Permit Application Status

PRSUBD20230406


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20230406
Public Infrastructure
Substantial Completion
ENTRES DEVELOPMENT LLC
DEVELOPMENT COMPLETE
Orchard Woods - Final Plat. ESC & Mass Grading, Public Water, Sanitary Sewer, Streets & Storm.
01/30/2023
12/08/2023
Locations
Address
4000 NE APPLE GROVE DR, LEES SUMMIT, MO 64064

Address
4008 NE APPLE GROVE DR, LEES SUMMIT, MO 64064

Address
4012 NE APPLE GROVE DR, LEES SUMMIT, MO 64064

Address
4016 NE APPLE GROVE DR, LEES SUMMIT, MO 64064

Address
4020 NE APPLE GROVE DR, LEES SUMMIT, MO 64064

Address
4100 NE APPLE GROVE DR, LEES SUMMIT, MO 64064

Address
4104 NE APPLE GROVE DR, LEES SUMMIT, MO 64064

Address
4108 NE APPLE GROVE DR, LEES SUMMIT, MO 64064

Address
4112 NE APPLE GROVE DR, LEES SUMMIT, MO 64064

Address
4116 NE APPLE GROVE DR, LEES SUMMIT, MO 64064

Address
1200 NE PIEDMONT DR, LEES SUMMIT, MO 64064

Address
1204 NE PIEDMONT DR, LEES SUMMIT, MO 64064

Address
1208 NE PIEDMONT DR, LEES SUMMIT, MO 64064

Address
1212 NE PIEDMONT DR, LEES SUMMIT, MO 64064

Address
1216 NE PIEDMONT DR, LEES SUMMIT, MO 64064

Address
1217 NE PIEDMONT DR, LEES SUMMIT, MO 64064

Address
1213 NE PIEDMONT DR, LEES SUMMIT, MO 64064

Address
1209 NE PIEDMONT DR, LEES SUMMIT, MO 64064

Address
1205 NE PIEDMONT DR, LEES SUMMIT, MO 64064

Address
1201 NE PIEDMONT DR, LEES SUMMIT, MO 64064

Address
1200 NE APPLE GROVE CT, LEES SUMMIT, MO 64064

Address
1204 NE APPLE GROVE CT, LEES SUMMIT, MO 64064

Address
1208 NE APPLE GROVE CT, LEES SUMMIT, MO 64064

Address
1212 NE APPLE GROVE CT, LEES SUMMIT, MO 64064

Address
1216 NE APPLE GROVE CT, LEES SUMMIT, MO 64064

Address
1213 NE APPLE GROVE CT, LEES SUMMIT, MO 64064

Address
1209 NE APPLE GROVE CT, LEES SUMMIT, MO 64064

Address
1205 NE APPLE GROVE CT, LEES SUMMIT, MO 64064

Address
1201 NE APPLE GROVE CT, LEES SUMMIT, MO 64064

Address
1200 NE CIDER MILL DR, LEES SUMMIT, MO 64064

Address
4009 NE APPLE GROVE DR, LEES SUMMIT, MO 64064

Address
4005 NE APPLE GROVE DR, LEES SUMMIT, MO 64064

Address
4001 NE APPLE GROVE DR, LEES SUMMIT, MO 64064

Address
4120 NE APPLE GROVE DR, LEES SUMMIT, MO 64064

Property
43600232500000000

Property
43600232400000000

Property
43600232300000000

Property
43600232200000000

Property
43600232100000000

Property
43600232000000000

Property
43600231900000000

Property
43600231800000000

Property
43600231700000000

Property
43600231600000000

Property
43600232600000000

Property
43600231100000000

Property
43600231200000000

Property
43600231300000000

Property
43600231400000000

Property
43600231000000000

Property
43600430700000000

Property
43600430800000000

Property
43600430900000000

Property
43600430600000000

Property
43600430100000000

Property
43600430500000000

Property
43600430200000000

Property
43600430400000000

Property
43600430300000000

Property
43600231500000000

Property
43600431500000000

Property
43600431200000000

Property
43600431300000000

Property
43600431100000000

Property
43600431400000000

Property
43600431000000000

Property
43600530300000000

Property
43600530200000000

Property
43600530100000000

Address
4004 NE APPLE GROVE DR, LEES SUMMIT, MO 64064

Contacts
ENTRES DEVELOPMENT LLC, Address:424 NE BROCKTON DR  
Daniel Villanueva, Address:424 BROCKTON DR NE, Phone:(310) 760-6205  
Doug Ubben, Address:Phelps Engineering, Phone:(913) 393-1155  
Scott Ready, Phone: 8169691225  
JWM Development Contracting, LLC, Address:420 NE Brockton Dr, Phone:(913) 530-4205  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Record Drawing Review - Street/Storm Accepted 03/27/2024 03/25/2024
Sue Pyles, P.E.
Licensed Contractors Approved 02/01/2023
Scott Ready
Fees
Paid Fees Amount Paid Owing Date Paid
9110072-Water Test Fee $600.00 $600.00 Paid 06/09/2023
91100C9-Water Insp Fee $7,997.10 $7,997.10 Paid 06/09/2023
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 06/09/2023
91100C8-Sanitary Sewer Insp Fees $9,304.50 $9,304.50 Paid 06/09/2023
9110071-Site Grading Fee $5,699.96 $5,699.96 Paid 04/20/2023
9110068-Storm Sewer Inspection Fee $7,912.23 $7,912.23 Paid 12/08/2023
9110081-Paved Surface Inspection Fee $13,948.68 $13,948.68 Paid 12/08/2023
$13,948.68
9110071-Site Grading Fee $3,010.50 $3,010.50 Paid 12/08/2023
$8,710.46
9110069-After Hours Inspections (Public Works)(Per Hour) $1,170.00 $1,170.00 Paid 12/08/2023
Outstanding Fees Amount Paid Owing Date Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $1,550.00 $0.00 $1,550.00 Not Paid


$1,550.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Pavement-Curb Construction Pending
Misc
Informational
04/30/2024
1-4-24 NS Site visited and it appears work is done but some curbs will need to be replaced. I spray painted the ones that need to be replaced. 4-30-24 NS Site visited and it appears that curb has failed and the developer is out here today replacing them and they will pour them back.
Pavement-Aggregate Base Pending
Misc
Corrective Action Required
04/30/2024
1-4-24 NS Site visited and it appears some of the base has failed in part of the road and will need to be redone. 4-30-24 NS Site visited and construction crew has dug up all parts of road that have failed and will put asphalt back.
ESC - (Vegetation/Ground Cover) Pending
Misc
Corrective Action Required
02/24/2025
3-29-24 NS Site Visited and it appears that ground is covered 8-8-24 NS Site Visited and it appears that more grass seed is needed 10-31-24 NS Site Visited and grass is growing 12-13-24 NS Site Visited and grass has stopped growing since it is winter. 12-31-24 NS Site Visited and grass has stopped growing since it is winter. 1-10-25 NS Site Visited and grass has stopped growing since it is winter 1-16-25 NS Site Visited and grass has stopped growing since it is winter 1-24-25 NS Site Visited and grass has stopped growing since it is winter 2-3-25 NS Site Visited and grass has stopped growing since it is winter 2-10-25 NS Site Visited and grass has stopped growing since it is winter 2-17-25 NS Site Visited and grass has stopped growing since it is winter 2-24-25 NS Site Visited and grass has stopped growing since it is winter
Sidewalk Inspection Pending
Misc
Corrective Action Required
05/13/2025
11-27-23 NS Site visited this morning and sidewalk ADA where being poured and it appears that the ground was still frozen and the temp of the ground was 27 degrees F. I told the contactor he will need to teach out all ramps put in this morning. I also told him that it is his job to make sure there is a pre pour inspection done before he can pour. 1-4-24 NS Site visited and it appears that 4 sidewalk ADA ramps do not meet standard and will need to be replaced. I have marked with pink spray paint what needs to be tore out and replaced. 5-13-25 NS Site visited, and it appears sidewalks will need to be replaced because of it cracking.
Erosion Control Inspection Pending
Misc
Informational
05/14/2025
Orchard Woods/ water tower 5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up. 8-8-24 NS Site Visited and crew where putting up more erosion control on 8-7. It appears no problem from this rain so far. 8-22-24 NS Site Visited and no erosion control issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Clean out silt fence around job area clean the roads off of any dirt or debris Put grass seed down 10-31-24 NS Site Visited and still nothing has been done. 11-6-24 NS Site Visited and gutter buddies need to be cleaned out. 11-13-24 NS Site Visited and it appears grass seed has been put down 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues 3-08-25 NS Mud still is in the street 3-19-25 NS Drove by and had a guy cleaning up the mud 3-26-25 NS Mud is still on the street. I will contact developer 4-2-25 NS Went by and mud is still in road way 4-16-25 NS Mud has been cleaned up and I asked the developer to put down grass seed 4-24-25 NS Mud is back on the road. 4-29-25. 4-29-25 RH. Silt socks full and need replaced or cleaned out. Sift fence down along curbs. Mud over curbs needs cleaned. Seeding is needed. 5-14-25 NS Site visited and no work has been done.
Water Line - Coliform Test 1 Pending
Site Visit Pending 6/3/2025
Misc
Informational
05/28/2025
Orchard Woods 8-27-24 NS Site Visited crews are working on the building. 9-4-24 NS Site visited and it appears no work is being done. 9-17-24 NS Site visited and it appears no work is being done. 9-18-24 NS Site visited and gas is being put in. 9-19-24 NS Site visited gas is still working in development. 10-14-24 NS Site visited and Evergy is still working in the development. 11-8-24 NS no work being done but there is part of he road that has started sinking 11-21-24 NS Site visited no work being done. Talked to Jeff about putting more grass seed down and cleaning out the detention pond that has been cleaned out multiple times but every time it rains more mud falls into the detention pond. He is also going to more grass seed down in areas that he did not get covered. 11-25-24 NS Site visited no work being done. 12-13-24 NS Site Visited and crews are working on houses. 12-31-24 NS Site visited it appears no work due to rain. 1-31-25 NS Site visited crews are not working because of rain. The road is still sinking in a area and I have let everyone know. 2-28-25 NS Site visited and it appears no work is being done I showed Ryan on Monday the problem that has been accruing with the road and also the road needs to have the mud on the road to clean up. 5-21-25 NS Site visited and I notice that the development is cleaning up the erosion control and is fixing the problems that have been pointed out. 5-28-25 NS Site visited and the developer is on his property doing work around the erosion control.
Sanitary Sewer - Mandrel Pending 6/19/2025
Sanitary Sewer - Vacuum Pending 6/19/2025
Sanitary Sewer - Camera Test Pending 6/19/2025
Pavement-Surface Pending 6/19/2025
Misc
Informational
01/04/2024
1-4-24 NS Site visited and it appears that part of the road has failed and will need to be redone.
Install Street and Stop Signs Pending 6/19/2025
Misc
Informational
01/04/2024
1-4-24 NS Site visited and signs have been installed will need Jason to go out and inspect them.
Pavement-Stabilized Subgrade Pending 6/19/2025
Misc
Corrective Action Required
01/04/2024
1-4-24 NS Site visited and it appears that part of the subgrade failed and will need to be replaced.
Storm Sewer Construction Inspection Pending 6/19/2025
Misc
Informational
01/04/2024
1-4-24 NS Site visited and it appears work is done and passed.
Erosion Control Inspection Failed 05/16/2023
Misc
Corrective Action Required
05/16/2023
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott
Erosion Control Inspection Partial 05/19/2023
Misc
Corrective Action Required
05/16/2023
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC
Sanitary Sewer Construction Inspection Partial 07/11/2023
Misc
Informational
07/11/2023
7-11-23 NS Site visited and the crews yesterday dug up the exciting sewer stub. Then today they started working on Man Hole D-2 and laid about 100 foot of pipe.
Sanitary Sewer Construction Inspection Partial 7/12/2023 7/12/2023 07/12/2023
Misc
Informational
07/11/2023
7-11-23 NS Site visited and the crews yesterday dug up man hole D-1 sewer stub. Then today they started working on Man Hole A-1 and laid about 100 foot of pipe. 7-12-23 NS Site visited and the crews today dug and laid about 50 feet of pipe. From A-1 and the crew is about to set Man hole A-2. Also the crew is installing the private tie in stubs. the crew is going to bury them tonight before the rain hits. I stayed until 5pm
Sanitary Sewer Construction Inspection Partial 7/13/2023 7/13/2023 07/13/2023
Misc
Informational
07/12/2023
7-11-23 NS Site visited and the crews yesterday dug up man hole D-1 sewer stub. Then today they started working on Man Hole A-1 and laid about 100 foot of pipe. 7-12-23 NS Site visited and the crews today dug and laid about 50 feet of pipe. From A-1 and the crew is about to set Man hole A-2. Also the crew is installing the private tie in stubs. the crew is going to bury them tonight before the rain hits. I stayed until 5pm 7-13-23 NS Site visited the crews are working at A-2 manhole. The other crew is working on sewer to connect to D-2 Man hole. Crew is running into a lot of rock. Crew 2 put in D-2 and back filled Crew 1 only made it 100 feet until they started to hit major rock. I left the job at 4pm
Sanitary Sewer Construction Inspection Partial 07/14/2023
Misc
Informational
07/13/2023
7-11-23 NS Site visited and the crews yesterday dug up man hole D-1 sewer stub. Then today they started working on Man Hole A-1 and laid about 100 foot of pipe. 7-12-23 NS Site visited and the crews today dug and laid about 50 feet of pipe. From A-1 and the crew is about to set Man hole A-2. Also the crew is installing the private tie in stubs. the crew is going to bury them tonight before the rain hits. I stayed until 5pm 7-13-23 NS Site visited the crews are working at A-2 manhole. The other crew is working on sewer to connect to D-2 Man hole. Crew is running into a lot of rock. Crew 2 put in D-2 and back filled Crew 1 only made it 100 feet until they started to hit major rock. I left the job at 4pm 7-14-23 NS Site visited crew put in Man hole D-2 and about 50 feet of pipe then left before lunch.
Sanitary Sewer Construction Inspection Partial 7/17/2023 7/25/2023 07/25/2023
Misc
Informational
07/14/2023
7-11-23 NS Site visited and the crews yesterday dug up man hole D-1 sewer stub. Then today they started working on Man Hole A-1 and laid about 100 foot of pipe. 7-12-23 NS Site visited and the crews today dug and laid about 50 feet of pipe. From A-1 and the crew is about to set Man hole A-2. Also the crew is installing the private tie in stubs. the crew is going to bury them tonight before the rain hits. I stayed until 5pm 7-13-23 NS Site visited the crews are working at A-2 manhole. The other crew is working on sewer to connect to D-2 Man hole. Crew is running into a lot of rock. Crew 2 put in D-2 and back filled Crew 1 only made it 100 feet until they started to hit major rock. I left the job at 4pm 7-14-23 NS Site visited crew put in Man hole D-2 and about 50 feet of pipe then left before lunch. 7-17-23 NS Site visited and crews are working on sewer. 7-18-23 NS Site visited and the crews are working on sewer but are hitting rock. no pipe put in 7-19-23 NS Site visited and the crews are working on sewer but are hitting rock. No pipe installed 7-20-23 NS Site visited and the crews are working on sewer but are hitting rock. 1 stick installed 7-21-23 NS Site visited and the crews are not working because of rain. 7-24-23 NS Site visited and the crews are working on sewer but are hitting rock. 2 sticks and MH installed 7-25-23 NS Site visited and the crews are working on sewer but are hitting rock.
Sanitary Sewer Construction Inspection Partial 07/26/2023
Misc
Informational
07/25/2023
7-11-23 NS Site visited and the crews yesterday dug up man hole D-1 sewer stub. Then today they started working on Man Hole A-1 and laid about 100 foot of pipe. 7-12-23 NS Site visited and the crews today dug and laid about 50 feet of pipe. From A-1 and the crew is about to set Man hole A-2. Also the crew is installing the private tie in stubs. the crew is going to bury them tonight before the rain hits. I stayed until 5pm 7-13-23 NS Site visited the crews are working at A-2 manhole. The other crew is working on sewer to connect to D-2 Man hole. Crew is running into a lot of rock. Crew 2 put in D-2 and back filled Crew 1 only made it 100 feet until they started to hit major rock. I left the job at 4pm 7-14-23 NS Site visited crew put in Man hole D-2 and about 50 feet of pipe then left before lunch. 7-17-23 NS Site visited and crews are working on sewer. 7-18-23 NS Site visited and the crews are working on sewer but are hitting rock. no pipe put in 7-19-23 NS Site visited and the crews are working on sewer but are hitting rock. No pipe installed 7-20-23 NS Site visited and the crews are working on sewer but are hitting rock. 1 stick installed 7-21-23 NS Site visited and the crews are not working because of rain. 7-24-23 NS Site visited and the crews are working on sewer but are hitting rock. 2 sticks and MH installed 7-25-23 NS Site visited and the crews are working on sewer but are hitting rock. 7-26-23 NS Site visited and the crews are working on sewer they put in 300 feet of pipe today with out hitting rock.
Sanitary Sewer Construction Inspection Partial 07/27/2023
Misc
Informational
07/26/2023
7-11-23 NS Site visited and the crews yesterday dug up man hole D-1 sewer stub. Then today they started working on Man Hole A-1 and laid about 100 foot of pipe. 7-12-23 NS Site visited and the crews today dug and laid about 50 feet of pipe. From A-1 and the crew is about to set Man hole A-2. Also the crew is installing the private tie in stubs. the crew is going to bury them tonight before the rain hits. I stayed until 5pm 7-13-23 NS Site visited the crews are working at A-2 manhole. The other crew is working on sewer to connect to D-2 Man hole. Crew is running into a lot of rock. Crew 2 put in D-2 and back filled Crew 1 only made it 100 feet until they started to hit major rock. I left the job at 4pm 7-14-23 NS Site visited crew put in Man hole D-2 and about 50 feet of pipe then left before lunch. 7-17-23 NS Site visited and crews are working on sewer. 7-18-23 NS Site visited and the crews are working on sewer but are hitting rock. no pipe put in 7-19-23 NS Site visited and the crews are working on sewer but are hitting rock. No pipe installed 7-20-23 NS Site visited and the crews are working on sewer but are hitting rock. 1 stick installed 7-21-23 NS Site visited and the crews are not working because of rain. 7-24-23 NS Site visited and the crews are working on sewer but are hitting rock. 2 sticks and MH installed 7-25-23 NS Site visited and the crews are working on sewer but are hitting rock. 7-26-23 NS Site visited and the crews are working on sewer they put in 300 feet of pipe today with out hitting rock. 7-27-23 NS Site visited and the crews are working on sewer they put in 150 feet of pipe today with out hitting rock. Man Hole A-2 A-3 A-4 are put in the ground. with a 1% slope 7-31-23 NS Site visited workers are not working today since rain. 8-1-23 NS Site visited Crews are working on the sewer main that runs up to the cu-de-sac's.
Sanitary Sewer Construction Inspection Partial 08/07/2023
Misc
Informational
07/27/2023
7-11-23 NS Site visited and the crews yesterday dug up man hole D-1 sewer stub. Then today they started working on Man Hole A-1 and laid about 100 foot of pipe. 7-12-23 NS Site visited and the crews today dug and laid about 50 feet of pipe. From A-1 and the crew is about to set Man hole A-2. Also the crew is installing the private tie in stubs. the crew is going to bury them tonight before the rain hits. I stayed until 5pm 7-13-23 NS Site visited the crews are working at A-2 manhole. The other crew is working on sewer to connect to D-2 Man hole. Crew is running into a lot of rock. Crew 2 put in D-2 and back filled Crew 1 only made it 100 feet until they started to hit major rock. I left the job at 4pm 7-14-23 NS Site visited crew put in Man hole D-2 and about 50 feet of pipe then left before lunch. 7-17-23 NS Site visited and crews are working on sewer. 7-18-23 NS Site visited and the crews are working on sewer but are hitting rock. no pipe put in 7-19-23 NS Site visited and the crews are working on sewer but are hitting rock. No pipe installed 7-20-23 NS Site visited and the crews are working on sewer but are hitting rock. 1 stick installed 7-21-23 NS Site visited and the crews are not working because of rain. 7-24-23 NS Site visited and the crews are working on sewer but are hitting rock. 2 sticks and MH installed 7-25-23 NS Site visited and the crews are working on sewer but are hitting rock. 7-26-23 NS Site visited and the crews are working on sewer they put in 300 feet of pipe today with out hitting rock. 7-27-23 NS Site visited and the crews are working on sewer they put in 150 feet of pipe today with out hitting rock. Man Hole A-2 A-3 A-4 are put in the ground. with a 1% slope 7-31-23 NS Site visited workers are not working today since rain. 8-1-23 NS Site visited Crews are working on the sewer main that runs up to the cu-de-sac's. 8-2-23 NS Site Visited and crews are rained out 8-3-23 NS Site Visited and crews are rained out 8-4-23 NS Site Visited and crews are working on Cu-de-sac installed MH-6-1 and MH C-1 8-7-23 NS Site visited and the crews are from MH C-1 to MH C-2 8-8-23 NS Site visited and the crews worked on sewer stubs and are back filling MH C-1 to C-2 8-9-23 NS Site visited crews are not working because of rain 8-10-23 NS Site visited and crews are working on sewer stubs in the middle cu-de-sac. worked through lunch 8-14 NS Site visited crews worked on MH B-2 8-15 NS Site visited and crews finished sewer line and started pouring inverts into man hole.
Sanitary Sewer Construction Inspection Partial 8/17/2023 8/16/2023 08/17/2023
Misc
Informational
08/07/2023
7-11-23 NS Site visited and the crews yesterday dug up man hole D-1 sewer stub. Then today they started working on Man Hole A-1 and laid about 100 foot of pipe. 7-12-23 NS Site visited and the crews today dug and laid about 50 feet of pipe. From A-1 and the crew is about to set Man hole A-2. Also the crew is installing the private tie in stubs. the crew is going to bury them tonight before the rain hits. I stayed until 5pm 7-13-23 NS Site visited the crews are working at A-2 manhole. The other crew is working on sewer to connect to D-2 Man hole. Crew is running into a lot of rock. Crew 2 put in D-2 and back filled Crew 1 only made it 100 feet until they started to hit major rock. I left the job at 4pm 7-14-23 NS Site visited crew put in Man hole D-2 and about 50 feet of pipe then left before lunch. 7-17-23 NS Site visited and crews are working on sewer. 7-18-23 NS Site visited and the crews are working on sewer but are hitting rock. no pipe put in 7-19-23 NS Site visited and the crews are working on sewer but are hitting rock. No pipe installed 7-20-23 NS Site visited and the crews are working on sewer but are hitting rock. 1 stick installed 7-21-23 NS Site visited and the crews are not working because of rain. 7-24-23 NS Site visited and the crews are working on sewer but are hitting rock. 2 sticks and MH installed 7-25-23 NS Site visited and the crews are working on sewer but are hitting rock. 7-26-23 NS Site visited and the crews are working on sewer they put in 300 feet of pipe today with out hitting rock. 7-27-23 NS Site visited and the crews are working on sewer they put in 150 feet of pipe today with out hitting rock. Man Hole A-2 A-3 A-4 are put in the ground. with a 1% slope 7-31-23 NS Site visited workers are not working today since rain. 8-1-23 NS Site visited Crews are working on the sewer main that runs up to the cu-de-sac's. 8-2-23 NS Site Visited and crews are rained out 8-3-23 NS Site Visited and crews are rained out 8-4-23 NS Site Visited and crews are working on Cu-de-sac installed MH-6-1 and MH C-1 8-7-23 NS Site visited and the crews are from MH C-1 to MH C-2
Sanitary Sewer Construction Inspection Partial 8/17/2023 8/17/2023 08/17/2023
Misc
Informational
08/17/2023
7-11-23 NS Site visited and the crews yesterday dug up man hole D-1 sewer stub. Then today they started working on Man Hole A-1 and laid about 100 foot of pipe. 7-12-23 NS Site visited and the crews today dug and laid about 50 feet of pipe. From A-1 and the crew is about to set Man hole A-2. Also the crew is installing the private tie in stubs. the crew is going to bury them tonight before the rain hits. I stayed until 5pm 7-13-23 NS Site visited the crews are working at A-2 manhole. The other crew is working on sewer to connect to D-2 Man hole. Crew is running into a lot of rock. Crew 2 put in D-2 and back filled Crew 1 only made it 100 feet until they started to hit major rock. I left the job at 4pm 7-14-23 NS Site visited crew put in Man hole D-2 and about 50 feet of pipe then left before lunch. 7-17-23 NS Site visited and crews are working on sewer. 7-18-23 NS Site visited and the crews are working on sewer but are hitting rock. no pipe put in 7-19-23 NS Site visited and the crews are working on sewer but are hitting rock. No pipe installed 7-20-23 NS Site visited and the crews are working on sewer but are hitting rock. 1 stick installed 7-21-23 NS Site visited and the crews are not working because of rain. 7-24-23 NS Site visited and the crews are working on sewer but are hitting rock. 2 sticks and MH installed 7-25-23 NS Site visited and the crews are working on sewer but are hitting rock. 7-26-23 NS Site visited and the crews are working on sewer they put in 300 feet of pipe today with out hitting rock. 7-27-23 NS Site visited and the crews are working on sewer they put in 150 feet of pipe today with out hitting rock. Man Hole A-2 A-3 A-4 are put in the ground. with a 1% slope 7-31-23 NS Site visited workers are not working today since rain. 8-1-23 NS Site visited Crews are working on the sewer main that runs up to the cu-de-sac's. 8-2-23 NS Site Visited and crews are rained out 8-3-23 NS Site Visited and crews are rained out 8-4-23 NS Site Visited and crews are working on Cu-de-sac installed MH-6-1 and MH C-1 8-7-23 NS Site visited and the crews are from MH C-1 to MH C-2 8-8-23 NS Site visited and the crews worked on sewer stubs and are back filling MH C-1 to C-2 8-9-23 NS Site visited crews are not working because of rain 8-10-23 NS Site visited and crews are working on sewer stubs in the middle cu-de-sac. worked through lunch 8-14 NS Site visited crews worked on MH B-2 8-15 NS Site visited and crews finished sewer line and started pouring inverts into man hole. 8-17-23 NS Site visited and crews started to work on Sewer line B
Sanitary Sewer Construction Inspection Partial 8/18/2023 8/18/2023 08/18/2023
Misc
Informational
08/17/2023
7-11-23 NS Site visited and the crews yesterday dug up man hole D-1 sewer stub. Then today they started working on Man Hole A-1 and laid about 100 foot of pipe. 7-12-23 NS Site visited and the crews today dug and laid about 50 feet of pipe. From A-1 and the crew is about to set Man hole A-2. Also the crew is installing the private tie in stubs. the crew is going to bury them tonight before the rain hits. I stayed until 5pm 7-13-23 NS Site visited the crews are working at A-2 manhole. The other crew is working on sewer to connect to D-2 Man hole. Crew is running into a lot of rock. Crew 2 put in D-2 and back filled Crew 1 only made it 100 feet until they started to hit major rock. I left the job at 4pm 7-14-23 NS Site visited crew put in Man hole D-2 and about 50 feet of pipe then left before lunch. 7-17-23 NS Site visited and crews are working on sewer. 7-18-23 NS Site visited and the crews are working on sewer but are hitting rock. no pipe put in 7-19-23 NS Site visited and the crews are working on sewer but are hitting rock. No pipe installed 7-20-23 NS Site visited and the crews are working on sewer but are hitting rock. 1 stick installed 7-21-23 NS Site visited and the crews are not working because of rain. 7-24-23 NS Site visited and the crews are working on sewer but are hitting rock. 2 sticks and MH installed 7-25-23 NS Site visited and the crews are working on sewer but are hitting rock. 7-26-23 NS Site visited and the crews are working on sewer they put in 300 feet of pipe today with out hitting rock. 7-27-23 NS Site visited and the crews are working on sewer they put in 150 feet of pipe today with out hitting rock. Man Hole A-2 A-3 A-4 are put in the ground. with a 1% slope 7-31-23 NS Site visited workers are not working today since rain. 8-1-23 NS Site visited Crews are working on the sewer main that runs up to the cu-de-sac's. 8-2-23 NS Site Visited and crews are rained out 8-3-23 NS Site Visited and crews are rained out 8-4-23 NS Site Visited and crews are working on Cu-de-sac installed MH-6-1 and MH C-1 8-7-23 NS Site visited and the crews are from MH C-1 to MH C-2 8-8-23 NS Site visited and the crews worked on sewer stubs and are back filling MH C-1 to C-2 8-9-23 NS Site visited crews are not working because of rain 8-10-23 NS Site visited and crews are working on sewer stubs in the middle cu-de-sac. worked through lunch 8-14 NS Site visited crews worked on MH B-2 8-15 NS Site visited and crews finished sewer line and started pouring inverts into man hole. 8-17-23 NS Site visited and crews started to work on Sewer line B 8-18-23 NS Site visited and the crews are working on finding utilities for the water bore to be put in place crossing Lakewood way 8-21-23 NS Site visited crews are working on Sewer line B put in 100 feet 8-22-23 NS Site visited Crews are working on sewer B but have come into water 8-23-23 NS Site visited Crews have installed 150 feet 8-24-23 NS Site visited crews are working on the last of Sewer line B and they should be done today. 8-28-23 NS Site visited and crews are working on final sewer that ties into the main. 8-29-23 NS Site visited and the crews are working on sewer stubs for line B. The second to last sewer stub can not make 30 degrees on the Y I contacted Brent with the water department to ask the question and I am waiting for a response. 8-30-23 NS Site visited and the crews figured out the Y and put it at 35 degrees. Sewer is complete and the 30 days till the test starts today and September 29th they can start on sewer testing.
Water Line - Construction Inspection Partial 08/18/2023
Misc
Informational
08/18/2023
8-18-23 NS Site visited and the crews are working on finding utilities for the water bore to be put in place crossing Lakewood way
Storm Sewer Construction Inspection Partial 08/24/2023
Misc
Informational
08/24/2023
8-21-23 NS Trucks have started hauling in storm water supplies. 8-22-23 NS Trucks have started hauling storm water supplies 8-23-23 Site visited and crews have not touched the supplies until the sewer is complete.
Storm Sewer Construction Inspection Partial 9/6/2023 9/6/2023 09/05/2023
Misc
Informational
08/24/2023
8-21-23 NS Trucks have started hauling in storm water supplies. 8-22-23 NS Trucks have started hauling storm water supplies 8-23-23 Site visited and crews have not touched the supplies until the sewer is complete. 8-31-23 Crews will be starting on storm water today 9-5-23 NS Crews started today on storm water installation 929.94 to 930.63 9-6-23 NS Crews worked on storm water installation of 930.10 930.75 9-7-23 NS Crews worked on storm water installation of 934.55 938.55 9-8-23 NS Crews worked on storm water installation of 939.10 939.09 9-11-23 NS Crews worked collars around storm boxes 9-12-23 NS Crews worked collars around storm boxes 9-13-23 NS Crews worked collars around storm boxes 9-14-23 NS Crews worked on storm water installation of 947.68 944.07 9-15-23 NS Crews worked on storm water installation of 951.26 954.28 9-18-23 NS Crews worked collars around storm boxes the crew also had a 3rd part tester out there testing the dirt 9-19-23 NS Crews worked collars around storm boxes the crew also had a 3rd part tester out there testing the dirt
Site Visit Partial 09/14/2023
Misc
Informational
09/14/2023
9-14-26 A.A Visited with contractor. The are pouring inverts on storm today. 12-14-23 Dustin A. working on pond
Site Visit Complete 9/14/2023 9/14/2023 09/14/2023
Misc
Informational
09/14/2023
9-14-26 A.A Visited with contractor. The are pouring inverts on storm today. 1-16-24 Dustin A, No activity due to weather
Water Line - Construction Inspection Partial 8/21/2023 8/21/2023 09/19/2023
Misc
Informational
08/18/2023
8-18-23 NS Site visited and the crews are working on finding utilities for the water bore to be put in place crossing Lakewood way 9-19-23 NS site visited and the crew are digging up the water line and it appears that they could not find the watermain and stopped until water is out there to help locate the main.
Water Line - Construction Inspection Partial 09/20/2023
Misc
Informational
09/19/2023
8-18-23 NS Site visited and the crews are working on finding utilities for the water bore to be put in place crossing Lakewood way 9-19-23 NS site visited and the crew are digging up the water line and it appears that they could not find the watermain and stopped until water is out there to help locate the main. 9-20-23 NS Site visited and crews started on water line 1 and 2 they put in 4 water valves.
Sanitary Sewer Construction Inspection Partial 9/27/2023 9/27/2023 09/27/2023
Misc
Informational
08/18/2023
7-11-23 NS Site visited and the crews yesterday dug up man hole D-1 sewer stub. Then today they started working on Man Hole A-1 and laid about 100 foot of pipe. 7-12-23 NS Site visited and the crews today dug and laid about 50 feet of pipe. From A-1 and the crew is about to set Man hole A-2. Also the crew is installing the private tie in stubs. the crew is going to bury them tonight before the rain hits. I stayed until 5pm 7-13-23 NS Site visited the crews are working at A-2 manhole. The other crew is working on sewer to connect to D-2 Man hole. Crew is running into a lot of rock. Crew 2 put in D-2 and back filled Crew 1 only made it 100 feet until they started to hit major rock. I left the job at 4pm 7-14-23 NS Site visited crew put in Man hole D-2 and about 50 feet of pipe then left before lunch. 7-17-23 NS Site visited and crews are working on sewer. 7-18-23 NS Site visited and the crews are working on sewer but are hitting rock. no pipe put in 7-19-23 NS Site visited and the crews are working on sewer but are hitting rock. No pipe installed 7-20-23 NS Site visited and the crews are working on sewer but are hitting rock. 1 stick installed 7-21-23 NS Site visited and the crews are not working because of rain. 7-24-23 NS Site visited and the crews are working on sewer but are hitting rock. 2 sticks and MH installed 7-25-23 NS Site visited and the crews are working on sewer but are hitting rock. 7-26-23 NS Site visited and the crews are working on sewer they put in 300 feet of pipe today with out hitting rock. 7-27-23 NS Site visited and the crews are working on sewer they put in 150 feet of pipe today with out hitting rock. Man Hole A-2 A-3 A-4 are put in the ground. with a 1% slope 7-31-23 NS Site visited workers are not working today since rain. 8-1-23 NS Site visited Crews are working on the sewer main that runs up to the cu-de-sac's. 8-2-23 NS Site Visited and crews are rained out 8-3-23 NS Site Visited and crews are rained out 8-4-23 NS Site Visited and crews are working on Cu-de-sac installed MH-6-1 and MH C-1 8-7-23 NS Site visited and the crews are from MH C-1 to MH C-2 8-8-23 NS Site visited and the crews worked on sewer stubs and are back filling MH C-1 to C-2 8-9-23 NS Site visited crews are not working because of rain 8-10-23 NS Site visited and crews are working on sewer stubs in the middle cu-de-sac. worked through lunch 8-14 NS Site visited crews worked on MH B-2 8-15 NS Site visited and crews finished sewer line and started pouring inverts into man hole. 8-17-23 NS Site visited and crews started to work on Sewer line B 8-18-23 NS Site visited and the crews are working on finding utilities for the water bore to be put in place crossing Lakewood way 9-27-23 DP. Crew is conducting their own sewer testing in preparation for official testing that will be conducted next week.
Water Line - Construction Inspection Partial 10/09/2023
Misc
Informational
09/20/2023
8-18-23 NS Site visited and the crews are working on finding utilities for the water bore to be put in place crossing Lakewood way 9-19-23 NS site visited and the crew are digging up the water line and it appears that they could not find the watermain and stopped until water is out there to help locate the main. 9-20-23 NS Site visited and crews started on water line 1 and 2 they put in 4 water valves. 9-21-23 NS Site visited and crew is working on water main 9-22-23 NS Site visited and crew is working on water main 9-25-23 NS Site visited and crew is working on water main 9-26-23 NS Site visited and crew is working on water main 10-2-23 NS Site visited and crew is pouring kicker blocks 10-3-23 NS Site visited and crew is working on water main 10-4-23 NS Site visited and crew is working on water main 10-5-23 NS Site visited and crew is working on water main 10-6-23 NS Site visited and crew is pouring kicker blocks 10-9-23 NS Site visited and crew is complete with water mains and is going to start working on mains that tie into mains that are existing
Sanitary Sewer Construction Inspection Partial 10/16/2023
Misc
Informational
09/27/2023
7-11-23 NS Site visited and the crews yesterday dug up man hole D-1 sewer stub. Then today they started working on Man Hole A-1 and laid about 100 foot of pipe. 7-12-23 NS Site visited and the crews today dug and laid about 50 feet of pipe. From A-1 and the crew is about to set Man hole A-2. Also the crew is installing the private tie in stubs. the crew is going to bury them tonight before the rain hits. I stayed until 5pm 7-13-23 NS Site visited the crews are working at A-2 manhole. The other crew is working on sewer to connect to D-2 Man hole. Crew is running into a lot of rock. Crew 2 put in D-2 and back filled Crew 1 only made it 100 feet until they started to hit major rock. I left the job at 4pm 7-14-23 NS Site visited crew put in Man hole D-2 and about 50 feet of pipe then left before lunch. 7-17-23 NS Site visited and crews are working on sewer. 7-18-23 NS Site visited and the crews are working on sewer but are hitting rock. no pipe put in 7-19-23 NS Site visited and the crews are working on sewer but are hitting rock. No pipe installed 7-20-23 NS Site visited and the crews are working on sewer but are hitting rock. 1 stick installed 7-21-23 NS Site visited and the crews are not working because of rain. 7-24-23 NS Site visited and the crews are working on sewer but are hitting rock. 2 sticks and MH installed 7-25-23 NS Site visited and the crews are working on sewer but are hitting rock. 7-26-23 NS Site visited and the crews are working on sewer they put in 300 feet of pipe today with out hitting rock. 7-27-23 NS Site visited and the crews are working on sewer they put in 150 feet of pipe today with out hitting rock. Man Hole A-2 A-3 A-4 are put in the ground. with a 1% slope 7-31-23 NS Site visited workers are not working today since rain. 8-1-23 NS Site visited Crews are working on the sewer main that runs up to the cu-de-sac's. 8-2-23 NS Site Visited and crews are rained out 8-3-23 NS Site Visited and crews are rained out 8-4-23 NS Site Visited and crews are working on Cu-de-sac installed MH-6-1 and MH C-1 8-7-23 NS Site visited and the crews are from MH C-1 to MH C-2 8-8-23 NS Site visited and the crews worked on sewer stubs and are back filling MH C-1 to C-2 8-9-23 NS Site visited crews are not working because of rain 8-10-23 NS Site visited and crews are working on sewer stubs in the middle cu-de-sac. worked through lunch 8-14 NS Site visited crews worked on MH B-2 8-15 NS Site visited and crews finished sewer line and started pouring inverts into man hole. 8-17-23 NS Site visited and crews started to work on Sewer line B 8-18-23 NS Site visited and the crews are working on finding utilities for the water bore to be put in place crossing Lakewood way 9-27-23 DP. Crew is conducting their own sewer testing in preparation for official testing that will be conducted next week. 10-12-23 NS Site visited and crew is doing sewer testing 10-13-23 NS Site visited and crew is doing sewer testing 10-16-23 NS Crew is done today doing sewer testing all of the man holes and pipes passed the vacuumed test and mandrill test. Water came out and check the man holes and only two did not pass because of trash and the one man hole does not have the correct cover.
Pavement-Proof Roll Partial 10/20/2023
Misc
Corrective Action Required
10/20/2023
10-20-23 Site visited and did the north side of road for proof roll and it failed around the man holes I am having them re dig it up and recompact it. Monday 10-23 they are doing another proof roll before they pave asphalt.
Pavement-Proof Roll Passed 10/23/2023
Misc
Corrective Action Required
10/20/2023
10-20-23 Site visited and did the north side of road for proof roll and it failed around the man holes I am having them re dig it up and recompact it. Monday 10-23 they are doing another proof roll before they pave asphalt. 10-23-23 Site visited for a proof roll everything passed after compacting around man holes. two man holes B-1 and C-1 will have to be dug back up and lowered or raised to meet ada standards and I will have them pour concrete around the man hole.
Pavement-Aggregate Base Passed 10/23/2023
Misc
Informational
10/23/2023
10-23-23 Site visited and crews showed up to put base down and they completed it today. There are two man holes that will have to be re dug up and Raised or Lowered to meet ADA standards. B-1 and C-1 tomorrow they will start on surface.
Erosion Control Inspection Failed 10/25/2023
Misc
Corrective Action Required
05/19/2023
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today.
Pavement-Aggregate Base Partial 10/26/2023 10/26/2023 10/26/2023
MISC
Corrective Action Required
10/26/2023
10-26-23 NS Site visited and it appears that road has failed because of compaction where the contractor did not compact. I did a proof roll but we could not get a dump truck in between the man hole and curb. I told the contractor to use the hand tamper. Contractor will have to go back cut out put flow able fill and concrete up the rest. 11-1-23 NS Site visited and crew poured flow-able-fill around 3 man holes 11-2-23 Ns site visited and crews are pouring concrete today around man holes.
Water Line - Coliform Test 1 Partial 10/31/2023
Misc
Informational
10/31/2023
10-31-23 NS Site visited and talked to the Forman and the pipe was chlorinated on 10-26-23 and they are going to put more in because the last part of the line does not have enough chlorine in it.
Sidewalk Inspection Partial 11/27/2023
Misc
Corrective Action Required
11/27/2023
11-27-23 NS Site visited this morning and sidewalk ADA where being poured and it appears that the ground was still frozen and the temp of the ground was 27 degrees F. I told the contactor he will need to teach out all ramps put in this morning. I also told him that it is his job to make sure there is a pre pour inspection done before he can pour.
Erosion Control Inspection Partial 12/18/2023 12/18/2023
Misc
Corrective Action Required
10/25/2023
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 12/20/2023 12/20/2023
Misc
Corrective Action Required
12/18/2023
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 12/22/2023 12/22/2023
Misc
Corrective Action Required
12/20/2023
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 12/28/2023 12/28/2023
Misc
Corrective Action Required
12/22/2023
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 1/2/2024 01/03/2024
Misc
Informational
01/03/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues
Storm Sewer Construction Inspection Partial 9/6/2023 1/4/2024 01/04/2024
Misc
Informational
09/05/2023
8-21-23 NS Trucks have started hauling in storm water supplies. 8-22-23 NS Trucks have started hauling storm water supplies 8-23-23 Site visited and crews have not touched the supplies until the sewer is complete. 8-31-23 Crews will be starting on storm water today 9-5-23 NS Crews started today on storm water installation 929.94 to 930.63 1-4-24 NS Site visited and it appears all storm has been installed and will go and look to check if storm boxes are clean
Water Line - Construction Inspection Passed 10/10/2023 1/4/2024 01/04/2024
Misc
Informational
10/09/2023
8-18-23 NS Site visited and the crews are working on finding utilities for the water bore to be put in place crossing Lakewood way 9-19-23 NS site visited and the crew are digging up the water line and it appears that they could not find the watermain and stopped until water is out there to help locate the main. 9-20-23 NS Site visited and crews started on water line 1 and 2 they put in 4 water valves. 9-21-23 NS Site visited and crew is working on water main 9-22-23 NS Site visited and crew is working on water main 9-25-23 NS Site visited and crew is working on water main 9-26-23 NS Site visited and crew is working on water main 10-2-23 NS Site visited and crew is pouring kicker blocks 10-3-23 NS Site visited and crew is working on water main 10-4-23 NS Site visited and crew is working on water main 10-5-23 NS Site visited and crew is working on water main 10-6-23 NS Site visited and crew is pouring kicker blocks 10-9-23 NS Site visited and crew is complete with water mains and is going to start working on mains that tie into mains that are existing 1-4-24 NS Site visited and it appears work is done and passed.
Sanitary Sewer Construction Inspection Passed 1/4/2024 01/04/2024
Misc
Informational
10/16/2023
7-11-23 NS Site visited and the crews yesterday dug up man hole D-1 sewer stub. Then today they started working on Man Hole A-1 and laid about 100 foot of pipe. 7-12-23 NS Site visited and the crews today dug and laid about 50 feet of pipe. From A-1 and the crew is about to set Man hole A-2. Also the crew is installing the private tie in stubs. the crew is going to bury them tonight before the rain hits. I stayed until 5pm 7-13-23 NS Site visited the crews are working at A-2 manhole. The other crew is working on sewer to connect to D-2 Man hole. Crew is running into a lot of rock. Crew 2 put in D-2 and back filled Crew 1 only made it 100 feet until they started to hit major rock. I left the job at 4pm 7-14-23 NS Site visited crew put in Man hole D-2 and about 50 feet of pipe then left before lunch. 7-17-23 NS Site visited and crews are working on sewer. 7-18-23 NS Site visited and the crews are working on sewer but are hitting rock. no pipe put in 7-19-23 NS Site visited and the crews are working on sewer but are hitting rock. No pipe installed 7-20-23 NS Site visited and the crews are working on sewer but are hitting rock. 1 stick installed 7-21-23 NS Site visited and the crews are not working because of rain. 7-24-23 NS Site visited and the crews are working on sewer but are hitting rock. 2 sticks and MH installed 7-25-23 NS Site visited and the crews are working on sewer but are hitting rock. 7-26-23 NS Site visited and the crews are working on sewer they put in 300 feet of pipe today with out hitting rock. 7-27-23 NS Site visited and the crews are working on sewer they put in 150 feet of pipe today with out hitting rock. Man Hole A-2 A-3 A-4 are put in the ground. with a 1% slope 7-31-23 NS Site visited workers are not working today since rain. 8-1-23 NS Site visited Crews are working on the sewer main that runs up to the cu-de-sac's. 8-2-23 NS Site Visited and crews are rained out 8-3-23 NS Site Visited and crews are rained out 8-4-23 NS Site Visited and crews are working on Cu-de-sac installed MH-6-1 and MH C-1 8-7-23 NS Site visited and the crews are from MH C-1 to MH C-2 8-8-23 NS Site visited and the crews worked on sewer stubs and are back filling MH C-1 to C-2 8-9-23 NS Site visited crews are not working because of rain 8-10-23 NS Site visited and crews are working on sewer stubs in the middle cu-de-sac. worked through lunch 8-14 NS Site visited crews worked on MH B-2 8-15 NS Site visited and crews finished sewer line and started pouring inverts into man hole. 8-17-23 NS Site visited and crews started to work on Sewer line B 8-18-23 NS Site visited and the crews are working on finding utilities for the water bore to be put in place crossing Lakewood way 9-27-23 DP. Crew is conducting their own sewer testing in preparation for official testing that will be conducted next week. 10-12-23 NS Site visited and crew is doing sewer testing 10-13-23 NS Site visited and crew is doing sewer testing 10-16-23 NS Crew is done today doing sewer testing all of the man holes and pipes passed the vacuumed test and mandrill test. Water came out and check the man holes and only two did not pass because of trash and the one man hole does not have the correct cover. 1-4-24 NS Site visited and it appears work is done and passed.
Pavement-Aggregate Base Partial 1/4/2024 01/04/2024
MISC
Corrective Action Required
10/26/2023
10-26-23 NS Site visited and it appears that road has failed because of compaction where the contractor did not compact. I did a proof roll but we could not get a dump truck in between the man hole and curb. I told the contractor to use the hand tamper. Contractor will have to go back cut out put flow able fill and concrete up the rest. 1-4-24 NS Site visited and it appears that part of the road has fail and will need to be re done all the way across with concrete and a 2 inch asphalt cap.
Water Line - Coliform Test 1 Passed 1/4/2024 01/04/2024
Misc
Informational
10/31/2023
10-31-23 NS Site visited and talked to the Forman and the pipe was chlorinated on 10-26-23 and they are going to put more in because the last part of the line does not have enough chlorine in it. 1-4-24 NS Site visited and test have passed.
Sidewalk Inspection Partial 1/4/2024 01/04/2024
Misc
Corrective Action Required
11/27/2023
11-27-23 NS Site visited this morning and sidewalk ADA where being poured and it appears that the ground was still frozen and the temp of the ground was 27 degrees F. I told the contactor he will need to teach out all ramps put in this morning. I also told him that it is his job to make sure there is a pre pour inspection done before he can pour. 1-4-24 NS Site visited and it appears that 4 sidewalk ADA ramps do not meet standard and will need to be replaced. I have marked with pink spray paint what needs to be tore out and replaced.
Sanitary - Material Verification Passed 1/4/2024 01/04/2024
Misc
Informational
01/04/2024
1-4-24 NS Site visited and it appears work is done and passed.
Sanitary Sewer Construction Inspection Passed 1/4/2024 01/04/2024
Misc
Informational
01/04/2024
1-4-24 NS Site visited and it appears work is done and passed.
Sanitary Sewer - Air Test Passed 1/4/2024 01/04/2024
Misc
Informational
01/04/2024
1-4-24 NS Site visited and it appears work is done and passed.
Sanitary Sewer - Mandrel Passed 1/4/2024 01/04/2024
Misc
Informational
01/04/2024
1-4-24 NS Site visited and it appears work is done and passed.
Sanitary Sewer - Vacuum Passed 1/4/2024 01/04/2024
Misc
Informational
01/04/2024
1-4-24 NS Site visited and it appears work is done and passed.
Grading/Excavation/Fill Inspection Partial 1/4/2024 01/04/2024
Misc
Informational
01/04/2024
1-4-24 NS Site visited and it appears work is done and passed.
Pavement-Surface Partial 1/4/2024 01/04/2024
Misc
Informational
01/04/2024
1-4-24 NS Site visited and it appears that part of the road has failed and will need to be redone.
Pavement-Aggregate Base Partial 1/4/2024 01/04/2024
Misc
Corrective Action Required
01/04/2024
1-4-24 NS Site visited and it appears some of the base has failed in part of the road and will need to be redone.
Install Street and Stop Signs Partial 1/4/2024 01/04/2024
Misc
Informational
01/04/2024
1-4-24 NS Site visited and signs have been installed will need Jason to go out and inspect them.
Pavement-Curb Construction Partial 1/4/2024 01/04/2024
Misc
Informational
01/04/2024
1-4-24 NS Site visited and it appears work is done but some curbs will need to be replaced. I spray painted the ones that need to be replaced.
Pavement-Stabilized Subgrade Partial 1/4/2024 01/04/2024
Misc
Corrective Action Required
01/04/2024
1-4-24 NS Site visited and it appears that part of the subgrade failed and will need to be replaced.
Storm Sewer Construction Inspection Passed 1/4/2024 01/04/2024
Misc
Informational
01/04/2024
1-4-24 NS Site visited and it appears work is done and passed.
Erosion Control Inspection Partial 1/23/2024 01/23/2024
Misc
Informational
01/03/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 2/28/2024 02/28/2024
Misc
Informational
01/23/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues
Site Visit Partial 3/6/2024 3/6/2024 03/06/2024
Misc
Informational
03/06/2024
3-6-24 PS No activity on site
Site Visit Partial 3/8/2024 3/8/2024 03/08/2024
Misc
Informational
03/06/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site
Erosion Control Inspection Partial 3/29/2024 03/29/2024
Misc
Informational
02/28/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues
ESC - (Vegetation/Ground Cover) Partial 3/29/2024 03/29/2024
Misc
Informational
03/29/2024
3-29-24 NS Site Visited and it appears that ground is covered
Grading/Excavation/Fill Inspection Passed 3/29/2024 03/29/2024
Misc
Informational
01/04/2024
1-4-24 NS Site visited and it appears work is done and passed.
Erosion Control Inspection Partial 4/18/2024 04/18/2024
Misc
Informational
03/29/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues
Pavement-Curb Construction Partial 04/30/2024
Misc
Informational
01/04/2024
1-4-24 NS Site visited and it appears work is done but some curbs will need to be replaced. I spray painted the ones that need to be replaced. 4-30-24 NS Site visited and it appears that curb has failed and the developer is out here today replacing them and they will pour them back.
Pavement-Aggregate Base Partial 04/30/2024
Misc
Corrective Action Required
01/04/2024
1-4-24 NS Site visited and it appears some of the base has failed in part of the road and will need to be redone. 4-30-24 NS Site visited and construction crew has dug up all parts of road that have failed and will put asphalt back.
Erosion Control Inspection Partial 4/30/2024 04/30/2024
Misc
Informational
04/18/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 6/28/2024 06/28/2024
Misc
Informational
04/30/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed.
Site Visit Partial 7/19/2024 7/19/2024 07/19/2024
Misc
Informational
03/08/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site 7-19-24 Dustin A, no work out here for us.
Site Visit Partial 7/22/2024 7/22/2024 07/22/2024
Misc
Informational
07/19/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site 7-19-24 Dustin A, no work out here for us. 7-22-24 Dustin A, no work on site
Erosion Control Inspection Partial 7/25/2024 07/25/2024
Misc
Informational
06/28/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up.
Erosion Control Inspection Partial 8/6/2024 08/06/2024
Misc
Informational
07/25/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up.
Site Visit Partial 8/8/2024 08/08/2024
Misc
Informational
07/22/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site 7-19-24 Dustin A, no work out here for us. 7-22-24 Dustin A, no work on site 8-8-24 NS Site Visited and no one is working due to rain.
ESC - (Vegetation/Ground Cover) Partial 8/8/2024 08/08/2024
Misc
Corrective Action Required
08/08/2024
3-29-24 NS Site Visited and it appears that ground is covered 8-8-24 NS Site Visited and it appears that more grass seed is needed
Erosion Control Inspection Partial 8/8/2024 08/08/2024
Misc
Informational
08/06/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up. 8-8-24 NS Site Visited and crew where putting up more erosion control on 8-7. It appears no problem from this rain so far.
Site Visit Partial 8/19/2024 8/19/2024 08/19/2024
Misc
Informational
08/19/2024
8-19-24 Dustin A no work for us, trimming weeds along silt fence
Erosion Control Inspection Partial 8/22/2024 08/22/2024
Misc
Informational
08/08/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up. 8-8-24 NS Site Visited and crew where putting up more erosion control on 8-7. It appears no problem from this rain so far. 8-22-24 NS Site Visited and no erosion control issues
Site Visit Partial 8/27/2024 08/27/2024
Misc
Informational
08/08/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site 7-19-24 Dustin A, no work out here for us. 7-22-24 Dustin A, no work on site 8-8-24 NS Site Visited and no one is working due to rain. 8-27-24 NS Site Visited no work being done.
Site Visit Partial 8/27/2024 08/27/2024
Misc
Informational
08/27/2024
8-27-24 NS Site Visited crews are working on the building.
Site Visit Partial 9/4/2024 09/04/2024
Misc
Informational
08/27/2024
8-27-24 NS Site Visited crews are working on the building. 9-4-24 NS Site visited and it appears no work is being done.
Site Visit Partial 9/17/2024 09/17/2024
Misc
Informational
09/04/2024
8-27-24 NS Site Visited crews are working on the building. 9-4-24 NS Site visited and it appears no work is being done. 9-17-24 NS Site visited and it appears no work is being done.
Site Visit Partial 9/18/2024 09/18/2024
Misc
Informational
09/17/2024
8-27-24 NS Site Visited crews are working on the building. 9-4-24 NS Site visited and it appears no work is being done. 9-17-24 NS Site visited and it appears no work is being done. 9-18-24 NS Site visited and gas is being put in.
Site Visit Partial 9/19/2024 09/19/2024
Misc
Informational
09/18/2024
Orchard Woods 8-27-24 NS Site Visited crews are working on the building. 9-4-24 NS Site visited and it appears no work is being done. 9-17-24 NS Site visited and it appears no work is being done. 9-18-24 NS Site visited and gas is being put in. 9-19-24 NS Site visited gas is still working in development.
Erosion Control Inspection Partial 9/30/2024 09/30/2024
Misc
Informational
08/22/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up. 8-8-24 NS Site Visited and crew where putting up more erosion control on 8-7. It appears no problem from this rain so far. 8-22-24 NS Site Visited and no erosion control issues 9-30-24 NS Site Visited and no erosion control issues
Erosion Control Inspection Failed 10/11/2024 10/14/2024
Misc
Informational
09/30/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up. 8-8-24 NS Site Visited and crew where putting up more erosion control on 8-7. It appears no problem from this rain so far. 8-22-24 NS Site Visited and no erosion control issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Clean out silt fence around job area clean the roads off of any dirt or debris Put grass seed down
Site Visit Partial 10/10/2024 10/14/2024
Misc
Informational
09/19/2024
Orchard Woods 8-27-24 NS Site Visited crews are working on the building. 9-4-24 NS Site visited and it appears no work is being done. 9-17-24 NS Site visited and it appears no work is being done. 9-18-24 NS Site visited and gas is being put in. 9-19-24 NS Site visited gas is still working in development. 10-14-24 NS Site visited and Evergy is still working in the development.
ESC - (Vegetation/Ground Cover) Partial 10/31/2024 10/31/2024
Misc
Corrective Action Required
08/08/2024
3-29-24 NS Site Visited and it appears that ground is covered 8-8-24 NS Site Visited and it appears that more grass seed is needed 10-31-24 NS Site Visited and grass is growing
Erosion Control Inspection Partial 10/31/2024 10/31/2024
Misc
Informational
10/14/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up. 8-8-24 NS Site Visited and crew where putting up more erosion control on 8-7. It appears no problem from this rain so far. 8-22-24 NS Site Visited and no erosion control issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Clean out silt fence around job area clean the roads off of any dirt or debris Put grass seed down 10-31-24 NS Site Visited and still nothing has been done.
Site Visit Partial 11/8/2024 11/08/2024
Misc
Informational
10/14/2024
Orchard Woods 8-27-24 NS Site Visited crews are working on the building. 9-4-24 NS Site visited and it appears no work is being done. 9-17-24 NS Site visited and it appears no work is being done. 9-18-24 NS Site visited and gas is being put in. 9-19-24 NS Site visited gas is still working in development. 10-14-24 NS Site visited and Evergy is still working in the development. 11-8-24 NS no work being done but there is part of he road that has started sinking
Erosion Control Inspection Failed 11/13/2024 11/13/2024
Misc
Informational
10/31/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up. 8-8-24 NS Site Visited and crew where putting up more erosion control on 8-7. It appears no problem from this rain so far. 8-22-24 NS Site Visited and no erosion control issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Clean out silt fence around job area clean the roads off of any dirt or debris Put grass seed down 10-31-24 NS Site Visited and still nothing has been done. 11-6-24 NS Site Visited and gutter buddies need to be cleaned out. 11-13-24 NS Site Visited and it appears grass seed has been put down
Site Visit Partial 11/21/2024 11/21/2024
Misc
Informational
11/08/2024
Orchard Woods 8-27-24 NS Site Visited crews are working on the building. 9-4-24 NS Site visited and it appears no work is being done. 9-17-24 NS Site visited and it appears no work is being done. 9-18-24 NS Site visited and gas is being put in. 9-19-24 NS Site visited gas is still working in development. 10-14-24 NS Site visited and Evergy is still working in the development. 11-8-24 NS no work being done but there is part of he road that has started sinking 11-21-24 NS Site visited no work being done. Talked to Jeff about putting more grass seed down and cleaning out the detention pond that has been cleaned out multiple times but every time it rains more mud falls into the detention pond. He is also going to more grass seed down in areas that he did not get covered.
Site Visit Partial 11/26/2024 11/26/2024
Misc
Informational
11/21/2024
Orchard Woods 8-27-24 NS Site Visited crews are working on the building. 9-4-24 NS Site visited and it appears no work is being done. 9-17-24 NS Site visited and it appears no work is being done. 9-18-24 NS Site visited and gas is being put in. 9-19-24 NS Site visited gas is still working in development. 10-14-24 NS Site visited and Evergy is still working in the development. 11-8-24 NS no work being done but there is part of he road that has started sinking 11-21-24 NS Site visited no work being done. Talked to Jeff about putting more grass seed down and cleaning out the detention pond that has been cleaned out multiple times but every time it rains more mud falls into the detention pond. He is also going to more grass seed down in areas that he did not get covered. 11-25-24 NS Site visited no work being done.
Erosion Control Inspection Partial 12/13/2024 12/13/2024
Misc
Informational
11/13/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up. 8-8-24 NS Site Visited and crew where putting up more erosion control on 8-7. It appears no problem from this rain so far. 8-22-24 NS Site Visited and no erosion control issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Clean out silt fence around job area clean the roads off of any dirt or debris Put grass seed down 10-31-24 NS Site Visited and still nothing has been done. 11-6-24 NS Site Visited and gutter buddies need to be cleaned out. 11-13-24 NS Site Visited and it appears grass seed has been put down 12-13-24 NS Site Visited and still no erosion control issues
ESC - (Vegetation/Ground Cover) Partial 12/13/2024 12/13/2024
Misc
Corrective Action Required
10/31/2024
3-29-24 NS Site Visited and it appears that ground is covered 8-8-24 NS Site Visited and it appears that more grass seed is needed 10-31-24 NS Site Visited and grass is growing 12-13-24 NS Site Visited and grass has stopped growing since it is winter.
Site Visit Partial 12/13/2024 12/13/2024
Misc
Informational
11/26/2024
Orchard Woods 8-27-24 NS Site Visited crews are working on the building. 9-4-24 NS Site visited and it appears no work is being done. 9-17-24 NS Site visited and it appears no work is being done. 9-18-24 NS Site visited and gas is being put in. 9-19-24 NS Site visited gas is still working in development. 10-14-24 NS Site visited and Evergy is still working in the development. 11-8-24 NS no work being done but there is part of he road that has started sinking 11-21-24 NS Site visited no work being done. Talked to Jeff about putting more grass seed down and cleaning out the detention pond that has been cleaned out multiple times but every time it rains more mud falls into the detention pond. He is also going to more grass seed down in areas that he did not get covered. 11-25-24 NS Site visited no work being done. 12-13-24 NS Site Visited and crews are working on houses.
Site Visit Partial 12/31/2024 12/31/2024
Misc
Informational
12/13/2024
Orchard Woods 8-27-24 NS Site Visited crews are working on the building. 9-4-24 NS Site visited and it appears no work is being done. 9-17-24 NS Site visited and it appears no work is being done. 9-18-24 NS Site visited and gas is being put in. 9-19-24 NS Site visited gas is still working in development. 10-14-24 NS Site visited and Evergy is still working in the development. 11-8-24 NS no work being done but there is part of he road that has started sinking 11-21-24 NS Site visited no work being done. Talked to Jeff about putting more grass seed down and cleaning out the detention pond that has been cleaned out multiple times but every time it rains more mud falls into the detention pond. He is also going to more grass seed down in areas that he did not get covered. 11-25-24 NS Site visited no work being done. 12-13-24 NS Site Visited and crews are working on houses. 12-31-24 NS Site visited it appears no work due to rain.
Erosion Control Inspection Partial 12/31/2024 12/31/2024
Misc
Informational
12/13/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up. 8-8-24 NS Site Visited and crew where putting up more erosion control on 8-7. It appears no problem from this rain so far. 8-22-24 NS Site Visited and no erosion control issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Clean out silt fence around job area clean the roads off of any dirt or debris Put grass seed down 10-31-24 NS Site Visited and still nothing has been done. 11-6-24 NS Site Visited and gutter buddies need to be cleaned out. 11-13-24 NS Site Visited and it appears grass seed has been put down 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues
ESC - (Vegetation/Ground Cover) Partial 12/31/2024 12/31/2024
Misc
Corrective Action Required
12/13/2024
3-29-24 NS Site Visited and it appears that ground is covered 8-8-24 NS Site Visited and it appears that more grass seed is needed 10-31-24 NS Site Visited and grass is growing 12-13-24 NS Site Visited and grass has stopped growing since it is winter. 12-31-24 NS Site Visited and grass has stopped growing since it is winter.
Erosion Control Inspection Partial 1/25/2025 01/25/2025
Misc
Informational
12/31/2024
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up. 8-8-24 NS Site Visited and crew where putting up more erosion control on 8-7. It appears no problem from this rain so far. 8-22-24 NS Site Visited and no erosion control issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Clean out silt fence around job area clean the roads off of any dirt or debris Put grass seed down 10-31-24 NS Site Visited and still nothing has been done. 11-6-24 NS Site Visited and gutter buddies need to be cleaned out. 11-13-24 NS Site Visited and it appears grass seed has been put down 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues
ESC - (Vegetation/Ground Cover) Partial 1/25/2025 01/25/2025
Misc
Corrective Action Required
12/31/2024
3-29-24 NS Site Visited and it appears that ground is covered 8-8-24 NS Site Visited and it appears that more grass seed is needed 10-31-24 NS Site Visited and grass is growing 12-13-24 NS Site Visited and grass has stopped growing since it is winter. 12-31-24 NS Site Visited and grass has stopped growing since it is winter. 1-10-25 NS Site Visited and grass has stopped growing since it is winter 1-16-25 NS Site Visited and grass has stopped growing since it is winter 1-24-25 NS Site Visited and grass has stopped growing since it is winter
Erosion Control Inspection Partial 1/31/2025 01/31/2025
Misc
Informational
01/25/2025
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up. 8-8-24 NS Site Visited and crew where putting up more erosion control on 8-7. It appears no problem from this rain so far. 8-22-24 NS Site Visited and no erosion control issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Clean out silt fence around job area clean the roads off of any dirt or debris Put grass seed down 10-31-24 NS Site Visited and still nothing has been done. 11-6-24 NS Site Visited and gutter buddies need to be cleaned out. 11-13-24 NS Site Visited and it appears grass seed has been put down 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues
Site Visit Partial 1/31/2025 01/31/2025
Misc
Informational
12/31/2024
Orchard Woods 8-27-24 NS Site Visited crews are working on the building. 9-4-24 NS Site visited and it appears no work is being done. 9-17-24 NS Site visited and it appears no work is being done. 9-18-24 NS Site visited and gas is being put in. 9-19-24 NS Site visited gas is still working in development. 10-14-24 NS Site visited and Evergy is still working in the development. 11-8-24 NS no work being done but there is part of he road that has started sinking 11-21-24 NS Site visited no work being done. Talked to Jeff about putting more grass seed down and cleaning out the detention pond that has been cleaned out multiple times but every time it rains more mud falls into the detention pond. He is also going to more grass seed down in areas that he did not get covered. 11-25-24 NS Site visited no work being done. 12-13-24 NS Site Visited and crews are working on houses. 12-31-24 NS Site visited it appears no work due to rain. 1-31-25 NS Site visited crews are not working because of rain. The road is still sinking in a area and I have let everyone know.
Erosion Control Inspection Partial 2/24/2025 02/24/2025
Misc
Informational
01/31/2025
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up. 8-8-24 NS Site Visited and crew where putting up more erosion control on 8-7. It appears no problem from this rain so far. 8-22-24 NS Site Visited and no erosion control issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Clean out silt fence around job area clean the roads off of any dirt or debris Put grass seed down 10-31-24 NS Site Visited and still nothing has been done. 11-6-24 NS Site Visited and gutter buddies need to be cleaned out. 11-13-24 NS Site Visited and it appears grass seed has been put down 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues
ESC - (Vegetation/Ground Cover) Partial 2/24/2025 02/24/2025
Misc
Corrective Action Required
01/25/2025
3-29-24 NS Site Visited and it appears that ground is covered 8-8-24 NS Site Visited and it appears that more grass seed is needed 10-31-24 NS Site Visited and grass is growing 12-13-24 NS Site Visited and grass has stopped growing since it is winter. 12-31-24 NS Site Visited and grass has stopped growing since it is winter. 1-10-25 NS Site Visited and grass has stopped growing since it is winter 1-16-25 NS Site Visited and grass has stopped growing since it is winter 1-24-25 NS Site Visited and grass has stopped growing since it is winter 2-3-25 NS Site Visited and grass has stopped growing since it is winter 2-10-25 NS Site Visited and grass has stopped growing since it is winter 2-17-25 NS Site Visited and grass has stopped growing since it is winter 2-24-25 NS Site Visited and grass has stopped growing since it is winter
Erosion Control Inspection Partial 2/28/2025 02/28/2025
Misc
Informational
02/24/2025
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up. 8-8-24 NS Site Visited and crew where putting up more erosion control on 8-7. It appears no problem from this rain so far. 8-22-24 NS Site Visited and no erosion control issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Clean out silt fence around job area clean the roads off of any dirt or debris Put grass seed down 10-31-24 NS Site Visited and still nothing has been done. 11-6-24 NS Site Visited and gutter buddies need to be cleaned out. 11-13-24 NS Site Visited and it appears grass seed has been put down 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues
Site Visit Partial 2/28/2025 02/28/2025
Misc
Informational
01/31/2025
Orchard Woods 8-27-24 NS Site Visited crews are working on the building. 9-4-24 NS Site visited and it appears no work is being done. 9-17-24 NS Site visited and it appears no work is being done. 9-18-24 NS Site visited and gas is being put in. 9-19-24 NS Site visited gas is still working in development. 10-14-24 NS Site visited and Evergy is still working in the development. 11-8-24 NS no work being done but there is part of he road that has started sinking 11-21-24 NS Site visited no work being done. Talked to Jeff about putting more grass seed down and cleaning out the detention pond that has been cleaned out multiple times but every time it rains more mud falls into the detention pond. He is also going to more grass seed down in areas that he did not get covered. 11-25-24 NS Site visited no work being done. 12-13-24 NS Site Visited and crews are working on houses. 12-31-24 NS Site visited it appears no work due to rain. 1-31-25 NS Site visited crews are not working because of rain. The road is still sinking in a area and I have let everyone know. 2-28-25 NS Site visited and it appears no work is being done I showed Ryan on Monday the problem that has been accruing with the road and also the road needs to have the mud on the road to clean up.
Erosion Control Inspection Partial 4/23/2025 04/24/2025
Misc
Informational
02/28/2025
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up. 8-8-24 NS Site Visited and crew where putting up more erosion control on 8-7. It appears no problem from this rain so far. 8-22-24 NS Site Visited and no erosion control issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Clean out silt fence around job area clean the roads off of any dirt or debris Put grass seed down 10-31-24 NS Site Visited and still nothing has been done. 11-6-24 NS Site Visited and gutter buddies need to be cleaned out. 11-13-24 NS Site Visited and it appears grass seed has been put down 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues 3-08-25 NS Mud still is in the street 3-19-25 NS Drove by and had a guy cleaning up the mud 3-26-25 NS Mud is still on the street. I will contact developer 4-2-25 NS Went by and mud is still in road way 4-16-25 NS Mud has been cleaned up and I asked the developer to put down grass seed 4-24-25 NS Mud is back on the road.
Erosion Control Inspection Failed 4/29/2025 4/29/2025 04/29/2025
Misc
Informational
04/24/2025
5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up. 8-8-24 NS Site Visited and crew where putting up more erosion control on 8-7. It appears no problem from this rain so far. 8-22-24 NS Site Visited and no erosion control issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Clean out silt fence around job area clean the roads off of any dirt or debris Put grass seed down 10-31-24 NS Site Visited and still nothing has been done. 11-6-24 NS Site Visited and gutter buddies need to be cleaned out. 11-13-24 NS Site Visited and it appears grass seed has been put down 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues 3-08-25 NS Mud still is in the street 3-19-25 NS Drove by and had a guy cleaning up the mud 3-26-25 NS Mud is still on the street. I will contact developer 4-2-25 NS Went by and mud is still in road way 4-16-25 NS Mud has been cleaned up and I asked the developer to put down grass seed 4-24-25 NS Mud is back on the road. 4-29-25. 4-29-25 RH. Silt socks full and need replaced or cleaned out. Sift fence down along curbs. Mud over curbs needs cleaned. Seeding is needed.
Sidewalk Inspection Partial 5/14/2025 05/13/2025
Misc
Corrective Action Required
01/04/2024
11-27-23 NS Site visited this morning and sidewalk ADA where being poured and it appears that the ground was still frozen and the temp of the ground was 27 degrees F. I told the contactor he will need to teach out all ramps put in this morning. I also told him that it is his job to make sure there is a pre pour inspection done before he can pour. 1-4-24 NS Site visited and it appears that 4 sidewalk ADA ramps do not meet standard and will need to be replaced. I have marked with pink spray paint what needs to be tore out and replaced. 5-13-25 NS Site visited, and it appears sidewalks will need to be replaced because of it cracking.
Erosion Control Inspection Partial 5/15/2025 05/14/2025
Misc
Informational
04/29/2025
Orchard Woods/ water tower 5-16-23 Site visited and it appears that there is no erosion control set up. Please get the erosion control set up that is approved on the plans. If you have any question please call me 816-977-5652 Nick Scott 5-19-23 NS. ESC has not been set up yet. I talked to Jeff the developer and he said that they are working on someone to come out and put up ESC 10-25-23 NS Site visited and erosion control has failed I let the developer Jeff know and he had some out to fix it today. 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited I talked to Jeff and he is going to get the site cleaned up and erosion control fixed. 7-25-24 NS Site Visited and still needs a little bit of clean up but for the most part it is clean and more erosion control has been set up. 8-8-24 NS Site Visited and crew where putting up more erosion control on 8-7. It appears no problem from this rain so far. 8-22-24 NS Site Visited and no erosion control issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Clean out silt fence around job area clean the roads off of any dirt or debris Put grass seed down 10-31-24 NS Site Visited and still nothing has been done. 11-6-24 NS Site Visited and gutter buddies need to be cleaned out. 11-13-24 NS Site Visited and it appears grass seed has been put down 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues 3-08-25 NS Mud still is in the street 3-19-25 NS Drove by and had a guy cleaning up the mud 3-26-25 NS Mud is still on the street. I will contact developer 4-2-25 NS Went by and mud is still in road way 4-16-25 NS Mud has been cleaned up and I asked the developer to put down grass seed 4-24-25 NS Mud is back on the road. 4-29-25. 4-29-25 RH. Silt socks full and need replaced or cleaned out. Sift fence down along curbs. Mud over curbs needs cleaned. Seeding is needed. 5-14-25 NS Site visited and no work has been done.
Site Visit Partial 5/15/2025 05/14/2025
Misc
Informational
02/28/2025
Orchard Woods 8-27-24 NS Site Visited crews are working on the building. 9-4-24 NS Site visited and it appears no work is being done. 9-17-24 NS Site visited and it appears no work is being done. 9-18-24 NS Site visited and gas is being put in. 9-19-24 NS Site visited gas is still working in development. 10-14-24 NS Site visited and Evergy is still working in the development. 11-8-24 NS no work being done but there is part of he road that has started sinking 11-21-24 NS Site visited no work being done. Talked to Jeff about putting more grass seed down and cleaning out the detention pond that has been cleaned out multiple times but every time it rains more mud falls into the detention pond. He is also going to more grass seed down in areas that he did not get covered. 11-25-24 NS Site visited no work being done. 12-13-24 NS Site Visited and crews are working on houses. 12-31-24 NS Site visited it appears no work due to rain. 1-31-25 NS Site visited crews are not working because of rain. The road is still sinking in a area and I have let everyone know. 2-28-25 NS Site visited and it appears no work is being done I showed Ryan on Monday the problem that has been accruing with the road and also the road needs to have the mud on the road to clean up.
Site Visit Partial 5/21/2025 05/21/2025
Misc
Informational
05/14/2025
Orchard Woods 8-27-24 NS Site Visited crews are working on the building. 9-4-24 NS Site visited and it appears no work is being done. 9-17-24 NS Site visited and it appears no work is being done. 9-18-24 NS Site visited and gas is being put in. 9-19-24 NS Site visited gas is still working in development. 10-14-24 NS Site visited and Evergy is still working in the development. 11-8-24 NS no work being done but there is part of he road that has started sinking 11-21-24 NS Site visited no work being done. Talked to Jeff about putting more grass seed down and cleaning out the detention pond that has been cleaned out multiple times but every time it rains more mud falls into the detention pond. He is also going to more grass seed down in areas that he did not get covered. 11-25-24 NS Site visited no work being done. 12-13-24 NS Site Visited and crews are working on houses. 12-31-24 NS Site visited it appears no work due to rain. 1-31-25 NS Site visited crews are not working because of rain. The road is still sinking in a area and I have let everyone know. 2-28-25 NS Site visited and it appears no work is being done I showed Ryan on Monday the problem that has been accruing with the road and also the road needs to have the mud on the road to clean up. 5-21-25 NS Site visited and I notice that the development is cleaning up the erosion control and is fixing the problems that have been pointed out.
Site Visit Partial 5/27/2025 05/28/2025
Misc
Informational
05/21/2025
Orchard Woods 8-27-24 NS Site Visited crews are working on the building. 9-4-24 NS Site visited and it appears no work is being done. 9-17-24 NS Site visited and it appears no work is being done. 9-18-24 NS Site visited and gas is being put in. 9-19-24 NS Site visited gas is still working in development. 10-14-24 NS Site visited and Evergy is still working in the development. 11-8-24 NS no work being done but there is part of he road that has started sinking 11-21-24 NS Site visited no work being done. Talked to Jeff about putting more grass seed down and cleaning out the detention pond that has been cleaned out multiple times but every time it rains more mud falls into the detention pond. He is also going to more grass seed down in areas that he did not get covered. 11-25-24 NS Site visited no work being done. 12-13-24 NS Site Visited and crews are working on houses. 12-31-24 NS Site visited it appears no work due to rain. 1-31-25 NS Site visited crews are not working because of rain. The road is still sinking in a area and I have let everyone know. 2-28-25 NS Site visited and it appears no work is being done I showed Ryan on Monday the problem that has been accruing with the road and also the road needs to have the mud on the road to clean up. 5-21-25 NS Site visited and I notice that the development is cleaning up the erosion control and is fixing the problems that have been pointed out. 5-28-25 NS Site visited and the developer is on his property doing work around the erosion control.
Water Line - Hydrostatic Test Passed 6/19/2025 06/20/2025
Misc
Corrective Action Required
06/20/2025
6-20-25 NS Site visited, Passed.
Sanitary Sewer - Air Test Passed 6/19/2025 06/20/2025
Misc
Informational
06/20/2025
6-20-25 NS Site visited, Passed.
Sanitary Sewer - Mandrel Passed 6/19/2025 06/20/2025
Misc
Informational
06/20/2025
6-20-25 NS Site visited, Passed.
Sanitary Sewer - Vacuum Passed 6/19/2025 06/20/2025
Misc
Informational
06/20/2025
6-20-25 NS Site visited, Passed.
Water Line - Coliform Test 2 Passed 6/19/2025 06/20/2025
Misc
Informational
06/20/2025
6-20-25 NS Site visited, Passed.
Sanitary Sewer - Camera Test Passed 6/19/2025 06/20/2025
Misc
Informational
06/20/2025
6-20-25 NS Site visited, Passed.
Sanitary Sewer - Air Test Passed 6/19/2025 06/20/2025
Misc
Informational
06/20/2025
6-20-25 NS Site visited, Passed.
Documents & Images
Date Uploaded File Type Document Name
02/01/2023 Engineers Estimate OPC - Mass Grading and ESC
02/14/2023 Approved Plans Orchard Woods Sanitary Approved 02 14 23
02/14/2023 Activity Document Fees PL2022324 Orchard Woods Water
01/30/2023 Engineers Estimate OPC - Onsite Water
02/14/2023 Activity Document Fees PL2022323 Orchard Woods Sanitary Sewer
01/30/2023 Engineers Estimate OPC - Onsite Sanitary Sewer
02/22/2023 Approved Plans Orchard Woods Mass Grading and ESC Approved 02 15 23
02/22/2023 Approved Plans Orchard Woods Water Approved 02 15 23
02/24/2023 Engineers Estimate OPC - Mass Grading and ESC
02/24/2023 Activity Document Fees PL2022322 Orchard Woods Mass Grading and ESC
02/22/2023 Approved Plans Orchard Woods Mass Grading and ESC Approved 02 15 23
04/20/2023 Receipt Receipt for transaction:2023-002262
04/20/2023 Letter DE-Permit
05/16/2023 Letter INSPECTION SUMMARY
06/09/2023 Receipt Receipt for transaction:2023-004176
07/11/2023 Letter INSPECTION SUMMARY
07/11/2023 Letter INSPECTION SUMMARY
07/11/2023 Letter INSPECTION SUMMARY
07/12/2023 Letter INSPECTION SUMMARY
07/14/2023 Letter INSPECTION SUMMARY
07/14/2023 Letter INSPECTION SUMMARY
07/25/2023 Letter INSPECTION SUMMARY
07/27/2023 Letter INSPECTION SUMMARY
07/27/2023 Letter INSPECTION SUMMARY
07/31/2023 Letter INSPECTION SUMMARY
08/05/2023 Approved Plans Orchard Woods Street Storm MDP Approved 08 05 23
08/05/2023 Activity Document Fees PL2022325 Orchard Woods Street Storm
08/04/2023 Engineers Estimate OPC 08-04-2023 - Onsite Street & Storm
08/05/2023 Approved Plans Orchard Woods Street Storm MDP Approved 08 05 23
08/07/2023 Letter INSPECTION SUMMARY
08/08/2023 Letter INSPECTION SUMMARY
08/17/2023 Letter INSPECTION SUMMARY
08/17/2023 Letter INSPECTION SUMMARY
08/18/2023 Letter INSPECTION SUMMARY
08/18/2023 Letter INSPECTION SUMMARY
08/24/2023 Letter INSPECTION SUMMARY
08/24/2023 Letter INSPECTION SUMMARY
09/05/2023 Letter INSPECTION SUMMARY
09/14/2023 Letter INSPECTION SUMMARY
09/15/2023 20230915_104115
09/15/2023 20230915_104058
09/19/2023 Letter INSPECTION SUMMARY
09/19/2023 Letter INSPECTION SUMMARY
09/20/2023 Letter INSPECTION SUMMARY
10/09/2023 Letter INSPECTION SUMMARY
10/09/2023 Letter INSPECTION SUMMARY
10/13/2023 Approved Plans Orchard Woods Street Storm Revised Curbs Approved 10 13 23
10/16/2023 Letter INSPECTION SUMMARY
10/23/2023 Letter INSPECTION SUMMARY
10/23/2023 Letter INSPECTION SUMMARY
10/23/2023 Letter INSPECTION SUMMARY
10/25/2023 Letter INSPECTION SUMMARY
10/31/2023 Letter INSPECTION SUMMARY
10/31/2023 Letter INSPECTION SUMMARY
11/02/2023 Letter INSPECTION SUMMARY
11/27/2023 Letter INSPECTION SUMMARY
12/08/2023 Receipt Receipt for transaction:2023-008979
12/08/2023 Letter DE-Permit
12/14/2023 Letter INSPECTION SUMMARY
01/23/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
03/06/2024 Letter INSPECTION SUMMARY
03/08/2024 Letter INSPECTION SUMMARY
03/18/2024 Letter DE-Certificate of Substantial Completion Single Lot
03/18/2024 Letter DE-Certificate of Substantial Completion Single Lot
03/18/2024 Letter DE-Punch List
03/25/2024 Engineer Report/Study 2024-03-20 BMP Establishment & Maintenance
03/29/2024 Letter INSPECTION SUMMARY
03/29/2024 Letter INSPECTION SUMMARY
03/29/2024 Letter INSPECTION SUMMARY
04/18/2024 Letter INSPECTION SUMMARY
04/30/2024 Letter INSPECTION SUMMARY
04/30/2024 Letter INSPECTION SUMMARY
04/30/2024 Letter INSPECTION SUMMARY
05/09/2024 Letter DE-Certificate of Substantial Completion Single Lot
06/28/2024 Letter INSPECTION SUMMARY
07/12/2024 Final Affidavit and Agreement Form - JWM 2024-07-11
07/19/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
08/06/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/19/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
09/04/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/19/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/31/2024 Letter INSPECTION SUMMARY
10/31/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
11/12/2024 Security Document Concrete Bond
11/13/2024 Letter INSPECTION SUMMARY
11/20/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/26/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/20/2024 Letter On Site Utilities Bond
12/31/2024 Letter INSPECTION SUMMARY
12/31/2024 Letter INSPECTION SUMMARY
12/31/2024 Letter INSPECTION SUMMARY
01/21/2025 Security Document Maintenance Bond_Seal-O-Matic Paving Company
01/25/2025 Letter INSPECTION SUMMARY
01/25/2025 Letter INSPECTION SUMMARY
01/31/2025 Letter INSPECTION SUMMARY
01/31/2025 Letter INSPECTION SUMMARY
02/24/2025 Letter INSPECTION SUMMARY
02/24/2025 Letter INSPECTION SUMMARY
02/24/2025 Letter INSPECTION SUMMARY
02/28/2025 Letter INSPECTION SUMMARY
02/28/2025 Letter INSPECTION SUMMARY
04/24/2025 Letter INSPECTION SUMMARY
04/29/2025 Letter INSPECTION SUMMARY
05/13/2025 Letter INSPECTION SUMMARY
05/14/2025 Letter INSPECTION SUMMARY
05/14/2025 Letter INSPECTION SUMMARY
05/21/2025 Letter INSPECTION SUMMARY
05/28/2025 Letter INSPECTION SUMMARY
06/20/2025 Letter INSPECTION SUMMARY
06/20/2025 Letter INSPECTION SUMMARY
06/20/2025 Letter INSPECTION SUMMARY
06/20/2025 Letter INSPECTION SUMMARY
06/20/2025 Letter INSPECTION SUMMARY
06/20/2025 Letter INSPECTION SUMMARY
06/20/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home