Permit Application Status

PRCOM20223368


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20223368
Building Permit - Commercial
Certificate of Occupancy
DH4 HOLDINGS LLC
NEW COMMERCIAL
NEW BUILDING FOR ELECTRIC KART RACING - INCLUDES RESTAURANT, GAME ARCADE AND PUBLIC MEETING ROOMS
07/20/2022
09/19/2022
02/25/2023
11/17/2023
Locations
Contacts
CENTRIC CONSTRUCTION GROUP, Address:520 W PENNWAY STE 100, Phone:(816) 389-8300  
SHANE CLINE, Address:CENTRIC BUILD  
B & C MECHANICAL SERVICES LLC, Address:2008 E SPRUCE CIR STE B, Phone:(913) 681-0088  
TORGESON ELECTRIC CO INC, Address:3545 SW 6TH AVE, Phone:(785) 233-2213 Ext:101  
PRO DESIGN CONTRACTORS LLC, Address:918 E WARREN ST, Phone:(913) 308-6900  
SLAGGIE ARCHITECTS INC, Address:4600 MADISON AVE STE 350, Phone:(816) 756-1958 Ext:243  
CFS ENGINEERS, Address:1421 EAST 104TH STREET STE 100, Phone:(816) 333-4477  
DH4 HOLDINGS LLC, Address:10624 S EASTERN AVE, STE A-975, Phone:(816) 853-8323  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 03/07/2023
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
03/07/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Stamped plans received March 6, 2023.
Installation acceptance testing
Corrective Action Required
03/07/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule hydrostatic and flow testing.
Alarm Plan Review Released for Construction 01/30/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
01/30/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Plans received 1/22/2023.
Installation acceptance testing
Corrective Action Required
01/30/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Cal (816) 9691300 to schedule an alarm test. Coordinate with sprinkler flow test.
Miscellaneous Correction
Corrective Action Required
01/30/2023

Provide an additional notification appliance in the kitchen. Verified at inspection.
Licensed Contractors Approved 09/12/2022 09/14/2022
Joe Frogge
LC - MEP Subs
Resolved
09/14/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 8/22/22 - acknowledged in letter 9/2/22 - Torgeson Electric not licensed with us
Building Plan Review Approved 09/12/2022 09/14/2022
Joe Frogge
Final Development Plan
Resolved
09/14/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 8/22/22 - acknowledged in letter
Misc
Resolved
09/02/2022

Inadequate information to complete review. Provide the following: - **kitchen design prompts additional comments. See added comments at bottom of this report. - - **battery information provided prompts additional comments. See added comments at bottom of this report.Types of batteries and chargers for karts. Due to use of lead-acid, modify designs to demonstrate compliance with IMC 502.4 & IFC 1206.11.3
Miscellaneous Correction
Resolved
09/02/2022

**Comments added after review of kitchen designs. - Coordinate plumbing design with grease trap location. (currently GW runs to nowhere west of kitchen while MEP and FDP plans show trap in parking lot) - Provide Type II hood over oven or provide verification that the oven is rated for non-hood use and that the hvac system is designed to compensate for any heat and humidity.
Miscellaneous Correction
Resolved
09/02/2022

**Comment added after review of battery information provided. - Due to use of lead-acid, modify designs to demonstrate compliance with ventilation requirements of 2018 IMC 502.4 & 2018 IFC 1206.11.3
Fire Plan Review Approved with Conditions 09/12/2022 09/13/2022
Ben Hicks
09/13/2022

09/13/2022

Construction documents for fire alarm systems
Informational
09/02/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Informational
09/02/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide shop drawings for review and approval.
Installation acceptance testing
Informational
09/02/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Address numbers required
Informational
09/02/2022

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Verified at inspection.
Final Development Plan Review Approved 09/12/2022 09/07/2022
Mike Weisenborn
Fire Plan Review Rejected 08/25/2022 08/25/2022
Jim Eden
Construction documents for fire alarm systems
Informational
08/25/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Informational
08/25/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide shop drawings for review and approval.
Installation acceptance testing
Informational
08/25/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Miscellaneous Correction
Resolved
08/25/2022

Complete requirements for the Final Development Plan.
Address numbers required
Informational
08/25/2022

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Verified at inspection.
Knox box required
Corrective Action Required
08/25/2022

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Action required- A Knox box shall be located 6' AFF over the FDC and not by the front door.
Portable fire extinguishers for commercial cooking equipment.
Resolved
08/25/2022

2018 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher.
Portable fire extinguishers - general
Resolved
08/25/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required- Show the locations of the fire extinguishers.
Miscellaneous Correction
Corrective Action Required
08/18/2022

Provide information on the type of batteries to be used for the go carts, quantity, charging methods and interlocks, how and where will spare batteries be stored. Manufacturers safety requirements. Provide the manufacturers specifications for the batteries and charging systems. What are thquanty of batteries in pounds? What interlocks are provided during charging?
Miscellaneous Correction
Resolved
08/25/2022

Confirm the roof hatch is in Closet 204.
Posting of occupant load
Resolved
08/25/2022

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Verified at inspection.
Miscellaneous Correction
Resolved
08/25/2022

Confirm emergency lighting is provided in the dining area.
Miscellaneous Correction
Resolved
08/25/2022

Confirm the sprinkler riser will be located in the electrical room and space has been provided.
Miscellaneous Correction
Resolved
08/25/2022

The Door Hardware on the Door Schedule is not defined.
Building Plan Review Rejected 08/25/2022 08/22/2022
Joe Frogge
Final Development Plan
Corrective Action Required
08/18/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 8/22/22 - acknowledged in letter
IBC 1704.2 Special Inspections
Resolved
08/22/2022

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Health Dept Inspection
Resolved
08/22/2022

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 8/22/22 - acknowledged in letter
IMC 306.5 Equipment on roofs
Resolved
08/22/2022

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide complete construction details for ladder and hatch including side rail extender.
IBC 1004.1 Design occupant load
Resolved
08/22/2022

2018 IBC 1004.1 Design occupant load. In determining means of egress requirements, the number of occupants for whom means of egress facilities shall be provided shall be determined in accordance with this section. Action required: Provide maximum occupant load signage. 8/22/22 - acknowledged in letter
Misc
Corrective Action Required
08/18/2022

Inadequate information to complete review. Provide the following: - **kitchen design prompts additional comments. See added comments at bottom of this report. - - **battery information provided prompts additional comments. See added comments at bottom of this report.Types of batteries and chargers for karts. Due to use of lead-acid, modify designs to demonstrate compliance with IMC 502.4 & IFC 1206.11.3
IMC 602.2.1 Materials within plenums
Resolved
08/22/2022

2018 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions) Action required: PVC not allowed in plenums. To be verified at inspections.
IMC 801.2 Combustion air required
Resolved
08/22/2022

2018 IMC 801.2 General. Every fuel-burning appliance shall discharge the products of combustion to a vent, factory-built chimney or masonry chimney, except for appliances vented in accordance with Section 804. The chimney or vent shall be designed for the type of appliance being ventilated. (see code for exception) Action required: Provide calculations to verify that gas water heater (DWH-2) in kitchen is not in a "confined area" or provide complete design for intake air.
NEC Article 110.26 (C)(2) Large equipment
Resolved
08/22/2022

2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: Modify design to show that Door #120 in Electrical Room swings outward and is equipped with panic hardware.
Miscellaneous Correction
Corrective Action Required
08/22/2022

**Comments added after review of kitchen designs. - Coordinate plumbing design with grease trap location. (currently GW runs to nowhere west of kitchen while MEP and FDP plans show trap in parking lot) - Provide Type II hood over oven or provide verification that the oven is rated for non-hood use and that the hvac system is designed to compensate for any heat and humidity.
Miscellaneous Correction
Corrective Action Required
08/22/2022

**Comment added after review of battery information provided. - Due to use of lead-acid, modify designs to demonstrate compliance with ventilation requirements of 2018 IMC 502.4 & 2018 IFC 1206.11.3
Special Inspections Review Approved 08/22/2022
Joe Frogge
Licensed Contractors Rejected 08/25/2022 08/22/2022
Joe Frogge
LC - General Contractor
Resolved
08/22/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent. 8/22/22 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
08/18/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 8/22/22 - acknowledged in letter
Building Plan Review Rejected 08/03/2022 08/08/2022
Joe Frogge
Final Development Plan
Corrective Action Required
08/08/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
IBC 1704.2 Special Inspections
Corrective Action Required
08/08/2022

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Health Dept Inspection
Corrective Action Required
08/08/2022

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational.
IMC 306.5 Equipment on roofs
Corrective Action Required
08/08/2022

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide complete construction details for ladder and hatch including side rail extender.
IBC 1004.1 Design occupant load
Corrective Action Required
08/08/2022

2018 IBC 1004.1 Design occupant load. In determining means of egress requirements, the number of occupants for whom means of egress facilities shall be provided shall be determined in accordance with this section. Action required: Provide maximum occupant load signage.
Misc
Corrective Action Required
08/08/2022

Inadequate information to complete review. Provide the following: - Kitchen designs. (Are hoods required? Grease trap? Indirect drains, etc.) - Break Room dryer exhaust design. - Types of batteries and chargers for karts.
IMC 602.2.1 Materials within plenums
Corrective Action Required
08/08/2022

2018 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions) Action required: PVC not allowed in plenums. To be verified at inspections.
IMC 801.2 Combustion air required
Corrective Action Required
08/08/2022

2018 IMC 801.2 General. Every fuel-burning appliance shall discharge the products of combustion to a vent, factory-built chimney or masonry chimney, except for appliances vented in accordance with Section 804. The chimney or vent shall be designed for the type of appliance being ventilated. (see code for exception) Action required: Provide calculations to verify that gas water heater (DWH-2) in kitchen is not in a "confined area" or provide complete design for intake air.
NEC Article 110.26 (C)(2) Large equipment
Corrective Action Required
08/08/2022

2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: Modify design to show that Door #120 in Electrical Room swings outward and is equipped with panic hardware.
Licensed Contractors Rejected 08/03/2022 08/08/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
08/08/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
08/08/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 08/03/2022 08/02/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
08/02/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Corrective Action Required
08/02/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide shop drawings for review and approval.
Installation acceptance testing
Corrective Action Required
08/02/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Miscellaneous Correction
Corrective Action Required
08/02/2022

Complete requirements for the Final Development Plan.
Address numbers required
Corrective Action Required
08/02/2022

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Verified at inspection.
Knox box required
Corrective Action Required
08/02/2022

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Action required- A Knox box shall be located 6'AFF . The FDC is not shown.
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
08/02/2022

2018 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher.
Portable fire extinguishers - general
Corrective Action Required
08/02/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required- Show the locations of the fire extinguishers.
Miscellaneous Correction
Corrective Action Required
08/02/2022

Provide information on the type of batteries to be used for the go carts, quantity, charging methods and interlocks, how and where will spare batteries be stored. Manufacturers safety requirements.
Miscellaneous Correction
Corrective Action Required
08/02/2022

Confirm the roof hatch is in Closet 204.
Posting of occupant load
Corrective Action Required
08/02/2022

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Verified at inspection.
Miscellaneous Correction
Corrective Action Required
08/02/2022

Confirm emergency lighting is provided in the dining area.
Miscellaneous Correction
Corrective Action Required
08/02/2022

Confirm the sprinkler riser will be located in the electrical room and space has been provided.
Miscellaneous Correction
Corrective Action Required
08/02/2022

The Door Hardware on the Door Schedule is not defined.
Health Department Review Approved 07/26/2022
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $25,320.00 $25,320.00 Paid 09/14/2022
7232302-Commercial License Tax Fee $56,100.00 $56,100.00 Paid 06/29/2023
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 09/07/2022
8331401-Water Tap Fee $24,865.00 $24,865.00 Paid 09/07/2022
8350015-Water Meter Fee $3,102.16 $3,102.16 Paid 09/07/2022
8331507-Sanitary Sewer Development Fee $9,230.00 $9,230.00 Paid 09/07/2022
9110068-Storm Fee $3,600.94 $3,600.94 Paid 09/07/2022
9110081-Paved Surface Inspection Fee $12,996.58 $12,996.58 Paid 09/07/2022
91100C9-Water Insp Fee $1,662.09 $1,662.09 Paid 09/07/2022
91100C8-Sanitary Sewer Insp Fees $501.19 $501.19 Paid 09/07/2022
9110071-Site Grading Fee $18,624.46 $18,624.46 Paid 09/07/2022
9110069-After Hours Inspections (Public Works)(Per Hour) $100.00 $100.00 Paid 06/29/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 07/13/2023
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid


$75.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Grading/Excavation/Fill Inspection Partial 09/09/2022
Misc
Informational
09/09/2022
9-9-22 AN meet with Kyle form pro design and the are goin got start grading next week
Erosion Control Inspection Partial 09/14/2022
Misc
Informational
09/14/2022
9-14-22 AN Silt fence is installed
Grading/Excavation/Fill Inspection Partial 09/14/2022
Misc
Informational
09/09/2022
9-9-22 AN meet with Kyle form pro design and the are goin got start grading next week 9-14-22 crew has began to grade the lot
Grading/Excavation/Fill Inspection Partial 09/26/2022
Misc
Informational
09/14/2022
9-9-22 AN meet with Kyle form pro design and the are goin got start grading next week 9-14-22 crew has began to grade the lot 9-14 to 9-26 AN crew has continued to grade the lot and is appears that they have some footings down
Erosion Control Inspection Partial 10/10/2022
Misc
Informational
09/14/2022
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues
Site Visit Partial 10/10/2022
Misc
Informational
10/10/2022
10-7-22 AN stop by to touch base with contractor to see when they are going to start work.
Site Visit Partial 10/10/2022
Misc
Informational
10/10/2022
10-7-22 AN stop by to touch base with contractor to see when they are going to start work. 10-10-22 AN no one on site
Footing Inspection - Commercial Partial 10/13/2022 10/13/2022
Misc
Informational
10/13/2022
Exterior wall grade beam approved to pour below: -West GB starting from C.5 to B/5 to B/3.5 to A/3.5 to A/2.3 to B/2.3 to B/1 to E.7
Footing Inspection - Commercial Partial 10/14/2022 10/14/2022
Misc
Informational
10/13/2022
Exterior wall grade beam approved to pour below: -West GB starting from C.5 to B/5 to B/3.5 to A/3.5 to A/2.3 to B/2.3 to B/1 to E.7; continue to H/5 SW corner
Footing Inspection - Commercial Partial 10/17/2022 (11:00) 10/17/2022 10/17/2022
Misc
Informational
10/14/2022
Exterior wall grade beam approved to pour below: -West GB starting from C.5 to B/5 to B/3.5 to A/3.5 to A/2.3 to B/2.3 to B/1 to E.7; continue to H/5 SW corner **10-17-22 Line 5/H to 5/G, line ZD to 27.5, Line I/1 to I/2
Footing Inspection - Commercial Partial 10/18/2022 10/18/2022
Misc
Informational
10/17/2022
Exterior wall grade beam approved to pour below: -West GB starting from C.5 to B/5 to B/3.5 to A/3.5 to A/2.3 to B/2.3 to B/1 to E.7; continue to H/5 SW corner; 5/H to 5/G, line ZD to 27.5, Line I/1 to I/2; B/5 to B/2.3 Column pads approved to pour below: -5 pads on line 2; 3/F, 3/G, 3/C; 4/C
Underslab Electrical Inspection - Commercial Partial 10/18/2022 10/18/2022
Misc
Informational
10/18/2022
Underslab electrical OK below: -raceway from service panel to sub panel
Footing Inspection - Commercial Partial 10/19/2022 10/19/2022 10/19/2022
Misc
Informational
10/18/2022
Exterior wall grade beam approved to pour below: -West GB starting from C.5 to B/5 to B/3.5 to A/3.5 to A/2.3 to B/2.3 to B/1 to E.7; continue to H/5 SW corner; 5/H to 5/G, line ZD 5/G to Z7.5, Line I/1 to I/2; B/5 to B/2.3 Column pads approved to pour below: -5 pads on line 2; 3/F, 3/G, 3/C; 4/C; 4.6/G; 2 pads on line Z4.5
Footing Inspection - Commercial Partial 10/20/2022 (11:00) 10/20/2022 10/20/2022
Misc
Informational
10/19/2022
Exterior wall grade beam approved to pour below: -West GB starting from C.5 to B/5 to B/3.5 to A/3.5 to A/2.3 to B/2.3 to B/1 to E.7; continue to H/5 SW corner; 5/H to 5/G, line ZD 5/G to Z7.5, Line I/1 to I/2; B/5 to B/2.3; line Z7/ZD to Z7/ZA to Z10/ZA to Z10/C.5 Column pads approved to pour below: -5 pads on line 2; 3/F, 3/G, 3/C; 4/C; 4.6/G; 2 pads on line Z4.5
Underslab Plumbing Inspection - Commercial Partial 10/19/2022 10/19/2022 10/20/2022
Misc
Informational
10/20/2022
Underslab plumbing OK below: -Storm drain at NW section of building
Footing Inspection - Commercial Partial 10/21/2022 10/21/2022 10/21/2022
Misc
Informational
10/20/2022
Exterior wall grade beam approved to pour below: -West GB starting from C.5 to B/5 to B/3.5 to A/3.5 to A/2.3 to B/2.3 to B/1 to E.7; continue to H/5 SW corner; 5/H to 5/G, line ZD 5/G to Z7.5, Line I/1 to I/2; B/5 to B/2.3; line Z7/ZD to Z7/ZA to Z10/ZA to Z10/C.5 Column pads approved to pour below: -5 pads on line 2; 3/F, 3/G, 3/C; 4/C; 4.6/G; 2 pads on line Z4.5; 2 col pads on line Z10, 3 pads on line ZE
Underslab Plumbing Inspection - Commercial Partial 10/21/2022 10/21/2022 10/21/2022
Misc
Informational
10/20/2022
Underslab plumbing OK below: -Storm drain at NW section of building -Sanitary drain for 111/112/113/114 to near point C.5/4.5
Water Line - Construction Inspection Partial 10/26/2022
Misc
Informational
10/26/2022
10-26-22 AN. Boring under the road, crew pot holed on each side of the street and did not hit rock .
Underslab Plumbing Inspection - Commercial Partial 10/26/2022 10/26/2022
Misc
Informational
10/21/2022
Underslab plumbing OK below: -Storm drain at NW to SW section of building -Sanitary drain for 111/112/113/114 to near point C.5/4.5
Underslab Electrical Inspection - Commercial Partial 10/26/2022 10/26/2022
Misc
Informational
10/18/2022
Underslab electrical OK below: -All raceways except the middle section of buildoing where the crane will enter
Erosion Control Inspection Partial 11/22/2022
Misc
Informational
10/10/2022
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues 11-22-22 AN. No erosion control issues
Site Visit Partial 11/22/2022
Misc
Informational
10/10/2022
10-7-22 AN stop by to touch base with contractor to see when they are going to start work. 10-10-22 AN no one on site 11-22-22 AN. Stoped by and utilities mite start mid December
Erosion Control Inspection Partial 11/30/2022
Misc
Informational
11/22/2022
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues 11-22-22 AN. No erosion control issues 11-30-22 AN no erosion control issues
Site Visit Partial 12/05/2022
Misc
Informational
11/22/2022
10-7-22 AN stop by to touch base with contractor to see when they are going to start work. 10-10-22 AN no one on site 11-22-22 AN. Stoped by and utilities mite start mid December 12-5-22 AN. Crew has been working on the slab area and putting the crane together to put up walls
Water Line - Construction Inspection Partial 12/06/2022
Misc
Informational
10/26/2022
10-26-22 AN. Boring under the road, crew pot holed on each side of the street and did not hit rock . 12-6-22 AN crew stubbed out the fire line and water service line under the footings . Pic attached
Water Service Inspection Partial 12/06/2022
Misc
Informational
12/06/2022
12-6-22 AN crew stubbed out the fire line and water service line under the footings . Pic attached
Underslab Electrical Inspection - Commercial Partial 12/7/2022 12/7/2022 12/07/2022
Misc
Informational
10/26/2022
Underslab electrical OK below: -All raceways except the middle section of buildoing where the crane will enter -UE under electrical rm
Footing Inspection - Commercial Partial 12/9/2022 (11:30) 12/9/2022 12/09/2022
Misc
Informational
10/21/2022
Exterior wall grade beam approved to pour below: -West GB starting from C.5 to B/5 to B/3.5 to A/3.5 to A/2.3 to B/2.3 to B/1 to E.7; continue to H/5 SW corner; 5/H to 5/G, line ZD 5/G to Z7.5, Line I/1 to I/2; B/5 to B/2.3; line Z7/ZD to Z7/ZA to Z10/ZA to Z10/C.5 Column pads approved to pour below: -Col pads on lines 2,3,4,5; 4.6/G; 2 pads on line Z4.5; 2 col pads on line Z10, 3 pads on line ZE
Underslab Plumbing Inspection - Commercial Failed 12/14/2022 12/14/2022 12/14/2022
Misc
Informational
10/26/2022
Underslab plumbing OK below: -Storm drain at NW to SW section of building -Sanitary drain for 111/112/113/114 to near point C.5/4.5
Storm Sewer Construction Inspection Partial 12/15/2022
Misc
Informational
12/15/2022
12-15-22 AN crew has began to work on the storm. starting to tie in to storm structure X-2
Underslab Plumbing Inspection - Commercial Partial 12/15/2022 12/15/2022 12/15/2022
Misc
Informational
12/14/2022
Underslab plumbing OK below: -Storm drain at NW to SW section of building -Sanitary drain-ok
Storm Sewer Construction Inspection Partial 12/16/2022
Misc
Informational
12/15/2022
12-15-22 AN crew has began to work on the storm. starting to tie in to storm structure X-2 12-16-22 AN installed drain basin 1+46.17 and pipe up to sta 3+00
Underslab Electrical Inspection - Commercial Passed 12/16/2022 12/16/2022 12/16/2022
Misc
Resolved
12/16/2022
Underslab electrical OK below: -All raceways except the middle section of buildoing where the crane will enter -UE under electrical rm
Underslab Plumbing Inspection - Commercial Passed 12/16/2022 12/16/2022 12/16/2022
Misc
Resolved
12/16/2022
Underslab plumbing OK below: -Storm drain -Sanitary drain-ok
Storm Sewer Construction Inspection Partial 12/19/2022
Misc
Informational
12/16/2022
12-15-22 AN crew has began to work on the storm. starting to tie in to storm structure X-2 12-16-22 AN installed drain basin 1+46.17 and pipe up to sta 3+00 12-19-22 AN drain basin 2+66.63 to 3+87.09 installed
Storm Sewer Construction Inspection Partial 12/21/2022
Misc
Informational
12/19/2022
12-15-22 AN crew has began to work on the storm. starting to tie in to storm structure X-2 12-16-22 AN installed drain basin 1+46.17 and pipe up to sta 3+00 12-19-22 AN drain basin 2+66.63 to 3+87.09 installed 12-20 12-21-22 AN crew is breaking rock and have storm installed almost up to 5+07.55
Site Visit Partial 12/29/2022
Misc
Informational
12/05/2022
10-7-22 AN stop by to touch base with contractor to see when they are going to start work. 10-10-22 AN no one on site 11-22-22 AN. Stoped by and utilities mite start mid December 12-5-22 AN. Crew has been working on the slab area and putting the crane together to put up walls 12-29-22 DP no work for development
Storm Sewer Construction Inspection Partial 01/04/2023
Misc
Informational
12/21/2022
12-15-22 AN crew has began to work on the storm. starting to tie in to storm structure X-2 12-16-22 AN installed drain basin 1+46.17 and pipe up to sta 3+00 12-19-22 AN drain basin 2+66.63 to 3+87.09 installed 12-20 12-21-22 AN crew is breaking rock and have storm installed almost up to 5+07.55 1-4-23 DP Crew is working on installing storm line 5+7.55 to 6+66.13
Storm Sewer Construction Inspection Partial 01/05/2023
Misc
Informational
01/04/2023
12-15-22 AN crew has began to work on the storm. starting to tie in to storm structure X-2 12-16-22 AN installed drain basin 1+46.17 and pipe up to sta 3+00 12-19-22 AN drain basin 2+66.63 to 3+87.09 installed 12-20 12-21-22 AN crew is breaking rock and have storm installed almost up to 5+07.55 1-4-23 DP Crew is working on installing storm line 5+7.55 to 6+66.13 1-5-23 AN crew is working on line 3 between structure 301 and 302
Sewer Service Inspection Partial 01/05/2023
Misc
Informational
01/05/2023
1-5-23 AN crew tied in the the wye for the sewer service and installed a cleaned out
Storm Sewer Construction Inspection Partial 01/06/2023
Misc
Informational
01/05/2023
12-15-22 AN crew has began to work on the storm. starting to tie in to storm structure X-2 12-16-22 AN installed drain basin 1+46.17 and pipe up to sta 3+00 12-19-22 AN drain basin 2+66.63 to 3+87.09 installed 12-20 12-21-22 AN crew is breaking rock and have storm installed almost up to 5+07.55 1-4-23 DP Crew is working on installing storm line 5+7.55 to 6+66.13 1-5-23 AN crew is working on line 3 between structure 301 and 302 1-6-23 DP crew is working on line 3 and made it to STA 1+75.08
Sewer Service Inspection Partial 01/09/2023
Misc
Informational
01/05/2023
1-5-23 AN crew tied in the the wye for the sewer service and installed a cleaned out 1-9-23 DP crew is continuing to work on running the sanitary line up towards the building
Storm Sewer Construction Inspection Partial 1/10/2023 1/10/2023 01/10/2023
Misc
Informational
01/06/2023
12-15-22 AN crew has began to work on the storm. starting to tie in to storm structure X-2 12-16-22 AN installed drain basin 1+46.17 and pipe up to sta 3+00 12-19-22 AN drain basin 2+66.63 to 3+87.09 installed 12-20 12-21-22 AN crew is breaking rock and have storm installed almost up to 5+07.55 1-4-23 DP Crew is working on installing storm line 5+7.55 to 6+66.13 1-5-23 AN crew is working on line 3 between structure 301 and 302 1-6-23 DP crew is working on line 3 and made it to STA 1+75.08 1-10-23 DP crew install Structure 304 and tied into building for roof drain
Water Line - Construction Inspection Partial 1/10/2023 1/10/2023 01/10/2023
Misc
Informational
12/06/2022
10-26-22 AN. Boring under the road, crew pot holed on each side of the street and did not hit rock . 12-6-22 AN crew stubbed out the fire line and water service line under the footings . Pic attached 1-10-22 DP. Crew started digging up 16" main off of Independence and should start boring the line tomorrow.
Water Line - Construction Inspection Partial 1/11/2023 1/11/2023 01/11/2023
Misc
Informational
01/10/2023
10-26-22 AN. Boring under the road, crew pot holed on each side of the street and did not hit rock . 12-6-22 AN crew stubbed out the fire line and water service line under the footings . Pic attached 1-10-22 DP. Crew started digging up 16" main off of Independence and should start boring the line tomorrow. 1-11-23 DP Crew is boring under Independence for the 6" tie in
Backflow Preventer and Vault Partial 1/12/2023 1/12/2023 01/12/2023
Misc
Informational
01/12/2023
1-12-23 DP crew is excavating and setting the East (next to building) backflow vault.
Backflow Preventer and Vault Partial 01/16/2023
Misc
Informational
01/12/2023
1-12-23 DP crew is excavating and setting the East (next to building) backflow vault. 1-16-23 AN crew is working on setting and installing the vaults and backflows
Backflow Preventer and Vault Partial 01/16/2023
Misc
Informational
01/16/2023
1-12-23 DP crew is excavating and setting the East (next to building) backflow vault. 1-16-23 AN crew is working on setting and installing the vaults and backflows 1-16-23 AN crew is trenching for the water line on the backflow next to the building and reinforcing the 90deg joints pic attached
Water Line - Construction Inspection Partial 1/13/2023 1/13/2023 01/17/2023
Misc
Informational
01/11/2023
10-26-22 AN. Boring under the road, crew pot holed on each side of the street and did not hit rock . 12-6-22 AN crew stubbed out the fire line and water service line under the footings . Pic attached 1-10-22 DP. Crew started digging up 16" main off of Independence and should start boring the line tomorrow. 1-11-23 DP Crew is boring under Independence for the 6" tie in 1-13-23 DP Crew tied into the 16" main off of independence
Backflow Preventer and Vault Partial 1/17/2023 1/17/2023 01/17/2023
Misc
Informational
01/16/2023
1-12-23 DP crew is excavating and setting the East (next to building) backflow vault. 1-16-23 AN crew is working on setting and installing the vaults and backflows 1-16-23 AN crew is trenching for the water line on the backflow next to the building and reinforcing the 90deg joints pic attached 1-17-23 DP Crew is working on running the water line from the north vault to the building
Erosion Control Inspection Partial 1/18/2023 1/18/2023 01/18/2023
Misc
Informational
11/30/2022
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues 11-22-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-18-23 DP No erosion control issues
Water Line - Construction Inspection Partial 1/19/2023 1/19/2023 01/19/2023
Misc
Informational
01/17/2023
10-26-22 AN. Boring under the road, crew pot holed on each side of the street and did not hit rock . 12-6-22 AN crew stubbed out the fire line and water service line under the footings . Pic attached 1-10-22 DP. Crew started digging up 16" main off of Independence and should start boring the line tomorrow. 1-11-23 DP Crew is boring under Independence for the 6" tie in 1-13-23 DP Crew tied into the 16" main off of independence 1-19-23 DP Crew is finishing up fire line up by the building and is chlorinating both lines
Erosion Control Inspection Failed 1/20/2023 1/20/2023 01/20/2023
Misc
Corrective Action Required
01/20/2023
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues 11-22-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-18-23 DP No erosion control issues 1-20-23 DP Erosion control needs to be addressed and Independence needs to be cleaned up
Water Line - Coliform Test 1 Partial 1/20/2023 1/20/2023 01/20/2023
Misc
Informational
01/20/2023
1-20-23 DP Crew Chlorinated the 6" line coming across Independence and the domestic line up by the building. They will be ready for samples next week.
Water Line - Coliform Test 1 Partial 1/24/2023 1/24/2023 01/24/2023
Misc
Informational
01/20/2023
1-20-23 DP Crew Chlorinated the 6" line coming across Independence and the domestic line up by the building. They will be ready for samples next week. 1-24-23 DP We took the first samples of the 6" line coming across Independence and also the 4" domestic line up by the building
Water Line - Hydrostatic Test Passed 01/25/2023
Misc
Informational
01/20/2023
1-20-23 DP Crew preformed hydrostatic test on the fire line up by the building and it passed. 1-25-23 DP Crew preformed hydrostatic test on the 6" line running under Independence up to the fire hydrant and it passed. They tested it at 200psi 1-25-23 DP Crew preformed hydrostatic test on the domestic line up by the building and it passed.
Water Line - Coliform Test 2 Partial 1/25/2023 1/25/2023 01/25/2023
Misc
Informational
01/25/2023
1-25-23 DP. Crew took sample #2 of the 6" line coming across Independence and also the domestic up by the building
Water Line - Coliform Test 1 Passed 1/27/2023 1/27/2023 01/27/2023
Misc
Informational
01/24/2023
1-20-23 DP Crew Chlorinated the 6" line coming across Independence and the domestic line up by the building. They will be ready for samples next week. 1-24-23 DP We took the first samples of the 6" line coming across Independence and also the 4" domestic line up by the building 1-27-23 DP Samples for the 6" and 4" water lines passed
Water Line - Coliform Test 2 Passed 1/27/2023 1/27/2023 01/27/2023
Misc
Informational
01/25/2023
1-25-23 DP. Crew took sample #2 of the 6" line coming across Independence and also the domestic up by the building 1-27-23 DP. Water Samples for the 6" and 4" water lines passed.
Water Line - Coliform Test 1 Partial 1/27/2023 1/27/2023 01/27/2023
Misc
Informational
01/27/2023
1-27-23 DP Both samples have passed for both the 6" and 4" water lines. The 2" meter servicing the 4" domestic will remain off until the building is closed in or no risk of freezing. Per Water utilities before tying into that service line we will need to flush really good from water being stagnant and take 1 passing water sample.
Underground Electrical Inspection - Commercial Partial 1/31/2023 1/31/2023 01/31/2023
Misc
Informational
01/31/2023
OK BRLOW: -TRANSFORMER SECONDARY TO SERVICE EQUIPMENT LOCATION
Site Visit Partial 2/2/2023 2/2/2023 02/02/2023
Misc
Informational
12/29/2022
10-7-22 AN stop by to touch base with contractor to see when they are going to start work. 10-10-22 AN no one on site 11-22-22 AN. Stoped by and utilities mite start mid December 12-5-22 AN. Crew has been working on the slab area and putting the crane together to put up walls 12-29-22 DP no work for development 2-2-23 DP. No work for development.
Erosion Control Inspection Partial 2/8/2023 2/8/2023 02/08/2023
Misc
Corrective Action Required
01/20/2023
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues 11-22-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-18-23 DP No erosion control issues 1-20-23 DP Erosion control needs to be addressed and Independence needs to be cleaned up 2-8-23 DP. No erosion control issues
Site Visit Partial 2/15/2023 2/15/2023 02/15/2023
Misc
Informational
02/02/2023
10-7-22 AN stop by to touch base with contractor to see when they are going to start work. 10-10-22 AN no one on site 11-22-22 AN. Stoped by and utilities mite start mid December 12-5-22 AN. Crew has been working on the slab area and putting the crane together to put up walls 12-29-22 DP no work for development 2-2-23 DP. No work for development. 2-15-23 PS No work for development
Site Visit Partial 2/16/2023 2/16/2023 02/16/2023
Misc
Informational
02/15/2023
10-7-22 AN stop by to touch base with contractor to see when they are going to start work. 10-10-22 AN no one on site 11-22-22 AN. Stoped by and utilities mite start mid December 12-5-22 AN. Crew has been working on the slab area and putting the crane together to put up walls 12-29-22 DP no work for development 2-2-23 DP. No work for development. 2-15-23 PS No work for development 2-16-23 PS No work for development
Site Visit Partial 2/17/2023 2/17/2023 02/17/2023
Misc
Informational
02/16/2023
10-7-22 AN stop by to touch base with contractor to see when they are going to start work. 10-10-22 AN no one on site 11-22-22 AN. Stoped by and utilities mite start mid December 12-5-22 AN. Crew has been working on the slab area and putting the crane together to put up walls 12-29-22 DP no work for development 2-2-23 DP. No work for development. 2-15-23 PS No work for development 2-16-23 PS No work for development 2-17-23 PS No work for development
Site Visit Partial 2/21/2023 2/21/2023 02/21/2023
Misc
Informational
02/17/2023
10-7-22 AN stop by to touch base with contractor to see when they are going to start work. 10-10-22 AN no one on site 11-22-22 AN. Stoped by and utilities mite start mid December 12-5-22 AN. Crew has been working on the slab area and putting the crane together to put up walls 12-29-22 DP no work for development 2-2-23 DP. No work for development. 2-15-23 PS No work for development 2-16-23 PS No work for development 2-17-23 PS No work for development 2-21-23 PS Contractor working on building interior. No inspections for F.E.
Underslab Plumbing Inspection - Commercial Partial 2/22/2023 02/22/2023
Misc
Informational
02/22/2023
DVW and storm drain under garage, except the trench drain-OK
Site Visit Partial 2/22/2023 2/22/2023 02/22/2023
Misc
Informational
02/21/2023
10-7-22 AN stop by to touch base with contractor to see when they are going to start work. 10-10-22 AN no one on site 11-22-22 AN. Stoped by and utilities mite start mid December 12-5-22 AN. Crew has been working on the slab area and putting the crane together to put up walls 12-29-22 DP no work for development 2-2-23 DP. No work for development. 2-15-23 PS No work for development 2-16-23 PS No work for development 2-17-23 PS No work for development 2-21-23 PS Contractor working on building interior. No inspections for F.E. 2-22-23 PS No work for development
Site Visit Partial 2/23/2023 2/23/2023 02/23/2023
Misc
Informational
02/22/2023
10-7-22 AN stop by to touch base with contractor to see when they are going to start work. 10-10-22 AN no one on site 11-22-22 AN. Stoped by and utilities mite start mid December 12-5-22 AN. Crew has been working on the slab area and putting the crane together to put up walls 12-29-22 DP no work for development 2-2-23 DP. No work for development. 2-15-23 PS No work for development 2-16-23 PS No work for development 2-17-23 PS No work for development 2-21-23 PS Contractor working on building interior. No inspections for F.E. 2-22-23 PS No work for development 2-23-23 PS No work for development
Underslab Plumbing Inspection - Commercial Passed 2/27/2023 2/27/2023 02/27/2023
Misc
Informational
02/22/2023
DVW and storm drain under garage-OK
Site Visit Partial 3/2/2023 3/2/2023 03/02/2023
Misc
Informational
02/23/2023
10-7-22 AN stop by to touch base with contractor to see when they are going to start work. 10-10-22 AN no one on site 11-22-22 AN. Stoped by and utilities mite start mid December 12-5-22 AN. Crew has been working on the slab area and putting the crane together to put up walls 12-29-22 DP no work for development 2-2-23 DP. No work for development. 2-15-23 PS No work for development 2-16-23 PS No work for development 2-17-23 PS No work for development 2-21-23 PS Contractor working on building interior. No inspections for F.E. 2-22-23 PS No work for development 2-23-23 PS No work for development 3-2-23 DP No work for development
Erosion Control Inspection Partial 3/7/2023 3/7/2023 03/07/2023
Misc
Informational
03/07/2023
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues 11-22-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-18-23 DP No erosion control issues 1-20-23 DP Erosion control needs to be addressed and Independence needs to be cleaned up 2-8-23 DP. No erosion control issues 3-7-23 DP. ESC is currently in good working order
Site Visit Partial 3/7/2023 3/7/2023 03/07/2023
Misc
Informational
03/02/2023
10-7-22 AN stop by to touch base with contractor to see when they are going to start work. 10-10-22 AN no one on site 11-22-22 AN. Stoped by and utilities mite start mid December 12-5-22 AN. Crew has been working on the slab area and putting the crane together to put up walls 12-29-22 DP no work for development 2-2-23 DP. No work for development. 2-15-23 PS No work for development 2-16-23 PS No work for development 2-17-23 PS No work for development 2-21-23 PS Contractor working on building interior. No inspections for F.E. 2-22-23 PS No work for development 2-23-23 PS No work for development 3-2-23 DP No work for development 3-7-23 DP No work for development
In-wall Inspection Partial 3/8/2023 3/8/2023 03/08/2023
Misc
Corrective Action Required
03/08/2023
-Facade framing (E.7-H)-ok to sheath
Erosion Control Inspection Partial 3/9/2023 3/9/2023 03/09/2023
Misc
Informational
03/07/2023
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues 11-22-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-18-23 DP No erosion control issues 1-20-23 DP Erosion control needs to be addressed and Independence needs to be cleaned up 2-8-23 DP. No erosion control issues 3-7-23 DP. ESC is currently in good working order 3-9-23 DP. ESC is currently in good working order.
Site Visit Partial 3/13/2023 3/13/2023 03/13/2023
Misc
Informational
03/07/2023
10-7-22 AN stop by to touch base with contractor to see when they are going to start work. 10-10-22 AN no one on site 11-22-22 AN. Stoped by and utilities mite start mid December 12-5-22 AN. Crew has been working on the slab area and putting the crane together to put up walls 12-29-22 DP no work for development 2-2-23 DP. No work for development. 2-15-23 PS No work for development 2-16-23 PS No work for development 2-17-23 PS No work for development 2-21-23 PS Contractor working on building interior. No inspections for F.E. 2-22-23 PS No work for development 2-23-23 PS No work for development 3-2-23 DP No work for development 3-7-23 DP No work for development 3-13-23 DP No work for development
Site Visit Partial 3/14/2023 3/14/2023 03/14/2023
Misc
Informational
03/13/2023
10-7-22 AN stop by to touch base with contractor to see when they are going to start work. 10-10-22 AN no one on site 11-22-22 AN. Stoped by and utilities mite start mid December 12-5-22 AN. Crew has been working on the slab area and putting the crane together to put up walls 12-29-22 DP no work for development 2-2-23 DP. No work for development. 2-15-23 PS No work for development 2-16-23 PS No work for development 2-17-23 PS No work for development 2-21-23 PS Contractor working on building interior. No inspections for F.E. 2-22-23 PS No work for development 2-23-23 PS No work for development 3-2-23 DP No work for development 3-7-23 DP No work for development 3-13-23 DP No work for development 3-14-23 DP. Contractor installed a new temp. parking lot for construction workers, stopped and made contact, should be tying into water next week, will need 1 passing sample. Also will give heads up before planning to do parking lot.
Erosion Control Inspection Partial 3/16/2023 3/16/2023 03/16/2023
Misc
Informational
03/09/2023
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues 11-22-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-18-23 DP No erosion control issues 1-20-23 DP Erosion control needs to be addressed and Independence needs to be cleaned up 2-8-23 DP. No erosion control issues 3-7-23 DP. ESC is currently in good working order 3-9-23 DP. ESC is currently in good working order. 3-16-23 DP. ESC is in good working order
Site Visit Partial 3/17/2023 3/17/2023 03/17/2023
Misc
Informational
03/14/2023
10-7-22 AN stop by to touch base with contractor to see when they are going to start work. 10-10-22 AN no one on site 11-22-22 AN. Stoped by and utilities mite start mid December 12-5-22 AN. Crew has been working on the slab area and putting the crane together to put up walls 12-29-22 DP no work for development 2-2-23 DP. No work for development. 2-15-23 PS No work for development 2-16-23 PS No work for development 2-17-23 PS No work for development 2-21-23 PS Contractor working on building interior. No inspections for F.E. 2-22-23 PS No work for development 2-23-23 PS No work for development 3-2-23 DP No work for development 3-7-23 DP No work for development 3-13-23 DP No work for development 3-14-23 DP. Contractor installed a new temp. parking lot for construction workers, stopped and made contact, should be tying into water next week, will need 1 passing sample. Also will give heads up before planning to do parking lot. 3-17-23 DP. No work for development
Site Visit Partial 3/23/2023 3/23/2023 03/23/2023
Misc
Informational
03/17/2023
10-7-22 AN stop by to touch base with contractor to see when they are going to start work. 10-10-22 AN no one on site 11-22-22 AN. Stoped by and utilities mite start mid December 12-5-22 AN. Crew has been working on the slab area and putting the crane together to put up walls 12-29-22 DP no work for development 2-2-23 DP. No work for development. 2-15-23 PS No work for development 2-16-23 PS No work for development 2-17-23 PS No work for development 2-21-23 PS Contractor working on building interior. No inspections for F.E. 2-22-23 PS No work for development 2-23-23 PS No work for development 3-2-23 DP No work for development 3-7-23 DP No work for development 3-13-23 DP No work for development 3-14-23 DP. Contractor installed a new temp. parking lot for construction workers, stopped and made contact, should be tying into water next week, will need 1 passing sample. Also will give heads up before planning to do parking lot. 3-17-23 DP. No work for development 3-23-23 DP. No work for development
In-wall Inspection Partial 3/27/2023 3/27/2023 03/27/2023
Misc
Corrective Action Required
03/08/2023
Framing OK for sheathing: -Facade framing (E.7-H) -Exterior wall (D to ZA)
Erosion Control Inspection Partial 3/28/2023 3/28/2023 03/28/2023
Misc
Informational
03/16/2023
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues 11-22-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-18-23 DP No erosion control issues 1-20-23 DP Erosion control needs to be addressed and Independence needs to be cleaned up 2-8-23 DP. No erosion control issues 3-7-23 DP. ESC is currently in good working order 3-9-23 DP. ESC is currently in good working order. 3-16-23 DP. ESC is in good working order 3-28-23 NS ESC is in good working order.
Erosion Control Inspection Partial 3/31/2023 3/31/2023 03/31/2023
Misc
Informational
03/28/2023
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues 11-22-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-18-23 DP No erosion control issues 1-20-23 DP Erosion control needs to be addressed and Independence needs to be cleaned up 2-8-23 DP. No erosion control issues 3-7-23 DP. ESC is currently in good working order 3-9-23 DP. ESC is currently in good working order. 3-16-23 DP. ESC is in good working order 3-28-23 NS ESC is in good working order. 3-31-23 DP. ESC is currently in good working order.
Water Line - Coliform Test 1 Partial 04/03/2023
Misc
Informational
01/27/2023
1-27-23 DP Both samples have passed for both the 6" and 4" water lines. The 2" meter servicing the 4" domestic will remain off until the building is closed in or no risk of freezing. Per Water utilities before tying into that service line we will need to flush really good from water being stagnant and take 1 passing water sample. 4-3-23 DP. The 3rd sample was taken today
Water Line - Coliform Test 1 Passed 04/06/2023
Misc
Informational
04/03/2023
1-27-23 DP Both samples have passed for both the 6" and 4" water lines. The 2" meter servicing the 4" domestic will remain off until the building is closed in or no risk of freezing. Per Water utilities before tying into that service line we will need to flush really good from water being stagnant and take 1 passing water sample. 4-3-23 DP. The 3rd sample was taken today 4-6-23 DP. The 3rd sample that water wanted passed.
Above Ceiling Inspection Partial 4/6/2023 4/6/2023 04/06/2023
Misc
Informational
04/06/2023
Above ceiling OK to cover below: -Exterior canopy ceiling above SW corner of building
Grading/Excavation/Fill Inspection Partial 4/12/2023 4/12/2023 04/12/2023
Misc
Informational
09/26/2022
9-9-22 AN meet with Kyle form pro design and the are goin got start grading next week 9-14-22 crew has began to grade the lot 9-14 to 9-26 AN crew has continued to grade the lot and is appears that they have some footings down 4-12-23 NS, DP & Third Party Inspector Tracy are out here to do a proof roll on sub grade for curb and pavement. with 20 tons on a dump truck the proof roll passed. once they put rock back down before they asphalt it they will do another proof roll.
Pavement-Curb Construction Partial 04/12/2023
Misc
Informational
04/12/2023
4-12-23 NS, DP Subgrade proof roll passed
Pavement-Proof Roll Partial 4/14/2023 4/14/2023 04/12/2023
Misc
Informational
04/12/2023
4-12-23 NS, DP Subgrade proof roll passed
Pavement-Curb Construction Partial 4/14/2023 4/14/2023 04/14/2023
Misc
Informational
04/12/2023
4-12-23 NS, DP Subgrade proof roll passed 4-14-23 NS Site visited and it appears that rock has been put down for a proof roll. I will wait until the forman contacts me for a proof roll.
Pavement-Proof Roll Partial 04/14/2023
Misc
Informational
04/12/2023
4-12-23 NS, DP Subgrade proof roll passed 4-14-23 NS Site visited and it appears that rock has been put down over subgrade for parking lot will come back when they call to do a proof roll.
Pavement-Curb Construction Partial 4/21/2023 4/21/2023 04/21/2023
Misc
Informational
04/14/2023
4-12-23 NS, DP Subgrade proof roll passed 4-14-23 NS Site visited and it appears that rock has been put down for a proof roll. I will wait until the forman contacts me for a proof roll. 4-21-23 NS Site visited and it appears that they are setting up to pour curn they will need to do a proof roll for curb.
Water Line - Hydrostatic Test Passed 1/20/2023 1/20/2023 04/24/2023
Misc
Informational
01/20/2023
1-20-23 DP Crew preformed hydrostatic test on the fire line up by the building and it passed.
Grading/Excavation/Fill Inspection Partial 4/14/2023 4/25/2023 04/25/2023
Misc
Informational
04/12/2023
9-9-22 AN meet with Kyle form pro design and the are goin got start grading next week 9-14-22 crew has began to grade the lot 9-14 to 9-26 AN crew has continued to grade the lot and is appears that they have some footings down 4-12-23 NS, DP & Third Party Inspector Tracy are out here to do a proof roll on sub grade for curb and pavement. with 20 tons on a dump truck the proof roll passed. once they put rock back down before they asphalt it they will do another proof roll. 4-25-23 NS Shane called me to scedule a proof roll for tomorrow at 8am.
Curb - Proof Roll Partial 4/24/2023 4/25/2023 04/25/2023
Misc
Informational
04/25/2023
4-25-23 NS Shane called me to schedule a proof roll for tomorrow at 8am.
Pavement-Proof Roll Partial 4/21/2023 4/25/2023 04/25/2023
Misc
Informational
04/14/2023
4-12-23 NS, DP Subgrade proof roll passed 4-14-23 NS Site visited and it appears that rock has been put down over subgrade for parking lot will come back when they call to do a proof roll. 4-25-23 NS Shane called me to schedule a proof roll for tomorrow at 8am.
Curb - Proof Roll Partial 4/26/2023 4/26/2023 04/26/2023
Misc
Informational
04/25/2023
4-25-23 NS Shane called me to schedule a proof roll for tomorrow at 8am. 4-26-23 NS Site visited to do a proof roll of the curb and the front parking lot passed but the back ally on the north end of the building needs rock and needs the water at the very end to be drained. I told them they can pour the front parking lot curb but will need another proof roll on the back of the ally. The driver did not have a ticket. The guy who is in charge of the curbs will send me a picture of the ticket. The 3rd party inspector Tyler is going to send me his report as well.
Pavement-Proof Roll Partial 4/26/2023 4/26/2023 04/26/2023
Misc
Informational
04/25/2023
4-12-23 NS, DP Subgrade proof roll passed 4-14-23 NS Site visited and it appears that rock has been put down over subgrade for parking lot will come back when they call to do a proof roll. 4-25-23 NS Shane called me to schedule a proof roll for tomorrow at 8am. 4-26-23 NS Shane told me they will not pave the parking lot I will schedule this out for a couple weeks.
Grading/Excavation/Fill Inspection Partial 4/26/2023 4/26/2023 04/26/2023
Misc
Informational
04/25/2023
9-9-22 AN meet with Kyle form pro design and the are goin got start grading next week 9-14-22 crew has began to grade the lot 9-14 to 9-26 AN crew has continued to grade the lot and is appears that they have some footings down 4-12-23 NS, DP & Third Party Inspector Tracy are out here to do a proof roll on sub grade for curb and pavement. with 20 tons on a dump truck the proof roll passed. once they put rock back down before they asphalt it they will do another proof roll. 4-25-23 NS Shane called me to scedule a proof roll for tomorrow at 8am. 4-26-23 NS Site visited and Shane told me that they are not going to pave the parking lot for a while I will schedule this out for a couple weeks.
Water Line - Fire Hydrant Passed 4/26/2023 4/26/2023 04/26/2023
Misc
Informational
04/26/2023
4-26-23 DP. Met Adam with Pro Design Construction on site to flush the fire line that feeds into the building. They flushed the line for 10 minutes.
Pavement-Curb Construction Partial 04/27/2023
Misc
Informational
04/21/2023
4-12-23 NS, DP Subgrade proof roll passed 4-14-23 NS Site visited and it appears that rock has been put down for a proof roll. I will wait until the forman contacts me for a proof roll. 4-21-23 NS Site visited and it appears that they are setting up to pour curb they will need to do a proof roll for curb. 4-27-23 NS Site visited and curb is being put in today.
In-wall Inspection Partial 4/27/2023 4/27/2023 04/27/2023
Misc
Corrective Action Required
03/27/2023
Framing OK for sheathing: -Facade framing (E.7-H) -Exterior wall (D to ZA) In-wall OK to rock: -Area south of line C.5/Z10-C.7/4
Pavement-Aggregate Base Partial 5/4/2023 5/4/2023 05/04/2023
Misc
Informational
05/04/2023
Site visited and K1 speed is putting type 2 asphalt down as a base today and should have the whole parking lot done and will come back next week.
Pavement-Aggregate Base Passed 5/16/2023 05/04/2023
Misc
Informational
05/04/2023
Site visited and the sub grade passed inspection to be able to put asphalt down.
In-wall Inspection Partial 5/4/2023 5/4/2023 05/04/2023
Misc
Informational
05/04/2023
Framing OK for sheathing: -Facade framing (E.7-H) -Exterior wall (D to ZA) All interior in-wall OK to rock
Above Ceiling Inspection Partial 5/8/2023 5/8/2023 05/08/2023
Misc
Informational
04/06/2023
Above ceiling OK to cover below: -Exterior canopy ceiling above SW corner of building -Front entry vestibule, soffits in lobby area outside 103/104 -Women restroom
Pavement-Stabilized Subgrade Partial 05/08/2023
Misc
Informational
05/08/2023
5-8-23 NS Site visited and I talked to Shane and they will not finish the asphalt for another month.
Above Ceiling Inspection Partial 5/9/2023 5/9/2023 05/09/2023
Misc
Informational
05/08/2023
Above ceiling OK to cover below: -Exterior canopy ceiling above SW corner of building -Front entry vestibule, soffits in lobby area outside 103/104 -Women&men restrooms
Footing Inspection - Commercial Partial 5/9/2023 (8:15) 5/9/2023 05/09/2023
Misc
Informational
12/09/2022
Exterior wall grade beam approved to pour below: -West GB starting from C.5 to B/5 to B/3.5 to A/3.5 to A/2.3 to B/2.3 to B/1 to E.7; continue to H/5 SW corner; 5/H to 5/G, line ZD 5/G to Z7.5, Line I/1 to I/2; B/5 to B/2.3; line Z7/ZD to Z7/ZA to Z10/ZA to Z10/C.5 Column pads approved to pour below: -Col pads on lines 2,3,4,5; 4.6/G; 2 pads on line Z4.5; 2 col pads on line Z10, 3 pads on line ZE
Misc
Corrective Action Required
05/09/2023
Retaining wall at per L300-Provide min 36" frost depth per plan
Pavement-Surface Partial 05/17/2023
Misc
Informational
05/17/2023
5-17-23 NS I received a call from Shane the Forman of the job site and he is not expecting to put surface pavement until June.
Pavement-Curb Construction Passed 4/27/2023 5/17/2023 05/17/2023
Misc
Informational
04/27/2023
4-12-23 NS, DP Subgrade proof roll passed 4-14-23 NS Site visited and it appears that rock has been put down for a proof roll. I will wait until the forman contacts me for a proof roll. 4-21-23 NS Site visited and it appears that they are setting up to pour curb they will need to do a proof roll for curb. 4-27-23 NS Site visited and curb is being put in today. 5-17-23 NS Site visited and it appears that curb is complete passed.
Erosion Control Inspection Partial 05/19/2023
Misc
Informational
03/31/2023
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues 11-22-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-18-23 DP No erosion control issues 1-20-23 DP Erosion control needs to be addressed and Independence needs to be cleaned up 2-8-23 DP. No erosion control issues 3-7-23 DP. ESC is currently in good working order 3-9-23 DP. ESC is currently in good working order. 3-16-23 DP. ESC is in good working order 3-28-23 NS ESC is in good working order. 3-31-23 DP. ESC is currently in good working order. 5-19-23 NS. ESC is currently in good working order.
Gas Service Inspection - Commercial Passed 5/24/2023 05/24/2023
Electrical Service Inspection Passed 5/24/2023 05/24/2023
Misc
Informational
05/24/2023
Installed service is a 1200 amp service-inspected OK. Plan shows 1600 amp service. Submit change to city
Erosion Control Inspection Partial 6/1/2023 06/01/2023
Misc
Informational
05/19/2023
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues 11-22-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-18-23 DP No erosion control issues 1-20-23 DP Erosion control needs to be addressed and Independence needs to be cleaned up 2-8-23 DP. No erosion control issues 3-7-23 DP. ESC is currently in good working order 3-9-23 DP. ESC is currently in good working order. 3-16-23 DP. ESC is in good working order 3-28-23 NS ESC is in good working order. 3-31-23 DP. ESC is currently in good working order. 5-19-23 NS. ESC is currently in good working order. 6-1-23 NS No erosion control issues
Sidewalk Inspection Failed 6/8/2023 06/08/2023
Misc
Corrective Action Required
06/08/2023
6-8-23 NS Site visited Sidewalk ramp did not pass ADA. There is no 5 foot turn around for a person that is in a wheel chair. This will need to be tore out and replaced to meet ADA standards. I talked to David at K1 speed and explained what was wrong. When the contractor comes out to replace the ramp Please call me Nick Scott at 816-977-5652 to meet up and I can explain what needs to change.
Erosion Control Inspection Partial 6/9/2023 06/09/2023
Misc
Informational
06/01/2023
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues 11-22-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-18-23 DP No erosion control issues 1-20-23 DP Erosion control needs to be addressed and Independence needs to be cleaned up 2-8-23 DP. No erosion control issues 3-7-23 DP. ESC is currently in good working order 3-9-23 DP. ESC is currently in good working order. 3-16-23 DP. ESC is in good working order 3-28-23 NS ESC is in good working order. 3-31-23 DP. ESC is currently in good working order. 5-19-23 NS. ESC is currently in good working order. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues
Erosion Control Inspection Partial 6/12/2023 06/12/2023
Misc
Informational
06/09/2023
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues 11-22-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-18-23 DP No erosion control issues 1-20-23 DP Erosion control needs to be addressed and Independence needs to be cleaned up 2-8-23 DP. No erosion control issues 3-7-23 DP. ESC is currently in good working order 3-9-23 DP. ESC is currently in good working order. 3-16-23 DP. ESC is in good working order 3-28-23 NS ESC is in good working order. 3-31-23 DP. ESC is currently in good working order. 5-19-23 NS. ESC is currently in good working order. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues
Above Ceiling Inspection Failed 6/14/2023 6/14/2023 06/14/2023
Misc
Informational
05/09/2023
Above ceiling OK to cover below: -Exterior canopy ceiling above SW corner of building -Front entry vestibule, soffits in lobby area outside 103/104 -Women&men restrooms
Misc
Corrective Action Required
06/14/2023
-Material in plenum space must meet the flame spread and smoke develop index rating per code. Check all plumbing -Remove temporary lighting -CMR and CMX cables are not allowed to be installed within plenum space. See NEC Table 700.154(a) -Support MC wire with independent support wire, not ceiling grid support wires
Miscellaneous Inspection Partial 6/16/2023 06/16/2023
Misc
Informational
06/16/2023
-Checked all wall receptacles in gaming room before gaming machines are installed
Above Ceiling Inspection Failed 6/27/2023 6/27/2023 06/27/2023
Misc
Informational
06/14/2023
Above ceiling OK to cover below: -Exterior canopy ceiling above SW corner of building -Front entry vestibule, soffits in lobby area outside 103/104 -Women&men restrooms
Misc
Corrective Action Required
06/14/2023
-Material in plenum space must meet the flame spread and smoke develop index rating per code. Check all plumbing -CMR and CMX cables are not allowed to be installed within plenum space. See NEC Table 700.154(a)
In-wall Inspection Passed 6/20/2023 6/27/2023 06/27/2023
Misc
Resolved
06/27/2023
Framing OK for sheathing: -Facade framing (E.7-H) -Exterior wall (D to ZA) All interior in-wall OK to rock
Footing Inspection - Commercial Passed 6/27/2023 06/27/2023
Misc
Resolved
06/27/2023
Exterior wall grade beam approved to pour below: -West GB starting from C.5 to B/5 to B/3.5 to A/3.5 to A/2.3 to B/2.3 to B/1 to E.7; continue to H/5 SW corner; 5/H to 5/G, line ZD 5/G to Z7.5, Line I/1 to I/2; B/5 to B/2.3; line Z7/ZD to Z7/ZA to Z10/ZA to Z10/C.5 Column pads approved to pour below: -Col pads on lines 2,3,4,5; 4.6/G; 2 pads on line Z4.5; 2 col pads on line Z10, 3 pads on line ZE
Misc
Resolved
06/27/2023
Retaining wall at per L300-Provide min 36" frost depth per plan
Sprinkler - Flow Test Passed 6/29/2023 06/30/2023
Sprinkler - Hydrostatic Test Passed 5/12/2023 06/30/2023
Miscellaneous Inspection Partial 6/30/2023 6/30/2023 06/30/2023
Misc
Informational
06/30/2023
**Building is approved for stocking and training
Miscellaneous Correction
Corrective Action Required
06/30/2023
Staff from the Building Inspections and Fire Departments have performed a life saftey inspection of the faciltiy. The facility is released for stocking items necesary for opertation of the facility and for hiring and training of staff. The faciltiy is not release for opening to the public. Additional inspections will be scheduled in the near future to release the facility to be opened to the public for its intended purposes.
Above Ceiling Inspection Passed 7/12/2023 07/12/2023
Misc
Resolved
07/12/2023
Above ceiling OK to cover below: -Exterior canopy ceiling above SW corner of building -Front entry vestibule, soffits in lobby area outside 103/104 -Women&men restrooms
Misc
Resolved
07/12/2023
-Material in plenum space must meet the flame spread and smoke develop index rating per code. Check all plumbing -CMR and CMX cables are not allowed to be installed within plenum space. See NEC Table 700.154(a)
Occupancy Inspection - Engineering Temporary C of O 7/12/2023 07/12/2023
Misc
Informational
07/12/2023
7-12-23 NS Site visited to do a TCO Inspection Development is good with occupancy the only thing that needs to be done is on the driveway the sidewalk ADA ramp has been broke. I spray painted the corner that is broken. I also told Shane
Occupancy Inspection - Planning Temporary C of O 7/12/2023 07/12/2023
Corrective Action Required
07/12/2023
LANDSCAPING. Complete sodding/vegetation of the area along the south property line.
Occupancy Inspection - Codes Commercial Failed 7/12/2023 7/12/2023 07/12/2023
Misc
Corrective Action Required
07/12/2023
-Approval required from following departments: Jackson County Health, Fire, Field Engineers, Water, and Planning -Provide 3rd party Special Inspection report -Underground electrical to light poles and light pole piers not inspected by city -Electrical service changed from city-approved plan (1200 amp from 1600) -Provide compliance with NEC 110.16 for electrical service rated 1200 amp or more -Transformer grounding verification -Install backflow preventer at hose bibb in service room -Complete installing restroom partitions and dispensers -Provide occupant load sign for assembly area -Provide panic hardware for exterior door 115 out of playroom -Provide signage for main exit door per IBC 1010.1.9.4, item 2 stating THIS DOOR TO REMAIN UNLOCKED WHEN THIS SPACE IS OCCUPIED -Gfci required for outlets in kitchen per NEC 210.8(B) -Secure LFNC raceway within 12” of dishwasher disconnect -Provide backflow preventer for ice machine water supply outlet -Remove all trash and debris from rooftop -Install damper for dryer duct exhaust outlet -Complete installation of all RTUs
Occupancy Inspection - Water Utilities Passed 7/13/2023 07/13/2023
Occupancy Inspection - Codes Commercial Ready for Temp CO 7/13/2023 7/13/2023 07/13/2023
Misc
Corrective Action Required
07/12/2023
-Approval required from following departments: Jackson County Health, Fire, Field Engineers, Water, and Planning -Provide 3rd party Special Inspection report -Underground electrical to light poles and light pole piers not inspected by city -Electrical service changed from city-approved plan (1200 amp from 1600) -Provide compliance with NEC 110.16 for electrical service rated 1200 amp or more -Transformer grounding verification -Install backflow preventer at hose bibb in service room -Provide occupant load sign for assembly area -Gfci required for outlets in kitchen per NEC 210.8(B) -Secure LFNC raceway within 12” of dishwasher disconnect -Provide backflow preventer for ice machine water supply outlet -Remove all trash and debris from rooftop -Install damper for dryer duct exhaust outlet -Complete installation of all RTUs
Erosion Control Inspection Partial 7/17/2023 07/17/2023
Misc
Informational
06/12/2023
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues 11-22-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-18-23 DP No erosion control issues 1-20-23 DP Erosion control needs to be addressed and Independence needs to be cleaned up 2-8-23 DP. No erosion control issues 3-7-23 DP. ESC is currently in good working order 3-9-23 DP. ESC is currently in good working order. 3-16-23 DP. ESC is in good working order 3-28-23 NS ESC is in good working order. 3-31-23 DP. ESC is currently in good working order. 5-19-23 NS. ESC is currently in good working order. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues
Erosion Control Inspection Partial 7/24/2023 07/24/2023
Misc
Informational
07/17/2023
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues 11-22-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-18-23 DP No erosion control issues 1-20-23 DP Erosion control needs to be addressed and Independence needs to be cleaned up 2-8-23 DP. No erosion control issues 3-7-23 DP. ESC is currently in good working order 3-9-23 DP. ESC is currently in good working order. 3-16-23 DP. ESC is in good working order 3-28-23 NS ESC is in good working order. 3-31-23 DP. ESC is currently in good working order. 5-19-23 NS. ESC is currently in good working order. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-24-23 NS Site visited and no erosion control issues
Erosion Control Inspection Partial 7/31/2023 07/31/2023
Misc
Informational
07/24/2023
9-14-22 AN Silt fence is installed 10-10-22 AN no erosion control issues 11-22-22 AN. No erosion control issues 11-30-22 AN no erosion control issues 1-18-23 DP No erosion control issues 1-20-23 DP Erosion control needs to be addressed and Independence needs to be cleaned up 2-8-23 DP. No erosion control issues 3-7-23 DP. ESC is currently in good working order 3-9-23 DP. ESC is currently in good working order. 3-16-23 DP. ESC is in good working order 3-28-23 NS ESC is in good working order. 3-31-23 DP. ESC is currently in good working order. 5-19-23 NS. ESC is currently in good working order. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-24-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues
Sidewalk Inspection Passed 6/22/2023 8/3/2023 08/03/2023
Misc
Corrective Action Required
06/08/2023
6-8-23 NS Site visited Sidewalk ramp did not pass ADA. There is no 5 foot turn around for a person that is in a wheel chair. This will need to be tore out and replaced to meet ADA standards. Please call me Nick Scott at 816-977-5652 to meet up and I can explain what needs to change. 8-3-23 NS Site visited and it appears that sidewalk meets city standards ADA passed.
Occupancy Inspection - Codes Commercial Ready for Temp CO 8/15/2023 08/15/2023
Misc
Corrective Action Required
07/13/2023
-Approval required from following departments: Jackson County Health, Fire, and Planning -Provide 3rd party Special Inspection report -Underground electrical to light poles and light pole piers not inspected by city -Electrical service changed from city-approved plan (1200 amp from 1600) -Provide compliance with NEC 110.16 for electrical service rated 1200 amp or more -Transformer grounding verification -Install backflow preventer at hose bibb in service room -Provide occupant load sign for assembly area -Gfci required for outlets in kitchen per NEC 210.8(B) -Secure LFNC raceway within 12” of dishwasher disconnect -Provide backflow preventer for ice machine water supply outlet -Remove all trash and debris from rooftop -Install damper for dryer duct exhaust outlet -Complete installation of all RTUs
Occupancy Inspection - Planning Passed 8/15/2023 08/15/2023
Occupancy Inspection - Engineering Passed 8/15/2023 08/15/2023
Misc
Resolved
08/15/2023
7-12-23 NS Site visited to do a TCO Inspection Development is good with occupancy the only thing that needs to be done is on the driveway the sidewalk ADA ramp has been broke. I spray painted the corner that is broken. I also told Shane
Underground Electrical Inspection - Commercial Passed 08/18/2023
Misc
Resolved
08/18/2023
OK BRLOW: -TRANSFORMER SECONDARY TO SERVICE EQUIPMENT LOCATION
Miscellaneous Inspection Passed 8/18/2023 08/18/2023
Miscellaneous Correction
Resolved
08/18/2023
Staff from the Building Inspections and Fire Departments have performed a life saftey inspection of the faciltiy. The facility is released for stocking items necesary for opertation of the facility and for hiring and training of staff. The faciltiy is not release for opening to the public. Additional inspections will be scheduled in the near future to release the facility to be opened to the public for its intended purposes.
Occupancy Inspection - Codes Commercial Failed 10/25/2023 10/26/2023 10/26/2023
Misc
Corrective Action Required
08/15/2023
-Approval required from Fire
Occupancy Inspection - Fire Not Ready 10/24/2023 10/26/2023 11/03/2023
Occupancy Inspection - Fire Passed 11/06/2023
Occupancy Inspection - Codes Commercial Full C of O 11/17/2023
Misc
Resolved
11/17/2023
-Approval required from Fire
Documents & Images
Date Uploaded File Type Document Name
07/20/2022 Application Form Commercial Permit Application_K1 Speed Entertainment Complex_2022-07-20
07/20/2022 Plans 2022-07-19_K1 Speed Lees Summit, MO_Permit Set - ALL DRAWINGS
07/20/2022 Specifications 2022-07-19_K1 Speed_Project Manual Volume One
07/20/2022 Specifications 2022-07-19_K1 Speed_Project Manual Volume Two
07/20/2022 Engineer Report/Study 2022-06-27_ K1 Speed Kart Racing Facility Geotech Report
07/20/2022 Engineer Report/Study 2022-07-20_ K1 Speed COMcheck-Web_compliance_report
07/26/2022 Letter jxn cty Plan Review (11)
07/29/2022 Letter License Tax Bill
08/08/2022 Letter DS P/R Corrections Document
08/18/2022 Plans 211107_Responses to City Comments_2022-08-18
08/29/2022 Letter DS P/R Corrections Document
09/01/2022 Letter 211107_Responses to City Comments_2022-09-01
09/02/2022 Plans resub drawings
09/07/2022 Approved Plans Approved Civil K1 Speed 9.7.2022
09/07/2022 Receipt Receipt for transaction:2022-007352
09/09/2022 Letter INSPECTION SUMMARY
09/12/2022 Email Re_ K1 Speed
09/13/2022 Letter Fire Building Plan Review
09/14/2022 Receipt Receipt for transaction:2022-007509
09/14/2022 Letter INSPECTION SUMMARY
09/14/2022 Letter INSPECTION SUMMARY
09/16/2022 Plans 211107_K1 Speed LSMO_Current Conformed CD Set_2022-09-14
09/20/2022 Approved Plans approved - 211107_K1 Speed LSMO_Current Conformed CD Set_2022-09-14
09/21/2022 Letter DS Building Permit
09/21/2022 K1 Speed Building Permit
09/26/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter Fire Building Plan Review
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/13/2022 Letter INSPECTION SUMMARY
10/14/2022 Letter Fire Building Plan Review
10/14/2022 Letter Fire Building Plan Review
10/14/2022 Letter Codes Residential Plan Review
10/14/2022 Letter INSPECTION SUMMARY
10/17/2022 Letter INSPECTION SUMMARY
10/18/2022 Letter INSPECTION SUMMARY
10/18/2022 Letter INSPECTION SUMMARY
10/19/2022 Letter INSPECTION SUMMARY
10/20/2022 Letter INSPECTION SUMMARY
10/20/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
10/26/2022 Letter INSPECTION SUMMARY
10/26/2022 Letter INSPECTION SUMMARY
10/26/2022 Letter INSPECTION SUMMARY
11/22/2022 Letter INSPECTION SUMMARY
11/22/2022 Letter INSPECTION SUMMARY
11/28/2022 Permit FAA letter_562549385 - K1 Speed 2022-3368 - Max Crane Height 200FT
11/30/2022 Letter INSPECTION SUMMARY
12/05/2022 Letter INSPECTION SUMMARY
12/06/2022 Letter INSPECTION SUMMARY
12/06/2022 Letter INSPECTION SUMMARY
12/06/2022 Fire line and water service line trust block
12/07/2022 Letter INSPECTION SUMMARY
12/09/2022 Letter Fire Building Plan Review
12/09/2022 Letter INSPECTION SUMMARY
12/14/2022 Letter INSPECTION SUMMARY
12/15/2022 Letter INSPECTION SUMMARY
12/15/2022 Letter INSPECTION SUMMARY
12/16/2022 Letter INSPECTION SUMMARY
12/16/2022 sta 1+46_17 storm
12/16/2022 storm box tie in
12/16/2022 strom1
12/16/2022 Letter INSPECTION SUMMARY
12/16/2022 Letter INSPECTION SUMMARY
12/19/2022 Letter INSPECTION SUMMARY
12/21/2022 Letter INSPECTION SUMMARY
12/29/2022 Letter INSPECTION SUMMARY
01/04/2023 Letter INSPECTION SUMMARY
01/05/2023 Letter INSPECTION SUMMARY
01/05/2023 Letter INSPECTION SUMMARY
01/05/2023 sewer service wye
01/05/2023 storm box 301
01/06/2023 Letter INSPECTION SUMMARY
01/09/2023 Letter INSPECTION SUMMARY
01/10/2023 Letter INSPECTION SUMMARY
01/10/2023 storm sewer into building
01/10/2023 Letter INSPECTION SUMMARY
01/11/2023 Letter INSPECTION SUMMARY
01/12/2023 Letter INSPECTION SUMMARY
01/16/2023 Letter INSPECTION SUMMARY
01/16/2023 Letter INSPECTION SUMMARY
01/16/2023 water tie in 1 (2)
01/16/2023 water tie in 2 (1)
01/16/2023 reinforce joints
01/17/2023 Letter INSPECTION SUMMARY
01/17/2023 Letter INSPECTION SUMMARY
01/18/2023 Letter INSPECTION SUMMARY
01/19/2023 Letter INSPECTION SUMMARY
01/20/2023 Letter INSPECTION SUMMARY
01/20/2023 Letter INSPECTION SUMMARY
01/20/2023 Letter INSPECTION SUMMARY
01/24/2023 Letter INSPECTION SUMMARY
01/25/2023 Letter INSPECTION SUMMARY
01/25/2023 Letter INSPECTION SUMMARY
01/27/2023 K1 Speed 6inch and 4inch sample 1
01/27/2023 K1 Speed 6inch and 4inch sample 2
01/27/2023 Letter INSPECTION SUMMARY
01/27/2023 Letter INSPECTION SUMMARY
01/27/2023 Letter INSPECTION SUMMARY
01/30/2023 APP_283111-01.0_Fire Alarm SD_SBE Reviewed_2022-12-27
01/30/2023 Letter Fire (Alarm) Plan Review Notice
01/31/2023 Letter INSPECTION SUMMARY
02/02/2023 Letter INSPECTION SUMMARY
02/08/2023 Letter INSPECTION SUMMARY
02/15/2023 Letter INSPECTION SUMMARY
02/16/2023 Letter INSPECTION SUMMARY
02/17/2023 Letter INSPECTION SUMMARY
02/21/2023 Letter INSPECTION SUMMARY
02/22/2023 Letter INSPECTION SUMMARY
02/22/2023 Letter INSPECTION SUMMARY
02/22/2023 Letter INSPECTION SUMMARY
02/23/2023 Letter INSPECTION SUMMARY
02/27/2023 Letter INSPECTION SUMMARY
03/02/2023 Letter INSPECTION SUMMARY
03/07/2023 Letter INSPECTION SUMMARY
03/07/2023 Letter INSPECTION SUMMARY
03/08/2023 Letter INSPECTION SUMMARY
03/09/2023 Letter INSPECTION SUMMARY
03/13/2023 Letter INSPECTION SUMMARY
03/14/2023 Letter INSPECTION SUMMARY
03/16/2023 Letter INSPECTION SUMMARY
03/17/2023 Letter INSPECTION SUMMARY
03/23/2023 Letter INSPECTION SUMMARY
03/24/2023 Letter Fire (Sprinkler) Plan Review
03/27/2023 Letter INSPECTION SUMMARY
03/28/2023 Letter INSPECTION SUMMARY
03/31/2023 Letter INSPECTION SUMMARY
04/03/2023 Letter INSPECTION SUMMARY
04/06/2023 K1 speed 3rd and final passing water sample
04/06/2023 Letter INSPECTION SUMMARY
04/06/2023 Letter INSPECTION SUMMARY
04/12/2023 Letter INSPECTION SUMMARY
04/12/2023 Letter INSPECTION SUMMARY
04/12/2023 Letter INSPECTION SUMMARY
04/14/2023 Letter INSPECTION SUMMARY
04/14/2023 Letter INSPECTION SUMMARY
04/21/2023 Letter INSPECTION SUMMARY
04/24/2023 Letter INSPECTION SUMMARY
04/24/2023 Letter INSPECTION SUMMARY
04/24/2023 Letter INSPECTION SUMMARY
04/25/2023 Letter INSPECTION SUMMARY
04/25/2023 Letter INSPECTION SUMMARY
04/25/2023 Letter INSPECTION SUMMARY
04/26/2023 Letter INSPECTION SUMMARY
04/26/2023 Letter INSPECTION SUMMARY
04/26/2023 Letter INSPECTION SUMMARY
04/26/2023 Letter INSPECTION SUMMARY
04/27/2023 Letter INSPECTION SUMMARY
04/27/2023 Letter INSPECTION SUMMARY
05/04/2023 Letter INSPECTION SUMMARY
05/04/2023 Letter INSPECTION SUMMARY
05/04/2023 Letter INSPECTION SUMMARY
05/08/2023 Letter INSPECTION SUMMARY
05/08/2023 Letter INSPECTION SUMMARY
05/08/2023 Letter INSPECTION SUMMARY
05/09/2023 Letter INSPECTION SUMMARY
05/09/2023 Letter INSPECTION SUMMARY
05/17/2023 Letter INSPECTION SUMMARY
05/17/2023 Letter INSPECTION SUMMARY
05/24/2023 Letter INSPECTION SUMMARY
05/24/2023 Letter INSPECTION SUMMARY
06/08/2023 Letter INSPECTION SUMMARY
06/08/2023 Letter INSPECTION SUMMARY
06/08/2023 Letter INSPECTION SUMMARY
06/08/2023 Letter INSPECTION SUMMARY
06/09/2023 Letter INSPECTION SUMMARY
06/12/2023 Letter INSPECTION SUMMARY
06/14/2023 Letter INSPECTION SUMMARY
06/16/2023 Letter INSPECTION SUMMARY
06/27/2023 Letter INSPECTION SUMMARY
06/27/2023 Letter INSPECTION SUMMARY
06/27/2023 Letter INSPECTION SUMMARY
06/29/2023 Receipt Receipt for transaction:2023-005044
06/30/2023 Letter INSPECTION SUMMARY
06/30/2023 Letter INSPECTION SUMMARY
07/06/2023 K1 Virtual Reality AS-Built
07/12/2023 Letter INSPECTION SUMMARY
07/12/2023 Letter INSPECTION SUMMARY
07/12/2023 Letter INSPECTION SUMMARY
07/12/2023 Letter INSPECTION SUMMARY
07/13/2023 Letter INSPECTION SUMMARY
07/13/2023 Certificate/License Codes Temporary Certificate of Occupancy
07/13/2023 Receipt Receipt for transaction:2023-005455
07/13/2023 3RD Party Insp Report SLAGG2206-L071223 - Light Pole Bases
07/24/2023 Letter INSPECTION SUMMARY
07/24/2023 Letter INSPECTION SUMMARY
07/31/2023 Letter INSPECTION SUMMARY
08/03/2023 Letter INSPECTION SUMMARY
08/10/2023 TCOExtension Request Form- K1 Speed
08/15/2023 Letter INSPECTION SUMMARY
08/15/2023 Letter INSPECTION SUMMARY
08/18/2023 Letter INSPECTION SUMMARY
08/18/2023 Letter INSPECTION SUMMARY
10/26/2023 Letter INSPECTION SUMMARY
11/03/2023 Engineer Report/Study Arlon_ASTM_E84_Fire_Rating_Statement_10262023
11/17/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home