Summary
PRRES20212191
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT -
05/03/2021
07/21/2021
11/02/2021
04/30/2024
Locations
Contacts
NICK ZVACEK CONSTRUCTION LLC, Address:1009 INDUSTRIAL DR, Phone:(816) 213-7204  
Julie Pitts, Address:10707 Indiana Ave  
COMFORT SYSTEMS HTG/CLG, Address:17232 BEL-RAY PL, Phone:(816) 322-1013  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
NZVACEK@GMAIL.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,237.03 $1,237.03 Paid 07/21/2021
8331507-Sewer Connection Fee $450.00 $450.00 Paid 07/21/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 07/21/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 07/21/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 07/21/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 07/21/2021
$0.00 $0.00 $0.00 N/A
$0.00 $0.00 $0.00 N/A
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/27/2021 07/27/2021
Informational
07/27/2021
footing approved by engineer
Erosion Control Inspection Residential Passed 8/20/2021 08/20/2021
Sewer Service Inspection - R Passed 8/20/2021 (10:45) 8/20/2021 08/20/2021
Water Service Inspection - R Partial 8/20/2021 (10:45) 8/20/2021 08/20/2021
Water Service Inspection - R Passed 8/24/2021 (1:00) 8/24/2021 08/24/2021
Underslab Plumbing Inspection - Residential Passed 8/25/2021 8/25/2021 08/25/2021
Piers/Caissons Inspection - Residential Passed 10/8/2021 (9:00) 10/8/2021 10/08/2021
All Rough Inspection - Residential Failed 11/15/2021 11/15/2021 11/15/2021
Misc
Corrective Action Required
11/15/2021
-Nail exterior siding per code -Install trimmings and flashings per code -Install all windows and doors -Support front porch roof -Garage PFH walls: nail straps, install 2”x2” washers -Anchor garage sill plates per code -Nail corner studs per code. -How are the wall corners insulated? -Complete gas piping to fireplace and retest. Fix leakage first. Pressure less than 10 -Support all hip rafters at ridge -Fb all wall plates penetrations ; fb floor penetrations -Protect refrigerator line -Install hanger for triple joist connection above pantry -Support (4)2x10 joist at I beam connection at rear dining/great room corner -Have engineer address exterior wall bracing requirement at rear dining walls where windows and doors are changed from the approved plan -Have engineer address address non-full-height 2x6 studs at rear great room walls -Toe nail all joists to wall top plates -Vent all bathroom fans -Dryer duct exceeds max length allowed -Pan off parallel electrical in return air space across from stair -Strap all interior bearing wall and exterior wall top plates cut more than 50% with min (4)10d nails each side. Install longer straps at 3” pvc so you can have min 4 nails fully nailed -Provide 2 stud support for roof beam at bedroom 3 closet/stair wall -In the bedroom 2 closet, fur out wall for the dryer duct, protect dryer duct, and Fb at top of fur out wall -Install double 2x12 roof support beam above bedroom 2. Coordinate with the mechanical sub to correct this -Install vent roof flashings -Ceiling beams load bearing on the side wall between master bedroom and closet, instead of front and back walls. Have engineer check on this -Support bottom of valley rafter above master bedroom near door to bathroom -Fb master bathroom wall from roof -Fb basement wall from all soffits and fur down ceiling space; fb wall vertically at ten ft or less interval ; fb gap at top of basement bedroom wall -Double joists under kitchen island -Connect the gas piping bonding jumper to the equipment grounding bus bar, not the grounded neutral bar **DO NOT INSULATE
Gas Service Inspection - Residential Failed 11/15/2021 11/15/2021 11/15/2021
Misc
Corrective Action Required
11/15/2021
-Complete gas piping to fireplace and retest. Fix leakage first. Pressure less than 10
Electrical Service Inspection Passed 11/15/2021 11/15/2021 11/15/2021
All Rough Inspection - Residential Failed 11/18/2021 11/18/2021
Misc
Corrective Action Required
11/15/2021
-Nail exterior siding per code -Install trimmings and flashings per code -Install all windows and doors -Support front porch roof -Garage PFH walls: nail straps, install 2”x2” washers -Anchor garage sill plates per code -Nail corner studs per code. -How are the wall corners insulated? -Complete gas piping to fireplace and retest. Fix leakage first. Pressure less than 10 -Support all hip rafters at ridge -Fb all wall plates penetrations ; fb floor penetrations -Protect refrigerator line -Install hanger for triple joist connection above pantry -Support (4)2x10 joist at I beam connection at rear dining/great room corner -Have engineer address exterior wall bracing requirement at rear dining walls where windows and doors are changed from the approved plan -Have engineer address address non-full-height 2x6 studs at rear great room walls -Toe nail all joists to wall top plates -Vent all bathroom fans -Dryer duct exceeds max length allowed -Pan off parallel electrical in return air space across from stair -Strap all interior bearing wall and exterior wall top plates cut more than 50% with min (4)10d nails each side. Install longer straps at 3” pvc so you can have min 4 nails fully nailed -Provide 2 stud support for roof beam at bedroom 3 closet/stair wall -In the bedroom 2 closet, fur out wall for the dryer duct, protect dryer duct, and Fb at top of fur out wall -Install double 2x12 roof support beam above bedroom 2. Coordinate with the mechanical sub to correct this -Install vent roof flashings -Ceiling beams load bearing on the side wall between master bedroom and closet, instead of front and back walls. Have engineer check on this -Support bottom of valley rafter above master bedroom near door to bathroom -Fb master bathroom wall from roof -Fb basement wall from all soffits and fur down ceiling space; fb wall vertically at ten ft or less interval ; fb gap at top of basement bedroom wall -Double joists under kitchen island -Connect the gas piping bonding jumper to the equipment grounding bus bar, not the grounded neutral bar **DO NOT INSULATE
Misc
Corrective Action Required
11/18/2021
I called Jeff in responce to a VM i recieved. explained i was not at inspection and if he called or emailed Khanh. it was a waste of his time. i tried to explain that the window size or oepening was different from the plans is why khanh stated the braced wall at the rear of the house. he said Khnah walked a way from the inspection and would not help. i said with a list like that and carpenters still working at the time of the inspection i would walk also. Jeff said it's that fuckyou attitude that we do not help people. I ended the phone call. Email you inspector and communicate in writing or hire an engineer to address the structural items on the list.
All Rough Inspection - Residential Failed 12/22/2021 12/22/2021
Misc
Corrective Action Required
11/18/2021
-Garage PFH walls: install 2”x2” washers **at the wall where the anchor is not within middle 1/3 of sill plate, install another 5/8” anchor with 2”x2” washer -Anchor garage sill plates per code **anchor sill plate within 12” of break near 3rd car garage door -Nail corner studs per code **Nail the 2x6 corner studs -Complete gas piping to fireplace and retest. Fix leakage first. **Pressure less than 10 -Have engineer address exterior wall bracing requirement at rear dining walls where windows and doors are changed from the approved plan **Install double plates below expanded kitchen window per engineer letter -Toe nail all joists to wall top plates **toe nail joists to top plates w/4-8d or 3-10d nails -Vent all bathroom fans **Flexible duct cannot exceed length limit of 14 ft, especially the 3” duct. Per table IRC1504.2, 3” flexible duct is not allowed. Must use 4” duct, either flexible or hard duct. 4” hard duct will allow much more vent distance, since each elbow in the duct reduce vent distance by 15 ft (4” flexible duct can only go 56 ft of straight run). Look at bath fan from half bathroom. There’s also a hole torn in the duct -Pan off parallel electrical in return air space across from stair -In the bedroom 2 closet, fur out wall for the dryer duct **protect dryer duct at bottom wall plate and Fb at top of fur out wall -Install double 2x12 roof support beam above bedroom 2. Coordinate with the mechanical sub to correct this **The beam is notched about 40%. You can have engineer address this -Ceiling beams load bearing on the side wall between master bedroom and closet, instead of front and back walls. Have engineer check on this -Fb master bathroom wall from roof **Fb gaps; close off holes in the subfloor -Fb basement wall from all soffits and fur down ceiling space -Connect the gas piping bonding jumper to the equipment grounding bus bar, not the grounded neutral bar **Post max dryer exhaust duct length limit at final **DO NOT INSULATE
Misc
Resolved
12/22/2021
I called Jeff in responce to a VM i recieved. explained i was not at inspection and if he called or emailed Khanh. it was a waste of his time. i tried to explain that the window size or oepening was different from the plans is why khanh stated the braced wall at the rear of the house. he said Khnah walked a way from the inspection and would not help. i said with a list like that and carpenters still working at the time of the inspection i would walk also. Jeff said it's that fuckyou attitude that we do not help people. I ended the phone call. Email you inspector and communicate in writing or hire an engineer to address the structural items on the list.
All Rough Inspection - Residential Failed 1/5/2022 1/5/2022 01/05/2022
Misc
Corrective Action Required
12/22/2021
-Connect the gas piping bonding jumper to the equipment grounding bus bar, not the grounded neutral bar **OK TO ROCK
Gas Service Inspection - Residential Passed 1/5/2022 1/5/2022 01/05/2022
Misc
Resolved
01/05/2022
-Complete gas piping to fireplace and retest. Fix leakage first. Pressure less than 10
All Rough Inspection - Residential Passed 1/14/2022 1/14/2022 01/14/2022
Misc
Resolved
01/14/2022
-Connect the gas piping bonding jumper to the equipment grounding bus bar, not the grounded neutral bar **OK TO ROCK
Driveway Inspection Partial 3/8/2022 3/8/2022 03/08/2022
Misc
Informational
03/08/2022
3-8-22 AN forms are in place and aggregate is present and compacted.. if concrete is poured today it will need blankets on it
Driveway Inspection Passed 3/18/2022 3/18/2022 03/22/2022
Misc
Informational
03/08/2022
3-8-22 AN forms are in place and aggregate is present and compacted.. if concrete is poured today it will need blankets on it
Misc
Informational
03/22/2022
3-22-22AN driveway looks good and has expansion joints at curb and right of way. Meets ADA spec
Sidewalk Inspection Failed 5/19/2022 5/19/2022 04/18/2022
Misc
Corrective Action Required
04/18/2022
Sidewalk on west side of driveway is poured. East side of driveway is framed up with aggregate in place, but framing is not to spec. Some areas are at an almost 6% grade. 4/18/22 ES
Sidewalk Inspection Failed 04/19/2022
Misc
Corrective Action Required
04/18/2022
Sidewalk on west side of driveway is poured. East side of driveway is framed up with aggregate in place, but framing is not to spec. Some areas are at an almost 6% grade. 4/18/22 ES
Miscellaneous Correction
Corrective Action Required
04/19/2022
4-19-22 AN came back to check on this side walk that Eric inspected . Several panels are out of ADA spec and they also didn’t put white cure on any of the panels.. the whole sidewalk needs to be redone.
Sidewalk Inspection Partial 5/19/2022 05/19/2022
Misc
Corrective Action Required
04/19/2022
Sidewalk on west side of driveway is poured. East side of driveway is framed up with aggregate in place, but framing is not to spec. Some areas are at an almost 6% grade. 4/18/22 ES
Miscellaneous Correction
Corrective Action Required
04/19/2022
4-19-22 AN came back to check on this side walk that Eric inspected . Several panels are out of ADA spec and they also didn’t put white cure on any of the panels.. the whole sidewalk needs to be redone.
Misc
Informational
05/19/2022
5-19-22 AN concrete crew took out two panels that were out of spec and reframed it . Ready to pour
Occupancy Inspection - Codes Residential Failed 5/24/2022 5/24/2022 05/24/2022
Misc
Corrective Action Required
05/24/2022
-Sidewalk not approved on record -As-graded plot plan is required -Provide sewer tracer wire port at grade -Provide sump pump extension -Seal exterior wall penetrations; seal above meter, seal siding under meter, AC disconnect, seal exterior lights, etc -Install tamper-proof caps at AC valves -Deck: cedar posts cannot be exposed to soil; provide two 1/2” through bolts at deck beam-post connection; have engineer address support of the deck beam to house -Provide secondary lock for the dining slide door per security code -Garage door not self-closing -Provide fall protection per IRC 312.2 for bedroom windows with openings less than 24” above floor and more than 72” above finished grade outside -Install backflow preventer at hose bibb -Basement bathroom fan not working -Basement bedroom window well ladder bottom rung must be within 18” of landing; fill in landing
Sidewalk Inspection Passed 5/23/2022 5/23/2022 05/27/2022
Misc
Corrective Action Required
05/19/2022
Sidewalk on west side of driveway is poured. East side of driveway is framed up with aggregate in place, but framing is not to spec. Some areas are at an almost 6% grade. 4/18/22 ES
Miscellaneous Correction
Corrective Action Required
05/19/2022
4-19-22 AN came back to check on this side walk that Eric inspected . Several panels are out of ADA spec and they also didn’t put white cure on any of the panels.. the whole sidewalk needs to be redone.
Misc
Informational
05/19/2022
5-19-22 AN concrete crew took out two panels that were out of spec and reframed it . Ready to pour
Misc
Informational
05/27/2022
5-27-22 AN sidewalk panels have been replaced and meet ADA spec
Occupancy Inspection - Codes Residential Failed 6/7/2022 6/7/2022 06/07/2022
Misc
Corrective Action Required
05/24/2022
-As-graded plot plan is required **make sure that after sodding is completed at adjacent house, that the filter fabric around the rear storm water inlet is removed -Install sewer tracer wire port at grade -Deck: cedar posts cannot be exposed to soil; have engineer address support of the deck beam to house -Provide secondary lock for the dining slide door per security code **slide door at rear dining -Garage door not self-closing -Provide fall protection per IRC 312.2 for bedroom windows with openings less than 24” above floor and more than 72” above finished grade outside **the window opening device shall comply with article IRC 312.2.2 (ASTM F2090 and min 5.7 sq ft opening when window is fully open). Get back with the window supplier for a proper fall protection device -Basement bedroom window well ladder bottom rung must be within 18” of landing; fill in landing
Occupancy Inspection - Codes Residential Temporary C of O 6/8/2022 6/8/2022 06/08/2022
Misc
Corrective Action Required
06/07/2022
-As-graded plot plan is required **make sure that after sodding is completed at adjacent house, that the filter fabric around the rear storm water inlet is removed -Deck-have engineer address support of the deck beam to house ** I need detail from the engineer on how to support the end of the (2)2x12 deck beam to the house. The plan calls for HUC212-2 hanger with structural screws. Currently, 2 structural screws are used to attach the deck beam to the ledger board, with only one screw actually going through the ledger board. Code does not allow the ledger board to support concentrate load (beam, post) **the soil underneath the deck settled significantly. Backfill the area to final grade level
Plot Plan Inspection Passed 6/9/2022 06/09/2022
Occupancy Inspection - Codes Residential Failed 9/12/2022 9/12/2022 09/12/2022
Misc
Corrective Action Required
06/08/2022
-As-graded plot plan is required **make sure that after sodding is completed at adjacent house, that the filter fabric around the rear storm water inlet is removed -Deck-have engineer address support of the deck beam to house ** I need detail from the engineer on how to support the end of the (2)2x12 deck beam to the house. The plan calls for HUC212-2 hanger with structural screws. Currently, 2 structural screws are used to attach the deck beam to the ledger board, with only one screw actually going through the ledger board. Code does not allow the ledger board to support concentrate load (beam, post) **the soil underneath the deck settled significantly. Backfill the area to final grade level
Occupancy Inspection - Codes Residential Failed 7/18/2023 7/18/2023 07/18/2023
Misc
Corrective Action Required
09/12/2022
-Remove the filter fabric around the rear storm water inlet -Update the plot plan with enlarged deck (4 ft deck extension beyond the deck on the original plan)
Occupancy Inspection - Codes Residential Full C of O 04/30/2024
Misc
Resolved
04/30/2024
-Remove the filter fabric around the rear storm water inlet -Update the plot plan with enlarged deck (4 ft deck extension beyond the deck on the original plan)
Documents & Images
Date Uploaded File Type Document Name
05/03/2021 Application Form APPLICATION
05/04/2021 Application Form excise tax
05/06/2021 Plot Plan APPROVED PLOT PLAN
05/06/2021 Permit Codes Residential Plan Review
05/12/2021 Permit Codes Residential Plan Review
05/27/2021 Permit Codes Residential Plan Review
07/21/2021 Permit DS Building Permit
07/21/2021 Receipt Receipt for transaction: 2021-005840
07/26/2021 M L Crose 4808 Jamestown Dr LSMO Monticello Lot 126 3rd Party Footing Inspection Report 7-26-21
08/20/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
08/24/2021 Letter INSPECTION SUMMARY
08/24/2021 Letter INSPECTION SUMMARY
08/25/2021 Letter INSPECTION SUMMARY
10/08/2021 Letter INSPECTION SUMMARY
11/04/2021 Approved Plans approved plans
11/15/2021 Letter INSPECTION SUMMARY
11/15/2021 Letter INSPECTION SUMMARY
11/15/2021 Letter INSPECTION SUMMARY
11/18/2021 Letter INSPECTION SUMMARY
12/13/2021 Engineer Report/Study ENGINEER LETTER
12/22/2021 Letter INSPECTION SUMMARY
12/29/2021 Engineer Report/Study ENGINEER LETTER
01/05/2022 Letter INSPECTION SUMMARY
01/05/2022 Letter INSPECTION SUMMARY
01/14/2022 Letter INSPECTION SUMMARY
03/08/2022 Letter INSPECTION SUMMARY
03/22/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/19/2022 Letter INSPECTION SUMMARY
05/19/2022 Letter INSPECTION SUMMARY
05/24/2022 Letter INSPECTION SUMMARY
05/31/2022 Letter INSPECTION SUMMARY
06/06/2022 Engineer Report/Study ENGINEER LETTER
06/07/2022 Letter INSPECTION SUMMARY
06/07/2022 Letter INSPECTION SUMMARY
06/08/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
06/08/2022 Letter Codes Temporary Certificate of Occupancy
06/09/2022 Letter INSPECTION SUMMARY
07/22/2022 Letter Codes 10 Day Letter
09/12/2022 Letter INSPECTION SUMMARY
03/10/2023 eng report 4808
07/18/2023 Letter INSPECTION SUMMARY
07/25/2023 Plot Plan approved plot plan
04/30/2024 Letter Codes Final Certificate of Occupancy
04/30/2024 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home