PRRES20234858
Building Permit - Residential
Certificate of Occupancy
FROEHLICH CONSTRUCTION LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK STOP WORK ORDER generated on 04/02/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 05/08/2024 12:00 AM by username 'Robb Popp'.
09/25/2023
10/06/2023
03/27/2024
11/12/2024
Locations
Contacts
KC CUSTOM HOMES, Address:406 NW DONOVAN RD, Phone:(816) 564-5149  
FROEHLICH CONSTRUCTION LLC, Address:209 SW LEWIS CT  
Steve Froehlich, Address:406 NW Donovan Rd  
STEVE@KC-CUSTOMHOMES.COM  
PRAIRIE CENTER PLUMBING HEATING & A/C, Address:242 N MARION, Phone:(913) 829-6263  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
PRAIRIE CENTER PLUMBING HEATING & A/C, Address:242 N MARION, Phone:(913) 829-6263  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 10/06/2023
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 10/06/2023
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 10/06/2023
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 10/06/2023
8350015-Water Meter Fee $680.46 $680.46 Paid 10/06/2023
9110078-Valuation Fee New Single Family $2,975.42 $2,975.42 Paid 10/06/2023
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 06/07/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 06/07/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 06/07/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 10/23/2023 10/23/2023
Misc
Informational
10/23/2023
Footing approved by David Ainsworth on 10/19/23
Underslab Plumbing Inspection - Residential Passed 11/20/2023 11/20/2023 11/20/2023
Erosion Control Inspection Residential Failed 2/6/2024 02/06/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/06/2024
2/6/24 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. PROVIDE EROSION CONTROL METHODS AT PERIMETER OF LOT, LOT ACCESS REQUIRES MIN 6” LIFT OF MIN 3/4” GRAVEL. REMOVE TRASH AND LOOSE DEBRIS FROM SITE
Erosion Control Inspection Residential Failed 2/12/2024 2/12/2024 02/12/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
02/12/2024
2/6/24 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. PROVIDE EROSION CONTROL METHODS AT PERIMETER OF LOT, LOT ACCESS REQUIRES MIN 6” LIFT OF MIN 3/4” GRAVEL. REMOVE TRASH AND LOOSE DEBRIS FROM SITE
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/12/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Maintain silt fence and clean debris from street
Sewer Service Inspection - R Passed 2/21/2024 2/21/2024 02/21/2024
Water Service Inspection - R Passed 2/23/2024 2/23/2024 02/23/2024
Erosion Control Inspection Residential Failed 3/27/2024 03/27/2024
DCM2 ESC DEFICIENT INSTALLATION
Resolved
03/27/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Maintain silt fence and clean debris from street
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/27/2024
3/27/24 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Gas Service Inspection - Residential Failed 4/2/2024 4/2/2024 04/02/2024
Misc
Corrective Action Required
04/02/2024
-Bond gas line -complete gas line install at fire place (provide shut off of fireplace not installed)
Erosion Control Inspection Residential Failed - Stop Work 4/2/2024 4/2/2024 04/02/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/27/2024
3/27/24 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Misc
Corrective Action Required
04/02/2024
Erosion control still not in compliance stop work issued Maintain gravel Drive Maintain silt fence Cleanup Street
Erosion Control Inspection Residential Failed - Stop Work 5/1/2024 5/1/2024 05/01/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
05/01/2024
3/27/24 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Misc
Corrective Action Required
04/02/2024
5/1/24 Erosion control still not in compliance stop work remains Maintain gravel Drive with min 6" lift of 3/4" gravel Maintain silt fence-still missing at front corner of lot Remove construction debris
Erosion Control Inspection Residential Partial 5/8/2024 5/8/2024 05/08/2024
Misc
Resolved
05/08/2024
5/1/24 Erosion control still not in compliance stop work remains Maintain gravel Drive with min 6" lift of 3/4" gravel Maintain silt fence-still missing at front corner of lot Remove construction debris
Misc
Informational
05/08/2024
In compliance at time of inspection
Gas Service Inspection - Residential Passed 5/9/2024 5/9/2024 05/09/2024
Misc
Corrective Action Required
04/02/2024
-Bond gas line -complete gas line install at fire place (provide shut off of fireplace not installed)
Electrical Service Inspection Failed 5/9/2024 5/9/2024 05/09/2024
Misc
Corrective Action Required
05/09/2024
-Missing grounding conductor to Ufer and gas line
All Rough Inspection - Residential Failed 5/9/2024 5/9/2024 05/09/2024
All Rough Inspection - Residential Failed 5/9/2024 05/09/2024
Misc
Corrective Action Required
05/09/2024
-Missing blocking above I beam in garage -Missing supports at soffit in garage -Loose vent connection at bathroom fan near garage/kitchen area -Missing Simpson H2 5A or similar rafter ties throughout -Secure gas line at fireplace -Missing collar ties at covered deck -Use approved means to connect fans to bathroom vents throughout -Add more security blocking at front door -Missing fire blocking at back upstairs bedroom top plate -Missing fire blocking top plate in basement near DWV east side -Missing supports at soffit in basement -Missing ufer and gas line grounding conductor
Misc
Corrective Action Required
05/09/2024
Previous list was inconclusive. see complete list. -Fire stop soffit and garage wall. -Fur out heat ducks in garage wall to meet energy code. -Plate bolts front garage wall board through edge of plate install correctly or have engineer address issue. -Top of double joist notched for second-floor shower over two car garage. -Seal return air penetrations in wall left of garage entry door -Can light and Romex in return air over pantry room off garage. -Fire stop heat chase garage wall. -Electrical box in r/a garage pantry wall. -Master deck door not installed .? -Protect Romex board holes through studs left of kitchen hood under LVL. -Deck post not continuous. -Install all LIB bracing first and second floor were required by plan. -Install fireplace and for inspection. -Protect CSST right side of fireplace comes through floor. -Install snow blocking at step splashing and fireplace over master bedroom attic. -Terminate and support waterline coming out of master shower right side. -Terminate all electrical in boxes, fireplace, stairwell, sconce, tile grounds, and Romex hanging out of soffit with mechanical connection. -Use approved material for fire stopping, not half-inch siding. Over fireplace, etc. Basement – -Open ductwork to soffit at upper basement near Canlite. -Terminate Romex in a box in soffit missing Canlite. Fire stop columns for being post vertical horizontal. -Fire stop ends of drop ceilings vertical to horizontal from wall. -Connect all bath vents. -Open concrete trench from bar sink wall install electrical conduit. -Secure and support CSST to furnaces as per manufacture requirement. -Support flex duck over lower basement. -Support pecks waterline pipe it over ceiling of lower basement bedrooms . - Support Romex under floor joist over basement bedroom lower level, bottom of floor joist for first floor. -Support Romex to right side furnace at floor Joist, 4.5 feet on center. -Pan lower level shower wall from return air. -Install lateral bracing at ceiling joist above lower bedroom at end. -Fur out waterline to hose bib left side of rear basement wall. -Support flex duck over sump pump. -Remove sidelong and cover in deck framing , no support u get lvl ridge. Or provide engineers report . -Install post to beam connections at deck per plans. Plan shows for steel post, revise plans or provide approved engineers design.
Electrical Service Inspection Not Ready 5/21/2024 5/21/2024 05/21/2024
Misc
Corrective Action Required
05/09/2024
-Missing grounding conductor to Ufer and gas line
All Rough Inspection - Residential Not Ready 5/21/2024 5/21/2024 05/21/2024
Misc
Corrective Action Required
05/09/2024
-Missing blocking above I beam in garage -Missing supports at soffit in garage -Loose vent connection at bathroom fan near garage/kitchen area -Missing Simpson H2 5A or similar rafter ties throughout -Secure gas line at fireplace -Missing collar ties at covered deck -Use approved means to connect fans to bathroom vents throughout -Add more security blocking at front door -Missing fire blocking at back upstairs bedroom top plate -Missing fire blocking top plate in basement near DWV east side -Missing supports at soffit in basement -Missing ufer and gas line grounding conductor
Misc
Corrective Action Required
05/09/2024
Previous list was inconclusive. see complete list. -Fire stop soffit and garage wall. -Fur out heat ducts in garage wall to meet energy code. -Plate bolts front garage wall bored through edge of plate install correctly or have engineer address issue. -Top of double joist notched for second-floor shower over two car garage. -Seal return air penetrations in wall left of garage entry door -Can light and Romex in return air over pantry room off garage. -Fire stop heat chase garage wall. -Electrical box in r/a garage pantry wall. -Master deck door not installed .? -Protect Romex board holes through studs left of kitchen hood under LVL. -Deck post not continuous. -Install all LIB bracing first and second floor were required by plan. -Install fireplace and for inspection. -Protect CSST right side of fireplace comes through floor. -Install snow blocking at step splashing and fireplace over master bedroom attic. -Terminate and support waterline coming out of master shower right side. -Terminate all electrical in boxes, fireplace, stairwell, sconce, tile grounds, and Romex hanging out of soffit with mechanical connection. -Use approved material for fire stopping, not half-inch siding. Over fireplace, etc. Basement – -Open ductwork to soffit at upper basement near Canlite. -Terminate Romex in a box in soffit missing Canlite. Fire stop columns for being post vertical horizontal. -Fire stop ends of drop ceilings vertical to horizontal from wall. -Connect all bath vents. -Open concrete trench from bar sink wall install electrical conduit. -Secure and support CSST to furnaces as per manufacture requirement. -Support flex duck over lower basement. -Support pecks waterline pipe it over ceiling of lower basement bedrooms . - Support Romex under floor joist over basement bedroom lower level, bottom of floor joist for first floor. -Support Romex to right side furnace at floor Joist, 4.5 feet on center. -Pan lower level shower wall from return air. -Install lateral bracing at ceiling joist above lower bedroom at end. -Fur out waterline to hose bib left side of rear basement wall. -Support flex duck over sump pump. -Remove sidelong and cover in deck framing , no support u get lvl ridge. Or provide engineers report . -Install post to beam connections at deck per plans. Plan shows for steel post, revise plans or provide approved engineers design.
Electrical Service Inspection Failed 6/6/2024 6/6/2024 06/06/2024
Misc
Partial Correction
06/06/2024
-Missing grounding conductor to Ufer and gas line (Still missing ground to gas line)
All Rough Inspection - Residential Failed 6/6/2024 6/6/2024 06/07/2024
Misc
Informational
06/07/2024
-Missing blocking above I beam in garage -Missing supports at soffit in garage -Loose vent connection at bathroom fan near garage/kitchen area -Missing Simpson H2 5A or similar rafter ties throughout -Secure gas line at fireplace -Missing collar ties at covered deck -Use approved means to connect fans to bathroom vents throughout -Add more security blocking at front door -Missing fire blocking at back upstairs bedroom top plate -Missing fire blocking top plate in basement near DWV east side -Missing supports at soffit in basement -Missing ufer and gas line grounding conductor
Misc
Partial Correction
06/06/2024
Previous list was inconclusive. see complete list. -Electrical box in r/a garage pantry wall. -Master deck door not installed? -Protect Romex at bored holes through studs left of kitchen hood under LVL. -Deck post not continuous. -Install all LIB bracing first and second floor were required by plan. -Install fireplace and for inspection. FIREPLACE IS ELECTRIC, NOT USING GAS LINE -Terminate all electrical in boxes, fireplace, stairwell, sconce, tile grounds, and Romex hanging out of soffit with mechanical connection. Basement – -Terminate Romex in a box in soffit missing Can light. -Fire stop columns for being post vertical horizontal. -Open concrete trench from bar sink wall install electrical conduit. -Remove sidelong and cover in deck framing , no support u get lvl ridge. Or provide engineers report . -Install post to beam connections at deck per plans. Plan shows for steel post, revise plans or provide approved engineers design.
All Rough Inspection - Residential Failed 6/13/2024 6/13/2024 06/13/2024
Misc
Informational
06/13/2024
Misc
Partial Correction
06/06/2024
-Open concrete trench from bar sink wall
Electrical Service Inspection Failed 6/13/2024 6/13/2024 06/13/2024
Misc
Partial Correction
06/06/2024
-Missing grounding conductor to Ufer and gas line (Still missing ground to gas line) NOW JUST MISSING CLAMP TO GAS LINE
Driveway Inspection Partial 6/28/2024 6/28/2024 06/28/2024
Misc
Informational
06/28/2024
6-28-24 Dustin A, DW is formed and compacted to city specs. Approved to pour
Sidewalk Inspection Partial 6/28/2024 6/28/2024 06/28/2024
Misc
Informational
06/28/2024
6-28-24 Dustin A, Sw is formed and compacted to city specs. Slopes are in compliance. Approved to pour
All Rough Inspection - Residential Passed 7/3/2024 7/3/2024 07/03/2024
Misc
Informational
06/13/2024
Misc
Resolved
07/03/2024
Electrical Service Inspection Passed 7/3/2024 7/3/2024 07/03/2024
Misc
Resolved
07/03/2024
Driveway Inspection Passed 7/9/2024 7/9/2024 07/09/2024
Misc
Informational
06/28/2024
6-28-24 Dustin A, DW is formed and compacted to city specs. Approved to pour 7-9-24 Dustin A, DW is poured to city specs and slopes are in compliance. Passed
Sidewalk Inspection Passed 7/9/2024 7/9/2024 07/09/2024
Misc
Informational
06/28/2024
6-28-24 Dustin A, Sw is formed and compacted to city specs. Slopes are in compliance. Approved to pour 7-9-24 Dustin A, SW is poured to city specs and slopes are in compliance. Passed
Erosion Control Inspection Residential Passed 11/1/2024 11/1/2024 11/01/2024
Misc
Informational
05/08/2024
In compliance at time of inspection
Plot Plan Inspection Passed 11/1/2024 11/1/2024 11/01/2024
Occupancy Inspection - Codes Residential Failed 11/1/2024 11/1/2024 11/01/2024
Misc
Corrective Action Required
11/01/2024
-Secure AC whips within 12" -Connect whip to AC unit -Provide GFCI/AFCI protection at wall receptacle in laundry -Provide AFCI protection at fridge and washer -Install sliding glass door hardware -Label non GFCI receptacles -Anchor column base in mechanical room -Obtain lawn irrigation permit and backflow certification
Occupancy Inspection - Codes Residential Failed 11/7/2024 11/7/2024 11/07/2024
Misc
Corrective Action Required
11/01/2024
-Connect whip to AC unit-not done on lower unit -Provide AFCI protection at fridge and washer-breakers 1,4 -Anchor column base in mechanical room-not done. (This is column in unfinished wall in room behind stairs)
Occupancy Inspection - Codes Residential Full C of O 11/12/2024 11/12/2024 11/12/2024
Misc
Resolved
11/12/2024
-Connect whip to AC unit-not done on lower unit -Provide AFCI protection at fridge and washer-breakers 1,4 -Anchor column base in mechanical room-not done. (This is column in unfinished wall in room behind stairs)
Documents & Images
Date Uploaded File Type Document Name
09/25/2023 Permit Application
09/25/2023 Excise Tax Application
09/25/2023 Stamped Plot Plan
09/25/2023 SF-7036 Engineered Blueprint
09/27/2023 Permit Codes Residential Plan Review
09/28/2023 SF-7036 Engineered Blueprint
09/29/2023 Permit Codes Residential Plan Review
10/02/2023 Revised Plot Plan
10/02/2023 Plot Plan approved plot plan
10/02/2023 Approved Plans approved plans
10/02/2023 Plot Plan approved plot plan
10/02/2023 Plans grinder pump info 2
10/02/2023 Plans grinder pump info
10/02/2023 Permit Codes Residential Plan Review
10/06/2023 Permit DS Building Permit
10/06/2023 Receipt Receipt for transaction: 2023-007596
10/21/2023 Wilmoth 2147 NW Killarney LN LSMO Foundation Footing Inspection Report 10-19-23
10/23/2023 Letter INSPECTION SUMMARY
10/31/2023 2147 NW Killarney LN LSMO Foundation Footing Inspection Report 10-19-23
11/20/2023 Letter INSPECTION SUMMARY
11/21/2023 Letter pier inspection
11/28/2023 Final_2023_11_21 DPiers_Pat Cochran_report
02/06/2024 Letter INSPECTION SUMMARY
02/12/2024 Letter INSPECTION SUMMARY
02/21/2024 Letter INSPECTION SUMMARY
02/23/2024 Letter INSPECTION SUMMARY
03/27/2024 Letter INSPECTION SUMMARY
04/02/2024 Letter INSPECTION SUMMARY
04/02/2024 Letter Stop Work Order
05/01/2024 Letter Stop Work Order
05/08/2024 Letter INSPECTION SUMMARY
05/09/2024 Letter INSPECTION SUMMARY
05/09/2024 Letter INSPECTION SUMMARY
05/09/2024 Letter INSPECTION SUMMARY
05/09/2024 Letter INSPECTION SUMMARY
05/21/2024 Letter INSPECTION SUMMARY
05/21/2024 Letter INSPECTION SUMMARY
05/24/2024 Revised Blueprint showing 8 x 8 deck posts
05/28/2024 Approved Plans APPROVED UPDATED PLANS
06/06/2024 Letter INSPECTION SUMMARY
06/06/2024 Letter INSPECTION SUMMARY
06/07/2024 Receipt Receipt for transaction:2024-004493
06/13/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
06/28/2024 Letter INSPECTION SUMMARY
06/28/2024 Letter INSPECTION SUMMARY
07/03/2024 Letter INSPECTION SUMMARY
07/03/2024 Letter INSPECTION SUMMARY
07/09/2024 Letter INSPECTION SUMMARY
07/09/2024 Letter INSPECTION SUMMARY
11/01/2024 Letter INSPECTION SUMMARY
11/01/2024 Letter INSPECTION SUMMARY
11/01/2024 Letter INSPECTION SUMMARY
11/07/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter Codes Final Certificate of Occupancy
11/12/2024 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home