Permit Application Status

PRCOM20230570


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20230570
Building Permit - Commercial
Certificate of Occupancy
MIDWEST DIVISION LSH LLC
NEW COMMERCIAL
LEES SUMMIT MEDICAL CENTER - NEW AMBULATORY SURGICAL CENTER BUILDING
02/09/2023
10/13/2023
08/23/2023
12/04/2024
Locations
Contacts
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
ACI BOLAND ARCHITECTS, Address:1710 WYANDOTTE ST, Phone:(816) 595-9513  
PM CONTRACTING INC, Address:4015 E 143RD ST, Phone:(816) 318-9844  
STACO ELECTRIC CONSTRUCTION COMPANY INC, Address:11030 HICKMAN MILLS DR, Phone:(816) 765-7112  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
Alpha Omega Geotech Inc, Address:1701 State Ave  
BRADY MYERS, Address:JE DUNN, Phone:(816) 292-8619  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 05/30/2024 05/16/2024
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
05/16/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Revised plans received 5/16/2024.
Installation acceptance testing
Corrective Action Required
05/16/2024

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 for hydrostatic and flow tests.
Miscellaneous Correction
Corrective Action Required
05/16/2024

Inspectors test for the dry system was not shown. Provide at a hydraulically remote location. Verified at inspection.
Misc
Corrective Action Required
05/16/2024

The correct address for the building is 1950 SE Blue Pkwy. For information only.
revised plans uploaded. Wrong address on the plans. Brandon Kalwei 05/16/2024 10:45 AM
Fire Plan Review Approved with Conditions 05/09/2024 05/08/2024
Jim Eden
Miscellaneous Correction
Corrective Action Required
04/30/2024

Ventilation of the Med Gas Room may use the mechanical ventilation requirements specified in NFPA 99.
Building Plan Review Approved 05/09/2024 05/06/2024
Joe Frogge
Sprinkler Plan Review Released for Construction 12/12/2023 12/12/2023
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
12/12/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Received November 28,2023.
Installation acceptance testing
Corrective Action Required
12/12/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule hydrostatic and flow tests.
Miscellaneous Correction
Corrective Action Required
12/12/2023

Provide remote dry system inspectors test, not shown. Verified at inspection.
Alarm Plan Review Released for Construction 10/17/2023 10/18/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
10/18/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Plans received 10/3/2023.
Miscellaneous Correction
Corrective Action Required
10/18/2023

The exterior horn/strobe shall be located over the FDC. Coordinate with the sprinkler contractor.
Installation acceptance testing
Corrective Action Required
10/18/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule alarm testing.
Building Plan Review Approved 03/24/2023 07/27/2023
Joe Frogge
Final Development Plan
Resolved
07/27/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 3/20/23 - acknowledged in letter.
IBC 502.1 - Address Identification
Resolved
03/20/2023

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: This building has been assigned the address 1950 SE Blue Pkwy. Update your records and inform your client.
IBC 1704.2 Special Inspections
Resolved
07/25/2023

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 3/20/23 - acknowledged in letter.
Code analysis required
Resolved
03/20/2023

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Update code analysis to reflect the following: - Occupancy Group = B (ambulatory care facility) - Common Path of Travel = 100 feet maximum.
IMC 306.5 Equipment on roofs
Resolved
03/20/2023

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide ladder or similar for access to condensing unit CU-1 on lower roof. 3/20/23 - unit relocated to upper roof
Licensed Contractors Approved 03/24/2023 07/27/2023
Joe Frogge
LC - General Contractor
Resolved
07/27/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 3/20/23 - Phone number still needed for on site contact.
LC - MEP Subs
Resolved
07/27/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 3/20/23 - acknowledged in letter.
Special Inspections Review Approved 07/25/2023
Joe Frogge
Final Development Plan Review Approved 04/07/2023 04/06/2023
Diana Johnson
HCA Lee's Summit Medical Center Surgery Center (ASC)
Fire Plan Review Approved with Conditions 03/24/2023 03/29/2023
Jim Eden
Miscellaneous Correction
Corrective Action Required
03/29/2023

Ventilation of the Med Gas Room may use the mechanical ventilation requirements specified in NFPA 99.
Engineering Review Rejected 02/24/2023 02/23/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
02/23/2023

de shop drawings for review and approval.vi2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Corrective Action Required
02/23/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for review and approval.
Miscellaneous Correction
Corrective Action Required
02/23/2023

5306.2.1 One-hour exterior rooms. A 1-hour exterior room shall be a room or enclosure separated from the remainder of the building by fire barriers constructed in accordance with Section 707 of the International Building Code or horizontal assemblies constructed in accordance with Section 711 of the International Building Code, or both, with a fire-resistance rating of not less than 1 hour. Openings between the room or enclosure and interior spaces shall be self-closing smoke- and draft-control assemblies having a fire protection rating of not less than 1 hour. Rooms shall have not less than one exterior wall that is provided with not less than two vents. Each vent shall have a minimum free opening area of 36 square inches (232 cm2) for each 1,000 cubic feet (28 m3) at normal temperature and pressure (NTP) of gas stored in the room and shall be not less than 72 square inches (465 cm2) in aggregate free opening area. One vent shall be within 6 inches (152 mm) of the floor and one shall be within 6 inches (152 mm) of the ceiling. Rooms shall be provided with not less than one automatic sprinkler to provide container cooling in case of fire. Provide ventlation for the gas storage room.
Miscellaneous Correction
Corrective Action Required
02/23/2023

(FPO.1) Correct all of your fire protection notes to reference the 2018 IBC and IBC, and the 2016 NFPA 13. Kansas City Fire is NOT the AHJ.
Knox box required
Corrective Action Required
02/23/2023

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Provide a Knox keybox over the FDC (6'AFF). Order the keybox from Knoxbox.com.
Miscellaneous Correction
Corrective Action Required
02/23/2023

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. The proposed location of the FDC is obstructed and exceeds 100 feet to a hydrant. Locate the FDC on the north side of the building near the hydrant.
Miscellaneous Correction
Corrective Action Required
02/23/2023

5306.5 Medical gas systems. Medical gas systems including,but not limited to, distribution piping, supply manifolds, connections, pressure regulators and relief devices and valves, shall be installed in accordance with NFPA 99 and the general provisions of this chapter. Existing medical gas systems shall be maintained in accordance with the maintenance, inspection and testing provisions of NFPA 99 for medical gas systems. Labeling of gas piping and the storage room shall be in accordance with NFPA 99 and the IFC. Verified at inspection. Documentation of gas piping pressure testing shall be provided at occupancy inspection.
Miscellaneous Correction
Corrective Action Required
02/23/2023

Correct the occupancy group on the Code Analysis.
Building Plan Review Rejected 02/24/2023 02/23/2023
Joe Frogge
Final Development Plan
Corrective Action Required
02/21/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
IBC 502.1 - Address Identification
Corrective Action Required
02/21/2023

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: This building has been assigned the address 1950 SE Blue Pkwy. Update your records and inform your client.
IBC 1704.2 Special Inspections
Corrective Action Required
02/21/2023

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Code analysis required
Corrective Action Required
02/21/2023

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Update code analysis to reflect the following: - Occupancy Group = B (ambulatory care facility) - Common Path of Travel = 100 feet maximum.
IMC 306.5 Equipment on roofs
Corrective Action Required
02/23/2023

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide ladder or similar for access to condensing unit CU-1 on lower roof.
Licensed Contractors Rejected 02/24/2023 02/21/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
02/21/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
02/21/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Shell Building $57,040.23 $57,040.23 Paid 10/13/2023
Commercial Excise Tax Fee $9,966.00 $9,966.00 Paid 10/13/2023
Water Tap Fee $25,070.00 $25,070.00 Paid 10/13/2023
Water Meter Fee $3,467.24 $3,467.24 Paid 10/13/2023
Sanitary Sewer Development Fee $14,401.00 $14,401.00 Paid 10/13/2023
Sanitary Sewer Insp Fees $411.00 $411.00 Paid 10/13/2023
Water Insp Fee $1,233.75 $1,233.75 Paid 10/13/2023
Storm Sewer Inspection Fee $2,404.50 $2,404.50 Paid 10/13/2023
Paved Surface Inspection Fee $15,623.40 $15,623.40 Paid 10/13/2023
Site Grading Fee $3,163.50 $3,163.50 Paid 10/13/2023
Water Test Fee $200.00 $200.00 Paid 10/13/2023
Temporary Occupancy Fee $50.00 $50.00 Paid 10/18/2024
Temporary Occupancy Fee $50.00 $50.00 Paid 11/14/2024
Escrow Deposit $5,060.00 $5,060.00 Paid 12/04/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 11/3/2023 11/3/2023 11/03/2023
Misc
Corrective Action Required
11/03/2023
Exterior wall GB and column footing-OK below: -A.2/1.2 to 5.2
Footing Inspection - Commercial Partial 11/7/2023 (9:00) 11/7/2023 11/07/2023
Misc
Corrective Action Required
11/03/2023
Exterior wall GB and column footing-OK below: -A.2/1.2 to 5.2; cont. to A.2/8 to F.4/7 Interior column pad-OK below: -D/6
Footing Inspection - Commercial Partial 11/7/2023 (1:00) 11/7/2023 11/07/2023
Misc
Corrective Action Required
11/07/2023
Exterior wall GB and column footing-OK below: -A.2/1.2 to 5.2; cont. to A.2/8 to F.4/7 Interior column pad-OK below: -B/2-3.5; C/5-6; D/5-6
Footing Inspection - Commercial Partial 11/8/2023 (1:00) 11/8/2023 11/08/2023
Misc
Corrective Action Required
11/07/2023
Exterior wall GB and column footing-OK below: -A.2/1.2 to 5.2; cont. to A.2/8 to F.4/7 -A.2/1.2 to F.5/3 Interior column pad-OK below: -B/2-3.5; C/3.5-4-5-6; D/5-6;
Footing Inspection - Commercial Partial 11/9/2023 (1:00) 11/9/2023 11/09/2023
Misc
Corrective Action Required
11/08/2023
Exterior wall GB and column footing-OK below: -A.2/1.2 to 5.2; cont. to A.2/8 to F.4/7 -A.2/1.2 to F.5/3; cont. to G.5/2.3 All interior column pads-OK below
Footing Inspection - Commercial Partial 11/13/2023 11/13/2023
Misc
Corrective Action Required
11/09/2023
Exterior wall GB and column footing-OK below: -A.2/1.2 to 5.2; cont. to A.2/8 to F.4/7 -A.2/1.2 to F.5/3; cont. to G.5/2.3 All interior column pads-OK below Exterior GB and column pads-OK below: -xA/1&1.5&3.5; x2/C.5&D.5; x1/C.5 to D.5
Underground Electrical Inspection - Commercial Partial 11/13/2023 11/13/2023
Misc
Informational
11/13/2023
Underground electrical OK: -CT to MDP; generator to EDP
Footing Inspection - Commercial Partial 11/15/2023 (1:00) 11/15/2023 11/15/2023
Misc
Corrective Action Required
11/13/2023
Exterior wall GB and column footing-OK below: -A.2/1.2 to 5.2; cont. to A.2/8 to F.4/7 -A.2/1.2 to F.5/3; cont. to G.5/2.3 All interior column pads-OK below Exterior GB and column pads-OK below: -xA/1&1.5&3.5; x2/C.5&D.5; x1/C.5 to D.5 -Remaining footing -OK
Footing Inspection - Commercial Partial 11/17/2023 11/17/2023
Misc
Corrective Action Required
11/15/2023
Exterior wall GB and column footing-OK below: -A.2/1.2 to 5.2; cont. to A.2/8 to F.4/7 -A.2/1.2 to F.5/3; cont. to G.5/2.3 All interior column pads-OK below Exterior GB and column pads-OK below: -xA/1&1.5&3.5; x2/C.5&D.5; x1/C.5 to D.5 -Remaining footing - OK -Trash enclosure - OK
Underslab Plumbing Inspection - Commercial Partial 11/17/2023 11/17/2023 11/17/2023
Misc
Corrective Action Required
11/17/2023
11/17/23 -DWV complete from: Line A to C complete Line C to E from 8 to 5 Line E to F from 8 to 6
Footing Inspection - Commercial Partial 11/28/2023 11/28/2023 11/28/2023
Misc
Corrective Action Required
11/17/2023
Exterior wall GB and column footing-OK below: -A.2/1.2 to 5.2; cont. to A.2/8 to F.4/7 -A.2/1.2 to F.5/3; cont. to G.5/2.3 -Remaining footing All interior column pads-OK Exterior GB and column pads-OK below: -xA/1&1.5&3.5; x2/C.5&D.5; x1/C.5 to D.5 -Trash enclosure -Chiller&generator
Underslab Plumbing Inspection - Commercial Partial 11/29/2023 11/29/2023
Misc
Corrective Action Required
11/17/2023
DWV complete from: -Line A to F Storm completed
Underslab Plumbing Inspection - Commercial Failed 12/1/2023 12/01/2023
Misc
Corrective Action Required
11/29/2023
DWV complete from: -Line A to F Storm completed **12/1-Not ready for inspection. New completed sections of plumbing are not capped off and pressurized
Underslab Plumbing Inspection - Commercial Partial 12/5/2023 12/5/2023 12/05/2023
Misc
Corrective Action Required
12/01/2023
DWV complete from: -All underslab plumbing completed, except the plumbing from the mechanical room Storm completed
Underslab Plumbing Inspection - Commercial Passed 12/6/2023 12/6/2023 12/06/2023
Misc
Resolved
12/06/2023
DWV complete from: -All underslab plumbing completed, except the plumbing from the mechanical room Storm completed
Footing Inspection - Commercial Failed 12/7/2023 12/7/2023 12/07/2023
Misc
Corrective Action Required
11/28/2023
Exterior wall GB and column footing-OK below: -A.2/1.2 to 5.2; cont. to A.2/8 to F.4/7 -A.2/1.2 to F.5/3; cont. to G.5/2.3 -Remaining footing All interior column pads-OK Exterior GB and column pads-OK below: -xA/1&1.5&3.5; x2/C.5&D.5; x1/C.5 to D.5 -Trash enclosure -Chiller&generator pads **12/7-Chiller&generator enclosure wall footing not ready
Footing Inspection - Commercial Partial 12/7/2023 12/7/2023 12/07/2023
Misc
Corrective Action Required
12/07/2023
Exterior wall GB and column footing-OK below: -A.2/1.2 to 5.2; cont. to A.2/8 to F.4/7 -A.2/1.2 to F.5/3; cont. to G.5/2.3 -Remaining footing All interior column pads-OK Exterior GB and column pads-OK below: -xA/1&1.5&3.5; x2/C.5&D.5; x1/C.5 to D.5 -Trash enclosure -Chiller&generator pads and footing
Underslab Electrical Inspection - Commercial Passed 12/11/2023 12/11/2023 12/11/2023
Rough Plumbing Inspection - Commercial Partial 3/25/2024 3/25/2024 03/25/2024
Misc
Informational
03/25/2024
Above-ground DVW pressure test OK: -Area B and C Roof drainage OK: -Area B and area C canopy
In-wall Inspection Partial 3/25/2024 3/25/2024 03/25/2024
Misc
Informational
03/25/2024
In-wall OK: -Rm 196-197; 108
Rough Plumbing Inspection - Commercial Partial 3/27/2024 3/27/2024 03/27/2024
Misc
Informational
03/25/2024
Above-ground DVW pressure test OK: -Area B and C Roof drainage OK: -Area A, B, and area C south canopy
In-wall Inspection Partial 3/27/2024 3/27/2024 03/27/2024
Misc
Informational
03/25/2024
In-wall OK: -Rm 196-197; 108
Misc
Corrective Action Required
03/27/2024
Exterior wall not ready
In-wall Inspection Partial 4/3/2024 4/3/2024 04/03/2024
Misc
Informational
03/27/2024
In-wall OK: -Rm 196-197; 108 -Exterior wall framing
Footing Inspection - Commercial Passed 04/03/2024
Misc
Resolved
04/03/2024
Exterior wall GB and column footing-OK below: -A.2/1.2 to 5.2; cont. to A.2/8 to F.4/7 -A.2/1.2 to F.5/3; cont. to G.5/2.3 -Remaining footing All interior column pads-OK Exterior GB and column pads-OK below: -xA/1&1.5&3.5; x2/C.5&D.5; x1/C.5 to D.5 -Trash enclosure -Chiller&generator pads and footing
Rated Assembly Inspection Partial 4/17/2024 04/17/2024
Misc
Informational
04/17/2024
Fire-rated wall assy screw pattern OK: -Rm 196&197
In-wall Inspection Failed 4/17/2024 4/17/2024 04/17/2024
Misc
Informational
04/03/2024
In-wall OK: -Rm 196-197; 108 -Exterior wall framing
Misc
Corrective Action Required
04/17/2024
**Area east of line E only: -Protect PVC at bottom wall tracks with BOCA plates -Complete trap primer @169 -Support all metal plumbing pipe vertically at 10 ft -Secure all MC within 12” of boxes -Support all boxes **Not ready. Complete all trades**
Rated Assembly Inspection Partial 4/26/2024 4/26/2024 04/26/2024
Misc
Informational
04/17/2024
Fire-rated wall assy screw pattern OK: Wall above-ceiling line OK: -172,174,176, 180
In-wall Inspection Partial 4/26/2024 4/26/2024 04/26/2024
Misc
Informational
04/17/2024
In-wall OK: -Exterior wall framing -Rm 108,161,163,165,167,169,170,171,172,174,175,176,177,178,179,182,186,190,191,192,196,197,199
Misc
Corrective Action Required
04/17/2024
-Submit revised plan to city
Rated Assembly Inspection Failed 5/1/2024 5/1/2024 05/01/2024
Misc
Informational
04/26/2024
Fire-rated wall assy screw pattern OK: Wall above-ceiling line OK: -172,174,176, 180
Misc
Corrective Action Required
05/01/2024
Screw GB per UL schedule
In-wall Inspection Partial 5/1/2024 5/1/2024 05/01/2024
Misc
Informational
04/26/2024
In-wall OK: -Exterior wall framing -Rm 108,161,163,165,167,169,170,171,172,174,175,176,177,178,179,182,186,190,191,192,195,196,197,199 -South wall of hall 150, 100,100B,102,103,104,105,107,108,109,111,112,113,118,119,122,129,131,132,133,134,135,136137,138,139,142,144,146,148,157,
Misc
Corrective Action Required
04/26/2024
-Submit revised plan to city
Rated Assembly Inspection Partial 5/6/2024 5/6/2024 05/06/2024
Misc
Informational
05/01/2024
Fire-rated wall below ceiling line screw pattern OK: -Smoke wall 161,163,165,167,169 Fire-rated wall above ceiling screw pattern line OK: -Smoke wall (both sides) from rm 161->179->end of hall 168; 171,173,182,180, 184, 192
Misc
Resolved
05/06/2024
Above Ceiling Inspection Partial 5/6/2024 05/06/2024
Misc
Informational
05/06/2024
Above ceiling OK: -Staff court yard 200x, north side exterior soffit
In-wall Inspection Partial 5/8/2024 5/8/2024 05/08/2024
Misc
Informational
05/01/2024
In-wall OK: -Exterior wall framing -Rm 108,161,163,165,167,169,170,171,172,174,175,176,177,178,179,182,186,190,191,192,195,196,197,199 -South wall of hall 150, 100,100B,102,103,104,105,107,108,109,111,112,113,115,116,117,118,119,121,122,123,124,125,126,127,128,129,131,132,133,134,135,136,137,138,139,142,144,146,148,157,
Misc
Resolved
05/08/2024
In-wall Inspection Partial 5/10/2024 5/10/2024 05/10/2024
Misc
Informational
05/08/2024
In-wall OK: -Exterior wall framing -Rm 108,161,163,165,167,169,170,171,172,174,175,176,177,178,179,182,183,185,186,190,191,192,195,196,197,199 -South wall of hall 150, 100,100B,102,103,104,105,107,108,109,111,112,113,115,116,117,118,119,121,122,123,124,125,126,127,128,129,131,132,133,134,135,136,137,138,139,142,144,146,148,157,
Misc
Corrective Action Required
05/10/2024
-Rm OR1: Route electrical to inside stud space; maximum size electrical box allowed in rated wall is no more than 16 sq inches
In-wall Inspection Partial 5/15/2024 5/15/2024 05/15/2024
Misc
Informational
05/10/2024
In-wall OK: -Exterior wall framing -Rm 108,161,163,165,167,169,170,171,172,173,174,175,176,177,178,179,181,182,183,185,186,190,191,192,195,196,197,198,199 -South wall of hall 150, 100,100B,102,103,104,105,107,108,109,111,112,113,115,116,117,118,119,121,122,123,124,125,126,127,128,129,131,132,133,134,135,136,137,138,139,142,144,146,148,157,
Misc
Resolved
05/15/2024
Rated Assembly Inspection Partial 5/15/2024 5/15/2024 05/15/2024
Misc
Informational
05/06/2024
Fire-rated wall below ceiling line screw pattern OK: -Smoke wall 161,163,165,167,169 Fire-rated wall above ceiling screw pattern line OK: -Smoke wall (both sides) from rm 161->179->end of hall 168; 171,173,182,180, 184, 192
Misc
Corrective Action Required
05/15/2024
Screw board to bottom track @ 8" oc
Rated Assembly Inspection Partial 5/16/2024 5/16/2024 05/16/2024
Misc
Informational
05/15/2024
Fire-rated wall below ceiling line screw pattern OK: -Smoke wall 161,163,165,167,169 Fire-rated wall above ceiling screw pattern line OK: -Smoke wall (both sides) from rm 161->179->end of hall 168; 171,173,182,180, 184, 192 - Fire-rated wall screw pattern 182 - Fire rated wall above ceiling both sides 187 - Smoke wall above ceiling start @ 172, 129,112,181
Misc
Resolved
05/16/2024
Screw board to bottom track @ 8" oc
Sprinkler - Hydrostatic Test Passed 05/16/2024
In-wall Inspection Partial 5/22/2024 05/22/2024
Misc
Informational
05/15/2024
In-wall OK: -Exterior wall framing -Rm 100,100B,102,103,104,105,107,108,109,111,112,113,115,116,117,118,119,121,122,123,124,125,126,127,128,129,131,132,133,134,135,136,137,138,139,142,144,146,148,150,152,153,154,155,156,157,161,163,165,167,169,170,171,172,173,174,175,176,177,178,179,181,182,183,185,186,190,191,192,195,196,197,198,199
Above Ceiling Inspection Partial 5/31/2024 5/31/2024 05/31/2024
Misc
Informational
05/06/2024
Above ceiling OK: -Staff court yard 200x, north side exterior soffit -West and south canopies
Rated Assembly Inspection Partial 5/31/2024 5/31/2024 05/31/2024
Misc
Informational
05/16/2024
Fire-rated wall below ceiling line screw pattern OK: -Smoke wall 161,163,165,167,169, 173 -182 Fire-rated wall above ceiling screw pattern line OK: -Smoke wall (both sides) from rm 161->179->end of hall 168 -171,180,182,184,192 - Fire rated wall above ceiling both sides 187 - Smoke wall above ceiling start @ 172, 129,112,181 Fire-rated wall screw pattern-OK: -197,198,199
Electrical Service Inspection Partial 6/6/2024 06/06/2024
Misc
Informational
06/06/2024
-Ground to water service below insulating joint and install a 3/0 cu bonding jumper around all insulating joints to bond the building water supply **1200 amp service OK for release
Rated Assembly Inspection Partial 6/6/2024 06/06/2024
Misc
Informational
05/31/2024
Fire-rated wall below ceiling line screw pattern OK: -Smoke wall 161,163,165,167,169, 173 -182 Fire-rated wall above ceiling screw pattern line OK: -Smoke wall (both sides) from rm 161->179->end of hall 168 -171,180,182,184,192 - Fire rated wall above ceiling both sides 187 - Smoke wall above ceiling start @ 172, 129,112 Fire-rated wall floor-to-roof deck screw pattern-OK: -122,124,126,128,135,162,164,181,195, 197,198,199
Rated Assembly Inspection Partial 6/7/2024 6/7/2024 06/07/2024
Misc
Informational
06/06/2024
Fire-rated wall below ceiling line screw pattern OK: -Smoke wall 161,163,165,167,169, 173 -182 Fire-rated wall above ceiling screw pattern line OK: -Smoke wall (both sides) from rm 161->179->end of hall 168 -171,180,182,184,192 - Fire rated wall above ceiling both sides 187 - Smoke wall above ceiling start @ 172, 129,112 Fire-rated wall floor-to-roof deck screw pattern-OK: -walls around rm 153,154, and 155; walls around 135,137, and 164 -112,129,181,195, 197,198,199
Underground Electrical Inspection - Commercial Partial 6/11/2024 6/11/2024 06/11/2024
Misc
Informational
11/13/2023
Underground electrical OK: -CT to MDP; generator to EDP -Bldg to generator/chiller area -Circuits to 4 NE LP piers
Underground Electrical Inspection - Commercial Partial 6/12/2024 06/12/2024
Misc
Informational
06/11/2024
Underground electrical OK: -CT to MDP; generator to EDP -Bldg to generator/chiller area Light poles: -Underground raceways to 4 NE LP; 4 NE LP piers OK
Underground Electrical Inspection - Commercial Partial 6/13/2024 6/13/2024 06/13/2024
Misc
Informational
06/12/2024
Underground electrical OK: -CT to MDP; generator to EDP -Bldg to generator/chiller area Light poles: -Underground raceways to 6 NE LP; 6 NE LP piers OK
Underground Electrical Inspection - Commercial Partial 6/14/2024 06/14/2024
Misc
Informational
06/13/2024
Underground electrical OK: -CT to MDP; generator to EDP -Bldg to generator/chiller area Light poles: -Underground raceways to 6 NE LP; 6 NE LP piers OK -UE to 2 west LP; 2 west LP piers OK
Underground Electrical Inspection - Commercial Partial 6/18/2024 6/18/2024 06/18/2024
Misc
Informational
06/14/2024
Underground electrical OK: -CT to MDP; generator to EDP -Bldg to generator/chiller area -Underground raceways to all light poles and LP piers-OK
Above Ceiling Inspection Partial 6/21/2024 06/21/2024
Misc
Informational
05/31/2024
Above ceiling OK: -Staff court yard 200x, north side exterior soffit -West and south canopies
Misc
Corrective Action Required
06/21/2024
OR1 and OR2 rooms: -Install fire rated wall labels in above ceiling space -Fire caulk penetrations -Add support for ceiling grids -Make sure to remove temporary lighting
Above Ceiling Inspection Partial 6/25/2024 06/25/2024
Misc
Informational
06/21/2024
Above ceiling OK: -Staff court yard 200x, north side exterior soffit -West and south canopies -OR2
Misc
Corrective Action Required
06/21/2024
OR1 room: -Install fire rated wall labels in above ceiling space per IBC 703.7 -Make sure to remove temporary lighting -Architect to address 1-hr rating continuity requirement of the smoke barrier, including the wall in OR1, and fire barrier wall from floor to roof deck. Some part of walls only go to the bottom of the roof I beams
Rated Assembly Inspection Partial 7/2/2024 7/2/2024 07/02/2024
Misc
Informational
06/07/2024
Fire-rated wall below ceiling line screw pattern OK: -Smoke wall 161,163,165,167,169, 173 -182 Fire-rated wall above ceiling screw pattern line OK: -Smoke wall (both sides) from rm 161->179->end of hall 168 -171,180,182,184,192 - Fire rated wall above ceiling both sides 187 - Smoke wall above ceiling start @ 172, 129,112 Fire-rated wall floor-to-roof deck screw pattern-OK: -walls around rm 153,154, and 155; walls around 135,137, and 164 -112,129,181,195, 197,198,199 Shaft walls in rm 122,135,164-OK to rock
Above Ceiling Inspection Partial 7/8/2024 07/08/2024
Misc
Informational
06/25/2024
Above ceiling OK: -Staff court yard 200x, north side exterior soffit -West and south canopies -OR2
Misc
Corrective Action Required
06/25/2024
OR1 room: -Install fire rated wall labels in above ceiling space per IBC 703.7 -Make sure to remove temporary lighting -Architect to address 1-hr rating continuity requirement of the smoke barrier, including the wall in OR1, and fire barrier wall from floor to roof deck. Some part of walls only go to the bottom of the roof I beams OR3 room: -Install fire rated wall labels in above ceiling space per IBC 703.7 -Fire caulk penetrations of fire-rated wall
Foundation Inspection - Commercial Passed 7/8/2024 07/08/2024
Informational
07/08/2024
Not required inspection but reinforced concrete driveway to trash enclosure OK
Above Ceiling Inspection Partial 7/12/2024 7/12/2024 07/12/2024
Misc
Informational
07/08/2024
Above ceiling OK: -Staff court yard 200x, north side exterior soffit -West and south canopies -OR2, OR3
Misc
Corrective Action Required
07/08/2024
OR1 room: -Architect to address 1-hr rating continuity requirement of the smoke barrier, including the wall in OR1, and fire barrier wall from floor to roof deck. Some part of walls only go to the bottom of the roof I beams **Make sure to remove temporary lighting in above-ceiling space
Rated Assembly Inspection Partial 7/12/2024 07/12/2024
Misc
Informational
07/02/2024
Fire-rated wall below ceiling line screw pattern OK: -Smoke barrier wall -182 Fire-rated wall above ceiling screw pattern line OK: -Smoke wall (both sides) from rm 161->179->end of hall 168; -Smoke wall (both sides) from 112->161 -171,180,182,184; Fire-rated wall floor-to-roof deck screw pattern-OK: -walls around rm 153,154, and 155; walls around 135,137, and 164 -112,129,173,181,187,192,195, 197,198,199 Shaft walls in rm 122,135,164-OK to rock
Above Ceiling Inspection Partial 7/22/2024 7/22/2024 07/22/2024
Misc
Informational
07/12/2024
Above ceiling OK: -Staff court yard 200x, north side exterior soffit -West and south canopies -OR2, OR3 -Rooms 112 and 113 PASSED 7/22/24 AF
Misc
Corrective Action Required
07/12/2024
OR1 room: -Architect to address 1-hr rating continuity requirement of the smoke barrier, including the wall in OR1, and fire barrier wall from floor to roof deck. Some part of walls only go to the bottom of the roof I beams **Make sure to remove temporary lighting in above-ceiling space
Above Ceiling Inspection Partial 7/25/2024 7/25/2024 07/25/2024
Misc
Informational
07/22/2024
Above ceiling OK: -Staff court yard 200x, north side exterior soffit -West and south canopies -OR2, OR3 -Rooms 112 and 113 PASSED 7/22/24 AF
Misc
Corrective Action Required
07/22/2024
OR1 room: -Complete rocking the shaft wall covering the I beam
Pavement-Proof Roll Passed 7/26/2024 7/26/2024 07/26/2024
Misc
Informational
07/26/2024
7-26-24 BR Contractor preformed a proof roll on north and south parking lot. Ready for asphalt.
Pavement-Aggregate Base Passed 7/11/2024 7/11/2024 07/26/2024
Misc
Informational
07/11/2024
7-11-24 BR Contractor formed up driveway entrance at 8'' with aggregate base is placed and compacted ready for concrete.
Sidewalk Inspection Passed 7/26/2024 7/26/2024 07/26/2024
Misc
Informational
07/16/2024
7-15-24 BR Contractor (JE Dunn) formed up and aggregate is placed and compacted on north side of building ready for concrete. 7-16-24 BR Contractor (JE Dunn) poured concrete to sidewalk on north side of building that is connected to patient pick up driveway. 7-19-24 BR Contractor (JE Dunn) poured patient entrance sidewalk on south side of building. 7-26-24 BR Contractor (JE Dunn) poured public sidewalks on north and south of driveway entrances to LS and ADA specifications.
Above Ceiling Inspection Partial 7/29/2024 07/29/2024
Misc
Informational
07/25/2024
Above ceiling OK: -Staff court yard 200x, north side exterior soffit -West and south canopies -OR1,OR2, OR3 -Rooms 112 and 113 PASSED 7/22/24 AF
Misc
Resolved
07/29/2024
Rated Assembly Inspection Partial 7/29/2024 07/29/2024
Misc
Informational
07/12/2024
Fire-rated wall floor-to-roof deck screw pattern-OK: -Smoke barrier wall -walls around rm 153,154, and 155; walls around 135,137, and 164; walls around 171,182,184 -173,181,182,186,187,192,195,196,197,198,199 Shaft walls in rm 122,135,164
Above Ceiling Inspection Partial 7/31/2024 07/31/2024
Misc
Informational
07/29/2024
Above ceiling OK: -Staff court yard 200x, north side exterior soffit -West and south canopies -112,113 -161,163,165,167,168,169,171,173,172,174,175,176,177,178,180,181,182,183,185,186,187,192
Gas Service Inspection - Commercial Passed 7/31/2024 07/31/2024
Underground Electrical Inspection - Commercial Passed 08/02/2024
Misc
Informational
06/18/2024
Underground electrical OK: -CT to MDP; generator to EDP -Bldg to generator/chiller area -Underground raceways to all light poles and LP piers-OK
Rough Plumbing Inspection - Commercial Passed 08/02/2024
Misc
Informational
03/27/2024
Above-ground DVW pressure test OK: -Area B and C Roof drainage OK: -Area A, B, and area C south canopy
Above Ceiling Inspection Partial 8/2/2024 08/02/2024
Misc
Informational
07/31/2024
Above ceiling OK: -Staff court yard 200x, north side exterior soffit -West and south canopies -112,113,114,115,116,117,121,122,123,124,125,127,129,132,133,134,136,137,138,142,144,146,148,150,152,156,157 -161,163,164,165,167,168,169,171,173,172,174,175,176,177,178,180,181,182,183,185,186,187,192
Above Ceiling Inspection Partial 8/7/2024 08/07/2024
Misc
Informational
08/02/2024
Above ceiling OK: -Staff court yard 200x, north side exterior soffit -West and south canopies -112,113,114,115,116,117,118,121,122,123,124,125,126,127,128,129,132,133,134,136,137,138,140, 142,144,146,148,150,152,154, 155, 156,157, 160 -161,163,164,165,167,168,169,171,173,172,174,175,176,177,178,180,181,182,183,185,186,187,192
Misc
Corrective Action Required
08/07/2024
153-Seal penetrations Corridor 150-seal penetrations 135-Seal penetrations and install fire rated access panel
Above Ceiling Inspection Partial 8/9/2024 08/09/2024
Misc
Informational
08/07/2024
Above ceiling OK: -Staff court yard 200x, north side exterior soffit -West and south canopies - 102,103,104,105,107,109,110,111,112,113,114,115,116,117,118,121,122,123,124,125,126,127,128,129,132,133,134,136,137,138,140, 142,144,146,148,150,152,153,,154, 155, 156,157, 160 -161,163,164,165,167,168,169,170,171,173,172,174,175,176,177,178,180,181,182,183,184,185,186,187,190,192
Misc
Corrective Action Required
08/07/2024
135-Seal penetrations and install fire rated access panel
Driveway Inspection Passed 7/22/2024 7/22/2024 08/28/2024
Misc
Informational
07/11/2024
7-10-24 BR Contractor (JB Bishop) formed up and compacted aggregate on north side entrance ready for concrete. 7-12-24 BR Contractor (JE Dunn) poured driveway entrance approach according to plan drawings and LS specifications. 7-19-24 BR Contractor (JE Dunn) poured patient drop off driveway entrance. 7-22-24 BR Contractor (JE Dunn) formed up and compacted aggregate on south side entrance ready for concrete.
Erosion Control Inspection Residential Passed 8/15/2024 8/15/2024 08/28/2024
Misc
Informational
07/17/2024
7-10-24 BR Erosion control is up and working order. 7-17-24 BR Erosion control is up and working order 7-26-24 BR Erosion control is up and working order. 8-9-24 BR Erosion control is up and working order. 8-15-24 BR Erosion control is up and working order.
Pavement-Curb Construction Passed 7/11/2024 7/11/2024 08/28/2024
Misc
Informational
07/11/2024
6-19-24 BR Contractor (JE Dunn) saw cut curb on south entrance which are joint to joint. But on the north entrance there not cut at joint to joint. There are several curb sections that needs to be taking out along with storm box wing was damage and needs to be replace. 6-25-24 BR Contractor preformed a poof roll on the curbs which was successful. Ready for concrete. 7-9-24 BR Contractor (JE Dunn) poured concrete curbs on south side and north side of parking lot.
Above Ceiling Inspection Passed 9/3/2024 09/03/2024
Misc
Informational
08/09/2024
Above ceiling OK: -Staff court yard 200x, north side exterior soffit -West and south canopies -100,101,102,103,104,105,107,109,110,111,112,113,114,115,116,117,118,121,122,123,124,125,126,127,128,129,132,133,134,136,137,138,140, 142,144,146,148,150,152,153,,154, 155, 156,157, 160 -161,163,164,165,167,168,169,170,171,173,172,174,175,176,177,178,180,181,182,183,184,185,186,187,190,192
Misc
Resolved
09/03/2024
135-Seal penetrations and install fire rated access panel
In-wall Inspection Passed 09/03/2024
Misc
Informational
05/22/2024
In-wall OK: -Exterior wall framing -Rm 100,100B,102,103,104,105,107,108,109,111,112,113,115,116,117,118,119,121,122,123,124,125,126,127,128,129,131,132,133,134,135,136,137,138,139,142,144,146,148,150,152,153,154,155,156,157,161,163,165,167,169,170,171,172,173,174,175,176,177,178,179,181,182,183,185,186,187,190,191,192,195,196,197,198,199
Misc
Resolved
09/03/2024
rm 187-cover the in-wall gas box with puddy pad
Rated Assembly Inspection Passed 09/03/2024
Misc
Resolved
09/03/2024
Fire-rated wall floor-to-roof deck screw pattern-OK: -Smoke barrier wall -walls around rm 153,154, and 155; walls around 135,137, and 164; walls around 167,171,182,184 -173,181,182,186,187,192,195,196,197,198,199 Shaft walls in rm 122,135,164
Miscellaneous Inspection Passed 10/4/2024 10/04/2024
Misc
Informational
10/04/2024
10/4/24-Made a site visit
Alarm Test Passed 10/10/2024 10/10/2024
Sprinkler - Flow Test Passed 10/10/2024 10/11/2024
Pavement-Surface Passed 10/15/2024 10/15/2024 10/15/2024
Misc
Informational
07/29/2024
7-29-24 BR Contactor (JE Dunn) poured 5'' asphalt base course TYPE-1 on south and north side of parking lot. 10-11-24 BR Contractor (JE Dunn) poured 2'' asphalt surface 100% on parking lot. Ready for striping parking lot. 10-15-24 BR Contractor (JE Dunn) stiped 100% of parking lot and signs installed.
Erosion Control Inspection Residential Passed 10/18/2024
Misc
Resolved
10/18/2024
7-10-24 BR Erosion control is up and working order. 7-17-24 BR Erosion control is up and working order
Occupancy Inspection - Planning Temporary C of O 10/18/2024 10/18/2024 10/18/2024
Misc
Corrective Action Required
10/18/2024
Complete installation of solid metal panels on trash enclosure gate frame per approved plan.
Electrical Service Inspection Passed 6/12/2024 10/18/2024
Misc
Resolved
10/18/2024
**1200 amp service OK for release
Occupancy Inspection - Engineering Temporary C of O 10/18/2024 10/18/2024 10/18/2024
Misc
Corrective Action Required
10/18/2024
10-18-24 BR Waiting on approval review of detention basin to get final.
Occupancy Inspection - Codes Commercial Ready for Temp CO 10/18/2024 10/18/2024 10/18/2024
Misc
Corrective Action Required
10/18/2024
-Approval required from: Fire, Planning, FEI -Provide compliance with NEC 110.16(B) -Provide gfi protection for receptacles located within 6 ft of nourishment area sink -Provide a clear floor space with minimum 30” width at urinal. Have architect address -All receptacles less than 5.5 ft from floor located in business offices and corridors of medical facility are required to be tamper-resistant receptacles. NEC 496.12 (5) -Provide verification of 1-hr fire rating of the roof access rm wall -Secure rooftop unit LFNC raceways per code
Occupancy Inspection - Water Utilities Passed 10/18/2024 10/18/2024 10/18/2024
Occupancy Inspection - Engineering Temporary C of O 10/18/2024 10/18/2024
Misc
Corrective Action Required
10/18/2024
10-18-24 BR Waiting on approval review of detention basin to get final.
Miscellaneous Correction
Corrective Action Required
10/18/2024
Revegitate the adjacent area to the north of the project.
Occupancy Inspection - Fire Temporary C of O 10/18/2024 10/18/2024 10/18/2024
Record Drawing Review Passed 10/23/2024 10/23/2024
Misc
Informational
10/23/2024
10-23-24 BR The project was constructed according to design plans.
Occupancy Inspection - Codes Commercial Ready for Temp CO 11/14/2024 11/14/2024
Misc
Corrective Action Required
10/18/2024
-Approval required from: Fire, Planning, FEI -Provide compliance with NEC 110.16(B) -Provide gfi protection for receptacles located within 6 ft of nourishment area sink -Provide a clear floor space with minimum 30” width at urinal. Min. distance from centerline of urinal to wall shall be 15". Have architect address. -All receptacles less than 5.5 ft from floor located in business offices and corridors of medical facility are required to be tamper-resistant receptacles. NEC 496.12 (5) -Provide verification of 1-hr fire rating of the roof access rm wall -Secure rooftop unit LFNC raceways per code
Occupancy Inspection - Planning Passed 11/22/2024
Misc
Resolved
11/22/2024
Complete installation of solid metal panels on trash enclosure gate frame per approved plan.
Occupancy Inspection - Codes Commercial Temporary C of O 12/3/2024 12/03/2024
Misc
Corrective Action Required
11/14/2024
-Approval required from: Fire, FEI
Occupancy Inspection - Fire Passed 12/3/2024 12/03/2024
Occupancy Inspection - Engineering Passed 12/04/2024
Misc
Resolved
12/04/2024
10-18-24 BR Waiting on approval review of detention basin to get final.
Miscellaneous Correction
Resolved
12/04/2024
Revegitate the adjacent area to the north of the project.
Occupancy Inspection - Codes Commercial Full C of O 12/04/2024
Misc
Resolved
12/04/2024
-Approval required from: Fire, FEI
Documents & Images
Date Uploaded File Type Document Name
02/09/2023 Application Form APPLICATION
02/09/2023 Plans HCA LS ASC_CD 020823
02/09/2023 Specifications LS ASC_Spec_Vol 01 - 020823
02/09/2023 Specifications LS ASC_Spec_Vol 02 - 020823
02/09/2023 Specifications LS ASC_Spec_Vol 03 - 020823
02/09/2023 Specifications LS ASC_Spec_Vol 04 - 020823
02/09/2023 Engineer Report/Study 22-440E L_S_ Amb_ Surgery Center - Revised - Geotechnical Report
02/09/2023 Engineer Report/Study HCA-LSMC-Calcs020823
02/13/2023 Letter License Tax Bill
02/24/2023 Letter DS P/R Corrections Document
03/17/2023 Letter LSASC_Response Letter_230317
03/17/2023 Code Mod Request Code Modificataion Request - Updated 3-25-22
03/17/2023 Plans LSMC ASC_Drawing Updates
04/06/2023 Approved Plans FDP Approval 04.06.2023_Surgery Center of Lee's Summit Civil Final FDP_240404
07/25/2023 Letter Special Inspections letter of engagement
07/25/2023 Letter License Tax Bill
10/03/2023 SURGERY CENTER OF LEES SUMMIT FIRE ALARM SYSTEM DRAWINGS - PE STAMPED
10/13/2023 Receipt Receipt for transaction:2023-007754
10/13/2023 Receipt Receipt for transaction: 2023-007761
10/13/2023 Letter DS Building Permit
10/18/2023 SURGERY CENTER OF LEES SUMMIT FIRE ALARM SYSTEM DRAWINGS - PE STAMPED APPROVED
11/03/2023 Letter Fire Building Plan Review
11/03/2023 Letter Fire (Alarm) Plan Review Notice
11/03/2023 Letter INSPECTION SUMMARY
11/07/2023 Letter INSPECTION SUMMARY
11/07/2023 Letter INSPECTION SUMMARY
11/08/2023 Letter INSPECTION SUMMARY
11/09/2023 Letter INSPECTION SUMMARY
11/13/2023 Letter INSPECTION SUMMARY
11/15/2023 Plans LSASC_Combined set thru Addm3
11/15/2023 Letter INSPECTION SUMMARY
11/15/2023 Approved Plans approved - LSASC_Combined set thru Addm3
11/17/2023 Letter INSPECTION SUMMARY
11/17/2023 Letter INSPECTION SUMMARY
11/17/2023 Letter INSPECTION SUMMARY
11/17/2023 Letter INSPECTION SUMMARY
11/28/2023 Letter INSPECTION SUMMARY
11/28/2023 LS SURGERY CENTER CALCS - PE STAMPED
11/28/2023 LS SURGERY CENTER FIRE SPRINKLER- PE STAMPED
11/29/2023 Letter INSPECTION SUMMARY
12/01/2023 Letter INSPECTION SUMMARY
12/05/2023 Letter INSPECTION SUMMARY
12/06/2023 Letter INSPECTION SUMMARY
12/07/2023 Letter INSPECTION SUMMARY
12/07/2023 Letter INSPECTION SUMMARY
12/11/2023 Letter INSPECTION SUMMARY
12/12/2023 Letter Fire (Sprinkler) Plan Review
12/12/2023 LS SURGERY CENTER FIRE SPRINKLER- PE STAMPED APPROVED
03/25/2024 Letter INSPECTION SUMMARY
03/25/2024 Letter INSPECTION SUMMARY
03/27/2024 Letter Fire (Sprinkler) Plan Review
03/27/2024 Letter INSPECTION SUMMARY
03/27/2024 Letter INSPECTION SUMMARY
04/03/2024 Letter INSPECTION SUMMARY
04/03/2024 Letter INSPECTION SUMMARY
04/17/2024 Letter INSPECTION SUMMARY
04/17/2024 Letter INSPECTION SUMMARY
04/26/2024 Letter INSPECTION SUMMARY
04/26/2024 Letter INSPECTION SUMMARY
04/30/2024 Letter LSMC ASC_ASI-06_Scope Processing and Canopy Adjustments_0430 Update
04/30/2024 Plans LS ASC_Posted Set_Thru ASI6
05/01/2024 Letter INSPECTION SUMMARY
05/01/2024 Letter INSPECTION SUMMARY
05/06/2024 Letter INSPECTION SUMMARY
05/06/2024 Letter INSPECTION SUMMARY
05/08/2024 Letter INSPECTION SUMMARY
05/10/2024 Letter INSPECTION SUMMARY
05/13/2024 Approved Plans Approved Plans
05/15/2024 Letter INSPECTION SUMMARY
05/15/2024 Letter INSPECTION SUMMARY
05/16/2024 4333CK HCA Surgery Center of LS Revised Drawings- PE Stamped
05/16/2024 4333CK HCA Surgery Center Of LS Revised Calcs- PE Stamped
05/16/2024 Letter INSPECTION SUMMARY
05/16/2024 Letter Fire (Sprinkler) Plan Review
05/20/2024 4333CK HCA Surgery Center of LS Revised Drawings- PE Stamped APPROVED
05/22/2024 Letter INSPECTION SUMMARY
05/31/2024 Letter INSPECTION SUMMARY
05/31/2024 Letter INSPECTION SUMMARY
06/06/2024 Letter INSPECTION SUMMARY
06/06/2024 Letter INSPECTION SUMMARY
06/07/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter Fire (Alarm) Plan Review Notice
06/14/2024 Letter INSPECTION SUMMARY
06/18/2024 Letter INSPECTION SUMMARY
06/21/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
07/02/2024 Letter INSPECTION SUMMARY
07/08/2024 Letter INSPECTION SUMMARY
07/08/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/16/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/19/2024 Letter INSPECTION SUMMARY
07/19/2024 Letter INSPECTION SUMMARY
07/19/2024 Letter INSPECTION SUMMARY
07/19/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
07/26/2024 Letter INSPECTION SUMMARY
07/26/2024 Letter INSPECTION SUMMARY
07/26/2024 Letter INSPECTION SUMMARY
07/26/2024 Letter INSPECTION SUMMARY
07/26/2024 Letter INSPECTION SUMMARY
07/26/2024 Letter INSPECTION SUMMARY
07/26/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
07/31/2024 Letter INSPECTION SUMMARY
07/31/2024 Letter INSPECTION SUMMARY
07/31/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/07/2024 Letter INSPECTION SUMMARY
08/09/2024 Letter INSPECTION SUMMARY
08/09/2024 Letter INSPECTION SUMMARY
08/09/2024 Letter INSPECTION SUMMARY
08/15/2024 Letter INSPECTION SUMMARY
08/15/2024 Letter INSPECTION SUMMARY
08/28/2024 Letter INSPECTION SUMMARY
08/28/2024 Letter INSPECTION SUMMARY
08/28/2024 Letter INSPECTION SUMMARY
08/28/2024 Letter INSPECTION SUMMARY
09/03/2024 Letter INSPECTION SUMMARY
09/03/2024 Letter INSPECTION SUMMARY
09/03/2024 Letter INSPECTION SUMMARY
09/30/2024 Engineer Report/Study final SI report
10/04/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/11/2024 Letter INSPECTION SUMMARY
10/11/2024 Letter INSPECTION SUMMARY
10/15/2024 Letter INSPECTION SUMMARY
10/15/2024 3rd Party Permit/Approval Alpha Omega - Third Party Testing - Final Acceptance Letter 09_26_24
10/15/2024 3RD Party Insp Report American Fire Sprinkler - Flow Test 10_18_23
10/15/2024 Activity Document City of Lee's Summit Fire Department Fire Alarm Approved Test
10/15/2024 Activity Document City of Lee's Summit Fire Department Fire Sprinkler Approved Test
10/15/2024 3rd Party Permit/Approval HCA LSMC ASC - 6inch Fire Backflow Test Certificate
10/15/2024 3rd Party Permit/Approval HCA LSMC ASC - Interior Backflow Tests
10/15/2024 3rd Party Permit/Approval HCA LSMC ASC - Side Arm Fire Backflow Test Certificate
10/15/2024 Plans LSMC ASC Detention Basin As-Built_Rev 0_PL2023008
10/18/2024 Letter INSPECTION SUMMARY
10/18/2024 Letter INSPECTION SUMMARY
10/18/2024 Letter INSPECTION SUMMARY
10/18/2024 Letter INSPECTION SUMMARY
10/18/2024 Letter INSPECTION SUMMARY
10/18/2024 Letter INSPECTION SUMMARY
10/18/2024 Letter INSPECTION SUMMARY
10/18/2024 Certificate/License Codes Temporary Certificate of Occupancy
10/18/2024 Receipt Receipt for transaction:2024-008433
10/18/2024 Letter INSPECTION SUMMARY
10/23/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/14/2024 Letter INSPECTION SUMMARY
11/14/2024 Certificate/License Codes Temporary Certificate of Occupancy
11/14/2024 Receipt Receipt for transaction:2024-008971
11/22/2024 Letter INSPECTION SUMMARY
12/03/2024 Certificate/License Codes Temporary Certificate of Occupancy
12/04/2024 Receipt Receipt for transaction:2024-009322
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter Field Certificate of Occupancy
12/04/2024 Letter Codes Final Certificate of Occupancy
12/04/2024 Activity Document Lees Summit Ambulatory Surgery Center ASC
12/09/2024 Letter Codes Final Certificate of Occupancy (Corrected)
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home