Planning Application Status

PL2022216




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2022216
Macadoodles
Commercial Preliminary Development Plan
Commercial Preliminary Development Plan
Expired
05/25/2022
SOUTHPORT BUSINESS CENTER LLC
Locations
Contacts
SOUTHPORT BUSINESS CENTER LLC, Address:1485 SW MARKET ST  
Scott Ready, Phone: 8169691225  
Robert Dimond Jr., Address:5400 Johnson Dr, Phone:(913) 789-8665  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Approved with Conditions 10/06/2022 10/07/2022
Scott Ready
Traffic Review Approved with Conditions 10/06/2022 10/05/2022
Brad Cooley, P.E., RSPI
Corrective Action Required
10/05/2022

The median along Persels will be required at FDP. Substantial completion shall be issued for the public improvements prior to issuance of permits for on-site improvements.
Engineering Review Approved with Conditions 10/06/2022 10/04/2022
Gene Williams, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
09/30/2022

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. This shall include off-site public traffic improvements associated with the median, and shall be submitted as a separate engineering plan set. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
09/30/2022

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #06 Land Disturbance
Corrective Action Required
09/30/2022

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #09 FDP Reviews
Corrective Action Required
09/30/2022

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
09/30/2022

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
Fire Review No Comments 10/06/2022 10/03/2022
Jim Eden
Planning Review Approved with Conditions 08/31/2022 09/01/2022
Hector Soto Jr.
Corrective Action Required
09/01/2022

PARKING LOT SETBACK. Staff acknowledges the applicant's desire to seek a modification to the two-way drive aisle width with or without staff's support of said modification. No additional response is necessary at this time.
Engineering Review Approved with Conditions 08/31/2022 08/31/2022
Gene Williams, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
08/24/2022

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
08/24/2022

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #06 Land Disturbance
Corrective Action Required
08/24/2022

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #09 FDP Reviews
Corrective Action Required
08/24/2022

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
08/24/2022

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
Traffic Review Approved with Conditions 08/31/2022 08/31/2022
Brad Cooley, P.E., RSPI
Corrective Action Required
08/31/2022

The median along Persels will be required at FDP. Since the applicant has agreed to the installation of public improvements, there is no need to update the traffic study.
Fire Review No Comments 08/31/2022 08/25/2022
Jim Eden
Traffic Review Approved with Conditions 08/02/2022 08/03/2022
Brad Cooley, P.E., RSPI
Corrective Action Required
08/03/2022

Signal Warrant 3 is met for peak hour traffic at Market and Persels. Due to the proximity of other signals, a new signal cannot function appropriately. In lieu of a signal at this location a median should be installed to improve the intersection, restricting left-turn movements.
Planning Review Approved with Conditions 08/02/2022 08/02/2022
Hector Soto Jr.
Corrective Action Required
08/02/2022

PARKING LOT SETBACK. Staff acknowledges the applicant's desire to seek a modification to the two-way drive aisle width with or without staff's support of said modification. No additional response is necessary at this time.
Engineering Review Approved with Conditions 08/02/2022 08/02/2022
Gene Williams, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
07/26/2022

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
07/26/2022

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #06 Land Disturbance
Corrective Action Required
07/26/2022

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #09 FDP Reviews
Corrective Action Required
07/26/2022

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
07/26/2022

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
Fire Review No Comments 08/02/2022 07/27/2022
Jim Eden
Code Statement
Corrective Action Required
07/26/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Planning Review Corrections 07/19/2022 07/19/2022
Hector Soto Jr.
Corrective Action Required
07/18/2022

LIGHTING. Please clarify the type of light fixture to be used with the gooseneck wall brackets. Is the floodlight fixture intended to be used on these brackets? If so, floodlight fixtures are allowed as accent lighting provided they are directionally shielded to eliminate glare to motorists and pedestrians.
Corrective Action Required
07/18/2022

ELEVATIONS. - A south and east building elevation was provided, but no west building elevation. Are no improvements of any kind proposed for the west elevation, including painting? If none, then no west elevation is required. If improvements, including painting, of the west elevation is proposed, then a west elevation shall be provided. - Label the proposed colors for all exterior materials on the south, east and west elevations. - The south and east elevations call out the use of wood to infill window openings. Wood is not approved material for commercial development. Wood alternatives such as wood-look cement fiberboard or other cementious material is allowed. A wood composite could also be used, but not real wood.
Corrective Action Required
07/19/2022

PARKING LOT SETBACK. - Staff supports the modificiation request for the parking lot setback from the east and west property lines to accommodate the relocated parking spaces and widened curb boundary to accommodate the drive-through lane entrance. - Staff will not support the request for the reduced drive-through lane width or the two-way drive aisle width. Staff will recommend that the south parking lot boundary be pushed further south to achieve enough width to accommodate the required 10' drive-through lane width and 24'-wide drive aisle width (exclusive of curb and gutter).
Traffic Review Corrections 07/19/2022 07/19/2022
Brad Cooley, P.E., RSPI
Corrective Action Required
07/19/2022

TIS: Persels is considered a two-lane road with turn lanes. Signal Warrant 3 is met for peak hour traffic. Due to the proximity of other signals, a median should be designed to improve the intersection of Persels and Market. Following the revised configuration, the TIS should be updated to reflect new trip distribution and LOS. This should be corrected prior to Public Hearing(s).
Engineering Review Approved with Conditions 07/19/2022 07/16/2022
Loic Nguinguiri, E.I.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
07/16/2022

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
07/16/2022

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #06 Land Disturbance
Corrective Action Required
07/16/2022

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #09 FDP Reviews
Corrective Action Required
07/16/2022

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
07/16/2022

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
Fire Review Approved with Conditions 07/19/2022 07/14/2022
Jim Eden
Code Statement
Corrective Action Required
07/12/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Planning Review Corrections 06/24/2022 06/24/2022
Victoria Nelson
Corrective Action Required
06/24/2022

Zoning. Please remove the proposed zoning text on C103.
Corrective Action Required
06/24/2022

Build line. The original plat shows the build line to be 20’ not 15’.
Corrective Action Required
06/24/2022

Lot. Please label the lot number and dimensions.
Corrective Action Required
06/24/2022

Lighting. Are you planning on having any wall mounted lighting, if so please show the specifications for all wall mounted lighting.
Corrective Action Required
06/24/2022

Elevations. Please label the elevation materials, to be sure it meets the list of approved materials. Refere to UDO Article 8 Site Design Standards.
Corrective Action Required
06/24/2022

Parking lot set back. Please label the parking lot setback.
Corrective Action Required
06/24/2022

ADA signs. Please show the specifications for the ADA signs to ensure that they meet the 60” requirement.
Corrective Action Required
06/24/2022

ADA parking. Please show the width dimensions for the ADA parking.
Corrective Action Required
06/24/2022

Drive through. The drive through lane has to be a minimum of 10’ wide when you measure to the front of the curb. Please show it meeting the 10’ requirement.
Corrective Action Required
06/24/2022

Two-way drive aisle. The width of the two-way drive aisle south of the relocated row of parking doesn’t meet the required minimum 24’, excluding curb and gutter.
Corrective Action Required
06/24/2022

The impervious and open area square footage. The impervious and open area square footage and percentage figures should be based on the overall development, not just the project area. Please show the percentage for the overall area.
Corrective Action Required
06/24/2022

Site floor area ratio. Please remove the line item of 0.08. Please show the .19 FAR line item for the total building.
Traffic Review Corrections 06/24/2022 06/23/2022
Brad Cooley, P.E., RSPI
Corrective Action Required
06/24/2022

Site Plan: Site circulation could be problematic. The layout will create several conflict points with vehicles entering/exiting/navigating the site, entering/exiting the drive-thru, and vehicles backing out of parking stalls.
Corrective Action Required
06/23/2022

Site Plan: The drive-thru lane appears too narrow. The turning movement provided shows a passenger car hitting the curb with a tire and building with the car. Will a full-size pickup be able to navigate through?
Corrective Action Required
06/23/2022

TIS: The trip generation used in the report was estimated using the 10th edition. The 11th is the current edition with higher estimated trips for this use. Additionally, the building size does not match the plans (10,000 sf. vs 12,500sf.).
Corrective Action Required
06/23/2022

TIS: Sight distance was not considered but should be documented. The City's AMC requires confirmation that the site access provides sufficient clearances and does not need to be modified.
Corrective Action Required
06/24/2022

TIS: The intersection of Persels and Market does not meet the desired goal of the City's Level of Service Policy. However, this is acceptable due to the improvements recommended for striping, adequate storage, and alternative travel routes.
Engineering Review Corrections 06/24/2022 06/22/2022
Loic Nguinguiri, E.I.
Corrective Action Required
06/22/2022

Revise the sheet callouts, in the sheet index on the cover sheet (e.g. sheet C101, sheet C102)
Corrective Action Required
06/22/2022

The address for the (sanitary and) water department is 1200 SE Hamblen Road, Lee’s Summit MO 64081.
Corrective Action Required
06/22/2022

The direct telephone number for the streets (and stormwater) department is (816) 969-1800.
Corrective Action Required
06/22/2022

Include a note stating that “All construction shall follow the City of Lee’s Summit’s Design and Construction manual”.
Corrective Action Required
06/22/2022

Include a note stating that “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with an inspector prior to any land disturbance work at (816) 969-1200”.
Corrective Action Required
06/22/2022

Add/show the two (2) existing public fire hydrants, on the site plan sheet.
Corrective Action Required
06/22/2022

There appears to be a 3 - 4 feet discrepancy between the existing contour elevations shown within our map database and the ones shown on the grading plan sheet. Please field-verify existing contour elevations prior to the submittal of the FDP.
Fire Review Approved with Conditions 06/24/2022 06/21/2022
Jim Eden
Code Statement
Corrective Action Required
06/24/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Commercial Preliminary Development Plan fee $2,175.00 $2,175.00 Paid 06/13/2022
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 06/13/2022
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 06/13/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 09/08/2022 5:00 PM Council Chambers 09/08/2022 05:00 PM
Public Hearing Review
Continued
09/08/2022
City Council Public Hearing 09/20/2022 6:00 PM Council Chambers 09/20/2022 06:00 PM
Public Hearing Review
Continued
09/20/2022
City Council Ordinance 2nd Reading 10/04/2022 6:00 PM Council Chambers 10/04/2022 06:00 PM
Public Hearing Review
Continued
Planning Commission Meeting 10/13/2022 5:00 PM Council Chambers 10/13/2022 05:00 PM
Public Hearing Review
Denied
10/13/2022
City Council Public Hearing 11/01/2022 6:00 PM Council Chambers 11/01/2022 06:00 PM
Public Hearing Review
Approved
11/01/2022
City Council Ordinance 2nd Reading 11/08/2022 6:00 PM Council Chambers 11/08/2022 06:00 PM
Public Hearing Review
Pending
Documents & Images
Date Uploaded File Type Document Name
06/10/2022 Drawing 04-25 - 2_1 - East Elevation
06/10/2022 Drawing 04-25 - 2_2 - South Drive Up Window
06/10/2022 Drawing 04-25 - 2_3 - Soutteast View 2
06/10/2022 Engineer Report/Study 2022 June _ Macadoodle TIS
06/10/2022 Engineer Report/Study 2022-06-10 SEALED Stormwater Memo with Exhibits
06/10/2022 Application Form Checklist-Preliminary Development Plan
06/10/2022 Letter Legal Description for PDP
06/10/2022 Plans MACADOODLES CIVIL PLANS - PDP 2022-06-10
06/10/2022 Application Form PRELIMINARY DEVELOPMENT PLAN APPLICATION-06082022
06/13/2022 Receipt Receipt for transaction: 2022-004603
06/24/2022 Letter Applicant Letter - Dev. Apps (DRCP)
07/12/2022 Letter 2022-07-12 Response to PDP Plan Review Comments
07/12/2022 Plans 2022-07-12 MACADOODLES CIVIL PLANS - PDP
07/12/2022 Letter 2022-07-12 Parking Lot - Modification Request
07/12/2022 Plans ARCH A200-PS-2436-07122022
07/12/2022 Specifications abolite-gooseneck-wallbracket-guide
07/12/2022 Specifications Roof Mounted flood-tmfl-specsheet
07/12/2022 Specifications Wall Mounted Light
07/12/2022 Letter 2022-07-12 SEALED Stormwater Memo with Exhibits
07/12/2022 Engineer Report/Study 2022 July_ Macadoodle TIS
07/19/2022 Letter Applicant Letter - Dev. Apps (DRCP)
07/20/2022 Meeting Summary Macadoodles Neighborhood Meeting 7-18
07/20/2022 Public Notice Document L-07072022-mtgnotification
07/20/2022 Receipt Notification Letter Receipts 1-6
07/20/2022 Receipt Notification Letter Receipts 7-9
07/26/2022 Letter 2022-07-26 Response to PDP Plan Review Comments
07/26/2022 Letter L-072522022-hs
08/05/2022 Photograph Macadoodles PDP_Public Notice Sign 1_080522
08/05/2022 Photograph macadoodles PDP_Public Notice Sign 2_080522
08/05/2022 Photograph macadoodles PDP_Public Notice Sign 3_080522
08/05/2022 Public Notice Document Affidavit of Notice to Property Owners_Macadoodles_PDP
08/24/2022 Letter 2022-08-24 Response to PDP Plan Review Comments
08/24/2022 Letter Median Location reference image
08/25/2022 Public Notice Document DOC082522-005
08/31/2022 Public Notice Document LEGAL PL2022-216 PDP
08/31/2022 Public Comment LEGAL PL2022-216 PDP
09/01/2022 Letter 2022 July_ Macadoodle TIS - SUMMARY
09/01/2022 Letter Applicant Letter - Dev. Apps (DRCP)
09/02/2022 Drawing Location Map
09/02/2022 Engineer Report/Study PL2022216 Macadoodles TIA
09/02/2022 Engineer Report/Study 2022 July_ Macadoodle TIS - SUMMARY -- abridged version
09/07/2022 Letter L-09062022-Afidavit
09/07/2022 Meeting Summary MM-08192022-meeting minutes
09/07/2022 Letter Report on Market Street meeting 8_31_22
09/14/2022 Public Notice Document DOC091322
09/30/2022 Engineer Report/Study 2022 September_ Macadoodle TIS
10/06/2022 Engineer Report/Study 2022 September_ Macadoodle TIS - SUMMARY
10/07/2022 Letter Applicant Letter - Dev. Apps (DRCP)
10/14/2022 Letter Staff Report -- revised
10/24/2022 Public Notice Document scan_98900_2022-10-24-16-23-17
11/15/2022 Ordinance 9545
10/07/2022 Letter Memo - Macadoodles
10/07/2022 Engineer Report/Study PL2022216 Macadoodles TIA - REVISED
08/03/2022 Letter Applicant Letter - Dev. Apps (DRCP)
09/07/2022 Letter Planning Commission letter, 09-05-22 from Bernell Rice
08/24/2022 Drawing L-08192022-mtgnotification
08/24/2022 Receipt Certified Mailing Receipts-08192022
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home