Permit Application Status

PRCOM20251547


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20251547
Building Permit - Commercial
Issued
CITY OF LEES SUMMIT
NEW COMMERCIAL
MIDWEST AVIONICS HANGAR - NEW BUILDING FOR AIRPLANE STORAGE AND SERVICE
04/16/2025
05/29/2025
11/09/2025
Locations
Contacts
First Class Heating and Cooling LLC, Address:305 N Independence St, Phone:(816) 380-5659  
All State Electric , Address:PO BOX 571  
ESSARY PLUMBING INC, Address:6238 MERRIAM DR, Phone:(913) 522-6222  
KOEHN BUILDING SYSTEMS LLC, Address:P O BOX 180, Phone:(417) 395-4305  
CITY OF LEES SUMMIT, Address:220 S MAIN  
Insight Design Architects, Address:112 South Main St, Phone:(417) 724-8553  
ALPHA-OMEGA GEOTECH, Address:1701 STATE AVE, Phone:(913) 371-0000  
Landon Swope - Koehn Building Systems, Phone:(660) 679-1170  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 05/22/2025 05/28/2025
Joe Frogge
Final Development Plan
Resolved
05/28/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 5/13/2025 - Acknowledged in letter.
License Tax - Payment
Corrective Action Required
05/15/2025

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $2,508.00 (Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process).
IBC 1209.2 Finish materials
Resolved
05/20/2025

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials at mop sink, urinal, and water closets. 5/13/2025 - Acknowledged in letter but not found in revised plans.
IPC 708.1 Cleanouts required
Resolved
05/20/2025

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanouts near where sanitary leaves building. 5/13/2025 - Required at sanitary serving trench drains also.
Final Development Plan Review Approved 05/22/2025 05/22/2025
Grant White
Licensed Contractors Approved 05/22/2025 05/20/2025
Joe Frogge
Fire Plan Review Approved with Conditions 05/22/2025 05/20/2025
Craig Hill
Construction documents for fire alarm systems
Informational
05/15/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Informational
05/15/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Knox box required
Corrective Action Required
05/15/2025

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.
Licensed Contractors Approved 05/14/2025 05/14/2025
Joe Frogge
LC - MEP Subs
Resolved
05/14/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (All State Electric and Essary Plumbing must obtain Lee's Summit business licenses) 5/13/2025 - Acknowledged in letter.
Building Plan Review Rejected 05/14/2025 05/13/2025
Joe Frogge
Final Development Plan
Corrective Action Required
05/07/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 5/13/2025 - Acknowledged in letter.
License Tax - Payment
Corrective Action Required
05/07/2025

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $2,508.00 (Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process).
IBC 1209.2 Finish materials
Corrective Action Required
05/07/2025

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials at mop sink, urinal, and water closets. 5/13/2025 - Acknowledged in letter but not found in revised plans.
IPC 305.4 Freezing - protection of potable water
Resolved
05/13/2025

Protection of Potable Water System 2018 IPC 305.4 Freezing. Water, soil, and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision is made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than 6” below the frost line (42” below grade) and not less than 12 inches below grade. Action required: Provide protection from freezing at restrooms' water piping or verification that current design is sufficient. (fyi - any type heating equipment in rooms can trigger requirements for exterior doors and 2hr rating of walls - see IBC 412.3.4) 5/13/2025 - Acknowledged in letter but not found in revised plans.
IPC 708.1 Cleanouts required
Corrective Action Required
05/07/2025

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanouts near where sanitary leaves building. 5/13/2025 - Required at sanitary serving trench drains also.
NEC Article 250.66 Size of AC Grounding electrode conductor
Resolved
05/13/2025

2017 NEC Article 250.66 Size of Alternating-Current Grounding Electrode Conductor. The size of the grounding electrode conductor at the service, at each building or structure where supplied by a feeder(s) or branch circuit(s), or at a separately derived system of a grounded or ungrounded ac system shall not be less than given in Table 250.66, except as permitted in 250.66(A) through (C). Action required: Specify size of all grounding electrode conductors.
IBC 2902.2 Separate facilities - fixture
Resolved
05/14/2025

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Action required: Label restrooms per gender or apply for Code Modificate Request to use 2024 IBC 5/13/2025 - CMR submitted to management for review
Fire Plan Review Approved with Conditions 05/14/2025 05/13/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
05/20/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
05/20/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Knox box required
Corrective Action Required
05/07/2025

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.
Special Inspections Review Approved 05/07/2025
Joe Frogge
Fire Plan Review Approved with Conditions 04/30/2025 05/01/2025
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
05/13/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
05/13/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Knox box required
Corrective Action Required
04/29/2025

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Action Required: Knox box needed at or near the FDC of all buildings. Verified at occupancy inspection. Action Required: Knox box needed at or near the FDC.
Building Plan Review Rejected 04/30/2025 04/30/2025
Joe Frogge
Final Development Plan
Corrective Action Required
04/30/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
IBC 1704.2 Special Inspections
Resolved
05/07/2025

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
License Tax - Payment
Corrective Action Required
04/30/2025

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $2,508.00 (Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process).
IBC 1209.2 Finish materials
Corrective Action Required
04/30/2025

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials at mop sink, urinal, and water closets.
IPC 305.4 Freezing - protection of potable water
Corrective Action Required
04/30/2025

Protection of Potable Water System 2018 IPC 305.4 Freezing. Water, soil, and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision is made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than 6” below the frost line (42” below grade) and not less than 12 inches below grade. Action required: Provide protection from freezing at restrooms' water piping or verification that current design is sufficient. (fyi - any type heating equipment in rooms can trigger requirements for exterior doors and 2hr rating of walls - see IBC 412.3.4)
IPC 708.1 Cleanouts required
Corrective Action Required
04/30/2025

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanouts near where sanitary leaves building.
NEC Article 250.66 Size of AC Grounding electrode conductor
Corrective Action Required
04/30/2025

2017 NEC Article 250.66 Size of Alternating-Current Grounding Electrode Conductor. The size of the grounding electrode conductor at the service, at each building or structure where supplied by a feeder(s) or branch circuit(s), or at a separately derived system of a grounded or ungrounded ac system shall not be less than given in Table 250.66, except as permitted in 250.66(A) through (C). Action required: Specify size of all grounding electrode conductors.
IBC 2902.2 Separate facilities - fixture
Corrective Action Required
05/02/2025

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Action required: Label restrooms per gender or apply for Code Modificate Request to use 2024 IBC
Licensed Contractors Rejected 04/30/2025 04/30/2025
Joe Frogge
LC - MEP Subs
Corrective Action Required
05/14/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (All State Electric and Essary Plumbing must obtain Lee's Summit business licenses)
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $5,200.00 $5,200.00 Paid 05/28/2025
7232302-Industrial/Warehouse Excise Tax Fee $2,508.00 $2,508.00 Paid 05/28/2025
91100C8-Sanitary Sewer Insp Fees $369.00 $369.00 Paid 05/28/2025
91100C9-Water Insp Fee $1,145.10 $1,145.10 Paid 05/28/2025
9110081-Paved Surface Inspection Fee $4,563.57 $4,563.57 Paid 05/28/2025
9110068-Storm Sewer Inspection Fee $31.50 $31.50 Paid 05/28/2025
9110071-Site Grading Fee $3,477.98 $3,477.98 Paid 05/28/2025
9110072-Water Test Fee $100.00 $100.00 Paid 05/28/2025
8331401-Water Tap Fee $10,595.00 $10,595.00 Paid 05/28/2025
8350015-Water Meter Fee $1,066.76 $1,066.76 Paid 05/28/2025
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 05/28/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Pending
Piers/Caissons Inspection - Commercial Pending
Underslab Plumbing Inspection - Commercial Pending
Water Service Inspection Pending
Electrical Service Inspection Pending
Gas Service Inspection - Commercial Pending
In-wall Inspection Pending
Above Ceiling Inspection Pending 8/27/2025
Footing Inspection - Commercial Partial 6/11/2025 6/11/2025 06/11/2025
Misc
Corrective Action Required
06/11/2025
Exterior wall footing: -A.5/1-5
Footing Inspection - Commercial Partial 6/12/2025 6/12/2025 06/12/2025
Misc
Corrective Action Required
06/11/2025
Exterior wall footing: -A.5/1-5; J.5/1-K/1-4.5
Documents & Images
Date Uploaded File Type Document Name
04/16/2025 Application Form APPLICATION
04/17/2025 Plans 2025 04 14 MIDWEST AVIONICS PERMIT SET
04/17/2025 Letter License Tax Bill
05/01/2025 Letter DS P/R Corrections Document
05/07/2025 Engineer Report/Study SI Engagement Letter
05/07/2025 Plans Addendum 1 Drawings
05/07/2025 Letter Addendum 1 Narrative
05/13/2025 Letter CMR
05/13/2025 Letter DS P/R Corrections Document
05/14/2025 Code Mod Request Approved CMR
05/15/2025 Plans Addendum 2 Drawings
05/15/2025 Letter Addendum 2 Narrative
05/20/2025 Approved Plans Approved construction plans
05/27/2025 Approved Plans Approved FDP_Midwest Avionics Hangar-Revised 5-27-25_PL2025085
05/28/2025 Approved Plans Approved Revisions to construction plans
05/28/2025 Receipt Receipt for transaction: 2025-003930
05/28/2025 Letter DS Building Permit
06/11/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home