Review Type |
Outcome |
Est. Completion Date |
Completed |
Redesign Review
|
No Comments
|
05/02/2023
|
04/27/2023
|
|
Gene Williams, P.E.
|
|
|
Planning Review
|
No Comments
|
05/02/2023
|
04/25/2023
|
|
Shannon McGuire
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee/sanitary impact fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $54,782.53
|
|
|
Engineering Review
|
Approved with Conditions
|
12/19/2022
|
12/16/2022
|
|
Gene Williams, P.E.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee/sanitary impact fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $54,782.53
|
|
|
Engineering Review
|
Approved with Conditions
|
12/14/2022
|
12/13/2022
|
|
Gene Williams, P.E.
|
|
DE Engineers Estimate
Corrective Action Required
The cost estimate was not sufficiiently itemized, and the following corrections should be made: 1) pavement and sawcutting and installation of joints as per plan, 2) subgrade, 3) curb and gutter, 4) sidewalk, 5) ADA-accessible ramps, 6) sanitary sewer, including wye connection and all pipe and cleanouts, 7) water line, including tap, 8) fire line, including cut-in tee, 9) valves, 10) private stormwater costs including piping and all structures, 11) grading for parking lot and peripheral areas not associated with the bulding pad, 12) erosion and sediment control measures and devices, 13) final restoration, including sodding, seeding, fertilizer, mulch, and topsoil. Please do not include gas, electric, building, lighting, or landsaping as these are not items reviewed or inspected by the engineering group.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
|
Building Codes Review
|
No Comments
|
12/14/2022
|
12/07/2022
|
|
Scott Ready
|
|
|
Traffic Review
|
No Comments
|
12/14/2022
|
12/07/2022
|
|
Scott Ready
|
|
|
Planning Review
|
No Comments
|
12/14/2022
|
12/07/2022
|
|
Scott Ready
|
|
|
Fire Review
|
Approved with Conditions
|
12/14/2022
|
12/07/2022
|
|
Scott Ready
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|
Engineering Review
|
Approved with Conditions
|
11/28/2022
|
11/28/2022
|
|
Gene Williams, P.E.
|
|
DE Engineers Estimate
Corrective Action Required
The cost estimate was not sufficiiently itemized, and the following corrections should be made: 1) pavement and sawcutting and installation of joints as per plan, 2) subgrade, 3) curb and gutter, 4) sidewalk, 5) ADA-accessible ramps, 6) sanitary sewer, including wye connection and all pipe and cleanouts, 7) water line, including tap, 8) fire line, including cut-in tee, 9) valves, 10) private stormwater costs including piping and all structures, 11) grading for parking lot and peripheral areas not associated with the bulding pad, 12) erosion and sediment control measures and devices, 13) final restoration, including sodding, seeding, fertilizer, mulch, and topsoil. Please do not include gas, electric, building, lighting, or landsaping as these are not items reviewed or inspected by the engineering group.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
|
Building Codes Review
|
No Comments
|
11/28/2022
|
11/22/2022
|
|
Mike Weisenborn
|
|
|
Planning Review
|
No Comments
|
11/28/2022
|
11/22/2022
|
|
Shannon McGuire
|
|
|
Traffic Review
|
No Comments
|
11/28/2022
|
11/22/2022
|
|
Brad Cooley, P.E., RSPI
|
|
|
Fire Review
|
Approved with Conditions
|
11/28/2022
|
11/17/2022
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|
Planning Review
|
Corrections
|
11/03/2022
|
11/03/2022
|
|
Shannon McGuire
|
|
Corrective Action Required
As part of the related minor plat application, sidewalks will be required adjacent to the western property line. Please show the required sidewalk and label its width.
|
|
Corrective Action Required
Will there be any ground mounted mechanical equipment? Please show the location, size, and type of material to be used in all screening of ground mounted mechanical equipment. Please provide the manufacturer’s specification sheets for proposed mechanical equipment to be used.
|
|
Corrective Action Required
Will there be any roof mounted mechanical equipment? On the elevations, please show a dashed line indicating the roof line and rooftop mechanical equipment. Please show the location, size and materials to be used in all screening of rooftop mechanical equipment.
|
|
Corrective Action Required
Deciduous trees shall be a minimum of three-inch caliper, measured at a point 6 inches above the ground or top of the root ball, at planting. Evergreen trees shall be a minimum height of eight feet at planting. As proposed the plans do not meet these requirements.
|
|
Corrective Action Required
Please label the widths of the driveways leading from the private drive.
|
|
|
Engineering Review
|
Corrections
|
11/03/2022
|
11/03/2022
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Public sanitary sewer plans and public stormwater plans shall be submitted as separate engineering plans since these are public improvements. Since the sanitary sewer plans will not require a separate MDNR permit, they can be submitted as a combination of both, or separately as desired. In any case, they must be separated from the Final Development Plan. Please revise by removing the public sanitary sewer plans and the public stormwater plans from the Final Development Plan, with perhaps a grayed-out outline showing the proposed improvements to be covered by "see other plans" or equivalent language and/or notes on the Final Development Plan.
|
|
Corrective Action Required
Since the public stormwater and public sanitary sewer plans were included within the Final Development Plan, I will provide comments on those plans as if they were submitted separately. They are presented below. Please be aware that even though the fire hydrant is public and would technically be considered a public improvement, separate plans for this feature is not needed. This is also the case for public sidewalk installed with the project.
|
|
Corrective Action Required
Water line plans: No isolation valve is requred on the domestic water main tap. This valve is part of the meter assembly. Please remove the note. Be aware the isolation valve shown on the fire line shall be required as shown on your plans.
|
|
Corrective Action Required
Fire protection line is called-out as ductile iron. If ductile iron pipe is used, it shall be zinc-coated. Recommend changing to C900 pipe rather than ductile iron pipe. If not, then please specify zinc-coated ductile iron pipe. Please revise as appropriate.
|
|
Corrective Action Required
Public and Private Stormwater Plan and Profile Sheets: All public lines shall include the hydraulic grade line for the design storm event, along with callouts indicating the storm event. All private lines with a diameter greater than 6 inches shall also include the hydraulic grade line in the profile view for the design storm event, along with a callout of the storm event. Please revise on the standalone public plans.
|
|
Corrective Action Required
Please show the existing City manhole numbers on the separate City standalone sanitary sewer plans. For reference, the northernmost City manhole is 05-243, and the downstream manhole number is 05-242 within the private drive. Please revise.
|
|
Corrective Action Required
ADA-accessible ramp details shall be shown for the sidewalk crossing the entrance. Details include slope callouts, ADA-accessible route width across the driveway, truncated domes, elevation callouts of the ramp and the transition to the ramp, cross-slope, running slope, and all other design information needed to construct the ADA-accessible ramp. Standard details shall not be considered a design. Please be aware the design limits for slope within the City of Lee's Summit are less than PROWAG, and are 1.5% for cross-slope, and 7.5% for running slope. This allows for construction tolerance, and the final product must be less than specified by PROWAG (i.e., 2.00% and 8.33%). Please submit ADA-accessible ramp details for the new commercial entrance.
|
|
Corrective Action Required
Slope callouts shall be shown for all ADA-accessible spaces within the parking lot. Elevation callouts without corresponding slope callouts are not sufficient. Please revise, and ensure the callouts meet the slope limits.
|
|
Corrective Action Required
Typically a stormwater table is presented within the plans for stormwater line and structure calculations. Please include a sheet for these calculations, along with the design storm. At a minimum, this shall be required on the public storm line modification plans, and is also recommended (but not required) on the private stormwater system. Please review and revise as appropriate.
|
|
Corrective Action Required
An itemized and sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. Items to include should be itemized, and should be limited to all sitework for the project.
|
|
Corrective Action Required
Since the site area is greater than 1 acre, a SWPPP is required for this project. Please provide a SWPPP.
|
|
|
Traffic Review
|
No Comments
|
11/03/2022
|
11/02/2022
|
|
Brad Cooley, P.E., RSPI
|
|
|
Fire Review
|
Approved with Conditions
|
11/03/2022
|
10/31/2022
|
|
Jim Eden
|
|
|
Building Codes Review
|
No Comments
|
11/03/2022
|
10/31/2022
|
|
Joe Frogge
|
|
|