Permit Application Status

PRCOM20235113


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20235113
Building Permit - Commercial
Issued
CITY OF LEE'S SUMMIT MISSOURI
NEW COMMERCIAL
LEE'S SUMMIT AIRPORT (LXT) NEW HANGAR WITH OFFICES AND EDUCATIONAL SPACES - ASSOCIATED SITE DEVELOPMENT COVERED BY CIP (CAPITAL IMPROVEMENT PROJECT) Mike Weisenborn 04/10/2024 12:19 PM - PARTIAL PERMIT ISSUED. WORK RELEASED IS FOOTINGS, PIERS, UNDERSLAB AND SLAB
10/05/2023
06/17/2024
Locations
Contacts
CITY OF LEE'S SUMMIT MISSOURI, Address:220 SE GREEN ST  
FOGEL-ANDERSON CONSTRUCTION CO, Address:1212 E 8TH ST, Phone:(816) 842-6914  
CMT ENGINEERING, Address:1627 MAIN ST, SUITE 600, Phone:(816) 853-2894  
Tyler Horn, Address:1627 Main St, Phone:(816) 853-2894  
FACILITY SOLUTIONS GROUP INC, Address:17880 W 99TH ST, Phone:(913) 422-8400  
HALE'S HEATING AND COOLING, Address:2109 KARA CT STE A, Phone:(816) 792-3300  
CJ Industries LLC , Address:610 S. 78th Street  
Olsson Engineering, Address:1301 Burlington, Suite 100, Phone:(816) 361-1177  
Wellner Architects, Inc., Address:1627 Main St, #100, Phone:(816) 221-0017  
Jerry Bollinger, Phone:(605) 222-7057  
David Zahner - Fogel Anderson, Address:1212 East 8th Street  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 01/29/2025 01/28/2025
Craig Hill
Alarm Plan Review Released for Construction 11/19/2024 11/18/2024
Craig Hill
Alarm testing.
Corrective Action Required
11/18/2024

2018 IFC 904.4.2- Alarm testing. Notification appliances, connections to fire alarm systems, and connections to approved supervising stations shall be tested in accordance with this section and Section 907 to verify proper operation. Information Only: Call (816) 696-1300 for tessting
Licensed Contractors Approved 04/10/2024 04/10/2024
Mike Weisenborn
LC - General Contractor
Resolved
04/10/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 11/16/23 - acknowledged
LC - MEP Subs
Resolved
04/10/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/16/23 - acknowledged
Special Inspections Review Approved 04/10/2024
Mike Weisenborn
Building Plan Review Approved with Conditions 02/12/2024 03/20/2024
Joe Frogge
Misc
Resolved
02/08/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. Fee not yet available.
Final Development Plan
Resolved
03/13/2024

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 11/16/23 - acknowledged
IBC 1704.2 Special Inspections
Resolved
03/20/2024

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 11/16/23 - acknowledged
Elevator Equipment Permit
Corrective Action Required
02/05/2024

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 11/16/23 - acknowledged
Elevator Equipment Inspection
Corrective Action Required
02/05/2024

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 11/16/23 - acknowledged
Elevator Certificate of Inspection
Corrective Action Required
02/05/2024

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 11/16/23 - acknowledged
IBC 1803.1 General - geotech
Resolved
02/08/2024

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. (4,000 shown on sheet S000) 11/16/23 - Geotech report does not recommend 4,000psf. Foundation recommendations are for 1,500 & 2,000psf.
NEC Article 250.50 Grounding electrode system
Resolved
02/08/2024

2017 NEC Article 250.50 Grounding Electrode System. All Grounding electrodes as described in 250.52(A)(1) through (A)(7) that are present at each building or structure served shall be bonded together to form the grounding electrodes system. Where none of these grounding electrodes exist, one or more of the grounding electrodes specified in 250.52(A)(4) through (A)(8) shall be installed and used. (see code section for exception) Action required: Modify designs to show that all available locations. Include all wire sizes. 11/16/23 - Detail provided but wire sizes not found.
IMC 403.2 Outdoor air required
Resolved
02/08/2024

2018 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. (see code for exception) Action required: Revise drawings to show outside air calculations as well as method of delivery. Action required: Provide outdoor air calculations and methods of delivery. 11/16/23 - Calcs provided but method of delivery missing. (i.e. how does outside air get to the furnaces and how is it controlled)
Final Development Plan Review Approved 03/01/2024 03/13/2024
Mike Weisenborn
Fire Plan Review Approved with Conditions 02/12/2024 02/12/2024
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
02/05/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm system plans as a deferred submital. Acknowledged
Address numbers required
Resolved
02/12/2024

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Verified at inspection.
Knox box required
Resolved
02/12/2024

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Provide a Knox Box 6' AFF over the FDC and Knox key switches on both gates to the flight line.
Construction documents - Fire protection systems
Corrective Action Required
02/05/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide deferred shop drawings for the sprinkler system. Reference Poole report for a wet fire protection system. Acknowledged
Miscellaneous Correction
Resolved
02/12/2024

The FDC shall be marked with a FDC sign (higher than the dumpster) due to view being obstructed by dumpster. The new location of the hydrant is more than 100 feet from a hydrant and the FDC is obstructed by the dumpster. Relocate on the south side of the lane and move the FDC on the wall closer to the riser.
Miscellaneous Correction
Resolved
02/12/2024

Correct items called out in the Final Development Plan.
Licensed Contractors Rejected 02/12/2024 02/08/2024
Joe Frogge
LC - General Contractor
Corrective Action Required
02/05/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 11/16/23 - acknowledged
LC - MEP Subs
Corrective Action Required
02/05/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/16/23 - acknowledged
Fire Plan Review Rejected 11/21/2023 11/27/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
11/14/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm system plans as a deferred submital. Acknowledged
Address numbers required
Corrective Action Required
11/14/2023

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Verified at inspection.
Knox box required
Corrective Action Required
11/14/2023

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Provide a Knox Box 6' AFF over the FDC and Knox key switches on both gates to the flight line.
Construction documents - Fire protection systems
Corrective Action Required
11/14/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide deferred shop drawings for the sprinkler system. Reference Poole report for a wet fire protection system. Acknowledged
Miscellaneous Correction
Resolved
11/21/2023

For Information Only- The 2021 Life Safety Code is not an adopted code for the City of Lee's Summit.
Miscellaneous Correction
Corrective Action Required
11/14/2023

The FDC shall be marked with a FDC sign (higher than the dumpster) due to view being obstructed by dumpster. The new location of the hydrant is more than 100 feet from a hydrant and the FDC is obstructed by the dumpster. Relocate on the south side of the lane and move the FDC on the wall closer to the riser.
Miscellaneous Correction
Resolved
11/21/2023

The high volume fans shall be connected to the building fire alarm system, and shut down on alarm activation. To be confirmed on alarm plans.
Miscellaneous Correction
Resolved
11/21/2023

Remove the exit sign from the southwest corner of the GSE, there isn't a door there.
Miscellaneous Correction
Resolved
11/21/2023

Will there be any charging of of battery operated vehicles or power units in the GSE? Powered industrial trucks and equipment shall be used, stored, fueled or charged in accordance with IFC SEction 309. Provide ventilation and larger fire extinguisher if indicated.
Miscellaneous Correction
Resolved
11/21/2023

Provide a clearly defined aircraft hangar classification. The size of the hangar door is not listed in the Door Schedule and the fire area separation does not meet IBC 707.3.10 Fire Areas, for a Group II or Group III hangar.
Miscellaneous Correction
Resolved
11/21/2023

The fire lanes on the north and south side shall be posted No Parking Fire Lane.
Miscellaneous Correction
Corrective Action Required
11/14/2023

Correct items called out in the Final Development Plan.
Building Plan Review Rejected 11/21/2023 11/16/2023
Joe Frogge
Misc
Corrective Action Required
11/14/2023

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. Fee not yet available.
Final Development Plan
Corrective Action Required
11/14/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 11/16/23 - acknowledged
IBC 1704.2 Special Inspections
Corrective Action Required
11/14/2023

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 11/16/23 - acknowledged
Elevator Equipment Permit
Corrective Action Required
11/14/2023

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 11/16/23 - acknowledged
Elevator Equipment Inspection
Corrective Action Required
11/14/2023

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 11/16/23 - acknowledged
Elevator Certificate of Inspection
Corrective Action Required
11/14/2023

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 11/16/23 - acknowledged
IBC 423.4 - Special Occ -Storm Shelters
Resolved
12/05/2023

2018 IBC 423.4 Group E occupancies (as amended). In areas where the shelter design wind speed for tornadoes is 250 mph in accordance with Figure 304.2(1) of ICC 500, all Group E occupancies with an occupant load of 50 or more shall have a storm shelter constructed in accordance with ICC 500. Exceptions: 1. Group E day care facilities. 2. Group E occupancies accessory to places of religious worship. 3. Buildings meeting the requirements for shelter design in ICC 500. 4. Group E occupancies that undergo alterations or additions where the cost of compliance with ICC 500 Section 702 is greater than 20% of the total project cost may omit the requirements of ICC 500 Section 702 only. ICC/NSSA 500 Standard for the Design and Construction of Storm Shelters - 106.1.1 Peer review. A peer review by an independent registered design professional for compliance with the requirements of Chapters 3, 5, 6, and 7 shall be conducted for the following shelter types. 1. Community shelters with occupant load greater than 50. 2. Storm shelters in elementary schools, secondary schools, and day care facilities with an occupant load greater than 16. 3. Storm shelters in Risk Category IV (essential facilities) as defined in Table 1604.5 in the International Building code. Actions required: Modify designs to demonstrate compliance. Include 3rd party study. 11/21/23 - Provide letter to demonstrate that you comply with exception listed in Code of Ordinances. Sec. 7-203. - International Building Code amended; Section 423.4. Storm Shelters. Section 423.4 is hereby amended to add the following language: Exception 4. Group E occupancies that undergo alterations or additions where the cost of compliance with ICC 500 Section 702 is greater than 20% of the total project cost may omit the requirements of ICC 500 Section 702 only. 12/5/23 - we have a letter from LSR7 restricting occupant load of E area to 49 which negates requirement. Design team has agreed to provide hardened area to compensate
IBC 1803.1 General - geotech
Corrective Action Required
11/14/2023

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. (4,000 shown on sheet S000) 11/16/23 - Geotech report does not recommend 4,000psf. Foundation recommendations are for 1,500 & 2,000psf.
IBC 1013.1 Where required - exit sign
Resolved
11/16/2023

2018 IBC Exit Signs 1013.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Provide exit signage that leads upper level occupants to Stair 1.
NEC Article 230.2 Number of services
Resolved
11/16/2023

2017 NEC Article 230.2 Number of Services. A building or other structure served shall be supplied by only one service unless permitted in 230.2(A) through (D). For the purpose of 230.40, exception No. 2 only, underground sets of conductors, 1/0 AWG and larger, running to the same location and connected together at their supply end but not connected together at their load end shall be considered to be one service. (see code for specific conditions) Action required: Only 1 service to this building is allowed. Modify designs.
NEC Article 250.50 Grounding electrode system
Corrective Action Required
11/14/2023

2017 NEC Article 250.50 Grounding Electrode System. All Grounding electrodes as described in 250.52(A)(1) through (A)(7) that are present at each building or structure served shall be bonded together to form the grounding electrodes system. Where none of these grounding electrodes exist, one or more of the grounding electrodes specified in 250.52(A)(4) through (A)(8) shall be installed and used. (see code section for exception) Action required: Modify designs to show that all available locations. Include all wire sizes. 11/16/23 - Detail provided but wire sizes not found.
IMC 403.2 Outdoor air required
Corrective Action Required
11/14/2023

2018 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. (see code for exception) Action required: Revise drawings to show outside air calculations as well as method of delivery. Action required: Provide outdoor air calculations and methods of delivery. 11/16/23 - Calcs provided but method of delivery missing. (i.e. how does outside air get to the furnaces and how is it controlled)
IPC 708.1 Cleanouts required
Resolved
11/16/2023

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanouts near where sanitary exits foundation.
Licensed Contractors Rejected 11/21/2023 11/16/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
11/14/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 11/16/23 - acknowledged
LC - MEP Subs
Corrective Action Required
11/14/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/16/23 - acknowledged
Fire Plan Review Rejected 10/19/2023 10/20/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
10/20/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm system plans as a deferred submital.
Address numbers required
Corrective Action Required
10/20/2023

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Verified at inspection.
Knox box required
Corrective Action Required
10/20/2023

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Provide a Knox Box 6' AFF over the FDC and Knox key switches on both gates to the flight line.
Construction documents - Fire protection systems
Corrective Action Required
10/20/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide deferred shop drawings for the sprinkler system. Reference Poole report for a wet fire protection system.
Miscellaneous Correction
Corrective Action Required
10/20/2023

For Information Only- The 2021 Life Safety Code is not an adopted code for the City of Lee's Summit.
Miscellaneous Correction
Corrective Action Required
10/20/2023

The FDC shall be marked with a FDC sign (higher than the dumpster) due to view being obstructed by dumpster.
Miscellaneous Correction
Corrective Action Required
10/20/2023

The high volume fans shall be connected to the building fire alarm system, and shut down on alarm activation. To be confirmed on alarm plans.
Miscellaneous Correction
Corrective Action Required
10/20/2023

Remove the exit sign from the southwest corner of the GSE, there isn't a door there.
Miscellaneous Correction
Corrective Action Required
10/20/2023

Will there be any charging of of battery operated vehicles or power units in the GSE? Powered industrial trucks and equipment shall be used, stored, fueled or charged in accordance with IFC SEction 309. Provide ventilation and larger fire extinguisher if indicated.
Miscellaneous Correction
Corrective Action Required
10/20/2023

Provide a clearly defined aircraft hangar classification. The size of the hangar door is not listed in the Door Schedule and the fire area separation does not meet IBC 707.3.10 Fire Areas, for a Group II or Group III hangar.
Miscellaneous Correction
Corrective Action Required
10/20/2023

The fire lanes on the north and south side shall be posted No Parking Fire Lane.
Miscellaneous Correction
Corrective Action Required
10/20/2023

Correct items called out in the Final Development Plan.
Building Plan Review Rejected 10/19/2023 10/18/2023
Joe Frogge
Misc
Corrective Action Required
10/16/2023

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. After credit for previous ??? occupant the fee will be $xxxx.xx
Final Development Plan
Corrective Action Required
10/16/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
IBC 1704.2 Special Inspections
Corrective Action Required
10/16/2023

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Elevator Equipment Permit
Corrective Action Required
10/16/2023

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational.
Elevator Equipment Inspection
Corrective Action Required
10/16/2023

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational.
Elevator Certificate of Inspection
Corrective Action Required
10/16/2023

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational.
IBC 706.1 Fire and Smoke Protection - General
Resolved
11/07/2023

2018 IBC 412.3.4 Heating equipment. Heating equipment shall be placed in another room separated by 2-hour fire barriers constructed in accordance with Section 707 or horizontal assemblies constructed in accordance with Section 711, or both. Entrance shall be from the outside or by means of a vestibule providing a two-doorway separation. (see code for exceptions) Action required: Modify designs to comply. re: walls, doors, ceiling/floors of Mech/Elec rooms 118 & 222.
IBC 2902.2 Separate facilities - fixture
Resolved
10/25/2023

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Actions required: - Label restrooms per gender - Provide shower for both genders **If current design meets 2024 IBC standards you can file for a Code Modification Request (CMR) to use the new code.
IBC 423.4 - Special Occ -Storm Shelters
Corrective Action Required
10/18/2023

2018 IBC 423.4 Group E occupancies (as amended). In areas where the shelter design wind speed for tornadoes is 250 mph in accordance with Figure 304.2(1) of ICC 500, all Group E occupancies with an occupant load of 50 or more shall have a storm shelter constructed in accordance with ICC 500. Exceptions: 1. Group E day care facilities. 2. Group E occupancies accessory to places of religious worship. 3. Buildings meeting the requirements for shelter design in ICC 500. 4. Group E occupancies that undergo alterations or additions where the cost of compliance with ICC 500 Section 702 is greater than 20% of the total project cost may omit the requirements of ICC 500 Section 702 only. ICC/NSSA 500 Standard for the Design and Construction of Storm Shelters - 106.1.1 Peer review. A peer review by an independent registered design professional for compliance with the requirements of Chapters 3, 5, 6, and 7 shall be conducted for the following shelter types. 1. Community shelters with occupant load greater than 50. 2. Storm shelters in elementary schools, secondary schools, and day care facilities with an occupant load greater than 16. 3. Storm shelters in Risk Category IV (essential facilities) as defined in Table 1604.5 in the International Building code. Actions required: Modify designs to demonstrate compliance. Include 3rd party study.
IBC 1803.1 General - geotech
Corrective Action Required
10/18/2023

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. (4,000 shown on sheet S000)
IBC 1013.1 Where required - exit sign
Corrective Action Required
10/18/2023

2018 IBC Exit Signs 1013.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Provide exit signage that leads upper level occupants to Stair 1.
NEC Article 230.2 Number of services
Corrective Action Required
10/18/2023

2017 NEC Article 230.2 Number of Services. A building or other structure served shall be supplied by only one service unless permitted in 230.2(A) through (D). For the purpose of 230.40, exception No. 2 only, underground sets of conductors, 1/0 AWG and larger, running to the same location and connected together at their supply end but not connected together at their load end shall be considered to be one service. (see code for specific conditions) Action required: Only 1 service to this building is allowed. Modify designs.
NEC Article 250.50 Grounding electrode system
Corrective Action Required
10/18/2023

2017 NEC Article 250.50 Grounding Electrode System. All Grounding electrodes as described in 250.52(A)(1) through (A)(7) that are present at each building or structure served shall be bonded together to form the grounding electrodes system. Where none of these grounding electrodes exist, one or more of the grounding electrodes specified in 250.52(A)(4) through (A)(8) shall be installed and used. (see code section for exception) Action required: Modify designs to show that all available locations. Include all wire sizes.
IMC 403.2 Outdoor air required
Corrective Action Required
10/18/2023

2018 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. (see code for exception) Action required: Revise drawings to show outside air calculations as well as method of delivery. Action required: Provide outdoor air calculations and methods of delivery.
IPC 708.1 Cleanouts required
Corrective Action Required
10/18/2023

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanouts near where sanitary exits foundation.
Licensed Contractors Rejected 10/19/2023 10/16/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
10/16/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
10/16/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Pending 04/30/2025
Joe Frogge
Elevator Equipment Permit
Corrective Action Required
04/23/2025

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 11/16/23 - acknowledged
Elevator Equipment Inspection
Corrective Action Required
04/23/2025

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 11/16/23 - acknowledged
Elevator Certificate of Inspection
Corrective Action Required
04/23/2025

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 11/16/23 - acknowledged
Fire Plan Review Pending 04/30/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
04/23/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm system plans as a deferred submital. Acknowledged
Construction documents - Fire protection systems
Corrective Action Required
04/23/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide deferred shop drawings for the sprinkler system. Reference Poole report for a wet fire protection system. Acknowledged
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $55,200.00 $55,200.00 Paid 04/10/2024
$0.00
7232302-Commercial License Tax Fee $9,792.75 $9,792.75 Paid 02/08/2024
$9,792.75
8331401-Water Tap Fee $25,070.00 $25,070.00 Paid 04/10/2024
8350015-Water Meter Fee $3,467.24 $3,467.24 Paid 04/10/2024
8331507-Sanitary Sewer Development Fee $14,401.00 $14,401.00 Paid 04/10/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Pending
Water Service Inspection Pending
Gas Service Inspection - Commercial Pending
In-wall Inspection Pending
Above Ceiling Inspection Pending
Alarm Test Pending
Rated Assembly Inspection Pending
Sprinkler - Hydrostatic Test Pending
Sprinkler - Flow Test Pending
Electrical Service Inspection Pending
Misc
Corrective Action Required
08/06/2024
- Parial inspection- transformer not complete
Verify Final Inspection Status - New Com Development Pending
Piers/Caissons Inspection - Commercial Pending
Misc
Corrective Action Required
03/12/2025
Light pole piers: -7 street LP and 2 parking lot LP **grounding to rod not done
Miscellaneous Inspection Pending
Misc
Informational
04/16/2025
-Underslab 277V heating cables under hangar doors and rail drainage collector per detail 5/A602
Electrical Service Inspection Partial 8/6/2024 08/06/2024
Misc
Corrective Action Required
08/06/2024
- Parial inspection- transformer not complete
Footing Inspection - Commercial Partial 9/26/2024 9/26/2024 09/26/2024
Misc
Informational
09/26/2024
Footing OK to pour: -Elevator pad
Underslab Plumbing Inspection - Commercial Partial 9/26/2024 9/26/2024 09/26/2024
Misc
Informational
09/26/2024
Building drain at the west side of the bdlg-OK
Underslab Plumbing Inspection - Commercial Partial 9/27/2024 9/27/2024 09/27/2024
Misc
Informational
09/26/2024
Building drain under hangar-OK
Footing Inspection - Commercial Partial 9/27/2024 9/27/2024 09/27/2024
Misc
Informational
09/26/2024
Footing OK to pour, pending approval from on-site special inspector: -Elevator pad -Exterior wall footing from 9/A to 9/L.6 **Submit revised plan to city
Footing Inspection - Commercial Partial 9/30/2024 9/30/2024 09/30/2024
Misc
Informational
09/27/2024
Footing OK to pour, pending approval from on-site special inspector: -Elevator pad and foundation wall -Exterior wall footing from 9/A to 9/L.6 **Submit revised plan to city
Underslab Plumbing Inspection - Commercial Partial 10/1/2024 10/1/2024 10/01/2024
Misc
Informational
09/27/2024
Building drain under hangar and GSE storage, to underground connection outside near interceptor-OK
Footing Inspection - Commercial Failed 10/2/2024 10/2/2024 10/02/2024
Misc
Informational
09/30/2024
Footing OK to pour, pending approval from on-site special inspector: -Elevator pad and foundation wall -Exterior wall footing from 9/A to 9/L.6
Misc
Corrective Action Required
10/02/2024
-Provide 3" clearance from soil to rebar -Top 2 column pedestal rebar ties @ 2", the rest 6" oc -Provide corner rebars at pipe through footing per 10/S202
Footing Inspection - Commercial Partial 10/3/2024 10/3/2024 10/03/2024
Misc
Informational
10/02/2024
Footing OK to pour, pending approval from on-site special inspector: -Elevator pad and foundation wall -Exterior wall footing from 9/A to 9/L.6; cont. to 9/N to N/6; N/3 to N/1 to 1/E
Misc
Resolved
10/03/2024
Footing Inspection - Commercial Partial 10/4/2024 10/4/2024 10/04/2024
Misc
Informational
10/03/2024
Footing OK to pour, pending approval from on-site special inspector: -Elevator pad and foundation wall -Exterior wall footing from 9/A to 9/L.6; cont. to 9/N to N/6; N/3 to N/1 to 1/E -Interior grade beam: Line 6 to 8 from M to E; Line 1.3 to 3 from M to J
Misc
Resolved
10/03/2024
Footing Inspection - Commercial Partial 10/9/2024 10/9/2024 10/09/2024
Misc
Informational
10/04/2024
Footing OK to pour, pending approval from on-site special inspector: -Elevator pad and foundation wall -Exterior wall footing from 9/A to 9/L.6; cont. to 9/N to N/6; N/3 to N/1 to 1/E -Interior grade beam: Line 6 from M to E; Line 7-8 from M to C; Line 1.3 to 5 from M to F -Restroom/storm shelter
Underslab Electrical Inspection - Commercial Partial 10/15/2024 10/15/2024 10/15/2024
THE FOLLOWING AREAS ARE APPROVED
Informational
10/15/2024
-Conduit for data at south from SW mechanical room to E exterior -Conduit for service lines from transformer to North exterior service location
Underslab Plumbing Inspection - Commercial Partial 10/16/2024 10/16/2024 10/16/2024
Misc
Informational
10/01/2024
Building drain under hangar and GSE storage, to underground connection outside near interceptor-OK Sanitary waste building drain at south side of building-OK
Footing Inspection - Commercial Partial 10/16/2024 10/16/2024 10/16/2024
Misc
Informational
10/15/2024
Footing OK to pour, pending approval from on-site special inspector: -Elevator pad and foundation wall -Exterior wall footing -Interior grade beam: Line 1.3 to 8 from M to C -Restroom/storm shelter -Trash enclosure
Erosion Control Inspection Residential Failed 10/16/2024 10/16/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
10/16/2024
DEFICIENT EROSION CONTROL INSTALLATION. PARTIAL EROSION CONTROL INSTALLED ALONG THE ROAD, BUT THE REST OF THE EROSION CONTROL WILL BE INSTALLED NEXT WEEK AFTER COMPLETION OF STORM WATER BASIN
Underslab Plumbing Inspection - Commercial Partial 10/18/2024 10/18/2024 10/18/2024
Misc
Informational
10/16/2024
Building drain under hangar and GSE storage, to underground connection outside near interceptor-OK Sanitary waste building drain at south side of building-OK Rest of sanitary drain, except from line 2 to 4
Underslab Electrical Inspection - Commercial Partial 10/18/2024 10/18/2024 10/18/2024
THE FOLLOWING AREAS ARE APPROVED
Informational
10/15/2024
-Conduit for data at south from SW mechanical room to E exterior -Conduit for service lines from transformer to North exterior service location -About 50 ft of raceways from elec/mech room along line 3
Underslab Plumbing Inspection - Commercial Partial 10/22/2024 10/22/2024 10/22/2024
Misc
Informational
10/18/2024
Building drain under hangar and GSE storage, to underground connection outside near interceptor-OK Sanitary waste building drain at south side of building-OK Rest of sanitary drain, except from line 2 to 4
Miscellaneous Correction
Informational
10/22/2024
All sanitary drain line is completed and is ok to cover Door track drains will be installed and called in for inspection at a later date This is a partial pass only
Underslab Electrical Inspection - Commercial Passed 10/22/2024 10/22/2024 10/22/2024
THE FOLLOWING AREAS ARE APPROVED
Resolved
10/22/2024
-Conduit for data at south from SW mechanical room to E exterior -Conduit for service lines from transformer to North exterior service location -About 50 ft of raceways from elec/mech room along line 3
Miscellaneous Correction
Informational
10/22/2024
Underground raceway to main panel passed and is okay to cover All under ground electrical is completed and is okay to cover
Underslab Electrical Inspection - Commercial Partial 11/25/2024 11/25/2024
Misc
Informational
11/25/2024
Almost completed except at a few sections for vehicle movement
Footing Inspection - Commercial Partial 11/25/2024 11/25/2024 11/25/2024
Misc
Informational
10/16/2024
Footing OK to pour, pending approval from on-site special inspector: -Elevator pad and foundation wall -Exterior wall footing -Interior grade beam: Line 1.3 to 8 from M to C -Restroom/storm shelter -Trash enclosure -Footing at trench drains
Underslab Electrical Inspection - Commercial Partial 11/27/2024 11/27/2024 11/27/2024
Misc
Informational
11/25/2024
Almost completed except at a few sections for vehicle movement -Only missing at (2) tie in sections at south center area by mezzanine
Underslab Electrical Inspection - Commercial Passed 12/3/2024 12/3/2024 12/03/2024
Misc
Resolved
12/03/2024
Footing Inspection - Commercial Partial 12/4/2024 12/6/2024 12/06/2024
Misc
Informational
11/25/2024
Footing OK to pour, pending approval from on-site special inspector: -Elevator pad and foundation wall -Exterior wall footing -Interior grade beam: Line 1.3 to 8 from M to C -Restroom/storm shelter -Trash enclosure -Footing at trench drains **Floor slab not ready
Underslab Plumbing Inspection - Commercial Passed 12/9/2024 12/09/2024
Misc
Resolved
12/09/2024
Building drain under hangar and GSE storage, to underground connection outside near interceptor-OK Sanitary waste building drain at south side of building-OK Rest of sanitary drain, except from line 2 to 4
Miscellaneous Correction
Resolved
12/09/2024
All sanitary drain line is completed and is ok to cover Door track drains will be installed and called in for inspection at a later date This is a partial pass only
Footing Inspection - Commercial Passed 12/9/2024 12/09/2024
Misc
Informational
12/06/2024
Footing OK to pour, pending approval from on-site special inspector: -Elevator pad and foundation wall -Exterior wall footing -Interior grade beam: Line 1.3 to 8 from M to C -Restroom/storm shelter -Trash enclosure -Footing at trench drains
Underground Plumbing Inspection - Commercial Passed 1/3/2025 1/3/2025 01/03/2025
Informational
01/03/2025
Oil and sewer separator-OK
Piers/Caissons Inspection - Commercial Partial 3/12/2025 3/12/2025 03/12/2025
Misc
Corrective Action Required
03/12/2025
Light pole piers: -6 street LP and 2 parking lot LP **grounding to rod not done
Piers/Caissons Inspection - Commercial Partial 3/12/2025 3/12/2025 03/12/2025
Misc
Corrective Action Required
03/12/2025
Light pole piers: -7 street LP and 2 parking lot LP **grounding to rod not done
Miscellaneous Inspection Partial 4/16/2025 4/16/2025 04/16/2025
Misc
Informational
04/16/2025
-Underslab 277V heating cables under hangar doors and rail drainage collector per detail 5/A602
Documents & Images
Date Uploaded File Type Document Name
10/05/2023 Application Form COMPLETED APPLICATION
10/06/2023 Plans 47732472 Plans LXT Eastside Development_V1_9_29_23
10/06/2023 Specifications 47732472 Specs LXT Eastside Development_V1_9_29_23
10/09/2023 Email LT info
10/23/2023 Letter DS P/R Corrections Document
10/25/2023 Code Mod Request restroom CMR
11/13/2023 Plans 47732472 FDP Plans LXT Eastside Development_V2 11_13_23
11/13/2023 Letter 47732472 PRCOM20235113 LS Airport Hangar 2 - Response
11/16/2023 Engineer Report/Study geotech report
11/27/2023 Letter DS P/R Corrections Document
12/05/2023 Letter Ltr_CityLS-Capacity_Memo_JB-sgnd_230920
02/05/2024 Letter PRCOM20235113 LS Airport Hangar 2 - Response 2 2524
02/05/2024 Plans 47732472 IFB Plans 2524
02/05/2024 Specifications 47732472 IFB Specs 2524
02/08/2024 Letter License Tax Bill
03/13/2024 Approved Plans Approved permit set
03/18/2024 Application Form 47732472 Commercial Permit Application
03/18/2024 Engineer Report/Study 47732472 Letter of Special Inspections
03/18/2024 Letter Applicant Letter - FDP (DFDP)1
04/10/2024 Receipt Receipt for transaction: 2024-002291
04/10/2024 Letter DS Building Permit
06/17/2024 Letter DS Building Permit
08/06/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/27/2024 Letter INSPECTION SUMMARY
09/27/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
10/01/2024 Plans 47732472_Revision 4_FULL_PDF_Revised
10/01/2024 Approved Plans Approved revisions
10/01/2024 Approved Plans LXT Revised Civil Plans_Rev 0_PL2023269
10/03/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/09/2024 3RD Party Insp Report S_Drain & Footing Penetration Letter_022-04268
10/09/2024 Letter Fire Building Plan Review
10/09/2024 Letter INSPECTION SUMMARY
10/09/2024 Letter INSPECTION SUMMARY
10/09/2024 Letter INSPECTION SUMMARY
10/15/2024 Letter INSPECTION SUMMARY
10/16/2024 Letter INSPECTION SUMMARY
10/16/2024 Letter INSPECTION SUMMARY
10/16/2024 Letter INSPECTION SUMMARY
10/18/2024 Letter INSPECTION SUMMARY
10/18/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
11/05/2024 LTX Hanger FA 10-9-2024
11/05/2024 LTX Hangar FA Submittal
11/18/2024 LTX Hanger FA 10-9-2024 RFC
11/18/2024 Letter Fire (Alarm) Plan Review Notice
11/25/2024 Letter INSPECTION SUMMARY
11/25/2024 Letter INSPECTION SUMMARY
11/27/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/06/2024 Letter INSPECTION SUMMARY
12/09/2024 Letter INSPECTION SUMMARY
12/09/2024 Letter INSPECTION SUMMARY
12/11/2024 Revision 5_Building
12/12/2024 Approved Plans Approved plans - Revision 5_Building
01/03/2025 Letter INSPECTION SUMMARY
01/09/2025 Approved Plans APPROVED REVISED 5 CIVIL SHEETS C103.C113.C131
01/15/2025 Plans Municipal Airport LTX Hanger FP Plan Rev_1
01/15/2025 Engineer Report/Study Municipal Airport LTX Hangar FP Hyd Calcs Rev_ 1
01/28/2025 Plans Municipal Airport LTX Hanger FP Plan Rev_1_RFC
01/28/2025 Letter Fire (Sprinkler) Plan Review
02/19/2025 Plans LXT Signed MEP sheets
02/19/2025 Approved Plans Approved revisions
03/12/2025 Letter INSPECTION SUMMARY
03/12/2025 Letter INSPECTION SUMMARY
04/16/2025 Letter INSPECTION SUMMARY
04/23/2025 2219 Lee's Summit - HANGAR 2_PR 09
04/23/2025 2219 Lee's Summit - HANGAR 2_PR 10
04/23/2025 2219 Lee's Summit - HANGAR 2_PR 11
04/23/2025 2219 Lee's Summit - HANGAR 2_PR 11_Version 2
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home