Summary
PL2025087
Ancho Agave - change of tenant Summit Fair
Commercial Final Development Plan
Commercial Final Development Plan
Approved
04/18/2025
RED SUMMIT FAIR LLC
Tenant change to restaurant, exterior and site changes in Summit Fair
Locations
Contacts
RED SUMMIT FAIR LLC, Address:ONE E WASHINGTON ST STE 300  
Bill Warner, Address:3711 N. Ravenswood, Phone:(773) 477-9009 Ext:2  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 05/23/2025 05/23/2025
Susan Nelson, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
05/23/2025

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
05/23/2025

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE Contact Field Eng. Inspector
Corrective Action Required
05/23/2025

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Future Repair Work
Corrective Action Required
05/23/2025

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE Engineers Estimate
Corrective Action Required
05/23/2025

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to he issuance of an infrastructure permit and/or the final processing of a building permit. $1,087.50
Planning Review No Comments 05/07/2025 05/07/2025
Ian Trefren
Traffic Review No Comments 05/07/2025 05/05/2025
Erin Ralovo
Building Codes Review Approved with Conditions 05/07/2025 05/05/2025
Joe Frogge
Miscellaneous Correction
Corrective Action Required
05/05/2025

This review does not include arch/struct/MEP.
Fire Review No Comments 05/07/2025 05/01/2025
Jim Eden
Engineering Review Corrections 05/07/2025 04/30/2025
Susan Nelson, P.E.
Corrective Action Required
04/30/2025

Submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
04/30/2025

Add a note stating: “All construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813. Where discrepancies exist between these plans and the Design and Construction Manual, the Design and Construction Manual shall prevail."
Corrective Action Required
04/30/2025

Add a note stating: “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with a Field Engineering Inspector prior to any land disturbance work at (816) 969-1200.”
Corrective Action Required
04/30/2025

Add private drive names to the plans.
Corrective Action Required
04/30/2025

Inspect the existing sidewalks, curb ramps and private street crossings along the proposed new restaurant exterior and include in this project the repair panels necessary to address concrete failures and any compromises to ADA compliance. Several areas were observed to require repair, including but not limited to, paver failures, ponding issues, cracks, spalling, and raised panel edges.
Corrective Action Required
04/30/2025

Provide a complete plan for the ADA-accessible ramps and sidewalks. Ensure that all elevation callouts, running slope callouts, and cross-slope points for construction of ADA-accessible ramps and sidewalk are shown. Site specific information is required including all ADA facilities for access to the building. Provide ADA compliant turning spaces at any changes in sidewalk direction and connection with existing sidewalk facilities. Provide the ADA information for the existing sidewalks and curb ramp. Add the City standard details for sidewalks.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $725.00 $725.00 Paid 04/23/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
04/18/2025 Plans Site Plan_PL2025087
04/18/2025 Plans Site Plan/Grading Plan_PL2025087
04/21/2025 Application Form Application/Affidavit_PL2025087
04/22/2025 Drawing Elevations_PL2025087
04/22/2025 Plans Landscape Plan_PL2025087
04/23/2025 Receipt Receipt_PL2025087
04/25/2025 Plans Plan Set_Rev0_PL2025087
05/07/2025 Letter Applicant Letter - FDP_PL2025087
05/15/2025 Letter Response Letter_PL2025087
05/15/2025 Plans Plan Set_Rev1_PL2025087
05/15/2025 Engineers Estimate Engineer's Cost Estimate_PL2025087
05/20/2025 Activity Document Engineer Fee Sheet_PL2025087
05/21/2025 Plans Plan Set_Rev2_PL2025087
05/22/2025 Plans Plan Set_Rev3_PL2025087
05/22/2025 Plans Plan Set_Rev4_PL2025087
05/23/2025 Letter Applicant Letter - FDP_PL2025087
05/27/2025 Plans Stamped Approved FDP Plans_PL2025087
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home