Permit Application Status

PRRES20200905


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20200905
Building Permit - Residential
Certificate of Occupancy
HUNT MIDWEST RESIDENTIAL LLC
NEW SINGLE FAMILY
NEW SINGLE FAMILY UNFINISHED BASEMENT COVERED DECK
04/09/2020
04/28/2020
10/21/2020
02/27/2024
Locations
Contacts
MCFARLAND CUSTOM BUILDERS, Address:P O BOX 25285, Phone:(816) 215-1660  
HUNT MIDWEST RESIDENTIAL LLC, Address:8300 NE UNDERGROUND DR  
marisa@mcfarlandkc.com  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
JOE KILOWATT INC, Address:6506 ROYAL, Phone:(816) 792-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 04/30/2020 04/28/2020
Steve Conrick
Residential Plan Review Approved 04/30/2020 04/28/2020
Steve Conrick
07 Identify emergency escape openings from bedrooms
Corrective Action Required
04/28/2020

Identify emergency escape openings from bedrooms and basement(s). (IRC Section R310 as amended per Ordinance)
12 Detail required separation between garage and living area including door
Corrective Action Required
04/28/2020

Detail required separation between garage and living area including door, door closer and gypsum board. (IRC R302.5)
Plot Plan Review Approved 04/24/2020 04/24/2020
Steve Conrick
Residential Plan Review Rejected 04/24/2020 04/24/2020
Steve Conrick
07 Identify emergency escape openings from bedrooms
Corrective Action Required
04/23/2020

Identify emergency escape openings from bedrooms and basement(s). (IRC Section R310 as amended per Ordinance)
12 Detail required separation between garage and living area including door
Corrective Action Required
04/24/2020

Detail required separation between garage and living area including door, door closer and gypsum board. (IRC R302.5)
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,421.22 $1,421.22 Paid 04/28/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 04/28/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 04/28/2020
8331507-Sewer Connection Fee $510.00 $510.00 Paid 04/28/2020
8331401-Water Tap Fee $3,477.00 $3,477.00 Paid 04/28/2020
8350015-Water Meter Fee $425.02 $425.02 Paid 04/28/2020
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 01/29/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 5/12/2020 (11:30) 5/12/2020 05/12/2020
Erosion Control Inspection Residential Failed 6/9/2020 06/09/2020
Misc
Corrective Action Required
06/09/2020
- POST ADDRESS - - MAINTAIN SILT FENCE - - SPREAD GRAVEL FILTER -
Underslab Plumbing Inspection - Residential Passed 6/9/2020 6/9/2020 06/09/2020
Miscellaneous Inspection Passed 6/23/2020 06/24/2020
Misc
Informational
06/24/2020
- 3RD PARTY STRUCTURAL GARAGE SLAB SIGNED & SEALED BY CHARLES R LOGAN
Erosion Control Inspection Residential Failed 09/16/2020
Misc
Corrective Action Required
06/09/2020
-Deficient erosion control installation, shall be in compliance within two days -Remove trash from site -Remove overgrown weeds and vegetation
All Rough Inspection - Residential Failed 10/5/2020 10/5/2020 10/05/2020
Misc
Corrective Action Required
10/05/2020
Inspection denied. City approved plans must be on site for all inspections
Electrical Service Inspection Passed 10/5/2020 10/06/2020
All Rough Inspection - Residential Failed 10/6/2020 10/6/2020 10/06/2020
Misc
Resolved
10/06/2020
Inspection denied. City approved plans must be on site for all inspections
Misc
Corrective Action Required
10/06/2020
-Fire block horizontal to vertical at all soffits and furr outs -Ensure all anchor bolts are properly tightened, garage and basement -Anchor bolt required within 12” of plate splice. Minimum of 2 anchor bolts per plate, garage & basement -furr out ducts in garage for insulation -Fire block all top and bottom plate penetrations -Seal penetrations in return air stud and joist cavities -mid point support for all vertical 2” and smaller DWV piping, at entry closet & kitchen/bath wall -provide bottom plate for plumbing furr out in living room -Remove exterior trim at rear elevation to verify sheathing fastening grid per plan- the two 18” wall sections per 3/S505 -Provide Simpson HTT4 with 5/8" Ø A307 threaded rod embedded and epoxied 6" into foundation at rear elevation engineered wall section per plan 3/S505 -Install window in living room -Provide 8-2x6 studs at rear elevation, between back door and engineered wall section per plan -Address over bored floor joist above entry door -Solid wood fillers or shims shall be used to eliminate any space between the wall structure and door frame behind each hinge at exterior doors -Stud to stud and abutting studs at intersecting wall corners at braced wall panels 12” OC nailing -Fire block between floor levels at tubs -Provide plumbing nail plate protection in entry closet -NM Conductors required to be protected 6” AFF at floor penetrations -Provide box at range electrical termination -Complete bath exhaust ducts and termination to exterior per plan -Complete water distribution piping to master bath -Provide baffling and blocking to prevent insulation from obstructing attic ventilation per plan -Address header deflection master bedroom door -Ensure purlin & T brace nailing is per plan -Flash plumbing vent roof penetrations -maintain required airspace at gas vent insulation shield -Air barrier requirements per plan- under energy conservation notes, see table N1102.4.1.1, 2018 IRC -Where cable is run at angles with joists in unfinished basement it shall be permissible to secure cables not smaller than two 6 AWG or three 8 AWG conductors directly to the lower edges of the joists. Smaller cables shall be run either through bored holes in joists or on running boards. -No gas piping installed. Provide piping, connect to appliances per manufacturer installation instructions and pressure test -Complete HVAC line set -Identify white conductors to be used as ungrounded conductors at both termination points -Provide joist hangers above basement bath -Address DF #2 floor joists where plan specificities DF #1 -Provide solid blocking where joists are parallel with foundation per plan DO NOT INSULATE DO NOT ROCK RE-INSPECTION REQUIRED
Gas Piping Inspection - Residential Failed 10/5/2020 10/06/2020
Misc
Corrective Action Required
10/06/2020
No gas piping installed. Provide piping, connect to appliances per manufacturer installation instructions and pressure test
Gas Service Inspection - Residential Failed 10/5/2020 10/06/2020
Misc
Corrective Action Required
10/06/2020
No gas piping installed. Provide piping, connect to appliances per manufacturer installation instructions and pressure test
All Rough Inspection - Residential Failed 10/12/2020 10/12/2020 10/14/2020
Misc
Corrective Action Required
10/06/2020
-Ensure all anchor bolts are properly tightened, basement -Anchor bolt required within 12” of plate splice. Minimum of 2 anchor bolts per plate, basement -furr out ducts in garage for insulation -Fire block all top and bottom plate penetrations, upstairs bedroom plumbing top plate -Remove exterior trim at rear elevation to verify sheathing fastening grid per plan- the two 18” wall sections per 3/S505 -Provide Simpson HTT4 with 5/8" Ø A307 threaded rod embedded and epoxied 6" into foundation at rear elevation engineered wall section per plan 3/S505 -Address over bored floor joist above entry door -Solid wood fillers or shims shall be used to eliminate any space between the wall structure and door frame behind each hinge at exterior doors -Stud to stud and abutting studs at intersecting wall corners at braced wall panels 12” OC nailing -NM Conductors required to be protected 6” AFF at floor penetrations -Complete bath exhaust ducts and termination to exterior per plan -Complete water distribution piping to master bath -Address header/top plate deflection master bedroom door -Ensure purlin & T brace nailing is per plan -Flash plumbing vent roof penetrations -maintain required airspace at gas vent insulation shield -Air barrier requirements per plan- under energy conservation notes, see table N1102.4.1.1, 2018 IRC -Where cable is run at angles with joists in unfinished basement it shall be permissible to secure cables not smaller than two 6 AWG or three 8 AWG conductors directly to the lower edges of the joists. Smaller cables shall be run either through bored holes in joists or on running boards. -No gas piping installed. Provide piping, connect to appliances per manufacturer installation instructions and pressure test -Complete HVAC line set -Identify white conductors to be used as ungrounded conductors at both termination points -Provide joist hangers above basement bath -Address DF #2 floor joists where plan specificities DF #1 -Provide solid blocking where joists are parallel with foundation per plan DO NOT INSULATE DO NOT ROCK RE-INSPECTION REQUIRED
All Rough Inspection - Residential Failed 10/20/2020 10/20/2020 10/20/2020
Misc
Corrective Action Required
10/12/2020
-Ensure all anchor bolts are properly tightened, basement -Anchor bolt required within 12” of plate splice. Minimum of 2 anchor bolts per plate, basement -furr out ducts in garage for insulation -Fire block all top and bottom plate penetrations, upstairs bedroom plumbing top plate -Remove exterior trim at rear elevation to verify sheathing fastening grid per plan- the two 18” wall sections per 3/S505 -Provide Simpson HTT4 with 5/8" Ø A307 threaded rod embedded and epoxied 6" into foundation at rear elevation engineered wall section per plan 3/S505 -Address over bored floor joist above entry door at plumbing penetration -Solid wood fillers or shims shall be used to eliminate any space between the wall structure and door frame behind each hinge at exterior doors -Stud to stud and abutting studs at intersecting wall corners at braced wall panels 12” OC nailing -Complete bath exhaust ducts and termination to exterior per plan -Complete water distribution piping to master bath -Address header/top plate deflection master bedroom door -Ensure purlin & T brace nailing is per plan -Flash plumbing vent roof penetrations -maintain required airspace at gas vent insulation shield -Air barrier requirements per plan- under energy conservation notes, see table N1102.4.1.1, 2018 IRC -Provide gas piping pressure test -Complete HVAC line set -Identify white conductors to be used as ungrounded conductors at both termination points -Provide joist hangers above basement bath -Address DF #2 floor joists where plan specificities DF #1 DO NOT INSULATE DO NOT ROCK RE-INSPECTION REQUIRED
Gas Service Inspection - Residential Failed 10/20/2020 10/20/2020 10/20/2020
Misc
Corrective Action Required
10/06/2020
pressure test piping
All Rough Inspection - Residential Failed 11/2/2020 11/2/2020 11/02/2020
Misc
Corrective Action Required
10/20/2020
-Ensure all anchor bolts are properly tightened, basement -Anchor bolt required within 12” of plate splice. Minimum of 2 anchor bolts per plate, basement -Remove exterior trim at rear elevation to verify sheathing fastening grid per plan- the two 18” wall sections per 3/S505 -Provide Simpson HTT4 with 5/8" Ø A307 threaded rod embedded and epoxied 6" into foundation at rear elevation engineered wall section per plan 3/S505 -Complete water distribution piping to master bath -Provide gas piping pressure test -Complete HVAC line set -Identify white conductors to be used as ungrounded conductors at both termination points -Provide joist hangers above basement bath UNABLE TO ACCESS BASEMENT DUE TO STANDING WATER 11/2/2010 OK TO INSULATE DO NOT ROCK RE-INSPECTION REQUIRED
All Rough Inspection - Residential Failed 11/3/2020 11/3/2020 11/03/2020
Misc
Corrective Action Required
11/02/2020
-Still to verify fastening grid at rear elevation engineered wall project per plan 3/S505 -Provide gas piping pressure test -Complete HVAC line set OK TO ROCK
Gas Service Inspection - Residential Passed 11/4/2020 11/4/2020 11/03/2020
Misc
Resolved
11/03/2020
pressure test piping
Gas Piping Inspection - Residential Passed 11/03/2020
Misc
Resolved
11/03/2020
No gas piping installed. Provide piping, connect to appliances per manufacturer installation instructions and pressure test
Piers/Caissons Inspection - Residential Passed 11/17/2020 (2:00) 11/17/2020 11/17/2020
Driveway Inspection Partial 11/17/2020 (P.M.) 11/17/2020 11/17/2020
Misc
Informational
11/17/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Partial 11/17/2020 (P.M.) 11/17/2020 11/17/2020
Misc
Informational
11/17/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Driveway Inspection Passed 11/24/2020 11/24/2020 11/30/2020
Misc
Informational
11/17/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Passed 11/24/2020 11/24/2020 11/30/2020
Misc
Informational
11/17/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Sewer Service Inspection - R Passed 12/3/2020 (8:30) 12/3/2020 12/03/2020
Water Service Inspection - R Passed 12/4/2020 (8:00) 12/4/2020 12/04/2020
Erosion Control Inspection Residential Failed 12/04/2020
Misc
Corrective Action Required
09/16/2020
-Erosion control requires continuous maintenance. Reestablish methods within two business days -Immediate Street clean up required -No further inspections until complete
Erosion Control Inspection Residential Failed 12/08/2020
Misc
Corrective Action Required
12/04/2020
-Erosion control requires continuous maintenance. Reestablish methods within two business days -Immediate Street clean up required -No further inspections until complete
All Rough Inspection - Residential Passed 01/29/2021
Misc
Resolved
01/29/2021
-Still to verify fastening grid at rear elevation engineered wall project per plan 3/S505 -Provide gas piping pressure test -Complete HVAC line set OK TO ROCK
Occupancy Inspection - Codes Residential Failed 1/29/2021 1/29/2021 01/29/2021
Misc
Corrective Action Required
01/29/2021
-all outstanding fees must be paid in full -Provide as graded plot plan for review/approval -Remove excavation spoils -Final grade and sod -Maintain erosion control until sod is in place -Remove debris from the street and sidewalk -Complete building façade -Provide gutters and downspouts -downspouts and sump piping to discharge minimum 36 inches from foundation -All main or front entry doors to dwelling units shall be arranged so that the occupant has a view of the area immediately outside the door without opening the door. The view may be provided by a door viewer having a field of view of not less than one hundred eighty (180) degrees, by window(s), or by view port(s). -Seal top and sides of exterior lighting exposed to the elements and at AC disconnect -Seal all exterior penetrations -Identify white insulated conductor used as current carrying conductor at both points of termination, condensing unit circuit -install anti tip device at range -GFCI protection of dishwasher circuit required -label single receptacle dedicated circuits in unfinished basement as non gfci protected -All 120V single phase 15 & 20A circuits in kitchens and laundry areas require AFCI protection -cap future bathroom DWV stub in basement -GFCI protection of laundry circuit required -All front mandoor entrances shall be protected with a minimum of one light outlet having a minimum of sixty (60) watts of lighting (or energy efficient equivalent). Those fixtures placed below eight (8) feet shall be fixtures manufactured such that the light source is not "readily accessible" as defined in the adopted National Electrical Code (NEC).
Occupancy Inspection - Codes Residential Temporary C of O 2/1/2021 2/1/2021 02/01/2021
Misc
Corrective Action Required
01/29/2021
-Provide as graded plot plan for review/approval -Remove excavation spoils -Final grade and sod -Maintain erosion control until sod is in place -Remove debris from the curb/gutter and sidewalk -Complete building façade -Provide gutters and downspouts -downspouts to discharge minimum 36 inches from foundation -All main or front entry doors to dwelling units shall be arranged so that the occupant has a view of the area immediately outside the door without opening the door. The view may be provided by a door viewer having a field of view of not less than one hundred eighty (180) degrees, by window(s), or by view port(s). -Seal top and sides of exterior lighting exposed to the elements -Identify white insulated conductors used as current carrying conductors at both points of termination, AC disconnect -repair yard across the road from water service installation TCO VALID THROUGH 03/01/2021
Occupancy Inspection - Codes Residential Temporary C of O 02/22/2021
Misc
Corrective Action Required
02/01/2021
-Provide as graded plot plan for review/approval -Remove excavation spoils -Final grade and sod -Maintain erosion control until sod is in place -Remove debris from the curb/gutter and sidewalk -Complete building façade -Provide gutters and downspouts -downspouts to discharge minimum 36 inches from foundation -All main or front entry doors to dwelling units shall be arranged so that the occupant has a view of the area immediately outside the door without opening the door. The view may be provided by a door viewer having a field of view of not less than one hundred eighty (180) degrees, by window(s), or by view port(s). -Seal top and sides of exterior lighting exposed to the elements -Identify white insulated conductors used as current carrying conductors at both points of termination, AC disconnect -repair yard across the road from water service installation TCO EXTENSION VALID THROUGH 04/01/2021 DUE TO WEATHER CONDITIONS
Erosion Control Inspection Residential Failed 03/05/2021
Misc
Corrective Action Required
12/08/2020
Excavation spoils from foundation installation is being removed by ABI corporation. Trucks are traveling through the green space behind the property, any damage to the green space will require restoration to original condition. Mud and debris are being tracked from river trail road through the subdivision nearly to Pryor Road, I have notified Carla with ABI that immediate Street clean up is required
Miscellaneous Inspection Failed 04/07/2021
Misc
Corrective Action Required
04/07/2021
-The temporary certificate of occupancy has expired at this address. A permit extension request must be submitted in writing with the expected date of completion. After the request is submitted, please schedule an occupancy inspection so the inspector may review current site conditions and either approve or deny the request. -Maintenance of erosion control methods is required until sod is in place. Streets and sidewalks must remain free of silt and debris.
Occupancy Inspection - Codes Residential Failed 05/18/2021
Misc
Corrective Action Required
02/22/2021
-Provide as graded plot plan for review/approval -Remove excavation spoils -Final grade and sod -Maintain erosion control until sod is in place -Remove debris from the curb/gutter and sidewalk -Complete building façade -Provide gutters and downspouts -downspouts to discharge minimum 36 inches from foundation -All main or front entry doors to dwelling units shall be arranged so that the occupant has a view of the area immediately outside the door without opening the door. The view may be provided by a door viewer having a field of view of not less than one hundred eighty (180) degrees, by window(s), or by view port(s). -Seal top and sides of exterior lighting exposed to the elements -Identify white insulated conductors used as current carrying conductors at both points of termination, AC disconnect -repair yard across the road from water service installation TCO EXTENSION VALID THROUGH 04/01/2021 DUE TO WEATHER CONDITIONS
Misc
Corrective Action Required
05/18/2021
The temporary certificate of occupancy has expired at this address. If remaining correction items are complete please schedule an occupancy inspection. If remaining correction items are not complete a permit extension request must be submitted in writing with the expected date of completion.
Occupancy Inspection - Codes Residential Failed 6/29/2021 6/29/2021 06/29/2021
Misc
Corrective Action Required
05/18/2021
-Provide as graded plot plan for review/approval
Misc
Resolved
06/29/2021
The temporary certificate of occupancy has expired at this address. If remaining correction items are complete please schedule an occupancy inspection. If remaining correction items are not complete a permit extension request must be submitted in writing with the expected date of completion.
Documents & Images
Date Uploaded File Type Document Name
04/09/2020 permit
04/10/2020 THE LEXINGTON II -2521 SW Rivertrail Rd - 2020-04-03
04/10/2020 permit (dragged)
04/22/2020 fixed THE LEXINGTON II -2521 SW Rivertrail Rd - Full Basement - 2020-04-17
04/22/2020 plot plan Eagle Creek 14th Plat Lot 671 20.0421
04/24/2020 Letter Codes Residential Plan Review
04/24/2020 APPROVED plot plan Eagle Creek 14th Plat Lot 671 20.0421
04/28/2020 APPROVED THE LEXINGTON II -2521 SW Rivertrail Rd - Full Basement - 2020-04-27
04/28/2020 Receipt Receipt for transaction:2020-001761
04/28/2020 Letter DS Building Permit
05/12/2020 Letter INSPECTION SUMMARY
06/09/2020 Letter INSPECTION SUMMARY
06/09/2020 Letter INSPECTION SUMMARY
06/24/2020 Letter INSPECTION SUMMARY
06/24/2020 Letter Garage slab inspection report
09/16/2020 Letter INSPECTION SUMMARY
10/05/2020 Letter INSPECTION SUMMARY
10/06/2020 Letter INSPECTION SUMMARY
10/06/2020 Letter INSPECTION SUMMARY
10/06/2020 Letter INSPECTION SUMMARY
10/06/2020 Letter INSPECTION SUMMARY
10/12/2020 Letter INSPECTION SUMMARY
10/14/2020 Letter INSPECTION SUMMARY
10/20/2020 Letter INSPECTION SUMMARY
10/20/2020 Letter INSPECTION SUMMARY
10/30/2020 Eagle Creek, Lot 671
11/02/2020 Letter INSPECTION SUMMARY
11/03/2020 Letter INSPECTION SUMMARY
11/03/2020 Letter INSPECTION SUMMARY
11/03/2020 Letter INSPECTION SUMMARY
11/03/2020 Letter INSPECTION SUMMARY
11/17/2020 Letter INSPECTION SUMMARY
11/17/2020 Letter INSPECTION SUMMARY
11/17/2020 Letter INSPECTION SUMMARY
11/17/2020 Letter INSPECTION SUMMARY
11/30/2020 Letter INSPECTION SUMMARY
11/30/2020 Letter INSPECTION SUMMARY
12/03/2020 Letter INSPECTION SUMMARY
12/04/2020 Letter INSPECTION SUMMARY
12/04/2020 Letter INSPECTION SUMMARY
12/08/2020 Letter INSPECTION SUMMARY
01/29/2021 Letter INSPECTION SUMMARY
01/29/2021 Letter INSPECTION SUMMARY
01/29/2021 Receipt Receipt for transaction:2021-000464
02/01/2021 Letter Codes Temporary Certificate of Occupancy
02/01/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter Codes Temporary Certificate of Occupancy
03/05/2021 Letter INSPECTION SUMMARY
04/07/2021 Letter INSPECTION SUMMARY
05/18/2021 Letter INSPECTION SUMMARY
06/29/2021 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home