Summary
PRRES20213306
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED/UNFINISHED BASEMENT - COVERED PATIO
06/28/2021
07/09/2021
12/28/2021
08/22/2022
Locations
Contacts
DAVE RICHARDS HOMEBUILDING INC, Address:605 SW US HIGHWAY 40 #414, Phone:(816) 365-8034  
DAVE3@DAVERICHARDSHONES.COM  
C.M. MOSE & SON, Address:6603 ROYAL ST BLDG E, Phone:(816) 781-4707  
INTREPID ELECTRIC LLC, Address:620 S KISNER CIR, Phone:(816) 796-2781  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $987.14 $987.14 Paid 07/09/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 07/09/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 07/09/2021
8331507-Sewer Connection Fee $450.00 $450.00 Paid 07/09/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 07/09/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 07/09/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 06/30/2022
9110078-Valuation Fee New Single Family $22.21 $22.21 Paid 06/30/2022
$1,009.35
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 9/17/2021 09/17/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
09/17/2021
EROSION CONTROL REQUIRED ALONG THE STREET. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Underslab Plumbing Inspection - Residential Passed 9/17/2021 9/17/2021 09/17/2021
Sewer Service Inspection - R Failed 9/20/2021 (8:30) 9/20/2021 09/20/2021
Misc
Corrective Action Required
09/20/2021
REPAIR THE BROKEN FOUNDATION DRAIN TILE
Erosion Control Inspection Residential Failed 9/21/2021 09/21/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
09/17/2021
EROSION CONTROL REQUIRED ALONG THE STREET. THE STREET SHALL BE CLEANED OF SOIL AND DEBRIS NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Water Service Inspection - R Passed 9/21/2021 09/21/2021
Erosion Control Inspection Residential Failed 11/19/2021 11/19/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
09/21/2021
EROSION CONTROL REQUIRED ALONG THE STREET. THE STREET SHALL BE CLEANED OF SOIL AND DEBRIS. MIN 3/4" GRAVEL SHALL BE PROVIDE AT LOT ENTRANCE FAILURE TO COMPLY WITHIN 2 DAYS WILL RESULT IN AN ISSUANCE OF STOP-WORK NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Sewer Service Inspection - R Passed 11/23/2021
Misc
Resolved
11/23/2021
REPAIR THE BROKEN FOUNDATION DRAIN TILE
Footing Inspection - Residential Passed 03/25/2022
Informational
03/25/2022
FOOTING APPROVED BY ENGINEER
Erosion Control Inspection Residential Failed 3/25/2022 03/25/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
11/19/2021
MIN 3/4" GRAVEL SHALL BE PROVIDED AT LOT ENTRANCE **INSPECTION DENIED
All Rough Inspection - Residential Failed 3/25/2022 3/25/2022 03/25/2022
Misc
Corrective Action Required
03/25/2022
MIN 3/4" GRAVEL SHALL BE PROVIDED AT LOT ENTRANCE **INSPECTION DENIED
Electrical Service Inspection Failed 3/25/2022 3/25/2022 03/25/2022
Misc
Corrective Action Required
03/25/2022
MIN 3/4" GRAVEL SHALL BE PROVIDED AT LOT ENTRANCE **INSPECTION DENIED
Gas Service Inspection - Residential Failed 3/25/2022 3/25/2022 03/25/2022
Misc
Corrective Action Required
03/25/2022
MIN 3/4" GRAVEL SHALL BE PROVIDED AT LOT ENTRANCE **INSPECTION DENIED
Gas Service Inspection - Residential Passed 3/28/2022 3/28/2022 03/28/2022
Misc
Corrective Action Required
03/25/2022
MIN 3/4" GRAVEL SHALL BE PROVIDED AT LOT ENTRANCE **INSPECTION DENIED
Electrical Service Inspection Failed 3/28/2022 3/28/2022 03/28/2022
Misc
Corrective Action Required
03/25/2022
-Install covers at SE connection to the main breaker
All Rough Inspection - Residential Failed 3/28/2022 3/28/2022 03/28/2022
Misc
Corrective Action Required
03/25/2022
-Install intersystem bonding block at service -Provide a receptacle within 25 ft of AC -Shim gap at bottom of master bedroom ceiling beam hanger -Strap header at rear master bedroom wall -Install great room wall appliance -Move smoke alarm to upper height of great room vaulted ceiling -Expose ridge beam support at rear patio -Provide full width bearing for kitchen I beam -Install (4)2x4 stud support for I beam at kitchen/bathroom wall intersection all the way down to grade beam below -Complete install bathroom tub -Install hanger above entry door -Secure SE within 12” of meter enclosure -Secure SE cable within 12” of panel -Securely fasten NM wirings every 4.5 ft to framing. Cannot just rest them onto soffit framing -Complete ducting of basement bath fan to outdoor -Complete ducting above basement bedroom -Provide min 1.5” of bearing for triple joists at wall intersection with basement bedroom wall -Support csst gas line above bottom stair landing every 32” -Support triple joist beam to pad near stair/future basement bathroom. Hanger is not meant to carry that load **OK TO INSULATE
Driveway Inspection Partial 4/5/2022 4/5/2022 04/05/2022
Misc
Informational
04/05/2022
4-5-22 AN forms are in place and aggregate is present and compacted.
All Rough Inspection - Residential Failed 4/8/2022 4/8/2022 04/08/2022
Misc
Corrective Action Required
03/28/2022
-Move smoke alarm to upper height of great room vaulted ceiling -Install (4)2x4 stud support for I beam at kitchen/bathroom wall intersection all the way down to grade beam below **refer to the plan. Min (4)2x4 I beam support must go down to grade beam below in basement -Complete install bathroom tub **fb floor penetration at trap -Complete ducting of basement bath fan to outdoor **Cannot use 3” flexible duct anymore. Switch to 4” flex duct no more than 14 ft per product UL, with hard duct for the remaining run -Complete ducting above basement bedroom **not done. Look above bedroom/bathroom wall -Provide min 1.5” of bearing for triple joists at wall intersection with basement bedroom wall **protect wiring at stud notch **OK TO INSULATE
Electrical Service Inspection Failed 4/8/2022 4/8/2022 04/08/2022
Misc
Corrective Action Required
03/28/2022
-Install covers at SE connection to the main breaker
Driveway Inspection Passed 04/08/2022
Misc
Informational
04/05/2022
4-5-22 AN forms are in place and aggregate is present and compacted.
Misc
Informational
04/08/2022
4-8-22 AN driveway looks good and has expansion joints at curb and right. Meets Ada specs
All Rough Inspection - Residential Not Ready 4/26/2022 4/26/2022 04/26/2022
Misc
Corrective Action Required
04/08/2022
-Install (4)2x4 stud support for I beam at kitchen/bathroom wall intersection all the way down to grade beam below **refer to the plan. Min (4)2x4 I beam support must go down to grade beam below in basement **The (4)2x4 support studs are way over cut. **Cannot have 1/2” gap at top of the support studs. **Reinstall electrical to bedroom receptacle -Complete install bathroom tub **fb floor penetration at trap **4/26-Not ready fee assessed for 3rd failed inspection and subsequent failed inspections
Electrical Service Inspection Failed 4/26/2022 4/26/2022 04/26/2022
Misc
Corrective Action Required
04/08/2022
-Install covers at SE connection to the main breaker
Electrical Service Inspection Passed 4/29/2022 4/29/2022 04/29/2022
Misc
Resolved
04/29/2022
-Install covers at SE connection to the main breaker
All Rough Inspection - Residential Failed 4/29/2022 4/29/2022 04/29/2022
Misc
Corrective Action Required
04/26/2022
- install (4)2 x4 stud support for I beam at kitchen/ bathroom wall intersection all the way down to grade beam below ** refer to the plan. Min (4) 2x4 I beam support must go down to grade beam below in basement **The (4)2x4 support studs are way over cut. ****Cannot have 1/2” gap at electrical of the support studs. **Reinstall electrical to bedroom receptacle **4/26-Not ready fee assessed for 3rd failed inspection and subsequent failed inspections
All Rough Inspection - Residential Passed 5/2/2022 5/2/2022 05/02/2022
Misc
Informational
05/02/2022
**4/26-Not ready fee assessed for 3rd failed inspection and subsequent failed inspections **OK TO ROCK
Sidewalk Inspection Partial 6/28/2022 6/28/2022 06/28/2022
Misc
Informational
06/28/2022
6-28-22 AN forms are in place and aggregate is present and compacted
Piers/Caissons Inspection - Residential Passed 06/29/2022
Informational
06/29/2022
piers approved by engineer
Occupancy Inspection - Codes Residential Failed 6/29/2022 6/29/2022 06/29/2022
Misc
Corrective Action Required
06/29/2022
-Not ready fee assessed on 4/26/22 has not been paid -Upgrade permit to include finished basement -Sidewalk not approved on record -As-graded plot plan is required -Provide swale at north side of lot and berm at back of lot -Final grade, sod, downspout and sump pump extension -Water meter shall be at grade level with meter-lid distance of 14”-18” -Seal exterior wall penetrations; seal above meter, AC disconnect, seal exterior lights, etc -Garage door not self-closing -Provide 5/8” gypsum protection below garage boxed out wall -Close excessive holes in the garage wall at stair -Complete venting kitchen hood -Provide secondary lock for the slide door -Install stair handrail
Occupancy Inspection - Codes Residential Temporary C of O 6/30/2022 6/30/2022 06/30/2022
Misc
Corrective Action Required
06/29/2022
-Sidewalk not approved on record -As-graded plot plan is required -Provide swale at north side of lot and berm at back of lot -Final grade, sod, downspout and sump pump extension -Water meter shall be at grade level with meter-lid distance of 14”-18”
Sidewalk Inspection Passed 7/5/2022 7/5/2022 07/06/2022
Misc
Informational
06/28/2022
6-28-22 AN forms are in place and aggregate is present and compacted
Misc
Informational
07/06/2022
7-6-22 AN sidewalk looks good and meets Ada spec
Erosion Control Inspection Residential Passed 08/19/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
06/29/2022
MIN 3/4" GRAVEL SHALL BE PROVIDED AT LOT ENTRANCE **INSPECTION DENIED
Occupancy Inspection - Codes Residential Full C of O 8/22/2022 08/22/2022
Misc
Resolved
08/22/2022
-Water meter shall be at grade level with meter-lid distance of 14”-18”
Documents & Images
Date Uploaded File Type Document Name
06/28/2021 Application Form Permit Application
06/28/2021 Application Form License Tax Form
06/28/2021 Permit Codes Residential Plan Review
06/28/2021 Plot Plan Approved Plot Plan
07/01/2021 Approved Plans Approved Drawings
07/01/2021 Permit Codes Residential Plan Review
07/07/2021 Permit Codes Residential Plan Review
07/09/2021 Permit DS Building Permit
07/09/2021 Receipt Receipt for transaction:2021-005495
08/18/2021 Garys Fndn 4805 NE Jamestown Dr Lee's Summit Mo Footings Forming & Reinforcement Inspection Report 8-17-21
09/17/2021 Letter INSPECTION SUMMARY
09/17/2021 Letter INSPECTION SUMMARY
09/20/2021 Letter INSPECTION SUMMARY
09/21/2021 Letter INSPECTION SUMMARY
09/21/2021 Letter INSPECTION SUMMARY
09/21/2021 Letter INSPECTION SUMMARY
11/19/2021 Letter INSPECTION SUMMARY
11/19/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
04/05/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
04/28/2022 Final_2022-04-15_DPier_LSMO_Pat Cochran Concrete
04/29/2022 Letter INSPECTION SUMMARY
04/29/2022 Letter INSPECTION SUMMARY
05/02/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/29/2022 Letter INSPECTION SUMMARY
06/29/2022 Letter INSPECTION SUMMARY
06/30/2022 Receipt Receipt for transaction:2022-005355
06/30/2022 Work Statement for MONT Lot 117
06/30/2022 Approved Plans APPROVED BASEMENT DRAWING
06/30/2022 Receipt Receipt for transaction:2022-005388
06/30/2022 Letter Codes Temporary Certificate of Occupancy
07/06/2022 Letter INSPECTION SUMMARY
07/18/2022 Plot Plan Approved As Graded Plot Plan
08/22/2022 Letter Codes Final Certificate of Occupancy
08/22/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home