Inspection |
Outcome |
Requested |
Scheduled |
Date Inspected |
Erosion Control Inspection Residential
|
Partial
|
|
|
06/30/2022
|
|
Misc
|
Erosion Control Inspection Residential
|
Partial
|
|
|
06/30/2022
|
|
Misc
|
Erosion Control Inspection Residential
|
Partial
|
|
|
07/20/2022
|
|
Misc
|
Grading/Excavation/Fill Inspection
|
Partial
|
|
|
07/20/2022
|
|
Misc
|
Site Visit
|
Partial
|
|
|
08/01/2022
|
|
Misc
|
Grading/Excavation/Fill Inspection
|
Partial
|
|
|
08/02/2022
|
|
Misc
|
Site Visit
|
Partial
|
|
|
08/04/2022
|
|
Misc
|
Site Visit
|
Partial
|
|
|
08/04/2022
|
|
Misc
|
Site Visit
|
Partial
|
|
|
08/04/2022
|
|
Misc
|
Erosion Control Inspection Residential
|
Partial
|
|
|
08/04/2022
|
|
Misc
|
Grading/Excavation/Fill Inspection
|
Partial
|
|
|
08/08/2022
|
|
Misc
|
Detention Basin
|
Partial
|
|
|
08/08/2022
|
|
Misc
|
Grading/Excavation/Fill Inspection
|
Partial
|
|
|
08/11/2022
|
|
Misc
|
Detention Basin
|
Partial
|
|
|
08/11/2022
|
|
Misc
|
Detention Basin
|
Partial
|
|
|
08/12/2022
|
|
Misc
|
Site Visit
|
Partial
|
|
|
08/17/2022
|
|
Misc
|
Site Visit
|
Partial
|
|
|
08/17/2022
|
|
Misc
|
Site Visit
|
Partial
|
|
|
08/19/2022
|
|
Misc
|
Site Visit
|
Partial
|
|
|
08/19/2022
|
|
Misc
|
Site Visit
|
Partial
|
|
|
08/22/2022
|
|
Misc
|
Erosion Control Inspection Residential
|
Partial
|
|
|
08/22/2022
|
|
Misc
|
Storm Sewer Construction Inspection
|
Partial
|
|
|
08/27/2022
|
|
Misc
|
Storm Sewer Construction Inspection
|
Partial
|
|
|
08/27/2022
|
|
Misc
|
Storm Sewer Construction Inspection
|
Partial
|
|
|
08/27/2022
|
|
Misc
|
Storm Sewer Construction Inspection
|
Partial
|
|
|
08/27/2022
|
|
Misc
|
Storm Sewer Construction Inspection
|
Partial
|
|
|
08/29/2022
|
|
Misc
|
Storm Sewer Construction Inspection
|
Partial
|
|
|
08/29/2022
|
|
Misc
|
Water Line - Construction Inspection
|
Partial
|
|
9/16/2022
|
09/06/2022
|
|
Misc
|
Storm Sewer Construction Inspection
|
Partial
|
|
|
09/12/2022
|
|
Misc
|
Storm Sewer Construction Inspection
|
Partial
|
|
|
09/13/2022
|
|
Misc
|
Storm Sewer Construction Inspection
|
Partial
|
|
|
09/14/2022
|
|
Misc
|
Water Line - Construction Inspection
|
Partial
|
|
9/16/2022
|
09/16/2022
|
|
Misc
|
Storm Sewer Construction Inspection
|
Partial
|
|
|
09/27/2022
|
|
Misc
|
Fire Line - Hydrostatic Test
|
Partial
|
|
|
09/27/2022
|
|
Misc
|
Fire Line - Hydrostatic Test
|
Passed
|
|
|
09/27/2022
|
|
Misc
|
Water Line - Construction Inspection
|
Passed
|
|
|
09/28/2022
|
|
Misc
|
Storm Sewer Construction Inspection
|
Passed
|
|
|
09/28/2022
|
|
Misc
|
Detention Basin
|
Partial
|
|
|
09/28/2022
|
|
Misc
|
Backflow Preventer and Vault
|
Partial
|
|
|
09/29/2022
|
|
Misc
|
Erosion Control Inspection Residential
|
Partial
|
|
|
10/04/2022
|
|
Misc
|
Backflow Preventer and Vault
|
Passed
|
|
|
10/21/2022
|
|
Misc
|
Footing Inspection - Commercial
|
Passed
|
11/3/2022
|
11/3/2022
|
11/03/2022
|
Grading/Excavation/Fill Inspection
|
Partial
|
|
|
11/22/2022
|
|
Misc
|
Grading/Excavation/Fill Inspection
|
Partial
|
|
|
11/25/2022
|
|
Misc
|
Detention Basin
|
Failed
|
|
|
11/30/2022
|
|
Misc
|
|
Miscellaneous Correction
Corrective Action Required
|
Erosion Control Inspection Residential
|
Partial
|
|
|
11/30/2022
|
|
Misc
|
Grading/Excavation/Fill Inspection
|
Partial
|
|
|
12/01/2022
|
|
Misc
|
Pavement-Aggregate Base
|
Partial
|
|
|
12/06/2022
|
|
Misc
|
Grading/Excavation/Fill Inspection
|
Partial
|
|
|
12/19/2022
|
|
Misc
|
Site Visit
|
Partial
|
|
|
12/21/2022
|
|
Misc
|
Site Visit
|
Partial
|
|
|
12/29/2022
|
|
Misc
|
|
Misc
|
Site Visit
|
Partial
|
|
|
01/04/2023
|
|
Misc
|
|
Misc
|
Erosion Control Inspection Residential
|
Partial
|
|
|
01/04/2023
|
|
Misc
|
Hydrant Inspection
|
Failed
|
|
|
01/09/2023
|
|
Misc
Corrective Action Required
|
|
Miscellaneous Correction
Corrective Action Required
|
Pavement-Proof Roll
|
Partial
|
1/10/2023
|
1/10/2023
|
01/10/2023
|
|
Misc
|
Pavement-Surface
|
Partial
|
1/10/2023
|
1/10/2023
|
01/10/2023
|
|
Misc
|
Pavement-Curb Construction
|
Partial
|
1/11/2023
|
1/11/2023
|
01/11/2023
|
|
Misc
|
Pavement-Surface
|
Partial
|
1/11/2023
|
1/11/2023
|
01/11/2023
|
|
Misc
|
Pavement-Proof Roll
|
Partial
|
|
|
01/16/2023
|
|
Misc
|
Grading/Excavation/Fill Inspection
|
Partial
|
|
|
01/16/2023
|
|
Misc
|
Pavement-Surface
|
Partial
|
1/17/2023
|
1/17/2023
|
01/17/2023
|
|
Misc
|
Erosion Control Inspection Residential
|
Partial
|
1/18/2023
|
1/18/2023
|
01/18/2023
|
|
Misc
|
Site Visit
|
Partial
|
1/23/2023
|
1/23/2023
|
01/23/2023
|
|
Misc
|
|
Misc
|
Site Visit
|
Partial
|
2/2/2023
|
2/2/2023
|
02/02/2023
|
|
Misc
|
Site Visit
|
Partial
|
2/23/2023
|
2/23/2023
|
02/23/2023
|
|
Misc
|
Pavement-Aggregate Base
|
Partial
|
3/1/2023
|
3/1/2023
|
03/01/2023
|
|
Misc
|
Grading/Excavation/Fill Inspection
|
Partial
|
3/2/2023
|
3/2/2023
|
03/02/2023
|
|
Misc
|
Erosion Control Inspection Residential
|
Partial
|
3/9/2023
|
3/9/2023
|
03/09/2023
|
|
Misc
|
|
Miscellaneous Correction
Corrective Action Required
|
Site Visit
|
Partial
|
3/13/2023
|
3/13/2023
|
03/13/2023
|
|
Misc
|
Erosion Control Inspection Residential
|
Partial
|
3/16/2023
|
3/16/2023
|
03/16/2023
|
|
Misc
|
|
Miscellaneous Correction
Corrective Action Required
|
Site Visit
|
Partial
|
3/17/2023
|
3/17/2023
|
03/17/2023
|
|
Misc
|
Site Visit
|
Partial
|
3/23/2023
|
3/23/2023
|
03/23/2023
|
|
Misc
|
Erosion Control Inspection Residential
|
Partial
|
3/31/2023
|
3/31/2023
|
03/31/2023
|
|
Misc
|
|
Miscellaneous Correction
Corrective Action Required
|
Site Visit
|
Partial
|
3/31/2023
|
3/31/2023
|
03/31/2023
|
|
Misc
|
Erosion Control Inspection Residential
|
Partial
|
|
|
04/03/2023
|
|
Misc
|
|
Miscellaneous Correction
Corrective Action Required
|
Pavement-Curb Construction
|
Partial
|
4/18/2023
|
4/18/2023
|
04/18/2023
|
|
Misc
|
Pavement-Curb Construction
|
Partial
|
4/19/2023
|
4/19/2023
|
04/19/2023
|
|
Misc
|
Pavement-Curb Construction
|
Partial
|
4/24/2023
|
4/24/2023
|
04/21/2023
|
|
Misc
|
Pavement-Curb Construction
|
Partial
|
4/24/2023
|
4/24/2023
|
04/24/2023
|
|
Misc
|
Pavement-Curb Construction
|
Partial
|
4/26/2023
|
4/26/2023
|
04/26/2023
|
|
Misc
|
Pavement-Curb Construction
|
Partial
|
5/5/2023
|
5/5/2023
|
05/05/2023
|
|
Misc
|
Pavement-Curb Construction
|
Partial
|
|
|
05/08/2023
|
|
Misc
|
Rough Electrical Inspection - Commercial
|
Passed
|
5/9/2023
|
5/9/2023
|
05/09/2023
|
|
|
Erosion Control Inspection Residential
|
Partial
|
|
|
05/19/2023
|
|
Misc
|
|
Miscellaneous Correction
Corrective Action Required
|
Pavement-Aggregate Base
|
Partial
|
|
5/22/2023
|
05/22/2023
|
|
Misc
|
All Rough Inspection - Commercial
|
Failed
|
|
5/23/2023
|
05/23/2023
|
|
Misc
Corrective Action Required
|
Occupancy Inspection - Codes Commercial
|
Failed
|
5/26/2023
|
5/26/2023
|
05/26/2023
|
|
Misc
Corrective Action Required
|
Occupancy Inspection - Engineering
|
Temporary C of O
|
6/6/2023
|
6/6/2023
|
06/06/2023
|
|
Misc
Corrective Action Required
|
Occupancy Inspection - Planning
|
Temporary C of O
|
6/6/2023
|
6/6/2023
|
06/06/2023
|
|
Corrective Action Required
|
|
Corrective Action Required
|
|
Corrective Action Required
|
Occupancy Inspection - Codes Commercial
|
Failed
|
6/6/2023
|
6/6/2023
|
06/06/2023
|
|
Misc
Corrective Action Required
|
|
Misc
Corrective Action Required
|
Occupancy Inspection - Fire
|
Passed
|
6/6/2023
|
6/6/2023
|
06/07/2023
|
All Rough Inspection - Commercial
|
Passed
|
|
|
06/09/2023
|
|
Misc
|
Occupancy Inspection - Codes Commercial
|
Ready for Temp CO
|
6/9/2023
|
6/9/2023
|
06/09/2023
|
|
Misc
Corrective Action Required
|
|
Misc
|
ESC - (Vegetation/Ground Cover)
|
Partial
|
|
|
06/16/2023
|
|
Misc
|
Occupancy Inspection - Codes Commercial
|
Ready for Temp CO
|
|
7/7/2023
|
07/07/2023
|
|
Misc
Corrective Action Required
|
Occupancy Inspection - Planning
|
Passed
|
8/3/2023
|
8/3/2023
|
08/03/2023
|
Occupancy Inspection - Codes Commercial
|
Failed
|
8/3/2023
|
8/3/2023
|
08/03/2023
|
|
Misc
Corrective Action Required
|
|
Misc
Corrective Action Required
|
Pavement-Aggregate Base
|
Passed
|
5/23/2023
|
8/4/2023
|
08/04/2023
|
|
Misc
|
Occupancy Inspection - Codes Commercial
|
Ready for Temp CO
|
8/7/2023
|
8/7/2023
|
08/07/2023
|
|
Misc
Corrective Action Required
|
|
Misc
Corrective Action Required
|
Occupancy Inspection - Codes Commercial
|
Ready for Temp CO
|
|
8/11/2023
|
08/11/2023
|
|
Misc
Corrective Action Required
|
|
Misc
Corrective Action Required
|
ESC - (Vegetation/Ground Cover)
|
Partial
|
9/1/2023
|
9/1/2023
|
09/01/2023
|
|
Misc
|
Final Inspection - Commercial
|
Partial
|
|
|
10/09/2023
|
|
Misc
Corrective Action Required
|
Pavement-Proof Roll
|
Passed
|
|
|
11/09/2023
|
|
Misc
|
Pavement-Surface
|
Passed
|
|
12/4/2023
|
12/04/2023
|
|
Misc
|
Grading/Excavation/Fill Inspection
|
Passed
|
|
12/4/2023
|
12/04/2023
|
|
Misc
|
Site Visit
|
Partial
|
|
12/4/2023
|
12/04/2023
|
|
Misc
|
Pavement-Curb Construction
|
Passed
|
|
12/4/2023
|
12/04/2023
|
|
Misc
|
Occupancy Inspection - Engineering
|
Temporary C of O
|
8/3/2023
|
12/4/2023
|
12/04/2023
|
|
Misc
Corrective Action Required
|
Site Visit
|
Partial
|
|
12/18/2023
|
12/18/2023
|
|
Misc
|
Site Visit
|
Partial
|
|
1/3/2024
|
01/03/2024
|
|
Misc
|
ESC - (Vegetation/Ground Cover)
|
Passed
|
|
1/3/2024
|
01/03/2024
|
|
Misc
|
Occupancy Inspection - Engineering
|
Passed
|
|
|
01/05/2024
|
|
Misc
Corrective Action Required
|
Occupancy Inspection - Codes Commercial
|
Temporary C of O
|
|
1/11/2024
|
01/11/2024
|
|
Misc
Corrective Action Required
|
Site Visit
|
Partial
|
|
1/23/2024
|
01/23/2024
|
|
Misc
|
Site Visit
|
Partial
|
|
2/26/2024
|
02/26/2024
|
|
Misc
|
Occupancy Inspection - Codes Commercial
|
Full C of O
|
|
|
02/29/2024
|
|
Misc
|
Site Visit
|
Complete
|
|
|
03/01/2024
|
|
Misc
|