Permit Application Status

PRCOM20200763


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20200763
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
NEW SHELL BUILDING
NEW SHELL FOR FUTURE RESTAURANTS AND BUSINESS SPACE
03/24/2020
07/16/2020
10/03/2020
05/31/2022
Locations
Contacts
A L HUBER INC, Address:10770 EL MONTE, Phone:(913) 341-4880  
GREEN FIELD ENERGY GROUP INC, Address:5 SW 4TH ST, Phone:(816) 524-5616  
GREEN FIELD ENERGY GROUP INC, Address:5 SW 4TH ST, Phone:(816) 524-5616  
STACO ELECTRIC CONSTRUCTION COMPANY INC, Address:11030 HICKMAN MILLS DR, Phone:(816) 765-7112  
SCHWERDT DESIGN GROUP INC, Address:2231 SW WAHAMAKER RD. , Phone:(785) 273-7540  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Final Development Plan Review Approved 07/16/2020
Joe Frogge
Building Plan Review Approved with Conditions 05/01/2020 07/16/2020
Joe Frogge
Final Development Plan
Resolved
07/16/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 4/27/20 - acknowledged in letter.
Project cost
Resolved
07/06/2020

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. 4/27/20 - acknowledged in letter.
Engineered truss package
Corrective Action Required
04/24/2020

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss package or request deferral. 4/27/20 - to be deferred per request
IBC 1803.1 General - geotech
Resolved
04/27/2020

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf.
Miscellaneous Correction
Resolved
04/27/2020

Inadequate information to complete review. Action required: Provide light pole base details.
Miscellaneous Correction
Corrective Action Required
04/24/2020

Drawings at end of specifications submittal not included in review. Action required: Comment is for informational purposes. 4/27/20 - acknowledged in letter.
Licensed Contractors Approved 05/01/2020 07/06/2020
Joe Frogge
LC - General Contractor
Resolved
07/06/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 4/27/20 - acknowledged in letter.
LC - MEP Subs
Resolved
07/06/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 4/27/20 - acknowledged in letter.
Fire Plan Review Approved with Conditions 05/01/2020 04/27/2020
Michael Weissenbach
Address numbers required
Corrective Action Required
04/24/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Address all exterior doors.
Fire Plan Review Approved with Conditions 04/16/2020 04/03/2020
Michael Weissenbach
Address numbers required
Corrective Action Required
04/03/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Address all exterior doors.
Building Plan Review Rejected 04/16/2020 04/03/2020
Joe Frogge
Final Development Plan
Corrective Action Required
04/03/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
Project cost
Corrective Action Required
04/03/2020

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes.
Engineered truss package
Corrective Action Required
04/03/2020

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss package or request deferral.
IBC 1803.1 General - geotech
Corrective Action Required
04/03/2020

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf.
Miscellaneous Correction
Corrective Action Required
04/03/2020

Inadequate information to complete review. Action required: Provide light pole base details.
Miscellaneous Correction
Corrective Action Required
04/03/2020

Drawings at end of specifications submittal not included in review. Action required: Comment is for informational purposes.
Licensed Contractors Rejected 04/16/2020 04/03/2020
Joe Frogge
LC - General Contractor
Corrective Action Required
04/03/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
04/03/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Shell Building $3,094.88 $3,094.88 Paid 07/13/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 7/29/2020 (10:00) 7/29/2020 07/29/2020
THE FOLLOWING AREAS ARE APPROVED
Informational
07/29/2020
- LINE 1 & 1.4 B TO F, B LINE 1.4 TO 1.8 -
Footing Inspection - Commercial Partial 8/3/2020 (2:00) 8/3/2020 08/03/2020
THE FOLLOWING AREAS ARE APPROVED
Informational
07/29/2020
- LINE 1 & 1.4 B TO F, B LINE 1.4 TO 1.8 - - LINE 1 A-E, B LINE, F 1-2.5 -
Footing Inspection - Commercial Partial 8/4/2020 (8:00) 8/4/2020 08/04/2020
THE FOLLOWING AREAS ARE APPROVED
Informational
08/03/2020
- LINE 1 & 1.4 B TO F, B LINE 1.4 TO 1.8 - - LINE 1 A-E, B LINE, F 1-2.5 - - PERIMETER FOOTING COMPLETE, LINE 2 (2) ISOLATED FOOTINGS ( F-2) -
Underslab Plumbing Inspection - Commercial Passed 8/10/2020 08/10/2020
Underslab Electrical Inspection - Commercial Passed 8/10/2020 8/10/2020 08/10/2020
Underground Electrical Inspection - Commercial Partial 8/12/2020 8/12/2020 08/12/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
08/12/2020
- CONDUIT FOR LIGHT POLE BASES NORTH , SOUTH & EAST OF BLDG -
Underground Electrical Inspection - Commercial Partial 8/13/2020 08/13/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
08/12/2020
- CONDUIT FOR LIGHT POLE BASES NORTH , SOUTH & EAST OF BLDG - - CONDUIT FOR 2 POLE BASE SOUTH SIDE AT LOWENSTEIN -
Underground Plumbing Inspection - Commercial Partial 8/19/2020 8/19/2020 08/19/2020
Misc
Informational
08/19/2020
- GREASE INTERCEPTOR - - VACUUM TEST PER PLAN APPROVED -
Underground Electrical Inspection - Commercial Partial 9/3/2020 9/3/2020 09/03/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
08/13/2020
- CONDUIT FOR LIGHT POLE BASES NORTH , SOUTH & EAST OF BLDG - - CONDUIT FOR 2 POLE BASE SOUTH SIDE AT LOWENSTEIN - - CONDUIT FROM TRANSFORMER TO 20' FROM REAR OF BUILDING -
Electrical Service Inspection Partial 9/15/2020 9/15/2020 09/15/2020
Misc
Informational
09/15/2020
- BUILDING STEEL GROUNDING (3) STEEL COLUMNS CENTER OF BUILDING (1) EACH TENANT -
All Rough Inspection - Commercial Partial 9/16/2020 9/16/2020 09/16/2020
Misc
Informational
09/16/2020
- ROOF SHEATHING NAILING PATTERN ONLY -
All Rough Inspection - Commercial Partial 9/16/2020 09/16/2020
Misc
Informational
09/16/2020
- ROOF SHEATHING NAILING PATTERN ONLY -
Footing Inspection - Commercial Partial 10/5/2020 (9:30) 10/5/2020 10/05/2020
THE FOLLOWING AREAS ARE APPROVED
Informational
08/04/2020
- LINE 1 & 1.4 B TO F, B LINE 1.4 TO 1.8 - - LINE 1 A-E, B LINE, F 1-2.5 - - PERIMETER FOOTING COMPLETE, LINE 2 (2) ISOLATED FOOTINGS ( F-2) - - FOOTING TRASH ENCLOSURE -
Piers/Caissons Inspection - Commercial Partial 10/9/2020 (9:00) 10/9/2020 10/09/2020
Misc
Informational
10/09/2020
- 7 OF 9 LIGHT POLE BASES OK TO POUR REBAR CAGES WITH DRIVEN GROUND ROUND PER PLAN -
Gas Piping Inspection - Commercial Failed 10/12/2020 10/12/2020 10/12/2020
Misc
Corrective Action Required
10/12/2020
- PROIVDE MIN 10 PSI FOR GAS TEST -
Piers/Caissons Inspection - Commercial Passed 10/12/2020 (1:00) 10/12/2020 10/12/2020
Misc
Informational
10/12/2020
- (2) OF 9 LIGHT POLE BASES, DRIVEN GROUND ROD IN PLACE -
Gas Service Inspection - Commercial Passed 10/13/2020 10/13/2020
Misc
Informational
10/13/2020
- (3) GAS LINES TO RTUs STEADY AT 11 PSI -
All Rough Inspection - Commercial Failed 10/14/2020 10/14/2020
Misc
Informational
09/16/2020
- ROOF SHEATHING NAILING PATTERN ONLY -
Misc
Corrective Action Required
10/14/2020
- TIGHTEN ANCOR BOLTS AT HOLD DOWNS - - PROVIDE ANCHOR BOLTS WITHIN 12" OF PLATE BREAK - - PROVIDE NAIL GUARDS GAS LINES -
In-wall Inspection Failed 10/14/2020 10/14/2020 10/14/2020
Misc
Corrective Action Required
10/14/2020
- TIGHTEN ANCHOR BOLTS AT HOLD DOWNS - - PROVIDE ANCHOR BOLTS WITHIN 12" OF PLATE BREAK - - PROVIDE NAIL GUARDS GAS LINES -
All Rough Inspection - Commercial Passed 10/19/2020 10/19/2020 10/19/2020
Misc
Informational
10/14/2020
- ROOF SHEATHING NAILING PATTERN ONLY -
Misc
Resolved
10/19/2020
Rated Assembly Inspection Partial 10/27/2020 10/27/2020 10/27/2020
Misc
Informational
10/27/2020
- 1ST LAYER 5/8 ON NORTH WALLS -
Electrical Service Inspection Failed 10/29/2020 10/29/2020 10/29/2020
Misc
Informational
09/15/2020
- BUILDING STEEL GROUNDING (3) STEEL COLUMNS CENTER OF BUILDING (1) EACH TENANT -
Misc
Corrective Action Required
10/29/2020
- LAND ALL CONDUCTORS IN LUGS -
Electrical Service Inspection Passed 10/30/2020 10/30/2020 10/30/2020
Misc
Informational
10/29/2020
- BUILDING STEEL GROUNDING (3) STEEL COLUMNS CENTER OF BUILDING (1) EACH TENANT -
Misc
Resolved
10/30/2020
Rated Assembly Inspection Partial 11/3/2020 11/3/2020 11/03/2020
Misc
Informational
10/27/2020
- 1ST LAYER 5/8 ON NORTH WALLS DETAIL P-1 & P-2 UL 301 - - 1ST LAYER ON SOUTH WALLS -
Rated Assembly Inspection Partial 11/5/2020 11/5/2020 11/05/2020
Misc
Informational
11/03/2020
- 1ST LAYER 5/8 ON NORTH WALLS DETAIL P-1 & P-2 UL 301 - - 1ST LAYER ON SOUTH WALLS - - 2ND LAYER ON SOUTH WALL IN STARBUCKS UNIT OK TO TAPE -
Rated Assembly Inspection Partial 11/6/2020 11/6/2020 11/06/2020
Misc
Informational
11/05/2020
- 1ST LAYER 5/8 ON NORTH WALLS DETAIL P-1 & P-2 UL 301 - - 1ST LAYER ON SOUTH WALLS - - 2ND LAYER ON SOUTH WALL IN STARBUCKS UNIT OK TO TAPE - - 2ND LAYER ON NORTH & SOUTH WALLS MIDDLE UNIT OK TO TAPE -
Rated Assembly Inspection Partial 11/9/2020 11/9/2020 11/09/2020
Misc
Informational
11/06/2020
- 1ST LAYER 5/8 ON NORTH WALLS DETAIL P-1 & P-2 UL 301 - - 1ST LAYER ON SOUTH WALLS - - 2ND LAYER ON SOUTH WALL IN STARBUCKS UNIT OK TO TAPE - - 2ND LAYER ON NORTH & SOUTH WALLS MIDDLE UNIT OK TO TAPE - - 2ND LAYER NORTH UNIT OK TO TAPE -
Occupancy Inspection - Engineering Temporary C of O 11/11/2020 11/11/2020
Misc
Corrective Action Required
11/11/2020
Temporary Occupancy can be given. 2 Items before final can be given. 1. Graffiti on the curb of ADA ramp needs to be repaced or grinded off. 2. Vegetation needs to be established. They are still installing sprinklers and landscaping as of now.
Footing Inspection - Commercial Passed 11/11/2020 11/11/2020
THE FOLLOWING AREAS ARE APPROVED
Informational
10/05/2020
- LINE 1 & 1.4 B TO F, B LINE 1.4 TO 1.8 - - LINE 1 A-E, B LINE, F 1-2.5 - - PERIMETER FOOTING COMPLETE, LINE 2 (2) ISOLATED FOOTINGS ( F-2) - - FOOTING TRASH ENCLOSURE -
Gas Piping Inspection - Commercial Passed 10/13/2020 11/11/2020 11/11/2020
Misc
Resolved
10/13/2020
- PROIVDE MIN 10 PSI FOR GAS TEST -
In-wall Inspection Passed 11/11/2020 11/11/2020
Misc
Resolved
11/11/2020
Rated Assembly Inspection Passed 11/11/2020 11/11/2020
Misc
Informational
11/09/2020
- 1ST LAYER 5/8 ON NORTH WALLS DETAIL P-1 & P-2 UL 301 - - 1ST LAYER ON SOUTH WALLS - - 2ND LAYER ON SOUTH WALL IN STARBUCKS UNIT OK TO TAPE - - 2ND LAYER ON NORTH & SOUTH WALLS MIDDLE UNIT OK TO TAPE - - 2ND LAYER NORTH UNIT OK TO TAPE - - FIRE TAPE FIRE CAULKING COMPLETE -
Rough Electrical Inspection - Commercial Passed 11/11/2020 11/11/2020
Rough Mechanical Inspection - Commercial Passed 11/11/2020 11/11/2020
Rough Plumbing Inspection - Commercial Passed 11/11/2020 11/11/2020
Underground Electrical Inspection - Commercial Passed 11/11/2020 11/11/2020
THE FOLLOWING AREAS ARE APPROVED
Resolved
11/11/2020
- CONDUIT FOR LIGHT POLE BASES NORTH , SOUTH & EAST OF BLDG - - CONDUIT FOR 2 POLE BASE SOUTH SIDE AT LOWENSTEIN - - CONDUIT FROM TRANSFORMER TO 20' FROM REAR OF BUILDING -
Underground Plumbing Inspection - Commercial Passed 11/11/2020 11/11/2020
Misc
Informational
08/19/2020
- GREASE INTERCEPTOR - - VACUUM TEST PER PLAN APPROVED -
Occupancy Inspection - Water Utilities Passed 11/11/2020 11/11/2020
Occupancy Inspection - Fire Passed 11/11/2020 11/11/2020 11/11/2020
Occupancy Inspection - Codes Commercial Temporary C of O 11/11/2020 11/11/2020 11/11/2020
Misc
Informational
11/11/2020
- CODES SHELL OK FOR C OF O PENDING OTHER DEPTS -
Occupancy Inspection - Planning Passed 11/17/2020 11/17/2020
Occupancy Inspection - Engineering Passed 4/20/2022 04/20/2022
Misc
Corrective Action Required
11/11/2020
Temporary Occupancy can be given. 2 Items before final can be given. 1. Graffiti on the curb of ADA ramp needs to be repaced or grinded off. 2. Vegetation needs to be established. They are still installing sprinklers and landscaping as of now.
Misc
Informational
04/20/2022
All items have been completed for Final Occupancy.
Occupancy Inspection - Codes Commercial Full C of O 5/31/2022 05/31/2022
Documents & Images
Date Uploaded File Type Document Name
03/24/2020 Application Form permit application
04/03/2020 Specifications 190224 Streets of West Pryor Lot 3 PROJECT MANUAL
04/03/2020 Plans 190224 Streets of West Pryor Lot 3 FINAL CDs 040120
04/03/2020 Letter Fire Building Plan Review
04/06/2020 Letter DS P/R Corrections Document
04/24/2020 Engineer Report/Study 4.24.20 SWP Lot 3 Geo tech report
04/24/2020 Plans 4.24.20 SWP Lot 3 REVISED CDs reduced 042420
04/24/2020 Letter 4.24.20 SWP Lot 3 Response Letter
04/27/2020 Letter Fire Building Plan Review
07/06/2020 Letter cost est
07/13/2020 Receipt Receipt for transaction:2020-004378
07/16/2020 Approved Plans Approved 7_16_20 SWP Lot 3 FDP
07/16/2020 Specifications Approved - Streets of West Pryor Lot 3 PROJECT MANUAL
07/16/2020 Approved Plans Approved - West Pryor Lot 3 REVISED CDs reduced 042420
07/16/2020 Letter Codes Plan Review Conditions
07/16/2020 Letter DS Building Permit
07/24/2020 Plans Roof Truss Shop Dwgs_Final_072420
07/27/2020 Plans Approved - West Pryor Lot 3 REVISED CDs reduced 042420
07/27/2020 Approved Plans Approved - Roof Truss Shop Dwgs_Final_072420
07/28/2020 190224 West Pryor Lot 3 ASI writeups 2-7
07/28/2020 190224 West Pryor Lot 3 072720 thru ASI #7
07/29/2020 Letter INSPECTION SUMMARY
08/03/2020 Letter INSPECTION SUMMARY
08/04/2020 Letter INSPECTION SUMMARY
08/10/2020 Letter INSPECTION SUMMARY
08/10/2020 Letter INSPECTION SUMMARY
08/12/2020 Letter INSPECTION SUMMARY
08/13/2020 Letter INSPECTION SUMMARY
08/19/2020 Letter INSPECTION SUMMARY
09/03/2020 Letter INSPECTION SUMMARY
09/15/2020 Letter INSPECTION SUMMARY
09/16/2020 Letter INSPECTION SUMMARY
09/16/2020 Letter INSPECTION SUMMARY
10/05/2020 Letter INSPECTION SUMMARY
10/09/2020 Letter INSPECTION SUMMARY
10/12/2020 Letter INSPECTION SUMMARY
10/12/2020 Letter INSPECTION SUMMARY
10/13/2020 Letter INSPECTION SUMMARY
10/14/2020 Letter INSPECTION SUMMARY
10/14/2020 Letter INSPECTION SUMMARY
10/19/2020 Letter INSPECTION SUMMARY
10/29/2020 Letter INSPECTION SUMMARY
10/30/2020 Letter INSPECTION SUMMARY
11/03/2020 Letter INSPECTION SUMMARY
11/06/2020 Letter INSPECTION SUMMARY
11/06/2020 Lot 3 - SWP Final Letter
11/09/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter DE-Daily Inspection Summary
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter Codes Temporary Certificate of Occupancy
01/29/2021 Letter INSPECTION SUMMARY
04/20/2022 Letter Inspection Summary
04/28/2022 Letter INSPECTION SUMMARY
05/31/2022 Letter Codes Final Certificate of Occupancy
06/01/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home