Permit Application Status

PRCOM20201014


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20201014
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEE'S SUMMIT MISSOURI
NEW COMMERCIAL
NEW HANGAR
04/21/2020
08/19/2020
01/03/2021
07/08/2021
Locations
Contacts
CITY OF LEE'S SUMMIT MISSOURI, Address:220 SE GREEN ST  
RIGID GLOBAL BUILDINGS, Address:9350 E COSTILLA AVE, UNIT 325, Phone:(303) 446-7461  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
R & R PLUMBING INC, Address:2001 GASLIGHT DR, Phone:(816) 772-5431  
TSLAMIN@GMAIL.COM  
Van Deurzen and Associates, Address:11011 King Street, Suite 130, Phone:(913) 451-6305  
THOMPSON BUILDERS LLC, Address:4559 GROVE ST, Phone:(913) 915-2836  
PREMIER ELECTRIC & LIGHTING DESIGN, Address:PO BOX 1311, Phone:(816) 564-7660  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/13/2020 08/17/2020
Joe Frogge
LC - General Contractor
Resolved
08/17/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. (license for Thompson Builders has lapsed)
LC - MEP Subs
Resolved
08/17/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (license for Premier Electric has lapsed)
Building Plan Review Approved with Conditions 08/20/2020 08/14/2020
Joe Frogge
Miscellaneous Correction
Corrective Action Required
08/13/2020

2018 IBC 412.3.4 Heating equipment. Heating equipment shall be placed in another room separated by 2-hour fire barriers constructed in accordance with Section 707 or horizontal assemblies constructed in accordance with Section 711, or both. Entrance shall be from the outside or by means of a vestibule providing a two-doorway separation. (see code for exceptions) Action required: Modify designs to comply. 6/22/20 - This code section also applies to the furnaces in office area. If you want to use the separation wall for this it must be minimum 2 hour rated. (and extend to roof deck or rated horizontal assembly) 7/7/20 - Raised ignition source only applies to location of doors. 8/14/20 - Approved as shown. Minimum 18" elevation to be field verified.
IBC 1209.2 Finish materials
Resolved
08/14/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant materials at restrooms and mop/service/janitor sinks. 6/22/20 - if paint is used it must be epoxy based. 7/7/20 - Comment also applies to walls around mop sink.
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Corrective Action Required
08/13/2020

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Provide verification that "Bar" counters will be no taller than 34" 6/22/20 - 36" length counter at max. 34" high as noted in letter to include sink. Field verify.
Miscellaneous Correction
Corrective Action Required
08/13/2020

All wiring shall be in accordance with 2017 NEC Article 513 Aircraft Hangars. Action required: Comment is for informational purposes. To be field verified.
Fire Plan Review Approved with Conditions 08/20/2020 08/13/2020
Michael Weissenbach
Construction documents for fire alarm systems
Resolved
08/13/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide electronic shop drawings for the fire alarm system to mike.weissenbach@cityofls.net 6/22/20 Without the fire sprinkler system, and the fire area separation, a fire alarm system is not required.
Address numbers required
Corrective Action Required
08/13/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Resolved
08/13/2020

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Action Required) Order a Knox Box from knoxbox.com. Placement to be made by FDC and outside horn/strobe. 6/22/2020 Knox Box not required because the structure is not provided with a fire sprinkler system.
Door operations
Corrective Action Required
08/13/2020

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Building Plan Review Rejected 07/07/2020 07/27/2020
Joe Frogge
Miscellaneous Correction
Resolved
07/10/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 6/19/20 - acknowledged in letter.
Final Development Plan
Resolved
07/27/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 6/19/20 - acknowledged in letter.
IBC 1704.2 Special Inspections
Resolved
07/10/2020

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 6/19/20 - acknowledged in letter. (letter from special inspections company not yet received) 7/7/20 - not received
Miscellaneous Correction
Corrective Action Required
06/29/2020

2018 IBC 412.3.4 Heating equipment. Heating equipment shall be placed in another room separated by 2-hour fire barriers constructed in accordance with Section 707 or horizontal assemblies constructed in accordance with Section 711, or both. Entrance shall be from the outside or by means of a vestibule providing a two-doorway separation. (see code for exceptions) Action required: Modify designs to comply. 6/22/20 - This code section also applies to the furnaces in office area. If you want to use the separation wall for this it must be minimum 2 hour rated. (and extend to roof deck or rated horizontal assembly) 7/7/20 - Raised ignition source only applies to location of doors.
Misc
Resolved
07/07/2020

Inadequate information to complete review. Provide the following: - - Wall construction information 6/22/20 - (1) Details required for all walls, not just fire rated partition. (2) Fire rated wall must extend to structure above or you'll have to rate the ceiling at office area. (3) Wall construction details conflict between Cover and A104 - 2x4 or 2x6? - - Door and window schedules 6/22/20 - identify on plans which doors are to be rated
IBC 1209.2 Finish materials
Corrective Action Required
06/29/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant materials at restrooms and mop/service/janitor sinks. 6/22/20 - if paint is used it must be epoxy based. 7/7/20 - Comment also applies to walls around mop sink.
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Corrective Action Required
06/29/2020

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Provide verification that "Bar" counters will be no taller than 34" 6/22/20 - 36" length counter at max. 34" high as noted in letter to include sink. Field verify.
Miscellaneous Correction
Corrective Action Required
06/29/2020

All wiring shall be in accordance with 2017 NEC Article 513 Aircraft Hangars. Action required: Comment is for informational purposes. To be field verified.
Final Development Plan Review Approved 07/27/2020
Joe Frogge
Special Inspections Review Approved 07/10/2020
Joe Frogge
Fire Plan Review Approved with Conditions 07/07/2020 07/07/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
06/29/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide electronic shop drawings for the fire alarm system to mike.weissenbach@cityofls.net 6/22/20 Without the fire sprinkler system, and the fire area separation, a fire alarm system is not required.
Address numbers required
Corrective Action Required
06/29/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
06/29/2020

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Action Required) Order a Knox Box from knoxbox.com. Placement to be made by FDC and outside horn/strobe. 6/22/2020 Knox Box not required because the structure is not provided with a fire sprinkler system.
Door operations
Corrective Action Required
06/29/2020

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Licensed Contractors Approved 07/07/2020 07/06/2020
Joe Frogge
Fire Plan Review Approved with Conditions 06/26/2020 06/22/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
06/19/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide electronic shop drawings for the fire alarm system to mike.weissenbach@cityofls.net 6/22/20 Without the fire sprinkler system, and the fire area separation, a fire alarm system is not required.
Address numbers required
Corrective Action Required
06/19/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
06/19/2020

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Action Required) Order a Knox Box from knoxbox.com. Placement to be made by FDC and outside horn/strobe. 6/22/2020 Knox Box not required because the structure is not provided with a fire sprinkler system.
Construction documents - Fire protection systems
Resolved
06/22/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide electronic shop drawings for the fire sprinkler system to mike.weissenbach@cityofls.net
Portable fire extinguishers - conspicuous locations
Resolved
06/22/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Action Required) Provide 1 2A10BC fire extinguisher per 3000 sq.ft
Misc
Resolved
06/22/2020

(Action Required) Provide a code analysis and PE stamped plans for the project.
Miscellaneous Correction
Resolved
06/22/2020

(Action Required) IFC 2018 1024.4 Dead ends Corridors are more than 50 feet in length. (Upper and Lower floors) Provide an additional exit.
Door operations
Corrective Action Required
06/19/2020

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Building Plan Review Rejected 06/26/2020 06/22/2020
Joe Frogge
Miscellaneous Correction
Corrective Action Required
06/19/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 6/19/20 - acknowledged in letter.
Final Development Plan
Corrective Action Required
06/19/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 6/19/20 - acknowledged in letter.
IBC 1704.2 Special Inspections
Corrective Action Required
06/19/2020

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 6/19/20 - acknowledged in letter. (letter from special inspections company not yet received)
Code analysis required
Resolved
06/19/2020

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Provide detailed code analysis.
IPC 403.1 Minimum number of fixtures
Resolved
06/19/2020

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountain or approved alternate.
Miscellaneous Correction
Corrective Action Required
06/19/2020

2018 IBC 412.3.4 Heating equipment. Heating equipment shall be placed in another room separated by 2-hour fire barriers constructed in accordance with Section 707 or horizontal assemblies constructed in accordance with Section 711, or both. Entrance shall be from the outside or by means of a vestibule providing a two-doorway separation. (see code for exceptions) Action required: Modify designs to comply. 6/22/20 - This code section also applies to the furnaces in office area. If you want to use the separation wall for this it must be minimum 2 hour rated. (and extend to roof deck or rated horizontal assembly)
Gen - Plan submittals 2018 codes
Resolved
06/22/2020

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Update code reference on sheet A101.
Misc
Corrective Action Required
06/19/2020

Inadequate information to complete review. Provide the following: - Foundation plans. 6/22/20 - Incorrect code reference on S100 - Wall construction information 6/22/20 - (1) Details required for all walls, not just fire rated partition. (2) Fire rated wall must extend to structure above or you'll have to rate the ceiling at office area. (3) Wall construction details conflict between Cover and A104 - 2x4 or 2x6? - - Door and window schedules 6/22/20 - identify on plans which doors are to be rated
Gen - Plan submittal documents
Resolved
06/22/2020

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Architectural drawings are required to be sealed/signed by architect.
IBC 1006.2.1 Egress based on occupant load and common path of egress travel distance
Resolved
06/22/2020

2018 IBC 1006.2.1 Egress based on occupant load and common path of egress travel distance. Two exits or exit access doorways from any space shall be provided where the design occupant load or the common path of egress travel distance exceeds the values listed in Table 1006.2.1. The cumulative occupant load from adjacent rooms, areas or spaces shall be determined in accordance with Section 1004.2. (see code for special requirements for foyers, lobbies, vestibules, and care suites in I-2 occupancies) Action required: Modify design. Maximum common path of travel exceeded from offices #3 & #4.
IBC 1209.2 Finish materials
Corrective Action Required
06/19/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant materials at restrooms and mop/service/janitor sinks. 6/22/20 - if paint is used it must be epoxy based.
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Corrective Action Required
06/19/2020

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Provide verification that "Bar" counters will be no taller than 34" 6/22/20 - 36" length counter at max. 34" high as noted in letter to include sink. Field verify.
Miscellaneous Correction
Corrective Action Required
06/19/2020

All wiring shall be in accordance with 2017 NEC Article 513 Aircraft Hangars. Action required: Comment is for informational purposes. To be field verified.
IBC 1020.2 Width and capacity - corridor width
Resolved
06/22/2020

Dead end corridor 2018 IBC 1020.4 Dead Ends. Where more than one exit or exit access doorway is required, the exit access shall be arranged such that dead-end corridors do not exceed 20 feet. Exceptions: 1. In Group I-3, Condition 2, 3 or 4, occupancies, the dead end in a corridor shall not exceed 50 feet. 2. In occupancies in Groups B, E, F, I-1, M, R-1, R-2, S and U, where the building is equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1, the length of the dead end corridors shall not exceed 50 feet. 3. A dead-end corridor shall not be limited in length where the length of the corridor is less than 2.5 times the least width of the dead end corridor. Action required: Modify design to comply.
Licensed Contractors Approved 06/19/2020 06/19/2020
Joe Frogge
Fire Plan Review Rejected 05/29/2020 05/18/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
05/18/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide electronic shop drawings for the fire alarm system to mike.weissenbach@cityofls.net
Address numbers required
Corrective Action Required
05/18/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
05/18/2020

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Action Required) Order a Knox Box from knoxbox.com. Placement to be made by FDC and outside horn/strobe.
Construction documents - Fire protection systems
Corrective Action Required
05/18/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide electronic shop drawings for the fire sprinkler system to mike.weissenbach@cityofls.net
Portable fire extinguishers - conspicuous locations
Corrective Action Required
05/18/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Action Required) Provide 1 2A10BC fire extinguisher per 3000 sq.ft
Misc
Corrective Action Required
05/18/2020

(Action Required) Provide a code analysis and PE stamped plans for the project.
Miscellaneous Correction
Corrective Action Required
05/18/2020

(Action Required) IFC 2018 1024.4 Dead ends Corridors are more than 50 feet in length. (Upper and Lower floors) Provide an additional exit.
Door operations
Corrective Action Required
05/18/2020

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Building Plan Review Rejected 05/29/2020 05/18/2020
Joe Frogge
Miscellaneous Correction
Corrective Action Required
05/15/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Final Development Plan
Corrective Action Required
05/15/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
IBC 1704.2 Special Inspections
Corrective Action Required
05/15/2020

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Code analysis required
Corrective Action Required
05/15/2020

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Provide detailed code analysis.
Planning - Screening of ground mounted equipment
Resolved
05/18/2020

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. **not required
IPC 403.1 Minimum number of fixtures
Corrective Action Required
05/15/2020

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountain or approved alternate.
Miscellaneous Correction
Resolved
05/18/2020

2018 IBC 412.3.1 Exterior walls. Exterior walls located less than 30 feet from lot lines or a public way shall have a fire-resistance rating not less than 2 hours. Action required: Modify designs to comply.
Miscellaneous Correction
Corrective Action Required
05/15/2020

2018 IBC 412.3.4 Heating equipment. Heating equipment shall be placed in another room separated by 2-hour fire barriers constructed in accordance with Section 707 or horizontal assemblies constructed in accordance with Section 711, or both. Entrance shall be from the outside or by means of a vestibule providing a two-doorway separation. (see code for exceptions) Action required: Modify designs to comply.
Gen - Plan submittals 2018 codes
Corrective Action Required
05/18/2020

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Update code reference on sheet A101.
Misc
Corrective Action Required
05/18/2020

Inadequate information to complete review. Provide the following: - Foundation plans. - Wall construction information - Floor construction information - Door and window schedules
Gen - Plan submittal documents
Corrective Action Required
05/18/2020

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Architectural drawings are required to be sealed/signed by architect.
IBC 1006.2.1 Egress based on occupant load and common path of egress travel distance
Corrective Action Required
05/18/2020

2018 IBC 1006.2.1 Egress based on occupant load and common path of egress travel distance. Two exits or exit access doorways from any space shall be provided where the design occupant load or the common path of egress travel distance exceeds the values listed in Table 1006.2.1. The cumulative occupant load from adjacent rooms, areas or spaces shall be determined in accordance with Section 1004.2. (see code for special requirements for foyers, lobbies, vestibules, and care suites in I-2 occupancies) Action required: Modify design. Maximum common path of travel exceeded from offices #3 & #4.
IBC 1209.2 Finish materials
Corrective Action Required
05/18/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant materials at restrooms and mop/service/janitor sinks.
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Corrective Action Required
05/18/2020

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Provide verification that "Bar" counters will be no taller than 34"
Miscellaneous Correction
Corrective Action Required
05/18/2020

All wiring shall be in accordance with 2017 NEC Article 513 Aircraft Hangars. Action required: Comment is for informational purposes. To be field verified.
IBC 1020.2 Width and capacity - corridor width
Corrective Action Required
05/18/2020

Dead end corridor 2018 IBC 1020.4 Dead Ends. Where more than one exit or exit access doorway is required, the exit access shall be arranged such that dead-end corridors do not exceed 20 feet. Exceptions: 1. In Group I-3, Condition 2, 3 or 4, occupancies, the dead end in a corridor shall not exceed 50 feet. 2. In occupancies in Groups B, E, F, I-1, M, R-1, R-2, S and U, where the building is equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1, the length of the dead end corridors shall not exceed 50 feet. 3. A dead-end corridor shall not be limited in length where the length of the corridor is less than 2.5 times the least width of the dead end corridor. Action required: Modify design to comply.
Licensed Contractors Approved 05/05/2020 04/21/2020
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $2,400.00 $2,400.00 Paid 08/19/2020
7232302-Industrial/Warehouse License Tax Fee $2,080.00 $2,080.00 Paid 08/19/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 08/19/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 08/19/2020
9110081-Paved Surface Inspection Fee $1,035.00 $1,035.00 Paid 08/19/2020
91100C9-Water Insp Fee $90.00 $90.00 Paid 08/19/2020
9110071-Site Grading Fee $225.00 $225.00 Paid 08/19/2020
91100C8-Sanitary Sewer Insp Fees $120.00 $120.00 Paid 08/19/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Failed 11/19/2020 (8:00) 11/19/2020 11/19/2020
Misc
Corrective Action Required
11/19/2020
incomplete- if using 3rd party ,ufer ground needs to be verified. provide soil engineers report.
Footing Inspection - Commercial Partial 11/20/2020 11/20/2020
Misc
Informational
11/20/2020
-Provide third-party inspection report -Provide soil analysis report -Schedule inspection of interior grade beams
Piers/Caissons Inspection - Commercial Partial 11/20/2020 11/20/2020
Misc
Corrective Action Required
11/20/2020
-Column pads- -Provide third-party inspection report -Provide soil analysis report
Underslab Plumbing Inspection - Commercial Failed 12/3/2020 12/3/2020 12/02/2020
Misc
Corrective Action Required
12/02/2020
-Not installed per plan -pressure test required
Underslab Plumbing Inspection - Commercial Passed 12/3/2020 12/3/2020 12/03/2020
Misc
Resolved
12/03/2020
-Not installed per plan -pressure test required NOT READY Michael Harkins 12/03/2020 11:59 AM
Footing Inspection - Commercial Partial 12/4/2020 (1:00) 12/4/2020 12/04/2020
Misc
Informational
11/20/2020
-Provide third-party inspection report -Provide soil analysis report - INTERIOR GRADE BEAMS, BARS AT COLUMN ANCHORS -
Site Visit Complete 12/17/2020
Misc
Informational
12/17/2020
12/17/20 Thursday 12:00PM Checking project to get an approximation of when they will be installing sanitary & water lines to future building. Contractor believes that installation of these will not happen until Spring after the building structure is erected.
All Rough Inspection - Commercial Failed 4/21/2021 04/21/2021
Misc
Corrective Action Required
04/21/2021
-The in-wall NM cables must be covered with 20-min fire rated barrier -Stair treads depth shall be min 11”. Riser height shall be no more than 7” -Install blockings for wrap bars -Complete venting the bath fan -Steel columns protruding into egress path -Fasten bottom plate to floor -Mezzanine spaces will not be built, but will be constructed for storage, according to the builder. Also, furnace is moved to mezzanine floor. Submit all changes to plan examiner -Plan calls for 11-7/8” lvl every 16”. TJI joists installed instead. Have this change submitted -Provide floor TJI joist plan -Complete building exits -Install headers for all openings on mezzanine; Install openings king/trimmer studs per plan -Install EM light in lounge per plan **OK TO INSULATE
All Rough Inspection - Commercial Partial 4/27/2021 4/27/2021 04/27/2021
Misc
Corrective Action Required
04/21/2021
-Steel columns protruding into egress path. Provide compliance with ANSI 117 307&403 -The 2-hour fire barrier for the furnace closet is required. Submit all changes to plan examiner -Complete building exits **OK TO ROCK
Electrical Service Inspection Failed 4/27/2021 4/27/2021 04/27/2021
Misc
Corrective Action Required
04/27/2021
-At each service disconnect, connect the grounding electrode conductor to service grounded conductor per NEC 250.24(B) -Tape the EGC inside each disconnect with proper color -Bond raceways and enclosure enclosing the service conductors per NEC 250.92(B) -Tighten grounding connection to ufer rebar
Electrical Service Inspection Failed 5/3/2021 5/3/2021 05/03/2021
Misc
Corrective Action Required
04/27/2021
-Bond raceways and enclosure enclosing the service conductors per NEC 250.92(B) **Not done -Tighten grounding connection to ufer rebar **No access
Rated Assembly Inspection Failed 5/5/2021 5/5/2021 05/05/2021
Misc
Corrective Action Required
05/05/2021
-The 1-hr separation wall between hangar and office is not per UL design. Only 5/8" GB type X installed on hangar side. Screw pattern inspected on hangar side is OK. The interior side is covered with 1/2" GB. The side under the stair is not protected. -The mechanical equipment is now on 2nd floor. The 2-hr fire barrier is required. The architect must submit this change to the plan reviewer for approval. No inspection can be made if this change is not reflected on the approved plan
Electrical Service Inspection Passed 5/5/2021 05/05/2021
Misc
Informational
05/05/2021
-Provide access to the ufer grounding connection. Check later. Service is ok
Rated Assembly Inspection Partial 5/11/2021 5/11/2021 05/11/2021
Misc
Corrective Action Required
05/05/2021
-The mechanical equipment is now on 2nd floor. The 2-hr fire barrier enclosure around the furnace is not framed at this moment. The wall&ceiling inside of the closet below the furnace is protected with 2 layers of 5/8" rock -The office/hangar 1 hour wall is completed
All Rough Inspection - Commercial Failed 5/11/2021 5/11/2021 05/11/2021
Misc
Corrective Action Required
04/27/2021
-Complete exit for mezzanine **OK TO ROCK
Occupancy Inspection - Planning Passed 06/21/2021
Occupancy Inspection - Codes Commercial Failed 6/21/2021 6/21/2021 06/21/2021
Misc
Corrective Action Required
06/21/2021
-Approval required from: Fire, Water, Field Engineer, Planning -Install box extension for receptacle boxes. Extensions must shield combustible wall finish from inside of boxes -Fire-rated windows and doors required ; doors at rated wall shall be self-closing -Fire caulk all penetrations of the fire-rated wall -Breaker lock for water heater -Gas test failed. Provide min 10 psi pressure for testing -Paint gas service to protect against corrosion -Install ADA compliant door knobs at restroom -Bottom of mirror shall be no more than 40” AFF -Install open-front toilet seat -Install restroom signage -Handrail shall be 34”-38” in height. Handrail shall extend to bottom riser and extend horizontally min 1 tread depth -Provide nosing at top riser -MN cable exposed above top stair enclosure -Extend plumbing vent to outdoor -Complete mezzanine exterior exit and 2-hr enclosure for furnace space with damper installation -Provide Special Inspection required per code; provide soil analysis for footing
Occupancy Inspection - Fire Failed 6/21/2021 6/21/2021 06/21/2021
Occupancy Inspection - Engineering Temporary C of O 6/21/2021 06/23/2021
Misc
Corrective Action Required
06/23/2021
Temporary Occupancy is granted. Items needed for Final Occupancy- 1. Vegetation to be established on the hill behind the building and in the area to the north of the building where construction equipment was parked.
Occupancy Inspection - Water Utilities Passed 06/25/2021
Occupancy Inspection - Codes Commercial Failed 6/28/2021 6/28/2021 06/28/2021
Misc
Corrective Action Required
06/21/2021
-Approval required from: Fire, Water, -Gas test failed. Provide min 10 psi pressure for testing -Paint gas service to protect against corrosion -Install restroom signage -Extend plumbing vent to outdoor -Provide Special Inspection required per code; provide soil analysis for footing
Misc
Corrective Action Required
06/28/2021
MARK HARDING 06/28/2021 3:57 PM -- install joist hangers at header joist and tail joist as per manufactures listing. also install web stiffeners where required on I joist locations. --Low psi on gas pressure test. lower than 10 psi. retest. --install approved handicap signage on restrooms. --area at the stairs 1st and 2nd floor needs to be finished. 2nd floor 2hr firewall. - Provide fire damper type listing and specifications used. -install listed 2hr fire dampers in the 2hr wall correctly. - framing around the opening when the dampers are installed needs to be inspected prior to covering with sheetrock. --1st layer on interior of mechanical room, install backing and screw pattern. --interior side of door jam. fill in the opening on the 2x6 door jam with 2x material to meet the 1st layer of sheetrock. -- hvac duct need to penetrate the fire wall horizontally not at a 45degree angle. -- openings between the return and supply need to be framed sheetrock and complete per UL listing, no gap between flex duct and sheetrock is allowed. Dampers, 1st layer, 2nd layers need to inspected separately and approved prior to scheduling a final inspection.
Rated Assembly Inspection Partial 7/1/2021 7/1/2021 07/01/2021
Misc
Corrective Action Required
05/11/2021
ok to install 2nd layer on the mechanical room walls.
Rated Assembly Inspection Passed 7/8/2021 7/8/2021 07/08/2021
Misc
Resolved
07/08/2021
ok to install 2nd layer on the mechanical room walls.
Occupancy Inspection - Codes Commercial Full C of O 7/8/2021 07/08/2021
Misc
Resolved
07/08/2021
-Approval required from: Fire, Water, -Gas test failed. Provide min 10 psi pressure for testing -Paint gas service to protect against corrosion -Install restroom signage -Extend plumbing vent to outdoor -Provide Special Inspection required per code; provide soil analysis for footing
Misc
Resolved
07/08/2021
MARK HARDING 06/28/2021 3:57 PM -- install joist hangers at header joist and tail joist as per manufactures listing. also install web stiffeners where required on I joist locations. --Low psi on gas pressure test. lower than 10 psi. retest. --install approved handicap signage on restrooms. --area at the stairs 1st and 2nd floor needs to be finished. 2nd floor 2hr firewall. - Provide fire damper type listing and specifications used. -install listed 2hr fire dampers in the 2hr wall correctly. - framing around the opening when the dampers are installed needs to be inspected prior to covering with sheetrock. --1st layer on interior of mechanical room, install backing and screw pattern. --interior side of door jam. fill in the opening on the 2x6 door jam with 2x material to meet the 1st layer of sheetrock. -- hvac duct need to penetrate the fire wall horizontally not at a 45degree angle. -- openings between the return and supply need to be framed sheetrock and complete per UL listing, no gap between flex duct and sheetrock is allowed. Dampers, 1st layer, 2nd layers need to inspected separately and approved prior to scheduling a final inspection.
Occupancy Inspection - Fire Passed 08/11/2021
Occupancy Inspection - Engineering Passed 10/13/2021 08/11/2021
Misc
Corrective Action Required
06/23/2021
Temporary Occupancy is granted. Items needed for Final Occupancy- 1. Vegetation to be established on the hill behind the building and in the area to the north of the building where construction equipment was parked.
Documents & Images
Date Uploaded File Type Document Name
04/21/2020 Application Form Hangar V COM Application
04/21/2020 Plans Doc - Apr 21 2020 - 1-06 PM
04/21/2020 Plans Site Plan Doc - Apr 21 2020 - 1-09 PM
05/12/2020 Plans Hangar V Plumbing & Mechanical Plans
05/15/2020 Plans 67148 RevA-signed - metal building
05/15/2020 Plans 20388 Electrical
05/15/2020 Plans Signature Builders New Hanger Project_merged
05/18/2020 Letter Fire Building Plan Review
05/18/2020 Letter DS P/R Corrections Document
06/19/2020 Letter PRCOM20201014 LS airport Hanger Unit V
06/19/2020 Plans LS hanger V Permit 6_18
06/19/2020 Letter License Tax Bill
06/22/2020 Letter Fire Building Plan Review
06/22/2020 Letter DS P/R Corrections Document
06/29/2020 Letter PLAN REVIEW CONDITION RESPONSE LETTER 2_
06/29/2020 Plans PRCOM20201014 LS hanger V R2 6_29_20
07/07/2020 Letter Fire Building Plan Review
07/07/2020 Letter DS P/R Corrections Document
07/10/2020 Letter Letter of Spec Insp_07-10-20
07/10/2020 Application Form Hangar V - Lees Summit Excise Tax(1)
08/13/2020 Plans PRCOM20201014 LS hanger v REV 3 7-7-20
08/13/2020 Letter Fire Building Plan Review
08/14/2020 Approved Plans Approved Hangar V building plans
08/17/2020 Approved Plans Approved Hangar V Civil
08/19/2020 Receipt Receipt for transaction:2020-005405
08/19/2020 Letter DS Building Permit
11/19/2020 Letter INSPECTION SUMMARY
11/20/2020 Letter INSPECTION SUMMARY
11/20/2020 Letter INSPECTION SUMMARY
11/20/2020 Letter INSPECTION SUMMARY
12/02/2020 Letter INSPECTION SUMMARY
12/02/2020 Letter Codes Plan Review Conditions
12/03/2020 Letter INSPECTION SUMMARY
12/04/2020 Letter INSPECTION SUMMARY
04/21/2021 Letter INSPECTION SUMMARY
04/22/2021 Engineer Report/Study Hanger V I-joist Analysis
04/22/2021 Approved Plans approved - Hanger V I-joist Layout
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
05/03/2021 Letter INSPECTION SUMMARY
05/05/2021 Letter INSPECTION SUMMARY
05/05/2021 Letter INSPECTION SUMMARY
05/11/2021 Approved Plans approved - LShanger r4 5_10_21
05/11/2021 Letter INSPECTION SUMMARY
05/11/2021 Letter INSPECTION SUMMARY
06/21/2021 Letter INSPECTION SUMMARY
06/21/2021 Letter Fire Loss Reduction Form
06/23/2021 Approved Plans approved - LShanger R5 6_23_21
06/23/2021 Letter Inspection Summary
06/25/2021 3RD Party Insp Report Domestic Water Service Backflow Test
06/25/2021 3RD Party Insp Report Irrigation Backflow Test
06/28/2021 Letter INSPECTION SUMMARY
07/01/2021 Letter INSPECTION SUMMARY
07/08/2021 Letter INSPECTION SUMMARY
07/08/2021 3RD Party Insp Report Hanger V_Final Inspection Report_06-21-21
08/11/2021 Letter Field Certificate of Occupancy
08/11/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home