Planning Application Status

PL2018222




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2018222
STORAGE MART 156
Commercial Rezoning with Preliminary Development Plan
Commercial Rezoning with Preliminary Development Plan
Approved
12/03/2018
NEW TKG-KC LLC
STORAGE MART 156
Locations
Contacts
NEW TKG-KC LLC, Address:215 N STADIUM BLVD STE 207  
NEW TKG-KC LLC, Address:215 N STADIUM BLVD STE 207  
CROCKETT ENGINEERING CONSULTANTS , Address:1000 W NIFONG BLVD, SUITE 207 , Phone:(573) 447-0292  
NEW TKG-STORAGEMART PARTNERS PORTFLLC, Address:215 N STADIUM BLVD STE 207  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Approved with Conditions 06/04/2019 09/09/2019
Joshua Johnson
Engineering Review Approved with Conditions 06/04/2019 06/21/2019
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
06/19/2019

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
06/19/2019

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #06 Land Disturbance
Corrective Action Required
06/19/2019

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #09 FDP Reviews
Corrective Action Required
06/19/2019

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
06/19/2019

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
Fire Review Approved with Conditions 06/04/2019 06/03/2019
Jim Eden
Code Statement
Informational
05/21/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Water Supply
Corrective Action Required
05/21/2019

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required: Confirm adequate water for the required fire flow and hydrants. App. B and C.
Traffic Review No Comments 06/04/2019 05/24/2019
Michael Park
Traffic Review No Comments 01/14/2019 03/19/2019
Mike Weisenborn
Engineering Review Corrections 03/19/2019 03/19/2019
Sue Pyles, P.E.
Corrective Action Required
03/19/2019

Pavement design must meet UDO Section 8.620 and Design and Construction manual requirements. Asphalt paving requires EITHER 6" granular base course with Geogrid OR 6" granular base course with 6" stabilized subgrade.The Please revise section accordingly.
Corrective Action Required
03/19/2019

Sidewalk is required along the Mo-291 frontage with ADA-accessible ramps at driveways. Please show and label the sidewalk and ADA-accessible ramps throughout the plan set. Revise Note M on Sheet CE6 to remove the "future" designation from the sidewalk since it is part of this project and delete the second sentence because it is not applicable.
Corrective Action Required
03/19/2019

The 100-year WSE boundary has been shown and labeled throughout the plan set. Please add the elevation to each Plan view.
Corrective Action Required
03/19/2019

As previously requested, please revise the outlet structure to meet the one inch (1") minimum orifice diameter requirement. Revise both the plan set and the Detention & Water Quality Calculations.
Fire Review Approved with Conditions 01/14/2019 03/18/2019
Jim Eden
Code Statement
Informational
03/06/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Water Supply
Corrective Action Required
03/06/2019

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required: Confirm adequate water for the required fire flow and hydrants. App. B and C.
Planning Review Corrections 01/14/2019 03/18/2019
Jennifer Thompson
Corrective Action Required
03/18/2019

As part of the review for a Special Use Permit, Preliminary Development Plan, and a Rezoning application, specific UDO criteria is required to be analyzed. Please respond in narrative form to the following UDO criteria. In the UDO please respond to the following sections: Rezoning Criteria: Sec. 2.260.B PDP Criteria: Sec. 2.260.C. SUP Criteria: Sec.6.650.B SUP Conditions: 6.102.A.B.C SUP Conditions: 6.1185.A.B.C.D
Corrective Action Required
03/18/2019

Staff cannot support the exterior garage doors and 6-foot fencing along the M-291 Hwy frontage. Staff's recommendation will include a condition of approval for the removal of exterior doors and fencing. Has there been consideration for this to be revised?
Corrective Action Required
03/18/2019

A modification narrative is needed, providing justification for the requested modifications. It appears there are modification requests for the tree heights, caliper sizes, and the requested islands in the parking areas. Staff does not support the requested modifications. In addition there is a modification request needed for the SUP condition for pitched roofs.
Corrective Action Required
03/18/2019

Thank you for the comprehensive response to the M-150 corridor criteria. Please provide this information on a separate plan sheet/narrative sheet for clarity.
Corrective Action Required
03/18/2019

Staff cannot support an indefinite time period, staff will be recommending a 25 year time period.
Corrective Action Required
03/18/2019

Staff will be recommending a condition of approval that all windows shall be opaque so that storage doors will not be seen from behind the windows.
Corrective Action Required
03/19/2019

The next Planning Commission Agenda is April 11th. In order to keep on that agenda, please provide requested information by March 26th. If this remains on the April 11th PC agenda, the City Council date would be May 7th. Re-noticing may not be required under certain circumstances, we can discuss in more detail.
Corrective Action Required
03/19/2019

All RTU's shall be screened from view in accordance with the UDO. It's noted the locations of the units and screening methods has not been established at this time.
Corrective Action Required
03/19/2019

Please label the building material called out as the tan band.
Corrective Action Required
03/19/2019

Additional discussion is needed regarding the proposed cool roof and the associated parapet-metal areas.
Planning Review Corrections 12/14/2018 12/13/2018
Jennifer Thompson
Legal Description
Corrective Action Required
12/11/2018

Please submit an electronic copy of the legal description. Microsoft Word document or selectable text PDF are the preferred file formats. The legal description can be emailed to the planner's email address above.
Corrective Action Required
12/11/2018

When resubmitting, please submit an electronic copy of the site plan and architectural drawings.
Corrective Action Required
12/11/2018

Prior to the issuance of a building permit, a minor plat combining the two lots, shall be submitted, reviewed, approved, and recorded at Jackson County Recorder's office.
Corrective Action Required
12/11/2018

Provide the lot dimensions on sheet CE4.
Corrective Action Required
12/11/2018

Provide the parking dimensions for the angled parking spaces on Sheet CE6.
Corrective Action Required
12/11/2018

Label and show the access easement and UE easement that is to be vacated.
Corrective Action Required
12/11/2018

Is a trash enclosure dumpster area proposed? Please provide the location and a detail of the enclosure.
Corrective Action Required
12/11/2018

Provide a fencing detail for the proposed vinyl fence with brick pilasters.
Corrective Action Required
12/11/2018

Provide the lighting specification sheets.
Corrective Action Required
12/11/2018

The accessible sign detail needs to be revised to indicate the correct max heights per the UDO. The sign can be mounted on a pole or other structure located between 3'-5' above ground, measured from the bottom of the sign.
Corrective Action Required
12/11/2018

Revise the paving detail for alternate asphalt to meet the UDO requirements for fire lanes and truck access. The asphalt base course is required to be 5". It's noted on Sheet CE 6 that this could be used as an alternate to concrete.
Corrective Action Required
12/11/2018

The minimum tree caliper size for deciduous trees is 3-inches and the minimum evergreen tree height is 8-feet. Please revise the plant schedule accordingly.
Corrective Action Required
12/12/2018

A medium impact screen is required along the south property line. The impact screen provided reflects the low impact screening options. Please refer to Article 8, Section 8.900 B. Medium Impact Screening options and revise the landscape table accordingly.
Corrective Action Required
12/12/2018

Sheet LS1 shows the parking space at 90 degree angles, however all the civil sheets reflect angled parking. Please update the LS1 sheet to reflect the appropriate layout.
Corrective Action Required
12/12/2018

Four of the street trees along M-291 Hwy are proposed outside of the property line. Update the plan to show those within the proposed lot.
Corrective Action Required
12/12/2018

The trees and shrubs shown to account for the open yard and shrub requirements are not shown on the project lot. Update the plan to show them on the proposed lot. Parking lot screening has not been provided along M-291 Hwy. Please refer to Article 8 of the UDO to determine the requirements.
Corrective Action Required
12/12/2018

As part of the M-150 CDO overlay district regulations, native landscape materials are required. (See the native plant list at http://grownative.org/native-plant-info/plant-picker. The following species will need to be switched to a native species (per submitted landscape plan): Elm, Birch, Crab Apple, Magnolia, Arborvitae, Non-native Hydrangea, Viburnum, Norway Spruce, Boxwood, and Lilac.
Corrective Action Required
12/12/2018

M-150 CDO Overlay Sustainability Requirements. Please refer to Article 5. Section 5510. C. Sustainability Requirements. Please respond in narrative form how each of these standards will be met. The list covers 2.a.(1)-(10) and 2.b. (1)-(11). In addition, can a sheet be supplemented to the plan outlining the M-150 sustainability standards and your response to each item? Staff feels this would be an easy way to compare/illustrate what the requirements are and how they are proposed to be met.
Corrective Action Required
12/12/2018

Staff does not support the first floor garage door/access fronting M-291 Hwy. More discussion can occur during the pre-application meeting.
Corrective Action Required
12/12/2018

In order to meet screening requirements for the garage loading areas on the first floor along the south and west elevations, an opaque screen shall be provided. Screening options can be found in the UDO in Article 5.510. 3. (3)(b).
Corrective Action Required
12/12/2018

Parking lot islands with CG-1 curbing shall be provided at the end of the parking area for the parking spaces located near the front entrance. Reference the CG-1 curbing within the detail sheets.
Corrective Action Required
12/13/2018

How does the loading/drive-thru area function? Will the doors be open during loading/unloading?
Corrective Action Required
12/13/2018

Required Corrections for Elevations. -Labels. Many of the labels seem either mis-labled or are missing labels. -Color. Provide the proposed colors for all building materials, garage doors, service doors, etc. Can color elevations be provided? -Material Samples. Provide (in color) material sample swatches on the elevation sheets -Building Materials. Several of the exterior building materials seem have same the same pattern. Can the patterns reflect the building material? -RTU location. With dashed lines indicate the location of the roof-mounted units, indicating they will be screened via the parapet. -South elevation. The large expanse of wall is not labeled on the south elevation. -Vertical articulation--four sided architecture. Additional vertical and four sided architecture is needed on all four sides of the building. -East elevation. A provision of insets, with details, to break up the expanse on the east elevation is needed. -Staff can support approximately 30% of an E.I.F.S product on a given elevation. Provide the percentages of E.I.F.S for each elevation. -Please confirm what if anything that is visible behind the proposed windows. Staff does not support the faux storage door visible behind any of the windows. -Windows. Additional windows are needed on the other elevations. -Cornice. The cornice should wrap around and provide a more substantial feature. -Signs. What are the proposed signage of the building? -Elevations. Once revisions are submitted and as we move forward to Planning Commission and City Council additional renderings/perspectives with of the building viewed from M-291 Hwy/Raintree Drive illustrating the building, proposed, landscaping and fencing will be requested. -Garage Doors. What is the garage door material and the large overhead door material? Has consideration been given to aluminum/glass product for the large overhead door?
Corrective Action Required
12/13/2018

Please provide a narrative of hours of operation, etc.
Corrective Action Required
12/13/2018

The Pole sign will need to be removed, if not coming down due to construction.
Engineering Review Corrections 12/14/2018 12/13/2018
Sue Pyles, P.E.
Corrective Action Required
12/13/2018

Pavement design must meet UDO Section 8.620 and Design and Construction manual requirements. Please revise sections accordingly.
Corrective Action Required
12/13/2018

Please use City of Lee’s Summit standard details for all items other than erosion and sediment control.
Corrective Action Required
12/13/2018

Include sidewalk along the Mo-291 frontage. ADA-accessible ramps are required at driveways.
Corrective Action Required
12/13/2018

Show and label the 100-year WSE throughout the plan set. A minimum of one foot (1’) of freeboard is required between the emergency spillway design stage and the top of berm. It appears that requirement has not been met. Please revise accordingly.
Corrective Action Required
12/13/2018

The minimum orifice size is one inch (1”) diameter. Please revise outlet structure accordingly.
Corrective Action Required
12/13/2018

Storm sewer calculations will be required in the plan set with the Final Development Plan.
Corrective Action Required
12/13/2018

Add the HGL to the storm sewer profile.
Corrective Action Required
12/13/2018

Show and label all existing easements that are being vacated.
Traffic Review No Comments 12/14/2018 12/11/2018
Michael Park
Fire Review Corrections 12/14/2018 12/04/2018
Jim Eden
Code Statement
Informational
12/04/2018

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Hydrants
Corrective Action Required
12/04/2018

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: The hydrant exceeds the 300 feert measured around the building. Extending a hose from the hydrant to the FDC would also block the only access into the facility. Private a hydrant that will meet both requirements.
Fire Lanes - Marking
Informational
12/04/2018

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Water Supply
Corrective Action Required
12/04/2018

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required: Confirm adequate water for the required fire flow and hydrants. App. B and C.
Dumpsters
Corrective Action Required
12/04/2018

IFC 304.3.3 - Dumpsters and containers with an individual capacity of 1.5 cubic yards [40.5 cubic feet (1.15 m3)] or more shall not be stored in buildings or placed within 5 feet (1524 mm) of combustible walls, openings or combustible roof eave lines. Action required: Will a dumpster and dumpster enclosure be provided?
Knox Locks
Corrective Action Required
12/04/2018

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official.
Imposed Loads
Corrective Action Required
12/05/2018

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. Action required: Designate heavy duty asphalt areas.
Fees
Paid Fees Amount Paid Owing Date Paid
Commercial Rezoning and Preliminary Development Plan fee $2,800.00 $2,800.00 Paid 12/03/2018
Legal Notice Publishing Charge $165.00 $165.00 Paid 12/03/2018
Legal Notice Publishing Charge $165.00 $165.00 Paid 12/03/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 07/11/2019 05:00 PM Council Chambers 07/11/2019 05:00 PM
Public Hearing Review
Approved
06/27/2019
City Council Public Hearing 08/06/2019 06:15 PM Council Chambers 08/06/2019 06:15 PM
Public Hearing Review
Approved
07/09/2019
City Council Ordinance 08/13/2019 06:15 PM Council Chambers 08/13/2019 06:15 PM
Public Hearing Review
Approved
08/20/2019
Documents & Images
Date Uploaded File Type Document Name
12/03/2018 Receipt Receipt for transaction: 2018-007416
12/03/2018 Letter Routing Sheet
12/14/2018 Letter Applicant Letter - Dev. Apps (DRCP)
02/15/2019 Letter Neighborhood meeting letter
03/05/2019 170504 WQ & Detention Calcs - 2019-03-04
03/05/2019 170504-Plans_1 of 2_2019-03-04
03/05/2019 170504-Plans_2 of 2_2019-03-04
03/05/2019 Commercial Rezoing with PDP Resubmittal Letter 2019-03-04
03/05/2019 Lee's Summit Storage Mart Trip Letter
03/05/2019 Legal Description
03/05/2019 Lighting Specs
03/05/2019 20181218_131211
03/05/2019 S3rd Floor 19021512480
03/05/2019 Adjacent Property Owners
03/05/2019 1013-Trex-Seclusions-6ft
03/05/2019 170504_Storage Mart-291
03/06/2019 Letter Resubmittal Routing Sheet
03/06/2019 Aff of Notice to Property Owners
03/19/2019 Letter Applicant Letter - Dev. Apps (DRCP)
05/02/2019 Plans STORAGE MART 156 ADDITION
05/02/2019 Plans 170504_Prelim_Development Plan_2019-05-02
05/21/2019 Letter Resubmittal Routing Sheet
05/21/2019 Plans 170504_Plans_2019-05-17_1
05/21/2019 Letter 170504 Narrative
05/21/2019 Plans 170504_Plans_2019-05-17_2
05/21/2019 Engineer Report/Study 170504_Detention Calc_2019-05-13
05/23/2019 Letter Affidavit of Notice
05/23/2019 Letter Notice to Property Owners
06/03/2019 Plans 201515.07 From HWY 052819 update
07/17/2019 Notice of Action Revised notice to property owners
08/19/2019 Ordinance Signed Ordinance
09/12/2019 Storage Mart PDP, REZ, SUP Staff Report
09/18/2019 8701 SUP ORD
09/18/2019 8700 REZ PDP ORD
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home