Planning Application Status

PL2021200




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2021200
New Longview - Building 31
Commercial Final Development Plan
Commercial Final Development Plan
Approved
06/04/2021
NLVC LLC
Locations
Contacts
BOX REAL ESTATE DEVELOPMENT, Address:440 SW LONGVIEW BLVD, Phone:(913) 735-9861  
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
NLVC LLC, Address:3152 SW GRANDSTAND, Phone:(816) 589-4415  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 05/11/2022 05/11/2022
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
04/29/2022

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
04/29/2022

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
04/29/2022

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $15,637.84
Fire Review Approved with Conditions 08/25/2021 08/23/2021
Jim Eden
Code Statement
Corrective Action Required
08/24/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code. *Additional fire protection and egress may be required depending on occupancy type.Verified at building permit plan review.
Traffic Review No Comments 08/25/2021 08/23/2021
Brad Cooley, P.E., RSPI
Engineering Review Approved with Conditions 08/25/2021 08/20/2021
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
08/20/2021

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
08/20/2021

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
08/20/2021

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $15,637.84
Planning Review No Comments 08/25/2021 08/20/2021
Victoria Nelson
Miscellaneous Correction
Resolved
08/24/2021

Parking space length. The new measurements you are showing do not meet the UDO requirements and they need to be revised to meet the 19’ length, measured from the face of the curb, since the sidewalk is less than 6’ wide.
Miscellaneous Correction
Resolved
08/24/2021

Please pay the $600 applicable fee. This fee must be paid prior to the release of comments on the next resubmittal.
Building Codes Review No Comments 08/25/2021 08/19/2021
Joe Frogge
Engineering Review Corrections 07/08/2021 07/08/2021
Sue Pyles, P.E.
Corrective Action Required
07/08/2021

Please update contact information and City related notes on the cover sheet. Several projects designed by your firm have been reviewed recently. Those should provide adequate guidance.
Fire Review Approved with Conditions 07/08/2021 07/07/2021
Jim Eden
Code Statement
Informational
07/07/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code. *Additional fire protection and egress may be required depending on occupancy type.Verified at building permit plan review.
Traffic Review No Comments 07/08/2021 07/07/2021
Brad Cooley, P.E., RSPI
Planning Review Corrections 07/08/2021 07/06/2021
Victoria Nelson
Miscellaneous Correction
Resolved
07/06/2021

Parking space measurement. It appears you are measuring to the back of the curb, we ask that you measure to the face of the curb instead. Please re-measure.
Miscellaneous Correction
Resolved
07/06/2021

Utility easements. Please show widths of U/E’s.
Miscellaneous Correction
Resolved
07/06/2021

Setback lines. Please show building line and parking lot line setbacks.
Miscellaneous Correction
Resolved
07/06/2021

Lighting Spec Sheets. Please submit the manufacturer proposed exterior lighting including both parking lot pole mounted and wall fixtures.
Miscellaneous Correction
Resolved
07/06/2021

Landscaping. All deciduous trees shall be a minimum of 3” caliber. Evergreen trees shall be a minimum of 8’
Miscellaneous Correction
Resolved
07/06/2021

Shrub count. You say there are 37 BGV plants, I count 35. For CAK, you say 17, I counted 16.
Miscellaneous Correction
Corrective Action Required
07/06/2021

Parking space length. The new measurements you are showing do not meet the UDO requirements and they need to be revised to meet the 19’ length, measured from the face of the curb, since the sidewalk is less than 6’ wide.
Miscellaneous Correction
Corrective Action Required
07/08/2021

Please pay the $600 applicable fee. This fee must be paid prior to the release of comments on the next resubmittal.
Building Codes Review No Comments 07/08/2021 07/02/2021
Joe Frogge
Engineering Review Corrections 06/18/2021 06/18/2021
Sue Pyles, P.E.
Corrective Action Required
06/18/2021

General: • Please include a cover sheet. • Please show and label all utility easements throughout the plan set. • Please submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
06/18/2021

Sheet C1.0: Please differentiate the different types and locations of pavements to match the pavement sections provided in the details.
Corrective Action Required
06/18/2021

Sheet C2.0: • The proposed contours are shown beyond the expected limits of construction. Please revise. • Please include existing elevations where the proposed sidewalk will connect to the existing sidewalk at the NE corner of the site. • Please include specific designs for the proposed ADA-accessible ramps that meet the City’s slope requirements of 1.5% maximum cross-slope and 7.5% maximum longitudinal slope.
Traffic Review No Comments 06/18/2021 06/16/2021
Brad Cooley, P.E., RSPI
Informational
06/16/2021

Developer may want to look at the on-street parking to the west of proposed drive. May have sight distance conflicts with vehicles exiting.
Planning Review Corrections 06/18/2021 06/15/2021
Victoria Nelson
Miscellaneous Correction
Corrective Action Required
06/15/2021

Parking space measurement. It appears you are measuring to the back of the curb, we ask that you measure to the face of the curb instead. Please re-measure.
Miscellaneous Correction
Corrective Action Required
06/15/2021

Utility easements. Please show widths of U/E’s.
Miscellaneous Correction
Corrective Action Required
06/15/2021

Setback lines. Please show building line and parking lot line setbacks.
Miscellaneous Correction
Corrective Action Required
06/15/2021

Lighting Spec Sheets. Please submit the manufacturer proposed exterior lighting including both parking lot pole mounted and wall fixtures.
Miscellaneous Correction
Corrective Action Required
06/15/2021

Landscaping. All deciduous trees shall be a minimum of 3” caliber. Evergreen trees shall be a minimum of 8’
Miscellaneous Correction
Corrective Action Required
06/15/2021

Shrub count. You say there are 37 BGV plants, I count 35. For CAK, you say 17, I counted 16.
Building Codes Review No Comments 06/18/2021 06/11/2021
Joe Frogge
Fire Review Approved with Conditions 06/18/2021 06/07/2021
Jim Eden
Code Statement
Corrective Action Required
06/07/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code. *Additional fire protection and egress may be required depending on occupancy type.Verified at building permit plan review.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 07/09/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: