Summary
PRCOM20182607
Building Permit - Commercial
Certificate of Occupancy
TOWNSEND SUMMIT LLC
NEW MULTI-FAMILY
B#2- 4 STORY APARTMENT BUILDING *FOUNDATION PERMIT - PRCOM20183263
08/14/2018
08/05/2019
09/25/2020
Locations
Contacts
NEIGHBORS CONSTRUCTION COMPANY INC, Address:1708 E 123RD ST, Phone:(913) 422-5555  
AIR DOCTOR SOLUTIONS LLC, Address:P O BOX 842400, Phone:(435) 688-3060  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
  
CITY OF LEES SUMMIT MO, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Special Inspections Review Approved 10/09/2018
Joe Frogge
Final Development Plan Review Approved 02/28/2019 10/08/2018
Joe Frogge
Licensed Contractors Approved 02/28/2019 09/28/2018
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $21,433.11 $21,433.11 Paid 11/09/2018
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 11/09/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Partial 9/13/2019 9/16/2019 at 8:30 AM 09/16/2019
Misc
Partial Correction
09/16/2019
OK TO ONE-SIDE DOUBLE-WYTHE STAIRWELL WALLS: NORTH STAIR BASEMENT LEVEL;
Rated Assembly Inspection Partial 9/18/2019 at 3:15 PM 09/18/2019
Misc
Partial Correction
09/18/2019
OK TO COVER WHEN READY COMPONENTS OF 5/8" GWB RATED ASSEMBLY AT STAIRWELLS: NORTH STAIR: BASEMENT LEVEL LAYER AT INTERIOR + BETWEEN JOISTS AT BACKSIDE;
Rated Assembly Inspection Partial 9/27/2019 9/27/2019 at 8:00 AM 09/27/2019
Misc
Partial Correction
09/18/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLWALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER; 1ST FLOOR: 2ND FLOOR: 3RD FLOOR: 4TH FLOOR: SOUTH STAIRWELL: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED.
All Rough Inspection - Commercial Partial 9/30/2019 9/30/2019 at 7:10 AM 09/30/2019
Misc
Partial Correction
09/16/2019
OK TO GWB ONE-SIDE DOUBLE-WYTHE STAIRWELL WALLS: NORTH STAIR: BASEMENT LEVEL; 1ST FLOOR; SOUTH STAIR: 1ST FLOOR;
Rated Assembly Inspection Partial 10/8/2019 10/8/2019 at 7:50 AM 10/08/2019
Misc
Partial Correction
09/27/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLWALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND FLOOR: 3RD FLOOR: 4TH FLOOR: SOUTH STAIRWELL: 1ST FLOOR: 1ST LAYER; 2ND FLOOR: 3RD FLOOR: 4TH FLOOR: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK.
Rated Assembly Inspection Partial 10/10/2019 10/10/2019 at 11:25 AM 10/10/2019
Misc
Partial Correction
10/08/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLWALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 3RD FLOOR: 4TH FLOOR: SOUTH STAIRWELL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 3RD FLOOR: 4TH FLOOR: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK.
All Rough Inspection - Commercial Failed 10/30/2019 10/30/2019 at 7:10 AM 10/30/2019
Misc
Partial Correction
09/30/2019
OK TO GWB ONE-SIDE DOUBLE-WYTHE STAIRWELL WALLS: NORTH STAIR: BASEMENT LEVEL; 1ST FLOOR; SOUTH STAIR: 1ST FLOOR;
Misc
Corrective Action Required
10/30/2019
STAIR NOT BUILT FOR ACCESS
Electrical Service Inspection Partial 10/30/2019 10/30/2019 at 8:35 AM 10/30/2019
Misc
Partial Correction
10/30/2019
RELEASE SERVICE AT ONE TEMPORARY POST-MOUNTED SERVICE LABELED 829A
All Rough Inspection - Commercial Partial 11/26/2019 at 7:50 AM 11/26/2019
Misc
Partial Correction
10/30/2019
OK TO GWB ONE-SIDE DOUBLE-WYTHE STAIRWELL WALLS: NORTH STAIR: BASEMENT LEVEL; 1ST FLOOR; SOUTH STAIR: 1ST FLOOR;
Misc
Partial Correction
11/26/2019
OK TO HANG GWB WHEN READY FRAMING AT INTERIOR OF STAIRWELLS AND BACKSIDE BETWEEN JOISTS AT: 2ND FLOOR BOTH STAIRWELLS;
Rated Assembly Inspection Partial 11/27/2019 11/27/2019 at 7:05 AM 11/27/2019
Misc
Partial Correction
10/10/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLWALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 3RD FLOOR: 4TH FLOOR: SOUTH STAIRWELL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 3RD FLOOR: 4TH FLOOR: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRE CAULK.
Misc
Partial Correction
11/27/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS ?INSIDE FACE AND? SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT LEVEL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND FLOOR: 3RD FLOOR: 4TH FLOOR:
Rated Assembly Inspection Partial 12/2/2019 12/2/2019 at 2:40 PM 12/02/2019
Misc
Partial Correction
11/27/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLWALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL #2: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 4TH FLOOR: SOUTH STAIRWELL #1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 4TH FLOOR: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRE CAULK.
Misc
Partial Correction
11/27/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT LEVEL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 4TH FLOOR:
All Rough Inspection - Commercial Partial 12/10/2019 12/10/2019 at 3:45 PM 12/10/2019
Misc
Partial Correction
11/26/2019
OK TO GWB STAIRWELL FACE DOUBLE-WYTHE STAIRWELL WALLS: NORTH STAIR #2: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; SOUTH STAIR #1: 1ST FLOOR; 2ND FLOOR; 3RD FLOOR;
Misc
Partial Correction
11/26/2019
OK TO HANG GWB WHEN READY FRAMING AT INTERIOR OF STAIRWELLS AND BACKSIDE BETWEEN JOISTS AT: 2ND FLOOR BOTH STAIRWELLS;
Rated Assembly Inspection Partial 12/23/2019 12/23/2019 at 11:10 AM 12/23/2019
Misc
Partial Correction
12/02/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLWALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL #2: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 4TH FLOOR: SOUTH STAIRWELL #1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 4TH FLOOR: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRE CAULK.
Misc
Partial Correction
12/02/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT LEVEL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 4TH FLOOR:
Rough Framing Inspection - Commercial Partial 11/27/2019 12/26/2019 at 3:10 PM 12/26/2019
Misc
Partial Correction
12/26/2019
NO ISSUES FOUND ON INSTALLATION OF ROOF SHEATHING; OK TO COVER WHEN READY.
Rated Assembly Inspection Partial 12/27/2019 12/27/2019 at 10:25 AM 12/27/2019
Misc
Partial Correction
12/23/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLWALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL #2: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: SOUTH STAIRWELL #1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRE CAULK.
Misc
Partial Correction
12/23/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT LEVEL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR:
Rough Framing Inspection - Commercial Partial 1/6/2020 at 8:00 AM 01/06/2020
Misc
Partial Correction
12/26/2019
OK TO COVER WHEN READY: INSTALLATION OF ROOF SHEATHING; SHEATHING OF SHEAR WALL AT SOUTH END;
Rough Framing Inspection - Commercial Partial 1/8/2020 at 8:15 AM 01/08/2020
Misc
Partial Correction
01/06/2020
OK TO COVER WHEN READY: INSTALLATION OF SHEAR WALL SHEATHING; SHEATHING OF SHEAR WALL AT SOUTH END; SHEAR WALL AT NORTH END
Rough Framing Inspection - Commercial Partial 2/14/2020 02/14/2020
Misc
Corrective Action Required
09/23/2020
OK TO COVER WHEN READY: INSTALLATION OF SHEAR WALL SHEATHING; SHEATHING OF SHEAR WALL AT SOUTH END; SHEAR WALL AT NORTH END ; PRE-ROCK ARES 1ST-4TH FLOORS
Rated Assembly Inspection Partial 2/19/2020 2/19/2020 at 8:40 AM 02/19/2020
Misc
Partial Correction
12/27/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLWALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL #2: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: SOUTH STAIRWELL #1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRE CAULK.
Misc
Partial Correction
12/27/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT LEVEL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR:
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
02/19/2020
OK TO COVER 5/8" MOLD-RESISTENT TYPE "X" GWB AT TUB/SHOWER WALLS: ONE LAYER AT 4TH FLOOR, 3RD FLR, 2ND FLR, 1ST FLR;
All Rough Inspection - Commercial Partial 2/19/2020 at 9:20 AM 02/19/2020
Misc
Partial Correction
12/10/2019
OK TO GWB STAIRWELL FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: SOUTH STAIR #1: 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; 4TH FLOOR NORTH STAIR #2: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; 4TH FLOOR
Misc
Resolved
12/10/2019
OK TO HANG GWB WHEN READY FRAMING AT INTERIOR OF STAIRWELLS AND BACKSIDE BETWEEN JOISTS AT: 2ND FLOOR BOTH STAIRWELLS;
Rated Assembly Inspection Partial 2/20/2020 2/20/2020 at 12:50 PM 02/20/2020
Misc
Partial Correction
02/19/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLWALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL #2: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: SOUTH STAIRWELL #1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRE CAULK.
Misc
Partial Correction
02/19/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT LEVEL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR:
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
02/19/2020
OK TO COVER 5/8" MOLD-RESISTENT TYPE "X" GWB AT TUB/SHOWER WALLS: ONE LAYER AT 4TH FLOOR, 3RD FLR, 2ND FLR, 1ST FLR; TWO LAYERS WHERE REQUIRED AT SHEAR WALLS, TUBS/SHOWERS ADJACENT TO STAIRWELLS, ELEVATOR, CORRIDORS - ALL FLOORS
All Rough Inspection - Commercial Partial 2/20/2020 at 1:35 PM 02/20/2020
Misc
Partial Correction
02/19/2020
OK TO GWB STAIRWELL FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: SOUTH STAIR #1: 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; 4TH FLOOR NORTH STAIR #2: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; 4TH FLOOR
Misc
Partial Correction
02/20/2020
OK TO COVER CEILINGS, WALLS AT: WALLS ONLY AT MECH / ELEVATOR MACH RMS AT BASEMENT;
All Rough Inspection - Commercial Partial 2/21/2020 at 1:05 PM 02/21/2020
Misc
Partial Correction
02/20/2020
OK TO HANG GWB AT STAIRWELL FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: SOUTH STAIR #1: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS 1ST FLOOR, 2ND FLOOR, 3RD FLOOR, 4TH FLOOR; BASEMENT NORTH & EAST WALLS; NORTH STAIR #2: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; 4TH FLOOR
Misc
Partial Correction
02/20/2020
OK TO COVER CEILINGS, WALLS AT: WALLS ONLY AT MECH / ELEVATOR MACH RMS AT BASEMENT; STAIRWELL 1 AT BASEMENT NORTH
Rated Assembly Inspection Partial 2/21/2020 at 1:20 PM 02/21/2020
Misc
Partial Correction
02/20/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLWALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL #2: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: SOUTH STAIRWELL #1: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRE CAULK.
Misc
Partial Correction
02/20/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT LEVEL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR:
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
02/20/2020
OK TO COVER 5/8" MOLD-RESISTENT TYPE "X" GWB AT TUB/SHOWER WALLS: ONE LAYER AT 4TH FLOOR, 3RD FLR, 2ND FLR, 1ST FLR; TWO LAYERS WHERE REQUIRED AT SHEAR WALLS, TUBS/SHOWERS ADJACENT TO STAIRWELLS, ELEVATOR, CORRIDORS - ALL FLOORS BASEMENT STORAGE ROOMS & ELEVATOR MACHINE ROOM WALLS 1 LAYER;
Rated Assembly Inspection Partial 2/25/2020 2/25/2020 at 11:05 AM 02/25/2020
Misc
Partial Correction
02/21/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: SOUTH STAIRWELL #1: BASEMENT: N&E WALLS 1ST LAYER; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; NORTH STAIRWELL #2: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRE CAULK.
Misc
Partial Correction
02/21/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT LEVEL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR:
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
02/21/2020
OK TO COVER 5/8" MOLD-RESISTENT TYPE "X" GWB AT TUB/SHOWER WALLS: ONE LAYER AT 4TH FLOOR, 3RD FLR, 2ND FLR, 1ST FLR; TWO LAYERS WHERE REQUIRED AT SHEAR WALLS, TUBS/SHOWERS ADJACENT TO STAIRWELLS, ELEVATOR, CORRIDORS - ALL FLOORS
Misc
Partial Correction
02/25/2020
BASEMENT UTILITY ROOMS: DATA/ELECT RM: WALLS 1 LAYER; 2ND LAYER; ELEVATOR EQUIP RM: WALLS 1 LAYER; 2ND LAYER; WALLS: WALLS 1 LAYER; 2ND LAYER;
Rated Assembly Inspection Partial 2/27/2020 2/27/2020 at 2:15 PM 02/27/2020
Misc
Partial Correction
02/25/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: SOUTH STAIRWELL #1: BASEMENT: N&E WALLS 1ST LAYER; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER; NORTH STAIRWELL #2: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 1ST LAYER; 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRE CAULK.
Misc
Partial Correction
02/25/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT LEVEL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR:
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
02/25/2020
OK TO COVER 5/8" MOLD-RESISTENT TYPE "X" GWB AT TUB/SHOWER WALLS: ONE LAYER AT 4TH FLOOR, 3RD FLR, 2ND FLR, 1ST FLR; TWO LAYERS WHERE REQUIRED AT SHEAR WALLS, TUBS/SHOWERS ADJACENT TO STAIRWELLS, ELEVATOR, CORRIDORS - ALL FLOORS
Misc
Partial Correction
02/25/2020
BASEMENT UTILITY ROOMS: DATA/ELECT RM: WALLS 1 LAYER; 2ND LAYER; ELEVATOR EQUIP RM: WALLS 1 LAYER; 2ND LAYER; WALLS: WALLS 1 LAYER; 2ND LAYER;
Sprinkler - Hydrostatic Test Passed 3/2/2020 03/02/2020
All Rough Inspection - Commercial Partial 3/3/2020 3/3/2020 at 9:55 AM 03/03/2020
Misc
Partial Correction
02/21/2020
OK TO HANG GWB AT STAIRWELL FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: SOUTH STAIR #1: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS 1ST FLOOR, 2ND FLOOR, 3RD FLOOR, 4TH FLOOR; BASEMENT NORTH & EAST WALLS; LOW CEILINGS AT 4TH FLR; NORTH STAIR #2: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; LOW CEILINGS AT 4TH FLR;
Misc
Partial Correction
02/21/2020
OK TO COVER CEILINGS, WALLS AT: WALLS ONLY AT MECH / ELEVATOR MACH RMS AT BASEMENT; STAIRWELL 1 AT BASEMENT NORTH
Misc
Partial Correction
03/03/2020
OK TO COVER WHEN READY FRAMING & SYSTEMS TO BE ENCLOSED AT UNDERSIDE OF BALCONY PLATFORMS AT: 4TH, 3RD, 2ND, 1ST FLOORS
Rated Assembly Inspection Partial 3/3/2020 at 2:25 PM 03/03/2020
Misc
Partial Correction
02/27/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: SOUTH STAIRWELL #1: BASEMENT: N&E WALLS WELL FACE 1ST & 2ND LAYERS 1ST FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 2ND FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 3RD FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 4TH FLOOR: WELL FACE 1ST LAYER; 2ND LAYER TOWER: WALLS 1ST LAYER; HIGH & LOW CEILINGS 1ST LAYER; NORTH STAIRWELL #2: BASEMENT LEVEL: WELL FACE 1ST LAYER; 2ND LAYER; 1ST FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 2ND FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 3RD FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 4TH FLOOR: WELL FACE 1ST LAYER; 2ND LAYER TOWER: WALLS 1ST LAYER; HIGH & LOW CEILINGS 1ST LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRE CAULK.
Misc
Partial Correction
02/27/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT LEVEL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR:
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
02/27/2020
OK TO COVER 5/8" MOLD-RESISTENT TYPE "X" GWB AT TUB/SHOWER WALLS: ONE LAYER AT 4TH FLOOR, 3RD FLR, 2ND FLR, 1ST FLR; TWO LAYERS WHERE REQUIRED AT SHEAR WALLS, TUBS/SHOWERS ADJACENT TO STAIRWELLS, ELEVATOR, CORRIDORS - ALL FLOORS
Misc
Partial Correction
02/27/2020
BASEMENT UTILITY ROOMS: DATA/ELECT RM: WALLS 1 LAYER; 2ND LAYER; ELEVATOR EQUIP RM: WALLS 1 LAYER; 2ND LAYER; WALLS: WALLS 1 LAYER; 2ND LAYER;
Rated Assembly Inspection Partial 3/5/2020 3/5/2020 at 10:55 AM 03/05/2020
Misc
Partial Correction
03/03/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: SOUTH STAIRWELL #1: BASEMENT: N&E WALLS WELL FACE 1ST & 2ND LAYERS 1ST FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 2ND FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 3RD FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 4TH FLOOR: WELL FACE 1ST LAYER; 2ND LAYER TOWER: WALLS 1ST LAYER; HIGH & LOW CEILINGS 1ST LAYER + 2ND LAYER; NORTH STAIRWELL #2: BASEMENT LEVEL: WELL FACE 1ST LAYER; 2ND LAYER; 1ST FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 2ND FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 3RD FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 4TH FLOOR: WELL FACE 1ST LAYER; 2ND LAYER TOWER: WALLS 1ST LAYER; HIGH & LOW CEILINGS 1ST LAYER + 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRE CAULK.
Misc
Partial Correction
03/03/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT LEVEL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR:
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
03/03/2020
OK TO COVER 5/8" MOLD-RESISTENT TYPE "X" GWB AT TUB/SHOWER WALLS: ONE LAYER AT 4TH FLOOR, 3RD FLR, 2ND FLR, 1ST FLR; TWO LAYERS WHERE REQUIRED AT SHEAR WALLS, TUBS/SHOWERS ADJACENT TO STAIRWELLS, ELEVATOR, CORRIDORS - ALL FLOORS
Misc
Partial Correction
03/03/2020
BASEMENT UTILITY ROOMS: DATA/ELECT RM: WALLS 1 LAYER; 2ND LAYER; ELEVATOR EQUIP RM: WALLS 1 LAYER; 2ND LAYER; WALLS: WALLS 1 LAYER; 2ND LAYER;
All Rough Inspection - Commercial Partial 3/5/2020 at 11:20 AM 03/05/2020
Misc
Partial Correction
03/03/2020
OK TO HANG GWB AT STAIRWELL FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: SOUTH STAIR #1: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS 1ST FLOOR, 2ND FLOOR, 3RD FLOOR, 4TH FLOOR; BASEMENT NORTH & EAST WALLS; LOW CEILINGS AT 4TH FLR; NORTH STAIR #2: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; LOW CEILINGS AT 4TH FLR;
Misc
Partial Correction
03/03/2020
OK TO COVER FRAMING & SYSTEMS TO BE CONCEALED AT ELEVATOR: WALLS ONLY AT MECH / ELEVATOR MACHINE RMS AT BASEMENT; ELEVATOR SHAFT FULL HEIGHT OK FOR GWB AT SHAFT FACE
Misc
Partial Correction
03/03/2020
OK TO COVER WHEN READY FRAMING & SYSTEMS TO BE ENCLOSED AT UNDERSIDE OF BALCONY PLATFORMS AT: 4TH, 3RD, 2ND, 1ST FLOORS
Rated Assembly Inspection Partial 3/10/2020 03/10/2020
Misc
Resolved
03/10/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: SOUTH STAIRWELL #1: BASEMENT: N&E WALLS WELL FACE 1ST & 2ND LAYERS 1ST FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 2ND FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 3RD FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 4TH FLOOR: WELL FACE 1ST LAYER; 2ND LAYER TOWER: WALLS 1ST LAYER; HIGH & LOW CEILINGS 1ST LAYER + 2ND LAYER; NORTH STAIRWELL #2: BASEMENT LEVEL: WELL FACE 1ST LAYER; 2ND LAYER; 1ST FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 2ND FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 3RD FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 4TH FLOOR: WELL FACE 1ST LAYER; 2ND LAYER TOWER: WALLS 1ST LAYER; HIGH & LOW CEILINGS 1ST LAYER + 2ND LAYER; NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRE CAULK.
Misc
Resolved
03/10/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT LEVEL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR:
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
03/05/2020
OK TO COVER 5/8" MOLD-RESISTENT TYPE "X" GWB AT TUB/SHOWER WALLS: ONE LAYER AT 4TH FLOOR, 3RD FLR, 2ND FLR, 1ST FLR; TWO LAYERS WHERE REQUIRED AT SHEAR WALLS, TUBS/SHOWERS ADJACENT TO STAIRWELLS, ELEVATOR, CORRIDORS - ALL FLOORS JOIST CAVITIES: BASEMENT UTILITY ROOMS: DATA/ELECT RM: WALLS 1 LAYER; 2ND LAYER; ELEVATOR EQUIP RM: WALLS 1 LAYER; 2ND LAYER; WALLS: WALLS 1 LAYER; 2ND LAYER; OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT LEVEL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR:
LOWER LEVEL
Resolved
03/10/2020
STAIR TOWER 1
Corrective Action Required
03/10/2020
SOUTH; 4TH FLOOR CEILING- WALLS STAIR WELL- 3RD FL 1ST LAYER OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: SOUTH STAIRWELL #1: BASEMENT: N&E WALLS WELL FACE 1ST & 2ND LAYERS 1ST FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 2ND FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 3RD FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 4TH FLOOR: WELL FACE 1ST LAYER; 2ND LAYER TOWER: WALLS 1ST LAYER; HIGH & LOW CEILINGS 1ST LAYER + 2ND LAYER;
STAIR TOWER 2
Corrective Action Required
03/10/2020
NORTH: 4TH FL- STAIRWELL : 3RD FL 1ST LAYER; OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL #2: BASEMENT LEVEL: WELL FACE 1ST LAYER; 2ND LAYER; 1ST FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 2ND FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 3RD FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 4TH FLOOR: WELL FACE 1ST LAYER; 2ND LAYER TOWER: WALLS 1ST LAYER; HIGH & LOW CEILINGS 1ST LAYER + 2ND LAYER;
All Rough Inspection - Commercial Partial 3/10/2020 3/10/2020 03/10/2020
Misc
Resolved
03/10/2020
OK TO HANG GWB AT STAIRWELL FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: SOUTH STAIR #1: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS 1ST FLOOR, 2ND FLOOR, 3RD FLOOR, 4TH FLOOR; BASEMENT NORTH & EAST WALLS; LOW CEILINGS AT 4TH FLR; NORTH STAIR #2: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; LOW CEILINGS AT 4TH FLR;
Misc
Resolved
03/10/2020
OK TO COVER FRAMING & SYSTEMS TO BE CONCEALED AT ELEVATOR: WALLS ONLY AT MECH / ELEVATOR MACHINE RMS AT BASEMENT; ELEVATOR SHAFT FULL HEIGHT OK FOR GWB AT SHAFT FACE
Misc
Resolved
03/10/2020
OK TO COVER WHEN READY FRAMING & SYSTEMS TO BE ENCLOSED AT UNDERSIDE OF BALCONY PLATFORMS AT: 4TH, 3RD, 2ND, 1ST FLOORS;
FOURTH FLOOR
Corrective Action Required
03/10/2020
ALL-ROUGH-COMPELTE
THIRD FLOOR
Corrective Action Required
03/10/2020
ALL-ROUGH COMPLETE
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/10/2020
OK TO COVER FRAMING & SYSTEMS TO BE CONCEALED AT ELEVATOR: WALLS ONLY AT MECH / ELEVATOR MACHINE RMS AT BASEMENT; ELEVATOR SHAFT FULL HEIGHT OK FOR GWB AT SHAFT FACE >>> OK TO COVER WHEN READY FRAMING & SYSTEMS TO BE ENCLOSED AT UNDERSIDE OF BALCONY PLATFORMS AT: 4TH, 3RD, 2ND, 1ST FLOORS; >>> OK TO HANG GWB AT STAIRWELL FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: SOUTH STAIR #1: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS 1ST FLOOR, 2ND FLOOR, 3RD FLOOR, 4TH FLOOR; BASEMENT NORTH & EAST WALLS; LOW CEILINGS AT 4TH FLR; NORTH STAIR #2: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; LOW CEILINGS AT 4TH FLR;
Rated Assembly Inspection Partial 3/11/2020 03/11/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
03/10/2020
OK TO COVER 5/8" MOLD-RESISTENT TYPE "X" GWB AT TUB/SHOWER WALLS: ONE LAYER AT 4TH FLOOR, 3RD FLR, 2ND FLR, 1ST FLR; TWO LAYERS WHERE REQUIRED AT SHEAR WALLS, TUBS/SHOWERS ADJACENT TO STAIRWELLS, ELEVATOR, CORRIDORS - ALL FLOORS JOIST CAVITIES: BASEMENT UTILITY ROOMS: DATA/ELECT RM: WALLS 1 LAYER; 2ND LAYER; ELEVATOR EQUIP RM: WALLS 1 LAYER; 2ND LAYER; WALLS: WALLS 1 LAYER; 2ND LAYER; OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT LEVEL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR:
STAIR TOWER 1
Corrective Action Required
03/10/2020
SOUTH; 4TH FLOOR CEILING- WALLS STAIR WELL- 4TH FLOOR 1ST,2ND LAYER UNIT SIDES 3RD FL 1ST LAYER OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: SOUTH STAIRWELL #1: BASEMENT: N&E WALLS WELL FACE 1ST & 2ND LAYERS 1ST FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 2ND FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 3RD FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 4TH FLOOR: WELL FACE 1ST LAYER; 2ND LAYER TOWER: WALLS 1ST LAYER; HIGH & LOW CEILINGS 1ST LAYER + 2ND LAYER;
STAIR TOWER 2
Corrective Action Required
03/10/2020
NORTH: 4TH FL- 4TH FLOOR 1ST,2ND LAYER UNIT SIDES STAIRWELL : 3RD FL 1ST LAYER; OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL #2: BASEMENT LEVEL: WELL FACE 1ST LAYER; 2ND LAYER; 1ST FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 2ND FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 3RD FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 4TH FLOOR: WELL FACE 1ST LAYER; 2ND LAYER TOWER: WALLS 1ST LAYER; HIGH & LOW CEILINGS 1ST LAYER + 2ND LAYER;
All Rough Inspection - Commercial Partial 3/11/2020 03/11/2020
FOURTH FLOOR
Corrective Action Required
03/10/2020
ALL-ROUGH-COMPELTE
THIRD FLOOR
Corrective Action Required
03/10/2020
ALL-ROUGH COMPLETE
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/10/2020
OK TO COVER FRAMING & SYSTEMS TO BE CONCEALED AT ELEVATOR: WALLS ONLY AT MECH / ELEVATOR MACHINE RMS AT BASEMENT; ELEVATOR SHAFT FULL HEIGHT OK FOR GWB AT SHAFT FACE >>> OK TO COVER WHEN READY FRAMING & SYSTEMS TO BE ENCLOSED AT UNDERSIDE OF BALCONY PLATFORMS AT: 4TH, 3RD, 2ND, 1ST FLOORS; >>> OK TO HANG GWB AT STAIRWELL FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: SOUTH STAIR #1: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS 1ST FLOOR, 2ND FLOOR, 3RD FLOOR, 4TH FLOOR; BASEMENT NORTH & EAST WALLS; LOW CEILINGS AT 4TH FLR; NORTH STAIR #2: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; LOW CEILINGS AT 4TH FLR;
SECOND FLOOR
Corrective Action Required
03/11/2020
CORRECTIONS MADE DURING INSPECTION , FOLLOW UP AT INSULATION.
Rated Assembly Inspection Partial 3/12/2020 3/12/2020 03/12/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
03/11/2020
OK TO COVER 5/8" MOLD-RESISTENT TYPE "X" GWB AT TUB/SHOWER WALLS: ONE LAYER AT 4TH FLOOR, 3RD FLR, 2ND FLR, 1ST FLR; TWO LAYERS WHERE REQUIRED AT SHEAR WALLS, TUBS/SHOWERS ADJACENT TO STAIRWELLS, ELEVATOR, CORRIDORS - ALL FLOORS JOIST CAVITIES: BASEMENT UTILITY ROOMS: DATA/ELECT RM: WALLS 1 LAYER; 2ND LAYER; ELEVATOR EQUIP RM: WALLS 1 LAYER; 2ND LAYER; WALLS: WALLS 1 LAYER; 2ND LAYER; OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT LEVEL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR:
STAIR TOWER 1
Corrective Action Required
03/11/2020
SOUTH; 4TH FLOOR CEILING- WALLS STAIR WELL- 4TH FLOOR 1ST,2ND LAYER UNIT SIDES 3RD FL 1ST LAYER OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: SOUTH STAIRWELL #1: BASEMENT: N&E WALLS WELL FACE 1ST & 2ND LAYERS 1ST FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 2ND FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 3RD FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 4TH FLOOR: WELL FACE 1ST LAYER; 2ND LAYER TOWER: WALLS 1ST LAYER; HIGH & LOW CEILINGS 1ST LAYER + 2ND LAYER;
STAIR TOWER 2
Corrective Action Required
03/11/2020
NORTH: 4TH FL- 4TH FLOOR 1ST,2ND LAYER UNIT SIDES STAIRWELL : 3RD FL 1ST LAYER; OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL #2: BASEMENT LEVEL: WELL FACE 1ST LAYER; 2ND LAYER; 1ST FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 2ND FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 3RD FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 4TH FLOOR: WELL FACE 1ST LAYER; 2ND LAYER TOWER: WALLS 1ST LAYER; HIGH & LOW CEILINGS 1ST LAYER + 2ND LAYER;
ELEVATOR 1
Corrective Action Required
03/12/2020
1ST,2ND LAYER ELEVATOR SHAFT INSIDE
Rated Assembly Inspection Partial 3/13/2020 3/13/2020 03/13/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
03/12/2020
OK TO COVER 5/8" MOLD-RESISTENT TYPE "X" GWB AT TUB/SHOWER WALLS: ONE LAYER AT 4TH FLOOR, 3RD FLR, 2ND FLR, 1ST FLR; TWO LAYERS WHERE REQUIRED AT SHEAR WALLS, TUBS/SHOWERS ADJACENT TO STAIRWELLS, ELEVATOR, CORRIDORS - ALL FLOORS JOIST CAVITIES: BASEMENT UTILITY ROOMS: DATA/ELECT RM: WALLS 1 LAYER; 2ND LAYER; ELEVATOR EQUIP RM: WALLS 1 LAYER; 2ND LAYER; WALLS: WALLS 1 LAYER; 2ND LAYER; OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT LEVEL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 3rd floor RC channel all units ceiling, corridor walls & ceiling
STAIR TOWER 1
Corrective Action Required
03/12/2020
SOUTH; 4TH FLOOR CEILING- WALLS STAIR WELL- 4TH FLOOR 1ST,2ND LAYER UNIT SIDES 3RD FL 1ST LAYER OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: SOUTH STAIRWELL #1: BASEMENT: N&E WALLS WELL FACE 1ST & 2ND LAYERS 1ST FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 2ND FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 3RD FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 4TH FLOOR: WELL FACE 1ST LAYER; 2ND LAYER TOWER: WALLS 1ST LAYER; HIGH & LOW CEILINGS 1ST LAYER + 2ND LAYER; 1st layer outside
STAIR TOWER 2
Corrective Action Required
03/12/2020
NORTH: 4TH FL- 4TH FLOOR 1ST,2ND LAYER UNIT SIDES STAIRWELL : 3RD FL 1ST LAYER; OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL #2: BASEMENT LEVEL: WELL FACE 1ST LAYER; 2ND LAYER; 1ST FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 2ND FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 3RD FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 4TH FLOOR: WELL FACE 1ST LAYER; 2ND LAYER TOWER: WALLS 1ST LAYER; HIGH & LOW CEILINGS 1ST LAYER + 2ND LAYER; 1st layer outside
ELEVATOR 1
Corrective Action Required
03/12/2020
1ST,2ND LAYER ELEVATOR SHAFT INSIDE 1st layer outside
Electrical Service Inspection Passed 3/16/2020 03/16/2020
Rated Assembly Inspection Partial 3/16/2020 03/16/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
03/13/2020
OK TO COVER 5/8" MOLD-RESISTENT TYPE "X" GWB AT TUB/SHOWER WALLS: ONE LAYER AT 4TH FLOOR, 3RD FLR, 2ND FLR, 1ST FLR; TWO LAYERS WHERE REQUIRED AT SHEAR WALLS, TUBS/SHOWERS ADJACENT TO STAIRWELLS, ELEVATOR, CORRIDORS - ALL FLOORS JOIST CAVITIES: BASEMENT UTILITY ROOMS: DATA/ELECT RM: WALLS 1 LAYER; 2ND LAYER; ELEVATOR EQUIP RM: WALLS 1 LAYER; 2ND LAYER; WALLS: WALLS 1 LAYER; 2ND LAYER; OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT LEVEL: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; 3RD FLOOR: 1ST LAYER; 2ND LAYER; 4TH FLOOR: 3rd floor RC channel all units ceiling, corridor walls & ceiling
STAIR TOWER 1
Corrective Action Required
03/13/2020
SOUTH; 4TH FLOOR CEILING- WALLS STAIR WELL- 4TH FLOOR 1ST,2ND LAYER UNIT SIDES 3RD FL 1ST LAYER OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: SOUTH STAIRWELL #1: BASEMENT: N&E WALLS WELL FACE 1ST & 2ND LAYERS 1ST FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 2ND FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 3RD FLOOR: WELL FACE 1ST LAYER; 2ND LAYER; 4TH FLOOR: WELL FACE 1ST LAYER; 2ND LAYER TOWER: WALLS 1ST LAYER; HIGH & LOW CEILINGS 1ST LAYER + 2ND LAYER; 1st layer outside
STAIR TOWER 2
Corrective Action Required
03/13/2020
NORTH: 4TH FL- 4TH FLOOR 1ST,2ND LAYER UNIT SIDES STAIRWELL : 3RD FL 1ST LAYER; OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL #2: BASEMENT LEVEL: WELL FACE 1ST LAYER; 2ND LAYER; 1ST FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 2ND FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 3RD FLOOR: WELL FACE 1ST LAYER; 2ND LAYER 4TH FLOOR: WELL FACE 1ST LAYER; 2ND LAYER TOWER: WALLS 1ST LAYER; HIGH & LOW CEILINGS 1ST LAYER + 2ND LAYER; 1st layer outside
ELEVATOR 1
Corrective Action Required
03/13/2020
1ST,2ND LAYER ELEVATOR SHAFT INSIDE 1st layer outside CEIILING 1,2,3,HAT CHANNEL.
All Rough Inspection - Commercial Partial 3/16/2020 03/16/2020
FOURTH FLOOR
Corrective Action Required
03/11/2020
ALL-ROUGH-COMPELTE
THIRD FLOOR
Corrective Action Required
03/11/2020
ALL-ROUGH COMPLETE
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/11/2020
OK TO COVER FRAMING & SYSTEMS TO BE CONCEALED AT ELEVATOR: WALLS ONLY AT MECH / ELEVATOR MACHINE RMS AT BASEMENT; ELEVATOR SHAFT FULL HEIGHT OK FOR GWB AT SHAFT FACE >>> OK TO COVER WHEN READY FRAMING & SYSTEMS TO BE ENCLOSED AT UNDERSIDE OF BALCONY PLATFORMS AT: 4TH, 3RD, 2ND, 1ST FLOORS; >>> OK TO HANG GWB AT STAIRWELL FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: SOUTH STAIR #1: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS 1ST FLOOR, 2ND FLOOR, 3RD FLOOR, 4TH FLOOR; BASEMENT NORTH & EAST WALLS; LOW CEILINGS AT 4TH FLR; NORTH STAIR #2: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; LOW CEILINGS AT 4TH FLR;
SECOND FLOOR
Corrective Action Required
03/11/2020
CORRECTIONS MADE DURING INSPECTION , FOLLOW UP AT INSULATION.
FIRST FLOOR
Corrective Action Required
03/16/2020
PENDING ITEMS AT WALK THROUGH
All Rough Inspection - Commercial Partial 3/17/2020 3/17/2020 03/17/2020
FOURTH FLOOR
Informational
09/23/2020
ALL-ROUGH-COMPELTE
THIRD FLOOR
Informational
09/23/2020
ALL-ROUGH COMPLETE
THE FOLLOWING AREAS ARE APPROVED
Informational
09/23/2020
OK TO COVER FRAMING & SYSTEMS TO BE CONCEALED AT ELEVATOR: WALLS ONLY AT MECH / ELEVATOR MACHINE RMS AT BASEMENT; ELEVATOR SHAFT FULL HEIGHT OK FOR GWB AT SHAFT FACE >>> OK TO COVER WHEN READY FRAMING & SYSTEMS TO BE ENCLOSED AT UNDERSIDE OF BALCONY PLATFORMS AT: 4TH, 3RD, 2ND, 1ST FLOORS; >>> OK TO HANG GWB AT STAIRWELL FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: SOUTH STAIR #1: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS 1ST FLOOR, 2ND FLOOR, 3RD FLOOR, 4TH FLOOR; BASEMENT NORTH & EAST WALLS; LOW CEILINGS AT 4TH FLR; NORTH STAIR #2: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; LOW CEILINGS AT 4TH FLR;
SECOND FLOOR
Informational
09/23/2020
CORRECTIONS MADE DURING INSPECTION , FOLLOW UP AT INSULATION.
FIRST FLOOR
Informational
09/23/2020
PENDING ITEMS AT WALK THROUGH
LOWER LEVEL
Resolved
09/23/2020
TRUSS REPAIR DETAIL AND SUPPORT PLUMBING IN GARAGES.
Rated Assembly Inspection Partial 3/17/2020 3/17/2020 03/17/2020
STAIR TOWER 1
Corrective Action Required
03/17/2020
INTERIOR WALLS , 2 LAYERS.
STAIR TOWER 2
Corrective Action Required
03/16/2020
INTERIOR WALLS. 2 LAYERS
ELEVATOR 1
Corrective Action Required
03/16/2020
1ST,2ND LAYER ELEVATOR SHAFT INSIDE 1st layer outside, exterior 1st layer CEIILING 1,2,3,HAT CHANNEL.4th layer.
FOURTH FLOOR
Corrective Action Required
03/17/2020
UNITS AND CORRIDORS
THIRD FLOOR
Corrective Action Required
03/17/2020
RC- 1ST,2ND LAYERS AT STAIRS AND ELEVATOR WALLS.
SECOND FLOOR
Corrective Action Required
03/17/2020
FIRST FLOOR
Corrective Action Required
03/17/2020
Rated Assembly Inspection Partial 3/18/2020 03/18/2020
STAIR TOWER 1
Corrective Action Required
03/17/2020
INTERIOR WALLS , 2 LAYERS.
STAIR TOWER 2
Corrective Action Required
03/17/2020
INTERIOR WALLS. 2 LAYERS
ELEVATOR 1
Corrective Action Required
03/17/2020
1ST,2ND LAYER ELEVATOR SHAFT INSIDE 1st layer outside, exterior 1st layer CEIILING 1,2,3,HAT CHANNEL.4th layer.
FOURTH FLOOR
Corrective Action Required
03/17/2020
UNITS AND CORRIDORS
THIRD FLOOR
Corrective Action Required
03/17/2020
RC- 1ST,2ND LAYERS AT STAIRS AND ELEVATOR WALLS.
SECOND FLOOR
Corrective Action Required
03/17/2020
RC-OK
FIRST FLOOR
Corrective Action Required
03/17/2020
Rated Assembly Inspection Partial 3/19/2020 03/19/2020
STAIR TOWER 1
Corrective Action Required
03/18/2020
INTERIOR WALLS , 2 LAYERS.
STAIR TOWER 2
Corrective Action Required
03/18/2020
INTERIOR WALLS. 2 LAYERS
ELEVATOR 1
Corrective Action Required
03/18/2020
1ST,2ND LAYER ELEVATOR SHAFT INSIDE 1st layer outside, exterior 1st layer CEIILING 1,2,3,HAT CHANNEL.4th layer.
FOURTH FLOOR
Corrective Action Required
03/18/2020
UNITS AND CORRIDORS
THIRD FLOOR
Corrective Action Required
03/18/2020
RC- 1ST,2ND LAYERS AT STAIRS AND ELEVATOR WALLS. Wall type X & ceiling type C screw patterns units & corridors
SECOND FLOOR
Corrective Action Required
03/18/2020
RC-OK
FIRST FLOOR
Corrective Action Required
03/18/2020
Rated Assembly Inspection Partial 3/20/2020 3/20/2020 03/20/2020
STAIR TOWER 1
Corrective Action Required
03/19/2020
INTERIOR WALLS , 2 LAYERS.
STAIR TOWER 2
Corrective Action Required
03/19/2020
INTERIOR WALLS. 2 LAYERS
ELEVATOR 1
Corrective Action Required
03/19/2020
1ST,2ND LAYER ELEVATOR SHAFT INSIDE 1st layer outside, exterior 1st layer CEIILING 1,2,3,HAT CHANNEL.4th layer.
FOURTH FLOOR
Corrective Action Required
03/19/2020
UNITS AND CORRIDORS
THIRD FLOOR
Corrective Action Required
03/19/2020
RC- 1ST,2ND LAYERS AT STAIRS AND ELEVATOR WALLS. Wall type X & ceiling type C screw patterns units & corridors Fire collars roof drains (4) bedroom closets
SECOND FLOOR
Corrective Action Required
03/19/2020
RC-OK
FIRST FLOOR
Corrective Action Required
03/19/2020
RC-OK
LOWER LEVEL
Corrective Action Required
03/20/2020
RC garage ceilings OK
Rated Assembly Inspection Partial 3/23/2020 at 2:10 PM 03/23/2020
STAIR TOWER 1
Corrective Action Required
03/20/2020
INTERIOR WALLS , 2 LAYERS. STAIR UNDERSIDE-OK **FOR OUTER SIDES-SEE EACH FLOOR LEVEL
STAIR TOWER 2
Corrective Action Required
03/20/2020
INTERIOR WALLS. 2 LAYERS STAIR UNDERSIDE-OK **FOR OUTER SIDES-SEE EACH FLOOR LEVEL
ELEVATOR 1
Corrective Action Required
03/20/2020
1ST,2ND LAYER ELEVATOR SHAFT INSIDE 1st layer outside, exterior 1st layer CEIILING 1,2,3,HAT CHANNEL.4th layer. **FOR OUTER SIDES-SEE EACH FLOOR LEVEL
FOURTH FLOOR
Corrective Action Required
03/20/2020
UNITS AND CORRIDORS
THIRD FLOOR
Corrective Action Required
03/20/2020
RC- 1ST,2ND LAYERS AT STAIRS AND ELEVATOR WALLS. Wall type X & ceiling type C screw patterns units & corridors Fire collars roof drains (4) bedroom closets
SECOND FLOOR
Corrective Action Required
03/20/2020
RC-OK SHEAR WALLS 6-2ND LAYER OK ON BOTH SIDES STAIR ENCLOSURES 1 AND 2 OUTER SIDE-2ND LAYER OK ELEVATOR ENCLOSURE OUTER SIDE-2ND LAYER OK ALL OTHER WALLS AND CEILING-OK
FIRST FLOOR
Corrective Action Required
03/20/2020
RC-OK STAIR ENCLOSURES 1 AND 2 OUTER SIDE-1ST LAYER OK ELEVATOR ENCLOSURE OUTER SIDE-1ST LAYER OK SHEAR WALLS 4-1ST LAYER OK ON BOTH SIDES SHEAR WALL 2 DWELLING SIDE-1ST LAYER OK
LOWER LEVEL
Corrective Action Required
03/20/2020
RC garage ceilings OK RC CORRIDOR&ROOMS OK
Rated Assembly Inspection Partial 3/26/2020 3/26/2020 at 10:40 AM 03/26/2020
STAIR TOWER 1
Corrective Action Required
03/23/2020
INTERIOR WALLS , 2 LAYERS. STAIR UNDERSIDE-OK OUTER SIDE: LOWER FL-1ST LAYER OK 1ST FL- 1ST LAYER OK 2ND FL-2ND LAYER OK 3RD FL 4TH FL
STAIR TOWER 2
Corrective Action Required
03/23/2020
INTERIOR WALLS. 2 LAYERS STAIR UNDERSIDE-OK OUTER SIDE: LOWER FL-1ST LAYER OK 1ST FL-1ST LAYER OK 2ND FL-2ND LAYER OK 3RD FL- 4TH FL-
ELEVATOR 1
Corrective Action Required
03/23/2020
1ST,2ND LAYER ELEVATOR SHAFT INSIDE 1st layer outside, exterior 1st layer CEIILING 1,2,3,HAT CHANNEL.4th layer. OUTER SIDE: LOWER FL-1ST LAYER OK 1ST FL-1ST LAYER OK 2ND FL-2ND LAYER OK 3RD FL- 4TH FL-
FOURTH FLOOR
Corrective Action Required
03/23/2020
UNITS AND CORRIDORS
THIRD FLOOR
Corrective Action Required
03/23/2020
RC- 1ST,2ND LAYERS AT STAIRS AND ELEVATOR WALLS. Wall type X & ceiling type C screw patterns units & corridors Fire collars roof drains (4) bedroom closets
SECOND FLOOR
Corrective Action Required
03/23/2020
RC-OK SHEAR WALLS 6-2ND LAYER OK ON BOTH SIDES ALL OTHER WALLS AND CEILING-OK
FIRST FLOOR
Corrective Action Required
03/23/2020
RC-OK SHEAR WALLS 4-1ST LAYER OK ON BOTH SIDES SHEAR WALL 2 DWELLING SIDE-1ST LAYER OK
LOWER LEVEL
Corrective Action Required
03/23/2020
RC garage ceilings OK RC CORRIDOR&ROOMS OK BOTH GARAGES AT ENDS OF BUILDING-CEILING PREROCK OK BEFORE SE CABLE FUR-DOWN SHEAR WALL 4-1ST LAYER OK ON BOTH SIDES SHEAR WALL 2-ALL ROOMS ALONG CORRIDOR WALL-1ST LAYER OK ELEVATOR EQUIPMENT ROOM: CEILING-1ST LAYER OK
Rated Assembly Inspection Partial 3/27/2020 at 10:30 AM 03/27/2020
STAIR TOWER 1
Corrective Action Required
03/26/2020
INTERIOR WALLS , 2 LAYERS. STAIR UNDERSIDE-OK LOWER LEVEL-SOUTH WALL-2ND LAYER OK OUTER SIDE: LOWER FL-2ND LAYER OK 1ST FL- 1ST LAYER OK 2ND FL-2ND LAYER OK 3RD FL 4TH FL
STAIR TOWER 2
Corrective Action Required
03/26/2020
INTERIOR WALLS. 2 LAYERS STAIR UNDERSIDE-OK OUTER SIDE: LOWER FL-2ND LAYER OK 1ST FL-1ST LAYER OK 2ND FL-2ND LAYER OK 3RD FL- 4TH FL-
ELEVATOR 1
Corrective Action Required
03/26/2020
1ST,2ND LAYER ELEVATOR SHAFT INSIDE 1st layer outside, exterior 1st layer CEIILING 1,2,3,HAT CHANNEL.4th layer. OUTER SIDE: LOWER FL-2ND LAYER OK 1ST FL-1ST LAYER OK 2ND FL-2ND LAYER OK 3RD FL- 4TH FL-
FOURTH FLOOR
Corrective Action Required
03/26/2020
UNITS AND CORRIDORS
THIRD FLOOR
Corrective Action Required
03/26/2020
RC- 1ST,2ND LAYERS AT STAIRS AND ELEVATOR WALLS. Wall type X & ceiling type C screw patterns units & corridors Fire collars roof drains (4) bedroom closets
SECOND FLOOR
Corrective Action Required
03/26/2020
RC-OK SHEAR WALLS 6-2ND LAYER OK ON BOTH SIDES ALL OTHER WALLS AND CEILING-OK
FIRST FLOOR
Corrective Action Required
03/26/2020
RC-OK SHEAR WALLS 4-1ST LAYER OK ON BOTH SIDES SHEAR WALL 2 DWELLING SIDE-1ST LAYER OK
LOWER LEVEL
Corrective Action Required
03/26/2020
RC garage ceilings OK RC CORRIDOR&ROOMS OK BOTH GARAGES AT ENDS OF BUILDING-CEILING PREROCK OK BEFORE SE CABLE FUR-DOWN. SE PENETRATIONS ARE FIRE-CAULKED SHEAR WALL 4-2ND LAYER OK ON BOTH SIDES SHEAR WALL 2-ALL ROOMS ALONG CORRIDOR WALL-2ND LAYER OK ELEVATOR EQUIPMENT ROOM: CEILING-2ND LAYER OK
Rated Assembly Inspection Partial 3/30/2020 03/30/2020
STAIR TOWER 1
Corrective Action Required
03/27/2020
INTERIOR WALLS , 2 LAYERS. STAIR UNDERSIDE-OK LOWER LEVEL-SOUTH WALL-2ND LAYER OK OUTER SIDE: LOWER FL-2ND LAYER OK 1ST FL- 1ST LAYER OK 2ND FL-2ND LAYER OK 3RD FL 4TH FL
STAIR TOWER 2
Corrective Action Required
03/27/2020
INTERIOR WALLS. 2 LAYERS STAIR UNDERSIDE-OK OUTER SIDE: LOWER FL-2ND LAYER OK 1ST FL-1ST LAYER OK 2ND FL-2ND LAYER OK 3RD FL- 4TH FL-
ELEVATOR 1
Corrective Action Required
03/27/2020
1ST,2ND LAYER ELEVATOR SHAFT INSIDE 1st layer outside, exterior 1st layer CEIILING 1,2,3,HAT CHANNEL.4th layer. OUTER SIDE: LOWER FL-2ND LAYER OK 1ST FL-1ST LAYER OK 2ND FL-2ND LAYER OK 3RD FL- 4TH FL-
FOURTH FLOOR
Informational
03/30/2020
UNITS AND CORRIDORS
THIRD FLOOR
Informational
03/30/2020
RC- 1ST,2ND LAYERS AT STAIRS AND ELEVATOR WALLS. Wall type X & ceiling type C screw patterns units & corridors Fire collars roof drains (4) bedroom closets
SECOND FLOOR
Informational
03/30/2020
complete
FIRST FLOOR
Informational
03/30/2020
complete
LOWER LEVEL
Corrective Action Required
03/27/2020
RC garage ceilings OK RC CORRIDOR&ROOMS OK BOTH GARAGES AT ENDS OF BUILDING-CEILING PREROCK OK BEFORE SE CABLE FUR-DOWN. SE PENETRATIONS ARE FIRE-CAULKED SHEAR WALL 4-2ND LAYER OK ON BOTH SIDES SHEAR WALL 2-ALL ROOMS ALONG CORRIDOR WALL-2ND LAYER OK ELEVATOR EQUIPMENT ROOM: CEILING-2ND LAYER OK
Above Ceiling Inspection Failed 12/27/2019 3/31/2020 03/31/2020
FOURTH FLOOR
Resolved
09/23/2020
Rated Assembly Inspection Partial 3/31/2020 03/31/2020
STAIR TOWER 1
Corrective Action Required
03/30/2020
INTERIOR WALLS , 2 LAYERS. STAIR UNDERSIDE-OK LOWER LEVEL-SOUTH WALL-2ND LAYER OK OUTER SIDE: LOWER FL-2ND LAYER OK 1ST FL- 1ST LAYER OK 2ND FL-2ND LAYER OK 3RD FL 4TH FL
STAIR TOWER 2
Corrective Action Required
03/30/2020
INTERIOR WALLS. 2 LAYERS STAIR UNDERSIDE-OK OUTER SIDE: LOWER FL-2ND LAYER OK 1ST FL-1ST LAYER OK 2ND FL-2ND LAYER OK 3RD FL- 4TH FL-
ELEVATOR 1
Corrective Action Required
03/30/2020
1ST,2ND LAYER ELEVATOR SHAFT INSIDE 1st layer outside, exterior 1st layer CEIILING 1,2,3,HAT CHANNEL.4th layer. OUTER SIDE: LOWER FL-2ND LAYER OK 1ST FL-1ST LAYER OK 2ND FL-2ND LAYER OK 3RD FL- 4TH FL-
FOURTH FLOOR
Informational
03/30/2020
UNITS AND CORRIDORS
THIRD FLOOR
Informational
03/30/2020
RC- 1ST,2ND LAYERS AT STAIRS AND ELEVATOR WALLS. Wall type X & ceiling type C screw patterns units & corridors Fire collars roof drains (4) bedroom closets
SECOND FLOOR
Informational
03/30/2020
complete
FIRST FLOOR
Informational
03/30/2020
complete
LOWER LEVEL
Corrective Action Required
03/30/2020
RC garage ceilings OK RC CORRIDOR&ROOMS OK BOTH GARAGES AT ENDS OF BUILDING-CEILING PREROCK OK BEFORE SE CABLE FUR-DOWN. SE PENETRATIONS ARE FIRE-CAULKED SHEAR WALL 4-2ND LAYER OK ON BOTH SIDES SHEAR WALL 2-ALL ROOMS ALONG CORRIDOR WALL-2ND LAYER OK ELEVATOR EQUIPMENT ROOM: CEILING-1,2,3RD
Miscellaneous Inspection Failed 9/16/2020 09/16/2020
Misc
Corrective Action Required
09/16/2020
T- PROVIDE EXPANSION TANKS AT WATER HEATER THROUGHOUT - - NO ACCESS TO MECHANICAL CLOSETS HALLWAYS - - 400 SECURE ANTI TIP DEVICE RANGE - - 401 SEAL JOINT IN MECHANICAL CLOSET - - 403 ADJUST ENTRY DOOR TO SELF CLOSE & LATCH, SEAL PENETRATIONS IN FLOOR AT MECH CLOSET - - 404 SEAL PENETRATION IN MECHANICAL BACK LINE - - 406 LOOSE GFCI LEFT SIDE OF RANGE - - 407 TAPE OR FIRE CAULK CEILING MECH ROOM - - 408 SOFT GFCI EXTERIOR - - 410 SEAL GAP IN ROCK MECH CLOSET - - - 3RD FLOOR STAIRWAY # 1 PROVIDE CHILD FALL GUARD WINDOW AT LANDING - - 303 SEAL GAPS IN FIRE CAULK MECH CLOSET - - 305 INSTALL RAILING, SECURE DISCHARGE LINE UNDER SINK - - 307 SEAL AT FIRE CAULK IN MECH CLOSET - - 309 SECURE DISCHARGE LINE - - 313 SMOKE DETECTOR OUTSIDE SECOND BEDROOM NOT FUNCTIONING PROPERLY, ANTI TIP DEVICE RANGE -
Alarm Test Failed 9/17/2020 09/17/2020
Sprinkler - Flow Test Passed 9/17/2020 09/17/2020
Alarm Test Passed 9/18/2020 09/18/2020
Miscellaneous Inspection Partial 9/18/2020 9/18/2020 09/18/2020
Misc
Corrective Action Required
09/16/2020
T- PROVIDE EXPANSION TANKS AT WATER HEATER THROUGHOUT - - NO ACCESS TO MECHANICAL CLOSETS HALLWAYS - - 400 SECURE ANTI TIP DEVICE RANGE - - 401 SEAL JOINT IN MECHANICAL CLOSET - - 403 ADJUST ENTRY DOOR TO SELF CLOSE & LATCH, SEAL PENETRATIONS IN FLOOR AT MECH CLOSET - - 404 SEAL PENETRATION IN MECHANICAL BACK LINE - - 406 LOOSE GFCI LEFT SIDE OF RANGE - - 407 TAPE OR FIRE CAULK CEILING MECH ROOM - - 408 SOFT GFCI EXTERIOR - - 410 SEAL GAP IN ROCK MECH CLOSET - - - 3RD FLOOR STAIRWAY # 1 PROVIDE CHILD FALL GUARD WINDOW AT LANDING - - 303 SEAL GAPS IN FIRE CAULK MECH CLOSET - - 305 INSTALL RAILING, SECURE DISCHARGE LINE UNDER SINK - - 307 SEAL AT FIRE CAULK IN MECH CLOSET - - 309 SECURE DISCHARGE LINE - - 313 SMOKE DETECTOR OUTSIDE SECOND BEDROOM NOT FUNCTIONING PROPERLY, ANTI TIP DEVICE RANGE - -2ND FLOOR STAIRWAY 2 PROVIDE SAFETY LATCH AT WINDOW -200 SECURE DISCHARGE LINE ABOVE BOWL OF SINK -201 SECURE DISCHARGE LINE ABOVE BOWL OF SINK, SMOKE DETECTOR LOW BATTERY -202 SECURE DISCHARGE LINE ABOVE BOWL OF SINK, SEAL PENETRATION OF LINE SET AT FLOOR IN MECHANICAL ROOM -204 SEAL PENETRATIONS IN MECHANICAL CLOSET -205 FIRE CAULK MECHANICAL ROOM CEILING AT HVAC -206 ADJUST ENTRY DOOR TO SELF CLOSE AND LATCH, SECURE ANTI TIP DEVICE AT RANGE -208 SEAL PENETRATIONS AT MECHANICAL CLOSET, SECURE DISCHARGE LINE ABOVE BOWL OF SINK -210 ADJUST ENTRY DOOR TO SELF CLOSE AND LATCH -213 SECURE DISCHARGE LINE ABOVE BOWL OF SINK
Rated Assembly Inspection Passed 9/23/2020 09/23/2020
STAIR TOWER 1
Informational
09/23/2020
INTERIOR WALLS , 2 LAYERS. STAIR UNDERSIDE-OK LOWER LEVEL-SOUTH WALL-2ND LAYER OK OUTER SIDE: LOWER FL-2ND LAYER OK 1ST FL- 1ST LAYER OK 2ND FL-2ND LAYER OK 3RD FL 4TH FL
STAIR TOWER 2
Informational
09/23/2020
INTERIOR WALLS. 2 LAYERS STAIR UNDERSIDE-OK OUTER SIDE: LOWER FL-2ND LAYER OK 1ST FL-1ST LAYER OK 2ND FL-2ND LAYER OK 3RD FL- 4TH FL-
ELEVATOR 1
Informational
09/23/2020
1ST,2ND LAYER ELEVATOR SHAFT INSIDE 1st layer outside, exterior 1st layer CEIILING 1,2,3,HAT CHANNEL.4th layer. OUTER SIDE: LOWER FL-2ND LAYER OK 1ST FL-1ST LAYER OK 2ND FL-2ND LAYER OK 3RD FL- 4TH FL-
FOURTH FLOOR
Informational
03/31/2020
UNITS AND CORRIDORS
THIRD FLOOR
Informational
03/31/2020
RC- 1ST,2ND LAYERS AT STAIRS AND ELEVATOR WALLS. Wall type X & ceiling type C screw patterns units & corridors Fire collars roof drains (4) bedroom closets
SECOND FLOOR
Informational
03/31/2020
complete
FIRST FLOOR
Informational
03/31/2020
complete
LOWER LEVEL
Informational
09/23/2020
RC garage ceilings OK RC CORRIDOR&ROOMS OK BOTH GARAGES AT ENDS OF BUILDING-CEILING PREROCK OK BEFORE SE CABLE FUR-DOWN. SE PENETRATIONS ARE FIRE-CAULKED SHEAR WALL 4-2ND LAYER OK ON BOTH SIDES SHEAR WALL 2-ALL ROOMS ALONG CORRIDOR WALL-2ND LAYER OK ELEVATOR EQUIPMENT ROOM: CEILING-1,2,3RD
Rough Electrical Inspection - Commercial Passed 9/23/2020 09/23/2020
Rough Framing Inspection - Commercial Passed 9/23/2020 09/23/2020
Misc
Resolved
09/23/2020
OK TO COVER WHEN READY: INSTALLATION OF SHEAR WALL SHEATHING; SHEATHING OF SHEAR WALL AT SOUTH END; SHEAR WALL AT NORTH END ; PRE-ROCK ARES 1ST-4TH FLOORS
Miscellaneous Inspection Passed 9/23/2020 09/23/2020
Misc
Resolved
09/23/2020
Above Ceiling Inspection Passed 9/23/2020 09/23/2020
FOURTH FLOOR
Corrective Action Required
03/31/2020
SECURE NM WITHIN 12" OF BOXES
All Rough Inspection - Commercial Passed 9/23/2020 09/23/2020
FOURTH FLOOR
Informational
09/23/2020
ALL-ROUGH-COMPELTE
THIRD FLOOR
Informational
09/23/2020
ALL-ROUGH COMPLETE
THE FOLLOWING AREAS ARE APPROVED
Informational
09/23/2020
OK TO COVER FRAMING & SYSTEMS TO BE CONCEALED AT ELEVATOR: WALLS ONLY AT MECH / ELEVATOR MACHINE RMS AT BASEMENT; ELEVATOR SHAFT FULL HEIGHT OK FOR GWB AT SHAFT FACE >>> OK TO COVER WHEN READY FRAMING & SYSTEMS TO BE ENCLOSED AT UNDERSIDE OF BALCONY PLATFORMS AT: 4TH, 3RD, 2ND, 1ST FLOORS; >>> OK TO HANG GWB AT STAIRWELL FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: SOUTH STAIR #1: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS 1ST FLOOR, 2ND FLOOR, 3RD FLOOR, 4TH FLOOR; BASEMENT NORTH & EAST WALLS; LOW CEILINGS AT 4TH FLR; NORTH STAIR #2: FACE AND BACKSIDE BETWEEN JOISTS AT DOUBLE-WYTHE STAIRWELL WALLS: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; LOW CEILINGS AT 4TH FLR;
SECOND FLOOR
Resolved
09/23/2020
CORRECTIONS MADE DURING INSPECTION , FOLLOW UP AT INSULATION.
FIRST FLOOR
Resolved
09/23/2020
PENDING ITEMS AT WALK THROUGH
LOWER LEVEL
Resolved
09/23/2020
TRUSS REPAIR DETAIL AND SUPPORT PLUMBING IN GARAGES.
Occupancy Inspection - Fire Passed 9/23/2020 9/23/2020 09/23/2020
Occupancy Inspection - Codes Commercial Failed 9/23/2020 9/23/2020 09/23/2020
Misc
Corrective Action Required
09/23/2020
- STAIR 1 CHILD GUARDS WINDOWS FLOORS 1,2,3,4 - - CORRIDOR @ S1 PATCH HOLES IN CEILING - - MECH CLOSET AT ELEVATOR FIRE CAULK CEILING, OPEN J BOX CEILING - - PROVIDE SIGN @ FIRE ACCESS PANEL ROOM - - DATA ROOM PATCH HOLE IN REAR WALL - - FIRE CAULK CEILING ABOVE ALL OVERHEAD GARAGE DOORS - - S1 ADJUST DOOR CLOSER - - S5 ADJUST DOOR CLOSER - - S8 ADJUST DOOR CLOSER - - 100 PROVIDE (2) 3" SCREWS IN EACH EXTERIOR DOOR HINGE & STRIKE - - 102 PROVIDE (2) 3" SCREWS IN EACH EXTERIOR DOOR HINGE & STRIKE PLATE, SECURE DISHWASHER DISCHARGE LINE ABOVE BOWL OF SINK - - 104 SMOKE DETECTOR LOW BATTERY CHIRP - - 108 ADA UNDER COUNTER CLEARANCE AT SINK, NO BATH FAN, GRAB BARS SHOWER & TOLIET, SMOKES LOW BATTERY CHIRP, REMOVE DUST COVERS SMOKES- - 110 SEAL GAP IN ROCK AT MECH CLOSET BY MC, LOW BATTERY CHIRP SMOKES, DUST COVERS SMOKES- -113 LOW BATTERY CHIRP SMOKES, DUST COVERS SMOKES, MISSING ESCUTCHEON AT KITCHEN - - 202 SECURE DISHWASHER DISCHARGE LINE ABOVE BOWL OF SINK - - 204 FIRE CAULK MECH ROOM - - 208 ADJUST DOOR TO SELF CLOSE & LATCH, SEAL AROUND GAPS IN FIRE CAULK OF BACK LINE SETIN MECH ROOM -
Occupancy Inspection - Engineering Passed 9/23/2020 09/23/2020
Occupancy Inspection - Planning Passed 9/23/2020 09/23/2020
Occupancy Inspection - Water Utilities Passed 9/24/2020 09/24/2020
Occupancy Inspection - Codes Commercial Full C of O 9/25/2020 9/25/2020 09/25/2020
Misc
Corrective Action Required
09/23/2020
Documents & Images
Date Uploaded File Type Document Name
08/15/2018 Summit SqPhII - Site
08/15/2018 Summit Sq Ph II - Permits
11/09/2018 Receipt Receipt for transaction: 2018-007174
08/05/2019 Letter DS Building Permit
09/16/2019 Letter INSPECTION SUMMARY
09/18/2019 Letter INSPECTION SUMMARY
09/27/2019 Letter INSPECTION SUMMARY
09/30/2019 Letter INSPECTION SUMMARY
10/08/2019 Letter INSPECTION SUMMARY
10/10/2019 Letter INSPECTION SUMMARY
10/30/2019 Letter INSPECTION SUMMARY
10/30/2019 Letter INSPECTION SUMMARY
11/26/2019 Letter INSPECTION SUMMARY
11/27/2019 Letter INSPECTION SUMMARY
12/02/2019 Letter INSPECTION SUMMARY
12/10/2019 Letter INSPECTION SUMMARY
12/23/2019 Letter INSPECTION SUMMARY
12/26/2019 Letter INSPECTION SUMMARY
12/27/2019 Letter INSPECTION SUMMARY
01/06/2020 Letter INSPECTION SUMMARY
01/08/2020 Letter INSPECTION SUMMARY
02/14/2020 Letter INSPECTION SUMMARY
02/19/2020 Letter INSPECTION SUMMARY
02/19/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
02/21/2020 Letter INSPECTION SUMMARY
02/21/2020 Letter INSPECTION SUMMARY
02/25/2020 Letter INSPECTION SUMMARY
02/27/2020 Letter INSPECTION SUMMARY
03/03/2020 Letter INSPECTION SUMMARY
03/03/2020 Letter INSPECTION SUMMARY
03/03/2020 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
03/10/2020 Letter INSPECTION SUMMARY
03/11/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/13/2020 Letter INSPECTION SUMMARY
03/16/2020 Letter INSPECTION SUMMARY
03/16/2020 Letter INSPECTION SUMMARY
03/16/2020 Letter INSPECTION SUMMARY
03/17/2020 Letter INSPECTION SUMMARY
03/17/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/19/2020 Letter INSPECTION SUMMARY
03/20/2020 Letter INSPECTION SUMMARY
03/23/2020 Letter INSPECTION SUMMARY
03/26/2020 Letter INSPECTION SUMMARY
03/27/2020 Letter INSPECTION SUMMARY
03/30/2020 Letter INSPECTION SUMMARY
03/31/2020 Letter INSPECTION SUMMARY
03/31/2020 Letter INSPECTION SUMMARY
09/18/2020 Letter INSPECTION SUMMARY
09/23/2020 Letter INSPECTION SUMMARY
09/25/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home