Permit Application Status

PRRES20212205


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20212205
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED PATIO - COVERED PATIO
05/04/2021
06/07/2021
10/31/2021
03/09/2023
Locations
Contacts
DAVE RICHARDS HOMEBUILDING INC, Address:605 SW US HIGHWAY 40 #414, Phone:(816) 365-8034  
DAVE@DAVERICHARDSHOMES.COM  
INTREPID ELECTRIC LLC, Address:620 S KISNER CIR, Phone:(816) 796-2781  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
C.M. MOSE & SON, Address:6603 ROYAL ST BLDG E, Phone:(816) 781-4707  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8350015-Water Meter Fee $455.54 $455.54 Paid 06/07/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 06/07/2021
8331507-Sewer Connection Fee $420.00 $420.00 Paid 06/07/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 06/07/2021
9110078-Valuation Fee New Single Family $1,097.19 $1,097.19 Paid 06/07/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 06/07/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 08/22/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 08/22/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 08/23/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Passed 7/22/2021 7/22/2021 07/22/2021
Erosion Control Inspection Residential Failed 8/19/2021 8/19/2021 08/19/2021
Misc
Corrective Action Required
08/19/2021
8/19/21 NL - Silt fence at the South side from the street back to the property corner needs to be fixed. SW corner of the property silt fence is down due to equipment running over it.
Erosion Control Inspection Residential Failed 8/25/2021 8/25/2021 08/25/2021
Misc
Corrective Action Required
08/19/2021
8/19/21 NL - Silt fence at the South side from the street back to the property corner needs to be fixed. SW corner of the property silt fence is down due to equipment running over it.
Misc
Corrective Action Required
08/25/2021
8/25/21 15:15 - Fix and lift silt fence around the property.
Erosion Control Inspection Residential Failed 9/1/2021 9/1/2021 09/01/2021
Misc
Corrective Action Required
08/25/2021
8/19/21 NL - Silt fence at the South side from the street back to the property corner needs to be fixed. SW corner of the property silt fence is down due to equipment running over it.
Misc
Corrective Action Required
08/25/2021
8/25/21 15:15 - Fix and lift silt fence around the property.
Misc
Corrective Action Required
09/01/2021
9/1/21 14:25 - Final Warning.. Silt fence around the site needs to be placed back up and street needs to be cleaned. Will check back in a week, if items haven’t been fixed a stop work order will be placed.
Erosion Control Inspection Residential Partial 9/8/2021 9/8/2021 09/08/2021
Misc
Corrective Action Required
09/01/2021
8/19/21 NL - Silt fence at the South side from the street back to the property corner needs to be fixed. SW corner of the property silt fence is down due to equipment running over it.
Misc
Corrective Action Required
09/01/2021
8/25/21 15:15 - Fix and lift silt fence around the property.
Misc
Corrective Action Required
09/01/2021
9/1/21 14:25 - Final Warning.. Silt fence around the site needs to be placed back up and street needs to be cleaned. Will check back in a week, if items haven’t been fixed a stop work order will be placed.
Misc
Informational
09/08/2021
9/8/21 10:42 - Silt fence has been repaired and debris have been removed from the road. Looks like sidewalk was installed and silt fence was knocked down, this area needs to be repaired.
All Rough Inspection - Residential Not Ready 11/11/2021 11/11/2021 11/11/2021
Misc
Corrective Action Required
11/11/2021
11-11-21 This house is not ready for inspection. List reflects the garage only and is subject to change and will be completed when full inspection is performed. Complete these items before further inspection: -Provide tension straps at PFH -Nail top plate to header at PFH per code -Provide 2.25” x 3/16” square washer at PFH and tighten nuts -Complete plumbing in garage or remove unused vent, fireblock penetrations and provide structural strap at both side of over bored top plate -Fireblock dead space at furout wall in garage -Address exterior walls not tied together at top plate at garage/entry -Address rafters not connected to ceiling joists -Fireblock ceiling line at garage/ entry -Provide anchor bolts within 12” of plate break -Tighten anchor bolts -Nail corner and intersecting wall studs per code -Replace or sister over notched stud at garage wall -Provide joist hangers at attic access
All Rough Inspection - Residential Failed 11/17/2021 11/17/2021
Misc
Corrective Action Required
11/11/2021
11/17-Inspection denied. Framers are still working inside the house. Erosion control shall be installed along the street. 11-11-21 This house is not ready for inspection. List reflects the garage only and is subject to change and will be completed when full inspection is performed. Complete these items before further inspection: -Provide tension straps at PFH -Nail top plate to header at PFH per code -Provide 2.25” x 3/16” square washer at PFH and tighten nuts -Complete plumbing in garage or remove unused vent, fireblock penetrations and provide structural strap at both side of over bored top plate -Fireblock dead space at furout wall in garage -Address exterior walls not tied together at top plate at garage/entry -Address rafters not connected to ceiling joists -Fireblock ceiling line at garage/ entry -Provide anchor bolts within 12” of plate break -Tighten anchor bolts -Nail corner and intersecting wall studs per code -Replace or sister over notched stud at garage wall -Provide joist hangers at attic access
Electrical Service Inspection Passed 11/30/2021 11/30/2021 11/30/2021
Gas Service Inspection - Residential Passed 11/30/2021 11/30/2021 11/30/2021
All Rough Inspection - Residential Failed 11/30/2021 11/30/2021 11/30/2021
Misc
Corrective Action Required
11/17/2021
**SHALL REPAIR EROSION CONTROL AT REAR FLOOD BASIN -Provide rear yard flood light -Anchor basement sill plates per code; tighten down all anchor nuts -Install rear basement door. Engineer address proper size header beam for span -Solid block joist ends above I beams -Fb basement wall space from soffit and fur down ceiling space -Toe nail all joists to basement sill plates and wall top plates per code -At I beam pocket near fur, shall provide proper bearing material under I beam -Unblock return air path st basement bathroom/hallway wall; pan off return air space from fur down ceiling space -Provide a wall receptacle at hallway outside basement bedrooms -Cannot just lay wiring in ceiling soffit framing. Must securely fasten per code -Pan off all return air space from fur down ceiling space -Provide min 15” of clearance distance from middle of basement bathroom water closet to finished wall -Seal penetrations of ceiling return air space in basement -Fb stair wall from roof -Provide double joist at stair per plan; connect double to double header joist with hanger -Over spanned 9.25” lvl beam above stair. Have engineer check this beam spanning over 16.5 ft -Provide 4 stud support for lvl beams at stair/pantry wall -Protect wiring at pantry/garage bottom wall plate; at oven wall, -Provide kitchen countertop receptacle spacing per code -Nail corner studs per code -Security blocking for deck door -Nail double joist hanger at kitchen lvl beam connection -Provide solid support for kitchen 14” lvl point load down to pad below. Currently on subfloor sheathing with return air space below -Support valley rafters above rear of living room ; purlin shall be min same size as rafter (no notch) and supported at max 4 ft apart -Fb all wall plates penetrations -Support roof above front entry door -Pan off return air space behind shower at front bedroom -Support roof per code above front bedroom -Install roof flashings for vents -Fb space at front bath shower -Repair vapor barrier above master bathroom sink -Provide a receptacle at hallway more than ten ft outside bedrooms -Secure electrical wiring per code in garage; protect wiring within six ft of attic access -Replace or sister over notched stud at garage wall **DO NOT INSULATE
Sewer Service Inspection - R Passed 12/9/2021 (8:00) 12/9/2021 12/09/2021
Water Service Inspection - R Passed 12/9/2021 (1:00) 12/9/2021 12/09/2021
All Rough Inspection - Residential Failed 3/9/2022 3/9/2022 03/09/2022
Misc
Corrective Action Required
11/30/2021
**SHALL REPAIR EROSION CONTROL AT REAR FLOOD BASIN. NO FURTHER INSPECTION IF NOT IN COMPLIANCE -Provide rear yard flood light -Anchor basement sill plates per code; tighten down all anchor nuts **min 2 anchors for short sill plate at door; tighten down anchor nut at same plate -Install rear basement door. Engineer address proper size header beam for span -Fb basement wall space from soffit and fur down ceiling space **not done -At I beam pocket near furnace, shall provide proper bearing material under I beam **add more shims across width of I beam -Provide min 15” of clearance distance from middle of basement bathroom water closet to finished wall -Fb stair wall from roof -Provide double joist at stair per plan; connect double to double header joist with hanger **also the triple joist at stair is not fully supported to the pad below; -Over spanned 9.25” lvl beam above stair. Have engineer check this beam spanning over 16.5 ft -Protect wiring at oven wall bottom plate -Provide solid support for kitchen 14” lvl point load down to pad below. Currently on subfloor sheathing with return air space below **support studs still not directly under the lvl point load. -Support valley rafters above rear of living room ; purlin shall be min same size as rafter (no notch) and supported at max 4 ft apart **you can install a larger purlin (2x12) -Fb space at front bath shower **Staple insulation in place **Provide flashings above the wall protrusion at front of house garage **OK TO INSULATE **SEE EROSION CONTROL ABOVE. DO NOT SCHEDULE AN INSPECTION WHEN EROSION CONTROL IS NOT IN COMPLIANCE
Driveway Inspection Partial 4/5/2022 4/5/2022 04/05/2022
Misc
Informational
04/05/2022
4-5-22 AN forms are in place and aggregate is present and compacted.
Driveway Inspection Passed 04/08/2022
Misc
Informational
04/05/2022
4-5-22 AN forms are in place and aggregate is present and compacted.
Misc
Informational
04/08/2022
4-8-22 AN driveway looks good and has expansion joints at curb and right of way. Meet ADA spec
Miscellaneous Inspection Failed 04/08/2022
Miscellaneous Correction
Corrective Action Required
04/08/2022
4-8-22 AN, ES manhole was buried and we came out uncovered it and marked it with stakes and pink paint. Someone has come out and buried it with a load of dirt again..
Miscellaneous Correction
Corrective Action Required
04/08/2022
4-8-22 AN manhole will probably have to be raised to meet grade.
All Rough Inspection - Residential Not Ready 4/12/2022 4/12/2022 04/12/2022
Misc
Corrective Action Required
03/09/2022
**SHALL REPAIR EROSION CONTROL AT REAR FLOOD BASIN. NO FURTHER INSPECTION IF NOT IN COMPLIANCE -Anchor basement sill plates per code; tighten down all anchor nuts **min 2 anchors for short sill plate at door; tighten down anchor nut at same plate -Install rear basement door. Engineer address proper size header beam for span -Fb basement wall space from soffit and fur down ceiling space **not done -At I beam pocket near furnace, shall provide proper bearing material under I beam **add more shims across width of I beam -Provide min 15” of clearance distance from middle of basement bathroom water closet to finished wall -Provide double joist at stair per plan; connect double to double header joist with hanger **also the triple joist at stair is not fully supported to the pad below; -Over spanned 9.25” lvl beam above stair. Have engineer check this beam spanning over 16.5 ft -Protect wiring at oven wall bottom plate -Provide solid support for kitchen 14” lvl point load down to pad below. Currently on subfloor sheathing with return air space below **support studs still not directly under the lvl point load. -Support valley rafters above rear of living room ; purlin shall be min same size as rafter (no notch) and supported at max 4 ft apart **you can install a larger purlin (2x12) -Fb space at front bath shower **Staple insulation in place **Provide flashings above the wall protrusion at front of house garage **OK TO INSULATE **SEE EROSION CONTROL ABOVE. DO NOT SCHEDULE AN INSPECTION WHEN EROSION CONTROL IS NOT IN COMPLIANCE **4/12-REINSPECTION FEE ASSESSED FOR 3RD FAILED ALLROUGH INSPECTION
Footing Inspection - Residential Passed 06/02/2022
Informational
06/02/2022
FOOTING APPROVED BY ENGINEER
All Rough Inspection - Residential Failed 6/2/2022 6/2/2022 06/02/2022
Misc
Corrective Action Required
04/12/2022
-Fb basement wall space from soffit and fur down ceiling space **not done -Provide min 15” of clearance distance from middle of basement bathroom water closet to finished wall -Install hangers at joist connections to double joist above stair wall -Nail the basement portal frame wall sheathing @3” oc **OK TO INSULATE **4/12-REINSPECTION FEE ASSESSED FOR 3RD FAILED ALLROUGH INSPECTION
All Rough Inspection - Residential Passed 6/3/2022 6/3/2022 06/03/2022
Misc
Informational
06/03/2022
**OK TO ROCK **4/12-REINSPECTION FEE ASSESSED FOR 3RD FAILED ALLROUGH INSPECTION
Sidewalk Inspection Partial 6/28/2022 6/28/2022 06/28/2022
Misc
Informational
06/28/2022
6-28-22 AN forms are in place and aggregate is present and compacted
Miscellaneous Inspection Failed 06/28/2022
Miscellaneous Correction
Corrective Action Required
06/28/2022
4-8-22 AN, ES manhole was buried and we came out uncovered it and marked it with stakes and pink paint. Someone has come out and buried it with a load of dirt again.. 4-8-22 AN manhole will probably have to be raised to meet grade. 6-28-22 AN MH is still buried . DO ISSUE TCO
Miscellaneous Inspection Failed 06/28/2022
Miscellaneous Correction
Corrective Action Required
06/28/2022
4-8-22 AN, ES manhole was buried and we came out uncovered it and marked it with stakes and pink paint. Someone has come out and buried it with a load of dirt again.. 4-8-22 AN manhole will probably have to be raised to meet grade. 6-28-22 AN MH is still buried . DO NOT ISSUE TCO
Sidewalk Inspection Passed 7/5/2022 7/5/2022 07/06/2022
Misc
Informational
06/28/2022
6-28-22 AN forms are in place and aggregate is present and compacted
Misc
Informational
07/06/2022
7-6-22 AN sidewalk looks good and meets Ada spec
Piers/Caissons Inspection - Residential Passed 08/19/2022
Informational
08/19/2022
PATIO PIERS APPROVED BY ENGINEER
Occupancy Inspection - Codes Residential Failed 8/19/2022 8/19/2022 08/19/2022
Misc
Corrective Action Required
08/19/2022
**Mow overgrown vegetation **Install erosion along the street and rear basin; clean mud and debris off the street and storm inlet **Not-ready fees shall be paid in full before any occupancy can be issued -Sidewalk at ADA has settled -Obtain lawn irrigation permit and submit backflow valve test report to city -As-graded plot plan is required -Final grade, sod, downspout and sump pump extension -Provide sewer tracer wire port at grade -Provide two 1/2” through bolts or equivalent at each deck beam-post connection -Provide handrail at front entry stair -Provide garage stair handrail profile per code -Garage door not self-closing -Label or identify all dedicated non-gfci receptacles in basement -Screw the exterior door embedded jamb brace into studs -Install sump pump -Cut off excess rebars to safe length
Miscellaneous Inspection Passed 08/19/2022
Miscellaneous Correction
Resolved
08/19/2022
4-8-22 AN, ES manhole was buried and we came out uncovered it and marked it with stakes and pink paint. Someone has come out and buried it with a load of dirt again.. 4-8-22 AN manhole will probably have to be raised to meet grade. 6-28-22 AN MH is still buried . DO NOT ISSUE TCO
Occupancy Inspection - Codes Residential Ready for Temp CO 8/22/2022 8/22/2022 08/22/2022
Misc
Corrective Action Required
08/19/2022
-Sidewalk at ADA has settled -Obtain lawn irrigation permit and submit backflow valve test report to city **permit incomplete -As-graded plot plan is required -Final grade, sod, downspout and sump pump extension
Occupancy Inspection - Codes Residential Temporary C of O 08/23/2022
Misc
Corrective Action Required
08/22/2022
-Sidewalk at ADA has settled -Obtain lawn irrigation permit and submit backflow valve test report to city **permit incomplete -As-graded plot plan is required -Final grade, sod, downspout and sump pump extension
Erosion Control Inspection Residential Passed 08/24/2022
Misc
Resolved
08/24/2022
8/19/21 NL - Silt fence at the South side from the street back to the property corner needs to be fixed. SW corner of the property silt fence is down due to equipment running over it.
Misc
Resolved
08/24/2022
8/25/21 15:15 - Fix and lift silt fence around the property.
Misc
Resolved
08/24/2022
9/1/21 14:25 - Final Warning.. Silt fence around the site needs to be placed back up and street needs to be cleaned. Will check back in a week, if items haven’t been fixed a stop work order will be placed.
Misc
Resolved
08/24/2022
9/8/21 10:42 - Silt fence has been repaired and debris have been removed from the road. Looks like sidewalk was installed and silt fence was knocked down, this area needs to be repaired.
Plot Plan Inspection Passed 3/1/2023 03/01/2023
Occupancy Inspection - Codes Residential Full C of O 3/9/2023 3/9/2023 03/09/2023
Misc
Resolved
03/09/2023
-Obtain lawn irrigation permit and submit backflow valve test report to city **permit incomplete -Final grade, sod, downspout and sump pump extension
Documents & Images
Date Uploaded File Type Document Name
05/04/2021 Application Form APPLICATION
05/04/2021 Plot Plan APPROVED PLOT PLAN
05/04/2021 Application Form excise tax
05/04/2021 Plans plans
05/04/2021 Permit Codes Residential Plan Review
05/04/2021 Permit Codes Residential Plan Review
05/05/2021 Codes Residential Plan Review0 with Responses 5-5-21
05/05/2021 DRHI 4740 NE Jamestown Dr LSMO Haven 3 Garage Right Sealed Submittal 4-26-21 Pgs 1-6 Revise 5-5-21 To Address City Comments
05/05/2021 Approved Plans APPROVED PLANS
05/05/2021 Permit Codes Residential Plan Review
06/07/2021 Permit DS Building Permit
06/07/2021 Receipt Receipt for transaction:2021-004079
06/16/2021 Garys Fndn 4740 NE Jamestown Dr Lee's Summit Mo 3rd Party Footing Inspection Report 6-16-21
07/22/2021 Letter INSPECTION SUMMARY
08/19/2021 Failed Erosion South Side .jpg
08/19/2021 Letter INSPECTION SUMMARY
08/25/2021 Letter INSPECTION SUMMARY
08/25/2021 Letter INSPECTION SUMMARY
09/01/2021 Letter INSPECTION SUMMARY
09/08/2021 Letter INSPECTION SUMMARY
11/11/2021 Letter INSPECTION SUMMARY
11/17/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter INSPECTION SUMMARY
12/09/2021 Letter INSPECTION SUMMARY
12/09/2021 Letter INSPECTION SUMMARY
03/09/2022 Letter INSPECTION SUMMARY
04/05/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
04/28/2022 Final_2022_04_15_DPier_LSOM_Pat Cochran Concrete
06/02/2022 DRHI 4740 NE Jamestown Dr LSMO Monticello Lot 135 Framing Issues Report 3-12-22
06/02/2022 Letter INSPECTION SUMMARY
06/03/2022 Letter INSPECTION SUMMARY
06/03/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
07/06/2022 Letter INSPECTION SUMMARY
08/19/2022 Letter INSPECTION SUMMARY
08/19/2022 Letter INSPECTION SUMMARY
08/19/2022 Letter INSPECTION SUMMARY
08/22/2022 Receipt Receipt for transaction:2022-006860
08/23/2022 Receipt Receipt for transaction:2022-006916
08/23/2022 Letter Codes Temporary Certificate of Occupancy
08/24/2022 Letter INSPECTION SUMMARY
10/04/2022 Letter Codes 10 Day Letter
02/28/2023 M-135-AG Plot Plan
02/28/2023 Plot Plan APPROVED AS GRADED PLOT PLAN
03/01/2023 Letter INSPECTION SUMMARY
03/09/2023 Letter Codes Final Certificate of Occupancy
03/09/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: