Permit Application Status

PRCOM20242441


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20242441
Building Permit - Commercial
Certificate of Occupancy
NEW TENANT FINISH
H & R BLOCK - OFFICE AND WAREHOUSE SPACE FOR IT AND COMPUTER WORK. COMPUTER/IT ITEMS STORED AT THIS FACILITY
05/14/2024
07/10/2024
12/07/2024
10/10/2024
Locations
Contacts
Forge Construction LLC, Address:1307 Union Avenue  
METRO AIR CONDITIONING , Address:8151 MCCOY ST, Phone:(913) 888-3991  
HERITAGE ELECTRIC, Address:841 N MARTWAY DR, Phone:(913) 747-0528  
ACCURATE MECHANICAL LLC, Address:205 E 13TH AVE, Phone:(816) 471-2272  
Chris Hinkin - Forge Construction, Phone:(816) 215-3208  
Studio North Architecture, Address:3315 North Oak Trafficway, Phone:(816) 888-7380  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved 08/19/2024 08/19/2024
Craig Hill
Miscellaneous Correction
Corrective Action Required
08/12/2024

The west space of the office has an occupant load of 63 and requires a second remote egress. IFC Section 1016.2 does not allow egress into the warehouse, except under certain circumstances. Action needed: Provide exit signage from the west side of the space to hallway 117 and change the door swing of door 118A. 07/05/2024- provide exit signage over the west side of the hallway. Verified at inspection.
Building Plan Review Approved 08/19/2024 08/12/2024
Joe Frogge
Fire Plan Review Approved with Conditions 08/08/2024 08/08/2024
Jim Eden
Miscellaneous Correction
Corrective Action Required
07/25/2024

The west space of the office has an occupant load of 63 and requires a second remote egress. IFC Section 1016.2 does not allow egress into the warehouse, except under certain circumstances. Action needed: Provide exit signage from the west side of the space to hallway 117 and change the door swing of door 118A. 07/05/2024- provide exit signage over the west side of the hallway. Verified at inspection.
Alarm Plan Review Released for Construction 07/29/2024 07/29/2024
Craig Hill
Miscellaneous Correction
Corrective Action Required
07/29/2024

Any high-volume large-diameter fans shall shutdown upon any activation of the fire alarm.
Alarms connected to automatic sprinkler system
Corrective Action Required
07/29/2024

2018 IFC 903.4.2- Alarms. Approved audible and visual devices shall be connected to every automatic sprinkler system. Such sprinkler water-flow alarm devices shall be activated by water flow equivalent to the flow of a single sprinkler of the smallest orifice size installed in the system. Listed alarm notification devices shall be provided on the exterior and interior of the building in an approved location. Where a fire alarm system is installed, actuation of the automatic sprinkler system shall actuate the building fire alarm system.
Alarm testing.
Corrective Action Required
07/29/2024

2018 IFC 904.4.2- Alarm testing. Notification appliances, connections to fire alarm systems, and connections to approved supervising stations shall be tested in accordance with this section and Section 907 to verify proper operation.
Building Plan Review Approved 05/24/2024 07/25/2024
Joe Frogge
Fire Plan Review Approved with Conditions 07/22/2024 07/22/2024
Jim Eden
Construction documents for fire alarm systems
Resolved
07/22/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide tenant finish alarm notification plans.
Construction documents - Fire protection systems
Resolved
07/22/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans as a seperate submittal.
Miscellaneous Correction
Resolved
07/22/2024

3201.3 Construction documents. At the time of building permit application for new structures designed to accommodate high-piled storage or for requesting a change of occupancy/use, and at the time of application for a storage permit, plans and specifications shall be submitted for review and approval. In addition to the information required by the International Building Code, the storage permit submittal shall include the information specified in this section. The construction documents shall include all of the following: 1. Floor plan of the building showing locations and dimensions of high-piled storage areas. 2. Usable storage height for each storage area. 3. Number of tiers within each rack, if applicable. 4. Commodity clearance between top of storage and the sprinkler deflector for each storage arrangement. 5. Aisle dimensions between each storage array. 6. Maximum pile volume for each storage array. 7. Location and classification of commodities in accordance with Section 3203. 8. Location of commodities that are banded or encapsulated. 9. Location of required fire department access doors. 10. Type of fire suppression and fire detection systems. 11. Location of valves controlling the water supply of ceiling and in-rack sprinklers. 12. Type, location and specifications of smoke removal and curtain board systems. 13. Dimension and location of transverse and longitudinal flue spaces. 14. Additional information regarding required design features, commodities, storage arrangement and fire protection features within the high-piled storage area shall be provided at the time of permit, where required by the fire code official. Provide rack storage plans for the warehouse.
Miscellaneous Correction
Corrective Action Required
07/08/2024

The west space of the office has an occupant load of 63 and requires a second remote egress. IFC Section 1016.2 does not allow egress into the warehouse, except under certain circumstances. Action needed: Provide exit signage from the west side of the space to hallway 117 and change the door swing of door 118A. 07/05/2024- provide exit signage over the west side of the hallway. Verified at inspection.
Building Plan Review Approved 07/22/2024 07/22/2024
Joe Frogge
Fire Plan Review Approved with Conditions 07/03/2024 07/05/2024
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
06/26/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide tenant finish alarm notification plans.
Address numbers required
Resolved
07/05/2024

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Provide suite numbers on all exterior doors.
Construction documents - Fire protection systems
Corrective Action Required
06/26/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans as a seperate submittal.
Portable fire extinguishers - general
Resolved
07/05/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Show the location of extinguishers in the warehouse.
Miscellaneous Correction
Corrective Action Required
06/26/2024

3201.3 Construction documents. At the time of building permit application for new structures designed to accommodate high-piled storage or for requesting a change of occupancy/use, and at the time of application for a storage permit, plans and specifications shall be submitted for review and approval. In addition to the information required by the International Building Code, the storage permit submittal shall include the information specified in this section. The construction documents shall include all of the following: 1. Floor plan of the building showing locations and dimensions of high-piled storage areas. 2. Usable storage height for each storage area. 3. Number of tiers within each rack, if applicable. 4. Commodity clearance between top of storage and the sprinkler deflector for each storage arrangement. 5. Aisle dimensions between each storage array. 6. Maximum pile volume for each storage array. 7. Location and classification of commodities in accordance with Section 3203. 8. Location of commodities that are banded or encapsulated. 9. Location of required fire department access doors. 10. Type of fire suppression and fire detection systems. 11. Location of valves controlling the water supply of ceiling and in-rack sprinklers. 12. Type, location and specifications of smoke removal and curtain board systems. 13. Dimension and location of transverse and longitudinal flue spaces. 14. Additional information regarding required design features, commodities, storage arrangement and fire protection features within the high-piled storage area shall be provided at the time of permit, where required by the fire code official. Provide rack storage plans for the warehouse.
Miscellaneous Correction
Corrective Action Required
06/26/2024

The west space of the office has an occupant load of 63 and requires a second remote egress. IFC Section 1016.2 does not allow egress into the warehouse, except under certain circumstances. Action needed: Provide exit signage from the west side of the space to hallway 117 and change the door swing of door 118A. 07/05/2024- {rovide exit signage over the west side of the hallway. Verified at inspection.
Building Plan Review Approved 07/03/2024 07/03/2024
Joe Frogge
Suite address
Resolved
07/03/2024

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Comment is informational. This tenant has been assigned the address of 1220 NW Main St, Unit:E. Please update your records and inform your client.
License Tax - Payment
Corrective Action Required
06/26/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $7,128.00 7/3/2024 - acknowledged in letter.
IBC 1606.2 Design dead load - structural
Resolved
07/03/2024

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that roof structure will support new roof mounted equipment.
Misc
Resolved
07/03/2024

2 sheets are blank. Action required: Upon resubmittal verify that sheets E1.10 and E2.00 are printed correctly. (we were able to review the sheets based on supplemental electrical set uploaded after original set)
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Resolved
07/03/2024

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide convenience receptacle near condensing unit CU-01. (re: hvac serving offices 201 & 202)
Licensed Contractors Approved 07/03/2024 07/03/2024
Joe Frogge
Sprinkler Plan Review Released for Construction 06/27/2024 07/01/2024
Craig Hill
Misc
Corrective Action Required
06/30/2024

25.2.1.4.1 Where modification is made to an existing system affecting more than 20 sprinklers, the new portion shall be isolated and tested at not less than 200 psi (13.8 bar) for 2 hours.
Fire Plan Review Rejected 06/06/2024 06/08/2024
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
06/08/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide tenant finish alarm notification plans.
Address numbers required
Corrective Action Required
06/08/2024

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Provide suite numbers on all exterior doors.
Construction documents - Fire protection systems
Corrective Action Required
06/08/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans as a seperate submittal.
Portable fire extinguishers - general
Corrective Action Required
06/08/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Show the location of extinguishers in the warehouse.
Miscellaneous Correction
Corrective Action Required
06/08/2024

3201.3 Construction documents. At the time of building permit application for new structures designed to accommodate high-piled storage or for requesting a change of occupancy/use, and at the time of application for a storage permit, plans and specifications shall be submitted for review and approval. In addition to the information required by the International Building Code, the storage permit submittal shall include the information specified in this section. The construction documents shall include all of the following: 1. Floor plan of the building showing locations and dimensions of high-piled storage areas. 2. Usable storage height for each storage area. 3. Number of tiers within each rack, if applicable. 4. Commodity clearance between top of storage and the sprinkler deflector for each storage arrangement. 5. Aisle dimensions between each storage array. 6. Maximum pile volume for each storage array. 7. Location and classification of commodities in accordance with Section 3203. 8. Location of commodities that are banded or encapsulated. 9. Location of required fire department access doors. 10. Type of fire suppression and fire detection systems. 11. Location of valves controlling the water supply of ceiling and in-rack sprinklers. 12. Type, location and specifications of smoke removal and curtain board systems. 13. Dimension and location of transverse and longitudinal flue spaces. 14. Additional information regarding required design features, commodities, storage arrangement and fire protection features within the high-piled storage area shall be provided at the time of permit, where required by the fire code official. Provide rack storage plans for the warehouse.
Miscellaneous Correction
Corrective Action Required
06/08/2024

The west space of the office has an occupant load of 63 and requires a second remote egress. IFC Section 1016.2 does not allow egress into the warehouse, except under certain circumstances. Action needed: Provide exit signage from the west side of the space to hallway 117 and change the door swing of door 118A.
Building Plan Review Rejected 06/06/2024 06/05/2024
Joe Frogge
Suite address
Corrective Action Required
06/04/2024

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Comment is informational. This tenant has been assigned the address of 1220 NW Main St, Unit:E. Please update your records and inform your client.
License Tax - Payment
Corrective Action Required
06/04/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $7,128.00
IBC 1606.2 Design dead load - structural
Corrective Action Required
06/04/2024

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that roof structure will support new roof mounted equipment.
Misc
Corrective Action Required
06/04/2024

2 sheets are blank. Action required: Upon resubmittal verify that sheets E1.10 and E2.00 are printed correctly. (we were able to review the sheets based on supplemental electrical set uploaded after original set)
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
06/05/2024

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide convenience receptacle near condensing unit CU-01. (re: hvac serving offices 201 & 202)
Licensed Contractors Approved 06/06/2024 06/04/2024
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $4,296.74 $4,296.74 Paid 07/08/2024
7232302-Industrial/Warehouse Excise Tax Fee $7,128.00 $7,128.00 Paid 07/29/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Electrical Inspection - Commercial Passed 7/25/2024 07/25/2024
In-wall Inspection Partial 7/25/2024 07/25/2024
Misc
Corrective Action Required
07/25/2024
Inspection for demising wall only: -Complete framing at return wall and pass through -Update and submit plan to show new demising wall labeled as existing on plans and provide UL details for firewall *OK TO START 1 SIDE ROCK
In-wall Inspection Partial 7/26/2024 07/26/2024
Misc
Corrective Action Required
07/25/2024
Inspection for demising wall only: -Submit plan to show new demising wall labeled as existing on plans and provide UL details for firewall *OK FOR 1ST LAYER
Underslab Plumbing Inspection - Commercial Passed 7/26/2024 7/26/2024 07/26/2024
Rated Assembly Inspection Partial 7/31/2024 07/31/2024
Misc
Corrective Action Required
07/31/2024
Provide UL design details -Install missing screws at seams in storage 119 -Patch broken and or missing pieces of rock
In-wall Inspection Partial 7/31/2024 07/31/2024
Misc
Corrective Action Required
07/26/2024
Partial only: Rooms 109-119 OK TO COVER
In-wall Inspection Partial 8/9/2024 08/09/2024
Misc
Corrective Action Required
07/31/2024
Partial only, complete except as noted; 105, 201-203 -Provide Bocca plates at dwv. Ok to 1 side
In-wall Inspection Partial 8/12/2024 08/12/2024
Misc
Corrective Action Required
08/09/2024
Partial only, complete except as noted; 105, 201-203
In-wall Inspection Passed 8/21/2024 8/21/2024 08/21/2024
Misc
Resolved
08/21/2024
Partial only, complete except as noted; 105, 201-203
Gas Service Inspection - Commercial Passed 8/21/2024 08/21/2024
Above Ceiling Inspection Partial 8/21/2024 8/21/2024 08/21/2024
Misc
Informational
08/21/2024
Hard lids at bathrooms 106,107, lobby 101 and break room104 approved
Electrical Service Inspection Failed 8/30/2024 08/30/2024
Misc
Corrective Action Required
08/30/2024
*Installation not per plan -Plans show 600 amp CT cabinet and fused disconnect. 400 amp installed -Plans do not show ground and neutral connected at fused disconnect
Electrical Service Inspection Failed 8/30/2024 08/30/2024
Misc
Corrective Action Required
08/30/2024
*Installation not per plan -Plans show 600 amp CT cabinet and fused disconnect. 400 amp installed -Plans do not show ground and neutral connected at fused disconnect -Provide site address at meter and disconnect
Electrical Service Inspection Passed 9/3/2024 9/3/2024 09/03/2024
Misc
Resolved
09/03/2024
*Installation not per plan -Plans show 600 amp CT cabinet and fused disconnect. 400 amp installed -Plans do not show ground and neutral connected at fused disconnect -Provide site address at meter and disconnect
Above Ceiling Inspection Passed 9/12/2024 9/12/2024 09/12/2024
Misc
Resolved
09/12/2024
Hard lids at bathrooms 106,107, lobby 101 and break room104 approved
Sprinkler - Hydrostatic Test Passed 9/17/2024 09/17/2024
Occupancy Inspection - Fire Temporary C of O 9/30/2024 9/30/2024 09/27/2024
Occupancy Inspection - Codes Commercial Failed 9/30/2024 9/30/2024 09/30/2024
Miscellaneous Correction
Corrective Action Required
09/30/2024
-Change address at main door to read 1220 E -Complete electrical at lobby -Ensure counter height at lobby is 34" aff max -Secure whip at water heater -Complete electrical at back warehouse -Mirror in warehouse restroom to be max 40" aff to reflective surface -Provide permanent tag at gas meter -Complete all corrections for LSFD **OK for furniture. DO NOT OCCUPY
Occupancy Inspection - Codes Commercial Full C of O 10/10/2024 10/10/2024 10/10/2024
Miscellaneous Correction
Resolved
10/10/2024
-Change address at main door to read 1220 E -Complete electrical at lobby -Ensure counter height at lobby is 34" aff max -Secure whip at water heater -Complete electrical at back warehouse -Mirror in warehouse restroom to be max 40" aff to reflective surface -Provide permanent tag at gas meter -Complete all corrections for LSFD **OK for furniture. DO NOT OCCUPY
Documents & Images
Date Uploaded File Type Document Name
05/14/2024 Application Form APPLICATION
05/23/2024 Plans HR Block Depot Permit Drawings 5_14_24
05/23/2024 Letter License Tax Bill
05/29/2024 Plans Electrical - Sealed Permit Docs 5_13_24
06/10/2024 Letter DS P/R Corrections Document
06/13/2024 Drawing FP28168 H&R Block PE Stamped
06/26/2024 Letter Forge PRCOM20242441 Response
06/26/2024 Letter sN_Plan Review PRCOM20242441-HR BLOCK DEPOT&ASI
06/26/2024 Plans PRCOM20242441 Resubmission - 6_26_24
07/01/2024 Letter Fire (Sprinkler) Plan Review
07/08/2024 Approved Plans Approved construction plans
07/08/2024 Receipt Receipt for transaction:2024-005568
07/08/2024 Plans 24-1680(H & R Block),Dtls - 06-25-2024 (Digitally Signed 06-26-24 MG)
07/08/2024 Engineer Report/Study 24-1680(H & R Block),Calcs - 06-25-2024 (Digitally Signed 06-26-24 MG)
07/10/2024 Letter DS Building Permit
07/15/2024 Plans H&R BLOCK FA Drawings
07/15/2024 Specifications H&R BLOCK FA SUBMITTALS
07/19/2024 Plans HRBlockRRAdd (002) Permit stamped drawings
07/22/2024 Approved Plans Approved plumbing revisions
07/23/2024 Approved Plans Approved Racking Plans
07/25/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
07/25/2024 Plans 24-1680(H & R Block), R0_1, Dtls (Digitally Signed 07-18-24 MG) (1)
07/25/2024 Engineer Report/Study 24-1680(H & R Block),Calcs - 06-25-2024 (Digitally Signed 06-26-24 MG)
07/26/2024 Letter INSPECTION SUMMARY
07/26/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter Fire (Alarm) Plan Review Notice
07/29/2024 Receipt Receipt for transaction:2024-006334
07/31/2024 Letter INSPECTION SUMMARY
07/31/2024 Letter INSPECTION SUMMARY
08/05/2024 Letter sN_Demising Wall PRCOM20242441-HRB DEPOT
08/09/2024 Letter INSPECTION SUMMARY
08/12/2024 Letter INSPECTION SUMMARY
08/19/2024 Approved Plans Approved racking plans
08/21/2024 Letter INSPECTION SUMMARY
08/21/2024 Letter INSPECTION SUMMARY
08/21/2024 Letter INSPECTION SUMMARY
08/30/2024 Letter INSPECTION SUMMARY
08/30/2024 Letter INSPECTION SUMMARY
08/30/2024 Drawing E400 - 8_30_24
08/30/2024 Approved Plans Approved E400
09/03/2024 Letter INSPECTION SUMMARY
09/12/2024 Letter INSPECTION SUMMARY
09/25/2024 Engineer Report/Study SPECIAL INSPECTION LETTER
09/30/2024 Letter INSPECTION SUMMARY
10/10/2024 Letter Codes Final Certificate of Occupancy
10/10/2024 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home