Summary
PRCOM20251166
Building Permit - Commercial
Issued
NEW MULTI-FAMILY
THE REUNION AT BLACKWELL - BUILDING 26, TYPE C -4 PLEX PLAN REVIEW COMPLETED UNDER PRCOM20250089
03/31/2025
06/17/2025
Locations
Contacts
Avital Homes, LLC, Address:7500 W 151st Street, #23100, Phone:(816) 914-7128  
RED DOG ELECTRIC SERVICES, Address:PO BOX 1, Phone:(913) 208-4816  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
COLLINS WEBB ARCHITECTURE LLC, Address:307 SW MARKET ST, Unit A, Phone:(816) 249-2270  
Doug Jenson - Avital Homes, Phone:(816) 266-0685  
Reviews
Review Type Outcome Est. Completion Date Completed
Final Development Plan Review Approved 04/14/2025 03/31/2025
Mike Weisenborn
Building Plan Review Approved with Conditions 04/14/2025 03/31/2025
Mike Weisenborn
Miscellaneous Correction
Resolved
06/17/2025

Foundation and underlsab plumbing only released at this time. Substantial completion on the santiary and water before private connections can be made. Full access and live hydrants required prior to release of vertical construction.
Licensed Contractors Approved 04/14/2025 03/31/2025
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $10,595.00 $10,595.00 Paid 04/03/2025
Water Meter Fee $1,066.76 $1,066.76 Paid 04/03/2025
Sanitary Sewer Development Fee $6,101.00 $6,101.00 Paid 04/03/2025
Valuation Fee for New 3 or 4 Family $4,451.71 $4,451.71 Paid 04/03/2025
Residential Excise Tax Fee $2,480.64 $2,480.64 Paid 04/03/2025
3rd and Subsequent Inspection Fee (Per Hour) $75.00 $75.00 Paid 01/27/2026
Not Ready Inspection Fee $75.00 $75.00 Paid 01/27/2026
Not Ready Inspection Fee $75.00 $75.00 Paid 01/27/2026
Not Ready Inspection Fee $75.00 $75.00 Paid 01/27/2026
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Pending
Occupancy Inspection - Codes Commercial Pending 4/2/2026 4/2/2026
Misc
Corrective Action Required
02/25/2026
-final grade -sod -splash blocks/down spouts to extend 36” from foundation 653,655 ,657,659
Footing Inspection - Commercial Failed 5/5/2025 05/05/2025
Misc
Corrective Action Required
05/05/2025
failed 5/1 no erosion control
Erosion Control Inspection Partial 5/5/2025 5/5/2025 05/05/2025
Miscellaneous Correction
Informational
05/05/2025
5-5-25 Dustin A, Erosion control is installed. Will need to be maintained through construction process.
Footing Inspection - Commercial Partial 5/12/2025 05/12/2025
Misc
Resolved
05/12/2025
failed 5/1 no erosion control
Misc
Informational
05/12/2025
Footing okay to pour
Footing Inspection - Commercial Passed 5/16/2025 5/16/2025 05/16/2025
Misc
Resolved
05/16/2025
Footing okay to pour
Underslab Plumbing Inspection - Commercial Passed 5/28/2025 5/28/2025 05/28/2025
Sewer Service Inspection Passed 7/18/2025 7/18/2025 07/18/2025
Misc
Informational
07/18/2025
7-18-25 Dustin A, both sewer stubs for duplex are attached to existing 6 in sewer stub. Pass
All Rough Inspection - Commercial Failed 9/19/2025 9/19/2025 09/19/2025
Misc
Corrective Action Required
09/19/2025
NOT A COMPLETE INSPECTION -Provide city stamped truss plans on site for inspection Throughout -no more than 2 NM through top plate penetrations check throughout -protect dryer vent at top plate -repair all holes and seal all penetrations in seperation walls -ufer ground not ran yet -anchor bolts not tightened throughout -fire rated roof sheathing to extend 4’ each side of separation wall 653 -protect dwv at top plate 2” front bedroom -smoke/co outside front bedrooms not to be within 3’ of bathroom -solid bock at back door hinges -
All Rough Inspection - Commercial Failed 9/24/2025 9/24/2025 09/24/2025
Misc
Corrective Action Required
09/19/2025
NOT A COMPLETE INSPECTION, TRUSSES NOT INSPECTED -Provide city stamped truss plans on site for inspection Throughout -repair all holes and seal all penetrations in seperation walls -vertical to horizontal fire blocking to be ever 10’ in party walls (missing in areas and to far spaced in others) -screw patten on party wall behind tubs not to plans -will check GB bracing at time of drywall 653 -protect dwv at top plate 2” below front bedroom -missing stud in stud pack per plans front bedroom -provide exterior receptacle for hvac service ability -wall between 653/655 sheet rocked between part walls at garage 655 -stud spacing front bedroom exterior door all exceeding 16” -Address party wall all not full height NE -fire rated roof sheathing to extend 4’ each side of separation wall (see rear bedroom, check throughout) 657 -top plate penetration front bedroom/bathroom wall -not more than 2 NM through top plate penetration together. Rear bedroom 659 -support supply vent above bedroom up off of electrical -provide exterior receptacle for hvac service ability -outlet spacing greater than 6’ from opening rear bedroom
All Rough Inspection - Commercial Failed 9/26/2025 9/26/2025 09/26/2025
Misc
Corrective Action Required
09/24/2025
NOT A COMPLETE INSPECTION, TRUSSES NOT INSPECTED DO NOT INSULATE -Provide city stamped truss plans on site for inspection Throughout -repair all holes and seal all penetrations in seperation walls -screw patten on party wall behind tubs not to plans -will check GB bracing at time of drywall 653 -missing stud in stud pack per plans front bedroom -provide exterior receptacle for hvac service ability -wall between 653/655 sheet rocked between part walls at garage 655 -stud spacing front bedroom exterior door all exceeding 16” -fire rated roof sheathing to extend 4’ each side of separation wall (see rear bedroom, check throughout) 657 659 -support supply vent above bedroom up off of electrical
Electrical Service Inspection Passed 9/26/2025 9/26/2025 09/26/2025
All Rough Inspection - Commercial Failed 9/29/2025 9/29/2025 09/29/2025
Misc
Corrective Action Required
09/26/2025
NOT A COMPLETE INSPECTION, TRUSSES NOT INSPECTED DO NOT INSULATE -Provide city stamped truss plans on site for inspection Throughout -will check GB bracing at time of drywall 653 -missing stud in stud pack per plans front bedroom 655 657 659
Water Service Inspection Passed 10/16/2025
Misc
Informational
10/16/2025
10-16-25 Dustin A, Water service is installed to city specs
All Rough Inspection - Commercial Not Ready 10/28/2025 10/28/2025 10/28/2025
Misc
Corrective Action Required
09/29/2025
NOT A COMPLETE INSPECTION, TRUSSES NOT INSPECTED COMPLETELY DO NOT INSULATE Throughout -will check GB bracing at time of drywall Check plans and all trusses throughout Only 653 inspected 653 -msta30 hold downs require 22 fasteners as designed front bedroom -repair stud cut to install htt4 in kitchen area with full length stud -missing nails in fl2A truss -multiple trusses missing lateral bracing. 655 657 659
Rated Assembly Inspection Failed 10/28/2025 10/28/2025 10/28/2025
Misc
Corrective Action Required
10/28/2025
Fill all larger gaps, penetrations, missing areas throughout -655 stud spacing at party wall greater that 16” O.C (garage) -notched sheet rock areas above kitchen to large in some areas -can not get 2 layers behind plumbing in bath unit 657 E wall
Rated Assembly Inspection Failed 10/28/2025 10/28/2025 10/28/2025
Misc
Corrective Action Required
10/28/2025
Fill all larger gaps, penetrations, missing areas throughout -655 stud spacing at party wall greater that 16” O.C (garage) -notched sheet rock areas above kitchen to large in some areas -can not get 2 layers behind plumbing in bath unit 657 E wall -gypsum board must extend to exterior sheathing
Rated Assembly Inspection Failed 11/4/2025 11/4/2025 11/04/2025
Misc
Corrective Action Required
10/28/2025
Fill all larger gaps, penetrations, missing areas throughout (foam is not approved for sealing gaps in separation between walls) -can not get 2 layers behind plumbing and electrical in bath unit 657 E wall -gypsum board must extend to exterior sheathing -659 garage wall stud spacing greater that 16” OC
All Rough Inspection - Commercial Failed 11/4/2025 11/4/2025 11/04/2025
Misc
Corrective Action Required
10/28/2025
DO NOT INSULATE Throughout -will check GB bracing at time of drywall -provide H2.5 per plans Check plans and all trusses throughout 653 -msta30 hold downs require 22 fasteners as designed -repair stud cut to install htt4 in bedroom with full length stud 655 657 -address broken truss above bedroom 1 659
All Rough Inspection - Commercial Failed 11/12/2025 11/12/2025 11/12/2025
Misc
Corrective Action Required
11/04/2025
DO NOT INSULATE Throughout -will check GB bracing at time of drywall -provide H2.5 per plans Check plans and all trusses throughout 653 655 657 -address broken truss above bedroom 1 (Fix to engineer specifications) 659
Rated Assembly Inspection Partial 11/14/2025 11/14/2025 11/14/2025
Misc
Resolved
11/14/2025
Fill all larger gaps, penetrations, missing areas throughout (foam is not approved for sealing gaps in separation between walls) -can not get 2 layers behind plumbing and electrical in bath unit 657 E wall -gypsum board must extend to exterior sheathing -659 garage wall stud spacing greater that 16” OC
Misc
Corrective Action Required
11/14/2025
1st layer okay to cover.
All Rough Inspection - Commercial Partial 11/14/2025 11/14/2025 11/14/2025
Misc
Corrective Action Required
11/12/2025
Throughout -will check GB bracing at time of drywall
Rated Assembly Inspection Partial 11/19/2025 11/19/2025 11/19/2025
Misc
Corrective Action Required
11/14/2025
1st layer okay to cover.
Misc
Informational
11/19/2025
2nd layer attic screw pattern ok
Driveway Inspection Failed 11/24/2025 11/24/2025 11/24/2025
Misc
Corrective Action Required
11/24/2025
11-24-25 Dustin A, Dw has standing water and has not been compacted.
Rated Assembly Inspection Partial 12/3/2025 12/3/2025 12/03/2025
Misc
Informational
12/03/2025
1st layer okay to cover. 2nd layer in attic space complete
Misc
Resolved
12/03/2025
2nd layer attic screw pattern ok
Driveway Inspection Failed 12/8/2025 12/8/2025 12/08/2025
Misc
Corrective Action Required
11/24/2025
11-24-25 Dustin A, Dw has standing water and has not been compacted. 12-8-25 Dustin A, Dw has water\ice .
Driveway Inspection Failed 12/9/2025 12/9/2025 12/09/2025
Misc
Corrective Action Required
12/08/2025
11-24-25 Dustin A, Dw has standing water and has not been compacted. 12-8-25 Dustin A, Dw has water\ice . 12-9-25 Dustin A, Water still in dw
Rated Assembly Inspection Failed 12/10/2025 12/10/2025 12/10/2025
Misc
Informational
12/03/2025
1st layer okay to cover. 2nd layer in attic space complete
Misc
Corrective Action Required
12/10/2025
657-missing drywall in dead space 657/655 wall
All Rough Inspection - Commercial Passed 12/11/2025 12/11/2025 12/11/2025
Misc
Resolved
12/11/2025
Throughout okay -will check GB bracing at time of drywall
Rated Assembly Inspection Failed 12/11/2025 12/11/2025 12/11/2025
Misc
Informational
12/10/2025
1st layer okay to cover. 2nd layer in attic space complete
Misc
Corrective Action Required
12/10/2025
657-missing drywall in dead space 657/655 wall (laundry)
Driveway Inspection Failed 12/10/2025 12/10/2025 12/12/2025
Misc
Corrective Action Required
12/09/2025
11-24-25 Dustin A, Dw has standing water and has not been compacted. 12-8-25 Dustin A, Dw has water\ice . 12-9-25 Dustin A, Water still in dw 12-10-25 Dustin A, Nick said he needed to reschedule
Rated Assembly Inspection Not Ready 12/15/2025 12/15/2025 12/15/2025
Misc
Informational
12/11/2025
1st layer okay to cover. 2nd layer in attic space complete
Misc
Corrective Action Required
12/11/2025
657-missing drywall in dead space 657/655 wall (laundry) NOT DONE
Rated Assembly Inspection Not Ready 12/18/2025 12/18/2025 12/18/2025
Misc
Informational
12/15/2025
1st layer okay to cover. 2nd layer in attic space complete
Misc
Corrective Action Required
12/15/2025
657-missing drywall in dead space 657/655 wall (laundry) NOT DONE NOT DONE. MEET ON SITE TO SHOW YOU BEFORE CALLING TO RESCHEDULE
Rated Assembly Inspection Passed 12/19/2025 12/19/2025 12/19/2025
Misc
Resolved
12/19/2025
1st layer okay to cover. 2nd layer in attic space complete
Misc
Resolved
12/19/2025
657-missing drywall in dead space 657/655 wall NOT DONE NOT DONE. MEET ON SITE TO SHOW YOU BEFORE CALLING TO RESCHEDULE
Driveway Inspection Partial 12/30/2025 12/30/2025 12/30/2025
Misc
Corrective Action Required
12/12/2025
11-24-25 Dustin A, Dw has standing water and has not been compacted. 12-8-25 Dustin A, Dw has water\ice . 12-9-25 Dustin A, Water still in dw 12-10-25 Dustin A, Nick said he needed to reschedule 12-30-25 Dustin A, Dw has been formed and compacted. Good to pour as long as ground temp is above 32 degrees . Please call to have ground temp checked before pouring.
Driveway Inspection Partial 1/5/2026 1/5/2026 01/05/2026
Misc
Corrective Action Required
12/30/2025
11-24-25 Dustin A, Dw has standing water and has not been compacted. 12-8-25 Dustin A, Dw has water\ice . 12-9-25 Dustin A, Water still in dw 12-10-25 Dustin A, Nick said he needed to reschedule 12-30-25 Dustin A, Dw has been formed and compacted. Aggregate needs to be 4 inch. . Please call to have ground temp checked before pouring. 1-5-25 Dustin A, Dw does not have enough aggregate an there is dirt\mud showing through 1-5-26 Dustin A, Dw has been formed and compacted. Good to pour as long as ground temp is above 32 degrees .
Driveway Inspection Passed 1/22/2026 1/22/2026 01/22/2026
Misc
Corrective Action Required
01/05/2026
11-24-25 Dustin A, Dw has standing water and has not been compacted. 12-8-25 Dustin A, Dw has water\ice . 12-9-25 Dustin A, Water still in dw 12-10-25 Dustin A, Nick said he needed to reschedule 12-30-25 Dustin A, Dw has been formed and compacted. Aggregate needs to be 4 inch. . Please call to have ground temp checked before pouring. 1-5-25 Dustin A, Dw does not have enough aggregate an there is dirt\mud showing through 1-22-26 Dw has been poured to city spec.
Occupancy Inspection - Codes Commercial Failed 2/18/2026 2/18/2026 02/18/2026
Misc
Corrective Action Required
02/18/2026
No further inspections until erosion control is in compliance Repair all down silt fence -final grade -sod -splash blocks/down spouts to extend 36” from foundation -A/c breaker oversized -anti tip device at oven 653 -missing attic access cover -afci protection for all kitchen circuits -garage door to be self closing and latching -spark rings required at kitchen backsplash 655 657 -address gap in drywall at outlet in separation wall primary bedroom 659 -disposal circuit to be afci/gfci protected
Occupancy Inspection - Engineering Passed 2/18/2026 2/18/2026 02/18/2026
Occupancy Inspection - Codes Commercial Failed 2/25/2026 2/25/2026 02/25/2026
Misc
Corrective Action Required
02/18/2026
-final grade -sod -splash blocks/down spouts to extend 36” from foundation 653 -outlet cover missing in kitchen at the backsplash 655 657 -outlet cover missing in separation wall primary bedroom 659
Occupancy Inspection - Codes Commercial Failed 2/25/2026 02/25/2026
Misc
Corrective Action Required
02/25/2026
-final grade -sod -splash blocks/down spouts to extend 36” from foundation 653,655 ,657,659
Documents & Images
Date Uploaded File Type Document Name
04/03/2025 Receipt Receipt for transaction:2025-002032
04/03/2025 Letter DS Building Permit
03/31/2025 Approved Plans Approved plans V1
05/05/2025 Letter INSPECTION SUMMARY
05/05/2025 Letter INSPECTION SUMMARY
05/12/2025 Letter INSPECTION SUMMARY
05/16/2025 Letter INSPECTION SUMMARY
05/28/2025 Letter INSPECTION SUMMARY
06/17/2025 Letter DS Building Permit
07/18/2025 Letter INSPECTION SUMMARY
03/31/2025 Approved Plans Approved plans V1
03/06/2025 Approved Plans Approved plans V2
09/19/2025 Letter INSPECTION SUMMARY
09/24/2025 Letter INSPECTION SUMMARY
09/26/2025 Letter INSPECTION SUMMARY
09/26/2025 Letter INSPECTION SUMMARY
09/29/2025 Letter INSPECTION SUMMARY
10/16/2025 Letter INSPECTION SUMMARY
10/17/2025 Approved Plans Approved Bldg C Trusses
10/17/2025 Approved Plans Building C truss Seals All C buildngs_STAND REVIEWED
10/28/2025 Letter INSPECTION SUMMARY
10/28/2025 Letter INSPECTION SUMMARY
10/28/2025 Letter INSPECTION SUMMARY
11/04/2025 Letter INSPECTION SUMMARY
11/04/2025 Letter INSPECTION SUMMARY
11/05/2025 Approved Plans Approved G111
11/12/2025 Letter INSPECTION SUMMARY
11/12/2025 Approved Plans Approved Truss repair
11/14/2025 Letter INSPECTION SUMMARY
11/14/2025 Letter INSPECTION SUMMARY
11/17/2025 Approved Plans Truss repair doc
11/19/2025 Letter INSPECTION SUMMARY
11/24/2025 Letter INSPECTION SUMMARY
12/03/2025 Letter INSPECTION SUMMARY
12/08/2025 Approved Plans Approved E200 revision
12/08/2025 Letter INSPECTION SUMMARY
12/08/2025 Letter INSPECTION SUMMARY
12/09/2025 Letter INSPECTION SUMMARY
12/10/2025 Letter INSPECTION SUMMARY
12/11/2025 Letter INSPECTION SUMMARY
12/11/2025 Letter INSPECTION SUMMARY
12/12/2025 Letter INSPECTION SUMMARY
12/15/2025 E-MAIL reguarding Grounding diagrams for fourplexes
12/15/2025 Letter INSPECTION SUMMARY
12/18/2025 Letter INSPECTION SUMMARY
12/19/2025 Letter INSPECTION SUMMARY
12/30/2025 Letter INSPECTION SUMMARY
12/30/2025 Letter INSPECTION SUMMARY
01/05/2026 Letter INSPECTION SUMMARY
01/05/2026 Letter INSPECTION SUMMARY
01/05/2026 Letter INSPECTION SUMMARY
01/22/2026 Letter INSPECTION SUMMARY
01/27/2026 Receipt Receipt for transaction:2026-000528
02/09/2026 Approved Plans REUNION GRADING PLA
02/18/2026 Letter INSPECTION SUMMARY
02/18/2026 Letter INSPECTION SUMMARY
02/25/2026 Letter INSPECTION SUMMARY
02/25/2026 Letter INSPECTION SUMMARY
02/25/2026 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home