Permit Application Status

PRCOM20214329


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20214329
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
NEW TENANT FINISH
TENANT FINISH FOR PET SUPPLY STORE WITH PET WASH STATIONS
08/19/2021
11/08/2021
04/04/2022
01/19/2022
Locations
Contacts
PYCIOR & CO, Address:302 NE DOUGLAS ST, Phone:(816) 564-7791  
bwmirman@gmail.com, Address:bwmirman@gmail.com  
JAKE'S INDUSTRIAL INC, Address:1101 SW 1ST, Phone:(816) 690-3173  
VELOCITY ELECTRIC AND AUTOMATION LLC, Address:1704 SW RED FOX CIR, Phone:(816) 215-1514  
PRODIGY PLUMBING & MECHANICAL INC, Address:8402 WESTRIDGE RD, Phone:(816) 984-9292  
Onyx Creative, Address:25001 Emery Road, Suite 400, Phone:(216) 223-3200  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 11/17/2021 11/17/2021
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
11/17/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Sprinkler Plan Review Released for Construction 11/10/2021 11/10/2021
Michael Weissenbach
Licensed Contractors Approved 11/08/2021 11/08/2021
Joe Frogge
LC - General Contractor
Resolved
11/08/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact. 10/4/21 - acknowledged in letter
LC - MEP Subs
Resolved
11/08/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/4/21 - acknowledged in letter
Building Plan Review Approved with Conditions 11/08/2021 11/04/2021
Joe Frogge
Miscellaneous Correction
Resolved
11/04/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 10/4/21 - acknowledged in letter
IBC 1109.12.9 Point of sale and service counters - accessibility
Corrective Action Required
11/01/2021

2018 IBC 1109.12.3 Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. Action required: Point of sale to be accessible. To be field verified. 10/4/21 - acknowledged in letter
Fire Plan Review Approved with Conditions 11/08/2021 11/01/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
11/01/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
11/01/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
11/01/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Miscellaneous Correction
Corrective Action Required
11/01/2021

(Action Required) 2018 IFC 504.2 Provide signage on the doors not being used as an entrance/exit. "DOOR BLOCKED" 9/30/21 Send sheet A1.0 10/5/21 The two doors not being used as an exit(welded shut) need signage on the exterior side stating DOOR BLOCKED. 11/01/21 Verified At Inspection
Illumination required
Resolved
11/01/2021

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Verified At Inspection) If not existing, provide exterior emergency lighting.
Fire Plan Review Rejected 10/12/2021 10/05/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
10/05/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Address numbers required
Resolved
10/05/2021

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Provide address on the exterior exit doors. 9/30/21 Send sheet A1.0
Construction documents - Fire protection systems
Corrective Action Required
10/05/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
10/05/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Miscellaneous Correction
Corrective Action Required
10/05/2021

(Action Required) 2018 IFC 504.2 Provide signage on the doors not being used as an entrance/exit. "DOOR BLOCKED" 9/30/21 Send sheet A1.0 10/5/21 The two doors not being used as an exit(welded shut) need signage on the exterior side stating DOOR BLOCKED.
Illumination required
Corrective Action Required
10/05/2021

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Verified At Inspection) If not existing, provide exterior emergency lighting.
Building Plan Review Rejected 10/12/2021 10/05/2021
Joe Frogge
Miscellaneous Correction
Corrective Action Required
10/05/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 10/4/21 - acknowledged in letter
IPC 403.1 Minimum number of fixtures
Resolved
10/05/2021

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountain. 10/4/21 - architectural drawings not found in resubmittal.
IBC 1209.2 Finish materials
Resolved
10/05/2021

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish materials at mop sink and toilets. If paint is used it must be epoxy based. 10/4/21 - architectural drawings not found in resubmittal
IBC 1109.12.9 Point of sale and service counters - accessibility
Corrective Action Required
10/05/2021

2018 IBC 1109.12.3 Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. Action required: Point of sale to be accessible. To be field verified. 10/4/21 - acknowledged in letter
Licensed Contractors Rejected 10/05/2021 10/05/2021
Joe Frogge
LC - General Contractor
Corrective Action Required
10/05/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact. 10/4/21 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
10/05/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/4/21 - acknowledged in letter
Building Plan Review Rejected 10/06/2021 10/04/2021
Joe Frogge
Miscellaneous Correction
Corrective Action Required
09/29/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 10/4/21 - acknowledged in letter
Suite address
Resolved
10/04/2021

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: This suite has been designated as "J" with the entire address being 940 NW Pryor Rd, Unit:J. Please update your records and inform your client.
Gen - Plan submittals 2018 codes
Resolved
10/04/2021

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Update cover sheet with correct code references.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
10/04/2021

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountain. 10/4/21 - architectural drawings not found in resubmittal.
IBC 1209.2 Finish materials
Corrective Action Required
09/29/2021

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish materials at mop sink and toilets. If paint is used it must be epoxy based. 10/4/21 - architectural drawings not found in resubmittal
IMC 502.1 Required exhaust
Resolved
10/04/2021

2018 IMC 502.1 General. An exhaust system shall be provided, maintained and operated as specifically required by this section and for all occupied areas where machines, vats, tanks, furnaces, forges, salamanders and other appliances, equipment and processes in such areas produce or throw off dust or particles sufficiently light to float in the air, or emit heat, odors, fumes, spray, gas or smoke in such quantities so as to be irritating or injurious to health or safety. Action required: Provide exhaust air at both dog wash rooms.
Misc
Resolved
10/04/2021

Inadequate information to complete review. Action required: Provide plumbing pipe material schedule.
IBC 1008.3 Emergency power for illumination - at exit discharge
Resolved
10/04/2021

2018 IBC 1008.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency lighting at exterior side of exits. (or verification of existing)
IBC 1109.12.9 Point of sale and service counters - accessibility
Corrective Action Required
09/29/2021

2018 IBC 1109.12.3 Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. Action required: Point of sale to be accessible. To be field verified. 10/4/21 - acknowledged in letter
Licensed Contractors Rejected 10/06/2021 10/04/2021
Joe Frogge
LC - General Contractor
Corrective Action Required
09/29/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact. 10/4/21 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
09/29/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/4/21 - acknowledged in letter
Fire Plan Review Rejected 10/06/2021 09/30/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
09/29/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Address numbers required
Corrective Action Required
09/29/2021

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Provide address on the exterior exit doors. 9/30/21 Send sheet A1.0
Construction documents - Fire protection systems
Corrective Action Required
09/29/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
09/29/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Miscellaneous Correction
Corrective Action Required
09/29/2021

(Action Required) 2018 IFC 504.2 Provide signage on the doors not being used as an entrance/exit. "DOOR BLOCKED" 9/30/21 Send sheet A1.0
Illumination required
Corrective Action Required
09/29/2021

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Verified At Inspection) If not existing, provide exterior emergency lighting.
Licensed Contractors Rejected 08/25/2021
Joe Frogge
LC - General Contractor
Corrective Action Required
08/25/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
LC - MEP Subs
Corrective Action Required
08/25/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 08/31/2021 08/24/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
08/24/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Address numbers required
Corrective Action Required
08/24/2021

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Provide address on the exterior exit doors.
Construction documents - Fire protection systems
Corrective Action Required
08/24/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
08/24/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Miscellaneous Correction
Corrective Action Required
08/24/2021

(Action Required) 2018 IFC 504.2 Provide signage on the doors not being used as an entrance/exit. "DOOR BLOCKED"
Illumination required
Corrective Action Required
08/24/2021

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Verified At Inspection) If not existing, provide exterior emergency lighting.
Building Plan Review Rejected 08/31/2021 08/24/2021
Joe Frogge
Miscellaneous Correction
Corrective Action Required
08/24/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Suite address
Corrective Action Required
08/24/2021

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: This suite has been designated as "J" with the entire address being 940 NW Pryor Rd, Unit:J. Please update your records and inform your client.
Gen - Plan submittals 2018 codes
Corrective Action Required
08/24/2021

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Update cover sheet with correct code references.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
08/24/2021

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountain.
IBC 1209.2 Finish materials
Corrective Action Required
08/24/2021

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish materials at mop sink and toilets. If paint is used it must be epoxy based.
IMC 502.1 Required exhaust
Corrective Action Required
08/24/2021

2018 IMC 502.1 General. An exhaust system shall be provided, maintained and operated as specifically required by this section and for all occupied areas where machines, vats, tanks, furnaces, forges, salamanders and other appliances, equipment and processes in such areas produce or throw off dust or particles sufficiently light to float in the air, or emit heat, odors, fumes, spray, gas or smoke in such quantities so as to be irritating or injurious to health or safety. Action required: Provide exhaust air at both dog wash rooms.
Misc
Corrective Action Required
08/24/2021

Inadequate information to complete review. Action required: Provide plumbing pipe material schedule.
IBC 1008.3 Emergency power for illumination - at exit discharge
Corrective Action Required
08/24/2021

2018 IBC 1008.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency lighting at exterior side of exits. (or verification of existing)
IBC 1109.12.9 Point of sale and service counters - accessibility
Corrective Action Required
08/24/2021

2018 IBC 1109.12.3 Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. Action required: Point of sale to be accessible. To be field verified.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $580.00 $580.00 Paid 11/08/2021
8331507-Sewer Connection Fee $150.00 $150.00 Paid 11/08/2021
7232302-Commercial License Tax Fee $8,167.50 $8,167.50 Paid 11/08/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Failed 12/8/2021 12/8/2021 12/08/2021
Miscellaneous Correction
Corrective Action Required
12/08/2021
PROVIDE BOCA PLATES RESTROOM & DOG WASH STATIONS PROVIDE PLUMBING PROTECTION PLATES RESTROOM & DOG WASH STATIONS FIRE CAULK UPWARD FLOOR PENETRATIONS
In-wall Inspection Passed 12/9/2021 12/9/2021 12/09/2021
Miscellaneous Correction
Resolved
12/09/2021
Underslab Plumbing Inspection - Commercial Passed 12/20/2021 12/20/2021
Misc
Informational
12/20/2021
DWV CONNECTIONS IN UNDERGROUND PARKING GARAGE
Above Ceiling Inspection Passed 1/4/2022 1/4/2022 01/04/2022
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
01/04/2022
- HARD LID RESTROOM, OK TO DROP TILE IN DOG WASH STATIONS -
Occupancy Inspection - Codes Commercial Failed 1/10/2022 1/10/2022 01/10/2022
Miscellaneous Correction
Corrective Action Required
01/10/2022
Label service panel breakers Insulate sink plumbing in restroom Install drinking fountain per plans Install water heater per plans
Alarm Test Failed 1/10/2022 01/10/2022
Corrective Action Required
01/10/2022
Label north west door. "No exit door blocked" and "door blocked". Address main front door. Address back door to hallway. Fix fire alarm reporting.
Occupancy Inspection - Fire Failed 1/10/2022 1/10/2022 01/10/2022
Corrective Action Required
01/10/2022
Label north west door. "No exit door blocked" and "door blocked". Address main front door. Address back door to hallway. Fix fire alarm reporting.
Occupancy Inspection - Codes Commercial Full C of O 1/19/2022 1/19/2022 01/19/2022
Miscellaneous Correction
Resolved
01/19/2022
Alarm Test Passed 1/19/2022 01/19/2022
Occupancy Inspection - Fire Passed 1/19/2022 1/19/2022 01/19/2022
Corrective Action Required
02/07/2022
Occupancy passed, on approval form codes ok to occupy, stock, and open.
Documents & Images
Date Uploaded File Type Document Name
08/19/2021 Application Form Commercial Permit Application- completed
08/24/2021 Plans PetPeople_Lees Summit_MO_Construciton docs
08/24/2021 Letter Fire Building Plan Review
08/25/2021 Letter DS P/R Corrections Document
09/29/2021 Drawing 700_18894_KansasCity_MO_M1_0-M1_0
09/29/2021 Drawing 720_18894_KansasCity_MO_M2_0-M2_0
09/29/2021 Drawing 800_18894_KansasCity_MO_P1_0-P1_0
09/29/2021 Drawing 820_18894_KansasCity_MO_P2_0-P2_0
09/29/2021 Drawing 920_18894_KansasCity_MO_E2_0-E2_0
09/29/2021 Drawing 920_18894_KansasCity_MO_E2_0-E2_1
09/29/2021 Drawing 910_18894_KansasCity_MO_E1_0-E1_0
09/29/2021 Drawing 930_18894_KansasCity_MO_E3_0-E3_0
09/29/2021 Drawing 000_18894_KansasCity_MO_CS1_0-CS1_0
09/29/2021 Letter 2021-09-27 Lees Summit city response letter
09/30/2021 Letter Fire Building Plan Review
10/04/2021 Letter DS P/R Corrections Document
10/04/2021 Drawing 200_18894_KansasCity_MO_A1_0-A1_0
10/04/2021 Drawing 204_18894_KansasCity_MO_A4_0-A4_0
10/04/2021 Drawing 206_18894_KansasCity_MO_A6_0-A6_0
10/04/2021 Drawing 000_18894_KansasCity_MO_CS1_0-CS1_0
10/04/2021 Drawing 202_18894_KansasCity_MO_A2_0-A2_0
10/05/2021 Letter Fire Building Plan Review
10/06/2021 Letter DS P/R Corrections Document
11/01/2021 Letter 2021-10-22 Lees Summit city response letter2
11/01/2021 Drawing 199_18894_KansasCity_MO_D1_0-D1_0
11/01/2021 Drawing 200_18894_KansasCity_MO_A1_0-A1_0
11/01/2021 Drawing 000_18894_KansasCity_MO_CS1_0-CS1_0
11/01/2021 Drawing 204_18894_KansasCity_MO_A4_0-A4_0
11/01/2021 Drawing 202_18894_KansasCity_MO_A2_0-A2_0
11/01/2021 Drawing 203_18894_KansasCity_MO_A3_0-A3_0
11/01/2021 Drawing 204_18894_KansasCity_MO_A4_0-A4_1
11/01/2021 Drawing 700_18894_KansasCity_MO_M1_0-M1_0
11/01/2021 Drawing 800_18894_KansasCity_MO_P1_0-P1_0
11/01/2021 Drawing 205_18894_KansasCity_MO_A5_0-A5_0
11/01/2021 Drawing 910_18894_KansasCity_MO_E1_0-E1_0
11/01/2021 Drawing 206_18894_KansasCity_MO_A6_0-A6_0
11/01/2021 Drawing 920_18894_KansasCity_MO_E2_0-E2_0
11/01/2021 Letter Fire Building Plan Review
11/02/2021 Plans 2021-11-02_18894_KansasCity_MO_For construction
11/02/2021 Approved Plans approved - KansasCity_MO_For construction
11/04/2021 Application Form excise tax application
11/08/2021 Letter License Tax Bill
11/08/2021 Receipt Receipt for transaction:2021-008574
11/08/2021 Letter DS Building Permit
11/10/2021 15550 Pet People FP PE Stamp
11/10/2021 Letter Fire (Sprinkler) Plan Review
11/17/2021 Pet People Battery and Voltage Drop Calcs PE Stamp
11/17/2021 Pet People FA 11 10 21 PE Stamp
11/17/2021 Letter Fire (Alarm) Plan Review Notice
12/08/2021 Letter INSPECTION SUMMARY
12/09/2021 Letter INSPECTION SUMMARY
12/20/2021 Letter INSPECTION SUMMARY
01/04/2022 Letter INSPECTION SUMMARY
01/10/2022 Letter Fire Loss Reduction Form
01/10/2022 Letter Fire Loss Reduction Form
01/10/2022 Letter INSPECTION SUMMARY
01/19/2022 Letter Field Certificate of Occupancy
01/19/2022 Letter Field Certificate of Occupancy
01/19/2022 Letter Codes Final Certificate of Occupancy
01/19/2022 Letter Codes Final Certificate of Occupancy
01/19/2022 Letter Fire Loss Reduction Form
02/07/2022 Letter Fire Loss Reduction Form
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home