Summary
PRRES20231096
Building Permit - Residential
Certificate of Occupancy
CLAYTON PROPERTIES GROUP INC
NEW 3 OR 4 FAMILY
NEW TOWNHOME. ROOF TRUSSES. FINISHED/UNFINISHED BASEMENT. UNCOVERED DECK. "Clover & Hive has elected to construct a split-level home on this lot. MDP will not be impacted by this." Per discussions with Engineering Solutions and Gene Wiliams. Andrea Sessler 04/07/2023 4:16 PM
03/16/2023
04/10/2023
09/17/2023
09/15/2023
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
JASONH@CLOVERANDHIVE.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New 3 or 4 Family $4,029.45 $4,029.45 Paid 04/10/2023
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 04/10/2023
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 04/10/2023
8331401-Water Tap Fee $14,920.00 $14,920.00 Paid 04/10/2023
8350015-Water Meter Fee $2,202.00 $2,202.00 Paid 04/10/2023
8331507-Sanitary Sewer Development Fee $5,536.00 $5,536.00 Paid 04/10/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 4/20/2023 04/20/2023
Sewer Service Inspection - R Partial 4/27/2023 (10:45) 4/27/2023 04/27/2023
Miscellaneous Correction
Informational
04/27/2023
This is a partial pass for sewer on this permit. 2024 and 2026 SW Holdbrooks passed.
Underslab Plumbing Inspection - Residential Passed 4/28/2023 4/28/2023 04/28/2023
Water Service Inspection - R Partial 4/28/2023 (3:00) 4/28/2023 04/28/2023
Miscellaneous Correction
Corrective Action Required
04/28/2023
This is a partial pass. 2024 and 2026 both passed
Sewer Service Inspection - R Partial 4/28/2023 (3:00) 4/28/2023 04/28/2023
Miscellaneous Correction
Informational
04/27/2023
- This is a partial pass on the sewer for 2022
Sewer Service Inspection - R Passed 5/1/2023 (8:45) 5/1/2023 05/01/2023
Miscellaneous Correction
Resolved
05/01/2023
- This is a partial pass on the sewer for 2022
Water Service Inspection - R Passed 5/1/2023 05/01/2023
Miscellaneous Correction
Resolved
05/01/2023
This is a partial pass. 2024 and 2026 both passed
Erosion Control Inspection Residential Partial 6/13/2023 06/13/2023
Miscellaneous Correction
Informational
06/13/2023
Erosion control is in place at the time of this inspection
Rated Assembly Inspection Failed 6/13/2023 6/13/2023 06/13/2023
Miscellaneous Correction
Corrective Action Required
06/13/2023
- 2024 is missing fire blocking in the basement west wall ceiling - 2022 is missing fire blocking by kitchen in the vertical wall - fire blocking is needed around all metal conduit pipes in all units that breach the fire walls for electrical wiring
All Rough Inspection - Residential Failed 6/13/2023 6/13/2023 06/13/2023
Miscellaneous Correction
Corrective Action Required
06/13/2023
2028 - Anchor bolt needs tightened down in garage - Anchor bolt is missing a washer in the garage - Front door and window need shims installed where the jack stud meets the header - Front entry window needs shim installed at the header - HVAC chase needs fire blocking at the top plate - LIB is not nailed off in the kitchen/dining area - Top plate in the living room needs jack studs - Strap in needed in the utility room top plate - Nail guard in upstairs bathroom needs to cover up to 2 inches of pipe - Nail plate is needed for electrical in master bedroom - LIB needs to be nailed off in master bathroom - Fire block top plate throughout 2026 - Front door and window jack studs needs shims installed - Address top plate gaps - Replace LIB in kitchen - Address LIB in dining area - Up stairs bathroom needs a metal plate installed at the 1 1/2 drain - Up stairs bathroom 2 inch plumbing drain needs a metal plate extension 2024 - Fire block top plate in entry closet - Address top plate gaps in main living, dining room and kitchen - Fire blocking in HVAC chase ceiling is not completed - Up stairs bathroom needs a metal nail plate extension 2022 - garage anchor bolts need to be installed in the middle 1/3 seal plate - Need to fire block the HVAC chase better - 2 inch plumbing at upstairs bar needs metal plate extensions
Gas Service Inspection - Residential Passed 6/13/2023 6/13/2023 06/13/2023
Electrical Service Inspection Passed 6/13/2023 6/13/2023 06/13/2023
Rated Assembly Inspection Passed 6/14/2023 6/14/2023 06/14/2023
Miscellaneous Correction
Resolved
06/14/2023
- 2024 is missing fire blocking in the basement west wall ceiling - 2022 is missing fire blocking by kitchen in the vertical wall - fire blocking is needed around all metal conduit pipes in all units that breach the fire walls for electrical wiring
All Rough Inspection - Residential Passed 6/14/2023 6/14/2023 06/14/2023
Miscellaneous Correction
Resolved
06/14/2023
2028 - Anchor bolt needs tightened down in garage - Anchor bolt is missing a washer in the garage - Front door and window need shims installed where the jack stud meets the header - Front entry window needs shim installed at the header - HVAC chase needs fire blocking at the top plate - LIB is not nailed off in the kitchen/dining area - Top plate in the living room needs jack studs - Strap in needed in the utility room top plate - Nail guard in upstairs bathroom needs to cover up to 2 inches of pipe - Nail plate is needed for electrical in master bedroom - LIB needs to be nailed off in master bathroom - Fire block top plate throughout 2026 - Front door and window jack studs needs shims installed - Address top plate gaps - Replace LIB in kitchen - Address LIB in dining area - Up stairs bathroom needs a metal plate installed at the 1 1/2 drain - Up stairs bathroom 2 inch plumbing drain needs a metal plate extension 2024 - Fire block top plate in entry closet - Address top plate gaps in main living, dining room and kitchen - Fire blocking in HVAC chase ceiling is not completed - Up stairs bathroom needs a metal nail plate extension 2022 - garage anchor bolts need to be installed in the middle 1/3 seal plate - Need to fire block the HVAC chase better - 2 inch plumbing at upstairs bar needs metal plate extensions
Rated Assembly Inspection Failed 6/21/2023 06/21/2023
MISC
Informational
06/21/2023
2024 rated assembly screw pattern passed on both sides. This is a partial pass for 2024 only
Rated Assembly Inspection Passed 6/22/2023 6/22/2023 06/22/2023
MISC
Resolved
06/22/2023
2024 rated assembly screw pattern passed on both sides. This is a partial pass for 2024 only
Misc
Informational
06/22/2023
Screw pattern for all units at the fire rated assembly walls passed
Driveway Inspection Passed 7/18/2023 07/20/2023
Misc
Informational
07/18/2023
7-18-23 BR Driveway is framed and ready for concrete. 7-20-23 BR Driveway is concrete to LS specification
Sidewalk Inspection Passed 7/18/2023 07/20/2023
Misc
Informational
07/18/2023
7-18-23 BR Sidewalk is framed and ready for concrete. 7-20-23 BR Sidewalk is concrete to LS specification
Piers/Caissons Inspection - Residential Failed 7/28/2023 07/28/2023
Miscellaneous Correction
Informational
07/28/2023
2028 piers passed only. This is a partial pass for back deck piers at 2028 SW Holdbrooks. Other piers will be called in at a later date. 07/28/2023. KBEARD
Piers/Caissons Inspection - Residential Failed 8/2/2023 (8:00) 8/2/2023 08/02/2023
Miscellaneous Correction
Informational
07/28/2023
2028 piers passed only. This is a partial pass for back deck piers at 2028 SW Holdbrooks. Other piers will be called in at a later date. 07/28/2023. KBEARD
Miscellaneous Correction
Informational
08/02/2023
2026 piers for back deck passed only. Other piers will be called in at a later date 08/02/2023. KBEARD
Piers/Caissons Inspection - Residential Failed 8/3/2023 8/3/2023 08/03/2023
Miscellaneous Correction
Informational
08/02/2023
2028 piers passed only. This is a partial pass for back deck piers at 2028 SW Holdbrooks. Other piers will be called in at a later date. 07/28/2023. KBEARD
Miscellaneous Correction
Informational
08/02/2023
2026 piers for back deck passed only. Other piers will be called in at a later date 08/02/2023. KBEARD
Miscellaneous Correction
Informational
08/03/2023
2024 piers passed. This is the third partial. 2022 piers will be scheduled at a later date. This is a partial only
Piers/Caissons Inspection - Residential Passed 8/7/2023 (9:30) 8/7/2023 08/07/2023
Miscellaneous Correction
Informational
08/03/2023
2028 piers passed only. This is a partial pass for back deck piers at 2028 SW Holdbrooks. Other piers will be called in at a later date. 07/28/2023. KBEARD
Miscellaneous Correction
Informational
08/03/2023
2026 piers for back deck passed only. Other piers will be called in at a later date 08/02/2023. KBEARD
Miscellaneous Correction
Informational
08/03/2023
2024 piers passed. This is the third partial. 2022 piers will be scheduled at a later date. This is a partial only
Occupancy Inspection - Codes Residential Failed 8/8/2023 8/8/2023 08/08/2023
Miscellaneous Correction
Corrective Action Required
08/08/2023
2022 - self closing garage to house door will not seal correctly - All ceiling penetrations in garage need to be sealed - Garage electrical outlets not working - Basement handrail is not installed - HWT needs to be secured and pop off valve needs to have a drain hose installed - Furnace condensation drain needs to be vertically installed - Kitchen backsplash need spark rings installed - One electrical outlet in the kitchen is not finished - Attic access hatch is missing - Master bedroom smoke alarm is not connected to the rest of the system 2024 - House to garage door self closing hinge is not working - Seal all garage ceiling penetrations - handrails is not installed - Address stairwell at front landing to living room being at a width of 35 3/4 inches wide 2026 - Garage ceiling penetrations need to be sealed - Self closing hinge from house to garage is not working - Handrails are not installed - Stairway width from entry landing to living room is only 35 3/4 inches. Code is no less than 36 inches wide 2028 - hinge from house to garage is not working correctly - Garage ceiling penetrations need to be sealed - A/c disconnect whip needs to be secured to the house within 12 inches ALL units need sod, splash pads, sump pump extensions and deck pads to ground installed
Occupancy Inspection - Codes Residential Failed 8/11/2023 8/11/2023 08/11/2023
Miscellaneous Correction
Corrective Action Required
08/08/2023
2022 Passed for TCO only 08/11/2023. KBEARD 2024 - House to garage door self closing hinge is not working - Seal all garage ceiling penetrations - handrails is not installed - Address stairwell at front landing to living room being at a width of 35 3/4 inches wide 2026 - Garage ceiling penetrations need to be sealed - Self closing hinge from house to garage is not working - Handrails are not installed - Stairway width from entry landing to living room is only 35 3/4 inches. Code is no less than 36 inches wide 2028 Passed for TCO only 08/11/2023. KBEARD ALL units need sod, splash pads, sump pump extensions and deck pads to ground installed. This is a partial pass only. Units 2022 and 2028 passed for TCO only
Plot Plan Inspection Passed 8/31/2023 08/31/2023
Erosion Control Inspection Residential Passed 8/31/2023 08/31/2023
Miscellaneous Correction
Informational
06/13/2023
Erosion control is in place at the time of this inspection
Occupancy Inspection - Codes Residential Failed 8/31/2023 8/31/2023 08/31/2023
Miscellaneous Correction
Corrective Action Required
08/11/2023
2022 Passed for TCO only 08/11/2023. KBEARD 2024 - House to garage door self closing hinge is not working - Seal all garage ceiling penetrations - handrails is not installed - Address stairwell at front landing to living room being at a width of 35 3/4 inches wide 2026 - Garage ceiling penetrations need to be sealed - Self closing hinge from house to garage is not working - Handrails are not installed - Stairway width from entry landing to living room is only 35 3/4 inches. Code is no less than 36 inches wide 2028 Passed for TCO only 08/11/2023. KBEARD ALL units need sod, splash pads, sump pump extensions and deck pads to ground installed. This is a partial pass only. Units 2022 and 2028 passed for TCO only
Miscellaneous Correction
Corrective Action Required
08/31/2023
-Stairwell still failed in units 2024 and 2026. R311.7.1 stairways shall not be less than 36 inches in clear width at all points above the permitted handrail height and below the required headroom height - water meter height must be lowered to ground level - all back decks are missing (2) 1/2 inch all through bolts, nuts and washers - splash pads are missing on all units in the backyard
Occupancy Inspection - Codes Residential Full C of O 9/15/2023 9/15/2023 09/15/2023
Miscellaneous Correction
Resolved
09/15/2023
2022 Passed for TCO only 08/11/2023. KBEARD 2024 - House to garage door self closing hinge is not working - Seal all garage ceiling penetrations - handrails is not installed - Address stairwell at front landing to living room being at a width of 35 3/4 inches wide 2026 - Garage ceiling penetrations need to be sealed - Self closing hinge from house to garage is not working - Handrails are not installed - Stairway width from entry landing to living room is only 35 3/4 inches. Code is no less than 36 inches wide 2028 Passed for TCO only 08/11/2023. KBEARD ALL units need sod, splash pads, sump pump extensions and deck pads to ground installed. This is a partial pass only. Units 2022 and 2028 passed for TCO only
Miscellaneous Correction
Resolved
09/15/2023
-Stairwell still failed in units 2024 and 2026. R311.7.1 stairways shall not be less than 36 inches in clear width at all points above the permitted handrail height and below the required headroom height - water meter height must be lowered to ground level - all back decks are missing (2) 1/2 inch all through bolts, nuts and washers - splash pads are missing on all units in the backyard
Documents & Images
Date Uploaded File Type Document Name
03/21/2023 OS #3 - PERMIT APP
03/21/2023 Approved Plans APPROVED PLANS
03/21/2023 Permit Codes Residential Plan Review
03/21/2023 Permit Codes Residential Plan Review
04/10/2023 Plot Plan APPROVED PLOT PLAN
04/10/2023 Plot Plan PLOT PLAN LETTER
04/10/2023 Approved Plans APPROVED TRUSS PACKAGE
04/10/2023 Approved Plans APPROVED TRUSS LAYOUT
04/10/2023 Permit Codes Residential Plan Review
04/10/2023 Permit Codes Residential Plan Review
04/10/2023 Permit DS Building Permit
04/10/2023 Permit DS Building Permit
04/10/2023 Receipt Receipt for transaction:2023-001967
04/19/2023 M L Crose 2022, 2024, 2026, 2028 SW Holdbrooks Dr LSMO Osage Lot 3 Clayton P 2023-1096 3rd Party Footing Inspection Report 4-19-23
04/20/2023 Letter INSPECTION SUMMARY
04/20/2023 Letter INSPECTION SUMMARY
04/20/2023 Letter INSPECTION SUMMARY
04/27/2023 Letter INSPECTION SUMMARY
04/27/2023 Letter INSPECTION SUMMARY
04/28/2023 Letter INSPECTION SUMMARY
04/28/2023 Letter INSPECTION SUMMARY
04/28/2023 Letter INSPECTION SUMMARY
05/01/2023 Letter INSPECTION SUMMARY
05/01/2023 Letter INSPECTION SUMMARY
05/01/2023 Letter INSPECTION SUMMARY
05/01/2023 Letter INSPECTION SUMMARY
06/13/2023 Letter INSPECTION SUMMARY
06/13/2023 Letter INSPECTION SUMMARY
06/13/2023 Letter INSPECTION SUMMARY
06/13/2023 Letter INSPECTION SUMMARY
06/13/2023 Letter INSPECTION SUMMARY
06/14/2023 Letter INSPECTION SUMMARY
06/14/2023 Letter INSPECTION SUMMARY
06/21/2023 Letter INSPECTION SUMMARY
06/22/2023 Letter INSPECTION SUMMARY
07/18/2023 Letter INSPECTION SUMMARY
07/18/2023 Letter INSPECTION SUMMARY
07/20/2023 Letter INSPECTION SUMMARY
07/20/2023 Letter INSPECTION SUMMARY
07/28/2023 Letter INSPECTION SUMMARY
08/02/2023 Letter INSPECTION SUMMARY
08/03/2023 Letter INSPECTION SUMMARY
08/07/2023 Letter INSPECTION SUMMARY
08/08/2023 Letter INSPECTION SUMMARY
08/11/2023 Letter INSPECTION SUMMARY
08/31/2023 Letter INSPECTION SUMMARY
08/31/2023 Letter INSPECTION SUMMARY
08/31/2023 Letter INSPECTION SUMMARY
09/15/2023 CMR2024-26 Sw Holdsbrook Osage Townhome CMRstair clearance1
09/15/2023 Letter Codes Final Certificate of Occupancy
09/15/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home