06/14/2022
07/13/2022
01/02/2023
01/28/2025
Locations
Contacts
C & C HOME 2024, LLC, Phone:(819) 918-9871  
BEHOME LLC, Address:7500 W 95TH ST  
Michael Powell, Address:1101 SW US 40 Highway, Phone:(816) 591-6013  
C.M. MOSE & SON, Address:6603 ROYAL ST BLDG E, Phone:(816) 781-4707  
VELOCITY ELECTRIC AND AUTOMATION LLC, Address:1704 SW RED FOX CIR, Phone:(816) 215-1514  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
ROYALLENIII@GMAIL.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $480.00 $480.00 Paid 07/13/2022
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 07/13/2022
8350015-Water Meter Fee $479.24 $479.24 Paid 07/13/2022
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 07/13/2022
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 07/13/2022
9110078-Valuation Fee New Single Family $1,108.56 $1,108.56 Paid 07/13/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 12/20/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Failed 8/3/2022 8/3/2022 08/03/2022
Misc
Corrective Action Required
08/03/2022
- post address - plumbing not in yet.
Sewer Service Inspection - R Passed 8/4/2022 08/04/2022
Underslab Plumbing Inspection - Residential Passed 8/9/2022 8/9/2022 08/09/2022
Misc
Corrective Action Required
08/03/2022
- post address - plumbing not in yet.
Footing Inspection - Residential Passed 08/18/2022
Informational
08/18/2022
FOOTING APPROVED BY ENGINEER
Occupancy Inspection - Codes Residential Failed 8/19/2022 8/19/2022 08/19/2022
Misc
Corrective Action Required
08/19/2022
**THE HOUSE IS FAR FROM READY FOR OCCUPANCY INSPECTION **CLEAN THE STREET
Water Service Inspection - R Passed 11/23/2022 (10:30) 11/23/2022 11/23/2022
Electrical Service Inspection Failed 1/20/2023 1/20/2023 01/20/2023
Misc
Corrective Action Required
01/20/2023
-Install a #4 cu bonding jumper from the equivalent grounding bus bar where the GEC is connected to, to the grounded bus bar in middle -The grounding clamp to rebar is listed for rebar application? Tight connection?
Gas Service Inspection - Residential Failed 1/20/2023 1/20/2023 01/20/2023
Misc
Corrective Action Required
01/20/2023
-Provide min ten psi pressure for testing
All Rough Inspection - Residential Failed 1/20/2023 1/20/2023 01/20/2023
Misc
Corrective Action Required
01/20/2023
-Nail rear siding along edges @6” oc. Some siding nailing missing studs -Lag deck ledger board to rim band per plan. **Watch for the electrical wiring** -Nail garage PFH wall sheathing per code; anchor sill plate per code -Fb all wall plate holes and penetrations throughout -Provide box listed for floor receptacle -Fb fireplace space from roof (at both top lid and rear wall) -Complete fireplace venting; fasten fireplace to framing; provide min clearance from top of fireplace to combustible -Parallel electrical wiring within return air space at master bedroom wall -Block and seal off master bedroom return air space from roof -Brace ends of roof beam from rotation -Provide triple ceiling joists above great room per plan; take off roof load from triple joist and move to lvl beam/bearing wall -Provide a wall receptacle adjacent to the fixed slide door panel. FYI: this fixed panel is considered as a wall space. The countertop receptacle does not count -Parallel electrical wiring within return air space at kitchen/bedroom wall -Staple wiring along studs min 1.25” from stud nailing surface -Complete framing adjacent to shower and Fb from roof (at bathroom outside bedroom 2 ) -Anchor garage sill plate at front east corner -Complete soffit above wet bar and Fb as required -Un-block return air space above wet bar area -Electrician-go throughout the house and rectify electrical inside return air space -Fb top of fur out wall space; Fb wall space from ceiling & soffit space -Nail corner studs per code -Add another support stud for I beam at exterior wall corner of bedroom 4; install steel column at door -Protect plumbing in basement bedroom 4 bathroom at corner and at 3” DVW in closet -Anchor basement sill plate within 12” of the double door -Toe nail joists to sill plate and top plates per code -Over notched joist below master toilet **DO NOT INSULATE
Gas Service Inspection - Residential Passed 1/26/2023 1/26/2023 01/26/2023
Misc
Resolved
01/26/2023
-Provide min ten psi pressure for testing
Electrical Service Inspection Passed 1/31/2023 1/31/2023 01/31/2023
Misc
Resolved
01/31/2023
-Install a #4 cu bonding jumper from the equivalent grounding bus bar where the GEC is connected to, to the grounded bus bar in middle -The grounding clamp to rebar is listed for rebar application? Tight connection?
All Rough Inspection - Residential Failed 1/31/2023 01/31/2023
Misc
Corrective Action Required
01/20/2023
-Nail rear siding along edges @6” oc. -Fb fireplace space from roof (at both top lid and rear wall) **fb excessive gap -Complete fireplace venting; fasten fireplace to framing -Block and seal off master bedroom return air space from roof -Brace ends of lvl roof beam from rotation -Staple wiring along studs min 1.25” from stud nailing surface -Un-block return air space above wet bar area **take out the 2x10 solid blocking above I beam -Electrician-go throughout the house and rectify electrical inside return air space **also need to seal wire penetrations of return air space -Fb top of fur out wall space; Fb wall space from ceiling & soffit space **seal openings at rear bedroom ; unblock return air outside bedroom -Nail corner studs per code -At bedroom 4, install steel column at door -Protect plumbing in basement bedroom 4 bathroom at corner and at 3” DVW in closet -Toe nail joists to sill plate and top plates per code **remove insulation -Over notched joist below master toilet **complete plumbing **DO NOT INSULATE
All Rough Inspection - Residential Failed 2/23/2023 2/23/2023 02/23/2023
Misc
Corrective Action Required
01/31/2023
-Nail rear siding along edges @6” oc. -Brace ends of lvl roof beam from rotation -Staple wiring along studs min 1.25” from stud nailing surface throughout house -Electrician-go throughout the house and rectify electrical inside return air space **also need to seal wire penetrations of return air space -Fb top of fur out wall space; Fb wall space from ceiling & soffit space **seal openings at rear bedroom -Nail corner studs per code -At bedroom 4, install steel column at door -Protect plumbing in basement bedroom 4 bathroom at corner -Toe nail joists to sill plate and top plates per code **remove insulation **OK TO INSULATE
All Rough Inspection - Residential Passed 3/7/2023 3/7/2023 03/07/2023
Misc
Resolved
03/07/2023
-Fb top of fur out wall space; Fb wall space from ceiling & soffit space **seal openings at rear bedroom **OK TO INSULATE
Driveway Inspection Partial 3/27/2023 3/27/2023 03/27/2023
Misc
Informational
03/27/2023
Site visited and it appears that driveway meets city standards. I will come back after the driveway is poured and check ADA.
Sidewalk Inspection Partial 3/27/2023 3/27/2023 03/27/2023
Misc
Informational
03/27/2023
Site visited and it appears that sideway meets city standards and ADA standards. I will come back once sidewalk is poured. Deven also told them to clean up the street since there was mud that they had tracked. all down the street.
Driveway Inspection Passed 4/3/2023 4/3/2023 04/03/2023
Misc
Informational
03/27/2023
Site visited and it appears that driveway meets city standards. I will come back after the driveway is poured and check ADA. 4-3-23 site visited and the ada meets city standards passed.
Sidewalk Inspection Failed 4/3/2023 4/3/2023 04/03/2023
Misc
Informational
03/27/2023
Site visited and it appears that sideway meets city standards and ADA standards. I will come back once sidewalk is poured. Deven also told them to clean up the street since there was mud that they had tracked. all down the street.
Misc
Corrective Action Required
04/03/2023
4-3-23 site visited and the sidewalk has not been poured it is missing two panels are missing that are on the right side of the driveway when re-poured will need to be tied into the driveway.
Sidewalk Inspection Partial 4/10/2023 04/10/2023
Misc
Informational
04/03/2023
Site visited and it appears that sideway meets city standards and ADA standards. I will come back once sidewalk is poured. Deven also told them to clean up the street since there was mud that they had tracked. all down the street.
Misc
Corrective Action Required
04/03/2023
4-3-23 site visited and the sidewalk has not been poured it is missing two panels are missing that are on the right side of the driveway when re-poured will need to be tied into the driveway.
Sidewalk Inspection Partial 6/2/2023 6/8/2023 06/08/2023
Misc
Informational
04/10/2023
Site visited and it appears that sideway meets city standards and ADA standards. I will come back once sidewalk is poured. Deven also told them to clean up the street since there was mud that they had tracked. all down the street.
Misc
Corrective Action Required
04/10/2023
4-3-23 site visited and the sidewalk has not been poured it is missing two panels are missing that are on the right side of the driveway when re-poured will need to be tied into the driveway. 6-8-23 NS Site visited still no progress on finishing the sidewalk.
Erosion Control Inspection Residential Failed 7/24/2023 07/24/2023
Misc
Corrective Action Required
07/24/2023
Erosion control failed. Clean gravel out of street. Clean Storm drain.
Corrective Action Required
07/24/2023
Sidewalk Inspection Partial 8/1/2023 11/1/2023 11/01/2023
Misc
Informational
06/08/2023
Site visited and it appears that sideway meets city standards and ADA standards. I will come back once sidewalk is poured. Deven also told them to clean up the street since there was mud that they had tracked. all down the street.
Misc
Corrective Action Required
06/08/2023
4-3-23 site visited and the sidewalk has not been poured it is missing two panels are missing that are on the right side of the driveway when re-poured will need to be tied into the driveway. 6-8-23 NS Site visited still no progress on finishing the sidewalk. 11-1-23 Dustin A, Conditions have not changed
Sidewalk Inspection Partial 11/8/2023 11/8/2023 11/08/2023
Misc
Informational
11/01/2023
Site visited and it appears that sideway meets city standards and ADA standards. I will come back once sidewalk is poured. Deven also told them to clean up the street since there was mud that they had tracked. all down the street.
Misc
Corrective Action Required
11/01/2023
4-3-23 site visited and the sidewalk has not been poured it is missing two panels are missing that are on the right side of the driveway when re-poured will need to be tied into the driveway. 6-8-23 NS Site visited still no progress on finishing the sidewalk. 11-1-23 Dustin A, Conditions have not changed 11-8-23 Dustin A, Conditions have not changed
Occupancy Inspection - Codes Residential Failed 12/9/2024 12/9/2024 12/09/2024
Misc
Corrective Action Required
08/19/2022
-Obtain lawn irrigation permit and submit backflow valve test report to city -Sidewalk not approved on record -As-graded plot plan is required -Raise sewer manhole at front of lot to grade level -Lower water meter to flush with grade. Make sure meter top-to-lid distance is 14”-18” -Provide sewer tracer wire port at grade -Downspout extension/splash block must be min 36” from foundation wall -Seal rear receptacle adjacent to double door; seal above meter, AC disconnect, seal exterior lights, etc -Cover exposed NM cable near j-box under deck -Provide proper hangers for deck joists -Attach deck beam to each post with two 1/2” through bolts/washers/nuts or approved equivalent connections -Deck/roof support pier was not inspected by city. Provide engineer inspection and approval for piers -Install tamper-proof caps at AC valves -Provide receptacle at kitchen countertop per code -Complete installing receptacle under kitchen sink -Provide a water hammering arrestor for water supply to dishwasher -Deck receptacles shall be gfci-protected -Install secondary lock for all slide doors per security code -Provide box extensions for receptacle boxes recessed behind combustible wall finish in master bedroom -Cannot have pendant light fixture with exposed light bulbs inside master closet -All smoke alarms must be interconnected and activate at same time -Provide water hammering arrestors at laundry water outlets -Provide tamper-resistant receptacles as required -Garage door not self-closing -Water heater PT valve discharge pipe must extend to within 6” of floor -Secure raceways within 12” of the steamer disconnect -Secure water service pex line to wall
Occupancy Inspection - Codes Residential Ready for Temp CO 12/18/2024 12/18/2024 12/18/2024
Misc
Corrective Action Required
12/09/2024
-Sidewalk not approved on record -As-graded plot plan is required -Deck/roof support pier was not inspected by city. Provide engineer inspection and approval for piers
Plot Plan Inspection Passed 1/17/2025 01/17/2025
Sidewalk Inspection Passed 01/28/2025
Misc
Informational
11/08/2023
Site visited and it appears that sideway meets city standards and ADA standards. I will come back once sidewalk is poured. Deven also told them to clean up the street since there was mud that they had tracked. all down the street. 1-28-25 NS site visited and it appears that sidewalk and driveway meet city standards and ADA standards passed
Misc
Corrective Action Required
11/08/2023
4-3-23 site visited and the sidewalk has not been poured it is missing two panels are missing that are on the right side of the driveway when re-poured will need to be tied into the driveway. 6-8-23 NS Site visited still no progress on finishing the sidewalk. 11-1-23 Dustin A, Conditions have not changed 11-8-23 Dustin A, Conditions have not changed 12-16-24 NS Site Visited and it appears that sidewalk was poured with no inspection called in and the sidewalk is one monolithic pour next to the driveway and will either need to be cut or replaced.
Sidewalk Inspection Passed 01/28/2025
Misc
Resolved
01/28/2025
Site visited and it appears that sideway meets city standards and ADA standards. I will come back once sidewalk is poured. Deven also told them to clean up the street since there was mud that they had tracked. all down the street.
Misc
Resolved
01/28/2025
4-3-23 site visited and the sidewalk has not been poured it is missing two panels are missing that are on the right side of the driveway when re-poured will need to be tied into the driveway. 6-8-23 NS Site visited still no progress on finishing the sidewalk. 11-1-23 Dustin A, Conditions have not changed 11-8-23 Dustin A, Conditions have not changed 12-16-24 NS Site Visited and it appears that sidewalk was poured with no inspection called in and the sidewalk is one monolithic pour next to the driveway and will either needs or replaced.
Occupancy Inspection - Codes Residential Full C of O 1/28/2025 01/28/2025
Misc
Resolved
01/28/2025
-Sidewalk not approved on record
Documents & Images
Date Uploaded File Type Document Name
06/30/2022 License_Tax_Application Lee's Summit
07/01/2022 Residental Permit Application_1
07/06/2022 M L Crose 4809 NE Freehold Ct LSMO Monticello Lot 129 Be Home Permit 2022-2650 3rd Party Footing Inspection Report 7-5-22
07/06/2022 Permit Codes Residential Plan Review
07/12/2022 Approved Plans APPROVED PLANS
07/12/2022 Plot Plan APPROVED PLOT PLAN
07/12/2022 Permit Codes Residential Plan Review
07/13/2022 Permit DS Building Permit
07/13/2022 Receipt Receipt for transaction: 2022-005722
08/03/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/09/2022 Letter INSPECTION SUMMARY
08/15/2022 Final_2022_08_12_GBSLab_LSMO_K&E Flatwork
08/18/2022 Letter INSPECTION SUMMARY
08/19/2022 Letter INSPECTION SUMMARY
11/23/2022 Letter INSPECTION SUMMARY
01/20/2023 Letter INSPECTION SUMMARY
01/20/2023 Letter INSPECTION SUMMARY
01/20/2023 Letter INSPECTION SUMMARY
01/26/2023 Letter INSPECTION SUMMARY
01/31/2023 Letter INSPECTION SUMMARY
01/31/2023 Letter INSPECTION SUMMARY
02/23/2023 Letter INSPECTION SUMMARY
03/07/2023 Letter INSPECTION SUMMARY
03/27/2023 Letter INSPECTION SUMMARY
03/27/2023 Letter INSPECTION SUMMARY
03/27/2023 Letter INSPECTION SUMMARY
04/03/2023 Letter INSPECTION SUMMARY
04/03/2023 Letter INSPECTION SUMMARY
04/10/2023 Letter INSPECTION SUMMARY
06/08/2023 Letter INSPECTION SUMMARY
11/01/2023 Letter INSPECTION SUMMARY
11/08/2023 Letter INSPECTION SUMMARY
03/18/2024 Application Form NEW OWNER APP
03/18/2024 Application Form NEW OWNER DEED
03/18/2024 Letter DS Building Permit
03/27/2024 Letter Codes 180 Day Letter
12/03/2024 Application Form EXTENSION FORM
12/09/2024 Letter INSPECTION SUMMARY
12/09/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/18/2024 Letter INSPECTION SUMMARY
12/20/2024 Certificate/License Codes Temporary Certificate of Occupancy
12/20/2024 Receipt Receipt for transaction: 2024-009628
01/16/2025 3RD Party Insp Report ENGINEER REPORT
01/16/2025 Plot Plan approved as graded plot plan
01/17/2025 Letter INSPECTION SUMMARY
01/28/2025 Letter INSPECTION SUMMARY
01/28/2025 Letter INSPECTION SUMMARY
01/28/2025 Letter INSPECTION SUMMARY
01/28/2025 Letter Field Certificate of Occupancy
01/28/2025 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home