is being done 8-12-24 NS Work is being done on street. Ryan put in a inspection because Larry did not call in for a proof roll and they had started pouring and did not stop them because they had already put 40 yards of concrete down. 9-13-24 DP. No work onsite today. 9-16-24 DP. No site work today
Site Visit Partial 9/17/2024 9/17/2024 09/17/2024
Misc
Informational
09/16/2024
3-27-24 Dustin A, Forming storm box corners, working on storm, and other crew working on bore hole 4-2-24 Dustin A, No activity due to weather 5-2-24 Dustin A, No activity due to rain 5-3-24 Dustin A, Form crew working, have concrete scheduled for 245 but doubtful due to muddy conditions. Will call if needed 5-17-24 DP. Travis' crew is onsite and were digging to set storm boxes that will be in the curb line of Colbern. They exposed the 20" transmission water main and the box is going to set 3/10ths of an inch off the top of the water main. Earl with Insentric is sending this issue back to their engineers and will resubmit a plan. 6-17-24 DP. Travis' crew was pulled off site for now. Currently no work for development onsite. They do have a excavator on the south side just breaking rock. The final segment of sewer can be tested on 6/28/24. The LS Water Dept. is currently onsite doing the camera test with what is already tested. 8-5 to 8-9-24 NS No work is being done 8-12-24 NS Work is being done on street. Ryan put in a inspection because Larry did not call in for a proof roll and they had started pouring and did not stop them because they had already put 40 yards of concrete down. 9-13-24 DP. No work onsite today. 9-16-24 DP. No site work today 9-17-24 NS It appears not work is being done today.
Water Line - Coliform Test 1 Partial 9/23/2024 9/23/2024 09/23/2024
Misc
Informational
08/27/2024
8-20-24 DP. I met Seth with ESS on site and pulled 2 samples off the 12" public south phase. Samples were delivered to Blue Valley Lab. 8-21-24 DP. Both samples failed. 8-21-24 DP. Met Matt with ESS on site and pulled a second set of samples. We pulled these before knowing the first samples failed. So if these pass, these samples will count as sample 1. 8-23-24 DP. Second set of samples failed. Talked to Reese with ESS and the plan going forward is to start over and rechlorinate next week. 8-26-24 DP. Met Reese and Matt onsite and rechlorinated the public water main 8-27-24 DP. Met Reese with ESS onsite and dechlorinated the public water main with samples beginning tomorrow. 9-23-24 DP. ESS in onsite today rechlorinating the water line. We will flush tomorrow afternoon.
Water Line - Coliform Test 1 Partial 9/24/2024 9/24/2024 09/24/2024
Misc
Informational
09/23/2024
8-20-24 DP. I met Seth with ESS on site and pulled 2 samples off the 12" public south phase. Samples were delivered to Blue Valley Lab. 8-21-24 DP. Both samples failed. 8-21-24 DP. Met Matt with ESS on site and pulled a second set of samples. We pulled these before knowing the first samples failed. So if these pass, these samples will count as sample 1. 8-23-24 DP. Second set of samples failed. Talked to Reese with ESS and the plan going forward is to start over and rechlorinate next week. 8-26-24 DP. Met Reese and Matt onsite and rechlorinated the public water main 8-27-24 DP. Met Reese with ESS onsite and dechlorinated the public water main with samples beginning tomorrow. 9-23-24 DP. ESS in onsite today rechlorinating the water line. We will flush tomorrow afternoon. 9-24-24 DP. Matt with ESS was onsite and flushed out the chlorine in the water lines with 1st samples being taken tomorrow.
Water Line - Coliform Test 1 Partial 9/25/2024 9/25/2024 09/26/2024
Misc
Informational
09/24/2024
8-20-24 DP. I met Seth with ESS on site and pulled 2 samples off the 12" public south phase. Samples were delivered to Blue Valley Lab. 8-21-24 DP. Both samples failed. 8-21-24 DP. Met Matt with ESS on site and pulled a second set of samples. We pulled these before knowing the first samples failed. So if these pass, these samples will count as sample 1. 8-23-24 DP. Second set of samples failed. Talked to Reese with ESS and the plan going forward is to start over and rechlorinate next week. 8-26-24 DP. Met Reese and Matt onsite and rechlorinated the public water main 8-27-24 DP. Met Reese with ESS onsite and dechlorinated the public water main with samples beginning tomorrow. 9-23-24 DP. ESS in onsite today rechlorinating the water line. We will flush tomorrow afternoon. 9-24-24 DP. Matt with ESS was onsite and flushed out the chlorine in the water lines with 1st samples being taken tomorrow. 9-25-24 DP. Met Colton with ESS onsite and took 1st samples from the public water main (south phase) 2 spots. and delivered them to Blue Valley Labs.
Water Line - Coliform Test 1 Passed 9/26/2024 9/26/2024 09/26/2024
Misc
Informational
09/26/2024
8-20-24 DP. I met Seth with ESS on site and pulled 2 samples off the 12" public south phase. Samples were delivered to Blue Valley Lab. 8-21-24 DP. Both samples failed. 8-21-24 DP. Met Matt with ESS on site and pulled a second set of samples. We pulled these before knowing the first samples failed. So if these pass, these samples will count as sample 1. 8-23-24 DP. Second set of samples failed. Talked to Reese with ESS and the plan going forward is to start over and rechlorinate next week. 8-26-24 DP. Met Reese and Matt onsite and rechlorinated the public water main 8-27-24 DP. Met Reese with ESS onsite and dechlorinated the public water main with samples beginning tomorrow. 9-23-24 DP. ESS in onsite today rechlorinating the water line. We will flush tomorrow afternoon. 9-24-24 DP. Matt with ESS was onsite and flushed out the chlorine in the water lines with 1st samples being taken tomorrow. 9-25-24 DP. Met Colton with ESS onsite and took 1st samples from the public water main (south phase) 2 spots. and delivered them to Blue Valley Labs. 9-26-24 DP. First set of samples passed
Water Line - Coliform Test 2 Partial 9/26/2024 9/26/2024 09/26/2024
Misc
Informational
09/26/2024
9-26-24 DP. Met Matt with ESS onsite and pulled second set of water samples off of public water main and delivered them to Blue Valley Labs
Water Line - Coliform Test 2 Passed 9/30/2024 9/30/2024 09/30/2024
Misc
Informational
09/26/2024
9-26-24 DP. Met Matt with ESS onsite and pulled second set of water samples off of public water main and delivered them to Blue Valley Labs 9-30-24 DP. Both public samples have passed. The 12" south phase public water line can now be put in service.
Erosion Control Inspection Partial 9/30/2024 9/30/2024 09/30/2024
Misc
Informational
09/10/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
09/10/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue. 5-6-24 DP. ESC is still in good working order. ESS ran a temporary ditch for storm water to prevent Colburn from flooding again. 5-15-24 DP. ESC is still in good working order. 5-20-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order. 6-17-24 DP. ESC is in good working order. 6-25-24 DP. ESC is in good working order 7-16-24 DP. ESC is in good working order. 7-23-24 DP. ESC is in good working order. 8-15-24 DP. ESC is in good working order. 9-10-24 DP. ESC is in good working order. 9-30-24 DP. ESC is in good working order.
Site Visit Partial 11/12/2024 11/12/2024 11/12/2024
Misc
Informational
09/17/2024
3-27-24 Dustin A, Forming storm box corners, working on storm, and other crew working on bore hole 4-2-24 Dustin A, No activity due to weather 5-2-24 Dustin A, No activity due to rain 5-3-24 Dustin A, Form crew working, have concrete scheduled for 245 but doubtful due to muddy conditions. Will call if needed 5-17-24 DP. Travis' crew is onsite and were digging to set storm boxes that will be in the curb line of Colbern. They exposed the 20" transmission water main and the box is going to set 3/10ths of an inch off the top of the water main. Earl with Insentric is sending this issue back to their engineers and will resubmit a plan. 6-17-24 DP. Travis' crew was pulled off site for now. Currently no work for development onsite. They do have a excavator on the south side just breaking rock. The final segment of sewer can be tested on 6/28/24. The LS Water Dept. is currently onsite doing the camera test with what is already tested. 8-5 to 8-9-24 NS No work is being done 8-12-24 NS Work is being done on street. Ryan put in a inspection because Larry did not call in for a proof roll and they had started pouring and did not stop them because they had already put 40 yards of concrete down. 9-13-24 DP. No work onsite today. 9-16-24 DP. No site work today 9-17-24 NS It appears not work is being done today.
Misc
Informational
11/12/2024
11-12-24 DP. Work is being held up my Spire. They need to move their gas main before we can finish utility work.
Erosion Control Inspection Partial 11/12/2024 11/12/2024 11/12/2024
Misc
Informational
09/30/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
09/30/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue. 5-6-24 DP. ESC is still in good working order. ESS ran a temporary ditch for storm water to prevent Colburn from flooding again. 5-15-24 DP. ESC is still in good working order. 5-20-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order. 6-17-24 DP. ESC is in good working order. 6-25-24 DP. ESC is in good working order 7-16-24 DP. ESC is in good working order. 7-23-24 DP. ESC is in good working order. 8-15-24 DP. ESC is in good working order. 9-10-24 DP. ESC is in good working order. 9-30-24 DP. ESC is in good working order. 11-12-24 DP. ESC is in good working order.
Site Visit Partial 11/12/2024 11/12/2024 11/12/2024
Misc
Informational
11/12/2024
3-27-24 Dustin A, Forming storm box corners, working on storm, and other crew working on bore hole 4-2-24 Dustin A, No activity due to weather 5-2-24 Dustin A, No activity due to rain 5-3-24 Dustin A, Form crew working, have concrete scheduled for 245 but doubtful due to muddy conditions. Will call if needed 5-17-24 DP. Travis' crew is onsite and were digging to set storm boxes that will be in the curb line of Colbern. They exposed the 20" transmission water main and the box is going to set 3/10ths of an inch off the top of the water main. Earl with Insentric is sending this issue back to their engineers and will resubmit a plan. 6-17-24 DP. Travis' crew was pulled off site for now. Currently no work for development onsite. They do have a excavator on the south side just breaking rock. The final segment of sewer can be tested on 6/28/24. The LS Water Dept. is currently onsite doing the camera test with what is already tested. 8-5 to 8-9-24 NS No work is being done 8-12-24 NS Work is being done on street. Ryan put in a inspection because Larry did not call in for a proof roll and they had started pouring and did not stop them because they had already put 40 yards of concrete down. 9-13-24 DP. No work onsite today. 9-16-24 DP. No site work today 9-17-24 NS It appears not work is being done today.
Misc
Informational
11/12/2024
11-12-24 DP. Work is being held up my Spire. They need to move their gas main before we can finish utility work.
Erosion Control Inspection Partial 11/19/2024 11/19/2024 11/19/2024
Misc
Informational
11/12/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
11/12/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue. 5-6-24 DP. ESC is still in good working order. ESS ran a temporary ditch for storm water to prevent Colburn from flooding again. 5-15-24 DP. ESC is still in good working order. 5-20-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order. 6-17-24 DP. ESC is in good working order. 6-25-24 DP. ESC is in good working order 7-16-24 DP. ESC is in good working order. 7-23-24 DP. ESC is in good working order. 8-15-24 DP. ESC is in good working order. 9-10-24 DP. ESC is in good working order. 9-30-24 DP. ESC is in good working order. 11-12-24 DP. ESC is in good working order. 11-19-24 DP. ESC is in good working order
Sanitary Sewer Construction Inspection Partial 2/6/2025 2/6/2025 02/06/2025
Misc
Informational
02/06/2025
2-6-25 DP. ESS is onsite and has started fusing pipe together for the relocation of the force main.
Water Line - Construction Inspection Partial 2/11/2025 2/11/2025 02/11/2025
Misc
Informational
08/20/2024
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
02/11/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12"
Sanitary Sewer Construction Inspection Partial 2/11/2025 2/11/2025 02/11/2025
Misc
Informational
02/06/2025
2-6-25 DP. ESS is onsite and has started fusing pipe together for the relocation of the force main. 2-11-25 DP. ESS still on site just fusing together HDPE. Haven't started trenching yet
Water Line - Construction Inspection Partial 2/14/2025 2/14/2025 02/14/2025
Misc
Informational
02/11/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
02/11/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line
Water Line - Construction Inspection Partial 2/14/2025 2/14/2025 02/14/2025
Misc
Informational
02/14/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
02/14/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in
Sanitary Sewer Construction Inspection Partial 2/24/2025 2/24/2025 02/26/2025
Misc
Informational
02/11/2025
2-6-25 DP. ESS is onsite and has started fusing pipe together for the relocation of the force main. 2-11-25 DP. ESS still on site just fusing together HDPE. Haven't started trenching yet 2-24-25 DP. ESS is on site digging the trench for the force main and deleting the existing spire main
Sanitary Sewer Construction Inspection Partial 2/25/2025 2/25/2025 02/26/2025
Misc
Informational
02/26/2025
2-6-25 DP. ESS is onsite and has started fusing pipe together for the relocation of the force main. 2-11-25 DP. ESS still on site just fusing together HDPE. Haven't started trenching yet 2-24-25 DP. ESS is on site digging the trench for the force main and deleting the existing spire main 2-25-25 DP. ESS is continuing to work South with their trench. They buried 1/4 of the force main and back filled.
Water Line - Construction Inspection Partial 2/24/2025 2/24/2025 02/26/2025
Misc
Informational
02/14/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
02/14/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in 2-24-25 DP. Advanced Excavation is onsite continuing to install the north phase water line. Brent's crew was onsite completing the test shut for the tie in.
Water Line - Construction Inspection Partial 2/25/2025 2/25/2025 02/26/2025
Misc
Informational
02/26/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
02/26/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in 2-24-25 DP. Advanced Excavation is onsite continuing to install the north phase water line. Brent's crew was onsite completing the test shut for the tie in. 2-25-25 DP Advanced Excavation is onsite and still working on the north phase water line, they are close to where the bore under Douglas is.
Erosion Control Inspection Partial 2/25/2025 2/25/2025 02/26/2025
Misc
Informational
11/19/2024
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
11/19/2024
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue. 5-6-24 DP. ESC is still in good working order. ESS ran a temporary ditch for storm water to prevent Colburn from flooding again. 5-15-24 DP. ESC is still in good working order. 5-20-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order. 6-17-24 DP. ESC is in good working order. 6-25-24 DP. ESC is in good working order 7-16-24 DP. ESC is in good working order. 7-23-24 DP. ESC is in good working order. 8-15-24 DP. ESC is in good working order. 9-10-24 DP. ESC is in good working order. 9-30-24 DP. ESC is in good working order. 11-12-24 DP. ESC is in good working order. 11-19-24 DP. ESC is in good working order 2-25-25 DP. ESC is in good working order. Most areas are getting ESC inspections under FDP permits.
Water Line - Construction Inspection Partial 2/27/2025 2/27/2025 02/27/2025
Misc
Informational
02/26/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
02/26/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in 2-24-25 DP. Advanced Excavation is onsite continuing to install the north phase water line. Brent's crew was onsite completing the test shut for the tie in. 2-25-25 DP Advanced Excavation is onsite and still working on the north phase water line, they are close to where the bore under Douglas is. 2-27-25 DP. Advanced Excavation is onsite and completed laying the 12" c900 water line to the bore crossing. When I was on site today the contractor called to schedule the bore. They are planning to come out next week after the rain and bore the encasement under Douglass. The test shut from the Water department is complete and I will hang door hangers 48 hours before any tie in.
Water Line - Construction Inspection Partial 3/10/2025 3/10/2025 03/11/2025
Misc
Informational
02/27/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
02/27/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in 2-24-25 DP. Advanced Excavation is onsite continuing to install the north phase water line. Brent's crew was onsite completing the test shut for the tie in. 2-25-25 DP Advanced Excavation is onsite and still working on the north phase water line, they are close to where the bore under Douglas is. 2-27-25 DP. Advanced Excavation is onsite and completed laying the 12" c900 water line to the bore crossing. When I was on site today the contractor called to schedule the bore. They are planning to come out next week after the rain and bore the encasement under Douglass. The test shut from the Water department is complete and I will hang door hangers 48 hours before any tie in. 3-10-25 DP. Aaron's crew was digging the bore pit for the boring company. The tie in for the Tee and valve is now scheduled for 3/18/25 at 5 PM
Water Line - Construction Inspection Partial 3/14/2025 3/14/2025 03/14/2025
Misc
Informational
03/11/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
03/11/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in 2-24-25 DP. Advanced Excavation is onsite continuing to install the north phase water line. Brent's crew was onsite completing the test shut for the tie in. 2-25-25 DP Advanced Excavation is onsite and still working on the north phase water line, they are close to where the bore under Douglas is. 2-27-25 DP. Advanced Excavation is onsite and completed laying the 12" c900 water line to the bore crossing. When I was on site today the contractor called to schedule the bore. They are planning to come out next week after the rain and bore the encasement under Douglass. The test shut from the Water department is complete and I will hang door hangers 48 hours before any tie in. 3-10-25 DP. Aaron's crew was digging the bore pit for the boring company. The tie in for the Tee and valve is now scheduled for 3/18/25 at 5 PM 3-14-25 DP. I went to the houses today that will be affected by the tie in and provided notice of the shut down for 3/18/25
Water Line - Construction Inspection Partial 3/18/2025 3/18/2025 03/19/2025
Misc
Informational
03/14/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
03/14/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in 2-24-25 DP. Advanced Excavation is onsite continuing to install the north phase water line. Brent's crew was onsite completing the test shut for the tie in. 2-25-25 DP Advanced Excavation is onsite and still working on the north phase water line, they are close to where the bore under Douglas is. 2-27-25 DP. Advanced Excavation is onsite and completed laying the 12" c900 water line to the bore crossing. When I was on site today the contractor called to schedule the bore. They are planning to come out next week after the rain and bore the encasement under Douglass. The test shut from the Water department is complete and I will hang door hangers 48 hours before any tie in. 3-10-25 DP. Aaron's crew was digging the bore pit for the boring company. The tie in for the Tee and valve is now scheduled for 3/18/25 at 5 PM 3-14-25 DP. I went to the houses today that will be affected by the tie in and provided notice of the shut down for 3/18/25 3-18-25 DP. Advanced Excavation cut the tee in the public 12". Tomorrow they plan to push pipe under Lee's Summit Road and we will still need to test before connecting to Tee.
Water Line - Construction Inspection Partial 3/21/2025 3/21/2025 03/21/2025
Misc
Informational
03/19/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
03/19/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in 2-24-25 DP. Advanced Excavation is onsite continuing to install the north phase water line. Brent's crew was onsite completing the test shut for the tie in. 2-25-25 DP Advanced Excavation is onsite and still working on the north phase water line, they are close to where the bore under Douglas is. 2-27-25 DP. Advanced Excavation is onsite and completed laying the 12" c900 water line to the bore crossing. When I was on site today the contractor called to schedule the bore. They are planning to come out next week after the rain and bore the encasement under Douglass. The test shut from the Water department is complete and I will hang door hangers 48 hours before any tie in. 3-10-25 DP. Aaron's crew was digging the bore pit for the boring company. The tie in for the Tee and valve is now scheduled for 3/18/25 at 5 PM 3-14-25 DP. I went to the houses today that will be affected by the tie in and provided notice of the shut down for 3/18/25 3-18-25 DP. Advanced Excavation cut the tee in the public 12". Tomorrow they plan to push pipe under Lee's Summit Road and we will still need to test before connecting to Tee. 3-21-25 DP. Aaron's crew is onsite and pushing water pipe through the encasement under Lee's Summit Road.
Water Line - Construction Inspection Partial 3/24/2025 3/24/2025 03/24/2025
Misc
Informational
03/21/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
03/21/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in 2-24-25 DP. Advanced Excavation is onsite continuing to install the north phase water line. Brent's crew was onsite completing the test shut for the tie in. 2-25-25 DP Advanced Excavation is onsite and still working on the north phase water line, they are close to where the bore under Douglas is. 2-27-25 DP. Advanced Excavation is onsite and completed laying the 12" c900 water line to the bore crossing. When I was on site today the contractor called to schedule the bore. They are planning to come out next week after the rain and bore the encasement under Douglass. The test shut from the Water department is complete and I will hang door hangers 48 hours before any tie in. 3-10-25 DP. Aaron's crew was digging the bore pit for the boring company. The tie in for the Tee and valve is now scheduled for 3/18/25 at 5 PM 3-14-25 DP. I went to the houses today that will be affected by the tie in and provided notice of the shut down for 3/18/25 3-18-25 DP. Advanced Excavation cut the tee in the public 12". Tomorrow they plan to push pipe under Lee's Summit Road and we will still need to test before connecting to Tee. 3-21-25 DP. Aaron's crew is onsite and pushing water pipe through the encasement under Lee's Summit Road. 3-24-25 DP. Aaron's crew is onsite tying together the water life from the tie in back. Today they were installing ceta lok c900 pipe and are leaving open fittings for kickers.
Erosion Control Inspection Partial 3/26/2025 3/26/2025 03/26/2025
Misc
Informational
02/26/2025
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
02/26/2025
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue. 5-6-24 DP. ESC is still in good working order. ESS ran a temporary ditch for storm water to prevent Colburn from flooding again. 5-15-24 DP. ESC is still in good working order. 5-20-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order. 6-17-24 DP. ESC is in good working order. 6-25-24 DP. ESC is in good working order 7-16-24 DP. ESC is in good working order. 7-23-24 DP. ESC is in good working order. 8-15-24 DP. ESC is in good working order. 9-10-24 DP. ESC is in good working order. 9-30-24 DP. ESC is in good working order. 11-12-24 DP. ESC is in good working order. 11-19-24 DP. ESC is in good working order 2-25-25 DP. ESC is in good working order. Most areas are getting ESC inspections under FDP permits. 3-26-25 DP ESC is in good working order. Crews were onsite this week addressing potential problem areas.
Water Line - Construction Inspection Partial 3/31/2025 3/31/2025 03/31/2025
Misc
Informational
03/24/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
03/24/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in 2-24-25 DP. Advanced Excavation is onsite continuing to install the north phase water line. Brent's crew was onsite completing the test shut for the tie in. 2-25-25 DP Advanced Excavation is onsite and still working on the north phase water line, they are close to where the bore under Douglas is. 2-27-25 DP. Advanced Excavation is onsite and completed laying the 12" c900 water line to the bore crossing. When I was on site today the contractor called to schedule the bore. They are planning to come out next week after the rain and bore the encasement under Douglass. The test shut from the Water department is complete and I will hang door hangers 48 hours before any tie in. 3-10-25 DP. Aaron's crew was digging the bore pit for the boring company. The tie in for the Tee and valve is now scheduled for 3/18/25 at 5 PM 3-14-25 DP. I went to the houses today that will be affected by the tie in and provided notice of the shut down for 3/18/25 3-18-25 DP. Advanced Excavation cut the tee in the public 12". Tomorrow they plan to push pipe under Lee's Summit Road and we will still need to test before connecting to Tee. 3-21-25 DP. Aaron's crew is onsite and pushing water pipe through the encasement under Lee's Summit Road. 3-24-25 DP. Aaron's crew is onsite tying together the water life from the tie in back. Today they were installing ceta lok c900 pipe and are leaving open fittings for kickers. 3-31-25 All fittings are tired together with all thread. They only have 1 45 left to install to complete the line to the tie in.
Water Line - Construction Inspection Partial 3/26/2025 3/26/2025 03/31/2025
Misc
Informational
03/31/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
03/31/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in 2-24-25 DP. Advanced Excavation is onsite continuing to install the north phase water line. Brent's crew was onsite completing the test shut for the tie in. 2-25-25 DP Advanced Excavation is onsite and still working on the north phase water line, they are close to where the bore under Douglas is. 2-27-25 DP. Advanced Excavation is onsite and completed laying the 12" c900 water line to the bore crossing. When I was on site today the contractor called to schedule the bore. They are planning to come out next week after the rain and bore the encasement under Douglass. The test shut from the Water department is complete and I will hang door hangers 48 hours before any tie in. 3-10-25 DP. Aaron's crew was digging the bore pit for the boring company. The tie in for the Tee and valve is now scheduled for 3/18/25 at 5 PM 3-14-25 DP. I went to the houses today that will be affected by the tie in and provided notice of the shut down for 3/18/25 3-18-25 DP. Advanced Excavation cut the tee in the public 12". Tomorrow they plan to push pipe under Lee's Summit Road and we will still need to test before connecting to Tee. 3-21-25 DP. Aaron's crew is onsite and pushing water pipe through the encasement under Lee's Summit Road. 3-24-25 DP. Aaron's crew is onsite tying together the water life from the tie in back. Today they were installing ceta lok c900 pipe and are leaving open fittings for kickers. 3-26-25 DP. Aarons crew performed they hydrostatic test which held at 150 psi for 2 hours. 3-31-25 All fittings are tired together with all thread. They only have 1 45 left to install to complete the line to the tie in.
Water Line - Construction Inspection Partial 3/26/2025 3/26/2025 03/31/2025
Misc
Informational
03/31/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
03/31/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in 2-24-25 DP. Advanced Excavation is onsite continuing to install the north phase water line. Brent's crew was onsite completing the test shut for the tie in. 2-25-25 DP Advanced Excavation is onsite and still working on the north phase water line, they are close to where the bore under Douglas is. 2-27-25 DP. Advanced Excavation is onsite and completed laying the 12" c900 water line to the bore crossing. When I was on site today the contractor called to schedule the bore. They are planning to come out next week after the rain and bore the encasement under Douglass. The test shut from the Water department is complete and I will hang door hangers 48 hours before any tie in. 3-10-25 DP. Aaron's crew was digging the bore pit for the boring company. The tie in for the Tee and valve is now scheduled for 3/18/25 at 5 PM 3-14-25 DP. I went to the houses today that will be affected by the tie in and provided notice of the shut down for 3/18/25 3-18-25 DP. Advanced Excavation cut the tee in the public 12". Tomorrow they plan to push pipe under Lee's Summit Road and we will still need to test before connecting to Tee. 3-21-25 DP. Aaron's crew is onsite and pushing water pipe through the encasement under Lee's Summit Road. 3-24-25 DP. Aaron's crew is onsite tying together the water life from the tie in back. Today they were installing ceta lok c900 pipe and are leaving open fittings for kickers. 3-26-25 DP. Aarons crew performed they hydrostatic test which held at 150 psi for 2 hours. 3-26-25 DP. Crew chlorinated the water line 3-31-25 All fittings are tired together with all thread. They only have 1 45 left to install to complete the line to the tie in.
Water Line - Construction Inspection Partial 3/27/2025 3/27/2025 03/31/2025
Misc
Informational
03/31/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
03/31/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in 2-24-25 DP. Advanced Excavation is onsite continuing to install the north phase water line. Brent's crew was onsite completing the test shut for the tie in. 2-25-25 DP Advanced Excavation is onsite and still working on the north phase water line, they are close to where the bore under Douglas is. 2-27-25 DP. Advanced Excavation is onsite and completed laying the 12" c900 water line to the bore crossing. When I was on site today the contractor called to schedule the bore. They are planning to come out next week after the rain and bore the encasement under Douglass. The test shut from the Water department is complete and I will hang door hangers 48 hours before any tie in. 3-10-25 DP. Aaron's crew was digging the bore pit for the boring company. The tie in for the Tee and valve is now scheduled for 3/18/25 at 5 PM 3-14-25 DP. I went to the houses today that will be affected by the tie in and provided notice of the shut down for 3/18/25 3-18-25 DP. Advanced Excavation cut the tee in the public 12". Tomorrow they plan to push pipe under Lee's Summit Road and we will still need to test before connecting to Tee. 3-21-25 DP. Aaron's crew is onsite and pushing water pipe through the encasement under Lee's Summit Road. 3-24-25 DP. Aaron's crew is onsite tying together the water life from the tie in back. Today they were installing ceta lok c900 pipe and are leaving open fittings for kickers. 3-26-25 DP. Aarons crew performed they hydrostatic test which held at 150 psi for 2 hours. 3-26-25 DP. Crew chlorinated the water line 3-27-25 DP. Water line was flushed 3-31-25 All fittings are tired together with all thread. They only have 1 45 left to install to complete the line to the tie in.
Water Line - Hydrostatic Test Partial 3/26/2025 3/26/2025 03/31/2025
Misc
Informational
03/31/2025
3-26-25 DP. The north phase 12" public water line has completed the hydrostatic test. 150psi for 2 hours. The line has been chlorinated.
Water Line - Hydrostatic Test Partial 3/27/2025 3/27/2025 03/31/2025
Misc
Informational
03/31/2025
3-26-25 DP. The north phase 12" public water line has completed the hydrostatic test. 150psi for 2 hours. The line has been chlorinated. 3-27-25 DP. The line has been flushed.
Water Line - Hydrostatic Test Partial 3/31/2025 3/31/2025 03/31/2025
Misc
Informational
03/31/2025
3-26-25 DP. The north phase 12" public water line has completed the hydrostatic test. 150psi for 2 hours. The line has been chlorinated. 3-27-25 DP. The line has been flushed.
Water Line - Coliform Test 1 Partial 3/31/2025 3/31/2025 03/31/2025
Misc
Informational
03/31/2025
3-31-25 DP. We pulled first samples today at 2 spots and delivered them to Blue Valley Labs
Water Line - Construction Inspection Partial 4/1/2025 4/1/2025 04/18/2025
Misc
Informational
03/31/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
03/31/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in 2-24-25 DP. Advanced Excavation is onsite continuing to install the north phase water line. Brent's crew was onsite completing the test shut for the tie in. 2-25-25 DP Advanced Excavation is onsite and still working on the north phase water line, they are close to where the bore under Douglas is. 2-27-25 DP. Advanced Excavation is onsite and completed laying the 12" c900 water line to the bore crossing. When I was on site today the contractor called to schedule the bore. They are planning to come out next week after the rain and bore the encasement under Douglass. The test shut from the Water department is complete and I will hang door hangers 48 hours before any tie in. 3-10-25 DP. Aaron's crew was digging the bore pit for the boring company. The tie in for the Tee and valve is now scheduled for 3/18/25 at 5 PM 3-14-25 DP. I went to the houses today that will be affected by the tie in and provided notice of the shut down for 3/18/25 3-18-25 DP. Advanced Excavation cut the tee in the public 12". Tomorrow they plan to push pipe under Lee's Summit Road and we will still need to test before connecting to Tee. 3-21-25 DP. Aaron's crew is onsite and pushing water pipe through the encasement under Lee's Summit Road. 3-24-25 DP. Aaron's crew is onsite tying together the water life from the tie in back. Today they were installing ceta lok c900 pipe and are leaving open fittings for kickers. 3-26-25 DP. Aarons crew performed they hydrostatic test which held at 150 psi for 2 hours. 3-26-25 DP. Crew chlorinated the water line 3-27-25 DP. Water line was flushed 3-31-25 All fittings are tired together with all thread. They only have 1 45 left to install to complete the line to the tie in. 4-1-25 DP. Crew passed the hydrostatic test on the north phase 12 in water line. It held 150 psi for 2 hours.
Water Line - Construction Inspection Partial 4/1/2025 4/1/2025 04/18/2025
Misc
Informational
04/18/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
04/18/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in 2-24-25 DP. Advanced Excavation is onsite continuing to install the north phase water line. Brent's crew was onsite completing the test shut for the tie in. 2-25-25 DP Advanced Excavation is onsite and still working on the north phase water line, they are close to where the bore under Douglas is. 2-27-25 DP. Advanced Excavation is onsite and completed laying the 12" c900 water line to the bore crossing. When I was on site today the contractor called to schedule the bore. They are planning to come out next week after the rain and bore the encasement under Douglass. The test shut from the Water department is complete and I will hang door hangers 48 hours before any tie in. 3-10-25 DP. Aaron's crew was digging the bore pit for the boring company. The tie in for the Tee and valve is now scheduled for 3/18/25 at 5 PM 3-14-25 DP. I went to the houses today that will be affected by the tie in and provided notice of the shut down for 3/18/25 3-18-25 DP. Advanced Excavation cut the tee in the public 12". Tomorrow they plan to push pipe under Lee's Summit Road and we will still need to test before connecting to Tee. 3-21-25 DP. Aaron's crew is onsite and pushing water pipe through the encasement under Lee's Summit Road. 3-24-25 DP. Aaron's crew is onsite tying together the water life from the tie in back. Today they were installing ceta lok c900 pipe and are leaving open fittings for kickers. 3-26-25 DP. Aarons crew performed they hydrostatic test which held at 150 psi for 2 hours. 3-26-25 DP. Crew chlorinated the water line 3-27-25 DP. Water line was flushed 3-31-25 All fittings are tired together with all thread. They only have 1 45 left to install to complete the line to the tie in. 4-1-25 DP. Crew passed the hydrostatic test on the north phase 12 in water line. It held 150 psi for 2 hours. 4-1-25 DP. Crew chlorinated the water line.
Water Line - Construction Inspection Partial 4/2/2025 4/2/2025 04/18/2025
Misc
Informational
04/18/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
04/18/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in 2-24-25 DP. Advanced Excavation is onsite continuing to install the north phase water line. Brent's crew was onsite completing the test shut for the tie in. 2-25-25 DP Advanced Excavation is onsite and still working on the north phase water line, they are close to where the bore under Douglas is. 2-27-25 DP. Advanced Excavation is onsite and completed laying the 12" c900 water line to the bore crossing. When I was on site today the contractor called to schedule the bore. They are planning to come out next week after the rain and bore the encasement under Douglass. The test shut from the Water department is complete and I will hang door hangers 48 hours before any tie in. 3-10-25 DP. Aaron's crew was digging the bore pit for the boring company. The tie in for the Tee and valve is now scheduled for 3/18/25 at 5 PM 3-14-25 DP. I went to the houses today that will be affected by the tie in and provided notice of the shut down for 3/18/25 3-18-25 DP. Advanced Excavation cut the tee in the public 12". Tomorrow they plan to push pipe under Lee's Summit Road and we will still need to test before connecting to Tee. 3-21-25 DP. Aaron's crew is onsite and pushing water pipe through the encasement under Lee's Summit Road. 3-24-25 DP. Aaron's crew is onsite tying together the water life from the tie in back. Today they were installing ceta lok c900 pipe and are leaving open fittings for kickers. 3-26-25 DP. Aarons crew performed they hydrostatic test which held at 150 psi for 2 hours. 3-26-25 DP. Crew chlorinated the water line 3-27-25 DP. Water line was flushed 3-31-25 All fittings are tired together with all thread. They only have 1 45 left to install to complete the line to the tie in. 4-1-25 DP. Crew passed the hydrostatic test on the north phase 12 in water line. It held 150 psi for 2 hours. 4-1-25 DP. Crew chlorinated the water line. 4-2-25 DP. Crew flushed the water line.
Water Line - Coliform Test 1 Partial 4/3/2025 4/3/2025 04/18/2025
Misc
Informational
03/31/2025
3-31-25 DP. We pulled first samples today at 2 spots and delivered them to Blue Valley Labs 4-3-25 DP. Spots 1 and 2 on the north phase 12 in public water line both passed 1st samples
Water Line - Coliform Test 1 Passed 4/3/2025 4/3/2025 04/18/2025
Misc
Informational
04/18/2025
3-31-25 DP. We pulled first samples today at 2 spots and delivered them to Blue Valley Labs 4-3-25 DP. Spots 1 and 2 on the north phase 12 in public water line both passed 1st samples
Water Line - Coliform Test 2 Partial 4/7/2025 4/7/2025 04/18/2025
Misc
Informational
04/18/2025
4-7-25 DP. Second samples were pulled on north phase 12 in public water line for spots 1 and 2
Water Line - Coliform Test 2 Passed 4/8/2025 4/8/2025 04/18/2025
Misc
Informational
04/18/2025
4-7-25 DP. Second samples were pulled on north phase 12 in public water line for spots 1 and 2 4-8-25 DP. Second samples have passed. Water line is able to be put into service.
Water Line - Hydrostatic Test Passed 4/1/2025 4/1/2025 04/18/2025
Misc
Informational
03/31/2025
3-26-25 DP. The north phase 12" public water line has completed the hydrostatic test. 150psi for 2 hours. The line has been chlorinated. 3-27-25 DP. The line has been flushed.
Water Line - Construction Inspection Partial 4/18/2025 4/18/2025 04/18/2025
Misc
Informational
04/18/2025
7-12-24 DP. Travis' crew was onsite and completed the water crossing under colburn road. They backfilled the trench with AB3 and added steel plates across Colburn R 7-15-24 DP. I spoke with Perry Allen and Andy with ESS this morning. ESS is going to remove the AB3 down to 12" above highest point of water casing and will add flow fill to top of existing pavement. They will need to leave steel plates until the flow fill sets up. Onces it is set up, they can remove steel plates and open to traffic. This is being allowed because Clarkson will be redoing Colburn Rd. soon. 7-30-24 DP. ESS was wanting to fill the public 12" water line (south phase) with a jumper from the live 20" water line. That was denied by the water department. ESS said the north phase (where the north tie in would be) is being help up. I checked with MW and it is not being held up on our end. I called Earl with Insentric and he knew nothing about it. Brent with LS water is currently checking on status of CIP's water line that will meet up to ours on Colburn. We will either need their section to be in service or the easements to get figured out on the north end so that we can do 1 tie in before performing testing. I communicated this with Reese with ESS. 8-12-24 DP. Dustin worked with ESS and completed the cross tie in of water line A. 8-16-24 DP. I met AJ with ESS on site today and we chlorinated all of the public water that have been installed. It will sit over the weekend and flush on monday with samples following. 8-19-24 DP. AJ was on site and flushed all public water.
Misc
Informational
04/18/2025
2-11-25 DP. Aarons crew with Advanced Excavation is working on the north phase 12" 2-14-25 DP. Aarons crew is back onsite working north installing the north phase 12" water line 2-14-25 DP. I scheduled a test shut with brent for next week. After getting the test shut report, we will schedule the tie in 2-24-25 DP. Advanced Excavation is onsite continuing to install the north phase water line. Brent's crew was onsite completing the test shut for the tie in. 2-25-25 DP Advanced Excavation is onsite and still working on the north phase water line, they are close to where the bore under Douglas is. 2-27-25 DP. Advanced Excavation is onsite and completed laying the 12" c900 water line to the bore crossing. When I was on site today the contractor called to schedule the bore. They are planning to come out next week after the rain and bore the encasement under Douglass. The test shut from the Water department is complete and I will hang door hangers 48 hours before any tie in. 3-10-25 DP. Aaron's crew was digging the bore pit for the boring company. The tie in for the Tee and valve is now scheduled for 3/18/25 at 5 PM 3-14-25 DP. I went to the houses today that will be affected by the tie in and provided notice of the shut down for 3/18/25 3-18-25 DP. Advanced Excavation cut the tee in the public 12". Tomorrow they plan to push pipe under Lee's Summit Road and we will still need to test before connecting to Tee. 3-21-25 DP. Aaron's crew is onsite and pushing water pipe through the encasement under Lee's Summit Road. 3-24-25 DP. Aaron's crew is onsite tying together the water life from the tie in back. Today they were installing ceta lok c900 pipe and are leaving open fittings for kickers. 3-26-25 DP. Aarons crew performed they hydrostatic test which held at 150 psi for 2 hours. 3-26-25 DP. Crew chlorinated the water line 3-27-25 DP. Water line was flushed 3-31-25 All fittings are tired together with all thread. They only have 1 45 left to install to complete the line to the tie in. 4-1-25 DP. Crew passed the hydrostatic test on the north phase 12 in water line. It held 150 psi for 2 hours. 4-1-25 DP. Crew chlorinated the water line. 4-2-25 DP. Crew flushed the water line.
Misc
Informational
04/18/2025
4-18-25 DP. All public water lines on this permit have been installed except the short line C on the southwest side of the property by Colbern Rd. This can not be installed until the force main is tied in.
Erosion Control Inspection Partial 4/18/2025 4/18/2025 04/18/2025
Misc
Informational
03/26/2025
11-1-23 DP. Contractor was working on installing all erosion control on the perimeter of the site. 11-6-23 DP. Contractor has erosion control installed and is currently in good working condition. 11-9-23 DP. ESC is currently in good working order. 11-15-23 DP ESC is currently in good working order. No issues. 11-17-23 DP. Crew has rip rap on site to construct the construction entrance off of Colburn. Contractor has all sediment traps dug on the north property. The have started digging sediment traps on south side of zone 2. No issues. 12-4-23 DP. ESC is in good working order. There is a little of tracking from the entrance off of Colburn caused by the CIP contractor. I will touch base with the CIP inspector if it doesn't get cleaned up. ESS is not on site today. 12-12-23 DP. ESC is in good working order. Crew is moving dirt across colburn and knows to keep the road clean. They also have steel plates across the road 12-20-23 DP. ESC is in good working order. Need to keep up on remembering steel plates when crossing colburn Rd.
Misc
Informational
03/26/2025
1-2-24 DP. ESC is in good working order around the property. We do need to reestablish the construction entrances where the scraper trucks cross on both sides of Colburn Road. I know Mears in currently in the way but we need to figure out a way to get it established and maintained. 2-19-24 DP. ESC is in good working order still. ESS is doing a good job of cleaning up after themselves nightly. 3-25-24 DP. ESC is in good working order. 4-8-24 DP. ESC is in good working order. ESS is doing a great job on this project correcting any mishaps that may happen. 4-18-24 DP. ESC is in good working order. Al ot of mud was tracked out onto Colbern on the far west side of the project. This was done from the CIP project. Joe was contacted and is working on getting it cleaned up. 4-25-24 DP. ESC is in good working order. 4-30-24 DP. ESC is still in good working order. There was an area of Colburn RD that flooded from grading not being right yet. Crew showed up on site today and addressed the issue. 5-6-24 DP. ESC is still in good working order. ESS ran a temporary ditch for storm water to prevent Colburn from flooding again. 5-15-24 DP. ESC is still in good working order. 5-20-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order. 6-17-24 DP. ESC is in good working order. 6-25-24 DP. ESC is in good working order 7-16-24 DP. ESC is in good working order. 7-23-24 DP. ESC is in good working order. 8-15-24 DP. ESC is in good working order. 9-10-24 DP. ESC is in good working order. 9-30-24 DP. ESC is in good working order. 11-12-24 DP. ESC is in good working order. 11-19-24 DP. ESC is in good working order 2-25-25 DP. ESC is in good working order. Most areas are getting ESC inspections under FDP permits. 3-26-25 DP ESC is in good working order. Crews were onsite this week addressing potential problem areas. 4-18-25 DP. ESC is in good working order.
Documents & Images
Date Uploaded File Type Document Name
06/26/2023 Plans 23-06-14_Zone 4 Mass Grading
06/26/2023 Plans 23-06-26_Zone 2 Mass Grading
06/26/2023 Application Form The Village at Discovery Park - Land Disturbance application - zones 2 and 4 executed
09/27/2023 Receipt Receipt for transaction:2023-007360
09/29/2023 Plans 23-09-28_Zone 2 Mass Grading
09/29/2023 Plans 23-09-28_Zone 4 Mass Grading
10/25/2023 Receipt Receipt for transaction: 2023-008048
10/25/2023 Approved Plans MASS GRADING AND ESC APPROVED PLANS
10/26/2023 Engineers Estimate 2023-10-26_Mass Grading Zone 2 Estimate
10/26/2023 Engineers Estimate 2023-10-26_Mass Grading Zone 4 Estimate
10/26/2023 Letter SUBD Comment Letter
10/26/2023 Letter 23-10-26_GNCV_Comment Response Letter_City
10/26/2023 Plans 23-10-26_Zone 2 and 4 Mass Grading
10/27/2023 Letter INSPECTION SUMMARY
10/27/2023 Approved Plans MASS GRADING 2 AND 4 STAMPED APPROVEDONES
10/27/2023 Activity Document MASS GRADING PHASE 2 FeeWorksheetZone2and4MassGradingESC
10/27/2023 Approved Plans PUBLIC STORM STAMPED APPROVED
11/01/2023 Letter INSPECTION SUMMARY
11/01/2023 Letter INSPECTION SUMMARY
11/06/2023 Letter INSPECTION SUMMARY
11/06/2023 Letter INSPECTION SUMMARY
11/07/2023 Letter INSPECTION SUMMARY
11/07/2023 Letter SUBD Building Permit
11/09/2023 Letter INSPECTION SUMMARY
11/09/2023 Letter INSPECTION SUMMARY
11/10/2023 Letter INSPECTION SUMMARY
11/15/2023 Letter INSPECTION SUMMARY
11/15/2023 Letter INSPECTION SUMMARY
11/07/2023 Approved Plans TRAFFIC OFFSITE STAMPED APPROVED PLANS
11/07/2023 Activity Document TRAFFIC OFFSITE IMPROVEMENTS FeeWorksheetOffSiteTraffic
10/24/2023 Engineers Estimate 23-10-20_Discovery Park Public Road Improvements_Opinion of Probable Cost
10/25/2023 Approved Plans MASS GRADING AND ESC APPROVED PLANS
08/16/2023 Activity Document MASS GRADING PHASE 1 FeeWorksheetDiscoveryParkPhase1MassGradingDetentionESC
08/09/2023 Engineers Estimate MASS GRADING PHASE 1 Cost Estimate
11/17/2023 Letter INSPECTION SUMMARY
11/21/2023 Receipt Receipt for transaction:2023-008663
11/21/2023 Letter SUBD Building Permit
11/14/2023 Approved Plans WATER STAMPED APPROVED PLANS
11/14/2023 Activity Document WATER FeeWorksheetWaterDiscoveryParkZone1
11/09/2023 Engineers Estimate WATER 23-11-09_Public Water Cost Estimate
11/27/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/05/2023 Letter INSPECTION SUMMARY
12/12/2023 Letter INSPECTION SUMMARY
12/12/2023 Letter INSPECTION SUMMARY
12/12/2023 Letter INSPECTION SUMMARY
12/20/2023 Letter INSPECTION SUMMARY
12/20/2023 Letter INSPECTION SUMMARY
12/20/2023 Letter INSPECTION SUMMARY
12/20/2023 Letter INSPECTION SUMMARY
01/02/2024 Letter INSPECTION SUMMARY
01/02/2024 Letter INSPECTION SUMMARY
01/05/2024 Letter INSPECTION SUMMARY
01/10/2024 Plans Public Sanitary Sewer and Force Main Reolocation Plans
01/18/2024 Letter INSPECTION SUMMARY
01/22/2024 Receipt Receipt for transaction:2024-000326
01/22/2024 Letter DE-Permit
01/23/2024 Letter INSPECTION SUMMARY
01/29/2024 Letter INSPECTION SUMMARY
01/30/2024 Letter INSPECTION SUMMARY
02/02/2024 Letter INSPECTION SUMMARY
02/05/2024 Letter INSPECTION SUMMARY
02/06/2024 Letter INSPECTION SUMMARY
02/08/2024 Letter INSPECTION SUMMARY
02/09/2024 Letter INSPECTION SUMMARY
02/13/2024 Letter INSPECTION SUMMARY
02/13/2024 Letter INSPECTION SUMMARY
02/13/2024 Letter INSPECTION SUMMARY
02/13/2024 Letter INSPECTION SUMMARY
02/13/2024 Letter INSPECTION SUMMARY
02/15/2024 Letter INSPECTION SUMMARY
02/16/2024 Letter INSPECTION SUMMARY
02/19/2024 Letter INSPECTION SUMMARY
02/19/2024 Letter INSPECTION SUMMARY
02/22/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
03/04/2024 Letter INSPECTION SUMMARY
03/04/2024 Letter INSPECTION SUMMARY
03/07/2024 Letter INSPECTION SUMMARY
03/11/2024 Letter INSPECTION SUMMARY
03/15/2024 Letter INSPECTION SUMMARY
03/15/2024 Letter INSPECTION SUMMARY
03/15/2024 Letter INSPECTION SUMMARY
03/18/2024 Letter INSPECTION SUMMARY
03/18/2024 Letter INSPECTION SUMMARY
03/21/2024 Letter INSPECTION SUMMARY
03/22/2024 Letter INSPECTION SUMMARY
03/22/2024 Letter INSPECTION SUMMARY
03/22/2024 Letter INSPECTION SUMMARY
03/25/2024 Letter INSPECTION SUMMARY
03/25/2024 Letter INSPECTION SUMMARY
03/26/2024 Letter INSPECTION SUMMARY
03/27/2024 Letter INSPECTION SUMMARY
03/28/2024 Letter INSPECTION SUMMARY
03/28/2024 Letter INSPECTION SUMMARY
04/02/2024 Letter INSPECTION SUMMARY
04/05/2024 Letter INSPECTION SUMMARY
04/08/2024 Letter INSPECTION SUMMARY
04/08/2024 Letter INSPECTION SUMMARY
04/08/2024 Letter INSPECTION SUMMARY
04/09/2024 Letter INSPECTION SUMMARY
04/09/2024 Letter INSPECTION SUMMARY
04/11/2024 Letter INSPECTION SUMMARY
04/11/2024 Letter INSPECTION SUMMARY
04/12/2024 Letter INSPECTION SUMMARY
04/16/2024 Letter INSPECTION SUMMARY
04/16/2024 Letter INSPECTION SUMMARY
04/17/2024 Letter INSPECTION SUMMARY
04/17/2024 Letter INSPECTION SUMMARY
04/18/2024 Letter INSPECTION SUMMARY
04/23/2024 Letter INSPECTION SUMMARY
04/23/2024 Letter INSPECTION SUMMARY
04/23/2024 Letter INSPECTION SUMMARY
04/25/2024 Letter INSPECTION SUMMARY
04/30/2024 Letter INSPECTION SUMMARY
05/02/2024 Letter INSPECTION SUMMARY
05/03/2024 Letter INSPECTION SUMMARY
05/06/2024 Letter INSPECTION SUMMARY
05/06/2024 Letter INSPECTION SUMMARY
05/08/2024 Letter INSPECTION SUMMARY
05/13/2024 Receipt Receipt for transaction:2024-003285
05/13/2024 Letter DE-Permit
05/15/2024 Letter INSPECTION SUMMARY
05/15/2024 Letter INSPECTION SUMMARY
05/17/2024 Letter INSPECTION SUMMARY
05/21/2024 Letter INSPECTION SUMMARY
05/21/2024 Letter INSPECTION SUMMARY
05/21/2024 Letter INSPECTION SUMMARY
05/23/2024 Letter INSPECTION SUMMARY
05/29/2024 Letter INSPECTION SUMMARY
05/30/2024 Letter INSPECTION SUMMARY
05/31/2024 Letter INSPECTION SUMMARY
05/31/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter INSPECTION SUMMARY
06/18/2024 Letter INSPECTION SUMMARY
06/18/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
06/26/2024 Letter INSPECTION SUMMARY
07/01/2024 Letter INSPECTION SUMMARY
07/01/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/15/2024 Letter INSPECTION SUMMARY
07/15/2024 Letter INSPECTION SUMMARY
07/15/2024 Letter INSPECTION SUMMARY
07/15/2024 Letter INSPECTION SUMMARY
07/15/2024 Letter INSPECTION SUMMARY
07/16/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/23/2024 Letter INSPECTION SUMMARY
07/23/2024 Letter INSPECTION SUMMARY
07/26/2024 Letter INSPECTION SUMMARY
07/30/2024 Letter INSPECTION SUMMARY
07/30/2024 Letter INSPECTION SUMMARY
08/14/2024 Letter INSPECTION SUMMARY
08/15/2024 Letter INSPECTION SUMMARY
08/15/2024 Letter INSPECTION SUMMARY
08/15/2024 Letter INSPECTION SUMMARY
08/16/2024 Letter INSPECTION SUMMARY
08/20/2024 Letter INSPECTION SUMMARY
08/21/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter INSPECTION SUMMARY
08/23/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
09/04/2024 Letter INSPECTION SUMMARY
09/06/2024 Letter INSPECTION SUMMARY
09/10/2024 Letter INSPECTION SUMMARY
09/13/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/24/2024 Letter INSPECTION SUMMARY
09/24/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/26/2024 Discovery Park 1st passing water sample on Public and Private
09/30/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
10/07/2024 Discovery Park 2nd passing water sample Private and Public minus spot 3
11/12/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/19/2024 Letter INSPECTION SUMMARY
02/06/2025 Letter INSPECTION SUMMARY
02/11/2025 Letter INSPECTION SUMMARY
02/11/2025 Letter INSPECTION SUMMARY
02/14/2025 Letter INSPECTION SUMMARY
02/14/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/27/2025 Letter INSPECTION SUMMARY
03/11/2025 Letter INSPECTION SUMMARY
03/14/2025 Letter INSPECTION SUMMARY
03/19/2025 Letter INSPECTION SUMMARY
03/21/2025 Letter INSPECTION SUMMARY
03/24/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Discovery Park north phase 12 in sample 1 spot 1 and 2
04/18/2025 Discovery Park north phase 12 in sample 2 spot 1
04/18/2025 Discovery Park north phase 12 in sample 2 spot 2
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home