Planning Application Status

PL2021282




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2021282
Blue Parkway Mixed Use Residential (Residences, Reserve and Reunion)
Residential Rezoning with Preliminary Development Plan
Residential Rezoning with Preliminary Development Plan
Approved
07/22/2021
FORT HAYS STATE UNIVERSITY FOUNDATION
Mixed density residential development project
Locations
Contacts
FORT HAYS STATE UNIVERSITY FOUNDATION, Address:ONE TIGER PLACE PO BOX 1060  
GRIFFIN RILEY PROPERTY GROUP, Address:21 SE 29TH TER, Phone:(816) 366-7900  
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
Mike Weisenborn, Address:220 GREEN ST  
Hector Soto Jr., Phone: 8169691238  
Shannon McGuire, Phone: 8169691237  
Kent Monter, Phone: 8169691229  
Sue Pyles, P.E., Phone: 8169691245  
David Lohe, Phone:(816) 969-1840  
Brad Cooley, P.E., RSPI  
Joe Frogge, Phone: 8169691241  
Jim Eden, Phone:(816) 969-1303  
Aaron Evans, Phone:(816) 969-1765  
Jeff Thorn, Phone:(816) 969-1922  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Corrections 09/13/2021 09/13/2021
Shannon McGuire
Corrective Action Required
09/13/2021

The proposed wood on the commercial buildings is not an approved material. Stall will not support this material but would support a synthetic material like Trex.
Corrective Action Required
09/13/2021

The rear elevation of the commercial building is lacking in the required architectural projections. The roof line and flat plan of the rear wall need to be broken up.
Engineering Review Approved with Conditions 09/13/2021 09/13/2021
Kent Monter
Corrective Action Required
09/13/2021

Due to excessive water main dead end length during phase 2, water line shall be looped in phase 2. This shall require the extension of public roads and storm sewer during phase 2. In particular, from the endpoint in phase 2 on Riley Ln., and proceeding to Heritage St., and then proceeding southwest to the endpoint of Phase 1.
Corrective Action Required
09/13/2021

Interior water lines, storm lines, and sanitary sewer lines shown within phase 3 may be considered private. Final determination to be made during the Final Development Plan.
Corrective Action Required
09/13/2021

Sanitary sewer serving phase 2 and shown to be installed beneath unfinished road bed shall be installed with a finished road, along with water main and storm lines.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
09/13/2021

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
09/13/2021

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #06 Land Disturbance
Corrective Action Required
09/13/2021

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #07 Easements
Corrective Action Required
09/13/2021

All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to approval of Final Development Plans or engineering plans. A certified copy shall be submitted to the City for verification.
DE C&O #11 Pavement Thickness
Corrective Action Required
09/13/2021

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE C&O #12 Cut & Fill
Corrective Action Required
09/13/2021

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
DE C&O #13 ADA Sidewalk Ramps
Corrective Action Required
09/13/2021

All ADA sidewalk ramps shall be constructed by the developer at the time the street is constructed.
Traffic Review No Comments 09/13/2021 09/13/2021
Brad Cooley, P.E., RSPI
Fire Review Corrections 09/13/2021 09/09/2021
Jim Eden
Code Statement
Informational
09/03/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Water Supply
Corrective Action Required
09/03/2021

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required- Provide information on total square footage and construction type for the apartments and retail buildings. Only a 50% reduction in fire flow is allowed for buildings with an automatic sprinkler system.
Miscellaneous Correction
Corrective Action Required
09/03/2021

IFC D107.1 One- or two-family dwelling residential developments. Developments of one- or two-family dwellings where the number of dwelling units exceeds 50 shall be provided with two separate and approved fire apparatus access roads. IFC D106.1Multiple-family residential projects having more than 100 dwelling units shall be equipped throughout with two separate and approved fire apparatus access roads. Action required- The second access required does not meet the intent of: D106.3 Remoteness. Where two fire apparatus access roads are required, they shall be placed a distance apart equal to not less than one-half of the length of the maximum overall diagonal dimension of the property or area to be served, measured in a straight line between accesses. Action required- The second access on the west side meets the intent of the code, however that portion of the project is a later phase. Provide a dedicated access that will be available for all phases and while the retail portion of the project is being constructed. A gated access is acceptable.
Misc.
Resolved
09/09/2021

Planning Review Corrections 08/31/2021 08/31/2021
Shannon McGuire
Corrective Action Required
08/31/2021

Sheet C1.3 seems to be missing the landscaping layer. As presented there is no landscaping on the plan sheet. Please update this to meet the UDO requirements.
Corrective Action Required
08/31/2021

Four-sided architecture is required. The rear elevations of the proposed commercial building lack the required architectural breaks to meet the UDO requirements. Both horizontal and vertical breaks are needed.
Engineering Review Corrections 08/31/2021 08/31/2021
Gene Williams, P.E.
Corrective Action Required
08/31/2021

Phasing Plan: Phase 1 of the plan shows the installation of a sanitary sewer overland. What is the maximum depth of the sanitary sewer along the proposed route? Will future road grading affect the sanitary sewer? Maximum depth from final grade to flowline is 20 feet, so please ensure these depths are not exceeded either for the proposed condition in Phase 1, or subsequent phases.
Corrective Action Required
08/31/2021

Phasing Plan: Where is the off-site water main loop requested in the previous applicant letter (comment 10)? As shown, no loop exists. This shall be required to be shown on the plan, even if a conceptual plan subject to future modification. The general intent of this requirement shall be to provide a northerly loop for the water main.
Corrective Action Required
08/31/2021

Sheet C2.0: Please refer to comment 16 in the previous applicant letter. The response to comments states the swale continues "off site". According to Sheet C2.0, the swale does not continue off site, but rather, is collected by a field inlet and routed to the northeast detention basin. If this is the case, why is a waiver being requested for detention for detention within this area? Was this area accounted in the stormwater study?
Corrective Action Required
08/31/2021

Phasing Plan: It would appear the off-site water main loop shall be required during Phase 2 of the project. Is the intent to acquire an off-site easement from the Summit Mill HOA for the water line loop, or to provide the loop through Brookeplace Substation? It would appear the substation has existing general utility easements on the north and south sides.
Corrective Action Required
08/31/2021

Waiver Request: Please see previous comment concerning the need for a waiver. The grading plan shows the rear yard swale terminating at a field inlet, which then is conveyed to the detention basin in the northeast portion of the project. If this is not the case, the plan shall be reconciled to reflect proposed conditions.
Corrective Action Required
08/31/2021

Waiver Request: If a waiver is still required, the exhibit and summary report should be revised to include the pre-development drainage area in addition to the post-development drainage area (in graphic format on an additional exhibit or on the same exhibit).
Corrective Action Required
08/31/2021

Phase 2 of the phasing plan should include extension of the roadway from the current termination point near the northeast detention basin, to the end of the road on Heritage St. (i.e., at the limits currently shown on the phasing plan). It shall also include the completion of the interior water main loop along the Heritage/Riley right of way.
Corrective Action Required
08/31/2021

Heritage St. should be extended to the east property line during Phase 2. It is currently showing this extension in Phase 3.
Corrective Action Required
08/31/2021

Phase 2 shows the completion of a detention basin in the northeast corner of the project. Stormwater runoff, however, will continue from the southwest "undetained". Did the stormwater report account for undetained stormwater runoff from the southwest? It does not appear to be the case. It is possible the detention basin shown within Phase 3 may need to be constructed during Phase 2. Please reconcile.
Corrective Action Required
08/31/2021

Sanitary sewer line in the northeast is too close to the townhomes. A minimum distance of 15 feet is required, as measured from the outside of the sanitary sewer, to the furthest point on the outside of the building (typically overhangs). Only 8 feet was provided.
Corrective Action Required
08/31/2021

Please see comment 4 within the previous applicant letter. Sizing of the connection points is particularly critical at the water line connection point on Blue Pkwy. We are showing a 12 inch connection, but the line reduces to a 6 inch just a few feet beyond this 12 inch line line. It is possible an extension is required to the 16 inch line existing on the southern roundabout at Blackwell.
Fire Review Corrections 08/31/2021 08/30/2021
Jim Eden
Fire Lanes - Marking
Resolved
08/30/2021

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Action required- Parking will only be allowed on one side of the street in front of the townhomes. Show areas to be posted.
Code Statement
Informational
08/24/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
FDC
Resolved
08/30/2021

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required- Show the location of the FDC's on the retail and apartment buildings along with the accessible fire hydrant within 100 feet.
Water Supply
Corrective Action Required
08/24/2021

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required- Provide information on total square footage and construction type for the apartment and retail buildings. Only a 50% reduction in fire flow is allowed for buildings with an automatic sprinkler system.
Miscellaneous Correction
Corrective Action Required
08/24/2021

IFC D107.1 One- or two-family dwelling residential developments. Developments of one- or two-family dwellings where the number of dwelling units exceeds 50 shall be provided with two separate and approved fire apparatus access roads. IFC D106.1Multiple-family residential projects having more than 100 dwelling units shall be equipped throughout with two separate and approved fire apparatus access roads. Action required- The second access required does not meet the intent of: D106.3 Remoteness. Where two fire apparatus access roads are required, they shall be placed a distance apart equal to not less than one-half of the length of the maximum overall diagonal dimension of the property or area to be served, measured in a straight line between accesses. Provide a second access from the west side of the retail center.
Hydrants
Resolved
08/30/2021

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required- Provide a hydrant plan.
Misc.
Corrective Action Required
08/24/2021

Steet names- Highland is already used in another part of the city.
Miscellaneous Correction
Resolved
08/30/2021

All private streets fronting the townhomes shall be 28 feet wide with parking on one side only.
Traffic Review No Comments 08/31/2021 08/30/2021
Brad Cooley, P.E., RSPI
Planning Review Corrections 08/13/2021 08/13/2021
Shannon McGuire
Corrective Action Required
08/13/2021

Information only; the requested CP-1 will limit they type of commercial uses that will be permitted for future occupants. Most notably a dine in or drive through restaurant use is not permitted in the requested zoning district. If you wish for this type of use, the CP-2 zoning district would be more appropriate. Additionally, please also note that the UDO has reduced allowances for tenant signage in the CP-1 zoning district.
Corrective Action Required
08/13/2021

Please provide a legal description of the project in a selectable format that can be inserted into a word document.
Corrective Action Required
08/13/2021

Please provide a vicinity map with north arrow indicating the location of the property within the City.
Corrective Action Required
08/13/2021

Please add the following information to rezoning map; 1. Legal Description 2. Existing and proposed zoning districts of the property to be rezoned. 3. Zoning, land use, and ownership of all parcels within 300 feet of the property to be rezoned.
Corrective Action Required
08/13/2021

If this will be a phased project please provide a phasing plan.
Corrective Action Required
08/13/2021

Please provide the name, location, width, radii, centerline, and grade of proposed streets and alleys, both public and private.
Corrective Action Required
08/13/2021

Maximum block length in residential areas shall be based on land use and zoning district, for the RP-3 district it is 800’. The section of road in the north east corner of the project appears to be close to the maximum length. If it is over the maximum block length you will need to seek a modification for it.
Corrective Action Required
08/13/2021

On local and access streets in residential areas, sidewalks shall be constructed on one side of the street if the single-family density is 1.5 to 4.0 dwelling units per gross acre excluding common area and on both sides of the street if the density is over 4.0 dwelling units per gross acre. Duplex and multi-family development shall require sidewalks on both sides of the street. On all other streets (including, but not limited to, major and minor arterials, industrial and commercial collectors, and residential collectors), sidewalks shall be required on both sides of the street. Please provide the location and width of proposed sidewalks and public walkways.
Corrective Action Required
08/13/2021

Please label the dimensions of the proposed accessible spaces.
Corrective Action Required
08/13/2021

Please provide information on the proposed exterior lighting, including parking lot lights and wall-mounted fixtures, including fixture type, location, height and intensity. Manufacturer’s specification sheets shall be submitted.
Corrective Action Required
08/13/2021

For the commercial building, please provide preliminary building elevations of all sides depicting the general style, size and exterior construction materials and color schedule of the building proposed. If this information is not supplied at during this PDP a separate PDP will be required for development of the commercial lot.
Corrective Action Required
08/13/2021

For all residential buildings (single family, 4-plex and apartment) please label the proposed building materials. Please label the proposed building material for the dumpster enclosures and garages as well.
Corrective Action Required
08/13/2021

In the site data table on sheet C1.4 please label the proposed FAR.
Corrective Action Required
08/13/2021

Please provide a narrative statement that explains the need for and justifications for all modifications of the applicable zoning district regulations that you are requesting. Its staff’s recommendation that you limit the modification request to only what is needed. Example: on sheet C1.4 you are requesting a 15ft parking lot setback from the ROW in lieu of the 20’ required. I only see 1 location that you are not meeting the required setback by less then 1’. In the instance staff would only support a 1’ modification and as the requested 5’ is not needed.
Corrective Action Required
08/13/2021

Below is the list of modification requested. Please let me know if I have missed anything. 1. Landscaping a. Reduce the caliper of the shade trees from 3 inches to 2.5 inches for the buffer screening area. b. Reduce the height of the evergreen trees from 8 feet to 6 feet. c. Reduce the caliper of the ornamental trees from 3" to 2". 2. Parking lot setback from the ROW. 3. RP-1 district a. Density modification: 4 du/ac - 6.26 du/ac b. Min lot size: 6,600 sf - 4,000 sf c. Min lot width: 60 ft - 40 ft
Corrective Action Required
08/13/2021

A low impact buffer is required along the full length of the north property line and the west property line where the proposed RP-1 district abuts the R-1 district.
Corrective Action Required
08/13/2021

A medium landscaping buffer is required where the CP-1 district abuts the RP-1 district, along the north property line of the CP-1 lot.
Corrective Action Required
08/13/2021

A medium landscaping buffer is required where the RP-4 district abuts the RP-3 and CP-1 districts.
Corrective Action Required
08/13/2021

Landscape buffers are required to be placed along the property lines. It appears that you are proposing buffers that are inset from the property lines due to interference with existing UE’s. This will require a modification (staff supported). Please include this with the other requested modifications.
Corrective Action Required
08/13/2021

All signs must comply with the sign requirements as outlined in the sign section of the ordinance. If you need a deviation for a sign you may seek it now as a modification during this approval process.
Engineering Review Corrections 08/13/2021 08/13/2021
Gene Williams, P.E.
Corrective Action Required
08/12/2021

Waiver request shall be submitted with the standard cover sheet template, and a summary report attached and referenced to the template form. This template shall be forwarded separately.
Corrective Action Required
08/12/2021

Waiver request discusses "release point 2". The summary report does not show the location of "release point 2". In addition, there were no measureable quantities provided when discussing the pre-versus post development drainage areas, or the pre versus post development peak flow rates. The summary report attached to the template should discuss these measurable quantities, and should also show release point 2. It may also be beneficial to discuss the proposed swale to be constructed in the rear of the yards which should help alleviate any potential negative impacts to adjacent properties.
Corrective Action Required
08/12/2021

The City no longer allows the Type B ramp shown on standard detail GEN-3A, unless it is serving the intersection of two (2) sidewalks and two (2) separate street crossings. The majority of the ADA-accessible ramps for this project only show one (1) street crossing when two (2) ramps intersect, so the Type B ramp proposed on the drawings will need to be revised. An example can be supplied if necessary, and it will only be necessary to show the conceptual geometry of the ramp on the Preliminary Development Plan.
Corrective Action Required
08/12/2021

A separate utility plan was missing from the Preliminary Development Plan. Please provide a separate utility plan showing City water service and City sanitary sewer service, including all off-site extensions. This plan shall also include all water line connection to existing water mains, sizing of existing water mains, sizing of existing sanitary sewer mains, and sizing of proposed sanitary sewer and water mains. It shall also include notation of whether the line is public or private.
Corrective Action Required
08/12/2021

All water lines and sanitary sewer lines within "Apartments Lot 1", "Townhome Lot 1", "Townhome Lot 3", "Townhome Lot 2",and "Retail Lot 1" shall be private. Please show this on the separate utility sheet discussed elsewhere in this comment letter.
Corrective Action Required
08/12/2021

What is the phasing for this project? Will all improvements be made simultaneously? This will have a bearing on the utility plans, and infrastructure plans. This shall be discussed at the applicant meeting, and a phasing plan provided unless all improvements are to occur simultaneously.
Corrective Action Required
08/12/2021

Off-site sanitary sewer improvements discussed within the separate sanitary sewer memordandum shall be discussed at the applicant meeting. For purposes of a resubmittal, a general concept plan along with preliminary profile views of the off-site sanitary improvements shall be required.
Corrective Action Required
08/12/2021

Ensure that public water service and public sanitary sewer service is provided for the property to the south of Blue Pkwy. Public sanitary sewer and water service shall be provided to the plat boundary.
Corrective Action Required
08/13/2021

A water line loop may be required to the north or northwest. This will be discussed at the applicant meeting.
Corrective Action Required
08/13/2021

There was no graphical representation of the 100 year water surface elevation (100% clogged/zero available storage) shown on the overall site plan or anywhere within the Preliminary Development Plan for any of the detention or retention basins. Please show and label this line within each detention or retention basin, and ensure there is a minimum 20 feet from any building, or property line.
Corrective Action Required
08/13/2021

Please show the locations of all sidewalks on the Overall Preliminary Plat, with proposed geometry of the ADA-accessible ramps at each intersection.
Corrective Action Required
08/13/2021

Detention basin in the northeast corner of the project does not show any apparent means of discharge without negative impact to adjacent property owners. What are the proposed improvements in this area to convey stormwater discharges from this detention basin? The grading plan on Sheet C2.2 shows what appears to be a storm line extending to the north and ending. This would require an off-site easement from the property owner to the north, and verification any existing storm structure on the adjacent property is capable of managing the 100 year event without surcharging.
Corrective Action Required
08/13/2021

Detention basin on the east side of the "Apartments Lot 1" shows no apparent discharge. There were no off-site contours shown on Sheet C2.3 showing how the stormwater discharge will be conveyed to the adjacent property without negative impacts.
Corrective Action Required
08/13/2021

Detention basin serving the retail lot in the southwest portion of the project does not show any apparent means of stormwater conveyance from the detention basin.
Corrective Action Required
08/13/2021

Grading plan shown on Sheet C2.1 proposes a swale on the west property line. However, the swale ends in the northwest of the project, with no apparent means of stormwater conveyance after the swale abruptly ends.
Corrective Action Required
08/13/2021

Please be aware a 3 inch sanitary sewer force main exists along Blue Pkwy. This force main extends the entire length of Blue Pkwy. along the southern boundary of the project.
Traffic Review Corrections 08/13/2021 08/12/2021
Brad Cooley, P.E., RSPI
Corrective Action Required
08/12/2021

Make at least one connection to the existing trail on the school property (north). If multiple are desired, the City would accept.
Fire Review Corrections 08/13/2021 07/30/2021
Jim Eden
Fire Lanes - Marking
Corrective Action Required
07/29/2021

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Action required- Parking will only be allowed on one side of the street in front of the townhomes. Show areas to be posted.
Code Statement
Informational
07/29/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
FDC
Corrective Action Required
07/29/2021

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required- Show the location of the FDC's on the retail and apartment buildings along with the accessible fire hydrant within 100 feet.
Water Supply
Corrective Action Required
07/29/2021

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required- Provide information on total square footage and construction type for the apartment and retail buildings. Only a 50% reduction in fire flow is allowed for buildings with an automatic sprinkler system.
Miscellaneous Correction
Corrective Action Required
07/29/2021

IFC D107.1 One- or two-family dwelling residential developments. Developments of one- or two-family dwellings where the number of dwelling units exceeds 50 shall be provided with two separate and approved fire apparatus access roads. IFC D106.1Multiple-family residential projects having more than 100 dwelling units shall be equipped throughout with two separate and approved fire apparatus access roads. Action required- A second remote access is required to the single-familiy, townhome portion of the project.
Hydrants
Corrective Action Required
07/30/2021

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required- Provide a hydrant plan.
Misc.
Corrective Action Required
07/30/2021

Provide street names.
Miscellaneous Correction
Corrective Action Required
07/30/2021

All private streets fronting the townhomes shall be 28 feet wide with parking on one side only.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Residential Rezoning and Preliminary Development Plan fee $3,625.00 $3,625.00 Paid 07/23/2021
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 07/23/2021
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 07/23/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 09/23/2021 05:00 PM Council Chambers 09/23/2021 05:00 PM
Public Hearing Review
Complete
09/23/2021
City Council Public Hearing 11/09/2021 06:00 PM Council Chambers 11/09/2021 06:00 PM
Public Hearing Review
Approved
11/09/2021
Documents & Images
Date Uploaded File Type Document Name
07/23/2021 Application Form RP-3 Design Standards - Planned Residential Checkist
07/23/2021 Application Form Rezoning Application Checklist
07/23/2021 Application Form RP-1 Design Standards - Planned Residential Checkist
07/23/2021 Application Form RP-4 Design Standards - Planned Residential Checklist
07/23/2021 Plans cobalt
07/23/2021 Plans honeydew
07/23/2021 Plans indigo
07/23/2021 Plans Sapphire
07/23/2021 Plans sienna
07/23/2021 Plans Oak Tree Commons 3 - Commercial Elevation
07/23/2021 Plans Oak Tree Commons 2 - Commercial Elevation
07/23/2021 Application Form Single Family Residential Compatibility Chart
07/23/2021 Application Form COMMERCIALDESIGNSTANDARDSCHECKLIST
07/23/2021 Application Form Revised RP-4 Design Standards - Planned Residential Checklist
07/23/2021 Engineer Report/Study Blue Parkway Development TIS
07/23/2021 Plans 21075_Blackwell_Single Family_210721 concept
07/23/2021 Plans 21075_Blackwell_55 Plus_SD101
07/23/2021 Application Form SKMBT_C364e21072310190
07/23/2021 Plans 21 0723-Blackwell-L100
07/23/2021 Plans 21 0723-Blackwell-SP100
07/23/2021 Application Form LA Plan Checklist
07/23/2021 Plans 21 0723 - CLUB TRASH GARAGE - PDP Sub
07/23/2021 Plans 21 0723 - APARTMENTS - PDP SUB
07/23/2021 Application Form Application
07/23/2021 Receipt Receipt for transaction: 2021-005900
07/29/2021 Plans 20-205_ PDP_C1.3 APARTMENT SITE PLAN
08/02/2021 Waiver/Modification Document Waiver Request Report
08/02/2021 Engineer Report/Study 20-205-Prelim_ Stormwater Management Plan
08/02/2021 Plans 2021-08-02_20-205 PDP REV 0
08/02/2021 Engineer Report/Study Sanitary Sewer Memo and Offsite Improvements
08/03/2021 Public Notice Document Adjacent Property Owners
08/13/2021 Letter Applicant Letter - Dev. Apps (DRCP)
08/24/2021 Waiver/Modification Document Waiver Request Report
08/24/2021 Waiver/Modification Document 20-205-Waiver Request
08/24/2021 Engineer Report/Study LEGAL FROM ALTA
08/24/2021 Engineer Report/Study 20-205-Prelim_ Stormwater Management Plan
08/24/2021 Plans 210820-5753_A3_00 revised
08/24/2021 Plans 210820-5753_A_3_01 revised
08/24/2021 Plans 2021-08-24_20-205 PDP REV 1
08/24/2021 Engineer Report/Study 20210824-20-205-BLUE PARKWAY MEMORANDUM-REV(1)
08/26/2021 Letter Response to Comments dated 8-13-21 for 2840 SE Blue Pkwy Rezoning w-PDP
08/26/2021 Plans Retail
08/26/2021 Plans RETAIL color elevations
08/30/2021 Waiver/Modification Document BLUE PARKWAY MIXED USE modifications
09/01/2021 Letter Applicant Letter - Dev. Apps (DRCP)
09/01/2021 Public Notice Document Notice to Property Owners PC CC
09/03/2021 Public Notice Document LEGAL PL2021-282 REZ PDP
09/03/2021 Plans Apartment Landscaping Plan
09/03/2021 Plans Apartment Landscaping Plan - Color
09/03/2021 Plans 2021-09-02_20-205 PDP REV 2
09/07/2021 Public Notice Document Scan of Certified Receipts for Planning Commission
09/07/2021 Public Notice Document Affidavit of Mailing for PC 9-23-21
09/07/2021 Public Notice Document Notice to Property Owners PC CC
09/07/2021 Public Notice Document 20-205 NOTICE LOCATION MAP
09/07/2021 Public Notice Document Scanned Sign In Sheet and Notes
09/07/2021 Letter Response to Comments dated 9-1-21 for 2840 SE Blue Pkwy Rezoning w-PDP
09/07/2021 Engineer Report/Study 20-205-Prelim_ Stormwater Management Plan
09/08/2021 Letter Response to Comments dated 9-7-21 for 2840 SE Blue Pkwy Rezoning w-PDP
09/16/2021 Engineer Report/Study PL2021282 Blue Parkway M-D Residential Development TIA
09/16/2021 Engineer Report/Study Blue Parkway Development TIS - SUMMARY
09/17/2021 Drawing Parking Exhibit
09/17/2021 Letter PL2021-282 REZ PDP Blue Parkway Mixed Use PC
09/17/2021 Engineer Report/Study TIA
09/20/2021 Public Notice Document DOC092021-002
09/20/2021 Activity Document PL2021-282 REZ PDP Blue Parkway Mixed Use PC
09/28/2021 Letter Notice to Property Owners PC CC
09/30/2021 Public Notice Document LEGAL PL2021-282 REZ PDP
10/13/2021 Public Notice Document DOC101321-003
12/21/2021 Ordinance Ordinance 9292
06/19/2023 Agreement (executed) Executed Development Agreement
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home