Permit Application Status

PRCOM20220956


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20220956
Building Permit - Commercial
Certificate of Occupancy
WHD MANAGEMENT LLC
NEW COMMERCIAL
NEW 6 BAY SELF STORAGE BUILDING
03/15/2022
05/19/2022
09/26/2022
02/29/2024
Locations
Contacts
PELLA BUILDING SYSTEMS INCORPORATED, Address:906 W 9TH ST, Phone:(641) 628-9300  
Tporter@MegaStorageUSA.com, Address:troy porter, Phone:(515) 414-1101  
FAITH TECHNOLOGIES INC, Address:P O BOX 260, Phone:(920) 225-6500  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
WHD MANAGEMENT LLC, Address:PO BOX 1059  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 04/21/2022 05/18/2022
Joe Frogge
LC - MEP Subs
Resolved
05/18/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 4/14/22 - not addressed
LC - General Contractor
Resolved
05/18/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact which is where inspection reports will be sent. 4/14/22 - not addressed
Final Development Plan Review Approved 05/06/2022 04/22/2022
Joe Frogge
Building Plan Review Approved 04/21/2022 04/19/2022
Joe Frogge
Final Development Plan
Resolved
04/19/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
Gen - Design professional seals
Resolved
04/14/2022

Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects – Board Rules, Division 2030 – Chapter 3, 20 CSR 2030-3.060 Licensees Seal Documents must bear design professionals original seal with signature and date. (relevant portion paraphrased – reference original document for additional information) Action required: All drawings are to bear dated seal and signature from architect/engineer of record. (including pre-engineered metal building drawings)
Fire Plan Review Approved with Conditions 04/21/2022 04/14/2022
Joe Frogge
Portable fire extinguishers - general
Corrective Action Required
04/14/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required- Provide a minimum 2A:10B:C fire extinguisher in each of the spaces, or provide a fire extinguisher(s) on the exterior of the building that meet travel distances. Verified at inspection.
Misc
Corrective Action Required
04/14/2022

[BE] 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. Verified at inspection.
Fire Plan Review Approved with Conditions 03/29/2022 03/30/2022
Jim Eden
Portable fire extinguishers - general
Corrective Action Required
03/30/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required- Provide a minimum 2A:10B:C fire extinguisher in each of the spaces, or provide a fire extinguisher(s) on the exterior of the building that meet travel distances. Verified at inspection.
Misc
Corrective Action Required
03/30/2022

[BE] 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. Verified at inspection.
Building Plan Review Rejected 03/29/2022 03/17/2022
Joe Frogge
Final Development Plan
Corrective Action Required
03/16/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
Gen - Design professional seals
Corrective Action Required
03/16/2022

Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects – Board Rules, Division 2030 – Chapter 3, 20 CSR 2030-3.060 Licensees Seal Documents must bear design professionals original seal with signature and date. (relevant portion paraphrased – reference original document for additional information) Action required: All drawings are to bear dated seal and signature from architect/engineer of record. (including pre-engineered metal building drawings)
Licensed Contractors Rejected 03/29/2022 03/16/2022
Joe Frogge
LC - MEP Subs
Corrective Action Required
03/16/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
LC - General Contractor
Corrective Action Required
03/16/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact which is where inspection reports will be sent.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $584.46 $584.46 Paid 05/18/2022
7232302-Industrial/Warehouse License Tax Fee $850.00 $850.00 Paid 05/18/2022
9110068-Storm Fee $4,646.70 $4,646.70 Paid 05/18/2022
9110081-Paved Surface Inspection Fee $23,687.21 $23,687.21 Paid 05/18/2022
91100C9-Water Insp Fee $2,519.55 $2,519.55 Paid 05/18/2022
9110071-Site Grading Fee $1,500.00 $1,500.00 Paid 05/18/2022
9110072-Water Test Fee $200.00 $200.00 Paid 05/18/2022
9110069-After Hours Inspections (Public Works)(Per Hour) $100.00 $100.00 Paid 06/09/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 06/09/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 07/07/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 08/07/2023
Outstanding Fees Amount Paid Owing Date Paid
9110078-Temporary Occupancy Fee $50.00 $0.00 $50.00 Not Paid


$50.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Partial 06/30/2022
Misc
Informational
06/30/2022
6-30-22 Gordon is installing silt fence
Erosion Control Inspection Residential Partial 06/30/2022
Misc
Informational
06/30/2022
6-30-22 Gordon is installing silt fence
Erosion Control Inspection Residential Partial 07/20/2022
Misc
Informational
06/30/2022
6-30-22 Gordon is installing silt fence 7-20-22 AN silt fence is still in good working order
Grading/Excavation/Fill Inspection Partial 07/20/2022
Misc
Informational
07/20/2022
AN crew is still grading and working on the detention basin
Site Visit Partial 08/01/2022
Misc
Informational
08/01/2022
8-1-22 AN no work being done on the this site
Grading/Excavation/Fill Inspection Partial 08/02/2022
Misc
Informational
07/20/2022
AN crew is still grading and working on the detention basin 8-2-22 AN crew is continuing to grade the site for mega storage
Site Visit Partial 08/04/2022
Misc
Informational
08/01/2022
8-1-22 AN no work being done on the this site 8-2-22 AN working on site pad
Site Visit Partial 08/04/2022
Misc
Informational
08/04/2022
8-1-22 AN no work being done on the this site 8-2-22 AN working on site pad 8-3-22 AN working on site pad
Site Visit Partial 08/04/2022
Misc
Informational
08/04/2022
8-1-22 AN no work being done on the this site 8-2-22 AN working on site pad 8-3-22 AN working on site pad 8-4-22 AN working on site pad
Erosion Control Inspection Residential Partial 08/04/2022
Misc
Informational
07/20/2022
6-30-22 Gordon is installing silt fence 7-20-22 AN silt fence is still in good working order 8-4-22 AN silt fence is good but need to clan up street
Grading/Excavation/Fill Inspection Partial 08/08/2022
Misc
Informational
08/02/2022
AN crew is still grading and working on the detention basin 8-2-22 AN crew is continuing to grade the site for mega storage 8-8-22 AN crew grading for all the storage unit pads
Detention Basin Partial 08/08/2022
Misc
Informational
08/08/2022
8-8-22 AN crew is digging out the detention basin
Grading/Excavation/Fill Inspection Partial 08/11/2022
Misc
Informational
08/08/2022
AN crew is still grading and working on the detention basin 8-2-22 AN crew is continuing to grade the site for mega storage 8-8-22 AN crew grading for all the storage unit pads 8-10-22 AN crew is working on site pads
Detention Basin Partial 08/11/2022
Misc
Informational
08/08/2022
8-8-22 AN crew is digging out the detention basin 8-11-22 AN crew is still working on grading the basin
Detention Basin Partial 08/12/2022
Misc
Informational
08/11/2022
8-8-22 AN crew is digging out the detention basin 8-11-22 AN crew is still working on grading the basin 8-12-22 AN crew is continuing to grade the basin
Site Visit Partial 08/17/2022
Misc
Informational
08/04/2022
8-1-22 AN no work being done on the this site 8-2-22 AN working on site pad 8-3-22 AN working on site pad 8-4-22 AN working on site pad 8-16-22 AN. No work raining
Site Visit Partial 08/17/2022
Misc
Informational
08/17/2022
8-1-22 AN no work being done on the this site 8-2-22 AN working on site pad 8-3-22 AN working on site pad 8-4-22 AN working on site pad 8-16-22 AN. No work raining 8-17-22 AN no work
Site Visit Partial 08/19/2022
Misc
Informational
08/17/2022
8-1-22 AN no work being done on the this site 8-2-22 AN working on site pad 8-3-22 AN working on site pad 8-4-22 AN working on site pad 8-16-22 AN. No work raining 8-17-22 AN no work 8-18–22AN no work
Site Visit Partial 08/19/2022
Misc
Informational
08/19/2022
8-1-22 AN no work being done on the this site 8-2-22 AN working on site pad 8-3-22 AN working on site pad 8-4-22 AN working on site pad 8-16-22 AN. No work raining 8-17-22 AN no work 8-18–22AN no work 8-19-22 AN no work
Site Visit Partial 08/22/2022
Misc
Informational
08/19/2022
8-1-22 AN no work being done on the this site 8-2-22 AN working on site pad 8-3-22 AN working on site pad 8-4-22 AN working on site pad 8-16-22 AN. No work raining 8-17-22 AN no work 8-18–22AN no work 8-19-22 AN no work 8-22-22 AN no work for development
Erosion Control Inspection Residential Partial 08/22/2022
Misc
Informational
08/04/2022
6-30-22 Gordon is installing silt fence 7-20-22 AN silt fence is still in good working order 8-4-22 AN silt fence is good but need to clan up street 9-22-22 AN no work for development
Storm Sewer Construction Inspection Partial 08/27/2022
Misc
Informational
08/27/2022
8-26-22 AN site rite has begun to install the the storm pipe for mega storage
Storm Sewer Construction Inspection Partial 08/27/2022
Misc
Informational
08/27/2022
8-26-22 AN site rite has begun to install the the storm pipe for mega storage 8-27-22 AN. Crew is waiting on storm boxes so they are just laying pipe. 8-27-22 AN pipe is installed for 1-6 to 1-7 to 1-8
Storm Sewer Construction Inspection Partial 08/27/2022
Misc
Informational
08/27/2022
8-26-22 AN site rite has begun to install the the storm pipe for mega storage 8-27-22 AN. Crew is waiting on storm boxes so they are just laying pipe. 8-27-22 AN pipe is installed for 1-6 to 1-7 to 1-8 8-27-22 AN pipe installed 1-7 to 9-1 and 1-8 to 8-1. 2-2 to 2-3 2-3 to 2-4
Storm Sewer Construction Inspection Partial 08/27/2022
Misc
Informational
08/27/2022
8-26-22 AN site rite has begun to install the the storm pipe for mega storage 8-27-22 AN. Crew is waiting on storm boxes so they are just laying pipe. 8-27-22 AN pipe is installed for 1-6 to 1-7 to 1-8 8-27-22 AN pipe installed 1-7 to 9-1 and 1-8 to 8-1. 2-2 to 2-3 2-3 to 2-4 8-27-22 AN. Installed 2-4 to 10-1
Storm Sewer Construction Inspection Partial 08/29/2022
Misc
Informational
08/27/2022
8-26-22 AN site rite has begun to install the the storm pipe for mega storage 8-27-22 AN. Crew is waiting on storm boxes so they are just laying pipe. 8-27-22 AN pipe is installed for 1-6 to 1-7 to 1-8 8-27-22 AN pipe installed 1-7 to 9-1 and 1-8 to 8-1. 2-2 to 2-3 2-3 to 2-4 8-27-22 AN. Installed 2-4 to 10-1 8-29-22 AN installed pipe from 2-2 to 2-1. Also 7-2 to 7-1
Storm Sewer Construction Inspection Partial 08/29/2022
Misc
Informational
08/29/2022
8-26-22 AN site rite has begun to install the the storm pipe for mega storage 8-27-22 AN. Crew is waiting on storm boxes so they are just laying pipe. 8-27-22 AN pipe is installed for 1-6 to 1-7 to 1-8 8-27-22 AN pipe installed 1-7 to 9-1 and 1-8 to 8-1. 2-2 to 2-3 2-3 to 2-4 8-27-22 AN. Installed 2-4 to 10-1 8-29-22 AN installed pipe from 2-2 to 2-1. Also 7-2 to 7-1. 11-1 to 2-3
Water Line - Construction Inspection Partial 9/16/2022 09/06/2022
Misc
Informational
09/06/2022
8-29 to 9-6 AN. Site rite has been install the private fire line and have the south , west and north line in . Two more fire hydrant still have to be installed.
Storm Sewer Construction Inspection Partial 09/12/2022
Misc
Informational
08/29/2022
8-26-22 AN site rite has begun to install the the storm pipe for mega storage 8-27-22 AN. Crew is waiting on storm boxes so they are just laying pipe. 8-27-22 AN pipe is installed for 1-6 to 1-7 to 1-8 8-27-22 AN pipe installed 1-7 to 9-1 and 1-8 to 8-1. 2-2 to 2-3 2-3 to 2-4 8-27-22 AN. Installed 2-4 to 10-1 8-29-22 AN installed pipe from 2-2 to 2-1. Also 7-2 to 7-1. 11-1 to 2-3 9-12-22 AN. Box 1-2 and 1-3 is installed
Storm Sewer Construction Inspection Partial 09/13/2022
Misc
Informational
09/12/2022
8-26-22 AN site rite has begun to install the the storm pipe for mega storage 8-27-22 AN. Crew is waiting on storm boxes so they are just laying pipe. 8-27-22 AN pipe is installed for 1-6 to 1-7 to 1-8 8-27-22 AN pipe installed 1-7 to 9-1 and 1-8 to 8-1. 2-2 to 2-3 2-3 to 2-4 8-27-22 AN. Installed 2-4 to 10-1 8-29-22 AN installed pipe from 2-2 to 2-1. Also 7-2 to 7-1. 11-1 to 2-3 9-12-22 AN. Box 1-2 and 1-3 is installed 9-13-22 AN box 1-4 and 1-5 installed
Storm Sewer Construction Inspection Partial 09/14/2022
Misc
Informational
09/13/2022
8-26-22 AN site rite has begun to install the the storm pipe for mega storage 8-27-22 AN. Crew is waiting on storm boxes so they are just laying pipe. 8-27-22 AN pipe is installed for 1-6 to 1-7 to 1-8 8-27-22 AN pipe installed 1-7 to 9-1 and 1-8 to 8-1. 2-2 to 2-3 2-3 to 2-4 8-27-22 AN. Installed 2-4 to 10-1 8-29-22 AN installed pipe from 2-2 to 2-1. Also 7-2 to 7-1. 11-1 to 2-3 9-12-22 AN. Box 1-2 and 1-3 is installed 9-13-22 AN box 1-4 and 1-5 installed 9-14-22 AN crew is back filling around some boxes and are going to try and set a back flow vault. They are also waiting on around 3 box so they can install
Water Line - Construction Inspection Partial 9/16/2022 09/16/2022
Misc
Informational
09/06/2022
8-29 to 9-6 AN. Site rite has been install the private fire line and have the south , west and north line in . Two more fire hydrant still have to be installed. Backflow vault still needs to be installed Backflow vault still needs to be installed 9/16/22 SR Backfow has been partially installed and will be looking for a hydrostatic test sometime next week.
Storm Sewer Construction Inspection Partial 09/27/2022
Misc
Informational
09/14/2022
8-26-22 AN site rite has begun to install the the storm pipe for mega storage 8-27-22 AN. Crew is waiting on storm boxes so they are just laying pipe. 8-27-22 AN pipe is installed for 1-6 to 1-7 to 1-8 8-27-22 AN pipe installed 1-7 to 9-1 and 1-8 to 8-1. 2-2 to 2-3 2-3 to 2-4 8-27-22 AN. Installed 2-4 to 10-1 8-29-22 AN installed pipe from 2-2 to 2-1. Also 7-2 to 7-1. 11-1 to 2-3 9-12-22 AN. Box 1-2 and 1-3 is installed 9-13-22 AN box 1-4 and 1-5 installed 9-14-22 AN crew is back filling around some boxes and are going to try and set a back flow vault. They are also waiting on around 3 box so they can install 9-27-22 AN crew is setting some more storm box lids
Fire Line - Hydrostatic Test Partial 09/27/2022
Misc
Informational
09/27/2022
9-27-22 AN. Private water main with 4 hydrants on it. Do a hydro test at 200 psi for 2 hours
Fire Line - Hydrostatic Test Passed 09/27/2022
Misc
Informational
09/27/2022
9-27-22 AN. Private water main with 4 hydrants on it. hydro test at 200 psi for 2 hours 1:26pm 9-27-22 AN 3:26pm hydrostatic test passed at 200psi for 2 hours 9-28-22 AN. ( Correction ) there was only 3 hydrants on the mega storage job
Water Line - Construction Inspection Passed 09/28/2022
Misc
Informational
09/16/2022
8-29 to 9-6 AN. Site rite has been install the private fire line and have the south , west and north line in . Two more fire hydrant still have to be installed. Backflow vault still needs to be installed Backflow vault still needs to be installed 9/16/22 SR Backfow has been partially installed and will be looking for a hydrostatic test sometime next week. 9-28-22 AN site rite has all of their fire line installed , trust blocks , and hydro test complete
Storm Sewer Construction Inspection Passed 09/28/2022
Misc
Informational
09/27/2022
8-26-22 AN site rite has begun to install the the storm pipe for mega storage 8-27-22 AN. Crew is waiting on storm boxes so they are just laying pipe. 8-27-22 AN pipe is installed for 1-6 to 1-7 to 1-8 8-27-22 AN pipe installed 1-7 to 9-1 and 1-8 to 8-1. 2-2 to 2-3 2-3 to 2-4 8-27-22 AN. Installed 2-4 to 10-1 8-29-22 AN installed pipe from 2-2 to 2-1. Also 7-2 to 7-1. 11-1 to 2-3 9-12-22 AN. Box 1-2 and 1-3 is installed 9-13-22 AN box 1-4 and 1-5 installed 9-14-22 AN crew is back filling around some boxes and are going to try and set a back flow vault. They are also waiting on around 3 box so they can install 9-27-22 AN crew is setting some more storm box lids 9-28-22 AN. All of the storm lines, boxes and lids are installed
Detention Basin Partial 09/28/2022
Misc
Informational
08/12/2022
8-8-22 AN crew is digging out the detention basin 8-11-22 AN crew is still working on grading the basin 8-12-22 AN crew is continuing to grade the basin 9-28-22 AN basin is completed but they did not install a skimmer. When job is completed we will need as graded and as builts for all the structures
Backflow Preventer and Vault Partial 09/29/2022
Misc
Informational
09/29/2022
9-29-22 AN spoke with Jeremy form site rite and let him know that they need to get a floor poured in the vault and a permanently installed pump and pumped to day light or storm or a gravity drain . Also needs steps
Erosion Control Inspection Residential Partial 10/04/2022
Misc
Informational
08/22/2022
6-30-22 Gordon is installing silt fence 7-20-22 AN silt fence is still in good working order 8-4-22 AN silt fence is good but need to clan up street 9-22-22 AN no work for development 9-4-22 AN. No erosion control issues
Backflow Preventer and Vault Passed 10/21/2022
Misc
Informational
09/29/2022
9-29-22 AN spoke with Jeremy form site rite and let him know that they need to get a floor poured in the vault and a permanently installed pump and pumped to day light or storm or a gravity drain . Also needs steps 10-21-22 AN. Back flow fault is now complete, floor is installed and they put in a gravity drain
Footing Inspection - Commercial Passed 11/3/2022 11/3/2022 11/03/2022
Grading/Excavation/Fill Inspection Partial 11/22/2022
Misc
Informational
08/11/2022
AN crew is still grading and working on the detention basin 8-2-22 AN crew is continuing to grade the site for mega storage 8-8-22 AN crew grading for all the storage unit pads 8-10-22 AN crew is working on site pads 11-22-22 AN. Shaw is grading and compacting for the drive/parking for the storage units
Grading/Excavation/Fill Inspection Partial 11/25/2022
Misc
Informational
11/22/2022
AN crew is still grading and working on the detention basin 8-2-22 AN crew is continuing to grade the site for mega storage 8-8-22 AN crew grading for all the storage unit pads 8-10-22 AN crew is working on site pads 11-22-22 AN. Shaw is grading and compacting for the drive/parking for the storage units 11-25-22 AN Shaw is doing some more grading
Detention Basin Failed 11/30/2022
Misc
Informational
09/28/2022
8-8-22 AN crew is digging out the detention basin 8-11-22 AN crew is still working on grading the basin 8-12-22 AN crew is continuing to grade the basin 9-28-22 AN basin is completed but they did not install a skimmer. When job is completed we will need as graded and as builts for all the structures
Miscellaneous Correction
Corrective Action Required
11/30/2022
11-30-22 AN. Detention basin is not draining properly and is holding water. Water needs to drain 100% in 48hours
Erosion Control Inspection Residential Partial 11/30/2022
Misc
Informational
10/04/2022
6-30-22 Gordon is installing silt fence 7-20-22 AN silt fence is still in good working order 8-4-22 AN silt fence is good but need to clan up street 9-22-22 AN no work for development 9-4-22 AN. No erosion control issues 11-30-22 AN no erosion control issues
Grading/Excavation/Fill Inspection Partial 12/01/2022
Misc
Informational
11/25/2022
AN crew is still grading and working on the detention basin 8-2-22 AN crew is continuing to grade the site for mega storage 8-8-22 AN crew grading for all the storage unit pads 8-10-22 AN crew is working on site pads 11-22-22 AN. Shaw is grading and compacting for the drive/parking for the storage units 11-25-22 AN Shaw is doing some more grading 12-1-22 AN crew is out re surveying everything for the road and drive areas. Kissick construction is taking over the job
Pavement-Aggregate Base Partial 12/06/2022
Misc
Informational
12/06/2022
12-6-22 AN kissick has began to lay base rock
Grading/Excavation/Fill Inspection Partial 12/19/2022
Misc
Informational
12/01/2022
AN crew is still grading and working on the detention basin 8-2-22 AN crew is continuing to grade the site for mega storage 8-8-22 AN crew grading for all the storage unit pads 8-10-22 AN crew is working on site pads 11-22-22 AN. Shaw is grading and compacting for the drive/parking for the storage units 11-25-22 AN Shaw is doing some more grading 12-1-22 AN crew is out re surveying everything for the road and drive areas. Kissick construction is taking over the job 12-19-22 AN kissick is grading the lot for concrete
Site Visit Partial 12/21/2022
Misc
Informational
08/22/2022
8-1-22 AN no work being done on the this site 8-2-22 AN working on site pad 8-3-22 AN working on site pad 8-4-22 AN working on site pad 8-16-22 AN. No work raining 8-17-22 AN no work 8-18–22AN no work 8-19-22 AN no work 8-22-22 AN no work for development 12-21-22 AN crew has began to put up the storage unit structures
Site Visit Partial 12/29/2022
Misc
Informational
12/21/2022
8-1-22 AN no work being done on the this site 8-2-22 AN working on site pad 8-3-22 AN working on site pad 8-4-22 AN working on site pad 8-16-22 AN. No work raining 8-17-22 AN no work 8-18–22AN no work 8-19-22 AN no work 8-22-22 AN no work for development 12-21-22 AN crew has began to put up the storage unit structures 12-29-22 DP no work for development, started building storage units
Misc
Informational
12/29/2022
Site Visit Partial 01/04/2023
Misc
Informational
12/29/2022
8-1-22 AN no work being done on the this site 8-2-22 AN working on site pad 8-3-22 AN working on site pad 8-4-22 AN working on site pad 8-16-22 AN. No work raining 8-17-22 AN no work 8-18–22AN no work 8-19-22 AN no work 8-22-22 AN no work for development 12-21-22 AN crew has began to put up the storage unit structures 12-29-22 DP no work for development, started building storage units 1-4-23 DP. no work for development
Misc
Informational
12/29/2022
Erosion Control Inspection Residential Partial 01/04/2023
Misc
Informational
11/30/2022
6-30-22 Gordon is installing silt fence 7-20-22 AN silt fence is still in good working order 8-4-22 AN silt fence is good but need to clan up street 9-22-22 AN no work for development 9-4-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-5-4-23 DP no erosion control issues
Hydrant Inspection Failed 01/09/2023
Misc
Corrective Action Required
01/09/2023
1-9-22 DP all private fire hydrants need to have a silver painted bonnet.
Miscellaneous Correction
Corrective Action Required
01/09/2023
Pavement-Proof Roll Partial 1/10/2023 1/10/2023 01/10/2023
Misc
Informational
01/10/2023
1-10-23 DP Crew started pouring concrete and never did a proof roll. There was soft spots due to rain/snow/temps.
Pavement-Surface Partial 1/10/2023 1/10/2023 01/10/2023
Misc
Informational
01/10/2023
1-10-23 DP Crew started pouring concrete and never did a proof roll. There was soft spots due to rain/snow/temps.
Pavement-Curb Construction Partial 1/11/2023 1/11/2023 01/11/2023
Misc
Informational
01/11/2023
1-11-23 DP crew is forming up some curb
Pavement-Surface Partial 1/11/2023 1/11/2023 01/11/2023
Misc
Informational
01/10/2023
1-10-23 DP Crew started pouring concrete and never did a proof roll. There was soft spots due to rain/snow/temps. 1-11-23 DP Crew is cutting lines in concrete that was poured yesterday
Pavement-Proof Roll Partial 01/16/2023
Misc
Informational
01/10/2023
1-10-23 DP Crew started pouring concrete and never did a proof roll. There was soft spots due to rain/snow/temps. 1-16-23 AN did a proof roll for the middle alley and it did have a couple soft spots. they will be digging up letting dry and recompacting
Grading/Excavation/Fill Inspection Partial 01/16/2023
Misc
Informational
12/19/2022
AN crew is still grading and working on the detention basin 8-2-22 AN crew is continuing to grade the site for mega storage 8-8-22 AN crew grading for all the storage unit pads 8-10-22 AN crew is working on site pads 11-22-22 AN. Shaw is grading and compacting for the drive/parking for the storage units 11-25-22 AN Shaw is doing some more grading 12-1-22 AN crew is out re surveying everything for the road and drive areas. Kissick construction is taking over the job 12-19-22 AN kissick is grading the lot for concrete 1-16-23 AN kissick is regrading some areas that did not get graded properly
Pavement-Surface Partial 1/17/2023 1/17/2023 01/17/2023
Misc
Informational
01/11/2023
1-10-23 DP Crew started pouring concrete and never did a proof roll. There was soft spots due to rain/snow/temps. 1-11-23 DP Crew is cutting lines in concrete that was poured yesterday 1-17-23 DP Proof roll passed and now the crew is pouring the middle alley.
Erosion Control Inspection Residential Partial 1/18/2023 1/18/2023 01/18/2023
Misc
Informational
01/04/2023
6-30-22 Gordon is installing silt fence 7-20-22 AN silt fence is still in good working order 8-4-22 AN silt fence is good but need to clan up street 9-22-22 AN no work for development 9-4-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-5-4-23 DP no erosion control issues 1-18-23 DP no erosion control issues
Site Visit Partial 1/23/2023 1/23/2023 01/23/2023
Misc
Informational
01/04/2023
8-1-22 AN no work being done on the this site 8-2-22 AN working on site pad 8-3-22 AN working on site pad 8-4-22 AN working on site pad 8-16-22 AN. No work raining 8-17-22 AN no work 8-18–22AN no work 8-19-22 AN no work 8-22-22 AN no work for development 12-21-22 AN crew has began to put up the storage unit structures 12-29-22 DP no work for development, started building storage units 1-4-23 DP. no work for development 1-23-23 DP Crew is continuing to erect buildings
Misc
Informational
01/04/2023
Site Visit Partial 2/2/2023 2/2/2023 02/02/2023
Misc
Informational
02/02/2023
2-2-23 DP. Crew is still working on buildings. Concrete crew hasn't been on site for a few weeks.
Site Visit Partial 2/23/2023 2/23/2023 02/23/2023
Misc
Informational
02/02/2023
2-2-23 DP. Crew is still working on buildings. Concrete crew hasn't been on site for a few weeks. 2-23-23 PS Crews on site are working on steel buildings. No work for development
Pavement-Aggregate Base Partial 3/1/2023 3/1/2023 03/01/2023
Misc
Informational
12/06/2022
12-6-22 AN kissick has began to lay base rock 3-1-22 DP Crew has returned and is fixing wet spots in hopes of doing a proof roll this afternoon.
Grading/Excavation/Fill Inspection Partial 3/2/2023 3/2/2023 03/02/2023
Misc
Informational
01/16/2023
AN crew is still grading and working on the detention basin 8-2-22 AN crew is continuing to grade the site for mega storage 8-8-22 AN crew grading for all the storage unit pads 8-10-22 AN crew is working on site pads 11-22-22 AN. Shaw is grading and compacting for the drive/parking for the storage units 11-25-22 AN Shaw is doing some more grading 12-1-22 AN crew is out re surveying everything for the road and drive areas. Kissick construction is taking over the job 12-19-22 AN kissick is grading the lot for concrete 1-16-23 AN kissick is regrading some areas that did not get graded properly 3-2-23 DP. Crew is grading out wet spots in hopes of passing a Proof roll monday
Erosion Control Inspection Residential Partial 3/9/2023 3/9/2023 03/09/2023
Misc
Informational
01/18/2023
6-30-22 Gordon is installing silt fence 7-20-22 AN silt fence is still in good working order 8-4-22 AN silt fence is good but need to clan up street 9-22-22 AN no work for development 9-4-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-5-4-23 DP no erosion control issues 1-18-23 DP no erosion control issues
Miscellaneous Correction
Corrective Action Required
03/09/2023
3-9-23. DP I need a contact that I can communicate with about issues with Erosion Control. There is a storm structure at the bottom of the hill by the stop sign that has a lot of sediment not allowing water to drain. I personally made it functionable last rain storm. Please send me a contact at devon.perry@cityofLS.net or 816-317-5705.
Site Visit Partial 3/13/2023 3/13/2023 03/13/2023
Misc
Informational
02/23/2023
2-2-23 DP. Crew is still working on buildings. Concrete crew hasn't been on site for a few weeks. 2-23-23 PS Crews on site are working on steel buildings. No work for development 3-13-23 DP. No work for development
Erosion Control Inspection Residential Partial 3/16/2023 3/16/2023 03/16/2023
Misc
Informational
03/09/2023
6-30-22 Gordon is installing silt fence 7-20-22 AN silt fence is still in good working order 8-4-22 AN silt fence is good but need to clan up street 9-22-22 AN no work for development 9-4-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-5-4-23 DP no erosion control issues 1-18-23 DP no erosion control issues
Miscellaneous Correction
Corrective Action Required
03/09/2023
3-9-23. DP I need a contact that I can communicate with about issues with Erosion Control. There is a storm structure at the bottom of the hill by the stop sign that has a lot of sediment not allowing water to drain. I personally made it functionable last rain storm. Please send me a contact at devon.perry@cityofLS.net or 816-317-5705. 3-17-23 DP. Still have not received a contact about erosion control issues.
Site Visit Partial 3/17/2023 3/17/2023 03/17/2023
Misc
Informational
03/13/2023
2-2-23 DP. Crew is still working on buildings. Concrete crew hasn't been on site for a few weeks. 2-23-23 PS Crews on site are working on steel buildings. No work for development 3-13-23 DP. No work for development 3-17-23 DP. No work for development
Site Visit Partial 3/23/2023 3/23/2023 03/23/2023
Misc
Informational
03/17/2023
2-2-23 DP. Crew is still working on buildings. Concrete crew hasn't been on site for a few weeks. 2-23-23 PS Crews on site are working on steel buildings. No work for development 3-13-23 DP. No work for development 3-17-23 DP. No work for development 3-23-23 DP. No work for development
Erosion Control Inspection Residential Partial 3/31/2023 3/31/2023 03/31/2023
Misc
Informational
03/16/2023
6-30-22 Gordon is installing silt fence 7-20-22 AN silt fence is still in good working order 8-4-22 AN silt fence is good but need to clan up street 9-22-22 AN no work for development 9-4-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-5-4-23 DP no erosion control issues 1-18-23 DP no erosion control issues 3-31-23 DP. Erosion control issues have been handled and is currently in good working order.
Miscellaneous Correction
Corrective Action Required
03/16/2023
3-9-23. DP I need a contact that I can communicate with about issues with Erosion Control. There is a storm structure at the bottom of the hill by the stop sign that has a lot of sediment not allowing water to drain. I personally made it functionable last rain storm. Please send me a contact at devon.perry@cityofLS.net or 816-317-5705. 3-17-23 DP. Still have not received a contact about erosion control issues.
Site Visit Partial 3/31/2023 3/31/2023 03/31/2023
Misc
Informational
03/23/2023
2-2-23 DP. Crew is still working on buildings. Concrete crew hasn't been on site for a few weeks. 2-23-23 PS Crews on site are working on steel buildings. No work for development 3-13-23 DP. No work for development 3-17-23 DP. No work for development 3-23-23 DP. No work for development 3-31-23 DP. No work for development
Erosion Control Inspection Residential Partial 04/03/2023
Misc
Informational
03/31/2023
6-30-22 Gordon is installing silt fence 7-20-22 AN silt fence is still in good working order 8-4-22 AN silt fence is good but need to clan up street 9-22-22 AN no work for development 9-4-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-5-4-23 DP no erosion control issues 1-18-23 DP no erosion control issues 3-31-23 DP. Erosion control issues have been handled and is currently in good working order. 4-3-23 NS. No Erosion control issues.
Miscellaneous Correction
Corrective Action Required
03/31/2023
3-9-23. DP I need a contact that I can communicate with about issues with Erosion Control. There is a storm structure at the bottom of the hill by the stop sign that has a lot of sediment not allowing water to drain. I personally made it functionable last rain storm. Please send me a contact at devon.perry@cityofLS.net or 816-317-5705. 3-17-23 DP. Still have not received a contact about erosion control issues.
Pavement-Curb Construction Partial 4/18/2023 4/18/2023 04/18/2023
Misc
Informational
01/11/2023
1-11-23 DP crew is forming up some curb 4-18-23 NS Site visited to do a proof roll one spot failed but they are digging it out and putting new rock and compacting the rock I will go out tomorrow and check again before they pour more curb.
Pavement-Curb Construction Partial 4/19/2023 4/19/2023 04/19/2023
Misc
Informational
04/18/2023
1-11-23 DP crew is forming up some curb 4-18-23 NS Site visited to do a proof roll one spot failed but they are digging it out and putting new rock and compacting the rock I will go out tomorrow and check again before they pour more curb. 4-19-23 NS Site visited this morning and the sub grade is compacted and passed proof roll they started to pour curb. I will come back once curb is done and check again.
Pavement-Curb Construction Partial 4/24/2023 4/24/2023 04/21/2023
Misc
Informational
04/19/2023
1-11-23 DP crew is forming up some curb 4-18-23 NS Site visited to do a proof roll one spot failed but they are digging it out and putting new rock and compacting the rock I will go out tomorrow and check again before they pour more curb. 4-19-23 NS Site visited this morning and the north side sub grade is compacted and passed proof roll they started to pour curb. I will come back once curb is done and check again. 4-21-23 NS Site Visited to do a proof roll for the east side of the building is Compacted and and it passed.
Pavement-Curb Construction Partial 4/24/2023 4/24/2023 04/24/2023
Misc
Informational
04/21/2023
1-11-23 DP crew is forming up some curb 4-18-23 NS Site visited to do a proof roll one spot failed but they are digging it out and putting new rock and compacting the rock I will go out tomorrow and check again before they pour more curb. 4-19-23 NS Site visited this morning and the north side sub grade is compacted and passed proof roll they started to pour curb. I will come back once curb is done and check again. 4-21-23 NS Site Visited to do a proof roll for the east side of the building is Compacted and and it passed. 4-24-23 NS BR Site visited and on the east side of the building they are pouring the concrete pad and curb. On Wednesday they will do a proof roll of the south side of the building.
Pavement-Curb Construction Partial 4/26/2023 4/26/2023 04/26/2023
Misc
Informational
04/24/2023
1-11-23 DP crew is forming up some curb 4-18-23 NS Site visited to do a proof roll one spot failed but they are digging it out and putting new rock and compacting the rock I will go out tomorrow and check again before they pour more curb. 4-19-23 NS Site visited this morning and the north side sub grade is compacted and passed proof roll they started to pour curb. I will come back once curb is done and check again. 4-21-23 NS Site Visited to do a proof roll for the east side of the building is Compacted and and it passed. 4-24-23 NS BR Site visited and on the east side of the building they are pouring the concrete pad and curb. On Wednesday they will do a proof roll of the south side of the building. 4-26-23 NS yesterday they did a proof roll of the south side and the first one failed. but they re dug out the rock and put new type 5 in and I went back for a second proof roll at 4pm and it passed the dump truck did not have a ticket but I had them fill it full. I will get a concrete ticket.
Pavement-Curb Construction Partial 5/5/2023 5/5/2023 05/05/2023
Misc
Informational
04/26/2023
1-11-23 DP crew is forming up some curb 4-18-23 NS Site visited to do a proof roll one spot failed but they are digging it out and putting new rock and compacting the rock I will go out tomorrow and check again before they pour more curb. 4-19-23 NS Site visited this morning and the north side sub grade is compacted and passed proof roll they started to pour curb. I will come back once curb is done and check again. 4-21-23 NS Site Visited to do a proof roll for the east side of the building is Compacted and and it passed. 4-24-23 NS BR Site visited and on the east side of the building they are pouring the concrete pad and curb. On Wednesday they will do a proof roll of the south side of the building. 4-26-23 NS yesterday they did a proof roll of the south side and the first one failed. but they re dug out the rock and put new type 5 in and I went back for a second proof roll at 4pm and it passed the dump truck did not have a ticket but I had them fill it full. I will get a concrete ticket. 5-5-23 NS Site visited and the crew is doing the dirt work for the private drive. Daniel asked yesterday for a proof roll and I contacted Steve Robbins and he said since they are not putting down Geo Grid that they will not need a proof roll until they put rock down. I told Daniel to get a compaction test of 95% of the standards Proctor. I will wait until the test is done and upload the document that has been sent to me.
Pavement-Curb Construction Partial 05/08/2023
Misc
Informational
05/05/2023
1-11-23 DP crew is forming up some curb 4-18-23 NS Site visited to do a proof roll one spot failed but they are digging it out and putting new rock and compacting the rock I will go out tomorrow and check again before they pour more curb. 4-19-23 NS Site visited this morning and the north side sub grade is compacted and passed proof roll they started to pour curb. I will come back once curb is done and check again. 4-21-23 NS Site Visited to do a proof roll for the east side of the building is Compacted and and it passed. 4-24-23 NS BR Site visited and on the east side of the building they are pouring the concrete pad and curb. On Wednesday they will do a proof roll of the south side of the building. 4-26-23 NS yesterday they did a proof roll of the south side and the first one failed. but they re dug out the rock and put new type 5 in and I went back for a second proof roll at 4pm and it passed the dump truck did not have a ticket but I had them fill it full. I will get a concrete ticket. 5-5-23 NS Site visited and the crew is doing the dirt work for the private drive. Daniel asked yesterday for a proof roll and I contacted Steve Robbins and he said since they are not putting down Geo Grid that they will not need a proof roll until they put rock down. I told Daniel to get a compaction test of 95% of the standards Proctor. I will wait until the test is done and upload the document that has been sent to me. 5-8-23 NS Site visited and crew is not working. 5-17-23 NS Site visited and the crew has not worked in the past week.
Rough Electrical Inspection - Commercial Passed 5/9/2023 5/9/2023 05/09/2023
Informational
05/09/2023
BUILDING POWER SUPPLY FROM MAIN ELECTRICAL SERVICE AT BLDG 3-OK
Erosion Control Inspection Residential Partial 05/19/2023
Misc
Informational
04/03/2023
6-30-22 Gordon is installing silt fence 7-20-22 AN silt fence is still in good working order 8-4-22 AN silt fence is good but need to clan up street 9-22-22 AN no work for development 9-4-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-5-4-23 DP no erosion control issues 1-18-23 DP no erosion control issues 3-31-23 DP. Erosion control issues have been handled and is currently in good working order. 4-3-23 NS. No Erosion control issues. 5-19-23 NS. ESC is currently in good working order.
Miscellaneous Correction
Corrective Action Required
04/03/2023
3-9-23. DP I need a contact that I can communicate with about issues with Erosion Control. There is a storm structure at the bottom of the hill by the stop sign that has a lot of sediment not allowing water to drain. I personally made it functionable last rain storm. Please send me a contact at devon.perry@cityofLS.net or 816-317-5705. 3-17-23 DP. Still have not received a contact about erosion control issues.
Pavement-Aggregate Base Partial 5/22/2023 05/22/2023
Misc
Informational
03/01/2023
12-6-22 AN kissick has began to lay base rock 3-1-22 DP Crew has returned and is fixing wet spots in hopes of doing a proof roll this afternoon. 5-22-23 NS Jeff with Kissic construction is going to do a proof roll tomorrow at 11am.
All Rough Inspection - Commercial Failed 5/23/2023 05/23/2023
Misc
Corrective Action Required
05/23/2023
Check all buildings: -Secure MC cable within 12" of enclosures -Address endwall corner framing not per plan. Add support for girder -Support receptacle yoke at storage space 96 **Other issues that need to be resolved: -Light pole piers inspection and underground electrical inspection not performed
Occupancy Inspection - Codes Commercial Failed 5/26/2023 5/26/2023 05/26/2023
Misc
Corrective Action Required
05/26/2023
-Approval required from Planning and Field Service Engineering -Underground electrical to light pole piers and the light pole piers themselves were never inspected by the city. Submit letter of approval from the engineer of record -Secure MC raceways within 12” of boxes. Check buildings A-D -Support loose receptacle yoke in storage unit 96
Occupancy Inspection - Engineering Temporary C of O 6/6/2023 6/6/2023 06/06/2023
Misc
Corrective Action Required
05/26/2023
5-26-23 NS Site visited for a TCO and they need to put in the drive and approaches to pass. 6-6-23 NS Site visited for a TCO and they have completed everything that I need but still need to put in a sidewalk and a sewer man hole before the end of the project. Sewer on plans is A-1
Occupancy Inspection - Planning Temporary C of O 6/6/2023 6/6/2023 06/06/2023
Corrective Action Required
06/06/2023
Complete landscaping per approved plan.
Corrective Action Required
06/06/2023
Construct the required 5' public sidewalk along the site's NE Town Centre Drive street frontage.
Corrective Action Required
06/06/2023
Install temporary asphalt curb along the entire northern boundary of the parking lot where it will be extended for the second phase of the storage facility. This temporary asphalt curbing may not be required to be installed if construction of the second phase of the storage facility will commence shortly. But for this option of no temporary curb installation to be considered by the City, we will need a construction timeline for the second phase to be provided for the City to consider and approve.
Occupancy Inspection - Codes Commercial Failed 6/6/2023 6/6/2023 06/06/2023
Misc
Corrective Action Required
05/26/2023
-Approval required from Planning and Field Service Engineering -Underground electrical to light pole piers and the light pole piers themselves were never inspected by the city. Submit letter of approval from the engineer of record -Secure MC raceways within 12” of boxes. Check buildings A-D -Support loose receptacle yoke in storage unit 96
Misc
Corrective Action Required
06/06/2023
Addreess previous items from 5/26/23. TCO will not be issued until items have been discussed or addressed.
Occupancy Inspection - Fire Passed 6/6/2023 6/6/2023 06/07/2023
All Rough Inspection - Commercial Passed 06/09/2023
Misc
Resolved
06/09/2023
Check all buildings: -Secure MC cable within 12" of enclosures -Address endwall corner framing not per plan. Add support for girder -Support receptacle yoke at storage space 96 **Other issues that need to be resolved: -Light pole piers inspection and underground electrical inspection not performed
Occupancy Inspection - Codes Commercial Ready for Temp CO 6/9/2023 6/9/2023 06/09/2023
Misc
Corrective Action Required
06/06/2023
-Approval required from Planning and Field Service Engineering -Submit letter of approval for the light pole piers (not inspected by city) from the engineer of record **TCO APPROVED FOR 30 DAYS.
Misc
Resolved
06/09/2023
Addreess previous items from 5/26/23. TCO will not be issued until items have been discussed or addressed.
ESC - (Vegetation/Ground Cover) Partial 06/16/2023
Misc
Informational
06/16/2023
6-16-23 NS Talked to Troy and he is going to put sod down. I am going to schedule this out till September of 2023.
Occupancy Inspection - Codes Commercial Ready for Temp CO 7/7/2023 07/07/2023
Misc
Corrective Action Required
06/09/2023
-Approval required from Planning and Field Service Engineering -Submit letter of approval for the light pole piers (not inspected by city) from the engineer of record **TCO APPROVED FOR 30 DAYS.
Occupancy Inspection - Planning Passed 8/3/2023 8/3/2023 08/03/2023
Occupancy Inspection - Codes Commercial Failed 8/3/2023 8/3/2023 08/03/2023
Misc
Corrective Action Required
07/07/2023
-Approval required from Planning and Field Service Engineering -Submit letter of approval for the light pole piers (not inspected by city) from the engineer of record **TCO APPROVED FOR 30 DAYS.
Misc
Corrective Action Required
08/03/2023
8/3/23 -No change to any of the correction items -Submit TCO extension request and pay fee to keep TCO from expiring ***Expiration Date: 8/6/2023 12:00:00 AM
Pavement-Aggregate Base Passed 5/23/2023 8/4/2023 08/04/2023
Misc
Informational
05/22/2023
12-6-22 AN kissick has began to lay base rock 3-1-22 DP Crew has returned and is fixing wet spots in hopes of doing a proof roll this afternoon. 5-22-23 NS Jeff with Kissic construction is going to do a proof roll tomorrow at 11am. 8-4-23 NS Site visited and it appears that parking lot is complete
Occupancy Inspection - Codes Commercial Ready for Temp CO 8/7/2023 8/7/2023 08/07/2023
Misc
Corrective Action Required
08/03/2023
-Approval required from Planning and Field Service Engineering -Submit letter of approval for the light pole piers (not inspected by city) from the engineer of record **TCO APPROVED FOR 30 DAYS.
Misc
Corrective Action Required
08/03/2023
8/3/23 -No change to any of the correction items -Submit TCO extension request and pay fee to keep TCO from expiring ***Expiration Date: 8/6/2023 12:00:00 AM
Occupancy Inspection - Codes Commercial Ready for Temp CO 8/11/2023 08/11/2023
Misc
Corrective Action Required
08/07/2023
-Approval required from Planning and Field Service Engineering -Submit letter of approval for the light pole piers (not inspected by city) from the engineer of record **TCO APPROVED FOR 30 DAYS.
Misc
Corrective Action Required
08/07/2023
8/3/23 -No change to any of the correction items -Submit TCO extension request and pay fee to keep TCO from expiring ***Expiration Date: 8/6/2023 12:00:00 AM
ESC - (Vegetation/Ground Cover) Partial 9/1/2023 9/1/2023 09/01/2023
Misc
Informational
06/16/2023
6-16-23 NS Talked to Troy and he is going to put sod down. I am going to schedule this out till September of 2023. 9-1-23 NS Sod has been put down.
Final Inspection - Commercial Partial 10/09/2023
Misc
Corrective Action Required
10/09/2023
Site visited and it appears that sidewalks ADA ramps have not been replace and will need to before it can be passed.
Pavement-Proof Roll Passed 11/09/2023
Misc
Informational
01/16/2023
1-10-23 DP Crew started pouring concrete and never did a proof roll. There was soft spots due to rain/snow/temps. 1-16-23 AN did a proof roll for the middle alley and it did have a couple soft spots. they will be digging up letting dry and recompacting 11-9-23 NS Site visited to do a proof roll on the north end of maga storage. and it passed some areas sank and they are going to compact and put more ab3 down. 11-13-23 NS Site visited for a proof roll and it appears that gravel needs to be re compacted before the concrete can be poured. passed
Pavement-Surface Passed 12/4/2023 12/04/2023
Misc
Informational
01/17/2023
1-10-23 DP Crew started pouring concrete and never did a proof roll. There was soft spots due to rain/snow/temps. 1-11-23 DP Crew is cutting lines in concrete that was poured yesterday 1-17-23 DP Proof roll passed and now the crew is pouring the middle alley. 12-4-23 NS Site Visited all concrete has been poured and passed
Grading/Excavation/Fill Inspection Passed 12/4/2023 12/04/2023
Misc
Informational
03/02/2023
AN crew is still grading and working on the detention basin 8-2-22 AN crew is continuing to grade the site for mega storage 8-8-22 AN crew grading for all the storage unit pads 8-10-22 AN crew is working on site pads 11-22-22 AN. Shaw is grading and compacting for the drive/parking for the storage units 11-25-22 AN Shaw is doing some more grading 12-1-22 AN crew is out re surveying everything for the road and drive areas. Kissick construction is taking over the job 12-19-22 AN kissick is grading the lot for concrete 1-16-23 AN kissick is regrading some areas that did not get graded properly 3-2-23 DP. Crew is grading out wet spots in hopes of passing a Proof roll monday 12-4-23 NS Site Visited and proof roll has passed
Site Visit Partial 12/4/2023 12/04/2023
Misc
Informational
03/31/2023
2-2-23 DP. Crew is still working on buildings. Concrete crew hasn't been on site for a few weeks. 2-23-23 PS Crews on site are working on steel buildings. No work for development 3-13-23 DP. No work for development 3-17-23 DP. No work for development 3-23-23 DP. No work for development 3-31-23 DP. No work for development 12-4-23 NS Site Visited and it appears work has not started.
Pavement-Curb Construction Passed 12/4/2023 12/04/2023
Misc
Informational
05/08/2023
1-11-23 DP crew is forming up some curb 4-18-23 NS Site visited to do a proof roll one spot failed but they are digging it out and putting new rock and compacting the rock I will go out tomorrow and check again before they pour more curb. 4-19-23 NS Site visited this morning and the north side sub grade is compacted and passed proof roll they started to pour curb. I will come back once curb is done and check again. 4-21-23 NS Site Visited to do a proof roll for the east side of the building is Compacted and and it passed. 4-24-23 NS BR Site visited and on the east side of the building they are pouring the concrete pad and curb. On Wednesday they will do a proof roll of the south side of the building. 4-26-23 NS yesterday they did a proof roll of the south side and the first one failed. but they re dug out the rock and put new type 5 in and I went back for a second proof roll at 4pm and it passed the dump truck did not have a ticket but I had them fill it full. I will get a concrete ticket. 5-5-23 NS Site visited and the crew is doing the dirt work for the private drive. Daniel asked yesterday for a proof roll and I contacted Steve Robbins and he said since they are not putting down Geo Grid that they will not need a proof roll until they put rock down. I told Daniel to get a compaction test of 95% of the standards Proctor. I will wait until the test is done and upload the document that has been sent to me. 5-8-23 NS Site visited and crew is not working. 12-4-23 NS Site Visited and it appears all work is done.
Occupancy Inspection - Engineering Temporary C of O 8/3/2023 12/4/2023 12/04/2023
Misc
Corrective Action Required
06/06/2023
5-26-23 NS Site visited for a TCO and they need to put in the drive and approaches to pass. 6-6-23 NS Site visited for a TCO and they have completed everything that I need but still need to put in a sidewalk and a sewer man hole before the end of the project. Sewer on plans is A-1 12-4-23 NS Site Visited and it appears they still need to install ADA ramps
Site Visit Partial 12/18/2023 12/18/2023
Misc
Informational
12/04/2023
2-2-23 DP. Crew is still working on buildings. Concrete crew hasn't been on site for a few weeks. 2-23-23 PS Crews on site are working on steel buildings. No work for development 3-13-23 DP. No work for development 3-17-23 DP. No work for development 3-23-23 DP. No work for development 3-31-23 DP. No work for development 12-4-23 NS Site Visited and it appears concrete driveway and parking lot are complete passed. 12-18-23 NS Site Visited and no more work has been done.
Site Visit Partial 1/3/2024 01/03/2024
Misc
Informational
12/18/2023
2-2-23 DP. Crew is still working on buildings. Concrete crew hasn't been on site for a few weeks. 2-23-23 PS Crews on site are working on steel buildings. No work for development 3-13-23 DP. No work for development 3-17-23 DP. No work for development 3-23-23 DP. No work for development 3-31-23 DP. No work for development 12-4-23 NS Site Visited and it appears concrete driveway and parking lot are complete passed. 12-18-23 NS Site Visited and no more work has been done. 1-3-24 NS Site Visited and no more work has been done.
ESC - (Vegetation/Ground Cover) Passed 1/3/2024 01/03/2024
Misc
Informational
09/01/2023
6-16-23 NS Talked to Troy and he is going to put sod down. I am going to schedule this out till September of 2023. 9-1-23 NS Sod has been put down. 1-3-24 NS Site visited passed
Occupancy Inspection - Engineering Passed 01/05/2024
Misc
Corrective Action Required
12/04/2023
5-26-23 NS Site visited for a TCO and they need to put in the drive and approaches to pass. 6-6-23 NS Site visited for a TCO and they have completed everything that I need but still need to put in a sidewalk and a sewer man hole before the end of the project. Sewer on plans is A-1 12-4-23 NS Site Visited and it appears they still need to install ADA ramps 1-5-24 NS Site visited, ADA ramps have been completed. Punch list items have been completed, passed. 5-8-24 NS Site visited for the second part for a TCO The detention pond needs to have seed put on it and any concrete that is tore up needs to be replaced.
Occupancy Inspection - Codes Commercial Temporary C of O 1/11/2024 01/11/2024
Misc
Corrective Action Required
08/11/2023
-Approval required from Planning and Field Service Engineering
Site Visit Partial 1/23/2024 01/23/2024
Misc
Informational
01/03/2024
2-2-23 DP. Crew is still working on buildings. Concrete crew hasn't been on site for a few weeks. 2-23-23 PS Crews on site are working on steel buildings. No work for development 3-13-23 DP. No work for development 3-17-23 DP. No work for development 3-23-23 DP. No work for development 3-31-23 DP. No work for development 12-4-23 NS Site Visited and it appears concrete driveway and parking lot are complete passed. 12-18-23 NS Site Visited and no more work has been done. 1-3-24 NS Site Visited and no more work has been done. 1-16-24 Dustin A, No activity due to weather 1-23-24 NS Site visited, no activity due to weather
Site Visit Partial 2/26/2024 02/26/2024
Misc
Informational
01/23/2024
2-2-23 DP. Crew is still working on buildings. Concrete crew hasn't been on site for a few weeks. 2-23-23 PS Crews on site are working on steel buildings. No work for development 3-13-23 DP. No work for development 3-17-23 DP. No work for development 3-23-23 DP. No work for development 3-31-23 DP. No work for development 12-4-23 NS Site Visited and it appears concrete driveway and parking lot are complete passed. 12-18-23 NS Site Visited and no more work has been done. 1-3-24 NS Site Visited and no more work has been done. 1-16-24 Dustin A, No activity due to weather 1-23-24 NS Site visited, no activity due to weather NS 2-26-24 Site visited, no activity
Occupancy Inspection - Codes Commercial Full C of O 02/29/2024
Misc
Resolved
02/29/2024
-Approval required from Planning and Field Service Engineering
Site Visit Complete 03/01/2024
Misc
Informational
02/26/2024
2-2-23 DP. Crew is still working on buildings. Concrete crew hasn't been on site for a few weeks. 2-23-23 PS Crews on site are working on steel buildings. No work for development 3-13-23 DP. No work for development 3-17-23 DP. No work for development 3-23-23 DP. No work for development 3-31-23 DP. No work for development 12-4-23 NS Site Visited and it appears concrete driveway and parking lot are complete passed. 12-18-23 NS Site Visited and no more work has been done. 1-3-24 NS Site Visited and no more work has been done. 1-16-24 Dustin A, No activity due to weather 1-23-24 NS Site visited, no activity due to weather NS 2-26-24 Site visited, no activity
Documents & Images
Date Uploaded File Type Document Name
03/15/2022 Application Form Mega Storage Permit Application
03/15/2022 Engineer Report/Study ~Bldg 1 Calcs Lee Summit
03/15/2022 Engineer Report/Study ~Bldg 2 Calcs Lee Summit
03/15/2022 Engineer Report/Study ~Bldg 4 Calcs Lee Summit
03/15/2022 Engineer Report/Study ~Bldg 8 Calcs Lee Summit
03/15/2022 Engineer Report/Study ~Bldg 9 Calcs Lee Summit
03/15/2022 Plans 20231 - Mega Storage Permit Set - 03_09_2022
03/15/2022 Letter Building Valuation
03/15/2022 Plans MEGA STORAGE LS BUILDING 1,2,3 DRAWINGS
03/15/2022 Plans MEGA STORAGE LS BUILDING 4,5 DRAWINGS
03/15/2022 Plans MEGA STORAGE LS BUILDING 8,13,14,15 DRAWINGS
03/15/2022 Plans MEGA STORAGE LS BUILDING 9,10 DRAWINGS
03/15/2022 Engineer Report/Study Mega Storage_Structural Design Calculations_2022_03_02
03/30/2022 Letter DS P/R Corrections Document
04/14/2022 Plans ~Lees Summit Bldg 1-3 012122
04/14/2022 Plans ~Lees Summit Bldg 2 012122
04/14/2022 Plans ~Lees Summit Bldg 4 012122
04/14/2022 Plans ~Lees Summit Bldg 8 012122
04/14/2022 Plans ~Lees Summit Bldg 9 012122
04/19/2022 Approved Plans approved - 20231 - Mega Storage Permit Set - 03_09_2022
04/19/2022 Approved Plans approved ~Lees Summit Bldg 1-3 012122
04/19/2022 Approved Plans approved ~Lees Summit Bldg 2 012122
04/19/2022 Approved Plans approved ~Lees Summit Bldg 4 012122
04/19/2022 Approved Plans approved ~Lees Summit Bldg 8 012122
04/19/2022 Approved Plans approved ~Lees Summit Bldg 9 012122
04/27/2022 Approved Plans Approved - 20231 - Mega Storage Arch FDP Set - 03_23_2022
04/27/2022 Approved Plans Approved - 20231 - Mega Storage Civil FDP Set - 03_23_2022
04/27/2022 Letter Fire Building Plan Review
05/18/2022 Letter License Tax Bill
05/18/2022 Receipt Receipt for transaction:2022-003635
04/27/2022 Approved Plans Approved - 20231 - Mega Storage Civil FDP Set - 03_23_2022
06/30/2022 Letter INSPECTION SUMMARY
06/30/2022 Letter DS Building Permit
06/30/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
08/11/2022 Letter INSPECTION SUMMARY
08/11/2022 Letter INSPECTION SUMMARY
08/12/2022 Letter INSPECTION SUMMARY
08/17/2022 Letter INSPECTION SUMMARY
08/17/2022 Letter INSPECTION SUMMARY
08/19/2022 Letter INSPECTION SUMMARY
08/19/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/27/2022 Letter INSPECTION SUMMARY
08/27/2022 Letter INSPECTION SUMMARY
08/27/2022 Letter INSPECTION SUMMARY
08/27/2022 Letter INSPECTION SUMMARY
08/29/2022 Letter INSPECTION SUMMARY
08/29/2022 Letter INSPECTION SUMMARY
09/06/2022 Letter INSPECTION SUMMARY
09/09/2022 Drawing 9-8-22_Mega S_ Lee's Summit RW1
09/09/2022 Engineer Report/Study 9-9-22_Mega S_ LS RWCALC
09/09/2022 Approved Plans approved - retaining wall
09/12/2022 Letter INSPECTION SUMMARY
09/13/2022 Letter INSPECTION SUMMARY
09/14/2022 Letter INSPECTION SUMMARY
09/16/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/28/2022 Letter INSPECTION SUMMARY
09/28/2022 Letter INSPECTION SUMMARY
09/28/2022 Letter INSPECTION SUMMARY
09/28/2022 Detention storm 1 9-27-22
09/28/2022 Detention storm 2 9-27-22
09/28/2022 Letter INSPECTION SUMMARY
09/29/2022 Letter INSPECTION SUMMARY
09/30/2022 20231 - Mega Storage Permit Set - 09_30_2022
09/30/2022 A3_1 - Building Elevations
09/30/2022 A3_2 - Building Elevations
10/04/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
11/03/2022 Letter INSPECTION SUMMARY
11/22/2022 Letter INSPECTION SUMMARY
11/25/2022 Letter INSPECTION SUMMARY
11/30/2022 Letter INSPECTION SUMMARY
11/30/2022 Letter INSPECTION SUMMARY
12/01/2022 Letter INSPECTION SUMMARY
12/06/2022 Letter INSPECTION SUMMARY
12/19/2022 Letter INSPECTION SUMMARY
12/21/2022 Letter INSPECTION SUMMARY
12/29/2022 Letter INSPECTION SUMMARY
01/04/2023 Letter INSPECTION SUMMARY
01/04/2023 Letter INSPECTION SUMMARY
01/09/2023 Letter INSPECTION SUMMARY
01/10/2023 Letter INSPECTION SUMMARY
01/10/2023 Letter INSPECTION SUMMARY
01/10/2023 Letter INSPECTION SUMMARY
01/11/2023 Letter INSPECTION SUMMARY
01/11/2023 Letter INSPECTION SUMMARY
01/16/2023 Letter INSPECTION SUMMARY
01/16/2023 Letter INSPECTION SUMMARY
01/17/2023 Letter INSPECTION SUMMARY
01/18/2023 Letter INSPECTION SUMMARY
01/23/2023 Letter INSPECTION SUMMARY
02/02/2023 Letter INSPECTION SUMMARY
02/23/2023 Letter INSPECTION SUMMARY
03/01/2023 Letter INSPECTION SUMMARY
03/02/2023 Letter INSPECTION SUMMARY
03/09/2023 Letter INSPECTION SUMMARY
03/13/2023 Letter INSPECTION SUMMARY
03/16/2023 Letter INSPECTION SUMMARY
03/17/2023 Letter INSPECTION SUMMARY
03/23/2023 Letter INSPECTION SUMMARY
03/31/2023 Letter INSPECTION SUMMARY
03/31/2023 Letter INSPECTION SUMMARY
04/03/2023 Letter INSPECTION SUMMARY
04/18/2023 Letter INSPECTION SUMMARY
04/19/2023 Letter INSPECTION SUMMARY
04/21/2023 Letter INSPECTION SUMMARY
04/21/2023 Maga Storage Proof Roll East side ticket
04/24/2023 Maga Storage Concrete Ticket
04/24/2023 Letter INSPECTION SUMMARY
04/26/2023 Letter INSPECTION SUMMARY
04/26/2023 Maga Storage Concrete ticket South side
05/05/2023 Letter INSPECTION SUMMARY
05/08/2023 Letter INSPECTION SUMMARY
05/09/2023 Letter INSPECTION SUMMARY
05/17/2023 Letter INSPECTION SUMMARY
05/22/2023 Letter INSPECTION SUMMARY
05/22/2023 Letter INSPECTION SUMMARY
05/23/2023 Letter INSPECTION SUMMARY
05/26/2023 Letter INSPECTION SUMMARY
06/06/2023 Letter INSPECTION SUMMARY
06/09/2023 Receipt Receipt for transaction:2023-004162
06/09/2023 Letter INSPECTION SUMMARY
06/09/2023 Letter INSPECTION SUMMARY
06/09/2023 Letter INSPECTION SUMMARY
06/09/2023 Certificate/License Codes Temporary Certificate of Occupancy
06/09/2023 Receipt Receipt for transaction:2023-004193
06/16/2023 Letter INSPECTION SUMMARY
07/06/2023 Application Form TCO EXTENSION
07/07/2023 Certificate/License Codes Temporary Certificate of Occupancy
07/07/2023 Receipt Receipt for transaction:2023-005249
08/03/2023 Letter INSPECTION SUMMARY
08/03/2023 Letter INSPECTION SUMMARY
08/03/2023 Letter TCO EXTENSION
08/04/2023 Letter INSPECTION SUMMARY
08/07/2023 Certificate/License Codes Temporary Certificate of Occupancy
08/07/2023 Receipt Receipt for transaction:2023-006074
08/14/2023 Pole Base Letter
09/01/2023 Letter INSPECTION SUMMARY
10/09/2023 Letter INSPECTION SUMMARY
10/19/2023 Plans 22-086-Mega-Storage-Lee'-Summit-Water-As-Built-C1_2-2023-10-17
10/25/2023 Town Centre - Public Sanitary As-builts
11/09/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
01/05/2024 Letter INSPECTION SUMMARY
01/05/2024 Letter INSPECTION SUMMARY
01/05/2024 Letter INSPECTION SUMMARY
01/05/2024 Letter INSPECTION SUMMARY
01/11/2024 Certificate/License Codes Temporary Certificate of Occupancy
01/18/2024 Codes Temporary Certificate of Occupancy229
01/18/2024 Codes Temporary Certificate of Occupancy252
01/18/2024 Codes Temporary Certificate of Occupancy279
01/23/2024 Letter INSPECTION SUMMARY
02/26/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter Field Certificate of Occupancy
02/29/2024 Letter Codes Final Certificate of Occupancy
05/08/2024 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home