Permit Application Status

PRRES20215799


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20215799
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED DECK
11/05/2021
12/02/2021
05/07/2022
05/21/2024
Locations
Contacts
D AND D BUILDING INC, Address:PO BOX 7014, Phone:(816) 491-2125  
Kevin Stallings, Address:1100 NE Delta School Rd, Phone:(816) 491-2125  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,255.76 $1,255.76 Paid 12/02/2021
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 12/02/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 12/02/2021
8331507-Sewer Connection Fee $540.00 $540.00 Paid 12/02/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 12/02/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 12/02/2021
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 02/08/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 02/08/2024
9110080-3rd and Subsequent Inspection Fee (Per Hour) $75.00 $75.00 Paid 02/08/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 02/08/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 12/10/2021 (10:00) 12/10/2021 12/10/2021
Sewer Service Inspection - R Passed 1/5/2022 (10:30) 1/5/2022 01/05/2022
Water Service Inspection - R Passed 1/10/2022 (1:00) 1/10/2022 01/10/2022
Erosion Control Inspection Residential Failed 1/11/2022 01/11/2022
DCM5 ESC INSP DENIED
Corrective Action Required
01/11/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. -REPAIR SILT FENCE -CLEAN UP STREET
Underslab Plumbing Inspection - Residential Failed 1/11/2022 1/11/2022 01/11/2022
Misc
Corrective Action Required
01/11/2022
Inspection Denied erosion control not in compliance.
Erosion Control Inspection Residential Failed 1/21/2022 01/21/2022
DCM5 ESC INSP DENIED
Corrective Action Required
01/11/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. -REPAIR SILT FENCE -CLEAN UP STREET
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/21/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 01/21/2022 9:45 AM
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
01/21/2022
STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO INSPECTION(S) BEING PERFORMED.
Underslab Plumbing Inspection - Residential Failed 2/8/2022 2/8/2022 02/08/2022
Misc
Corrective Action Required
01/11/2022
-no address posted -no interior drain tile
Erosion Control Inspection Residential Failed 2/8/2022 2/8/2022 02/08/2022
DCM5 ESC INSP DENIED
Resolved
02/08/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. -REPAIR SILT FENCE -CLEAN UP STREET
DCM3 ESC REQUIRED 2 DAY
Resolved
02/08/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 01/21/2022 9:45 AM
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
02/08/2022
STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO INSPECTION(S) BEING PERFORMED.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/08/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -erosion control at SE side of lot not in compliance
Underslab Plumbing Inspection - Residential Passed 2/11/2022 2/11/2022 02/11/2022
Misc
Resolved
02/11/2022
-no address posted -no interior drain tile
Erosion Control Inspection Residential Passed 2/11/2022 2/11/2022 02/11/2022
DCM2 ESC DEFICIENT INSTALLATION
Resolved
02/11/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -erosion control at SE side of lot not in compliance
Miscellaneous Inspection Passed 8/23/2022 08/23/2022
Misc
Informational
08/23/2022
spoke with builder about permit experation. home is currently being framed. Mitchell Schwarz 08/23/2022 1:19 PM
Electrical Service Inspection Failed 10/20/2022 10/20/2022 10/20/2022
Misc
Corrective Action Required
10/20/2022
inspection denied erosion control not in compliance
Gas Service Inspection - Residential Failed 10/20/2022 10/20/2022 10/20/2022
Misc
Corrective Action Required
10/20/2022
inspection denied erosion control not in compliance
All Rough Inspection - Residential Failed 10/20/2022 10/20/2022 10/20/2022
Misc
Corrective Action Required
10/20/2022
inspection denied erosion control not in compliance
Erosion Control Inspection Residential Failed 10/20/2022 10/20/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/20/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
All Rough Inspection - Residential Not Ready 10/25/2022 10/25/2022 10/25/2022
Misc
Corrective Action Required
10/20/2022
inspection denied erosion control not in compliance -no plans on site
Gas Service Inspection - Residential Failed 10/26/2022 10/26/2022 10/26/2022
Misc
Corrective Action Required
10/20/2022
inspection denied erosion control still not in compliance maintain at garage side and clean street no city stamped plans on site
Electrical Service Inspection Failed 10/26/2022 10/26/2022 10/26/2022
Misc
Corrective Action Required
10/20/2022
inspection denied erosion control still not in compliance no city stamped plans on site
All Rough Inspection - Residential Not Ready 10/26/2022 10/26/2022 10/26/2022
Misc
Corrective Action Required
10/25/2022
inspection denied erosion control still not in compliance -no plans on site still Mitchell Schwarz 10/26/2022 9:18 AM
Electrical Service Inspection Passed 11/3/2022 11/3/2022 11/03/2022
Misc
Resolved
11/03/2022
inspection denied erosion control still not in compliance no city stamped plans on site
Gas Service Inspection - Residential Failed 11/3/2022 11/3/2022 11/03/2022
Misc
Corrective Action Required
10/26/2022
-gas pressure 6 psi, must maintain 10 psi for test
All Rough Inspection - Residential Failed 11/3/2022 11/3/2022 11/03/2022
Misc
Corrective Action Required
10/26/2022
-Submit plans for engineered floor I joists for approval and have plans on site at reinspect, approved plans call for 2x10 lumber joists -nail exterior sheathing garage PFH per IRC R602.10.6.2 -no top plate corner lap at garage wall to front entry wall, different plate heights -fireblock East garage wall steel column at rim joist -provide blocking at ridge end support at garage ceiling joist lateral race to provide bearing to steel I beam below -fireblock vertical to horizontal at 1st floor office ceiling furred down at HVAC chase -address overnotched hips, more than 25% -roof purlins all locations per plans -nail all intersecting corners braced wall panels 12” oc -provide insulation spacer sleeve at attic for living room gas fireplace vent -secure ward flex gas line living room fireplace -provide stud shoe at stud bored for data tube great room fireplace -solid block all sheathing breaks -fireblock ceiling furred down soffit line at master bath vanity -install transom window at front entry -CS-PF portal bracing at breakfast windows per plans -fireblock vertical to horizontal furred down soffit end basement wet bar, bedroom #3 -fireblock vertical every 10’ between studs and foundation/framing at finished basement -tighten all anchor bolts at basement -complete furred downs and fireblock at basement -fireblock fireplace lid at basement den -provide security blocking at basement walkout -DWV waste line above service panel mech room -support all DWV at basement 48” oc, traps not considered support -nail exterior sheathing for CS-PF master bed windows per IRC R602.10.6.4 -gas pressure 6 psi, must maintain 10 psi for test
All Rough Inspection - Residential Failed 11/29/2022 11/29/2022 11/29/2022
Misc
Corrective Action Required
11/03/2022
-fireblock vertical to horizontal at 1st floor office ceiling furred down at HVAC chase -address overnotched hips, more than 25% -roof purlins all locations per plans -provide stud shoe at stud bored for data tube great room fireplace -fireblock ceiling furred down soffit line at master bath vanity seal gaps -CS-PF portal bracing at breakfast windows per plans -fireblock vertical to horizontal furred down soffit end basement wet bar, bedroom #3 -fireblock vertical every 10’ between studs and foundation/framing at finished basement missing places -complete furred downs and fireblock at basement -fireblock fireplace lid at basement den/ bed 3 -nail exterior sheathing for CS-PF master bed windows per IRC R602.10.6.4
Gas Service Inspection - Residential Passed 11/30/2022 11/30/2022
Misc
Resolved
11/30/2022
-gas pressure 6 psi, must maintain 10 psi for test
All Rough Inspection - Residential Failed 12/2/2022 12/2/2022 12/02/2022
Misc
Corrective Action Required
11/29/2022
-address overnotched hips, more than 25% -provide stud shoe at stud bored for data tube great room fireplace -fireblock ceiling furred down soffit line at master bath vanity seal gaps -CS-PF portal bracing at breakfast windows per plans -fireblock vertical to horizontal furred down soffit ends -fireblock fireplace lid at basement den/ bed 3 -nail exterior sheathing for CS-PF master bed windows per IRC R602.10.6.4
All Rough Inspection - Residential Failed 12/14/2022 12/14/2022 12/14/2022
Misc
Corrective Action Required
12/02/2022
-fireblock ceiling furred down soffit line at master bath vanity seal gaps (see dwv) -fireblock vertical to horizontal furred down soffit ends(see both bedroom closets check all areas) -fireblock fireplace lid at basement den/ bed 3(red pex placed in area to identify)
Miscellaneous Inspection Passed 12/29/2022 12/29/2022
All Rough Inspection - Residential Passed 12/29/2022 12/29/2022
Misc
Resolved
12/29/2022
-fireblock ceiling furred down soffit line at master bath vanity seal gaps (see dwv) -fireblock vertical to horizontal furred down soffit ends(see both bedroom closets check all areas) -fireblock fireplace lid at basement den/ bed 3(red pex placed in area to identify)
Piers/Caissons Inspection - Residential Passed 12/30/2022 (1:30) 12/30/2022 12/30/2022
Driveway Inspection Partial 2/21/2023 2/21/2023 02/21/2023
Misc
Informational
02/21/2023
2-21-23 RH. Talked to contractor about driveway.
Erosion Control Inspection Residential Failed 3/9/2023 3/9/2023 03/09/2023
DCM3 ESC REQUIRED 2 DAY
Resolved
03/09/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
03/09/2023
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Driveway Inspection Failed 3/30/2023 3/30/2023 03/30/2023
Misc
Informational
02/21/2023
2-21-23 RH. Talked to contractor about driveway. 3-30-23 RH. Curb was not removed for driveway and grading was not complete. Not ready for inspection.
Sidewalk Inspection Failed 3/30/2023 3/30/2023 03/30/2023
Misc
Informational
03/30/2023
3-30-23 RH. Sidewalk was inspected pre pour and found to have not enough rock in some areas closer to the ADA ramp. There was visible dirt where there should be 4" of aggregate. Not approved to pour.
Sidewalk Inspection Partial 3/31/2023 3/31/2023 03/31/2023
Misc
Partial Correction
03/31/2023
3-31-23 RH. Most of sidewalk passed pre pour inspection but due to not enough aggregate being placed all did not pass. Part of sidewalk was approved to be poured.
Driveway Inspection Partial 3/31/2023 3/31/2023 03/31/2023
Misc
Informational
03/30/2023
2-21-23 RH. Talked to contractor about driveway. 3-30-23 RH. Curb was not removed for driveway and grading was not complete. Not ready for inspection. 3-31-23 RH. The upper entrance was approved to be poured before the approach.
Driveway Inspection Partial 4/3/2023 4/3/2023 04/03/2023
Misc
Informational
03/31/2023
2-21-23 RH. Talked to contractor about driveway. 3-30-23 RH. Curb was not removed for driveway and grading was not complete. Not ready for inspection. 3-31-23 RH. The upper entrance was approved to be poured before the approach. 4-4-23 PS Approach aggregate compacted, curb has been removed for approach with dowels added at existing highback curb. OK to pour approach
Sidewalk Inspection Partial 4/3/2023 4/3/2023 04/03/2023
Misc
Partial Correction
03/31/2023
3-31-23 RH. Most of sidewalk passed pre pour inspection but due to not enough aggregate being placed all did not pass. Part of sidewalk was approved to be poured. 4-3-23 PS Aggregate has been added and compacted. OK to pour sidewalk
Sidewalk Inspection Partial 4/10/2023 4/10/2023 04/10/2023
Misc
Informational
04/10/2023
3-31-23 RH. Most of sidewalk passed pre pour inspection but due to not enough aggregate being placed all did not pass. Part of sidewalk was approved to be poured. 4-3-23 PS Aggregate has been added and compacted. OK to pour sidewalk 4-10-23 PS Sidewalk appears to meet ADA and LS specifications but due to grading of lot am unable to currently see entirety of sidewalk condition due to soil cover. Will need to perform an inspection at later date once cleaned before completing inspection.
Driveway Inspection Partial 4/10/2023 4/10/2023 04/10/2023
Misc
Informational
04/03/2023
2-21-23 RH. Talked to contractor about driveway. 3-30-23 RH. Curb was not removed for driveway and grading was not complete. Not ready for inspection. 3-31-23 RH. The upper entrance was approved to be poured before the approach. 4-4-23 PS Approach aggregate compacted, curb has been removed for approach with dowels added at existing highback curb. OK to pour approach 4-10-23 PS Driveway approach appears to meet LS specifications but due to grading of lot am unable to currently see entirety of driveway/curb condition due to soil cover. Will need to perform an inspection at later date once cleaned before completing inspection.
Erosion Control Inspection Residential Failed 4/10/2023 4/10/2023 04/10/2023
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
03/09/2023
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. CLEAN ALL MUD AT STREETS AND CURB
Occupancy Inspection - Codes Residential Failed 4/13/2023 4/13/2023 04/13/2023
Misc
Corrective Action Required
04/13/2023
-address pending driveway inspection -address pending sidewalk inspection -missing sidewalk on W side of lot -final grade and sod, landscaping -splash blocks and sump pump discharge to extend 36” from foundation -label all non GFCI protected outlets in unfinished areas -security screws at rear door. (2 per hinge and strike plate) -bath fan in master bathroom not working -(2)1/2” though bolts at each deck post to beam connection -missing hanger on deck joists SE corner -repair hole in ceiling in unfinished area for fire protection of engineered I joists
Occupancy Inspection - Codes Residential Failed 4/13/2023 4/13/2023 04/13/2023
Misc
Corrective Action Required
04/13/2023
-obtain issued lawn irrigation permit -address pending driveway inspection -address pending sidewalk inspection -missing sidewalk on W side of lot -final grade and sod, landscaping -splash blocks and sump pump discharge to extend 36” from foundation -label all non GFCI protected outlets in unfinished areas -security screws at rear door. (2 per hinge and strike plate) -bath fan in master bathroom not working -(2)1/2” though bolts at each deck post to beam connection -missing hanger on deck joists SE corner -repair hole in ceiling in unfinished area for fire protection of engineered I joists
Occupancy Inspection - Codes Residential Failed 6/15/2023 6/15/2023 06/15/2023
Misc
Corrective Action Required
04/13/2023
-obtain issued lawn irrigation permit -address pending driveway inspection -address pending sidewalk inspection -missing sidewalk on W side of lot -label all non GFCI protected outlets in unfinished areas -security screws at rear door. (2 per hinge and strike plate)
Sidewalk Inspection Failed 6/20/2023 6/20/2023 06/20/2023
Misc
Informational
04/10/2023
3-31-23 RH. Most of sidewalk passed pre pour inspection but due to not enough aggregate being placed all did not pass. Part of sidewalk was approved to be poured. 4-3-23 PS Aggregate has been added and compacted. OK to pour sidewalk 6-20-23 PS Sidewalk required on west (garage side) of lot per approved plot plan. Complete all sidewalks before final inspection of LS and ADA compliance.
Driveway Inspection Failed 6/20/2023 6/20/2023 06/20/2023
Misc
Informational
04/10/2023
2-21-23 RH. Talked to contractor about driveway. 3-30-23 RH. Curb was not removed for driveway and grading was not complete. Not ready for inspection. 3-31-23 RH. The upper entrance was approved to be poured before the approach. 4-4-23 PS Approach aggregate compacted, curb has been removed for approach with dowels added at existing highback curb. OK to pour approach 6-20-23 PS Sidewalk required on west (garage/driveway side) of lot per approved design and plot plan. Complete all sidewalks before final inspection of LS and ADA compliance.
Occupancy Inspection - Codes Residential Failed 8/18/2023 08/18/2023
Misc
Corrective Action Required
06/15/2023
-address pending driveway inspection -address pending sidewalk inspection -missing sidewalk on W side of lot
Misc
Corrective Action Required
08/15/2023
Sidewalk must be installed on Swan Creek Cir as per the development plan. MARK HARDING 08/15/2023 4:13 PM
Sidewalk Inspection Not Ready 12/5/2023 (10:00) 12/5/2023 12/05/2023
Misc
Informational
06/20/2023
3-31-23 RH. Most of sidewalk passed pre pour inspection but due to not enough aggregate being placed all did not pass. Part of sidewalk was approved to be poured. 4-3-23 PS Aggregate has been added and compacted. OK to pour sidewalk 6-20-23 PS Sidewalk required on west (garage side) of lot per approved plot plan. Complete all sidewalks before final inspection of LS and ADA compliance.
Misc
Corrective Action Required
08/15/2023
Sidewalk must be installed on Swan Creek Cir as per the development plan. MARK HARDING 08/15/2023 4:13 PM
Misc
Corrective Action Required
12/05/2023
12-5-23 Dustin A, SW was originally called in on 1609. Was scheduled to be ready at 10. Upon arrival noticed that it is not ready for inspection. I talked with the super and also informed him on what panels on the approach that needed to be removed as well ( working from N to S panel 2 and 3 )
Sidewalk Inspection Failed 12/6/2023 12/6/2023 12/06/2023
Misc
Informational
12/05/2023
3-31-23 RH. Most of sidewalk passed pre pour inspection but due to not enough aggregate being placed all did not pass. Part of sidewalk was approved to be poured. 4-3-23 PS Aggregate has been added and compacted. OK to pour sidewalk 6-20-23 PS Sidewalk required on west (garage side) of lot per approved plot plan. Complete all sidewalks before final inspection of LS and ADA compliance.
Misc
Corrective Action Required
12/05/2023
Sidewalk must be installed on Swan Creek Cir as per the development plan. MARK HARDING 08/15/2023 4:13 PM
Misc
Corrective Action Required
12/05/2023
12-5-23 Dustin A, SW was originally called in on 1609. Was scheduled to be ready at 10. Upon arrival noticed that it is not ready for inspection. I talked with the super and also informed him on what panels on the approach that needed to be removed as well ( working from N to S panel 2 and 3 ) 12-6-23 Dustin A. SW is formed , Aggregate is compacted. Middle section through approach and south side connected to approach does not meet ADA specs. Fail
Driveway Inspection Partial 12/6/2023 12/06/2023
Misc
Informational
06/20/2023
2-21-23 RH. Talked to contractor about driveway. 3-30-23 RH. Curb was not removed for driveway and grading was not complete. Not ready for inspection. 3-31-23 RH. The upper entrance was approved to be poured before the approach. 4-4-23 PS Approach aggregate compacted, curb has been removed for approach with dowels added at existing highback curb. OK to pour approach 6-20-23 PS Sidewalk required on west (garage/driveway side) of lot per approved design and plot plan. Complete all sidewalks before final inspection of LS and ADA compliance.
Misc
Corrective Action Required
12/05/2023
12-5-23 Dustin A, Talked with super on which panels needed to be removed panel 2 and 3 working from North to South. 12-6-23 Dustin A. Panels that needed to be replaced have been removed. Reformed and aggregate is compacted. Will need to maintain ADA compliant slopes through approach. Approved to pour.
Driveway Inspection Passed 12/12/2023 12/12/2023 12/12/2023
Misc
Informational
12/06/2023
2-21-23 RH. Talked to contractor about driveway. 3-30-23 RH. Curb was not removed for driveway and grading was not complete. Not ready for inspection. 3-31-23 RH. The upper entrance was approved to be poured before the approach. 4-4-23 PS Approach aggregate compacted, curb has been removed for approach with dowels added at existing highback curb. OK to pour approach 6-20-23 PS Sidewalk required on west (garage/driveway side) of lot per approved design and plot plan. Complete all sidewalks before final inspection of LS and ADA compliance.
Misc
Corrective Action Required
12/06/2023
12-5-23 Dustin A, Talked with super on which panels needed to be removed panel 2 and 3 working from North to South. 12-6-23 Dustin A. Panels that needed to be replaced have been removed. Reformed and aggregate is compacted. Will need to maintain ADA compliant slopes through approach. 12-12-23 Dustin A, sw meets city standards. Passed
Sidewalk Inspection Passed 12/12/2023 12/12/2023
Misc
Informational
12/06/2023
3-31-23 RH. Most of sidewalk passed pre pour inspection but due to not enough aggregate being placed all did not pass. Part of sidewalk was approved to be poured. 4-3-23 PS Aggregate has been added and compacted. OK to pour sidewalk 6-20-23 PS Sidewalk required on west (garage side) of lot per approved plot plan. Complete all sidewalks before final inspection of LS and ADA compliance.
Misc
Corrective Action Required
12/06/2023
Sidewalk must be installed on Swan Creek Cir as per the development plan. MARK HARDING 08/15/2023 4:13 PM
Misc
Corrective Action Required
12/06/2023
12-5-23 Dustin A, SW was originally called in on 1609. Was scheduled to be ready at 10. Upon arrival noticed that it is not ready for inspection. I talked with the super and also informed him on what panels on the approach that needed to be removed as well ( working from N to S panel 2 and 3 ) 12-6-23 Dustin A. SW is formed , Aggregate is compacted. Middle section through approach and south side connected to approach does not meet ADA specs. Fail 12-6-23 Dustin A. sw errors have been fixed. Approved to pour. 12-12-23 Dustin A, sw meets city standards
Plot Plan Inspection Passed 1/19/2024 12/19/2023
Occupancy Inspection - Codes Residential Failed 12/19/2023 12/19/2023 12/19/2023
Misc
Corrective Action Required
08/18/2023
-pay all fees -complete vegetation/landscaping at driveway -remove storm inlet block at driveway
Misc
Resolved
12/19/2023
Sidewalk must be installed on Swan Creek Cir as per the development plan. MARK HARDING 08/15/2023 4:13 PM
Occupancy Inspection - Codes Residential Failed 5/8/2024 5/8/2024 05/08/2024
Misc
Corrective Action Required
12/19/2023
-remove storm inlet block at driveway
Erosion Control Inspection Residential Passed 05/21/2024
DCM2 ESC DEFICIENT INSTALLATION
Resolved
05/21/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. CLEAN ALL MUD AT STREETS AND CURB
Occupancy Inspection - Codes Residential Full C of O 5/21/2024 05/21/2024
Misc
Resolved
05/21/2024
-remove storm inlet block at driveway
Documents & Images
Date Uploaded File Type Document Name
11/08/2021 50ww application_
11/08/2021 Permit Codes Residential Plan Review
11/23/2021 Plot Plan APPROVED PLOT PLAN
11/30/2021 Approved Plans Approved Drawings
11/30/2021 Permit Codes Residential Plan Review
12/02/2021 Permit DS Building Permit
12/02/2021 Receipt Receipt for transaction:2021-009068
12/10/2021 Letter INSPECTION SUMMARY
01/10/2022 Letter INSPECTION SUMMARY
01/10/2022 Letter INSPECTION SUMMARY
01/11/2022 Letter INSPECTION SUMMARY
01/11/2022 Letter INSPECTION SUMMARY
01/21/2022 Letter INSPECTION SUMMARY
02/08/2022 Letter INSPECTION SUMMARY
02/08/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
07/01/2022 Letter Codes 140 Day Letter
08/10/2022 Letter Codes 180 Day Letter
08/23/2022 Letter INSPECTION SUMMARY
10/20/2022 Letter Codes Residential Plan Review
10/20/2022 Letter INSPECTION SUMMARY
10/20/2022 Letter INSPECTION SUMMARY
10/20/2022 Letter INSPECTION SUMMARY
10/20/2022 Letter INSPECTION SUMMARY
10/25/2022 Letter INSPECTION SUMMARY
10/26/2022 Letter INSPECTION SUMMARY
10/26/2022 Letter INSPECTION SUMMARY
10/26/2022 Letter INSPECTION SUMMARY
11/03/2022 Letter INSPECTION SUMMARY
11/03/2022 Letter INSPECTION SUMMARY
11/03/2022 Letter INSPECTION SUMMARY
11/09/2022 50ww IJoist layout
11/10/2022 50ww IJoist layout
11/10/2022 Approved Plans floor joist plan
12/02/2022 Letter INSPECTION SUMMARY
12/02/2022 Letter INSPECTION SUMMARY
12/02/2022 Letter INSPECTION SUMMARY
12/07/2022 DD-7130 Comment Inspection Response
12/14/2022 Letter INSPECTION SUMMARY
12/14/2022 Letter INSPECTION SUMMARY
12/29/2022 Letter INSPECTION SUMMARY
02/21/2023 Letter INSPECTION SUMMARY
03/09/2023 Letter INSPECTION SUMMARY
03/30/2023 Letter INSPECTION SUMMARY
03/30/2023 Letter INSPECTION SUMMARY
03/31/2023 Letter INSPECTION SUMMARY
03/31/2023 Letter INSPECTION SUMMARY
04/03/2023 Letter INSPECTION SUMMARY
04/03/2023 Letter INSPECTION SUMMARY
04/10/2023 Letter INSPECTION SUMMARY
04/10/2023 Letter INSPECTION SUMMARY
04/10/2023 Letter INSPECTION SUMMARY
04/13/2023 Letter INSPECTION SUMMARY
04/13/2023 Letter INSPECTION SUMMARY
04/13/2023 Letter INSPECTION SUMMARY
04/13/2023 Letter INSPECTION SUMMARY
06/14/2023 1509 SW 27th St ESTAR Final Inspection Report
06/15/2023 Letter INSPECTION SUMMARY
06/19/2023 WW50 Rev
06/20/2023 Letter INSPECTION SUMMARY
06/20/2023 Letter INSPECTION SUMMARY
08/18/2023 Letter INSPECTION SUMMARY
12/05/2023 Letter INSPECTION SUMMARY
12/06/2023 Letter INSPECTION SUMMARY
12/06/2023 Letter INSPECTION SUMMARY
12/06/2023 Letter INSPECTION SUMMARY
12/06/2023 Letter INSPECTION SUMMARY
12/06/2023 Letter INSPECTION SUMMARY
12/12/2023 Letter INSPECTION SUMMARY
12/12/2023 Letter INSPECTION SUMMARY
12/12/2023 Letter INSPECTION SUMMARY
12/19/2023 Letter INSPECTION SUMMARY
12/19/2023 Letter INSPECTION SUMMARY
02/08/2024 Receipt Receipt for transaction: 2024-000721
05/07/2024 Letter Codes 140 Day Letter
05/08/2024 Letter INSPECTION SUMMARY
05/21/2024 Letter INSPECTION SUMMARY
05/21/2024 Letter Field Certificate of Occupancy
05/21/2024 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home