Summary
PL2019332
PARAGON STAR - PARAGON PARKWAY BRIDGES
Engineering Plan Review
Engineering Plan Review
Approved
09/27/2019
HAPPY VALLEY PROPERTIES LLC
Locations
Contacts
HAPPY VALLEY PROPERTIES LLC, Address:801 NW COMMERCE DR  
GBA ARCHITECTS ENGINEERS , Address:9801 RENNER BLVD, Phone:(913) 492-0400  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 10/21/2020 10/20/2020
Sue Pyles, P.E.
Engineering Review Corrections 10/12/2020 10/12/2020
Sue Pyles, P.E.
Corrective Action Required
10/12/2020

Sheets 7 & 9 East Bridge: Remove the keyed joint from Section C-C, as it was correctly added to Section B-B.
Corrective Action Required
10/12/2020

Sheet A05.30: Is it more appropriate to locate the “weld all around” symbol at the connection point between the leader line and horizontal line? Revise as needed.
Corrective Action Required
10/12/2020

Submit an Engineer's Estimate of Probable Construction Costs.
Engineering Review Corrections 09/03/2020 09/01/2020
Sue Pyles, P.E.
Engineering Review Corrections 01/24/2020 01/21/2020
Sue Pyles, P.E.
Corrective Action Required
01/21/2020

Submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
01/21/2020

Bridge review comments will be sent separately.
Engineering Review Corrections 10/18/2019 10/21/2019
Sue Pyles, P.E.
Corrective Action Required
10/21/2019

The plan review will be done with the next submittal, the 60% complete plan set.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
09/27/2019 Letter Routing Sheet
10/02/2019 Plans 12720_Bridges_9-13-2019
10/21/2019 Letter DE-Comment Letter (Engineering Plans)
12/30/2019 Activity Document 12720_East_Bridge_11-27-2019
12/30/2019 Activity Document 12720_West_Bridge_11-27-2019
12/30/2019 Activity Document 20191105_Paragon Parkway Bridges_Review of 30pct plans by HDR GBA Response
01/21/2020 Activity Document 20200120_Paragon Parkway Bridges_Review of 60pct plans by HDR
01/21/2020 Letter DE-Comment Letter (Engineering Plans)
07/29/2020 12720_West_Bridge_7-29-2020
07/29/2020 12720_East_Bridge_7-29-2020
09/01/2020 100% Plan Set Review Comments Email to GBA
09/22/2020 Plans 2020_09_17-12720-WEST_BRIDGE-IFC-COMBINED
09/22/2020 Plans 2020_09_17-12720-EAST_BRIDGE-IFC-COMBINED
09/22/2020 Engineers Estimate 2020-09-17 Bridge Opinion of Probable Costs
09/24/2020 20200828_Paragon Parkway Bridges_Review of 100pct plans by HDR
10/12/2020 Letter DE-Comment Letter (Engineering Plans)
10/14/2020 Letter 2020_10_12 Paragon Bridge Response
10/14/2020 Plans 12720_East_Bridge
10/14/2020 Plans 12720_West_Bridge
10/20/2020 Activity Document 2020-10-20 Bridge Opinion of Probable Costs
10/20/2020 Activity Document Fees PL2019332 Paragon Star Paragon Pkwy Bridges
10/20/2020 Activity Document PL2019332 Paragon Star - Paragon Pkwy Bridges Pending Items
03/05/2021 Approved Plans Paragon Star East Bridge Approved 3.5.21
03/05/2021 Approved Plans Paragon Star West Bridge Approved 3.5.21
03/05/2021 Letter DE-Engineering Plans Approval Letter
01/14/2022 Plans 21-0042 - Paragon Star EAST Bridge Elevations - 12-21-21 SS
01/14/2022 Plans 2021-12-06 East Bridge Wallace Calcs
01/14/2022 Plans 21-0042 - Paragon Star WEST Bridge Elevations - 12-21-21 SS
01/14/2022 Plans 2021-11-19 West Bridge Wallace Calcs
01/28/2022 Approved Plans Paragon Star East Bridge Addendum Approved
01/28/2022 Approved Plans Paragon Star West Bridge Addendum Approved
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home