Summary
PRRES20243024
Building Permit - Residential
Issued
NZC HOMES LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK STOP WORK ORDER generated on 07/17/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 08/08/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER generated on 04/30/2025 12:00 AM by username 'Jamie Simerly'. STOP WORK ORDER removed on 05/22/2025 12:00 AM by username 'Drew Fischer'.
06/12/2024
06/20/2024
12/10/2024
Locations
Contacts
NICK ZVACEK CONSTRUCTION LLC, Address:1009 INDUSTRIAL DR, Phone:(816) 213-7204  
NZC HOMES LLC, Address:1009 INDUSTRIAL DR  
Dominick Zvacek, Address:1009 Industrial Drive, Phone:(816) 213-7204  
NZCONSTRUCTIONLLC@GMAIL.COM  
COMFORT SYSTEMS HTG/CLG, Address:128 W Markey Rd, Phone:(816) 322-1013  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 06/20/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 06/20/2024
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 06/20/2024
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 06/20/2024
8350015-Water Meter Fee $680.46 $680.46 Paid 06/20/2024
9110078-Valuation Fee New Single Family $2,381.13 $2,381.13 Paid 06/20/2024
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid


$525.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Driveway Inspection Pending
Misc
Informational
04/15/2025
4-7-25 Dustin A, sw is formed and slopes are compliant. Has not been compacted yet. Will need called back in after it is compacted before they can pour . 4-8-25 Dustin A, approach has been compacted approved to pour 4-15-25 Dustin A, Dw is poured, Saw cuts are not cut all the way to joints. fail
Erosion Control Inspection Residential Pending
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
06/12/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS IN COMPLIANCE. -MAINTAIN DOWNED SILT FENCE -CLEAN TRASH AND DEBRIS FROM ROADWAY
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/12/2025
04-25-25 Jamie S, Silt fence is down and needs to be repaired or reinstalled. Storm inlet protection also needs cleaned and reassessed north of lot. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 04-30-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed. 05-02-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed. 05-06-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed.
Misc
Corrective Action Required
06/12/2025
MH- called and talked with Nick. Drew will post property today. Silt fence is down , needs to be reset Provide erosion control on side yard to downhill neighbor Storm inlet needs cleaned and protection put in place
Misc
Corrective Action Required
06/12/2025
Clean up excess material on site Vegetation is overgrown and needs cut down
Footing Inspection - Residential Failed 7/17/2024 7/17/2024 07/17/2024
Misc
Corrective Action Required
07/17/2024
Third party footing inspection denied, erosion control not in compliance
Erosion Control Inspection Residential Failed - Stop Work 7/17/2024 07/17/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/17/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/17/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -overgrown vegetation -downed silt fence -no grave entrance
Erosion Control Inspection Residential Failed 8/5/2024 08/05/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/17/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/17/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -overgrown vegetation -downed silt fence -no grave entrance Still not in compliance 08/05/24
Erosion Control Inspection Residential Failed 8/7/2024 8/7/2024 08/07/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/05/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
08/05/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -overgrown vegetation -no grave entrance Still not in compliance 08/05/24 Still not in compliance 08/07/24
Erosion Control Inspection Residential Partial 8/8/2024 08/08/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
08/08/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
08/08/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -overgrown vegetation -no grave entrance Still not in compliance 08/05/24 Still not in compliance 08/07/24
Misc
Informational
08/08/2024
Erosion control in compliance at time of inspection
Sewer Service Inspection - R Passed 8/9/2024 08/09/2024
Water Service Inspection - R Partial 8/9/2024 08/09/2024
Misc
Informational
08/09/2024
Partial pex to meter location
Water Service Inspection - R Passed 8/13/2024 08/13/2024
Misc
Resolved
08/13/2024
Partial pex to meter location
Footing Inspection - Residential Passed 8/16/2024 08/16/2024
Misc
Resolved
08/16/2024
Third party footing inspection denied, erosion control not in compliance
Miscellaneous Correction
Informational
08/16/2024
Footing passed by a third party. Exterior piers were not mentioned in the footing inspection
Underslab Plumbing Inspection - Residential Failed 8/16/2024 08/16/2024
Miscellaneous Correction
Corrective Action Required
08/16/2024
- Support all drain lines with gravel - Remove all decaying wood from foundation let over from forms
Underslab Plumbing Inspection - Residential Failed 8/20/2024 08/20/2024
Miscellaneous Correction
Resolved
08/20/2024
- Support all drain lines with gravel - Remove all decaying wood from foundation let over from forms
Misc
Corrective Action Required
08/20/2024
-Sump pump pit not installed -Maintain silt fence and remove trash and debris from roadway
Erosion Control Inspection Residential Failed 8/27/2024 08/20/2024
Misc
Resolved
08/20/2024
Erosion control in compliance at time of inspection
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
08/20/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS IN COMPLIANCE. -MAINTAIN DOWNED SILT FENCE -CLEAN TRASH AND DEBRIS FROM ROADWAY
Underslab Plumbing Inspection - Residential Passed 8/27/2024 08/27/2024
Misc
Resolved
08/27/2024
-Sump pump pit not installed -Maintain silt fence and remove trash and debris from roadway
Piers/Caissons Inspection - Residential Failed 8/27/2024 8/27/2024 08/27/2024
Misc
Corrective Action Required
08/27/2024
Piers incorrect size Piers to be 18”x36” to plans.
Piers/Caissons Inspection - Residential Passed 8/30/2024 08/30/2024
Misc
Resolved
08/30/2024
Piers incorrect size Piers to be 18”x36” to plans.
All Rough Inspection - Residential Not Ready 12/3/2024 12/3/2024 12/03/2024
Misc
Corrective Action Required
12/03/2024
No city stamped plans on site. Re establish premises identification Scheduled gas and electric with all rough on re inspection
All Rough Inspection - Residential Not Ready 12/6/2024 12/6/2024 12/06/2024
Misc
Corrective Action Required
12/03/2024
Re establish premises identification Scheduled gas and electric with all rough on re inspection NOT A COMPLETE LIST HOUSE NOT READY FOR INSPECTION, COMPLETE LIST BEFORE CALLING FOR RE INSPECTION -garage portal frame nailing covered without inspection -anchor bolts to be within 12” of plate breaks in garage -missing PFH anchor bolt washers -fireblock garage rear wall into fire down above laundry -bring electrical to furred out wall into fire garage at laundry -provide hangers for joist above owners entry closet -connect bath vent at powder room -uncover steel colum in garage for inspection -nail plate under header at pfh to header 3” O.C per design -nail all exterior sheathing to plans 6” OC on edges and 12” OC in field.
All Rough Inspection - Residential Failed 12/12/2024 12/12/2024
Misc
Corrective Action Required
12/06/2024
Re establish premises identification -fireblock garage rear wall into furr down above laundry -bath vents to be 4” diameter -nail plate under header at pfh to header 3” O.C per design -seal penetrations in RA joist space above master bath -seal penetrations in master bath bottom plate -double studs at bored studs for master bath dwv -fireblock top of hvac chase at master shower -address multiple holes throughout entire home drilled in joists closer than 2” to one another -nail all exterior wall corners to plans and code -seal top plate penetration at fireplace/master bed wall -fireblock great room slider wall to ceiling space -deck roof framing covered without inspection -seal bottom plate penetration at kitchen exterior wall -missing stud pack under bed 2 LVL -address board studs in hall 2nd floor hall bath (no more than 2 successive studs shall be board and doubled. You have 3) -provide perlin supports per plans 2nd floor -provide rafter to ceiling joist connection throughout 2nd floors -seal penetrations in vertical to horizontal fire blocking in basement -seal penetrations in RA joist space in basement -anchor all steel columns in basement
All Rough Inspection - Residential Not Ready 12/16/2024 12/16/2024
Misc
Corrective Action Required
12/12/2024
Re establish premises identification -fireblock garage rear wall into furr down above laundry -bath vents to be 4” diameter -nail plate under header at pfh to header 3” O.C per design -seal penetrations in RA joist space above master bath/walk in -double studs at bored studs for master bath dwv -fireblock top of hvac chase at master shower -address multiple holes throughout entire home drilled in joists closer than 2” to one another -nail all exterior wall corners to plans and code -seal top plate penetration at fireplace/master bed wall -fireblock great room slider wall to ceiling space -deck roof framing covered without inspection -seal bottom plate penetration at kitchen exterior wall -missing stud pack under bed 2 LVL -address board studs in hall 2nd floor hall bath (no more than 2 successive studs shall be board and doubled. You have 3) -provide perlin supports per plans 2nd floor -provide rafter to ceiling joist connection throughout 2nd floors -seal penetrations in vertical to horizontal fire blocking in basement -seal penetrations in RA joist space in basement -anchor all steel columns in basement
Gas Service Inspection - Residential Passed 12/30/2024 12/30/2024 12/30/2024
All Rough Inspection - Residential Not Ready 12/30/2024 12/30/2024 12/30/2024
Misc
Corrective Action Required
12/16/2024
Re establish correct premises identification -fireblock garage rear wall into furr down above laundry -bath vents to be 4” diameter -seal penetrations in RA joist space above master bath/walk in -fireblock top of hvac chase at master shower -address multiple holes throughout entire home drilled in joists closer than 2” to one another -nail all exterior wall corners to plans and code -seal top plate penetration at fireplace/master bed wall -fireblock great room slider wall to ceiling space -deck roof framing covered without inspection -seal bottom plate penetration at kitchen exterior wall -seal top plate penetrations in front entry “data room” -address board studs in hall 2nd floor hall bath (no more than 2 successive studs shall be board and doubled. You have 3) -provide rafter to ceiling joist connection throughout 2nd floors -seal penetrations in vertical to horizontal fire blocking in basement -seal penetrations in RA joist space in basement
All Rough Inspection - Residential Not Ready 1/6/2025 1/7/2025 01/07/2025
Misc
Corrective Action Required
12/30/2024
Premises identification is still incorrect. Fix before re inspection Re establish correct premises identification -seal penetrations in RA joist space above master bath/walk in -fireblock top of hvac chase at master shower -address multiple holes throughout entire home drilled in joists closer than 2” to one another -fireblock great room slider wall to ceiling space -provide rafter to ceiling joist connection throughout 2nd floor -seal penetrations in vertical to horizontal fire blocking in basement -seal penetrations in RA joist space in basement
All Rough Inspection - Residential Not Ready 1/8/2025 1/8/2025 01/08/2025
Misc
Corrective Action Required
01/07/2025
PREMISES IDENTIFICATION STILL NOT CORRECTED. INSPECTION DENIED 1/8/25 Premises identification is still incorrect. Fix before re inspection Re establish correct premises identification -seal penetrations in RA joist space above master bath/walk in -fireblock top of hvac chase at master shower -address multiple holes throughout entire home drilled in joists closer than 2” to one another -fireblock great room slider wall to ceiling space -provide rafter to ceiling joist connection throughout 2nd floor -seal penetrations in vertical to horizontal fire blocking in basement -seal penetrations in RA joist space in basement
All Rough Inspection - Residential Not Ready 1/9/2025 1/9/2025 01/09/2025
Misc
Corrective Action Required
01/08/2025
Home not ready, No items completed. Complete all inspection items before calling for Reinspection. 01/09/2025 -seal penetrations in RA joist space above master bath/walk in -fireblock top of hvac chase at master shower -address multiple holes throughout entire home drilled in joists closer than 2” to one another -fireblock great room slider wall to ceiling space -provide rafter to ceiling joist connection throughout 2nd floor -seal penetrations in vertical to horizontal fire blocking in basement -seal penetrations in RA joist space in basement
All Rough Inspection - Residential Failed 1/16/2025 1/16/2025 01/16/2025
Misc
Corrective Action Required
01/09/2025
-address multiple holes throughout entire home drilled in joists closer than 2” to one another
Electrical Service Inspection Passed 1/16/2025 1/16/2025 01/16/2025
All Rough Inspection - Residential Failed 1/21/2025 1/21/2025 01/21/2025
Misc
Corrective Action Required
01/16/2025
-multiple holes throughout entire home drilled in joists closer than 2” to one another(all holes not address provide engineer report for fix uploaded to portal and onsite)
All Rough Inspection - Residential Failed 2/11/2025 02/11/2025
Misc
Corrective Action Required
01/21/2025
-multiple holes throughout entire home drilled in joists closer than 2” to one another(all holes not address provide engineer report for fix uploaded to portal and onsite) Last item on engineer reprint addresses
All Rough Inspection - Residential Failed 2/25/2025 2/26/2025 02/26/2025
Misc
Corrective Action Required
02/11/2025
-multiple holes throughout entire home drilled in joists closer than 2” to one another(all holes not address provide engineer report for fix uploaded to portal and onsite) Last item on engineer reprint addresses
All Rough Inspection - Residential Passed 3/4/2025 3/4/2025 03/04/2025
Misc
Resolved
03/04/2025
-multiple holes throughout entire home drilled in joists closer than 2” to one another(all holes not address provide engineer report for fix uploaded to portal and onsite) Last item on engineer reprint addresses
Driveway Inspection Failed 4/7/2025 4/7/2025 04/07/2025
Misc
Corrective Action Required
04/07/2025
4-7-25 Dustin A, sw is formed and slopes are compliant. Has not been compacted yet. Will need called back in after it is compacted before they can pour .
Driveway Inspection Partial 4/8/2025 4/8/2025 04/08/2025
Misc
Corrective Action Required
04/07/2025
4-7-25 Dustin A, sw is formed and slopes are compliant. Has not been compacted yet. Will need called back in after it is compacted before they can pour . 4-8-25 Dustin A, approach has been compacted approved to pour
Driveway Inspection Failed 4/15/2025 4/15/2025 04/15/2025
Misc
Informational
04/15/2025
4-7-25 Dustin A, sw is formed and slopes are compliant. Has not been compacted yet. Will need called back in after it is compacted before they can pour . 4-8-25 Dustin A, approach has been compacted approved to pour 4-15-25 Dustin A, Dw is poured, Saw cuts are not cut all the way to joints. fail
Erosion Control Inspection Residential Failed 4/25/2025 4/25/2025 04/25/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
08/20/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS IN COMPLIANCE. -MAINTAIN DOWNED SILT FENCE -CLEAN TRASH AND DEBRIS FROM ROADWAY
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/25/2025
04-25-25 Jamie S, Silt fence is down and needs to be repaired or reinstalled. Storm inlet protection also needs cleaned and reassessed north of lot. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 4/30/2025 4/30/2025 04/30/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/25/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS IN COMPLIANCE. -MAINTAIN DOWNED SILT FENCE -CLEAN TRASH AND DEBRIS FROM ROADWAY
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/25/2025
04-25-25 Jamie S, Silt fence is down and needs to be repaired or reinstalled. Storm inlet protection also needs cleaned and reassessed north of lot. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 04-30-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed.
Erosion Control Inspection Residential Failed - Stop Work 5/2/2025 5/2/2025 05/02/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/30/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS IN COMPLIANCE. -MAINTAIN DOWNED SILT FENCE -CLEAN TRASH AND DEBRIS FROM ROADWAY
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/30/2025
04-25-25 Jamie S, Silt fence is down and needs to be repaired or reinstalled. Storm inlet protection also needs cleaned and reassessed north of lot. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 04-30-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed. 05-02-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed.
Erosion Control Inspection Residential Failed - Stop Work 5/6/2025 5/6/2025 05/06/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/02/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS IN COMPLIANCE. -MAINTAIN DOWNED SILT FENCE -CLEAN TRASH AND DEBRIS FROM ROADWAY
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/02/2025
04-25-25 Jamie S, Silt fence is down and needs to be repaired or reinstalled. Storm inlet protection also needs cleaned and reassessed north of lot. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 04-30-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed. 05-02-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed. 05-06-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed.
Erosion Control Inspection Residential Failed - Stop Work 5/13/2025 5/13/2025 05/13/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/06/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS IN COMPLIANCE. -MAINTAIN DOWNED SILT FENCE -CLEAN TRASH AND DEBRIS FROM ROADWAY
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/06/2025
04-25-25 Jamie S, Silt fence is down and needs to be repaired or reinstalled. Storm inlet protection also needs cleaned and reassessed north of lot. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 04-30-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed. 05-02-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed. 05-06-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed.
Erosion Control Inspection Residential Failed - Stop Work 5/16/2025 05/16/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/13/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS IN COMPLIANCE. -MAINTAIN DOWNED SILT FENCE -CLEAN TRASH AND DEBRIS FROM ROADWAY _working under stop work order
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/13/2025
04-25-25 Jamie S, Silt fence is down and needs to be repaired or reinstalled. Storm inlet protection also needs cleaned and reassessed north of lot. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 04-30-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed. 05-02-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed. 05-06-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/16/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. _ work being perfored under stop work order
Erosion Control Inspection Residential Failed - Stop Work 5/19/2025 05/19/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/16/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS IN COMPLIANCE. -MAINTAIN DOWNED SILT FENCE -CLEAN TRASH AND DEBRIS FROM ROADWAY
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/16/2025
04-25-25 Jamie S, Silt fence is down and needs to be repaired or reinstalled. Storm inlet protection also needs cleaned and reassessed north of lot. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 04-30-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed. 05-02-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed. 05-06-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed.
Misc
Corrective Action Required
05/19/2025
MH- called and talked with Nick. Drew will post property today. Silt fence is down , needs to be reset Provide erosion control on side yard to downhill neighbor Storm inlet needs cleaned and protection put in place
Erosion Control Inspection Residential Partial 5/22/2025 05/22/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/19/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS IN COMPLIANCE. -MAINTAIN DOWNED SILT FENCE -CLEAN TRASH AND DEBRIS FROM ROADWAY
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/19/2025
04-25-25 Jamie S, Silt fence is down and needs to be repaired or reinstalled. Storm inlet protection also needs cleaned and reassessed north of lot. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 04-30-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed. 05-02-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed. 05-06-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed.
Misc
Corrective Action Required
05/19/2025
MH- called and talked with Nick. Drew will post property today. Silt fence is down , needs to be reset Provide erosion control on side yard to downhill neighbor Storm inlet needs cleaned and protection put in place
Erosion Control Inspection Residential Failed 6/12/2025 06/12/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/22/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS IN COMPLIANCE. -MAINTAIN DOWNED SILT FENCE -CLEAN TRASH AND DEBRIS FROM ROADWAY
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/22/2025
04-25-25 Jamie S, Silt fence is down and needs to be repaired or reinstalled. Storm inlet protection also needs cleaned and reassessed north of lot. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 04-30-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed. 05-02-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed. 05-06-25 Jamie S, Silt fence is still down, and storm inlet has not been addressed.
Misc
Corrective Action Required
05/22/2025
MH- called and talked with Nick. Drew will post property today. Silt fence is down , needs to be reset Provide erosion control on side yard to downhill neighbor Storm inlet needs cleaned and protection put in place
Misc
Corrective Action Required
06/12/2025
Clean up excess material on site Vegetation is overgrown and needs cut down
Documents & Images
Date Uploaded File Type Document Name
06/12/2024 115SFV_Residental Permit Application
06/12/2024 115SFV_License_Tax_Application
06/13/2024 Permit Codes Residential Plan Review
06/19/2024 Permit Codes Residential Plan Review
06/19/2024 Approved Plans APPROVED PLANS
06/19/2024 Plot Plan APPROVED PLOT PLAN
06/20/2024 Permit DS Building Permit
06/20/2024 Receipt Receipt for transaction: 2024-004964
07/16/2024 THIRD PARTY FOOTING INSPECTION
07/17/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter Stop Work Order
08/05/2024 Letter INSPECTION SUMMARY
08/06/2024 M L Crose 3217 SW Saddlebred Terr LSMO Permit 2024-3024 Footing Inspection Report 8-5--24
08/07/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/09/2024 Letter INSPECTION SUMMARY
08/09/2024 Letter INSPECTION SUMMARY
08/13/2024 Letter INSPECTION SUMMARY
08/16/2024 Letter INSPECTION SUMMARY
08/16/2024 Letter INSPECTION SUMMARY
08/20/2024 Letter INSPECTION SUMMARY
08/20/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/30/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/06/2024 Letter INSPECTION SUMMARY
12/12/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/30/2024 Letter INSPECTION SUMMARY
12/30/2024 Letter INSPECTION SUMMARY
01/07/2025 Letter INSPECTION SUMMARY
01/08/2025 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/16/2025 Letter INSPECTION SUMMARY
01/16/2025 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
02/10/2025 Engineer Report/Study ENG. REPORT
02/11/2025 Letter INSPECTION SUMMARY
03/04/2025 Letter INSPECTION SUMMARY
03/04/2025 Letter INSPECTION SUMMARY
04/07/2025 Letter INSPECTION SUMMARY
04/07/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/15/2025 Letter INSPECTION SUMMARY
04/15/2025 Letter INSPECTION SUMMARY
04/25/2025 Letter INSPECTION SUMMARY
04/30/2025 Letter Stop Work Order
05/02/2025 Letter Stop Work Order
05/06/2025 Letter Stop Work Order
05/13/2025 Letter Stop Work Order
05/16/2025 Letter Stop Work Order
05/19/2025 IMG_0025
05/19/2025 IMG_0023
05/19/2025 IMG_0022
05/19/2025 IMG_0024
05/19/2025 Letter Stop Work Order
05/22/2025 Letter INSPECTION SUMMARY
06/12/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.